2015 building condition survey instrument - 2015 building
TRANSCRIPT
![Page 1: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/1.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
Building Information1. Name of School District:
RYE CITY SD
2. SED District 8-Digit BEDS Code:
661800010000
3. Building Name:
Osborn ES
4. SED 4-Digit Facility Code:
00001
5. Survey Inspection Date:
09/14/2015
6. Building 911 Address:
10 Osborn Road
7. City:
Rye
8. Zip Code:
10580
9. Certificate of Occupancy Status:
A - Annual
T - Temporary
N - None
10. Certificate of Occupancy Expiration Date:
09/01/2016
Building Age, Gross Square Footage and Maintenance Staff
11. Year of Original Building:
1956
12. Gross square ft. of Building as currently configured:
72,800
13. Number of Floors:
1
14. How many full-time and part-time custodians are employed at the school (or work in the building)?
Count Employees
Full-time custodians:4
Part-time custodians:0
Totals: 4.00
06/02/2016 10:47 AM Page 1 of 46
![Page 2: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/2.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
Building Ownership and Occupancy Status
15. Building Ownership (check one):
Owned and used by district
Owned by District and leased to non-district entity
Owned by District, part used by district, part leased to non-district entity
Owned by non-district entity and leased to district
16. For which of the following purposes is the building currently used? (check all that apply)
Used for student instructional purposes
Used for district administration
Used for other district purposes
Used by other organization(s)
Building Users
17. How many students were registered to receive instruction in this building as of October 1, 2014? (If none,
enter "0") and skip to "Program Spaces" section. (Do not include evening class students)
621
18. Of these registered students, how many receive most of their instruction in:
Quantity
18a. Permanent instructional spaces (i.e., regularclassrooms) 581
18b. Temporary instructional spaces (i.e., portable ordemountable classrooms) attached to the building 40
18c. Non-instructional spaces used as instructionalspaces 0
18c.1 If the answer is greater than zero, which types of non-instructional spaces were being used for instructional
purposes on October 1, 2014? (check all that apply)
Cafeteria
Gymnasium
Administrative Spaces
Library
Lobby
Stairwell
Storage space
Other (please describe)
None
19. Grades Housed:
k-5
20. For how many instructional days during the 2013-14 school year (July 1 through June 30, was the building
closed due to facilities failures, system malfunctions, structural problems, fire, etc? (if none, enter "0")
0
21. Is the building used for instructional purposes in the summer?
Yes
No
06/02/2016 10:47 AM Page 2 of 46
![Page 3: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/3.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
22. Have there been renovations or construction in the building during the past 12 months?
Yes
No
23. Was major construction/renovation work since 2010 conducted when school was in session?
Yes
No
06/02/2016 10:47 AM Page 3 of 46
![Page 4: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/4.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyProgram Spaces
Program Spaces
24. Number of instructional classrooms:
40
25. Gross square footage of all instructional classrooms (combined):
34,000.00
26. Other spaces provided: (check all that apply)
a. N/A (none)
b. Administration
c. Art
d. Audio Visual
e. Auditorium
f. Cafeteria
g. Computer Room
h. Guidance
i. Gymnasium
j. Health Office
k. Home & Careers
l. Kitchen
m. Large Group Instruction
n. Library
o. Multipurpose Rooms
p. Music
q. Pre-K
r. Remedial Rooms
s. Resource Rooms
t. Science Labs
u. Special Education
v. Swimming Pool
w. Teacher Resource
x. Technology/Shop
y. Other (please describe)
26y. Describe other spaces
(No Response)
Space Adequacy
27. Rating of space adequacy:
Good
Fair
Poor
27a. Enter comments:
(No Response)
28. Estimated capital construction expenses anticipated for this building through 2020-2021 school year
excluding maintenance (to be answered after the building inspection is complete) $
8,463,240.00
29. Overall building rating (to be answered after the building inspection is complete)
Excellent
Satisfactory
Unsatisfactory
Poor
30. Was overall building rating established after consultation with health and safety committee?
Yes
No
A/E Information:
31. A/E Firm Name:
KSQ Architects
06/02/2016 10:47 AM Page 4 of 46
![Page 5: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/5.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyProgram Spaces
32. A/E Firm Address:
235 Main Street Suite 410
White Plains NY 10601
33. A/E Firm Phone Number:
9146823700
34. E-mail:
35. A/E Name:
Scott Hillje
36. A/E License #:
025556
06/02/2016 10:47 AM Page 5 of 46
![Page 6: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/6.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
Site Utilities
37. Water
Yes
No
37a. Type of Service:
Municipal or Utility provided
Well
Other
37b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
37c. Year of Last Major Reconstruction/Replacement:
2008
37d. Expected Remaining Useful Life (Years):
10
37e. Cost to Reconstruct/Replace $:
(No Response)
37f. Comments:
(No Response)
38. Site Sanitary (H)
Yes
No
38a. Type of Service:
Municipal or utility sewer
Site septic
Other
38b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
38c. Year of Last Major Reconstruction/Replacement:
2006
38d. Expected Remaining Useful Life (Years):
10
06/02/2016 10:47 AM Page 6 of 46
![Page 7: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/7.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
38e. Cost to reconstruct/Replace $:
(No Response)
38f. Comments:
(No Response)
39. Site Gas (H)
Yes
No
39a. Type of gas service:
Natural Gas
Liquid Petroleum
39b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
39c. Year of Last Major Reconstruction/Replacement;
2012
39d. Expected Remaining Useful Life (Years):
10
39e. Cost to Reconstruct/Replace $:
(No Response)
39f. Comments:
(No Response)
40. Site Fuel Oil (H)
Yes
No
40a. Number of Above-Ground Tanks:
0
40a.1 Capacity of Above-Ground Tanks (gallons):
0
40b. Number of Below-Ground Tanks:
1
40b.1 Capacity of Below-Ground Tanks (gallons):
10,000
06/02/2016 10:47 AM Page 7 of 46
![Page 8: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/8.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
40c. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
N/A
40d. Year of Last Major Reconstruction/Replacement:
2000
40e. Expected Remaining Useful Life (Years):
10
40f. Cost to Reconstruct/Replace $:
(No Response)
40g. Comments:
(No Response)
41. Site Electrical, Including Exterior Distribution (H)
Yes
No
41a. Service Provider:
Municipal or utility provided
Self-Generated
Other
N/A
41b. Type of Service:
Above Ground
Below Ground
N/A
41c. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
41d. Year of Last Major Reconstruction/Replacement:
2006
41e. Expected Remaining Useful Life (Years):
15
41f. Cost to Reconstruct/Replace $:
(No Response)
06/02/2016 10:47 AM Page 8 of 46
![Page 9: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/9.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
41g. Comments:
(No Response)
Stormwater Management
42. Closed Drainage Pipe Stormwater Management System
42a. Does this facility have a closed pipe system?
Yes
No
42b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
42c. Year of Last Major Reconstruction/Replacement:
1956
42d. Expected Remaining Useful Life (Years):
15
42e. Cost to Reconstruct/Replace $:
(No Response)
42f. Comments:
(No Response)
43. Open Drainage Pipe Stormwater Management System
43a. Does this facility have an open stormwater system (ditch)?
Yes
No
44. Catch Basins/Drop Inlets/Manholes
44a. Does this facility have catch basins/drop inlets/manholes?
Yes
No
44b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
44c. Year of Last Major Reconstruction/Replacement:
1956
06/02/2016 10:47 AM Page 9 of 46
![Page 10: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/10.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
44d. Expected Remaining Useful Life (Years):
15
44e. Cost to Reconstruct/Replace $:
(No Response)
44f. Comments:
(No Response)
45. Culverts
45a. Does this facility have culverts?
Yes
No
46. Outfalls
46a. Does this facility have outfalls?
Yes
No
47. Infiltration Basins/Chambers
47a. Does this facility have infiltration basins/chambers?
Yes
No
48. Retention Basins
48a. Does this facility have retention basins?
Yes
No
49. Wetponds
49a. Does this facility have wetponds?
Yes
No
50. Manufactured Stormwater Proprietary Units
50a. Does this facility have proprietary units?
Yes
No
06/02/2016 10:47 AM Page 10 of 46
![Page 11: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/11.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
51. Point of Outfall Discharge: (check all that apply)
Municipal storm sewer system
Combined sewer system
Surface Water
On-site recharge
Other (describe)
Not Applicable
52. Outfall Reconnaissance Inventory
Were all stormwater outfalls inspected during dry weather for signs of non-stormwater discharge?
Yes
No
Not Applicable
06/02/2016 10:47 AM Page 11 of 46
![Page 12: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/12.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyOther Site Features
Other Site Features
53. Pavement (Roadways and Parking Lots)
Yes
No
53a. Type: (check all that apply)
Concrete
Asphalt
Gravel
Other
None
53b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
53c. Year of Last Major Reconstruction/Replacement:
2007
53d. Expected Remaining Useful Life (Years):
5
53e. Cost to Reconstruct/Replace $:
(No Response)
53f. Comments:
recommend replacing front bus loop and parking lot
54. Sidewalks
Yes
No
54a. Type: (check all that apply)
Concrete
Asphalt
Paver
Other
54b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
54c. Year of Last Major Reconstruction/Replacement:
1996
06/02/2016 10:47 AM Page 12 of 46
![Page 13: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/13.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyOther Site Features
54d. Expected Remaining Useful Life (Years):
5
54e. Cost to Reconstruct/Replace $:
(No Response)
54f. Comments:
Recommend replacing sidewalk at front entrance and bus loop
55. Playgrounds and Playground Equipment
Yes
No
55a. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
55b. Year of Last Major Reconstruction/Replacement:
2000
55c. Expected Remaining Useful Life (Years):
10
55d. Cost to Reconstruct/Replace $:
(No Response)
55e. Comments:
(No Response)
56. Athletic Fields and Play Fields
Yes
No
56a. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
56b. Year of Last Major Reconstruction/Replacement:
1956
56c. Expected Remaining Useful Life (Years):
15
56d. Cost to Reconstruct/Replace $:
(No Response)
06/02/2016 10:47 AM Page 13 of 46
![Page 14: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/14.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyOther Site Features
56e. Comments:
(No Response)
56f. Does the facility have synthetic turf field(s)
Yes
No
56f.1 If Yes, how many synthetic turf fields?
(No Response)
56f.2 Expected Remaining Useful Life of Synthetic Turf Field(s):
(No Response)
56f.3 Type of synthetic turf field infill:
(No Response)
57. Exterior Bleachers / Stadiums
Yes
No
58. Related Structures (such as Press Boxes, Dugouts, Climbing Walls, etc.)
Yes
No
06/02/2016 10:47 AM Page 14 of 46
![Page 15: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/15.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySubstructure
Substructure
59. Foundation (S)
59a. Type (check all that apply):
Reinforced Concrete
Masonry on Concrete Footing
Other
59b. Evidence of structural concerns (check all that apply):
Structural Cracks
Heaving/Jacking
Decay/Corrosion
Water Penetration
Unsupported Ends
Other
None
59c. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
59d. Year of Last Major Reconstruction/Replacement:
2006
59e. Expected Remaining Useful Life (Years):
50
59f. Cost to Reconstruct/Replace $:
(No Response)
59g. Comments:
(No Response)
06/02/2016 10:47 AM Page 15 of 46
![Page 16: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/16.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
BUILDING ENVELOPE
60. Structural Floors (S)
60a. Type (check all that apply):
Reinforced Concrete Slab on Grade
Concrete/Metal Deck/Metal Joists
Precast Concrete Structural System
Wood Deck on Wood Trusses
Wood Deck on Wood Joists
Concrete Deck on Wood Structure
Other (specify)
60b. Evidence of Structural Concerns with Floor Support System (Beams/Joists/Trusses, etc.) (check all that
apply):
Structural Cracks
Unsupported Ends
Rot/Decay/Corrosion
Deflection
Seriously Damaged/Missing Components
Other Problems
None
60b.1 Describe Other Problems:
(No Response)
60c. Evidence of Structural Concerns with Structural Floor Deck (check all that apply):
Cracks
Deflection
Rot/Decay/Corrosion
None
60d. Overall Condition of Structural Floors:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
60e. Year of Last Major Reconstruction/Replacement:
2006
60f. Expected Remaining Useful Life (Years):
30
60g. Cost to Reconstruct/Replace $:
(No Response)
60h. Comments:
(No Response)
06/02/2016 10:47 AM Page 16 of 46
![Page 17: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/17.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
61. Exterior Walls/Columns (S)
61a. Material (check all that apply):
Concrete
Masonry
Steel
Wood
Other (specify)
61b. Evidence of Structural Concerns with Support System (columns, base plates, connections, etc.) (check all
that apply):
Structural Cracks
Rot/Decay/Corrosion
Other Problems
None
61b.1 Describe Other Problems:
(No Response)
61c. Evidence of Concerns with Exterior Cladding (check all that apply):
Cracks/Gaps
Inadequate Flashing
Efflorescence
Moisture Penetration
Rot/Decay/Corrosion
Other Problems
None
61c.1 Describe Other Problems:
(No Response)
61d. Overall Condition of Exterior Walls/Columns:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
61e. Year of Last Major Reconstruction/Replacement:
2006
61f. Expected Remaining Useful Life (Years):
40
61g. Cost to Reconstruct/Replace $:
(No Response)
61h. Comments:
recommend spot brick repointing
06/02/2016 10:47 AM Page 17 of 46
![Page 18: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/18.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
62. Chimneys (S)
Yes
No
62a. Material (check all that apply):
Masonry
Concrete
Metal
Wood
Other
62a.1 Specify other:
(No Response)
62b. Overall Condition of Chimneys:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical failure
62c. Year of Last Major Reconstruction/Replacement:
1956
62.d Expected Remaining Useful Life (Years):
10
62e. Cost to Reconstruct/Replace $:
(No Response)
62f. Comments:
(No Response)
63. Parapets (S)
Yes
No
63a. Construction Type (check all that apply):
Masonry
Concrete
Metal
Wood
Other (specify)
63a.1 Specify Other:
(No Response)
63b. Overall condition of parapets:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:47 AM Page 18 of 46
![Page 19: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/19.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
63c. Year of Last Major Reconstruction/Replacement:
2006
63d. Expected Remaining Useful Life (Years):
30
63e. Cost to Reconstruct/Replace $:
(No Response)
63f. Comments:
(No Response)
64. Exterior Doors
64a. Overall Condition of Exterior Door Units:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
64b. Overall condition of exterior door hardware:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
64c. Do any exterior doors have magnetic locking devices?
Yes
No
64d. Safety/Security features are adequate?
Yes
No
64e. Year of Last Major Reconstruction/Replacement:
2006
64f. Expected Remaining Useful Life (Years):
5
64g. Cost to Reconstruct/Replace $:
(No Response)
64h. Comments:
Replacement of Front Entrance door is recommended
65. Exterior Steps, Stairs, Ramps (S)
Yes
No
06/02/2016 10:47 AM Page 19 of 46
![Page 20: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/20.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
66. Fire Escapes (S)
66a. Does This Facility Have One or More Fire Escapes?
Yes
No
67. Windows
Yes
No
67a. Window Material: (check all that apply)
Aluminum
Steel
Vinyl
Solid Wood
Wood w/ External Cladding System
Other
67b. Overall Condition of Windows:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
67c. All Rescue Windows are Operable:
Yes
No
N/A
67d. Year of Last Major Reconstruction/Replacement:
2006
67e. Expected Remaining Useful Life (Years):
10
67f. Cost to Reconstruct/Replace $:
(No Response)
67g. Comments:
recommend replacement of single glazed windows
Roof and Skylights (S)
68. Roof and Skylights (S)
Yes
No
06/02/2016 10:47 AM Page 20 of 46
![Page 21: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/21.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
68a. Type of roof construction (check all that apply):
Metal deck on metal trusses/joists
Wood deck on wood trusses/joists
Wood deck on metal trusses/joists
Concrete on metal deck on metal trusses/joists
Other (describe below)
68a.1 Other roof construction type:
(No Response)
68b. Type of roofing material (check all that apply):
Single-ply membrane
Built-up
Asphalt shingle
Pre-formed metal
IRMA
Slate
Other (describe below)
68b.1 Other roofing material:
(No Response)
68c. Evidence of structural concerns with roof support system (beams/joists/trusses, etc.) (check all that apply):
Structural cracks
Unsupported ends
Rot/Decay/Corrosion
Deflection
Seriously damaged/missing components
Other concerns (describe)
None
68c.1 Describe other concerns:
(No Response)
68d. Evidence of structural concerns with roof deck (check all that apply):
Cracks
Deflection
Rot/Decay/Corrosion
None
68e. Does this facility have skylights?
Yes
No
68f. Skylight material (check all that apply):
Plastic
Glass
Other
N/A
06/02/2016 10:47 AM Page 21 of 46
![Page 22: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/22.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
68g. Overall condition of skylights:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
68h. Evidence of concerns with roofing, skylights, flashings, and drains (check all that apply):
Failures/Splits/Cracks
Rot/Decay/Corrosion
Inadequate flashing/curbs/pitch pockets
Inadequate or poorly functioning roof drains
Evidence of water penetration/active leaks
Other (specify)
None
68h.1 Specify other concerns:
(No Response)
68i. Overall Condition of Roof and Skylights:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
68j. Year of Last Major Reconstruction/Replacement:
1992
68k. Expected Remaining Useful Life (Years):
5
68l. Cost to Reconstruct/Replace $:
(No Response)
68m. Comments:
Replacement of skylights recommended
06/02/2016 10:47 AM Page 22 of 46
![Page 23: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/23.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
INTERIOR SPACES
69. Interior Bearing Walls and Fire Walls (S)
Yes
No
69a. Overall condition of interior bearing walls and fire walls:
Excellent
Satisfactory
Unsatisfactory
Non-functioning
Critical Failure
69b. Year of Last Major Reconstruction/Replacement:
2006
69c. Expected Remaining Useful Life (Years):
20
69d. Cost to Reconstruct/Replace $:
(No Response)
69e. Comments:
(No Response)
Other Interior Walls
70. Other Interior Walls
Yes
No
70a. Overall condition of other interior walls:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
70b. Year of Last Major Reconstruction/Replacement:
2006
70c. Expected Remaining Useful Life (Years):
20
70d. Cost to Reconstruct/Replace $:
(No Response)
70e. Comments:
(No Response)
Floor Finishes
71. Carpet
Yes
No
06/02/2016 10:47 AM Page 23 of 46
![Page 24: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/24.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
71a. Where located (check all that apply):
Instructional Space
Common Area
71b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
71c. Year of Last Major Reconstruction/Replacement:
2006
71d. Expected Remaining Useful Life (Years):
5
71e. Cost to Reconstruct/Replace $:
(No Response)
71f. Comments:
(No Response)
72. Resilient Tiles or Sheet Flooring
Yes
No
72a. Where located (check all that apply):
Instructional Space
Common Area
72b. Overall condition of resilient tiles or sheet flooring:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
72c. Year of Last Major Reconstruction/Replacement:
2000
72d. Expected Remaining Useful Life (Years):
5
72e. Cost to Reconstruct/Replace $:
(No Response)
72f. Comments:
Recommend replacement of corridor VCT
06/02/2016 10:47 AM Page 24 of 46
![Page 25: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/25.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
73. Hard Flooring (concrete; ceramic tile; stone; etc)
Yes
No
73a. Where located (check all that apply):
Instructional Space
Common Area
73b. Overall condition of hard flooring:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
73c. Year of Last Major Reconstruction/Replacement:
2006
73d. Expected Remaining Useful Life (Years):
15
73e. Cost to Reconstruct/Replace $:
(No Response)
73f. Comments:
(No Response)
74. Wood Flooring
Yes
No
74a. Where located (check all that apply):
Instructional Space
Common Area
74b. Overall condition of wood flooring:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
74c. Year of Last Major Reconstruction/Replacement:
1956
74d. Expected Remaining Useful Life (Years):
15
74e. Cost to Reconstruct/Replace $:
(No Response)
06/02/2016 10:47 AM Page 25 of 46
![Page 26: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/26.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
74f. Comments:
(No Response)
Ceilings (H)
75. Ceilings (H)
Yes
No
75a. Overall condition of ceilings:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
75b. Year of Last Major Reconstruction/Replacement:
2002
75c. Expected Remaining Useful Life (Years):
10
75d. Cost to Reconstruct/Replace $:
(No Response)
75e. Comments:
Recommend replacement of corridor ceilings
Lockers
76. Lockers
Yes
No
76d. Cost to Reconstruct/Replace $:
(No Response)
Interior Doors
77. Interior Doors
Yes
No
77a. Overall condition of interior door units:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:47 AM Page 26 of 46
![Page 27: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/27.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
77b. Overall condition of interior door hardware:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
77c. Year of Last Major Reconstruction/Replacement:
2006
77d. Expected Remaining Useful Life (Years):
10
77e. Cost to Reconstruct/Replace $:
(No Response)
77f. Comments:
(No Response)
Interior Stairs (S)
78. Interior Stairs (S)
Yes
No
Elevator, Lifts and Escalators (H)
79. Elevator, Lift, and Escalators (H)
Yes
No
Interior Electrical Distribution (H)
80. Interior Electrical Distribution (H)
Yes
No
80a. Interior electrical supply meets current needs:
Yes
No
80b. Condition of interior electrical distribution:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
80c. Year of Last Major Reconstruction/Replacement:
1997
80d. Expected Remaining Useful Life (Years):
10
06/02/2016 10:47 AM Page 27 of 46
![Page 28: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/28.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
80e. Cost to Reconstruct/Replace $:
(No Response)
80f. Comments:
Recommend replacement of old panel boards, thermal and megger testing
Lighting Fixtures
81. Interior Lighting Fixtures
Yes
No
81a. Condition of interior lighting fixtures:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
81b. Year of Last Major Reconstruction/Replacement:
2006
81c. Expected Remaining Useful Life (Years):
10
81d. Cost to Reconstruct/Replace $:
(No Response)
81e. Comments:
occupancy senors recommended
Communication Systems (H)
82. Communication Systems (H)
Yes
No
82a. Communication systems are adequate:
Yes
No
82b. Condition of communication systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
82c. Year of Last Major Reconstruction/Replacement:
2006
82d. Expected Remaining Useful Life (Years):
10
06/02/2016 10:47 AM Page 28 of 46
![Page 29: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/29.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
82e. Cost to Replace/Reconstruct $:
(No Response)
82f. Comments:
(No Response)
Swimming Pool and Swimming Pool Systems
83. Swimming Pool and Swimming Pool Systems
Yes
No
06/02/2016 10:47 AM Page 29 of 46
![Page 30: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/30.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
PLUMBING
84. Water Distribution System (H)
Yes
No
84a. Types of pipes (check all that apply):
Iron
Galvanized
Copper
Lead
PVC
Other
84b. Overall condition of water distribution system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
84c. Year of Last Major Reconstruction/Replacement:
2006
84d. Expected Remaining Useful Life (Years):
10
84e. Cost to Reconstruct/Replace $:
(No Response)
84f. Comments:
(No Response)
Plumbing Drainage System (H)
85. Plumbing Drainage System (H)
Yes
No
85a. Types of pipes (check all that apply):
Iron
Galvanized
Copper
Lead
PVC
Other
85b. Overall condition of drainage system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:47 AM Page 30 of 46
![Page 31: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/31.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
85c. Year of Last Major Reconstruction/Replacement:
2006
85d. Expected Remaining Useful Life (Years):
10
85e. Cost to Reconstruct/Replace $:
(No Response)
85f. Comments:
(No Response)
Hot Water Heaters (H)
86. Hot Water Heaters (H)
Yes
No
86a. Type of fuel (check all that apply):
Oil
Natural Gas
Electricity
Propane
Other
86b. Overall condition of hot water heaters:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
86c. Year of Last Major Reconstruction/Replacement:
2012
86d. Expected Remaining Useful Life (Years):
20
86e. Cost to Reconstruct/Replace $:
(No Response)
86f. Comments:
(No Response)
Plumbing Fixtures
87. Plumbing Fixtures
Yes
No
06/02/2016 10:47 AM Page 31 of 46
![Page 32: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/32.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
87a. Overall condition of plumbing fixtures (including toilets, urinals, lavatories, etc):
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
87b. Year of Last Major Reconstruction/Replacement:
2006
87c. Expected Remaining Useful Life (Years):
10
87d. Cost to Reconstruct/Replace $:
(No Response)
87e. Comments:
(No Response)
06/02/2016 10:47 AM Page 32 of 46
![Page 33: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/33.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
HVAC SYSTEMS
88. HVAC Systems Type
88a. Does this building have a central HVAC system?
Yes
No
88b. If yes, what type of technology does it use (check all that apply)?
Constant volume (CV)
Variable air volume (VAV)
Dual-duct or multi-zone
Other (describe below)
N/A
Heat Generating Systems (H)
88b.1 Other central HVAC system technology:
(No Response)
89. Heat Generating Systems (H)
Yes
No
89a. Heat generation source (check all that apply):
Boiler / Hot Water
Boiler / Steam
Furnace / Forced Air
Unit Ventilation
Geothermal
Biomass
Electric
Other (describe below)
89a.1 Other heat generation source:
(No Response)
89b. Overall condition of heat generating systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
89c. Year of Last Major Reconstruction/Replacement:
2013
89d. Expected Remaining Useful Life (Years):
2
89e. Cost to Reconstruct/Replace $:
(No Response)
06/02/2016 10:47 AM Page 33 of 46
![Page 34: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/34.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
89f. Comments:
(No Response)
Heating Fuel/Energy Systems (H)
90. Heating Fuel / Energy Systems (H)
Yes
No
90a. Overall condition of heating fuel / energy systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
90b. Year of Last Major Reconstruction/Replacement:
2000
90c. Expected Remaining Useful Life (Years):
10
90d. Cost to Reconstruct/Replace $:
(No Response)
90e. Comments:
(No Response)
Cooling/Air Conditioning Generating Systems
91. Cooling / Air-Conditioning Generating Systems
Yes
No
91a. Overall condition of cooling/air-conditioning generating systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
91b. Year of Last Major Reconstruction/Replacement:
1996
91c. Expected Remaining Useful Life (Years):
10
91d. Cost to Reconstruct/Replace $:
(No Response)
91e. Comments:
(No Response)
AIR HANDLING AND VENTILATION EQUIPMENT
06/02/2016 10:47 AM Page 34 of 46
![Page 35: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/35.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
92. Air Handling and Ventilation Equipment: Supply Units, Exhaust Units, Relief/Return Units, etc. (H)
Yes
No
92a. Overall condition of air handling and ventilation systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
92b. Year of Last Major Reconstruction/Replacement:
1965
92c. Expected Remaining Useful Life (Years):
5
92d. Cost to Reconstruct/Replace $:
(No Response)
92e. Comments:
recommend to upgrade ventilation system in 1965 wing
Piped Heating and Cooling Distribution Systems
93. Piped Heating and Cooling Distribution Systems: Piping, Pumps, Radiators, Convectorss, Traps, Insulation,
etc. (H)
Yes
No
93a. Overall condition of piped heating and cooling distribution systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
93b. Year of Last Major Reconstruction/Replacement:
1965
93c. Expected Remaining Useful Life (Years):
5
93d. Cost to Reconstruct/Replace $:
(No Response)
93e. Comments:
Recommend replacement of in-line pumps 1965 wing
Ducted Heating and Cooling Distrbution Systems
06/02/2016 10:47 AM Page 35 of 46
![Page 36: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/36.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
94. Ducted Heating and Cooling Distribution Systems: Ductwork, Control Dampers, Fire/Smoke Dampers, VAVs,
Insulation, etc. (H)
Yes
No
94a. Overall condition of ducted heating and cooling distribution systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
94b. Year of Last Major Reconstruction/Replacement:
1956
94c. Expected Remaining Useful Life (Years):
5
94d. Cost to Reconstruct/Replace $:
(No Response)
94e. Comments:
(No Response)
HVAC Control Systems
95. HVAC Control Systems (H)
Yes
No
95a. Overall condition of control systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
95b. Year of Last Major Reconstruction/Replacement:
1956
95c. Expected Remaining Useful Life (Years):
5
95d. Cost to Reconstruct/Replace $:
(No Response)
95e. Comments:
upgrade pneumatic controls to direct digital
06/02/2016 10:47 AM Page 36 of 46
![Page 37: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/37.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyFire Safety Systems
Fire Safety Systems
96. Fire Alarm Systems (H)
Yes
No
96a. Overall condition of fire alarm system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
96b. Year of Last Major Reconstruction/Replacement:
2006
96c. Expected Remaining Useful Life (Years):
10
96d. Cost to Reconstruct/Replace $:
(No Response)
96e. Comments:
provide carbon monoxide detectors and additional fire alarm strobes in classrooms
Smoke Detection System (H)
97. Smoke Detection Systems (H)
Yes
No
97a. Overall condition of smoke detection systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
97b. Year of Last Major Reconstruction/Replacement:
2006
97c. Expected Remaining Useful Life (Years):
10
97d. Cost to Reconstruct/Replace $:
(No Response)
97e. Comments:
(No Response)
Fire Suppression Systems
98. Fire Suppression Systems: Sprinklers, Standpipes, Kitchen Hoods, etc. (H)
Yes
No
06/02/2016 10:47 AM Page 37 of 46
![Page 38: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/38.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyFire Safety Systems
98a. Overall condition of fire suppression systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
98b. Year of Last Major Reconstruction/Replacement:
2006
98c. Expected Remaining Useful Life (Years):
10
98d. Cost to Reconstruct/Replace $:
(No Response)
98e. Comments:
(No Response)
Emergency/Exit Lighting Systems
99. Emergency / Exit Lighting Systems (H)
Yes
No
99a. Overall condition of emergency / exit lighting systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
99b. Year of Last Major Reconstruction/Replacement:
2006
99c. Expected Remaining Useful Life (Years):
10
99d. Cost to Reconstruct/Replace $:
(No Response)
99e. Comments;
provide exterior emergency egress lighting
Emergency/Standby Power Systems
100. Emergency or Standby Power System (H)
Yes
No
06/02/2016 10:47 AM Page 38 of 46
![Page 39: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/39.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyFire Safety Systems
100a. Overall condition of emergency/standby power systems:
Excellent
Satifactory
Unsatisfactory
Non-Functioning
Crtitical Failure
N/A
100b. Year of Last Major Reconstruction/Replacement:
2006
100c. Expected Remaining Useful Life (Years):
10.00
100d. Cost to Reconstruct/Replace $:
(No Response)
100e. Comments:
(No Response)
06/02/2016 10:47 AM Page 39 of 46
![Page 40: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/40.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyAccessibility
ACCESSIBILITY
101. Exterior Accessible Route (H)
People with disabilities should be able to arrive on site, approach the building, and enter as freely as everyone
else. At least one route of travel should be safe and accessible for everyone, including people with disabilities.
This route must include handicapped parking, curb cuts, ramps, and automatic door operators as necessary to
enter the building.
Is there an accessible exterior route as specified above?
Yes
No
102. Interior Accessible Route, Access to Goods and Services, and Restroom Facilities (H)
The layout of the building should allow people with disabilities to obtain materials or services and use the facilities
without assistance. This should include access to general purpose and specialized classrooms, public assembly
spaces (such as libraries, gymnasiums, auditoriums), nurse's office, main office, and restroom facilities. Services
include drinking fountains, telephones, and other amenities.
Is there an accessible interior route as specified above?
Yes
No
103. Additional Information on Accessibility
If the building lacks accessible interior or exterior routes:
103a. Cost of improvements needed to provide accessible exterior and interior routes as specified above $:
(No Response)
103b. Comments:
(No Response)
06/02/2016 10:47 AM Page 40 of 46
![Page 41: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/41.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyEnvironment/Comfort/Health
ENVIRONMENT/COMFORT/HEALTH
104. General Appearance
104a. Overall Rating:
Good
Fair
Poor
104b. Comments:
(No Response)
105. Cleanliness
105a. Overall Rating:
Good
Fair
Poor
105b. Comments:
(No Response)
106. Are there walk off mats; grills in the entryway?
Yes
No
106a. If yes: at least 6 feet long?
Yes
No
107. Is there noise in classrooms from HVAC units, traffic, etc. that may impact education?
Yes
No
108. Lighting Quality:
108a. Types of lighting in general purpose classrooms (check all that apply):
Daylight
Flourescent-not full spectrum
Flourescent full spectrum
Incandescent
Other (describe)
108b. Are there blinds in the classroom to prevent glare?
Yes
No
108c. Overall Rating:
Good
Fair
Poor
06/02/2016 10:47 AM Page 41 of 46
![Page 42: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/42.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyEnvironment/Comfort/Health
108d. Comments:
(No Response)
109. Evidence of Vermin
109a. Is there evidence of active infestations of...(check all that apply)?
Rodents
Wood-boring or Wood-eating Insects
Cockroaches
Other Vermin
None
06/02/2016 10:47 AM Page 42 of 46
![Page 43: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/43.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
Indoor Air Quality
110. Mold
110a. Is there visible mold or moldy odors?
Yes
No
110c. Are any surfaces constructed of any of the following materials?
Paper-faced or gypsum products
Cellulose products (typically ceiling tiles)
110d. Estimated cost of necessary improvements $:
(No Response)
110d. Comments:
(No Response)
111. Humidity/Moisture
111a. Overall rating of humidity/moisture condition in building:
Good
Fair
Poor
111b. Are any of the following found in/or around classroom areas (check all that apply)?
Active leaks in roof
Active leaks in plumbing
Moisture condensation
Visible stains or water damage
None
111c. Are any of the following found in/or around other areas (check all that apply)?
Active leaks in roof
Active leaks in plumbing
Moisture condensation
Visible stains or water damage
None
112. Ventilation: fresh air intake locations, air filters, etc.
112a. Are fresh air intakes near the bus loading, truck delivery, or garbage storage/disposal areas?
Yes
No
112b. Is there accumulated dirt, dust or debris around fresh air intakes?
Yes
No
112c. Are fresh air intakes free of blockage?
Yes
No
06/02/2016 10:47 AM Page 43 of 46
![Page 44: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/44.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
112d. Is accumulated dirt, dust or debris in ductwork?
Yes
No
112e. Are dampers functioning as designed?
Yes
No
112f. Condition of air filters:
Good
Fair
Poor
112g. Outside air is adequate for occupant load:
Yes
No
112h. Rating of ventilation/indoor air quality:
Good
Fair
Poor
112i. Comments:
(No Response)
113. Indoor Air Quality (IAQ) Plan
113a. Does the school district use EPA's Tools for Schools program?
Yes
No
113b. If No, is some other IAQ management plan used?
Yes
No
113c. Has the District assigned IAQ responsibilities to a designated individual?
Yes
No
113c.1 If Yes, what is their job title?
(No Response)
114. Does the school practice IPM?
Yes
No
114a. Is vegetation kept one foot away from the building?
Yes
No
114b. Are crevices and holes in walls, floors and pavement sealed or eliminated?
Yes
No
06/02/2016 10:47 AM Page 44 of 46
![Page 45: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/45.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
114c. Is there a certified pesticide applicator on staff?
Yes
No
114d. Are pesticides used in the building?
Yes
No
114d.1 If Yes, how are they typically applied?
Spot treatment
Area wide treatments
114e. Are pesticides used on the grounds?
Yes
No
114e.1 If Yes, was an emergency exemption granted by the Board of Education?
Yes
No
115. Does the school have a passive radon mitigation system installed (was built with radon resistant features)?
Yes
No
115a. Has the facility been tested for the presence of radon?
Yes
No
115b. Were any of the results of the test greater than or equal to 4 picocuries per liter (pCi/L)?
Yes
No
115c. If Yes, did the school take steps to mitigate the elevated radon levels?
Yes, active mitigation system installed
Yes, passive mitigation system made active
Yes, ventilation controls (HVAC) adjusted
Yes, other (describe)
No action taken
115c.1 Describe other actions taken to mitigate elevated radon levels:
(No Response)
06/02/2016 10:47 AM Page 45 of 46
![Page 46: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/46.jpg)
RYE CITY SD Status Date: 03/15/2016 04:02 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyAmerican Red Cross
American Red Cross Shelter
116. American Red Cross Shelter
Yes
No
06/02/2016 10:47 AM Page 46 of 46
![Page 47: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/47.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
Building Information1. Name of School District:
RYE CITY SD
2. SED District 8-Digit BEDS Code:
661800010000
3. Building Name:
Osborn Portable #1
4. SED 4-Digit Facility Code:
0014
5. Survey Inspection Date:
09/14/2015
6. Building 911 Address:
10 Osborn Road
7. City:
Rye
8. Zip Code:
10580
9. Certificate of Occupancy Status:
A - Annual
T - Temporary
N - None
10. Certificate of Occupancy Expiration Date:
09/01/2016
Building Age, Gross Square Footage and Maintenance Staff
11. Year of Original Building:
2003
12. Gross square ft. of Building as currently configured:
1,700
13. Number of Floors:
1
14. How many full-time and part-time custodians are employed at the school (or work in the building)?
Count Employees
Full-time custodians:0
Part-time custodians:0
Totals:
Building Ownership and Occupancy Status06/02/2016 10:46 AM Page 1 of 40
![Page 48: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/48.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
15. Building Ownership (check one):
Owned and used by district
Owned by District and leased to non-district entity
Owned by District, part used by district, part leased to non-district entity
Owned by non-district entity and leased to district
16. For which of the following purposes is the building currently used? (check all that apply)
Used for student instructional purposes
Used for district administration
Used for other district purposes
Used by other organization(s)
Building Users
17. How many students were registered to receive instruction in this building as of October 1, 2014? (If none,
enter "0") and skip to "Program Spaces" section. (Do not include evening class students)
20
18. Of these registered students, how many receive most of their instruction in:
Quantity
18a. Permanent instructional spaces (i.e., regularclassrooms) 20
18b. Temporary instructional spaces (i.e., portable ordemountable classrooms) attached to the building 0
18c. Non-instructional spaces used as instructionalspaces 0
18c.1 If the answer is greater than zero, which types of non-instructional spaces were being used for instructional
purposes on October 1, 2014? (check all that apply)
Cafeteria
Gymnasium
Administrative Spaces
Library
Lobby
Stairwell
Storage space
Other (please describe)
None
19. Grades Housed:
k-5
20. For how many instructional days during the 2013-14 school year (July 1 through June 30, was the building
closed due to facilities failures, system malfunctions, structural problems, fire, etc? (if none, enter "0")
0
21. Is the building used for instructional purposes in the summer?
Yes
No
22. Have there been renovations or construction in the building during the past 12 months?
Yes
No
06/02/2016 10:46 AM Page 2 of 40
![Page 49: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/49.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
23. Was major construction/renovation work since 2010 conducted when school was in session?
Yes
No
06/02/2016 10:46 AM Page 3 of 40
![Page 50: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/50.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyProgram Spaces
Program Spaces
24. Number of instructional classrooms:
2
25. Gross square footage of all instructional classrooms (combined):
1,700.00
26. Other spaces provided: (check all that apply)
a. N/A (none)
b. Administration
c. Art
d. Audio Visual
e. Auditorium
f. Cafeteria
g. Computer Room
h. Guidance
i. Gymnasium
j. Health Office
k. Home & Careers
l. Kitchen
m. Large Group Instruction
n. Library
o. Multipurpose Rooms
p. Music
q. Pre-K
r. Remedial Rooms
s. Resource Rooms
t. Science Labs
u. Special Education
v. Swimming Pool
w. Teacher Resource
x. Technology/Shop
y. Other (please describe)
26y. Describe other spaces
(No Response)
Space Adequacy
27. Rating of space adequacy:
Good
Fair
Poor
27a. Enter comments:
(No Response)
28. Estimated capital construction expenses anticipated for this building through 2020-2021 school year
excluding maintenance (to be answered after the building inspection is complete) $
21,000.00
29. Overall building rating (to be answered after the building inspection is complete)
Excellent
Satisfactory
Unsatisfactory
Poor
30. Was overall building rating established after consultation with health and safety committee?
Yes
No
A/E Information:
31. A/E Firm Name:
KSQ Architects
06/02/2016 10:46 AM Page 4 of 40
![Page 51: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/51.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyProgram Spaces
32. A/E Firm Address:
235 Main Street, Suite 410
White Plains, NY 10601
33. A/E Firm Phone Number:
9146823700
34. E-mail:
35. A/E Name:
Scott Hillje
36. A/E License #:
025556
06/02/2016 10:46 AM Page 5 of 40
![Page 52: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/52.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
Site Utilities
37. Water
Yes
No
37a. Type of Service:
Municipal or Utility provided
Well
Other
37b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
37c. Year of Last Major Reconstruction/Replacement:
2003
37d. Expected Remaining Useful Life (Years):
10
37e. Cost to Reconstruct/Replace $:
(No Response)
37f. Comments:
(No Response)
38. Site Sanitary (H)
Yes
No
38a. Type of Service:
Municipal or utility sewer
Site septic
Other
38b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
38c. Year of Last Major Reconstruction/Replacement:
2003
38d. Expected Remaining Useful Life (Years):
15
06/02/2016 10:46 AM Page 6 of 40
![Page 53: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/53.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
38e. Cost to reconstruct/Replace $:
(No Response)
38f. Comments:
(No Response)
39. Site Gas (H)
Yes
No
40. Site Fuel Oil (H)
Yes
No
41. Site Electrical, Including Exterior Distribution (H)
Yes
No
41a. Service Provider:
Municipal or utility provided
Self-Generated
Other
N/A
41b. Type of Service:
Above Ground
Below Ground
N/A
41c. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
41d. Year of Last Major Reconstruction/Replacement:
2003
41e. Expected Remaining Useful Life (Years):
15
41f. Cost to Reconstruct/Replace $:
(No Response)
41g. Comments:
(No Response)
Stormwater Management
06/02/2016 10:46 AM Page 7 of 40
![Page 54: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/54.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
42. Closed Drainage Pipe Stormwater Management System
42a. Does this facility have a closed pipe system?
Yes
No
43. Open Drainage Pipe Stormwater Management System
43a. Does this facility have an open stormwater system (ditch)?
Yes
No
44. Catch Basins/Drop Inlets/Manholes
44a. Does this facility have catch basins/drop inlets/manholes?
Yes
No
45. Culverts
45a. Does this facility have culverts?
