2016 annual environmental management report · .1 chan mine con employee actions r complian 6.1...

186
A M ANN MA MUSWE NUAL ANA ELLBRO 2 L EN AGEM OOK CO 2016 NVIR MEN OAL CO 6 RONM NT R MPAN MEN EPO Y NTA ORT AL

Upload: others

Post on 10-Oct-2019

0 views

Category:

Documents


0 download

TRANSCRIPT

 

A

     

M

ANNMA

MUSWE

NUALANA

ELLBRO

2L ENAGEM

OOK CO

2016NVIRMEN

 

OAL CO

6 RONMNT R

MPAN

MENEPO

NTAORT 

AL 

2016 An

MUSWELL

nnual Environ

LBROOK COAL

nmental Man

This 

L COMPANY L

nagement Re

page has b

IMITED

eport

een left blaank intentionnally. 

2016 An

Name o  Name o

Titles/M

  MOP CoMOP Co AEMR CAEMR E  Reporti Title:    Signatu

Date:   

MUSWELL

nnual Environ

of Leasehold

of Mine:    Mining Leas

ommencemompletion D

CommencemEnd Date:  

ng Officer: 

   

re:            

LBROOK COAL

nmental Man

der: 

es: 

ment Date: Date:  

ment Date: 

 

L COMPANY L

nagement Re

 

 

 

  

  

 

 

 

 

IMITED

eport

Muswe

Muswe

ConsoliMiningMining

31 Mar31 Dece

1 Janua31 Dece

Julie Th

Environ

ellbrook Coa

ellbrook Coa

idated Coalg Lease 1304g Lease 1562

rch 2015 ember 2020

ary 2016 ember 2016

homas 

nmental Co

 

 

al Company

al 

l Lease 713 4 2 

ordinator 

y Limited 

    

   

ii 

2016 An

MUSWELL

nnual Environ

LBROOK COAL

nmental Man

This 

L COMPANY L

nagement Re

page has b

IMITED

eport

een left blaank intentionnally. 

iii 

2016 An

1.0  I

1.1 

1.2 

1.2

1.3 

1.4 

1.5 

1.6 

1.6

1.6

2.0  A

2.1 

2.2 

2.2

2.3 

2.4 

2.5 

2.6 

2.7 

2.8 

2.9 

2.9

2.9

2.9

2.10 

2.1

2.1

2.1

2.11 

3.0  E

3.1 

3.2 

3.2

MUSWELL

nnual Environ

NTRODUCTI

STRUCTUR

CONSENTS

.1  CHAN

MINE CON

EMPLOYEE

ACTIONS R

COMPLIAN

6.1  REPO

6.2  COM

ACTIVITIES D

EXPLORAT

LAND PREP

.1  TOPS

CONSTRUC

MINING ...

MINERAL P

WASTE MA

PRODUCT 

PRODUCTI

HAZARDO

.1  FUEL 

.2  CHEM

.3  EXPLO

WATER MA

0.1  WATE

0.2  GROU

0.3  WATE

OTHER INF

ENVIRONME

ENVIRONM

METEORO

.1  WIND

LBROOK COAL

nmental Man

ON ..............

RE OF THIS R

S, LEASES AN

NGES TO APP

NTACTS ........

E LEVELS ......

REQUIRED FR

NCE STATUS 

ORTABLE INC

PLIANCE REV

DURING THE 

TION ............

PARATION ..

OIL MANAG

CTION .........

....................

PROCESSING

ANAGEMENT

COAL AND T

ION SUMMA

US MATERIA

STORAGE ...

MALERT SYST

OSIVES ........

ANAGEMENT

ER STORAGE

UNDWATER 

ER BALANCE

FRASTRUCTU

NTAL MANA

MENTAL MA

OLOGICAL .....

D SPEED AND

L COMPANY L

nagement Re

TABLE

....................

EPORT .........

ND LICENCES

PROVALS ......

....................

....................

ROM PREVIO

....................

IDENTS ........

VIEW ............

REPORTING 

....................

....................

EMENT ........

....................

....................

G ...................

T ..................

TRANSPORT .

ARY ...............

ALS MANAGE

....................

TEM ..............

....................

T ..................

 ...................

EXTRACTION

....................

URE MANAG

AGEMENT AN

NAGEMENT .

....................

D DIRECTION

IMITED

eport

E OF CONT

....................

....................

...................

....................

....................

....................

OUS AEMR RE

....................

....................

....................

PERIOD .......

....................

....................

....................

....................

....................

....................

....................

....................

....................

EMENT .........

....................

....................

....................

....................

....................

N ..................

....................

EMENT .......

ND PERFORM

....................

....................

N ...................

TENTS 

....................

....................

....................

....................

....................

....................

EVIEW .........

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

MANCE .........

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

iv 

............ 1 

............ 1 

............ 1 

............ 3 

............ 3 

............ 4 

............ 4 

............ 9 

............ 9 

............ 9 

.......... 12 

.......... 12 

.......... 12 

.......... 12 

.......... 12 

.......... 12 

.......... 13 

.......... 15 

.......... 15 

.......... 15 

.......... 16 

.......... 16 

.......... 16 

.......... 16 

.......... 16 

.......... 17 

.......... 17 

.......... 17 

.......... 18 

.......... 19 

.......... 19 

.......... 19 

.......... 21 

2016 An

3.2

3.2

3.2

3.3 

3.3

3.3

3.3

3.4 

3.5 

3.5

3.5

3.5

3.6 

3.6

3.6

3.6

3.7 

3.7

3.7

3.7

3.8 

3.9 

3.9

3.9

3.9

3.10 

3.1

3.1

3.11 

3.1

3.1

3.1

3.12 

3.1

MUSWELL

nnual Environ

.2  RAINF

.3  TEMP

.4  INVER

AIR QUALI

.1  ACTIV

.2  AIR Q

.3  ACTIV

GREENHO

EROSION A

.1  ACTIV

.2  EROS

.3  ACTIV

SURFACE W

6.1  ACTIV

6.2  SURF

6.3  ACTIV

GROUNDW

.1  ACTIV

.2  GROU

.1  ACTIV

CONTAMIN

FLORA AN

.1  ACTIV

.2  FLORA

.3  ACTIV

WEEDS AN

0.1  ACTIV

0.2  ACTIV

BLASTING 

1.1  ACTIV

1.2  BLAST

1.1  ACTIV

NOISE MA

2.1  ACTIV

LBROOK COAL

nmental Man

FALL ............

PERATURE ...

RSION MONI

TY MANAGE

VITIES THIS R

QUALITY MON

VITIES NEXT 

USE GAS .....

AND SEDIME

VITIES THIS R

SION AND SE

VITIES NEXT 

WATER MAN

VITIES THIS R

ACE WATER 

VITIES NEXT 

WATER MAN

VITIES THIS R

UNDWATER 

VITIES NEXT 

NATED LAND

D FAUNA MA

VITIES THIS R

A AND FAUN

VITIES NEXT 

ND FERAL AN

VITIES THIS R

VITIES NEXT 

...................

VITIES THIS R

T MONITORI

VITIES NEXT 

ANAGEMENT 

VITIES THIS R

L COMPANY L

nagement Re

....................

....................

ITORING ......

EMENT .........

REPORTING P

NITORING ....

REPORTING 

....................

ENT CONTRO

REPORTING P

DIMENT CON

REPORTING 

NAGEMENT ..

REPORTING P

MONITORIN

REPORTING 

AGEMENT ...

REPORTING P

MONITORIN

REPORTING 

D ..................

ANAGEMENT

REPORTING P

NA MONITOR

REPORTING 

NIMALS .........

REPORTING P

REPORTING 

....................

REPORTING P

NG ..............

REPORTING 

....................

REPORTING P

IMITED

eport

....................

....................

....................

....................

PERIOD ........

....................

PERIOD .......

....................

OL .................

PERIOD ........

NTROL MON

PERIOD .......

....................

PERIOD ........

NG ................

PERIOD .......

....................

PERIOD ........

G ................

PERIOD .......

....................

T .................

PERIOD ........

RING ............

PERIOD .......

....................

PERIOD ........

PERIOD .......

....................

PERIOD ........

....................

PERIOD .......

....................

PERIOD ........

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

NITORING .....

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

.......... 22 

.......... 23 

.......... 26 

.......... 26 

.......... 26 

.......... 28 

.......... 36 

.......... 36 

.......... 41 

.......... 41 

.......... 41 

.......... 41 

.......... 42 

.......... 42 

.......... 42 

.......... 44 

.......... 51 

.......... 51 

.......... 51 

.......... 63 

.......... 63 

.......... 63 

.......... 63 

.......... 63 

.......... 63 

.......... 64 

.......... 64 

.......... 64 

.......... 64 

.......... 64 

.......... 65 

.......... 66 

.......... 66 

.......... 66 

2016 An

3.1

3.1

3.13 

3.14 

3.15 

3.16 

3.1

3.1

3.17 

3.18 

3.19 

3.20 

3.21 

4.0  C

4.1 

4.2 

4.3 

5.0  R

5.1 

5.2 

5.2

5.2

5.2

5.2

5.3 

5.3

5.4 

5.4

5.4

5.4

5.5 

5.5

5.5

5.5

MUSWELL

nnual Environ

2.2  NOISE

2.1  ACTIV

VISUAL, ST

ABORIGIN

EUROPEAN

SPONTANE

6.1  ACTIV

6.2  ACTIV

BUSHFIRE.

HYDROCA

METHANE

PUBLIC SA

OTHER ISS

COMMUNITY

ENVIRONM

COMMUN

COMMUN

REHABILITAT

BUILDINGS

REHABILIT

.1  REHA

.2  SPECI

.3  REHA

.4  REHA

REHABILIT

.1  SITE S

FLORA MO

4.1  PERM

4.2  FULL 

4.3  BIOM

FLORA MO

.1  SPECI

.2  BIOM

.3  COM

LBROOK COAL

nmental Man

E MONITORI

VITIES NEXT 

TRAY LIGHT .

AL HERITAG

N HERITAGE 

EOUS COMB

VITIES THIS R

VITIES NEXT 

....................

RBON CONT

 DRAINAGE/

AFETY ...........

SUES AND RIS

Y RELATIONS

MENTAL COM

ITY LIAISON,

ITY CONSUL

TION ............

S ..................

TATION OF D

ABILITATION 

IES SELECTIO

ABILITATION 

ABILITATION 

TATION MON

SELECTION ..

ONITORING M

MANENT MO

FLORISTIC A

METRIC SURV

ONITORING R

IES RICHNESS

METRIC DATA

PARISON TO

L COMPANY L

nagement Re

NG ..............

REPORTING 

....................

E ..................

....................

USTION .......

REPORTING P

REPORTING 

....................

AMINATION

/VENTILATIO

....................

SKS ..............

S ...................

MPLAINTS ....

, SPONSORSH

TATIVE COM

....................

....................

ISTURBED LA

PROCESS .....

ON ................

ACTIVITIES T

ACTIVITIES N

NITORING .....

....................

METHODOLO

NITORING TR

ND STRUCTU

VEY................

RESULTS .......

S ..................

A ...................

O COMPLETIO

IMITED

eport

....................

PERIOD .......

....................

....................

....................

....................

PERIOD ........

PERIOD .......

....................

 ...................

ON ................

....................

....................

....................

....................

HIPS AND DO

MMITTEE ......

....................

....................

ANDS ...........

....................

....................

THIS REPORT

NEXT REPORT

....................

....................

OGY .............

RANSECTS/P

URE .............

....................

....................

....................

....................

ON CRITERIA

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

ONATIONS ...

....................

....................

....................

....................

....................

....................

TING PERIOD

TING PERIOD

....................

....................

....................

PLOTS ...........

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

 ...................

D ..................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

vi 

.......... 71 

.......... 74 

.......... 75 

.......... 75 

.......... 75 

.......... 75 

.......... 75 

.......... 77 

.......... 77 

.......... 78 

.......... 78 

.......... 78 

.......... 78 

.......... 79 

.......... 79 

.......... 82 

.......... 82 

.......... 83 

.......... 83 

.......... 83 

.......... 83 

.......... 83 

.......... 85 

.......... 87 

.......... 89 

.......... 89 

.......... 96 

.......... 96 

.......... 96 

.......... 97 

.......... 97 

.......... 97 

.......... 99 

........ 100 

2016 An

5.5

5.6 

5.6

5.6

5.6

5.7 

5.7

5.7

5.7

5.7

5.8 

5.9 

5.9

5.9

5.9

5.10 

5.11 

5.12 

5.13 

5.14 

5.15 

6.0  A

 

Table 1: 

Table 2: 

Table 3: 

Table 4: 

Table 5: 

Table 6: 

Table 7: 

Table 8: 

Table 9: 

Table 10

Table 11

Table 12

Table 13

MUSWELL

nnual Environ

.4  CONC

FAUNA MO

6.1  REMO

6.2  BIRD 

6.3  MICR

FAUNA MO

.1  REMO

.2  BIRD 

.3  MICR

.4  CONC

SOIL MON

SOIL MON

.1  WOO

.2  PAST

.3  CONC

EROSION A

CARRYING

BIODIVERS

FIRE AFFEC

REHABILIT

FURTHER D

ACTIVITIES P

Consents, A

Mine Conta

Employee L

Actions from

Actions from

Compliance

Mining Flee

Waste Strea

Production 

0: Stored Wa

1: Groundwa

2: Site Water

3: Rainfall Da

LBROOK COAL

nmental Man

CLUSIONS ....

