2015 strategic partner exchange presentation · © 2015 trane 1 strategic partner exchange ......
Embed Size (px)
TRANSCRIPT

1 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 1
Jammin’ on Products and Systems Lee Cline PE
Staff Systems Engineer
© 2015 Trane | 2
• Bryan Ware Light Unitary Product Manager
• Matt Muhlada Large Unitary Product Manager
• Marcela Nino Catalog Air Handling Portfolio Leader
• Mike Enderlin VRF/Source Product Business Leader
• Vijay Deshmukh Water-Cooled Chiller Portfolio Manager
• Todd Duncan Air-Cooled Chiller Portfolio Manager
• Gene Shedivy Controls Product Leader
• Lee Cline Staff Systems Engineer
Presenters and Agenda

2 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 3
Jammin’
on Unitary Products Bryan Ware Light Unitary Portfolio Ldr
Matt Muhlada Large Unitary Portfolio Ldr
© 2015 Trane | 4
BACK TO BASICS Jammin’ on Unitary Products
1. Intense focus on quality in Clarksville
2. On time delivery with accurate ship dates
3. Additional inventory - units & accessories
Example: Work instructions

3 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 5
Inventory Availability - Table Stakes Jammin’ on Unitary Products
What are we doing? • Increased inventory of materials • Significant increase in standard finished goods (warehouse) • Simple tool development to help with order visibility
Example: 3 – 5 Ton Units 60% above 2014 Peak Example: Splits 70% to 80% above 2014 Peak
© 2015 Trane | 6
New Unitary Products, New Trane Tools &
Impending Regulatory Changes

4 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 7
Completing the Portfolio
6 – 10 Ton Variable Speed
Benefits of Variable Speed
Compressor Cycling
Energy
Efficiency
Space Temperature
Control
Dehumidification
Capabilities
Variable Speed Fixed Speed Benefit of Variable Speed
Reduced compressor cycling leads
to increased compressor reliability.
Less cycling with variable speed.
VFDs match the compressor speed
to the specific demands of the work
being performed
By matching the load needs of
the zone being cooled, space
temperature variation is reduced Best Good
Compressors run longer (at
reduced speeds) always performing
latent work
Reduced Increased
© 2015 Trane | 8
Precedent™ – 6-10 Ton eFlex™ - Mid to Late 2016
Units can be selected down to half nominal airflow
(200 cfm/nominal ton)
Benefits:
• Handle increased OA requirements
• Properly size supply airflow and refrigeration
capacity
• Reduce Installation Cost
• Improve Comfort
Expanding on success of Variable! Variable! Variable!
Benefits:
• Compressor and fan speeds match load demand
• Improved Comfort (Temperature & Humidity)
• Industry Leading Part Load Efficiencies (IEER)
• Standard Lead Times
• Intelligent Ventilation
• Quiet
• MZVAV System Opportunity
Voyager™ - 25 Ton Hot Gas Reheat – Late 2015

5 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 9
IntelliPak™ 1 “eDrive” Direct Drive Plenum Fan Review • Direct-drive plenum fan
Non-banded Design
Piezometer Ring option
• Up to 20% higher static efficiency than traditional FC fans
• Quieter
• Reduced maintenance No belts to adjust
No fan bearing lubrication
Reduced filter change-out (belt particles)
• Startup/ Commissioning of max CFM FC - Belts
DDP - VFD
• Now available with Gas heat 2 stage, Full Modulation (up to 8:1)…. PLUS….
New 15:1 modulating Gas option
SAME- footprint/ unit dimensions
SAME- human interface & electrical connections
Higher efficiency with increased reliability and simplified installation
(NOW available with GAS Heat - 1st ship August 2015)
FIRST SHIP
3Q 2015
Replacement
“Ready”
© 2015 Trane | 10
IntelliPak™ with eFlex™ Technology
• Available in 40-70T IntelliPak
• Next enhancements expand line
to 75T, and 90-150T (IPAK2)
• 3 efficiency tiers − Standard
− High efficiency (EER optimized)
− eFlex (IEER optimized)
• Better performance − Less compressor cycling
− Full modulation from 100 down to 15%
− LAT equivalent to chilled water systems
• Same human interface − Simple startup and commissioning
− Delivers new technology at a “push of a
button”
Trane is leading the market with eFlex™
Variable Speed Technology, delivering industry
leading IEER in an integrated package.
FIRST SHIP
1Q 2016