Yes
No
46. Outfalls
46a. Does this facility have outfalls?
Yes
No
47. Infiltration Basins/Chambers
47a. Does this facility have infiltration basins/chambers?
Yes
No
48. Retention Basins
48a. Does this facility have retention basins?
Yes
No
49. Wetponds
49a. Does this facility have wetponds?
Yes
No
06/02/2016 10:46 AM Page 8 of 40
![Page 55: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/55.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
50. Manufactured Stormwater Proprietary Units
50a. Does this facility have proprietary units?
Yes
No
51. Point of Outfall Discharge: (check all that apply)
Municipal storm sewer system
Combined sewer system
Surface Water
On-site recharge
Other (describe)
Not Applicable
52. Outfall Reconnaissance Inventory
Were all stormwater outfalls inspected during dry weather for signs of non-stormwater discharge?
Yes
No
Not Applicable
06/02/2016 10:46 AM Page 9 of 40
![Page 56: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/56.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyOther Site Features
Other Site Features
53. Pavement (Roadways and Parking Lots)
Yes
No
54. Sidewalks
Yes
No
54a. Type: (check all that apply)
Concrete
Asphalt
Paver
Other
54b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
54c. Year of Last Major Reconstruction/Replacement:
2003
54d. Expected Remaining Useful Life (Years):
5
54e. Cost to Reconstruct/Replace $:
(No Response)
54f. Comments:
(No Response)
55. Playgrounds and Playground Equipment
Yes
No
56. Athletic Fields and Play Fields
Yes
No
56f. Does the facility have synthetic turf field(s)
Yes
No
56f.1 If Yes, how many synthetic turf fields?
(No Response)
06/02/2016 10:46 AM Page 10 of 40
![Page 57: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/57.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyOther Site Features
56f.2 Expected Remaining Useful Life of Synthetic Turf Field(s):
(No Response)
56f.3 Type of synthetic turf field infill:
(No Response)
57. Exterior Bleachers / Stadiums
Yes
No
58. Related Structures (such as Press Boxes, Dugouts, Climbing Walls, etc.)
Yes
No
06/02/2016 10:46 AM Page 11 of 40
![Page 58: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/58.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySubstructure
Substructure
59. Foundation (S)
59a. Type (check all that apply):
Reinforced Concrete
Masonry on Concrete Footing
Other
59b. Evidence of structural concerns (check all that apply):
Structural Cracks
Heaving/Jacking
Decay/Corrosion
Water Penetration
Unsupported Ends
Other
None
59c. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
59d. Year of Last Major Reconstruction/Replacement:
2003
59e. Expected Remaining Useful Life (Years):
20
59f. Cost to Reconstruct/Replace $:
(No Response)
59g. Comments:
Not Accessible
06/02/2016 10:46 AM Page 12 of 40
![Page 59: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/59.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
BUILDING ENVELOPE
60. Structural Floors (S)
60a. Type (check all that apply):
Reinforced Concrete Slab on Grade
Concrete/Metal Deck/Metal Joists
Precast Concrete Structural System
Wood Deck on Wood Trusses
Wood Deck on Wood Joists
Concrete Deck on Wood Structure
Other (specify)
60b. Evidence of Structural Concerns with Floor Support System (Beams/Joists/Trusses, etc.) (check all that
apply):
Structural Cracks
Unsupported Ends
Rot/Decay/Corrosion
Deflection
Seriously Damaged/Missing Components
Other Problems
None
60b.1 Describe Other Problems:
(No Response)
60c. Evidence of Structural Concerns with Structural Floor Deck (check all that apply):
Cracks
Deflection
Rot/Decay/Corrosion
None
60d. Overall Condition of Structural Floors:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
60e. Year of Last Major Reconstruction/Replacement:
2003
60f. Expected Remaining Useful Life (Years):
15
60g. Cost to Reconstruct/Replace $:
(No Response)
60h. Comments:
(No Response)
06/02/2016 10:46 AM Page 13 of 40
![Page 60: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/60.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
61. Exterior Walls/Columns (S)
61a. Material (check all that apply):
Concrete
Masonry
Steel
Wood
Other (specify)
61b. Evidence of Structural Concerns with Support System (columns, base plates, connections, etc.) (check all
that apply):
Structural Cracks
Rot/Decay/Corrosion
Other Problems
None
61b.1 Describe Other Problems:
(No Response)
61c. Evidence of Concerns with Exterior Cladding (check all that apply):
Cracks/Gaps
Inadequate Flashing
Efflorescence
Moisture Penetration
Rot/Decay/Corrosion
Other Problems
None
61c.1 Describe Other Problems:
(No Response)
61d. Overall Condition of Exterior Walls/Columns:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
61e. Year of Last Major Reconstruction/Replacement:
2003
61f. Expected Remaining Useful Life (Years):
15
61g. Cost to Reconstruct/Replace $:
(No Response)
61h. Comments:
repair/replace damaged wood skirt boards
06/02/2016 10:46 AM Page 14 of 40
![Page 61: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/61.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
62. Chimneys (S)
Yes
No
63. Parapets (S)
Yes
No
63f. Comments:
(No Response)
64. Exterior Doors
64a. Overall Condition of Exterior Door Units:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
64b. Overall condition of exterior door hardware:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
64c. Do any exterior doors have magnetic locking devices?
Yes
No
64d. Safety/Security features are adequate?
Yes
No
64e. Year of Last Major Reconstruction/Replacement:
2003
64f. Expected Remaining Useful Life (Years):
5
64g. Cost to Reconstruct/Replace $:
(No Response)
64h. Comments:
(No Response)
65. Exterior Steps, Stairs, Ramps (S)
Yes
No
06/02/2016 10:46 AM Page 15 of 40
![Page 62: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/62.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
65a. Overall Condition of Exterior Steps, Stairs and Ramps
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
65b. Year of Last Major Reconstruction/Replacement:
2003
65c. Expected Remaining Useful Life (Years):
7
65d. Cost to Reconstruct/Replace $:
(No Response)
65e. Comments:
paint steps and railings to extend useful life
66. Fire Escapes (S)
66a. Does This Facility Have One or More Fire Escapes?
Yes
No
67. Windows
Yes
No
67a. Window Material: (check all that apply)
Aluminum
Steel
Vinyl
Solid Wood
Wood w/ External Cladding System
Other
67b. Overall Condition of Windows:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
67c. All Rescue Windows are Operable:
Yes
No
N/A
67d. Year of Last Major Reconstruction/Replacement:
2003
06/02/2016 10:46 AM Page 16 of 40
![Page 63: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/63.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
67e. Expected Remaining Useful Life (Years):
10
67f. Cost to Reconstruct/Replace $:
(No Response)
67g. Comments:
(No Response)
Roof and Skylights (S)
68. Roof and Skylights (S)
Yes
No
68a. Type of roof construction (check all that apply):
Metal deck on metal trusses/joists
Wood deck on wood trusses/joists
Wood deck on metal trusses/joists
Concrete on metal deck on metal trusses/joists
Other (describe below)
68a.1 Other roof construction type:
(No Response)
68b. Type of roofing material (check all that apply):
Single-ply membrane
Built-up
Asphalt shingle
Pre-formed metal
IRMA
Slate
Other (describe below)
68b.1 Other roofing material:
(No Response)
68c. Evidence of structural concerns with roof support system (beams/joists/trusses, etc.) (check all that apply):
Structural cracks
Unsupported ends
Rot/Decay/Corrosion
Deflection
Seriously damaged/missing components
Other concerns (describe)
None
68c.1 Describe other concerns:
(No Response)
06/02/2016 10:46 AM Page 17 of 40
![Page 64: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/64.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
68d. Evidence of structural concerns with roof deck (check all that apply):
Cracks
Deflection
Rot/Decay/Corrosion
None
68e. Does this facility have skylights?
Yes
No
68f. Skylight material (check all that apply):
Plastic
Glass
Other
N/A
68g. Overall condition of skylights:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
68h. Evidence of concerns with roofing, skylights, flashings, and drains (check all that apply):
Failures/Splits/Cracks
Rot/Decay/Corrosion
Inadequate flashing/curbs/pitch pockets
Inadequate or poorly functioning roof drains
Evidence of water penetration/active leaks
Other (specify)
None
68h.1 Specify other concerns:
(No Response)
68i. Overall Condition of Roof and Skylights:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
68j. Year of Last Major Reconstruction/Replacement:
2003
68k. Expected Remaining Useful Life (Years):
5
68l. Cost to Reconstruct/Replace $:
(No Response)
68m. Comments:
(No Response)
06/02/2016 10:46 AM Page 18 of 40
![Page 65: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/65.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
INTERIOR SPACES
69. Interior Bearing Walls and Fire Walls (S)
Yes
No
69a. Overall condition of interior bearing walls and fire walls:
Excellent
Satisfactory
Unsatisfactory
Non-functioning
Critical Failure
69b. Year of Last Major Reconstruction/Replacement:
2003
69c. Expected Remaining Useful Life (Years):
10
69d. Cost to Reconstruct/Replace $:
(No Response)
69e. Comments:
(No Response)
Other Interior Walls
70. Other Interior Walls
Yes
No
70a. Overall condition of other interior walls:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
70b. Year of Last Major Reconstruction/Replacement:
2003
70c. Expected Remaining Useful Life (Years):
10
70d. Cost to Reconstruct/Replace $:
(No Response)
70e. Comments:
(No Response)
Floor Finishes
71. Carpet
Yes
No
06/02/2016 10:46 AM Page 19 of 40
![Page 66: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/66.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
71a. Where located (check all that apply):
Instructional Space
Common Area
71b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
71c. Year of Last Major Reconstruction/Replacement:
2003
71d. Expected Remaining Useful Life (Years):
5
71e. Cost to Reconstruct/Replace $:
(No Response)
71f. Comments:
(No Response)
72. Resilient Tiles or Sheet Flooring
Yes
No
72a. Where located (check all that apply):
Instructional Space
Common Area
72b. Overall condition of resilient tiles or sheet flooring:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
72c. Year of Last Major Reconstruction/Replacement:
2003
72d. Expected Remaining Useful Life (Years):
5
72e. Cost to Reconstruct/Replace $:
(No Response)
72f. Comments:
(No Response)
06/02/2016 10:46 AM Page 20 of 40
![Page 67: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/67.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
73. Hard Flooring (concrete; ceramic tile; stone; etc)
Yes
No
74. Wood Flooring
Yes
No
Ceilings (H)
75. Ceilings (H)
Yes
No
75a. Overall condition of ceilings:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
75b. Year of Last Major Reconstruction/Replacement:
2003
75c. Expected Remaining Useful Life (Years):
10
75d. Cost to Reconstruct/Replace $:
(No Response)
75e. Comments:
(No Response)
Lockers
76. Lockers
Yes
No
76d. Cost to Reconstruct/Replace $:
(No Response)
Interior Doors
77. Interior Doors
Yes
No
06/02/2016 10:46 AM Page 21 of 40
![Page 68: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/68.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
77a. Overall condition of interior door units:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
77b. Overall condition of interior door hardware:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
77c. Year of Last Major Reconstruction/Replacement:
2003
77d. Expected Remaining Useful Life (Years):
10
77e. Cost to Reconstruct/Replace $:
(No Response)
77f. Comments:
(No Response)
Interior Stairs (S)
78. Interior Stairs (S)
Yes
No
Elevator, Lifts and Escalators (H)
79. Elevator, Lift, and Escalators (H)
Yes
No
Interior Electrical Distribution (H)
80. Interior Electrical Distribution (H)
Yes
No
80a. Interior electrical supply meets current needs:
Yes
No
80b. Condition of interior electrical distribution:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:46 AM Page 22 of 40
![Page 69: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/69.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
80c. Year of Last Major Reconstruction/Replacement:
2003
80d. Expected Remaining Useful Life (Years):
15
80e. Cost to Reconstruct/Replace $:
(No Response)
80f. Comments:
(No Response)
Lighting Fixtures
81. Interior Lighting Fixtures
Yes
No
81a. Condition of interior lighting fixtures:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
81b. Year of Last Major Reconstruction/Replacement:
2003
81c. Expected Remaining Useful Life (Years):
10
81d. Cost to Reconstruct/Replace $:
(No Response)
81e. Comments:
(No Response)
Communication Systems (H)
82. Communication Systems (H)
Yes
No
82a. Communication systems are adequate:
Yes
No
82b. Condition of communication systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:46 AM Page 23 of 40
![Page 70: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/70.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
82c. Year of Last Major Reconstruction/Replacement:
2003
82d. Expected Remaining Useful Life (Years):
5
82e. Cost to Replace/Reconstruct $:
(No Response)
82f. Comments:
(No Response)
Swimming Pool and Swimming Pool Systems
83. Swimming Pool and Swimming Pool Systems
Yes
No
06/02/2016 10:46 AM Page 24 of 40
![Page 71: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/71.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
PLUMBING
84. Water Distribution System (H)
Yes
No
84a. Types of pipes (check all that apply):
Iron
Galvanized
Copper
Lead
PVC
Other
84b. Overall condition of water distribution system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
84c. Year of Last Major Reconstruction/Replacement:
2003
84d. Expected Remaining Useful Life (Years):
8
84e. Cost to Reconstruct/Replace $:
(No Response)
84f. Comments:
(No Response)
Plumbing Drainage System (H)
85. Plumbing Drainage System (H)
Yes
No
85a. Types of pipes (check all that apply):
Iron
Galvanized
Copper
Lead
PVC
Other
85b. Overall condition of drainage system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:46 AM Page 25 of 40
![Page 72: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/72.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
85c. Year of Last Major Reconstruction/Replacement:
2003
85d. Expected Remaining Useful Life (Years):
15
85e. Cost to Reconstruct/Replace $:
(No Response)
85f. Comments:
(No Response)
Hot Water Heaters (H)
86. Hot Water Heaters (H)
Yes
No
86a. Type of fuel (check all that apply):
Oil
Natural Gas
Electricity
Propane
Other
86b. Overall condition of hot water heaters:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
86c. Year of Last Major Reconstruction/Replacement:
2003
86d. Expected Remaining Useful Life (Years):
5
86e. Cost to Reconstruct/Replace $:
(No Response)
86f. Comments:
(No Response)
Plumbing Fixtures
87. Plumbing Fixtures
Yes
No
06/02/2016 10:46 AM Page 26 of 40
![Page 73: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/73.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
87a. Overall condition of plumbing fixtures (including toilets, urinals, lavatories, etc):
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
87b. Year of Last Major Reconstruction/Replacement:
2003
87c. Expected Remaining Useful Life (Years):
5
87d. Cost to Reconstruct/Replace $:
(No Response)
87e. Comments:
(No Response)
06/02/2016 10:46 AM Page 27 of 40
![Page 74: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/74.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
HVAC SYSTEMS
88. HVAC Systems Type
88a. Does this building have a central HVAC system?
Yes
No
88b. If yes, what type of technology does it use (check all that apply)?
Constant volume (CV)
Variable air volume (VAV)
Dual-duct or multi-zone
Other (describe below)
N/A
Heat Generating Systems (H)
88b.1 Other central HVAC system technology:
(No Response)
89. Heat Generating Systems (H)
Yes
No
89a. Heat generation source (check all that apply):
Boiler / Hot Water
Boiler / Steam
Furnace / Forced Air
Unit Ventilation
Geothermal
Biomass
Electric
Other (describe below)
89a.1 Other heat generation source:
Heated via electric heat coil
89b. Overall condition of heat generating systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
89c. Year of Last Major Reconstruction/Replacement:
2003
89d. Expected Remaining Useful Life (Years):
10
89e. Cost to Reconstruct/Replace $:
(No Response)
06/02/2016 10:46 AM Page 28 of 40
![Page 75: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/75.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
89f. Comments:
(No Response)
Heating Fuel/Energy Systems (H)
90. Heating Fuel / Energy Systems (H)
Yes
No
90a. Overall condition of heating fuel / energy systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
90b. Year of Last Major Reconstruction/Replacement:
2003
90c. Expected Remaining Useful Life (Years):
10
90d. Cost to Reconstruct/Replace $:
(No Response)
90e. Comments:
(No Response)
Cooling/Air Conditioning Generating Systems
91. Cooling / Air-Conditioning Generating Systems
Yes
No
91a. Overall condition of cooling/air-conditioning generating systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
91b. Year of Last Major Reconstruction/Replacement:
2003
91c. Expected Remaining Useful Life (Years):
10
91d. Cost to Reconstruct/Replace $:
(No Response)
91e. Comments:
(No Response)
AIR HANDLING AND VENTILATION EQUIPMENT
06/02/2016 10:46 AM Page 29 of 40
![Page 76: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/76.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
92. Air Handling and Ventilation Equipment: Supply Units, Exhaust Units, Relief/Return Units, etc. (H)
Yes
No
92a. Overall condition of air handling and ventilation systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
92b. Year of Last Major Reconstruction/Replacement:
2003
92c. Expected Remaining Useful Life (Years):
5
92d. Cost to Reconstruct/Replace $:
(No Response)
92e. Comments:
(No Response)
Piped Heating and Cooling Distribution Systems
93. Piped Heating and Cooling Distribution Systems: Piping, Pumps, Radiators, Convectorss, Traps, Insulation,
etc. (H)
Yes
No
Ducted Heating and Cooling Distrbution Systems
94. Ducted Heating and Cooling Distribution Systems: Ductwork, Control Dampers, Fire/Smoke Dampers, VAVs,
Insulation, etc. (H)
Yes
No
94a. Overall condition of ducted heating and cooling distribution systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
94b. Year of Last Major Reconstruction/Replacement:
2003
94c. Expected Remaining Useful Life (Years):
10
94d. Cost to Reconstruct/Replace $:
(No Response)
06/02/2016 10:46 AM Page 30 of 40
![Page 77: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/77.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
94e. Comments:
(No Response)
HVAC Control Systems
95. HVAC Control Systems (H)
Yes
No
95a. Overall condition of control systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
95b. Year of Last Major Reconstruction/Replacement:
2003
95c. Expected Remaining Useful Life (Years):
5
95d. Cost to Reconstruct/Replace $:
(No Response)
95e. Comments:
(No Response)
06/02/2016 10:46 AM Page 31 of 40
![Page 78: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/78.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyFire Safety Systems
Fire Safety Systems
96. Fire Alarm Systems (H)
Yes
No
96a. Overall condition of fire alarm system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
96b. Year of Last Major Reconstruction/Replacement:
2003
96c. Expected Remaining Useful Life (Years):
10
96d. Cost to Reconstruct/Replace $:
(No Response)
96e. Comments:
(No Response)
Smoke Detection System (H)
97. Smoke Detection Systems (H)
Yes
No
97a. Overall condition of smoke detection systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
97b. Year of Last Major Reconstruction/Replacement:
2003
97c. Expected Remaining Useful Life (Years):
10
97d. Cost to Reconstruct/Replace $:
(No Response)
97e. Comments:
(No Response)
Fire Suppression Systems
98. Fire Suppression Systems: Sprinklers, Standpipes, Kitchen Hoods, etc. (H)
Yes
No
06/02/2016 10:46 AM Page 32 of 40
![Page 79: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/79.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyFire Safety Systems
Emergency/Exit Lighting Systems
99. Emergency / Exit Lighting Systems (H)
Yes
No
99a. Overall condition of emergency / exit lighting systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
99b. Year of Last Major Reconstruction/Replacement:
2003
99c. Expected Remaining Useful Life (Years):
5
99d. Cost to Reconstruct/Replace $:
(No Response)
99e. Comments;
Provide exterior emergency egress lights
Emergency/Standby Power Systems
100. Emergency or Standby Power System (H)
Yes
No
06/02/2016 10:46 AM Page 33 of 40
![Page 80: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/80.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyAccessibility
ACCESSIBILITY
101. Exterior Accessible Route (H)
People with disabilities should be able to arrive on site, approach the building, and enter as freely as everyone
else. At least one route of travel should be safe and accessible for everyone, including people with disabilities.
This route must include handicapped parking, curb cuts, ramps, and automatic door operators as necessary to
enter the building.
Is there an accessible exterior route as specified above?
Yes
No
102. Interior Accessible Route, Access to Goods and Services, and Restroom Facilities (H)
The layout of the building should allow people with disabilities to obtain materials or services and use the facilities
without assistance. This should include access to general purpose and specialized classrooms, public assembly
spaces (such as libraries, gymnasiums, auditoriums), nurse's office, main office, and restroom facilities. Services
include drinking fountains, telephones, and other amenities.
Is there an accessible interior route as specified above?
Yes
No
103. Additional Information on Accessibility
If the building lacks accessible interior or exterior routes:
103a. Cost of improvements needed to provide accessible exterior and interior routes as specified above $:
(No Response)
103b. Comments:
(No Response)
06/02/2016 10:46 AM Page 34 of 40
![Page 81: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/81.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyEnvironment/Comfort/Health
ENVIRONMENT/COMFORT/HEALTH
104. General Appearance
104a. Overall Rating:
Good
Fair
Poor
104b. Comments:
(No Response)
105. Cleanliness
105a. Overall Rating:
Good
Fair
Poor
105b. Comments:
(No Response)
106. Are there walk off mats; grills in the entryway?
Yes
No
107. Is there noise in classrooms from HVAC units, traffic, etc. that may impact education?
Yes
No
108. Lighting Quality:
108a. Types of lighting in general purpose classrooms (check all that apply):
Daylight
Flourescent-not full spectrum
Flourescent full spectrum
Incandescent
Other (describe)
108b. Are there blinds in the classroom to prevent glare?
Yes
No
108c. Overall Rating:
Good
Fair
Poor
108d. Comments:
(No Response)
06/02/2016 10:46 AM Page 35 of 40
![Page 82: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/82.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyEnvironment/Comfort/Health
109. Evidence of Vermin
109a. Is there evidence of active infestations of...(check all that apply)?
Rodents
Wood-boring or Wood-eating Insects
Cockroaches
Other Vermin
None
06/02/2016 10:46 AM Page 36 of 40
![Page 83: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/83.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
Indoor Air Quality
110. Mold
110a. Is there visible mold or moldy odors?
Yes
No
110c. Are any surfaces constructed of any of the following materials?
Paper-faced or gypsum products
Cellulose products (typically ceiling tiles)
110d. Estimated cost of necessary improvements $:
(No Response)
110d. Comments:
(No Response)
111. Humidity/Moisture
111a. Overall rating of humidity/moisture condition in building:
Good
Fair
Poor
111b. Are any of the following found in/or around classroom areas (check all that apply)?
Active leaks in roof
Active leaks in plumbing
Moisture condensation
Visible stains or water damage
None
111c. Are any of the following found in/or around other areas (check all that apply)?
Active leaks in roof
Active leaks in plumbing
Moisture condensation
Visible stains or water damage
None
112. Ventilation: fresh air intake locations, air filters, etc.
112a. Are fresh air intakes near the bus loading, truck delivery, or garbage storage/disposal areas?
Yes
No
112b. Is there accumulated dirt, dust or debris around fresh air intakes?
Yes
No
112c. Are fresh air intakes free of blockage?
Yes
No
06/02/2016 10:46 AM Page 37 of 40
![Page 84: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/84.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
112d. Is accumulated dirt, dust or debris in ductwork?
Yes
No
112e. Are dampers functioning as designed?
Yes
No
112f. Condition of air filters:
Good
Fair
Poor
112g. Outside air is adequate for occupant load:
Yes
No
112h. Rating of ventilation/indoor air quality:
Good
Fair
Poor
112i. Comments:
(No Response)
113. Indoor Air Quality (IAQ) Plan
113a. Does the school district use EPA's Tools for Schools program?
Yes
No
113b. If No, is some other IAQ management plan used?
Yes
No
113c. Has the District assigned IAQ responsibilities to a designated individual?
Yes
No
113c.1 If Yes, what is their job title?
(No Response)
114. Does the school practice IPM?
Yes
No
114a. Is vegetation kept one foot away from the building?
Yes
No
114b. Are crevices and holes in walls, floors and pavement sealed or eliminated?
Yes
No
06/02/2016 10:46 AM Page 38 of 40
![Page 85: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/85.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
114c. Is there a certified pesticide applicator on staff?
Yes
No
114d. Are pesticides used in the building?
Yes
No
114d.1 If Yes, how are they typically applied?
Spot treatment
Area wide treatments
114e. Are pesticides used on the grounds?
Yes
No
114e.1 If Yes, was an emergency exemption granted by the Board of Education?
Yes
No
115. Does the school have a passive radon mitigation system installed (was built with radon resistant features)?
Yes
No
115a. Has the facility been tested for the presence of radon?
Yes
No
115b. Were any of the results of the test greater than or equal to 4 picocuries per liter (pCi/L)?
Yes
No
115c. If Yes, did the school take steps to mitigate the elevated radon levels?
Yes, active mitigation system installed
Yes, passive mitigation system made active
Yes, ventilation controls (HVAC) adjusted
Yes, other (describe)
No action taken
115c.1 Describe other actions taken to mitigate elevated radon levels:
(No Response)
06/02/2016 10:46 AM Page 39 of 40
![Page 86: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/86.jpg)
RYE CITY SD Status Date: 03/16/2016 03:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyAmerican Red Cross
American Red Cross Shelter
116. American Red Cross Shelter
Yes
No
06/02/2016 10:46 AM Page 40 of 40
![Page 87: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/87.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
Building Information1. Name of School District:
RYE CITY SD
2. SED District 8-Digit BEDS Code:
661800010000
3. Building Name:
Osborne Portable#2
4. SED 4-Digit Facility Code:
0016
5. Survey Inspection Date:
09/14/2015
6. Building 911 Address:
10 Osborne Road
7. City:
rye
8. Zip Code:
10580
9. Certificate of Occupancy Status:
A - Annual
T - Temporary
N - None
10. Certificate of Occupancy Expiration Date:
09/01/2016
Building Age, Gross Square Footage and Maintenance Staff
11. Year of Original Building:
2003
12. Gross square ft. of Building as currently configured:
1,700
13. Number of Floors:
1
14. How many full-time and part-time custodians are employed at the school (or work in the building)?
Count Employees
Full-time custodians:0
Part-time custodians:0
Totals:
Building Ownership and Occupancy Status06/02/2016 10:33 AM Page 1 of 40
![Page 88: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/88.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
15. Building Ownership (check one):
Owned and used by district
Owned by District and leased to non-district entity
Owned by District, part used by district, part leased to non-district entity
Owned by non-district entity and leased to district
16. For which of the following purposes is the building currently used? (check all that apply)
Used for student instructional purposes
Used for district administration
Used for other district purposes
Used by other organization(s)
Building Users
17. How many students were registered to receive instruction in this building as of October 1, 2014? (If none,
enter "0") and skip to "Program Spaces" section. (Do not include evening class students)
20
18. Of these registered students, how many receive most of their instruction in:
Quantity
18a. Permanent instructional spaces (i.e., regularclassrooms) 20
18b. Temporary instructional spaces (i.e., portable ordemountable classrooms) attached to the building 0
18c. Non-instructional spaces used as instructionalspaces 0
18c.1 If the answer is greater than zero, which types of non-instructional spaces were being used for instructional
purposes on October 1, 2014? (check all that apply)
Cafeteria
Gymnasium
Administrative Spaces
Library
Lobby
Stairwell
Storage space
Other (please describe)
None
19. Grades Housed:
k-5
20. For how many instructional days during the 2013-14 school year (July 1 through June 30, was the building
closed due to facilities failures, system malfunctions, structural problems, fire, etc? (if none, enter "0")
0
21. Is the building used for instructional purposes in the summer?
Yes
No
22. Have there been renovations or construction in the building during the past 12 months?
Yes
No
06/02/2016 10:33 AM Page 2 of 40
![Page 89: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/89.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
23. Was major construction/renovation work since 2010 conducted when school was in session?
Yes
No
06/02/2016 10:33 AM Page 3 of 40
![Page 90: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/90.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyProgram Spaces
Program Spaces
24. Number of instructional classrooms:
2
25. Gross square footage of all instructional classrooms (combined):
1,700.00
26. Other spaces provided: (check all that apply)
a. N/A (none)
b. Administration
c. Art
d. Audio Visual
e. Auditorium
f. Cafeteria
g. Computer Room
h. Guidance
i. Gymnasium
j. Health Office
k. Home & Careers
l. Kitchen
m. Large Group Instruction
n. Library
o. Multipurpose Rooms
p. Music
q. Pre-K
r. Remedial Rooms
s. Resource Rooms
t. Science Labs
u. Special Education
v. Swimming Pool
w. Teacher Resource
x. Technology/Shop
y. Other (please describe)
26y. Describe other spaces
(No Response)
Space Adequacy
27. Rating of space adequacy:
Good
Fair
Poor
27a. Enter comments:
(No Response)
28. Estimated capital construction expenses anticipated for this building through 2020-2021 school year
excluding maintenance (to be answered after the building inspection is complete) $
21,000.00
29. Overall building rating (to be answered after the building inspection is complete)
Excellent
Satisfactory
Unsatisfactory
Poor
30. Was overall building rating established after consultation with health and safety committee?
Yes
No
A/E Information:
31. A/E Firm Name:
KSQ Architects
06/02/2016 10:33 AM Page 4 of 40
![Page 91: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/91.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyProgram Spaces
32. A/E Firm Address:
235 Main Street, Suite 410
White Plains, ny 10601
33. A/E Firm Phone Number:
9146823700
34. E-mail:
35. A/E Name:
Scott Hillje
36. A/E License #:
025556
06/02/2016 10:33 AM Page 5 of 40
![Page 92: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/92.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
Site Utilities
37. Water
Yes
No
37a. Type of Service:
Municipal or Utility provided
Well
Other
37b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
37c. Year of Last Major Reconstruction/Replacement:
2003
37d. Expected Remaining Useful Life (Years):
10
37e. Cost to Reconstruct/Replace $:
(No Response)
37f. Comments:
(No Response)
38. Site Sanitary (H)
Yes
No
38a. Type of Service:
Municipal or utility sewer
Site septic
Other
38b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
38c. Year of Last Major Reconstruction/Replacement:
2003
38d. Expected Remaining Useful Life (Years):
15
06/02/2016 10:33 AM Page 6 of 40
![Page 93: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/93.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
38e. Cost to reconstruct/Replace $:
(No Response)
38f. Comments:
(No Response)
39. Site Gas (H)
Yes
No
40. Site Fuel Oil (H)
Yes
No
41. Site Electrical, Including Exterior Distribution (H)
Yes
No
41a. Service Provider:
Municipal or utility provided
Self-Generated
Other
N/A
41b. Type of Service:
Above Ground
Below Ground
N/A
41c. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
41d. Year of Last Major Reconstruction/Replacement:
2003
41e. Expected Remaining Useful Life (Years):
15
41f. Cost to Reconstruct/Replace $:
(No Response)
41g. Comments:
(No Response)
Stormwater Management
06/02/2016 10:33 AM Page 7 of 40
![Page 94: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/94.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
42. Closed Drainage Pipe Stormwater Management System
42a. Does this facility have a closed pipe system?
Yes
No
43. Open Drainage Pipe Stormwater Management System
43a. Does this facility have an open stormwater system (ditch)?
Yes
No
44. Catch Basins/Drop Inlets/Manholes
44a. Does this facility have catch basins/drop inlets/manholes?
Yes
No
45. Culverts
45a. Does this facility have culverts?
Yes
No
46. Outfalls
46a. Does this facility have outfalls?
Yes
No
47. Infiltration Basins/Chambers
47a. Does this facility have infiltration basins/chambers?
Yes
No
48. Retention Basins
48a. Does this facility have retention basins?
Yes
No
49. Wetponds
49a. Does this facility have wetponds?
Yes
No
06/02/2016 10:33 AM Page 8 of 40
![Page 95: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/95.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
50. Manufactured Stormwater Proprietary Units
50a. Does this facility have proprietary units?
Yes
No
51. Point of Outfall Discharge: (check all that apply)
Municipal storm sewer system
Combined sewer system
Surface Water
On-site recharge
Other (describe)
Not Applicable
52. Outfall Reconnaissance Inventory
Were all stormwater outfalls inspected during dry weather for signs of non-stormwater discharge?
Yes
No
Not Applicable
06/02/2016 10:33 AM Page 9 of 40
![Page 96: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/96.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyOther Site Features
Other Site Features
53. Pavement (Roadways and Parking Lots)
Yes
No
54. Sidewalks
Yes
No
54a. Type: (check all that apply)
Concrete
Asphalt
Paver
Other
54b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
54c. Year of Last Major Reconstruction/Replacement:
2003
54d. Expected Remaining Useful Life (Years):
5
54e. Cost to Reconstruct/Replace $:
(No Response)
54f. Comments:
(No Response)
55. Playgrounds and Playground Equipment
Yes
No
56. Athletic Fields and Play Fields
Yes
No
56f. Does the facility have synthetic turf field(s)
Yes
No
56f.1 If Yes, how many synthetic turf fields?
(No Response)
06/02/2016 10:33 AM Page 10 of 40
![Page 97: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/97.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyOther Site Features
56f.2 Expected Remaining Useful Life of Synthetic Turf Field(s):
(No Response)
56f.3 Type of synthetic turf field infill:
(No Response)
57. Exterior Bleachers / Stadiums
Yes
No
58. Related Structures (such as Press Boxes, Dugouts, Climbing Walls, etc.)
Yes
No
06/02/2016 10:33 AM Page 11 of 40
![Page 98: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/98.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySubstructure
Substructure
59. Foundation (S)
59a. Type (check all that apply):
Reinforced Concrete
Masonry on Concrete Footing
Other
59b. Evidence of structural concerns (check all that apply):
Structural Cracks
Heaving/Jacking
Decay/Corrosion
Water Penetration
Unsupported Ends
Other
None
59c. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
59d. Year of Last Major Reconstruction/Replacement:
2003
59e. Expected Remaining Useful Life (Years):
20
59f. Cost to Reconstruct/Replace $:
(No Response)
59g. Comments:
Not Accessible
06/02/2016 10:33 AM Page 12 of 40
![Page 99: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/99.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
BUILDING ENVELOPE
60. Structural Floors (S)
60a. Type (check all that apply):
Reinforced Concrete Slab on Grade
Concrete/Metal Deck/Metal Joists
Precast Concrete Structural System
Wood Deck on Wood Trusses
Wood Deck on Wood Joists
Concrete Deck on Wood Structure
Other (specify)
60b. Evidence of Structural Concerns with Floor Support System (Beams/Joists/Trusses, etc.) (check all that
apply):
Structural Cracks
Unsupported Ends
Rot/Decay/Corrosion
Deflection
Seriously Damaged/Missing Components
Other Problems
None
60b.1 Describe Other Problems:
(No Response)
60c. Evidence of Structural Concerns with Structural Floor Deck (check all that apply):
Cracks
Deflection
Rot/Decay/Corrosion
None
60d. Overall Condition of Structural Floors:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
60e. Year of Last Major Reconstruction/Replacement:
2003
60f. Expected Remaining Useful Life (Years):
15
60g. Cost to Reconstruct/Replace $:
(No Response)
60h. Comments:
(No Response)
06/02/2016 10:33 AM Page 13 of 40
![Page 100: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/100.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
61. Exterior Walls/Columns (S)
61a. Material (check all that apply):
Concrete
Masonry
Steel
Wood
Other (specify)
61b. Evidence of Structural Concerns with Support System (columns, base plates, connections, etc.) (check all
that apply):
Structural Cracks
Rot/Decay/Corrosion
Other Problems
None
61b.1 Describe Other Problems:
(No Response)
61c. Evidence of Concerns with Exterior Cladding (check all that apply):
Cracks/Gaps
Inadequate Flashing
Efflorescence
Moisture Penetration
Rot/Decay/Corrosion
Other Problems
None
61c.1 Describe Other Problems:
(No Response)
61d. Overall Condition of Exterior Walls/Columns:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
61e. Year of Last Major Reconstruction/Replacement:
2003
61f. Expected Remaining Useful Life (Years):
15
61g. Cost to Reconstruct/Replace $:
(No Response)
61h. Comments:
repair /replace damaged wood foundation skirt boards
06/02/2016 10:33 AM Page 14 of 40
![Page 101: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/101.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
62. Chimneys (S)
Yes
No
63. Parapets (S)
Yes
No
63f. Comments:
(No Response)
64. Exterior Doors
64a. Overall Condition of Exterior Door Units:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
64b. Overall condition of exterior door hardware:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
64c. Do any exterior doors have magnetic locking devices?
Yes
No
64d. Safety/Security features are adequate?
Yes
No
64e. Year of Last Major Reconstruction/Replacement:
2003
64f. Expected Remaining Useful Life (Years):
5
64g. Cost to Reconstruct/Replace $:
(No Response)
64h. Comments:
(No Response)
65. Exterior Steps, Stairs, Ramps (S)
Yes
No
06/02/2016 10:33 AM Page 15 of 40
![Page 102: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/102.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
65a. Overall Condition of Exterior Steps, Stairs and Ramps
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
65b. Year of Last Major Reconstruction/Replacement:
2003
65c. Expected Remaining Useful Life (Years):
7
65d. Cost to Reconstruct/Replace $:
(No Response)
65e. Comments:
Paint steps and railings to extend useful life
66. Fire Escapes (S)
66a. Does This Facility Have One or More Fire Escapes?
Yes
No
67. Windows
Yes
No
67a. Window Material: (check all that apply)
Aluminum
Steel
Vinyl
Solid Wood
Wood w/ External Cladding System
Other
67b. Overall Condition of Windows:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
67c. All Rescue Windows are Operable:
Yes
No
N/A
67d. Year of Last Major Reconstruction/Replacement:
2003
06/02/2016 10:33 AM Page 16 of 40
![Page 103: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/103.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
67e. Expected Remaining Useful Life (Years):
10
67f. Cost to Reconstruct/Replace $:
(No Response)
67g. Comments:
(No Response)
Roof and Skylights (S)
68. Roof and Skylights (S)
Yes
No
68a. Type of roof construction (check all that apply):
Metal deck on metal trusses/joists
Wood deck on wood trusses/joists
Wood deck on metal trusses/joists
Concrete on metal deck on metal trusses/joists
Other (describe below)
68a.1 Other roof construction type:
(No Response)
68b. Type of roofing material (check all that apply):
Single-ply membrane
Built-up
Asphalt shingle
Pre-formed metal
IRMA
Slate
Other (describe below)
68b.1 Other roofing material:
(No Response)
68c. Evidence of structural concerns with roof support system (beams/joists/trusses, etc.) (check all that apply):
Structural cracks
Unsupported ends
Rot/Decay/Corrosion
Deflection
Seriously damaged/missing components
Other concerns (describe)
None
68c.1 Describe other concerns:
(No Response)
06/02/2016 10:33 AM Page 17 of 40
![Page 104: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/104.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
68d. Evidence of structural concerns with roof deck (check all that apply):
Cracks
Deflection
Rot/Decay/Corrosion
None
68e. Does this facility have skylights?
