BIM in Canada: where are we headed?
98th Annual Conference
Erik A. Poirier, PhDPostdoctoral Fellow | Dept. of Civil Eng.
University of British Columbia | Vancouver (BC) Canada
Vice-‐Chair, Operations | Chair, Communications
buildingSMART Canada
![Page 2: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/2.jpg)
• BIM is a catalyst for change• We need the appropriate regulatory / policy framework to support this change• 3 key elements to this framework
• National BIM strategy• National BIM mandate• National BIM standards
March 8, 2016 © Poirier, 2016 2
Key takeaways
BIM strategy
BIM standards
BIM mandate
![Page 3: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/3.jpg)
March 8, 2016 © Poirier, 2016 3
Where are we now?
Where are we headed?
How do we get there?
![Page 4: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/4.jpg)
March 8, 2016 4
• Established in 2010• Joint national committee• Objectives:
• Define collaborative approaches• Develop and recommend consistent terminology & best practices
• Endorse and Develop Open BIM Standards
• Industry BIM education
© Poirier, 2016
![Page 5: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/5.jpg)
March 8, 2016 5
• Established in 2011• Initiated and run by IBC• provide the appropriate body and home for Canadian BIM Standards Development • participation in the development of international BIM standards
© Poirier, 2016
![Page 6: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/6.jpg)
March 8, 2016 6© Poirier, 2016
![Page 7: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/7.jpg)
March 8, 2016 © Poirier, 2016 7
• Established in 2008• “the business voice of Canada’s BIM Community”
![Page 8: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/8.jpg)
March 8, 2016 © Poirier, 2016 8
Where are we now ?
![Page 9: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/9.jpg)
9
(n=175)
(McGraw-‐Hill, 2009) March 8, 2016 © Poirier, 2016
![Page 10: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/10.jpg)
© Poirier, 2016 10(McGraw-‐Hill, 2012)
(n=29)(n=175)
March 8, 2016
![Page 11: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/11.jpg)
11(NBS, 2013)
(n=72)March 8, 2016 © Poirier, 2016
![Page 12: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/12.jpg)
(n=127)March 8, 2016 12© Poirier, 2016
(NBS, 2015)
![Page 13: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/13.jpg)
March 8, 2016 © Poirier, 2016 13
(n=521)(Tahrani, Poirier & Forgues, 2015)
BIM & integrated approaches in Quebec
![Page 14: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/14.jpg)
March 8, 2016 © Poirier, 2016 14
BIM & integrated approaches in Quebec
(n=521)
(Tahrani, Poirier & Forgues, 2015)
![Page 15: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/15.jpg)
March 8, 2016 © Poirier, 2016 15(n=127)(NBS survey, 2015)
![Page 16: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/16.jpg)
• Limited rate of adoption
• Limited to specific portions of the supply chain
• Inconsistentuse of BIM across Canada
• Variable level of maturity and capability
• Hinders potential value to Canada
March 8, 2016 © Poirier, 2016 16
Some observations
![Page 17: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/17.jpg)
March 8, 2016 © Poirier, 2016 17
Resources currently available
![Page 18: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/18.jpg)
IBC Contract Appendix for BIM projects
18
• IBC 100-‐2014 – IBC BIM Contract Appendix• IBC 201-‐2014 – IBC LOD, Authorized Uses and Model Elements Table
March 8, 2016 © Poirier, 2016
![Page 19: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/19.jpg)
Benefits of BIM for Owners Report
19
•Benefits of BIM for Owners Report•Overview of BIM from Owners Perspective• Non-‐technical• Case Studies which attempt to measure the impact of BIM
March 8, 2016 © Poirier, 2016
![Page 20: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/20.jpg)
IBC BIM PxPToolkits
March 8, 2016 20© Poirier, 2016
![Page 21: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/21.jpg)
March 8, 2016 21
Other resources
© Poirier, 2016
![Page 22: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/22.jpg)
March 8, 2016 22
Other resources
© Poirier, 2016
![Page 23: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/23.jpg)
March 8, 2016 © Poirier, 2016 23
Where are we headed ?
![Page 24: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/24.jpg)
International Consensus
Strategic reform of the industry
Adoption of innovative approaches
• Integrated Approaches
• Building Information Modeling
• Lean Construction
24
The need to change
March 8, 2016 © Poirier, 2016
Source: (Tahrani et al. 2015)
![Page 25: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/25.jpg)
March 8, 2016 25
Where do we focus?
