![Page 1: 2016 06 05 FR CLG Presentation - Auckland Transport · What"do"wehaveplanned"for"July2016? •Discuss)with)Auckland)Councila)method)to)streamline)the) buildingconsent)processingrequiredfor)privatedrainage](https://reader033.vdocuments.net/reader033/viewer/2022060208/5f0428b97e708231d40c9a66/html5/thumbnails/1.jpg)
1Franklin Road ImprovementsCommunity Liaison Group meeting5 July 2016
![Page 2: 2016 06 05 FR CLG Presentation - Auckland Transport · What"do"wehaveplanned"for"July2016? •Discuss)with)Auckland)Councila)method)to)streamline)the) buildingconsent)processingrequiredfor)privatedrainage](https://reader033.vdocuments.net/reader033/viewer/2022060208/5f0428b97e708231d40c9a66/html5/thumbnails/2.jpg)
Update from Watercare
![Page 3: 2016 06 05 FR CLG Presentation - Auckland Transport · What"do"wehaveplanned"for"July2016? •Discuss)with)Auckland)Councila)method)to)streamline)the) buildingconsent)processingrequiredfor)privatedrainage](https://reader033.vdocuments.net/reader033/viewer/2022060208/5f0428b97e708231d40c9a66/html5/thumbnails/3.jpg)
Franklin Road Upgrades
Water Main Renewals and Wastewater Separation Works
July 2016
![Page 4: 2016 06 05 FR CLG Presentation - Auckland Transport · What"do"wehaveplanned"for"July2016? •Discuss)with)Auckland)Councila)method)to)streamline)the) buildingconsent)processingrequiredfor)privatedrainage](https://reader033.vdocuments.net/reader033/viewer/2022060208/5f0428b97e708231d40c9a66/html5/thumbnails/4.jpg)
What do we have planned for July 2016?• Discuss with Auckland Council a method to streamline the building consent processing required for private drainage works.
• Start to meet with the residents to obtain sign-off for the individual building consents for each property.
• Contractor will finalise all the requirements of the Resource Consent prior to mobilising on site – for example completion of construction management plans
• Identify and mark out of existing services in Franklin Road starting from the lower end
• Site establishment by the contractor in preparation for start of works.
![Page 5: 2016 06 05 FR CLG Presentation - Auckland Transport · What"do"wehaveplanned"for"July2016? •Discuss)with)Auckland)Councila)method)to)streamline)the) buildingconsent)processingrequiredfor)privatedrainage](https://reader033.vdocuments.net/reader033/viewer/2022060208/5f0428b97e708231d40c9a66/html5/thumbnails/5.jpg)
AT Works Progress Update
![Page 6: 2016 06 05 FR CLG Presentation - Auckland Transport · What"do"wehaveplanned"for"July2016? •Discuss)with)Auckland)Councila)method)to)streamline)the) buildingconsent)processingrequiredfor)privatedrainage](https://reader033.vdocuments.net/reader033/viewer/2022060208/5f0428b97e708231d40c9a66/html5/thumbnails/6.jpg)
6
• Cycleway design further developed at upper and lower Franklin Rd
• Internal AT technical inputs included• Scheme road safety audit - initial feedback included
• Bus stop relocation anticipated for mid 2017• Wellington Street roundabout modified • Additional parking spaces identified• New World entrance discussions commenced
Design Progress
![Page 7: 2016 06 05 FR CLG Presentation - Auckland Transport · What"do"wehaveplanned"for"July2016? •Discuss)with)Auckland)Councila)method)to)streamline)the) buildingconsent)processingrequiredfor)privatedrainage](https://reader033.vdocuments.net/reader033/viewer/2022060208/5f0428b97e708231d40c9a66/html5/thumbnails/7.jpg)
7
Franklin Road Improvements
![Page 8: 2016 06 05 FR CLG Presentation - Auckland Transport · What"do"wehaveplanned"for"July2016? •Discuss)with)Auckland)Councila)method)to)streamline)the) buildingconsent)processingrequiredfor)privatedrainage](https://reader033.vdocuments.net/reader033/viewer/2022060208/5f0428b97e708231d40c9a66/html5/thumbnails/8.jpg)
8
Upper Franklin Scheme Design
![Page 9: 2016 06 05 FR CLG Presentation - Auckland Transport · What"do"wehaveplanned"for"July2016? •Discuss)with)Auckland)Councila)method)to)streamline)the) buildingconsent)processingrequiredfor)privatedrainage](https://reader033.vdocuments.net/reader033/viewer/2022060208/5f0428b97e708231d40c9a66/html5/thumbnails/9.jpg)
9
Upper Franklin Scheme Design• Added a central lead in lane for confident cyclists