Yes
No
68f. Skylight material (check all that apply):
Plastic
Glass
Other
N/A
68g. Overall condition of skylights:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
68h. Evidence of concerns with roofing, skylights, flashings, and drains (check all that apply):
Failures/Splits/Cracks
Rot/Decay/Corrosion
Inadequate flashing/curbs/pitch pockets
Inadequate or poorly functioning roof drains
Evidence of water penetration/active leaks
Other (specify)
None
68h.1 Specify other concerns:
(No Response)
68i. Overall Condition of Roof and Skylights:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
68j. Year of Last Major Reconstruction/Replacement:
2003
68k. Expected Remaining Useful Life (Years):
5
68l. Cost to Reconstruct/Replace $:
(No Response)
68m. Comments:
(No Response)
06/02/2016 10:33 AM Page 18 of 40
![Page 105: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/105.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
INTERIOR SPACES
69. Interior Bearing Walls and Fire Walls (S)
Yes
No
69a. Overall condition of interior bearing walls and fire walls:
Excellent
Satisfactory
Unsatisfactory
Non-functioning
Critical Failure
69b. Year of Last Major Reconstruction/Replacement:
2003
69c. Expected Remaining Useful Life (Years):
10
69d. Cost to Reconstruct/Replace $:
(No Response)
69e. Comments:
(No Response)
Other Interior Walls
70. Other Interior Walls
Yes
No
70a. Overall condition of other interior walls:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
70b. Year of Last Major Reconstruction/Replacement:
2003
70c. Expected Remaining Useful Life (Years):
10
70d. Cost to Reconstruct/Replace $:
(No Response)
70e. Comments:
(No Response)
Floor Finishes
71. Carpet
Yes
No
06/02/2016 10:33 AM Page 19 of 40
![Page 106: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/106.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
71a. Where located (check all that apply):
Instructional Space
Common Area
71b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
71c. Year of Last Major Reconstruction/Replacement:
2003
71d. Expected Remaining Useful Life (Years):
5
71e. Cost to Reconstruct/Replace $:
(No Response)
71f. Comments:
(No Response)
72. Resilient Tiles or Sheet Flooring
Yes
No
72a. Where located (check all that apply):
Instructional Space
Common Area
72b. Overall condition of resilient tiles or sheet flooring:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
72c. Year of Last Major Reconstruction/Replacement:
2003
72d. Expected Remaining Useful Life (Years):
5
72e. Cost to Reconstruct/Replace $:
(No Response)
72f. Comments:
(No Response)
06/02/2016 10:33 AM Page 20 of 40
![Page 107: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/107.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
73. Hard Flooring (concrete; ceramic tile; stone; etc)
Yes
No
74. Wood Flooring
Yes
No
Ceilings (H)
75. Ceilings (H)
Yes
No
75a. Overall condition of ceilings:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
75b. Year of Last Major Reconstruction/Replacement:
2003
75c. Expected Remaining Useful Life (Years):
10
75d. Cost to Reconstruct/Replace $:
(No Response)
75e. Comments:
(No Response)
Lockers
76. Lockers
Yes
No
76d. Cost to Reconstruct/Replace $:
(No Response)
Interior Doors
77. Interior Doors
Yes
No
06/02/2016 10:33 AM Page 21 of 40
![Page 108: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/108.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
77a. Overall condition of interior door units:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
77b. Overall condition of interior door hardware:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
77c. Year of Last Major Reconstruction/Replacement:
2003
77d. Expected Remaining Useful Life (Years):
10
77e. Cost to Reconstruct/Replace $:
(No Response)
77f. Comments:
(No Response)
Interior Stairs (S)
78. Interior Stairs (S)
Yes
No
Elevator, Lifts and Escalators (H)
79. Elevator, Lift, and Escalators (H)
Yes
No
Interior Electrical Distribution (H)
80. Interior Electrical Distribution (H)
Yes
No
80a. Interior electrical supply meets current needs:
Yes
No
80b. Condition of interior electrical distribution:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:33 AM Page 22 of 40
![Page 109: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/109.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
80c. Year of Last Major Reconstruction/Replacement:
2003
80d. Expected Remaining Useful Life (Years):
15
80e. Cost to Reconstruct/Replace $:
(No Response)
80f. Comments:
(No Response)
Lighting Fixtures
81. Interior Lighting Fixtures
Yes
No
81a. Condition of interior lighting fixtures:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
81b. Year of Last Major Reconstruction/Replacement:
2003
81c. Expected Remaining Useful Life (Years):
10
81d. Cost to Reconstruct/Replace $:
(No Response)
81e. Comments:
(No Response)
Communication Systems (H)
82. Communication Systems (H)
Yes
No
82a. Communication systems are adequate:
Yes
No
82b. Condition of communication systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:33 AM Page 23 of 40
![Page 110: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/110.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
82c. Year of Last Major Reconstruction/Replacement:
2003
82d. Expected Remaining Useful Life (Years):
5
82e. Cost to Replace/Reconstruct $:
(No Response)
82f. Comments:
(No Response)
Swimming Pool and Swimming Pool Systems
83. Swimming Pool and Swimming Pool Systems
Yes
No
06/02/2016 10:33 AM Page 24 of 40
![Page 111: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/111.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
PLUMBING
84. Water Distribution System (H)
Yes
No
84a. Types of pipes (check all that apply):
Iron
Galvanized
Copper
Lead
PVC
Other
84b. Overall condition of water distribution system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
84c. Year of Last Major Reconstruction/Replacement:
2003
84d. Expected Remaining Useful Life (Years):
8
84e. Cost to Reconstruct/Replace $:
(No Response)
84f. Comments:
(No Response)
Plumbing Drainage System (H)
85. Plumbing Drainage System (H)
Yes
No
85a. Types of pipes (check all that apply):
Iron
Galvanized
Copper
Lead
PVC
Other
85b. Overall condition of drainage system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:33 AM Page 25 of 40
![Page 112: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/112.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
85c. Year of Last Major Reconstruction/Replacement:
2003
85d. Expected Remaining Useful Life (Years):
15
85e. Cost to Reconstruct/Replace $:
(No Response)
85f. Comments:
(No Response)
Hot Water Heaters (H)
86. Hot Water Heaters (H)
Yes
No
86a. Type of fuel (check all that apply):
Oil
Natural Gas
Electricity
Propane
Other
86b. Overall condition of hot water heaters:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
86c. Year of Last Major Reconstruction/Replacement:
2003
86d. Expected Remaining Useful Life (Years):
5
86e. Cost to Reconstruct/Replace $:
(No Response)
86f. Comments:
(No Response)
Plumbing Fixtures
87. Plumbing Fixtures
Yes
No
06/02/2016 10:33 AM Page 26 of 40
![Page 113: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/113.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
87a. Overall condition of plumbing fixtures (including toilets, urinals, lavatories, etc):
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
87b. Year of Last Major Reconstruction/Replacement:
2003
87c. Expected Remaining Useful Life (Years):
5
87d. Cost to Reconstruct/Replace $:
(No Response)
87e. Comments:
(No Response)
06/02/2016 10:33 AM Page 27 of 40
![Page 114: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/114.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
HVAC SYSTEMS
88. HVAC Systems Type
88a. Does this building have a central HVAC system?
Yes
No
88b. If yes, what type of technology does it use (check all that apply)?
Constant volume (CV)
Variable air volume (VAV)
Dual-duct or multi-zone
Other (describe below)
N/A
Heat Generating Systems (H)
88b.1 Other central HVAC system technology:
(No Response)
89. Heat Generating Systems (H)
Yes
No
89a. Heat generation source (check all that apply):
Boiler / Hot Water
Boiler / Steam
Furnace / Forced Air
Unit Ventilation
Geothermal
Biomass
Electric
Other (describe below)
89a.1 Other heat generation source:
heated via electric heat coil
89b. Overall condition of heat generating systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
89c. Year of Last Major Reconstruction/Replacement:
2003
89d. Expected Remaining Useful Life (Years):
10
89e. Cost to Reconstruct/Replace $:
(No Response)
06/02/2016 10:33 AM Page 28 of 40
![Page 115: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/115.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
89f. Comments:
(No Response)
Heating Fuel/Energy Systems (H)
90. Heating Fuel / Energy Systems (H)
Yes
No
90a. Overall condition of heating fuel / energy systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
90b. Year of Last Major Reconstruction/Replacement:
2003
90c. Expected Remaining Useful Life (Years):
10
90d. Cost to Reconstruct/Replace $:
(No Response)
90e. Comments:
(No Response)
Cooling/Air Conditioning Generating Systems
91. Cooling / Air-Conditioning Generating Systems
Yes
No
91a. Overall condition of cooling/air-conditioning generating systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
91b. Year of Last Major Reconstruction/Replacement:
2003
91c. Expected Remaining Useful Life (Years):
10
91d. Cost to Reconstruct/Replace $:
(No Response)
91e. Comments:
(No Response)
AIR HANDLING AND VENTILATION EQUIPMENT
06/02/2016 10:33 AM Page 29 of 40
![Page 116: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/116.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
92. Air Handling and Ventilation Equipment: Supply Units, Exhaust Units, Relief/Return Units, etc. (H)
Yes
No
92a. Overall condition of air handling and ventilation systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
92b. Year of Last Major Reconstruction/Replacement:
2003
92c. Expected Remaining Useful Life (Years):
5
92d. Cost to Reconstruct/Replace $:
(No Response)
92e. Comments:
(No Response)
Piped Heating and Cooling Distribution Systems
93. Piped Heating and Cooling Distribution Systems: Piping, Pumps, Radiators, Convectorss, Traps, Insulation,
etc. (H)
Yes
No
Ducted Heating and Cooling Distrbution Systems
94. Ducted Heating and Cooling Distribution Systems: Ductwork, Control Dampers, Fire/Smoke Dampers, VAVs,
Insulation, etc. (H)
Yes
No
94a. Overall condition of ducted heating and cooling distribution systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
94b. Year of Last Major Reconstruction/Replacement:
2003
94c. Expected Remaining Useful Life (Years):
10
94d. Cost to Reconstruct/Replace $:
(No Response)
06/02/2016 10:33 AM Page 30 of 40
![Page 117: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/117.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
94e. Comments:
(No Response)
HVAC Control Systems
95. HVAC Control Systems (H)
Yes
No
95a. Overall condition of control systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
95b. Year of Last Major Reconstruction/Replacement:
2003
95c. Expected Remaining Useful Life (Years):
5
95d. Cost to Reconstruct/Replace $:
(No Response)
95e. Comments:
(No Response)
06/02/2016 10:33 AM Page 31 of 40
![Page 118: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/118.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyFire Safety Systems
Fire Safety Systems
96. Fire Alarm Systems (H)
Yes
No
96a. Overall condition of fire alarm system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
96b. Year of Last Major Reconstruction/Replacement:
2003
96c. Expected Remaining Useful Life (Years):
10
96d. Cost to Reconstruct/Replace $:
(No Response)
96e. Comments:
(No Response)
Smoke Detection System (H)
97. Smoke Detection Systems (H)
Yes
No
97a. Overall condition of smoke detection systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
97b. Year of Last Major Reconstruction/Replacement:
2003
97c. Expected Remaining Useful Life (Years):
10
97d. Cost to Reconstruct/Replace $:
(No Response)
97e. Comments:
(No Response)
Fire Suppression Systems
98. Fire Suppression Systems: Sprinklers, Standpipes, Kitchen Hoods, etc. (H)
Yes
No
06/02/2016 10:33 AM Page 32 of 40
![Page 119: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/119.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyFire Safety Systems
Emergency/Exit Lighting Systems
99. Emergency / Exit Lighting Systems (H)
Yes
No
99a. Overall condition of emergency / exit lighting systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
99b. Year of Last Major Reconstruction/Replacement:
2003
99c. Expected Remaining Useful Life (Years):
10
99d. Cost to Reconstruct/Replace $:
(No Response)
99e. Comments;
provide exterior emergency egress lights
Emergency/Standby Power Systems
100. Emergency or Standby Power System (H)
Yes
No
06/02/2016 10:33 AM Page 33 of 40
![Page 120: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/120.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyAccessibility
ACCESSIBILITY
101. Exterior Accessible Route (H)
People with disabilities should be able to arrive on site, approach the building, and enter as freely as everyone
else. At least one route of travel should be safe and accessible for everyone, including people with disabilities.
This route must include handicapped parking, curb cuts, ramps, and automatic door operators as necessary to
enter the building.
Is there an accessible exterior route as specified above?
Yes
No
102. Interior Accessible Route, Access to Goods and Services, and Restroom Facilities (H)
The layout of the building should allow people with disabilities to obtain materials or services and use the facilities
without assistance. This should include access to general purpose and specialized classrooms, public assembly
spaces (such as libraries, gymnasiums, auditoriums), nurse's office, main office, and restroom facilities. Services
include drinking fountains, telephones, and other amenities.
Is there an accessible interior route as specified above?
Yes
No
103. Additional Information on Accessibility
If the building lacks accessible interior or exterior routes:
103a. Cost of improvements needed to provide accessible exterior and interior routes as specified above $:
(No Response)
103b. Comments:
(No Response)
06/02/2016 10:33 AM Page 34 of 40
![Page 121: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/121.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyEnvironment/Comfort/Health
ENVIRONMENT/COMFORT/HEALTH
104. General Appearance
104a. Overall Rating:
Good
Fair
Poor
104b. Comments:
(No Response)
105. Cleanliness
105a. Overall Rating:
Good
Fair
Poor
105b. Comments:
(No Response)
106. Are there walk off mats; grills in the entryway?
Yes
No
107. Is there noise in classrooms from HVAC units, traffic, etc. that may impact education?
Yes
No
108. Lighting Quality:
108a. Types of lighting in general purpose classrooms (check all that apply):
Daylight
Flourescent-not full spectrum
Flourescent full spectrum
Incandescent
Other (describe)
108b. Are there blinds in the classroom to prevent glare?
Yes
No
108c. Overall Rating:
Good
Fair
Poor
108d. Comments:
(No Response)
06/02/2016 10:33 AM Page 35 of 40
![Page 122: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/122.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyEnvironment/Comfort/Health
109. Evidence of Vermin
109a. Is there evidence of active infestations of...(check all that apply)?
Rodents
Wood-boring or Wood-eating Insects
Cockroaches
Other Vermin
None
06/02/2016 10:33 AM Page 36 of 40
![Page 123: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/123.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
Indoor Air Quality
110. Mold
110a. Is there visible mold or moldy odors?
Yes
No
110c. Are any surfaces constructed of any of the following materials?
Paper-faced or gypsum products
Cellulose products (typically ceiling tiles)
110d. Estimated cost of necessary improvements $:
(No Response)
110d. Comments:
(No Response)
111. Humidity/Moisture
111a. Overall rating of humidity/moisture condition in building:
Good
Fair
Poor
111b. Are any of the following found in/or around classroom areas (check all that apply)?
Active leaks in roof
Active leaks in plumbing
Moisture condensation
Visible stains or water damage
None
111c. Are any of the following found in/or around other areas (check all that apply)?
Active leaks in roof
Active leaks in plumbing
Moisture condensation
Visible stains or water damage
None
112. Ventilation: fresh air intake locations, air filters, etc.
112a. Are fresh air intakes near the bus loading, truck delivery, or garbage storage/disposal areas?
Yes
No
112b. Is there accumulated dirt, dust or debris around fresh air intakes?
Yes
No
112c. Are fresh air intakes free of blockage?
Yes
No
06/02/2016 10:33 AM Page 37 of 40
![Page 124: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/124.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
112d. Is accumulated dirt, dust or debris in ductwork?
Yes
No
112e. Are dampers functioning as designed?
Yes
No
112f. Condition of air filters:
Good
Fair
Poor
112g. Outside air is adequate for occupant load:
Yes
No
112h. Rating of ventilation/indoor air quality:
Good
Fair
Poor
112i. Comments:
(No Response)
113. Indoor Air Quality (IAQ) Plan
113a. Does the school district use EPA's Tools for Schools program?
Yes
No
113b. If No, is some other IAQ management plan used?
Yes
No
113c. Has the District assigned IAQ responsibilities to a designated individual?
Yes
No
113c.1 If Yes, what is their job title?
(No Response)
114. Does the school practice IPM?
Yes
No
114a. Is vegetation kept one foot away from the building?
Yes
No
114b. Are crevices and holes in walls, floors and pavement sealed or eliminated?
Yes
No
06/02/2016 10:33 AM Page 38 of 40
![Page 125: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/125.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
114c. Is there a certified pesticide applicator on staff?
Yes
No
114d. Are pesticides used in the building?
Yes
No
114d.1 If Yes, how are they typically applied?
Spot treatment
Area wide treatments
114e. Are pesticides used on the grounds?
Yes
No
114e.1 If Yes, was an emergency exemption granted by the Board of Education?
Yes
No
115. Does the school have a passive radon mitigation system installed (was built with radon resistant features)?
Yes
No
115a. Has the facility been tested for the presence of radon?
Yes
No
115b. Were any of the results of the test greater than or equal to 4 picocuries per liter (pCi/L)?
Yes
No
115c. If Yes, did the school take steps to mitigate the elevated radon levels?
Yes, active mitigation system installed
Yes, passive mitigation system made active
Yes, ventilation controls (HVAC) adjusted
Yes, other (describe)
No action taken
115c.1 Describe other actions taken to mitigate elevated radon levels:
(No Response)
06/02/2016 10:33 AM Page 39 of 40
![Page 126: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/126.jpg)
RYE CITY SD Status Date: 03/16/2016 04:53 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyAmerican Red Cross
American Red Cross Shelter
116. American Red Cross Shelter
Yes
No
06/02/2016 10:33 AM Page 40 of 40
![Page 127: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/127.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
Building Information1. Name of School District:
RYE CITY SD
2. SED District 8-Digit BEDS Code:
661800010000
3. Building Name:
Milton ES
4. SED 4-Digit Facility Code:
0003
5. Survey Inspection Date:
09/14/2015
6. Building 911 Address:
12 Hewlett Ave
7. City:
Rye
8. Zip Code:
10580
9. Certificate of Occupancy Status:
A - Annual
T - Temporary
N - None
10. Certificate of Occupancy Expiration Date:
09/01/2016
Building Age, Gross Square Footage and Maintenance Staff
11. Year of Original Building:
1900
12. Gross square ft. of Building as currently configured:
69,163
13. Number of Floors:
3
14. How many full-time and part-time custodians are employed at the school (or work in the building)?
Count Employees
Full-time custodians:3
Part-time custodians:1
Totals: 4.00
06/02/2016 10:19 AM Page 1 of 44
![Page 128: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/128.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
Building Information1. Name of School District:
RYE CITY SD
2. SED District 8-Digit BEDS Code:
661800010000
3. Building Name:
Midland ES
4. SED 4-Digit Facility Code:
0003
5. Survey Inspection Date:
09/14/2016
6. Building 911 Address:
312 Midland Avenue
7. City:
Rye
8. Zip Code:
10580
9. Certificate of Occupancy Status:
A - Annual
T - Temporary
N - None
10. Certificate of Occupancy Expiration Date:
09/01/2016
Building Age, Gross Square Footage and Maintenance Staff
11. Year of Original Building:
1951
12. Gross square ft. of Building as currently configured:
50,820
13. Number of Floors:
1
14. How many full-time and part-time custodians are employed at the school (or work in the building)?
Count Employees
Full-time custodians:3
Part-time custodians:1
Totals: 4.00
06/02/2016 10:31 AM Page 1 of 46
![Page 129: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/129.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
Building Ownership and Occupancy Status
15. Building Ownership (check one):
Owned and used by district
Owned by District and leased to non-district entity
Owned by District, part used by district, part leased to non-district entity
Owned by non-district entity and leased to district
16. For which of the following purposes is the building currently used? (check all that apply)
Used for student instructional purposes
Used for district administration
Used for other district purposes
Used by other organization(s)
Building Users
17. How many students were registered to receive instruction in this building as of October 1, 2014? (If none,
enter "0") and skip to "Program Spaces" section. (Do not include evening class students)
584
18. Of these registered students, how many receive most of their instruction in:
Quantity
18a. Permanent instructional spaces (i.e., regularclassrooms) 544
18b. Temporary instructional spaces (i.e., portable ordemountable classrooms) attached to the building 40
18c. Non-instructional spaces used as instructionalspaces 0
18c.1 If the answer is greater than zero, which types of non-instructional spaces were being used for instructional
purposes on October 1, 2014? (check all that apply)
Cafeteria
Gymnasium
Administrative Spaces
Library
Lobby
Stairwell
Storage space
Other (please describe)
None
19. Grades Housed:
k-5
20. For how many instructional days during the 2013-14 school year (July 1 through June 30, was the building
closed due to facilities failures, system malfunctions, structural problems, fire, etc? (if none, enter "0")
0
21. Is the building used for instructional purposes in the summer?
Yes
No
06/02/2016 10:31 AM Page 2 of 46
![Page 130: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/130.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
22. Have there been renovations or construction in the building during the past 12 months?
Yes
No
23. Was major construction/renovation work since 2010 conducted when school was in session?
Yes
No
06/02/2016 10:31 AM Page 3 of 46
![Page 131: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/131.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyProgram Spaces
Program Spaces
24. Number of instructional classrooms:
36
25. Gross square footage of all instructional classrooms (combined):
25,000.00
26. Other spaces provided: (check all that apply)
a. N/A (none)
b. Administration
c. Art
d. Audio Visual
e. Auditorium
f. Cafeteria
g. Computer Room
h. Guidance
i. Gymnasium
j. Health Office
k. Home & Careers
l. Kitchen
m. Large Group Instruction
n. Library
o. Multipurpose Rooms
p. Music
q. Pre-K
r. Remedial Rooms
s. Resource Rooms
t. Science Labs
u. Special Education
v. Swimming Pool
w. Teacher Resource
x. Technology/Shop
y. Other (please describe)
26y. Describe other spaces
(No Response)
Space Adequacy
27. Rating of space adequacy:
Good
Fair
Poor
27a. Enter comments:
(No Response)
28. Estimated capital construction expenses anticipated for this building through 2020-2021 school year
excluding maintenance (to be answered after the building inspection is complete) $
7,979,460.00
29. Overall building rating (to be answered after the building inspection is complete)
Excellent
Satisfactory
Unsatisfactory
Poor
30. Was overall building rating established after consultation with health and safety committee?
Yes
No
A/E Information:
31. A/E Firm Name:
KSQ Architects
06/02/2016 10:31 AM Page 4 of 46
![Page 132: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/132.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyProgram Spaces
32. A/E Firm Address:
235 Main Street, Suite 410
White Plains NY 10601
33. A/E Firm Phone Number:
9146823700
34. E-mail:
35. A/E Name:
Scott Hillje
36. A/E License #:
025556
06/02/2016 10:31 AM Page 5 of 46
![Page 133: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/133.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
Site Utilities
37. Water
Yes
No
37a. Type of Service:
Municipal or Utility provided
Well
Other
37b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
37c. Year of Last Major Reconstruction/Replacement:
1995
37d. Expected Remaining Useful Life (Years):
15
37e. Cost to Reconstruct/Replace $:
(No Response)
37f. Comments:
(No Response)
38. Site Sanitary (H)
Yes
No
38a. Type of Service:
Municipal or utility sewer
Site septic
Other
38b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
38c. Year of Last Major Reconstruction/Replacement:
1995
38d. Expected Remaining Useful Life (Years):
15
06/02/2016 10:31 AM Page 6 of 46
![Page 134: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/134.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
38e. Cost to reconstruct/Replace $:
(No Response)
38f. Comments:
(No Response)
39. Site Gas (H)
Yes
No
39a. Type of gas service:
Natural Gas
Liquid Petroleum
39b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
39c. Year of Last Major Reconstruction/Replacement;
2002
39d. Expected Remaining Useful Life (Years):
25
39e. Cost to Reconstruct/Replace $:
(No Response)
39f. Comments:
(No Response)
40. Site Fuel Oil (H)
Yes
No
40a. Number of Above-Ground Tanks:
1
40a.1 Capacity of Above-Ground Tanks (gallons):
10,000
40b. Number of Below-Ground Tanks:
0
40b.1 Capacity of Below-Ground Tanks (gallons):
0
06/02/2016 10:31 AM Page 7 of 46
![Page 135: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/135.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
40c. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
N/A
40d. Year of Last Major Reconstruction/Replacement:
1995
40e. Expected Remaining Useful Life (Years):
15
40f. Cost to Reconstruct/Replace $:
(No Response)
40g. Comments:
(No Response)
41. Site Electrical, Including Exterior Distribution (H)
Yes
No
41a. Service Provider:
Municipal or utility provided
Self-Generated
Other
N/A
41b. Type of Service:
Above Ground
Below Ground
N/A
41c. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
41d. Year of Last Major Reconstruction/Replacement:
1997
41e. Expected Remaining Useful Life (Years):
10
41f. Cost to Reconstruct/Replace $:
(No Response)
06/02/2016 10:31 AM Page 8 of 46
![Page 136: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/136.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
41g. Comments:
(No Response)
Stormwater Management
42. Closed Drainage Pipe Stormwater Management System
42a. Does this facility have a closed pipe system?
Yes
No
42b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
42c. Year of Last Major Reconstruction/Replacement:
2008
42d. Expected Remaining Useful Life (Years):
25
42e. Cost to Reconstruct/Replace $:
(No Response)
42f. Comments:
(No Response)
43. Open Drainage Pipe Stormwater Management System
43a. Does this facility have an open stormwater system (ditch)?
Yes
No
44. Catch Basins/Drop Inlets/Manholes
44a. Does this facility have catch basins/drop inlets/manholes?
Yes
No
44b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
44c. Year of Last Major Reconstruction/Replacement:
1951
06/02/2016 10:31 AM Page 9 of 46
![Page 137: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/137.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
44d. Expected Remaining Useful Life (Years):
10
44e. Cost to Reconstruct/Replace $:
(No Response)
44f. Comments:
(No Response)
45. Culverts
45a. Does this facility have culverts?
Yes
No
46. Outfalls
46a. Does this facility have outfalls?
Yes
No
47. Infiltration Basins/Chambers
47a. Does this facility have infiltration basins/chambers?
Yes
No
48. Retention Basins
48a. Does this facility have retention basins?
Yes
No
49. Wetponds
49a. Does this facility have wetponds?
Yes
No
50. Manufactured Stormwater Proprietary Units
50a. Does this facility have proprietary units?
Yes
No
06/02/2016 10:31 AM Page 10 of 46
![Page 138: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/138.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
51. Point of Outfall Discharge: (check all that apply)
Municipal storm sewer system
Combined sewer system
Surface Water
On-site recharge
Other (describe)
Not Applicable
52. Outfall Reconnaissance Inventory
Were all stormwater outfalls inspected during dry weather for signs of non-stormwater discharge?
Yes
No
Not Applicable
06/02/2016 10:31 AM Page 11 of 46
![Page 139: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/139.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyOther Site Features
Other Site Features
53. Pavement (Roadways and Parking Lots)
Yes
No
53a. Type: (check all that apply)
Concrete
Asphalt
Gravel
Other
None
53b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
53c. Year of Last Major Reconstruction/Replacement:
1990
53d. Expected Remaining Useful Life (Years):
5
53e. Cost to Reconstruct/Replace $:
(No Response)
53f. Comments:
Recommend future replacement of bus loop.
54. Sidewalks
Yes
No
54a. Type: (check all that apply)
Concrete
Asphalt
Paver
Other
54b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
54c. Year of Last Major Reconstruction/Replacement:
1990
06/02/2016 10:31 AM Page 12 of 46
![Page 140: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/140.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyOther Site Features
54d. Expected Remaining Useful Life (Years):
5
54e. Cost to Reconstruct/Replace $:
(No Response)
54f. Comments:
Recommend future replacement of front entrance/bus loop sidewalks
55. Playgrounds and Playground Equipment
Yes
No
55a. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
55b. Year of Last Major Reconstruction/Replacement:
2002
55c. Expected Remaining Useful Life (Years):
10
55d. Cost to Reconstruct/Replace $:
(No Response)
55e. Comments:
(No Response)
56. Athletic Fields and Play Fields
Yes
No
56a. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
56b. Year of Last Major Reconstruction/Replacement:
1951
56c. Expected Remaining Useful Life (Years):
10
56d. Cost to Reconstruct/Replace $:
(No Response)
06/02/2016 10:31 AM Page 13 of 46
![Page 141: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/141.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyOther Site Features
56e. Comments:
(No Response)
56f. Does the facility have synthetic turf field(s)
Yes
No
56f.1 If Yes, how many synthetic turf fields?
(No Response)
56f.2 Expected Remaining Useful Life of Synthetic Turf Field(s):
(No Response)
56f.3 Type of synthetic turf field infill:
(No Response)
57. Exterior Bleachers / Stadiums
Yes
No
58. Related Structures (such as Press Boxes, Dugouts, Climbing Walls, etc.)
Yes
No
06/02/2016 10:31 AM Page 14 of 46
![Page 142: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/142.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySubstructure
Substructure
59. Foundation (S)
59a. Type (check all that apply):
Reinforced Concrete
Masonry on Concrete Footing
Other
59b. Evidence of structural concerns (check all that apply):
Structural Cracks
Heaving/Jacking
Decay/Corrosion
Water Penetration
Unsupported Ends
Other
None
59c. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
59d. Year of Last Major Reconstruction/Replacement:
1992
59e. Expected Remaining Useful Life (Years):
30
59f. Cost to Reconstruct/Replace $:
(No Response)
59g. Comments:
(No Response)
06/02/2016 10:31 AM Page 15 of 46
![Page 143: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/143.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
BUILDING ENVELOPE
60. Structural Floors (S)
60a. Type (check all that apply):
Reinforced Concrete Slab on Grade
Concrete/Metal Deck/Metal Joists
Precast Concrete Structural System
Wood Deck on Wood Trusses
Wood Deck on Wood Joists
Concrete Deck on Wood Structure
Other (specify)
60b. Evidence of Structural Concerns with Floor Support System (Beams/Joists/Trusses, etc.) (check all that
apply):
Structural Cracks
Unsupported Ends
Rot/Decay/Corrosion
Deflection
Seriously Damaged/Missing Components
Other Problems
None
60b.1 Describe Other Problems:
(No Response)
60c. Evidence of Structural Concerns with Structural Floor Deck (check all that apply):
Cracks
Deflection
Rot/Decay/Corrosion
None
60d. Overall Condition of Structural Floors:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
60e. Year of Last Major Reconstruction/Replacement:
1992
60f. Expected Remaining Useful Life (Years):
30
60g. Cost to Reconstruct/Replace $:
(No Response)
60h. Comments:
(No Response)
06/02/2016 10:31 AM Page 16 of 46
![Page 144: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/144.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
61. Exterior Walls/Columns (S)
61a. Material (check all that apply):
Concrete
Masonry
Steel
Wood
Other (specify)
61b. Evidence of Structural Concerns with Support System (columns, base plates, connections, etc.) (check all
that apply):
Structural Cracks
Rot/Decay/Corrosion
Other Problems
None
61b.1 Describe Other Problems:
(No Response)
61c. Evidence of Concerns with Exterior Cladding (check all that apply):
Cracks/Gaps
Inadequate Flashing
Efflorescence
Moisture Penetration
Rot/Decay/Corrosion
Other Problems
None
61c.1 Describe Other Problems:
(No Response)
61d. Overall Condition of Exterior Walls/Columns:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
61e. Year of Last Major Reconstruction/Replacement:
2002
61f. Expected Remaining Useful Life (Years):
30
61g. Cost to Reconstruct/Replace $:
(No Response)
61h. Comments:
recommend spot brick repointing
06/02/2016 10:31 AM Page 17 of 46
![Page 145: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/145.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
62. Chimneys (S)
Yes
No
62a. Material (check all that apply):
Masonry
Concrete
Metal
Wood
Other
62a.1 Specify other:
(No Response)
62b. Overall Condition of Chimneys:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical failure
62c. Year of Last Major Reconstruction/Replacement:
1951
62.d Expected Remaining Useful Life (Years):
5
62e. Cost to Reconstruct/Replace $:
(No Response)
62f. Comments:
Masonry repointing recommended.
63. Parapets (S)
Yes
No
63a. Construction Type (check all that apply):
Masonry
Concrete
Metal
Wood
Other (specify)
63a.1 Specify Other:
(No Response)
63b. Overall condition of parapets:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:31 AM Page 18 of 46
![Page 146: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/146.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
63c. Year of Last Major Reconstruction/Replacement:
2002
63d. Expected Remaining Useful Life (Years):
25
63e. Cost to Reconstruct/Replace $:
(No Response)
63f. Comments:
(No Response)
64. Exterior Doors
64a. Overall Condition of Exterior Door Units:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
64b. Overall condition of exterior door hardware:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
64c. Do any exterior doors have magnetic locking devices?
Yes
No
64d. Safety/Security features are adequate?
Yes
No
64e. Year of Last Major Reconstruction/Replacement:
1992
64f. Expected Remaining Useful Life (Years):
10
64g. Cost to Reconstruct/Replace $:
(No Response)
64h. Comments:
(No Response)
65. Exterior Steps, Stairs, Ramps (S)
Yes
No
06/02/2016 10:31 AM Page 19 of 46
![Page 147: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/147.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
65a. Overall Condition of Exterior Steps, Stairs and Ramps
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
65b. Year of Last Major Reconstruction/Replacement:
2002
65c. Expected Remaining Useful Life (Years):
20
65d. Cost to Reconstruct/Replace $:
(No Response)
65e. Comments:
Recommend repair of cracked ramp walkway sections
66. Fire Escapes (S)
66a. Does This Facility Have One or More Fire Escapes?
Yes
No
67. Windows
Yes
No
67a. Window Material: (check all that apply)
Aluminum
Steel
Vinyl
Solid Wood
Wood w/ External Cladding System
Other
67b. Overall Condition of Windows:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
67c. All Rescue Windows are Operable:
Yes
No
N/A
67d. Year of Last Major Reconstruction/Replacement:
1995
06/02/2016 10:31 AM Page 20 of 46
![Page 148: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/148.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
67e. Expected Remaining Useful Life (Years):
10
67f. Cost to Reconstruct/Replace $:
(No Response)
67g. Comments:
(No Response)
Roof and Skylights (S)
68. Roof and Skylights (S)
Yes
No
68a. Type of roof construction (check all that apply):
Metal deck on metal trusses/joists
Wood deck on wood trusses/joists
Wood deck on metal trusses/joists
Concrete on metal deck on metal trusses/joists
Other (describe below)
68a.1 Other roof construction type:
(No Response)
68b. Type of roofing material (check all that apply):
Single-ply membrane
Built-up
Asphalt shingle
Pre-formed metal
IRMA
Slate
Other (describe below)
68b.1 Other roofing material:
(No Response)
68c. Evidence of structural concerns with roof support system (beams/joists/trusses, etc.) (check all that apply):
Structural cracks
Unsupported ends
Rot/Decay/Corrosion
Deflection
Seriously damaged/missing components
Other concerns (describe)
None
68c.1 Describe other concerns:
(No Response)
06/02/2016 10:31 AM Page 21 of 46
![Page 149: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/149.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
68d. Evidence of structural concerns with roof deck (check all that apply):
Cracks
Deflection
Rot/Decay/Corrosion
None
68e. Does this facility have skylights?
Yes
No
68f. Skylight material (check all that apply):
Plastic
Glass
Other
N/A
68g. Overall condition of skylights:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
68h. Evidence of concerns with roofing, skylights, flashings, and drains (check all that apply):
Failures/Splits/Cracks
Rot/Decay/Corrosion
Inadequate flashing/curbs/pitch pockets
Inadequate or poorly functioning roof drains
Evidence of water penetration/active leaks
Other (specify)
None
68h.1 Specify other concerns:
(No Response)
68i. Overall Condition of Roof and Skylights:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
68j. Year of Last Major Reconstruction/Replacement:
2007
68k. Expected Remaining Useful Life (Years):
10
68l. Cost to Reconstruct/Replace $:
(No Response)
68m. Comments:
Future replacement of cafeteria roof recommended
06/02/2016 10:31 AM Page 22 of 46
![Page 150: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/150.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
INTERIOR SPACES
69. Interior Bearing Walls and Fire Walls (S)
Yes
No
69a. Overall condition of interior bearing walls and fire walls:
Excellent
Satisfactory
Unsatisfactory
Non-functioning
Critical Failure
69b. Year of Last Major Reconstruction/Replacement:
1995
69c. Expected Remaining Useful Life (Years):
20
69d. Cost to Reconstruct/Replace $:
(No Response)
69e. Comments:
(No Response)
Other Interior Walls
70. Other Interior Walls
Yes
No
70a. Overall condition of other interior walls:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
70b. Year of Last Major Reconstruction/Replacement:
1995
70c. Expected Remaining Useful Life (Years):
20
70d. Cost to Reconstruct/Replace $:
(No Response)
70e. Comments:
(No Response)
Floor Finishes
71. Carpet
Yes
No
06/02/2016 10:31 AM Page 23 of 46
![Page 151: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/151.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
71a. Where located (check all that apply):
Instructional Space
Common Area
71b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
71c. Year of Last Major Reconstruction/Replacement:
1995
71d. Expected Remaining Useful Life (Years):
5
71e. Cost to Reconstruct/Replace $:
(No Response)
71f. Comments:
(No Response)
72. Resilient Tiles or Sheet Flooring
Yes
No
72a. Where located (check all that apply):
Instructional Space
Common Area
72b. Overall condition of resilient tiles or sheet flooring:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
72c. Year of Last Major Reconstruction/Replacement:
1995
72d. Expected Remaining Useful Life (Years):
10
72e. Cost to Reconstruct/Replace $:
(No Response)
72f. Comments:
(No Response)
06/02/2016 10:31 AM Page 24 of 46
![Page 152: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/152.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
73. Hard Flooring (concrete; ceramic tile; stone; etc)
Yes
No
73a. Where located (check all that apply):
Instructional Space
Common Area
73b. Overall condition of hard flooring:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
73c. Year of Last Major Reconstruction/Replacement:
2002
73d. Expected Remaining Useful Life (Years):
15
73e. Cost to Reconstruct/Replace $:
(No Response)
73f. Comments:
(No Response)
74. Wood Flooring
Yes
No
74a. Where located (check all that apply):
Instructional Space
Common Area
74b. Overall condition of wood flooring:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
74c. Year of Last Major Reconstruction/Replacement:
1951
74d. Expected Remaining Useful Life (Years):
10
74e. Cost to Reconstruct/Replace $:
(No Response)
06/02/2016 10:31 AM Page 25 of 46
![Page 153: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/153.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
74f. Comments:
(No Response)
Ceilings (H)
75. Ceilings (H)
Yes
No
75a. Overall condition of ceilings:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
75b. Year of Last Major Reconstruction/Replacement:
2002
75c. Expected Remaining Useful Life (Years):
5
75d. Cost to Reconstruct/Replace $:
(No Response)
75e. Comments:
Repacement of corridor ceilings recommended
Lockers
76. Lockers
Yes
No
76d. Cost to Reconstruct/Replace $:
(No Response)
Interior Doors
77. Interior Doors
Yes
No
77a. Overall condition of interior door units:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:31 AM Page 26 of 46
![Page 154: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/154.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
77b. Overall condition of interior door hardware:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
77c. Year of Last Major Reconstruction/Replacement:
2002
77d. Expected Remaining Useful Life (Years):
10
77e. Cost to Reconstruct/Replace $:
(No Response)
77f. Comments:
(No Response)
Interior Stairs (S)
78. Interior Stairs (S)
Yes
No
Elevator, Lifts and Escalators (H)
79. Elevator, Lift, and Escalators (H)
Yes
No
Interior Electrical Distribution (H)
80. Interior Electrical Distribution (H)
Yes
No
80a. Interior electrical supply meets current needs:
Yes
No
80b. Condition of interior electrical distribution:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
80c. Year of Last Major Reconstruction/Replacement:
1997
80d. Expected Remaining Useful Life (Years):
10
06/02/2016 10:31 AM Page 27 of 46
![Page 155: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/155.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
80e. Cost to Reconstruct/Replace $:
(No Response)
80f. Comments:
Replacement of old panelboards, thermal and megger testing and providing addition convenience outlets is recommended.
Lighting Fixtures
81. Interior Lighting Fixtures
Yes
No
81a. Condition of interior lighting fixtures:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
81b. Year of Last Major Reconstruction/Replacement:
2006
81c. Expected Remaining Useful Life (Years):
10
81d. Cost to Reconstruct/Replace $:
(No Response)
81e. Comments:
Recommend installing occupancy sensors
Communication Systems (H)
82. Communication Systems (H)
Yes
No
82a. Communication systems are adequate:
Yes
No
82b. Condition of communication systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
82c. Year of Last Major Reconstruction/Replacement:
2014
82d. Expected Remaining Useful Life (Years):
10
06/02/2016 10:31 AM Page 28 of 46
![Page 156: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/156.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
82e. Cost to Replace/Reconstruct $:
(No Response)
82f. Comments:
recommend providing additional public address speakers in corridors
Swimming Pool and Swimming Pool Systems
83. Swimming Pool and Swimming Pool Systems
Yes
No
06/02/2016 10:31 AM Page 29 of 46
![Page 157: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/157.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
PLUMBING
84. Water Distribution System (H)
Yes
No
84a. Types of pipes (check all that apply):
Iron
Galvanized
Copper
Lead
PVC
Other
84b. Overall condition of water distribution system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
84c. Year of Last Major Reconstruction/Replacement:
1995
84d. Expected Remaining Useful Life (Years):
10
84e. Cost to Reconstruct/Replace $:
(No Response)
84f. Comments:
(No Response)
Plumbing Drainage System (H)
85. Plumbing Drainage System (H)
Yes
No
85a. Types of pipes (check all that apply):
Iron
Galvanized
Copper
Lead
PVC
Other
85b. Overall condition of drainage system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:31 AM Page 30 of 46
![Page 158: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/158.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
85c. Year of Last Major Reconstruction/Replacement:
2002
85d. Expected Remaining Useful Life (Years):
15
85e. Cost to Reconstruct/Replace $:
(No Response)
85f. Comments:
(No Response)
Hot Water Heaters (H)
86. Hot Water Heaters (H)
Yes
No
86a. Type of fuel (check all that apply):
Oil
Natural Gas
Electricity
Propane
Other
86b. Overall condition of hot water heaters:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
86c. Year of Last Major Reconstruction/Replacement:
2010
86d. Expected Remaining Useful Life (Years):
10
86e. Cost to Reconstruct/Replace $:
(No Response)
86f. Comments:
(No Response)
Plumbing Fixtures
87. Plumbing Fixtures
Yes
No
06/02/2016 10:31 AM Page 31 of 46
![Page 159: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/159.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
87a. Overall condition of plumbing fixtures (including toilets, urinals, lavatories, etc):
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
87b. Year of Last Major Reconstruction/Replacement:
2002
87c. Expected Remaining Useful Life (Years):
5
87d. Cost to Reconstruct/Replace $:
(No Response)
87e. Comments:
(No Response)
06/02/2016 10:31 AM Page 32 of 46
![Page 160: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/160.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
HVAC SYSTEMS
88. HVAC Systems Type
88a. Does this building have a central HVAC system?
Yes
No
88b. If yes, what type of technology does it use (check all that apply)?
