2016 annual environmental management report · .1 chan mine con employee actions r complian 6.1...
TRANSCRIPT
A
M
ANNMA
MUSWE
NUALANA
ELLBRO
2L ENAGEM
OOK CO
2016NVIRMEN
OAL CO
6 RONMNT R
MPAN
MENEPO
Y
NTAORT
AL
2016 An
MUSWELL
nnual Environ
LBROOK COAL
nmental Man
This
L COMPANY L
nagement Re
page has b
IMITED
eport
een left blaank intentionnally.
i
2016 An
Name o Name o
Titles/M
MOP CoMOP Co AEMR CAEMR E Reporti Title: Signatu
Date:
MUSWELL
nnual Environ
of Leasehold
of Mine: Mining Leas
ommencemompletion D
CommencemEnd Date:
ng Officer:
re:
LBROOK COAL
nmental Man
der:
es:
ment Date: Date:
ment Date:
L COMPANY L
nagement Re
IMITED
eport
Muswe
Muswe
ConsoliMiningMining
31 Mar31 Dece
1 Janua31 Dece
Julie Th
Environ
ellbrook Coa
ellbrook Coa
idated Coalg Lease 1304g Lease 1562
rch 2015 ember 2020
ary 2016 ember 2016
homas
nmental Co
al Company
al
l Lease 713 4 2
0
6
ordinator
y Limited
ii
2016 An
MUSWELL
nnual Environ
LBROOK COAL
nmental Man
This
L COMPANY L
nagement Re
page has b
IMITED
eport
een left blaank intentionnally.
iii
2016 An
1.0 I
1.1
1.2
1.2
1.3
1.4
1.5
1.6
1.6
1.6
2.0 A
2.1
2.2
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.9
2.9
2.9
2.10
2.1
2.1
2.1
2.11
3.0 E
3.1
3.2
3.2
MUSWELL
nnual Environ
NTRODUCTI
STRUCTUR
CONSENTS
.1 CHAN
MINE CON
EMPLOYEE
ACTIONS R
COMPLIAN
6.1 REPO
6.2 COM
ACTIVITIES D
EXPLORAT
LAND PREP
.1 TOPS
CONSTRUC
MINING ...
MINERAL P
WASTE MA
PRODUCT
PRODUCTI
HAZARDO
.1 FUEL
.2 CHEM
.3 EXPLO
WATER MA
0.1 WATE
0.2 GROU
0.3 WATE
OTHER INF
ENVIRONME
ENVIRONM
METEORO
.1 WIND
LBROOK COAL
nmental Man
ON ..............
RE OF THIS R
S, LEASES AN
NGES TO APP
NTACTS ........
E LEVELS ......
REQUIRED FR
NCE STATUS
ORTABLE INC
PLIANCE REV
DURING THE
TION ............
PARATION ..
OIL MANAG
CTION .........
....................
PROCESSING
ANAGEMENT
COAL AND T
ION SUMMA
US MATERIA
STORAGE ...
MALERT SYST
OSIVES ........
ANAGEMENT
ER STORAGE
UNDWATER
ER BALANCE
FRASTRUCTU
NTAL MANA
MENTAL MA
OLOGICAL .....
D SPEED AND
L COMPANY L
nagement Re
TABLE
....................
EPORT .........
ND LICENCES
PROVALS ......
....................
....................
ROM PREVIO
....................
IDENTS ........
VIEW ............
REPORTING
....................
....................
EMENT ........
....................
....................
G ...................
T ..................
TRANSPORT .
ARY ...............
ALS MANAGE
....................
TEM ..............
....................
T ..................
...................
EXTRACTION
....................
URE MANAG
AGEMENT AN
NAGEMENT .
....................
D DIRECTION
IMITED
eport
E OF CONT
....................
....................
...................
....................
....................
....................
OUS AEMR RE
....................
....................
....................
PERIOD .......
....................
....................
....................
....................
....................
....................
....................
....................
....................
EMENT .........
....................
....................
....................
....................
....................
N ..................
....................
EMENT .......
ND PERFORM
....................
....................
N ...................
TENTS
....................
....................
....................
....................
....................
....................
EVIEW .........
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
MANCE .........
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
iv
............ 1
............ 1
............ 1
............ 3
............ 3
............ 4
............ 4
............ 9
............ 9
............ 9
.......... 12
.......... 12
.......... 12
.......... 12
.......... 12
.......... 12
.......... 13
.......... 15
.......... 15
.......... 15
.......... 16
.......... 16
.......... 16
.......... 16
.......... 16
.......... 17
.......... 17
.......... 17
.......... 18
.......... 19
.......... 19
.......... 19
.......... 21
2016 An
3.2
3.2
3.2
3.3
3.3
3.3
3.3
3.4
3.5
3.5
3.5
3.5
3.6
3.6
3.6
3.6
3.7
3.7
3.7
3.7
3.8
3.9
3.9
3.9
3.9
3.10
3.1
3.1
3.11
3.1
3.1
3.1
3.12
3.1
MUSWELL
nnual Environ
.2 RAINF
.3 TEMP
.4 INVER
AIR QUALI
.1 ACTIV
.2 AIR Q
.3 ACTIV
GREENHO
EROSION A
.1 ACTIV
.2 EROS
.3 ACTIV
SURFACE W
6.1 ACTIV
6.2 SURF
6.3 ACTIV
GROUNDW
.1 ACTIV
.2 GROU
.1 ACTIV
CONTAMIN
FLORA AN
.1 ACTIV
.2 FLORA
.3 ACTIV
WEEDS AN
0.1 ACTIV
0.2 ACTIV
BLASTING
1.1 ACTIV
1.2 BLAST
1.1 ACTIV
NOISE MA
2.1 ACTIV
LBROOK COAL
nmental Man
FALL ............
PERATURE ...
RSION MONI
TY MANAGE
VITIES THIS R
QUALITY MON
VITIES NEXT
USE GAS .....
AND SEDIME
VITIES THIS R
SION AND SE
VITIES NEXT
WATER MAN
VITIES THIS R
ACE WATER
VITIES NEXT
WATER MAN
VITIES THIS R
UNDWATER
VITIES NEXT
NATED LAND
D FAUNA MA
VITIES THIS R
A AND FAUN
VITIES NEXT
ND FERAL AN
VITIES THIS R
VITIES NEXT
...................
VITIES THIS R
T MONITORI
VITIES NEXT
ANAGEMENT
VITIES THIS R
L COMPANY L
nagement Re
....................
....................
ITORING ......
EMENT .........
REPORTING P
NITORING ....
REPORTING
....................
ENT CONTRO
REPORTING P
DIMENT CON
REPORTING
NAGEMENT ..
REPORTING P
MONITORIN
REPORTING
AGEMENT ...
REPORTING P
MONITORIN
REPORTING
D ..................
ANAGEMENT
REPORTING P
NA MONITOR
REPORTING
NIMALS .........
REPORTING P
REPORTING
....................
REPORTING P
NG ..............
REPORTING
....................
REPORTING P
IMITED
eport
....................
....................
....................
....................
PERIOD ........
....................
PERIOD .......
....................
OL .................
PERIOD ........
NTROL MON
PERIOD .......
....................
PERIOD ........
NG ................
PERIOD .......
....................
PERIOD ........
G ................
PERIOD .......
....................
T .................
PERIOD ........
RING ............
PERIOD .......
....................
PERIOD ........
PERIOD .......
....................
PERIOD ........
....................
PERIOD .......
....................
PERIOD ........
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
NITORING .....
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
v
.......... 22
.......... 23
.......... 26
.......... 26
.......... 26
.......... 28
.......... 36
.......... 36
.......... 41
.......... 41
.......... 41
.......... 41
.......... 42
.......... 42
.......... 42
.......... 44
.......... 51
.......... 51
.......... 51
.......... 63
.......... 63
.......... 63
.......... 63
.......... 63
.......... 63
.......... 64
.......... 64
.......... 64
.......... 64
.......... 64
.......... 65
.......... 66
.......... 66
.......... 66
2016 An
3.1
3.1
3.13
3.14
3.15
3.16
3.1
3.1
3.17
3.18
3.19
3.20
3.21
4.0 C
4.1
4.2
4.3
5.0 R
5.1
5.2
5.2
5.2
5.2
5.2
5.3
5.3
5.4
5.4
5.4
5.4
5.5
5.5
5.5
5.5
MUSWELL
nnual Environ
2.2 NOISE
2.1 ACTIV
VISUAL, ST
ABORIGIN
EUROPEAN
SPONTANE
6.1 ACTIV
6.2 ACTIV
BUSHFIRE.
HYDROCA
METHANE
PUBLIC SA
OTHER ISS
COMMUNITY
ENVIRONM
COMMUN
COMMUN
REHABILITAT
BUILDINGS
REHABILIT
.1 REHA
.2 SPECI
.3 REHA
.4 REHA
REHABILIT
.1 SITE S
FLORA MO
4.1 PERM
4.2 FULL
4.3 BIOM
FLORA MO
.1 SPECI
.2 BIOM
.3 COM
LBROOK COAL
nmental Man
E MONITORI
VITIES NEXT
TRAY LIGHT .
AL HERITAG
N HERITAGE
EOUS COMB
VITIES THIS R
VITIES NEXT
....................
RBON CONT
DRAINAGE/
AFETY ...........
SUES AND RIS
Y RELATIONS
MENTAL COM
ITY LIAISON,
ITY CONSUL
TION ............
S ..................
TATION OF D
ABILITATION
IES SELECTIO
ABILITATION
ABILITATION
TATION MON
SELECTION ..
ONITORING M
MANENT MO
FLORISTIC A
METRIC SURV
ONITORING R
IES RICHNESS
METRIC DATA
PARISON TO
L COMPANY L
nagement Re
NG ..............
REPORTING
....................
E ..................
....................
USTION .......
REPORTING P
REPORTING
....................
AMINATION
/VENTILATIO
....................
SKS ..............
S ...................
MPLAINTS ....
, SPONSORSH
TATIVE COM
....................
....................
ISTURBED LA
PROCESS .....
ON ................
ACTIVITIES T
ACTIVITIES N
NITORING .....
....................
METHODOLO
NITORING TR
ND STRUCTU
VEY................
RESULTS .......
S ..................
A ...................
O COMPLETIO
IMITED
eport
....................
PERIOD .......
....................
....................
....................
....................
PERIOD ........
PERIOD .......
....................
...................
ON ................
....................
....................
....................
....................
HIPS AND DO
MMITTEE ......
....................
....................
ANDS ...........
....................
....................
THIS REPORT
NEXT REPORT
....................
....................
OGY .............
RANSECTS/P
URE .............
....................
....................
....................
....................
ON CRITERIA
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
ONATIONS ...
....................
....................
....................
....................
....................
....................
TING PERIOD
TING PERIOD
....................
....................
....................
PLOTS ...........
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
...................
D ..................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
vi
.......... 71
.......... 74
.......... 75
.......... 75
.......... 75
.......... 75
.......... 75
.......... 77
.......... 77
.......... 78
.......... 78
.......... 78
.......... 78
.......... 79
.......... 79
.......... 82
.......... 82
.......... 83
.......... 83
.......... 83
.......... 83
.......... 83
.......... 85
.......... 87
.......... 89
.......... 89
.......... 96
.......... 96
.......... 96
.......... 97
.......... 97
.......... 97
.......... 99
........ 100
2016 An
5.5
5.6
5.6
5.6
5.6
5.7
5.7
5.7
5.7
5.7
5.8
5.9
5.9
5.9
5.9
5.10
5.11
5.12
5.13
5.14
5.15
6.0 A
Table 1:
Table 2:
Table 3:
Table 4:
Table 5:
Table 6:
Table 7:
Table 8:
Table 9:
Table 10
Table 11
Table 12
Table 13
MUSWELL
nnual Environ
.4 CONC
FAUNA MO
6.1 REMO
6.2 BIRD
6.3 MICR
FAUNA MO
.1 REMO
.2 BIRD
.3 MICR
.4 CONC
SOIL MON
SOIL MON
.1 WOO
.2 PAST
.3 CONC
EROSION A
CARRYING
BIODIVERS
FIRE AFFEC
REHABILIT
FURTHER D
ACTIVITIES P
Consents, A
Mine Conta
Employee L
Actions from
Actions from
Compliance
Mining Flee
Waste Strea
Production
0: Stored Wa
1: Groundwa
2: Site Water
3: Rainfall Da
LBROOK COAL
nmental Man
CLUSIONS ....
ONITORING
OTE CAMERA
CENSUS ......
ROCHIROPTE
ONITORING
OTE CAMERA
CENSUS ......
ROCHIROPTE
CLUSIONS ....
ITORING ME
ITORING RES
ODLAND SITE
URE SITES ...
CLUSIONS ....
AND LANDFO
G CAPACITY A
SITY OFFSET
CTED REHAB
TATION TRIAL
DEVELOPME
ROPOSED IN
Authorisation
cts ..............
evels ...........
m DRE AEMR
m MSC AEMR
e Review ......
et Utilised at
am Generatio
and Waste S
ater ..............
ater Extractio
r Balance .....
ata ...............
L COMPANY L
nagement Re
....................
METHODOLO
A SURVEY .....
....................
RAN BATS ....
RESULTS ......
A SURVEY .....
....................
RAN BATS ....
....................
ETHODOLOG
SULTS ..........
S ..................
....................
....................
ORM STABILI
AND PASTUR
AREA ...........
BILITATION SI
LS AND RESE
ENT OF THE F
N THE NEXT A
LISns and Licenc
....................
....................
R Inspections
R Inspection
....................
MCC ............
on ................
Summary .....
....................
on .................
....................
....................
IMITED
eport
....................
OGY ............
....................
....................
....................
....................
....................
....................
....................
....................
GY .................
....................
....................
....................
....................
ITY ...............
RE CONDITIO
....................
ITE ...............
EARCH .........
FINAL REHAB
AEMR PERIO
ST OF TABces ...............
....................
....................
s ..................
s ..................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
N .................
....................
....................
....................
BILITATION P
D .................
LES ....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
PLAN ............
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
vii
........ 100
........ 101
........ 101
........ 101
........ 101
........ 102
........ 102
........ 103
........ 104
........ 107
........ 107
........ 107
........ 107
........ 111
........ 114
........ 115
........ 119
........ 119
........ 123
........ 125
........ 125
........ 126
............ 2
............ 4
............ 4
............ 4
............ 7
............ 9
.......... 13
.......... 15
.......... 16
.......... 17
.......... 17
.......... 18
.......... 23
2016 An
Table 14
Table 15
Table 16
Table 17
Table 18
Table 19
Table 20
Table 21
Table 22
Table 23
Table 24
Table 25
Table 26
Table 27
Table 28
Table 29
Table 30
Table 31
Table 32
Table 33
Table 34
Table 35
Table 36
Table 37
Table 38
Table 39
Table 40
Table 41
Table 42
Table 43
Table 44
Table 45
Table 46
Table 47
Table 48
Table 49
Table 50
Table 51
Table 52
Table 53
Table 54
MUSWELL
nnual Environ
4: Temperatu
5: Control Pr
6: Control Pr
7: Deposition
8: Compariso
9: TSP Monit
0: TSP Averag
1: Compariso
2: Real‐Time
3: Compariso
4: PM10 HVAS
5: Compariso
6: Surface W
7: Compariso
8: Compariso
9: Compariso
0: Groundwa
1: Compariso
2: Compariso
3: Compariso
4: Compariso
5: Sandy Cree
6: Blast Crite
7: Blast Mon
8: Predicted
9: Noise Mon
0: Spontaneo
1: Summary o
2: Summary o
3: Recommen
4: Recommen
5: Rehabilitat
6: Maintenan
7: Flora Asse
8: Data Gathe
9: Rehabilitat
0: Remote Ca
1: Bat Calls Id
2: Evidence o
3: Estimated
4: Biodiversit
LBROOK COAL
nmental Man
ure Data ......
ocedures for
ocedures for
nal Dust Gau
on of Deposit
oring Locatio
ges ..............
on of TSP Res
PM10 Averag
on of Real‐Tim
S Average ....
on of PM10 Re
ater Monito
on of pH Res
on of EC Resu
on of TSS Res
ater Monitor
on of Underg
on of Depth t
on of pH Res
on of EC Resu
ek Groundw
ria ...............
itoring Netw
Noise Levels
nitoring Resu
ous Combust
of Spontane
of Complaint
nded Specie
nded Specie
tion Summa
nce Activities
mblage and
ered for Flor
tion Site Com
amera Result
dentified at R
of Erosion at
Carrying Cap
ty Offset Site
L COMPANY L
nagement Re
....................
r Wind Blow
r Mining Gen
ge Locations
tional Dust R
ons ..............
....................
sults .............
ges ...............
me PM10 Res
....................
esults ...........
ring Program
ults to Histor
ults to Histor
sults to Histo
ing Program
ground Work
to Historical
ults to Histor
ults to Histor
ater Monito
....................
work ..............
s ...................
ults ...............
tion Report S
ous Combus
ts .................
s List for Nat
s List for Pas
ry .................
s on Rehabili
Fauna Monit
ristic Assessm
mpletion Crit
ts .................
Remnant and
Rehabilitatio
pacity for Re
e PCT Classifi
IMITED
eport
....................
n Dust .........
nerated Dust
s ..................
Results .........
....................
....................
....................
....................
sults ............
....................
....................
m ..................
rical Results
rical Results .
orical Results
...................
king Results .
Results .......
rical Results
rical Results .
ring Trigger
....................
....................
....................
....................
Summary .....
stion Affecte
....................
tive Vegetati
sture ............
....................
itated Land .
toring for Re
ment of the W
teria Target .
....................
d Rehabilitat
on Woodlan
emnant and R
ication, EEC
....................
....................
t Sources......
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
s ...................
....................
....................
....................
....................
....................
Levels ..........
....................
....................
....................
....................
....................
d Areas With
....................
ion ...............
....................
....................
....................
ehabilitation
Woodland Si
....................
....................
tion Woodla
d and Pastur
Regrowth Pa
Equivalencie
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
hout Active C
....................
....................
....................
....................
....................
Monitoring
ites ..............
....................
....................
nd Sites .......
re Sites ........
asture Sites ..
es and Condit
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
Control .......
....................
....................
....................
....................
....................
Sites ...........
....................
....................
....................
....................
....................
....................
tion ............
viii
.......... 23
.......... 26
.......... 28
.......... 29
.......... 29
.......... 31
.......... 31
.......... 31
.......... 35
.......... 35
.......... 36
.......... 36
.......... 42
.......... 43
.......... 43
.......... 44
.......... 51
.......... 52
.......... 52
.......... 52
.......... 52
.......... 60
.......... 65
.......... 65
.......... 71
.......... 72
.......... 76
.......... 77
.......... 79
.......... 83
.......... 84
.......... 86
.......... 87
.......... 90
.......... 97
........ 100
........ 103
........ 106
........ 115
........ 119
........ 120
2016 An
Figure 1
Figure 2
Figure 3
Figure 4
Figure 5
Figure 6
Figure 7
Figure 8
Figure 9
Figure 1
Figure 1
Figure 1
Figure 1
Figure 1
Figure 1
Figure 1
Figure 1
Figure 1
Figure 1
Figure 2
Figure 2
Figure 2
Figure 2
Figure 2
Figure 2
Figure 2
Figure 2
Figure 2
Figure 2
Figure 3
Figure 3
Figure 3
Figure 3
Figure 3
Figure 3
Figure 3
Figure 3
Figure 3
Figure 3
Figure 4
Figure 4
Figure 4
Figure 4
Figure 4
MUSWELL
nnual Environ
: Mining Act
: Environme
: Quarterly W
4: Rainfall Gra
: Temperatu
: Temperatu
: Average De
: Site 1 TSP M
: Site 2 TSP M
0: Site 3 TSP
1: Site 1 PM
2: Site 2 PM
3: Site 3 PM
4: PM10 HVA
5: Monthly S
6: Monthly S
7: Monthly S
8: Quarterly
9: Quarterly
0: Quarterly
1: Location o
2: Water Lev
3: Water Qu
4: Water Lev
5: Sandy Cre
6: Sandy Cre
7: Sandy Cre
8: Sandy Cre
9: Sandy Cre
0: Queen Str
1: School Bla
2: 99 Queen
3: Nisbet Bla
4: Complain
5: Complain
6: Proposed
7: Rehabilita
8: Rehabilita
9: Floristic P
40: Comparis
41: Comparis
42: Biometric
43: Comparis
44: Comparis
LBROOK COAL
nmental Man
tivities This R
ntal Monito
Windroses ...
aph..............
ure Graph ....
ure Inversion
epositional D
Monitoring R
Monitoring R
P Monitoring
10 Results ....
10 Results ....
10 Results ....
AS Results ....
Surface Wate
Surface Wate
Surface Wate
y Surface Wa
y Surface Wa
y Surface Wa
of Alluvial La
vel for Unde
uality Data in
vel for Groun
eek Groundw
eek Water Q
eek Water Q
eek Groundw
eek Groundw
reet Blast M
ast Monitori
n Street Blast
ast Monitorin
t Summary .
t History .....
Activities Ne
ation Monito
ation Monito
Plot Diagram
on of Averag
on of Averag
c Data Averag
on of Biome
on of Averag
L COMPANY L
nagement Re
LISTReporting Pe
ring Location
....................
....................
....................
Graph ........
Dust Results .
Results .........
Results .........
Results .......
....................
....................
....................
....................
er Monitorin
er Results –
er Results – T
ter Results –
ter Monitori
ter Monitori
and Compare
rground Wo
Undergroun
ndwater Mon
water Depth .
uality – pH...
uality – Elect
water Monito
water Level C
onitoring Re
ng Results ...
t Monitoring
ng Results ....
....................
....................
ext Reportin
oring Program
oring Program
....................
ge Native Spe
ge Number o
ges ...............
tric Data Ave
ge Fauna Spe
IMITED
eport
T OF FIGUriod .............
ns ................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
ng Results – p
Electrical Co
Total Suspen
– pH .............
ing Results –
ing Results –
ed to Mine W
rkings ..........
nd Workings
nitoring on S
....................
....................
trical Conduc
oring Netwo
Catenary Tra
esults ...........
....................
g Results ......
....................
....................
....................
g Period ......
m – Flora Sit
m – Fauna Si
....................
ecies ...........
of Weed Spe
....................
erages .........
ecies Richnes
URES ....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
pH ................
nductivity ...
nded Solids ..
....................
– Electrical Co
– Total Suspe
Workings ......
....................
s ...................
Site ...............
....................
....................
ctivity ..........
rk, Sectional
nsect ...........
....................
....................
....................
....................
....................
....................
....................
es ................
tes ...............
....................
....................
cies ..............
....................
....................
ss .................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
onductivity ..
ended Solids
....................
....................
....................
....................
....................
....................
....................
Plan ...........
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
...................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
ix
.......... 14
.......... 20
.......... 22
.......... 24
.......... 25
.......... 27
.......... 30
.......... 32
.......... 33
.......... 34
.......... 37
.......... 38
.......... 39
.......... 40
.......... 45
.......... 46
.......... 47
.......... 48
.......... 49
.......... 50
.......... 53
.......... 54
.......... 55
.......... 56
.......... 57
.......... 58
.......... 59
.......... 61
.......... 62
.......... 67
.......... 68
.......... 69
.......... 70
.......... 80
.......... 81
.......... 88
.......... 94
.......... 95
.......... 96
.......... 98
.......... 98
.......... 99
........ 100
........ 103
2016 An
Figure 4
Figure 4
Figure 4
Figure 4
Figure 4
Figure 5
Figure 5
Figure 5
Figure 5
Figure 5
Figure 5
Figure 5
Figure 5
Figure 5
Figure 5
Figure 6
Figure 6
Figure 6
Figure 6
Figure 6
Figure 6
Append
Append
Append
Append
MUSWELL
nnual Environ
45: Bird Speci
46: Number o
47: Comparis
48: Comparis
49: Comparis
0: Comparis
1: Comparis
2: Comparis
3: Comparis
4: Comparis
5: Comparis
6: Comparis
7: Comparis
8: Comparis
9: Comparis
0: Comparis
1: Comparis
2: Erosion Si
3: Biodiversi
4: Vegetatio
5: Fire Affec
ix 1: Air Qua
ix 2: Water M
ix 3: Blast M
ix 4: Compla
LBROOK COAL
nmental Man
ies Identified
of Common a
on of Bat Sp
on of Soil pH
on of Soil Ele
on of Soil Po
on of Soil Su
on of Soil Nit
on of Soil Nit
on of Soil Or
on of Soil pH
on of Soil Ele
on of Soil Po
on of Soil Su
on of Soil Nit
on of Soil Nit
on of Soil Or
ites ..............
ity Offset Mo
on Communit
ted Monitor
lity Monitor
Monitoring R
onitoring Da
ints Summar
L COMPANY L
nagement Re
d at Remnan
and Threaten
ecies Record
H – Woodlan
ectrical Cond
otassium – W
lphur – Woo
trite + Nitrat
trogen – Wo
rganic Matte
H – Pasture ..
ectrical Cond
otassium – Pa
lphur – Past
trite + Nitrat
trogen – Pas
rganic Matte
....................
onitoring Site
ties Within B
ring Sites ......
LIST Oing Results
Results
ata
ry
IMITED
eport
t and Rehab
ned Bat Spec
ded at Wood
d .................
ductivity – W
Woodland .....
odland .........
te – Woodlan
oodland .......
er – Woodlan
....................
ductivity – Pa
asture .........
ture ..............
te (mg/kg) –
sture ............
er – Pasture .
....................
es ................
Biodiversity O
....................
OF APPEN
bilitation Site
cies Recorde
dland Sites ....
....................
Woodland ......
....................
....................
nd ................
....................
nd .................
....................
asture ..........
....................
....................
Pasture .......
....................
....................
....................
....................
Offset Site ....
....................
DICES
s .................
d at Woodla
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
and Sites .....
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
x
........ 104
........ 105
........ 105
........ 107
........ 108
........ 108
........ 109
........ 109
........ 110
........ 110
........ 111
........ 111
........ 112
........ 112
........ 113
........ 114
........ 114
........ 118
........ 121
........ 122
........ 124
2016 An
1.0 IMuswelLtd. Gromining cRoad, ap On 1 SeCouncil operatioThis appgranted life of th
1.1 STThe struAnnual EDG03 stipulatethe repo This Anenvironm(herein r In accor
Mus
Divis
Envi
Offic
Dep
MCC A copy ohttps://w
1.2 CMCC op205/200with thefound in Mining a1562 an In additi
EnviOpe
MUSWELL
nnual Environ
NTRODUClbrook Coal oup. MCC hacommencingpproximately
ptember 200(MSC) to extons in Marchproval has sin 2016 to a
he mining op
TRUCTUREucture of thiEnvironmenMREMP Gued in the MCorting requir
nnual Enviromental manreferred to a
dance with t
swellbrook S
sion of Reso
ironment Pro
ce of Environ
artment of P
C Community
of the reportwww.idemit
ONSENTS,erates unde02, which wae latest modn Section 1.2
activities at d Mining Lea
ion to the ab
ironmental Perations Act 1
LBROOK COAL
nmental Man
CTION Company (Mas a long assg in 1907 andy 3 kilometre
03, Developtend the forh 2005 and subsequentlyallow miningperations to 2
E OF THIS Ris report is bntal Manageuide V3 datCC Developmements in M
onmental Magement anas the ‘repor
the Developm
hire Council
urces and En
otection Aut
nment and H
Primary Indu
y Consultativ
t is also availtsu.com.au/o
, LEASES Ar a number oas approvedification bein2.1.
MCC are caase 1304.
bove approva
Protection L1997.
L COMPANY L
nagement Re
MCC) is a whsociation witd open cut oes to the nor
ment Consemer MCC Nohas a capacy been modg in an area 2022. Rehab
REPORT based on thement Reported Januaryment ConsentMCC’s water l
Managementd performanting period’)
ment Consen
(MSC);
nergy (DRE);
hority (EPA);
Heritage (OEH
stries – Wat
ve Committe
able on MCCoperations/m
ND LICENCof developm by MSC in ng approved
arried out w
als MCC ope
Licence (EPL)
IMITED
eport
holly ownedth coal mininoperations inrth‐east of M
nt for DA 20o.1 Open Cuity to produdified on sevknown as thbilitation act
e documentrt”, Departmy 2006 andt, specificallylicences and
t Report (Ance at MCC ).
nt, copies of
;
H);
ter (DPI‐Wat
ee (CCC).
C’s website:muswellbroo
CES ment consent2003. This d in 2016. M
holly within
rates under
) 656 issued
d subsidiary ng at Muswn 1944. The Muswellbrook
05/2002 wast. The No.1 uce up to 2,0veral occasiohe “Continuaivities will co
t “Guidelinesment of Minincorporat
y Condition 4mining lease
AEMR) provfrom 1 Janu
this AEMR w
er); and
k‐coal/appro
ts issued by DA has bee
More informa
Consolidate
the followin
d under the
of the Idemellbrook, witmine is locatk.
s granted by Open Cut Ex000,000 tonnons with theation Projectontinue past
s and Formaneral Resoures the repo42. This repoes.
ides a sumuary 2016 to
will be made
ovals‐plans‐r
MSC. The pn modified oation on this
ed Coal Leas
g licences:
Protection
itsu Kosan Cth undergroted on Musc
y Muswellbroxtension comnes coal pere latest modt” and to exthis date.
at for Preparces, Documorting requort also inco
mmary of ao 31 Decemb
available to
reports/
rimary conseon several os modificatio
se 713, Mini
of the Envi
1
Company und coal cle Creek
ook Shire mmenced r annum. dification xtend the
ration of ment No. irements orporates
activities, ber 2016
:
ent is DA occasions on can be
ng Lease
ronment
2016 An
Watund
Relevant
Approva
DA 86/9
DA 205/(MSC)
DA 205/(MSC) – AmendmConditio
DA 205/(MSC) Amendm1.1 and
DA 205/(MSC) Amendm11.1
DA 205/(MSC) Amendm1.1(a), 345 and 5
DA 205/(MSC) Amendm1.1, 1.2 &and addconditio60.
DA 205/(MSC) Grevision consent conditio
ConsolidLease 71
MUSWELL
nnual Environ
ter Licences er Part 5 of t
t consents, a
al
98 (MSC)
/2002
/2002
ment to on 1.1
/2002
ment to 11.3
/2002
ment to
/2002
ment to 31, 33, 39, 58.
/2002
ment to & 6.3.2 itional ons 59 &
/2002 General of ons
dated Coal 13
LBROOK COAL
nmental Man
20WA21692the Water Ac
authorisation
Table
Description
Approval foUndergroun
Approval foMCC Open C
Power line radditions to
Relocate offworkshop a
Extension oC
Revision to InfrastructuRequiremenRehabilitatipermit the cmining operadditional 5
ModificatioContinuatioOperations Coal Mine fFive (5) YeaAllotments‐Muswellbro
Modificatiooperations tareas and tolife to 2022.
Mining Leas
L COMPANY L
nagement Re
28, 20BL1690ct 1912.
ns and licenc
e 1: Consents
r Sandy Creend Mine
r Extension oCut 1
relocation ano Workshop
fice buildingsnd bath‐hou
f mining into
Mining ure Building nts and on Plan Revicontinuationrations for an5 years.
n to Permit ton of Mining at Muswellbor an Additiors‐ Multiple ‐ Coal Road ook.
n to allow mto mine addio extend the.
se
IMITED
eport
037, 20BL169
ces are summ
s, Authorisat
CoAu
ek MuSh
of MuSh
nd MuSh
s, use
MuSh
o Area MuSh
ision to n of n
MuSh
the
brook onal
MuSh
mining itional e mine
MuSh
DivReEn
9038, 20WA
marised in Ta
tions and Lic
onsent uthority
uswellbrook ire Council
uswellbrook ire Council
uswellbrook ire Council
uswellbrook ire Council
uswellbrook ire Council
uswellbrook ire Council
uswellbrook ire Council
uswellbrook ire Council
vision of sources and ergy
216982 and
able 1.
cences
Date Granted
12 Apr 19
1 Sep 200
19 Dec 20
13 July 20
23 Dec 20
29 Oct 20
12 Dec 20
26 Oct 20
5 May 19
20WA21159
ExpiryReneDate
999 12 Ap
03 MininDec 2No ento ap
005 MininDec 2No ento ap
009 MininDec 2No ento ap
010 MininDec 2No ento ap
013 MininDec 2No ento ap
013 MininDec 2No ento ap
016 MininDec 2No ento ap
990 24 No
2
98 issued
y/ wal
pr 2020
ng to 31 2022 nd date proval
ng to 31 2022 nd date proval
ng to 31 2022 nd date proval
ng to 31 2022 nd date proval
ng to 31 2022 nd date proval
ng to 31 2022 nd date proval
ng to 31 2022 nd date proval
ov 2024
2016 An
Approva
Mining L1304
Mining L1562
Mining L1513
EnvironmProtectiLicence
Water A20WA21
Water L20BL169
Water L20BL169
Water A20WA21
Water L20WA21
1.2.1 During tallow a capprovemining manageand danthe appr There w
1.3 MThe nammanage
MUSWELL
nnual Environ
al
Lease
Lease
Lease
mental on 656
Approval 16928
icence 9037
icence 9038
Approval 16982
icence 11598
CHANGES TOthe reportingcontinuationed maximummethods, cment and hangerous goodroval was gra
were no other
MINE CONTmes and conment, plann
LBROOK COAL
nmental Man
Description
Mining Leas
Mining Leas
Mining Leas
Environmen
Water Licen
Water Licen
Water Licen
Water Licen
Water Licen
O APPROVAg period MCCn of mining om productioncoal processandling, coalds managemanted on 26
r changes to
TACTS tacts of site ing and supp
L COMPANY L
nagement Re
se
se
se
ntal Licence
nce
nce
nce
nce
nce
LS C made an aoperations fon rate of 2 sing infrastrul transport, aent were prOctober 201
approvals d
personnel rport function
IMITED
eport
CoAu
DivReEn
DivReEn
DivReEn
EnProAu
DP
DP
DP
DP
DP
pplication toor a further 3million tonnucture, blasaccess to siteroposed as p16 with revis
uring the re
responsible fns are shown
onsent uthority
vision of sources and ergy
vision of sources and ergy
vision of sources and ergy
vironmentalotection uthority
PI‐Water
PI‐Water
PI‐Water
PI‐Water
PI‐Water
o MSC to mo3.5 years. Nnes per annsting methoe, employeepart of this msed consent c
porting perio
for mining, rn in Table 2.
Date Granted
12 Jan 19
16 Feb 20
20 Mar 20
6 Dec 200
1 July 201
5 Apr 201
5 Apr 201
1 July 201
1 Aug 200
dify the deveo changes wum (Mtpa). ds, water m numbers, h
modification. conditions.
od.
rehabilitation
ExpiryReneDate
993 24 No
005 16 Fe
002 20 M
00 Not applic
16 30 Ju
14 4 Apr
14 4 Apr
16 30 Ju
09 31 Ju
elopment cowere propose No changemanagemenhazardous su The modifi
n and enviro
3
y/ wal
ov 2024
eb 2026
ar 2023
cable
ne 2019
r 2019
r 2019
ne 2019
l 2022
onsent to ed to the s to any t, waste bstances cation to
onmental
2016 An
Gr
Leo
Ro
War
Ju
1.4 EThe numshown in
1.5 AAn envirto review23 Auguare show
No Iss
1. 20ReNarenoGaputh
MUSWELL
nnual Environ
Name
rant Clouten
on Claassens
od Gallagher
rren Edward
ulie Thomas
MPLOYEE mber of empn Table 3, al
Yea
201
201
ACTIONS REronmental inw site perforust 2016. Thwn in Table 4
sue/Observa
015 West Criehabilitationative Vegetahabilitation ot germinatealenia (Galenubescens) is oroughout th
LBROOK COAL
nmental Man
S
s Tec
s He
(app
LEVELS ployees and ong with a c
ar
16
15
EQUIRED Fnspection warmance. Core actions fro4.
Tabl
ation
ib n area: tion area has ed and nia occurring is area.
L COMPANY L
nagement Re
Table
Po
Senior Opera
hnical Servic
Production S
ealth, Safety,Training Su
Environmenpointed Envi
full‐time eqomparison t
Table 3
Employees
73
75
FROM PREVas conductedrrespondencom this inspe
e 4: Actions
DRE Actio
The 2015 area shouby a rehabspecialist tthe propouse establarea.
IMITED
eport
e 2: Mine Co
osition
ations Mana
ces Superinte
Superintend
Environmenuperintenden
tal Coordinaironmental O
quivalent conto the numbe
3: Employee
Ful
VIOUS AEMd by DRE on ce regarding ection along
from DRE A
on
rehabilitatiold be assessebilitation to ensure thosed final lanlishes within
ntacts
ager
endent
ent
nt and nt
ator Officer)
ntractors at ers from the
e Levels
l‐Time Equiv
1
MR REVIEW29 April 201actions fromwith how th
AEMR Inspec
Due D
on ed
at d this
Nove2016
Cont
(02)
(02)
(02)
(02)
(02)
MCC for thilast reportin
valent Contra
102
88
W 16 to reviewm this inspecthey have bee
tions
Date MC
mber Thialo201seasignoccassthegerrehwilproto m
tact Number
) 6542 2300
) 6542 2300
) 6542 2300
) 6542 2300
) 6542 2300
s reporting ng period.
actors
w the 2015 Action was recen addressed
CC Comment
is area has bone during th16/2017 groason to see ifnificant germcurs. This wisessed in 201ere is no signrmination a habilitation sl be engagedovide advice manage this
4
r
period is
EMR and ceived on d by MCC
t
een left he wing f any mination ill be 17 and if nificant
specialist d to on how area.
2016 An
No Iss
2. WWmM
3. Go(ARhGaRedoGr
MUSWELL
nnual Environ
sue/Observa
Weed ManageWeeds are notanaged effecCC.
olden WreatAcacia Salinghodes Grass ayana) Manaehabilitation ominated by rass and Aca
LBROOK COAL
nmental Man
ation
ement: t being ctively at
th Wattle a) and (Chloris agement: areas are Rhodes cia Salinga.
L COMPANY L
nagement Re
DRE Actio
The currenmanagemMCC is noweed manprogram tmanages wthroughouMuswellbon a reguldevelopedimplemendemonstraeffectivenstrategy.
MCC mustcompreherehabilitataddress thAcacia SalGrass. MCC mustrehabilitatwere not pAcacia Salmanaged tdo not outdesired sethe final lato be estaA strategyAcacia Salrehabilitatit was useshould be ensure secgerminatiooccur. MCC mustRhodes Grthroughouthat othercan establarea.
IMITED
eport
on
nt weed ent approac
ot satisfactorynagement that effectiveweeds ut the rook Coal Mar basis musd and nted. MCC mate the ness of the
t develop a ensive tion strategyhe dominancigna and Rho
t ensure thattion areas thplanted withigna are actito ensure tht compete theed mix and tand use is abblished. y for managinigna in tion areas wd as a seed mundertakencondary on does not
t ensure thatrass is managut site to ensr grass specielish within pa
Due D
ch at y. A
ely
ine st be
ust
Nove2016
y to ce of odes
t hat h vely ey he that ble
ng
here mix to
t ged sure es aste
No da
Date MC
mber MCprolooeffeslasmeGraforwestrabe dur
ate MCprolooeffeslasmeGraforMCrevmaSal
CC Comment
CC undertooogram this yeok at the fectiveness oshing as a coethod for Rhoass (see Sectr more detaileed managemategy for MCfurther refinring 2017.
CC undertooogram this yeok at the fectiveness oshing as a coethod for Rhoass (see Sectr more detailCC will continview optionsanagement oigna.
5
t
k a ear to
of ontrol odes tion 3.10 l). The ment CC will ned
k a ear to
of ontrol odes tion 3.10 l). nue to for the of Acacia
2016 An
No Iss
4. MreMcoeare
5. Re
6. Re
An envirto review20 April are show
MUSWELL
nnual Environ
sue/Observa
aintenance ehabilitation inor erosionontour drain astern emplahabilitation
ehabilitation
ehabilitation
ronmental inw site perfor2016. The
wn in Table 5
LBROOK COAL
nmental Man
ation
of areas: of a within the acement area.
n Strategy
n Specialist
nspection warmance. Coractions from5.
L COMPANY L
nagement Re
DRE Actio
Monitorinmaintenanrehabilitatincluding cand drop swithin oldrehabilitatundertakemaintenanundertakerequired.
A rehabilitoutlining aabove: 1. Rehabilperforman2. Weed m3. Acacia SRhodes GrManagem4. MaintenrehabilitatMust be pdepartmemust be areflect charehabilitatmethodolo
DRE encouengage a rspecialist teffectivenrehabilitatused at Min the devrevised restrategy fo
as conductedrrespondencm this inspec
IMITED
eport
on
ng and nce of tion areas, contour draistructures der tion, should en and nce activitiesen where
tation strateall issues liste
itation nce managementSaligna and rass
ment nance of tion areas provided to tnt and the Mmended to anges to tion ogy.
urages MCC rehabilitatioto assess theness of the tion strategyCC and to asvelopment ofhabilitation or MCM.
d by MSC once regarding ction along w
Due D
ns
be
s
2016
gy ed
t
he MOP
No da
to n e
y ssist f a
No da
19 April 201actions fromwith how the
Date MC
AEMR Themoincstamoideadderomawil
ate MCwoRehto ain 2neeMOoutDR
ate AdvrehwilthetheStrabo
16 to reviewm this inspectey have bee
CC Comment
e rehabilitatonitoring procludes landfoability. The onitoring thisentified someditional areaosion. Rehabaintenance al continue in
CC will commorking on a habilitation Saddress thes2017. If any ed to be madOP as a resultcome of thiRE will be not
vice from a habilitation sl be sought de developmee Rehabilitatrategy outlinove.
w the 2015 Action was recn addressed
6
t
ion ogram orm
s year e as of bilitation ctivities n 2017.
mence
Strategy se issues changes de to the t of the s study, tified.
specialist during ent of ion ed
EMR and ceived on d by MCC
2016 An
No Iss
1. Taofmananbere
2. Simwawepemcotwim
3. Tacoqu
4. TatimShbebere
5. Figcosoadre
MUSWELL
nnual Environ
sue/Observa
able 3 of the f the previouethodology ond Acacia Salny control ore clarified wiport.
milar to the as found on eed would beriod. This wake the weeontrol shouldwice a year bmplemented
able 5 in the olumn so it isuantities.
able 21 indicame and apprhould the vale investigatee mine relateadings excee
gure 21 indicontinuing to ourced from dditional turbported in th
LBROOK COAL
nmental Man
Table
ation
report adviss AEMR revion the manaigna, and no managementh DRE and r
above, Sectitopsoil stocke delayed un
would allow ted problem wd be undertaasis and so swithin the re
report wouls easier to as
ates that dusroaching the ues continued to see if it ed, action shed EA predic
cates TSS valrise. As the can overflowbidity shoulde next AEMR
L COMPANY L
nagement Re
e 5: Actions
Findings F
ses that the rew was to oagement of Rot to necessant. The outcreported in t
on 2.2.1 advkpiles, but contil the next the weed to worse in the fken on a minshould have beporting per
d benefit frossess the ann
st readings aEA predictede to rise, theis mine relatould be taketed levels.
ues for MCCdam these sw off site, thed be investigaR.