6 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 11
DOE Issues Notice of Proposed Rulemaking for Commercial Warm Air Furnace Standards
The Department of Energy has issued a pre-publication Federal Register notice of proposed rulemaking and public meeting for energy conservation standards for commercial warm air furnaces. (January 16, 2015)
DOE Update – Commercial HVAC Updates
Proposal 1: 2018 Impact • Increase part-load efficiencies above 5 Ton
• 25% - 30% above current standards – Light & Large RTU & Splits
Impacted
Proposal 2: Late 2018/Early 2019 Impact • 82% Thermal Efficiency
• Effective 3 years from final rule
• Evaluating Impact along w/ part load requirements
Our Focus – Be Out In front of these Changes
Leverage Products and Platforms that meet or exceed those standards today!
© 2015 Trane | 12
Competitive “Efficiency” Landscape vs DOE Minimums
FU
LL
LO
AD
FF
ICIE
NY
Delivering market leading
full & partial load energy
performance.
Hi Eff Tier (eDrive™- DDP)
Variable Speed (eFlex™)
Expanded segmentation options: Std. Efficiency, Hi-Efficiency and NEW Part-load (IEER)
with Trane eFlex™ Variable Speed Technology
Proposed 2018
Regulatory Requirements
PARTIAL LOAD EFFICIENY

7 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 13
Regulatory Challenges – DOE LCU Industry Impact
Proposed 2018
Regulatory Requirements
© 2015 Trane | 14
Improved ease and cost of installation
Enhanced product application flexibility
Enhanced VAV Box Capability VAV Controls Enhancements:
• Trane Air-Fi™ – Latest Wireless Communication Capability
Factory Mounted, Wired and Addressed
• Discharge Air Sensor – Factory Wired And Mounted
• Dual Duct Solution with a Single BACnet® Controller per unit
• Modulating Fan Speed Algorithms
• True Analog Damper Actuator - Option
VAV Unit Enhancements:
• Redesigned Series Sound Attenuator
Factory Assembled and Installed
• Redesigned Low Height Fan Powered Product
Including a Series Sensible Cooling Option

8 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 15
WSHP Update Product Enhancements • ECM option on Vertical Stack product (GET) – NOW!
• Two-speed compressor product (DXHV) – NOW!
• Plenum Fan option for variable speed - 3Q2015
up to 2.5” esp
• Acoustic Updates
Sound data being updated in TOPSS - 2Q2015 • GEHC, EXHV, DXHV, VSHV and GET
Control Enhancements • BACnet®, Wireless Sensors and Wireless Communication
Now! on most products in the family
• Trane Air-Fi™ –Capability - 2Q2015
Factory Mounted, Wired and Addressed
One of the broadest portfolios of heat pump systems of any manufacturer
© 2015 Trane | 16
IMPROVING TRANE TOOLS
1. Simple Tools to Improve YOUR Productivity
2. “Real-Time” Data from Oracle
3. Ties to the current Trane ComfortSite Tools

9 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 17
Our Vision: Search, Price, Order & Schedule Delivery from your Mobile Device
First Release: Search Inventory & Track Existing Orders
Mobile App to View LCU Stock & Order Status
© 2015 Trane | 18
We need Partners to Test and Provide Feedback!
Show of Hands if you are interested – Thank You!!
My Orders

10 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 19
TOPSS™ Made Easy!
• Works on all devices, platforms, and all modern
browsers
• Selections run faster, are always up-to-date, and
all changes are saved immediately to the cloud.
• https://www.youtube.com/watch?v=Vpzekga-ZLY&feature=youtu.be
• TOPSS Mobile Selection Software is available to: Sales
Customers
International
• Performance prediction on many Trane products Residential
Commercial
© 2015 Trane | 20
BACK TO BASICS
1. Intense focus on quality in Clarksville
2. On time delivery with accurate ship dates
3. Additional inventory of vertical self contained
units, Odyssey™, RTU’s & accessories
4. New Products in Light & Large Unitary
5. Trane 360 app for visibility of inventory &
existing orders / Mobile TOPSS™ Selection