Constant volume (CV)
Variable air volume (VAV)
Dual-duct or multi-zone
Other (describe below)
N/A
Heat Generating Systems (H)
88b.1 Other central HVAC system technology:
(No Response)
89. Heat Generating Systems (H)
Yes
No
89a. Heat generation source (check all that apply):
Boiler / Hot Water
Boiler / Steam
Furnace / Forced Air
Unit Ventilation
Geothermal
Biomass
Electric
Other (describe below)
89a.1 Other heat generation source:
(No Response)
89b. Overall condition of heat generating systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
89c. Year of Last Major Reconstruction/Replacement:
2006
89d. Expected Remaining Useful Life (Years):
10
89e. Cost to Reconstruct/Replace $:
(No Response)
06/02/2016 10:31 AM Page 33 of 46
![Page 161: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/161.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
89f. Comments:
(No Response)
Heating Fuel/Energy Systems (H)
90. Heating Fuel / Energy Systems (H)
Yes
No
90a. Overall condition of heating fuel / energy systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
90b. Year of Last Major Reconstruction/Replacement:
2000
90c. Expected Remaining Useful Life (Years):
10
90d. Cost to Reconstruct/Replace $:
(No Response)
90e. Comments:
(No Response)
Cooling/Air Conditioning Generating Systems
91. Cooling / Air-Conditioning Generating Systems
Yes
No
91a. Overall condition of cooling/air-conditioning generating systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
91b. Year of Last Major Reconstruction/Replacement:
2008
91c. Expected Remaining Useful Life (Years):
15
91d. Cost to Reconstruct/Replace $:
(No Response)
91e. Comments:
(No Response)
AIR HANDLING AND VENTILATION EQUIPMENT
06/02/2016 10:31 AM Page 34 of 46
![Page 162: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/162.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
92. Air Handling and Ventilation Equipment: Supply Units, Exhaust Units, Relief/Return Units, etc. (H)
Yes
No
92a. Overall condition of air handling and ventilation systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
92b. Year of Last Major Reconstruction/Replacement:
2002
92c. Expected Remaining Useful Life (Years):
5
92d. Cost to Reconstruct/Replace $:
(No Response)
92e. Comments:
(No Response)
Piped Heating and Cooling Distribution Systems
93. Piped Heating and Cooling Distribution Systems: Piping, Pumps, Radiators, Convectorss, Traps, Insulation,
etc. (H)
Yes
No
93a. Overall condition of piped heating and cooling distribution systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
93b. Year of Last Major Reconstruction/Replacement:
2006
93c. Expected Remaining Useful Life (Years):
10
93d. Cost to Reconstruct/Replace $:
(No Response)
93e. Comments:
(No Response)
Ducted Heating and Cooling Distrbution Systems
06/02/2016 10:31 AM Page 35 of 46
![Page 163: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/163.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
94. Ducted Heating and Cooling Distribution Systems: Ductwork, Control Dampers, Fire/Smoke Dampers, VAVs,
Insulation, etc. (H)
Yes
No
94a. Overall condition of ducted heating and cooling distribution systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
94b. Year of Last Major Reconstruction/Replacement:
2007
94c. Expected Remaining Useful Life (Years):
5
94d. Cost to Reconstruct/Replace $:
(No Response)
94e. Comments:
(No Response)
HVAC Control Systems
95. HVAC Control Systems (H)
Yes
No
95a. Overall condition of control systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
95b. Year of Last Major Reconstruction/Replacement:
2002
95c. Expected Remaining Useful Life (Years):
5
95d. Cost to Reconstruct/Replace $:
(No Response)
95e. Comments:
(No Response)
06/02/2016 10:31 AM Page 36 of 46
![Page 164: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/164.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyFire Safety Systems
Fire Safety Systems
96. Fire Alarm Systems (H)
Yes
No
96a. Overall condition of fire alarm system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
96b. Year of Last Major Reconstruction/Replacement:
2012
96c. Expected Remaining Useful Life (Years):
10
96d. Cost to Reconstruct/Replace $:
(No Response)
96e. Comments:
provide carbon monoxide detectors
Smoke Detection System (H)
97. Smoke Detection Systems (H)
Yes
No
97a. Overall condition of smoke detection systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
97b. Year of Last Major Reconstruction/Replacement:
2006
97c. Expected Remaining Useful Life (Years):
10
97d. Cost to Reconstruct/Replace $:
(No Response)
97e. Comments:
(No Response)
Fire Suppression Systems
98. Fire Suppression Systems: Sprinklers, Standpipes, Kitchen Hoods, etc. (H)
Yes
No
06/02/2016 10:31 AM Page 37 of 46
![Page 165: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/165.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyFire Safety Systems
98a. Overall condition of fire suppression systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
98b. Year of Last Major Reconstruction/Replacement:
2007
98c. Expected Remaining Useful Life (Years):
15
98d. Cost to Reconstruct/Replace $:
(No Response)
98e. Comments:
(No Response)
Emergency/Exit Lighting Systems
99. Emergency / Exit Lighting Systems (H)
Yes
No
99a. Overall condition of emergency / exit lighting systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
99b. Year of Last Major Reconstruction/Replacement:
2006
99c. Expected Remaining Useful Life (Years):
10
99d. Cost to Reconstruct/Replace $:
(No Response)
99e. Comments;
upgrade exterior egress emergency lighting
Emergency/Standby Power Systems
100. Emergency or Standby Power System (H)
Yes
No
06/02/2016 10:31 AM Page 38 of 46
![Page 166: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/166.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyFire Safety Systems
100a. Overall condition of emergency/standby power systems:
Excellent
Satifactory
Unsatisfactory
Non-Functioning
Crtitical Failure
N/A
100b. Year of Last Major Reconstruction/Replacement:
2006
100c. Expected Remaining Useful Life (Years):
10.00
100d. Cost to Reconstruct/Replace $:
(No Response)
100e. Comments:
(No Response)
06/02/2016 10:31 AM Page 39 of 46
![Page 167: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/167.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyAccessibility
ACCESSIBILITY
101. Exterior Accessible Route (H)
People with disabilities should be able to arrive on site, approach the building, and enter as freely as everyone
else. At least one route of travel should be safe and accessible for everyone, including people with disabilities.
This route must include handicapped parking, curb cuts, ramps, and automatic door operators as necessary to
enter the building.
Is there an accessible exterior route as specified above?
Yes
No
102. Interior Accessible Route, Access to Goods and Services, and Restroom Facilities (H)
The layout of the building should allow people with disabilities to obtain materials or services and use the facilities
without assistance. This should include access to general purpose and specialized classrooms, public assembly
spaces (such as libraries, gymnasiums, auditoriums), nurse's office, main office, and restroom facilities. Services
include drinking fountains, telephones, and other amenities.
Is there an accessible interior route as specified above?
Yes
No
103. Additional Information on Accessibility
If the building lacks accessible interior or exterior routes:
103a. Cost of improvements needed to provide accessible exterior and interior routes as specified above $:
(No Response)
103b. Comments:
(No Response)
06/02/2016 10:31 AM Page 40 of 46
![Page 168: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/168.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyEnvironment/Comfort/Health
ENVIRONMENT/COMFORT/HEALTH
104. General Appearance
104a. Overall Rating:
Good
Fair
Poor
104b. Comments:
(No Response)
105. Cleanliness
105a. Overall Rating:
Good
Fair
Poor
105b. Comments:
(No Response)
106. Are there walk off mats; grills in the entryway?
Yes
No
106a. If yes: at least 6 feet long?
Yes
No
107. Is there noise in classrooms from HVAC units, traffic, etc. that may impact education?
Yes
No
108. Lighting Quality:
108a. Types of lighting in general purpose classrooms (check all that apply):
Daylight
Flourescent-not full spectrum
Flourescent full spectrum
Incandescent
Other (describe)
108b. Are there blinds in the classroom to prevent glare?
Yes
No
108c. Overall Rating:
Good
Fair
Poor
06/02/2016 10:31 AM Page 41 of 46
![Page 169: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/169.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyEnvironment/Comfort/Health
108d. Comments:
(No Response)
109. Evidence of Vermin
109a. Is there evidence of active infestations of...(check all that apply)?
Rodents
Wood-boring or Wood-eating Insects
Cockroaches
Other Vermin
None
06/02/2016 10:31 AM Page 42 of 46
![Page 170: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/170.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
Indoor Air Quality
110. Mold
110a. Is there visible mold or moldy odors?
Yes
No
110c. Are any surfaces constructed of any of the following materials?
Paper-faced or gypsum products
Cellulose products (typically ceiling tiles)
110d. Estimated cost of necessary improvements $:
(No Response)
110d. Comments:
(No Response)
111. Humidity/Moisture
111a. Overall rating of humidity/moisture condition in building:
Good
Fair
Poor
111b. Are any of the following found in/or around classroom areas (check all that apply)?
Active leaks in roof
Active leaks in plumbing
Moisture condensation
Visible stains or water damage
None
111c. Are any of the following found in/or around other areas (check all that apply)?
Active leaks in roof
Active leaks in plumbing
Moisture condensation
Visible stains or water damage
None
112. Ventilation: fresh air intake locations, air filters, etc.
112a. Are fresh air intakes near the bus loading, truck delivery, or garbage storage/disposal areas?
Yes
No
112b. Is there accumulated dirt, dust or debris around fresh air intakes?
Yes
No
112c. Are fresh air intakes free of blockage?
Yes
No
06/02/2016 10:31 AM Page 43 of 46
![Page 171: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/171.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
112d. Is accumulated dirt, dust or debris in ductwork?
Yes
No
112e. Are dampers functioning as designed?
Yes
No
112f. Condition of air filters:
Good
Fair
Poor
112g. Outside air is adequate for occupant load:
Yes
No
112h. Rating of ventilation/indoor air quality:
Good
Fair
Poor
112i. Comments:
(No Response)
113. Indoor Air Quality (IAQ) Plan
113a. Does the school district use EPA's Tools for Schools program?
Yes
No
113b. If No, is some other IAQ management plan used?
Yes
No
113c. Has the District assigned IAQ responsibilities to a designated individual?
Yes
No
113c.1 If Yes, what is their job title?
(No Response)
114. Does the school practice IPM?
Yes
No
114a. Is vegetation kept one foot away from the building?
Yes
No
114b. Are crevices and holes in walls, floors and pavement sealed or eliminated?
Yes
No
06/02/2016 10:31 AM Page 44 of 46
![Page 172: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/172.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
114c. Is there a certified pesticide applicator on staff?
Yes
No
114d. Are pesticides used in the building?
Yes
No
114d.1 If Yes, how are they typically applied?
Spot treatment
Area wide treatments
114e. Are pesticides used on the grounds?
Yes
No
114e.1 If Yes, was an emergency exemption granted by the Board of Education?
Yes
No
115. Does the school have a passive radon mitigation system installed (was built with radon resistant features)?
Yes
No
115a. Has the facility been tested for the presence of radon?
Yes
No
115b. Were any of the results of the test greater than or equal to 4 picocuries per liter (pCi/L)?
Yes
No
115c. If Yes, did the school take steps to mitigate the elevated radon levels?
Yes, active mitigation system installed
Yes, passive mitigation system made active
Yes, ventilation controls (HVAC) adjusted
Yes, other (describe)
No action taken
115c.1 Describe other actions taken to mitigate elevated radon levels:
(No Response)
06/02/2016 10:31 AM Page 45 of 46
![Page 173: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/173.jpg)
RYE CITY SD Status Date: 03/14/2016 05:21 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyAmerican Red Cross
American Red Cross Shelter
116. American Red Cross Shelter
Yes
No
06/02/2016 10:31 AM Page 46 of 46
![Page 174: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/174.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
Building Ownership and Occupancy Status
15. Building Ownership (check one):
Owned and used by district
Owned by District and leased to non-district entity
Owned by District, part used by district, part leased to non-district entity
Owned by non-district entity and leased to district
16. For which of the following purposes is the building currently used? (check all that apply)
Used for student instructional purposes
Used for district administration
Used for other district purposes
Used by other organization(s)
Building Users
17. How many students were registered to receive instruction in this building as of October 1, 2014? (If none,
enter "0") and skip to "Program Spaces" section. (Do not include evening class students)
404
18. Of these registered students, how many receive most of their instruction in:
Quantity
18a. Permanent instructional spaces (i.e., regularclassrooms) 404
18b. Temporary instructional spaces (i.e., portable ordemountable classrooms) attached to the building 0
18c. Non-instructional spaces used as instructionalspaces 0
18c.1 If the answer is greater than zero, which types of non-instructional spaces were being used for instructional
purposes on October 1, 2014? (check all that apply)
Cafeteria
Gymnasium
Administrative Spaces
Library
Lobby
Stairwell
Storage space
Other (please describe)
None
19. Grades Housed:
k-5
20. For how many instructional days during the 2013-14 school year (July 1 through June 30, was the building
closed due to facilities failures, system malfunctions, structural problems, fire, etc? (if none, enter "0")
0
21. Is the building used for instructional purposes in the summer?
Yes
No
06/02/2016 10:19 AM Page 2 of 44
![Page 175: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/175.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
22. Have there been renovations or construction in the building during the past 12 months?
Yes
No
23. Was major construction/renovation work since 2010 conducted when school was in session?
Yes
No
06/02/2016 10:19 AM Page 3 of 44
![Page 176: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/176.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyProgram Spaces
Program Spaces
24. Number of instructional classrooms:
28
25. Gross square footage of all instructional classrooms (combined):
28,050.00
26. Other spaces provided: (check all that apply)
a. N/A (none)
b. Administration
c. Art
d. Audio Visual
e. Auditorium
f. Cafeteria
g. Computer Room
h. Guidance
i. Gymnasium
j. Health Office
k. Home & Careers
l. Kitchen
m. Large Group Instruction
n. Library
o. Multipurpose Rooms
p. Music
q. Pre-K
r. Remedial Rooms
s. Resource Rooms
t. Science Labs
u. Special Education
v. Swimming Pool
w. Teacher Resource
x. Technology/Shop
y. Other (please describe)
26y. Describe other spaces
(No Response)
Space Adequacy
27. Rating of space adequacy:
Good
Fair
Poor
27a. Enter comments:
(No Response)
28. Estimated capital construction expenses anticipated for this building through 2020-2021 school year
excluding maintenance (to be answered after the building inspection is complete) $
808,560.00
29. Overall building rating (to be answered after the building inspection is complete)
Excellent
Satisfactory
Unsatisfactory
Poor
30. Was overall building rating established after consultation with health and safety committee?
Yes
No
A/E Information:
31. A/E Firm Name:
KSQ Architects
06/02/2016 10:19 AM Page 4 of 44
![Page 177: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/177.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyProgram Spaces
32. A/E Firm Address:
235 Main Street, suite 410
White Plains NY 10601
33. A/E Firm Phone Number:
9146823700
34. E-mail:
35. A/E Name:
Scott Hillje
36. A/E License #:
025556
06/02/2016 10:19 AM Page 5 of 44
![Page 178: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/178.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
Site Utilities
37. Water
Yes
No
37a. Type of Service:
Municipal or Utility provided
Well
Other
37b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
37c. Year of Last Major Reconstruction/Replacement:
2007
37d. Expected Remaining Useful Life (Years):
10
37e. Cost to Reconstruct/Replace $:
(No Response)
37f. Comments:
(No Response)
38. Site Sanitary (H)
Yes
No
38a. Type of Service:
Municipal or utility sewer
Site septic
Other
38b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
38c. Year of Last Major Reconstruction/Replacement:
2007
38d. Expected Remaining Useful Life (Years):
10
06/02/2016 10:19 AM Page 6 of 44
![Page 179: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/179.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
38e. Cost to reconstruct/Replace $:
(No Response)
38f. Comments:
(No Response)
39. Site Gas (H)
Yes
No
39a. Type of gas service:
Natural Gas
Liquid Petroleum
39b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
39c. Year of Last Major Reconstruction/Replacement;
2007
39d. Expected Remaining Useful Life (Years):
10
39e. Cost to Reconstruct/Replace $:
(No Response)
39f. Comments:
(No Response)
40. Site Fuel Oil (H)
Yes
No
41. Site Electrical, Including Exterior Distribution (H)
Yes
No
41a. Service Provider:
Municipal or utility provided
Self-Generated
Other
N/A
41b. Type of Service:
Above Ground
Below Ground
N/A
06/02/2016 10:19 AM Page 7 of 44
![Page 180: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/180.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
41c. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
41d. Year of Last Major Reconstruction/Replacement:
2000
41e. Expected Remaining Useful Life (Years):
10
41f. Cost to Reconstruct/Replace $:
(No Response)
41g. Comments:
(No Response)
Stormwater Management
42. Closed Drainage Pipe Stormwater Management System
42a. Does this facility have a closed pipe system?
Yes
No
42b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
42c. Year of Last Major Reconstruction/Replacement:
2006
42d. Expected Remaining Useful Life (Years):
35
42e. Cost to Reconstruct/Replace $:
(No Response)
42f. Comments:
(No Response)
43. Open Drainage Pipe Stormwater Management System
43a. Does this facility have an open stormwater system (ditch)?
Yes
No
06/02/2016 10:19 AM Page 8 of 44
![Page 181: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/181.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
44. Catch Basins/Drop Inlets/Manholes
44a. Does this facility have catch basins/drop inlets/manholes?
Yes
No
44b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
44c. Year of Last Major Reconstruction/Replacement:
2006
44d. Expected Remaining Useful Life (Years):
25
44e. Cost to Reconstruct/Replace $:
(No Response)
44f. Comments:
(No Response)
45. Culverts
45a. Does this facility have culverts?
Yes
No
46. Outfalls
46a. Does this facility have outfalls?
Yes
No
47. Infiltration Basins/Chambers
47a. Does this facility have infiltration basins/chambers?
Yes
No
48. Retention Basins
48a. Does this facility have retention basins?
Yes
No
06/02/2016 10:19 AM Page 9 of 44
![Page 182: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/182.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
49. Wetponds
49a. Does this facility have wetponds?
Yes
No
50. Manufactured Stormwater Proprietary Units
50a. Does this facility have proprietary units?
Yes
No
51. Point of Outfall Discharge: (check all that apply)
Municipal storm sewer system
Combined sewer system
Surface Water
On-site recharge
Other (describe)
Not Applicable
52. Outfall Reconnaissance Inventory
Were all stormwater outfalls inspected during dry weather for signs of non-stormwater discharge?
Yes
No
Not Applicable
06/02/2016 10:19 AM Page 10 of 44
![Page 183: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/183.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyOther Site Features
Other Site Features
53. Pavement (Roadways and Parking Lots)
Yes
No
53a. Type: (check all that apply)
Concrete
Asphalt
Gravel
Other
None
53b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
53c. Year of Last Major Reconstruction/Replacement:
2006
53d. Expected Remaining Useful Life (Years):
15
53e. Cost to Reconstruct/Replace $:
(No Response)
53f. Comments:
(No Response)
54. Sidewalks
Yes
No
54a. Type: (check all that apply)
Concrete
Asphalt
Paver
Other
54b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
54c. Year of Last Major Reconstruction/Replacement:
2006
06/02/2016 10:19 AM Page 11 of 44
![Page 184: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/184.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyOther Site Features
54d. Expected Remaining Useful Life (Years):
20
54e. Cost to Reconstruct/Replace $:
0.00
54f. Comments:
(No Response)
55. Playgrounds and Playground Equipment
Yes
No
55a. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
55b. Year of Last Major Reconstruction/Replacement:
2006
55c. Expected Remaining Useful Life (Years):
15
55d. Cost to Reconstruct/Replace $:
(No Response)
55e. Comments:
(No Response)
56. Athletic Fields and Play Fields
Yes
No
56a. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
56b. Year of Last Major Reconstruction/Replacement:
2006
56c. Expected Remaining Useful Life (Years):
15
56d. Cost to Reconstruct/Replace $:
(No Response)
06/02/2016 10:19 AM Page 12 of 44
![Page 185: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/185.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyOther Site Features
56e. Comments:
(No Response)
56f. Does the facility have synthetic turf field(s)
Yes
No
56f.1 If Yes, how many synthetic turf fields?
(No Response)
56f.2 Expected Remaining Useful Life of Synthetic Turf Field(s):
(No Response)
56f.3 Type of synthetic turf field infill:
(No Response)
57. Exterior Bleachers / Stadiums
Yes
No
58. Related Structures (such as Press Boxes, Dugouts, Climbing Walls, etc.)
Yes
No
06/02/2016 10:19 AM Page 13 of 44
![Page 186: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/186.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySubstructure
Substructure
59. Foundation (S)
59a. Type (check all that apply):
Reinforced Concrete
Masonry on Concrete Footing
Other
59b. Evidence of structural concerns (check all that apply):
Structural Cracks
Heaving/Jacking
Decay/Corrosion
Water Penetration
Unsupported Ends
Other
None
59c. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
59d. Year of Last Major Reconstruction/Replacement:
2006
59e. Expected Remaining Useful Life (Years):
40
59f. Cost to Reconstruct/Replace $:
(No Response)
59g. Comments:
(No Response)
06/02/2016 10:19 AM Page 14 of 44
![Page 187: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/187.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
BUILDING ENVELOPE
60. Structural Floors (S)
60a. Type (check all that apply):
Reinforced Concrete Slab on Grade
Concrete/Metal Deck/Metal Joists
Precast Concrete Structural System
Wood Deck on Wood Trusses
Wood Deck on Wood Joists
Concrete Deck on Wood Structure
Other (specify)
60a.1 Specify Other Type:
wood deck on metal trusses
60b. Evidence of Structural Concerns with Floor Support System (Beams/Joists/Trusses, etc.) (check all that
apply):
Structural Cracks
Unsupported Ends
Rot/Decay/Corrosion
Deflection
Seriously Damaged/Missing Components
Other Problems
None
60b.1 Describe Other Problems:
(No Response)
60c. Evidence of Structural Concerns with Structural Floor Deck (check all that apply):
Cracks
Deflection
Rot/Decay/Corrosion
None
60d. Overall Condition of Structural Floors:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
60e. Year of Last Major Reconstruction/Replacement:
2006
60f. Expected Remaining Useful Life (Years):
25
60g. Cost to Reconstruct/Replace $:
(No Response)
60h. Comments:
(No Response)
06/02/2016 10:19 AM Page 15 of 44
![Page 188: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/188.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
61. Exterior Walls/Columns (S)
61a. Material (check all that apply):
Concrete
Masonry
Steel
Wood
Other (specify)
61b. Evidence of Structural Concerns with Support System (columns, base plates, connections, etc.) (check all
that apply):
Structural Cracks
Rot/Decay/Corrosion
Other Problems
None
61b.1 Describe Other Problems:
(No Response)
61c. Evidence of Concerns with Exterior Cladding (check all that apply):
Cracks/Gaps
Inadequate Flashing
Efflorescence
Moisture Penetration
Rot/Decay/Corrosion
Other Problems
None
61c.1 Describe Other Problems:
(No Response)
61d. Overall Condition of Exterior Walls/Columns:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
61e. Year of Last Major Reconstruction/Replacement:
2006
61f. Expected Remaining Useful Life (Years):
25
61g. Cost to Reconstruct/Replace $:
(No Response)
61h. Comments:
recommend spot masonry repointing.
06/02/2016 10:19 AM Page 16 of 44
![Page 189: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/189.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
62. Chimneys (S)
Yes
No
62a. Material (check all that apply):
Masonry
Concrete
Metal
Wood
Other
62a.1 Specify other:
(No Response)
62b. Overall Condition of Chimneys:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical failure
62c. Year of Last Major Reconstruction/Replacement:
2006
62.d Expected Remaining Useful Life (Years):
25
62e. Cost to Reconstruct/Replace $:
(No Response)
62f. Comments:
(No Response)
63. Parapets (S)
Yes
No
63a. Construction Type (check all that apply):
Masonry
Concrete
Metal
Wood
Other (specify)
63a.1 Specify Other:
(No Response)
63b. Overall condition of parapets:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:19 AM Page 17 of 44
![Page 190: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/190.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
63c. Year of Last Major Reconstruction/Replacement:
2006
63d. Expected Remaining Useful Life (Years):
25
63e. Cost to Reconstruct/Replace $:
(No Response)
63f. Comments:
(No Response)
64. Exterior Doors
64a. Overall Condition of Exterior Door Units:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
64b. Overall condition of exterior door hardware:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
64c. Do any exterior doors have magnetic locking devices?
Yes
No
64d. Safety/Security features are adequate?
Yes
No
64e. Year of Last Major Reconstruction/Replacement:
2006
64f. Expected Remaining Useful Life (Years):
10
64g. Cost to Reconstruct/Replace $:
(No Response)
64h. Comments:
recommend Replacing Auditorium doors
65. Exterior Steps, Stairs, Ramps (S)
Yes
No
06/02/2016 10:19 AM Page 18 of 44
![Page 191: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/191.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
65a. Overall Condition of Exterior Steps, Stairs and Ramps
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
65b. Year of Last Major Reconstruction/Replacement:
2006
65c. Expected Remaining Useful Life (Years):
20
65d. Cost to Reconstruct/Replace $:
(No Response)
65e. Comments:
(No Response)
66. Fire Escapes (S)
66a. Does This Facility Have One or More Fire Escapes?
Yes
No
67. Windows
Yes
No
67a. Window Material: (check all that apply)
Aluminum
Steel
Vinyl
Solid Wood
Wood w/ External Cladding System
Other
67b. Overall Condition of Windows:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
67c. All Rescue Windows are Operable:
Yes
No
N/A
67d. Year of Last Major Reconstruction/Replacement:
2006
06/02/2016 10:19 AM Page 19 of 44
![Page 192: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/192.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
67e. Expected Remaining Useful Life (Years):
25
67f. Cost to Reconstruct/Replace $:
(No Response)
67g. Comments:
recommend adjustment of rescue windows to improve operation
Roof and Skylights (S)
68. Roof and Skylights (S)
Yes
No
68a. Type of roof construction (check all that apply):
Metal deck on metal trusses/joists
Wood deck on wood trusses/joists
Wood deck on metal trusses/joists
Concrete on metal deck on metal trusses/joists
Other (describe below)
68a.1 Other roof construction type:
(No Response)
68b. Type of roofing material (check all that apply):
Single-ply membrane
Built-up
Asphalt shingle
Pre-formed metal
IRMA
Slate
Other (describe below)
68b.1 Other roofing material:
(No Response)
68c. Evidence of structural concerns with roof support system (beams/joists/trusses, etc.) (check all that apply):
Structural cracks
Unsupported ends
Rot/Decay/Corrosion
Deflection
Seriously damaged/missing components
Other concerns (describe)
None
68c.1 Describe other concerns:
(No Response)
06/02/2016 10:19 AM Page 20 of 44
![Page 193: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/193.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
68d. Evidence of structural concerns with roof deck (check all that apply):
Cracks
Deflection
Rot/Decay/Corrosion
None
68e. Does this facility have skylights?
Yes
No
68f. Skylight material (check all that apply):
Plastic
Glass
Other
N/A
68g. Overall condition of skylights:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
68h. Evidence of concerns with roofing, skylights, flashings, and drains (check all that apply):
Failures/Splits/Cracks
Rot/Decay/Corrosion
Inadequate flashing/curbs/pitch pockets
Inadequate or poorly functioning roof drains
Evidence of water penetration/active leaks
Other (specify)
None
68h.1 Specify other concerns:
(No Response)
68i. Overall Condition of Roof and Skylights:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
68j. Year of Last Major Reconstruction/Replacement:
2006
68k. Expected Remaining Useful Life (Years):
15
68l. Cost to Reconstruct/Replace $:
(No Response)
68m. Comments:
(No Response)
06/02/2016 10:19 AM Page 21 of 44
![Page 194: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/194.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
INTERIOR SPACES
69. Interior Bearing Walls and Fire Walls (S)
Yes
No
69a. Overall condition of interior bearing walls and fire walls:
Excellent
Satisfactory
Unsatisfactory
Non-functioning
Critical Failure
69b. Year of Last Major Reconstruction/Replacement:
2006
69c. Expected Remaining Useful Life (Years):
20
69d. Cost to Reconstruct/Replace $:
(No Response)
69e. Comments:
(No Response)
Other Interior Walls
70. Other Interior Walls
Yes
No
70a. Overall condition of other interior walls:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
70b. Year of Last Major Reconstruction/Replacement:
2006
70c. Expected Remaining Useful Life (Years):
20
70d. Cost to Reconstruct/Replace $:
(No Response)
70e. Comments:
(No Response)
Floor Finishes
71. Carpet
Yes
No
06/02/2016 10:19 AM Page 22 of 44
![Page 195: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/195.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
71a. Where located (check all that apply):
Instructional Space
Common Area
71b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
71c. Year of Last Major Reconstruction/Replacement:
2006
71d. Expected Remaining Useful Life (Years):
10
71e. Cost to Reconstruct/Replace $:
(No Response)
71f. Comments:
(No Response)
72. Resilient Tiles or Sheet Flooring
Yes
No
72a. Where located (check all that apply):
Instructional Space
Common Area
72b. Overall condition of resilient tiles or sheet flooring:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
72c. Year of Last Major Reconstruction/Replacement:
2006
72d. Expected Remaining Useful Life (Years):
20
72e. Cost to Reconstruct/Replace $:
(No Response)
72f. Comments:
(No Response)
06/02/2016 10:19 AM Page 23 of 44
![Page 196: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/196.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
73. Hard Flooring (concrete; ceramic tile; stone; etc)
Yes
No
73a. Where located (check all that apply):
Instructional Space
Common Area
73b. Overall condition of hard flooring:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
73c. Year of Last Major Reconstruction/Replacement:
2006
73d. Expected Remaining Useful Life (Years):
20
73e. Cost to Reconstruct/Replace $:
(No Response)
73f. Comments:
(No Response)
74. Wood Flooring
Yes
No
74a. Where located (check all that apply):
Instructional Space
Common Area
74b. Overall condition of wood flooring:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
74c. Year of Last Major Reconstruction/Replacement:
2006
74d. Expected Remaining Useful Life (Years):
20
74e. Cost to Reconstruct/Replace $:
(No Response)
06/02/2016 10:19 AM Page 24 of 44
![Page 197: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/197.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
74f. Comments:
(No Response)
Ceilings (H)
75. Ceilings (H)
Yes
No
75a. Overall condition of ceilings:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
75b. Year of Last Major Reconstruction/Replacement:
2006
75c. Expected Remaining Useful Life (Years):
20
75d. Cost to Reconstruct/Replace $:
(No Response)
75e. Comments:
(No Response)
Lockers
76. Lockers
Yes
No
76d. Cost to Reconstruct/Replace $:
(No Response)
Interior Doors
77. Interior Doors
Yes
No
77a. Overall condition of interior door units:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:19 AM Page 25 of 44
![Page 198: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/198.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
77b. Overall condition of interior door hardware:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
77c. Year of Last Major Reconstruction/Replacement:
2006
77d. Expected Remaining Useful Life (Years):
20
77e. Cost to Reconstruct/Replace $:
(No Response)
77f. Comments:
Replace Gymatorium doors
Interior Stairs (S)
78. Interior Stairs (S)
Yes
No
78a. Overall condition of interior stairs:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
78b. Year of Last Major Reconstruction/Replacement:
2006
78c. Expected Remaining Useful Life (Years):
20
78d. Cost to Reconstruct/Replace $:
(No Response)
78e. Comments:
(No Response)
Elevator, Lifts and Escalators (H)
79. Elevator, Lift, and Escalators (H)
Yes
No
06/02/2016 10:19 AM Page 26 of 44
![Page 199: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/199.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
79a. Overall condition of elevators, lifts, escalators:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
79b. Year of Last Major Reconstruction/Replacement:
2006
79c. Expected Remaining Useful Life (Years):
20
79d. Cost to Reconstruct/Replace $
(No Response)
79e. Comments:
(No Response)
Interior Electrical Distribution (H)
80. Interior Electrical Distribution (H)
Yes
No
80a. Interior electrical supply meets current needs:
Yes
No
80b. Condition of interior electrical distribution:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
80c. Year of Last Major Reconstruction/Replacement:
2006
80d. Expected Remaining Useful Life (Years):
10
80e. Cost to Reconstruct/Replace $:
(No Response)
80f. Comments:
(No Response)
Lighting Fixtures
81. Interior Lighting Fixtures
Yes
No
06/02/2016 10:19 AM Page 27 of 44
![Page 200: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/200.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
81a. Condition of interior lighting fixtures:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
81b. Year of Last Major Reconstruction/Replacement:
2006
81c. Expected Remaining Useful Life (Years):
10
81d. Cost to Reconstruct/Replace $:
(No Response)
81e. Comments:
(No Response)
Communication Systems (H)
82. Communication Systems (H)
Yes
No
82a. Communication systems are adequate:
Yes
No
82b. Condition of communication systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
82c. Year of Last Major Reconstruction/Replacement:
2006
82d. Expected Remaining Useful Life (Years):
10
82e. Cost to Replace/Reconstruct $:
(No Response)
82f. Comments:
(No Response)
Swimming Pool and Swimming Pool Systems
83. Swimming Pool and Swimming Pool Systems
Yes
No
06/02/2016 10:19 AM Page 28 of 44
![Page 201: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/201.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
PLUMBING
84. Water Distribution System (H)
Yes
No
84a. Types of pipes (check all that apply):
Iron
Galvanized
Copper
Lead
PVC
Other
84b. Overall condition of water distribution system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
84c. Year of Last Major Reconstruction/Replacement:
2007
84d. Expected Remaining Useful Life (Years):
10
84e. Cost to Reconstruct/Replace $:
(No Response)
84f. Comments:
(No Response)
Plumbing Drainage System (H)
85. Plumbing Drainage System (H)
Yes
No
85a. Types of pipes (check all that apply):
Iron
Galvanized
Copper
Lead
PVC
Other
85b. Overall condition of drainage system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:19 AM Page 29 of 44
![Page 202: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/202.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
85c. Year of Last Major Reconstruction/Replacement:
2007
85d. Expected Remaining Useful Life (Years):
10
85e. Cost to Reconstruct/Replace $:
(No Response)
85f. Comments:
(No Response)
Hot Water Heaters (H)
86. Hot Water Heaters (H)
Yes
No
86a. Type of fuel (check all that apply):
Oil
Natural Gas
Electricity
Propane
Other
86b. Overall condition of hot water heaters:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
86c. Year of Last Major Reconstruction/Replacement:
2007
86d. Expected Remaining Useful Life (Years):
10
86e. Cost to Reconstruct/Replace $:
(No Response)
86f. Comments:
(No Response)
Plumbing Fixtures
87. Plumbing Fixtures
Yes
No
06/02/2016 10:19 AM Page 30 of 44
![Page 203: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/203.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
87a. Overall condition of plumbing fixtures (including toilets, urinals, lavatories, etc):
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
87b. Year of Last Major Reconstruction/Replacement:
2007
87c. Expected Remaining Useful Life (Years):
10
87d. Cost to Reconstruct/Replace $:
(No Response)
87e. Comments:
(No Response)
06/02/2016 10:19 AM Page 31 of 44
![Page 204: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/204.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
HVAC SYSTEMS
88. HVAC Systems Type
88a. Does this building have a central HVAC system?
Yes
No
Heat Generating Systems (H)
88b.1 Other central HVAC system technology:
(No Response)
89. Heat Generating Systems (H)
Yes
No
89a. Heat generation source (check all that apply):
Boiler / Hot Water
Boiler / Steam
Furnace / Forced Air
Unit Ventilation
Geothermal
Biomass
Electric
Other (describe below)
89a.1 Other heat generation source:
(No Response)
89b. Overall condition of heat generating systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
89c. Year of Last Major Reconstruction/Replacement:
1991
89d. Expected Remaining Useful Life (Years):
5
89e. Cost to Reconstruct/Replace $:
(No Response)
89f. Comments:
(No Response)
Heating Fuel/Energy Systems (H)
90. Heating Fuel / Energy Systems (H)
Yes
No
06/02/2016 10:19 AM Page 32 of 44
![Page 205: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/205.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
90a. Overall condition of heating fuel / energy systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
90b. Year of Last Major Reconstruction/Replacement:
2007
90c. Expected Remaining Useful Life (Years):
10
90d. Cost to Reconstruct/Replace $:
(No Response)
90e. Comments:
(No Response)
Cooling/Air Conditioning Generating Systems
91. Cooling / Air-Conditioning Generating Systems
Yes
No
91a. Overall condition of cooling/air-conditioning generating systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
91b. Year of Last Major Reconstruction/Replacement:
2007
91c. Expected Remaining Useful Life (Years):
10
91d. Cost to Reconstruct/Replace $:
(No Response)
91e. Comments:
(No Response)
AIR HANDLING AND VENTILATION EQUIPMENT
92. Air Handling and Ventilation Equipment: Supply Units, Exhaust Units, Relief/Return Units, etc. (H)
Yes
No
06/02/2016 10:19 AM Page 33 of 44
![Page 206: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/206.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
92a. Overall condition of air handling and ventilation systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
92b. Year of Last Major Reconstruction/Replacement:
2007
92c. Expected Remaining Useful Life (Years):
5
92d. Cost to Reconstruct/Replace $:
(No Response)
92e. Comments:
(No Response)
Piped Heating and Cooling Distribution Systems
93. Piped Heating and Cooling Distribution Systems: Piping, Pumps, Radiators, Convectorss, Traps, Insulation,
etc. (H)
Yes
No
93a. Overall condition of piped heating and cooling distribution systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
93b. Year of Last Major Reconstruction/Replacement:
2007
93c. Expected Remaining Useful Life (Years):
10
93d. Cost to Reconstruct/Replace $:
(No Response)
93e. Comments:
(No Response)
Ducted Heating and Cooling Distrbution Systems
94. Ducted Heating and Cooling Distribution Systems: Ductwork, Control Dampers, Fire/Smoke Dampers, VAVs,
Insulation, etc. (H)
Yes
No
06/02/2016 10:19 AM Page 34 of 44
![Page 207: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/207.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
94a. Overall condition of ducted heating and cooling distribution systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
94b. Year of Last Major Reconstruction/Replacement:
2007
94c. Expected Remaining Useful Life (Years):
10
94d. Cost to Reconstruct/Replace $:
(No Response)
94e. Comments:
(No Response)
HVAC Control Systems
95. HVAC Control Systems (H)
Yes
No
95a. Overall condition of control systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
95b. Year of Last Major Reconstruction/Replacement:
2007
95c. Expected Remaining Useful Life (Years):
10
95d. Cost to Reconstruct/Replace $:
(No Response)
95e. Comments:
(No Response)
06/02/2016 10:19 AM Page 35 of 44
![Page 208: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/208.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyFire Safety Systems
Fire Safety Systems
96. Fire Alarm Systems (H)
Yes
No
96a. Overall condition of fire alarm system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
96b. Year of Last Major Reconstruction/Replacement:
2000
96c. Expected Remaining Useful Life (Years):
10
96d. Cost to Reconstruct/Replace $:
(No Response)
96e. Comments:
Provide carbon monoxide detector
Smoke Detection System (H)
97. Smoke Detection Systems (H)
Yes
No
97a. Overall condition of smoke detection systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
97b. Year of Last Major Reconstruction/Replacement:
2000
97c. Expected Remaining Useful Life (Years):
10
97d. Cost to Reconstruct/Replace $:
(No Response)
97e. Comments:
(No Response)
Fire Suppression Systems
98. Fire Suppression Systems: Sprinklers, Standpipes, Kitchen Hoods, etc. (H)
Yes
No
06/02/2016 10:19 AM Page 36 of 44
![Page 209: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/209.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyFire Safety Systems
Emergency/Exit Lighting Systems
99. Emergency / Exit Lighting Systems (H)
Yes
No
99a. Overall condition of emergency / exit lighting systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
99b. Year of Last Major Reconstruction/Replacement:
2000
99c. Expected Remaining Useful Life (Years):
10
99d. Cost to Reconstruct/Replace $:
(No Response)
99e. Comments;
Provide exterior egress emergency lighting
Emergency/Standby Power Systems
100. Emergency or Standby Power System (H)
Yes
No
100a. Overall condition of emergency/standby power systems:
Excellent
Satifactory
Unsatisfactory
Non-Functioning
Crtitical Failure
N/A
100b. Year of Last Major Reconstruction/Replacement:
2006
100c. Expected Remaining Useful Life (Years):
10.00
100d. Cost to Reconstruct/Replace $:
(No Response)
100e. Comments:
(No Response)
06/02/2016 10:19 AM Page 37 of 44
![Page 210: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/210.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyAccessibility
ACCESSIBILITY
101. Exterior Accessible Route (H)
People with disabilities should be able to arrive on site, approach the building, and enter as freely as everyone
else. At least one route of travel should be safe and accessible for everyone, including people with disabilities.
This route must include handicapped parking, curb cuts, ramps, and automatic door operators as necessary to
enter the building.
Is there an accessible exterior route as specified above?
Yes
No
102. Interior Accessible Route, Access to Goods and Services, and Restroom Facilities (H)
The layout of the building should allow people with disabilities to obtain materials or services and use the facilities
without assistance. This should include access to general purpose and specialized classrooms, public assembly
spaces (such as libraries, gymnasiums, auditoriums), nurse's office, main office, and restroom facilities. Services
include drinking fountains, telephones, and other amenities.
Is there an accessible interior route as specified above?
Yes
No
103. Additional Information on Accessibility
If the building lacks accessible interior or exterior routes:
103a. Cost of improvements needed to provide accessible exterior and interior routes as specified above $:
(No Response)
103b. Comments:
(No Response)
06/02/2016 10:19 AM Page 38 of 44
![Page 211: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/211.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyEnvironment/Comfort/Health
ENVIRONMENT/COMFORT/HEALTH
104. General Appearance
104a. Overall Rating:
Good
Fair
Poor
104b. Comments:
(No Response)
105. Cleanliness
105a. Overall Rating:
Good
Fair
Poor
105b. Comments:
(No Response)
106. Are there walk off mats; grills in the entryway?
Yes
No
106a. If yes: at least 6 feet long?
Yes
No
107. Is there noise in classrooms from HVAC units, traffic, etc. that may impact education?
Yes
No
108. Lighting Quality:
108a. Types of lighting in general purpose classrooms (check all that apply):
Daylight
Flourescent-not full spectrum
Flourescent full spectrum
Incandescent
Other (describe)
108b. Are there blinds in the classroom to prevent glare?
Yes
No
108c. Overall Rating:
Good
Fair
Poor
06/02/2016 10:19 AM Page 39 of 44
![Page 212: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/212.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyEnvironment/Comfort/Health
108d. Comments:
(No Response)
109. Evidence of Vermin
109a. Is there evidence of active infestations of...(check all that apply)?
Rodents
Wood-boring or Wood-eating Insects
Cockroaches
Other Vermin
None
06/02/2016 10:19 AM Page 40 of 44
![Page 213: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/213.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
Indoor Air Quality
110. Mold
110a. Is there visible mold or moldy odors?
Yes
No
110c. Are any surfaces constructed of any of the following materials?
Paper-faced or gypsum products
Cellulose products (typically ceiling tiles)
110d. Estimated cost of necessary improvements $:
(No Response)
110d. Comments:
(No Response)
111. Humidity/Moisture
111a. Overall rating of humidity/moisture condition in building:
Good
Fair
Poor
111b. Are any of the following found in/or around classroom areas (check all that apply)?
Active leaks in roof
Active leaks in plumbing
Moisture condensation
Visible stains or water damage
None
111c. Are any of the following found in/or around other areas (check all that apply)?
Active leaks in roof
Active leaks in plumbing
Moisture condensation
Visible stains or water damage
None
112. Ventilation: fresh air intake locations, air filters, etc.
112a. Are fresh air intakes near the bus loading, truck delivery, or garbage storage/disposal areas?
Yes
No
112b. Is there accumulated dirt, dust or debris around fresh air intakes?
Yes
No
112c. Are fresh air intakes free of blockage?
Yes
No
06/02/2016 10:19 AM Page 41 of 44
![Page 214: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/214.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
112d. Is accumulated dirt, dust or debris in ductwork?
Yes
No
112e. Are dampers functioning as designed?
Yes
No
112f. Condition of air filters:
Good
Fair
Poor
112g. Outside air is adequate for occupant load:
Yes
No
112h. Rating of ventilation/indoor air quality:
Good
Fair
Poor
112i. Comments:
(No Response)
113. Indoor Air Quality (IAQ) Plan
113a. Does the school district use EPA's Tools for Schools program?
Yes
No
113b. If No, is some other IAQ management plan used?