Findings
IMITED
eport
from MSC A
rom Review
requirementnly provide Rhodes grassarily implemecome needs tthe next AEM
vises that weontrol of thereporting drop seed afuture. Weenimum of a been iod.
om a totals nual waste
are rising oved levels. e cause shouted. Should en before the
C9 are amples are e source of tated and
From Site In
AEMR Inspec
MCC C
w of Report
ts
s ent to MR
It has bthe reqmethoRhodesslashinyear tometho(more
eed
nd ed
The mawere uprocesundertprior to
The wathe totthe yea
er
ld it e
The avcontinuperiodthese r2017.
his
Only oMCC9 tcollectwater lhas bedetailecouldnof this results
nspection
ctions
omment
been confirmquirement wdology on ths Grass and Ag program wo determine d of controlldetails in Sec
ajority of theutilised in thes this year. Waken on the o disturbanc
aste removaltal waste remar.
erage PM10 ued to rise th. A review oresults will b
ne sample wthis year. Thed in March level was veren dry since ed analysis of’t be undertdam will conbeing review
med with DREwas to only prhe managemAcacia Salignwas undertakif this is an eling Rhodes Gction 3.10).
e topsoil stoce rehabilitatiWeed contro topsoil stocce.
l table now imoved from
results havehis reportingof the sourcee undertake
was collectedhe sample w2016 when ry low. The this time sof the TSS treaken. Monitntinue with twed regularl
7
E that rovide a
ment of na. A ken this effective Grass
ckpiles on ol was kpiles
ncludes site for
e g of n in
from as the dam a nd toring the ly.
2016 An
No Iss
1. Thinsdaanleacothtrawaofpoinsthmthto20adan
2. Pitcohigbaeashbetreofcoaffwisigquuncothwore
MUSWELL
nnual Environ
sue/Observa
he drainage ospected. It wam was full onother sedimaving the siteoal is classifiee site. It waacked out ofas being wasff site. Due totential minespected. There is doubtanagement se site. Musw
o provide Cou016 outliningddress the cond address th
t 1 was obseombustion. Hgh wall and iackfilled pit. armarked to hutdown of teing irrigatedeatment of tf an inert maould be expefected areasith no appargnificantly exuoted in the nderstand thombustion me floor of thorkings. Cousult.
LBROOK COAL
nmental Man
ation
of the coal stwas found thof sediment, ment dam ande. Water thaed as mine ws also observf the site fromshed off the o time conste water loss ferefore give about the astructures wwellbrook Council with a rg their preferoncern for whe shortcom
erved for evidHeating was in a number One area ontreat shortlyhe washery d. There wasthe backfilledterial ramp hcted to help s. The remaient treatmexceeded the 2015 AEMR e complexity
management e pit and lowuncil expect a
L COMPANY L
nagement Re
tockpile areahat an existinwater flow wd mine wateat has been iwater and shoved that coam the coal trbitumen roatraints otherfrom the siten what was odequacy of a
where mine woal Companyreport by therred course oater manageings of the a
dence of spoobserved in of areas of tn the high way following a and the othes minimal apd areas. Thehad commenin a portion nder of the ant, would ha203 sqm avereport. Whiy of spontanin areas of ow wall shouldand request
IMITED
eport
as was ng sediment was missing er was directin contact would not leaval fines beingransport trucad and going r areas of e were not observed, all water water can leay are requeste 6th May of action to ement on sitarea inspecte
ontaneous 2 areas on tthe recently all was temporary er area was pparent e constructionced, and th of the area affectedave erage area ilst we eous old workings,d be devoid oa better
MCC C
ly with ve g cks
ave ted
e ed.
MCC wtime tosupplieThis reno othwork toleavinginto plaidentif(see Se
the
n is
d,
, of
MCC hspontamanagreportithe arecombufor mo
omment
were grantedo supply this ed to MSC onport identifieer areas on so prevent cog site. An actace to addreied during thection 3.6.1 f
ave continueneous combement throuing period weas affected stion noted re detail).
an extensioreport and in 16 June 20ed that thersite that reqontaminatedtion plan waess the issueshe site inspefor more det
ed to focus obustion ughout the with a decreaby spontane(see Section
8
on to the it was 16. e were uired water s put s ction tail).
on
se in eous n 3.16
2016 An
No Iss
3. AnofwiThtowoSaannembubeaspr
1.6 C
1.6.1 During t
1.6.2 In accorcompliastatutorconditioand statcomplia
Number
12
MUSWELL
nnual Environ
sue/Observa
n area of rehf Rhodes grasith the view his would resopsoil. Shoulould containaligna seed. ny type of naew area be soay be able tourden contaie consulted rs an outcomeroblem. We
OMPLIANC
REPORTABLthe reporting
COMPLIANCrdance with nce review ry approvals ons in place otutory appronces are sho
r Conditio
For the agreed there is that: a) CompApprovein New Sb) Is capof tempIndustriunless afollowinThe wea• Wind • Wind • Tempe• Tempe
LBROOK COAL
nmental Man
ation
habilitation css and Acaciaof removingsult in the losd this soil ben significant RThis would mative vegetatown to impro out compened in this sregarding thee to manage would be gu
CE STATUS
LE INCIDENTSg period ther
CE REVIEW the requireof the perwas undertaon 31 Decemovals with theown in Table
on
life of the deby Council tha meteorolo
plies with theed Methods South Walespable of contperature inveal Noise Polia suitable altng consultatiather stationdirection at speed at 10 erature at 2 erature at 10
L COMPANY L
nagement Re
ontaining a ma Saligna wag and buryingss of some ine removed anRhodes grassmake the estion difficult. oved pasturete the expecoil. Council e possible lothe future e
uided by thei
S
S re were no re
ments of Corformance oaken at the ember 2016. Me exception 6.
Table 6:
Developme
evelopment,he Applicant ogical station
e requiremefor Samplings guidelines; tinuous real ersions in accicy or supersernative is aon with the n must meas10 metres ametres abovmetres abov0 metres abo
IMITED
eport
monocultures inspected g this materinsitu replacend respread,s and Acacia tablishment Should the e grasses, thcted weed ask that DREss of this soiexpected weeir advice.
eportable in
ondition 42 of the projeend of the reMCC were coof those list
: Compliance
ent Consent
or as otherw must ensuren located on
nts in the g of Air Polluand time measucordance of tseding documpproved by EPA. ure the follobove the grove the grounve the grounove the grou
MCC C
e
al. ed , it
of
hey
E l, ed
MCC hissue asacrificburdenis very to salv
cidents at M
(a) of the dect against eporting perompliant wited in Table 6
e Review
M
DA205/2002
wise e that site
utants
rement the ment, Council
owing: ound nd nd nd
Thmrewethof OcThwereupthco
omment
ave consultend it has beece this topson. Also, the tthin and woage.
CC.
evelopmentconditions oiod. This revh all of the c6. Actions to
CC Commen
2
he weather onitoring quirements ere revised ine modificatiothe consentctober 2016.he current eather statioquires an pgrade to meese revised onditions.
ed with DRE en agreed toil due to thetopsoil in thiould be very
t consent, a of this consview was agconditions ofo address th
nts Actio
n on t in .
on
eet
MCC engagcontrassistupgraweathstatiowork schedcomp2017.
9
on this o weed s area difficult
detailed sent and ainst the f consent ese non‐
n
has ged a actor to t with ading the her on. The is duled for pletion in .
2016 An
Number
27
P1.1
MUSWELL
nnual Environ
r Conditio
• Sigma• RainfaAll measaveragerainfall t
The AppfeasibleemployegeneratexceedaresidencThe reledevelopof the coNote: • Total iconcentbackgrosources• Excludprescribincidentwithin tCouncil
The folloare idenmonitoremissioEPA ID #At locatbeing saof the oprevailinresidentEPA ID #where dthe leveother seoperatioEPA ID #located NorthinEPA ID #located Northin
LBROOK COAL
nmental Man
on
theta at 10 all surements aed over 15 mthat is avera
plicant must avoidance aed so that pated by the deance of the rce on privateevant air quapment are coonsent.
impact (i.e. itrations due ound concent); des extraordbed burning, ts, (but not She mine) or
E
owing pointsntified in thisring and/ or tn of pollutan#1: Total Susions where tampled is repoperation of tng wind diretial propertie#2: Dust Depdust depositiels experiencensitive receon of the min#7: Particulatat co‐ordinag) #8: Particulatat co‐ordinag)
L COMPANY L
nagement Re
metres abov
re to be coninutes with tged hourly."
ensure that and mitigatioarticulate maevelopment delevant air qely owned laality criteria fontained in T
ncremental to the develtrations due
inary eventsdust stormsSpontaneousany other ac
Environment
s referred tos licence for tthe setting onts to the airpended Partthe level of ppresentativethe mine takction and loces or other sposition Netwon levels areced at resideivers, resultine. te Matter Mates 305245
te Matter Mates 306051
IMITED
eport
ve the groun
tinuous and the exceptio"
all reasonabons measureatter emissiodo not causequality criternd. for the Table 1 and T
increase in lopment plus to all other
s such as buss, sea fog, fires Combustionctivity agreed
tal Protectio
o in the tablethe purposeof limits for tr from the poticulates Netparticulate me of the emisking into accocation of sensitive recework ‐ At loce representantial properting from the
Monitor ‐ TEO6432503 (Ea
Monitor ‐ TEO6429270 (Ea
M
nd
on of
ble and es are ons e ia at a
Table 2
s
hfires, e n d by
Ongr50Nisois thhainfac
on Licence 65
below s of the oint. twork ‐ matter sions ount
eivers. ations ative of ties, or
OM asting
OM asting
PMwecobyisseqmOvthcoDe‐ 1notobo
CC Commen
ne result waseater than 0ug/m3 at sbet. The urce of the dinconclusivee result mayave been fluenced by tivities at MC
56
M10 – 55 eveere not ollected causy power suppsues and quipment alfunctions. verall 95% ofe data was ollected. epositional D1 sample wasot collected da broken du
ottle.
nts Actio
s
dust e but y
CC.
MCC continmonitqualitaccorwith tdevelconselicencrequi
ents
ed ply
f
Dust s due ust
Brokeequipbeen
10
n
will nue to tor air ty in rdance the opment ent and ce rements.
en pment has repaired.
2016 An
Number
M4.1
MUSWELL
nnual Environ
r Conditio
For eachbelow tobtaininspecifiesamplinperiod aoppositeWind DiAM‐2 &Wind SpAM‐4 AtmospAM‐4
LBROOK COAL
nmental Man
on
h monitoringhe licensee mng results by d in Column g method, uand samplinge in the otheirection: deg AM‐4 peed: m/s, c
heric Inversi
L COMPANY L
nagement Re
g point specifmust monitoanalysis) the1. The licensnits of measg at the frequer columns.grees, contin
continuous, 1
ion: oC/100m
IMITED
eport
fied in the taor (by samplie parametersee must usesure, averagiuency, speci
uous, 15‐min
15‐minute, A
m, continuou
M
able ng and rs e the ng fied
nute,
AM‐2 &
us, 1‐hr,
Thstabuupmsta
CC Commen
he weather ation is set uut requires anpgrade to fulatch these andards
nts Actio
up n ly
MCC engagcontrassistupgraweathstatiowork schedcomp2017.
11
n
has ged a actor to t with ading the her on. The is duled for pletion in .
2016 An
2.0 A
2.1 EXDuring tThese hodrilling pand was
2.2 LALand prvegetatistrippingmining t
2.2.1 Previousrehabilitinspecterehabilitremoved
2.3 CDuring t
2.4 MAll minin24 houris shown The Opeduring tthroughMuswelthe St Hcombust During tthe eastall UG wthis min Open CuCollierieundergrduring mgeotech
MUSWELL
nnual Environ
ACTIVITIES
XPLORATIOthe reportingoles were loprogram coms approved b
AND PREPreparation ision clearing, g occurred. to continue.
TOPSOIL MAsly stripped ttation activited on a regutation activitd.
ONSTRUCTthe reporting
MINING ng activities s a day, seven in Figure 1.
en Cut 1 mithe year, m to the Lodelbrook UG wHeliers floortion
the second qt of the curreworkings wiling starts th
ut 1 will cones. Site baseound pillar cmining progrnical study c
LBROOK COAL
nmental Man
S DURING
ON g period MCCcated in the mmencing thby DRE.
ARATION s the procetopsoil strip There was There was n
ANAGEMENTtopsoil is stoties. The stoular basis. Sties. Weed m
TION g period no c
this reportinen days a we.
ning schedumining down er seam. Minworking thatr by the en
quarter overent Pit 1. Whl be mined e dumping o
tinue to exped procedurcoal. These ress. Open completed fo
L COMPANY L
nagement Re
G THE REP
C drilled six rehabilitatedhe Mining O
ess of prepapping and to a disturbanno salvageab
T ockpiled in loockpile locatome of the management
construction
ng period haeek. The stat
ule will contithrough th
ning has alsohad pillar ed of 2017 a
rburden striphen the contiout removinof waste mat
pose undergrres have beeprocedures cut wall desor MCC by La
IMITED
eport
PORTING P
exploration d area betweOperations P
aring the laopsoil stockpnce of 4.67hble topsoil in
ocations aroutions are awtopsoil stockt was undert
activities oc
ve occurredtus of mining
inue within he seam seqo started in aextraction doassisting in
pping will coinuation areng any fuel sterial in Pit 2
round workinen developeare reviewesigns were uambert Geot
PERIOD
holes to coneen Open CuPlan was mo
nd for openpiling. Duringha of previothis area.
und the site fway from curkpiles were taken on the
ccurred.
in Open Cutg activities at
the Northerquences as a section of one. This wilthe eliminat
ommence ina mining is csources for swill comme
ngs of the Nd to allow sed to reflect undertaken ftech P/L.
nfirm the coaut 1 and Opedified to inc
n cut mining the reportiously rehabil
for use and wrrent miningremoved thise stockpiles
t 1 with opet the end of
rn section othey presenthe continual allow this tion of sour
the whole ccompleted atspontaneousnce.
o. 2 Undergsafe extractithe operatinfollowing rec
al quality in ten Cut 2. Prioclude these
ng. Activitiesing period nlitated land
will be used g operationsis year to bes prior to the
rations able the reportin
of the approvnt from the ation area aarea to be mrces of spon
continuationt the end of s combustio
ground and Sion of the reng experienccommendat
12
the area. or to this activities
s include o topsoil to allow
in future s and are e used in em being
to occur ng period
ved area Fleming bove old mined to ntaneous
n area to mine life n. When
St Heliers emaining ce gained ions of a
2016 An
Mining relevant Mining trucks. T
Equipme
Excavato
Dump T
Front En
Blast Ho
Grader
Water C
Dozer
2.5 MMCC proand wasthe CPP Coal frothe undeof appro The CPPand fineand ablemateria
MUSWELL
nnual Environ
operations t approvals, l
is achieved The current f
ent
or
ruck
nd Loader
ole Drill
Cart
MINERAL Poduces thermshed throughdirectly to t
m Open Cuterground rooximately 24
P uses a belt e reject matee to be hanl is undertak
LBROOK COAL
nmental Man
at MCC areleases and lic
through opefleet used fo
T
Mode
HitachHydra
HitachHydra
Hitach
CAT 77
CAT 99
SMW
CAT 16
Water70,000
CAT D
ROCESSINmal coal for h the Coal Phe product s
t 1 requires wadways. The40 tonnes pe
press filter terial will be tndled in theken in accord
L COMPANY L
nagement Re
e undertakencences.
en cut methr mining at M
Table 7: Min
l
hi EX3600 ulic Excavato
hi EX2600 ulic Excavato
hi 3500 (170 T
77C (85 Ton)
90H
Drilltech 45
6H Grader
r Cart (CAT 70 litre
10T
G both export
Preparation Pstockpile.
washing by te CPP uses ar hour. The C
to treat the ftrucked backe same mandance with th
IMITED
eport
n in accorda
ods using exMCC is provi
ning Fleet Ut
No
or 2
or 1
Ton) 8
) 3
1
1
2
777) 2
3
t and domesPlant (CPP) w
the CPP as aa jig as the mCPP is used o
fines or tailink to the openner as overhe Spontane
ance with th
xcavators, frded in Table
ilised at MC
o Work A
Overburemova
Overburemova
Overburemova
Overbu
Coal st
Drillinginterbu
Surface
Dust su
Dumpsarea pr
stic markets.while low as
a result of dimain method on an ‘as req
ngs componn cuts for disrburden matous Combus
he Mining O
ront‐end loa 7.
C
Area
urden, interbal
urden, interbal
urden, interbal
urden, coal a
ockpile man
g for blastingurden and co
e preparatio
uppression, r
s, roads, coalreparation
High ash cosh coal is cru
ilution assocof separatiouired’ basis.
ent of the cosposal. This terial. Dispotion Manage
Operations P
aders and re
burden and c
burden and c
burden and c
and rejects
nagement
g in overburdoal
n, road main
road mainte
l and overbu
oal is mined,ushed and b
ciated with mon and has a
oal feed. Bot material is qosal of carboement Plan (
13
Plan and
ear dump
coal
coal
coal
den,
ntenance
nance
urden
, crushed by‐passes
mining of capacity
th coarse quite dry onaceous (SCMP).
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 1: Miningg Activities This RReporting Period
1
14
2016 An
2.6 WDuring tService tpaper rewhen po Table 8
January
February
March 2
April 201
May 201
June 201
July 201
August 2
Septemb
October
Novemb
Decemb
Total
2.7 PProduct total capEnglandtranspor
2.8 PThe amo
MUSWELL
nnual Environ
WASTE MAthe reportinto manage aecycling, timossible, to as
shows the a
Month
2016
y 2016
2016
16
16
16
6
2016
ber 2016
r 2016
ber 2016
ber 2016
RODUCT Ccoal is haulepacity of 250 Highway trted to the p
RODUCTIOount of prod
LBROOK COAL
nmental Man
ANAGEMENng period Mall waste streber, waste ossist in reduc
mount of wa
Tota
COAL AND ed from the 0,000 tonneso the Raveport of Newc
ON SUMMuction and a
L COMPANY L
nagement Re
NT CC continueeams generaoil, and steelcing the amo
aste that was
Table 8: Wa
al Waste Rem(tonnes)
110.41
98.79
105.61
100.47
153.75
99.52
134.51
120.15
108.74
103.79
98.80
106.75
1,341.28
TRANSPOproduct bin s. Product consworth Coastle.
ARY associated w
IMITED
eport
ed to maintated on site.. MCC contiount of waste
s removed fr
aste Stream
moved
RT by truck to toal is truckedal Terminal
waste generat
ain a Total . This includeinue to sepae going to th
rom site duri
Generation
Total WastLandfill (to
2.98
7.66
2.90
1.95
3.73
5.03
2.53
1.93
2.84
1.79
2.48
2.15
37.97
the stockpiled off site via (RCT) for t
ted by MCC i
Integrated Wes general wrate and rece local landf
ing the repo
te to nnes)
P
es. Five prodMuscle Creetrain loading
is detailed in
Waste Manwaste, cardbocycle waste mfill.
rting period.
Percentage RRecycle
97.31
92.24
97.26
98.06
97.57
94.94
98.12
98.40
97.39
98.28
97.49
97.98
97.09
uct stockpileek Road and g. This coal
n Table 9.
15
agement oard and materials
.
Reused/ ed
1
4
6
6
7
4
2
0
9
8
9
8
9
es have a the New l is then
2016 An
Topsoil S
Topsoil u
Topsoil s
Waste R
Open Cu
Undergr
Total Co
Processi
Open Cu
Undergr
Total Pro
2.9 H
2.9.1 Diesel fueach. ThLicense f
2.9.2 MCC ussystem chemicadisposalselectiona focus o
2.9.3 MCC harelevantmagazinproduct commonpremiseA blastin
2.10 WThe primmanagewater remanage The obje
Mee
MUSWELL
nnual Environ
Stripped (m3
used/spread
stockpiled (m
Rock (BCM)
ut ROM Coal
round ROM C
oal (t)
ing Waste (t)
ut Product Co
round Produ
oduct Coal (t
HAZARDOU
FUEL STORAuel is storedhe tanks arefor Keeping
CHEMALERTe a web bausers can aal hazard mal of chemican and use caon safe chem
EXPLOSIVESs a licence tt legislation nes and an can also be
n practice toes are listed ung contracto
WATER MAmary objectment of on‐esources, boment system
ectives of the
et the water
LBROOK COAL
nmental Man
Ta
3)
d (m3)
m3)
(t)
Coal (t)
)
oal (t)
ct Coal (t)
t)
US MATERI
AGE in three Clae located 50mDangerous G
T SYSTEM ased ChemAaccess the dnagement toals. A Dangean be readilymical use and
S to supply anunder Liceabove groue stored on o do so as tunder MCC’sr is employe
ANAGEMENtive of the ‐site water toth on and m during the
e SWMP are
supply need
L COMPANY L
nagement Re
ble 9: Produ
At ERepo
7,
1,
1,
2
1,
1,
ALS MANA
ass C1 abovem from any Goods No. 35
lert system database froool that conterous Goodsy accessed frd storage by
nd store expence Numbeund tank forthe mobile
this is only us Notificationed to carry ou
NT Site Watero minimise tadjacent toreporting pe
to:
ds of the proj
IMITED
eport
uction and W
End of This orting Period
0
10,940
3,662
,557,556
,652,181
0
,652,181
254,164
,424,073
0
,424,073
AGEMENT
e ground, semajor build5/021999, is
to manage om the MCCtains informas manifest aom the MCCthe Health a
plosives and er XSPL1000r raw mateprocessing
used on an n of Hazardout total load
Managementhe impact oo the mine seriod.
ject;
Waste Summ
PRO
d At
Repo
7
1
1
1
1
lf bunded tadings. They asued by Wor
chemical usC intranet sation on theand safe opC intranet seand Safety Co
explosive p002. This rials with 3unit with a as needs baous Chemicaing service o
nt Plan (SWof mining opsite. No ch
ary
ODUCTION
End of Last orting Period
0
7,765
34,057
7,004,916
1,705,930
0
1,705,930
277,760
1,428,170
0
1,428,170
anks, with a are currentlyrkcover NSW
se at the mite. The Chestorage, tra
perating procrver. Audits ommittee re
recursors in storage con0,000L capacapacity of sis. All dangals, Licence Non site.
WMP) is to eperations onanges were
d EstimNex
7
1
1
1
1
capacity of 1y listed undeW.
mining operaemAlert systansportation,cedure for are underta
epresentative
accordancensists of 2 acity. Bulk e8,000L but
gerous goodNumber NDG
enable the n surface andmade to th
16
mate, End ofxt Reporting Period
0
0
3,662
,859,124
,654,929
0
,654,929
153,539
,501,390
0
,501,390
105,000L er MCC’s
tion and tem is a , use and chemical ken with es.
e with all external explosive it is not s on the G021999.
effective d ground he water
f
2016 An
Sepaand
Use
Wheand
Allow(fireby h
Wheas m
Havemin
Monuse
2.10.1 Volumes
Volum
Blues C
Brickw
Brickw
Final Se
Dam 3
Dam1
Dam 2
No.2 O
2.10.2 MCC hoof grouconstruc
20BL
20BL
20BL
20BL
2.10.3 The calcindicateup for th
MUSWELL
nnual Environ
arate clean wcontaminate
appropriate
ere possible,wash down
w clean watefighting systharvestable r
ere possible,mine water st
e nil dischaimising the r
nitor surfaceand underta
WATER STOs of stored w
es (m3)
Crusher Dam
orks Dam 1
orks Dam 2
ettling Pond
O/C Void
GROUNDWAlds four licendwater excted during t
Licen
169014 (bor
169037 (No.
169038 (No.
170473 (bor
WATER BALculated wates a water dehis deficit.
LBROOK COAL
nmental Man
water runofed runoff fro
e sedimentat
, recycle andactivities;
er to flow thtem uses rawrights;
, and where torages;
arge of salinrisk of accide
e and groundaking remedi
ORAGE water availab
m
ATER EXTRAnces to extraxtracted in tthe reporting
ce No.
rehole RDH52
1 O/C Void)
2 O/C Void)
rehole RDH60
LANCE er balance foeficit for the
L COMPANY L
nagement Re
f produced om disturbed
ion controls
d reusing di
hrough the cw mine wate
mine safety
ne mine waental off site
dwater to deal action wh
ble at MCC ar
Table
Start Rep
6
7
5
3
7
SAL
2
2
6
ACTION act ground wthis reporting period.
Table 11: G
Re
29)
07)
or the repor year. Extra
IMITED
eport
by undisturbd catchment
for dirty wa
rty and con
catchment aer) and sensi
y permits, us
ater by condischarge; a
termine signhere required
re provided i
e 10: Stored W
porting Perio
DIRTY WA
6,472
7,480
5,935
3,330
7,920
LINE OR MIN
24,000
20,000
60,000
water, underng period a
Groundwate
porting PeriVolume
0.0
0.0
1,01
882
rting perioda water has b
bed catchmes;
ter;
taminated m
nd using cleaitive equipm
e disused op
taining all sand
nificant impad.
in Table 10.
Water
od End Re
ATER
NE WATER
r Part 5 of thare shown T
r Extraction
od Extractioe (ML)
0
0
5.1
2.1
is provided been source
ents from di
mine water f
an water forent where r
pen cuts and
saline mine
acts to water
eporting Per
1,065
0
2,579
7,141
3,993
18,900
20,000
943,300
he Water AcTable 11. N
on Extract(ML pe
2,00
in Table 12d from on‐s
irty (sedimen
for dust sup
r firefightingrequired and
d undergroun
water on
r quality or b
riod Stora
1
ct 1912. The No new bor
tion Entitlemer Annum Li
1,000
00 (combine
3,000
2. The waterite storages
17
nt‐laden)
ppression
supplies d allowed
nd mines
site and
beneficial
age Capacity
8,500
30,000
20,000
10,100
8,000
30,000
20,000
,200,000
volumes res were
ment imit)
d)
r balance to make
y
2016 An
INPUTS
Ground
Surface
Entrainm
Potable
Undergr
TOTAL
OUTPUT
Entrainm
Discharg
Dust Sup
Dust Sup
Evapora
Pumped
Septic P
TOTAL
2016 Ba
2.11 ONo othe
MUSWELL
nnual Environ
Water Seepa
Water Runo
ment in Coal
Water
round Worki
TS
ment in Coal
ge Off Site
ppression – w
ppression – w
ation from Da
d to Council V
ump Out
alance
OTHER INFRer manageme
LBROOK COAL
nmental Man
age
off and Dam C
ngs – Dewat
water infusio
water carts
ams
Void
RASTRUCTent of infrast
L COMPANY L
nagement Re
Table 12
Capture
tering Bores
on and spray
TURE MANAtructure occu
IMITED
eport
2: Site Water
ys
AGEMENTurred during
r Balance
T g this reporti
ML/ye
0.0
152.
123.
4.5
882.
1,162
ML/ye
144.
0.0
777.
352.
126.
0.0
1.0
1,401
‐238.
ng period.
ear M
0
.6
.7
5
.1
2.9
ear M
.5
0
.0
.5
.2
0
0
1.2
.3
18
ML/day
0.0
0.4
0.3
0.0
2.4
3.2
ML/day
0.4
0.0
2.1
1.0
0.3
0.0
0.0
3.8
‐0.6
2016 An
3.0 E
3.1 EIn orderlicences,areas. Tindividu
3.2 MDuring tStation (Real Timperimetfour weaccessib The prinrainfall, inversiosupplemsites, allinterval.temperamagneti
Meteoroand tem
MUSWELL
nnual Environ
ENVIRONM
NVIRONMr to measure, MCC undeThe locationsal monitorin
METEOROLthe reportin(MMS) on reme Environmer of the mieather statioble by MCC p
ncipal MMS phumidity, bn calculation
mentary MMlowing the t. The suppature for theic north.
ological datamperature res
LBROOK COAL
nmental Man
MENTAL M
MENTAL MAe compliancertakes a coms of the curng programs
LOGICAL ng period, Mehabilitated mental Monne propertyons continuopersonnel.
provides 10mbarometric n is based onS at Site 2. Ttemperatureplementary e purpose of
a provided insults are sum
L COMPANY L
nagement Re
MANAGEM
ANAGEMEe with the mmprehensiverrent monitoare provided
MCC continuland to the iitoring Systey at the TEOMously relay w
m elevation wpressure ann the 2m eleThese sites we inversion tMMS’s prointerpreting
this report wmmarised be
IMITED
eport
MENT AN
NT anagement e monitoringoring sites ad in the follo
ued to mainimmediate wem (RTEMSM and BAM weather dat
wind speed nd calculatedevation air tewere selectedo be extrapovide 2m eg TEOM and
was sourcedlow. Data re
D PERFOR
plans, the dg program inare shown inowing section
ntain a princwest of Open). Three othsites, providta to a pass
and directiod atmospheemperature d due to theolated and elevation wBAM results
d from the precovery for th
RMANCE
evelopment n the vicinityn Figure 2. Mns.
cipal Meteon Cut 1. This her MMS’s, de supplemeword protec
n, 2m elevateric temperafrom the prie 88m RL diffreported oveind speed, s. Wind direc
rincipal MMShe monitorin
consent andy of the MCMore detail
rological Mostation is palocated aro
ental informacted websit
tion air tempature inversincipal MMSference betwer a 100m edirection,
ction is refer
S. Wind datang period wa
19
d various C mining s on the
onitoring art of the ound the ation. All e that is
perature, ion. The S and the ween the elevation and air enced to
a, rainfall as 98.1%.
2016 An
MUSWELL
nnual Environ
LBROOK COAL
nmental Man
Figur
L COMPANY L
nagement Re
re 2: Environ
IMITED
eport
nmental Monnitoring Locaations
20
2016 An
3.2.1 Quarterpredom
MUSWELL
nnual Environ
WIND SPEEDly wind rosinant wind p
LBROOK COAL
nmental Man
D AND DIRECes are provpatterns in th
L COMPANY L
nagement Re
CTION vided in Figuhe Hunter Va
January
April
IMITED
eport
ure 3. Thesealley.
y – March W
l – June Wind
e results ar
Windrose
drose
e generally consistent
21
with the
2016 An
3.2.2 Total raaverage Hill Stre
MUSWELL
nnual Environ
RAINFALL ainfall record of 620.8mmeet in Musw
LBROOK COAL
nmental Man
ded during tm, recorded awellbrook. A
L COMPANY L
nagement Re
July – Se
October –
Figure 3:
the reportinat the nearessummary of
IMITED
eport
eptember W
– December
Quarterly W
ng period wast Australianf rainfall du
Windrose
Windrose
Windroses
as 535.3mmn Bureau of Mring the rep
m, which is bMeteorologyporting perio
below the loy (BOM) site od, compare
22
ong‐term at Lower ed to the
2016 An
historicaFigure 4
J
F
Se
O
N
D
3.2.3 Maximuwas ‐1.2of Metemonthly
J
F
Se
O
N
D
S
MUSWELL
nnual Environ
al rainfall at 4.
Month
January
February
March
April
May
June
July
August
eptember
October
ovember
December
Total
TEMPERATUum temperat2°C. This is weorology sitey temperatur
Month
January
February
March
April
May
June
July
August
eptember
October
ovember
December
ummary
LBROOK COAL
nmental Man
MCC and th
MusA
URE ture recordedwithin the lone at Scone, ‐res during th
Tem
L COMPANY L
nagement Re
e closest BO
Table
swellbrook CActual (mm)
102.8
6.8
16.4
30.7
21.2
70.2
40.2
40.4
55.2
40.6
47.6
63.2
535.3
d during theng term min‐5.1°C and 4he reporting
Table 14
Minimum mperature (o
12.3
13.5
10.9
8.8
1.2
‐0.3
‐1.2
2.2
3.8
3.9
5.9
12.7
‐1.2
IMITED
eport
OM station in
e 13: Rainfal
Coal Mu
e reporting pnimum and m44.2°C. A sumperiod is pro
4: Temperat
oC) Ave
n Muswellbr
l Data
uswellbrookAverage (mm
66.0
80.3
48.3
38.3
28.4
65.5
33.8
34.7
29.5
38.9
83.9
59.8
607.4
eriod was 39maximum remmary of movided in Tab
ure Data
rage Tempe(oC)
22.8
23.6
22.6
19.7
15.6
12.0
11.5
11.9
14.6
16.9
21.4
24.8
18.1
rook, is prov
k Coal m)
M
9.6°C and thecorded by th
minimum, mable 14 and Fi
rature
vided in Tabl
MuswellbrooAverage (m
69.6
66.9
52.8
43.5
41.5
51.3
44.2
38.6
40.7
48.6
56.1
67.0
620.8
e minimum rhe Australianaximum andigure 5.
MaximuTemperatur
38.8
39.3
35.9
34.2
26.8
20.3
23.4
23.3
24.4
31.1
35.7
39.6
39.6
23
e 13 and
ok BOM mm)
recorded n Bureau average
um re (oC)
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 4: Rainfall Grraph
2
24
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figuree 5: Temperature Graph
2
25
2016 An
3.2.4 InversioCreek RtemperaTemperais a temmay signInversioearly mo Over theeach moFigure 6having t
3.3 A
3.3.1 There wreportin The primdust frohave be Dust candust gen15 and T
Areas dimining
Coal HanStockpile
MUSWELL
nnual Environ
INVERSION n strength isRoad stationatures are usatures norm
mperature innificantly incns over 3°C orning in the
e reporting ponth recordi6. A strong inhe highest n
AIR QUALIT
ACTIVITIES Twere no chang period.
mary objectivom the operen divided in
n be generanerated by mTable 16.
Source
sturbed by
ndling and Ce Areas
LBROOK COAL
nmental Man
MONITORINs measured b (Site 2). Thsed to calculally decreasecrease with crease noiseper 100m are cooler mon
period, inverng an inversnversion wasnumber of da
TY MANAG
THIS REPORTanges made
ve of air quarations on thnto control p
ated from twmining activi
Table 1
oal
L COMPANY L
nagement Re
NG between thehe sites havate the tempe with increaheight. Me levels by fore considereths.
rsions were msion level of s recorded onays with 21 d
GEMENT
TING PERIODto the air
ality managehe environmprocedures fo
wo primary sties. The con
15: Control P
Disturb only
Reshape, toemplacementipping.
Maintain cocarts to min
Clean‐up aft
Water carts suppress du
IMITED
eport
e Open Cut mve an elevatperature diffase in heighteteorologicalocusing sound to be stro
monitored a3°C/100m on 149 days ddays above 3
D quality man
ement at MCment and neor wind‐blow
sources, eithntrol proced
Procedures fo
Cont
y the minimu
psoil and rehnt areas afte
al handling aimise windb
ter any spilla
to operate aust on roadw
meteorologiction differenferential pert above the gl conditions,nd‐wave prong and occu
nd the daily or greater (sduring the re3°C/100m.
nagement or
CC is to manarby residenwn dust and
her windblowdures for the
or Wind Blow
trol Procedu
um area nece
habilitate coer the compl
areas in a molown and tra
age event.
around the cays and the
cal station (Snce of 88 m100 metres ground. A te such as tempagation patr primarily d
maximum rtrong inverseporting peri
r monitoring
nage and minnces. Dust mining gene
wn dust fromese sources a
wn Dust
ures
essary for mi
mpleted oveetion of over
oist conditioaffic generat
coal stockpilecoal stockpil
Site 4) and thmetres and (inversion semperature imperature inths at a singduring the ev
recorded. Thsion) are dispod with Aug
g system du
nimise the immitigation merated dust s
m exposed aare outlined
ining.
erburden rburden
n using wateted dust.
e area to les.
26
he Sandy recorded trength). inversion nversion, gle point. vening to
e days in played in gust 2016
uring the
mpact of measures sources.
areas, or in Table
er
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 6: Teemperature Inversion Graph
227
2016 An
Haul roa
Minor ro
Topsoil s
Drilling
Blasting
Raw Coa
Coal HanPreparat
Equipmestockpilecyclones Further term ep
3.3.2 The Air combinaOscillatimeteoro Depositi
Monitor All gaugdepositi All dust analysisexcludedand labo
MUSWELL
nnual Environ
Ta
Source
ad dust
oads
stockpiling
al Receival B
ndling and tion Plant
ent used toes), sprays as or water in
control proisodic event
AIR QUALITYQuality Monation of depng Microbaological mon
ional Dust Ga
ring depositio
ges are analyonal dust on
gauges wer. Samples wid from the aoratory analy
LBROOK COAL
nmental Man
ble 16: Cont
in
control duat the Raw Cjection syste
cedures ares.
Y MONITORnitoring Netwpositional dalances (TEOnitoring statio
auge Results
onal dust ha
ysed for inson non‐mine o
re sampled ith excessiveannual averaysis.
L COMPANY L
nagement Re
trol Procedu
All roads andminimise th
Long term hmaterial.
Developmenrequired by
Minor roads
All topsoil stthe area exp
Long term tobe revegeta
Dust aprons
Drills will beinjection sys
Water injecthigh levels o
Stemming w
Blasting willManagemen
Sprays are tobin during h
Sprays are fi
st generatioCoal Receivalems on drill r
implemente
ING work is displust gauges, OM), Beta Aon.
s
s occurred in
oluble solids owned land i
on a 30±2 de contaminatage. Contam
IMITED
eport
res for Minin
Cont
d traffic areae generation
haul roads wi
nt of minor rmining.
s used regula
tockpiles wilposed to pre
opsoil stockpted.
s will be lowe
e equipped wstems.
tion or dust sof dust are b
will be used a
occur in accnt Plan relati
o be used whigh wind eve
itted at trans
on include: l Bin, sprays rigs.
ed during p
layed in FiguHigh Volum
Attenuation
n the area su
and ash ress 4.0g/m2/m
day cycle antion, includinmination is d
ng Generate
trol Procedu
as will be wan of dust.
ill be sheeted
roads will be
arly for acces
l be located vailing winds
piles, not use
ered during d
with dust ext
suppression eing generat
at all times.
cordance witing to meteo
hen tipping rents.
sfer points.
water cart at conveyor
eriods of hig
ure 2. The mme Air SamMass Mon
urrounding M
sidue. The anmonth.
nd sent to a ng bird droppetermined o
ed Dust Sour
ures
tered using w
d with hard w
limited to b
ss will be wat
and shaped s.
ed for over 6
drilling.
raction cyclo
sprays will bted.
th the Blast‐Vorological con
raw coal into
(sprays on hr transfer po
gh dust emi
monitoring nplers (HVASnitor (BAM),
MCC since 19
nnual averag
NATA accrepings, insectson the basis
rces
water carts t
wearing
be only as
tered.
to minimise
6 months wil
ones or wate
be used whe
Vibration nditions.
o the receiva
haul roads oints, dust ex
issions and f
network conS), Tapered , PM10 HV
983.
ge EPA maxi
edited laboras and vegeta of field obs
28
to
l
er
n
al
and coal xtraction
for short
sists of a Element
VAS, and
mum for
atory for ation, are servation
2016 An
There isFigure 2
All gaugrolling amonitormonitorAssessmlevels an
Y
2
2
2
201
201
201
201* ‐ averag
12‐montdepositi
MUSWELL
nnual Environ
s a network 2 with a desc
Locat
ges compliedaverage dustring sites waring results,ment. The rend are below
Year
2016
2015
2014
3‐2014
2‐2013
1‐2012
0‐2011 ge of all gaug
th rolling avonal dust mo
LBROOK COAL
nmental Man
of eight dusription provi
Tabl
tion Identifie
D7
D17
D18
D19
D22
D24
D26
D29
d with the mt depositionas 1.8g/m2/m, backgrounesults in 201w the predict
Table 1
AverageR
(g/m
es
erage and honitoring pro
L COMPANY L
nagement Re
t depositionided in Table
e 17: Depos
er
Que
San
S
Mus
San
Mus
aximum annn rate for inmonth. Tabnd results 16 are consised results fr
8: Comparis
e Monitoringesults 2/month)
1.8
1.8
2.2
2.1
1.9
1.7
1.6
istorical aveogram for th
IMITED
eport
n dust gaugee 17.
sitional Dust
Desc
een St Musw
ndy Creek Ro
Sandy Creek
McCullys G
scle Creek Ro
ndy Creek Ro
scle Creek Ro
Queen
nual dust crinsoluble solile 18 compaand predicstent with hom the EA.
son of Depos
g Back(g/
rage values he reporting
es with the lo
Gauge Loca
cription of Lo
wellbrook – w
oad – northw
Road – north
Gap – north o
oad – southe
oad – northw
oad – southe
n St – Muswe
teria of 4g/mds from Janares the avections madehistorical mo
sitional Dust
kground Resu/m2/month)
1.7
1.7
1.7
1.7
1.7
1.7
1.7
are displayeperiod are p
ocations of t
tions
ocation
west of opera
west of opera
h of operatio
of operations
east of opera
west of opera
east of opera
ellbrook
m2/month. Tnuary to Decerage resultse in the 2onitoring res
t Results
ults *
EA
ed in Figure 7resented in A
the gauges s
ations
ations
ons
s
ations
ations
ations
The mean 12cember 201s for 2016, h2010 Enviroults and bac
A Predicted (g/m2/mon
2.3
2.3
2.3
2.3
2.3
2.3
2.3
7. The resulAppendix 1.
29
shown in
2 month‐16 for all historical onmental ckground
Results nth)*
lts of the
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 7: Aveerage Depositionaal Dust Results
3
30
2016 An
Total Su
Three TSbeen opnominatlaboratoprovided
Loca
Annual Asites. Theach moresults o
Sit
1
2
3
All s
Table 21and prehistorica
Y
2
2
2
201
201
201
201* ‐ averag
MUSWELL
nnual Environ
uspended Par
SP HVAS uniperational sted six‐day ory for anald in Table 19
tion Identifi
Site 1
Site 2
Site 3
Average TSPhe ratio of PMonitoring locover the mon
te C
1
2
3
sites
1 compares edictions maal monitoring
Year
2016
2015
2014
3‐2014
2‐2013
1‐2012
0‐2011 ge of all sites
LBROOK COAL
nmental Man
rticulates (TS
its are locateince March run cycle. ysis. The lo9.
er
Corner
results for tM10 to TSP ocation duringnitoring perio
Annual AvConcentratio
28
30
35
31
the averageade in the 2g results, bac
AverageResult
L COMPANY L
nagement Re
SP) High Volu
ed at each o2005. SamFilter papercations of t
Table 19: TS
Quee
Sandy
r Sandy Cree
the reportingon HVAS rung the reportiod. A compr
Table
erage TSP on (µg/m3)*
.2
.1
.9
.4
e results for 2010 Envirockground lev
Table 21: Co
e Monitoringts (µg/m3)*
31.4
30.8
45.5
39.4
40.3
31.9
30.9
IMITED
eport
ume Air Sam
of the three ples are cors are then the HVAS a
SP Monitorin
Descrip
en St Muswe
y Creek Road
k Road and S
g period wer days is 45%ing period. Fehensive tab
e 20: TSP Ave
Annu
r 2016, histoonmental Asvels and the
omparison o
g Back
plers (HVAS)
real time dullected overcollected are detailed
ng Locations
ption of Loca
llbrook – we
d – northwes
St Heliers Ro
re below the%. Table 20 dFigure 8 – Fible of TSP res
erages
al Average C(µg/m3)
90
90
90
90
orical monitosessment. predicted re
f TSP Result
kground Resu(µg/m3)*
41.4
41.4
41.4
41.4
41.4
41.4
41.4
)
ust monitorinr a 24‐hour nd sent to in Figure 2
s
ation
st of operati
st of operati
ad – northw
e annual critedisplays the agure 10 dispsults is provi
Criteria
oring results,The results
esults in the E
s
ults EA
ng stations aperiod on a NATA ac
2 with a de
ions
ons
west of opera
eria of 90µg/average TSPplay the 24‐hided in Appe
2016 DaRecovery
100
100
100
100
, backgroun in 2016 arEA.
