2015 Exploration & ProductionWinter Standards Meeting SC10 & SC13 Updates
January 27-29, 2015Intercontinental HotelNew Orleans, LA
Subcommittee on Oil Well Cements (SC10)
Publication of API Specification 10A “Cements and Materials for Well Cementing” 24th Edition, December 2010, is up for reaffirmation in December 2015. Auditor findings and comments are being logged, reviewed and
discussed. “Special Work Session” on Thursday, January 29th, 2015
Future revision may include changes to Consistometer oil specification and section on “Well Cementing Composites.”
Publication of API RP 10B-2 “Testing Well Cements” Publication of RP 10B-2, 2nd Edition April 2013. Comments are being
logged, reviewed and discussed with set path forward after “Special Work Session” on Thursday, January 29rd, 2015
Future revisions to include: Stirred Fluid Loss Testing, Fluid Loss Screens and elimination of inconsistencies between API Spec 10A and RP 10B-2
Rewrite of API RP 10B-3 “Testing of Deepwater Well Cement Formulations” 1st Edition July 2004 Rewrite of RP 10B-3, 2nd Edition Draft ballot close June 4th, 2014. Draft
comments returned for resolution June 6th, 2014.
Rewrite of API RP 10B-4 “Preparation and Testing of Foamed Cement Slurries at Atmospheric Pressure”, 1st Edition July 2004 Rewrite of 10B-4 2nd Edition Draft ballot close June 4th, 2014. Draft
comments returned for resolution June 6th, 2014.
Technical Report (TR) on Foam Cement Behavior under Well Conditions is the second phase of this WG charge. Work progressing.
Both RP 10B-3 and 10B-4 are being prepared for circulation by API. Will be distributed before Summer Meeting and updates provided at Summer Meeting.
Subcommittee on Oil Well Cements (SC10)
Subcommittee on Oil Well Cements (SC10)
Rewrite of API Spec 10D, 6th Edition March 2002 “Bow Spring Casing Centralizers” Review and update API Spec 10D to include performance testing
requirements for centralizers that are to be used in applications where they are run through restrictions that are smaller than the hole size in which they are to be set.
Rewrite of API RP 10F, 3rd Edition April 2002 “Performance Testing of Cementing Float Equipment” WG will publish API Specification 10F, 1st Edition which will replace and
make obsolete API RP 10F, 3th Edition. This document will include required specifications and the associated performance testing protocols for the manufacturing of Cement Float Equipment
TR on “Mechanical Cementing Plugs used in Tubing, Casing and Drill Pipe” Final edit check with SC10 Publications Task Group and Formatting
by API is in final stage. Publication anticipated prior to Summer Meeting.
TR on “Mechanical Behavior of Cement” TG Chair forwarded document to API for review, formatting, and
subsequent Comment Only Ballot. Ballot anticipated to be distributed and closed before Summer Meeting. Update to be provided at Summer Meeting.
Subcommittee on Oil Well Cements (SC10)
Subcommittee on Drilling, Completion, and Fracturing Fluids (SC-13)
TG2: Publications
SC13 Work Program API Document TITLE TG: CHAIR Publication
Date Status / Required ballot date
SPEC 13A Specification for Drilling Fluid Materials18th Edition Feb 2010
TG8Schlemmer Feb 2010 Good till Feb 2015, two year
Extentsion
RP 13B-1Recommended Practice for Field Testing
Water-Based Drilling Fluids4th Edition March 2009
TG4Breeden Mar 2009 2 Yr Extension till March 2016
RP 13B-2Recommended Practice for Field Testing
Oil-Based Drilling Fluids5th Edition April 2014
TG3Burrows April 2014 Good till April 2019
RP 13C
Recommended Practice on Drilling Fluids Processing Systems
Evaluation5th Edition October 2014
TG5TBD Oct 2014 Good till Oct 2019
RP 13D
Recommended Practice on the Rheology and Hydraulics of Oil-Well
Drilling Fluids6th Edition May 2010