Yes
No
113c. Has the District assigned IAQ responsibilities to a designated individual?
Yes
No
113c.1 If Yes, what is their job title?
(No Response)
114. Does the school practice IPM?
Yes
No
114a. Is vegetation kept one foot away from the building?
Yes
No
114b. Are crevices and holes in walls, floors and pavement sealed or eliminated?
Yes
No
06/02/2016 10:19 AM Page 42 of 44
![Page 215: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/215.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
114c. Is there a certified pesticide applicator on staff?
Yes
No
114d. Are pesticides used in the building?
Yes
No
114d.1 If Yes, how are they typically applied?
Spot treatment
Area wide treatments
114e. Are pesticides used on the grounds?
Yes
No
114e.1 If Yes, was an emergency exemption granted by the Board of Education?
Yes
No
115. Does the school have a passive radon mitigation system installed (was built with radon resistant features)?
Yes
No
115a. Has the facility been tested for the presence of radon?
Yes
No
115b. Were any of the results of the test greater than or equal to 4 picocuries per liter (pCi/L)?
Yes
No
115c. If Yes, did the school take steps to mitigate the elevated radon levels?
Yes, active mitigation system installed
Yes, passive mitigation system made active
Yes, ventilation controls (HVAC) adjusted
Yes, other (describe)
No action taken
115c.1 Describe other actions taken to mitigate elevated radon levels:
(No Response)
06/02/2016 10:19 AM Page 43 of 44
![Page 216: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/216.jpg)
RYE CITY SD Status Date: 03/11/2016 11:26 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyAmerican Red Cross
American Red Cross Shelter
116. American Red Cross Shelter
Yes
No
06/02/2016 10:19 AM Page 44 of 44
![Page 217: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/217.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
Building Information1. Name of School District:
RYE CITY SD
2. SED District 8-Digit BEDS Code:
661800010000
3. Building Name:
Midland portable-1
4. SED 4-Digit Facility Code:
0013
5. Survey Inspection Date:
09/14/2015
6. Building 911 Address:
312 Midland Ave
7. City:
Rye
8. Zip Code:
10580
9. Certificate of Occupancy Status:
A - Annual
T - Temporary
N - None
10. Certificate of Occupancy Expiration Date:
09/01/2016
Building Age, Gross Square Footage and Maintenance Staff
11. Year of Original Building:
2001
12. Gross square ft. of Building as currently configured:
1,700
13. Number of Floors:
1
14. How many full-time and part-time custodians are employed at the school (or work in the building)?
Count Employees
Full-time custodians:0
Part-time custodians:0
Totals:
Building Ownership and Occupancy Status06/02/2016 10:38 AM Page 1 of 40
![Page 218: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/218.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
15. Building Ownership (check one):
Owned and used by district
Owned by District and leased to non-district entity
Owned by District, part used by district, part leased to non-district entity
Owned by non-district entity and leased to district
16. For which of the following purposes is the building currently used? (check all that apply)
Used for student instructional purposes
Used for district administration
Used for other district purposes
Used by other organization(s)
Building Users
17. How many students were registered to receive instruction in this building as of October 1, 2014? (If none,
enter "0") and skip to "Program Spaces" section. (Do not include evening class students)
20
18. Of these registered students, how many receive most of their instruction in:
Quantity
18a. Permanent instructional spaces (i.e., regularclassrooms) 20
18b. Temporary instructional spaces (i.e., portable ordemountable classrooms) attached to the building 0
18c. Non-instructional spaces used as instructionalspaces 0
18c.1 If the answer is greater than zero, which types of non-instructional spaces were being used for instructional
purposes on October 1, 2014? (check all that apply)
Cafeteria
Gymnasium
Administrative Spaces
Library
Lobby
Stairwell
Storage space
Other (please describe)
None
19. Grades Housed:
k-5
20. For how many instructional days during the 2013-14 school year (July 1 through June 30, was the building
closed due to facilities failures, system malfunctions, structural problems, fire, etc? (if none, enter "0")
0
21. Is the building used for instructional purposes in the summer?
Yes
No
22. Have there been renovations or construction in the building during the past 12 months?
Yes
No
06/02/2016 10:38 AM Page 2 of 40
![Page 219: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/219.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
23. Was major construction/renovation work since 2010 conducted when school was in session?
Yes
No
06/02/2016 10:38 AM Page 3 of 40
![Page 220: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/220.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyProgram Spaces
Program Spaces
24. Number of instructional classrooms:
2
25. Gross square footage of all instructional classrooms (combined):
1,700.00
26. Other spaces provided: (check all that apply)
a. N/A (none)
b. Administration
c. Art
d. Audio Visual
e. Auditorium
f. Cafeteria
g. Computer Room
h. Guidance
i. Gymnasium
j. Health Office
k. Home & Careers
l. Kitchen
m. Large Group Instruction
n. Library
o. Multipurpose Rooms
p. Music
q. Pre-K
r. Remedial Rooms
s. Resource Rooms
t. Science Labs
u. Special Education
v. Swimming Pool
w. Teacher Resource
x. Technology/Shop
y. Other (please describe)
26y. Describe other spaces
(No Response)
Space Adequacy
27. Rating of space adequacy:
Good
Fair
Poor
27a. Enter comments:
(No Response)
28. Estimated capital construction expenses anticipated for this building through 2020-2021 school year
excluding maintenance (to be answered after the building inspection is complete) $
38,750.00
29. Overall building rating (to be answered after the building inspection is complete)
Excellent
Satisfactory
Unsatisfactory
Poor
30. Was overall building rating established after consultation with health and safety committee?
Yes
No
A/E Information:
31. A/E Firm Name:
KSQ Architects
06/02/2016 10:38 AM Page 4 of 40
![Page 221: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/221.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyProgram Spaces
32. A/E Firm Address:
235 Main Street, Suite 410
White Plains, NY 10601
33. A/E Firm Phone Number:
9146823700
34. E-mail:
35. A/E Name:
Scott Hillje
36. A/E License #:
025556
06/02/2016 10:38 AM Page 5 of 40
![Page 222: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/222.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
Site Utilities
37. Water
Yes
No
37a. Type of Service:
Municipal or Utility provided
Well
Other
37b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
37c. Year of Last Major Reconstruction/Replacement:
2000
37d. Expected Remaining Useful Life (Years):
10
37e. Cost to Reconstruct/Replace $:
(No Response)
37f. Comments:
(No Response)
38. Site Sanitary (H)
Yes
No
38a. Type of Service:
Municipal or utility sewer
Site septic
Other
38b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
38c. Year of Last Major Reconstruction/Replacement:
2000
38d. Expected Remaining Useful Life (Years):
15
06/02/2016 10:38 AM Page 6 of 40
![Page 223: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/223.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
38e. Cost to reconstruct/Replace $:
(No Response)
38f. Comments:
(No Response)
39. Site Gas (H)
Yes
No
40. Site Fuel Oil (H)
Yes
No
41. Site Electrical, Including Exterior Distribution (H)
Yes
No
41a. Service Provider:
Municipal or utility provided
Self-Generated
Other
N/A
41b. Type of Service:
Above Ground
Below Ground
N/A
41c. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
41d. Year of Last Major Reconstruction/Replacement:
2000
41e. Expected Remaining Useful Life (Years):
15
41f. Cost to Reconstruct/Replace $:
(No Response)
41g. Comments:
(No Response)
Stormwater Management
06/02/2016 10:38 AM Page 7 of 40
![Page 224: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/224.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
42. Closed Drainage Pipe Stormwater Management System
42a. Does this facility have a closed pipe system?
Yes
No
43. Open Drainage Pipe Stormwater Management System
43a. Does this facility have an open stormwater system (ditch)?
Yes
No
44. Catch Basins/Drop Inlets/Manholes
44a. Does this facility have catch basins/drop inlets/manholes?
Yes
No
45. Culverts
45a. Does this facility have culverts?
Yes
No
46. Outfalls
46a. Does this facility have outfalls?
Yes
No
47. Infiltration Basins/Chambers
47a. Does this facility have infiltration basins/chambers?
Yes
No
48. Retention Basins
48a. Does this facility have retention basins?
Yes
No
49. Wetponds
49a. Does this facility have wetponds?
Yes
No
06/02/2016 10:38 AM Page 8 of 40
![Page 225: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/225.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
50. Manufactured Stormwater Proprietary Units
50a. Does this facility have proprietary units?
Yes
No
51. Point of Outfall Discharge: (check all that apply)
Municipal storm sewer system
Combined sewer system
Surface Water
On-site recharge
Other (describe)
Not Applicable
52. Outfall Reconnaissance Inventory
Were all stormwater outfalls inspected during dry weather for signs of non-stormwater discharge?
Yes
No
Not Applicable
06/02/2016 10:38 AM Page 9 of 40
![Page 226: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/226.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyOther Site Features
Other Site Features
53. Pavement (Roadways and Parking Lots)
Yes
No
54. Sidewalks
Yes
No
54a. Type: (check all that apply)
Concrete
Asphalt
Paver
Other
54b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
54c. Year of Last Major Reconstruction/Replacement:
2001
54d. Expected Remaining Useful Life (Years):
5
54e. Cost to Reconstruct/Replace $:
(No Response)
54f. Comments:
(No Response)
55. Playgrounds and Playground Equipment
Yes
No
56. Athletic Fields and Play Fields
Yes
No
56f. Does the facility have synthetic turf field(s)
Yes
No
56f.1 If Yes, how many synthetic turf fields?
(No Response)
06/02/2016 10:38 AM Page 10 of 40
![Page 227: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/227.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyOther Site Features
56f.2 Expected Remaining Useful Life of Synthetic Turf Field(s):
(No Response)
56f.3 Type of synthetic turf field infill:
(No Response)
57. Exterior Bleachers / Stadiums
Yes
No
58. Related Structures (such as Press Boxes, Dugouts, Climbing Walls, etc.)
Yes
No
06/02/2016 10:38 AM Page 11 of 40
![Page 228: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/228.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySubstructure
Substructure
59. Foundation (S)
59a. Type (check all that apply):
Reinforced Concrete
Masonry on Concrete Footing
Other
59b. Evidence of structural concerns (check all that apply):
Structural Cracks
Heaving/Jacking
Decay/Corrosion
Water Penetration
Unsupported Ends
Other
None
59c. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
59d. Year of Last Major Reconstruction/Replacement:
2000
59e. Expected Remaining Useful Life (Years):
20
59f. Cost to Reconstruct/Replace $:
(No Response)
59g. Comments:
not accessible
06/02/2016 10:38 AM Page 12 of 40
![Page 229: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/229.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
BUILDING ENVELOPE
60. Structural Floors (S)
60a. Type (check all that apply):
Reinforced Concrete Slab on Grade
Concrete/Metal Deck/Metal Joists
Precast Concrete Structural System
Wood Deck on Wood Trusses
Wood Deck on Wood Joists
Concrete Deck on Wood Structure
Other (specify)
60b. Evidence of Structural Concerns with Floor Support System (Beams/Joists/Trusses, etc.) (check all that
apply):
Structural Cracks
Unsupported Ends
Rot/Decay/Corrosion
Deflection
Seriously Damaged/Missing Components
Other Problems
None
60b.1 Describe Other Problems:
(No Response)
60c. Evidence of Structural Concerns with Structural Floor Deck (check all that apply):
Cracks
Deflection
Rot/Decay/Corrosion
None
60d. Overall Condition of Structural Floors:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
60e. Year of Last Major Reconstruction/Replacement:
2000
60f. Expected Remaining Useful Life (Years):
15
60g. Cost to Reconstruct/Replace $:
(No Response)
60h. Comments:
(No Response)
06/02/2016 10:38 AM Page 13 of 40
![Page 230: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/230.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
61. Exterior Walls/Columns (S)
61a. Material (check all that apply):
Concrete
Masonry
Steel
Wood
Other (specify)
61b. Evidence of Structural Concerns with Support System (columns, base plates, connections, etc.) (check all
that apply):
Structural Cracks
Rot/Decay/Corrosion
Other Problems
None
61b.1 Describe Other Problems:
(No Response)
61c. Evidence of Concerns with Exterior Cladding (check all that apply):
Cracks/Gaps
Inadequate Flashing
Efflorescence
Moisture Penetration
Rot/Decay/Corrosion
Other Problems
None
61c.1 Describe Other Problems:
(No Response)
61d. Overall Condition of Exterior Walls/Columns:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
61e. Year of Last Major Reconstruction/Replacement:
2000
61f. Expected Remaining Useful Life (Years):
15
61g. Cost to Reconstruct/Replace $:
(No Response)
61h. Comments:
(No Response)
06/02/2016 10:38 AM Page 14 of 40
![Page 231: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/231.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
62. Chimneys (S)
Yes
No
63. Parapets (S)
Yes
No
63f. Comments:
(No Response)
64. Exterior Doors
64a. Overall Condition of Exterior Door Units:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
64b. Overall condition of exterior door hardware:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
64c. Do any exterior doors have magnetic locking devices?
Yes
No
64d. Safety/Security features are adequate?
Yes
No
64e. Year of Last Major Reconstruction/Replacement:
2000
64f. Expected Remaining Useful Life (Years):
5
64g. Cost to Reconstruct/Replace $:
(No Response)
64h. Comments:
(No Response)
65. Exterior Steps, Stairs, Ramps (S)
Yes
No
06/02/2016 10:38 AM Page 15 of 40
![Page 232: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/232.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
65a. Overall Condition of Exterior Steps, Stairs and Ramps
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
65b. Year of Last Major Reconstruction/Replacement:
2000
65c. Expected Remaining Useful Life (Years):
7
65d. Cost to Reconstruct/Replace $:
(No Response)
65e. Comments:
Recomend painting of stairs and railings to extend usefull life
66. Fire Escapes (S)
66a. Does This Facility Have One or More Fire Escapes?
Yes
No
67. Windows
Yes
No
67a. Window Material: (check all that apply)
Aluminum
Steel
Vinyl
Solid Wood
Wood w/ External Cladding System
Other
67b. Overall Condition of Windows:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
67c. All Rescue Windows are Operable:
Yes
No
N/A
67d. Year of Last Major Reconstruction/Replacement:
2000
06/02/2016 10:38 AM Page 16 of 40
![Page 233: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/233.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
67e. Expected Remaining Useful Life (Years):
10
67f. Cost to Reconstruct/Replace $:
(No Response)
67g. Comments:
(No Response)
Roof and Skylights (S)
68. Roof and Skylights (S)
Yes
No
68a. Type of roof construction (check all that apply):
Metal deck on metal trusses/joists
Wood deck on wood trusses/joists
Wood deck on metal trusses/joists
Concrete on metal deck on metal trusses/joists
Other (describe below)
68a.1 Other roof construction type:
(No Response)
68b. Type of roofing material (check all that apply):
Single-ply membrane
Built-up
Asphalt shingle
Pre-formed metal
IRMA
Slate
Other (describe below)
68b.1 Other roofing material:
(No Response)
68c. Evidence of structural concerns with roof support system (beams/joists/trusses, etc.) (check all that apply):
Structural cracks
Unsupported ends
Rot/Decay/Corrosion
Deflection
Seriously damaged/missing components
Other concerns (describe)
None
68c.1 Describe other concerns:
(No Response)
06/02/2016 10:38 AM Page 17 of 40
![Page 234: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/234.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
68d. Evidence of structural concerns with roof deck (check all that apply):
Cracks
Deflection
Rot/Decay/Corrosion
None
68e. Does this facility have skylights?
Yes
No
68f. Skylight material (check all that apply):
Plastic
Glass
Other
N/A
68g. Overall condition of skylights:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
68h. Evidence of concerns with roofing, skylights, flashings, and drains (check all that apply):
Failures/Splits/Cracks
Rot/Decay/Corrosion
Inadequate flashing/curbs/pitch pockets
Inadequate or poorly functioning roof drains
Evidence of water penetration/active leaks
Other (specify)
None
68h.1 Specify other concerns:
(No Response)
68i. Overall Condition of Roof and Skylights:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
68j. Year of Last Major Reconstruction/Replacement:
2000
68k. Expected Remaining Useful Life (Years):
5
68l. Cost to Reconstruct/Replace $:
(No Response)
68m. Comments:
(No Response)
06/02/2016 10:38 AM Page 18 of 40
![Page 235: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/235.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
INTERIOR SPACES
69. Interior Bearing Walls and Fire Walls (S)
Yes
No
69a. Overall condition of interior bearing walls and fire walls:
Excellent
Satisfactory
Unsatisfactory
Non-functioning
Critical Failure
69b. Year of Last Major Reconstruction/Replacement:
2001
69c. Expected Remaining Useful Life (Years):
10
69d. Cost to Reconstruct/Replace $:
(No Response)
69e. Comments:
(No Response)
Other Interior Walls
70. Other Interior Walls
Yes
No
70a. Overall condition of other interior walls:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
70b. Year of Last Major Reconstruction/Replacement:
2001
70c. Expected Remaining Useful Life (Years):
10
70d. Cost to Reconstruct/Replace $:
(No Response)
70e. Comments:
(No Response)
Floor Finishes
71. Carpet
Yes
No
06/02/2016 10:38 AM Page 19 of 40
![Page 236: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/236.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
71a. Where located (check all that apply):
Instructional Space
Common Area
71b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
71c. Year of Last Major Reconstruction/Replacement:
2001
71d. Expected Remaining Useful Life (Years):
5
71e. Cost to Reconstruct/Replace $:
(No Response)
71f. Comments:
(No Response)
72. Resilient Tiles or Sheet Flooring
Yes
No
72a. Where located (check all that apply):
Instructional Space
Common Area
72b. Overall condition of resilient tiles or sheet flooring:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
72c. Year of Last Major Reconstruction/Replacement:
2001
72d. Expected Remaining Useful Life (Years):
5
72e. Cost to Reconstruct/Replace $:
(No Response)
72f. Comments:
(No Response)
06/02/2016 10:38 AM Page 20 of 40
![Page 237: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/237.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
73. Hard Flooring (concrete; ceramic tile; stone; etc)
Yes
No
74. Wood Flooring
Yes
No
Ceilings (H)
75. Ceilings (H)
Yes
No
75a. Overall condition of ceilings:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
75b. Year of Last Major Reconstruction/Replacement:
2001
75c. Expected Remaining Useful Life (Years):
10
75d. Cost to Reconstruct/Replace $:
(No Response)
75e. Comments:
(No Response)
Lockers
76. Lockers
Yes
No
76d. Cost to Reconstruct/Replace $:
(No Response)
Interior Doors
77. Interior Doors
Yes
No
06/02/2016 10:38 AM Page 21 of 40
![Page 238: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/238.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
77a. Overall condition of interior door units:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
77b. Overall condition of interior door hardware:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
77c. Year of Last Major Reconstruction/Replacement:
2001
77d. Expected Remaining Useful Life (Years):
10
77e. Cost to Reconstruct/Replace $:
(No Response)
77f. Comments:
(No Response)
Interior Stairs (S)
78. Interior Stairs (S)
Yes
No
Elevator, Lifts and Escalators (H)
79. Elevator, Lift, and Escalators (H)
Yes
No
Interior Electrical Distribution (H)
80. Interior Electrical Distribution (H)
Yes
No
80a. Interior electrical supply meets current needs:
Yes
No
80b. Condition of interior electrical distribution:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:38 AM Page 22 of 40
![Page 239: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/239.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
80c. Year of Last Major Reconstruction/Replacement:
2001
80d. Expected Remaining Useful Life (Years):
20
80e. Cost to Reconstruct/Replace $:
(No Response)
80f. Comments:
(No Response)
Lighting Fixtures
81. Interior Lighting Fixtures
Yes
No
81a. Condition of interior lighting fixtures:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
81b. Year of Last Major Reconstruction/Replacement:
2001
81c. Expected Remaining Useful Life (Years):
10
81d. Cost to Reconstruct/Replace $:
(No Response)
81e. Comments:
(No Response)
Communication Systems (H)
82. Communication Systems (H)
Yes
No
82a. Communication systems are adequate:
Yes
No
82b. Condition of communication systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:38 AM Page 23 of 40
![Page 240: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/240.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
82c. Year of Last Major Reconstruction/Replacement:
2001
82d. Expected Remaining Useful Life (Years):
5
82e. Cost to Replace/Reconstruct $:
(No Response)
82f. Comments:
(No Response)
Swimming Pool and Swimming Pool Systems
83. Swimming Pool and Swimming Pool Systems
Yes
No
06/02/2016 10:38 AM Page 24 of 40
![Page 241: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/241.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
PLUMBING
84. Water Distribution System (H)
Yes
No
84a. Types of pipes (check all that apply):
Iron
Galvanized
Copper
Lead
PVC
Other
84b. Overall condition of water distribution system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
84c. Year of Last Major Reconstruction/Replacement:
2001
84d. Expected Remaining Useful Life (Years):
15
84e. Cost to Reconstruct/Replace $:
(No Response)
84f. Comments:
(No Response)
Plumbing Drainage System (H)
85. Plumbing Drainage System (H)
Yes
No
85a. Types of pipes (check all that apply):
Iron
Galvanized
Copper
Lead
PVC
Other
85b. Overall condition of drainage system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:38 AM Page 25 of 40
![Page 242: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/242.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
85c. Year of Last Major Reconstruction/Replacement:
2001
85d. Expected Remaining Useful Life (Years):
15
85e. Cost to Reconstruct/Replace $:
(No Response)
85f. Comments:
(No Response)
Hot Water Heaters (H)
86. Hot Water Heaters (H)
Yes
No
86a. Type of fuel (check all that apply):
Oil
Natural Gas
Electricity
Propane
Other
86b. Overall condition of hot water heaters:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
86c. Year of Last Major Reconstruction/Replacement:
2001
86d. Expected Remaining Useful Life (Years):
5
86e. Cost to Reconstruct/Replace $:
(No Response)
86f. Comments:
(No Response)
Plumbing Fixtures
87. Plumbing Fixtures
Yes
No
06/02/2016 10:38 AM Page 26 of 40
![Page 243: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/243.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
87a. Overall condition of plumbing fixtures (including toilets, urinals, lavatories, etc):
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
87b. Year of Last Major Reconstruction/Replacement:
2001
87c. Expected Remaining Useful Life (Years):
10
87d. Cost to Reconstruct/Replace $:
(No Response)
87e. Comments:
(No Response)
06/02/2016 10:38 AM Page 27 of 40
![Page 244: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/244.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
HVAC SYSTEMS
88. HVAC Systems Type
88a. Does this building have a central HVAC system?
Yes
No
88b. If yes, what type of technology does it use (check all that apply)?
Constant volume (CV)
Variable air volume (VAV)
Dual-duct or multi-zone
Other (describe below)
N/A
Heat Generating Systems (H)
88b.1 Other central HVAC system technology:
(No Response)
89. Heat Generating Systems (H)
Yes
No
89a. Heat generation source (check all that apply):
Boiler / Hot Water
Boiler / Steam
Furnace / Forced Air
Unit Ventilation
Geothermal
Biomass
Electric
Other (describe below)
89a.1 Other heat generation source:
Heated via electric heat coil
89b. Overall condition of heat generating systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
89c. Year of Last Major Reconstruction/Replacement:
2001
89d. Expected Remaining Useful Life (Years):
10
89e. Cost to Reconstruct/Replace $:
(No Response)
06/02/2016 10:38 AM Page 28 of 40
![Page 245: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/245.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
89f. Comments:
(No Response)
Heating Fuel/Energy Systems (H)
90. Heating Fuel / Energy Systems (H)
Yes
No
90a. Overall condition of heating fuel / energy systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
90b. Year of Last Major Reconstruction/Replacement:
2001
90c. Expected Remaining Useful Life (Years):
10
90d. Cost to Reconstruct/Replace $:
(No Response)
90e. Comments:
(No Response)
Cooling/Air Conditioning Generating Systems
91. Cooling / Air-Conditioning Generating Systems
Yes
No
91a. Overall condition of cooling/air-conditioning generating systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
91b. Year of Last Major Reconstruction/Replacement:
2001
91c. Expected Remaining Useful Life (Years):
10
91d. Cost to Reconstruct/Replace $:
(No Response)
91e. Comments:
(No Response)
AIR HANDLING AND VENTILATION EQUIPMENT
06/02/2016 10:38 AM Page 29 of 40
![Page 246: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/246.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
92. Air Handling and Ventilation Equipment: Supply Units, Exhaust Units, Relief/Return Units, etc. (H)
Yes
No
92a. Overall condition of air handling and ventilation systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
92b. Year of Last Major Reconstruction/Replacement:
2001
92c. Expected Remaining Useful Life (Years):
5
92d. Cost to Reconstruct/Replace $:
(No Response)
92e. Comments:
(No Response)
Piped Heating and Cooling Distribution Systems
93. Piped Heating and Cooling Distribution Systems: Piping, Pumps, Radiators, Convectorss, Traps, Insulation,
etc. (H)
Yes
No
Ducted Heating and Cooling Distrbution Systems
94. Ducted Heating and Cooling Distribution Systems: Ductwork, Control Dampers, Fire/Smoke Dampers, VAVs,
Insulation, etc. (H)
Yes
No
94a. Overall condition of ducted heating and cooling distribution systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
94b. Year of Last Major Reconstruction/Replacement:
2001
94c. Expected Remaining Useful Life (Years):
10
94d. Cost to Reconstruct/Replace $:
(No Response)
06/02/2016 10:38 AM Page 30 of 40
![Page 247: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/247.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
94e. Comments:
(No Response)
HVAC Control Systems
95. HVAC Control Systems (H)
Yes
No
95a. Overall condition of control systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
95b. Year of Last Major Reconstruction/Replacement:
2001
95c. Expected Remaining Useful Life (Years):
5
95d. Cost to Reconstruct/Replace $:
(No Response)
95e. Comments:
(No Response)
06/02/2016 10:38 AM Page 31 of 40
![Page 248: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/248.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyFire Safety Systems
Fire Safety Systems
96. Fire Alarm Systems (H)
Yes
No
96a. Overall condition of fire alarm system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
96b. Year of Last Major Reconstruction/Replacement:
2001
96c. Expected Remaining Useful Life (Years):
10
96d. Cost to Reconstruct/Replace $:
(No Response)
96e. Comments:
(No Response)
Smoke Detection System (H)
97. Smoke Detection Systems (H)
Yes
No
97a. Overall condition of smoke detection systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
97b. Year of Last Major Reconstruction/Replacement:
2001
97c. Expected Remaining Useful Life (Years):
10
97d. Cost to Reconstruct/Replace $:
(No Response)
97e. Comments:
(No Response)
Fire Suppression Systems
98. Fire Suppression Systems: Sprinklers, Standpipes, Kitchen Hoods, etc. (H)
Yes
No
06/02/2016 10:38 AM Page 32 of 40
![Page 249: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/249.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyFire Safety Systems
Emergency/Exit Lighting Systems
99. Emergency / Exit Lighting Systems (H)
Yes
No
99a. Overall condition of emergency / exit lighting systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
99b. Year of Last Major Reconstruction/Replacement:
2001
99c. Expected Remaining Useful Life (Years):
5
99d. Cost to Reconstruct/Replace $:
(No Response)
99e. Comments;
provide exterior emergency egress lights
Emergency/Standby Power Systems
100. Emergency or Standby Power System (H)
Yes
No
06/02/2016 10:38 AM Page 33 of 40
![Page 250: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/250.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyAccessibility
ACCESSIBILITY
101. Exterior Accessible Route (H)
People with disabilities should be able to arrive on site, approach the building, and enter as freely as everyone
else. At least one route of travel should be safe and accessible for everyone, including people with disabilities.
This route must include handicapped parking, curb cuts, ramps, and automatic door operators as necessary to
enter the building.
Is there an accessible exterior route as specified above?
Yes
No
102. Interior Accessible Route, Access to Goods and Services, and Restroom Facilities (H)
The layout of the building should allow people with disabilities to obtain materials or services and use the facilities
without assistance. This should include access to general purpose and specialized classrooms, public assembly
spaces (such as libraries, gymnasiums, auditoriums), nurse's office, main office, and restroom facilities. Services
include drinking fountains, telephones, and other amenities.
Is there an accessible interior route as specified above?
Yes
No
103. Additional Information on Accessibility
If the building lacks accessible interior or exterior routes:
103a. Cost of improvements needed to provide accessible exterior and interior routes as specified above $:
(No Response)
103b. Comments:
(No Response)
06/02/2016 10:38 AM Page 34 of 40
![Page 251: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/251.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyEnvironment/Comfort/Health
ENVIRONMENT/COMFORT/HEALTH
104. General Appearance
104a. Overall Rating:
Good
Fair
Poor
104b. Comments:
(No Response)
105. Cleanliness
105a. Overall Rating:
Good
Fair
Poor
105b. Comments:
(No Response)
106. Are there walk off mats; grills in the entryway?
Yes
No
107. Is there noise in classrooms from HVAC units, traffic, etc. that may impact education?
Yes
No
108. Lighting Quality:
108a. Types of lighting in general purpose classrooms (check all that apply):
Daylight
Flourescent-not full spectrum
Flourescent full spectrum
Incandescent
Other (describe)
108b. Are there blinds in the classroom to prevent glare?
Yes
No
108c. Overall Rating:
Good
Fair
Poor
108d. Comments:
(No Response)
06/02/2016 10:38 AM Page 35 of 40
![Page 252: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/252.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyEnvironment/Comfort/Health
109. Evidence of Vermin
109a. Is there evidence of active infestations of...(check all that apply)?
Rodents
Wood-boring or Wood-eating Insects
Cockroaches
Other Vermin
None
06/02/2016 10:38 AM Page 36 of 40
![Page 253: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/253.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
Indoor Air Quality
110. Mold
110a. Is there visible mold or moldy odors?
Yes
No
110c. Are any surfaces constructed of any of the following materials?
Paper-faced or gypsum products
Cellulose products (typically ceiling tiles)
110d. Estimated cost of necessary improvements $:
(No Response)
110d. Comments:
(No Response)
111. Humidity/Moisture
111a. Overall rating of humidity/moisture condition in building:
Good
Fair
Poor
111b. Are any of the following found in/or around classroom areas (check all that apply)?
Active leaks in roof
Active leaks in plumbing
Moisture condensation
Visible stains or water damage
None
111c. Are any of the following found in/or around other areas (check all that apply)?
Active leaks in roof
Active leaks in plumbing
Moisture condensation
Visible stains or water damage
None
112. Ventilation: fresh air intake locations, air filters, etc.
112a. Are fresh air intakes near the bus loading, truck delivery, or garbage storage/disposal areas?
Yes
No
112b. Is there accumulated dirt, dust or debris around fresh air intakes?
Yes
No
112c. Are fresh air intakes free of blockage?
Yes
No
06/02/2016 10:38 AM Page 37 of 40
![Page 254: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/254.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
112d. Is accumulated dirt, dust or debris in ductwork?
Yes
No
112e. Are dampers functioning as designed?
Yes
No
112f. Condition of air filters:
Good
Fair
Poor
112g. Outside air is adequate for occupant load:
Yes
No
112h. Rating of ventilation/indoor air quality:
Good
Fair
Poor
112i. Comments:
(No Response)
113. Indoor Air Quality (IAQ) Plan
113a. Does the school district use EPA's Tools for Schools program?
Yes
No
113b. If No, is some other IAQ management plan used?
Yes
No
113c. Has the District assigned IAQ responsibilities to a designated individual?
Yes
No
113c.1 If Yes, what is their job title?
(No Response)
114. Does the school practice IPM?
Yes
No
114a. Is vegetation kept one foot away from the building?
Yes
No
114b. Are crevices and holes in walls, floors and pavement sealed or eliminated?
Yes
No
06/02/2016 10:38 AM Page 38 of 40
![Page 255: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/255.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
114c. Is there a certified pesticide applicator on staff?
Yes
No
114d. Are pesticides used in the building?
Yes
No
114d.1 If Yes, how are they typically applied?
Spot treatment
Area wide treatments
114e. Are pesticides used on the grounds?
Yes
No
114e.1 If Yes, was an emergency exemption granted by the Board of Education?
Yes
No
115. Does the school have a passive radon mitigation system installed (was built with radon resistant features)?
Yes
No
115a. Has the facility been tested for the presence of radon?
Yes
No
115b. Were any of the results of the test greater than or equal to 4 picocuries per liter (pCi/L)?
Yes
No
115c. If Yes, did the school take steps to mitigate the elevated radon levels?
Yes, active mitigation system installed
Yes, passive mitigation system made active
Yes, ventilation controls (HVAC) adjusted
Yes, other (describe)
No action taken
115c.1 Describe other actions taken to mitigate elevated radon levels:
(No Response)
06/02/2016 10:38 AM Page 39 of 40
![Page 256: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/256.jpg)
RYE CITY SD Status Date: 03/16/2016 01:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyAmerican Red Cross
American Red Cross Shelter
116. American Red Cross Shelter
Yes
No
06/02/2016 10:38 AM Page 40 of 40
![Page 257: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/257.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
Building Information1. Name of School District:
RYE CITY SD
2. SED District 8-Digit BEDS Code:
661800010000
3. Building Name:
Midland portable #2
4. SED 4-Digit Facility Code:
0015
5. Survey Inspection Date:
09/14/2015
6. Building 911 Address:
312 Midland Ave
7. City:
Rye
8. Zip Code:
10580
9. Certificate of Occupancy Status:
A - Annual
T - Temporary
N - None
10. Certificate of Occupancy Expiration Date:
09/01/2016
Building Age, Gross Square Footage and Maintenance Staff
11. Year of Original Building:
2001
12. Gross square ft. of Building as currently configured:
1,700
13. Number of Floors:
1
14. How many full-time and part-time custodians are employed at the school (or work in the building)?
Count Employees
Full-time custodians:0
Part-time custodians:0
Totals:
Building Ownership and Occupancy Status06/02/2016 10:43 AM Page 1 of 40
![Page 258: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/258.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
15. Building Ownership (check one):
Owned and used by district
Owned by District and leased to non-district entity
Owned by District, part used by district, part leased to non-district entity
Owned by non-district entity and leased to district
16. For which of the following purposes is the building currently used? (check all that apply)
Used for student instructional purposes
Used for district administration
Used for other district purposes
Used by other organization(s)
Building Users
17. How many students were registered to receive instruction in this building as of October 1, 2014? (If none,
enter "0") and skip to "Program Spaces" section. (Do not include evening class students)
20
18. Of these registered students, how many receive most of their instruction in:
Quantity
18a. Permanent instructional spaces (i.e., regularclassrooms) 20
18b. Temporary instructional spaces (i.e., portable ordemountable classrooms) attached to the building 0
18c. Non-instructional spaces used as instructionalspaces 0
18c.1 If the answer is greater than zero, which types of non-instructional spaces were being used for instructional
purposes on October 1, 2014? (check all that apply)
Cafeteria
Gymnasium
Administrative Spaces
Library
Lobby
Stairwell
Storage space
Other (please describe)
None
19. Grades Housed:
k-5
20. For how many instructional days during the 2013-14 school year (July 1 through June 30, was the building
closed due to facilities failures, system malfunctions, structural problems, fire, etc? (if none, enter "0")
0
21. Is the building used for instructional purposes in the summer?
Yes
No
22. Have there been renovations or construction in the building during the past 12 months?
Yes
No
06/02/2016 10:43 AM Page 2 of 40
![Page 259: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/259.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
23. Was major construction/renovation work since 2010 conducted when school was in session?
Yes
No
06/02/2016 10:43 AM Page 3 of 40
![Page 260: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/260.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyProgram Spaces
Program Spaces
24. Number of instructional classrooms:
2
25. Gross square footage of all instructional classrooms (combined):
1,700.00
26. Other spaces provided: (check all that apply)
a. N/A (none)
b. Administration
c. Art
d. Audio Visual
e. Auditorium
f. Cafeteria
g. Computer Room
h. Guidance
i. Gymnasium
j. Health Office
k. Home & Careers
l. Kitchen
m. Large Group Instruction
n. Library
o. Multipurpose Rooms
p. Music
q. Pre-K
r. Remedial Rooms
s. Resource Rooms
t. Science Labs
u. Special Education
v. Swimming Pool
w. Teacher Resource
x. Technology/Shop
y. Other (please describe)
26y. Describe other spaces
(No Response)
Space Adequacy
27. Rating of space adequacy:
Good
Fair
Poor
27a. Enter comments:
(No Response)
28. Estimated capital construction expenses anticipated for this building through 2020-2021 school year
excluding maintenance (to be answered after the building inspection is complete) $
38,750.00
29. Overall building rating (to be answered after the building inspection is complete)
Excellent
Satisfactory
Unsatisfactory
Poor
30. Was overall building rating established after consultation with health and safety committee?
Yes
No
A/E Information:
31. A/E Firm Name:
KSQ Architects
06/02/2016 10:43 AM Page 4 of 40
![Page 261: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/261.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyProgram Spaces
32. A/E Firm Address:
235 Main Street, Suite 410
White Plains, NY 10601
33. A/E Firm Phone Number:
9146823700
34. E-mail:
35. A/E Name:
Scott Hillje
36. A/E License #:
025556
06/02/2016 10:43 AM Page 5 of 40
![Page 262: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/262.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
Site Utilities
37. Water
Yes
No
37a. Type of Service:
Municipal or Utility provided
Well
Other
37b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
37c. Year of Last Major Reconstruction/Replacement:
2001
37d. Expected Remaining Useful Life (Years):
10
37e. Cost to Reconstruct/Replace $:
(No Response)
37f. Comments:
(No Response)
38. Site Sanitary (H)
Yes
No
38a. Type of Service:
Municipal or utility sewer
Site septic
Other
38b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
38c. Year of Last Major Reconstruction/Replacement:
2001
38d. Expected Remaining Useful Life (Years):
15
06/02/2016 10:43 AM Page 6 of 40
![Page 263: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/263.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
38e. Cost to reconstruct/Replace $:
(No Response)
38f. Comments:
(No Response)
39. Site Gas (H)
Yes
No
40. Site Fuel Oil (H)
Yes
No
41. Site Electrical, Including Exterior Distribution (H)
Yes
No
41a. Service Provider:
Municipal or utility provided
Self-Generated
Other
N/A
41b. Type of Service:
Above Ground
Below Ground
N/A
41c. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
41d. Year of Last Major Reconstruction/Replacement:
2001
41e. Expected Remaining Useful Life (Years):
15
41f. Cost to Reconstruct/Replace $:
(No Response)
41g. Comments:
(No Response)
Stormwater Management
06/02/2016 10:43 AM Page 7 of 40
![Page 264: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/264.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
42. Closed Drainage Pipe Stormwater Management System
42a. Does this facility have a closed pipe system?
Yes
No
43. Open Drainage Pipe Stormwater Management System
43a. Does this facility have an open stormwater system (ditch)?
Yes
No
44. Catch Basins/Drop Inlets/Manholes
44a. Does this facility have catch basins/drop inlets/manholes?
Yes
No
45. Culverts
45a. Does this facility have culverts?
Yes
No
46. Outfalls
46a. Does this facility have outfalls?
Yes
No
47. Infiltration Basins/Chambers
47a. Does this facility have infiltration basins/chambers?
Yes
No
48. Retention Basins
48a. Does this facility have retention basins?
Yes
No
49. Wetponds
49a. Does this facility have wetponds?
Yes
No
06/02/2016 10:43 AM Page 8 of 40
![Page 265: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/265.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
50. Manufactured Stormwater Proprietary Units
50a. Does this facility have proprietary units?
Yes
No
51. Point of Outfall Discharge: (check all that apply)
Municipal storm sewer system
Combined sewer system
Surface Water
On-site recharge
Other (describe)
Not Applicable
52. Outfall Reconnaissance Inventory
Were all stormwater outfalls inspected during dry weather for signs of non-stormwater discharge?
Yes
No
Not Applicable
06/02/2016 10:43 AM Page 9 of 40
![Page 266: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/266.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyOther Site Features
Other Site Features
53. Pavement (Roadways and Parking Lots)
Yes
No
54. Sidewalks
Yes
No
54a. Type: (check all that apply)
Concrete
Asphalt
Paver
Other
54b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
54c. Year of Last Major Reconstruction/Replacement:
2001
54d. Expected Remaining Useful Life (Years):
5
54e. Cost to Reconstruct/Replace $:
(No Response)
54f. Comments:
(No Response)
55. Playgrounds and Playground Equipment
Yes
No
56. Athletic Fields and Play Fields
Yes
No
56f. Does the facility have synthetic turf field(s)
Yes
No
56f.1 If Yes, how many synthetic turf fields?