ONITORING 

OTE CAMERA

CENSUS ......

ROCHIROPTE

ONITORING 

OTE CAMERA

CENSUS ......

ROCHIROPTE

CLUSIONS ....

ITORING ME

ITORING RES

ODLAND SITE

URE SITES ...

CLUSIONS ....

AND LANDFO

G CAPACITY A

SITY OFFSET 

CTED REHAB

TATION TRIAL

DEVELOPME

ROPOSED IN

Authorisation

cts ..............

evels ...........

m DRE AEMR

m MSC AEMR

e Review ......

et Utilised at 

am Generatio

and Waste S

ater ..............

ater Extractio

r Balance .....

ata ...............

L COMPANY L

nagement Re

....................

METHODOLO

A SURVEY .....

....................

RAN BATS ....

RESULTS ......

A SURVEY .....

....................

RAN BATS ....

....................

ETHODOLOG

SULTS ..........

S ..................

....................

....................

ORM STABILI

AND PASTUR

AREA ...........

BILITATION SI

LS AND RESE

ENT OF THE F

N THE NEXT A

LISns and Licenc

....................

....................

R Inspections

R Inspection

....................

MCC ............

on ................

Summary .....

....................

on .................

....................

....................

IMITED

eport

....................

OGY ............

....................

....................

....................

....................

....................

....................

....................

....................

GY .................

....................

....................

....................

....................

ITY ...............

RE CONDITIO

....................

ITE ...............

EARCH .........

FINAL REHAB

AEMR PERIO

ST OF TABces ...............

....................

....................

s ..................

s ..................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

N .................

....................

....................

....................

BILITATION P

D .................

LES ....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

PLAN ............

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

vii 

........ 100 

........ 101 

........ 101 

........ 101 

........ 101 

........ 102 

........ 102 

........ 103 

........ 104 

........ 107 

........ 107 

........ 107 

........ 107 

........ 111 

........ 114 

........ 115 

........ 119 

........ 119 

........ 123 

........ 125 

........ 125 

........ 126 

............ 2 

............ 4 

............ 4 

............ 4 

............ 7 

............ 9 

.......... 13 

.......... 15 

.......... 16 

.......... 17 

.......... 17 

.......... 18 

.......... 23 

2016 An

Table 14

Table 15

Table 16

Table 17

Table 18

Table 19

Table 20

Table 21

Table 22

Table 23

Table 24

Table 25

Table 26

Table 27

Table 28

Table 29

Table 30

Table 31

Table 32

Table 33

Table 34

Table 35

Table 36

Table 37

Table 38

Table 39

Table 40

Table 41

Table 42

Table 43

Table 44

Table 45

Table 46

Table 47

Table 48

Table 49

Table 50

Table 51

Table 52

Table 53

Table 54

 

 

MUSWELL

nnual Environ

4: Temperatu

5: Control Pr

6: Control Pr

7: Deposition

8: Compariso

9: TSP Monit

0: TSP Averag

1: Compariso

2: Real‐Time 

3: Compariso

4: PM10 HVAS

5: Compariso

6: Surface W

7: Compariso

8: Compariso

9: Compariso

0: Groundwa

1: Compariso

2: Compariso

3: Compariso

4: Compariso

5: Sandy Cree

6: Blast Crite

7: Blast Mon

8: Predicted 

9: Noise Mon

0: Spontaneo

1: Summary o

2: Summary o

3: Recommen

4: Recommen

5: Rehabilitat

6: Maintenan

7: Flora Asse

8: Data Gathe

9: Rehabilitat

0: Remote Ca

1: Bat Calls Id

2: Evidence o

3: Estimated 

4: Biodiversit

LBROOK COAL

nmental Man

ure Data ......

ocedures for

ocedures for

nal Dust Gau

on of Deposit

oring Locatio

ges ..............

on of TSP Res

PM10 Averag

on of Real‐Tim

S Average ....

on of PM10 Re

ater Monito

on of pH Res

on of EC Resu

on of TSS Res

ater Monitor

on of Underg

on of Depth t

on of pH Res

on of EC Resu

ek Groundw

ria ...............

itoring Netw

Noise Levels

nitoring Resu

ous Combust

of Spontane

of Complaint

nded Specie

nded Specie

tion Summa

nce Activities

mblage and 

ered for Flor

tion Site Com

amera Result

dentified at R

of Erosion at 

Carrying Cap

ty Offset Site

L COMPANY L

nagement Re

....................

r Wind Blow

r Mining Gen

ge Locations

tional Dust R

ons ..............

....................

sults .............

ges ...............

me PM10 Res

....................

esults ...........

ring Program

ults to Histor

ults to Histor

sults to Histo

ing Program

ground Work

to Historical 

ults to Histor

ults to Histor

ater Monito

....................

work ..............

s ...................

ults ...............

tion Report S

ous Combus

ts .................

s List for Nat

s List for Pas

ry .................

s on Rehabili

Fauna Monit

ristic Assessm

mpletion Crit

ts .................

Remnant and

Rehabilitatio

pacity for Re

e PCT Classifi

 

IMITED

eport

....................

n Dust .........

nerated Dust

s ..................

Results .........

....................

....................

....................

....................

sults ............

....................

....................

m ..................

rical Results

rical Results .

orical Results

 ...................

king Results .

Results .......

rical Results

rical Results .

ring Trigger 

....................

....................

....................

....................

Summary .....

stion Affecte

....................

tive Vegetati

sture ............

....................

itated Land .

toring for Re

ment of the W

teria Target .

....................

d Rehabilitat

on Woodlan

emnant and R

ication, EEC 

....................

....................

t Sources......

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

s ...................

....................

....................

....................

....................

....................

Levels ..........

....................

....................

....................

....................

....................

d Areas With

....................

ion ...............

....................

....................

....................

ehabilitation 

Woodland Si

....................

....................

tion Woodla

d and Pastur

Regrowth Pa

Equivalencie

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

hout Active C

....................

....................

....................

....................

....................

Monitoring 

ites ..............

....................

....................

nd Sites .......

re Sites ........

asture Sites ..

es and Condit

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

Control .......

....................

....................

....................

....................

....................

Sites ...........

....................

....................

....................

....................

....................

....................

tion ............

viii 

.......... 23 

.......... 26 

.......... 28 

.......... 29 

.......... 29 

.......... 31 

.......... 31 

.......... 31 

.......... 35 

.......... 35 

.......... 36 

.......... 36 

.......... 42 

.......... 43 

.......... 43 

.......... 44 

.......... 51 

.......... 52 

.......... 52 

.......... 52 

.......... 52 

.......... 60 

.......... 65 

.......... 65 

.......... 71 

.......... 72 

.......... 76 

.......... 77 

.......... 79 

.......... 83 

.......... 84 

.......... 86 

.......... 87 

.......... 90 

.......... 97 

........ 100 

........ 103 

........ 106 

........ 115 

........ 119 

........ 120 

2016 An

Figure 1

Figure 2

Figure 3

Figure 4

Figure 5

Figure 6

Figure 7

Figure 8

Figure 9

Figure 1

Figure 1

Figure 1

Figure 1

Figure 1

Figure 1

Figure 1

Figure 1

Figure 1

Figure 1

Figure 2

Figure 2

Figure 2

Figure 2

Figure 2

Figure 2

Figure 2

Figure 2

Figure 2

Figure 2

Figure 3

Figure 3

Figure 3

Figure 3

Figure 3

Figure 3

Figure 3

Figure 3

Figure 3

Figure 3

Figure 4

Figure 4

Figure 4

Figure 4

Figure 4

MUSWELL

nnual Environ

: Mining Act

: Environme

: Quarterly W

4: Rainfall Gra

: Temperatu

: Temperatu

: Average De

: Site 1 TSP M

: Site 2 TSP M

0: Site 3 TSP

1: Site 1 PM

2: Site 2 PM

3: Site 3 PM

4: PM10 HVA

5: Monthly S

6: Monthly S

7: Monthly S

8: Quarterly

9: Quarterly

0: Quarterly

1: Location o

2: Water Lev

3: Water Qu

4: Water Lev

5: Sandy Cre

6: Sandy Cre

7: Sandy Cre

8: Sandy Cre

9: Sandy Cre

0: Queen Str

1: School Bla

2: 99 Queen

3: Nisbet Bla

4: Complain

5: Complain

6: Proposed

7: Rehabilita

8: Rehabilita

9: Floristic P

40: Comparis

41: Comparis

42: Biometric

43: Comparis

44: Comparis

LBROOK COAL

nmental Man

tivities This R

ntal Monito

Windroses ...

aph..............

ure Graph ....

ure Inversion

epositional D

Monitoring R

Monitoring R

P Monitoring

10 Results ....

10 Results ....

10 Results ....

AS Results ....

Surface Wate

Surface Wate

Surface Wate

y Surface Wa

y Surface Wa

y Surface Wa

of Alluvial La

vel for Unde

uality Data in

vel for Groun

eek Groundw

eek Water Q

eek Water Q

eek Groundw

eek Groundw

reet Blast M

ast Monitori

n Street Blast

ast Monitorin

t Summary .

t History .....

 Activities Ne

ation Monito

ation Monito

Plot Diagram 

on of Averag

on of Averag

c Data Averag

on of Biome

on of Averag

L COMPANY L

nagement Re

LISTReporting Pe

ring Location

....................

....................

....................

 Graph ........

Dust Results .

Results .........

Results .........

Results .......

....................

....................

....................

....................

er Monitorin

er Results – 

er Results – T

ter Results –

ter Monitori

ter Monitori

and Compare

rground Wo

 Undergroun

ndwater Mon

water Depth .

uality – pH...

uality – Elect

water Monito

water Level C

onitoring Re

ng Results ...

t Monitoring

ng Results ....

....................

....................

ext Reportin

oring Program

oring Program

....................

ge Native Spe

ge Number o

ges ...............

tric Data Ave

ge Fauna Spe

IMITED

eport

T OF FIGUriod .............

ns ................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

ng Results – p

Electrical Co

Total Suspen

– pH .............

ing Results –

ing Results –

ed to Mine W

rkings ..........

nd Workings

nitoring on S

....................

....................

trical Conduc

oring Netwo

Catenary Tra

esults ...........

....................

g Results ......

....................

....................

....................

g Period ......

m – Flora Sit

m – Fauna Si

....................

ecies ...........

of Weed Spe

....................

erages .........

ecies Richnes

URES ....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

pH ................

nductivity ...

nded Solids ..

....................

– Electrical Co

– Total Suspe

Workings ......

....................

s ...................

Site ...............

....................

....................

ctivity ..........

rk, Sectional

nsect ...........

....................

....................

....................

....................

....................

....................

....................

es ................

tes ...............

....................

....................

cies ..............

....................

....................

ss .................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

onductivity ..

ended Solids 

....................

....................

....................

....................

....................

....................

....................

Plan ...........

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

...................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

ix 

.......... 14 

.......... 20 

.......... 22 

.......... 24 

.......... 25 

.......... 27 

.......... 30 

.......... 32 

.......... 33 

.......... 34 

.......... 37 

.......... 38 

.......... 39 

.......... 40 

.......... 45 

.......... 46 

.......... 47 

.......... 48 

.......... 49 

.......... 50 

.......... 53 

.......... 54 

.......... 55 

.......... 56 

.......... 57 

.......... 58 

.......... 59 

.......... 61 

.......... 62 

.......... 67 

.......... 68 

.......... 69 

.......... 70 

.......... 80 

.......... 81 

.......... 88 

.......... 94 

.......... 95 

.......... 96 

.......... 98 

.......... 98 

.......... 99 

........ 100 

........ 103 

2016 An

Figure 4

Figure 4

Figure 4

Figure 4

Figure 4

Figure 5

Figure 5

Figure 5

Figure 5

Figure 5

Figure 5

Figure 5

Figure 5

Figure 5

Figure 5

Figure 6

Figure 6

Figure 6

Figure 6

Figure 6

Figure 6

 

Append

Append

Append

Append

 

 

MUSWELL

nnual Environ

45: Bird Speci

46: Number o

47: Comparis

48: Comparis

49: Comparis

0: Comparis

1: Comparis

2: Comparis

3: Comparis

4: Comparis

5: Comparis

6: Comparis

7: Comparis

8: Comparis

9: Comparis

0: Comparis

1: Comparis

2: Erosion Si

3: Biodiversi

4: Vegetatio

5: Fire Affec

ix 1: Air Qua

ix 2: Water M

ix 3: Blast M

ix 4: Compla

LBROOK COAL

nmental Man

ies Identified

of Common a

on of Bat Sp

on of Soil pH

on of Soil Ele

on of Soil Po

on of Soil Su

on of Soil Nit

on of Soil Nit

on of Soil Or

on of Soil pH

on of Soil Ele

on of Soil Po

on of Soil Su

on of Soil Nit

on of Soil Nit

on of Soil Or

ites ..............

ity Offset Mo

on Communit

ted Monitor

lity Monitor

Monitoring R

onitoring Da

ints Summar

L COMPANY L

nagement Re

d at Remnan

and Threaten

ecies Record

H – Woodlan

ectrical Cond

otassium – W

lphur – Woo

trite + Nitrat

trogen – Wo

rganic Matte

H – Pasture ..

ectrical Cond

otassium – Pa

lphur – Past

trite + Nitrat

trogen – Pas

rganic Matte

....................

onitoring Site

ties Within B

ring Sites ......