A Predicted (µg/m3)
46.4
46.4
46.4
46.4
46.4
46.4
46.4
31
and have the EPA ccredited escription
ations
/m3 at all value at hour TSP endix 1.
ata y %
d results re below
Results )*
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 8: Site 1 TSP Monitoring Results
3
32
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 9: Site 2 TSP Monitoring Results
3
33
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 10: SSite 3 TSP Monitooring Results
3
34
2016 An
Particula
Three recontinuopersonn The PMcommunessentiaunits. There whour criduring treportincompreh
Site
A
Table 23and preconsisteresults i
Y
2
2
2
201
201
201
201
* ‐ avera A PM10 operatethe repooccurredeast. Asby MCC’the repo19.4µg/
MUSWELL
nnual Environ
ate Matter <
eal‐time PMously relay nel. The locat
10 units are nication lossal and data r
were no days iteria of 50µthe reportinng period whensive PM1
Number
1
2
3
All sites
3 compares edictions maent with histn the EA.
Year
2016
2015
2014
3‐2014
2‐2013
1‐2012
0‐2011
age of all site
HVAS unit hs on a 6 dayorting periodd on 24 Mars the unit is o’s operationorting periom3 with the
LBROOK COAL
nmental Man
<10µg (PM10)
M10 monitorinweather dations of thes
continuous es, power ourecovery leve
during the rµg/m3. The ng period. Twith the res
10 results is p
AnnuaConcen
the averagede in the 20torical monit
Table
AverageResult
es
has been esty cycle and isd where the rch 2016 witon the norths. The annuod. The annresults being
L COMPANY L
nagement Re
)
ng units havata to a pae units are s
electronic mutages and mels obtained
reporting peannual aveable 22 disults graphicrovided in A
Table 22: Re
al Average PMntration (µg/
14.3
15.5
12.3
14.1
e results for 010 Environtoring result
23: Compari
e Monitoringts (µg/m3)*
14.1
14.5
16.9
17.4
18.3
14.0
14.1
tablished wis not real‐tim24 hour PM1
h the predo‐western sidual average nual averageg displayed in
IMITED
eport
ve been opeassword prohown in Figu
monitoring symaintenance during the
eriod where terage PM10 dplays the avcally presentAppendix 1.
eal‐Time PM
M10 /m3)
r 2016, histonmental Assets, and belo
ison of Real‐
g Back
th the locatme like the o
10 result wasminant windde of the opePM10 did noe PM10 HVAn Figure 14 a
erational sinctected webure 2.
ystems that e downtime. reporting pe
the 24 hour did not exceverage PM10
ted in Figu
M10 Averages
Annual Aver(µg/
3
3
3
3
orical monitoessment. Thw the backg
‐Time PM10 R
kground Resu(µg/m3)*
17.6
17.6
17.6
17.6
17.6
17.6
17.6
tion of this sother PM10 us above the 2d direction oerations this ot exceed theAS recorded and Table 24
ce March 20site that is
are subject tHigh data reeriod were 9
PM10 resultseed the 30µ
0 value at ere 11 – Fig
s
rage Criteria/m3)
0
0
0
0
oring results,he results inground level
Results
ults EA
site shown iunits. There24‐hour criten this day beresult may he 30µg/m3 aover the re
4.
005. All thraccessible
to equipmeecovery is co95% across t
s were aboveµg/m3 annuaeach site dugure 13. A
a DaRecov
9
10
8
9
, backgrounn 2016 are gls and the p
A Predicted (µg/m3)
20.6
20.6
20.6
20.6
20.6
20.6
20.6
n Figure 2. e was one daeria of 50µg/eing from thhave been inannual critereporting pe
35
ree units by MCC
nt faults, onsidered the three
e the 24‐l criteria uring the table of
ata very %
7
00
7
5
d results generally predicted
Results )*
This unit ay during /m3. This he south‐fluenced ia during riod was
2016 An
Site
N
Table 25and preelevatedlevels pr
Y
2
2
2
201
201
201
201* ‐ averag
3.3.3 During tupdatedthe EPA MCC wil
3.4 GNo metreportinand wat MCC suGreenho
MUSWELL
nnual Environ
e Number
Nisbet
5 compares edictions mad when compredicted in th
Year
2016
2015
2014
3‐2014
2‐2013
1‐2012
0‐2011 ge of all sites
ACTIVITIES Nthe next repd to reflect thto the satisf
ll continue to
GREENHOUhane drainang period. A ter monitorin
upply data ouse and Ene
LBROOK COAL
nmental Man
AnnuaConcen
the averageade in the 2pared with hhe EA.
T
AverageResult
NEXT REPORporting periohe revised cofaction of MS
o manage an
USE GAS ge or ventilnumber of bng. These bo
to Idemitsuergy Reporti
L COMPANY L
nagement Re
Table 24
al Average PMntration (µg/
19.4
e results for 2010 Environhistorical mo
Table 25: Com
e Monitoringts (µg/m3)*
19.4
19.1
19.1
16.7
16.2
11.2
10.6
RTING PERIOod the Air Qonsent condSC.
nd monitor a
ation issuesboreholes inreholes are c
u for their ng (NGER’s)
IMITED
eport
4: PM10 HVAS
M10 /m3)
r 2016, histonmental Assonitoring resu
mparison of
g Back
OD Quality Manaitions. The A
ir quality im
s were assocntersect the capped and
corporate process.
S Average
Annual Aver(µg/
3
orical monitosessment. Tults and back
f PM10 Result
kground Resu(µg/m3)*
17.6
17.6
17.6
17.6
17.6
17.6
17.6
agement PlaAQMP will b
pacts in acco
ciated with tundergroundopened only
reporting r
rage Criteria/m3)
0
oring results,The results kground leve
ts
ults EA
n (AQMP) we developed
ordance with
the Open Cud workings ty for monitor
requirement
a DaRecov
10
, backgrounin 2016 areels but are b
A Predicted (µg/m3)
20.6
20.6
20.6
20.6
20.6
20.6
20.6
will be revied in consultat
h the revised
ut operationthat are usering purpose
ts for the
36
ata very %
00
d results e slightly elow the
Results )*
wed and tion with
d AQMP.
ns in this d for gas es.
National
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figuree 11: Site 1 PM10 RResults
3
37
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figuree 12: Site 2 PM10 RResults
3
38
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figuree 13: Site 3 PM10 RResults
3
39
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figuree 14: PM10 HVAS RResults
4
40
2016 An
3.5 E
3.5.1 The maithe site through
Sepacont
Red
Cont
Conreha
Imp Two maThe arearunoff ioperatio Drainagesuppresgraded bmine sit All distufrom catconstruc
Majpoteand an eceas
Minmantermnot rehamino
3.5.2 Erosion program
3.5.3 During tto reflecWMP. T During timpacts
MUSWELL
nnual Environ
ROSION A
ACTIVITIES Tn objective oand its tran the implem
arating cleataminated ru
ucing water
trolling flow
structing seabilitated dis
lementing co
in natural caa contains uis captured ons by divers
e from the csion. All distbanks) to coe.
urbed or newtchment arected:
or graded bential for erodirect wate
extended peses.
or graded bnagement dum because a require themabilitation pror flows and
EROSION ANand sedime
m. Surface w
ACTIVITIES Nthe next repoct the revisedThe WMP wi
the next repin accordan
LBROOK COAL
nmental Man
ND SEDIM
THIS REPORTof the erosiosport downsentation of t
an water runoff from d
runoff veloc
volume and
ediment consturbed area
ontrol struct
atchments exndisturbed lby dams.
sion banks, a
coal crushingturbed or nentrol the flo
wly rehabilitaas and to co
banks – Theosion or scor flow in a mriod and are
banks – Thesuring the firssuccessful rm. The spacrogram and d two to thre
ND SEDIMENent control water monito
NEXT REPORorting periodd consent coll be develop
porting perioce with the W
L COMPANY L
nagement Re
MENT CONT
TING PERIODon and sedimstream, resuthe following
runoff prodisturbed cat
city;
d path;
ntrol dams as to improve
ures that pro
xist in the arand surfacesWater fromand channelle
g plant and sewly rehabilow of water f
ated areas wntain dirty r
y will be couring will bemore controle intended to
se are tempt stage of reehabilitationing of minorsoil conserve years of ac
NT CONTROLmonitoring ring is discus
RTING PERIOd the Water onditions. Erped in consu
od MCC will WMP.
IMITED
eport
TROL
D ment control ulting in sedig strategies:
duced by chments;
at the basee quality of d
omote stable
rea of minins that drain m undisturbeed into adjac
stockpile arelitated areasfrom catchm
will contain dunoff on the
onstructed te rock‐lined led manner.o be perman
porary pastuhabilitation.n strategy wr banks will vation princiccumulated s
L MONITORIis conductessed in Secti
OD Managemenrosion and seltation with
continue to
at MCC is toimentation o
undisturbed
e of rehabildischarged w
e landforms.
g, associatedtowards Saned catchmecent waterco
ea is collectes contain divment areas a
diversion bae mine site. T
to fall by upor stabilised. Major gradnent feature
ure furrows Pasture furrill result in abe based onples. Adequsediment.
NG ed as part oon 3.6.2.
nt Plan (WMediment conDPI‐Water t
manage and
o prevent theof watercour
catchment
itated emplwater; and
d with Muscndy Creek. Hoents is diverourses.
ed in a dam version banknd to contai
nks to contrThere shall b
p to 1.0%. Bd to reduce wded banks ws after minin
which are urows are nota well vegetan the actual ate storage
of the surfac
MP) will be retrol will be io the satisfa
d monitor e
e erosion of rses. This is
ts from di
lacement ar
le and Sandyowever, somrted around
and re‐usedks (major ann dirty runo
rol the flow be two types
Banks that hwater runoffwill be maintang and reha
used to assist required inated slope wrequiremenwill be prov
ce water mo
eviewed and ncorporatedaction of MSC
rosion and s
41
soil from achieved
irty and
reas and
y Creeks. me of the d mining
for dust nd minor ff on the
of water of banks
have the f velocity ained for bilitation
st in site the long
which will ts of the vided for
onitoring
updated d into the C.
sediment
2016 An
3.6 S
3.6.1 There wduring tFinal Setsedimen The surfin Figure
Site
No 1 Vo
No 2 Vo
Dam 1/2
MCC7 – Upstrea
MCC8 – Downstr
MCC9 –
MCC12 –
MCC23 –Dam Sou
MCC24 –Dam
MCC25 –Dam No
MCC26 –
MCC27 –
ComprepH, EC, TNitrate, Hg, Se, T
Annual aQuarter
3.6.2 The surfgraphicamonitor
MUSWELL
nnual Environ
URFACE W
ACTIVITIES Twere no signthe reportingttling Dams nt control we
face water me 2.
id
id
2
Muscle Creem
Muscle Creeream
Brickworks
– Final Settli
– E. Emplaceuth
– East Haul R
– E. Emplaceorth
– Blues Crus
– Dam 3
hensive anaTSS, HardnesOil and greaTPH, PAH
analysis is unly analysis is
SURFACE Wface water pally in Figurring results a
LBROOK COAL
nmental Man
WATER MA
THIS REPORTificant changg period. Mand the CHPere cleaned o
monitoring p
Table
M
M
A
M
A
M
A
ek M
A
ek M
A
Dam Q
A
ng Dam M
A
ement Q
A
Road Q
A
ement Q
A
her Dam Q
A
Q
A
lysis monitorss, Ca, Mg, Nase, Ammoni
ndertaken in undertaken
WATER MONIH, Electrical re 15 – Figre provided
L COMPANY L
nagement Re
NAGEMEN
TING PERIODges made to
Minor improvPP access roout as requir
rogram is sh
e 26: Surface
Monitoring F
Monthly
Annually
Monthly
Annually
Monthly
Annually
Monthly
Annually
Monthly
Annually
Quarterly
Annually
Monthly
Annually
Quarterly
Annually
Quarterly
Annually
Quarterly
Annually
Quarterly
Annually
Quarterly
Annually
rs for the folNa, K, Sulfatea, Dissolved
March each in June, Sep
TORING Conductivitygure 20. Thein Appendix
IMITED
eport
NT
D o the surfacvements weroad to redirered.
hown in Tabl
e Water Mo
Frequency
lowing: e, Chloride, F Fe, Total Fe
h year ptember and
y (EC) and Toe data and x 2.
e water manre made to sect water int
e 26. The lo
nitoring Pro
Analy
pH, E
Comp
pH, E
Comp
pH, E
Comp
pH, E
Comp
pH, E
Comp
pH, E
Comp
pH, E
Comp
pH, E
Comp
pH, E
Comp
pH, E
Comp
pH, E
Comp
pH, E
Comp
louride, Carb, Mn, As, Ba,
d December e
otal Suspendthe annua
nagement osome drainao the site da
ocations of th
gram
ysis
C, TSS
prehensive
C, TSS
prehensive
C, TSS
prehensive
C, TSS
prehensive
C, TSS
prehensive
C, TSS
prehensive
C, TSS
prehensive
C, TSS
prehensive
C, TSS
prehensive
C, TSS
prehensive
C, TSS
prehensive
C, TSS
prehensive
bonate, Bica, B, Cd, Cr, Cu
each year
ed Solids (TSl comprehe
or monitoringage areas aroams. Dams
hese sites ar
rbonate, u, Ni, Pb, Zn,
SS) results arnsive surfac
42
g system ound the used for
re shown
,
re shown ce water
MS
No
No
MS
No
No
2016 An
pH The pH pH levelreportinbackgro
Location
Dam 1/2
MCC12 Final ettling Pond
o.2 Open CuVoid
o.1 Open CuVoid
MCC07
MCC08
MCC9
MCC23
MCC24
MCC25
MCC26
MCC27
ElectricaTypicallysurrounenvironminfluenc As showpreviouspredictio
Location
Dam 1/2
MCC12 Final ettling Pond
o.2 Open CuVoid
o.1 Open CuVoid
MCC07
MCC08
MUSWELL
nnual Environ
levels at surls of 6.5 – 9ng period arund results o
2010‐20
7.6
8.1
t 7.6
t 7.7
not sample
not sample
8.0
8.9
8.6
8.0
8.4
8.5
al Conductiviy, EC levelsding watercment from Eced by rainfa
wn in Table s reporting ons to comp
2010‐20
5,818
6,760
t 5,285
t 4,365
not sample
not sample
LBROOK COAL
nmental Man
face water m.5 throughoue consistentor Environm
Table 27: C
11 2011‐2
7.6
8.1
7.6
7.7
d no
samp
d no
samp
8.1
8.2
8.4
7.9
8.3
8.3
ity (EC) for mine wcourses. As EC levels in ll with highe
28 the resuperiods. Tare these re
Table 28:
11 2011‐2
5,81
6,76
5,28
4,36
d no
samp
d no
samp
L COMPANY L
nagement Re
monitoring sut the report with the rental Assess
Comparison
2012 2012
6 7
1 8
6 7
7 7
t pled
7
t pled
7
1 8
2 8
4 8
9 no r
3 8
3 8
water are gmine watemine waterr levels durin
lts from thisThere are sults to.
Comparison
Electrical
2012 2012
18 5,
60 8,
85 5,
65 5,
t pled
2,
t pled
2,
IMITED
eport
sites were gerting period.results fromment predic
of pH Resul
pH Ann
2‐2013 20
7.8
8.1
7.9
7.8
7.8
7.9
8.3
8.8
8.3
results
8.4
8.3
greater thanr is not discr dams. Theng dry period
s reporting no backgro
n of EC Resul
l Conductivit
2‐2013 20
,886
,836
,941
,030
,064
,800
enerally with As shown previous re
ctions to com
lts to Histori
nual Average
013‐2014
7.8
8.3
8.0
7.7
7.8
7.8
8.6
8.6
8.2
7.5
8.7
8.2
n 4,000μS/ccharged off e EC levels ids and lower
period are cund results
ts to Histori
ty Annual Av
013‐2014
5,975
8,359
6,267
5,533
2,843
3,672
hin the recomin Table 27 eporting permpare these r
cal Results
e
2014
7.7
8.3
8.1
no results
7.8
7.9
8.7
9.3
8.0
no results
8.9
8.4
cm, with lowsite there in surroundinr levels durin
consistent wor Environ
cal Results
verage (µS/c
2014
6,133
8,530
6,465
no results
4,780
5,207
mmended ecthe results friods. Thereresults to.
2015
7.7
8.3
7.9
no results
7.9
7.9
8.7
9.2
7.7
7.6
8.3
8.0
wer levels fis no impacng watercoung wet perio
with the resunmental Ass
cm)
2015
6,337
7,523
6,526
no results
2,887
3,185
43
cosystem from this e are no
2016
7.9
8.4
8.0
no resul
8.0
7.9
8.4
8.8
7.8
7.8
8.4
8.2
found in t on the urses are ds.
ults from sessment
2016
6,511
7,514
6,683
no resu
2,594
3,338
lts
lt
MS
No
No
2016 An
Location
MCC9
MCC23
MCC24
MCC25
MCC26
MCC27
Total SuTSS resuthis watwater daduring wfound du As showpreviousthat wassince Mcompare
Location
Dam 1/2
MCC12 Final ettling Pond
o.2 Open CuVoid
o.1 Open CuVoid
MCC07
MCC08
MCC9
MCC23
MCC24
MCC25
MCC26
MCC27
3.6.3 During tto reflecWater to MCC wil
MUSWELL
nnual Environ
2010‐20
8,186
8,192
6,710
3,703
5,524
8,950
uspended Solults in site dater is not disams. The TSwet periods wuring “norm
wn in Table s reporting ps collected iarch 2016. e these resu
2010‐20
16
19
t 21
t 86
not sample
not sample
14
34
14
8
41
26
ACTIVITIES Nthe next repoct the reviseo the satisfac
ll continue to
LBROOK COAL
nmental Man
11 2011‐2
4,83
2,76
3,47
1,83
5,64
7,76
ids (TSS) ams can be ischarged off SS levels in suwhere thereal” condition
29 the resuperiods, withn March 201There are nlts to.
Table 29: C
11 2011‐2
16
19
21
86
d no
samp
d no
samp
21
7
9
7
13
31
NEXT REPORorting perioded consent cction of MSC
o manage an
L COMPANY L
nagement Re
Electrical
2012 2012
33 4,
60 3,
75 5,
37 no r
43 6,
63 10
influenced bsite there isurrounding we is runoff orns.
lts from thish the except16 when theno backgrou
Comparison
Total Sus
2012 2012
6
9
1
6
t pled
t pled
1
2
no r
3
1
RTING PERIOd the Water conditions. C.
nd monitor su
IMITED
eport
l Conductivit
2‐2013 20
,718
,110
,278
results
,300
0,175
by water movs no impact watercourser during dry w
s reporting tion of MCC9e water levelund results o
of TSS Resu
spended Sol
2‐2013 20
13
18
18
16
14
12
10
15
21
results
16
13
OD ManagemenThe WMP w
urface water
ty Annual Av
013‐2014
4,043
1,953
3,933
1,740
4,868
9,588
vements andon the envirs are influenwhen water
period are c9. The resull in the damor Environm
lts to Histor
ids Annual A
013‐2014
14
22
20
13
16
13
11
20
13
13
15
14
nt Plan (WMwill be deve
r impacts in
verage (µS/c
2014
3,900
2,080
3,840
no results
6,615
9,405
d runoff stirrronment fronced by rainflevels are lo
consistent wt at MCC9 wwas dry. Thental Assess
ical Results
Average (mg/
2014
7
16
12
no results
11
10
4
18
14
no results
42
31
MP) will be reeloped in co
accordance w
cm)
2015
4,985
1,950
3,940
1,533
4,133
8,273
ring up sedimm TSS levelsfall with highow. Lower le
with the resuwas from onehis site has sment predi
g/L)
2015
11
18
12
no results
8
8
33
7
7
5
5
9
eviewed and onsultation w
with the WM
44
2016
12,400
1,970
2,740
3,413
4,660
8,623
ment. As s in mine her levels evels are
ults from e sample been dry ctions to
2016
9
31
9
no resul
8
7
608
22
11
9
7
15
updated with DPI‐
MP.
0
lts
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figuure 15: Monthly SSurface Water Moonitoring Results – pH
4
45
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 116: Monthly Surfaace Water Resultss – Electrical Condductivity
4
46
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 17: Monthly Surfaace Water Resultss – Total Suspended Solids
4
47
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 18: Quarrterly Surface Waater Results – pH
4
48
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 19: Quaarterly Surface WWater Monitoring Results – Electrical Conductivity
4
49
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 20: Quaarterly Surface Waater Monitoring RResults – Total Suuspended Solids
5
50
2016 An
3.7 G
3.7.1 There wduring t The grouin Figure
Site
RDH607
RDH616
RDH617
RDH624
RDH650
MCC100
MCC100
MCC100
MCC101
MCC101
MCC101
ComprepH, EC, TNitrate, Hg, Se, T
Annual a
Water groundwbetweendemonsBased ogroundw
3.7.2 Ground
The watand Figu24. Thereportinchangesannual c
MUSWELL
nnual Environ
GROUNDW
ACTIVITIES Twere no signhe reporting
undwater me 2.
7/RDH529
6
7
4
0
03
05
06
15
17
18
hensive anaTSS, HardnesOil and greaTPH, PAH
analysis is un
Licence 20Bwater from en alluvial latrates that tn this informwater from e
GROUNDWAWater Moni
ter level, pH ure 23. The wese results sng period. Ths are consistcomprehensi
LBROOK COAL
nmental Man
WATER MAN
THIS REPORTnificant chang period.
onitoring pr
Tabl
M
M
A
M
M
M
M
M
A
M
A
M
A
M
A
M
M
lysis monitorss, Ca, Mg, Nase, Ammoni
ndertaken in
BL169014 hentering the nds and thehere has bee
mation there entering the
ATER MONITitoring Resul
and Electricwater levels show there here was a stent with hiive groundw
L COMPANY L
nagement Re
NAGEMEN
TING PERIODnges made t
ogram is sho
le 30: Groun
Monitoring F
Monthly
Annually
Monthly
Monthly
Monthly
Monthly
Monthly
Annually
Monthly
Annually
Monthly
Annually
Monthly
Annually
Monthly
Monthly
rs for the folNa, K, Sulfatea, Dissolved
March each
has a requimine workine mining open no impacthas been nomine workin
TORING ts – Mining O
cal Conductivin groundwahas been mlight changestorical chan
water monito
IMITED
eport
NT
D o the groun
own in Table
ndwater Mon
Frequency
lowing: e, Chloride, F Fe, Total Fe
h year
rement to ngs. As showperations. Mt on alluvial o requiremenngs.
Operations
vity of the uater monitor
minimal flucte in the watenges in the oring results a
ndwater man
e 30. The lo
nitoring Prog
Analy
Dept
Comp
Dept
Dept
Dept
Dept
Dept
Comp
Dept
Comp
Dept
Comp
Dept
Comp
Dept
Dept
louride, Carb, Mn, As, Ba,
implement wn in Figure Monitoring dgroundwatent to implem
nderground ring wells locuation in waer levels in thundergrounare provided
nagement o
ocations of th
gram
ysis
h, pH, EC
prehensive
h
h
h
h
h, pH, EC
prehensive
h, pH, EC
prehensive
h, pH, EC
prehensive
h, pH, EC
prehensive
h
h
bonate, Bica, B, Cd, Cr, Cu
measures 21 there is adata presenter from MCC’ment measure
working arecated on siteater levels ohe underground workings.d in Appendix
r monitoring
hese sites ar
rbonate, u, Ni, Pb, Zn,
to preventa significant ted in Secti’s mining opes to preven
e shown in Fe are shown or quality duund working. The data x 2.
51
g system
re shown
,
t alluvial distance on 3.7.2 erations. nt alluvial
Figure 22 in Figure uring the gs. These and the
2016 An
As showpreviouswater leEnvironm
Ground
The alluopen cuare presmonitor As showfrom prpredictio
Location
MCC1003
MCC1005
MCC1006
MCC1015
MCC1017
MCC1018
Location
MCC1003
MCC1005
MCC1006
MCC1015
Location
MCC1003
MCC1005
MCC1006
MCC1015
MUSWELL
nnual Environ
wn in Table 3s reporting pevels are gemental Asses
Year
2016
2015
2014
2013‐201
2012‐201
Water Moni
vial and hardut footprint asented in Firing results a
wn in Table 3evious repoons to comp
2010‐20
3.2
7.2
5.6
3.6
17.3
17.5
2010‐20
7.4
7.4
7.3
7.3
2010‐20
1,434
2,635
1,095
2,417
LBROOK COAL
nmental Man
31 the pH reperiods. Eleenerally consssment pred
Table 31:
14
13
itoring Resul
d rock aquifeand no impaigure 25 – Fre provided
2 – Table 34rting periodare these re
Table 32
11 2011‐2
2.5
6.7
4.4
3.6
17.
17.
Table 33: C
11 2011‐2
7.3
7.4
7.3
7.1
Table 34:
11 2011‐2
1,41
1,57
933
2,53
L COMPANY L
nagement Re
sults from thectrical Condsistent with dictions to co
Comparison
Average pH
7.5
7.3
7.3
7.1
7.6
ts – Sandy Cr
ers in the Sacts have beeFigure 27. in Appendix
4 the results fs. There arsults to.
2: Compariso
2012 2012
5 3
7 7
4 5
6 3
0 1
0 1
Comparison
2012 2012
3 7
4 7
3 7
1 7
Comparison
Electrical
2012 2012
10 1,
79 1,
3 1,
31 2,
IMITED
eport
his reportingductivity is sprevious re
ompare these
n of Undergr
Ave(μ
Creek Area
ndy Creek aren determinThe data anx 2.
from this repre no backg
on of Depth
Depth Annu
2‐2013 20
3.8
7.3
5.7
3.8
17.0
16.6
of pH Resul
pH Ann
2‐2013 20
7.2
7.1
7.1
7.1
n of EC Resul
l Conductivit
2‐2013 20
,359
,947
,087
,169
g period are slightly higheesults. There results to.
round Worki
erage EC μS/cm)
6,482
6,196
5,525
5,078
5,711
rea are a siged. Ground nd the annu
porting perioround result
to Historica
ual Average (
013‐2014
4.5
7.8
6.5
3.6
17.1
16.7
lts to Histori
nual Average
013‐2014
7.3
7.2
7.2
7.1
ts to Histori
ty Annual Av
013‐2014
1,480
2,544
1,117
2,452
consistent wer than preve are no ba
ng Results
Relativ(AHD
11
12
nificant laterwater depthual compreh
od are consists or Environ
l Results
(mbgl)
2014
5.8
8.3
no result
3.7
16.8
16.8
cal Results
e
2014
7.2
7.2
no result
7.1
cal Results
verage (µS/c
2014
1,701
2,697
no result
2,402
with the resuvious resultsackground r
ve Level (RL) D metres)
114
114
116
15‐117
23‐146
ral distance hs and qualithensive grou
stent with thnmental Ass
2015
3.6
7.9
no result
3.7
17.1
17.3
2015
7.2
7.1
no result
7.2
cm)
2015
1,345
2,768
no result
2,659
52
ults from and the esults or
from the ty results undwater
he results sessment
2016
3.9
7.5
5.6
3.8
17.1
17.6
2016
7.1
7.2
7.2
7.2
2016
1,471
2,170
982
2,100
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 21: Location of AAlluvial Land Compared to Mine WWorkings
5
53
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 22: Waterr Level for Undergground Workingss
5
54
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figgure 23: Water Quuality Data in Undderground Workiings
5
55
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 24: Water Leveel for Groundwatter Monitoring onn Site
5
56
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 25: Sandy Creek Groundwater Depth
5
57
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 26: Saandy Creek Waterr Quality – pH
5
58
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figuree 27: Sandy Creekk Water Quality –– Electrical Conduuctivity
5
59
2016 An
Trigger lgroundwgreater period. that is dElectricamonitorbaselinepH. Thelevels folevels du
Bore/
MCC
MCC
MCC
MCC
MCC
MCC
Bore/
MCC
MCC
MCC
MCC
Bore/
MCC
MCC
MCC
MCC
A sectio28. To apressuripresenteSandy Cconnect
MUSWELL
nnual Environ
levels have bwater level tthan 5% froIn addition, deeper thanal Conductivring sites to e minimum ae trigger levor 3 continuouring the rep
T
/Well
1003
1005
1006
1015
1017 H
1018 H
/Well
1003
1005
1006
1015
/Well
1003
1005
1006
1015
nal plan depassist in detesation in thed in Figurereek area duion between
LBROOK COAL
nmental Man
been establitrigger will bom the histoto initiate th the naturalvity (EC) andmonitor watand maximuels are initiaous monthly porting perio
Table 35: San
Aquifer
Alluvial
Alluvial
Alluvial
Alluvial
Hardrock
Hardrock
Aquifer
Alluvial
Alluvial
Alluvial
Alluvial
Aquifer
Alluvial
Alluvial
Alluvial
Alluvial
picting the loermining if ahe ground we 29. The trauring the repn the alluvial
L COMPANY L
nagement Re
shed for selbe initiated orical minimuhe trigger, thl variability d pH are thter quality. Tum EC and ±ated if monitresults. Tab
od.
ndy Creek Gr
WA
Lower Trigger Lev
(m)TOC
2.17
6.27
4.00
3.27
14.71
14.10
Lower Trigger p
6.3
5.9
6.2
6.3
ELECTRICA
Lower Trigger E
876
1,513
765
1,494
ocation of theany reversal water is occuansect graphporting perio and hard ro
IMITED
eport
ected sites wif the grounum and maxhe reductionmeasured ae main specThe trigger le±0.5pH units tored conditble 35 shows
roundwater
ATER LEVELS
vel C
LowTrig
Excee20
N
N
N
N
N
N
pH
H
LowTrig
Excee20
N
N
N
N
AL CONDUCT
EC
LowTrig
Excee20
N
N
N
N
e monitoringin ground wurring, a cath clearly indod. Based onock aquifers.
with the trigndwater leveximum stand in water levcross all mocies regularlevels are setfrom the btions are ou that there w
Monitoring
wer gger eded in 016
Tr
No
No
No
No
No
No
wer gger eded in 016
T
No
No
No
No
TIVITY
wer gger eded in 016
T
No
No
No
No
g sites in Sanwater gradientenary transicates no sign the monito
gger levels shel in a piezoding water level will also onitoring borly analysed t at a variatioaseline minitside the upwas no excee
Trigger Leve
Upper igger Level (m)TOC
8.34
11.46
10.14
13.97
18.53
19.69
Upper Trigger pH
8.8
8.3
8.1
8.1
Upper Trigger EC
2,461
7,533
1,610
3,726
ndy Creek arent or other csect has beegn of a draworing data the
hown in Tabometer fluctevel over a need to be ares for eachat the grouon of >15% imum and mpper or loweedance of th
els
Upper Trigger
Exceeded2016
No
No
No
No
No
No
Upper Trigger
Exceeded2016
No
No
No
No
Upper Trigger
Exceeded2016
No
No
No
No
ea is shown consequenceen developew‐down effeere appears
60
ble 35. A uates by 3 month at a level h aquifer. undwater from the maximum er trigger he trigger
r d in
r d in
r d in
in Figure es to de‐ed and is ct in the to be no
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 28: SSandy Creek Grouundwater Monitooring Network, Seectional Plan
6
61
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 29: Sandy Creek Groundwater Level Catenary Traansect
6
62
2016 An
3.7.1 During tto reflecWater to MCC wil
3.8 CMCC havtested. dumped
3.9 F
3.9.1 During twith the The obje
Iden
Outl
Esta
Detaenco
Deta
Defi
Deta
Defi No treeremnant
3.9.2 Inspectioduring t
Suga
Bat
Bruswere
3.9.3 During taccordaconditioincluded
MUSWELL
nnual Environ
ACTIVITIES Nthe next repoct the reviseo the satisfac
ll continue to
ONTAMINve a BioremWhen the ted in the minin
LORA AND
ACTIVITIES Tthe reportine Flora and F
ectives of the
ntify any stra
line the strat
ablish metho
ail the proceountered;
ail how micro
ne the post‐
ail how the p
ne the meas
e clearing wt vegetation
FLORA ANDons of nestihe reporting
ar Glider (2)
(4) – not occ
shtail Possume observed.
ACTIVITIES Nthe next rence with thons there is d in the MOP
LBROOK COAL
nmental Man
NEXT REPORorting perioded consent cction of MSC
o manage an
NATED LANediation Areest results inng areas.
D FAUNA M
THIS REPORTg period MCauna Manag
e approved F
ategic habitat
tegic mitigat
ds to manag
ess to be ad
o habitats w
‐mining lands
post‐mining f
sures to prot
as undertak.
FAUNA MOng boxes arg period are s
– not occupi
cupied and n
m (2) – one
NEXT REPORporting perihe Mining Ono longer a
P.
L COMPANY L
nagement Re
RTING PERIOd the Water conditions. C.
nd monitor g
ND ea where mandicate that t
MANAGEM
TING PERIODCC continuedgement Plan
FFMP are to:
t areas on sit
tion measure
ge remnant v
opted if any
ill be recreat
scape;
flora will be
tect, monitor
ken during t
ONITORINGe performedshown below
ied and no si
o signs of ac
box was occ
RTING PERIOiod MCC wiOperations Pa requireme
IMITED
eport
OD ManagemenThe WMP w
roundwater
aterial contathe material
MENT
D d to manage(FFMP).
:
te;
es to be adop
vegetation;
y threatened
ted;
established;
r and mainta
the reportin
d every 6 mw.
igns of sugar
ctivity were o
cupied in Oc
OD ill continue Plan (MOP).ent for a FF
nt Plan (WMwill be deve
impacts in a
aminated wit is no longer
e impacts o
pted in the F
d flora or fau
and
ain rehabilita
g period an
onths. Resul
r glider activ
observed.
tober, other
to manage In accordFMP, with a
MP) will be reeloped in co
accordance w
th hydrocarbr contaminat
n flora and
FMP;
una not iden
ation areas;
nd there wa
lts of the ins
ity were obs
rwise no sign
impacts ondance with tll relevant m
eviewed and onsultation w
with the WM
bons is manated it is remo
fauna in acc
ntified in the
s no disturb
spections co
served.
ns of possum
n flora and the revised management
63
updated with DPI‐
MP.
aged and oved and
cordance
e EIS are
bance to
ompleted
m activity
fauna in consent t actions
2016 An
3.10 W
3.10.1 During tthe Land The LMPand conAuthorit Weed co
Prom
Min
Spra
Phys During tremovin A slashinduring tRhodes was mospecies slashing MCC weimplemeAssociat
3.10.2 During taccordaconditioincluded Weed an
3.11 B
3.11.1 There wreportin
MembeService Muswel The interequiremground v
MUSWELL
nnual Environ
WEEDS AND
ACTIVITIES Tthe reportingd Manageme
P contains antrolled as ty, using a co
ontrol and er
motion of vig
imisation of
aying with se
sical remova
the reportingng the weed
ng program the reportingGrass and tonitored in Spin the area program.
ere involvedented in ction.
ACTIVITIES Nthe next repnce with thons there is d in the MOP
nd feral anim
BLASTING
ACTIVITIES Twere no signing period.
rs of the puLine where tlbrook Shire
ent of best ments for eavibration, fu
LBROOK COAL
nmental Man
D FERAL AN
THIS REPORTg period MCent Plan (LM
section on per the reqombination o
radication te
gorous pastu
area availab
elective herb
al by chipping
g period MCsource prior
to reduce thg period. Ao encourage pring 2016 anoted. On
d in a dog onjunction
NEXT REPORporting periohe Mining Ono longer
P.
mal control w
THIS REPORTficant chang
blic are notithey hear a r Council We
practice goaach blast. Thmes and odo
L COMPANY L
nagement Re
NIMALS
TING PERIODCC continuedP).
weed controquirements oof control str
echniques us
ure growth to
ble for weed
icides; and
g/slashing.
CC undertook to the sprea
he amount oApproximatethe understoas part of thengoing monit
baiting progwith surro
RTING PERIOod MCC will Operations Pa requireme
will continue
TING PERIODges made to
fied of proprecorded mebsite.
als in drill ane use of besours from bla
IMITED
eport
D d to manage
ol, and speciof Local Lanrategies.
sed at MCC in
o out‐compe
infestation,
k weed contading of the
of Rhodes Gly 202ha of orey speciese Rehabilitattoring will c
gram duringunding land
OD continue toPlan (MOP).ent for a LM
to be under
D the blast m
posed blastinessage or by
nd blast actst practice teasting activit
weeds and
ifies that all nd Services
nclude:
ete weeds;
through pro
trol on the totopsoil on th
rass on rehaarea was sl
s to out comption Monitorcontinue to
g the reportdowners th
o manage w In accordMP, with al
taken during
anagement
ng times by looking at th
tivities is to echniques wties.
feral animal
noxious weeand the Up
mpt reveget
opsoil stockphe rehabilitat
abilitation arlashed to repete the Rhoring programassess the e
ting period. rough the
eed and ferdance with tl relevant m
g the next re
or monitorin
contacting the “Blasting
comply withwill reduce ai
s in accorda
eds will be mpper Hunte
tation of bar
piles with thtion areas.
reas was uneduce the voodes Grass. Tm with an inceffectivenes
This progHebden W
ral animal imthe revised management
eporting peri
ng system du
he Blast InfoNotices” pag
h the fragmr blast overp
64
nce with
managed r Weeds
e areas;
he aim of
dertaken olume of This area crease in ss of this
ram was Wild Dog
mpacts in consent t actions
od.
uring the
ormation ge of the
mentation pressure,
2016 An
Best pra
A hiachi
Use
Corr
Regumay
Load
Prop
Effeexpl
Minexpl
Takethe
Vide
Vibr
3.11.2 All blastin accord The blas
Ov
The blas
Blast Mo
B1 (Quee
B2 (Scho
B3 (99 Q
B4 (Nisbe
During toperatioperiod. There w A summmonitor
MUSWELL
nnual Environ
actice drill an
gh degree oeved using A
of water wh
rect selection
ular inspectiy create a pat
ding of the e
per placeme
ctive placemlosive produ
imise the slelosive mater
e into accoublast and, if
eo recording
ration and ov
BLAST MONs are monitodance with t
sting criteria
Vibration (m
5
10
verpressure
115
120
st monitoring
onitor
en St)
ol)
Queen St)
et)
the reportinonal through
was no exceed
mary of blasrs is shown in
LBROOK COAL
nmental Man
nd blast activ
of accuracy iAutomatic Po
hen drilling to
n of bulk pro
ons of grouth for the pr
explosive mat
nt of decking
ment of gooct;
eep time of ial;
nt any advepossible, def
of blasts as
verpressure
NITORING ored by four the relevant
that apply to
mm/s)
(dB(L))
g network is
Location
In the vic
At the M
At the no
Sandy Cr
ng period, 1hout the rep
dance of crit
t monitoringn Appendix 3
L COMPANY L
nagement Re
vities at MCC
n the placemositioning Sy
o reduce dus
oduct in wet
nd and hole remature rele
terial so that
g charges if r
od quality st
the blast pa
rse meteorofer or modify
a tool to com
monitoring f
automaticalstandards an
o MCC are sh
Table
5% o
5% o
provided in
Table 37: Bl
cinity of the n
uswellbrook
orthern end o
eek Road, ap
105 blast evporting peri
teria during t
g results is 3.
IMITED
eport
C include:
ment of drillystem (APS) o
st;
blast holes t
conditions tease of gase
t holes are n
required;
temming to
attern to min
ological condy the blast to
mpare actua
for all blastin
lly triggered nd calibrated
hown in Tab
e 36: Blast Cr
Al
of total numb
Al
of total numb
Table 37 an
ast Monitor
nearest non‐
k Public Scho
of Queen Str
pproximately
vents occurriod, with 10
the reporting
displayed in
l holes so thor other surv
to prevent fu
to identify aeous product
ot loaded in
design colu
nimise the p
ditions that mo accommod
l blast result
ng activities o
blast monitod annually.
le 36.
riteria
llowable Exc
ber of blasts
0%
llowable Exc
ber of blasts
0%
d locations a
ring Network
‐company ow
ol, Roger Str
reet, North M
y 1.2km to th
red at MCC.00% of data
g period.
n Figure 30
hat design spvey control;
ume;
any geologicas from explo
excess of th
umn height
potential for
may be prevdate those co
s with predic
on site.
ors. The mon
ceedance
over a 12 mo
ceedance
over a 12 mo
are displayed
k
wned residen
reet, North M
Muswellbroo
he north of M
. All four b captured d
to Figure 3
pacing and b
al abnormalosive materia
he design;
for contain
deterioratio
vailing at theonditions;
cted outcom
nitors are ma
onth period
onth period
d in Figure 2.
nce
Muswellbroo
ok
MCC
blast monitoduring the r
33. Blast dat
65
burden is
ities that al;
nment of
on of the
e time of
mes; and
aintained
.
ok
ors were reporting
ta for all
2016 An
During tfrom th114dB(Lduring t
3.11.1 During treflect tDRE to t During taccorda
3.12 N
3.12.1 There wreportin The maoperatioachieve
Outl
Mai
Idencom
Defi
Deta
Detaexce
DetaInve
Spec
MUSWELL
nnual Environ
the preparathe mining oL) and the mhis reporting
ACTIVITIES Nthe next repohe revised cthe satisfacti
the next repnce with the
NOISE MAN
ACTIVITIES Twere no signing period.
in objectiveons on the ethis objectiv
line the mea
ntain a noise
ntify the rismpliance;
ne the mech
ail the Comp
ail the manaeed the crite
ail the specestigations; a
cify the regu
LBROOK COAL
nmental Man
tion of enviroperation wemaximum vibg period wer
NEXT REPORorting periodonsent condon of MSC.
porting perioe BMP.