11 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 21
Jammin’
on Air Handling Products Marcela Nino
Catalog Air Handling Portfolio Leader
© 2015 Trane | 22
An air handler for every need
Performance Climate Changer™ Air Handlers
Model CSAA
Indoor
Model CSAA
Outdoor
Model UCCA
Indoor Model TCFS
Custom
Blower Coil Unit Ventilator
Model UCCA
Outdoor
UniTrane™ Fan Coil and
ForceFlo™ Cabinet Heater

12 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 23
Status Update
UCCA Indoor Recent Changes
• 5 week standard lead time
• 3 week quick cycle
• UC600 controller now available
• Improved submittal drawings
Design special offerings • Base rail • Heat pump coils • Coated coils • .025” tube wall thickness • CD50 aluminum dampers • TEFC motors • Paint • Single opening
Activity is ramping up, seeing great benefit vs LPC
% Impact by Vertical Market
© 2015 Trane | 24
Status Update
UCCA Indoor – New Standard Options
3 new UCCA options
• Most common
design specials
requested
Availability
• Selectable in
TOPSS, May
• First shipment
in June
If needed now, send
in request for pricing
Extended Drain and Vent
Added coil/access section
Access Doors on Both Sides
Expanding options on our entry-level offering

13 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 25
What’s coming?
UCCA Outdoor Key Features • 2” Double wall injected foam casing
• Coil flexibility similar to UCCA Indoor
• Fan options include: Low cost housed forward curved or direct drive fan
One per unit size, front or bottom discharge
• Vertical return fan economizer option
• High voltage controls Optional factory mounted and wired low cost VFD
• Low voltage controls Factory mounted and wired unit controller
Factory mounted control end devices wired to a
terminal strip
• Outdoor specific features Piping cabinet, inlet hood, roof curb, paint,
weatherization, down discharge
Availability
• Selectable in TOPSS™, May
• First shipment, September
Filling an important gap
© 2015 Trane | 26
PHASE 1
CSAA
- Casing
- Lead time
- Healthcare (CDQ & TCACS)
TCFS – CV Offering
PHASE 2
CSAA
- New Options
- Testing Capabilities
PHASE 3
Integrated semi-custom offering
Lexington/Fort Smith
- Complimentary products spanning entire segment
Fort Smith
Lexington
Total Market Estimated at $1,700 Million
What’s coming?
Winning in the Semi-Custom Market

14 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 27
What’s coming?
CSAA as semi-custom
Market-leading performance and flexibility enables access to semi-custom market
CSAA Winning Today • Superior casing
No thru-metal
Leading leakage/
deflection/thermal
• Lead times
• Factory wiring
• Health care options CDQ and TCACS
New Options • Expand fan array offering
Full redundancy down to size 35
• Stainless steel door hinges
• End of unit doors, test ports
• Thermal pane window
• New UV light offering
• End of unit service cabinet
• Improved controls offering New, smaller terminal strip
Flexible light switch
PPS download
Coming Soon • More Direct drive fan flexibility
Full redundancy down to size 17
Vertical DDP – Q4
• Staggered coils – Q3
• Enhanced energy wheel offering
• VFD per fan – Q4
• Factory Testing - May
Model CSAA Performance Climate Changer Size 3-120
© 2015 Trane | 28
• Leakage and Deflection
• Dedicated factory test area
• Selectable in TOPSS™ - April
• Two week add to lead-time
• Two testing options
Factory Test • Test report signed and mailed to customer
Witness Test • Bring your customer to Lexington to witness unit testing
• New part of customer visit experience
Demonstrating, proving and promoting our superior casing
What’s coming?
Factory Testing