© Poirier, 2016
Improve performance Generate value
![Page 26: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/26.jpg)
March 8, 2016 © Poirier, 2016 26
Where do we focus?
![Page 27: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/27.jpg)
27March 8, 2016 © Poirier, 2016
![Page 28: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/28.jpg)
A call to action
March 8, 2016 © Poirier, 2016 28
(Goodland, Lindberg & Shorthouse, 2015)
![Page 29: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/29.jpg)
29March 8, 2016 © Poirier, 2016
![Page 30: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/30.jpg)
30March 8, 2016 © Poirier, 2016
![Page 31: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/31.jpg)
March 8, 2016 31
Are we ready?
© Poirier, 2016
Grande Rencontres BIM Contech, May 2015 CanBIM quick poll, December 2015
![Page 32: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/32.jpg)
March 8, 2016 32
Are we ready?
• Should government mandate the use of open standards for BIM in their projects?• Yes, federal• Yes, provincial• Yes, municipal• Yes, all level of government• No
© Poirier, 2016
99% Yes, all levels of
governmentbSCMembers’ Community Meeting – January 2016 (n=31)
![Page 33: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/33.jpg)
March 8, 2016 © Poirier, 2016 33
How do we get there ?
![Page 34: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/34.jpg)
March 8, 2016 © Poirier, 2016 34
How do we structure the BIM adoption and implementation process in Canada?
![Page 35: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/35.jpg)
1. learn from other countries’ experiences in the transition to innovative project delivery approaches?
2. develop a comprehensive reform strategy in order to improve its performance and efficiency to ensure its sustainability and competitiveness?
35
How can the Canadian AECO industry:
March 8, 2016 © Poirier, 2016
Source: (Tahrani et al. 2015)
![Page 36: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/36.jpg)
Public sector
Governmental policy
BIM standards and guidelines
Clear information exchange
requirements
Designated organizations
Reporting and promotion of
BIM
BIM research programs
36
Key Drivers for Canada
(Wong et al., 2010) March 8, 2016 © Poirier, 2016
![Page 37: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/37.jpg)
1. Public sector
International • Recognition of the power of the public sector as a key actor in the reform of the AECO industry
• A specific government department leads the initiative
• Investments
Canada • The complexity of multi-‐layered governmental context
• The need for a national initiative
• National framework for innovative project delivery adapted at all levels of government
37March 8, 2016 © Poirier, 2016
Source: (Tahrani et al. 2015)
![Page 38: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/38.jpg)
Country Organization Investment
United Kingdom
BIM Task Group
Public sector funding
Mobilisation -‐ £ 1.4 million
Operations – £ 480 000 / year (5 years)
Total – £ 3.86 million ($ 6.94 million CAN)
FinlandTekes Public and private sector funding
Pre program at RYM oy. R & D – € 21.7 million (4 years between 2010 and 2014) ($ 30.9 million CAN)
Norway StatsbyggPublic and private sector funding
R & D – € 21.7 million (4 years between 2010 and 2014) ($ 30.9 million CAN)
Singapore Building Construction Authority (BCA)
Public sector funding
BIM fund – cover up to 50% of costs associated to BIM adoption within firms:
12 millions SGD ($ 10.4 millions CAN)
France Transition committee € 20 million for a road map
1. Public sector
38March 8, 2016 © Poirier, 2016
![Page 39: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/39.jpg)
2. Governmental policy
39© Poirier, 2016March 8, 2016
Source: (Tahrani et al. 2015)
![Page 40: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/40.jpg)
No formal policy mandating BIM implementation on all public projects in Canada
Four separate initiatives
40
2. Governmental policy
Space management and open BIM
Royal Alberta Museum pilot project
Several small pilot projects
Moose Jaw Hospital
March 8, 2016 © Poirier, 2016Source: (Tahrani et al. 2015)
![Page 41: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/41.jpg)
No formal policy mandating BIM implementation on all public projects in Canada
Four separate initiatives
41
2. Governmental policy
Space management and open BIM
Royal Alberta Museum pilot project
Several small pilot projects
Moose Jaw Hospital
Fragmented initiatives across the county
March 8, 2016 © Poirier, 2016Source: (Tahrani et al. 2015)
![Page 42: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/42.jpg)
3. BIM standards and guidelines
A Review of BIM-‐-‐Guidelines: Content, Scope & PositioningMartin Hooper, LTH Interreg midtvejsseminar 2 November 2011
Presence of so many different standardsProblem for broadcasting a consistent message and gaining traction within the industry