TG7Samuel May 2010 Letter Ballot closes 2/10/15
RP 13IRecommended Practice for
Laboratory Testing Drilling Fluids8th Edition March 2009
TG4Breeden Mar 2009 2 Yr Extension till March 2016
13J Testing of Heavy Brines5th Edition October 2014
TG6Guy-Caffey Oct 2014 Good till Oct 2019
13KRecommended Practice for Chemical Analysis of Barite
3rd Edition May 2011
TG8Schlemmer May 2011 Good till May 2016
TG2: Publications
SC13 Work ProgramAPI Document TITLE TG: CHAIR Publication
Date Status / Required ballot date
13LRecommended Practice for Training and
Qualification of Drilling Fluids Technologists1st Edition Feb 2003 Reaffirmed Oct 2010
TG2Scott/Fraboulet
Chambers
Feb 03Reaff:Oct 10
Oct 2015Undergoing a Major Revision
RP 13M
Recommended Practice for the Measurement of Viscous Properties of
Completion Fluids1st Edition July 2004 (Reaffirmed Oct 2010)
TG9Asadi
Jul 04Reaff: Oct 10
Good till Oct 2015Needs periodic review by Summer
meeting : 2 year extension or 5 year reaffirmation
RP 13M-4Part 4: Recommended Practice for
Measuring Stimulation and Gravel-pack Fluid Leakoff Under Static Conditions
1st Edition December 2006
TG9Asadi Dec 06
2 Yr Ext ExpiredCurrently being balloted for
reaffirmation
Proposed as 13M-6 Measuring leakoff completion fluids under
dynamic conditions First edition 2014-03-15TG9Asadi June 2015
RP 19C
Recommended Practice for Measurement of Properties of Proppants Used in
Hydraulic Fracturing and Gravel-packing Operations
1st Edition May 2008 ( 2 Yr Ext June 2013 )
TG10Powell May 08
2 yr extension till May 2015
Ballot passed May 2014(under comment resolution revision)
RP 19DRecommended Practice for Measuring the
Long-Term Conductivity of Proppants1st Edition March 2008 ( 2 YR Ext June
2013 )
TG10Powell March 2008
2 yr extension expires March 2015Needs to be approved for ballot as
reaffirmation
NOTE: Documents required to be reviewed every 5 years
TG2: Publications
SC13 Work Program
API Document TITLE TG: CHAIR
Publication Date Status / Begin 5 yr Review
RP 13MRecommended Practice for the Measurement of Viscous
Properties of Completion Fluids1st Edition July 2004 (Reaffirmed Oct 2010)
TG9Asadi
Jul 04Reaff: Oct 10
Good till Oct 2015Needs periodic review by
Summer meeting or 2 year extension
RP 13M-4Part 4: Recommended Practice for Measuring
Stimulation and Gravel-pack Fluid Leakoff Under Static Conditions
1st Edition December 2006
TG9Asadi Dec 06
2 Yr Ext ExpiredCurrently being balloted for
reaffirmation
Proposed as 13M-6
Completion fluids and materials – Measuring leakoff completion fluids under dynamic conditions First edition
2014-03-15
TG9Asadi June 2015
RP 19CRecommended Practice for Measurement of Properties of Proppants Used in Hydraulic Fracturing and Gravel-
packing Operations1st Edition May 2008 ( 2 Yr Ext June 2013 )
TG10Powell May 08
2 yr extension till May 2015
Ballot passed May 2014(under comment resolution
revision)
RP 19D
)
Recommended Practice for Measuring the Long-Term Conductivity of Proppants
1st Edition March 2008 ( 2 YR Ext June 2013 )
TG10Powell March 2008
2 yr extension expires March 2015
Needs to be approved for ballot as reaffirmation
TG2: Publications
SC13 Publications In Progress
TITLE TG: CHAIRAnticipatedPublication
DateStatus
RP13M-?Standard Methodology for Friction Reduction
Measurements in Newtonian Fluids (Friction)
TG9 Shah
2016 Q4Final review
Jan,26th
API 13M-?Procedure for Measuring Matrix Permeability
Damage of Completion Fluids (Regain Permeability)
TG 09Asadi/Quintero
2016 Q4
Final reviewJan,
RP13M-?Standard Methodology for Friction Reduction
Measurements in Non-Newtonian Fluids (Friction)
TG9Navarrete
2017 In Progress
API 13JProcedure for measuring the emulsion
tendencies of completion fluids
TG6Guy-Caffey / Pietrangeli
2016 /2017 ? In Progress