15 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 29
Quick Select Strategy
• 2 minutes per unit
• Few inputs Airflow, Indoor/Outdoor,
Controls (Y/N)
• System Type Configurations Factory Recommended
User Defined Favorite
Previously Ordered
• Outputs Dimensional Drawings
Weight
Budget Pricing
Faster Selections, cleaner BOM, reduction of complexity
What’s coming?
Mobile TOPSS™
© 2015 Trane | 30
• Enhanced User Interface
• Feature Selection View
• Controls Selection View
• Smart rules fix errors
• Option pricing
• Superior output reports
Release in December
What’s coming?
Mobile TOPSS™

16 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 31
Terminal Products
Blower Coil - 3 phase EC Motor • Trane is on the leading edge implementing ECM as
our standard motors across all terminal products fan
coil, unit vent and blower coil
• Single Zone VAV ready
• Increased motor efficiency Direct drive motor eliminates belt loss
• Labor and Component Maintenance Savings Belt and sheave replacement and maintenance is
eliminated
Variable airflow capability
• No need to field install a VFD for variable airflow
© 2015 Trane | 32
Terminal Products
MotorLator™ Energy Calculator • Web based tool used to
quantify and visualize
energy savings of EC motor
• Allows comparison of
several products including
Fan Coil, Unit Ventilator,
and Blower Coil
• Customer version available
February 2015

17 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 33
Airside Wrap-Up Air Handling Units • UCCA Indoor Line Extension Offerings
• UCCA Outdoor
• Semi-custom market (Lexington & Fort Smith) Phase In Approach
Factory Testing
• Mobile TOPSS™
Terminal Products • Blower Coil – 3 phase EC motor
• MotorLator™ Energy Calculator
Improving and increasing offerings to help you win and grow
Providing tools that will enable you to be more effective
© 2015 Trane | 34
Jammin’
on Ductless Products Mike Enderlin
VRF/Sourced Product Business Leader

18 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 35
Ductless Portfolio Update
© 2015 Trane | 36
WIIFM? VRF MARKET FACTS
• Fastest growing product
market segment
• 2014 $ Market was
greater than large
rooftops or chillers
• Trane Goals:
“Spec Share” = 35%
Trane B.O.D. = 10%

19 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 37
2014 PORTFOLIO ENHANCEMENTS
• Water Source VRF Indoor/Outdoor
Units
• Convertible Air Handlers
• New Control Options Touchscreen Controller
Simplified Wired Controller
Power Meter Interface
• High Walls with Factory Installed EEVs
© 2015 Trane | 38
WATER SOURCE VRF
• Up to 48 tons system capacity
• Industry leading efficiencies
• Install indoors Centrally located piping runs up to 984 ft.
Can re-use existing water loops
Low ambient heating capacity
superior to air source VRF
No requirement for defrost
• Application Flexibility Cooling Tower & Boiler
Closed Loop Renewable Water
Closed Loop Ground Source

20 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 39
WHAT’S COMING IN 2015? • New MSP/HSP ducted units
Maximum ESP = 0.6” for 7.5~18 MBh models
Maximum ESP = 0.8” for 24~48 MBh models
UL 1995 Compliant
• VRF Blower Coil Pre-engineered, catalogued, light duty air handlers
Factory configured for VRF application
EC Motor standard
Draw-thru design
400 to 3,000 nominal cfm; up to 2.5” ESP
Most Trane BCHD and BCVD options available
• Sales Tools On-Line Installer Training and Expanded Curriculum
Additional Regional Training Centers
Expanded Technical Support Team
Different iat i ng
Trane
© 2015 Trane | 40
NEXT ON DECK • 14 & 16 ton ODU
Lower Installed Cost
Smaller footprint
Up to 48 Total Tons
• VRF Classroom Unit Ventilator – 1H2016
Standard Trane Unit Ventilator Cabinet
Factory configured for VRF application
Fresh air ventilation and filtration
Most Trane VUV options available
Different iat i ng
Trane
20 Tons 16 Tons