NAGEMENT
THIS REPORTficant chang
e of the NMnvironment ve:
asures to be
e monitoring
sk levels at
hanisms for c
plaint Handlin
gement mearion;
ifications anand
latory repor
L COMPANY L
nagement Re
ronmental aere calculatebration level e below pred
RTING PERIOd the Blast Mditions. The
od MCC wil
T
TING PERIODges made to
MP is to maand nearby
undertaken
g program;
which min
community c
ng Procedure
asures to be
nd procedur
ting requirem
IMITED
eport
ssessments ed. The mwas 2.2mmdicted levels
OD ManagementBMP will be
l continue t
D the noise m
anage and mresidences.
on site to m
ne operation
consultation;
e;
undertaken
res to be us
ments.
predicted omaximum prm/s in North s and are con
t Plan (BMP) e developed
to manage a
anagement
minimise the The followi
itigate noise
ns may nee
;
where the n
sed for the
verpressure edicted oveMuswellbronsistent with
will be reviein consultati
and monitor
or monitorin
e impact ofng actions w
emissions;
ed to be m
noise levels a
purpose of
and vibratioerpressure leook. The blash previous re
ewed and upion with the
r blasting im
ng system du
f noise fromwill be under
modified to
are demonst
f Independe
66
on levels evel was st results sults.
pdated to EPA and
mpacts in
uring the
m mining rtaken to
manage
trated to
nt Noise
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 30: Queeen Street Blast Moonitoring Results
6
67
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 31: Scchool Blast Monittoring Results
6
68
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
FFigure 32: 99 Queeen Street Blast MMonitoring Resultts
6
69
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 33: Nisbet Blast Monittoring Results
7
70
2016 An
3.12.2 The locaattendeattendeNight‐tim“ NSW Australiaspecifiedperiod. Measureas defincalibraticompletlevels, a The actu
The
The
Imp
Prev
Prev Attendenoise levby MCC During operatioreportinnoise limthis surv
The noisprevious
MUSWELL
nnual Environ
NOISE MONations of thed noise survd noise survme periods Industrial Nan Standardd in the NMP
ements werened in AS12on as per mtion of meast each monit
ual noise leve
location of m
elevation of
acts from ot
vailing wind c
vailing meteo
ed noise monvels at the nmining oper
the preparaon were calcng period comits at all mvey are summ
se results dus results.
LBROOK COAL
nmental Man
NITORING e noise monvey locationsvey is conduare monito
Noise Policy”d 1055 “AcoP. Two six‐m
e taken in th259‐1990 “Aanufacturer’surements wtoring site, w
el received a
mining equip
f mining equ
her noise so
conditions; a
orological co
nitoring was nominated nrations.
ation of envculated. Thmplied with onitoring locmarised in Ta
S
uring this re
L COMPANY L
nagement Re
nitoring sitess. Monitorinucted over ared. All nois” (INP) guideoustics, Desconthly atten
hird‐octave bAcoustics –’s instructionwith a Soundwere determ
at individual
pment;
ipment;
urces;
and
onditions.
conducted doise monitor
vironmental hese noise lethe day, evcations durinable 39.
Table 38:
Site
R7
R13
R15
R16
R17
R20
porting perio
IMITED
eport
s are displayng is conducta 24‐hour pese surveys aelines, the cription and nded noise su
bands with aSound Levens and calibrd Level Calibined.
residences m
during May ring location
assessmentevels are shvening and nng the monit
Predicted No
Predic
od were bel
yed in Figureted at these eriod so thaare performPeriodic NoMeasuremeurveys were
an instrumenel Meters”. ration was abrator. The L
may vary as a
and Novembns and deter
ts predictedhown in Tabnight LAeq(15mi
toring period
oise Levels
cted Noise Le
32
38
35
35
33
34
ow predicte
e 2. MCC hsites on a 6t each of thed in accorise Monitorent of Envirundertaken
nt that has TThe instrumlso confirmeLAeq (15‐min
a result of:
ber 2016, tomine the pro
d noise leveble 38. Noi
inute) and alsod. Noise mea
evels (dB)
ed levels and
as a networ6 monthly bahe Day, Everdance with ring programronmental N during the r
Type 1 charament had aed prior to annute) noise
o quantify thoportion con
els from these levels duo the night asurement r
d are consist
71
rk of five asis. Each ning and the EPA
mme and Noise” as reporting
cteristics current nd at the emission
e overall ntributed
e mining uring the LA1(1minute) results of
tent with
2
MUSWE
2016 Annual Envir
Location Sta
DateTim
R7 25/015:
R7 25/020:
R7 25/022:
R13 25/015:
R13 25/020:
R13 25/022:
R15 25/014:
R15 25/019:
R15 25/023:
R17 25/014:
R17 25/019:
R17 25/022:
R20 25/013:
R20 25/018:
R20 25/022:
ELLBROOK COAL CO
ronmental Manag
art e and me
Wind Speed (m/s)
5/16 :25
0.7
5/16 :39
0.0
5/16 :00
0.0
5/16 :55
3.0
5/16 :20
0.0
5/16 :21
0.0
5/16 :45
0.7
5/16 :52
0.0
5/16 :14
0.0
5/16 :19
2.7
5/16 :28
0.0
5/16 :51
1.1
5/16 :33
2.7
5/16 :04
0.0
5/16 :01
0.0
OMPANY LIMITED
gement Report
VTC 0C/ 100m
Cr
‐2.3
3.5
1.3
‐1.8
2.7
2.7
‐3.2
4.7
4.7
‐2.7
4.7
3.7
‐3.6
0.2
1.3
Table 39
LAeq 15 Minut
iterion (dB)
CriteriApplie
36 Yes
36 No
36 Yes
40 Yes
40 Yes
40 Yes
35 Yes
35 No
35 No
35 Yes
35 No
35 No
38 Yes
38 Yes
38 Yes
: Noise Monitorin
te
ion es?1
MCC LAeq (dB)2
IA
<25
<25
IA
IA
<25
IA
IA
<25
IA
IA
<30
IA
IA
NM
ng Results
Exceedance3
Nil
NA
Nil
Nil
Nil
Nil
Nil
NA
NA
Nil
NA
NA
Nil
Nil
Nil
Criterion (dB)
CriAp
‐‐‐
‐‐‐
44
‐‐‐
‐‐‐
51
‐‐‐
‐‐‐
46
‐‐‐
‐‐‐
46
‐‐‐
‐‐‐
48
LA1 1 Minute
terion plies?1
MCC LAeq (dB)2
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
Yes <25
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
Yes <25
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
No 32
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
No <30
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
Yes NM
7
Exceedance3
‐‐‐
‐‐‐
Nil
‐‐‐
‐‐‐
Nil
‐‐‐
‐‐‐
NA
‐‐‐
‐‐‐
NA
‐‐‐
‐‐‐
Nil
72
3
2
N
MUSWE
2016 Annual Envir
Location Sta
DateTim
R7 22/117:
R7 22/119:
R7 22/122:
R13 22/117:
R13 22/119:
R13 22/122:
R15 22/116:
R15 22/118:
R15 22/123:
R17 22/116:
R17 22/118:
R17 22/123:
R20 22/115:
R20 22/119:
R20 22/123:
Notes: 1. Limits apply
ELLBROOK COAL CO
ronmental Manag
art e and me
Wind Speed (m/s)
1/16:02
2.1
1/16 :42
2.1
1/16 :34
1.8
1/16 :25
2.4
1/16 :20
1.8
1/16 :12
1.3
1/16 :29
1.0
1/16 :01
2.7
1/16 :22
1.8
1/16 :06
1.9
1/16 :28
1.3
1/16 :01
0.3
1/16 :33
1.6
1/16 :03
1.8
1/16 :52
0.7
y for winds up to 3m/s (
OMPANY LIMITED
gement Report
VTC 0C/ 100m
Cr
‐2.5
0.8
2.3
‐4.1
‐1.8
0.8
‐3.3
‐3.5
1.7
‐2.1
‐3.6
2.1
‐2.4
‐2.9
1.8
at a height of 10m abov
LAeq 15 Minut
iterion (dB)
CriteriApplie
36 Yes
36 Yes
36 Yes
40 Yes
40 Yes
40 Yes
35 Yes
35 Yes
35 Yes
35 Yes
35 Yes
35 Yes
38 Yes
38 Yes
38 Yes
ve ground level); or tem
te
ion es?1
MCC LAeq (dB)2
IA
<25
IA
IA
IA
<30
NM
NM
IA
IA
IA
IA
IA
IA
NM
perature inversions of u
Exceedance3
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
up to 30C/100m;
Criterion (dB)
CriAp
‐‐‐
‐‐‐
44
‐‐‐
‐‐‐
51
‐‐‐
‐‐‐
46
‐‐‐
‐‐‐
46
‐‐‐
‐‐‐
48
LA1 1 Minute
terion plies?1
MCC LAeq (dB)2
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
Yes IA
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
Yes <30
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
Yes IA
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
Yes IA
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
Yes NM
7
Exceedance3
‐‐‐
‐‐‐
Nil
‐‐‐
‐‐‐
Nil
‐‐‐
‐‐‐
Nil
‐‐‐
‐‐‐
Nil
‐‐‐
‐‐‐
Nil
73
3
2
3Db D
MUSWE
2016 Annual Envir
2. These are r3. NA means a
3.12.3 ACTIVITIEDuring the next rebe developed in co
During the next re
ELLBROOK COAL CO
ronmental Manag
esults for MCC in the abatmospheric conditions
S NEXT REPORTINeporting period thonsultation with t
eporting period M
OMPANY LIMITED
gement Report
bsence of all other mine outside conditions spec
NG PERIOD he Noise Managethe EPA to the sat
MCC will continue t
sources; and cified in development co
ment Plan (NMP)tisfaction of MSC.
to manage and m
onsent, criterion is not a
will be reviewed.
monitor noise relat
pplicable.
and updated to
ted impacts in acc
reflect the revise
cordance with the
d consent conditi
e NMP.
7
ions. The NMP w
74
will
2016 An
3.13 VDuring tLighting The obje
To p
To p
To m
To o MCC’s ooverbur During tLighting revised c
3.14 AThe obje
IdenMCC
Mitiequi
Conproc
Maicost
Dev MCC haAborigin During tgroups. Commu As part updatingsites.
3.15 EThere arongoing
3.16 S
3.16.1 The maspontan
MUSWELL
nnual Environ
VISUAL, STRthe reportinManagemen
ectives of the
provide suffic
provide lighti
minimise the
outline a pro
operations aden emplace
the next repand Landscconsent con
ABORIGINAectives for m
ntifying any cC operations
gating any cipment so th
sulting withcesses and m
ntaining the ts; and
eloping envi
as successfunal cultural s
the reportingA member nity Consulta
of the ongog them on t
UROPEANre no Europeg manageme
PONTANEO
ACTIVITIES Tin objective
neous combu
LBROOK COAL
nmental Man
RAY LIGHTng period Mnt Plan (LiMP
e LiMP are:
cient lighting
ing that is of
impact of o
cess to addr
are screenedement areas
porting perioaping Manaditions and w
AL HERITAGmanaging arc
cultural heris;
cultural herithat impacts t
h all relevanmanagement
mine’s oper
ronmental p
lly completeite located w
g period, no of the Waative Commi
oing consultthe status of
HERITAGEean Heritagent.
OUS COMB
THIS REPORTe of the SCustion in:
L COMPANY L
nagement Re
T MCC continueP).
g on‐site to f
f an appropri
n‐site lightin
ess light spil
d from direc, and the nat
od lighting imgement Planwill be prepa
GE haeology an
tage issues t
tage risk duto cultural re
nt Aboriginalactions;
rational statu
procedures fo
ed salvage owithin the mi
ground distunaruah Locaittee (CCC).
tation procef the current
E e sites locate
BUSTION
TING PERIODMP is to m
IMITED
eport
ed to manag
facilitate safe
iate standard
ng sources on
lage issues.
ct view of retural topogr
mpacts will n (VALLMP). ared to the s
d cultural he
that arise be
e to the desesources are
l community
us, thus redu
or the manag
operations aine lease bou
urbance opeal Aborigina
ess with Abot mining ope
ed within the
D minimise the
ge lighting i
ety and secu
d and approp
n residents o
esidents or aphy of the s
be included The VALLMatisfaction o
eritage at MC
ecause of the
sign and insminimised;
y representa
ucing any like
gement of h
and continueundary.
rations requl Lands Cou
original grouerations and
e disturbanc
e occurrence
impacts in a
rity to minin
priately direc
or road users
the travellinsurrounding
in the updaMP will be upof MSC.
CC include:
e design and
tallation of
atives on th
ely time dela
eritage sites
es to mainta
ired consultauncil present
ps a letter d manageme
ce boundary
e and mana
accordance
g operations
cted;
s; and
ng public by area.
ated Visual Apdated to re
d constructio
new mine p
he plans, ob
ay risks or im
s at MCC.
ain and pro
ation with Atly sits on t
is sent out ent of archa
at MCC tha
age the effe
75
with the
s;
y existing
Amenity, eflect the
on of the
plant and
bjectives,
mpacts on
tect one
Aboriginal the MCC
annually eological
t require
ect from
2016 An
Exist
Drill
Min
Min
Emp
Emp
Coa As part oidentifie
Examspon
Examdyin
Usin
Mea
Mea MCC hacombust
Coo
Rem
Min
Reteimm
Sealingr
Regular existing these prand comareas. Four spoThe majareas thareas wi
MUSWELL
nnual Environ
ting open cu
ing and blas
ing of overb
ing of coal;
placement of
placement of
l stockpiles.
of preparatioed by:
mining previntaneous co
mining the sng vegetation
ng infra‐red p
asuring bore
asuring surfa
as successftion. Metho
ling the heat
moval of the f
imisation of
ention of 5 mediately req
ing of remaess of oxyge
spontaneouand new incrocedures, emplaints rece
ontaneous cjority of affehat were treithout active
ReM
J
F
M
A
M
J
LBROOK COAL
nmental Man
ut and underg
ting;
urden;
f overburden
f washery rej
on for minin
ous informambustion;
surface for an and increas
photography
hole temper
ace temperat
ul experienods used to m
ted area with
fuel by minin
areas of coa
metres of quired for mi
ining unminn.
us combusticidents of speffectivenesseived. The re
ombustion rected areas weated each me control mea
Table 40
eporting Month A
Jan‐16
Feb‐16
Mar‐16
Apr‐16
May‐16
Jun‐16
L COMPANY L
nagement Re
ground work
n;
ject; and
g of areas af
tion records
any physicalsed surface t
y, where app
ratures for te
tures.
ce in manmanage mini
h water befo
ng the coal;
al exposed to
overburdenining operati
ed undergro
on reports ontaneous cs of actions, port also inc
reports werewere within month are sasures is pro
: Spontaneo
SpontaneouCombustionAreas Cappe
(m2)
8
40
4
20
74
32
IMITED
eport
kings;
ffected by sp
s, accumulate
l effects of temperature
propriate, to
emperature
naging and ng in areas p
ore mining (w
o the air prio
n above woions; and
ound workin
are providecombustion, areas cappecludes a plan
e submitted the open cuhown in Tabovided in Tab
ous Combust
us n ed
SpontCombAreas
(m
1
2
pontaneous c
ed over the
spontaneouse;
show areas
increases; an
controlling prone to spo
water infusio
or to mining;
orkings to e
gs with clay
ed to both mitigation ped, areas min showing th
to DRE and ut and overbble 40. A hble 41.
tion Report S
taneous bustion s Mined m2)
W
12
0
24
4
4
0
combustion,
last ten year
s combustio
of increased
nd
areas pronntaneous co
on);
exclude oxyg
or inert ma
DRE and EPprocedures aned, areas ue extent and
EPA during tburden empistorical com
Summary
Area UndeWater Infusi
(m2)
26,900
26,900
38,500
35,300
32,600
30,100
higher risk a
rs, for occurr
on such as b
temperatur
ne to sponombustion in
gen from a
aterial to pre
PA. Reportsand improveunder waterd location of
the reportingplacement armparison of
er ion
76
areas are
rences of
brown or
re;
ntaneous nclude:
reas not
event the
identify ments to infusion problem
g period. reas. The affected
Jan‐M
Apr‐J
Jul‐S
Oct‐D
YeaAver
2016 An
Note: Areaend of the
Ta
2007
Mar 6,694
Jun 25,54
Sep 37,2
Dec 3,91
rly age
9,970
Note: These
During ton an oDue to active co
3.16.2 During treviewethe satis During accorda
3.17 BManage(BFMP). The obje
To m
Cont
To p
To poutb
There w
MUSWELL
nnual Environ
ReM
A
S
O
N
Ds capped and aremonth. This area
able 41: Sum
7 2008
4 1,726
46 661
1 1,076
8 646
0 1027
e values are the v
the reportingngoing basisthe ongoingontrol decre
ACTIVITIES Nthe next repd and updatsfaction of M
the next rence with the
BUSHFIRE ement of bu
ectives of the
manage activ
tain fuel load
put in place h
put in place break of fire
were no bush
LBROOK COAL
nmental Man
eporting Month A
Jul‐16
Aug‐16
Sep‐16
Oct‐16
Nov‐16
Dec‐16 eas mined are tha may change du
mmary of Spo
Total Are
2009
6 641
187
6 34
70
233
values at the end
g period mins according tg managemeased during
NEXT REPORporting perioted to reflecMSC.
eporting pee SCMP.
shfire risks a
e Bushfire M
vities on site
ds to accepta
hazard mitiga
arrangemenoccur at MC
fire outbrea
L COMPANY L
nagement Re
SpontaneouCombustionAreas Cappe
(m2)
50
0
40
0
4
4 he total of the arring the month.
ontaneous C
ea Affected b
2010
40
85
135
45
76
d of the respectiv
ning of spontto the severient of spontathe reportin
RTING PERIOod the Spont the revised
riod MCC w
are underta
Management
are to minim
able levels to
ation measu
nts to liaise wCC or threate
ks with the d
IMITED
eport
us n ed
SpontCombAreas
(m
2
3
2
reas treated duri
Combustion A
by Spontane
2011
215
95
85
64
115
ve reporting perio
taneous comity of the praneous comng period.
OD ntaneous Cod consent co
will continu
ken in accor
Plan are:
mise the risk
o moderate
res to conta
with and suen MCC’s ope
development
taneous bustion s Mined m2)
W
24
0
36
24
4
4 ng that month.
Affected Are
eous Combus
2012
71
53
45
57
57
od. These areas m
mbustion areroblem and tmbustion on
mbustion Monditions. T
e to manag
rdance with
of outbreak
fire intensity
in an outbre
pport the Ruerations.
t consent are
Area UndeWater Infusi
(m2)
21,600
5,000
5,000
17,900
0
3,500 Area under wate
eas Without
stion (m2)
2013
65
57
149
45
79
may change durin
eas and watethe ability tosite, the aff
anagement he SCMP wil
ge spontane
the Bushfir
of fire;
y;
ak of fire sho
ural Fire Ser
ea during the
er ion
er infusion is the
Active Cont
2014
156
177
119
151
ng the reporting p
er infusion coo access thefected areas
Plan (SCMPll be develop
eous combu
re Managem
ould one occ
rvice (RFS) s
e reporting p
77
e area at the
rol
2015 2
145 2
232 1
190
242
203 1
period.
ontinued se areas. s without
P) will be ped in to
ustion in
ment Plan
cur; and
hould an
period.
2016
248
182
48
56
133
2016 An
3.18 HHydrocafacilitieshandlinghydroca
Abo
Was
Oily bun
Runoil/w
A BioremmanagepotentiaWaste Cwaste itprior to
3.19 MAs no uventilati
3.20 PDuring tFences maintain A securi(Christm
3.21 ONo incid
MUSWELL
nnual Environ
HYDROCARarbon storags. These stog of flammarbon contam
ve ground fu
ste oil from t
water runoded; and
off from thwater separa
mediation M material tally contamiClassificationt is disposeddisposal or i
METHANE Dnderground ion was requ
UBLIC SAFthe reportingsurroundingned.
ity patrol is cmas, shutdow
OTHER ISSUdents of dam
LBROOK COAL
nmental Man
RBON CONTge facilities orage facilitiable and commination incl
uel storage t
the worksho
off from the
e hardstandator. The co
Managementthat is potenated is testn Guidelines on site. If tt is taken off
DRAINAGEmining occu
uired.
FETY g period, pubg the opera
conducted bwns, etc.) wh
UES AND Rage to surfa
L COMPANY L
nagement Re
TAMINATIwere constes comply wmbustible liqude:
anks are self
p is stored in
e re‐fuelling
d wash‐dowllected silt is
Plan has beentially contted with thePart 1: Classthe materialf site for disp
E/VENTILATurred at MC
blic safety wational areas
by a local secen the site is
ISKS ce infrastruc
IMITED
eport
ON tructed as pwith the reuids. Activiti
f‐bunded to
n a bunded w
bay drains
n bay passes routinely cle
een developtaminated we results beisifying Wastl is classifiedposal.
TION CC during the
as managed s and along
curity firm os not manne
cture were re
part of the equirements ies undertak
contain any
waste oil tan
into an abo
es through eaned out.
ped by MCCwith hydrocing comparee (2014). If d as contami
e reporting
in accordancg property b
over weekened.
ecorded duri
workshop, of AS1940
ken on site t
spillage whic
k and is remo
ove ground
a three‐stag
to provide carbons. Aed to the limthe materianated it is e
period, no m
ce with curreboundaries w
ds and othe
ing this repo
stores and – The stor
to reduce th
ch may occu
oved as requ
sump which
ged silt trap
guidance onAny materialmits in the Nl is classifiedeither treate
methane dra
ent MCC prowere inspec
er nominated
orting period
78
blasting rage and he risk of
r;
uired;
h is fully
p and an
n how to l that is NSW EPA d as solid d on site
ainage or
ocedures. cted and
d periods
.
2016 An
4.0 CMCC undiscussio(1800 60
4.1 EMCC opcommuncomplaifindingsContact Develop 94 comprovidedduring t
In compreportinFigure 3
MUSWELL
nnual Environ
COMMUNndertakes cons with com00 205).
NVIRONMperates a tonicate their cnt, take acti. The recorLine is con
pment Conse
plaints wered in Appendhe reporting
parison, theng period co35.
LBROOK COAL
nmental Man
NITY RELATcommunity mmunity me
MENTAL COoll free 24‐hconcerns to ion to reducrding of envnducted in ent Condition
e received ddix 4. Tableg period.
Type of Co
Odo
Bla
Du
Haul
Ligh
Noi
Visu
Oth
Tot
re has beenmpared to p
L COMPANY L
nagement Re
TIONS consultation
embers and o
OMPLAINTShour Environsite personnce impact asvironmental accordance ns.
during the re 42 and Fig
Table 42: S
omplaint
our
st
st
age
ht
se
ual
her
tal
n an increaprevious rep
IMITED
eport
n through operating a t
S nmental Connel. On reces required ancomplaintswith the M
reporting pegure 34 prov
Summary of
Numb
78
3
10
1
0
0
2
0
94
ase in the norting perio
the Commtoll free 24‐h
ntact Line wiving a compnd report ba and the oMCC Environ
eriod. Morevide a summ
Complaints
ber P
number of cds. The com
unity Consuhour Environ
where commplaint, MCC sack to the cooperation ofnmental Pro
e details on mary of the
Percentage
83%
3%
11%
1%
0%
0%
2%
0%
100%
complaints rmplaint histo
ultative Comnmental Con
munity memstaff investigomplainant f the Envirootection Lice
the complacomplaints
received duory chart is s
79
mmittee, ntact Line
bers can gates the with the onmental ence and
aints are received
ring this shown in
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 34: Complaint Suummary
8
80
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figuree 35: Complaint HHistory
8
81
2016 An
4.2 CMCC peand dev Commuorganisa
YMC
Heb
Den
Mus
Scon
Mus
Mus
Scon
Mus
Mar
St Jo In additthis year
4.3 CMCC’s Cthe locarepresenrepresenthat memattersactively operatio8 Marchwas can
MUSWELL
nnual Environ
OMMUNITrsonnel maieloping stro
nity supporations:
CA – Swimat
den Wild Do
man Chamb
swellbrook R
ne Netball Cl
swellbrook R
swellbrook S
ne Bowling C
swellbrook S
rk Hughes Fo
oseph’s High
ion to directr for the End
OMMUNITCommunity Cal communitntatives (incntatives. Theembers of th. CCC meetininvolved in tons through h 2016, 6 Secelled due to
LBROOK COAL
nmental Man
TY LIAISONntain contacng links with
rt througho
hon Event
og Associatio
er of Comme
Rotary – Ende
lub – team u
Race Club – M
hire Council
Club – region
hire Council
oundation
School
t donations deavour Foun
TY CONSUConsultative ty. The CCCcluding one e aim of the he local comngs are genethe review opresentationptember 201o lack of atte
L COMPANY L
nagement Re
N, SPONSOct with nearh the commu
out the rep
on
erce – Uppe
eavour Grou
niform
Melbourne C
– Bottoms U
nal bowls eve
– Fulcrum 3
from the condation.
LTATIVE COCommittee
C is comprisfrom the Wcommittee
mmunity haverally held qof environmens and site v16 and 13 Dendance.
IMITED
eport
ORSHIPS ANby residentsunity.
porting peri
r Hunter Foo
p
Cup Race Day
Up Festival
ent
3D Wind Mod
ompany, MC
OMMITTE(CCC) provided of three
Wanaruah Lois to provideve adequateuarterly at tental monitoisits. During
December 20
ND DONATs and are co
iod included
od and Wine
y
delling Proje
CC employee
E des informatie council repcal Aborigine an effective informationthe MCC offioring data ang the reportin016. The me
TIONS mmitted to
d donations
Affair
ct
es and contr
ion regardingpresentativeal Lands Cove communicn on miningice and comnd are kept ung period meeeting schedu
continually
s to the f
ractors raised
g mine operes, three coouncil) and tcation mechg and enviromittee memup to date oeetings wereuled for 7 Ju
82
fostering
following
d money
ations to mmunity two MCC anism so onmental mbers are n mining e held on une 2016
2016 An
5.0 RDuring tLand Ma The objefauna spand surr During twith theno longe Rehabili
5.1 BNo build
5.2 R
5.2.1 The reha
Shap
In th10cm
Cont
In th100
Prio MCC’s rSkelletaacross thincorporagricultu
5.2.2 The natiarea priospecies
MUSWELL
nnual Environ
REHABILITthe reportinganagement P
ectives of thepecies, implerounding are
the next repe Mining Opeer a requirem
tation is con
BUILDINGS dings were d
REHABILITA
REHABILITAabilitation pr
ping is condu
he areas whm.
tour banks a
he areas whetonnes/ha.
r to seeding,
rehabilitatior Ridge areahe lease areration of natural land suit
SPECIES SELive vegetatioor to miningin the final la
Botanic
Acacia
Acacia
Acacia
Acacia
Acacia
Allocas
Brachy
LBROOK COAL
nmental Man
TATION g period MCPlan (LMP).
e LMP are toement sustaieas.
porting perioerations Planment for a LM
nducted in ac
emolished o
ATION OF D
ATION PROCErocess at MC
ucted in acco
ere trees ar
are construct
ere pasture
, topsoil and
n program as north anda creating a tive vegetatitability of the
LECTION on seed mix g and is baseandform is d
Table 43: Re
cal Name
decora
falcata
implexa
linearifolia
paradoxa
suarina luehm
ychiton popul
L COMPANY L
nagement Re
C continued
o reduce thenable land p
d MCC will cn (MOP). In MP, with all r
ccordance w
r rehabilitate
DISTURBED
ESS CC is:
ordance with
e the final v
ted in accord
is the final v
/or OGM are
aims to lind south of thviable wildlion areas to e site during
used at MCCd on the Cenependent on
ecommende
mannii
lneus
IMITED
eport
d to manage
e impact of mpractices and
continue to accordance relevant man
ith the MOP
ed during th
D LANDS
h the design
vegetation to
dance with th
vegetation O
e incorporat
k existing rhe lease arefe corridor. continue theg the reportin
C (Table 43) ntral Huntern availability
ed Species Li
C
W
S
H
N
K
B
K
land related
mining operad enhance ha
manage lanwith the revnagement ac
.
e reporting p
requirement
opsoil is spre
he Erosion a
OGM is sprea
ed into the u
remnant vega by plantinRehabilitatioe corridor. Tng period.
is based on r Grey Box‐Iry of seed.
st for Native
Common Nam
Western Silve
Sally Wattle
Hickory Watt
Narrow‐leave
Kangaroo Tho
Bulloak
Kurrajong
d impacts in
tions on exisabitat connec
d related imvised consenctions includ
period.
ts outlined in
ead to a dep
nd Sediment
ad at a rate o
underlying so
getation in ng corridors on planning fThere has be
species thatronbark Woo
e Vegetation
me
er Wattle
le
ed Wattle
orn
accordance
sting native fctivity within
mpacts in accnt conditionsed in the MO
n the MOP.
pth of appro
t Control Pla
of approxim
oil.
Bells Mounof native vefor MCC incleen no chang
t were preseodland. Use
n
83
with the
flora and n the site
cordance s there is OP.
oximately
n.
ately 80‐
tain and egetation udes the ge to the
ent in the of these
2016 An
Pasture PerenniaMillet isinoculatapproximestablishfor the Con site e44. Use
MUSWELL
nnual Environ
Botanic
Bursari
Calotis
Cassini
Cheilan
Chloris
Corymb
Cyperu
Desmo
Enchyla
Eremop
Eucalyp
Eucalyp
Eucalyp
Eucalyp
Geijera
Glycine
Gooden
Harden
Indigof
Loman
Loman
Loman
Myopo
Rytidos
Rytidos
Veronc
mixtures usal Rye Lucer added to thted and lime mately 200 hment recomCoal Mining experience aof these spe
Botani
Bromus
Cynodo
Festuca
Lolium
Lolium
Medica
Pennise
Phalari
Setaria
Trifoliu
LBROOK COAL
nmental Man
cal Name
ia spinosa
lappulacea
ia aculeata
nthes sieberi
ventricosa
bia maculata
us gracilis
odium brachy
aena toment
phlia debilis
ptus crebra
ptus molucca
ptus punctat
ptus teretico
a parviflora
e tabacina
nia hederace
nbergia viola
fera australis
dra confertif
dra filiformis
dra multiflor
orum montan
sperma bipar
sperma racem
cia calycina
sed in rehabrne, Haifa Whe mix, whilscoated. Fertkg/Ha with mmendationIndustry (Hand monitoriecies in the fi
Table 4
cal Name
s wildenowie
on dactylon
a arundinace
perenne
rigidum
ago sativa
etum clande
is aquatic
a sphacelata
um repens
L COMPANY L
nagement Re
a
ypodum
tosa
ana
ta
ornis
ea
acea
s
folia
s
ra
num
rtitum
mosum
ilitation genWhite Cloverst Oats are atilizer in the the pastures for the Huannan, J.C., 1ng results. Tnal landform
44: Recomm
e
ea
stinum
IMITED
eport
C
B
Y
D
P
P
S
S
T
R
W
N
G
G
F
W
‐
F
F
A
M
M
M
W
W
W
H
erally consisr and sub‐cloadded duringform of Grae mix. The snter Valley i1995). This sThe recommm is depende
mended Spec
Comm
Prairie
Couch
Tall Fe
Perenn
Annua
Lucern
Kikuyu
Phalar
Setaria
White
Common Nam
Blackthorn
Yellow Burr‐d
Dolly Bush
Poison Rock F
Plump Windm
Spotted Gum
Slender Flat‐s
Tick‐trefoil
Ruby Saltbush
Winter Apple
Narrow‐leave
Gum Topped
Grey Gum
Forest Red Gu
Wilga
Forest Goode
False Sarsapa
Australian Ind
Mat‐Rush
Mat‐Rush
Mat‐Rush
Western Boob
Wallaby Gras
Wallaby Gras
Hairy Speedw
st of Couch, over. Duringg the colder nulock 15 haspecies mix n the book Mseed mix hasended specieent on availa
cies List for P
mon Name
e Grass (sown
escue
nial Rye gras
al Rye grass
ne
u grass
ris
a
Clover
me
daisy
Fern
mill Grass
sedge
h
ed Ironbark
Box
um
nia
arilla
digo
bialla
s
s
well
Pioneer Falcg the summwinter montas been incohas been baMine Rehabis been modies list for pasbility of seed
Pasture
n in Autumn
s
cata, Wimmer months Jths. The leguorporated at ased on theilitation: A Hfied over timsture shownd.
only)
84
ena Rye, Japanese umes are a rate of
e pasture Handbook me based n in Table
2016 An
5.2.3 During tmain are
264 with
Wesseed
No.2
BlueThisredurepo
This is athe 2015
The rehaTable 46
MUSWELL
nnual Environ
Botani
Trifoliu
REHABILITAthe reportingeas were tar
Dump – bulh tree and pa
st Crib Hut –ding with tre
2 Open Cut –
es Road – bu area was duundant equiporting period
variation fr5 AEMR.
abilitation an6.
LBROOK COAL
nmental Man
cal Name
um subterran
ATION ACTIVg period MCgeted this re
k shaping, spasture specie
–bulk shapinee and pastu
–bulk shaping
ulk shaping aue to be seepment the sed.
om what wa
nd maintena
L COMPANY L
nagement Re
neum
ITIES THIS RCC continuedeporting peri
preading of tes.
ng, spreadinre species.
g activities, s
activities, aneded during teeding was n
as identified
ance summa
IMITED
eport
Comm
Subter
EPORTING Pd to undertaiod with the
topsoil and O
ng of topsoil
spreading of
nd commencthis reportinnot complet
in the MOP
ry for the re
mon Name
rranean Clov
PERIOD ke rehabilitaactivities in
Organic Grow
l and Organ
f topsoil, and
cement of reng period bued. This are
but was con
eporting peri
er
ation activitiethese areas
wth Medium
ic Growth M
d seeding wit
emoval of ret due to a dea will be see
nsistent with
od can be fo
es around siincluding:
m (OGM), and
Medium (OG
th tree speci
edundant eqelay in remoeded during
h what was s
ound in Tabl
85
te. Four
d seeding
GM), and
es.
uipment. oving the the next
shown in
e 45 and
2016 An
A
B
C
D
E
F
G
MUSWELL
nnual Environ
MINE LEAS
A1 Ma
DISTURBED
B1 In
B2 A(e
B3 W(a
B4 T(a
B5 S(a
B6 T(v
ALL DISTUR
REHABILITA
C1 T(e
REHABILITA
D1 1
D2 G
SURFACE O
E1 P
E2 N
E3 P
E4 Oo
DE‐HAB ‐ d
F1 P
F2 N
SURFACE Chectares re
G1 PT
LBROOK COAL
nmental Man
AREA
SE AREA
Mine Lease And ML1562
D AREAS
nfrastructure
Active Miningexcluding ite
Waste Emplaactive/unsha
ailing Emplaactive/unsha
haped Wastawaits final v
emporary Stvegetation a
RBED AREAS
ATION PROG
otal Rehabilexcept for m
ATION ON S
0 to 18 degr
Greater than
OF REHABILIT
asture and g
Native forest
lantation an
Other (includutcomes)
disturbed are
asture and g
Native forest
CONVERSIONeflected in Se
asture/Coverees
L COMPANY L
nagement Re
Table 45: R
A AFFECTED /
Area: CCL 713
e Area
g Area ms B3‐B5 be
cements aped/in or ou
acements aped/uncapp
te Emplacemvegetation)
tabilisation rea for dust
S
GRESS
itation Areaaintenance)
LOPES
rees
18 degrees
TATED LAND
grasses
/ecosystems
nd crops
e non‐veget
eas previousl
grasses
/ecosystems
N ‐ previouslyection E)
er Crop areas
IMITED
eport
Rehabilitatio
/ REHABILIT
3, ML 1304
elow)
ut‐of‐pit)
ped)
ment
control)
a
D
s
ative
ly rehabilitat
s
y reported pa
s planted to
on Summary
TATED (hecta
To Dat
1788
48.7
71.1
113.1
0.0
2.3
0.0
235.2
377.5
45.7
0.0
245.2
137.0
0.0
0.0
ted, figures r
0.0
4.7
asture (cove
0.0
ares)
te Las
Repo
178
48.
88.
1 111
0.0
6.0
0.0
2 253
5 363
45.
0.0
2 238
0 124
0.0
0.0
eflected in Se
4.5
3.1
r crop) areas
0.0
st ort
NRe(E
88 17
3 4
3 7
1.3 12
0 0
0 0
0 2
3.9 27
3.5 34
7 4
0 0
8.7 24
4.8 9
0 0
0 0
Section E
5 0
1 4
s planted to
0 0
86
ext port Est.)
788
8.3
7.9
24.8
0.0
0.0
6.7
77.7
40.1
5.7
0.0
47.7
2.9
0.0
0.0
0.0
0.4
trees,
0.0
2016 An
NA
Additio(drainsprotect
Re‐cov(detail sealing
Soil Tre(detail etc.)
Treatm(detail slashin
Re‐see(detail etc.)
Advers(detail
Feral A(detail trappin
5.2.4 The prowork is rehabilit
MUSWELL
nnual Environ
ATURE OF TR
onal erosions, re‐contourtion)
vering ‐ further topg etc.)
eatment ‐ fertiliser, li
ment / Mana‐ grazing, crog)
ding / Repla‐ species de
sely Affected– type and t
Animal Contr– additionalng, shooting,
REHABILITAposed area to comple
tation activit
LBROOK COAL
nmental Man
Table 46:
REATMENT
control woring, rock
psoil, subsoil
ime gypsum
gement opping,
anting nsity, season
d by Weeds treatment)
rol fencing, , baiting etc.)
ATION ACTIVfor rehabilitte areas thties are plann
L COMPANY L
nagement Re
Maintenanc
AREA
RepoPerio
rks 0
0
0
202
n 0
0
) Unkno
ITIES NEXT Ration duringhat weren’t ned during th
IMITED
eport
ce Activities
TREATED (H
ort od
NexPerio
0
0
0
2 0
0
0
own 0
REPORTING g the next reseeded duhe next repo
on Rehabilit
a) Com
xt od
NA
NA
NA
Slashin
NA
NA
Regionareas othe pro
PERIOD eporting perring this reorting period
tated Land
mment / ConTreatme
ng to control
al dog baitinof MCC land ogram
iod is shownporting per.
ntrol Strategent Detail
Rhodes Gra
ng program wbeing includ
n on Figure riod. No a
87
gies /
ss
with ded in
36. This dditional
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
FFigure 36: Propossed Activities Nexxt Reporting Periood
8
88
2016 An
5.3 R
5.3.1 A total oreportinrehabilitby indicapasture wider re Within tEndangeSouth WConservthree Re The paswere est Table 47(PCT) (wFigure 3monitor
MUSWELL
nnual Environ
REHABILITA
SITE SELECTof 18 permanng period. Ttation areas ative locatiorehabilitatio
ehabilitation
the woodlanered EcologiWales Northation Act 19ehabilitation
sture sites mtablished wit
7 lists the idwhere applica37 indicatesring equipme
LBROOK COAL
nmental Man
ATION MO
ION nent sites, nhis incorporas per the rns with specon areas. Altareas.
nd sites, threcal Communh Coast an995 (TSC Acts Blocks (A, B
monitored inthin each of
dentificationable), flora as the locatioent has been
L COMPANY L
nagement Re
NITORING
ine woodlanated sites inequirementscific on grounthough sites
ee analoguenity (EEC) Ced Sydney Bt). The remaB and C).
ncluded threthe three Re
numbers foassemblage pon of the m set up.