• Added a facility to provide less confident cyclists with the opportunity to move off the road and onto the footpath
• Bus stops outside nos. 2 and 11 removed due to changes in bus routes expected in mid-2017
• Added one parking space near intersection on north side
![Page 10: 2016 06 05 FR CLG Presentation - Auckland Transport · What"do"wehaveplanned"for"July2016? •Discuss)with)Auckland)Councila)method)to)streamline)the) buildingconsent)processingrequiredfor)privatedrainage](https://reader033.vdocuments.net/reader033/viewer/2022060208/5f0428b97e708231d40c9a66/html5/thumbnails/10.jpg)
10
Wellington St Roundabout
![Page 11: 2016 06 05 FR CLG Presentation - Auckland Transport · What"do"wehaveplanned"for"July2016? •Discuss)with)Auckland)Councila)method)to)streamline)the) buildingconsent)processingrequiredfor)privatedrainage](https://reader033.vdocuments.net/reader033/viewer/2022060208/5f0428b97e708231d40c9a66/html5/thumbnails/11.jpg)
11
• Added facilities for confident and non- confident to move through the roundabout
• Kerb lines modified to accommodate bus tracking • Heavy vehicles can now track over the roundabout
Wellington St Roundabout
![Page 12: 2016 06 05 FR CLG Presentation - Auckland Transport · What"do"wehaveplanned"for"July2016? •Discuss)with)Auckland)Councila)method)to)streamline)the) buildingconsent)processingrequiredfor)privatedrainage](https://reader033.vdocuments.net/reader033/viewer/2022060208/5f0428b97e708231d40c9a66/html5/thumbnails/12.jpg)
12
Lower Franklin Scheme Design
![Page 13: 2016 06 05 FR CLG Presentation - Auckland Transport · What"do"wehaveplanned"for"July2016? •Discuss)with)Auckland)Councila)method)to)streamline)the) buildingconsent)processingrequiredfor)privatedrainage](https://reader033.vdocuments.net/reader033/viewer/2022060208/5f0428b97e708231d40c9a66/html5/thumbnails/13.jpg)
13
• Removed separator islands near Victoria Street West intersection
• Added eastbound central lead in lane for confident cyclists• Added a facility to provide less confident cyclists with the opportunity to move off the road and onto the footpath
• Westbound cycleway starts on concrete on berm area by Birdcage
• Gateway treatment inserted to restrict excessive 2 lane stacking
• New bus stop located at No.97 (subject approval from AT’s public transport staff)
• New World entrance discussions progressing
Lower Franklin Scheme Design
![Page 14: 2016 06 05 FR CLG Presentation - Auckland Transport · What"do"wehaveplanned"for"July2016? •Discuss)with)Auckland)Councila)method)to)streamline)the) buildingconsent)processingrequiredfor)privatedrainage](https://reader033.vdocuments.net/reader033/viewer/2022060208/5f0428b97e708231d40c9a66/html5/thumbnails/14.jpg)
14
• Finalise New World discussions • Progress landscape design• Consider road safety audit feed back • Further discussions with AT’s Public Transport team on bus stop relocation
• Final agreement on the scheme design• Commence detailed design
Next Steps
![Page 15: 2016 06 05 FR CLG Presentation - Auckland Transport · What"do"wehaveplanned"for"July2016? •Discuss)with)Auckland)Councila)method)to)streamline)the) buildingconsent)processingrequiredfor)privatedrainage](https://reader033.vdocuments.net/reader033/viewer/2022060208/5f0428b97e708231d40c9a66/html5/thumbnails/15.jpg)
15
Scheduled Communications
![Page 16: 2016 06 05 FR CLG Presentation - Auckland Transport · What"do"wehaveplanned"for"July2016? •Discuss)with)Auckland)Councila)method)to)streamline)the) buildingconsent)processingrequiredfor)privatedrainage](https://reader033.vdocuments.net/reader033/viewer/2022060208/5f0428b97e708231d40c9a66/html5/thumbnails/16.jpg)
16
• Next couple of weeks - windscreen flyers letting people who park on Franklin Road know that construction will be commencing soon
• Community BBQ – agree a date so we can organiseand invite residents
• Pre-construction newsletter from AT• Pre-construction letter from Watercare
Pre-construction communications
![Page 17: 2016 06 05 FR CLG Presentation - Auckland Transport · What"do"wehaveplanned"for"July2016? •Discuss)with)Auckland)Councila)method)to)streamline)the) buildingconsent)processingrequiredfor)privatedrainage](https://reader033.vdocuments.net/reader033/viewer/2022060208/5f0428b97e708231d40c9a66/html5/thumbnails/17.jpg)
Thank you.