LIST Oing Results 

Results 

ata 

ry 

IMITED

eport

t and Rehab

ned Bat Spec

ded at Wood

d .................

ductivity – W

Woodland .....

odland .........

te – Woodlan

oodland .......

er – Woodlan

....................

ductivity – Pa

asture .........

ture ..............

te (mg/kg) –

sture ............

er – Pasture .

....................

es ................

Biodiversity O

....................

OF APPEN

bilitation Site

cies Recorde

dland Sites ....

....................

Woodland ......

....................

....................

nd ................

....................

nd .................

....................

asture ..........

....................

....................

Pasture .......

....................

....................

....................

....................

Offset Site ....

....................

DICES 

s .................

d at Woodla

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

and Sites .....

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

........ 104 

........ 105 

........ 105 

........ 107 

........ 108 

........ 108 

........ 109 

........ 109 

........ 110 

........ 110 

........ 111 

........ 111 

........ 112 

........ 112 

........ 113 

........ 114 

........ 114 

........ 118 

........ 121 

........ 122 

........ 124 

2016 An

1.0   IMuswelLtd. Gromining cRoad, ap On 1 SeCouncil operatioThis  appgranted life of th 

1.1 STThe  struAnnual EDG03 stipulatethe repo This  Anenvironm(herein r In accor

Mus

Divis

Envi

Offic

Dep

MCC A copy ohttps://w 

1.2 CMCC op205/200with thefound in Mining a1562 an In additi

EnviOpe

MUSWELL

nnual Environ

NTRODUClbrook Coal oup. MCC hacommencingpproximately

ptember 200(MSC) to extons  in Marchproval  has  sin 2016 to a

he mining op

TRUCTUREucture of  thiEnvironmenMREMP  Gued in the MCorting requir

nnual  Enviromental manreferred to a

dance with t

swellbrook S

sion of Reso

ironment Pro

ce of Environ

artment of P

C Community

of the reportwww.idemit

ONSENTS,erates unde02, which wae latest modn Section 1.2

activities at d Mining Lea

ion to the ab

ironmental  Perations Act 1

LBROOK COAL

nmental Man

CTION Company  (Mas a  long assg in 1907 andy 3 kilometre

03, Developtend the forh 2005 and subsequentlyallow miningperations to 2

E OF THIS Ris  report  is bntal  Manageuide  V3  datCC Developmements in M

onmental  Magement anas the ‘repor

the Developm

hire Council 

urces and En

otection Aut

nment and H

Primary Indu

y Consultativ

t is also availtsu.com.au/o

, LEASES Ar a number oas approvedification bein2.1. 

MCC are caase 1304. 

bove approva

Protection  L1997. 

L COMPANY L

nagement Re

MCC)  is a whsociation witd open cut oes to the nor

ment Consemer MCC Nohas a capacy  been modg  in an area 2022.  Rehab

REPORT based on  thement  Reported  Januaryment ConsentMCC’s water l

Managementd performanting period’)

ment Consen

(MSC); 

nergy (DRE);

hority (EPA);

Heritage (OEH

stries – Wat

ve Committe

able on MCCoperations/m

ND LICENCof developm by MSC  in ng approved

arried out w

als MCC ope

Licence  (EPL)

IMITED

eport

holly ownedth coal mininoperations inrth‐east of M

nt for DA 20o.1 Open Cuity  to produdified  on  sevknown as thbilitation act

e documentrt”,  Departmy  2006  andt, specificallylicences and 

t  Report  (Ance at MCC ).  

nt, copies of 

H); 

ter (DPI‐Wat

ee (CCC). 

C’s website:muswellbroo

CES ment consent2003.   This d in 2016.  M

holly within 

rates under 

)  656  issued

d subsidiary ng at Muswn 1944. The Muswellbrook

05/2002 wast. The No.1 uce up  to 2,0veral  occasiohe “Continuaivities will co

t  “Guidelinesment  of  Minincorporat

y Condition 4mining lease

AEMR)  provfrom 1  Janu

this AEMR w

er); and 

k‐coal/appro

ts issued by DA has bee

More informa

Consolidate

the followin

d  under  the

of  the  Idemellbrook, witmine is locatk. 

s granted by Open Cut Ex000,000  tonnons with  theation Projectontinue past 

s and Formaneral  Resoures  the  repo42.  This repoes. 

ides  a  sumuary 2016  to

will be made 

ovals‐plans‐r

MSC.  The pn modified oation on this

ed Coal Leas

g licences: 

Protection 

itsu Kosan Cth undergroted on Musc

y Muswellbroxtension comnes coal pere  latest modt” and to exthis date. 

at  for Preparces,  Documorting  requort also inco

mmary  of  ao 31 Decemb

available to

reports/ 

rimary conseon several os modificatio

se 713, Mini

of  the  Envi

Company und coal cle Creek 

ook Shire mmenced r annum.  dification xtend the 

ration of ment  No. irements orporates 

activities, ber 2016 

ent is DA occasions on can be 

ng Lease 

ronment 

2016 An

Watund

 Relevant 

Approva

DA 86/9

DA 205/(MSC) 

DA 205/(MSC) – AmendmConditio

DA 205/(MSC) Amendm1.1 and 

DA 205/(MSC) Amendm11.1 

DA 205/(MSC) Amendm1.1(a), 345 and 5

DA 205/(MSC) Amendm1.1, 1.2 &and addconditio60. 

DA 205/(MSC) Grevision consent conditio

ConsolidLease 71

MUSWELL

nnual Environ

ter Licences er Part 5 of t

t consents, a

al 

98 (MSC) 

/2002 

/2002 

ment to on 1.1 

/2002 

ment to 11.3 

/2002 

ment to 

/2002 

ment to 31, 33, 39, 58. 

/2002 

ment to & 6.3.2 itional ons 59 & 

/2002 General of  ons 

dated Coal 13 

LBROOK COAL

nmental Man

20WA21692the Water Ac

authorisation

Table

Description

Approval foUndergroun

Approval foMCC Open C

Power line radditions to

Relocate offworkshop a

Extension oC 

Revision to InfrastructuRequiremenRehabilitatipermit the cmining operadditional 5

ModificatioContinuatioOperations Coal Mine fFive (5) YeaAllotments‐Muswellbro

Modificatiooperations tareas and tolife to 2022.

Mining Leas

L COMPANY L

nagement Re

28, 20BL1690ct 1912. 

ns and licenc

e 1: Consents

 

r Sandy Creend Mine 

r Extension oCut 1 

relocation ano Workshop

fice buildingsnd bath‐hou

f mining into

Mining ure Building nts and on Plan Revicontinuationrations for an5 years. 

n to Permit ton of Mining at Muswellbor an Additiors‐ Multiple ‐ Coal Road ook. 

n to allow mto mine addio extend the. 

se 

IMITED

eport

037, 20BL169

ces are summ

s, Authorisat

CoAu

ek  MuSh

of  MuSh

nd  MuSh

s, use 

MuSh

o Area  MuSh

ision to n of n 

MuSh

the 

brook onal 

MuSh

mining itional e mine 

MuSh

DivReEn

9038, 20WA

marised in Ta

tions and Lic

onsent uthority 

uswellbrook ire Council 

uswellbrook ire Council 

uswellbrook ire Council 

uswellbrook ire Council 

uswellbrook ire Council 

uswellbrook ire Council 

uswellbrook ire Council 

uswellbrook ire Council 

vision of sources and ergy 

216982 and 

able 1. 

cences 

Date Granted 

12 Apr 19

1 Sep 200

19 Dec 20

13 July 20

23 Dec 20

29 Oct 20

12 Dec 20

26 Oct 20

5 May 19

20WA21159

ExpiryReneDate 

999  12 Ap

03  MininDec 2No ento ap

005  MininDec 2No ento ap

009  MininDec 2No ento ap

010  MininDec 2No ento ap

013  MininDec 2No ento ap

013  MininDec 2No ento ap

016  MininDec 2No ento ap

990  24 No

98 issued 

y/ wal 

pr 2020 

ng to 31 2022 nd date proval 

ng to 31 2022 nd date proval 

ng to 31 2022 nd date proval 

ng to 31 2022 nd date proval 

ng to 31 2022 nd date proval 

ng to 31 2022 nd date proval 

ng to 31 2022 nd date proval 

ov 2024 

2016 An

Approva

Mining L1304 

Mining L1562 

Mining L1513 

EnvironmProtectiLicence 

Water A20WA21

Water L20BL169

Water L20BL169

Water A20WA21

Water L20WA21

 

1.2.1 During tallow a capprovemining manageand danthe appr There w 

1.3 MThe nammanage 

MUSWELL

nnual Environ

al 

Lease 

Lease 

Lease 

mental on 656 

Approval 16928 

icence 9037 

icence 9038 

Approval 16982 

icence 11598 

CHANGES TOthe reportingcontinuationed maximummethods,  cment and hangerous goodroval was gra

were no other

MINE CONTmes and conment, plann

LBROOK COAL

nmental Man

Description

Mining Leas

Mining Leas

Mining Leas

Environmen

Water Licen

Water Licen

Water Licen

Water Licen

Water Licen

O APPROVAg period MCCn of mining om  productioncoal  processandling, coalds managemanted on 26 

r changes to

TACTS tacts of site ing and supp

L COMPANY L

nagement Re

 

se 

se 

se 

ntal Licence

nce 

nce 

nce 

nce 

nce 

LS C made an aoperations fon  rate  of  2 sing  infrastrul transport, aent were prOctober 201

approvals d

personnel rport function 

IMITED

eport

CoAu

DivReEn

DivReEn

DivReEn

EnProAu

DP

DP

DP

DP

DP

pplication toor a further 3million  tonnucture,  blasaccess to siteroposed as p16 with revis

uring the re

responsible fns are shown

onsent uthority 

vision of sources and ergy 

vision of sources and ergy 

vision of sources and ergy 

vironmentalotection uthority 

PI‐Water 

PI‐Water 

PI‐Water 

PI‐Water 

PI‐Water 

o MSC to mo3.5 years.  Nnes  per  annsting  methoe, employeepart of this msed consent c

porting perio

for mining, rn in Table 2.

Date Granted 

12 Jan 19

16 Feb 20

20 Mar 20

  6 Dec 200

1 July 201

5 Apr 201

5 Apr 201

1 July 201

1 Aug 200

dify the deveo changes wum  (Mtpa). ds,  water  m numbers, h

modification. conditions. 

od. 

rehabilitation

ExpiryReneDate 

993  24 No

005  16 Fe

002  20 M

00  Not applic

16  30 Ju

14  4 Apr

14  4 Apr

16  30 Ju

09  31 Ju

elopment cowere propose  No  changemanagemenhazardous su The modifi

n and enviro

y/ wal 

ov 2024 

eb 2026 

ar 2023 

cable 

ne 2019 

r 2019 

r 2019 

ne 2019 

l 2022 

onsent to ed to the s  to  any t,  waste bstances cation to 

onmental 

2016 An

Gr

Leo

Ro

War

Ju

 

1.4 EThe numshown in 

 

1.5 AAn envirto review23 Auguare show 

No  Iss

1.   20ReNarenoGaputh

MUSWELL

nnual Environ

Name 

rant Clouten 

on Claassens

od Gallagher 

rren Edward

ulie Thomas 

MPLOYEE mber of empn Table 3, al

Yea

201

201

ACTIONS REronmental inw site perforust 2016.  Thwn in Table 4

sue/Observa

015 West Criehabilitationative Vegetahabilitation ot germinatealenia (Galenubescens) is oroughout th

LBROOK COAL

nmental Man

S

s  Tec

s He

(app

LEVELS ployees and ong with a c

ar 

16 

15 

EQUIRED Fnspection warmance.  Core actions fro4. 

Tabl

ation 

ib n area: tion area has ed and nia occurring is area. 

L COMPANY L

nagement Re

Table

Po

Senior Opera

hnical Servic

Production S

ealth, Safety,Training Su

Environmenpointed Envi

full‐time eqomparison t

Table 3

Employees

73 

75 

FROM PREVas conductedrrespondencom this inspe

e 4: Actions 

DRE Actio

The 2015 area shouby a rehabspecialist tthe propouse establarea. 