IMITED
eport
G
nd sites and n both remnas as set out nd sites chos were select
e sites were entral HunterBasin Bioregaining six loc
ee within remehabilitation
or each monpresent, conmonitoring s
nine pastureant (for purpin the MOP.sen randomlted randoml
establishedr Grey Box –gion listed cations were
mnant pastus Blocks (A,
nitoring locatdition and thsites and Fig
e sites, were pose of refer The localityy within desy they are r
within rem– Ironbark Wunder the e established
ure areas anB and C).
tion, the Plahe fauna mogure 38 ind
e surveyed durence/analoy of sites waignated woorepresentativ
mnant patcheWoodland in Threatenedd within eac
nd the rema
ant Communonitoring unddicates whe
89
uring the gue) and as guided odland or ve of the
es of the the New
d Species ch of the
aining six
nity Type dertaken. re fauna
2
S
A
A
A
R
R
R
R
R
R
MUSWE
2016 Annual Envir
Site Category
Analogue
Analogue
Analogue
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
ELLBROOK COAL CO
ronmental Manag
T
Monitoring Site ID
RWoodNew1
RWoodNew2
RWoodNew3
RW1
RW2
RW3
RW4
RW5
RW6
OMPANY LIMITED
gement Report
Table 47: Flora As
Plant CommunitVegetation Com
PCT ‐ 1603 Narrow‐leaved Igrass open fores
PCT ‐ 1603 Narrow‐leaved Igrass open fores
PCT ‐ 1603 Narrow‐leaved Igrass open fores
Corymbia maculcanopy with an Aand weedy grou
A. saligna domin
C. maculata, E. ccanopy with spamidstorey and a
C. maculata, E. cwith a native/we
Stunted C. macumidstorey and a
C. maculata andAcacia dominateunderstorey
ssemblage and Fa
ty Type (PCT) or Rmposition
ronbark ‐ Bull Oast of the central a
ronbark ‐ Bull Oast of the central a
ronbark ‐ Bull Oast of the central a
lata and EucalyptAcacia saligna doundcover
nated canopy and
crebra and Eucalyarse A. saligna anda weedy groundco
cladocalyx and C. eedy groundcove
ulata canopy witha weedy grass und
d C. citriodora stuned midstorey and
auna Monitoring
Rehabilitation
k ‐ Grey Box shrund lower Hunter
k ‐ Grey Box shrund lower Hunter
k ‐ Grey Box shrund lower Hunter
tus cladocalyx stuominated mid‐sto
d weedy groundco
yptus sp. stunted d Acacia sp. over
citriodora canopyr
h an Acacia dominderstorey
nted canopy with a weedy grass
for Rehabilitation
EEC Equiv
b ‐ Central HuIronbark WNew SouthCoast andBioregion
b ‐ Central HuIronbark WNew SouthCoast andBioregion
b ‐ Central HuIronbark WNew SouthCoast andBioregion
nted rey
‐
over ‐
‐
y ‐
ated ‐
an ‐
n Monitoring Site
alent
unter Grey Box – Woodland in the h Wales North d Sydney Basin
unter Grey Box – Woodland in the h Wales North d Sydney Basin
unter Grey Box – Woodland in the h Wales North d Sydney Basin
es
Condition
Moderate – Good
Moderate – Good
Moderate
Low
Low
Low
Moderate
Low
Low
9
Fauna Monitorin
1 Remote Camer1 Songmeter
1 Remote Camer1 Songmeter
1 Remote Camer1 Songmeter
1 Remote Camer1 Songmeter
1 Remote Camer1 Songmeter
1 Remote Camer1 Songmeter
1 Songmeter
1 Remote Camer1 Songmeter
1 Remote Camer1 Songmeter
90
ng
ra
ra
ra
ra
ra
ra
ra
ra
2
S
A
A
A
MUSWE
2016 Annual Envir
Site Category
Analogue
Analogue
Analogue
ELLBROOK COAL CO
ronmental Manag
Monitoring Site ID
RPastNew1
RPastNew2
RPast03
OMPANY LIMITED
gement Report
Plant CommunitVegetation Com
Disturbed remnanative grasses, sCymbopogon refDichelachne micLomandra filiforrush), Dicopogonrepens (White clCarthamus lanapubescens (Gale
Disturbed remnanative grasses, sCymbopogon refDichelachne micSporobolus crebfiliformis subsp. weed species incHypochaeris radLinum trigynum
Disturbed remnanative grasses arefractus (Barbe(Plumegrass) an(Rock fern). Wee(Scarlet pimpernBriza minors (Qu(Rhodes grass).
ty Type (PCT) or Rmposition
ant pasture compsedges and desirafractus (Barbed‐wcrantha (Shorthairrmis subsp. filiformn sp. (Chocolate Llover). Weed spectus (Saffron thistlenia).
ant pasture compsedges and desirafractus (Barbed‐wcrantha (Shorthairer (Western RatstFiliformis, Loliumcluding Plantago dicata (Flatweed) (French Flax).
ant pasture compnd forbs includinged‐wire Grass), Dicd Cheilanthes siebed species includenel), Bromus molluaking grass) and
Rehabilitation
prising a mixture oble species includwire Grass), r Plumegrass), mis (Wattle mat‐Lily) and Trifoliumcies include e) and Galenia
prising a mixture oble species includwire Grass), r Plumegrass), tail grass), Loman
m sp. (A Rye grass)lanceolata (Ribwoand
prising a mixture og Cymbopogon chelachne sp. beri subsp. Siebere Anagallis arvensiformis (Soft BromChloris gayana
EEC Equiv
of ding
m
‐
of ding
ndra and ort),
‐
of
ri sis me),
‐
alent Condition
Low – Moderate
Low – Moderate
Low – Moderate
9
Fauna Monitorin
‐
‐
‐
91
ng
2
S
R
R
R
R
MUSWE
2016 Annual Envir
Site Category
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
ELLBROOK COAL CO
ronmental Manag
Monitoring Site ID
RP1
RP2
RP3
RP4
OMPANY LIMITED
gement Report
Plant CommunitVegetation Com
Rehabilitated paspecies includingMedicago minim(Tall windmill gr(Fireweed), TrifoTrifolium campespecies Trifolium
Rehabilitated paspecies includingMedicago minimarvense (Haresfo(Hop Clover). Th(White clover) is
Rehabilitated paspecies includingBromus mollifor(Quaking grass),melilotis indicus(Ribwort) and Trsmall amount of(Barbed‐wire Grsp. Is also prese
Rehabilitated paspecies includingTrifolium campe(Haresfoot CloveThe desirable spis also present.
ty Type (PCT) or Rmposition
asture composed g melilotis indicusma (Woolly burr mrass), Senecio madolium arvense (Haestre (Hop Clover)m repens (White c
asture composed g Chloris gayana ma (Woolly burr moot Clover) and Trhe desirable specis also present.
asture composed g Chloris gayana rmis (Soft Brome),, Hypochaeris radi (Sour clover), Plarifolium campestrf native Cymboporass) and the desint.
asture composed g Medicago truncestre (Hop Clover)er) and Plantago lpecies Trifolium re
Rehabilitation
primarily of weeds (Sour clover), medic) Chloris gaydagascariensis aresfoot Clover), ). The desirable clover) is also pres
primarily of weed(Tall windmill gramedic), Trifolium Trifolium campestres Trifolium repen
primarily of weed(Tall windmill gra, Briza maxima icata (Flatweed), antago lanceolatare (Hop Clover). Agon refractus rable species Loliu
primarily of weedcatula (Barrel clov), Trifolium arvenslanceolata (Ribwoepens (White clov
EEC Equiv
d
yana
sent.
‐
d ss),
re ns
‐
d ss),
a
um
‐
d ver), se ort). er)
‐
alent Condition
Low
Low
Low
Low
9
Fauna Monitorin
‐
‐
‐
‐
92
ng
2
S
R
R
MUSWE
2016 Annual Envir
Site Category
Rehabilitation
Rehabilitation
ELLBROOK COAL CO
ronmental Manag
Monitoring Site ID
RP5
RP6
OMPANY LIMITED
gement Report
Plant CommunitVegetation Com
Rehabilitated paspecies includinggayana (Tall winclover). The desis also present.
Rehabilitated paspecies includingSenecio madaga(Sour clover), Mand Medicago trspecies Lolium s(White clover) is
ty Type (PCT) or Rmposition
asture composed g Galenia pubescendmill grass) and mirable species Loli
asture composed g Chloris gayana ascariensis (Firew
Medicago polymorpruncatula (Barrel sp. (A Rye grass) as also present.
Rehabilitation
largely of weed ens (Galenia), Chlmelilotis indicus (ium sp. (A Rye gra
primarily of weed(Tall windmill graeed), melilotis indphya (Burr medicclover). The desirnd Trifolium repe
EEC Equiv
oris Sour ass)
‐
d ss), dicus ) rable ense
‐
alent Condition
Low
Low
9
Fauna Monitorin
‐
‐
93
ng
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figuure 37: Rehabilitaation Monitoring Program – Flora SSites
9
94
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 38: Rehabilitattion Monitoring PProgram – Fauna Sites
9
95
2016 An
5.4 F
5.4.1 At each establishGPS coorecordeddata bia
5.4.2 Floristic This waseach ploAssessm
MUSWELL
nnual Environ
LORA MON
PERMANENof the nine whed centred ordinates wed. All plots wsed towards
FULL FLORISassessments a measureot the attribument Method
LBROOK COAL
nmental Man
NITORING
T MONITORwoodland sitover a 50mere taken atwere establis vegetation
STIC AND STRts for speciee of both spute for nativdology 2014.
50
L COMPANY L
nagement Re
METHODO
RING TRANSEtes, 20m x 5 transect mat the start ashed across and soil char
Figure 39:
RUCTURE s richness wecies presenve and exotic
IMITED
eport
OLOGY
ECTS/PLOTS0m plots witarked using and finish pthe slope (aracteristics i
: Floristic Plo
were conducnce, includinc species is
20
10
th a nested 2star pickets points of theapproximateln rip lines an
ot Diagram
cted within tng cover andrecorded in
0
10
20m x 20m fthe start ande transect aly 45 degreend/or planted
the 20m x 2d abundanceaccordance
20
full floristic pd end of (Fignd site detaes) to avoid cd rows.
20m plot (Fige (Table 48).with the Bio
96
plot were gure 39). ails were collecting
gure 39). . Within oBanking
2016 An
Attribut
Stratum
Growth
Species
Cover
Abundan
All vascusamplesNew Souas prese In additiacross th
5.4.3 Within tMethodalong thcover wregenera
5.5 FTo demomonitorsites. ‘rehabiliestablishmonitorprojecte
5.5.1 The spebased orehabilitthose spIronbark The avethan thaaverage monitor
MUSWELL
nnual Environ
Table
te
form
name
nce rating
ular plants sps of unknownuth Wales (Hented on Plan
ion to this, the entire veg
BIOMETRIC the 20 m x 5ology (DECChe 50m transere recordedation (trees
LORA MONonstrate comring survey reKey comple
itation monihed are comring reports ed foliage cov
SPECIES RICcies richnesson the averatation woodpecies consik Woodland
erage numbeat of native native specring years sh
LBROOK COAL
nmental Man
48: Data Ga
Survey Requ
Stratum and
Growth form
Scientific na
A measure ospecies; recospecies is leestimated c
A relative mplot. Use the1,2,3,4,5,6,7required
pecies were n species colHarden 1992ntNET (RBGD
the total numgetation zon
SURVEY 50 m plot, bC 2008). Attrsect. Shrub cd every one less than 5cm
NITORING mpliance witesults was coetion criteritoring repor
mparative to confirm thaver or are co
HNESS s measured age number land sites. Tidered desircommunity
er of native species preies richness ows an incre
L COMPANY L
nagement Re
thered for F
uirement
d layer in wh
m for each re
ame and com
or estimate oorded from 1ss than 1% aover should
measure of the following i7,8,9,10,20,5
recorded anlected for fu2; 1993; 2000DT 2012) and
mber of eace.
iometric attributes includcover, grass metre. Lengm DBH) was
RESULTSth the compompared to ia in the Mrts confirm tthe seed m
at after two omparable to
at each wooof native sThis relates ed native sin the remna
species pressent across across remnease in the n
IMITED
eport
Floristic Asse
ich each spe
ecorded spec
mmon name
of the appro1–5% and thand the specibe entered (
he number ofntervals; num50,100,500,1
nd identifiedurther identif0; 2002), andd other speci
h species re
ributes wereded canopy ccover, othegth of logs, noccurring w
pletion criterbenchmarks
MOP, relevanthat after twix and the ryears after
o analogue s
odland monispecies and to the recompecies consant sites.
sent within the rehabilinant and rehnumber of sp
essment of th
ecies occurs
cies
priate cover hen to the neies is conside(e.g. 0.4)
f individuals mbers above1000 or speci
to the lowefication. Nod any subseqific botanical
generating w
e recorded ucover and mr (herbs, fornumber of here all recor
ria indicated s derived thront to this mwo years froespective anseeding weites’.
toring site isweed specimmended spistent with
the remnantation woodhabilitation species record
he Woodlan
measure forearest 5%. If tered importa
or shoots ofe about 20 arify a number
st taxonomimenclature fquent recentl sources.
was assessed
using the Bioid‐storey covbs, sedges) collow bearinded.
in the MOPough the momonitoring pm planting, nalogue siteseeds represe
s representees present pecies list inthe Central
t woodland dland sites. Aites betweended across bo
nd Sites
r each recordthe cover ofant, then the
f a species wre estimatesr greater tha
c level possifollowed thet taxonomic
d and record
obanking Assver every fivcover, exoticng trees and
P for woodlaonitoring of aprogram, sta>80% of thes’ and ‘rehaent less than
ed in Figure 4within remnn Table 43 aHunter Gre
sites is fouA comparison the 2015 aoth the rem
97
ded f a e
within the s only: n 1000 if
ble, with e Flora of changes
ded from
sessment e metres c species whether
and sites, analogue ates that e species bilitation n 20% of
40 and is nant and s well as ey Box –
r greater on of the and 2016 nant and
2016 An
rehabilitadditionrehabilitspecies,
A compathe 201across rRWoodNRWoodNweed spnine add
MUSWELL
nnual Environ
tation sites nal 14 spectation sites RRW5 one sp
arison of the5 and 2016 remnant anNew1 had oNew3 sevenpecies, RW2 ditional weed
LBROOK COAL
nmental Man
from 2015 cies, RWoodRW1 had an pecies, and R
Figure
e average wemonitoring
nd rehabilitaone less we additional five speciesd species.
Figure 41: C
L COMPANY L
nagement Re
to 2016. IdNew2 fiveadditional tw
RW6 five add
40: Compar
eed species ryears showsation sites feed species species. Acr, RW3 12 sp
omparison o
IMITED
eport
In the remne species awo species, ditional speci
rison of Aver
richness acros a general from 2015 present, RW
ross the rehpecies, RW4
of Average N
nant woodland RWoodRW2 five spees.
rage Native S
oss remnant increase in tto 2016. InWoodNew2 abilitation s14 species,
Number of W
and sites RNew3 six secies, RW3 s
Species
and rehabilithe number n the remnhad six addites RW1 haRW5 four sp
Weed Species
RWoodNew1 species. Acrsix species, R
itation sites of species nant woodladitional spead an additipecies, and R
s
98
had an ross the RW4 four
between recorded and sites cies and ional ten RW6 had
2016 An
5.5.2 Averageother cocover, lirehabilit The remhigher pmid‐storfour andunder twsimilar b
The dataincrease2015 anrehabilitto that plant (gGeneralhowevedown toremainethere hacover haremnantbetweenslight de
MUSWELL
nnual Environ
BIOMETRIC e percentageover was metter and bartation woodl
mnant woodproportion inrey cover wad a half timewo times grebetween bot
a gathered ded in remnannd 2016 (Figtation sites fof the 2015round) covely, exotic plar there has o 58%. Natived consistentas been a slas remainedt sites. Litten 2015 and ecrease in ba
LBROOK COAL
nmental Man
DATA e of native oeasured for re ground wland sites.
land sites cn over‐storeyas only presees greater ineater in rehah site types.
during the 2nt woodlandure 43). Gefor both year5 data with ter. Exotic oveant (ground)been a decve grass covt for rehabilight decreas consistent er cover has 2016. Bare are ground in
L COMPANY L
nagement Re
ver‐storey aremnant andere also rec
ontained a y, grass coveent at rehabin rehabilitatabilitation si
Figure 42: B
2016 monitod sites and henerally, midrs. The data the exotic cer‐storey an) cover has ncrease in theer has decrelitation sitesse in cover abetween yearemained cground coven rehabilitati
IMITED
eport
nd mid‐stord rehabilitatcorded and p
greater proer, shrub anilitation sitestion sites as ites as comp
Biometric Da
oring period has remainedd‐storey covgathered thcover separand mid‐storenot varied sie rehabilitateased slightls. Generally at remnant ars for rehaconsistent acerage is minon sites betw
ey cover andted woodlanprovide a co
portion of nd native oths and exotic compared t
pared to rem
ata Averages
shows that d similar acrver was consis year has bated into exoey is only pregnificantly bion sites froly between shrub coversites betweebilitation sitcross both rnimal at all sween 2015 a
d native grasd sites (Figumparison be
native specieher cover. Exground coveto remnant mnant sites a
s
the native mross rehabilitsistent acrosbeen displayeotic over‐stoesent withinbetween yeaom 70% exoyears for rer is low acroen 2015 andes and has iremnant andsites, howevand 2016.
ss, shrub, anure 42). Exoetween remn
es in generaxotic over‐stoer was approsites. Litter and bare gro
mid‐storey ctation sites ss both remned slightly diorey, mid‐ston rehabilitatiars for remnaotic ground cmnant sites oss all sites, d 2016. Natiincreased slid rehabilitatver there ha
99
nd native otic plant nant and
al with a orey and oximately was just
ound was
cover has between nant and ifferently orey and ion sites. ant sites, coverage and has however ive other ightly for tion sites s been a
2016 An
5.5.3 In relatestablish49. In woodlanweeds in
Site
RW1
RW2
RW3
RW4
RW5
RW6
5.5.4 There ha2015 mospecies species areas. Itcurrentlare currMOP.
MUSWELL
nnual Environ
COMPARISOtion to selehed native scomparison
nd sites (anan remnant w
Compltarget (
est
CONCLUSIOas been somonitoring evrichness anthat are nott is unlikely y stand andrently under
LBROOK COAL
nmental Man
Figure 4
ON TO COMPected comppecies compn, the averaalogue sites) woodland site
Table 49:
letion criteri(native specitablished)
>80%
>80%
>80%
>80%
>80%
>80%
ONS me improvement. Generad structural t locally endethat the re
d adaptive mreview and
L COMPANY L
nagement Re
43: Compari
PLETION CRIletion criterposition and age percentahas been caes weeds is 1
Rehabilitatio
a ies
2016 result
19%
29%
37%
35%
25%
38%
ment in the splly these sitediversity. Temic or reprhabilitation
managementchanges to t
IMITED
eport
son of Biom
ITERIA ria, the resprojected foage of nativalculated at 713%.
on Site Com
Target reached
No
No
No
No
No
No
pecies richnees are still nThis can be resentative osites will m
t approachestargets will b
metric Data A
sults of theoliage cover ve species e74%. The av
mpletion Crite
Completiotarget
projectedcov
<20
<20
<20
<20
<20
<20
ess at rehabnot comparaattributed toof local vegemeet the coms should bebe incorpora
Averages
e rehabilitatfor weeds iestablished verage proje
eria Target
on criteria (weed d foliage ver)
0%
0%
0%
0%
0%
0%
ilitation wooble to the reo previous ptation commmpletion critconsidered.
ated into the
tion woodlas presented within the ected foliage
2016 result ex
57%
98%
58%
42%
98%
99%
odland sites emnant sitespractices of munities withteria targets. Completione next revisio
100
and sites in Table remnant cover of
Target xceeded
Yes
Yes
Yes
Yes
Yes
Yes
from the s in both planting hin these s as they n criteria on of the
2016 An
From thpoor. Thto provisigns of pressurepasture pasture Trifolium
5.6 FAFauna mspecies as oppomonitorhabitat focused once ad
5.6.1 Remote station fremote MOP staend of identifyi
5.6.2 A new muse of sand useactivity each of locationwoodlansuitable An ecolohas usemonitor
5.6.3 Songmefrequenwoodlanhour pe Call idenNew Sou
MUSWELL
nnual Environ
e perspectivhe majority cde ground cpasture deges and potenspecies thusites there
ms and Medi
AUNA MOmonitoring de(i.e. bird andosed to attering, evidencrecreation ton collectinequate data
REMOTE CAcameras wefilled with acamera was ated a total othe week oing the type
BIRD CENSUmethodologyongmeters. ed to record were capturthe woodlan of a songmend, however(comprising
ogist experieed this, in cring, to comp
MICROCHIReters were incy bat calls. nd sites. A triod from pr
ntifications wuth Wales (P
LBROOK COAL
nmental Man
ve of pasturecontain weedoverage. Thegradation anntially long us leading thas been ancs since the
ONITORINGesign and locd bat speciesempting to mce of appropto areas adjang baseline dover subseq
AMERA SURVere placed a combinatioplaced on aof 3 nights, hof monitoringof animal ob
US y was underThe songmebird call actred at exactnd sites thuseter at RW4r it was consg greater dive
enced in ideonjunction wpile a bird list
ROPTERAN BAstalled at ea All songmetime delay wior to dusk u
were made uPennay et al.
L COMPANY L
nagement Re
e condition ady grass spee remnant pd high weedperiods of so higher wen increase in2015 monito
G METHODcation was gs). The monimonitor all riate fauna sacent to thedata, with mquent monito
VEY at seven of ton of oats, h tree trunk fhowever, an g and equipbserved at ea
taken for coeters were ptivity. The betly the sames providing c. In 2015 theidered that ersity of euca
entifying birdwith incident for the woo
ATS ch of the nineters were dwas programuntil midnigh
using regiona2004); and s
IMITED
eport
and productiecies that havasture sites d species comet stocking eed numbern the numbeoring event.
DOLOGY guided by theitoring progrspecies founstructures we mining opemore rigorousoring years h
the nine woohoney and pefacing the ba additional npment collecach site.
ollecting birdplaced at eacenefits of use time of moconsistency ae location wathe habitat alypts, shrub
d calls from ntal bird ideodland sites
ne woodlanddirected alonmmed such thht.
al based guisouth‐east Q
vity the rehave likely beeare in bettemposition mthat has redrs. Across ber and cover
e MOP and hram is focusend on site.
were noted iferations. Ats data analyshas been coll
odland sites,eanut butteait station fonight was recction. Analy
d data acrosch of the ninsing this meorning and aacross all siteas mid‐way dat the top obs and grasse
recordings rentification across the M
d sites for foung a potentiahat the song
des to the eQueensland a
abilitation paen planted asr condition,
most likely duduced the proth remnanage of palat
has targeteded on key ind In conjuncf observed wt this stage, sis and testilected.
, and comprr and placedr a total of focorded as thysis of came
s the MCC sne woodlandthod are thaat the same es. One chandown the slof the hill at es) for prese
reviewed thewhilst condMCC site.
ur nights andal flyway, wgmeters reco
cholocation and north‐ea
asture sites s a fast growhowever alsue to historiresence of pnt and rehatable species
d highly mobdicator faunaction with thwhich may asfauna monng to be un
rised of a plad at ground our nights/dis coincided era images
site and invod sites for foat recording temperaturnge was madope and withRW4 would ence of birds.
e data colleucting reha
d used to rechere possiblorded calls fo
calls of micast New Sou
101
are fairly wing crop o exhibit c grazing preferred bilitation s such as
bile fauna a species he fauna ssist with itoring is dertaken
astic bait level. A ays. The with the included
olved the ur nights gs of bird re across de to the hin acacia be more .
cted and bilitation
cord high le, in the or a four
robats in th Wales
2016 An
(ReinholNSW. Bat callcharactereliable
Sear(Mc
Recolabe
Fouro o o o
Nyctiden
Sequand
Data ondefinite site.
5.7 FA
5.7.1 The resuindicatiothat acroreptiles rehabilitdecrease
MUSWELL
nnual Environ
ld et al. 200
s are analyeristic frequand accurate
rch phase caKenzie et al.
ordings contelled as short
r categories definite – idprobable – lpossible – munidentifiabspecies grou
tophilus sppntify this gen
uences not adon’t repres
n the numbeand probab
AUNA MO
REMOTE CAults of the ron of fauna soss the remnwere not retation sites, ed, reptiles a
LBROOK COAL
nmental Man
1) and the a
sed using sency, initial e results the
alls were use 2002)
taining less t (Law et al. 1
of confidencentity not inow probabil
medium to higble, poor or lup.
. are difficultus to species
attributed tosent microba
er of passes ble call passe
ONITORING
AMERA SURVremote camspecies richnnant woodlaecorded for 2 the numbeare absent as
L COMPANY L
nagement Re
accompanyin
pecies‐specislope and following pr
ed in the an
than three 1999)
ce in species doubt ity of confusgh probabilitow quality–
t to identify s level (Penn
o microbat eat activity at
of each bates were used
G RESULTS
VEY mera data is ness at each and sites ma2016 and oner of mamms they were
IMITED
eport
ng reference
ific paramettime betwerotocols (ada
nalysis, rathe
pulses wer
identificatio
sion with spety of confusicalls made b
confidently nay et al. 200
echolocationthe site.
t species ped to represe
presented iwoodland simmals havene additionalmals has sliin 2015 and
library of o
ters of the een calls (Rinapted from L
er than cruis
e not analy
on were used
ecies of similaon with specby bats whic
from their ca04)
n calls were
r monitoringnt species c
in Figure 44ite surveyed increased cl pest specieightly increathe number
ver 200 calls
call profile nehold et aLloyd et. al. 2
se phase cal
sed and the
d (Mills et al.
ar calls cies with simch cannot be
alls and no a
labelled as j
g site was call activity a
4 and Table in 2015 andonsiderably,es has been rased, the nuof pests has
s from north
such as cal. 2001). T2006) were f
lls or feedin
ese sequenc
. 1996):
milar calls e identified t
attempt was
junk or non‐
collated, thoand presence
50 and prod 2016. Resu, birds have recorded. Acumber of bs remained c
102
h‐eastern
ll shape, o obtain followed:
g buzzes
ces were
to even a
made to
‐bat calls
ugh only e at each
ovides an ults show doubled, cross the birds has constant.
2016 An
S
Macropus nec
Macrop(Eastern
Macro(Comm
Tachyglo(E
Trichos(Brush
Oryctol(
Rattus ra
Vulpes
Gymno(Austra
Corcorax m(White
5.7.2 Bird speand acroincreaseshowed
MUSWELL
nnual Environ
Species
rufogriseus ck Wallaby)
pus giganteugrey kangar
opus robustumon Wallaroo
ossus aculeaEchidna)
urus vulpecuhtail possum
lagus cunicul(Rabbit)
attus (Black
s vulpes (Fox
orhina tibicealian Magpie
melanorhamwing Choug
BIRD CENSUecies were idoss 2015 ande in the avera notable in
LBROOK COAL
nmental Man
Figure 44: C
RW
(Red‐
us roo)
us o)
atus
ula m)
lus
rat)
x)
en e)
mphos gh)
US dentified witd 2016 showrage bird spencrease in bir
L COMPANY L
nagement Re
Comparison
Table 50: R
Rem
WoodNew1
x
x
x
x
x
h a comparisn in Figure 4ecies presentrd species pr
IMITED
eport
of Average
Remote Cam
mnant Wood
RWoodNew
x
x
x
son between45. Across tht from 11 inresent with a
Fauna Speci
mera Results
land Sites
w2 RWoo
n remnant ahe remnant wn 2015 to 13an average o
es Richness
odNew3
x
x
x
x
x
x
x
nd rehabilitawoodland sitin 2016. Thf eight in 201
RehabilWoodlan
RW1 RW
x
x
x
x
ation woodltes there wae rehabilitat15 to 14 in 2
103
itation nd Sites
W4 RW6
x
x
and sites as a slight tion sites 2016.
2016 An
One sign(Rainbow
5.7.3 The resuTable 51surveyedequipmebeing niRW2 anidentifieMiniopteChalinolBentwin
MUSWELL
nnual Environ
nificant specw bee‐eater)
Figur
MICROCHIRults of the M1 indicating d. No bat aent malfuncne, RWoodNnd RW5 anded at sites Rerus australilobus dwyerng‐bat).
LBROOK COAL
nmental Man
cies was iden). This specie
re 45: Bird Sp
ROPTERAN BAMicro‐bat cethe presencactivity was tion. RWooNew3 and RW RWoodNewWoodNew1,is (Little Benri (Large‐ea
L COMPANY L
nagement Re
ntified at remes is listed as
pecies Ident
ATS ensus using ce (and numdetected fo
odNew1 andW1 were belw2 and RW3, RW1, RW2twing‐bat), Mred Pied B
IMITED
eport
mnant woods a Migratory
ified at Rem
songmeter mber of callsor rehabilitatd RW4 had tlow this at si3 had four 2, RW3, RW4MormopteruBat) and Mi
land site RWy under the E
mnant and Re
data captures) of bat spetion woodlathe highest nix species. Fispecies reco4 and RW5. us setirostris iniopterus s
WoodNew2 bEPBC Act.
ehabilitation
e is presentecies utilisinnd site RW6number of bve bat speciorded. ThreaThese threaeleryi (Hairyschreibersii
being Merops
n Sites
ted in Figureg the wood6 most likelbat species ries were idenatened specatened bats y‐nosed Freeoceanensis
104
s ornatus
e 46 and land site y due to recorded ntified at ies were included etail Bat), (Eastern
2016 An
Fig All wooincreasinfrom onone to n
MUSWELL
nnual Environ
gure 46: Num
odland sites ng from foune to four spnine species (
Figu
LBROOK COAL
nmental Man
mber of Com
have increr to nine sppecies, RWoo(seven comm
ure 47: Com
L COMPANY L
nagement Re
mmon and Th
ased in theecies (sevenodNew3 incrmon and two
parison of B
IMITED
eport
hreatened Ba
e number on common areased fromo threatened
Bat Species R
at Species Re
of bat specind two thre five to six sd) (Figure 47)
Recorded at
ecorded at W
es recordedatened), RWspecies and ).
Woodland S
Woodland Si
d with RWoWoodNew2 iRW4 increas
Sites
105
ites
oodNew1 ncreased sed from
2
Spe
White‐StriB
Gould's W
Chocolate
Little Bent(
Eastern B(
Large‐Ear(V
Eastern Ho
South‐EastB
Eastern F
Hairy‐nosBa
Inland BrB
Eastern BB
Long‐ea
**
MUSWE
2016 Annual Envir
ecies R
De
ped Freetail Bat
Wattled Bat 2
Wattled Bat 2
‐Winged Bat (V)
Bentwig Bat (V)
red Pied Bat V) **
orseshoe Bat
tern Freetail Bat
Freetail Bat
sed Freetail at (E)
road‐nosed Bat
road‐nosed Bat
ared Bats
* No recordings at R** Listed as vulnera
ELLBROOK COAL CO
ronmental Manag
RWoodNew1
efinite Probable
11 2
220 53
281 81
1 6
4 1
25 4
3 2
42 14
15 6
1
RW6 due to technicble under both Stat
OMPANY LIMITED
gement Report
Table 51: Bat
RWoodNew2
Definite Probable
3 2
15 5
21 8
28 5
cal issues with equipte and Federal legis
t Calls Identified
RWoodNew3
Definite Probab
8 1
52 14
603 20
44 10
6 1
pment slation
at Remnant and R
RW1
le Definite Prob
2
21 6
11 1
32 4
2 2
1
Rehabilitation W
RW2
bable Definite Pr
6 31
1 90
3
4 36
2 9
2
oodland Sites
RW
robable Definite
12 1
13 91
3
1
4 14
1
W3 R
Probable Definite
1
1 5
55
1
1
1
3
10
10
RW4
Probable Definit
1
17
9 24
1
32
2
06
RW5
te Probable
1
7
5
7
2
1
2016 An
5.7.4 At this subsequhabitat there haacross bincluding Of the tconsiderbeen cotwo fox to be im
5.8 SOAt each soil samof 5m in
5.9 SO
5.9.1 The pH i5.8 in 2generall
The ave49). Witthere ha
MUSWELL
nnual Environ
CONCLUSIOstage, faun
uent years, trfor a range as been a cboth the remg four bats a
three introdred to be a ollected and cubs presen
mplemented t
OIL MONITof the monitples were contervals along
OIL MONIT
WOODLANDin remnant w2015. There y within the
rage measurthin the rehas been an
LBROOK COAL
nmental Man
ONS a monitorinrends may bof highly m
considerable nant and rehand one migr
uced vertebKey Threateoverall num
nt which showto try and lim
TORING Mtoring sites, ollected using each of the
TORING RE
D SITES woodland sitwas little vaverage ran
Figur
red electricahabilitation sincrease in t
L COMPANY L
nagement Re
ng is focusebe found thatobile fauna increase in habilitation sratory bird is
brate speciesening Procesmbers of thisws that breemit breeding
METHODOLincluding theg a soil coree 50m transe
ESULTS
tes was slighvariation in nge of the rem
re 48: Compa
l conductivitsites the avthe EC reco
IMITED
eport
d on collect indicate wspecies. Bas the numbesites. The ides a positive r
s identified sses (KTP) us species is ueding is occu on site.
LOGY e additional r and bulkedects.
htly higher inwoodland rmnant wood
arison of So
ty of soils in verage electrrded across
cting baselinhether woodsed on the der and varietentification oesult for the
within the Mnder the TSunknown, horring within
5 sites withid using the st
n 2016 with arehabilitationdland sites (F
il pH – Wood
remnant worical conducboth remna
e data. Witdland sites adata collectety of microbof four threaMCC site.
MCC site onSC Act. No qowever datathe site. Co
in the biodivtandard soils
an average on sites fromFigure 48).
dland
odland site wctivity was 1ant and reha
th data collare providinged in 2016, gbat and birdatened fauna
nly V. vulpesquantitative a captured idontrol measu
versity offsets sampling te
of 6.3 compam 2015 and
was 90μS/cm185μS/cm. Gabilitation w
107
ected in g suitable generally d species a species,
s (Fox) is data has dentified res need
t area, 10 echnique
ared with all were
m (Figure Generally woodland
2016 An
sites froof EC rec
The ave(Figure 0.6meq/rehabilit
The avewoodlanlevel of
MUSWELL
nnual Environ
om 2015 to 2corded at bo
Fig
erage excha50). All wo/100g. Theretation sites f
rage sulphurnd sites weresulphur rec
LBROOK COAL
nmental Man
2016. The sigoth RW4 and
gure 49: Com
ngeable Potodland rehae has been rom 2015 to
Figure 50
r measured e significantorded at bo
L COMPANY L
nagement Re
gnificant incrd RW6 which
mparison of S
tassium meabilitation sitlittle variat
o 2016.
0: Compariso
in remnant wly higher at th RW4 and
IMITED
eport
rease in reha is represent
Soil Electrica
asured at rtes were gention in Pota
on of Soil Po
woodland si135 mg/kg. d RW6 which
abilitation sitted by the la
al Conductivi
remnant wonerally withiassium reco
otassium – W
tes was 35mThis large vh is represen
tes is attriburge standard
ity – Woodla
oodland sitein this rangerded across
Woodland
mg/kg (Figureariation is atnted by the
uted to the hd error bar.
and
s was 0.7me with an avs both remn
e 51). Rehattributed to large standa
108
high level
meq/100g verage of nant and
bilitation the high ard error
2016 An
bar. Sulconsider
The averehabilitbeen a Nitrate Nresult ofthe large
MUSWELL
nnual Environ
phur has inrably for reh
rage measurtation sites wsmall increaNitrogen in rf 50mg/kg. Ter overall av
LBROOK COAL
nmental Man
creased maabilitation si
Figure 5
red soil Nitritwere well abase across rrehabilitationThis outlying erage.
Figure 52: C
L COMPANY L
nagement Re
rginally betwites.
51: Compari
te + Nitrate iove this withremnant won sites, howeresult is rep
Comparison
IMITED
eport
ween 2015
son of Soil S
in remnant wh an averageoodland sitesever this is apresented by
of Soil Nitrit
and 2016 fo
Sulphur – Wo
woodland site of 11.2 mg/s and a signattributed tothe large sta
te + Nitrate –
or remnant
oodland
tes was 3.2m/kg. Comparnificant incre site RW3 haandard error
– Woodland
woodland s
mg/kg (Figurered to 2015 tease in the aving hugelyr bar and con
d
109
sites and
e 52). All there has average
y outlying ntributes
2016 An
The aveaverage there ha
The meaMatter woodlanrehabilit
MUSWELL
nnual Environ
erage soil N Nitrogen atas been a dec
asured soil across the nd sites thetation woodl
LBROOK COAL
nmental Man
Nitrogen in rt rehabilitatiocrease acros
Figure 5
Organic Matrehabilitatio
ere has beeland sites in
Figure 54: C
L COMPANY L
nagement Re
remnant woon site fell bss both remn
53: Comparis
tter in remnon sites waen a slight comparison
Comparison
IMITED
eport
oodland sitebelow this at nant and reha
son of Soil N
nant woodlaas approximdecrease into 2015.
of Soil Orga
es was at ap2,025mg/kgabilitation w
Nitrogen – W
and site is amately 4.6% n organic m
anic Matter –
pproximatelyg (Figure 53)woodland site
oodland
pproximatel(Figure 54
matter and
– Woodland
y 2,166mg/. Comparedes.
y 5.9%. Soil4). Across a slight inc
110
kg. The d to 2015
Organic remnant crease in
2016 An
5.9.2 The avewas slig2015.
The aveaverage change rehabilitscore at
MUSWELL
nnual Environ
PASTURE SITrage pH in rhtly lower a
erage measu for rehabilibetween 20tation sites b RP6 which i
F
LBROOK COAL
nmental Man
TES remnant past 6.0 (Figure
Figu
red electricatation sites 015 and 201between 20s indicated b
igure 56: Co
L COMPANY L
nagement Re
ture sites wae 55). Gener
ure 55: Com
al conductivwas well ab6 for remna15 and 2016by the large s
omparison of
IMITED
eport
as 6.5 and trally the pH
parison of S
vity of soils ibove this at ant sites and6. However, standard err
f Soil Electric
he average phas not vari
oil pH – Past
in remnant 403µS/cm (Fd a significanthis is attri
ror bar.
cal Conducti
pH in rehabied greatly fr
ture
pasture site Figure 56). Tnt increase ibuted to the
vity – Pastur
ilitation pastrom that rec
e was 54µS/cThere has bein the averae very large
re
111
ture sites corded in
cm. The een little age EC in outlying
2016 An
The aveRehabiliremnant2016.
The averehabilitlarge ouno variarehabilit
MUSWELL
nnual Environ
erage exchatation pastut and rehab
erage sulphutation pasturutlying score ation of resutation sites d
LBROOK COAL
nmental Man
angeable Poure sites habilitation site
Figure 5
ur measuredre sites was at RP6 whic
ults across redue to the ou
Figure
L COMPANY L
nagement Re
otassium med an averages there was
57: Compari
d in remnanwell above tch is indicateemnant sitesutlier (RP6).
e 58: Compa
IMITED
eport
easured at ge of 0.7mes little varia
ison of Soil P
t pasture sithis at 339 med by the lars from 2015
rison of Soil
remnant paeq/100g (Figtion betwee
Potassium –
ites was 9mmg/kg. Howege standard to 2016 and
Sulphur – P
asture sites gure 57). Geen results re
Pasture
mg/kg. The ever this is aerror bar (Fd significant
asture
was 1.2menerally acroecorded in 2
average Sulttributed to Figure 57). Th variation w
112
eq/100g. oss both 2015 and
phur for the very here was
within the
2016 An
The avesites wethere hathere isdemons
The aveNitrogenbetweenrecordeddecrease60).
MUSWELL
nnual Environ
rage measurere consideraas been a sigs considerabtrated by th
Fig
rage soil Nitn at rehabilin remnant pd in remnaned slightly fr
LBROOK COAL
nmental Man
red soil Nitritably lower wgnificant incrble variabilite large stand
gure 59: Com
trogen in remitation site fpasture sitesnt pasture sirom 2015 an
L COMPANY L
nagement Re
te + Nitrate iwith an averaease across ty in Nitratdard error ba
mparison of S
mnant pastufell below ths from 2015tes for bothd was slightl
IMITED
eport
in remnant page of 2.8mgboth remnate Nitrogen ars.
Soil Nitrite +
re sites washis at 2,1165 to 2016 ah years. The ly lower than
pasture sitesg/kg (Figure 5nt and rehabrecorded a
+ Nitrate (mg
at approximmg/kg. Genand little vaaverage soin that record
was 5.2mg/59). In compbilitation pasacross both
g/kg) – Pastu
mately 3,000nerally thereriation betwl Nitrogen inded for the r
/kg. All rehaparison with sture sites. H of these
ure
0mg/kg. Thee was little ween Nitrogen rehabilitatremnant site
113
bilitation last year However, areas as
e average variation en levels tion sites es (Figure
2016 An
The mearehabilitslight inc
5.9.3 The soilused forEC resulmajorityproduct
MUSWELL
nnual Environ
asured soil Otation sites wcrease in org
CONCLUSIOs at the mar the constrults indicate ty of rehabilition of orga
LBROOK COAL
nmental Man
Figure
Organic Matwas slightly lganic matter
Figure 61
ONS jority of theuction of rehthat all sitestation sites nic matter
L COMPANY L
nagement Re
60: Compar
ter in remnaower at 4.3% across both
: Compariso
e rehabilitatihabilitated as are non‐saare low in relies on a
IMITED
eport
rison of Soil
ant pasture % (Figure 61h remnant an
n of Soil Org
ion monitoriareas. No maaline and noorganic matnumber of
Nitrogen – P
sites is 7.5%). Comparednd rehabilitat
ganic Matter
ing sites areajor issues aot likely to intter, howevefactors rela
Pasture
%. Soil Organd with last ytion pasture
r – Pasture
e fairly charare present renhibit the grer this is to ating to the
nic Matter acyear there hasites.
acteristic of egarding soirowth of plabe expectequality of
114
cross the as been a
the soils il pH and ants. The ed as the the soils
2016 An
includingsoils fauof the nlimiting and sulp
5.10 EIn conjueach ofinstabilitpresent
Rills
Fine
Hole
Loss
Loss
Hum
Roo
Bare In ordererosion the leve The resmonitorat all 12first siterock andlarge baseedling
RehabiliSite
RW1
MUSWELL
nnual Environ
g soil structuna such as eutrient poorfactors acrophur.