(No Response)
06/02/2016 10:43 AM Page 10 of 40
![Page 267: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/267.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyOther Site Features
56f.2 Expected Remaining Useful Life of Synthetic Turf Field(s):
(No Response)
56f.3 Type of synthetic turf field infill:
(No Response)
57. Exterior Bleachers / Stadiums
Yes
No
58. Related Structures (such as Press Boxes, Dugouts, Climbing Walls, etc.)
Yes
No
06/02/2016 10:43 AM Page 11 of 40
![Page 268: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/268.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySubstructure
Substructure
59. Foundation (S)
59a. Type (check all that apply):
Reinforced Concrete
Masonry on Concrete Footing
Other
59b. Evidence of structural concerns (check all that apply):
Structural Cracks
Heaving/Jacking
Decay/Corrosion
Water Penetration
Unsupported Ends
Other
None
59c. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
59d. Year of Last Major Reconstruction/Replacement:
2001
59e. Expected Remaining Useful Life (Years):
20
59f. Cost to Reconstruct/Replace $:
(No Response)
59g. Comments:
Not Accessible
06/02/2016 10:43 AM Page 12 of 40
![Page 269: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/269.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
BUILDING ENVELOPE
60. Structural Floors (S)
60a. Type (check all that apply):
Reinforced Concrete Slab on Grade
Concrete/Metal Deck/Metal Joists
Precast Concrete Structural System
Wood Deck on Wood Trusses
Wood Deck on Wood Joists
Concrete Deck on Wood Structure
Other (specify)
60b. Evidence of Structural Concerns with Floor Support System (Beams/Joists/Trusses, etc.) (check all that
apply):
Structural Cracks
Unsupported Ends
Rot/Decay/Corrosion
Deflection
Seriously Damaged/Missing Components
Other Problems
None
60b.1 Describe Other Problems:
(No Response)
60c. Evidence of Structural Concerns with Structural Floor Deck (check all that apply):
Cracks
Deflection
Rot/Decay/Corrosion
None
60d. Overall Condition of Structural Floors:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
60e. Year of Last Major Reconstruction/Replacement:
2001
60f. Expected Remaining Useful Life (Years):
15
60g. Cost to Reconstruct/Replace $:
(No Response)
60h. Comments:
(No Response)
06/02/2016 10:43 AM Page 13 of 40
![Page 270: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/270.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
61. Exterior Walls/Columns (S)
61a. Material (check all that apply):
Concrete
Masonry
Steel
Wood
Other (specify)
61b. Evidence of Structural Concerns with Support System (columns, base plates, connections, etc.) (check all
that apply):
Structural Cracks
Rot/Decay/Corrosion
Other Problems
None
61b.1 Describe Other Problems:
(No Response)
61c. Evidence of Concerns with Exterior Cladding (check all that apply):
Cracks/Gaps
Inadequate Flashing
Efflorescence
Moisture Penetration
Rot/Decay/Corrosion
Other Problems
None
61c.1 Describe Other Problems:
(No Response)
61d. Overall Condition of Exterior Walls/Columns:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
61e. Year of Last Major Reconstruction/Replacement:
2001
61f. Expected Remaining Useful Life (Years):
15
61g. Cost to Reconstruct/Replace $:
(No Response)
61h. Comments:
replace deteriorated sections of foundation skirt boards
06/02/2016 10:43 AM Page 14 of 40
![Page 271: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/271.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
62. Chimneys (S)
Yes
No
63. Parapets (S)
Yes
No
63f. Comments:
(No Response)
64. Exterior Doors
64a. Overall Condition of Exterior Door Units:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
64b. Overall condition of exterior door hardware:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
64c. Do any exterior doors have magnetic locking devices?
Yes
No
64d. Safety/Security features are adequate?
Yes
No
64e. Year of Last Major Reconstruction/Replacement:
2001
64f. Expected Remaining Useful Life (Years):
5
64g. Cost to Reconstruct/Replace $:
(No Response)
64h. Comments:
(No Response)
65. Exterior Steps, Stairs, Ramps (S)
Yes
No
06/02/2016 10:43 AM Page 15 of 40
![Page 272: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/272.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
65a. Overall Condition of Exterior Steps, Stairs and Ramps
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
65b. Year of Last Major Reconstruction/Replacement:
2001
65c. Expected Remaining Useful Life (Years):
7
65d. Cost to Reconstruct/Replace $:
(No Response)
65e. Comments:
Paint wood deck and railing to extend life
66. Fire Escapes (S)
66a. Does This Facility Have One or More Fire Escapes?
Yes
No
67. Windows
Yes
No
67a. Window Material: (check all that apply)
Aluminum
Steel
Vinyl
Solid Wood
Wood w/ External Cladding System
Other
67b. Overall Condition of Windows:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
67c. All Rescue Windows are Operable:
Yes
No
N/A
67d. Year of Last Major Reconstruction/Replacement:
2001
06/02/2016 10:43 AM Page 16 of 40
![Page 273: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/273.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
67e. Expected Remaining Useful Life (Years):
10
67f. Cost to Reconstruct/Replace $:
(No Response)
67g. Comments:
(No Response)
Roof and Skylights (S)
68. Roof and Skylights (S)
Yes
No
68a. Type of roof construction (check all that apply):
Metal deck on metal trusses/joists
Wood deck on wood trusses/joists
Wood deck on metal trusses/joists
Concrete on metal deck on metal trusses/joists
Other (describe below)
68a.1 Other roof construction type:
(No Response)
68b. Type of roofing material (check all that apply):
Single-ply membrane
Built-up
Asphalt shingle
Pre-formed metal
IRMA
Slate
Other (describe below)
68b.1 Other roofing material:
(No Response)
68c. Evidence of structural concerns with roof support system (beams/joists/trusses, etc.) (check all that apply):
Structural cracks
Unsupported ends
Rot/Decay/Corrosion
Deflection
Seriously damaged/missing components
Other concerns (describe)
None
68c.1 Describe other concerns:
(No Response)
06/02/2016 10:43 AM Page 17 of 40
![Page 274: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/274.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
68d. Evidence of structural concerns with roof deck (check all that apply):
Cracks
Deflection
Rot/Decay/Corrosion
None
68e. Does this facility have skylights?
Yes
No
68f. Skylight material (check all that apply):
Plastic
Glass
Other
N/A
68g. Overall condition of skylights:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
68h. Evidence of concerns with roofing, skylights, flashings, and drains (check all that apply):
Failures/Splits/Cracks
Rot/Decay/Corrosion
Inadequate flashing/curbs/pitch pockets
Inadequate or poorly functioning roof drains
Evidence of water penetration/active leaks
Other (specify)
None
68h.1 Specify other concerns:
(No Response)
68i. Overall Condition of Roof and Skylights:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
68j. Year of Last Major Reconstruction/Replacement:
2001
68k. Expected Remaining Useful Life (Years):
5
68l. Cost to Reconstruct/Replace $:
(No Response)
68m. Comments:
(No Response)
06/02/2016 10:43 AM Page 18 of 40
![Page 275: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/275.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
INTERIOR SPACES
69. Interior Bearing Walls and Fire Walls (S)
Yes
No
69a. Overall condition of interior bearing walls and fire walls:
Excellent
Satisfactory
Unsatisfactory
Non-functioning
Critical Failure
69b. Year of Last Major Reconstruction/Replacement:
2001
69c. Expected Remaining Useful Life (Years):
10
69d. Cost to Reconstruct/Replace $:
(No Response)
69e. Comments:
(No Response)
Other Interior Walls
70. Other Interior Walls
Yes
No
70a. Overall condition of other interior walls:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
70b. Year of Last Major Reconstruction/Replacement:
2001
70c. Expected Remaining Useful Life (Years):
10
70d. Cost to Reconstruct/Replace $:
(No Response)
70e. Comments:
(No Response)
Floor Finishes
71. Carpet
Yes
No
06/02/2016 10:43 AM Page 19 of 40
![Page 276: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/276.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
71a. Where located (check all that apply):
Instructional Space
Common Area
71b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
71c. Year of Last Major Reconstruction/Replacement:
2001
71d. Expected Remaining Useful Life (Years):
5
71e. Cost to Reconstruct/Replace $:
(No Response)
71f. Comments:
(No Response)
72. Resilient Tiles or Sheet Flooring
Yes
No
72a. Where located (check all that apply):
Instructional Space
Common Area
72b. Overall condition of resilient tiles or sheet flooring:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
72c. Year of Last Major Reconstruction/Replacement:
2001
72d. Expected Remaining Useful Life (Years):
5
72e. Cost to Reconstruct/Replace $:
(No Response)
72f. Comments:
(No Response)
06/02/2016 10:43 AM Page 20 of 40
![Page 277: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/277.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
73. Hard Flooring (concrete; ceramic tile; stone; etc)
Yes
No
74. Wood Flooring
Yes
No
Ceilings (H)
75. Ceilings (H)
Yes
No
75a. Overall condition of ceilings:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
75b. Year of Last Major Reconstruction/Replacement:
2001
75c. Expected Remaining Useful Life (Years):
10
75d. Cost to Reconstruct/Replace $:
(No Response)
75e. Comments:
(No Response)
Lockers
76. Lockers
Yes
No
76d. Cost to Reconstruct/Replace $:
(No Response)
Interior Doors
77. Interior Doors
Yes
No
06/02/2016 10:43 AM Page 21 of 40
![Page 278: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/278.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
77a. Overall condition of interior door units:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
77b. Overall condition of interior door hardware:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
77c. Year of Last Major Reconstruction/Replacement:
2001
77d. Expected Remaining Useful Life (Years):
10
77e. Cost to Reconstruct/Replace $:
(No Response)
77f. Comments:
(No Response)
Interior Stairs (S)
78. Interior Stairs (S)
Yes
No
Elevator, Lifts and Escalators (H)
79. Elevator, Lift, and Escalators (H)
Yes
No
Interior Electrical Distribution (H)
80. Interior Electrical Distribution (H)
Yes
No
80a. Interior electrical supply meets current needs:
Yes
No
80b. Condition of interior electrical distribution:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:43 AM Page 22 of 40
![Page 279: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/279.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
80c. Year of Last Major Reconstruction/Replacement:
2001
80d. Expected Remaining Useful Life (Years):
20
80e. Cost to Reconstruct/Replace $:
(No Response)
80f. Comments:
(No Response)
Lighting Fixtures
81. Interior Lighting Fixtures
Yes
No
81a. Condition of interior lighting fixtures:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
81b. Year of Last Major Reconstruction/Replacement:
2001
81c. Expected Remaining Useful Life (Years):
10
81d. Cost to Reconstruct/Replace $:
(No Response)
81e. Comments:
(No Response)
Communication Systems (H)
82. Communication Systems (H)
Yes
No
82a. Communication systems are adequate:
Yes
No
82b. Condition of communication systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:43 AM Page 23 of 40
![Page 280: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/280.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
82c. Year of Last Major Reconstruction/Replacement:
2001
82d. Expected Remaining Useful Life (Years):
5
82e. Cost to Replace/Reconstruct $:
(No Response)
82f. Comments:
(No Response)
Swimming Pool and Swimming Pool Systems
83. Swimming Pool and Swimming Pool Systems
Yes
No
06/02/2016 10:43 AM Page 24 of 40
![Page 281: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/281.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
PLUMBING
84. Water Distribution System (H)
Yes
No
84a. Types of pipes (check all that apply):
Iron
Galvanized
Copper
Lead
PVC
Other
84b. Overall condition of water distribution system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
84c. Year of Last Major Reconstruction/Replacement:
2001
84d. Expected Remaining Useful Life (Years):
15
84e. Cost to Reconstruct/Replace $:
(No Response)
84f. Comments:
(No Response)
Plumbing Drainage System (H)
85. Plumbing Drainage System (H)
Yes
No
85a. Types of pipes (check all that apply):
Iron
Galvanized
Copper
Lead
PVC
Other
85b. Overall condition of drainage system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:43 AM Page 25 of 40
![Page 282: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/282.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
85c. Year of Last Major Reconstruction/Replacement:
2001
85d. Expected Remaining Useful Life (Years):
15
85e. Cost to Reconstruct/Replace $:
(No Response)
85f. Comments:
(No Response)
Hot Water Heaters (H)
86. Hot Water Heaters (H)
Yes
No
86a. Type of fuel (check all that apply):
Oil
Natural Gas
Electricity
Propane
Other
86b. Overall condition of hot water heaters:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
86c. Year of Last Major Reconstruction/Replacement:
2001
86d. Expected Remaining Useful Life (Years):
5
86e. Cost to Reconstruct/Replace $:
(No Response)
86f. Comments:
(No Response)
Plumbing Fixtures
87. Plumbing Fixtures
Yes
No
06/02/2016 10:43 AM Page 26 of 40
![Page 283: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/283.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
87a. Overall condition of plumbing fixtures (including toilets, urinals, lavatories, etc):
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
87b. Year of Last Major Reconstruction/Replacement:
2001
87c. Expected Remaining Useful Life (Years):
10
87d. Cost to Reconstruct/Replace $:
(No Response)
87e. Comments:
(No Response)
06/02/2016 10:43 AM Page 27 of 40
![Page 284: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/284.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
HVAC SYSTEMS
88. HVAC Systems Type
88a. Does this building have a central HVAC system?
Yes
No
88b. If yes, what type of technology does it use (check all that apply)?
Constant volume (CV)
Variable air volume (VAV)
Dual-duct or multi-zone
Other (describe below)
N/A
Heat Generating Systems (H)
88b.1 Other central HVAC system technology:
(No Response)
89. Heat Generating Systems (H)
Yes
No
89a. Heat generation source (check all that apply):
Boiler / Hot Water
Boiler / Steam
Furnace / Forced Air
Unit Ventilation
Geothermal
Biomass
Electric
Other (describe below)
89a.1 Other heat generation source:
Heated via Electric heat coil
89b. Overall condition of heat generating systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
89c. Year of Last Major Reconstruction/Replacement:
2001
89d. Expected Remaining Useful Life (Years):
10
89e. Cost to Reconstruct/Replace $:
(No Response)
06/02/2016 10:43 AM Page 28 of 40
![Page 285: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/285.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
89f. Comments:
(No Response)
Heating Fuel/Energy Systems (H)
90. Heating Fuel / Energy Systems (H)
Yes
No
90a. Overall condition of heating fuel / energy systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
90b. Year of Last Major Reconstruction/Replacement:
2001
90c. Expected Remaining Useful Life (Years):
10
90d. Cost to Reconstruct/Replace $:
(No Response)
90e. Comments:
(No Response)
Cooling/Air Conditioning Generating Systems
91. Cooling / Air-Conditioning Generating Systems
Yes
No
91a. Overall condition of cooling/air-conditioning generating systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
91b. Year of Last Major Reconstruction/Replacement:
2001
91c. Expected Remaining Useful Life (Years):
10
91d. Cost to Reconstruct/Replace $:
(No Response)
91e. Comments:
(No Response)
AIR HANDLING AND VENTILATION EQUIPMENT
06/02/2016 10:43 AM Page 29 of 40
![Page 286: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/286.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
92. Air Handling and Ventilation Equipment: Supply Units, Exhaust Units, Relief/Return Units, etc. (H)
Yes
No
92a. Overall condition of air handling and ventilation systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
92b. Year of Last Major Reconstruction/Replacement:
2001
92c. Expected Remaining Useful Life (Years):
5
92d. Cost to Reconstruct/Replace $:
(No Response)
92e. Comments:
(No Response)
Piped Heating and Cooling Distribution Systems
93. Piped Heating and Cooling Distribution Systems: Piping, Pumps, Radiators, Convectorss, Traps, Insulation,
etc. (H)
Yes
No
Ducted Heating and Cooling Distrbution Systems
94. Ducted Heating and Cooling Distribution Systems: Ductwork, Control Dampers, Fire/Smoke Dampers, VAVs,
Insulation, etc. (H)
Yes
No
94a. Overall condition of ducted heating and cooling distribution systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
94b. Year of Last Major Reconstruction/Replacement:
2001
94c. Expected Remaining Useful Life (Years):
10
94d. Cost to Reconstruct/Replace $:
(No Response)
06/02/2016 10:43 AM Page 30 of 40
![Page 287: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/287.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
94e. Comments:
(No Response)
HVAC Control Systems
95. HVAC Control Systems (H)
Yes
No
95a. Overall condition of control systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
95b. Year of Last Major Reconstruction/Replacement:
2001
95c. Expected Remaining Useful Life (Years):
5
95d. Cost to Reconstruct/Replace $:
(No Response)
95e. Comments:
(No Response)
06/02/2016 10:43 AM Page 31 of 40
![Page 288: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/288.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyFire Safety Systems
Fire Safety Systems
96. Fire Alarm Systems (H)
Yes
No
96a. Overall condition of fire alarm system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
96b. Year of Last Major Reconstruction/Replacement:
2001
96c. Expected Remaining Useful Life (Years):
10
96d. Cost to Reconstruct/Replace $:
(No Response)
96e. Comments:
(No Response)
Smoke Detection System (H)
97. Smoke Detection Systems (H)
Yes
No
97a. Overall condition of smoke detection systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
97b. Year of Last Major Reconstruction/Replacement:
2001
97c. Expected Remaining Useful Life (Years):
10
97d. Cost to Reconstruct/Replace $:
(No Response)
97e. Comments:
(No Response)
Fire Suppression Systems
98. Fire Suppression Systems: Sprinklers, Standpipes, Kitchen Hoods, etc. (H)
Yes
No
06/02/2016 10:43 AM Page 32 of 40
![Page 289: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/289.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyFire Safety Systems
Emergency/Exit Lighting Systems
99. Emergency / Exit Lighting Systems (H)
Yes
No
99a. Overall condition of emergency / exit lighting systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
99b. Year of Last Major Reconstruction/Replacement:
2001
99c. Expected Remaining Useful Life (Years):
5
99d. Cost to Reconstruct/Replace $:
(No Response)
99e. Comments;
provide exterior emergency egress lights
Emergency/Standby Power Systems
100. Emergency or Standby Power System (H)
Yes
No
06/02/2016 10:43 AM Page 33 of 40
![Page 290: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/290.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyAccessibility
ACCESSIBILITY
101. Exterior Accessible Route (H)
People with disabilities should be able to arrive on site, approach the building, and enter as freely as everyone
else. At least one route of travel should be safe and accessible for everyone, including people with disabilities.
This route must include handicapped parking, curb cuts, ramps, and automatic door operators as necessary to
enter the building.
Is there an accessible exterior route as specified above?
Yes
No
102. Interior Accessible Route, Access to Goods and Services, and Restroom Facilities (H)
The layout of the building should allow people with disabilities to obtain materials or services and use the facilities
without assistance. This should include access to general purpose and specialized classrooms, public assembly
spaces (such as libraries, gymnasiums, auditoriums), nurse's office, main office, and restroom facilities. Services
include drinking fountains, telephones, and other amenities.
Is there an accessible interior route as specified above?
Yes
No
103. Additional Information on Accessibility
If the building lacks accessible interior or exterior routes:
103a. Cost of improvements needed to provide accessible exterior and interior routes as specified above $:
(No Response)
103b. Comments:
(No Response)
06/02/2016 10:43 AM Page 34 of 40
![Page 291: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/291.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyEnvironment/Comfort/Health
ENVIRONMENT/COMFORT/HEALTH
104. General Appearance
104a. Overall Rating:
Good
Fair
Poor
104b. Comments:
(No Response)
105. Cleanliness
105a. Overall Rating:
Good
Fair
Poor
105b. Comments:
(No Response)
106. Are there walk off mats; grills in the entryway?
Yes
No
107. Is there noise in classrooms from HVAC units, traffic, etc. that may impact education?
Yes
No
108. Lighting Quality:
108a. Types of lighting in general purpose classrooms (check all that apply):
Daylight
Flourescent-not full spectrum
Flourescent full spectrum
Incandescent
Other (describe)
108b. Are there blinds in the classroom to prevent glare?
Yes
No
108c. Overall Rating:
Good
Fair
Poor
108d. Comments:
(No Response)
06/02/2016 10:43 AM Page 35 of 40
![Page 292: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/292.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyEnvironment/Comfort/Health
109. Evidence of Vermin
109a. Is there evidence of active infestations of...(check all that apply)?
Rodents
Wood-boring or Wood-eating Insects
Cockroaches
Other Vermin
None
06/02/2016 10:43 AM Page 36 of 40
![Page 293: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/293.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
Indoor Air Quality
110. Mold
110a. Is there visible mold or moldy odors?
Yes
No
110c. Are any surfaces constructed of any of the following materials?
Paper-faced or gypsum products
Cellulose products (typically ceiling tiles)
110d. Estimated cost of necessary improvements $:
(No Response)
110d. Comments:
(No Response)
111. Humidity/Moisture
111a. Overall rating of humidity/moisture condition in building:
Good
Fair
Poor
111b. Are any of the following found in/or around classroom areas (check all that apply)?
Active leaks in roof
Active leaks in plumbing
Moisture condensation
Visible stains or water damage
None
111c. Are any of the following found in/or around other areas (check all that apply)?
Active leaks in roof
Active leaks in plumbing
Moisture condensation
Visible stains or water damage
None
112. Ventilation: fresh air intake locations, air filters, etc.
112a. Are fresh air intakes near the bus loading, truck delivery, or garbage storage/disposal areas?
Yes
No
112b. Is there accumulated dirt, dust or debris around fresh air intakes?
Yes
No
112c. Are fresh air intakes free of blockage?
Yes
No
06/02/2016 10:43 AM Page 37 of 40
![Page 294: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/294.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
112d. Is accumulated dirt, dust or debris in ductwork?
Yes
No
112e. Are dampers functioning as designed?
Yes
No
112f. Condition of air filters:
Good
Fair
Poor
112g. Outside air is adequate for occupant load:
Yes
No
112h. Rating of ventilation/indoor air quality:
Good
Fair
Poor
112i. Comments:
(No Response)
113. Indoor Air Quality (IAQ) Plan
113a. Does the school district use EPA's Tools for Schools program?
Yes
No
113b. If No, is some other IAQ management plan used?
Yes
No
113c. Has the District assigned IAQ responsibilities to a designated individual?
Yes
No
113c.1 If Yes, what is their job title?
(No Response)
114. Does the school practice IPM?
Yes
No
114a. Is vegetation kept one foot away from the building?
Yes
No
114b. Are crevices and holes in walls, floors and pavement sealed or eliminated?
Yes
No
06/02/2016 10:43 AM Page 38 of 40
![Page 295: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/295.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
114c. Is there a certified pesticide applicator on staff?
Yes
No
114d. Are pesticides used in the building?
Yes
No
114d.1 If Yes, how are they typically applied?
Spot treatment
Area wide treatments
114e. Are pesticides used on the grounds?
Yes
No
114e.1 If Yes, was an emergency exemption granted by the Board of Education?
Yes
No
115. Does the school have a passive radon mitigation system installed (was built with radon resistant features)?
Yes
No
115a. Has the facility been tested for the presence of radon?
Yes
No
115b. Were any of the results of the test greater than or equal to 4 picocuries per liter (pCi/L)?
Yes
No
115c. If Yes, did the school take steps to mitigate the elevated radon levels?
Yes, active mitigation system installed
Yes, passive mitigation system made active
Yes, ventilation controls (HVAC) adjusted
Yes, other (describe)
No action taken
115c.1 Describe other actions taken to mitigate elevated radon levels:
(No Response)
06/02/2016 10:43 AM Page 39 of 40
![Page 296: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/296.jpg)
RYE CITY SD Status Date: 03/16/2016 02:46 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyAmerican Red Cross
American Red Cross Shelter
116. American Red Cross Shelter
Yes
No
06/02/2016 10:43 AM Page 40 of 40
![Page 297: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/297.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
Building Information1. Name of School District:
RYE CITY SD
2. SED District 8-Digit BEDS Code:
661800010000
3. Building Name:
Rye HS/MS
4. SED 4-Digit Facility Code:
0005
5. Survey Inspection Date:
09/14/2015
6. Building 911 Address:
1 Parsons Street
7. City:
Rye
8. Zip Code:
10580
9. Certificate of Occupancy Status:
A - Annual
T - Temporary
N - None
10. Certificate of Occupancy Expiration Date:
09/01/2016
Building Age, Gross Square Footage and Maintenance Staff
11. Year of Original Building:
1930
12. Gross square ft. of Building as currently configured:
260,795
13. Number of Floors:
3
14. How many full-time and part-time custodians are employed at the school (or work in the building)?
Count Employees
Full-time custodians:13
Part-time custodians:1
Totals: 14.00
06/02/2016 10:14 AM Page 1 of 47
![Page 298: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/298.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
Building Information1. Name of School District:
RYE CITY SD
2. SED District 8-Digit BEDS Code:
661800010000
3. Building Name:
Field House
4. SED 4-Digit Facility Code:
7006
5. Survey Inspection Date:
09/14/2015
6. Building 911 Address:
1 Parsons Street
7. City:
Rye
8. Zip Code:
10580
9. Certificate of Occupancy Status:
A - Annual
T - Temporary
N - None
10. Certificate of Occupancy Expiration Date:
09/01/2016
Building Age, Gross Square Footage and Maintenance Staff
11. Year of Original Building:
1973
12. Gross square ft. of Building as currently configured:
3,750
13. Number of Floors:
1
14. How many full-time and part-time custodians are employed at the school (or work in the building)?
Count Employees
Full-time custodians:0
Part-time custodians:0
Totals:
Building Ownership and Occupancy Status06/02/2016 10:34 AM Page 1 of 42
![Page 299: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/299.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
15. Building Ownership (check one):
Owned and used by district
Owned by District and leased to non-district entity
Owned by District, part used by district, part leased to non-district entity
Owned by non-district entity and leased to district
16. For which of the following purposes is the building currently used? (check all that apply)
Used for student instructional purposes
Used for district administration
Used for other district purposes
Used by other organization(s)
16a. Describe use for other district purposes:
Foot ball team room and storage
Building Users
17. How many students were registered to receive instruction in this building as of October 1, 2014? (If none,
enter "0") and skip to "Program Spaces" section. (Do not include evening class students)
0
18. Of these registered students, how many receive most of their instruction in:
Quantity
18a. Permanent instructional spaces (i.e., regularclassrooms) 0
18b. Temporary instructional spaces (i.e., portable ordemountable classrooms) attached to the building 0
18c. Non-instructional spaces used as instructionalspaces 0
18c.1 If the answer is greater than zero, which types of non-instructional spaces were being used for instructional
purposes on October 1, 2014? (check all that apply)
Cafeteria
Gymnasium
Administrative Spaces
Library
Lobby
Stairwell
Storage space
Other (please describe)
None
19. Grades Housed:
9-12
20. For how many instructional days during the 2013-14 school year (July 1 through June 30, was the building
closed due to facilities failures, system malfunctions, structural problems, fire, etc? (if none, enter "0")
0
21. Is the building used for instructional purposes in the summer?
Yes
No
06/02/2016 10:34 AM Page 2 of 42
![Page 300: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/300.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
22. Have there been renovations or construction in the building during the past 12 months?
Yes
No
23. Was major construction/renovation work since 2010 conducted when school was in session?
Yes
No
06/02/2016 10:34 AM Page 3 of 42
![Page 301: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/301.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyProgram Spaces
Program Spaces
24. Number of instructional classrooms:
0
25. Gross square footage of all instructional classrooms (combined):
0.00
26. Other spaces provided: (check all that apply)
a. N/A (none)
b. Administration
c. Art
d. Audio Visual
e. Auditorium
f. Cafeteria
g. Computer Room
h. Guidance
i. Gymnasium
j. Health Office
k. Home & Careers
l. Kitchen
m. Large Group Instruction
n. Library
o. Multipurpose Rooms
p. Music
q. Pre-K
r. Remedial Rooms
s. Resource Rooms
t. Science Labs
u. Special Education
v. Swimming Pool
w. Teacher Resource
x. Technology/Shop
y. Other (please describe)
26y. Describe other spaces
(No Response)
Space Adequacy
27. Rating of space adequacy:
Good
Fair
Poor
27a. Enter comments:
(No Response)
28. Estimated capital construction expenses anticipated for this building through 2020-2021 school year
excluding maintenance (to be answered after the building inspection is complete) $
800,000.00
29. Overall building rating (to be answered after the building inspection is complete)
Excellent
Satisfactory
Unsatisfactory
Poor
30. Was overall building rating established after consultation with health and safety committee?
Yes
No
A/E Information:
31. A/E Firm Name:
KSQ Architects
06/02/2016 10:34 AM Page 4 of 42
![Page 302: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/302.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyProgram Spaces
32. A/E Firm Address:
235 Main Street, suite 410
White Plains NY 10601
33. A/E Firm Phone Number:
9146823700
34. E-mail:
35. A/E Name:
Scott Hillje
36. A/E License #:
025556
06/02/2016 10:34 AM Page 5 of 42
![Page 303: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/303.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
Site Utilities
37. Water
Yes
No
37a. Type of Service:
Municipal or Utility provided
Well
Other
37b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
37c. Year of Last Major Reconstruction/Replacement:
1973
37d. Expected Remaining Useful Life (Years):
7
37e. Cost to Reconstruct/Replace $:
(No Response)
37f. Comments:
(No Response)
38. Site Sanitary (H)
Yes
No
38a. Type of Service:
Municipal or utility sewer
Site septic
Other
38b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
38c. Year of Last Major Reconstruction/Replacement:
1973
38d. Expected Remaining Useful Life (Years):
15
06/02/2016 10:34 AM Page 6 of 42
![Page 304: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/304.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
38e. Cost to reconstruct/Replace $:
(No Response)
38f. Comments:
(No Response)
39. Site Gas (H)
Yes
No
40. Site Fuel Oil (H)
Yes
No
40a. Number of Above-Ground Tanks:
0
40a.1 Capacity of Above-Ground Tanks (gallons):
0
40b. Number of Below-Ground Tanks:
1
40b.1 Capacity of Below-Ground Tanks (gallons):
2,500
40c. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
N/A
40d. Year of Last Major Reconstruction/Replacement:
2000
40e. Expected Remaining Useful Life (Years):
25
40f. Cost to Reconstruct/Replace $:
(No Response)
40g. Comments:
(No Response)
41. Site Electrical, Including Exterior Distribution (H)
Yes
No
06/02/2016 10:34 AM Page 7 of 42
![Page 305: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/305.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
41a. Service Provider:
Municipal or utility provided
Self-Generated
Other
N/A
41b. Type of Service:
Above Ground
Below Ground
N/A
41c. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
41d. Year of Last Major Reconstruction/Replacement:
1973
41e. Expected Remaining Useful Life (Years):
5
41f. Cost to Reconstruct/Replace $:
(No Response)
41g. Comments:
(No Response)
Stormwater Management
42. Closed Drainage Pipe Stormwater Management System
42a. Does this facility have a closed pipe system?
Yes
No
43. Open Drainage Pipe Stormwater Management System
43a. Does this facility have an open stormwater system (ditch)?
Yes
No
43b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:34 AM Page 8 of 42
![Page 306: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/306.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
43c. Year of Last Major Reconstruction/Replacement:
1973
43d. Expected Remaining Useful Life (Years):
5
43e. Cost to Reconstruct/Replace $:
(No Response)
43f. Comments:
(No Response)
44. Catch Basins/Drop Inlets/Manholes
44a. Does this facility have catch basins/drop inlets/manholes?
Yes
No
45. Culverts
45a. Does this facility have culverts?
Yes
No
46. Outfalls
46a. Does this facility have outfalls?
Yes
No
47. Infiltration Basins/Chambers
47a. Does this facility have infiltration basins/chambers?
Yes
No
48. Retention Basins
48a. Does this facility have retention basins?
Yes
No
49. Wetponds
49a. Does this facility have wetponds?
Yes
No
06/02/2016 10:34 AM Page 9 of 42
![Page 307: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/307.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
50. Manufactured Stormwater Proprietary Units
50a. Does this facility have proprietary units?
Yes
No
51. Point of Outfall Discharge: (check all that apply)
Municipal storm sewer system
Combined sewer system
Surface Water
On-site recharge
Other (describe)
Not Applicable
52. Outfall Reconnaissance Inventory
Were all stormwater outfalls inspected during dry weather for signs of non-stormwater discharge?
Yes
No
Not Applicable
06/02/2016 10:34 AM Page 10 of 42
![Page 308: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/308.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyOther Site Features
Other Site Features
53. Pavement (Roadways and Parking Lots)
Yes
No
53a. Type: (check all that apply)
Concrete
Asphalt
Gravel
Other
None
53b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
53c. Year of Last Major Reconstruction/Replacement:
1990
53d. Expected Remaining Useful Life (Years):
5
53e. Cost to Reconstruct/Replace $:
(No Response)
53f. Comments:
(No Response)
54. Sidewalks
Yes
No
54a. Type: (check all that apply)
Concrete
Asphalt
Paver
Other
54b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
54c. Year of Last Major Reconstruction/Replacement:
1990
06/02/2016 10:34 AM Page 11 of 42
![Page 309: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/309.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyOther Site Features
54d. Expected Remaining Useful Life (Years):
10
54e. Cost to Reconstruct/Replace $:
(No Response)
54f. Comments:
(No Response)
55. Playgrounds and Playground Equipment
Yes
No
56. Athletic Fields and Play Fields
Yes
No
56f. Does the facility have synthetic turf field(s)
Yes
No
56f.1 If Yes, how many synthetic turf fields?
(No Response)
56f.2 Expected Remaining Useful Life of Synthetic Turf Field(s):
(No Response)
56f.3 Type of synthetic turf field infill:
(No Response)
57. Exterior Bleachers / Stadiums
Yes
No
58. Related Structures (such as Press Boxes, Dugouts, Climbing Walls, etc.)
Yes
No
06/02/2016 10:34 AM Page 12 of 42
![Page 310: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/310.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySubstructure
Substructure
59. Foundation (S)
59a. Type (check all that apply):
Reinforced Concrete
Masonry on Concrete Footing
Other
59b. Evidence of structural concerns (check all that apply):
Structural Cracks
Heaving/Jacking
Decay/Corrosion
Water Penetration
Unsupported Ends
Other
None
59c. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
59d. Year of Last Major Reconstruction/Replacement:
1973
59e. Expected Remaining Useful Life (Years):
25
59f. Cost to Reconstruct/Replace $:
(No Response)
59g. Comments:
(No Response)
06/02/2016 10:34 AM Page 13 of 42
![Page 311: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/311.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
BUILDING ENVELOPE
60. Structural Floors (S)
60a. Type (check all that apply):
Reinforced Concrete Slab on Grade
Concrete/Metal Deck/Metal Joists
Precast Concrete Structural System
Wood Deck on Wood Trusses
Wood Deck on Wood Joists
Concrete Deck on Wood Structure
Other (specify)
60b. Evidence of Structural Concerns with Floor Support System (Beams/Joists/Trusses, etc.) (check all that
apply):
Structural Cracks
Unsupported Ends
Rot/Decay/Corrosion
Deflection
Seriously Damaged/Missing Components
Other Problems
None
60b.1 Describe Other Problems:
(No Response)
60c. Evidence of Structural Concerns with Structural Floor Deck (check all that apply):
Cracks
Deflection
Rot/Decay/Corrosion
None
60d. Overall Condition of Structural Floors:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
60e. Year of Last Major Reconstruction/Replacement:
1973
60f. Expected Remaining Useful Life (Years):
20
60g. Cost to Reconstruct/Replace $:
(No Response)
60h. Comments:
(No Response)
06/02/2016 10:34 AM Page 14 of 42
![Page 312: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/312.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
61. Exterior Walls/Columns (S)
61a. Material (check all that apply):
Concrete
Masonry
Steel
Wood
Other (specify)
61b. Evidence of Structural Concerns with Support System (columns, base plates, connections, etc.) (check all
that apply):
Structural Cracks
Rot/Decay/Corrosion
Other Problems
None
61b.1 Describe Other Problems:
(No Response)
61c. Evidence of Concerns with Exterior Cladding (check all that apply):
Cracks/Gaps
Inadequate Flashing
Efflorescence
Moisture Penetration
Rot/Decay/Corrosion
Other Problems
None
61c.1 Describe Other Problems:
(No Response)
61d. Overall Condition of Exterior Walls/Columns:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
61e. Year of Last Major Reconstruction/Replacement:
1973
61f. Expected Remaining Useful Life (Years):
20
61g. Cost to Reconstruct/Replace $:
(No Response)
61h. Comments:
(No Response)
06/02/2016 10:34 AM Page 15 of 42
![Page 313: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/313.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
62. Chimneys (S)
Yes
No
62a. Material (check all that apply):
Masonry
Concrete
Metal
Wood
Other
62a.1 Specify other:
(No Response)
62b. Overall Condition of Chimneys:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical failure
62c. Year of Last Major Reconstruction/Replacement:
1973
62.d Expected Remaining Useful Life (Years):
20
62e. Cost to Reconstruct/Replace $:
(No Response)
62f. Comments:
(No Response)
63. Parapets (S)
Yes
No
63f. Comments:
(No Response)
64. Exterior Doors
64a. Overall Condition of Exterior Door Units:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:34 AM Page 16 of 42
![Page 314: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/314.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
64b. Overall condition of exterior door hardware:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
64c. Do any exterior doors have magnetic locking devices?
Yes
No
64d. Safety/Security features are adequate?
Yes
No
64e. Year of Last Major Reconstruction/Replacement:
1973
64f. Expected Remaining Useful Life (Years):
5
64g. Cost to Reconstruct/Replace $:
(No Response)
64h. Comments:
(No Response)
65. Exterior Steps, Stairs, Ramps (S)
Yes
No
65a. Overall Condition of Exterior Steps, Stairs and Ramps
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
65b. Year of Last Major Reconstruction/Replacement:
1973
65c. Expected Remaining Useful Life (Years):
10
65d. Cost to Reconstruct/Replace $:
(No Response)
65e. Comments:
(No Response)
06/02/2016 10:34 AM Page 17 of 42
![Page 315: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/315.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
66. Fire Escapes (S)
66a. Does This Facility Have One or More Fire Escapes?
Yes
No
67. Windows
Yes
No
67a. Window Material: (check all that apply)
Aluminum
Steel
Vinyl
Solid Wood
Wood w/ External Cladding System
Other
67b. Overall Condition of Windows:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
67c. All Rescue Windows are Operable:
Yes
No
N/A
67d. Year of Last Major Reconstruction/Replacement:
1973
67e. Expected Remaining Useful Life (Years):
5
67f. Cost to Reconstruct/Replace $:
(No Response)
67g. Comments:
(No Response)
Roof and Skylights (S)
68. Roof and Skylights (S)
Yes
No
06/02/2016 10:34 AM Page 18 of 42
![Page 316: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/316.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
68a. Type of roof construction (check all that apply):
Metal deck on metal trusses/joists
Wood deck on wood trusses/joists
Wood deck on metal trusses/joists
Concrete on metal deck on metal trusses/joists
Other (describe below)
68a.1 Other roof construction type:
(No Response)
68b. Type of roofing material (check all that apply):
Single-ply membrane
Built-up
Asphalt shingle
Pre-formed metal
IRMA
Slate
Other (describe below)
68b.1 Other roofing material:
(No Response)
68c. Evidence of structural concerns with roof support system (beams/joists/trusses, etc.) (check all that apply):
Structural cracks
Unsupported ends
Rot/Decay/Corrosion
Deflection
Seriously damaged/missing components
Other concerns (describe)
None
68c.1 Describe other concerns:
(No Response)
68d. Evidence of structural concerns with roof deck (check all that apply):
Cracks
Deflection
Rot/Decay/Corrosion
None
68e. Does this facility have skylights?
Yes
No
68f. Skylight material (check all that apply):
Plastic
Glass
Other
N/A
06/02/2016 10:34 AM Page 19 of 42
![Page 317: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/317.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
68g. Overall condition of skylights:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
68h. Evidence of concerns with roofing, skylights, flashings, and drains (check all that apply):
Failures/Splits/Cracks
Rot/Decay/Corrosion
Inadequate flashing/curbs/pitch pockets
Inadequate or poorly functioning roof drains
Evidence of water penetration/active leaks
Other (specify)
None
68h.1 Specify other concerns:
(No Response)
68i. Overall Condition of Roof and Skylights:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
68j. Year of Last Major Reconstruction/Replacement:
1990
68k. Expected Remaining Useful Life (Years):
5
68l. Cost to Reconstruct/Replace $:
(No Response)
68m. Comments:
(No Response)
06/02/2016 10:34 AM Page 20 of 42
![Page 318: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/318.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
INTERIOR SPACES
69. Interior Bearing Walls and Fire Walls (S)
Yes
No
69a. Overall condition of interior bearing walls and fire walls:
Excellent
Satisfactory
Unsatisfactory
Non-functioning
Critical Failure
69b. Year of Last Major Reconstruction/Replacement:
1973
69c. Expected Remaining Useful Life (Years):
15
69d. Cost to Reconstruct/Replace $:
(No Response)
69e. Comments:
(No Response)
Other Interior Walls
70. Other Interior Walls
Yes
No
70a. Overall condition of other interior walls:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
70b. Year of Last Major Reconstruction/Replacement:
1973
70c. Expected Remaining Useful Life (Years):
10
70d. Cost to Reconstruct/Replace $:
(No Response)
70e. Comments:
(No Response)
Floor Finishes
71. Carpet
Yes
No
06/02/2016 10:34 AM Page 21 of 42
![Page 319: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/319.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
72. Resilient Tiles or Sheet Flooring
Yes
No
73. Hard Flooring (concrete; ceramic tile; stone; etc)
Yes
No
73a. Where located (check all that apply):
Instructional Space
Common Area
73b. Overall condition of hard flooring:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
73c. Year of Last Major Reconstruction/Replacement:
1973
73d. Expected Remaining Useful Life (Years):
10
73e. Cost to Reconstruct/Replace $:
(No Response)
73f. Comments:
(No Response)
74. Wood Flooring
Yes
No
Ceilings (H)
75. Ceilings (H)
Yes
No
75a. Overall condition of ceilings:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
75b. Year of Last Major Reconstruction/Replacement:
1973
06/02/2016 10:34 AM Page 22 of 42
![Page 320: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/320.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
75c. Expected Remaining Useful Life (Years):
5
75d. Cost to Reconstruct/Replace $:
(No Response)
75e. Comments:
(No Response)
Lockers
76. Lockers
Yes
No
76a. Overall condition of lockers:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
76b. Year of Last Major Reconstruction/Replacement:
1973
76c. Expected Remaining Useful Life (Years):
5
76d. Cost to Reconstruct/Replace $:
(No Response)
76e. Comments:
(No Response)
Interior Doors
77. Interior Doors
Yes
No
77a. Overall condition of interior door units:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
77b. Overall condition of interior door hardware:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:34 AM Page 23 of 42
![Page 321: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/321.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
77c. Year of Last Major Reconstruction/Replacement:
1973
77d. Expected Remaining Useful Life (Years):
5
77e. Cost to Reconstruct/Replace $:
(No Response)
77f. Comments:
(No Response)
Interior Stairs (S)
78. Interior Stairs (S)
Yes
No
Elevator, Lifts and Escalators (H)
79. Elevator, Lift, and Escalators (H)
Yes
No
Interior Electrical Distribution (H)
80. Interior Electrical Distribution (H)
Yes
No
80a. Interior electrical supply meets current needs:
Yes
No
80b. Condition of interior electrical distribution:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
80c. Year of Last Major Reconstruction/Replacement:
1973
80d. Expected Remaining Useful Life (Years):
10
80e. Cost to Reconstruct/Replace $:
(No Response)
80f. Comments:
(No Response)
Lighting Fixtures06/02/2016 10:34 AM Page 24 of 42
![Page 322: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/322.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
81. Interior Lighting Fixtures
Yes
No
81a. Condition of interior lighting fixtures:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
81b. Year of Last Major Reconstruction/Replacement:
1973
81c. Expected Remaining Useful Life (Years):
5
81d. Cost to Reconstruct/Replace $:
(No Response)
81e. Comments:
(No Response)
Communication Systems (H)
82. Communication Systems (H)
Yes
No
82a. Communication systems are adequate:
Yes
No
82b. Condition of communication systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
82c. Year of Last Major Reconstruction/Replacement:
1973
82d. Expected Remaining Useful Life (Years):
5
82e. Cost to Replace/Reconstruct $:
(No Response)
82f. Comments:
(No Response)
Swimming Pool and Swimming Pool Systems
06/02/2016 10:34 AM Page 25 of 42
![Page 323: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/323.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
83. Swimming Pool and Swimming Pool Systems
Yes
No
06/02/2016 10:34 AM Page 26 of 42
![Page 324: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/324.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
PLUMBING
84. Water Distribution System (H)
Yes
No
84a. Types of pipes (check all that apply):
Iron
Galvanized
Copper
Lead
PVC
Other
84b. Overall condition of water distribution system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
84c. Year of Last Major Reconstruction/Replacement:
1973
84d. Expected Remaining Useful Life (Years):
10
84e. Cost to Reconstruct/Replace $:
(No Response)
84f. Comments:
(No Response)
Plumbing Drainage System (H)
85. Plumbing Drainage System (H)
Yes
No
85a. Types of pipes (check all that apply):
Iron
Galvanized
Copper
Lead
PVC
Other
85b. Overall condition of drainage system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:34 AM Page 27 of 42
![Page 325: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/325.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
85c. Year of Last Major Reconstruction/Replacement:
1973
85d. Expected Remaining Useful Life (Years):
10
85e. Cost to Reconstruct/Replace $:
(No Response)
85f. Comments:
(No Response)
Hot Water Heaters (H)
86. Hot Water Heaters (H)
Yes
No
86a. Type of fuel (check all that apply):
Oil
Natural Gas
Electricity
Propane
Other
86b. Overall condition of hot water heaters:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
86c. Year of Last Major Reconstruction/Replacement:
1973
86d. Expected Remaining Useful Life (Years):
5
86e. Cost to Reconstruct/Replace $:
(No Response)
86f. Comments:
(No Response)
Plumbing Fixtures
87. Plumbing Fixtures
Yes
No
06/02/2016 10:34 AM Page 28 of 42
![Page 326: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/326.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
87a. Overall condition of plumbing fixtures (including toilets, urinals, lavatories, etc):
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
87b. Year of Last Major Reconstruction/Replacement:
1973
87c. Expected Remaining Useful Life (Years):
5
87d. Cost to Reconstruct/Replace $:
(No Response)
87e. Comments:
(No Response)
06/02/2016 10:34 AM Page 29 of 42
![Page 327: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/327.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
HVAC SYSTEMS
88. HVAC Systems Type
88a. Does this building have a central HVAC system?