IMITED

eport

e 2: Mine Co

osition 

ations Mana

ces Superinte

Superintend

 Environmenuperintenden

tal Coordinaironmental O

quivalent conto the numbe

3: Employee

Ful

VIOUS AEMd by DRE on ce regarding ection along 

 from DRE A

on 

rehabilitatiold be assessebilitation to ensure thosed final lanlishes within

ntacts 

ager 

endent 

ent 

nt and nt 

ator Officer) 

ntractors at ers from the 

e Levels 

l‐Time Equiv

1

MR REVIEW29 April 201actions fromwith how th

AEMR Inspec

Due D

on ed 

at d  this 

Nove2016

Cont

(02)

(02)

(02)

(02)

(02)

MCC  for  thilast reportin

valent Contra

102 

88 

W 16 to reviewm this inspecthey have bee

tions 

Date  MC

mber  Thialo201seasignoccassthegerrehwilproto m

tact Number

) 6542 2300 

) 6542 2300 

) 6542 2300 

) 6542 2300 

) 6542 2300 

s  reporting ng period. 

actors 

w the 2015 Action was recen addressed

CC Comment

is area has bone during th16/2017 groason to see ifnificant germcurs.  This wisessed in 201ere is no signrmination a habilitation sl be engagedovide advice manage this

period  is 

EMR and ceived on d by MCC 

een left he wing f any mination ill be 17 and if nificant 

specialist d to on how  area. 

2016 An

No  Iss

2.   WWmM

3.   Go(ARhGaRedoGr

MUSWELL

nnual Environ

sue/Observa

Weed ManageWeeds are notanaged effecCC. 

olden WreatAcacia Salinghodes Grass ayana) Manaehabilitation ominated by rass and Aca

LBROOK COAL

nmental Man

ation 

ement: t being ctively at 

th Wattle a) and (Chloris agement: areas are Rhodes cia Salinga. 

L COMPANY L

nagement Re

DRE Actio

The currenmanagemMCC is noweed manprogram tmanages wthroughouMuswellbon a reguldevelopedimplemendemonstraeffectivenstrategy.

MCC mustcompreherehabilitataddress thAcacia SalGrass. MCC mustrehabilitatwere not pAcacia Salmanaged tdo not outdesired sethe final lato be estaA strategyAcacia Salrehabilitatit was useshould be ensure secgerminatiooccur. MCC mustRhodes Grthroughouthat othercan establarea. 

IMITED

eport

on 

nt weed ent approac

ot satisfactorynagement that effectiveweeds ut the rook Coal Mar basis musd and nted. MCC mate the ness of the 

t develop a ensive tion strategyhe dominancigna and Rho

t ensure thattion areas thplanted withigna are actito ensure tht compete theed mix and tand use is abblished. y for managinigna in tion areas wd as a seed mundertakencondary on does not 

t ensure thatrass is managut site to ensr grass specielish within pa

Due D

ch at y. A 

ely 

ine st be 

ust 

Nove2016

y to ce of odes 

t hat h vely ey he that ble 

ng 

here mix  to 

t ged sure es aste 

No da

Date  MC

mber  MCprolooeffeslasmeGraforwestrabe dur

ate  MCprolooeffeslasmeGraforMCrevmaSal

CC Comment

CC undertooogram this yeok at the fectiveness oshing as a coethod for Rhoass (see Sectr more detaileed managemategy for MCfurther refinring 2017. 

CC undertooogram this yeok at the fectiveness oshing as a coethod for Rhoass (see Sectr more detailCC will continview optionsanagement oigna. 

k a ear to 

of ontrol odes tion 3.10 l).  The ment CC will ned 

k a ear to 

of ontrol odes tion 3.10 l).   nue to  for the of Acacia 

2016 An

No  Iss

4.   MreMcoeare

5.   Re

6.   Re

 An envirto review20 April are show 

MUSWELL

nnual Environ

sue/Observa

aintenance ehabilitation inor erosionontour drain astern emplahabilitation 

ehabilitation

ehabilitation

ronmental inw site perfor2016.   The 

wn in Table 5

LBROOK COAL

nmental Man

ation 

of areas:  of a within the acement area. 

n Strategy 

n Specialist 

nspection warmance.  Coractions from5. 

L COMPANY L

nagement Re

DRE Actio

Monitorinmaintenanrehabilitatincluding cand drop swithin oldrehabilitatundertakemaintenanundertakerequired.

A rehabilitoutlining aabove: 1. Rehabilperforman2. Weed m3. Acacia SRhodes GrManagem4. MaintenrehabilitatMust be pdepartmemust be areflect charehabilitatmethodolo

DRE encouengage a rspecialist teffectivenrehabilitatused at Min the devrevised restrategy fo

as conductedrrespondencm this  inspec

 

IMITED

eport

on 

ng and nce of tion areas, contour draistructures der tion, should en and nce activitiesen where 

tation strateall issues liste

itation nce managementSaligna and rass 

ment nance of tion areas provided to tnt and the Mmended to anges to tion ogy. 

urages MCC rehabilitatioto assess theness of the tion strategyCC and to asvelopment ofhabilitation or MCM. 

d by MSC once regarding ction along w

Due D

ns 

be 

2016

gy ed 

he MOP 

No da

to n e 

y ssist f a 

No da

 19 April 201actions fromwith how the

Date  MC

AEMR  Themoincstamoideadderomawil

ate  MCwoRehto ain 2neeMOoutDR

ate  AdvrehwilthetheStrabo

16 to reviewm this inspectey have bee

CC Comment

e rehabilitatonitoring procludes landfoability.  The onitoring thisentified someditional areaosion.  Rehabaintenance al continue in

CC will commorking on a habilitation Saddress thes2017.  If any ed to be madOP as a resultcome of thiRE will be not

vice from a habilitation sl be sought de developmee Rehabilitatrategy outlinove. 

w the 2015 Action was recn addressed

ion ogram orm 

s year e as of bilitation ctivities n 2017. 

mence 

Strategy se issues changes de to the t of the s study, tified. 

specialist during ent of ion ed 

EMR and ceived on d by MCC 

2016 An

No  Iss

1.   Taofmananbere

2.   Simwawepemcotwim

3.   Tacoqu

4.   TatimShbebere

5.   Figcosoadre

MUSWELL

nnual Environ

sue/Observa

able 3 of the f the previouethodology ond Acacia Salny control ore clarified wiport. 

milar to the as found on eed would beriod.  This wake the weeontrol shouldwice a year bmplemented 

able 5 in the olumn so it isuantities. 

able 21 indicame and apprhould the vale investigatee mine relateadings excee

gure 21 indicontinuing to ourced from dditional turbported in th

LBROOK COAL

nmental Man

Table

ation 

report adviss AEMR revion the manaigna, and no managementh DRE and r

above, Sectitopsoil stocke delayed un

would allow ted problem wd be undertaasis and so swithin the re

report wouls easier to as

ates that dusroaching the ues continued to see if it ed, action shed EA predic

cates TSS valrise.  As the can overflowbidity shoulde next AEMR

L COMPANY L

nagement Re

e 5: Actions 

Findings F

ses that the rew was to oagement of Rot to necessant.  The outcreported in t

on 2.2.1 advkpiles, but contil the next the weed to worse in the fken on a minshould have beporting per

d benefit frossess the ann

st readings aEA predictede to rise, theis mine relatould be taketed levels. 

ues for MCCdam these sw off site, thed be investigaR. 

Findings 

IMITED

eport

from MSC A

rom Review

requirementnly provide Rhodes grassarily implemecome needs tthe next AEM

vises that weontrol of thereporting drop seed afuture.  Weenimum of a been iod. 

om a totals nual waste 

are rising oved levels.  e cause shouted.  Should en before the

C9 are amples are e source of tated and 

From Site In

AEMR Inspec

MCC C

w of Report 

ts 

s ent to MR 

It has bthe reqmethoRhodesslashinyear tometho(more 

eed  

nd ed 

The mawere uprocesundertprior to

The wathe totthe yea

er 

ld it e 

The avcontinuperiodthese r2017.

his 

Only oMCC9 tcollectwater lhas bedetailecouldnof this results

nspection 

ctions 

omment 

been confirmquirement wdology on ths Grass and Ag program wo determine d of controlldetails in Sec

ajority of theutilised in thes this year.  Waken on the o disturbanc

aste removaltal waste remar. 

erage PM10 ued to rise th.  A review oresults will b

ne sample wthis year.  Thed in March level was veren dry since ed analysis of’t be undertdam will conbeing review

med with DREwas to only prhe managemAcacia Salignwas undertakif this is an eling Rhodes Gction 3.10). 

e topsoil stoce rehabilitatiWeed contro topsoil stocce. 

l table now imoved from 

 results havehis reportingof the sourcee undertake

was collectedhe sample w2016 when ry low.  The this time sof the TSS treaken.  Monitntinue with twed regularl

E that rovide a 

ment of na.  A ken this effective Grass 

ckpiles on ol was kpiles 

ncludes site for 

e g  of n in 

 from as the dam a nd toring the ly. 

2016 An

No  Iss

1.   Thinsdaanleacothtrawaofpoinsthmthto20adan

2.   Pitcohigbaeashbetreofcoaffwisigquuncothwore

MUSWELL

nnual Environ

sue/Observa

he drainage ospected.  It wam was full onother sedimaving the siteoal is classifiee site.  It waacked out ofas being wasff site.  Due totential minespected.  There is doubtanagement se site.  Musw

o provide Cou016 outliningddress the cond address th

t 1 was obseombustion.  Hgh wall and iackfilled pit.  armarked to hutdown of teing irrigatedeatment of tf an inert maould be expefected areasith no appargnificantly exuoted in the nderstand thombustion me floor of thorkings.  Cousult. 

LBROOK COAL

nmental Man

ation 

of the coal stwas found thof sediment, ment dam ande.  Water thaed as mine ws also observf the site fromshed off the o time conste water loss ferefore give about the astructures wwellbrook Council with a rg their preferoncern for whe shortcom

erved for evidHeating was in a number One area ontreat shortlyhe washery d.  There wasthe backfilledterial ramp hcted to help s.  The remaient treatmexceeded the 2015 AEMR e complexity

management e pit and lowuncil expect a

L COMPANY L

nagement Re

tockpile areahat an existinwater flow wd mine wateat has been iwater and shoved that coam the coal trbitumen roatraints otherfrom the siten what was odequacy of a

where mine woal Companyreport by therred course oater manageings of the a

dence of spoobserved in of areas of tn the high way following a and the othes minimal apd areas.  Thehad commenin a portion nder of the ant, would ha203 sqm avereport.  Whiy of spontanin areas of ow wall shouldand request 

IMITED

eport

as was ng sediment was missing er was directin contact would not leaval fines beingransport trucad and going r areas of e were not observed, all water water can leay are requeste 6th May of action to ement on sitarea inspecte

ontaneous  2 areas on tthe recently all was  temporary er area was pparent e constructionced, and th of the area affectedave erage area ilst we eous old workings,d be devoid oa better 

MCC C

ly with ve g cks 

ave ted 

e ed. 

MCC wtime tosupplieThis reno othwork toleavinginto plaidentif(see Se

the 

n is 

d, 

, of 

MCC hspontamanagreportithe arecombufor mo

omment 

were grantedo supply this ed to MSC onport identifieer areas on so prevent cog site.  An actace to addreied during thection 3.6.1 f

ave continueneous combement throuing period weas affected stion noted re detail). 

 an extensioreport and in 16 June 20ed that thersite that reqontaminatedtion plan waess the issueshe site inspefor more det

ed to focus obustion ughout the with a decreaby spontane(see Section

on to the it was 16.  e were uired water s put s ction tail). 

on 

se in eous n 3.16 

2016 An

No  Iss

3.   AnofwiThtowoSaannembubeaspr

 

1.6 C

1.6.1 During t 

1.6.2 In accorcompliastatutorconditioand statcomplia 

Number

12 

MUSWELL

nnual Environ

sue/Observa

n area of rehf Rhodes grasith the view his would resopsoil.  Shoulould containaligna seed.  ny type of naew area be soay be able tourden contaie consulted rs an outcomeroblem.  We 

OMPLIANC

REPORTABLthe reporting

COMPLIANCrdance with nce  review ry approvals ons in place otutory appronces are sho

r  Conditio

For the agreed there is that: a) CompApprovein New Sb) Is capof tempIndustriunless afollowinThe wea• Wind • Wind • Tempe• Tempe

LBROOK COAL

nmental Man

ation 

habilitation css and Acaciaof removingsult in the losd this soil ben significant RThis would mative vegetatown to impro out compened in this sregarding thee to manage would be gu

CE STATUS

LE INCIDENTSg period ther

CE REVIEW the  requireof  the  perwas undertaon 31 Decemovals with theown in Table 

on 

life of the deby Council tha meteorolo

plies with theed Methods South Walespable of contperature inveal Noise Polia suitable altng consultatiather stationdirection at speed at 10 erature at 2 erature at 10

L COMPANY L

nagement Re

ontaining a ma Saligna wag and buryingss of some ine removed anRhodes grassmake the estion difficult. oved pasturete the expecoil.  Council e possible lothe future e

uided by thei

S re were no re

ments of Corformance  oaken at the ember 2016.  Me exception 6. 