ROSION Anction with f the rehabty. The folwithin and s
, gullies and
e soil accumu
es through d
s in depth of
s of topsoil d
mmocking an
t exposure.
e patches wh
r to determiand 1 being l of erosion i
ults from thring sites are2 sites, howee located on d no topsoil are patch in gs is also pres
Table 52
itation EroOccTyp
Lim
LBROOK COAL
nmental Man
ure and its earthworms r overburdenoss rehabilita
ND LANDFthe rehabilitilitation molowing list psurrounding
tunnel inlet
ulation or the
rainage stru
topsoil/grow
ue to wind a
nd pedestallin
here groundc
ne the severminimal) haidentified.
he erosion e presented iever there arthe upper slpresent. Thwhich rill ersent here an
2: Evidence o
osion currence/ pe
mited (1)
L COMPANY L
nagement Re
potential toand the typns is often thation, and in
FORM STABtation monitnitoring siteprovides someach rehabil
and outlets.
e presence o
ctures.
wth medium
and sheet flo
ng.
cover vegeta
rity of erosioas been used
survey undein Table 52. re two areasope comprishe second sitrosion is occnd will aid in
of Erosion at
Comment
No evidenvicinity ofthis is liketopsoil inidue to winnatural decover preserosive fe
IMITED
eport
o hold moistpe of vegetathe limiting fan some cases
BILITY toring, obseres for any me of the flitation mon
.
of lag materia
ow
ation has bee
on, a scoringd with manag
ertaken at The survey
s identified wses of a largete, located fcurring. Somestablishing
t Rehabilitat
ts
nce of erosiof the site. Theely due to a nitially being and and/or shegeneration.sent which iseatures from
ure, the pretion growingactor when s remnant s
rvations wersigns of soeatures thatitoring site:
al at the bott
en denuded.
g system frogement optio
each of thefound that twithin close pe bare patchfurther towame natural re soil stability
tion Woodla
on was obserere is limitednumber of faapplied, poteheet flow du. There is a fas likely to ass occurring.
esence of vit. In mining srehabilitatinites include
e made in thil erosion ot were to b
tom of slope
m 1 to 10 (wons recomm
e six rehabihere is limitproximity to of earth witards the baseegeneration oy in the futur
nd and Past
rved at this sd topsoil prectors includientially somering establisair amount osist in the pr
tal soil microsituations thng these areaphosphorus
he areas suror obvious lbe recorded
es or in depre
with 10 beinmended depe
litation andted erosion o RP5 (Figureth considerae of the hill of Eucalypture.
ure Sites
site, or withinsent, howeving limited e loss of tophment and of vegetativerevention of
115
obes and e quality as. Other , nitrate,
rounding landform if found
essions.
ng severe nding on
pasture occurring e 62), the ble sized is also a
us crebra
n the ver,
soil
e
2016 An
RehabiliSite
RW2
RW3
RW4
RW5
RW6
RP1
MUSWELL
nnual Environ
itation EroOccTyp
Lim
Lim
Lim
Lim
Lim Losdueandleaero
Lim
LBROOK COAL
nmental Man
osion currence/ pe
mited (1)
mited (1)
mited (1)
mited (1)
mited at site
ss of topsoil e to wind d sheet flow ding to Rill osion (2)
mited
L COMPANY L
nagement Re
Comment
No evidenvicinity ofthis is liketopsoil inidue to winnatural decover preserosive fe
No evidenvicinity ofthis is liketopsoil inidue to winnatural dewhich groof the sitepresent wfeatures f
No evidenvicinity ofsignificantthis is likeuse of rocloss of topestablishmof bare grhowever tcanopy coof erosive
No evidenlow‐modecanopy co
No evidelimited toof factorpotentiallduring estThe areaspatches ogrowth hamonitorinlocations
No evidenlow‐modeis fairly hi
IMITED
eport
ts
nce of erosiof the site. Theely due to a nitially being and and/or shegeneration.sent which iseatures from
nce of erosiof the site. Theely due to a nitially being and and/or shegeneration.ound layer coe has both grwhich is likelyfrom occurrin
nce of erosiof the site. Thet amount of ely due to limck during lanpsoil due to wment and naround in whithe site has aover presente features fro
nce of erosioerate level ofover is fairly
nce of erosopsoil presens including y some loss tablishment s of sloped laof bare earthas occurred hng. There arewith minor r
nce of erosioerate level ofgh.
on was obserere is limitednumber of faapplied, poteheet flow du. There is a fas likely to ass occurring.
on was obserere is limitednumber of faapplied, poteheet flow du. There are pover is not prround and cay to assist in ng.
on was obserere is limitedbare ground
mited topsoil dform estabwind and/ortural degenech ground laa sparse gro which is likeom occurring
on was obserf topsoil preshigh.
sion was obnt, however, limited topof topsoil dand natural and in the vic, however cohere since the signs of toprill erosion o
on was obserf topsoil pres
rved at this sd topsoil prectors includientially somering establisair amount osist in the pr
rved at this sd topsoil prectors includientially somering establispatches of baresent, howeanopy vegetathe preventi
rved at this sd topsoil pred and rock prinitially beinlishment, por sheet flow deration. Therayer cover is und cover anely to assist ig.
rved at this ssent and gro
served at ththis is likely psoil initiallyue to wind adegeneratiocinity of site onsiderable vhe previous ypsoil loss in sccurring.
rved at this ssent and gro
site, or withinsent, howeving limited e loss of tophment and of vegetativerevention of
site, or withinsent, howeving limited e loss of tophment and are ground inever the majative cover ion of erosiv
site, or withinsent and a resent, howeng applied, thotentially somduring re are large anot present,nd moderaten the preven
site. There is ound layer an
his site. Thedue to a nuy being apand/or sheeton. RW6 shows vegetative year’s some small
site. There is ound layer co
116
n the ver,
soil
e
n the ver,
soil
n ority
ve
n the
ever, he me
areas , e ntion
a nd
ere is mber plied, t flow
a over
2016 An
RehabiliSite
RP2
RP3
RP4
RP5
RP6
Generalgood vesettleme
MUSWELL
nnual Environ
itation EroOccTyp
Lim
Lim
Lim
Lim
Lim
ly across thegetative covent or subsid
LBROOK COAL
nmental Man
osion currence/ pe
mited
mited
mited
mited
mited
e rehabilitativer and maindence areas w
L COMPANY L
nagement Re
Comment
No evidenlow‐modesignificantis fairly hi
No evidenlow‐modeis fairly hi
No evidenlimited toGround la
No evidenlimited tosince last ground lay
No evidenlimited tosince last ground lay
ion sites limntaining this were identif
IMITED
eport
ts
nce of erosioerate level oft patches of gh.
nce of erosioerate level ofgh.
nce of erosioopsoil presenayer cover is
nce of erosioopsoil presenyear’s monityer cover.
nce of erosioopsoil presenyear’s monityer cover.
ited erosioncover will limfied.
on was obserf topsoil presbare ground
on was obserf topsoil pres
on was obsernt and modermoderately
on was obsernt, however gtoring and co
on was obsernt, however gtoring and co
was encounmit further e
rved at this ssent, howeved present. Gr
rved at this ssent and gro
rved at this srate patcheshigh.
rved at this sgroundcoveromprises of
rved at this sgroundcoveromprises of
ntered. The erosion from
site. There is er there are round layer c
site. There is ound layer co
site. There is s of bare grou
site. There is r has increasa fairly high
site. There is r has increasa fairly high
majority of sm occurring. N
117
a
cover
a over
und.
ed
ed
sites had No major
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figgure 62: Erosion SSites
11
18
2016 An
5.11 CA
Carryingpasture the appr Carryingthe examshow thhave theone cowpresente
Sites
RPastNe
RPastNe
RPast03
RP1
RP2
RP3
RP4
RP5
RP6
5.12 BIn additthe BiodBlock A
MUSWELL
nnual Environ
ARRYING C
g capacity anrehabilitatioropriate futu
g capacity fomple of a 4at the remne capacity tow per 6ha. Ted in 2015.
Table 53:
Pastu
ew1 Nativfertiladde
ew2 Nativfertiladde
Nativfertiladde
Nativ(domspeci
Nativ(domspeci
Nativfertiladde
Nativfertiladde
Nativ(dominclud
Nativfertiladde
BIODIVERSIion to the 1diversity Off(Figure 63).
LBROOK COAL
nmental Man
CAPACITY
nd pasture con sites. Theure stocking
r each of the450kg dry stoant pasture o stock 1 cowThe 2016 re
Estimated C
ure Type
ve unimproveity (no seed d)
ve unimproveity (no seed d)
ve unimproveity (no seed d)
ve unimproveminated by unes)
ve unimproveminated by unes)
ve unimproveity (no seed d)
ve unimproveity (no seed d)
ve unimproveminated by unding Galenia
ve unimproveity (no seed d)
ITY OFFSET8 permanenfset site own Plots were
L COMPANY L
nagement Re
AND PAST
ondition moe data gatherates (carryi
e remnant aock (non‐lacsites have thw per 2ha, Results for est
Carrying Capa
ed – moderaor fertiliser
ed – moderaor fertiliser
ed – moderaor fertiliser
ed – low fertndesirable
ed – low fertndesirable
ed – moderaor fertiliser
ed – moderaor fertiliser
ed – low fertndesirable spa pubescens)
ed – moderaor fertiliser
T AREA nt sites survened by MCCundertaken
IMITED
eport
TURE COND
onitoring weered is used tng capacity)
nd rehabilitactating, non‐he ability to P1 and RP2timated carr
acity for Rem
R(DS
ate 1.
ate 1.
ate 1.
tility 1.
tility 1.
ate 1.
ate 1.
tility pecies 1.
ate 1.
eyed, five neC. This offsetusing the sa
DITION
re conducteto inform paof the rehab
ation pasture‐pregnant costock one cocould only srying capacit
mnant and R
Range SE/ha)
E
(
.5‐4.0
.5‐4.0
.5‐4.0
.0‐2.5
.0‐2.5
.5‐4.0
.5‐4.0
.0‐2.5
.5‐4.0
ew permanet site is locaame method
d at pastureasture conditbilitation are
e sites has bow). The reow per 1.5hatock one cowty have not
Regrowth Pa
stimated Value DSE/ha)
4
4
4
1.5
1.5
2
2
1
2
ent sites werated north‐eds as those u
e reference stion and to ieas.
been calculatesults from Ta. Sites RP3w per 4ha analtered from
sture Sites
Estimated ccapacity (4
dry sto
1 cow per
1 cow per
1 cow per
1 cow pe
1 cow pe
1 cow pe
1 cow pe
1 cow pe
1 cow pe
re establisheeast of rehaused across
119
sites and nfluence
ted using Table 53 and RP4 nd RP5 is m results
carrying 450kg ck)
1.5ha
1.5ha
1.5ha
r 4ha
r 4ha
r 2ha
r 2ha
r 6ha
r 2ha
ed within bilitation remnant
2016 An
and rehacross th The biodvegetatiin the rinformat
T
Site Categor
BiodiverOffset
BiodiverOffset
BiodiverOffset
BiodiverOffset
BiodiverOffset
MUSWELL
nnual Environ
abilitation she site.
diversity offion communremnant andtion present
Table 54: Bio
y MonSite
rsity O‐1
rsity O‐2
rsity O‐3
rsity O‐4
rsity O‐5
LBROOK COAL
nmental Man
ites and we
fset site comnities. Permad rehabilitatted in Figure
odiversity Of
nitoring ID
Pla
PCNaNafoup
PCGrraigoVaBio
PCNaOaopan
PCNa‐ MfoovHuSoBa
PCRoBlaleaGufersoBioreg
L COMPANY L
nagement Re
ere located i
mprised of cnent plots wtion monito64 and Tabl
ffset Site PCT
ant Commun
CT ‐ 1605 arrow‐leavedative Olive shrest of the cepper Hunter
CT ‐ 616 rey Myrtle ‐ Rinforest in saorges of the ualley, mainly oregion
CT ‐ 1603 arrow‐leavedak ‐ Grey Boxpen forest of nd lower Hun
CT – 617 arrow‐leavedMock Olive shrest mainly over sandstoneunter Valley, outh Bioregioasin Bioregio
CT – 481 ough‐barked akely's Red Gaved Stringybum sandstonrn open foreuthern Brigaoregion and gion
IMITED
eport
n vegetation
leared pastuwere establisring. Five vele 54.
T Classificat
nity Type (PC
d Ironbark ‐ hrubby openentral and
Rusty Fig dryandstone upper HunteSydney Basi
d Ironbark ‐ Bx shrub ‐ grasthe central
nter
d Ironbark ‐ bhrubby openon basalt sloe in the uppe Brigalow Beon and Sydnen
Apple ‐ Gum ‐ Narrowbark +/‐ Grene riparian grest on in the alow Belt SouUpper Hunt
n communit
ure land, regshed using thegetation co
ion, EEC Equ
CT) EEC Eq
n
Centra– Ironbthe NeNorth Basin B
y
er n
‐
Bull ss
Centra– Ironbthe NeNorth Basin B
box n pes er elt ey
‐
w‐y rass
uth er
‐
ies represen
generating phe same metommunities
uivalencies a
quivalent
al Hunter Grebark Woodlaew South WaCoast and SyBioregion
al Hunter Grebark Woodlaew South WaCoast and SyBioregion
ntative of ve
pasture sitesthodology awere samp
and Conditio
Co
ey Box and in ales ydney
M
Go
ey Box and in ales ydney
M
Mgo
M
120
egetation
s and six s utilised pled with
n
ondition
oderate
ood
oderate
oderate‐ood
oderate
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 63: Bioddiversity Offset MMonitoring Sites
12
21
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 664: Vegetation Coommunities Within Biodiversity Offfset Site
12
22
2016 An
The biodconditiodry rainEndangeWales N– Bulloaopen for There aOverall continuethe souboundar The ecosite couincluded The majnaturallypreviousboundarprevent
5.13 FAn unplaof Blockresilienclocationthe areaestablishtime shoburn occ At moniAcacia psuch as (Flatweespecies s At moniAcacia ssuch as T. campA few na No actiowhetherShould treplace
MUSWELL
nnual Environ
diversity offons. Of particforest in guered EcologiNorth Coast aak –Grey Boxrest.
re areas of there is vere to regenerthern and wry (Figure 64
logists undeld be underd in the next
jority of they. The bouns land owneries. MCC wgrazing and
IRE AFFECTanned fire ok C. Two moce of rehabils photos wea was recorhed. In subsowing the recurring so no
itoring pointparadoxa (KaSenecio maed), Sida rhosuch as Wah
itoring pointsaligna (GoldS. madagascestre, Setariative species
on needs tor the fire hasthe Acacia pthose lost in
LBROOK COAL
nmental Man
fset site is qcular note islly’s of the scal Communand Sydney Bx shrub ‐ gra
cleared landry little weerate naturallwestern bou4).
rtaking this rtaken on a revision of t
e site is in gndary of thisership bounill review thallow regen
TED REHABccurred on tnitoring poinlitation to imere taken frorded, includsequent yearecovery of spo data is avai
t 1, no canoangaroo thoadagascarienombifolia (Pahlenbergia co
t 2, no canoden wreath wcariensis, Chia sp., Trifolius such as W.
o be undertas had a signifparadoxa notn the fire.
L COMPANY L
nagement Re
quite diverses the presencsite and prenity Central Basin Bioregiass open for
d with somed species py with the eundary, how
monitoring hthree yearlythe MOP.
good conditi site is not dary fences e fencing reeration of pa
BILITATIONhe 14 Decemnts have beempacts of firm north, easing noting srs these mopecies. It is nilable for the
opy species orn), Groundnsis (Fireweeaddy's Lucerommunis (Tu
opy species wattle. Grouloris gayanaum arvense communis w
aken at this ficant impact recover an
IMITED
eport
e and contace of pocketesence of twHunter Greyions. These trest and Nar
e showing vresent on thexclusion of wever this d
have suggesty cycle to ca
ion and thocurrently depresent, pa
equirements addock sites
N SITE mber 2015 wen set up tore. These post, south andspecies regenitoring poinnoted that ne location pre
are presentd layer specied), Chloris grne) and Trifufted bluebe
are presentnd layer spea, H. radicata(Hare’s foot were also pre
location. Mct. Initial obsnd put on ne
ins a varietyts of good cowo community Box‐Ironbawo communrrow‐leaved
very good rehe site and grazing animoes not see
ted that monapture any c
se cleared aelineated byarticularly ato the sout
s to occur.
within the wemonitor the
oints were red west direcenerating annts can be rno photos of e‐burn.
t in the locaes consistedgayana (Chlofolium campll) were also
t in the locaecies consistea, Sonchus sclover) and
esent.
Monitoring inervations indew growth, it
y of vegetatondition Greties which aark Woodlannities are NarIronbark – N
egeneration it is likely tmals. Some fem to match
nitoring of thchanges ove
areas are stafencing andlong the soh and west o
estern and soe area in ordecorded usintions (Figurend any weerevisited witthe site we
ality. Shrub d of a majororis grass), Hestre (Hop Cpresent.
ality. Shrub ed of a majop., V. bonariCirsium. vul
n subsequendicate the sitt is suggeste
tion types iney‐Myrtle – Rare equivalennd in the Nerrow‐leaved Native Olive
of eucalyptsthat these afencing occuh that of th
he biodiverser time. Thi
arting to regd there seemuthern and of the offset
outh‐westerder to documng GPS and e 6). The coned species bh photos tare taken prio
species conrity of exoticHypochaeris Clover). A fe
species conority of exotiiensis, S. rholgare (Scotch
nt years will te is recovered plantings
123
n varying Rusty Fig nt to the ew South Ironbark shrubby
s/shrubs. reas will urs along he offset
ity offset s will be
generate ms to be western t area to
n section ment the at these
ndition of becoming ken over or to the
sisted of c species radicata w native
sisted of c species mbifolia, h thistle).
indicate ring well. occur to
2
MUSWE
2016 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 65: FFire Affected Monnitoring Sites
12
24
2016 An
5.14 RMCC are
5.15 FAs part improveall sloperemain, and/or b
MUSWELL
nnual Environ
REHABILITAe not current
URTHER Dof the mod
ements madees, including in Open Cuberms, as we
LBROOK COAL
nmental Man
ATION TRIAtly undertaki
DEVELOPMdification toe to the finafinal void ba
ut 2, which well as capping
L COMPANY L
nagement Re
ALS AND Ring any trials
ENT OF TH the develoal landform. atters, wouldwill be approg of exposed
IMITED
eport
RESEARCHs within the r
HE FINAL Ropment consThe revisedd be equal topriately tred coal seams.
rehabilitatio
EHABILITAsent the fin final landfoo or less thaeated with t.
n areas.
ATION PLANal landform orm has beenan 14 degreehe installatio
N was reviewn modified ses. One high on of a safe
125
wed with such that wall will
ety fence
2016 An
6.0 ADuring t
Enviwith
The Plan
Mai
MUSWELL
nnual Environ
ACTIVITIESthe next repo
ironmental Mh the change
revised comn will be impl
ntenance ac
LBROOK COAL
nmental Man
S PROPOSorting period
Managemenes to the deve
mmitments inlemented.
tivities on th
L COMPANY L
nagement Re
SED IN THd, the followi
t Plans and elopment co
n the Enviro
he rehabilitat
IMITED
eport
E NEXT Aing activities
the Mining onsent grante
onmental Ma
tion areas w
EMR PERIs are planned
Operations ed in Octobe
anagement P
ill continue.
IOD d:
Plan will beer 2016.
Plans and th
e updated to
e Mining Op
126
o comply
perations
2016 An
MUSWELL
nnual Environ
App
LBROOK COAL
nmental Man
pendix 1
L COMPANY L
nagement Re
1: Air Q
IMITED
eport
Quality MMonitorring Ressults
127
2
MUSWE
2016 Annual Envir
1
Ba
c = Caver
NR =
ELLBROOK COAL CO
ronmental Manag
DATE
Jan‐16
Feb‐16
Mar‐16
Apr‐16
May‐16
Jun‐16
Jul‐16
Aug‐16
Sep‐16
Oct‐16
Nov‐16
Dec‐16
2‐month Rolling
ackground Avera2009)
Contaminated resurages.
= No result. Include
OMPANY LIMITED
gement Report
g Average
age (2005‐
lt due to the presen
es broken or missing
DEPOSI
DM7 DM17
0.9 3.8
1.4 3.7
1.5 3.5
0.6 2.6
0.6 3.0
0.4 1.0
0.5 1.6
0.8 0.7
0.5 0.9
1.2 1.4
0.8 2.1
2.1 3.7
0.9 2.3
1.1 1.7
nce of bird droppin
g bottles.
TIONAL DUST R
7 DM18
1.7
2.1
2.9
1.7
0.8
2.3
5.3
0.8
0.7
1.1
1.7
3.4
2.0
1.1
gs, insects, or vege
RESULTS
*DM19 DM2
3.8 1.2
0.9 1.3
1.7 1.4
c3.5 1.6
0.8 1.6
1.3 1.0
c4.6 1.5
c5.7 1.4
2.7 1.4
c5.4 1.6
1.9 1.6
c8.3 2.4
1.9 1.5
2.5 1.9
tation in sample. C
22 *DM24
2 4.2
3 3.1
4 3.9
6 0.9
6 1.2
0 0.7
5 0.7
4 0.9
4 0.8
6 2.5
6 2.2
4 4.0
5 2.1
9 1.8
ontaminated result
DM26 *DM
NR 1.
1.4 2.
1.7 1.
2.6 1.
3.9 0.
1.7 0.
1.4 0.
1.9 0.
1.4 0.
c2.9 1.
2.4 3.
2.8 c3
2.1 1.
1.8 1.
ts excluded from
12
M29
.8
.0
.7
.0
.7
.6
.6
.6
.6
.6
.2
3.6
.3
.5
28
2016 An
MUSWELL
nnual Environ
D
06‐J
12‐J
18‐J
24‐J
30‐J
05‐F
11‐F
17‐F
23‐F
29‐F
06‐M
12‐M
18‐M
24‐M
30‐M
05‐A
11‐A
17‐A
23‐A
29‐A
05‐M
11‐M
17‐M
23‐M
29‐M
04‐J
10‐J
16‐J
22‐J
28‐J
04‐J
10‐J
16‐J
22‐J
28‐J
03‐A
09‐A
15‐A
21‐A
27‐A
02‐S
08‐S
14‐S
20‐S
26‐S
02‐O
08‐O
14‐O
20‐O
26‐O
01‐N
07‐N
LBROOK COAL
nmental Man
ate N
an‐16
an‐16
an‐16
an‐16
an‐16
Feb‐16
Feb‐16
Feb‐16
Feb‐16
Feb‐16
Mar‐16
Mar‐16
Mar‐16
Mar‐16
Mar‐16
Apr‐16
Apr‐16
Apr‐16
Apr‐16
Apr‐16
May‐16
May‐16
May‐16
May‐16
May‐16
un‐16
un‐16
un‐16
un‐16
un‐16
Jul‐16
Jul‐16
Jul‐16
Jul‐16
Jul‐16
Aug‐16
Aug‐16
Aug‐16
Aug‐16
Aug‐16
Sep‐16
Sep‐16
Sep‐16
Sep‐16
Sep‐16
Oct‐16
Oct‐16
Oct‐16
Oct‐16
Oct‐16
Nov‐16
Nov‐16
L COMPANY L
nagement Re
HVAS MONisbet PM10
12
19
17
18
20
30
25
47
47
29
29
45
18
52
14
29
36
39
31
30
12
4
15
36
4
15
1
12
3
1
16
8
15
1
2
11
5
33
16
9
6
24
3
5
8
5
18
17
24
18
29
18
IMITED
eport
ONITORINGSite 1 TSP
11
61
29
30
36
52
36
62
62
30
48
57
27
57
35
37
49
48
44
31
17
11
16
37
7
10
7
16
4
1
26
12
19
5
4
19
9
35
8
14
6
34
9
13
16
12
33
32
40
23
56
33
RESULTS P Site 2 T
14
58
31
28
38
54
45
58
58
29
40
59
35
52
32
34
39
45
39
38
16
18
17
37
7
8
4
15
5
1
33
11
17
7
4
17
10
33
7
19
9
31
8
29
15
12
47
45
58
42
51
40
TSP Site
1
7
7
3
3
5
5
1
1
5
4
7
4
8
3
3
4
5
4
1
1
1
1
3
1
1
3
1
2
1
1
5
1
1
3
1
2
1
1
4
4
4
2
4
3
3 TSP
18
73
75
35
36
59
51
119
118
55
44
72
46
82
33
37
44
51
41
119
16
11
17
32
7
12
5
14
4
1
38
14
22
6
6
17
10
51
8
13
17
38
10
25
13
11
42
41
47
25
48
33
137
2016 An
MUSWELL
nnual Environ
D
13‐N
19‐N
25‐N
01‐D
07‐D
13‐D
19‐D
25‐D
31‐D
LBROOK COAL
nmental Man
ate N
Nov‐16
Nov‐16
Nov‐16
Dec‐16
Dec‐16
Dec‐16
Dec‐16
Dec‐16
Dec‐16
L COMPANY L
nagement Re
Nisbet PM10
18
48
20
18
8
19
26
10
34
IMITED
eport
Site 1 TSP
35
43
46
34
14
26
36
14
48
P Site 2 T
42
52
52
35
17
32
36
14
55
TSP Site
3
4
4
3
2
3
3
1
5
3 TSP
33
47
46
39
26
31
39
14
51
138
2
R
MUSWE
2016 Annual Envir
REAL‐TIME PM1
SAMPLE
DATESITE 1
01‐Jan‐16 13.0
02‐Jan‐16 16.7
03‐Jan‐16 14.2
04‐Jan‐16 7.9
05‐Jan‐16 3.7
06‐Jan‐16 3.9
07‐Jan‐16 10.3
08‐Jan‐16 15.3
09‐Jan‐16 21.9
10‐Jan‐16 16.0
11‐Jan‐16 15.3
12‐Jan‐16 21.0
13‐Jan‐16 29.1
14‐Jan‐16 24.5
15‐Jan‐16 2.8
16‐Jan‐16 9.5
17‐Jan‐16 7.5
18‐Jan‐16 6.6
19‐Jan‐16 9.6
20‐Jan‐16 11.8
21‐Jan‐16 14.8
22‐Jan‐16 10.8
23‐Jan‐16 7.1
24‐Jan‐16 17.1
25‐Jan‐16 25.4
26‐Jan‐16 13.4
27‐Jan‐16 13.1
28‐Jan‐16 8.9
29‐Jan‐16 10.0
30‐Jan‐16 13.8
31‐Jan‐16 28.6
Janua
ELLBROOK COAL CO
ronmental Manag
10 MONITORING
SITE 2 SITE 3
13.7 10.4
18.6 21.0
15.6 12.3
8.7 6.2
3.9 2.3
3.8 2.5
12.5 14.4
17.2 14.0
25.2 19.8
23.9 28.0
26.0 29.4
30.3 32.8
39.3 34.4
34.4 14.5
1.7 11.0
13.7 7.7
9.3 5.5
12.2 8.6
10.0 11.5
12.4 13.6
16.8 13.8
13.1 10.0
8.7 12.6
18.9 21.8
26.8 18.3
14.3 13.2
14.3 10.6
10.4 8.6
12.2 8.2
14.1 11.7
30.5 25.2
ary 2016
OMPANY LIMITED
gement Report
G RESULTS
3SAMPLE
DATES
01‐Feb‐16
02‐Feb‐16
03‐Feb‐16
04‐Feb‐16
05‐Feb‐16
06‐Feb‐16
07‐Feb‐16
08‐Feb‐16
09‐Feb‐16
10‐Feb‐16
11‐Feb‐16
12‐Feb‐16
13‐Feb‐16
14‐Feb‐16
15‐Feb‐16
16‐Feb‐16
17‐Feb‐16
18‐Feb‐16
19‐Feb‐16
20‐Feb‐16
21‐Feb‐16
22‐Feb‐16
23‐Feb‐16
24‐Feb‐16
25‐Feb‐16
26‐Feb‐16
27‐Feb‐16
28‐Feb‐16
29‐Feb‐16
F
ITE 1 SITE 2
14.4 13.4
18.4 17.8
21.2 23.0
13.3 15.7
17.7 21.1
11.5 13.0
17.0 18.1
14.2 14.8
14.9 16.6
15.1 15.6
14.7 17.3
13.0 14.3
16.2 18.0
17.0 17.0
24.2 28.4
23.5 23.4
25.4 27.7
26.7 31.2
25.1 27.9
27.7 29.3
15.9 16.1
14.7 15.1
20.5 19.8
19.5 23.2
21.5 28.3
33.6 35.5
20.8 21.5
16.1 16.2
13.0 12.8
February 2016
SITE 3SAMPLE
DATE
11.1 01‐Mar‐1
14.8 02‐Mar‐1
19.2 03‐Mar‐1
12.5 04‐Mar‐1
17.5 05‐Mar‐1
11.5 06‐Mar‐1
16.5 07‐Mar‐1
23.1 08‐Mar‐1
15.7 09‐Mar‐1
12.8 10‐Mar‐1
26.3 11‐Mar‐1
12.8 12‐Mar‐1
18.4 13‐Mar‐1
14.4 14‐Mar‐1
23.3 15‐Mar‐1
20.5 16‐Mar‐1
25.0 17‐Mar‐1
22.7 18‐Mar‐1
23.2 19‐Mar‐1
27.0 20‐Mar‐1
16.3 21‐Mar‐1
16.5 22‐Mar‐1
24.5 23‐Mar‐1
22.2 24‐Mar‐1
18.2 25‐Mar‐1
32.5 26‐Mar‐1
20.6 27‐Mar‐1
17.0 28‐Mar‐1
17.3 29‐Mar‐1
30‐Mar‐1
31‐Mar‐1
E SITE 1 SITE
16 11.8 16.
16 18.8 26.
16 16.8 23.8
16 13.0 17.8
16 14.1 18.0
16 14.9 19.
16 14.8 20.0
16 16.4 23.
16 11.1 17.8
16 20.6 26.9
16 19.5 24.
16 19.1 27.
16 18.4 24.8
16 17.8 26.
16 14.3 18.
16 10.7 12.
16 11.4 12.
16 14.5 16.
16 12.3 13.
16 13.7 15.8
16 9.3 9.5
16 11.4 12.
16 19.2 22.9
16 24.8 27.4
16 20.3 24.9
16 22.4 26.
16 22.9 29.
16 23.7 30.
16 22.9 32.
16 12.0 11.
16 20.6 24.
March 2016
E 2 SITE 3S
6 15.4 0
1 20.9 0
8 22.2 03
8 14.1 04
0 13.8 05
2 14.3 06
0 18.1 07
5 19.6 08
8 7.0 09
9 no data 10
7 no data 1
1 no data 1
8 no data 13
3 no data 14
3 no data 15
3 no data 16
5 no data 17
6 no data 18
2 no data 19
8 no data 20
5 no data 2
7 no data 2
9 no data 23
4 no data 24
9 no data 25
1 no data 26
1 no data 27
7 no data 28
1 no data 29
1 no data 30
1 no data
6SAMPLE
DATESITE 1
1‐Apr‐16 15.3
2‐Apr‐16 26.0
3‐Apr‐16 33.7
4‐Apr‐16 25.2
5‐Apr‐16 18.4
6‐Apr‐16 19.4
7‐Apr‐16 28.4
8‐Apr‐16 20.4
9‐Apr‐16 21.3
0‐Apr‐16 21.7
1‐Apr‐16 23.9
2‐Apr‐16 27.4
3‐Apr‐16 16.2
4‐Apr‐16 12.4
5‐Apr‐16 13.0
6‐Apr‐16 19.2
7‐Apr‐16 26.5
8‐Apr‐16 16.2
9‐Apr‐16 14.5
0‐Apr‐16 18.0
1‐Apr‐16 21.9
2‐Apr‐16 24.3
3‐Apr‐16 15.0
4‐Apr‐16 17.2
5‐Apr‐16 19.0
6‐Apr‐16 11.3
7‐Apr‐16 10.7
8‐Apr‐16 12.1
9‐Apr‐16 16.1
0‐Apr‐16 17.4
April
13
SITE 2 SITE 3
16.7 no data
23.9 no data
36.4 no data
27.7 no data
19.2 no data
19.7 no data
30.3 28.2
21.1 20.7
24.0 23.1
23.0 24.2
25.9 21.6
28.9 24.4
16.3 15.0
12.8 10.7
12.3 16.7
19.8 15.4
25.3 21.1
17.3 17.2
15.7 16.7
18.8 17.1
25.4 33.1
22.9 25.4
14.3 14.5
19.0 17.0
19.0 18.4
11.6 15.4
14.8 10.6
14.0 10.6
20.3 11.7
16.9 25.2
2016
39
2
MUSWE
2016 Annual Envir
SAMPLE
DATESITE 1
01‐May‐16 5.2
02‐May‐16 7.2
03‐May‐16 6.0
04‐May‐16 9.7
05‐May‐16 12.1
06‐May‐16 14.3
07‐May‐16 25.2
08‐May‐16 24.3
09‐May‐16 20.7
10‐May‐16 8.7
11‐May‐16 9.8
12‐May‐16 10.6
13‐May‐16 7.4
14‐May‐16 12.0
15‐May‐16 14.4
16‐May‐16 17.2
17‐May‐16 13.9
18‐May‐16 13.6
19‐May‐16 16.5
20‐May‐16 17.1
21‐May‐16 no data
22‐May‐16 no data
23‐May‐16 no data
24‐May‐16 no data
25‐May‐16 no data
26‐May‐16 13.8
27‐May‐16 9.9
28‐May‐16 6.4
29‐May‐16 5.0
30‐May‐16 11.6
31‐May‐16 17.4
May
ELLBROOK COAL CO
ronmental Manag
SITE 2 SITE 3
6.0 14.7
7.3 2.8
6.7 5.3
9.7 4.7
12.1 7.5
18.3 10.3
24.6 13.4
24.4 20.1
20.7 18.0
10.4 7.4
11.7 7.1
11.6 8.1
7.6 5.4
12.1 8.9
14.6 10.9
18.3 14.1
15.0 11.7
13.7 9.2
20.2 12.6
18.3 12.0
29.7 no dat
26.7 no dat
19.5 16.2
13.5 9.3
13.9 11.0
13.5 9.0
7.2 5.0
5.9 4.4
5.4 4.0
13.5 10.6
17.8 16.0
y 2016
OMPANY LIMITED
gement Report
3SAMPLE
DATES
01‐Jun‐16
02‐Jun‐16
03‐Jun‐16
04‐Jun‐16
05‐Jun‐16
06‐Jun‐16
07‐Jun‐16
08‐Jun‐16
09‐Jun‐16
10‐Jun‐16
11‐Jun‐16
12‐Jun‐16
13‐Jun‐16
14‐Jun‐16
15‐Jun‐16
16‐Jun‐16
17‐Jun‐16
18‐Jun‐16
19‐Jun‐16
20‐Jun‐16
ta 21‐Jun‐16
ta 22‐Jun‐16
23‐Jun‐16
24‐Jun‐16
25‐Jun‐16
26‐Jun‐16
27‐Jun‐16
28‐Jun‐16
29‐Jun‐16
30‐Jun‐16
ITE 1 SITE 2
14.1 15.2
15.3 16.7
16.6 16.0
6.9 7.2
2.5 2.4
7.4 6.9
6.6 7.2
5.7 6.8
7.0 8.2
5.7 5.5
6.2 5.5
13.9 14.2
17.7 17.3
9.4 7.9
11.5 11.6
10.3 10.1
12.6 12.1
10.2 9.5
7.6 9.0
3.8 3.4
5.0 5.0
5.3 5.4
6.0 7.0
5.1 3.9
5.8 5.4
11.6 10.0
6.4 6.6
6.1 6.3
7.9 7.2
6.9 7.8
June 2016
SITE 3SAMPLE
DATE
13.6 01‐Jul‐16
13.6 02‐Jul‐16
13.5 03‐Jul‐16
7.0 04‐Jul‐16
2.2 05‐Jul‐16
4.5 06‐Jul‐16
5.2 07‐Jul‐16
4.0 08‐Jul‐16
4.5 09‐Jul‐16
3.6 10‐Jul‐16
4.3 11‐Jul‐16
14.6 12‐Jul‐16
17.2 13‐Jul‐16
6.3 14‐Jul‐16
6.3 15‐Jul‐16
9.3 16‐Jul‐16
7.5 17‐Jul‐16
9.1 18‐Jul‐16
10.0 19‐Jul‐16
8.7 20‐Jul‐16
2.3 21‐Jul‐16
3.6 22‐Jul‐16
3.5 23‐Jul‐16
3.9 24‐Jul‐16
3.3 25‐Jul‐16
4.5 26‐Jul‐16
6.6 27‐Jul‐16
4.9 28‐Jul‐16
4.5 29‐Jul‐16
4.8 30‐Jul‐16
31‐Jul‐16
E SITE 1 SITE
6 6.5 7.1
6 5.3 5.7
6 7.4 7.3
6 14.5 15.9
6 10.6 10.
6 3.9 4.3
6 10.4 9.9
6 6.7 7.0
6 9.9 10.8
6 9.7 9.6
6 10.2 10.
6 8.1 6.9
6 9.1 9.2
6 8.3 8.0
6 13.1 14.0
6 14.2 16.0
6 13.4 11.
6 6.9 7.4
6 14.6 17.
6 12.3 9.3
6 8.4 15.
6 3.9 9.4
6 8.6 8.3
6 7.0 8.1
6 6.8 8.1
6 7.2 8.1
6 7.6 8.7
6 5.8 5.6
6 5.0 6.3
6 9.8 12.4
6 10.0 11.
July 2016
E 2 SITE 3S
1 4.9 01
7 4.7 02
3 3.0 03
9 5.4 04
5 14.8 05
3 9.3 06
9 2.3 07
0 6.8 08
8 6.2 09
6 14.3 10
5 9.5 11
9 6.9 12
2 6.3 13
0 7.3 14
0 5.8 15
0 10.8 16
2 11.7 17
4 11.4 18
5 5.0 19
3 12.2 20
7 1.0 21
4 3.0 22
3 8.0 23
1 5.6 24
1 5.1 25
1 6.7 26
7 6.8 27
6 4.4 28
3 4.6 29
4 7.3 30
7 7.7 31
SAMPLE
DATESITE 1
1‐Aug‐16 12.6
2‐Aug‐16 13.8
3‐Aug‐16 9.2
4‐Aug‐16 9.8
5‐Aug‐16 11.8
6‐Aug‐16 9.6
7‐Aug‐16 11.2
8‐Aug‐16 12.5
9‐Aug‐16 8.7
0‐Aug‐16 13.1
1‐Aug‐16 8.1
2‐Aug‐16 6.6
3‐Aug‐16 9.4
4‐Aug‐16 12.9
5‐Aug‐16 19.6
6‐Aug‐16 16.7
7‐Aug‐16 11.9
8‐Aug‐16 12.7
9‐Aug‐16 13.8
0‐Aug‐16 6.4
1‐Aug‐16 6.8
2‐Aug‐16 14.6
3‐Aug‐16 9.1
4‐Aug‐16 9.1
5‐Aug‐16 4.6
6‐Aug‐16 8.0
7‐Aug‐16 9.9
8‐Aug‐16 6.6
9‐Aug‐16 15.1
0‐Aug‐16 22.8
1‐Aug‐16 16.5
August
14
SITE 2 SITE 3
13.2 9.8
14.5 14.2
9.4 7.5
9.9 8.4
11.5 8.8
9.0 7.8
12.0 11.1
10.6 7.3
9.5 6.6
13.7 10.1
8.2 6.9
7.0 5.3
8.9 6.1
12.8 12.0
18.0 18.5
14.2 10.9
12.2 9.5
12.7 10.4
14.2 10.3
7.5 6.2
7.2 5.3
14.9 12.4
8.8 9.0
9.0 6.8
5.1 4.3
7.8 6.9
10.4 8.0
7.5 5.3
15.0 15.0
23.8 19.1
16.2 12.8
t 2016
40
2
MUSWE
2016 Annual Envir
SAMPLE
DATESITE 1
01‐Sep‐16 8.1
02‐Sep‐16 9.5
03‐Sep‐16 6.8
04‐Sep‐16 5.5
05‐Sep‐16 9.7
06‐Sep‐16 no data
07‐Sep‐16 no data
08‐Sep‐16 19.6
09‐Sep‐16 14.5
10‐Sep‐16 5.3
11‐Sep‐16 6.3
12‐Sep‐16 13.2
13‐Sep‐16 21.1
14‐Sep‐16 7.4
15‐Sep‐16 4.2
16‐Sep‐16 5.9
17‐Sep‐16 8.2
18‐Sep‐16 no data
19‐Sep‐16 no data
20‐Sep‐16 no data
21‐Sep‐16 no data
22‐Sep‐16 9.6
23‐Sep‐16 8.4
24‐Sep‐16 11.1
25‐Sep‐16 no data
26‐Sep‐16 10.3
27‐Sep‐16 11.2
28‐Sep‐16 11.2
29‐Sep‐16 18.3
30‐Sep‐16 12.3
Septem
ELLBROOK COAL CO
ronmental Manag
SITE 2 SITE 3
6.6 3.9
11.2 12.5
7.6 6.7
5.9 4.6
9.0 7.2
9.3 6.4
16.8 14.7
16.1 16.0
14.4 11.1
5.9 6.7
6.4 5.6
12.4 10.8
19.1 17.6
8.0 5.6
5.4 4.0
6.2 3.4
7.9 5.2
13.6 12.4
5.7 4.1
11.5 no dat
9.6 8.0
7.9 4.7
10.1 5.1
7.6 9.1
6.2 4.5
6.8 5.4
12.8 8.1
11.0 8.6
17.5 13.4
12.7 10.6
mber 2016
OMPANY LIMITED
gement Report
3SAMPLE
DATES
01‐Oct‐16
02‐Oct‐16
03‐Oct‐16
04‐Oct‐16
05‐Oct‐16
06‐Oct‐16
07‐Oct‐16
08‐Oct‐16
09‐Oct‐16
10‐Oct‐16
11‐Oct‐16
12‐Oct‐16
13‐Oct‐16
14‐Oct‐16
15‐Oct‐16
16‐Oct‐16
17‐Oct‐16
18‐Oct‐16
19‐Oct‐16
ta 20‐Oct‐16
21‐Oct‐16
22‐Oct‐16
23‐Oct‐16
24‐Oct‐16
25‐Oct‐16
26‐Oct‐16
27‐Oct‐16
28‐Oct‐16
29‐Oct‐16
30‐Oct‐16
31‐Oct‐16
O
ITE 1 SITE 2
8.3 10.2
8.0 8.8
9.3 9.8
8.7 11.0
9.6 11.2
13.5 14.9
13.5 14.7
18.1 19.6
18.0 19.8
23.9 25.4
6.7 7.0
7.9 8.8
15.9 15.5
13.4 13.9
11.6 11.6
15.3 18.2
13.0 15.5
6.5 9.2
12.9 15.1
21.0 21.7
19.0 20.0
4.4 5.5
12.6 13.5
11.2 10.6
13.1 13.0
11.0 14.4
17.8 19.0
16.3 16.6
19.0 21.7
15.7 16.6
12.9 14.2
October 2016
SITE 3SAMPLE
DATE
10.4 01‐Nov‐1
6.2 02‐Nov‐1
5.0 03‐Nov‐1
5.0 04‐Nov‐1
6.8 05‐Nov‐1
7.4 06‐Nov‐1
8.8 07‐Nov‐1
10.1 08‐Nov‐1
13.3 09‐Nov‐1
17.2 10‐Nov‐1
17.3 11‐Nov‐1
7.4 12‐Nov‐1
5.7 13‐Nov‐1
15.8 14‐Nov‐1
12.1 15‐Nov‐1
6.9 16‐Nov‐1
13.7 17‐Nov‐1
9.4 18‐Nov‐1
4.5 19‐Nov‐1
12.5 20‐Nov‐1
15.1 21‐Nov‐1
14.3 22‐Nov‐1
6.0 23‐Nov‐1
10.2 24‐Nov‐1
8.8 25‐Nov‐1
8.3 26‐Nov‐1
7.4 27‐Nov‐1
22.8 28‐Nov‐1
20.9 29‐Nov‐1
16.3 30‐Nov‐1
13.2
E SITE 1 SITE
16 18.8 15.
16 16.3 14.
16 10.7 10.
16 12.2 13.
16 19.7 23.
16 18.7 18.8
16 16.9 16.
16 22.3 23.
16 14.3 16.
16 16.8 19.
16 22.7 23.
16 11.3 13.
16 14.2 16.
16 9.1 10.
16 11.9 14.8
16 15.7 16.
16 14.2 15.0
16 14.4 14.
16 23.8 25.4
16 25.5 28.4
16 24.5 25.
16 34.4 29.9
16 31.8 36.
16 18.8 15.
16 15.9 17.8
16 24.1 25.
16 26.2 32.
16 28.1 26.