21 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 41
DUCTLESS PORTFOLIO EXPANSION
NEW TRANE MINI-SPLITS • Multiple Efficiency Tiers
• 1:1 High Wall Applications
• Up to 130 ft. Pipe Lengths
• Cooling 0~110° F
• Heating 5~75° F
NEW TRANE MULTI-SPLITS • 2:1 thru 5:1 combinations
• High Wall, Concealed, Cassette,
Console and Floor Ceiling IDUs
• Up to 230 ft. Total Pipe Lengths
NEW TRANE U-MATCH • “Commercial Grade” Ductless Heat
Pump Systems
• 18 thru 48 MBh capacity
• Concealed and Cassette IDUs (1:1)
• Up to 245 ft. Total Pipe Lengths
• Up to 100 ft. Vertical Pipe Lengths
• Cooling 0~115° F
• Heating -4~75° F
© 2015 Trane | 42
Jammin’
on Water-Cooled Chillers Vijay Deshmukh
Water-Cooled Product Portfolio Leader,

22 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 43
Compact CVHE …New offering – Smaller Footprint, Air-Cooled Drive
• Narrower footprint than classic CVHE
• Meets or exceeds ASHRAE 90.1-2013
• Unit-Mounted Air-Cooled drive
• Lower cost vs. current CVHE drive
• Reduced lead times
Three Sizes Available:
• 250 Ton
• 275 Ton
• 300 Ton
Availability: 2Q, 2015
Improved footprint and competitive offering for part load efficiency play
© 2015 Trane | 44
AFD drive option on Water-Cooled Chillers
• Adaptive Frequency™ drives (AFD)
• With Tracer AdaptiView™ controls
• Substantial part-load efficiency improvements
Quick Paybacks & Utility Rebates make this an Easy Sell-Up
RTHD Optimus™
• 180-430 Tons
• 380-460V
• Launched Q4’15
RTWD
• 80-250 Tons
• 380-575V
• 1st Ship 2H’15

23 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 45
Water-Cooled Cubic Chillers Trane-branded chillers
• 20-50 tons (groups up to 280 tons)
• Meets stringent ASHRAE 90.1 2013 requirements
• Brazed-plate evap and cond matched
with 2 scroll compressors in a single-circuit
• High reliability and minimal maintenance
• One set of water strainers with blow-down
per grouping of chillers
• Varying header-pipe sizes keep water
velocities up and sedimentary deposits down
• Individual chiller controls & array controllers
Tight packages with no disassembling/reassembling of chillers
Project Status Currently Napps-branded
AHRI certified and Trane-
branded 2H 2015
© 2015 Trane | 46
myPLV™
IPLV
D3.3.2 Weather data is a weighted average of 29 cities
D3.3.3 Building type is a weighted average of all types
based on a DOE study of buildings in 1992 [DOE/EIA-
0246(92)].
D3.3.4 Operational hours are a weighted average of
various operations (with chiller plants only) taken from the
DOE study of 1992 and a BOMA study (1995 BEE Report).
D3.3.5 A weighted average of buildings (with chiller plants
only) with and without some form of economizer, based
upon data from the DOE and BOMA reports.
myPLV
Customized to your location
Closely Matched Building Type Capabilities (building use, chiller plant design)
Operational Hours Calculated
Selectable Number of Chillers
Condenser Control Strategy Customizable
Vs
Vs
Vs
Vs

24 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 47
myPLV™ 2.0
myPLV
140 U.S. and Canadian locations
IP units
Std weather /building load profiles
Standard Bid Form printing
myPLV 2.0
1,048 U.S. and 480 Canadian locations
4,000 additional international locations
SI or IP units
Standard and custom profiles
Custom column headings on bid form
Vs
Vs
Vs
Vs
© 2015 Trane | 48
myTest™ - The Next Evolution in Testing
• Precise control simulates real-world
conditions in the factory
• Specialized tests validate stringent
operating requirements
• Flexible loop can test chillers from
virtually any manufacturer
• Over 15 pre-defined chiller tests
Industry leading test capabilities
differentiate Trane chillers