Table 6:

Developme

evelopment,he Applicant ogical station

e requiremefor Samplings guidelines; tinuous real ersions in accicy or supersernative is aon with the n must meas10 metres ametres abovmetres abov0 metres abo

IMITED

eport

monocultures inspected g this materinsitu replacend respread,s and Acacia tablishment   Should the e grasses, thcted weed ask that DREss of this soiexpected weeir advice. 

eportable in

ondition 42 of  the  projeend of the reMCC were coof those list

: Compliance

ent Consent 

 or as otherw must ensuren located on 

nts in the g of Air Polluand time measucordance of tseding documpproved by EPA.  ure the follobove the grove the grounve the grounove the grou

MCC C

al.  ed , it 

of 

hey 

E l, ed 

MCC hissue asacrificburdenis very to salv

cidents at M

(a) of  the dect  against eporting perompliant wited in Table 6

e Review 

M

DA205/2002

wise e that site 

utants 

rement the ment, Council 

owing: ound nd nd nd 

Thmrewethof OcThwereupthco

omment 

ave consultend it has beece this topson.  Also, the tthin and woage. 

CC. 

evelopmentconditions  oiod.  This revh all of the c6.  Actions to

CC Commen

he weather onitoring quirements ere revised ine modificatiothe consentctober 2016.he current eather statioquires an pgrade to meese revised onditions. 

ed with DRE en agreed toil due to thetopsoil in thiould be very 

t  consent, a of  this  consview was agconditions ofo address th

nts  Actio

n on t in .  

on 

eet 

MCC engagcontrassistupgraweathstatiowork schedcomp2017.

on this o  weed s area difficult 

detailed sent  and ainst the f consent ese non‐

has ged a actor to t with ading the her on.  The is duled for pletion in . 

2016 An

Number

27 

P1.1 

MUSWELL

nnual Environ

r  Conditio

• Sigma• RainfaAll measaveragerainfall t

The AppfeasibleemployegeneratexceedaresidencThe reledevelopof the coNote:  • Total iconcentbackgrosources• Excludprescribincidentwithin tCouncil 

The folloare idenmonitoremissioEPA ID #At locatbeing saof the oprevailinresidentEPA ID #where dthe leveother seoperatioEPA ID #located NorthinEPA ID #located Northin

LBROOK COAL

nmental Man

on 

 theta at 10 all surements aed over 15 mthat is avera

plicant must  avoidance aed so that pated by the deance of the rce on privateevant air quapment are coonsent. 

impact (i.e. itrations due ound concent); des extraordbed burning, ts, (but not She mine) or 

E

owing pointsntified in thisring and/ or tn of pollutan#1: Total Susions where tampled is repoperation of tng wind diretial propertie#2: Dust Depdust depositiels experiencensitive receon of the min#7: Particulatat co‐ordinag) #8: Particulatat co‐ordinag) 

L COMPANY L

nagement Re

metres abov

re to be coninutes with tged hourly."

ensure that and mitigatioarticulate maevelopment delevant air qely owned laality criteria fontained in T

ncremental to the develtrations due 

inary eventsdust stormsSpontaneousany other ac

Environment

s referred tos licence for tthe setting onts to the airpended Partthe level of ppresentativethe mine takction and loces or other sposition Netwon levels areced at resideivers, resultine. te Matter Mates 305245 

te Matter Mates 306051 

IMITED

eport

ve the groun

tinuous and the exceptio" 

all reasonabons measureatter emissiodo not causequality criternd.    for the Table 1 and T

increase in lopment plus to all other 

s such as buss, sea fog, fires Combustionctivity agreed

tal Protectio

o in the tablethe purposeof limits for tr from the poticulates Netparticulate me of the emisking into accocation of sensitive recework ‐ At loce representantial properting from the 

Monitor ‐ TEO6432503 (Ea

Monitor ‐ TEO6429270 (Ea

M

nd 

on of 

ble and es are ons e ia at a 

Table 2 

hfires, e n d by 

Ongr50Nisois thhainfac

on Licence 65

 below s of the oint. twork ‐ matter sions ount 

eivers.  ations ative of ties, or 

OM asting 

OM asting 

PMwecobyisseqmOvthcoDe‐ 1notobo

CC Commen

ne result waseater than 0ug/m3 at sbet. The urce of the dinconclusivee result mayave been fluenced by tivities at MC

56 

M10 – 55 eveere not ollected causy power suppsues and quipment alfunctions. verall 95% ofe data was ollected. epositional D1 sample wasot collected da broken du

ottle. 

nts  Actio

dust e but y 

CC. 

MCC continmonitqualitaccorwith tdevelconselicencrequi

ents 

ed ply 

 f 

Dust s due ust 

Brokeequipbeen 

10 

will nue to tor air ty in rdance the opment ent and ce rements. 

en pment has repaired.  

2016 An

Number

M4.1 

  

MUSWELL

nnual Environ

r  Conditio

For eachbelow tobtaininspecifiesamplinperiod aoppositeWind DiAM‐2 &Wind SpAM‐4 AtmospAM‐4 

LBROOK COAL

nmental Man

on 

h monitoringhe licensee mng results by d in Column g method, uand samplinge in the otheirection: deg AM‐4 peed:  m/s, c

heric Inversi

L COMPANY L

nagement Re

g point specifmust monitoanalysis) the1. The licensnits of measg at the frequer columns.grees, contin

continuous, 1

ion: oC/100m

 

IMITED

eport

fied in the taor (by samplie parametersee must usesure, averagiuency, speci

uous, 15‐min

15‐minute, A

m, continuou

M

able ng and rs e the ng fied 

nute, 

AM‐2 & 

us, 1‐hr, 

Thstabuupmsta

CC Commen

he weather ation is set uut requires anpgrade to fulatch these andards 

nts  Actio

up n ly 

MCC engagcontrassistupgraweathstatiowork schedcomp2017.

11 

has ged a actor to t with ading the her on.  The is duled for pletion in . 

2016 An

2.0   A

2.1 EXDuring tThese hodrilling pand was 

2.2 LALand  prvegetatistrippingmining t 

2.2.1 Previousrehabilitinspecterehabilitremoved 

2.3 CDuring t 

2.4 MAll minin24 houris shown The Opeduring  tthroughMuswelthe  St  Hcombust During  tthe eastall UG wthis min Open CuCollierieundergrduring mgeotech 

MUSWELL

nnual Environ

ACTIVITIES

XPLORATIOthe reportingoles were loprogram coms approved b

AND PREPreparation  ision clearing, g  occurred. to continue. 

TOPSOIL MAsly stripped ttation activited on a regutation activitd. 

ONSTRUCTthe reporting

MINING ng activities s a day, seven in Figure 1.

en Cut 1 mithe  year,  m to the Lodelbrook UG wHeliers  floortion 

the second qt of the curreworkings wiling starts th

ut 1 will cones.    Site baseound pillar cmining progrnical study c

LBROOK COAL

nmental Man

S DURING

ON g period MCCcated in the mmencing  thby DRE. 

ARATION s  the  procetopsoil strip  There was There was n

ANAGEMENTtopsoil is stoties.   The  stoular basis.   Sties.  Weed m

TION g period no c

this reportinen days a we. 

ning  schedumining  down er seam. Minworking thatr  by  the  en

quarter overent Pit 1. Whl be mined e dumping o

tinue to exped procedurcoal.  These ress.   Open completed fo

L COMPANY L

nagement Re

G THE REP

C drilled six rehabilitatedhe Mining O

ess  of  prepapping and to  a  disturbanno salvageab

T ockpiled in loockpile  locatome of the management

construction 

ng period haeek. The stat

ule will  contithrough  th

ning has alsohad pillar ed  of  2017  a

rburden striphen the contiout  removinof waste mat

pose undergrres have beeprocedures cut wall desor MCC by La

IMITED

eport

PORTING P

exploration d area betweOperations P

aring  the  laopsoil stockpnce  of  4.67hble topsoil in

ocations aroutions are awtopsoil stockt was undert

activities oc

ve occurredtus of mining

inue within he  seam  seqo started in aextraction doassisting  in 

pping will coinuation areng any  fuel  sterial in Pit 2 

round workinen developeare reviewesigns were uambert Geot

PERIOD 

holes to coneen Open CuPlan was mo

nd  for  openpiling. Duringha  of  previothis area. 

und the site fway  from curkpiles were taken on the

ccurred. 

 in Open Cutg activities at

the Northerquences  as a section of one. This wilthe  eliminat

ommence  ina mining is csources  for  swill comme

ngs of the Nd  to allow  sed to reflect undertaken  ftech P/L. 

nfirm the coaut 1 and Opedified  to  inc

n  cut  mining the reportiously  rehabil

for use and wrrent miningremoved thise stockpiles

t 1 with opet the end of 

rn  section othey  presenthe continual allow this tion  of  sour

the whole ccompleted atspontaneousnce. 

o. 2 Undergsafe extractithe operatinfollowing  rec

al quality in ten Cut 2.  Prioclude  these 

ng.  Activitiesing period nlitated  land 

will be used g operationsis year to bes prior to the

rations able the reportin

of  the  approvnt  from  the ation area aarea to be mrces  of  spon

continuationt the end of s combustio

ground and Sion of  the  reng experienccommendat

12 

the area.  or to this activities 

s  include o topsoil to  allow 

in future s and are e used  in em being 

to occur ng period 

ved  area Fleming bove old mined to ntaneous 

n area  to mine life n. When 

St Heliers emaining ce gained ions of a 

2016 An

Mining relevant Mining trucks. T 

Equipme

Excavato

Dump T

Front En

Blast Ho

Grader 

Water C

Dozer 

 

2.5 MMCC proand wasthe CPP  Coal frothe undeof appro The CPPand fineand  ablemateria 

 

MUSWELL

nnual Environ

operations t approvals, l

is achieved The current f

ent 

or 

ruck 

nd Loader 

ole Drill 

Cart 

MINERAL Poduces thermshed  throughdirectly to t

m Open Cuterground rooximately 24

P uses a belt e reject matee  to  be  hanl is undertak

LBROOK COAL

nmental Man

at MCC  areleases and lic

through opefleet used fo

T

Mode

HitachHydra

HitachHydra

Hitach

CAT 77

CAT 99

SMW 

CAT 16

Water70,000

CAT D

ROCESSINmal coal for h  the Coal Phe product s

t 1 requires wadways.  The40 tonnes pe

press filter terial will be tndled  in  theken in accord

L COMPANY L

nagement Re

e  undertakencences.   

en cut methr mining at M

Table 7: Min

hi EX3600 ulic Excavato

hi EX2600 ulic Excavato

hi 3500 (170 T

77C (85 Ton)

90H 

Drilltech 45

6H Grader 

r Cart  (CAT 70 litre 

10T  

G both export

Preparation Pstockpile. 

washing by te CPP uses ar hour. The C

to treat the ftrucked backe  same mandance with th

IMITED

eport

n  in  accorda

ods using exMCC is provi

ning Fleet Ut

No

or 2

or  1

Ton)  8

)  3

1

1

2

777) 2

3

t and domesPlant  (CPP) w

the CPP as aa jig as the mCPP is used o

fines or tailink to the openner  as  overhe Spontane

ance  with  th

xcavators,  frded in Table

ilised at MC

o  Work A

Overburemova

Overburemova

Overburemova

Overbu

Coal st

Drillinginterbu

Surface

Dust su

Dumpsarea pr

stic markets.while  low as

a result of dimain method on an ‘as req

ngs componn cuts for disrburden matous Combus

he Mining  O

ront‐end  loa 7. 

Area 

urden, interbal 

urden, interbal 

urden, interbal 

urden, coal a

ockpile man

g for blastingurden and co

e preparatio

uppression, r

s, roads, coalreparation 

 High ash cosh coal  is cru

ilution assocof separatiouired’ basis. 

ent of the cosposal.  This terial.  Dispotion Manage

Operations  P

aders and  re

burden and c

burden and c

burden and c

and rejects 

nagement 

g in overburdoal 

n, road main

road mainte

l and overbu

oal is mined,ushed and b

ciated with mon and has a 

oal feed. Bot material is qosal  of  carboement Plan (

13 

Plan  and 

ear dump 

coal 

coal 

coal 

den, 

ntenance 

nance 

urden 

, crushed by‐passes 

mining of  capacity 

th coarse quite dry onaceous (SCMP). 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 1: Miningg Activities This RReporting Period

1

 

14 

2016 An

2.6 WDuring  tService tpaper rewhen po Table 8  

January 

February

March 2

April 201

May 201

June 201

July 201

August 2

Septemb

October

Novemb

Decemb

Total 

 

2.7 PProduct total capEnglandtranspor 

2.8 PThe amo 

MUSWELL

nnual Environ

WASTE MAthe  reportinto manage aecycling, timossible, to as

shows the a

Month 

2016 

y 2016 

2016 

16 

16 

16 

2016 

ber 2016 

r 2016 

ber 2016 

ber 2016 

RODUCT Ccoal is haulepacity of 250  Highway  trted to the p

RODUCTIOount of prod

LBROOK COAL

nmental Man

ANAGEMENng  period Mall waste streber, waste ossist in reduc

mount of wa

Tota

COAL AND ed from the 0,000 tonneso  the  Raveport of Newc

ON SUMMuction and a

L COMPANY L

nagement Re

NT CC  continueeams generaoil, and steelcing the amo

aste that was

Table 8: Wa

al Waste Rem(tonnes)

110.41 

98.79 

105.61 

100.47 

153.75 

99.52 

134.51 

120.15 

108.74 

103.79 

98.80 

106.75 

1,341.28

TRANSPOproduct bin s. Product consworth  Coastle. 