16 24.7 28.4
16 16.2 19.4
November 20
E 2 SITE 3S
5 9.7 01
1 15.0 02
3 8.8 03
7 7.8 04
7 13.0 05
8 19.2 06
7 11.8 07
6 12.0 08
5 21.0 09
3 14.2 10
3 19.9 11
2 17.3 12
2 10.0 13
5 10.9 14
8 9.5 15
7 13.8 16
0 14.3 17
6 13.0 18
4 11.2 19
4 27.1 20
6 22.0 21
9 no data 22
3 no data 23
5 no data 24
8 no data 25
1 no data 26
3 no data 27
2 no data 28
4 no data 29
4 no data 30
31
016SAMPLE
DATESITE 1
1‐Dec‐16 14.4
2‐Dec‐16 23.2
3‐Dec‐16 27.8
4‐Dec‐16 20.7
5‐Dec‐16 25.9
6‐Dec‐16 21.9
7‐Dec‐16 6.2
8‐Dec‐16 14.5
9‐Dec‐16 17.1
0‐Dec‐16 18.1
1‐Dec‐16 23.6
2‐Dec‐16 15.0
3‐Dec‐16 16.3
4‐Dec‐16 31.1
5‐Dec‐16 7.3
6‐Dec‐16 10.6
7‐Dec‐16 11.7
8‐Dec‐16 27.3
9‐Dec‐16 23.5
0‐Dec‐16 19.6
1‐Dec‐16 18.4
2‐Dec‐16 18.6
3‐Dec‐16 22.2
4‐Dec‐16 14.0
5‐Dec‐16 8.6
6‐Dec‐16 10.4
7‐Dec‐16 14.2
8‐Dec‐16 17.4
9‐Dec‐16 13.8
0‐Dec‐16 23.7
1‐Dec‐16 32.1
Decemb
14
SITE 2 SITE 3
15.4 34.0
21.4 20.1
29.4 23.4
23.6 22.6
30.0 27.0
25.5 24.2
7.3 13.8
18.3 13.0
18.2 16.4
21.9 16.2
29.1 24.0
17.5 18.4
17.7 11.7
15.7 14.5
9.0 16.0
11.4 11.7
12.2 15.6
28.8 no data
20.7 24.2
21.1 10.6
19.8 no data
19.2 no data
23.3 no data
17.7 no data
10.2 no data
11.1 no data
13.8 no data
18.4 no data
13.8 8.9
26.8 16.1
31.8 24.3
ber 2016
41
2016 An
MUSWELL
nnual Environ
A
LBROOK COAL
nmental Man
Appendi
L COMPANY L
nagement Re
ix 2: Wa
IMITED
eport
ater Moonitoringg Resultts
142
2016 An
MONTH
DATE
20‐Jan‐1
18‐Feb‐
16‐Mar‐
15‐Apr‐1
13‐May‐
23‐Jun‐1
25‐Jul‐1
19‐Aug‐
22‐Sep‐
20‐Oct‐1
23‐Nov‐
21‐Dec‐
Blank ce MONTH
DATE
20‐Jan‐1
18‐Feb‐
16‐Mar‐
15‐Apr‐1
13‐May‐
23‐Jun‐1
25‐Jul‐1
19‐Aug‐
22‐Sep‐
20‐Oct‐1
23‐Nov‐
21‐Dec‐
Blank ce MONTH
DATE
20‐Jan‐1
18‐Feb‐
16‐Mar‐
15‐Apr‐1
13‐May‐
23‐Jun‐1
MUSWELL
nnual Environ
HLY SURFAC
Dam 1
16 7.73
16 8.03
16 8.07
16 8.05
‐16 7.72
16 8.03
16 8.08
16 7.62
16 8.02
16 8.09
16 7.67
16 8.17
ells indicate t
HLY SURFAC
Dam 1
16 6,51
16 6,44
16 6,63
16 6,34
‐16 7,10
16 6,38
16 6,23
16 6,22
16 6,62
16 6,83
16 6,19
16 6,64
ells indicate t
HLY SURFAC
Dam 1
16 8
16 9
16 6
16 8
‐16 <5
16 9
LBROOK COAL
nmental Man
E WATER M
1/2
MCCFin
SettPon
3 8.2
3 8.3
7 8.3
5 8.4
2 8.4
3 8.3
8 8.3
2 8.4
2 8.3
9 8.3
7 8.3
7 8.3
that no samp
E WATER M
1/2
MCCFin
SettPon
10 2,5
40 6,8
30 9,4
40 11,3
00 10,0
80 6,1
30 6,2
20 7,3
20 6,5
30 8,4
90 7,1
40 8,1
that no samp
E WATER M
1/2
MCCFin
SettPon
13
10
5
<5
<5
17
L COMPANY L
nagement Re
MONITORING
C12 nal ling nd
NOpe
Vo
20 8
37 8
35 8
45 7
48 7
34 7
35
45 7
33 8
30 8
33
30 8
ple was colle
MONITORING
C12 nal ling nd
NOpe
Vo
80 6,
10 6,
80 6,
300 6,4
000 7,
60 6,
30 6,4
50 6,
30 6,
60 6,
10 6,
60 6,
ple was colle
MONITORING
C12 nal ling nd
NOpe
Vo
35 1
0
5
5 1
5 <
7
IMITED
eport
G RESULTS ‐
o.2 en Cut oid
NOp
V
.08
.21
.07
.92
.98
.96
8
.91
.12
.07
8
.05
ected
G RESULTS –
o.2 en Cut oid
NOp
V
850
760
850
440
250
540
440
330
660
880
350
850
ected
G RESULTS –
o.2 en Cut oid
NOp
V
10
8
6
10
<5
8
‐ pH
No.1 pen Cut Void
M
– ELECTRICA
No.1 pen Cut Void
M
– TOTAL SUS
No.1 pen Cut Void
MMC
up
MCC07
7.95
8.22
8.03
8.07
7.95
7.9
7.83
7.84
7.96
7.93
7.86
7.86
AL CONDUCT
MCC07
934
2,100
4,030
4,770
4,390
2,380
987
1,590
1,010
1,840
2,670
4,430
SPENDED SO
MCC07 Muscle Creek ‐ pstream
d
<5
<5
<5
6
<5
6
MCC08
7.95
8.22
7.98
8.03
7.98
7.19
7.86
7.81
7.99
7.95
7.72
7.89
TIVITY
MCC08
1,120
2,970
5,240
5,410
5,580
3,350
1,530
2,230
1,110
2,560
3,760
5,200
OLIDS
MCC08 Muscle Creek ‐
downstream
<5
<5
5
8
10
<5
143
2016 An
DATE
25‐Jul‐1
19‐Aug‐
22‐Sep‐
20‐Oct‐1
23‐Nov‐
21‐Dec‐
Blank ce QUARTE
DATE
16‐Mar‐
23‐Jun‐1
22‐Sep‐
21‐Dec‐
Blank ce QUARTE
DATE
16‐Mar‐
23‐Jun‐1
22‐Sep‐
21‐Dec‐
Blank ce QUARTE
DATE
16‐Mar‐
23‐Jun‐1
22‐Sep‐
21‐Dec‐
Blank ce
MUSWELL
nnual Environ
Dam 1
16 9
16 17
16 10
16 6
16 9
16 <5
ells indicate t
ERLY SURFA
MCC
16 8.41
16
16
16
ells indicate t
ERLY SURFA
MCC
16 12,40
16
16
16
ells indicate t
ERLY SURFA
MCC
16 608
16
16
16
ells indicate t
LBROOK COAL
nmental Man
1/2
MCCFin
SettPon
18
35
11
<5
20
<5
that no samp
ACE WATER
C9 MCC
1 9.1
8.59.18.1
that no samp
ACE WATER
C9 MCC
00 1,8
2,0
1,6
2,3
that no samp
ACE WATER
C9 MCC
8 41
8
10
30
that no samp
L COMPANY L
nagement Re
C12 nal ling nd
NOpe
Vo
8
5 1
1 1
5
0 1
5 1
ple was colle
MONITORIN
C23 MC
18
55 15 716
ple was colle
MONITORIN
C23 MC
80
20
80 2,
00
ple was colle
MONITORIN
C23 MC
1
8
0 1
0
ple was colle
IMITED
eport
o.2 en Cut oid
NOp
V
7
10
10
7
10
12
ected
NG RESULTS
CC24 M
.84
ected
NG RESULTS
CC24 M
3
2
740 3
4
ected
NG RESULTS
CC24 M
11
ected
No.1 pen Cut Void
MMC
up
S – pH
MCC25 M
7.81
7.88 7.61 7.90
S – ELECTRIC
MCC25 M
3,060
2,900
3,330
4,360
S – TOTAL S
MCC25 M
10
6
<5
10
MCC07 Muscle Creek ‐ pstream
d
16
6
5
<5
<5
<5
MCC26
8.28
8.21 8.75 8.45
CAL CONDU
MCC26
6,780
2,910
2,230
6,720
USPENDED
MCC26
6
8
6
6
MCC08 Muscle Creek ‐
downstream
7
6
7
<5
<5
<5
MCC27
8.03
8.19 8.28 8.41
CTIVITY
MCC27
11,000
7,200
6,540
9,750
SOLIDS
MCC27
<5
24
5
<5
144
2
AS
Ha(
C
Bic
Su
Ch
C
M
S
Po
Ir
A
MUSWE
2016 Annual Envir
ANNUAL SURFACSampled 16 March
ANALYTE
pH
EC (µS/cm)
TDS (mg/L)
TSS (mg/L)
ardness ‐ total (calculation ‐
mg/L)
Alkalinity ‐ arbonate (mg CaCO3/L)
Alkalinity ‐ carbonate (mg CaCO3/L)
lphates (mg/L)
hloride (mg/L)
Calcium ‐ total (mg/L)
Magnesium ‐ total (mg/L)
Sodium ‐ total (mg/L)
otassium ‐ total (mg/L)
ron‐ filterable (mg/L)
Arsenic (mg/L)
ELLBROOK COAL CO
ronmental Manag
CE WATER MONITh 2016
Dam 1/2
MCFin
SettPo
8.07 8.3
6630 94
6 5
3110 50
<1 1
251 20
2220 39
598 75
577 50
405 91
497 81
36 4
<0.05 <0
<0.001 0.0
OMPANY LIMITED
gement Report
TORING RESULTS
C12 nal tling ond
No.1 Open
Cut Void
35 Dry
480
5
000
10
06
940
54
00
11
12
40
.05
001
S
No.2 Open
Cut Void M
8.07 8
6850 4
6
3340 8
<1
222 2
2280 3
586 8
580 1
459
529 4
41
<0.05 <0
<0.001 0
MCC7 MCC8
8.03 7.98
4030 5240
<5 5
887 1310
<1 <1
292 329
391 773
835 965
192 266
99 158
468 646
4 3
0.05 <0.05
.002 0.002
MCC9 M
8.41
12400
608
4900
22
426
4080
1400
200
1070
1340
59
<0.05 <
0.023 0
MCC23 MCC24
9.18 Dry
1880
41
699
27
37
812
103
92
114
140
16
<0.05
0.005
4 MCC25
7.81
3060
10
862
<1
217
457
488
134
128
316
7
<0.05
0.002
14
MCC26 MCC2
8.28 8.03
6780 1100
6 <5
3440 4460
<1 <1
237 202
2430 4030
344 972
205 400
712 841
472 1130
19 27
<0.05 <0.0
0.001 0.00
45
27
3
00
0
2
0
2
0
1
0
5
1
2
B
Ca
Ch
C
N
Mfilt
Se
B
Iro
M
F
A
Nit
ToH
B
MUSWE
2016 Annual Envir
ANALYTE
Barium (mg/L)
admium (mg/L)
romium (mg/L)
opper (mg/L)
Nickel (mg/L)
Lead (mg/L)
Zinc (mg/L)
Manganese ‐ terable (mg/L)
elenium (mg/L)
Boron (mg/L)
n ‐ total (mg/L)
Mercury (mg/L)
luoride ‐ total (mg/L)
Nitrogen Ammonia (mg
N/L)
trates (mg N/L)
Oil & Grease (mg/L)
PAH (mg/L)
otal Petroleum Hydrocarbons
(mg/L)
Blank cells indicate
ELLBROOK COAL CO
ronmental Manag
Dam 1/2
MCFin
SettPo
0.038 0.0
<0.0001 <0.0
<0.001 <0.0
0.002 0.0
<0.001 <0.0
0.219 0.0
0.056 0.0
<0.01 <0
0.008 <0.0
0.66 0
0.38 0
<0.0001 <0.0
0.7 1
1.64 0.0
1.94 0.0
<5 <
<0.5 <0
<70 <7
e that no sample
OMPANY LIMITED
gement Report
C12 nal tling ond
No.1 Open
Cut Void
033
0001
001
002
001
064
015
.01
005
.6
.2
0001
.1
08
04
<5
0.5
70
was collected
No.2 Open
Cut Void M
0.035 0
<0.0001 <0
<0.001 <0
0.002 0
<0.001 <0
0.289 0
0.084 <0
<0.01 <0
0.008 <0
0.68 0
0.1 0
<0.0001 <0
0.8 0
0.94 <0
2.62 <0
<5
<0.5 <
<70 <
MCC7 MCC8
.075 0.073
.0001 <0.0001
0.001 <0.001
.002 <0.001
0.001 <0.001
.072 0.084
0.001 <0.001
0.01 <0.01
0.005 <0.005
0.11 0.11
0.07 0.11
.0001 <0.0001
0.3 0.4
0.01 <0.01
0.01 <0.01
<5 <5
<0.5 <0.5
<70 <70
MCC9 M
0.231 0
<0.0001 <0
0.03 <
0.014 0
0.012 <
3.65 0
0.041 0
<0.01 <
0.062 0
0.69 <
26
<0.0001 <0
0.8
0.17
<0.01 <
15
<0.5
<70
MCC23 MCC24
0.097
0.0001
<0.001
0.002
<0.001
0.017
0.006
<0.01
0.008
<0.05
1.03
0.0001
0.6
0.05
<0.01
<5
<0.5
<70
4 MCC25
0.086
<0.0001 <
<0.001
<0.001
<0.001
0.835
0.003
<0.01
<0.005
0.06
1.12
<0.0001 <
0.3
0.08
<0.01
<5
<0.5
<70
14
MCC26 MCC2
0.03 0.01
<0.0001 <0.00
<0.001 <0.00
0.001 0.00
<0.001 <0.00
0.043 0.05
0.004 0.00
<0.01 <0.0
<0.005 <0.00
0.11 0.27
0.13 0.12
<0.0001 <0.00
0.8 0.6
0.06 0.13
<0.01 0.01
<5 <5
<0.5 <0.5
<70 <70
46
27
8
01
01
1
01
3
3
1
05
7
2
01
3
1
5
0
2
G
MUSWE
2016 Annual Envir
GROUND WATER
DATE
Jan‐16
Feb‐16
Mar‐16
Apr‐16
May‐16
Jun‐16
Jul‐16
Aug‐16
Sep‐16
Oct‐16
Nov‐16
Dec‐16
AVERAGE
ELLBROOK COAL CO
ronmental Manag
R MONITORING R
Relative Lev(mAHD)
BORE
113.72
113.73
113.74
113.71
113.71
113.72
113.73
113.68
113.72
116.62
116.44
113.89
113.72
OMPANY LIMITED
gement Report
RESULTS – MININ
vel pH
RDH650
7.4
7.8
no result
8.0
7.3
no result
no result
7.3
no result
no result
no result
no result
7.6
NG AREAS
Electrical Conductivit(µS/cm)
6,600
6,380
t no result
6,350
7,020
t no result
t no result
6,060
t no result
t no result
t no result
t no result
6,482
ty
RDH61
53.92
55.94
56.08
57.22
57.08
54.59
53.86
54.9
54.48
55.45
55.07
55.23
55.32
Depth(
16 RD
2
4
8 4
2 4
8 4
9 4
6 4
4
8 4
5 4
7 4
3 4
2 4
h to Water mbgl)
DH617
48
49.1
49.39
49.76
49.71
48.12
47.89
48.39
48.01
48.39
48.25
48.25
48.61
RDH624
33.9
33.92
33.96
34
34.02
34.07
34.1
33.13
34.18
34.2
34.22
34.26
34.00
1447
2016 An
ANNUASampled
MUSWELL
nnual Environ
AL GROUNDWd 13 May 201
Hardness
Alkalinity
Alkalinity ‐
S
Ca
Mag
So
Pota
Iro
C
Manga
I
Flu
Nitrog
N
O
Total Petro
LBROOK COAL
nmental Man
WATER MO16
ANALYTE
pH
EC (µS/cm
TSS (mg/
‐ total (calcu
‐ Carbonate
‐ Bicarbonate
Sulphates (m
Chloride (m
lcium ‐ total
nesium ‐ tot
odium ‐ total
assium ‐ tota
on‐ filterable
Arsenic (mg
Barium (mg
Cadmium (m
Chromium (m
Copper (mg
Nickel (mg
Lead (mg/
Zinc (mg/
anese ‐ filtera
Selenium (m
Boron (mg
ron ‐ total (m
Mercury (m
uoride ‐ total
gen Ammoni
Nitrates (mg
Oil & Grease (
PAH (mg/
oleum Hydro
L COMPANY L
nagement Re
NITORING R
E
m)
/L)
ulation ‐ mg/
(mg CaCO3/
e (mg CaCO3/
mg/L)
g/L)
(mg/L)
tal (mg/L)
(mg/L)
al (mg/L)
(mg/L)
g/L)
g/L)
mg/L)
mg/L)
g/L)
g/L)
/L)
/L)
able (mg/L)
mg/L)
g/L)
mg/L)
mg/L)
(mg/L)
a (mg N/L)
g N/L)
(mg/L)
/L)
ocarbons (mg
IMITED
eport
RESULTS – M
/L)
/L)
3/L)
g/L)
MINING ARE
RDH
7.3
70
<
31
<
32
28
61
59
40
53
4
3.7
<0.0
0.0
<0.0
<0.0
0.0
0.0
0.0
0.3
0.6
<0.
0.7
3.7
<0.0
0.
6.
0.0
<
<0
<7
EAS
H607
32
20
5
80
1
23
00
10
98
09
37
2
73
001
039
0001
001
098
01
048
383
647
.01
73
78
0001
.7
.3
01
5
0.5
70
148
2
G
1
1
2
MUSWE
2016 Annual Envir
GROUND WATER
Date Sampled Dep
(mb
20‐Jan‐16 3.3
18‐Feb‐16 3.2
16‐Mar‐16 3.7
15‐Apr‐16 5.2
13‐May‐16 5.0
23‐Jun‐16 5.7
20‐Jul‐16 6.0
19‐Aug‐16 2.5
22‐Sep‐16 2.2
20‐Oct‐16 2.4
23‐Nov‐16 3.1
16‐Dec‐16 3.4
ELLBROOK COAL CO
ronmental Manag
R MONITORING R
MCC 1003
pth bgl)
pH (µ
36 7.1 1
27 7.0 1
79 7.0 1
22 7.1 1
04 7.6 1
72 7.1 1
08 7.2 1
52 7.3 1
29 7.1 1
46 7.1 1
10 7.0 1
45 7.1 1
OMPANY LIMITED
gement Report
RESULTS – SANDY
EC µS/cm)
Depth (mbgl)
1,508 7.55
1,673 7.61
1,383 7.75
1,592 7.90
1,700 8.00
1,641 no acc
1,666 8.03
1,078 7.19
1,304 6.90
1,426 7.08
1,304 7.30
1,377 7.56
Y CREEK
MCC 1005
pH EC
(µS/cm
7.1 1,966
7.0 1,927
7.1 1,609
7.1 1,994
7.7 2,260
cess – gate locked
7.3 1,959
7.2 2,250
7.1 2,780
7.1 2,480
7.0 2,350
7.0 2,300
MCC
m) Depth (mbgl)
p
6 5.43 7
7 5.17 7
9 5.57 7
4 6.11 7
0 6.66 7
7.37
9 d
0 d
0 5.07 7
0 4.81 7
0 4.96 7
0 5.26 7
C 1006
pH EC
(µS/cm)
.2 1,013
.0 1,024
.2 935
.1 1,023
.7 1,060
too low to sample
dry
dry
.2 1,010
.2 940
.1 901
.2 928
MCC 1015
Depth (mbgl)
pH
3.64 7.1
3.66 7.0
4.76 7.0
3.82 7.2
3.98 7.7
4.04 7.3
3.84 7.2
3.69 7.3
3.56 6.9
3.62 7.0
3.69 7.0
3.68 too lsam
5 MCC
EC (µS/cm)
Dep(mb
2,660 3.6
2,350 3.6
2,280 4.7
2,270 3.8
2,320 3.9
1,758 4.0
1,676 3.8
1,570 3.6
1,792 3.5
1,997 3.6
2,430 3.6
ow to mple
3.6
14
1017 MCC 1018
pth bgl)
Depth (mbgl)
64 17.41
66 17.41
76 17.42
82 17.57
98 17.57
04 17.56
84 17.65
69 17.66
56 17.62
62 17.73
69 17.67
68 17.73
49
8
2016 An
ANNUASampled
MUSWELL
nnual Environ
AL GROUNDWd 13 May 201
Hardness
Alkalini
Alkalinit
Su
Ch
Calci
Magne
Sodiu
Potass
Iron‐
A
B
Ca
Ch
C
Mang
N
Se
B
Iro
M
Fluor
Am
Ni
Ni
Oil &
ToHydr
LBROOK COAL
nmental Man
WATER MO16
Analyte
pH
EC (µS/cm)
TSS (mg/L)
s ‐ total (calcmg/L)
ity ‐ CarbonaCaCO3/L)
ty ‐ BicarbonCaCO3/L)
lphates (mg/
hloride (mg/
um ‐ total (m
esium ‐ total
um ‐ total (m
sium ‐ total (
‐ filterable (m
Arsenic (mg/L
Barium (mg/L
admium (mg/
romium (mg
opper (mg/L
Lead (mg/L)
ganese ‐ filte(mg/L)
Nickel (mg/L
elenium (mg/
Zinc (mg/L)
Boron (mg/L
n ‐ total (mg
Mercury (mg/
ride ‐ total (m
mmonia (mg/
itrite (mg N/
trate (mg N/
& Grease (m
PAH (mg/L)
otal Petroleurocarbons (m
L COMPANY L
nagement Re
NITORING R
M
culation ‐
ate (mg
ate (mg
/L)
/L)
mg/L)
(mg/L)
mg/L)
(mg/L)
mg/L)
L)
L)
/L)
g/L)
/L)
erable
)
/L)
)
g/L)
/L)
mg/L)
/L)
/L)
/L)
g/L)
um mg/L)
IMITED
eport
RESULTS – S
MCC1003 M
7.57
1700
<5
426
<1
249
149
294
93
47
179
2
<0.05
<0.001
0.049
<0.0001
<0.001
<0.001
<0.001
0.002
<0.001
<0.01
0.008
0.13
0.16
<0.0001
0.3
0.03
<0.01
0.43
<5
<0.5
<70
SANDY CREE
MCC1005 M
7.66
2260
<5
455
<1
277
165
425
85
59
282
2
0.05
<0.001
0.023
<0.0001
<0.001
<0.001
<0.001
0.13
<0.001
<0.01
0.026
0.06
0.32
<0.0001
0.3
1.32
0.03
0.37
<5
<0.5
<70
K
MCC1006 M
7.65
1060
11
272
<1
201
73
169
58
31
111
2
<0.05
<0.001
0.039
<0.0001
<0.001
<0.001
<0.001
0.004
<0.001
<0.01
0.01
0.1
0.43
<0.0001
0.3
0.04
<0.01
0.34
<5
<0.5
<70
MCC1015
7.72
2320
42
529
<1
332
265
376
108
63
266
3
0.06
0.002
0.076
0.0002
<0.001
0.004
0.003
1.04
0.001
<0.01
0.082
0.13
2.14
<0.0001
0.4
0.26
0.01
0.16
<5
<0.5
<70
150
2016 An
MUSWELL
nnual Environ
LBROOK COAL
nmental Man
Appen
L COMPANY L
nagement Re
ndix 3: B
IMITED
eport
Blast Moonitorinng Data
151
2
MUSWE
2016 Annual Envir
Date
12‐Jan‐
13‐Jan‐
19‐Jan‐
22‐Jan‐
25‐Jan‐
29‐Jan‐
2‐Feb‐
5‐Feb‐
10‐Feb
12‐Feb
16‐Feb
17‐Feb
19‐Feb
3‐Mar‐
4‐Mar‐
10‐Mar
16‐Mar
17‐Mar
22‐Mar
1‐Apr‐
6‐Apr‐
7‐Apr‐
12‐Apr
14‐Apr
19‐Apr
20‐Apr
22‐Apr
29‐Apr
ELLBROOK COAL CO
ronmental Manag
e Time
‐16 12:46
‐16 14:40
‐16 12:42
‐16 13:34
‐16 15:48
‐16 12:19
‐16 13:33
‐16 13:21
‐16 14:31
‐16 13:21
‐16 13:14
‐16 12:44
‐16 12:50
‐16 13:00
‐16 14:09
r‐16 12:46
r‐16 12:49
r‐16 12:54
r‐16 15:06
‐16 12:40
‐16 14:04
‐16 10:14
‐16 12:46
‐16 14:17
‐16 16:17
‐16 14:16
‐16 13:16
‐16 13:04
OMPANY LIMITED
gement Report
Queen Street
Overpressure dB(L)
GV
103.0
93.1
93.1
105.4
103.0
98.5
99.7
109.4
95.3
97.0
98.5
103.8
95.3
94.3
103.4
95.3
114.9
97.0
106.3
105.4
100.3
107.1
104.1
111.2
100.3
98.5
96.2
94.3
BLAST
(B1)
Ground Vibration mm/s
OverprdB
0.21 10
0.17 92
0.25 91
0.19 10
0.14 89
0.17 97
0.17 95
0.13 10
0.19 94
0.20 93
0.20 99
0.12 91
0.43 92
0.28 91
0.24 10
0.32 97
0.17 11
0.18 93
0.20 10
0.31 10
0.20 99
0.23 10
0.15 10
0.19 10
0.18 99
0.15 95
0.20 93
0.21 93
MONITORING R
School (B2)
ressure B(L)
GroundVibratiomm/s
3.8 0.12
2.4 0.09
1.1 0.15
4.4 0.09
9.5 0.08
7.1 0.09
5.5 0.11
8.4 0.08
4.6 0.11
3.6 0.12
9.6 0.12
1.1 0.08
2.4 0.13
1.1 0.13
1.9 0.14
7.8 0.16
1.6 0.12
3.6 0.09
4.1 0.21
1.9 0.15
9.6 0.15
0.1 0.11
0.6 0.09
3.8 0.13
9.6 0.12
5.5 0.11
3.6 0.12
3.6 0.13
RESULTS
99 Queen
d on
OverpressuredB(L)
100.6
91.9
93.1
105.9
91.9
95.0
98.5
110.4
95.8
96.6
99.1
89.0
94.1
93.1
102.2
96.6
114.9
91.9
105.1
103.9
96.6
105.1
105.9
105.9
102.6
101.4
95.8
93.1
Street (B3)
e Ground Vibrationmm/s
O
0.25
0.13
0.20
0.16
0.09
0.11
0.12
0.07
0.14
0.14
0.13
0.07
0.23
0.15
0.29
0.19
0.17
0.11
0.20
0.24
0.11
0.17
0.10
0.23
0.14
0.16
0.15
0.18
Nisbet (B4)
Overpressure dB(L)
GVi
104.3
96.5
98.3
105.8
99.3
94.2
103.1
108.3
104.0
103.1
105.8
93.3
99.3
95.8
109.9
102.8
111.6
95.0
109.6
109.5
97.7
105.6
107.4
106.2
105.3
108.2
102.5
97.1
15
)
Ground ibration mm/s
0.36
0.27
0.49
0.22
0.19
0.22
0.25
0.15
0.26
0.24
0.19
0.15
0.45
0.31
0.47
0.27
0.50
0.17
0.30
0.61
0.18
0.27
0.24
0.82
0.29
0.40
0.31
0.27
52
2
MUSWE
2016 Annual Envir
Date
4‐May‐
4‐May‐
6‐May‐
11‐May
13‐May
18‐May
19‐May
20‐May
26‐May
30‐May
31‐May
1‐Jun‐
3‐Jun‐
7‐Jun‐
10‐Jun‐
14‐Jun‐
15‐Jun‐
16‐Jun‐
17‐Jun‐
22‐Jun‐
27‐Jun‐
28‐Jun‐
29‐Jun‐
30‐Jun‐
30‐Jun‐
1‐Jul‐1
4‐Jul‐1
7‐Jul‐1
14‐Jul‐
ELLBROOK COAL CO
ronmental Manag
e Time
‐16 13:20
‐16 13:27
‐16 13:56
y‐16 11:22
y‐16 12:41
y‐16 14:32
y‐16 12:43
y‐16 12:25
y‐16 12:51
y‐16 12:42
y‐16 12:49
16 12:48
16 12:48
16 15:07
‐16 13:27
‐16 12:46
‐16 15:08
‐16 12:43
‐16 12:26
‐16 14:40
‐16 13:50
‐16 12:49
‐16 12:44
‐16 15:38
‐16 15:54
16 9:28
16 12:46
16 13:32
‐16 12:46
OMPANY LIMITED
gement Report
Queen Street
Overpressure dB(L)
GV
98.5
101.8
104.5
102.2
98.4
106.2
108.8
88.8
113.1
110.4
103.2
109.5
106.8
105.7
98.5
98.5
107.0
107.6
106.0
96.6
100.4
100.8
91.3
106.4
105.7
104.2
101.6
105.2
110.8
(B1)
Ground Vibration mm/s
OverprdB
0.26 96
0.13 87
0.18 10
0.17 96
0.30 94
0.20 10
0.37 10
0.13 91
0.17 10
0.31 10
0.19 10
0.19 10
0.21 10
0.19 91
0.17 95
0.16 93
0.25 10
0.23 10
0.22 10
0.20 10
0.19 96
0.27 97
0.21 90
0.16 10
0.19 10
0.20 10
0.17 10
0.15 10
0.19 10
School (B2)
ressure B(L)
GroundVibratiomm/s
6.3 0.14
7.5 0.07
1.9 0.11
6.3 0.09
4.6 0.15
1.1 0.11
4.4 0.18
1.1 0.10
4.4 0.10
5.3 0.16
1.5 0.09
5.3 0.10
8.8 0.11
1.1 0.09
5.5 0.08
3.6 0.10
4.5 0.16
6.8 0.14
7.5 0.13
2.8 0.15
6.0 0.13
7.5 0.15
0.8 0.11
7.7 0.11
6.6 0.11
8.5 0.17
3.5 0.11
1.3 0.10
8.3 0.11
99 Queen
d on
OverpressuredB(L)
96.6
93.1
103.9
99.1
94.1
103.6
105.6
87.0
100.6
108.8
103.9
109.1
106.4
106.1
98.5
97.3
106.4
107.1
107.1
92.8
98.8
97.9
90.8
94.3
100.4
99.6
102.3
103.9
109.7
Street (B3)
e Ground Vibrationmm/s
O
0.25
0.07
0.16
0.11
0.25
0.13
0.27
0.06
0.16
0.23
0.17
0.14
0.18
0.11
0.16
0.12
0.33
0.19
0.22
0.25
0.19
0.25
0.18
0.12
0.19
0.16
0.20
0.14
0.14
Nisbet (B4)
Overpressure dB(L)
GVi
105.3
102.5
104.3
106.2
103.4
111.5
111.1
97.1
102.1
113.0
108.3
109.7
108.7
100.2
103.1
101.8
104.0
106.2
101.0
103.7
101.4
101.4
91.1
99.8
104.8
105.5
98.8
103.7
103.1
15
)
Ground ibration mm/s
0.55
0.15
0.38
0.24
0.41
0.29
0.67
0.12
0.28
0.42
0.27
0.29
0.27
0.19
0.25
0.19
0.37
0.29
0.38
0.36
0.29
0.37
0.29
0.22
0.24
0.29
0.28
0.17
0.22
53
2
MUSWE
2016 Annual Envir
Date
15‐Jul‐
18‐Jul‐
19‐Jul‐
22‐Jul‐
25‐Jul‐
26‐Jul‐
29‐Jul‐
29‐Jul‐
1‐Aug‐
5‐Aug‐
9‐Aug‐
10‐Aug
12‐Aug
15‐Aug
18‐Aug
26‐Aug
29‐Aug
1‐Sep‐
2‐Sep‐
8‐Sep‐
13‐Sep
16‐Sep
20‐Sep
28‐Sep
28‐Sep
4‐Oct‐
5‐Oct‐
11‐Oct
12‐Oct
ELLBROOK COAL CO
ronmental Manag
e Time
‐16 15:30
‐16 14:40
‐16 14:31
‐16 11:57
‐16 15:40
‐16 14:20
‐16 12:49
‐16 13:09
‐16 13:36
‐16 13:30
‐16 12:39
g‐16 12:11
g‐16 13:37
g‐16 12:48
g‐16 12:51
g‐16 12:59
g‐16 15:10
‐16 12:44
‐16 9:44
‐16 12:46
‐16 14:10
‐16 12:48
‐16 12:51
‐16 15:21
‐16 15:35
16 13:23
16 9:55
‐16 15:03
‐16 12:46
OMPANY LIMITED
gement Report
Queen Street
Overpressure dB(L)
GV
106.2
95.9
97.9
108.2
109.5
95.9
103.6
96.6
103.3
98.4
102.7
110.2
99.0
97.3
92.4
97.9
110.2
101.6
94.4
98.4
102.0
110.9
99.0
91.3
104.5
110.1
104.5
104.5
102.3
(B1)
Ground Vibration mm/s
OverprdB
0.24 10
0.20 95
0.36 94
0.20 97
0.19 10
0.15 99
0.22 10
0.16 90
0.18 10
0.28 95
0.20 96
0.17 10
0.17 97
0.17 95
0.17 92
0.20 94
0.21 10
0.20 99
0.13 92
0.17 96
0.24 10
0.20 10
0.23 95
0.29 89
0.29 10
0.24 10
0.18 99
0.18 10
0.40 99
School (B2)
ressure B(L)
GroundVibratiomm/s
4.5 0.14
5.2 0.14
4.3 0.17
7.5 0.10
0.8 0.13
9.8 0.10
3.5 0.17
0.8 0.10
2.1 0.12
5.2 0.11
6.1 0.12
3.9 0.10
7.5 0.11
5.2 0.11
2.1 0.11
4.3 0.12
6.8 0.13
9.3 0.13
2.1 0.09
6.8 0.15
0.3 0.12
7.5 0.14
5.2 0.11
9.2 0.13
0.8 0.13
9.2 0.17
9.8 0.12
0.9 0.19
9.0 0.31
99 Queen
d on
OverpressuredB(L)
107.1
92.8
96.8
90.8
102.9
92.8
105.2
92.8
103.9
97.9
99.6
102.9
94.3
96.8
96.8
95.7
109.9
98.8
95.7
94.3
101.7
108.6
94.3
92.8
103.4
107.1
101.1
101.1
96.8
Street (B3)
e Ground Vibrationmm/s
O
0.20
0.19
0.26
0.18
0.17
0.11
0.23
0.12
0.15
0.22
0.18
0.12
0.17
0.14
0.12
0.21
0.21
0.25
0.10
0.13
0.19
0.19
0.21
0.25
0.24
0.31
0.19
0.16
0.61
Nisbet (B4)
Overpressure dB(L)
GVi
110.4
100.6
96.5
106.2
107.4
94.2
107.6
89.7
100.6
97.7
98.3
101.8
95.9
95.8
94.2
97.1
104.3
96.5
97.1
95.8
100.2
102.5
103.4
93.3
101.8
108.3
101.0
101.0
98.8
15
)
Ground ibration mm/s
0.45
0.30
0.65
0.18
0.50
0.13
0.56
0.15
0.19
0.39
0.23
0.12
0.25
0.18
0.14
0.32
0.38
0.38
0.12
0.17
0.47
0.53
0.28
0.39
0.75
0.54
0.48
0.22
1.56
54
2
MUSWE
2016 Annual Envir
Date
14‐Oct
18‐Oct
20‐Oct
24‐Oct
26‐Oct
27‐Oct
31‐Oct
2‐Nov‐
11‐Nov
11‐Nov
18‐Nov
23‐Nov
24‐Nov
30‐Nov
2‐Dec‐
5‐Dec‐
12‐Dec
14‐Dec
16‐Dec
ELLBROOK COAL CO
ronmental Manag
e Time
‐16 14:32
‐16 12:47
‐16 12:51
‐16 12:53
‐16 12:42
‐16 13:17
‐16 12:55
‐16 12:48
v‐16 13:28
v‐16 13:50
v‐16 13:22
v‐16 12:48
v‐16 10:40
v‐16 16:11
‐16 12:48
‐16 12:46
c‐16 12:44
c‐16 12:44
c‐16 10:51
OMPANY LIMITED
gement Report
Queen Street
Overpressure dB(L)
GV
101.2
103.3
107.4
107.2
110.1
109.9
109.5
106.2
94.4
108.2
89.9
107.8
91.3
111.7
99.0
99.9
89.8
105.5
108.0
(B1)
Ground Vibration mm/s
OverprdB
0.19 96
0.20 10
0.21 10
0.18 10
0.27 10
0.22 10
0.21 10
0.35 10
0.19 96
0.29 10
0.18 89
0.31 10
0.17 90
0.25 10
0.21 96
0.18 97
0.18 89
0.22 10
0.15 10
School (B2)
ressure B(L)
GroundVibratiomm/s
6.5 0.18
0.9 0.18
3.9 0.21
3.9 0.18
7.2 0.25
7.0 0.21
7.2 0.23
3.5 0.27
6.8 0.08
5.3 0.10
9.2 0.05
5.1 0.11
0.8 0.08
8.9 0.08
6.8 0.05
7.5 0.06
9.2 0.08
0.3 0.09
6.4 0.06
99 Queen
d on
OverpressuredB(L)
96.8
102.9
108.9
108.3
107.4
109.4
105.2
108.0
92.8
103.9
90.8
106.4
90.8
112.0
98.9
100.0
88.8
101.7
109.0
Street (B3)
e Ground Vibrationmm/s
O
0.16
0.20
0.24
0.24
0.42
0.25
0.25
0.37
0.15
0.27
0.15
0.25
0.12
0.17
0.13
0.12
0.08
0.15
0.14
Nisbet (B4)
Overpressure dB(L)
GVi
96.5
102.5
108.7
108.3
109.3
110.8
107.8
105.5
91.1
107.8
92.2
103.4
95.0
106.2
98.8
103.1
93.3
108.7
107.8
15
)
Ground ibration mm/s
0.18
0.40
0.50
0.58
0.95
1.30
0.54
0.78
0.21
0.53
0.22
0.51
0.19
0.35
0.23
0.21
0.12
0.21
0.30
55
2016 An
MUSWELL
nnual Environ
LBROOK COAL
nmental Man
Appen
L COMPANY L
nagement Re
ndix 4: C
IMITED
eport
Complaints Summmary
156
2
S
C
1
2
2
MUSWE
2016 Annual Envir
SUMMARY OF C
Date of Complaint
TimeCompl
1‐Jan‐16 1:03 P
1‐Jan‐16 5:59 P
9‐Jan‐16 8:26 A
ELLBROOK COAL CO
ronmental Manag
COMPLAINTS
e of laint
Date of Incident
M 11‐Jan‐16
M Various
AM Various
OMPANY LIMITED
gement Report
Time of Incident
L
8:00 AM WoRidg
Various Mu
Various WoRidg
Location TypCom
oodlands ge
Odou
scle Creek Odou
oodlands ge
Odou
pe of mplaint
Mode Conta
ur Email fromEPA
ur Direct calOCE
ur EnvironmHotline ‐ nurgent
of ct
NaturCompl
m Odour smehouse. Theconcerned health impaDust was vfrom coal loactivities.
l to Strong odospontaneoucombustionhad been sweek.
ental non
General enabout the s
re of laint
ell at ey are about acts. isible oading
The nigcomplaoutbreaprevenoutbreaoutbreafrom thin opersite obsdust beactivitieto the E
our from us n that trong all
There wthe cominspectspontaThere wsmoke the arespoke wdiscussand he
quiry smell
Attempdiscussunsucc
Action Ta
ght before and the maint, MCC were manaks of spontaneoust them from becomaks. This involved cak and digging out he other outbreak. ration at the coal loservations confirmeeing generated fromes. This informationEPA.
were no mining actmplaint due to shiftted the operation foneous combustion was a hot spot that with activities undeea. The Environmenwith the complainased their concerns ralth impacts.
pts to contact the cs the complaint furtessful.
15
aken
morning of the naging two small s combustion to ming larger covering one the hot material The water cart wasading activities anded that there was nm coal loading n was communicate
ivities at the time ot change. The OCE or fresh outbreaks owith none identifiewas creating someertaken to cool downtal Coordinator nt the next day andregarding the smell
omplainant to ther have been
57
s d no
ed
of
of ed. e wn
d
2
C
1
1
2
1
MUSWE
2016 Annual Envir
Date of Complaint
TimeCompl
3‐Feb‐16 9:51 A
5‐Feb‐16 7:04 P
6‐Feb‐16 7:01 A
0‐Mar‐16 9:31 A
ELLBROOK COAL CO
ronmental Manag
e of laint
Date of Incident
AM 13‐Feb‐16
M 15‐Feb‐16
AM 26‐Feb‐16
AM 10‐Mar‐16
OMPANY LIMITED
gement Report
Time of Incident
L
7:30 AM NorMu
7:04 PM NorMu
7:01 AM Mu
Morning Mu
Location TypCom
rthswellbrook
Odou
rthswellbrook
Odou
scle Creek Odou
scle Creek Odou
pe of mplaint
Mode Conta
ur EnvironmHotline anEmail fromEPA
ur EnvironmHotline ‐ nurgent
ur EnvironmHotline ‐ nurgent
ur EnvironmHotline ‐ nurgent
of ct
NaturCompl
ental nd m
Smoke polland odour
ental non
Concerning
ental non
Odour comthe mine folast 2 days
ental non
Strong smesulphur
re of laint
ution At the toperatiproducwas covthe sitenothingAttempunsuccoperatithe OC
g smell Miningstorm. materiasprays targetinCompla
ming from or the
Infusioelectrichighestlater thto covedump.
ell of Normathree infoggy ccomplawho cogettingSpontapracticecompla2016 ansponta
Action Ta
time of the complaions were moving bction following a fogvered in a thick haze and the boundaryg blowing towards Qpts to contact the cessful. The EPA wasions at the time of tE's observations."
activities were res No mining or procal or coal was occurwere running and wng areas of heatingainant didn't want a
n wasn't operationcal fault. Repair of tt priority on site anhat day. Extra dozeer the spontaneous Complainant didn'
l mining operationsnfusion sprays operconditions in the moaint was discussed wommented that the g worse over the lasneous combustion es were discussed. aint location at 10:0nd couldn't detect neous combustion
15
aken
int, mining back into full g delay. The Valley ze. The OCE checkey and could see Queen Street. omplainant were s advised of the the complaint and
uming following a essing of hot rring. Infusion water carts were in Strips 14 and 15a call back.
al due to an the pump was gived was operational rs were operationacombustion at the't want a call back.
s were occurring wirational. There werorning. The with the complainasmell has been st couple of monthsmanagement The EC visited the 00am on 10 March any odour relating at this time.