25 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 49
Upcoming Refrigerant changes
Continued pressure on HFCs Globally
Refrigerant Manufactures Bringing
New Solutions to Market
The Series E CenTraVac™ is an EcoWise™ chiller, with next-
generation, low-GWP solution (Currently offered outside NA)
CenTraVac Portfolio is
• Compatible and Convertible to future Refrigerant solutions
• Designed to meet EcoWise criteria
• Will be part of the EcoWise portfolio when the selected
next-generation refrigerant receives its ASHRAE
designation, SNAP approval, and is commercially available.
Portfolio of Products designed to
lower environmental impact with:
► next-generation, low-GWP
refrigerants and
► high efficiency operation
Trane taking leadership on Refrigerant changes
© 2015 Trane | 50
Trane Centrifugal Chiller Roadmap
1940
1950
1960
1970
1980
1990
2000
2010
2020
2030
R-113 (40 years)
R-11 (50 years)
2035
TURBOVAC™
R-113
R-11 R-123 (+35 years)
Montr
eal
Pro
tocol CenTraVac™
Lowest Environmental Impact:
• Efficiency:
• Reliability & Serviceability
• System Integration & Control
Convertible & Compatible Solutions: Continuing to help Customers Transition
Full line in 2017. Today, limited
size & regional availability.
Next-Generation, Low-GWP
Details will be shared late 2015, with product shipping in 2017

26 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 51
Summary
• New Offerings Competitive CVHE ~ new drive & smaller footprint
RTWD ~ new drive for part load efficiency
Cubic Chillers ~ 20-50 ton Trane branded products
• New Tools myPLV™ 2.0 ~ further customized for your location
myTest™ ~ more test choices
• Future Refrigerant Changes EcoWise™ ~ products with next generation low GWP refrigerants
CenTraVac™ products to be EcoWise™ by 2017 - convertible & compatible
© 2015 Trane | 52
Air-Cooled Chillers
Todd Duncan
Portfolio Leader – AC Chillers

27 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 53
StealthTM - Thank you for the success!
• Successful everywhere – not just regionally
Premier part load efficiency without sacrificing full
load efficiency
Multiple Sound Reduction Options with the quietest
offering the lowest published levels
Optional IEEE519 compliance
(Harmonic Control in Electric Power Systems)
© 2015 Trane | 54
6 4
Argentina – 2
Australia – 11
Bolivia – 2
Brazil – 3
Canada – 15
Columbia – 2
4
12 12
5
- 6
43
3
1 5 3
1
3
-
4
- 11
4
4
3
3
4
5
4
2
15
4
1
2
23
13
5
8
- 5
6
France – 1
Germany - 2
Hong Kong – 3
Mauritius – 1
Mexico – 9
Puerto Rico - 2
South Africa – 2
5
43
Some StealthTM Jobs

28 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 55
Introducing SintesisTM (RTAF)
• Positioned between StealthTM (RTAE) and
RTAC Models
Balancing low life-cycle costs
with lower first cost
Variable speed compressors
and condenser fans
Acoustical treatment
available
© 2015 Trane | 56
Portfolio of Products
• Products designed to lower environmental
impact with: next-generation, low-GWP refrigerants and
high efficiency operation
• SintesisTM (RTAF) - two refrigerant options: R-134a (same as RTAC and Stealth™/RTAE), or
DuPont Opteon® XP10 (R-513A) • GWP of 600 versus 1370 for R-134a
• A1 refrigerant under ASHRAE Standard 34
• Reduced refrigerant charge

29 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 57
CGAM Air-Cooled Chiller Update
• Higher Efficiency Options 20 – 70 ton available NOW!
110 – 120 ton available in 2nd Half 2015
• Microchannel cond option
in 2nd Half 2015 Efficiency improvement
Weight reduction
Reduced refrigerant charge 9
10
11
12
13
14
15
16
17
20 26 30 35 40 52 60 70 80 90 100 110 120 130
EF
FIC
IEN
CY
(E
ER
)
CAPACITY (TONS)
ASHRAE 90.1 2010 Part Load IPLV Minimum
ASHRAE 90.1 2010 Full Load EER Minimum
© 2015 Trane | 58
Options for Emergency Replacement
• Quick Ship 10 day lead time on CGAM 200V & 460V
15 day lead time on CGAM w/ pump package and/or
buffer tank
• Completed chillers will still be stocked
• Rental chillers in less than 24 hours….
Get cooling!