ARY associated w 

IMITED

eport

ed  to maintated on site..  MCC contiount of waste

s removed fr

aste Stream

moved 

RT by truck to toal is truckedal  Terminal 

waste generat

ain  a  Total . This includeinue to sepae going to th

rom site duri

Generation

Total WastLandfill (to

2.98

7.66

2.90

1.95

3.73

5.03

2.53

1.93

2.84

1.79

2.48

2.15

37.97

the stockpiled off site via (RCT)  for  t

ted by MCC i

Integrated Wes general wrate and rece local landf

ing the repo

te to nnes) 

P

es. Five prodMuscle Creetrain  loading

is detailed in

Waste Manwaste, cardbocycle waste mfill.   

rting period.

Percentage RRecycle

97.31

92.24

97.26

98.06

97.57

94.94

98.12

98.40

97.39

98.28

97.49

97.98

97.09

uct stockpileek Road and g.  This  coal

n Table 9. 

15 

agement oard and materials 

.   

Reused/ ed 

es have a the New l  is  then 

2016 An

 

Topsoil S

Topsoil u

Topsoil s

Waste R

Open Cu

Undergr

Total Co

Processi

Open Cu

Undergr

Total Pro

 

2.9 H

2.9.1 Diesel fueach. ThLicense f 

2.9.2 MCC  ussystem chemicadisposalselectiona focus o 

2.9.3 MCC harelevantmagazinproduct commonpremiseA blastin 

2.10 WThe  primmanagewater  remanage The obje

Mee

MUSWELL

nnual Environ

Stripped (m3

used/spread

stockpiled (m

Rock (BCM) 

ut ROM Coal 

round ROM C

oal (t) 

ing Waste (t)

ut Product Co

round Produ

oduct Coal (t

HAZARDOU

FUEL STORAuel is storedhe  tanks arefor Keeping 

CHEMALERTe  a web  bausers  can  aal hazard mal  of  chemican and use caon safe chem

EXPLOSIVESs a  licence  tt  legislation nes  and  an can  also be

n practice  toes are listed ung contracto

WATER MAmary  objectment of on‐esources,  boment system

ectives of the

et the water 

LBROOK COAL

nmental Man

Ta

3) 

d (m3) 

m3) 

 (t) 

Coal (t) 

oal (t) 

ct Coal (t) 

t) 

US MATERI

AGE  in three Clae  located 50mDangerous G

T SYSTEM ased  ChemAaccess  the  dnagement toals.  A  Dangean be readilymical use and

S to  supply anunder  Liceabove  groue  stored on o do  so as  tunder MCC’sr is employe

ANAGEMENtive  of  the ‐site water toth  on  and m during the 

e SWMP are 

supply need

L COMPANY L

nagement Re

ble 9: Produ

At ERepo

7,

1,

1,

2

1,

1,

ALS MANA

ass C1 abovem  from any Goods No. 35

lert  system database  froool that conterous  Goodsy accessed frd storage by 

nd  store expence  Numbeund  tank  forthe mobile 

this  is only us Notificationed to carry ou

NT Site  Watero minimise tadjacent  toreporting pe

to: 

ds of the proj

IMITED

eport

uction and W

End of This orting Period

10,940 

3,662 

,557,556 

,652,181 

,652,181 

254,164 

,424,073 

,424,073 

AGEMENT

e ground, semajor build5/021999, is

to manage om  the MCCtains informas manifest  aom the MCCthe Health a

plosives and er  XSPL1000r  raw  mateprocessing 

used on an n of Hazardout total load

Managementhe  impact oo  the mine  seriod.   

ject; 

Waste Summ

PRO

d At 

Repo

7

1

1

1

1

lf bunded tadings. They asued by Wor

chemical  usC  intranet  sation on theand  safe  opC intranet seand Safety Co

explosive p002.    This rials  with  3unit with  a as needs baous Chemicaing service o

nt  Plan  (SWof mining opsite.   No  ch

ary 

ODUCTION 

End of Last orting Period

7,765 

34,057 

7,004,916 

1,705,930 

1,705,930 

277,760 

1,428,170 

1,428,170 

anks, with a are currentlyrkcover NSW

se  at  the mite.  The  Chestorage, tra

perating  procrver. Audits ommittee re

recursors  in storage  con0,000L  capacapacity of sis. All dangals, Licence Non site. 

WMP)  is  to  eperations onanges were 

d EstimNex

7

1

1

1

1

capacity of 1y  listed undeW.  

mining  operaemAlert  systansportation,cedure  for are underta

epresentative

 accordancensists  of  2 acity.  Bulk  e8,000L but 

gerous goodNumber NDG

enable  the n surface andmade  to  th

16 

mate, End ofxt Reporting Period 

3,662 

,859,124 

,654,929 

,654,929 

153,539 

,501,390 

,501,390 

105,000L er MCC’s 

tion  and tem  is  a , use and chemical ken with es. 

e with all external explosive it  is not s on  the G021999.  

effective d ground he water 

2016 An

Sepaand 

Use 

Wheand 

Allow(fireby h

Wheas m

Havemin

Monuse 

 

2.10.1 Volumes 

Volum

Blues C

Brickw

Brickw

Final Se

Dam 3 

Dam1 

Dam 2 

No.2 O

 

2.10.2 MCC hoof  grouconstruc 

20BL

20BL

20BL

20BL

 

2.10.3 The  calcindicateup for th 

MUSWELL

nnual Environ

arate clean wcontaminate

appropriate

ere possible,wash down 

w clean watefighting systharvestable r

ere possible,mine water st

e  nil  dischaimising the r

nitor surfaceand underta

WATER STOs of stored w

es (m3) 

Crusher Dam

orks Dam 1  

orks Dam 2 

ettling Pond 

O/C Void 

GROUNDWAlds four licendwater  excted during t

Licen

169014 (bor

169037 (No.

169038 (No.

170473 (bor

WATER BALculated wates a water dehis deficit. 

LBROOK COAL

nmental Man

water  runofed runoff fro

e sedimentat

,  recycle andactivities; 

er to flow thtem uses rawrights; 

, and where torages;  

arge  of  salinrisk of accide

e and groundaking remedi

ORAGE water availab

m  

ATER EXTRAnces to extraxtracted  in  tthe reporting

ce No. 

rehole RDH52

1 O/C Void) 

2 O/C Void) 

rehole RDH60

LANCE er balance  foeficit for the

L COMPANY L

nagement Re

f produced om disturbed

ion controls 

d  reusing di

hrough the cw mine wate

mine safety

ne  mine  waental off site 

dwater to deal action wh

ble at MCC ar

Table

Start Rep

6

7

5

3

7

SAL

2

2

6

ACTION act ground wthis  reporting period. 

Table 11: G

Re

29) 

07) 

or  the  repor year.   Extra

 

IMITED

eport

by undisturbd catchment

for dirty wa

rty and  con

catchment aer) and sensi

y permits, us

ater  by  condischarge; a

termine signhere required

re provided i

e 10: Stored W

porting Perio

DIRTY WA

6,472 

7,480 

5,935 

3,330 

7,920 

LINE OR MIN

24,000 

20,000 

60,000 

water, underng  period  a

Groundwate

porting PeriVolume

0.0

0.0

1,01

882

rting perioda water has b

bed catchmes; 

ter; 

taminated m

nd using cleaitive equipm

e disused op

taining  all  sand 

nificant impad. 

in Table 10.

Water 

od  End Re

ATER 

NE WATER 

r Part 5 of thare  shown  T

r Extraction

od Extractioe (ML) 

5.1 

2.1 

is provided been source

ents  from di

mine water  f

an water forent where r

pen cuts and

saline  mine 

acts to water

eporting Per

1,065 

2,579 

7,141 

3,993 

18,900 

20,000 

943,300 

he Water AcTable  11.  N

on  Extract(ML pe

2,00

in Table 12d from on‐s

irty  (sedimen

for dust  sup

r firefightingrequired and

d undergroun

  water  on 

r quality or b

riod  Stora

1

ct 1912. The No  new  bor

tion Entitlemer Annum Li

1,000 

00 (combine

3,000 

2. The waterite storages 

17 

nt‐laden) 

ppression 

 supplies d allowed 

nd mines 

site  and 

beneficial 

age Capacity

8,500 

30,000 

20,000 

10,100 

8,000 

30,000 

20,000 

,200,000 

volumes res  were 

ment imit) 

d) 

r balance to make 

2016 An

INPUTS 

Ground 

Surface 

Entrainm

Potable 

Undergr

TOTAL 

OUTPUT

Entrainm

Discharg

Dust Sup

Dust Sup

Evapora

Pumped

Septic P

TOTAL 

2016 Ba

 

2.11 ONo othe

MUSWELL

nnual Environ

Water Seepa

Water Runo

ment in Coal 

Water 

round Worki

TS 

ment in Coal 

ge Off Site 

ppression – w

ppression – w

ation from Da

d to Council V

ump Out 

alance 

OTHER INFRer manageme

LBROOK COAL

nmental Man

age 

off and Dam C

ngs – Dewat

water infusio

water carts 

ams 

Void 

RASTRUCTent of infrast

L COMPANY L

nagement Re

Table 12

Capture 

tering Bores 

on and spray

TURE MANAtructure occu

IMITED

eport

2: Site Water

 

ys  

AGEMENTurred during

r Balance 

T g this reporti

ML/ye

0.0

152.

123.

4.5

882.

1,162

ML/ye

144.

0.0

777.

352.

126.

0.0

1.0

1,401

‐238.

ng period.

ear  M

.6 

.7 

.1 

2.9 

ear  M

.5 

.0 

.5 

.2 

1.2 

.3 

18 

ML/day 

0.0 

0.4 

0.3 

0.0 

2.4 

3.2 

ML/day 

0.4 

0.0 

2.1 

1.0 

0.3 

0.0 

0.0 

3.8 

‐0.6 

2016 An

3.0   E

3.1 EIn orderlicences,areas.  Tindividu 

3.2 MDuring  tStation (Real  Timperimetfour weaccessib The prinrainfall, inversiosupplemsites, allinterval.temperamagneti 

Meteoroand tem  

MUSWELL

nnual Environ

ENVIRONM

NVIRONMr to measure, MCC undeThe  locationsal monitorin

METEOROLthe  reportin(MMS) on reme  Environmer of the mieather  statioble by MCC p

ncipal MMS phumidity,  bn calculation

mentary MMlowing  the  t.  The  suppature for theic north. 

ological datamperature res

LBROOK COAL

nmental Man

MENTAL M

MENTAL MAe compliancertakes a coms  of  the  curng programs 

LOGICAL ng  period, Mehabilitated mental Monne propertyons  continuopersonnel.  

provides 10mbarometric n is based onS at Site 2. Ttemperatureplementary e purpose of 

a provided insults are sum

L COMPANY L

nagement Re

MANAGEM

ANAGEMEe with the mmprehensiverrent monitoare provided

MCC  continuland to the iitoring  Systey at the TEOMously  relay w

m elevation wpressure  ann the 2m eleThese sites we  inversion  tMMS’s  prointerpreting

 this report wmmarised be

IMITED

eport

MENT AN

NT anagement e monitoringoring  sites  ad in the follo

ued  to mainimmediate wem  (RTEMSM and BAM weather  dat

wind speed nd  calculatedevation air tewere selectedo be extrapovide  2m  eg TEOM and 

was sourcedlow. Data re

D PERFOR

plans, the dg program  inare  shown  inowing section

ntain  a  princwest of Open).  Three  othsites, providta  to  a  pass

and directiod  atmospheemperature d due to theolated and elevation  wBAM results

d from the precovery for th

RMANCE 

evelopment n  the vicinityn  Figure  2. Mns. 

cipal Meteon Cut 1. This her MMS’s, de supplemeword  protec

n, 2m elevateric  temperafrom the prie 88m RL diffreported oveind  speed, s. Wind direc

rincipal MMShe monitorin

consent andy of  the MCMore  detail

rological Mostation is palocated  aro

ental  informacted websit

tion air tempature  inversincipal MMSference betwer a 100m edirection, 

ction is refer

S.  Wind datang period wa

19 

d various C mining s  on  the 

onitoring art of the ound  the ation. All e  that  is 

perature, ion.  The S and the ween the elevation and  air enced to 

a, rainfall as 98.1%. 