58
ed
5.
n
al
ith re
nt
s.
to
2
C
1
2
2
MUSWE
2016 Annual Envir
Date of Complaint
TimeCompl
4‐Mar‐16 8:27 A
1‐Mar‐16 3:24 P
8‐Mar‐16 8:00 P
ELLBROOK COAL CO
ronmental Manag
e of laint
Date of Incident
AM Week prior to 14 March16
M 21‐Mar‐16
M 28‐Mar‐16
OMPANY LIMITED
gement Report
Time of Incident
L
h McC
3:15 PM McC
8:00 PM McC
Location TypCom
Cully's Gap Dust
Cully's Gap Dust
Cully's Gap Dust
pe of mplaint
Mode Conta
Direct calMCC officEC respon
Direct calMCC officEC respon
Direct calOCE phonOCE responde
of ct
NaturCompl
l to ce ‐ nded
Black dust covering thand the skycovered in film
l to ce ‐ nded
Dust cloudsfrom opera
l to ne ‐
d
Can smell oand see du
re of laint
is heir roof ylight is a fine
Dust mthe comhad beof the wup to 1the 24 highestcriteria
s coming ation
The duspontaactivitieto cool the dirtThis proand no was po
odour st
Removgenerawater ccoolingFollowidown athe dig diggingcriteriavisible
Action Ta
management contromplainant. Normal en occurring duringweather and PM10 14 March was undehour PM10 results t results being 27.1 of 50ug/m3.
st clouds were beinneous combustion es in OC2. The sprathe area down wet to give way generocess required 24‐4further action to c
ossible.
al of hot material inting more dust thancart was in operatiog the dig face prior ting the complaint tand a second waterface down before
g operations. Dust l and OCE's observadust was leaving sit
15
aken
l was discussed witmining operations g this time. A revielevels for the weekrtaken. Generally <25ug/m3 with theug/m3 against a
ng generated from management ays recently installere causing some of ating clouds of dus48 hours to settle ontrol the situation
n Strip 14 was n expected. One on to assist with to the complaint. he digger was shut r cart assisted to corecommencing levels were below ations were that note.
59
th
w k
e
ed
t.
n
ol
2
C
0
0
0
1
MUSWE
2016 Annual Envir
Date of Complaint
TimeCompl
4‐Apr‐16 3:51 P
6‐Apr‐16 5:49 P
6‐Apr‐16 7:53 P
3‐Apr‐16 7:22 A
ELLBROOK COAL CO
ronmental Manag
e of laint
Date of Incident
M 23‐Mar‐16
M 06‐Apr‐16
M 06‐Apr‐16
AM 13‐Apr‐16
OMPANY LIMITED
gement Report
Time of Incident
L
11:54 AM
NorMu
Various WoRidg
7:53 PM WoRidg
7:22 AM Unk
Location TypCom
rthswellbrook
Odou
oodlands ge
Odou
oodlands ge
Odou
known Haula
pe of mplaint
Mode Conta
ur Email fromEPA
ur EnvironmHotline ‐ urgent. Oresponde
ur Direct calOCE mobiOCE responde
age Direct calOCE mobiOCE responde
of ct
NaturCompl
m Affected byodour of bucoal, there blue haze i
ental
OCE d
Spontaneocombustiondust
l to ile ‐
d
Strong Odo
l to ile ‐
d
Coal haulagfalling fromtrucks on proads
re of laint
y strong urning is also a n the sky
MCC wcombucomplaassist wspontaactivitiewinds wcomplacommu
us n and
At the toperaticarts hainfusionwater cheatedlarge grAberde1:57pmthe comdiscuss
our Hot coaprocessin OC1.Muswe
ge ‐ coal m road public
Phone investigconduc
Action Ta
were actively managstion outbreak in Oaint. Water sprays wwith cooling the areneous combustion es were occurring iwere present on thaint. This informatiunicated to the EPA
time of the complaional due to shift chad been operationan sprays operating cart was present on coal in ROM stockrassfire between Meen. A return phonm on 07/04/16 withmplainant to call bas the complaint furt
al on ROM was beinsing. Water carts w. There was a large ellbrook and Aberde
call was communicgated the issue. Racted by MCC person
16
aken
ging a spontaneous OC2 on the day of thwere being used toea. Normal management n OC1. Light SW e day of the on was A.
int the pit was not hange. Two water al all shift with in OC1. From 6pm n ROM cooling piles. There was a
Muswellbrook and e call was made at a message left for ack if they wished tother.
ng targeted for were cooling hot aregrassfire between een.
cated to Daracon whandom audits were nnel
60
he o
a
o
ea
ho
2
C
1
1
2
2
2
MUSWE
2016 Annual Envir
Date of Complaint
TimeCompl
9‐Apr‐16 6:59 A
9‐Apr‐16 11:51 A
3‐Apr‐16 10:06
8‐Apr‐16 8:08 A
8‐Apr‐16 9:09 A
ELLBROOK COAL CO
ronmental Manag
e of laint
Date of Incident
AM 19‐Apr‐16
AM Various
PM Various
AM 28‐Apr‐16
AM Various
OMPANY LIMITED
gement Report
Time of Incident
L
6:59 AM Mu
Various Abe
Various Sco
6:00 AM WoRidg
Various Abe
Location TypCom
scle Creek Odou
erdeen Odou
one Odou
oodlands ge
Dust
erdeen Odou
pe of mplaint
Mode Conta
ur EnvironmHotline ‐ nurgent
ur EnvironmHotline ‐ nurgent
ur Direct calOCE phonOCE responde
Email fromEPA
ur Email fromEPA
of ct
NaturCompl
ental non
Offensive svery sulphu
ental non
Last couplemonths fresmelling strsmell of su
l to ne ‐
d
Sulphur smcoming frolast couple months
m Dust in the
m Strong smesulphur alocoal dust afcomplainan
re of laint
smell ‐ury
Ongoinmanagerain yesmorningenerano odocomplaon 19/0there wcould doperatimanagewere dapprec
e of equently rong lphur
The comcomingcontribspontaoperatiUHAQMcompla
mell m MCC of
Only eqloader aroundEC discsourceswas ap
air Informaspontadust lev
ell of ong with ffecting nt
Informaspontadust lev
Action Ta
ng mining operationement occurring atsterday with cloudyng. The EC observedl area of the complur being detected aaint was discussed w04/16. They wantewas a problem and tdo about it. Weatheions activities, sponement as well as thiscussed. The comiative of the call ba
mplainant has beeng from MCC. The smbute to headaches. neous combustion ional activities wereM network was discainant.
quipment operatingon the ROM. The Od and could not deteussed the sulphur ss with the complainpreciative of the ca
ation on operationaneous combustion vels provided to EP
ation on operationaneous combustion vels provided to EP
16
aken
ns and spontaneoust MCC. There was y conditions this d odour in the aint at ~7:40am witat this time. The with the complainaed to let us know to see what we er impacts, ntaneous combustiohe EC observations plainant was ck.
n told the odour is mell is starting to General management and e discussed. The cussed with the
g on site was the coOCE did a drive ect any sulphur. Thsmell and potentialnant. Complainant all back.
al activities, management and
PA.
al activities, management and
PA.
61
s
th
nt
on
oal
he
2
C
2
2
2
2
0
MUSWE
2016 Annual Envir
Date of Complaint
TimeCompl
8‐Apr‐16 11:07 A
8‐Apr‐16 11:21 A
8‐Apr‐16 11:53 A
8‐Apr‐16 11:56 A
9‐May‐16 1:40 P
ELLBROOK COAL CO
ronmental Manag
e of laint
Date of Incident
AM Last three days
AM 28‐Apr‐16
AM 28‐Apr‐16
AM Various
M Various
OMPANY LIMITED
gement Report
Time of Incident
L
Last three days
McC
Morning McC
11:53 AM
McC
Various Abe
Various WoRidg
Location TypCom
Cully's Gap Odou
Cully's Gap Odou
Cully's Gap Odou
erdeen Odou
oodlands ge
Odou
pe of mplaint
Mode Conta
ur Direct calOffice ‐ Oresponde
ur Direct calOffice ‐ ECresponde
ur Email fromEPA
ur Email fromEPA
ur EnvironmHotline ‐ nurgent
of ct
NaturCompl
l to CE d
Odour and over the lasdays
l to C d
Odour smehaze
m Smoke andcoming fromine as westrong odo
m Odour of coblack sticky
ental non
Ongoing odfrom MuswCoal
re of laint
haze st three
Two wainfusionThe comthe comcall.
ell and Two wainfusion
d dust m the ell as a ur
Informaspontadust lev
oal and y dust
Informaspontadust lev
dour wellbrook
OngoinmanageThe EC manageThe proregardidiscuss
Action Ta
ater carts were in on sprays operating mplaint's concerns mplainant at the tim
ater carts were in on sprays operating
ation on operationaneous combustion vels provided to EP
ation on operationaneous combustion vels provided to EP
ng spontaneous comement is occurring discussed spontanement activities witocess for making a sing the Continuatiosed with the compla
16
aken
operation with in OC1 and OC2. were discussed witme of their original
operation with in OC1 and OC2.
al activities, management and
PA.
al activities, management and
PA.
mbustion in OC1 and OC2. eous combustion th the complainantsubmission to MSCon Project was ainant.
62
th
t.
2
C
1
1
1
1
MUSWE
2016 Annual Envir
Date of Complaint
TimeCompl
2‐May‐16 2:32 P
3‐May‐16 8:33 A
4‐May‐16 10:00 A
8‐May‐16 2:19 P
ELLBROOK COAL CO
ronmental Manag
e of laint
Date of Incident
M 12‐May‐16
AM 13‐May‐16
AM 14‐May‐16
M Various
OMPANY LIMITED
gement Report
Time of Incident
L
1:30 PM onwards
WoRidg
8:30 AM WoRidg
overnight
WoRidg
Various Mu
Location TypCom
oodlands ge
Odou
oodlands ge
Odou
oodlands ge
Odou
scle Creek DRIV
pe of mplaint
Mode Conta
ur EnvironmHotline ‐ urgent. Eresponde
ur Direct calMCC OfficEC respon
ur EnvironmHotline ‐ urgent. Oresponde
VING Direct calMCC OfficEC respon
of ct
NaturCompl
ental
C d
Complainansee coal trumoving coaROM and wconcerned odour beingenerated activity.
l to ce ‐ nded
Smell and dmorning is concern. Tconcerned affecting thchildren's a
ental
OCE d
Ongoing susmell and shaze
l to ce ‐ nded
People not stopping atsign comingmine acces
re of laint
nt could ucks al to was about g from this
The EC managethe souvariety inspectthe sitewas deabout hoffer wsite to manageEPA witregardicompla
dust this a
They are it is he asthma
The EC manageis a lonwas mareview manageEPA witregardicompla
ulphur smoke
The OCmanagemateriaoperatiareas wbeing m
t stop g out of ss road
Commucontracstoppin
Action Ta
discussed spontanement with the comurce of the odour coof sources. The OCtion and monitorede and the complainatected. Complainahealth impacts on twas made for the coreview the spontanement. The complath a response proviing activities at the aint.
discussed spontanement with the comg‐term strategy to ade for the complaithe spontaneous cement. The complath a response proviing activities at the aint.
CE discussed spontaement with the comal was being mineding in OC1 and OC2was in progress withmined.
unication provided ctors regarding safeng at this stop sign.
16
aken
eous combustion mplainant and that ould be from a CE completed a sited gas levels betweenant’s house ‐ no gasnt is concerned heir children. An omplainant to visit neous combustion ainant also rang theided to the EPA time of the
eous combustion mplainant and that manage. An offer inant to visit site toombustion ainant also rang theided to the EPA time of the
aneous combustionmplainant. No hot with infusion spray2. Capping of hot h no hot material
to employees and e driving and
63
e n s
e
it
o
e
ys
2
C
1
2
2
2
2
2
2
MUSWE
2016 Annual Envir
Date of Complaint
TimeCompl
9‐May‐16 12:47
0‐May‐16 8:33 A
4‐May‐16 8:49 A
0‐May‐16 8:33 A
4‐May‐16 8:49 A
4‐May‐16 8:49 A
4‐May‐16 8:49 A
ELLBROOK COAL CO
ronmental Manag
e of laint
Date of Incident
PM 19‐May‐16
AM 14‐May‐16
AM 19‐May‐16
AM 15‐May‐16
AM 19‐May‐16
AM 19‐May‐16
AM 20‐May‐16
OMPANY LIMITED
gement Report
Time of Incident
L
12:43 PM
NorMu
9:25 AM WoRidg
8:37 AM WoRidg
7:08 PM WoRidg
1:48 PM WoRidg
4:50 PM WoRidg
9:28 PM WoRidg
Location TypCom
rthswellbrook
Blast
oodlands ge
Odou
oodlands ge
Odou
oodlands ge
Odou
oodlands ge
Dust
oodlands ge
Dust
oodlands ge
Odou
pe of mplaint
Mode Conta
t EnvironmHotline ‐ urgent. Eresponde
ur Email fromEPA
ur Email fromEPA
ur Email fromEPA
Email fromEPA
Email fromEPA
ur Email fromEPA
of ct
NaturCompl
ental
C d
Blast shookhouse
m Strong odoand haze
m Sulphur sm
m Strong odosulphur
m Dust from m
m Dust from m
m Sulphur sm
re of laint
k their Resultswere 0complaresponblast re
our smell Informaspontaweatheprovide
mell Informaspontaweatheprovide
our like Informaspontaweatheprovide
mine Informaspontamanagelevels w
mine Informaspontamanagelevels w
mell Informaspontaweatheprovide
Action Ta
s from closest moni.37mm/s and 108.8ainant also rang these provided to the esults.
ation on operationaneous combustion er conditions and ded to EPA.
ation on operationaneous combustion er conditions and ded to EPA.
ation on operationaneous combustion er conditions and ded to EPA.
ation on operationaneous combustion ement, weather cowere provided to EP
ation on operationaneous combustion ement, weather cowere provided to EP
ation on operationaneous combustion er conditions and ded to EPA.
16
aken
tor to complainant8dB. The e EPA with a EPA regarding the
al activities, management, ust levels were
al activities, management, ust levels were
al activities, management, ust levels were
al activities, management, dustnditions and dust PA.
al activities, management, dustnditions and dust PA.
al activities, management, ust levels were
64
t
t
2
C
2
2
2
2
2
MUSWE
2016 Annual Envir
Date of Complaint
TimeCompl
5‐May‐16 10:05 A
6‐May‐16 3:04 P
6‐May‐16 3:04 P
9‐May‐16 8:37 P
9‐May‐16 9:08 P
ELLBROOK COAL CO
ronmental Manag
e of laint
Date of Incident
AM 25‐May‐16
M 24‐May‐16
M 25‐May‐16
M 29‐May‐16
M 29‐May‐16
OMPANY LIMITED
gement Report
Time of Incident
L
10:05 AM
WoRidg
7:09 PM WoRidg
8:42 AM WoRidg
8:37 PM WoRidg
9:08 PM WoRidg
Location TypCom
oodlands ge
Odou
oodlands ge
Odou
oodlands ge
Odou
oodlands ge
Odou
oodlands ge
Odou
pe of mplaint
Mode Conta
ur Direct calMCC OfficEC respon
ur Email fromEPA
ur Email fromEPA
ur EnvironmHotline ‐ urgent. Oresponde
ur EnvironmHotline ‐ nurgent
of ct
NaturCompl
l to ce ‐ nded
Odour and
m Sulphur sm
m Offensive o
ental
OCE d
Sulphur smtaste
ental non
Sulphur sm
re of laint
haze The EC combucomplaon sponcomplaand wainformeseriousissue bcomplawas prosponta
mell Informaspontaweatheprovide
odour Informaspontamanagelevels w
mell and No hot infusionrunningmining complaactivitie
mell No hot infusionrunningmining was lefcall bac
Action Ta
discussed the currestion managementainant and the impantaneous combustiainant has had enouants it resolved. Thed that MCC are tasly and are working ut it is not a quick fainant also rang theovided to the EPA rneous combustion
ation on operationaneous combustion er conditions and ded to EPA.
ation on operationaneous combustion ement, weather cowere provided to EP
coal on ROM or ben sprays running ing and one drill operactivities were occainant was aware ofes being undertake
coal on ROM or ben sprays running ing and one drill operactivities were occft with the complainck if they wished to
16
aken
ent spontaneous activities with the act weather can havion. The ugh of the situatione complainant was king the issue on managing the fix solution. The e EPA and a responsregarding management.
al activities,management, ust levels were
al activities, management, dustnditions and dust PA.
eing processed and OC1 and OC2. CHPrating. No other curring. The f the management en on site.
eing processed and OC1 and OC2. CHPrating. No other curring. A message nant asking them to discuss further.
65
ve
n
se
t
PP
PP
o
2
C
3
2
2
2
2
MUSWE
2016 Annual Envir
Date of Complaint
TimeCompl
0‐May‐16 10:16 A
8‐Jun‐16 1:13 P
8‐Jun‐16 1:13 P
8‐Jun‐16 1:13 P
8‐Jun‐16 1:13 P
ELLBROOK COAL CO
ronmental Manag
e of laint
Date of Incident
AM 30‐May‐16
M 13‐Jun‐16
M 14‐Jun‐16
M 14‐Jun‐16
M 14‐Jun‐16
OMPANY LIMITED
gement Report
Time of Incident
L
During the morning
Mu
7:50 AM Mu
7:06 AM Mu
7:15 AM WoRidg
8:20 AM WoRidg
Location TypCom
scle Creek Odou
scle Creek Odou
scle Creek Odou
oodlands ge
Odou
oodlands ge
Odou
pe of mplaint
Mode Conta
ur EnvironmHotline ‐ nurgent
ur Email fromEPA
ur Email fromEPA
ur Email fromEPA
ur Email fromEPA
of ct
NaturCompl
ental non
Cloud of smsmell of od
m Strong smesulphur, lowplume overproperty, rissue. Start7am this m
m Strong sulpsmell comiMuswellbrosince 5:40a
m Odour fromMuswellbroat 6:00am tmorning. Odescribed aburning rotsulphur smputrid and strong.
m Strong smesulphur (rogas) in the described achemical sm
re of laint
moke and our
The EC manageoffer wthe sitebeing uback tocomplataking tmanagsolutio
ell of w fog r ecurring ted at
morning.
Informaspontamanageand du
phur ng from ook Coal am
Informaspontamanageand du
m ook Coal this Odour as tten ell, very very
Informaspontamanageand du
ell of otten egg air as a mell
Informaspontamanageand du
Action Ta
discussed spontanement with the com
was made for the coe so they could visuundertaken. The coo MCC about the sitainant was informedthe issue seriously ing the issue but it n.
ation on operationaneous combustion ement, weather cost levels were prov
ation on operationaneous combustion ement, weather cost levels were prov
ation on operationaneous combustion ement, weather cost levels were prov
ation on operationaneous combustion ement, weather cost levels were prov
16
aken
eous combustion mplainant and an omplainant to visit alise the activities omplainant will be te visit. The d that MCC are and are working onis not a quick fix
al activities, management, dustnditions, gas levelsided to EPA.
al activities, management, dustnditions, gas levelsided to EPA.
al activities, management, dustnditions, gas levelsided to EPA.
al activities, management, dustnditions, gas levelsided to EPA.
66
n
t s
t s
t s
t s
2
C
2
2
0
0
1
MUSWE
2016 Annual Envir
Date of Complaint
TimeCompl
8‐Jun‐16 1:13 P
8‐Jun‐16 1:13 P
1‐Jul‐16 4:13 P
4‐Jul‐16 8:20 P
5‐Jul‐16 11:16 A
ELLBROOK COAL CO
ronmental Manag
e of laint
Date of Incident
M 14‐Jun‐16
M 14‐Jun‐16
M 01‐Jul‐16
M 04‐Jul‐16
AM 12‐Jul‐16
OMPANY LIMITED
gement Report
Time of Incident
L
8:49 AM WoRidg
7:10 AM WoRidg
3:00 PM WoRidg
8:20 PM Abe
5:00 PM WoRidg
Location TypCom
oodlands ge
Odou
oodlands ge
Odou
oodlands ge
Dust
erdeen Odou
oodlands ge
Odou
pe of mplaint
Mode Conta
ur Email fromEPA
ur Email fromEPA
Email fromEPA
ur Direct calOffice ‐ Oresponde
ur Email fromEPA
of ct
NaturCompl
m Sulphur odthe area. Owere notice7:30am andpresent at Odours havinside the h
m Burning coaPutrid smeClinging to Affecting chbreathing.
m Dust blowinMuswellbroMine
l to CE d
Visual impaDartbrook and odour home
m Sulphur smarea
re of laint
ours in Odours ed at d still 8:50am. ve gone house
Informaspontamanagelevels w
al odour. ll. clothes. hildren's
Informaspontamanagelevels w
ng off ook Coal
As partmanagesprays outbreaorder tpush sowindro3:00pmobserviactivitiewas pro
acts from Road smell at
Water pit. ThCut 1 anew ou
mell in the A stronof the mthat theoperatithe EPA
Action Ta
ation on operationaneous combustion ement, weather cowere provided to EP
ation on operationaneous combustion ement, weather cowere provided to EP
t of MCC's spontaneement activities onwere being installeak of spontaneous o install these spraome material off thow. These activitiesm and 3:30pm with ing that the dust cloes dissipated quicklovided to the EPA.
sprays and water cae OCE conducted and Open Cut 2 andutbreaks of spontan
ng NW wind was premining operations aere was no haze visions. This informatA.
16
aken
al activities, management, dustnditions and dust PA.
al activities, management, dustnditions and dust PA.
eous combustion n site new water ed to control a smalcombustion. In ys a dozer needed te top of a s occurred betweensite personnel oud from these ly. This information
arts operational in n inspection of Opedid not identify an
neous combustion.
esent. An inspectioat ~4:00pm indicatesible from the tion was provided t
67
t
t
l
to
n
n
en y
on ed
o
2
C
1
1
1
MUSWE
2016 Annual Envir
Date of Complaint
TimeCompl
5‐Jul‐16 11:16 A
5‐Jul‐16 11:16 A
6‐Jul‐16 10:04 A
ELLBROOK COAL CO
ronmental Manag
e of laint
Date of Incident
AM 14‐Jul‐16
AM 15‐Jul‐16
AM 16‐Jul‐16
OMPANY LIMITED
gement Report
Time of Incident
L
8:00 AM WoRidg
10:00 AM
WoRidg
From 6:00 AM
Mu
Location TypCom
oodlandsge
Odou
oodlands ge
Odou
scle Creek Odou
pe of mplaint
Mode Conta
ur Email fromEPA
ur Email fromEPA
ur EnvironmHotline ‐ nurgent
of ct
NaturCompl
m Odour of bcoal (sulphodour)
m Dust and o
ental non
Strong smesulphur andhanging ov
re of laint
urning ur
A light was a vobservait was cno odoarea atprovide
dour A light was a vobservait was cno odoarea atprovide
ell of d fog er area
InfusioOC2, wspontaObservgeneraodour fsmoke complais healta quickthat MCcomplato the E
Action Ta
NW wind was presvisible haze from thations by site persoclear in Woodlands ur present in the W ~7:30am. This infoed to the EPA.
NW wind was presvisible haze from thations by site persoclear in Woodlands ur present in the W ~7:50am. This infoed to the EPA.
n sprays were operwater carts were woneous combustion vations by site persol area of complaintfrom spontaneous cwas detectable. Thainant on 18/07/16th impacts. They ark fix to the problem CC are working on ained to EPA with a EPA.
16
aken
ent. While there e operation, onnel indicated thatRidge and there w
Woodlands Ridge ormation was
ent. While there e operation, onnel indicated thatRidge and there w
Woodlands Ridge ormation was
rating in OC1 and orking on management. onnel at ~8:15am in did not indicate ancombustion, wood he EC rang the . Their main concere aware there is nobut are appreciativit. Complainant alsresponse provided
68
t as
t as
n n
rn ot ve so d
2
C
1
1
2
2
MUSWE
2016 Annual Envir
Date of Complaint
TimeCompl
8‐Jul‐16 4:07 P
9‐Jul‐16 4:30 P
0‐Jul‐16 9:52 A
2‐Jul‐16 9:41 A
ELLBROOK COAL CO
ronmental Manag
e of laint
Date of Incident
M 16‐Jul‐16
M 19‐Jul‐16
AM 20‐Jul‐16
AM 22‐Jul‐16
OMPANY LIMITED
gement Report
Time of Incident
L
8:00 AM WoRidg
4:30 PM McC
9:30 AM NorMu
From 8:00 AM
Mu
Location TypCom
oodlands ge
Odou
Cully's Gap Odou
rthswellbrook
Odou
scle Creek Odou
pe of mplaint
Mode Conta
ur Email fromEPA
ur Direct calOffice ‐ MaintenaSupervisoresponde
ur EnvironmHotline ‐ nurgent
ur EnvironmHotline ‐ nurgent
of ct
NaturCompl
m Sulphur smlayer of haz
l to
nce or d
Sulphur sm
ental non
SpontaneocombustionAppears tosmoke but tell due to cloud.
ental non
Sulphur sm
re of laint
mell and ze/smog
InfusiooperatispontaAccess Observgeneraodour finforma
mell The EC discussfrequenspontaactivitiediscuss
us n smell. be hard to low
There wOCE oboperatianythinand surnot detcomplathat the
mell Dams wwith tharea, weffectivsteam wwith thcommitavailabacceptealso coprovide
Action Ta
n sprays and K‐line ional and dozers weneous combustion to a hot area was bvations by site persol area of complaintfrom spontaneous cation was provided
rang the complainas their concerns. Thntly but yesterday wneous combustion es and weather impsed.
was wet weather anbserved odour at thion at ~10:40am anng. The EC observerrounding area at ~tect odour. The EC ainant at ~11:00am e odour had gone a
were being dewaterhe water being usedwhich was hot. The ve at cooling down was being generatehe complainant on 2tment made for soble) next time they sed by the complainmplained to the EPed to the EPA.
16
aken
sprays were ere working on management. being developed. onnel at ~7:50am in did not indicate ancombustion. This to the EPA.
ant on 20/07/16 tohey do smell odour was very bad. The management pacts were
nd low pressure. The edge of the nd could not smell d odour in Queen S~11:00am and couldspoke with the and they confirmeaway.
red after recent raid to cool the goaf water was very the area but a lot oed. The EC spoke 22/07/16 with a meone to visit (if smelt it. This was ant. Complainant PA with a response
69
n n
o
he
St d
ed
n
of
2
C
2
0
0
0
MUSWE
2016 Annual Envir
Date of Complaint
TimeCompl
2‐Jul‐16 3:07 P
1‐Aug‐16 12:15
1‐Aug‐16 9:46 A
2‐Aug‐16 8:17 A
ELLBROOK COAL CO
ronmental Manag
e of laint
Date of Incident
M 20‐Jul‐16
PM 29‐Jul‐16
AM 01‐Aug‐16
AM 02‐Aug‐16
OMPANY LIMITED
gement Report
Time of Incident
L
9:51 AM NorMu
8:30 AM WoRidg
9:46 AM Mu
8:17 AM Mu
Location TypCom
rthswellbrook
Odou
oodlands ge
Odou
scle Creek Odou
scle Creek VISUA
pe of mplaint
Mode Conta
ur Email fromEPA
ur Email fromEPA
ur EnvironmHotline ‐ urgent. Eresponde
AL EnvironmHotline ‐ urgent. Eresponde
of ct
NaturCompl
m Odour fromspontaneoucombustion
m Odour and from coal m
ental
C d
Strong smesulphur andplume hangtheir prope
ental
C d
Huge Fog/S
re of laint
m us n
There wOCE oboperatianythinand surnot detprovide
dust mine
Spontaand OCwere thoperatithe WoregardiEPA.
ell of d a ging over erty
Spontaand OCthe envdetect the EC propertdiscussodour wand EAcomplavisible. EPA an
Smoke Spontaand OCthe comthe comdetectecomplathe smtheir re
Action Ta
was wet weather anbserved odour at thion at ~10:40am anng. The EC observerrounding area at ~tect odour. This infed to the EPA.
neous managemenC2 were in place. Sihat a haze was visibion but was not direoodlands Ridge areaing the complaint w
neous managemenC2 were in place. Thvironment at ~7:30any odour. Followand EA visited the cty to make some obs the complainant's was no longer dete arrived, which wasainant. There was s The complainant ad a response was p
neous managemenC2 were in place. Thmplainant's residenmplaint. No odour ed at the complainaainant later confirmoke while driving aesidence rather tha
17
aken
nd low pressure. The edge of the nd could not smell d odour in Queen S~11:00am and couldformation was
nt activities in OC1 ite observations ble from the ectly impacting on a. Information was provided to the
nt activities in OC1 he EC had observedam and did not ing the complaint complainant's bservations and to concerns. The ctable when the ECs confirmed by the still a slight haze also contacted the provided to the EPA
nt activities in OC1 he EC and EA visitednce ~20 minutes aftor smoke was ant's residence. Thmed that they noticelong the road near t at their residence
70
he
St d
e
C
A.
d er
e ed
e.
2
C
0
0
0
0
0
1
2
MUSWE
2016 Annual Envir
Date of Complaint
TimeCompl
5‐Aug‐16 11:42 A
5‐Aug‐16 11:42 A
5‐Aug‐16 11:42 A
8‐Aug‐16 9:23 A
8‐Aug‐16 11:15 A
7‐Aug‐16 7:17 A
3‐Aug‐16 11:44 A
ELLBROOK COAL CO
ronmental Manag
e of laint
Date of Incident
AM 03‐Aug‐16
AM 04‐Jul‐16
AM 04‐Jul‐16
AM 08‐Aug‐16
AM 08‐Aug‐16
AM 17‐Aug‐16
AM 17‐Aug‐16
OMPANY LIMITED
gement Report
Time of Incident
L
11:30 AM
Sco
12:45 PM
WoRidg
12:45 PM
WoRidg
8:23 AM Mu
9:30 AM Mu
7:17 AM Mu
8:00 AM WoRidg
Location TypCom
one Odou
oodlands ge
Blast
oodlands ge
Blast
scle Creek Odou
scle Creek Odou
scle Creek Odou
oodlands ge
Odou
pe of mplaint
Mode Conta
ur Email fromEPA
t Email fromEPA
t Email fromEPA
ur Direct calOCE phonOCE responde
ur In person EnvironmAdvisor
ur EnvironmHotline ‐ urgent. Eresponde
ur Email fromEPA
of ct
NaturCompl
m Strong acridsulphur sm
m Blast causeto shake anbrown plumvisible folloblast
m Blast causeto shake anwindows to
l to ne ‐
d
Could see sand smell s
to ental
Odour smeproperty
ental
A d
Whole stre
m Burning coa
re of laint
d ell
Spontaand OCpresentwas pro
ed house nd a me was owing the
All blaslimits. was pro
ed house nd o rattle
All blaslimits. was pro
smoke sulphur
A spraythe goagenerawith a sdetecte
ell at A spraythe goageneracomplatheir ya
eet smells Spontaand OCcomplaagreemdetectoa limite
al smell Spontaand OCarea atA respo
Action Ta
neous managemenC2 were in place. Stt. Information regaovided to the EPA.
st results complied wInformation regardovided to the EPA.
st results complied wInformation regardovided to the EPA.
y had been placed oaf area and a lot of ted. The EA visitedsite gas monitor aned.
y had been placed oaf area and a lot of ted. With agreemeainant a gas detectoard for a limited tim
neous managemenC2 were in place. Thainant and could smment from the compor has been placed ed time.
neous managemenC2 were in place. Th ~7:10am and couldonse was provided t
17
aken
nt activities in OC1 trong SE winds werarding the complain
with allowable ding the complaint
with allowable ding the complaint
on hot material in steam was being d the complainant nd no gas was
on hot material in steam was being nt from the or has been placed me.
nt activities in OC1 he EA visited the mell odour. With plainant a gas near their house fo
nt activities in OC1 he EA was in the d not detect odourto the EPA.
71
e nt
in
or
.
2
C
2
2
2
2
1
1
1
MUSWE
2016 Annual Envir
Date of Complaint
TimeCompl
3‐Aug‐16 11:44 A
3‐Aug‐16 11:44 A
4‐Aug‐16 11:07 A
6‐Aug‐16 8:39 P
2‐Sep‐16 7:21 A
2‐Sep‐16 7:53 A
3‐Sep‐16 6:33 A
ELLBROOK COAL CO
ronmental Manag
e of laint
Date of Incident
AM 19‐Aug‐16
AM 22‐Aug‐16
AM 24‐Aug‐16
M 26‐Aug‐16
AM 12‐Sep‐16
AM 12‐Sep‐16
AM 13‐Sep‐16
OMPANY LIMITED
gement Report
Time of Incident
L
12:40 PM
WoRidg
5:00 AM ‐ 12:00 Noon
WoRidg
9:00 AM Sco
8:39 PM SouMu
7:21 AM Mu
7:53 AM Mu
6:33 AM Mu
Location TypCom
oodlands ge
Dust
oodlands ge
Odou
one Odou
uthswellbrook
Visua
scle Creek Odou
scle Creek Odou
scle Creek Odou
pe of mplaint
Mode Conta
Email fromEPA
ur Email fromEPA
ur Email fromEPA
al Direct calOCE phonOCE responde
ur EnvironmHotline ‐ urgent. Eresponde
ur EnvironmHotline ‐ urgent. Eresponde
ur EnvironmHotline ‐ urgent. Eresponde
of ct
NaturCompl
m Excessive dcoming frooperation
m Spontaneocombustion
m Odour fromDrayton or Muswellbro
l to ne ‐
d
Could see aof smoke ocoming frooperations
ental
A d
Sulphur Od
ental
A d
Horrendouof sulphur aplume hangvalley
ental
A d
There was the house
re of laint
dust m the
Dust lewas pro
us n odour
Spontaand OCarea atA respo
m either
ook Coal
Spontaand OCprovide
a plume or steam m the
Spontaand OCmined OC1 wa
dour Spontaand OCcomplacomplawere vithe odo
s smell and ging over
Spontaand OCcomplacomplawere vithe odo
odour at Spontaand OCvisited the comwere vithe odo
Action Ta
vels were below crovided to the EPA.
neous managemenC2 were in place. Th ~7:40am and couldonse was provided t
neous managemenC2 were in place. A ed to the EPA.
neous managemenC2 were in place. Hoat the time of the cas suspended until
neous managemenC2 were in place. Thainant location shoraint and observed tisible. The odour raour was patchy.
neous managemenC2 were in place. Thainant location shoraint and observed tisible. The odour raour was patchy.
neous managemenC2 were in place. Ththe complainant lomplaint and observeisible. The odour raour was irregular.
17
aken
iteria. A response
nt activities in OC1 he EA was in the d not detect odourto the EPA.
nt activities in OC1 response was
nt activities in OC1 ot material was beicomplaint. Mining the plume cleared.
nt activities in OC1 he EA visited the rtly after the hat haze and fog anking was 1/6 and
nt activities in OC1 he EA visited the rtly after the hat haze and fog anking was 1/6 and
nt activities in OC1 he EA and SOM ocation shortly aftered that haze and foanking was 1/6 and
72
.
ng in
d
d
r og d
2
C
1
1
2
2
0
0
MUSWE
2016 Annual Envir
Date of Complaint
TimeCompl
3‐Sep‐16 7:24 A
7‐Sep‐16 9:12 A
4‐Sep‐16 8:09 A
8‐Sep‐16 8:52 A
4‐Oct‐16 10:29 A
7‐Oct‐16 7:05 A
ELLBROOK COAL CO
ronmental Manag
e of laint
Date of Incident
AM 13‐Sep‐16
AM 17‐Sep‐16
AM 24‐Sep‐16
AM 28‐Sep‐16
AM 21‐Sep‐16
AM 07‐Oct‐16
OMPANY LIMITED
gement Report
Time of Incident
L
7:24 AM Mu
9:12 AM Mu
8:09 AM Mu
8:52 AM Mu
12:10 PM
WoRidg
7:05 AM Mu
Location TypCom
scle Creek Odou
scle Creek Odou
scle Creek Odou
scle Creek Odou
oodlands ge
Dust
scle Creek Odou
pe of mplaint
Mode Conta
ur EnvironmHotline ‐ urgent. Eresponde
ur EnvironmHotline ‐ urgent. Oresponde
ur EnvironmHotline ‐ nurgent. Oresponde
ur EnvironmHotline ‐ urgent. Eresponde
Email fromEPA
ur EnvironmHotline ‐ urgent. Eresponde
of ct
NaturCompl
ental
A d
Sulphur smhouse
ental
OCE d
Odour and
ental non OCE d
Sulphur Odstrong
ental
A d
Strong odofog
m Dust leavin
ental
A d
Sulphur od
re of laint
mell at Spontaand OCvisited the comwere vithe odo
haze Spontaand OCconstrugoaf arcompla
dour very Spontaand OCgeneraany odocomplaperform
our and Spontaand OCcomplawas visyard ofthe EPAto the E
ng site Dust mno excewas pro
our Spontafocusinclay. Mwith th
Action Ta
neous managemenC2 were in place. Ththe complainant lomplaint and observeisible. The odour raour was irregular.
neous managemenC2 were in place. Anucted for sealing of rea. Attempts by thainant to discuss we
neous managemenC2 were in place. Obl area at approx. 7:our. During a followainant commented mance has improve
neous managemenC2 were in place. Thainant following thesible and the odour f residence. The coA as well and a respEPA.
management activitieedance of dust critovided to the EPA.
neous combustion ng on plugging a roaManagement activithe complainant.
17
aken
nt activities in OC1 he EA and SOM ocation shortly aftered that haze and foanking was 1/6 and
nt activities in OC1 n inert seal was beinthe high wall in the
he OCE to contact there unsuccessful.
nt activities in OC1 bservations in the 15am did not detecw up phone call thethat the mine ed recently.
nt activities in OC1 he EA visited the e complaint. Haze ranked 1/6 in frontmplainant contacteponse was provided
es were in place witeria. A response
activities were adway in OC1 with ies were discussed
73
r og d
ng e he
ct e
t ed d
ith
2
C
0
1
1
1
1
0
0
0
MUSWE
2016 Annual Envir
Date of Complaint
TimeCompl
7‐Oct‐16 10:25 A
4‐Oct‐16 9:31 A
5‐Oct‐16 8:33 A
7‐Oct‐16 11:44 A
7‐Oct‐16 11:44 A
1‐Nov‐16 8:09 A
1‐Nov‐16 9:02 A
7‐Nov‐16 8:19 A
ELLBROOK COAL CO
ronmental Manag
e of laint
Date of Incident
AM 07‐Oct‐16
AM 13‐Oct‐16
AM 15‐Oct‐16
AM 15‐Oct‐16
AM 15‐Oct‐16
AM 01‐Nov‐16
AM 01‐Nov‐16
AM 07‐Nov‐16
OMPANY LIMITED
gement Report
Time of Incident
L
Unknown
WoRidg
8:00 AM Sco
8:33 AM Mu
8:00 AM WoRidg
8:30 AM WoRidg
8:09 AM Mu
7:30 AM WoRidg
8:19 AM Mu
Location TypCom
oodlands ge
Odou
one Odou
scle Creek Odou
oodlands ge
Odou
oodlands ge
Odou
scle Creek Odou
oodlands ge
Odou
scle Creek Odou
pe of mplaint
Mode Conta
ur Email fromEPA
ur Email fromEPA
ur EnvironmHotline ‐ urgent. Eresponde
ur Email fromEPA
ur Email fromEPA
ur EnvironmHotline ‐ urgent. Oresponde
ur Email fromEPA
ur EnvironmHotline ‐ urgent. Oresponde
of ct
NaturCompl
m Odour
m Odour of sufrom an unsource
ental
A d
Sulphur od
m Sulphur odburning coa
m Sulphur odburning coadust
ental
OCE d
Strong odoslight smok
m Smell of bucoal
ental
OCE d
Very strongand fumes
re of laint
Spontafocusinclay. Mwith thprovide
ulphur known
Spontaand OCprovide
our Spontaand OCundertaof the cdetectacomplawere d
our from al
Spontaactivitierespon
our from al and
Spontaactivitierespon
our and ke flume
Spontaactivitiecomplabeing u
urning Spontaand OCrespon
g sulphur in the air
SpontaactivitieAttempunsucclocatioodour.
Action Ta
neous combustion ng on plugging a roaManagement activithe complainant anded to the EPA.
neous managemenC2 were in place. A ed to the EPA.
neous managemenC2 were in place. Odaken by site personcomplaint indicatedable in the areas obainant was contacteiscussed further.
neous combustion es in OC1 and OC2 se was provided to
neous combustion es in OC1 and OC2 se was provided to
neous combustion es in OC1 and OC2 ainant was advised undertaken on site.
neous managemenC2 were in place. Thse was not required
neous combustion es in OC1 and OC2 pts to contact the cessful. The EA visitn at 8:35am and co
17
aken
activities were adway in OC1 with ies were discussed a response was
nt activities in OC1 response was
nt activities in OC1 dour observations nnel around the timd that odour wasn'tbserved. The ed and their concer
management were in place. A the EPA.
management were in place. A the EPA.
management were in place. Theof the activities
nt activities in OC1 he EPA advised thatd.
management were in place. omplainant were ted the complainanould not detect any
74
me t
rns
t a
t
2
C
1
0
1
1
2
MUSWE
2016 Annual Envir
Date of Complaint
TimeCompl
6‐Nov‐16 7:39 A
5‐Dec‐16 1:14 P
4‐Dec‐16 11:09 A
9‐Dec‐16 1:39 P
6‐Dec‐16 7:33 P
ELLBROOK COAL CO
ronmental Manag
e of laint
Date of Incident
AM 16‐Nov‐16
M 27‐Nov‐16
AM 13‐Dec‐16
M 17‐Dec‐16
M 26‐Dec‐16
OMPANY LIMITED
gement Report
Time of Incident
L
7:00 AM Mu
11:30 PM
Sco
7:20 AM WoRidg
6:05 AM WoRidg
7:33 PM NorMu
Location TypCom
scle Creek Odou
one Odou
oodlands ge
Odou
oodlands ge
Odou
rthswellbrook
Odou
pe of mplaint
Mode Conta
ur EnvironmHotline ‐ urgent. Oresponde
ur Email fromMSC
ur Email fromEPA
ur Email fromEPA
ur Direct calOCE phonOCE responde
of ct
NaturCompl
ental
OCE d
Strong sulpsmell
m Odour thatlike spontacombustion
m Strong coal
m Thick smoksulphur sm
l to ne ‐
d
Could not soutside thedue to the
re of laint
phur Spontaactivitiecomplabeing uthey co
t smells neous n
Spontaplace. Mreceivinnot req
l smell Spontaactivitieapproxdid notrespon
ke and ell
Spontaactivitieapproxdetecteamounto the rwas pro
sit eir house smell
No minChristmrunningdiscussmanage
Action Ta
neous combustion es in OC1 and OC2 ainant was advised undertaken on site. ould smell the odou
neous combustion MSC advised due tong the complaint thquired.
neous combustion es were in place. Oximately 1 hour befot detect any odour ise was provided to
neous combustion es were in place. Oximately 1.5 hours aed very weak odourts of steam were brain from the night ovided to the EPA.
ning equipment wasmas shutdown. Infug. OCE spoke with sed the spontaneouement activities oc
17
aken
management were in place. Theof the activities They commented
ur inside the house.
management was o the delay in hat a response was
management dour observations ore the complaint in the area. A the EPA.
management dour observations after the complaint r in the area. Minoeing generated duebefore. A respons
s operating due to usion sprays were the complainant anus combustion curring on site.
75
in
or e e
nd