Yes
No
Heat Generating Systems (H)
88b.1 Other central HVAC system technology:
(No Response)
89. Heat Generating Systems (H)
Yes
No
89a. Heat generation source (check all that apply):
Boiler / Hot Water
Boiler / Steam
Furnace / Forced Air
Unit Ventilation
Geothermal
Biomass
Electric
Other (describe below)
89a.1 Other heat generation source:
(No Response)
89b. Overall condition of heat generating systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
89c. Year of Last Major Reconstruction/Replacement:
1990
89d. Expected Remaining Useful Life (Years):
10
89e. Cost to Reconstruct/Replace $:
(No Response)
89f. Comments:
(No Response)
Heating Fuel/Energy Systems (H)
90. Heating Fuel / Energy Systems (H)
Yes
No
06/02/2016 10:34 AM Page 30 of 42
![Page 328: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/328.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
90a. Overall condition of heating fuel / energy systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
90b. Year of Last Major Reconstruction/Replacement:
2000
90c. Expected Remaining Useful Life (Years):
5
90d. Cost to Reconstruct/Replace $:
(No Response)
90e. Comments:
(No Response)
Cooling/Air Conditioning Generating Systems
91. Cooling / Air-Conditioning Generating Systems
Yes
No
AIR HANDLING AND VENTILATION EQUIPMENT
92. Air Handling and Ventilation Equipment: Supply Units, Exhaust Units, Relief/Return Units, etc. (H)
Yes
No
92a. Overall condition of air handling and ventilation systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
92b. Year of Last Major Reconstruction/Replacement:
1990
92c. Expected Remaining Useful Life (Years):
10
92d. Cost to Reconstruct/Replace $:
(No Response)
92e. Comments:
(No Response)
Piped Heating and Cooling Distribution Systems
06/02/2016 10:34 AM Page 31 of 42
![Page 329: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/329.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
93. Piped Heating and Cooling Distribution Systems: Piping, Pumps, Radiators, Convectorss, Traps, Insulation,
etc. (H)
Yes
No
93a. Overall condition of piped heating and cooling distribution systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
93b. Year of Last Major Reconstruction/Replacement:
1990
93c. Expected Remaining Useful Life (Years):
10
93d. Cost to Reconstruct/Replace $:
(No Response)
93e. Comments:
(No Response)
Ducted Heating and Cooling Distrbution Systems
94. Ducted Heating and Cooling Distribution Systems: Ductwork, Control Dampers, Fire/Smoke Dampers, VAVs,
Insulation, etc. (H)
Yes
No
94a. Overall condition of ducted heating and cooling distribution systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
94b. Year of Last Major Reconstruction/Replacement:
1990
94c. Expected Remaining Useful Life (Years):
10
94d. Cost to Reconstruct/Replace $:
(No Response)
94e. Comments:
(No Response)
HVAC Control Systems
06/02/2016 10:34 AM Page 32 of 42
![Page 330: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/330.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
95. HVAC Control Systems (H)
Yes
No
95a. Overall condition of control systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
95b. Year of Last Major Reconstruction/Replacement:
1990
95c. Expected Remaining Useful Life (Years):
5
95d. Cost to Reconstruct/Replace $:
(No Response)
95e. Comments:
(No Response)
06/02/2016 10:34 AM Page 33 of 42
![Page 331: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/331.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyFire Safety Systems
Fire Safety Systems
96. Fire Alarm Systems (H)
Yes
No
96a. Overall condition of fire alarm system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
96b. Year of Last Major Reconstruction/Replacement:
1973
96c. Expected Remaining Useful Life (Years):
5
96d. Cost to Reconstruct/Replace $:
(No Response)
96e. Comments:
(No Response)
Smoke Detection System (H)
97. Smoke Detection Systems (H)
Yes
No
97a. Overall condition of smoke detection systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
97b. Year of Last Major Reconstruction/Replacement:
1973
97c. Expected Remaining Useful Life (Years):
5
97d. Cost to Reconstruct/Replace $:
(No Response)
97e. Comments:
(No Response)
Fire Suppression Systems
98. Fire Suppression Systems: Sprinklers, Standpipes, Kitchen Hoods, etc. (H)
Yes
No
06/02/2016 10:34 AM Page 34 of 42
![Page 332: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/332.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyFire Safety Systems
Emergency/Exit Lighting Systems
99. Emergency / Exit Lighting Systems (H)
Yes
No
99a. Overall condition of emergency / exit lighting systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
99b. Year of Last Major Reconstruction/Replacement:
1973
99c. Expected Remaining Useful Life (Years):
5
99d. Cost to Reconstruct/Replace $:
(No Response)
99e. Comments;
Recommend adding exterior emergency egress lights
Emergency/Standby Power Systems
100. Emergency or Standby Power System (H)
Yes
No
06/02/2016 10:34 AM Page 35 of 42
![Page 333: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/333.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyAccessibility
ACCESSIBILITY
101. Exterior Accessible Route (H)
People with disabilities should be able to arrive on site, approach the building, and enter as freely as everyone
else. At least one route of travel should be safe and accessible for everyone, including people with disabilities.
This route must include handicapped parking, curb cuts, ramps, and automatic door operators as necessary to
enter the building.
Is there an accessible exterior route as specified above?
Yes
No
102. Interior Accessible Route, Access to Goods and Services, and Restroom Facilities (H)
The layout of the building should allow people with disabilities to obtain materials or services and use the facilities
without assistance. This should include access to general purpose and specialized classrooms, public assembly
spaces (such as libraries, gymnasiums, auditoriums), nurse's office, main office, and restroom facilities. Services
include drinking fountains, telephones, and other amenities.
Is there an accessible interior route as specified above?
Yes
No
103. Additional Information on Accessibility
If the building lacks accessible interior or exterior routes:
103a. Cost of improvements needed to provide accessible exterior and interior routes as specified above $:
(No Response)
103b. Comments:
(No Response)
06/02/2016 10:34 AM Page 36 of 42
![Page 334: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/334.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyEnvironment/Comfort/Health
ENVIRONMENT/COMFORT/HEALTH
104. General Appearance
104a. Overall Rating:
Good
Fair
Poor
104b. Comments:
(No Response)
105. Cleanliness
105a. Overall Rating:
Good
Fair
Poor
105b. Comments:
(No Response)
106. Are there walk off mats; grills in the entryway?
Yes
No
107. Is there noise in classrooms from HVAC units, traffic, etc. that may impact education?
Yes
No
108. Lighting Quality:
108a. Types of lighting in general purpose classrooms (check all that apply):
Daylight
Flourescent-not full spectrum
Flourescent full spectrum
Incandescent
Other (describe)
108b. Are there blinds in the classroom to prevent glare?
Yes
No
108c. Overall Rating:
Good
Fair
Poor
108d. Comments:
(No Response)
06/02/2016 10:34 AM Page 37 of 42
![Page 335: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/335.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyEnvironment/Comfort/Health
109. Evidence of Vermin
109a. Is there evidence of active infestations of...(check all that apply)?
Rodents
Wood-boring or Wood-eating Insects
Cockroaches
Other Vermin
None
06/02/2016 10:34 AM Page 38 of 42
![Page 336: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/336.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
Indoor Air Quality
110. Mold
110a. Is there visible mold or moldy odors?
Yes
No
110c. Are any surfaces constructed of any of the following materials?
Paper-faced or gypsum products
Cellulose products (typically ceiling tiles)
110d. Estimated cost of necessary improvements $:
(No Response)
110d. Comments:
(No Response)
111. Humidity/Moisture
111a. Overall rating of humidity/moisture condition in building:
Good
Fair
Poor
111b. Are any of the following found in/or around classroom areas (check all that apply)?
Active leaks in roof
Active leaks in plumbing
Moisture condensation
Visible stains or water damage
None
111c. Are any of the following found in/or around other areas (check all that apply)?
Active leaks in roof
Active leaks in plumbing
Moisture condensation
Visible stains or water damage
None
112. Ventilation: fresh air intake locations, air filters, etc.
112a. Are fresh air intakes near the bus loading, truck delivery, or garbage storage/disposal areas?
Yes
No
112b. Is there accumulated dirt, dust or debris around fresh air intakes?
Yes
No
112c. Are fresh air intakes free of blockage?
Yes
No
06/02/2016 10:34 AM Page 39 of 42
![Page 337: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/337.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
112d. Is accumulated dirt, dust or debris in ductwork?
Yes
No
112e. Are dampers functioning as designed?
Yes
No
112f. Condition of air filters:
Good
Fair
Poor
112g. Outside air is adequate for occupant load:
Yes
No
112h. Rating of ventilation/indoor air quality:
Good
Fair
Poor
112i. Comments:
(No Response)
113. Indoor Air Quality (IAQ) Plan
113a. Does the school district use EPA's Tools for Schools program?
Yes
No
113b. If No, is some other IAQ management plan used?
Yes
No
113c. Has the District assigned IAQ responsibilities to a designated individual?
Yes
No
113c.1 If Yes, what is their job title?
(No Response)
114. Does the school practice IPM?
Yes
No
114a. Is vegetation kept one foot away from the building?
Yes
No
114b. Are crevices and holes in walls, floors and pavement sealed or eliminated?
Yes
No
06/02/2016 10:34 AM Page 40 of 42
![Page 338: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/338.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
114c. Is there a certified pesticide applicator on staff?
Yes
No
114d. Are pesticides used in the building?
Yes
No
114d.1 If Yes, how are they typically applied?
Spot treatment
Area wide treatments
114e. Are pesticides used on the grounds?
Yes
No
114e.1 If Yes, was an emergency exemption granted by the Board of Education?
Yes
No
115. Does the school have a passive radon mitigation system installed (was built with radon resistant features)?
Yes
No
115a. Has the facility been tested for the presence of radon?
Yes
No
115b. Were any of the results of the test greater than or equal to 4 picocuries per liter (pCi/L)?
Yes
No
115c. If Yes, did the school take steps to mitigate the elevated radon levels?
Yes, active mitigation system installed
Yes, passive mitigation system made active
Yes, ventilation controls (HVAC) adjusted
Yes, other (describe)
No action taken
115c.1 Describe other actions taken to mitigate elevated radon levels:
(No Response)
06/02/2016 10:34 AM Page 41 of 42
![Page 339: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/339.jpg)
RYE CITY SD Status Date: 03/16/2016 07:39 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyAmerican Red Cross
American Red Cross Shelter
116. American Red Cross Shelter
Yes
No
06/02/2016 10:34 AM Page 42 of 42
![Page 340: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/340.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
Building Ownership and Occupancy Status
15. Building Ownership (check one):
Owned and used by district
Owned by District and leased to non-district entity
Owned by District, part used by district, part leased to non-district entity
Owned by non-district entity and leased to district
16. For which of the following purposes is the building currently used? (check all that apply)
Used for student instructional purposes
Used for district administration
Used for other district purposes
Used by other organization(s)
Building Users
17. How many students were registered to receive instruction in this building as of October 1, 2014? (If none,
enter "0") and skip to "Program Spaces" section. (Do not include evening class students)
1,793
18. Of these registered students, how many receive most of their instruction in:
Quantity
18a. Permanent instructional spaces (i.e., regularclassrooms) 1793
18b. Temporary instructional spaces (i.e., portable ordemountable classrooms) attached to the building 0
18c. Non-instructional spaces used as instructionalspaces 0
18c.1 If the answer is greater than zero, which types of non-instructional spaces were being used for instructional
purposes on October 1, 2014? (check all that apply)
Cafeteria
Gymnasium
Administrative Spaces
Library
Lobby
Stairwell
Storage space
Other (please describe)
None
19. Grades Housed:
9-12
20. For how many instructional days during the 2013-14 school year (July 1 through June 30, was the building
closed due to facilities failures, system malfunctions, structural problems, fire, etc? (if none, enter "0")
0
21. Is the building used for instructional purposes in the summer?
Yes
No
06/02/2016 10:14 AM Page 2 of 47
![Page 341: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/341.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
22. Have there been renovations or construction in the building during the past 12 months?
Yes
No
23. Was major construction/renovation work since 2010 conducted when school was in session?
Yes
No
06/02/2016 10:14 AM Page 3 of 47
![Page 342: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/342.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyProgram Spaces
Program Spaces
24. Number of instructional classrooms:
136
25. Gross square footage of all instructional classrooms (combined):
117,400.00
26. Other spaces provided: (check all that apply)
a. N/A (none)
b. Administration
c. Art
d. Audio Visual
e. Auditorium
f. Cafeteria
g. Computer Room
h. Guidance
i. Gymnasium
j. Health Office
k. Home & Careers
l. Kitchen
m. Large Group Instruction
n. Library
o. Multipurpose Rooms
p. Music
q. Pre-K
r. Remedial Rooms
s. Resource Rooms
t. Science Labs
u. Special Education
v. Swimming Pool
w. Teacher Resource
x. Technology/Shop
y. Other (please describe)
26y. Describe other spaces
(No Response)
Space Adequacy
27. Rating of space adequacy:
Good
Fair
Poor
27a. Enter comments:
(No Response)
28. Estimated capital construction expenses anticipated for this building through 2020-2021 school year
excluding maintenance (to be answered after the building inspection is complete) $
6,293,042.00
29. Overall building rating (to be answered after the building inspection is complete)
Excellent
Satisfactory
Unsatisfactory
Poor
30. Was overall building rating established after consultation with health and safety committee?
Yes
No
A/E Information:
31. A/E Firm Name:
KSQ Design
06/02/2016 10:14 AM Page 4 of 47
![Page 343: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/343.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyProgram Spaces
32. A/E Firm Address:
235 Main Street
Suite 410
White Plains NY 10601
33. A/E Firm Phone Number:
9146823700
34. E-mail:
35. A/E Name:
Scott Hillje
36. A/E License #:
025556
06/02/2016 10:14 AM Page 5 of 47
![Page 344: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/344.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
Site Utilities
37. Water
Yes
No
37a. Type of Service:
Municipal or Utility provided
Well
Other
37b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
37c. Year of Last Major Reconstruction/Replacement:
1992
37d. Expected Remaining Useful Life (Years):
10
37e. Cost to Reconstruct/Replace $:
0.00
37f. Comments:
(No Response)
38. Site Sanitary (H)
Yes
No
38a. Type of Service:
Municipal or utility sewer
Site septic
Other
38b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
38c. Year of Last Major Reconstruction/Replacement:
1960
38d. Expected Remaining Useful Life (Years):
10
06/02/2016 10:14 AM Page 6 of 47
![Page 345: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/345.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
38e. Cost to reconstruct/Replace $:
0.00
38f. Comments:
(No Response)
39. Site Gas (H)
Yes
No
39a. Type of gas service:
Natural Gas
Liquid Petroleum
39b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
39c. Year of Last Major Reconstruction/Replacement;
2011
39d. Expected Remaining Useful Life (Years):
10
39e. Cost to Reconstruct/Replace $:
0.00
39f. Comments:
(No Response)
40. Site Fuel Oil (H)
Yes
No
40a. Number of Above-Ground Tanks:
1
40a.1 Capacity of Above-Ground Tanks (gallons):
20,000
40b. Number of Below-Ground Tanks:
0
40b.1 Capacity of Below-Ground Tanks (gallons):
(No Response)
06/02/2016 10:14 AM Page 7 of 47
![Page 346: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/346.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
40c. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
N/A
40d. Year of Last Major Reconstruction/Replacement:
1950
40e. Expected Remaining Useful Life (Years):
5
40f. Cost to Reconstruct/Replace $:
(No Response)
40g. Comments:
(No Response)
41. Site Electrical, Including Exterior Distribution (H)
Yes
No
41a. Service Provider:
Municipal or utility provided
Self-Generated
Other
N/A
41b. Type of Service:
Above Ground
Below Ground
N/A
41c. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
41d. Year of Last Major Reconstruction/Replacement:
2006
41e. Expected Remaining Useful Life (Years):
10
41f. Cost to Reconstruct/Replace $:
0.00
06/02/2016 10:14 AM Page 8 of 47
![Page 347: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/347.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
41g. Comments:
(No Response)
Stormwater Management
42. Closed Drainage Pipe Stormwater Management System
42a. Does this facility have a closed pipe system?
Yes
No
42b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
42c. Year of Last Major Reconstruction/Replacement:
2014
42d. Expected Remaining Useful Life (Years):
5
42e. Cost to Reconstruct/Replace $:
(No Response)
42f. Comments:
(No Response)
43. Open Drainage Pipe Stormwater Management System
43a. Does this facility have an open stormwater system (ditch)?
Yes
No
44. Catch Basins/Drop Inlets/Manholes
44a. Does this facility have catch basins/drop inlets/manholes?
Yes
No
44b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
44c. Year of Last Major Reconstruction/Replacement:
2014
06/02/2016 10:14 AM Page 9 of 47
![Page 348: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/348.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
44d. Expected Remaining Useful Life (Years):
20
44e. Cost to Reconstruct/Replace $:
0.00
44f. Comments:
(No Response)
45. Culverts
45a. Does this facility have culverts?
Yes
No
46. Outfalls
46a. Does this facility have outfalls?
Yes
No
47. Infiltration Basins/Chambers
47a. Does this facility have infiltration basins/chambers?
Yes
No
48. Retention Basins
48a. Does this facility have retention basins?
Yes
No
49. Wetponds
49a. Does this facility have wetponds?
Yes
No
50. Manufactured Stormwater Proprietary Units
50a. Does this facility have proprietary units?
Yes
No
06/02/2016 10:14 AM Page 10 of 47
![Page 349: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/349.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
51. Point of Outfall Discharge: (check all that apply)
Municipal storm sewer system
Combined sewer system
Surface Water
On-site recharge
Other (describe)
Not Applicable
52. Outfall Reconnaissance Inventory
Were all stormwater outfalls inspected during dry weather for signs of non-stormwater discharge?
Yes
No
Not Applicable
06/02/2016 10:14 AM Page 11 of 47
![Page 350: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/350.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyOther Site Features
Other Site Features
53. Pavement (Roadways and Parking Lots)
Yes
No
53a. Type: (check all that apply)
Concrete
Asphalt
Gravel
Other
None
53b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
53c. Year of Last Major Reconstruction/Replacement:
2014
53d. Expected Remaining Useful Life (Years):
10
53e. Cost to Reconstruct/Replace $:
(No Response)
53f. Comments:
(No Response)
54. Sidewalks
Yes
No
54a. Type: (check all that apply)
Concrete
Asphalt
Paver
Other
54b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
54c. Year of Last Major Reconstruction/Replacement:
2014
06/02/2016 10:14 AM Page 12 of 47
![Page 351: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/351.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyOther Site Features
54d. Expected Remaining Useful Life (Years):
10
54e. Cost to Reconstruct/Replace $:
(No Response)
54f. Comments:
Replace damaged sections at MS
55. Playgrounds and Playground Equipment
Yes
No
56. Athletic Fields and Play Fields
Yes
No
56a. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
56b. Year of Last Major Reconstruction/Replacement:
2007
56c. Expected Remaining Useful Life (Years):
5
56d. Cost to Reconstruct/Replace $:
(No Response)
56e. Comments:
(No Response)
56f. Does the facility have synthetic turf field(s)
Yes
No
56f.1 If Yes, how many synthetic turf fields?
1
56f.2 Expected Remaining Useful Life of Synthetic Turf Field(s):
5
56f.3 Type of synthetic turf field infill:
rubber
06/02/2016 10:14 AM Page 13 of 47
![Page 352: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/352.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyOther Site Features
57. Exterior Bleachers / Stadiums
Yes
No
57a. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
57b. Year of Last Major Reconstruction/Replacement:
1996
57c. Expected Remaining Useful Life (Years):
20
57d. Cost to Reconstruct/Replace $:
(No Response)
57e. Comments:
(No Response)
58. Related Structures (such as Press Boxes, Dugouts, Climbing Walls, etc.)
Yes
No
06/02/2016 10:14 AM Page 14 of 47
![Page 353: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/353.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySubstructure
Substructure
59. Foundation (S)
59a. Type (check all that apply):
Reinforced Concrete
Masonry on Concrete Footing
Other
59b. Evidence of structural concerns (check all that apply):
Structural Cracks
Heaving/Jacking
Decay/Corrosion
Water Penetration
Unsupported Ends
Other
None
59c. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
59d. Year of Last Major Reconstruction/Replacement:
2014
59e. Expected Remaining Useful Life (Years):
40
59f. Cost to Reconstruct/Replace $:
(No Response)
59g. Comments:
(No Response)
06/02/2016 10:14 AM Page 15 of 47
![Page 354: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/354.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
BUILDING ENVELOPE
60. Structural Floors (S)
60a. Type (check all that apply):
Reinforced Concrete Slab on Grade
Concrete/Metal Deck/Metal Joists
Precast Concrete Structural System
Wood Deck on Wood Trusses
Wood Deck on Wood Joists
Concrete Deck on Wood Structure
Other (specify)
60b. Evidence of Structural Concerns with Floor Support System (Beams/Joists/Trusses, etc.) (check all that
apply):
Structural Cracks
Unsupported Ends
Rot/Decay/Corrosion
Deflection
Seriously Damaged/Missing Components
Other Problems
None
60b.1 Describe Other Problems:
(No Response)
60c. Evidence of Structural Concerns with Structural Floor Deck (check all that apply):
Cracks
Deflection
Rot/Decay/Corrosion
None
60d. Overall Condition of Structural Floors:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
60e. Year of Last Major Reconstruction/Replacement:
2014
60f. Expected Remaining Useful Life (Years):
30
60g. Cost to Reconstruct/Replace $:
(No Response)
60h. Comments:
(No Response)
06/02/2016 10:14 AM Page 16 of 47
![Page 355: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/355.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
61. Exterior Walls/Columns (S)
61a. Material (check all that apply):
Concrete
Masonry
Steel
Wood
Other (specify)
61b. Evidence of Structural Concerns with Support System (columns, base plates, connections, etc.) (check all
that apply):
Structural Cracks
Rot/Decay/Corrosion
Other Problems
None
61b.1 Describe Other Problems:
(No Response)
61c. Evidence of Concerns with Exterior Cladding (check all that apply):
Cracks/Gaps
Inadequate Flashing
Efflorescence
Moisture Penetration
Rot/Decay/Corrosion
Other Problems
None
61c.1 Describe Other Problems:
(No Response)
61d. Overall Condition of Exterior Walls/Columns:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
61e. Year of Last Major Reconstruction/Replacement:
2014
61f. Expected Remaining Useful Life (Years):
40
61g. Cost to Reconstruct/Replace $:
(No Response)
61h. Comments:
Recommend spot masory repointing
06/02/2016 10:14 AM Page 17 of 47
![Page 356: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/356.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
62. Chimneys (S)
Yes
No
62a. Material (check all that apply):
Masonry
Concrete
Metal
Wood
Other
62a.1 Specify other:
(No Response)
62b. Overall Condition of Chimneys:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical failure
62c. Year of Last Major Reconstruction/Replacement:
1930
62.d Expected Remaining Useful Life (Years):
20
62e. Cost to Reconstruct/Replace $:
(No Response)
62f. Comments:
(No Response)
63. Parapets (S)
Yes
No
63a. Construction Type (check all that apply):
Masonry
Concrete
Metal
Wood
Other (specify)
63a.1 Specify Other:
(No Response)
63b. Overall condition of parapets:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:14 AM Page 18 of 47
![Page 357: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/357.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
63c. Year of Last Major Reconstruction/Replacement:
2014
63d. Expected Remaining Useful Life (Years):
20
63e. Cost to Reconstruct/Replace $:
(No Response)
63f. Comments:
(No Response)
64. Exterior Doors
64a. Overall Condition of Exterior Door Units:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
64b. Overall condition of exterior door hardware:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
64c. Do any exterior doors have magnetic locking devices?
Yes
No
64d. Safety/Security features are adequate?
Yes
No
64e. Year of Last Major Reconstruction/Replacement:
2014
64f. Expected Remaining Useful Life (Years):
10
64g. Cost to Reconstruct/Replace $:
(No Response)
64h. Comments:
(No Response)
65. Exterior Steps, Stairs, Ramps (S)
Yes
No
06/02/2016 10:14 AM Page 19 of 47
![Page 358: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/358.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
65a. Overall Condition of Exterior Steps, Stairs and Ramps
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
65b. Year of Last Major Reconstruction/Replacement:
2014
65c. Expected Remaining Useful Life (Years):
5
65d. Cost to Reconstruct/Replace $:
(No Response)
65e. Comments:
(No Response)
66. Fire Escapes (S)
66a. Does This Facility Have One or More Fire Escapes?
Yes
No
67. Windows
Yes
No
67a. Window Material: (check all that apply)
Aluminum
Steel
Vinyl
Solid Wood
Wood w/ External Cladding System
Other
67b. Overall Condition of Windows:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
67c. All Rescue Windows are Operable:
Yes
No
N/A
67d. Year of Last Major Reconstruction/Replacement:
2014
06/02/2016 10:14 AM Page 20 of 47
![Page 359: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/359.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
67e. Expected Remaining Useful Life (Years):
10
67f. Cost to Reconstruct/Replace $:
(No Response)
67g. Comments:
(No Response)
Roof and Skylights (S)
68. Roof and Skylights (S)
Yes
No
68a. Type of roof construction (check all that apply):
Metal deck on metal trusses/joists
Wood deck on wood trusses/joists
Wood deck on metal trusses/joists
Concrete on metal deck on metal trusses/joists
Other (describe below)
68a.1 Other roof construction type:
(No Response)
68b. Type of roofing material (check all that apply):
Single-ply membrane
Built-up
Asphalt shingle
Pre-formed metal
IRMA
Slate
Other (describe below)
68b.1 Other roofing material:
(No Response)
68c. Evidence of structural concerns with roof support system (beams/joists/trusses, etc.) (check all that apply):
Structural cracks
Unsupported ends
Rot/Decay/Corrosion
Deflection
Seriously damaged/missing components
Other concerns (describe)
None
68c.1 Describe other concerns:
(No Response)
06/02/2016 10:14 AM Page 21 of 47
![Page 360: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/360.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
68d. Evidence of structural concerns with roof deck (check all that apply):
Cracks
Deflection
Rot/Decay/Corrosion
None
68e. Does this facility have skylights?
Yes
No
68f. Skylight material (check all that apply):
Plastic
Glass
Other
N/A
68g. Overall condition of skylights:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
68h. Evidence of concerns with roofing, skylights, flashings, and drains (check all that apply):
Failures/Splits/Cracks
Rot/Decay/Corrosion
Inadequate flashing/curbs/pitch pockets
Inadequate or poorly functioning roof drains
Evidence of water penetration/active leaks
Other (specify)
None
68h.1 Specify other concerns:
(No Response)
68i. Overall Condition of Roof and Skylights:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
68j. Year of Last Major Reconstruction/Replacement:
2014
68k. Expected Remaining Useful Life (Years):
5
68l. Cost to Reconstruct/Replace $:
(No Response)
68m. Comments:
(No Response)
06/02/2016 10:14 AM Page 22 of 47
![Page 361: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/361.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
INTERIOR SPACES
69. Interior Bearing Walls and Fire Walls (S)
Yes
No
69a. Overall condition of interior bearing walls and fire walls:
Excellent
Satisfactory
Unsatisfactory
Non-functioning
Critical Failure
69b. Year of Last Major Reconstruction/Replacement:
2014
69c. Expected Remaining Useful Life (Years):
40
69d. Cost to Reconstruct/Replace $:
(No Response)
69e. Comments:
(No Response)
Other Interior Walls
70. Other Interior Walls
Yes
No
70a. Overall condition of other interior walls:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
70b. Year of Last Major Reconstruction/Replacement:
2014
70c. Expected Remaining Useful Life (Years):
40
70d. Cost to Reconstruct/Replace $:
(No Response)
70e. Comments:
(No Response)
Floor Finishes
71. Carpet
Yes
No
06/02/2016 10:14 AM Page 23 of 47
![Page 362: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/362.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
71a. Where located (check all that apply):
Instructional Space
Common Area
71b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
71c. Year of Last Major Reconstruction/Replacement:
2005
71d. Expected Remaining Useful Life (Years):
5
71e. Cost to Reconstruct/Replace $:
(No Response)
71f. Comments:
(No Response)
72. Resilient Tiles or Sheet Flooring
Yes
No
72a. Where located (check all that apply):
Instructional Space
Common Area
72b. Overall condition of resilient tiles or sheet flooring:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
72c. Year of Last Major Reconstruction/Replacement:
2014
72d. Expected Remaining Useful Life (Years):
10
72e. Cost to Reconstruct/Replace $:
(No Response)
72f. Comments:
(No Response)
06/02/2016 10:14 AM Page 24 of 47
![Page 363: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/363.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
73. Hard Flooring (concrete; ceramic tile; stone; etc)
Yes
No
73a. Where located (check all that apply):
Instructional Space
Common Area
73b. Overall condition of hard flooring:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
73c. Year of Last Major Reconstruction/Replacement:
2014
73d. Expected Remaining Useful Life (Years):
10
73e. Cost to Reconstruct/Replace $:
(No Response)
73f. Comments:
(No Response)
74. Wood Flooring
Yes
No
74a. Where located (check all that apply):
Instructional Space
Common Area
74b. Overall condition of wood flooring:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
74c. Year of Last Major Reconstruction/Replacement:
2005
74d. Expected Remaining Useful Life (Years):
10
74e. Cost to Reconstruct/Replace $:
(No Response)
06/02/2016 10:14 AM Page 25 of 47
![Page 364: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/364.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
74f. Comments:
(No Response)
Ceilings (H)
75. Ceilings (H)
Yes
No
75a. Overall condition of ceilings:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
75b. Year of Last Major Reconstruction/Replacement:
2014
75c. Expected Remaining Useful Life (Years):
10
75d. Cost to Reconstruct/Replace $:
(No Response)
75e. Comments:
(No Response)
Lockers
76. Lockers
Yes
No
76a. Overall condition of lockers:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
76b. Year of Last Major Reconstruction/Replacement:
2014
76c. Expected Remaining Useful Life (Years):
15
76d. Cost to Reconstruct/Replace $:
(No Response)
76e. Comments:
(No Response)
Interior Doors
06/02/2016 10:14 AM Page 26 of 47
![Page 365: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/365.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
77. Interior Doors
Yes
No
77a. Overall condition of interior door units:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
77b. Overall condition of interior door hardware:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
77c. Year of Last Major Reconstruction/Replacement:
2014
77d. Expected Remaining Useful Life (Years):
10
77e. Cost to Reconstruct/Replace $:
(No Response)
77f. Comments:
reccomend replacing HS classroom doors except 2014 addition
Interior Stairs (S)
78. Interior Stairs (S)
Yes
No
78a. Overall condition of interior stairs:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
78b. Year of Last Major Reconstruction/Replacement:
2014
78c. Expected Remaining Useful Life (Years):
25
78d. Cost to Reconstruct/Replace $:
(No Response)
06/02/2016 10:14 AM Page 27 of 47
![Page 366: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/366.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
78e. Comments:
(No Response)
Elevator, Lifts and Escalators (H)
79. Elevator, Lift, and Escalators (H)
Yes
No
79a. Overall condition of elevators, lifts, escalators:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
79b. Year of Last Major Reconstruction/Replacement:
1983
79c. Expected Remaining Useful Life (Years):
15
79d. Cost to Reconstruct/Replace $
(No Response)
79e. Comments:
(No Response)
Interior Electrical Distribution (H)
80. Interior Electrical Distribution (H)
Yes
No
80a. Interior electrical supply meets current needs:
Yes
No
80b. Condition of interior electrical distribution:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
80c. Year of Last Major Reconstruction/Replacement:
2014
80d. Expected Remaining Useful Life (Years):
5
80e. Cost to Reconstruct/Replace $:
(No Response)
06/02/2016 10:14 AM Page 28 of 47
![Page 367: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/367.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
80f. Comments:
Recomend old panel board replacement, thermal and meggar testing. Provide general convenience receptacles for additional coverage.
Lighting Fixtures
81. Interior Lighting Fixtures
Yes
No
81a. Condition of interior lighting fixtures:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
81b. Year of Last Major Reconstruction/Replacement:
2014
81c. Expected Remaining Useful Life (Years):
5
81d. Cost to Reconstruct/Replace $:
(No Response)
81e. Comments:
Recommend replacing MS Gym Lighting. Upgrade Auditorium theatrical dimming sytem. Provide occupancy sensors throughout
Communication Systems (H)
82. Communication Systems (H)
Yes
No
82a. Communication systems are adequate:
Yes
No
82b. Condition of communication systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
82c. Year of Last Major Reconstruction/Replacement:
2014
82d. Expected Remaining Useful Life (Years):
5
82e. Cost to Replace/Reconstruct $:
(No Response)
06/02/2016 10:14 AM Page 29 of 47
![Page 368: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/368.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
82f. Comments:
Provide public address speakers throughout corridors and wireless synchronized clocks.
Swimming Pool and Swimming Pool Systems
83. Swimming Pool and Swimming Pool Systems
Yes
No
06/02/2016 10:14 AM Page 30 of 47
![Page 369: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/369.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
PLUMBING
84. Water Distribution System (H)
Yes
No
84a. Types of pipes (check all that apply):
Iron
Galvanized
Copper
Lead
PVC
Other
84b. Overall condition of water distribution system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
84c. Year of Last Major Reconstruction/Replacement:
2014
84d. Expected Remaining Useful Life (Years):
10
84e. Cost to Reconstruct/Replace $:
(No Response)
84f. Comments:
(No Response)
Plumbing Drainage System (H)
85. Plumbing Drainage System (H)
Yes
No
85a. Types of pipes (check all that apply):
Iron
Galvanized
Copper
Lead
PVC
Other
85b. Overall condition of drainage system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:14 AM Page 31 of 47
![Page 370: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/370.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
85c. Year of Last Major Reconstruction/Replacement:
2014
85d. Expected Remaining Useful Life (Years):
10
85e. Cost to Reconstruct/Replace $:
(No Response)
85f. Comments:
(No Response)
Hot Water Heaters (H)
86. Hot Water Heaters (H)
Yes
No
86a. Type of fuel (check all that apply):
Oil
Natural Gas
Electricity
Propane
Other
86b. Overall condition of hot water heaters:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
86c. Year of Last Major Reconstruction/Replacement:
2007
86d. Expected Remaining Useful Life (Years):
10
86e. Cost to Reconstruct/Replace $:
(No Response)
86f. Comments:
(No Response)
Plumbing Fixtures
87. Plumbing Fixtures
Yes
No
06/02/2016 10:14 AM Page 32 of 47
![Page 371: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/371.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
87a. Overall condition of plumbing fixtures (including toilets, urinals, lavatories, etc):
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
87b. Year of Last Major Reconstruction/Replacement:
2014
87c. Expected Remaining Useful Life (Years):
10
87d. Cost to Reconstruct/Replace $:
(No Response)
87e. Comments:
(No Response)
06/02/2016 10:14 AM Page 33 of 47
![Page 372: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/372.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
HVAC SYSTEMS
88. HVAC Systems Type
88a. Does this building have a central HVAC system?
Yes
No
Heat Generating Systems (H)
88b.1 Other central HVAC system technology:
(No Response)
89. Heat Generating Systems (H)
Yes
No
89a. Heat generation source (check all that apply):
Boiler / Hot Water
Boiler / Steam
Furnace / Forced Air
Unit Ventilation
Geothermal
Biomass
Electric
Other (describe below)
89a.1 Other heat generation source:
(No Response)
89b. Overall condition of heat generating systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
89c. Year of Last Major Reconstruction/Replacement:
2007
89d. Expected Remaining Useful Life (Years):
10
89e. Cost to Reconstruct/Replace $:
(No Response)
89f. Comments:
Recommend replacing all steam traps
Heating Fuel/Energy Systems (H)
90. Heating Fuel / Energy Systems (H)
Yes
No
06/02/2016 10:14 AM Page 34 of 47
![Page 373: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/373.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
90a. Overall condition of heating fuel / energy systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
90b. Year of Last Major Reconstruction/Replacement:
2011
90c. Expected Remaining Useful Life (Years):
10
90d. Cost to Reconstruct/Replace $:
(No Response)
90e. Comments:
(No Response)
Cooling/Air Conditioning Generating Systems
91. Cooling / Air-Conditioning Generating Systems
Yes
No
91a. Overall condition of cooling/air-conditioning generating systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
91b. Year of Last Major Reconstruction/Replacement:
2014
91c. Expected Remaining Useful Life (Years):
5
91d. Cost to Reconstruct/Replace $:
(No Response)
91e. Comments:
(No Response)
AIR HANDLING AND VENTILATION EQUIPMENT
92. Air Handling and Ventilation Equipment: Supply Units, Exhaust Units, Relief/Return Units, etc. (H)
Yes
No
06/02/2016 10:14 AM Page 35 of 47
![Page 374: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/374.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
92a. Overall condition of air handling and ventilation systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
92b. Year of Last Major Reconstruction/Replacement:
2014
92c. Expected Remaining Useful Life (Years):
5
92d. Cost to Reconstruct/Replace $:
(No Response)
92e. Comments:
recomend Removing abandoned AHU's. replace old AHU's and UV's. Provide powewed ventilation to rooms served by abandoned systems.
Piped Heating and Cooling Distribution Systems
93. Piped Heating and Cooling Distribution Systems: Piping, Pumps, Radiators, Convectorss, Traps, Insulation,
etc. (H)
Yes
No
93a. Overall condition of piped heating and cooling distribution systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
93b. Year of Last Major Reconstruction/Replacement:
2007
93c. Expected Remaining Useful Life (Years):
5
93d. Cost to Reconstruct/Replace $:
(No Response)
93e. Comments:
(No Response)
Ducted Heating and Cooling Distrbution Systems
94. Ducted Heating and Cooling Distribution Systems: Ductwork, Control Dampers, Fire/Smoke Dampers, VAVs,
Insulation, etc. (H)
Yes
No
06/02/2016 10:14 AM Page 36 of 47
![Page 375: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/375.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
94a. Overall condition of ducted heating and cooling distribution systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
94b. Year of Last Major Reconstruction/Replacement:
2007
94c. Expected Remaining Useful Life (Years):
5
94d. Cost to Reconstruct/Replace $:
(No Response)
94e. Comments:
(No Response)
HVAC Control Systems
95. HVAC Control Systems (H)
Yes
No
95a. Overall condition of control systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
95b. Year of Last Major Reconstruction/Replacement:
2014
95c. Expected Remaining Useful Life (Years):
5
95d. Cost to Reconstruct/Replace $:
(No Response)
95e. Comments:
(No Response)
06/02/2016 10:14 AM Page 37 of 47
![Page 376: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/376.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyFire Safety Systems
Fire Safety Systems
96. Fire Alarm Systems (H)
Yes
No
96a. Overall condition of fire alarm system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
96b. Year of Last Major Reconstruction/Replacement:
2014
96c. Expected Remaining Useful Life (Years):
5
96d. Cost to Reconstruct/Replace $:
(No Response)
96e. Comments:
provide carbon monoxide detectors
Smoke Detection System (H)
97. Smoke Detection Systems (H)
Yes
No
97a. Overall condition of smoke detection systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
97b. Year of Last Major Reconstruction/Replacement:
2006
97c. Expected Remaining Useful Life (Years):
10
97d. Cost to Reconstruct/Replace $:
(No Response)
97e. Comments:
provide carbon monoxide detectors
Fire Suppression Systems
98. Fire Suppression Systems: Sprinklers, Standpipes, Kitchen Hoods, etc. (H)
Yes
No
06/02/2016 10:14 AM Page 38 of 47
![Page 377: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/377.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyFire Safety Systems
98a. Overall condition of fire suppression systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
98b. Year of Last Major Reconstruction/Replacement:
2006
98c. Expected Remaining Useful Life (Years):
5
98d. Cost to Reconstruct/Replace $:
(No Response)
98e. Comments:
(No Response)
Emergency/Exit Lighting Systems
99. Emergency / Exit Lighting Systems (H)
Yes
No
99a. Overall condition of emergency / exit lighting systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
99b. Year of Last Major Reconstruction/Replacement:
2014
99c. Expected Remaining Useful Life (Years):
10
99d. Cost to Reconstruct/Replace $:
(No Response)
99e. Comments;
(No Response)
Emergency/Standby Power Systems
100. Emergency or Standby Power System (H)
Yes
No
06/02/2016 10:14 AM Page 39 of 47
![Page 378: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/378.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyFire Safety Systems
100a. Overall condition of emergency/standby power systems:
Excellent
Satifactory
Unsatisfactory
Non-Functioning
Crtitical Failure
N/A
100b. Year of Last Major Reconstruction/Replacement:
2006
100c. Expected Remaining Useful Life (Years):
10.00
100d. Cost to Reconstruct/Replace $:
(No Response)
100e. Comments:
(No Response)
06/02/2016 10:14 AM Page 40 of 47
![Page 379: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/379.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyAccessibility
ACCESSIBILITY
101. Exterior Accessible Route (H)
People with disabilities should be able to arrive on site, approach the building, and enter as freely as everyone
else. At least one route of travel should be safe and accessible for everyone, including people with disabilities.