2016 An

MUSWELL

nnual Environ

LBROOK COAL

nmental Man

Figur

L COMPANY L

nagement Re

re 2: Environ

IMITED

eport

nmental Monnitoring Locaations 

20 

 

2016 An

3.2.1 Quarterpredom 

MUSWELL

nnual Environ

WIND SPEEDly  wind  rosinant wind p

LBROOK COAL

nmental Man

D AND DIRECes  are  provpatterns in th

L COMPANY L

nagement Re

CTION vided  in  Figuhe Hunter Va

January

April 

IMITED

eport

ure  3.  Thesealley. 

y – March W

l – June Wind

e  results  ar

Windrose 

drose 

e  generally  consistent 

21 

with  the 

2016 An

 

3.2.2 Total  raaverage Hill  Stre

MUSWELL

nnual Environ

RAINFALL ainfall  record of 620.8mmeet  in Musw

LBROOK COAL

nmental Man

ded  during  tm, recorded awellbrook. A 

L COMPANY L

nagement Re

July – Se

October –

Figure 3: 

the  reportinat the nearessummary of

IMITED

eport

eptember W

– December 

Quarterly W

ng  period wast Australianf  rainfall du

Windrose 

Windrose 

Windroses 

as  535.3mmn Bureau of Mring  the  rep

m, which  is  bMeteorologyporting perio

below  the  loy (BOM) site od,  compare

22 

ong‐term at Lower ed  to  the 

2016 An

historicaFigure 4 

J

F

Se

O

N

D

 

3.2.3 Maximuwas ‐1.2of Metemonthly 

J

F

Se

O

N

D

S

MUSWELL

nnual Environ

al rainfall at 4.  

Month 

January 

February 

March 

April 

May 

June 

July 

August 

eptember 

October 

ovember 

December 

Total 

TEMPERATUum temperat2°C. This is weorology  sitey temperatur

Month 

January 

February 

March 

April 

May 

June 

July 

August 

eptember 

October 

ovember 

December 

ummary 

LBROOK COAL

nmental Man

MCC and th

MusA

URE ture recordedwithin the lone at Scone,  ‐res during th

Tem

L COMPANY L

nagement Re

e closest BO

Table

swellbrook CActual (mm)

102.8 

6.8 

16.4 

30.7 

21.2 

70.2 

40.2 

40.4 

55.2 

40.6 

47.6 

63.2 

535.3 

d during theng term min‐5.1°C and 4he reporting 

Table 14

Minimum mperature (o

12.3 

13.5 

10.9 

8.8 

1.2 

‐0.3 

‐1.2 

2.2 

3.8 

3.9 

5.9 

12.7 

‐1.2 

IMITED

eport

OM station in

e 13: Rainfal

Coal  Mu

e reporting pnimum and m44.2°C. A  sumperiod is pro

4: Temperat

oC) Ave

n Muswellbr

l Data 

uswellbrookAverage (mm

66.0 

80.3 

48.3 

38.3 

28.4 

65.5 

33.8 

34.7 

29.5 

38.9 

83.9 

59.8 

607.4 

eriod was 39maximum remmary of movided in Tab

ure Data 

rage Tempe(oC) 

22.8 

23.6 

22.6 

19.7 

15.6 

12.0 

11.5 

11.9 

14.6 

16.9 

21.4 

24.8 

18.1 

rook, is prov

k Coal m) 

M

9.6°C and thecorded by th

minimum, mable 14 and Fi

rature 

vided in Tabl

MuswellbrooAverage (m

69.6 

66.9 

52.8 

43.5 

41.5 

51.3 

44.2 

38.6 

40.7 

48.6 

56.1 

67.0 

620.8

e minimum rhe Australianaximum andigure 5. 

MaximuTemperatur

38.8 

39.3 

35.9 

34.2 

26.8 

20.3 

23.4 

23.3 

24.4 

31.1 

35.7 

39.6 

39.6 

23 

e 13 and 

ok BOM mm) 

recorded n Bureau  average 

um re (oC) 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 4: Rainfall Grraph 

2

 

24 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figuree 5: Temperature Graph

2

 

25 

2016 An

3.2.4 InversioCreek  RtemperaTemperais a  temmay signInversioearly mo Over theeach moFigure 6having t 

3.3 A

3.3.1 There  wreportin The primdust  frohave be Dust  candust gen15 and T 

Areas dimining 

Coal HanStockpile

   

MUSWELL

nnual Environ

INVERSION n strength isRoad  stationatures are usatures norm

mperature  innificantly  incns over 3°C orning in the

e reporting ponth recordi6. A strong inhe highest n

AIR QUALIT

ACTIVITIES Twere  no  chang period.   

mary objectivom  the operen divided in

n be generanerated by mTable 16. 

Source 

sturbed by 

ndling and Ce Areas 

LBROOK COAL

nmental Man

MONITORINs measured b  (Site  2).  Thsed to calculally decreasecrease with crease noiseper 100m are cooler mon

period, inverng an  inversnversion wasnumber of da

TY MANAG

THIS REPORTanges made 

ve of air quarations on  thnto control p

ated  from  twmining activi

Table 1

oal 

L COMPANY L

nagement Re

NG between thehe  sites  havate the tempe with increaheight.   Me  levels by fore considereths. 

rsions were msion  level of s recorded onays with 21 d

GEMENT 

TING PERIODto  the  air 

ality managehe  environmprocedures fo

wo primary  sties. The con

15: Control P

Disturb only

Reshape, toemplacementipping. 

Maintain cocarts to min

Clean‐up aft

Water carts suppress du

IMITED

eport

e Open Cut mve  an  elevatperature diffase in heighteteorologicalocusing sound to be stro

monitored a3°C/100m on 149 days ddays above 3

D quality man

ement at MCment  and neor wind‐blow

sources, eithntrol proced

Procedures fo

Cont

y the minimu

psoil and rehnt areas afte

al handling aimise windb

ter any spilla

to operate aust on roadw

meteorologiction  differenferential pert above the gl conditions,nd‐wave prong and occu

nd the daily or greater (sduring the re3°C/100m. 

nagement  or

CC  is to manarby  residenwn dust and 

her windblowdures for the

or Wind Blow

trol Procedu

um area nece

habilitate coer the compl

areas in a molown and tra

age event. 

around the cays and the 

cal station (Snce  of  88 m100 metres ground.  A te  such as  tempagation patr primarily d

maximum rtrong  inverseporting peri

r monitoring

nage and minnces.   Dust mining gene

wn dust  fromese sources a

wn Dust 

ures 

essary for mi

mpleted oveetion of over

oist conditioaffic generat

coal stockpilecoal stockpil

Site 4) and thmetres  and  (inversion semperature imperature  inths at a singduring the ev

recorded. Thsion) are dispod with Aug

g  system  du

nimise the  immitigation merated dust s

m exposed aare outlined

ining.  

erburden rburden 

n using wateted dust. 

e area to les. 

26 

he Sandy recorded trength).  inversion nversion, gle point.  vening to 

e days in played  in gust 2016 

uring  the 

mpact of measures sources. 

areas, or in Table 

er 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 6: Teemperature Inversion Graph 

227 

 

2016 An

Haul roa

Minor ro

Topsoil s

Drilling 

Blasting 

Raw Coa

Coal HanPreparat 

Equipmestockpilecyclones Further term ep 

3.3.2 The Air combinaOscillatimeteoro Depositi

Monitor All gaugdepositi All dust analysisexcludedand labo 

MUSWELL

nnual Environ

Ta

Source 

ad dust 

oads 

stockpiling 

al Receival B

ndling and tion Plant 

ent  used  toes), sprays as or water in

control proisodic event

AIR QUALITYQuality Monation  of  depng  Microbaological mon

ional Dust Ga

ring depositio

ges are analyonal dust on

gauges wer. Samples wid  from  the aoratory analy

LBROOK COAL

nmental Man

ble 16: Cont

in 

  control  duat the Raw Cjection syste

cedures  ares. 

Y MONITORnitoring Netwpositional  dalances  (TEOnitoring statio

auge Results

onal dust ha

ysed for  inson non‐mine o

re  sampled ith excessiveannual averaysis. 

L COMPANY L

nagement Re

trol Procedu

All roads andminimise th

Long term hmaterial. 

Developmenrequired by 

Minor roads

All topsoil stthe area exp

Long term tobe revegeta

Dust aprons

Drills will beinjection sys

Water injecthigh levels o

Stemming w

Blasting willManagemen

Sprays are tobin during h

Sprays are fi

st  generatioCoal Receivalems on drill r

implemente

ING work  is displust  gauges, OM),  Beta  Aon. 

s occurred in

oluble solids owned land i

on a 30±2 de contaminatage. Contam

IMITED

eport

res for Minin

Cont

d traffic areae generation

haul roads wi

nt of minor rmining. 

s used regula

tockpiles wilposed to pre

opsoil stockpted. 

s will be lowe

e equipped wstems. 

tion or dust sof dust are b

will be used a

 occur in accnt Plan relati

o be used whigh wind eve

itted at trans

on  include: l Bin, sprays rigs. 

ed during p

layed  in FiguHigh  Volum

Attenuation 

n the area su

and ash ress 4.0g/m2/m

day  cycle antion, includinmination  is d

ng Generate

trol Procedu

as will be wan of dust. 

ill be sheeted

roads will be

arly for acces

l be located vailing winds

piles, not use

ered during d

with dust ext

suppression eing generat

at all times.

cordance witing to meteo

hen tipping rents. 

sfer points.

water  cart at conveyor

eriods of hig

ure 2.   The mme  Air  SamMass  Mon

urrounding M

sidue. The anmonth.  

nd  sent  to a ng bird droppetermined o

ed Dust Sour

ures 

tered using w

d with hard w

limited to b

ss will be wat

and shaped s. 

ed for over 6

drilling. 

raction cyclo

sprays will bted. 

th the Blast‐Vorological con

raw coal into

(sprays  on  hr transfer po

gh dust emi

monitoring nplers  (HVASnitor  (BAM),

MCC since 19

nnual averag

NATA accrepings, insectson  the basis 

rces 

water carts t

wearing 

be only as 

tered. 

to minimise 

6 months wil

ones or wate

be used whe

Vibration nditions.  

o the receiva

haul  roads oints, dust ex

issions  and  f

network conS),  Tapered ,  PM10  HV

983.   

ge EPA maxi

edited  laboras and vegeta of  field obs

28 

to 

er 

al 

and  coal xtraction 

for  short 

sists of a Element 

VAS,  and 

mum for 

atory  for ation, are servation 

2016 An

There  isFigure 2 

 All gaugrolling  amonitormonitorAssessmlevels an 

Y

2

2

2

201

201

201

201* ‐ averag

 12‐montdepositi

MUSWELL

nnual Environ

s a network 2 with a desc

Locat

ges compliedaverage  dustring  sites waring  results,ment.   The  rend are below

Year 

2016 

2015 

2014 

3‐2014 

2‐2013 

1‐2012 

0‐2011 ge of all gaug

th rolling avonal dust mo

LBROOK COAL

nmental Man

of eight dusription provi

Tabl

tion Identifie

D7 

D17 

D18 

D19 

D22 

D24 

D26 

D29 

d with the mt  depositionas 1.8g/m2/m,  backgrounesults  in 201w the predict

Table 1

AverageR

(g/m

es 

erage and honitoring pro

L COMPANY L

nagement Re

t depositionided in Table

e 17: Depos

er 

Que

San

S

Mus

San

Mus

aximum annn  rate  for  inmonth.   Tabnd  results 16 are consised results fr

8: Comparis

e Monitoringesults 2/month) 

1.8 

1.8 

2.2 

2.1 

1.9 

1.7 

1.6 

istorical aveogram for th

IMITED

eport

n dust gaugee 17. 

sitional Dust 

Desc

een St Musw

ndy Creek Ro

Sandy Creek 

McCullys G

scle Creek Ro

ndy Creek Ro

scle Creek Ro

Queen

nual dust crinsoluble  solile 18  compaand  predicstent with hom the EA.

son of Depos

g Back(g/

rage values he reporting 

es with the  lo

Gauge Loca

cription of Lo

wellbrook – w

oad – northw

Road – north

Gap – north o

oad – southe

oad – northw

oad – southe

n St – Muswe

teria of 4g/mds  from  Janares  the  avections  madehistorical mo

sitional Dust

kground Resu/m2/month)

1.7 

1.7 

1.7 

1.7 

1.7 

1.7 

1.7 

are displayeperiod are p

ocations of t

tions 

ocation 

west of opera

west of opera

h of operatio

of operations

east of opera

west of opera

east of opera

ellbrook 

m2/month. Tnuary  to  Decerage  resultse  in  the  2onitoring  res

t Results 

ults * 

EA

ed in Figure 7resented in A

the gauges s

ations 

ations 

ons 

ations 

ations 

ations 

The mean 12cember  201s  for 2016, h2010  Enviroults and bac

A Predicted (g/m2/mon

2.3 

2.3 

2.3 

2.3 

2.3 

2.3 

2.3 

7.  The resulAppendix 1.

29 

shown  in 

2 month‐16  for  all historical onmental ckground 

Results nth)* 

lts of the   

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 7: Aveerage Depositionaal Dust Results 

3

 