42March 8, 2016 © Poirier, 2016
![Page 43: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/43.jpg)
Advantage for CanadaBenefit from the efforts and lessons learned of other countries
in developing its standards
43
3. BIM standards and guidelines
March 8, 2016 © Poirier, 2016Source: (Tahrani et al. 2015)
![Page 44: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/44.jpg)
International
44
4. IE & open standards
Reconfiguration of practice
Requirements for reuse of informationover the product lifecycle
Canada
An international consensus:
The use of the exchange standard provides relative stability and confidence
Joint statement in 2008 to support open BIM (IFC)
GSA, Senate Properties, Statsbygg and DECA (Denmark)
March 8, 2016 © Poirier, 2016
Source: (Tahrani et al. 2015)
![Page 45: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/45.jpg)
5. Designated organizationsTOP
Government
Designated organizationsFor BIM implementation
BottomIndustry
BIM task group-‐ UKBCA – Singapore
Professional associations –AIA, RIBA
45March 8, 2016 © Poirier, 2016
Source: (Tahrani et al. 2015)
![Page 46: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/46.jpg)
TOPGovernment
Designated organizationsFor BIM implementation
BottomIndustry
National level: IBC, bSC, CanBIMProvincial level: aceBIM, BIM BC user
group, BIM Quebec group
46
In Canada
The need for an organization mandated to lead the national initiative All professional associations to support and buy into this initiative
March 8, 2016 © Poirier, 2016
Source: (Tahrani et al. 2015)
5. Designated organizations
![Page 47: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/47.jpg)
TOPGovernment
BottomIndustry
47March 8, 2016 © Poirier, 2016
Source: (Tahrani et al. 2015)
Guidelines:AEC (Can) BIM Protocol
Toolkits, Practice Manual + contract language document
Strategy & Standards (people, process &
technology)
5. Designated organizations
![Page 48: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/48.jpg)
6. BIM research programs
International • Investment in research and development
• Innovation programs
• Technology development
• Transition Support
Canada • Involvement of research groups, universities and organizations
• Funds from government : Engage Grants, IRAP
• Research projects are one off and remain fragmented and the findings are highly contextual
The need to redefine professional curricula to fit the new context of integrated approaches
48
(Forgues and Farah, 2013)
March 8, 2016 © Poirier, 2016
![Page 49: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/49.jpg)
6. BIM research programs
49
(Goodland, Lindberg & Shorthouse, 2015)
March 8, 2016 © Poirier, 2016
![Page 50: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/50.jpg)
• Innovative approaches improve the performance and value generated
• Governments around the world are driving the reform
• Canadian mandate can rely on international efforts to inform its initiatives
• Canadian initiative must share a single vision
50
Some observations
March 8, 2016 © Poirier, 2016
Source: (Tahrani et al. 2015)
![Page 51: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/51.jpg)
51March 8, 2016 © Poirier, 2016
![Page 52: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/52.jpg)
Need for reliable Canadian data
• At the core of any change / continuous improvement effort
• If we want to inform decisions
• If we want to develop policy
• If we want to move forward
March 8, 2016 © Poirier, 2016 52
Next Steps:
![Page 53: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/53.jpg)
Need for a national strategy for the built environment
• Aimed at improving the performance of the industry
• Aimed at generating more value for Canada
• Aimed at delivering a better and more sustainable built
environment
March 8, 2016 © Poirier, 2016 53
Next Steps:
![Page 54: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/54.jpg)
March 8, 2016 © Poirier, 2016 54
(Goodland, Lindberg & Shorthouse, 2015)
Next Steps:
![Page 55: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/55.jpg)
March 8, 2016 55© Poirier, 2016
“Canada, with its federalist system, struggles with the same challenges international climate action poses: how to corral widely different political players – its diverse provinces – towards a stringent emissions target.”https://www.opencanada.org/features/cop21-‐what-‐canadas-‐role/
Next Steps:
![Page 56: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/56.jpg)
• BIM is a catalyst for change• We need the appropriate regulatory / policy framework to support this change• 3 key elements to this framework
• A national BIM strategy• A national BIM mandate• A national BIM standard
March 8, 2016 © Poirier, 2016 56
Key takeaways
BIM strategy
BIM standards
BIM mandate
![Page 57: 2016 03-08 b-sc_cca_final](https://reader031.vdocuments.net/reader031/viewer/2022020213/58ee95471a28abcf5f8b45bd/html5/thumbnails/57.jpg)
57March 8, 2016 © Poirier, 2016