This route must include handicapped parking, curb cuts, ramps, and automatic door operators as necessary to
enter the building.
Is there an accessible exterior route as specified above?
Yes
No
102. Interior Accessible Route, Access to Goods and Services, and Restroom Facilities (H)
The layout of the building should allow people with disabilities to obtain materials or services and use the facilities
without assistance. This should include access to general purpose and specialized classrooms, public assembly
spaces (such as libraries, gymnasiums, auditoriums), nurse's office, main office, and restroom facilities. Services
include drinking fountains, telephones, and other amenities.
Is there an accessible interior route as specified above?
Yes
No
103. Additional Information on Accessibility
If the building lacks accessible interior or exterior routes:
103a. Cost of improvements needed to provide accessible exterior and interior routes as specified above $:
(No Response)
103b. Comments:
(No Response)
06/02/2016 10:14 AM Page 41 of 47
![Page 380: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/380.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyEnvironment/Comfort/Health
ENVIRONMENT/COMFORT/HEALTH
104. General Appearance
104a. Overall Rating:
Good
Fair
Poor
104b. Comments:
(No Response)
105. Cleanliness
105a. Overall Rating:
Good
Fair
Poor
105b. Comments:
(No Response)
106. Are there walk off mats; grills in the entryway?
Yes
No
106a. If yes: at least 6 feet long?
Yes
No
107. Is there noise in classrooms from HVAC units, traffic, etc. that may impact education?
Yes
No
108. Lighting Quality:
108a. Types of lighting in general purpose classrooms (check all that apply):
Daylight
Flourescent-not full spectrum
Flourescent full spectrum
Incandescent
Other (describe)
108b. Are there blinds in the classroom to prevent glare?
Yes
No
108c. Overall Rating:
Good
Fair
Poor
06/02/2016 10:14 AM Page 42 of 47
![Page 381: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/381.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyEnvironment/Comfort/Health
108d. Comments:
(No Response)
109. Evidence of Vermin
109a. Is there evidence of active infestations of...(check all that apply)?
Rodents
Wood-boring or Wood-eating Insects
Cockroaches
Other Vermin
None
06/02/2016 10:14 AM Page 43 of 47
![Page 382: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/382.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
Indoor Air Quality
110. Mold
110a. Is there visible mold or moldy odors?
Yes
No
110c. Are any surfaces constructed of any of the following materials?
Paper-faced or gypsum products
Cellulose products (typically ceiling tiles)
110d. Estimated cost of necessary improvements $:
(No Response)
110d. Comments:
(No Response)
111. Humidity/Moisture
111a. Overall rating of humidity/moisture condition in building:
Good
Fair
Poor
111b. Are any of the following found in/or around classroom areas (check all that apply)?
Active leaks in roof
Active leaks in plumbing
Moisture condensation
Visible stains or water damage
None
111c. Are any of the following found in/or around other areas (check all that apply)?
Active leaks in roof
Active leaks in plumbing
Moisture condensation
Visible stains or water damage
None
112. Ventilation: fresh air intake locations, air filters, etc.
112a. Are fresh air intakes near the bus loading, truck delivery, or garbage storage/disposal areas?
Yes
No
112b. Is there accumulated dirt, dust or debris around fresh air intakes?
Yes
No
112c. Are fresh air intakes free of blockage?
Yes
No
06/02/2016 10:14 AM Page 44 of 47
![Page 383: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/383.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
112d. Is accumulated dirt, dust or debris in ductwork?
Yes
No
112e. Are dampers functioning as designed?
Yes
No
112f. Condition of air filters:
Good
Fair
Poor
112g. Outside air is adequate for occupant load:
Yes
No
112h. Rating of ventilation/indoor air quality:
Good
Fair
Poor
112i. Comments:
(No Response)
113. Indoor Air Quality (IAQ) Plan
113a. Does the school district use EPA's Tools for Schools program?
Yes
No
113b. If No, is some other IAQ management plan used?
Yes
No
113c. Has the District assigned IAQ responsibilities to a designated individual?
Yes
No
113c.1 If Yes, what is their job title?
(No Response)
114. Does the school practice IPM?
Yes
No
114a. Is vegetation kept one foot away from the building?
Yes
No
114b. Are crevices and holes in walls, floors and pavement sealed or eliminated?
Yes
No
06/02/2016 10:14 AM Page 45 of 47
![Page 384: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/384.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
114c. Is there a certified pesticide applicator on staff?
Yes
No
114d. Are pesticides used in the building?
Yes
No
114d.1 If Yes, how are they typically applied?
Spot treatment
Area wide treatments
114e. Are pesticides used on the grounds?
Yes
No
114e.1 If Yes, was an emergency exemption granted by the Board of Education?
Yes
No
115. Does the school have a passive radon mitigation system installed (was built with radon resistant features)?
Yes
No
115a. Has the facility been tested for the presence of radon?
Yes
No
115b. Were any of the results of the test greater than or equal to 4 picocuries per liter (pCi/L)?
Yes
No
115c. If Yes, did the school take steps to mitigate the elevated radon levels?
Yes, active mitigation system installed
Yes, passive mitigation system made active
Yes, ventilation controls (HVAC) adjusted
Yes, other (describe)
No action taken
115c.1 Describe other actions taken to mitigate elevated radon levels:
(No Response)
06/02/2016 10:14 AM Page 46 of 47
![Page 385: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/385.jpg)
RYE CITY SD Status Date: 12/16/2015 10:45 AM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyAmerican Red Cross
American Red Cross Shelter
116. American Red Cross Shelter
Yes
No
116a. Is there a written agreement with the American Red Cross for the use of this building as an emergency
shelter?
Yes
No
116b. Does this building have an emergency generator to support sheltering operations (lights, HVAC, etc.)?
Yes
No
116b.1 If Yes, what systems are connected to the emergency generator? (check all that apply)
Communication system
Fire alarm system
Security system
Lighting
HVAC
Sump pump
116c. Does this facility have a cooking/food preparation kitchen?
Yes
No
116c.1 If Yes, is the area outfitted for:
Full preparation
Warming capabilities only
116d. What items in the cooking/food preparation kitchen are powered by the emergency generator? (check all
that apply)
Cooking equipment
Refrigeration equipment
Other kitchen equipment
116e. Potable water:
Provided by municipal system
Provided by on-site wells - not connected to the emergency generator
Provided by on-site wells - connected to the emergency generator
116f. Sanitary:
Gravity discharge
Force main pumping station - not connected to the emergency generator
Force main pumping station - connected to the emergency generator
06/02/2016 10:14 AM Page 47 of 47
![Page 386: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/386.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
Building Information1. Name of School District:
RYE CITY SD
2. SED District 8-Digit BEDS Code:
661800010000
3. Building Name:
Alternative HS/PPS
4. SED 4-Digit Facility Code:
0004
5. Survey Inspection Date:
09/14/2016
6. Building 911 Address:
324 Midland Avenue
7. City:
Rye
8. Zip Code:
10580
9. Certificate of Occupancy Status:
A - Annual
T - Temporary
N - None
10. Certificate of Occupancy Expiration Date:
09/01/2016
Building Age, Gross Square Footage and Maintenance Staff
11. Year of Original Building:
1930
12. Gross square ft. of Building as currently configured:
3,621
13. Number of Floors:
3
14. How many full-time and part-time custodians are employed at the school (or work in the building)?
Count Employees
Full-time custodians:0
Part-time custodians:1
Totals: 1.00
06/02/2016 10:20 AM Page 1 of 43
![Page 387: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/387.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
Building Ownership and Occupancy Status
15. Building Ownership (check one):
Owned and used by district
Owned by District and leased to non-district entity
Owned by District, part used by district, part leased to non-district entity
Owned by non-district entity and leased to district
16. For which of the following purposes is the building currently used? (check all that apply)
Used for student instructional purposes
Used for district administration
Used for other district purposes
Used by other organization(s)
Building Users
17. How many students were registered to receive instruction in this building as of October 1, 2014? (If none,
enter "0") and skip to "Program Spaces" section. (Do not include evening class students)
14
18. Of these registered students, how many receive most of their instruction in:
Quantity
18a. Permanent instructional spaces (i.e., regularclassrooms) 14
18b. Temporary instructional spaces (i.e., portable ordemountable classrooms) attached to the building 0
18c. Non-instructional spaces used as instructionalspaces 0
18c.1 If the answer is greater than zero, which types of non-instructional spaces were being used for instructional
purposes on October 1, 2014? (check all that apply)
Cafeteria
Gymnasium
Administrative Spaces
Library
Lobby
Stairwell
Storage space
Other (please describe)
None
19. Grades Housed:
9-12
20. For how many instructional days during the 2013-14 school year (July 1 through June 30, was the building
closed due to facilities failures, system malfunctions, structural problems, fire, etc? (if none, enter "0")
0
21. Is the building used for instructional purposes in the summer?
Yes
No
06/02/2016 10:20 AM Page 2 of 43
![Page 388: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/388.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Information
22. Have there been renovations or construction in the building during the past 12 months?
Yes
No
23. Was major construction/renovation work since 2010 conducted when school was in session?
Yes
No
06/02/2016 10:20 AM Page 3 of 43
![Page 389: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/389.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyProgram Spaces
Program Spaces
24. Number of instructional classrooms:
2
25. Gross square footage of all instructional classrooms (combined):
600.00
26. Other spaces provided: (check all that apply)
a. N/A (none)
b. Administration
c. Art
d. Audio Visual
e. Auditorium
f. Cafeteria
g. Computer Room
h. Guidance
i. Gymnasium
j. Health Office
k. Home & Careers
l. Kitchen
m. Large Group Instruction
n. Library
o. Multipurpose Rooms
p. Music
q. Pre-K
r. Remedial Rooms
s. Resource Rooms
t. Science Labs
u. Special Education
v. Swimming Pool
w. Teacher Resource
x. Technology/Shop
y. Other (please describe)
26y. Describe other spaces
(No Response)
Space Adequacy
27. Rating of space adequacy:
Good
Fair
Poor
27a. Enter comments:
(No Response)
28. Estimated capital construction expenses anticipated for this building through 2020-2021 school year
excluding maintenance (to be answered after the building inspection is complete) $
992,700.00
29. Overall building rating (to be answered after the building inspection is complete)
Excellent
Satisfactory
Unsatisfactory
Poor
30. Was overall building rating established after consultation with health and safety committee?
Yes
No
A/E Information:
31. A/E Firm Name:
KSQ Architects
06/02/2016 10:20 AM Page 4 of 43
![Page 390: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/390.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyProgram Spaces
32. A/E Firm Address:
235 Main Street, Suite 410
White Plains NY 10601
33. A/E Firm Phone Number:
9146823700
34. E-mail:
35. A/E Name:
Scott Hillje
36. A/E License #:
025556
06/02/2016 10:20 AM Page 5 of 43
![Page 391: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/391.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
Site Utilities
37. Water
Yes
No
37a. Type of Service:
Municipal or Utility provided
Well
Other
37b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
37c. Year of Last Major Reconstruction/Replacement:
1950
37d. Expected Remaining Useful Life (Years):
10
37e. Cost to Reconstruct/Replace $:
(No Response)
37f. Comments:
(No Response)
38. Site Sanitary (H)
Yes
No
38a. Type of Service:
Municipal or utility sewer
Site septic
Other
38b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
38c. Year of Last Major Reconstruction/Replacement:
1950
38d. Expected Remaining Useful Life (Years):
10
06/02/2016 10:20 AM Page 6 of 43
![Page 392: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/392.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
38e. Cost to reconstruct/Replace $:
(No Response)
38f. Comments:
(No Response)
39. Site Gas (H)
Yes
No
40. Site Fuel Oil (H)
Yes
No
40a. Number of Above-Ground Tanks:
2
40a.1 Capacity of Above-Ground Tanks (gallons):
500
40b. Number of Below-Ground Tanks:
0
40b.1 Capacity of Below-Ground Tanks (gallons):
0
40c. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
N/A
40d. Year of Last Major Reconstruction/Replacement:
1980
40e. Expected Remaining Useful Life (Years):
5
40f. Cost to Reconstruct/Replace $:
(No Response)
40g. Comments:
(No Response)
41. Site Electrical, Including Exterior Distribution (H)
Yes
No
06/02/2016 10:20 AM Page 7 of 43
![Page 393: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/393.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
41a. Service Provider:
Municipal or utility provided
Self-Generated
Other
N/A
41b. Type of Service:
Above Ground
Below Ground
N/A
41c. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
41d. Year of Last Major Reconstruction/Replacement:
2002
41e. Expected Remaining Useful Life (Years):
25
41f. Cost to Reconstruct/Replace $:
(No Response)
41g. Comments:
(No Response)
Stormwater Management
42. Closed Drainage Pipe Stormwater Management System
42a. Does this facility have a closed pipe system?
Yes
No
43. Open Drainage Pipe Stormwater Management System
43a. Does this facility have an open stormwater system (ditch)?
Yes
No
44. Catch Basins/Drop Inlets/Manholes
44a. Does this facility have catch basins/drop inlets/manholes?
Yes
No
06/02/2016 10:20 AM Page 8 of 43
![Page 394: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/394.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
44b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
44c. Year of Last Major Reconstruction/Replacement:
1978
44d. Expected Remaining Useful Life (Years):
15
44e. Cost to Reconstruct/Replace $:
(No Response)
44f. Comments:
(No Response)
45. Culverts
45a. Does this facility have culverts?
Yes
No
46. Outfalls
46a. Does this facility have outfalls?
Yes
No
47. Infiltration Basins/Chambers
47a. Does this facility have infiltration basins/chambers?
Yes
No
48. Retention Basins
48a. Does this facility have retention basins?
Yes
No
49. Wetponds
49a. Does this facility have wetponds?
Yes
No
06/02/2016 10:20 AM Page 9 of 43
![Page 395: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/395.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySite Utilities
50. Manufactured Stormwater Proprietary Units
50a. Does this facility have proprietary units?
Yes
No
51. Point of Outfall Discharge: (check all that apply)
Municipal storm sewer system
Combined sewer system
Surface Water
On-site recharge
Other (describe)
Not Applicable
52. Outfall Reconnaissance Inventory
Were all stormwater outfalls inspected during dry weather for signs of non-stormwater discharge?
Yes
No
Not Applicable
06/02/2016 10:20 AM Page 10 of 43
![Page 396: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/396.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyOther Site Features
Other Site Features
53. Pavement (Roadways and Parking Lots)
Yes
No
53a. Type: (check all that apply)
Concrete
Asphalt
Gravel
Other
None
53b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
53c. Year of Last Major Reconstruction/Replacement:
1997
53d. Expected Remaining Useful Life (Years):
5
53e. Cost to Reconstruct/Replace $:
(No Response)
53f. Comments:
(No Response)
54. Sidewalks
Yes
No
54a. Type: (check all that apply)
Concrete
Asphalt
Paver
Other
54b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
54c. Year of Last Major Reconstruction/Replacement:
1997
06/02/2016 10:20 AM Page 11 of 43
![Page 397: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/397.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyOther Site Features
54d. Expected Remaining Useful Life (Years):
5
54e. Cost to Reconstruct/Replace $:
(No Response)
54f. Comments:
future replacement of Asphalt sidewalk recommended
55. Playgrounds and Playground Equipment
Yes
No
56. Athletic Fields and Play Fields
Yes
No
56f. Does the facility have synthetic turf field(s)
Yes
No
56f.1 If Yes, how many synthetic turf fields?
(No Response)
56f.2 Expected Remaining Useful Life of Synthetic Turf Field(s):
(No Response)
56f.3 Type of synthetic turf field infill:
(No Response)
57. Exterior Bleachers / Stadiums
Yes
No
58. Related Structures (such as Press Boxes, Dugouts, Climbing Walls, etc.)
Yes
No
06/02/2016 10:20 AM Page 12 of 43
![Page 398: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/398.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveySubstructure
Substructure
59. Foundation (S)
59a. Type (check all that apply):
Reinforced Concrete
Masonry on Concrete Footing
Other
59b. Evidence of structural concerns (check all that apply):
Structural Cracks
Heaving/Jacking
Decay/Corrosion
Water Penetration
Unsupported Ends
Other
None
59c. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
59d. Year of Last Major Reconstruction/Replacement:
1995
59e. Expected Remaining Useful Life (Years):
25
59f. Cost to Reconstruct/Replace $:
(No Response)
59g. Comments:
(No Response)
06/02/2016 10:20 AM Page 13 of 43
![Page 399: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/399.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
BUILDING ENVELOPE
60. Structural Floors (S)
60a. Type (check all that apply):
Reinforced Concrete Slab on Grade
Concrete/Metal Deck/Metal Joists
Precast Concrete Structural System
Wood Deck on Wood Trusses
Wood Deck on Wood Joists
Concrete Deck on Wood Structure
Other (specify)
60b. Evidence of Structural Concerns with Floor Support System (Beams/Joists/Trusses, etc.) (check all that
apply):
Structural Cracks
Unsupported Ends
Rot/Decay/Corrosion
Deflection
Seriously Damaged/Missing Components
Other Problems
None
60b.1 Describe Other Problems:
(No Response)
60c. Evidence of Structural Concerns with Structural Floor Deck (check all that apply):
Cracks
Deflection
Rot/Decay/Corrosion
None
60d. Overall Condition of Structural Floors:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
60e. Year of Last Major Reconstruction/Replacement:
1995
60f. Expected Remaining Useful Life (Years):
30
60g. Cost to Reconstruct/Replace $:
(No Response)
60h. Comments:
(No Response)
06/02/2016 10:20 AM Page 14 of 43
![Page 400: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/400.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
61. Exterior Walls/Columns (S)
61a. Material (check all that apply):
Concrete
Masonry
Steel
Wood
Other (specify)
61b. Evidence of Structural Concerns with Support System (columns, base plates, connections, etc.) (check all
that apply):
Structural Cracks
Rot/Decay/Corrosion
Other Problems
None
61b.1 Describe Other Problems:
(No Response)
61c. Evidence of Concerns with Exterior Cladding (check all that apply):
Cracks/Gaps
Inadequate Flashing
Efflorescence
Moisture Penetration
Rot/Decay/Corrosion
Other Problems
None
61c.1 Describe Other Problems:
(No Response)
61d. Overall Condition of Exterior Walls/Columns:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
61e. Year of Last Major Reconstruction/Replacement:
1995
61f. Expected Remaining Useful Life (Years):
10
61g. Cost to Reconstruct/Replace $:
(No Response)
61h. Comments:
Masonry repointing and select wood siding replacement recommended
06/02/2016 10:20 AM Page 15 of 43
![Page 401: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/401.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
62. Chimneys (S)
Yes
No
62a. Material (check all that apply):
Masonry
Concrete
Metal
Wood
Other
62a.1 Specify other:
(No Response)
62b. Overall Condition of Chimneys:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical failure
62c. Year of Last Major Reconstruction/Replacement:
1970
62.d Expected Remaining Useful Life (Years):
15
62e. Cost to Reconstruct/Replace $:
(No Response)
62f. Comments:
(No Response)
63. Parapets (S)
Yes
No
63f. Comments:
(No Response)
64. Exterior Doors
64a. Overall Condition of Exterior Door Units:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:20 AM Page 16 of 43
![Page 402: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/402.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
64b. Overall condition of exterior door hardware:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
64c. Do any exterior doors have magnetic locking devices?
Yes
No
64d. Safety/Security features are adequate?
Yes
No
64e. Year of Last Major Reconstruction/Replacement:
1995
64f. Expected Remaining Useful Life (Years):
10
64g. Cost to Reconstruct/Replace $:
(No Response)
64h. Comments:
recommend replacement of Alternative HS Doors
65. Exterior Steps, Stairs, Ramps (S)
Yes
No
65a. Overall Condition of Exterior Steps, Stairs and Ramps
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
65b. Year of Last Major Reconstruction/Replacement:
1995
65c. Expected Remaining Useful Life (Years):
15
65d. Cost to Reconstruct/Replace $:
(No Response)
65e. Comments:
(No Response)
06/02/2016 10:20 AM Page 17 of 43
![Page 403: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/403.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
66. Fire Escapes (S)
66a. Does This Facility Have One or More Fire Escapes?
Yes
No
67. Windows
Yes
No
67a. Window Material: (check all that apply)
Aluminum
Steel
Vinyl
Solid Wood
Wood w/ External Cladding System
Other
67b. Overall Condition of Windows:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
67c. All Rescue Windows are Operable:
Yes
No
N/A
67d. Year of Last Major Reconstruction/Replacement:
2002
67e. Expected Remaining Useful Life (Years):
10
67f. Cost to Reconstruct/Replace $:
(No Response)
67g. Comments:
Recommend future replacement of alternative HS windows
Roof and Skylights (S)
68. Roof and Skylights (S)
Yes
No
06/02/2016 10:20 AM Page 18 of 43
![Page 404: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/404.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
68a. Type of roof construction (check all that apply):
Metal deck on metal trusses/joists
Wood deck on wood trusses/joists
Wood deck on metal trusses/joists
Concrete on metal deck on metal trusses/joists
Other (describe below)
68a.1 Other roof construction type:
(No Response)
68b. Type of roofing material (check all that apply):
Single-ply membrane
Built-up
Asphalt shingle
Pre-formed metal
IRMA
Slate
Other (describe below)
68b.1 Other roofing material:
(No Response)
68c. Evidence of structural concerns with roof support system (beams/joists/trusses, etc.) (check all that apply):
Structural cracks
Unsupported ends
Rot/Decay/Corrosion
Deflection
Seriously damaged/missing components
Other concerns (describe)
None
68c.1 Describe other concerns:
(No Response)
68d. Evidence of structural concerns with roof deck (check all that apply):
Cracks
Deflection
Rot/Decay/Corrosion
None
68e. Does this facility have skylights?
Yes
No
68f. Skylight material (check all that apply):
Plastic
Glass
Other
N/A
06/02/2016 10:20 AM Page 19 of 43
![Page 405: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/405.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyBuilding Envelope
68g. Overall condition of skylights:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
68h. Evidence of concerns with roofing, skylights, flashings, and drains (check all that apply):
Failures/Splits/Cracks
Rot/Decay/Corrosion
Inadequate flashing/curbs/pitch pockets
Inadequate or poorly functioning roof drains
Evidence of water penetration/active leaks
Other (specify)
None
68h.1 Specify other concerns:
(No Response)
68i. Overall Condition of Roof and Skylights:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
68j. Year of Last Major Reconstruction/Replacement:
1995
68k. Expected Remaining Useful Life (Years):
10
68l. Cost to Reconstruct/Replace $:
(No Response)
68m. Comments:
(No Response)
06/02/2016 10:20 AM Page 20 of 43
![Page 406: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/406.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
INTERIOR SPACES
69. Interior Bearing Walls and Fire Walls (S)
Yes
No
69a. Overall condition of interior bearing walls and fire walls:
Excellent
Satisfactory
Unsatisfactory
Non-functioning
Critical Failure
69b. Year of Last Major Reconstruction/Replacement:
1995
69c. Expected Remaining Useful Life (Years):
20
69d. Cost to Reconstruct/Replace $:
(No Response)
69e. Comments:
(No Response)
Other Interior Walls
70. Other Interior Walls
Yes
No
70a. Overall condition of other interior walls:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
70b. Year of Last Major Reconstruction/Replacement:
1995
70c. Expected Remaining Useful Life (Years):
20
70d. Cost to Reconstruct/Replace $:
(No Response)
70e. Comments:
(No Response)
Floor Finishes
71. Carpet
Yes
No
06/02/2016 10:20 AM Page 21 of 43
![Page 407: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/407.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
71a. Where located (check all that apply):
Instructional Space
Common Area
71b. Condition:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
71c. Year of Last Major Reconstruction/Replacement:
1995
71d. Expected Remaining Useful Life (Years):
5
71e. Cost to Reconstruct/Replace $:
(No Response)
71f. Comments:
(No Response)
72. Resilient Tiles or Sheet Flooring
Yes
No
72a. Where located (check all that apply):
Instructional Space
Common Area
72b. Overall condition of resilient tiles or sheet flooring:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
72c. Year of Last Major Reconstruction/Replacement:
1995
72d. Expected Remaining Useful Life (Years):
10
72e. Cost to Reconstruct/Replace $:
(No Response)
72f. Comments:
(No Response)
06/02/2016 10:20 AM Page 22 of 43
![Page 408: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/408.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
73. Hard Flooring (concrete; ceramic tile; stone; etc)
Yes
No
73a. Where located (check all that apply):
Instructional Space
Common Area
73b. Overall condition of hard flooring:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
73c. Year of Last Major Reconstruction/Replacement:
1995
73d. Expected Remaining Useful Life (Years):
15
73e. Cost to Reconstruct/Replace $:
(No Response)
73f. Comments:
(No Response)
74. Wood Flooring
Yes
No
Ceilings (H)
75. Ceilings (H)
Yes
No
75a. Overall condition of ceilings:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
75b. Year of Last Major Reconstruction/Replacement:
1995
75c. Expected Remaining Useful Life (Years):
5
75d. Cost to Reconstruct/Replace $:
(No Response)
06/02/2016 10:20 AM Page 23 of 43
![Page 409: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/409.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
75e. Comments:
Replacement of Concealed Spline Ceilings in Alternative HS recommended
Lockers
76. Lockers
Yes
No
76d. Cost to Reconstruct/Replace $:
(No Response)
Interior Doors
77. Interior Doors
Yes
No
77a. Overall condition of interior door units:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
77b. Overall condition of interior door hardware:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
77c. Year of Last Major Reconstruction/Replacement:
1995
77d. Expected Remaining Useful Life (Years):
10
77e. Cost to Reconstruct/Replace $:
(No Response)
77f. Comments:
Replacement of boiler room door recommended
Interior Stairs (S)
78. Interior Stairs (S)
Yes
No
06/02/2016 10:20 AM Page 24 of 43
![Page 410: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/410.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
78a. Overall condition of interior stairs:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
78b. Year of Last Major Reconstruction/Replacement:
1930
78c. Expected Remaining Useful Life (Years):
10
78d. Cost to Reconstruct/Replace $:
(No Response)
78e. Comments:
Recommend upgrading handrails to meet current code and ADA requirements.
Elevator, Lifts and Escalators (H)
79. Elevator, Lift, and Escalators (H)
Yes
No
Interior Electrical Distribution (H)
80. Interior Electrical Distribution (H)
Yes
No
80a. Interior electrical supply meets current needs:
Yes
No
80b. Condition of interior electrical distribution:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
80c. Year of Last Major Reconstruction/Replacement:
1997
80d. Expected Remaining Useful Life (Years):
10
80e. Cost to Reconstruct/Replace $:
(No Response)
80f. Comments:
(No Response)
06/02/2016 10:20 AM Page 25 of 43
![Page 411: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/411.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
Lighting Fixtures
81. Interior Lighting Fixtures
Yes
No
81a. Condition of interior lighting fixtures:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
81b. Year of Last Major Reconstruction/Replacement:
2006
81c. Expected Remaining Useful Life (Years):
10
81d. Cost to Reconstruct/Replace $:
(No Response)
81e. Comments:
(No Response)
Communication Systems (H)
82. Communication Systems (H)
Yes
No
82a. Communication systems are adequate:
Yes
No
82b. Condition of communication systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
82c. Year of Last Major Reconstruction/Replacement:
1997
82d. Expected Remaining Useful Life (Years):
10
82e. Cost to Replace/Reconstruct $:
(No Response)
82f. Comments:
(No Response)
06/02/2016 10:20 AM Page 26 of 43
![Page 412: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/412.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyInterior Spaces
Swimming Pool and Swimming Pool Systems
83. Swimming Pool and Swimming Pool Systems
Yes
No
06/02/2016 10:20 AM Page 27 of 43
![Page 413: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/413.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
PLUMBING
84. Water Distribution System (H)
Yes
No
84a. Types of pipes (check all that apply):
Iron
Galvanized
Copper
Lead
PVC
Other
84b. Overall condition of water distribution system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
84c. Year of Last Major Reconstruction/Replacement:
1995
84d. Expected Remaining Useful Life (Years):
10
84e. Cost to Reconstruct/Replace $:
(No Response)
84f. Comments:
(No Response)
Plumbing Drainage System (H)
85. Plumbing Drainage System (H)
Yes
No
85a. Types of pipes (check all that apply):
Iron
Galvanized
Copper
Lead
PVC
Other
85b. Overall condition of drainage system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
06/02/2016 10:20 AM Page 28 of 43
![Page 414: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/414.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
85c. Year of Last Major Reconstruction/Replacement:
1997
85d. Expected Remaining Useful Life (Years):
10
85e. Cost to Reconstruct/Replace $:
(No Response)
85f. Comments:
(No Response)
Hot Water Heaters (H)
86. Hot Water Heaters (H)
Yes
No
86a. Type of fuel (check all that apply):
Oil
Natural Gas
Electricity
Propane
Other
86b. Overall condition of hot water heaters:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
86c. Year of Last Major Reconstruction/Replacement:
2001
86d. Expected Remaining Useful Life (Years):
10
86e. Cost to Reconstruct/Replace $:
(No Response)
86f. Comments:
(No Response)
Plumbing Fixtures
87. Plumbing Fixtures
Yes
No
06/02/2016 10:20 AM Page 29 of 43
![Page 415: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/415.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyPlumbing (Excluding HVAC Systems)
87a. Overall condition of plumbing fixtures (including toilets, urinals, lavatories, etc):
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
87b. Year of Last Major Reconstruction/Replacement:
1995
87c. Expected Remaining Useful Life (Years):
10
87d. Cost to Reconstruct/Replace $:
(No Response)
87e. Comments:
(No Response)
06/02/2016 10:20 AM Page 30 of 43
![Page 416: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/416.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
HVAC SYSTEMS
88. HVAC Systems Type
88a. Does this building have a central HVAC system?
Yes
No
Heat Generating Systems (H)
88b.1 Other central HVAC system technology:
(No Response)
89. Heat Generating Systems (H)
Yes
No
89a. Heat generation source (check all that apply):
Boiler / Hot Water
Boiler / Steam
Furnace / Forced Air
Unit Ventilation
Geothermal
Biomass
Electric
Other (describe below)
89a.1 Other heat generation source:
(No Response)
89b. Overall condition of heat generating systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
89c. Year of Last Major Reconstruction/Replacement:
1980
89d. Expected Remaining Useful Life (Years):
5
89e. Cost to Reconstruct/Replace $:
(No Response)
89f. Comments:
(No Response)
Heating Fuel/Energy Systems (H)
90. Heating Fuel / Energy Systems (H)
Yes
No
06/02/2016 10:20 AM Page 31 of 43
![Page 417: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/417.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
90a. Overall condition of heating fuel / energy systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
90b. Year of Last Major Reconstruction/Replacement:
1980
90c. Expected Remaining Useful Life (Years):
5
90d. Cost to Reconstruct/Replace $:
(No Response)
90e. Comments:
(No Response)
Cooling/Air Conditioning Generating Systems
91. Cooling / Air-Conditioning Generating Systems
Yes
No
91a. Overall condition of cooling/air-conditioning generating systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
91b. Year of Last Major Reconstruction/Replacement:
1995
91c. Expected Remaining Useful Life (Years):
10
91d. Cost to Reconstruct/Replace $:
(No Response)
91e. Comments:
(No Response)
AIR HANDLING AND VENTILATION EQUIPMENT
92. Air Handling and Ventilation Equipment: Supply Units, Exhaust Units, Relief/Return Units, etc. (H)
Yes
No
06/02/2016 10:20 AM Page 32 of 43
![Page 418: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/418.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
92a. Overall condition of air handling and ventilation systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
92b. Year of Last Major Reconstruction/Replacement:
1995
92c. Expected Remaining Useful Life (Years):
10
92d. Cost to Reconstruct/Replace $:
(No Response)
92e. Comments:
(No Response)
Piped Heating and Cooling Distribution Systems
93. Piped Heating and Cooling Distribution Systems: Piping, Pumps, Radiators, Convectorss, Traps, Insulation,
etc. (H)
Yes
No
93a. Overall condition of piped heating and cooling distribution systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
93b. Year of Last Major Reconstruction/Replacement:
1995
93c. Expected Remaining Useful Life (Years):
15
93d. Cost to Reconstruct/Replace $:
(No Response)
93e. Comments:
(No Response)
Ducted Heating and Cooling Distrbution Systems
94. Ducted Heating and Cooling Distribution Systems: Ductwork, Control Dampers, Fire/Smoke Dampers, VAVs,
Insulation, etc. (H)
Yes
No
06/02/2016 10:20 AM Page 33 of 43
![Page 419: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/419.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyHVAC Systems
94a. Overall condition of ducted heating and cooling distribution systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
94b. Year of Last Major Reconstruction/Replacement:
1995
94c. Expected Remaining Useful Life (Years):
15
94d. Cost to Reconstruct/Replace $:
(No Response)
94e. Comments:
(No Response)
HVAC Control Systems
95. HVAC Control Systems (H)
Yes
No
95a. Overall condition of control systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
95b. Year of Last Major Reconstruction/Replacement:
1995
95c. Expected Remaining Useful Life (Years):
10
95d. Cost to Reconstruct/Replace $:
(No Response)
95e. Comments:
(No Response)
06/02/2016 10:20 AM Page 34 of 43
![Page 420: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/420.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyFire Safety Systems
Fire Safety Systems
96. Fire Alarm Systems (H)
Yes
No
96a. Overall condition of fire alarm system:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
96b. Year of Last Major Reconstruction/Replacement:
1997
96c. Expected Remaining Useful Life (Years):
10
96d. Cost to Reconstruct/Replace $:
(No Response)
96e. Comments:
provide carbon monoxide detectors
Smoke Detection System (H)
97. Smoke Detection Systems (H)
Yes
No
97a. Overall condition of smoke detection systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
97b. Year of Last Major Reconstruction/Replacement:
1997
97c. Expected Remaining Useful Life (Years):
10
97d. Cost to Reconstruct/Replace $:
(No Response)
97e. Comments:
(No Response)
Fire Suppression Systems
98. Fire Suppression Systems: Sprinklers, Standpipes, Kitchen Hoods, etc. (H)
Yes
No
06/02/2016 10:20 AM Page 35 of 43
![Page 421: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/421.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyFire Safety Systems
Emergency/Exit Lighting Systems
99. Emergency / Exit Lighting Systems (H)
Yes
No
99a. Overall condition of emergency / exit lighting systems:
Excellent
Satisfactory
Unsatisfactory
Non-Functioning
Critical Failure
99b. Year of Last Major Reconstruction/Replacement:
2006
99c. Expected Remaining Useful Life (Years):
10
99d. Cost to Reconstruct/Replace $:
(No Response)
99e. Comments;
upgrade of exterior egress emergency lighting recommended
Emergency/Standby Power Systems
100. Emergency or Standby Power System (H)
Yes
No
06/02/2016 10:20 AM Page 36 of 43
![Page 422: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/422.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyAccessibility
ACCESSIBILITY
101. Exterior Accessible Route (H)
People with disabilities should be able to arrive on site, approach the building, and enter as freely as everyone
else. At least one route of travel should be safe and accessible for everyone, including people with disabilities.
This route must include handicapped parking, curb cuts, ramps, and automatic door operators as necessary to
enter the building.
Is there an accessible exterior route as specified above?
Yes
No
102. Interior Accessible Route, Access to Goods and Services, and Restroom Facilities (H)
The layout of the building should allow people with disabilities to obtain materials or services and use the facilities
without assistance. This should include access to general purpose and specialized classrooms, public assembly
spaces (such as libraries, gymnasiums, auditoriums), nurse's office, main office, and restroom facilities. Services
include drinking fountains, telephones, and other amenities.
Is there an accessible interior route as specified above?
Yes
No
103. Additional Information on Accessibility
If the building lacks accessible interior or exterior routes:
103a. Cost of improvements needed to provide accessible exterior and interior routes as specified above $:
(No Response)
103b. Comments:
(No Response)
06/02/2016 10:20 AM Page 37 of 43
![Page 423: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/423.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyEnvironment/Comfort/Health
ENVIRONMENT/COMFORT/HEALTH
104. General Appearance
104a. Overall Rating:
Good
Fair
Poor
104b. Comments:
(No Response)
105. Cleanliness
105a. Overall Rating:
Good
Fair
Poor
105b. Comments:
(No Response)
106. Are there walk off mats; grills in the entryway?
Yes
No
107. Is there noise in classrooms from HVAC units, traffic, etc. that may impact education?
Yes
No
108. Lighting Quality:
108a. Types of lighting in general purpose classrooms (check all that apply):
Daylight
Flourescent-not full spectrum
Flourescent full spectrum
Incandescent
Other (describe)
108b. Are there blinds in the classroom to prevent glare?
Yes
No
108c. Overall Rating:
Good
Fair
Poor
108d. Comments:
(No Response)
06/02/2016 10:20 AM Page 38 of 43
![Page 424: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/424.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyEnvironment/Comfort/Health
109. Evidence of Vermin
109a. Is there evidence of active infestations of...(check all that apply)?
Rodents
Wood-boring or Wood-eating Insects
Cockroaches
Other Vermin
None
06/02/2016 10:20 AM Page 39 of 43
![Page 425: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/425.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
Indoor Air Quality
110. Mold
110a. Is there visible mold or moldy odors?
Yes
No
110c. Are any surfaces constructed of any of the following materials?
Paper-faced or gypsum products
Cellulose products (typically ceiling tiles)
110d. Estimated cost of necessary improvements $:
(No Response)
110d. Comments:
(No Response)
111. Humidity/Moisture
111a. Overall rating of humidity/moisture condition in building:
Good
Fair
Poor
111b. Are any of the following found in/or around classroom areas (check all that apply)?
Active leaks in roof
Active leaks in plumbing
Moisture condensation
Visible stains or water damage
None
111c. Are any of the following found in/or around other areas (check all that apply)?
Active leaks in roof
Active leaks in plumbing
Moisture condensation
Visible stains or water damage
None
112. Ventilation: fresh air intake locations, air filters, etc.
112a. Are fresh air intakes near the bus loading, truck delivery, or garbage storage/disposal areas?
Yes
No
112b. Is there accumulated dirt, dust or debris around fresh air intakes?
Yes
No
112c. Are fresh air intakes free of blockage?
Yes
No
06/02/2016 10:20 AM Page 40 of 43
![Page 426: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/426.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
112d. Is accumulated dirt, dust or debris in ductwork?
Yes
No
112e. Are dampers functioning as designed?
Yes
No
112f. Condition of air filters:
Good
Fair
Poor
112g. Outside air is adequate for occupant load:
Yes
No
112h. Rating of ventilation/indoor air quality:
Good
Fair
Poor
112i. Comments:
(No Response)
113. Indoor Air Quality (IAQ) Plan
113a. Does the school district use EPA's Tools for Schools program?
Yes
No
113b. If No, is some other IAQ management plan used?
Yes
No
113c. Has the District assigned IAQ responsibilities to a designated individual?
Yes
No
113c.1 If Yes, what is their job title?
(No Response)
114. Does the school practice IPM?
Yes
No
114a. Is vegetation kept one foot away from the building?
Yes
No
114b. Are crevices and holes in walls, floors and pavement sealed or eliminated?
Yes
No
06/02/2016 10:20 AM Page 41 of 43
![Page 427: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/427.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyIndoor Air Quality
114c. Is there a certified pesticide applicator on staff?
Yes
No
114d. Are pesticides used in the building?
Yes
No
114d.1 If Yes, how are they typically applied?
Spot treatment
Area wide treatments
114e. Are pesticides used on the grounds?
Yes
No
114e.1 If Yes, was an emergency exemption granted by the Board of Education?
Yes
No
115. Does the school have a passive radon mitigation system installed (was built with radon resistant features)?
Yes
No
115a. Has the facility been tested for the presence of radon?
Yes
No
115b. Were any of the results of the test greater than or equal to 4 picocuries per liter (pCi/L)?
Yes
No
115c. If Yes, did the school take steps to mitigate the elevated radon levels?
Yes, active mitigation system installed
Yes, passive mitigation system made active
Yes, ventilation controls (HVAC) adjusted
Yes, other (describe)
No action taken
115c.1 Describe other actions taken to mitigate elevated radon levels:
(No Response)
06/02/2016 10:20 AM Page 42 of 43
![Page 428: 2015 Building Condition Survey Instrument - 2015 Building](https://reader030.vdocuments.net/reader030/viewer/2022012517/6191ad6c3eb91e032468221e/html5/thumbnails/428.jpg)
RYE CITY SD Status Date: 03/14/2016 02:59 PM
2015 Building Condition Survey Instrument - 2015 Building Conditions SurveyAmerican Red Cross
American Red Cross Shelter
116. American Red Cross Shelter
Yes
No
06/02/2016 10:20 AM Page 43 of 43