30 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 59
Jammin’
on Control Products Gene Shedivy
Controls Product Leader
© 2015 Trane | 60
Wireless Comm Benefits On Time – On Budget
• Compress the construction cycle
• Minimize construction costs
Reduced Risk
• Factory mounting – eliminate labor
• Eliminate wire and terminations
Problem Solving
• Sensor location
• Eliminate Comm link troubleshooting
Lifecycle costs savings
• Renovation flexibility
• Minimize service costs
Business Opportunities:
• New construction VAV
Rooftops
Fan Coils
Heat Pumps
• Retrofit jobs Historic buildings
Pneumatic VAV
Construction material abatement
Upgrading existing systems
Wireless Comm – becoming the new standard - 0 to 35% in 2 years!

31 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 61
Air-Fi™ Wireless
New Name! – Wireless Comm is now Air-Fi™
New product enhancements Maintenance Free Sensors (15-year battery life)
Increased Reliability – sensor is on the network
RH Option
Buy America Option
Capable of Averaging
2 Models • WCS-SD (Display)
• WCS-SB (Base)
No Price Change Planned
New in
2015!
The industry’s best wireless solution just got better
© 2015 Trane | 62
Tracer™ Concierge
for Small Buildings

32 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 63
Designed to work together
Delivered to the site ready to run
Tracer™ Concierge National Account Retail – Introduced in 2014
Built on
Tracer™
Controls
Platform
Tracer™ Concierge
System
First Step Towards a Full Line of Simple Buildings Offerings
© 2015 Trane | 64
Tracer™ Concierge for Small Buildings
• 10” Touch
Screen
• Local
Scheduling
• Custom
Graphics • Changeover VAV
Application
• UC210 Bypass
Taking Concierge Beyond Retail to Thousands of Small Buildings
• All-Variable Rooftops
• Factory WCI (late 2015)
New in
2015!

33 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 65
New 10” Commercial display
More durable display – larger for better user experience
© 2015 Trane | 66
Scheduling and Custom Graphics
Added functions to expand the market coverage

34 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 67
Tracer™ SC Variable Air Systems (VAS)
now supports changeover systems
– Variable Volume RTU or AHU
– Constant Volume RTU with Bypass Damper
Replaces VariTrac™ CCP
Application Improvements
Check-the-box simplicity with fewer boxes on the wall
© 2015 Trane | 68
New All-Variable Zoning System w/ Changeover
• VAV Rooftops Variable-speed fan, MZVAV
• Available 3 tons and up
Modulating heat • Available 12.5 tons and up
• No bypass damper required with Mod Heat ⃰ Bypass required with staged heat
• Energy efficient
• Lower installation costs
* Properly Applied
The new standard in small zoning systems

35 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 69
Zone and Bypass Dampers
• Zone Dampers VariTrane™ – full line of options
RIRO – damper and flow ring – lower cost
All available with factory or field UC210 VAV Controller and Air-Fi™
• Bypass Dampers VariTrane shutoff – no controls
RIRO – no controls
• Bypass Damper Controller Field-mount UC210 VAV Controller and Air-Fi™
Requires Duct Static Pressure control program
Pre-programmed option coming soon
Lots of options - including local reheat
© 2015 Trane | 70
Tracer™ Concierge in Existing Buildings
• Air-Fi™ enables cost-effective upgrades of many
existing systems UC210 VAV Controller
RIRO VAV boxes
• BAS R’newal™ for existing Trane systems Tracer 100, Tracker™, Tracer Summit upgrades
Tracer Comm3/4 bridge to existing equipment
Changeover Application – eliminate VariTrac™ CCP
Bypass Damper with UC210 and Air-Fi™
Thousands of existing systems that can be modernized

36 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 72
Workshop Survey
Tell Us How We Did! Please go online now and fill out the survey. You will complete a
survey for each workshop you attend.
Link to survey:
http://irco.az1.qualtrics.com/SE/?SID=SV_9LauROO2dnkarPL
Reminder
Email Photos from event to:

37 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange
© 2015 Trane | 73
The Next Event…
© 2015 Trane | 74
Mi gaan
(Good Bye)

38 © 2015 Trane
Strategic Partner Exchange – 2015
Feel the Rhythm — 25th Strategic Partner Exchange