30 

2016 An

Total Su

Three TSbeen  opnominatlaboratoprovided 

Loca

 Annual Asites. Theach moresults o 

Sit

1

2

3

All s

 Table 21and  prehistorica 

Y

2

2

2

201

201

201

201* ‐ averag

  

MUSWELL

nnual Environ

uspended Par

SP HVAS uniperational  sted  six‐day ory  for  anald in Table 19

tion Identifi

Site 1 

Site 2 

Site 3 

Average TSPhe ratio of PMonitoring  locover the mon

te C

sites 

1  compares edictions  maal monitoring

Year 

2016 

2015 

2014 

3‐2014 

2‐2013 

1‐2012 

0‐2011 ge of all sites 

LBROOK COAL

nmental Man

rticulates (TS

its are  locateince  March run  cycle. ysis.  The  lo9. 

er 

Corner

 results for tM10 to TSP ocation duringnitoring perio

Annual AvConcentratio

28

30

35

31

the averageade  in  the  2g results, bac

AverageResult

L COMPANY L

nagement Re

SP) High Volu

ed at each o2005.  SamFilter  papercations  of  t

Table 19: TS

Quee

Sandy

r Sandy Cree

the reportingon HVAS rung the reportiod. A compr

Table

erage TSP on (µg/m3)*

.2 

.1 

.9 

.4 

e  results  for 2010  Envirockground lev

Table 21: Co

e Monitoringts (µg/m3)* 

31.4 

30.8 

45.5 

39.4 

40.3 

31.9 

30.9 

IMITED

eport

ume Air Sam

of the three ples  are  cors  are  then the  HVAS  a

SP Monitorin

Descrip

en St Muswe

y Creek Road

k Road and S

g period wer days is 45%ing period. Fehensive tab

e 20: TSP Ave

Annu

r 2016, histoonmental  Asvels and the 

omparison o

g  Back

plers (HVAS)

real time dullected  overcollected  are  detailed 

ng Locations

ption of Loca

llbrook – we

d – northwes

St Heliers Ro

re below the%. Table 20 dFigure 8 – Fible of TSP res

erages 

al Average C(µg/m3) 

90 

90 

90 

90 

orical monitosessment.   predicted re

f TSP Result

kground Resu(µg/m3)* 

41.4 

41.4 

41.4 

41.4 

41.4 

41.4 

41.4 

ust monitorinr  a  24‐hour nd  sent  to in  Figure  2

ation 

st of operati

st of operati

ad – northw

e annual critedisplays the agure 10 dispsults is provi

Criteria 

oring  results,The  results 

esults in the E

ults  EA

ng stations aperiod  on a  NATA  ac

2  with  a  de

ions 

ons 

west of opera

eria of 90µg/average TSPplay the 24‐hided in Appe

2016 DaRecovery

100 

100 

100 

100 

, backgroun  in  2016  arEA. 

A Predicted (µg/m3)

46.4 

46.4 

46.4 

46.4 

46.4 

46.4 

46.4 

31 

and have the  EPA ccredited escription 

ations 

/m3 at all  value at hour TSP endix 1. 

ata y % 

d  results re  below 

Results )* 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 8: Site 1 TSP Monitoring Results 

3

 

32 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 9: Site 2 TSP Monitoring Results 

3

 

33 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 10: SSite 3 TSP Monitooring Results 

3

 

34 

2016 An

 Particula

Three  recontinuopersonn The PMcommunessentiaunits.   There whour  criduring  treportincompreh 

Site

A

 Table 23and  preconsisteresults i 

Y

2

2

2

201

201

201

201

* ‐ avera A PM10 operatethe repooccurredeast.  Asby MCC’the  repo19.4µg/ 

MUSWELL

nnual Environ

ate Matter <

eal‐time  PMously  relay nel. The locat

10 units are nication lossal and data r

were no days iteria  of  50µthe  reportinng  period  whensive PM1

 Number 

All sites 

3  compares edictions maent with histn the EA. 

Year 

2016 

2015 

2014 

3‐2014 

2‐2013 

1‐2012 

0‐2011 

age of all site

HVAS unit hs on a 6 dayorting periodd on 24 Mars the unit is o’s operationorting  periom3 with the 

LBROOK COAL

nmental Man

<10µg (PM10)

M10 monitorinweather  dations of thes

continuous es, power ourecovery  leve

during the rµg/m3.    The ng  period.  Twith  the  res

10 results is p

AnnuaConcen

the averagede  in  the  20torical monit

Table 

AverageResult

es 

has been esty cycle and isd where the rch 2016 witon the norths.   The annuod.    The  annresults being

L COMPANY L

nagement Re

ng  units  havata  to  a  pae units are s

electronic mutages and mels obtained

reporting peannual  aveable  22  disults  graphicrovided in A

Table 22: Re

al Average PMntration (µg/

14.3 

15.5 

12.3 

14.1 

e  results  for 010  Environtoring  result

23: Compari

e Monitoringts (µg/m3)* 

14.1 

14.5 

16.9 

17.4 

18.3 

14.0 

14.1 

tablished wis not real‐tim24 hour PM1

h the predo‐western sidual average nual  averageg displayed in

IMITED

eport

ve  been  opeassword  prohown in Figu

monitoring symaintenance during the 

eriod where terage  PM10  dplays  the  avcally  presentAppendix 1. 

eal‐Time PM

M10 /m3) 

r 2016, histonmental Assets,  and belo

ison of Real‐

g  Back

th  the  locatme like the o

10 result wasminant windde of the opePM10 did noe  PM10  HVAn Figure 14 a

erational  sinctected  webure 2. 

ystems that e downtime. reporting pe

the 24 hour did  not  exceverage  PM10

ted  in  Figu

M10 Averages

Annual Aver(µg/

3

3

3

3

orical monitoessment.    Thw  the backg

‐Time PM10 R

kground Resu(µg/m3)* 

17.6 

17.6 

17.6 

17.6 

17.6 

17.6 

17.6 

tion of  this  sother PM10 us above the 2d direction oerations this ot exceed theAS  recorded and Table 24

ce March  20site  that  is 

are subject tHigh data reeriod were 9

PM10 resultseed  the  30µ

0  value  at  ere  11  –  Fig

rage Criteria/m3) 

oring  results,he  results  inground  level

Results 

ults  EA

site  shown  iunits.   There24‐hour criten this day beresult may he 30µg/m3 aover  the  re

4.  

005.   All  thraccessible 

to equipmeecovery is co95% across t

s were aboveµg/m3  annuaeach  site  dugure  13.  A 

a  DaRecov

9

10

8

9

, backgrounn  2016  are  gls  and  the p

A Predicted (µg/m3)

20.6 

20.6 

20.6 

20.6 

20.6 

20.6 

20.6 

n Figure 2. e was one daeria of 50µg/eing from thhave been inannual critereporting  pe

35 

ree  units by  MCC 

nt faults, onsidered the three 

e the 24‐l  criteria uring  the table  of 

ata very % 

00 

d  results generally predicted 

Results )* 

This unit ay during /m3.  This he south‐fluenced ia during riod  was 

2016 An

Site

N

 Table 25and  preelevatedlevels pr 

Y

2

2

2

201

201

201

201* ‐ averag

 

3.3.3 During  tupdatedthe EPA  MCC wil 

3.4 GNo metreportinand wat MCC  suGreenho  

MUSWELL

nnual Environ

e Number 

Nisbet 

5  compares edictions mad when compredicted in th

Year 

2016 

2015 

2014 

3‐2014 

2‐2013 

1‐2012 

0‐2011 ge of all sites 

ACTIVITIES Nthe next  repd to reflect thto the satisf

ll continue to

GREENHOUhane drainang period. A ter monitorin

upply  data ouse and Ene

LBROOK COAL

nmental Man

AnnuaConcen

the averageade  in  the  2pared with hhe EA. 

T

AverageResult

NEXT REPORporting periohe revised cofaction of MS

o manage an

USE GAS ge or  ventilnumber of bng. These bo

to  Idemitsuergy Reporti

L COMPANY L

nagement Re

Table 24

al Average PMntration (µg/

19.4 

e  results  for 2010  Environhistorical mo

Table 25: Com

e Monitoringts (µg/m3)* 

19.4 

19.1 

19.1 

16.7 

16.2 

11.2 

10.6 

RTING PERIOod  the Air Qonsent condSC. 

nd monitor a

ation  issuesboreholes  inreholes are c

u  for  their ng (NGER’s)

IMITED

eport

4: PM10 HVAS

M10 /m3) 

r 2016, histonmental  Assonitoring resu

mparison of

g  Back

OD Quality Manaitions.  The A

ir quality im

s were  assocntersect the capped and 

corporate process. 

S Average 

Annual Aver(µg/

3

orical monitosessment.    Tults and back

f PM10 Result

kground Resu(µg/m3)* 

17.6 

17.6 

17.6 

17.6 

17.6 

17.6 

17.6 

agement PlaAQMP will b

pacts in acco

ciated with  tundergroundopened only

reporting  r

rage Criteria/m3) 

oring  results,The  results kground leve

ts 

ults  EA

n  (AQMP) we developed

ordance with

the Open Cud workings ty for monitor

requirement

a  DaRecov

10

, backgrounin  2016  areels but are b

A Predicted (µg/m3)

20.6 

20.6 

20.6 

20.6 

20.6 

20.6 

20.6 

will be  revied in consultat

h the revised

ut operationthat are usering purpose

ts  for  the 

36 

ata very % 

00 

d  results e  slightly elow the 

Results )* 

wed and tion with 

d AQMP. 

ns  in  this d for gas es. 

National 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figuree 11: Site 1 PM10 RResults   

3

 

37 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figuree 12: Site 2 PM10 RResults   

3

 

38 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figuree 13: Site 3 PM10 RResults   

3

 

39 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figuree 14: PM10 HVAS RResults 

4

 

40 

2016 An

3.5 E

3.5.1 The maithe site through

Sepacont

Red

Cont

Conreha

Imp Two maThe arearunoff  ioperatio Drainagesuppresgraded bmine sit All distufrom catconstruc

Majpoteand an eceas

Minmantermnot rehamino

 

3.5.2 Erosion program 

3.5.3 During tto reflecWMP.  T During timpacts 

MUSWELL

nnual Environ

ROSION A

ACTIVITIES Tn objective oand  its tran the implem

arating  cleataminated ru

ucing water 

trolling flow 

structing  seabilitated dis

lementing co

in natural caa contains uis  captured ons by divers

e from the csion. All distbanks) to coe.  

urbed or newtchment arected: 

or  graded  bential for erodirect wate

extended peses. 

or  graded  bnagement dum because a require themabilitation pror flows and

EROSION ANand  sedime

m.  Surface w

ACTIVITIES Nthe next repoct the revisedThe WMP wi

the next repin accordan

LBROOK COAL

nmental Man

ND SEDIM

THIS REPORTof the erosiosport downsentation of t

an  water  runoff from d

runoff veloc

 volume and

ediment  consturbed area

ontrol struct

atchments exndisturbed lby  dams. 

sion banks, a

coal crushingturbed or nentrol the flo

wly rehabilitaas and to co

banks  –  Theosion or scor flow in a mriod and are

banks  –  Thesuring the firssuccessful rm. The spacrogram and d two to thre

ND SEDIMENent  control water monito

NEXT REPORorting periodd consent coll be develop

porting perioce with the W

L COMPANY L

nagement Re

MENT CONT

TING PERIODon and sedimstream, resuthe following

runoff  prodisturbed cat

city; 

d path; 

ntrol  dams  as to improve

ures that pro

xist in the arand surfacesWater  fromand channelle

g plant and sewly  rehabilow of water f

ated areas wntain dirty r

y will  be  couring will bemore controle  intended to

se  are  tempt stage of reehabilitationing of minorsoil conserve years of ac

NT CONTROLmonitoring ring is discus

RTING PERIOd the Water onditions.  Erped in consu

od MCC will WMP. 

IMITED

eport

TROL 

D ment control ulting  in sedig strategies:

duced  by chments; 

at  the  basee quality of d

omote stable

rea of minins that drain m  undisturbeed into adjac

stockpile arelitated  areasfrom catchm

will contain dunoff on the

onstructed  te rock‐lined led manner.o be perman

porary  pastuhabilitation.n strategy wr banks will vation princiccumulated s

L MONITORIis  conductessed in Secti

OD Managemenrosion and seltation with 

continue to 

at MCC is toimentation o

undisturbed

e  of  rehabildischarged w

e landforms.

g, associatedtowards Saned  catchmecent waterco

ea  is collectes  contain divment areas a

diversion bae mine site. T

to  fall  by  upor stabilised.  Major gradnent feature

ure  furrows  Pasture furrill result in abe based onples. Adequsediment. 

NG ed  as  part  oon 3.6.2. 

nt Plan (WMediment conDPI‐Water t

manage and

o prevent theof watercour

catchment

itated  emplwater; and 

 

d with Muscndy Creek. Hoents  is  diverourses.  

ed  in a dam version banknd to contai

nks to contrThere shall b

p  to  1.0%.  Bd to reduce wded banks ws after minin

which  are  urows are nota well vegetan the actual ate  storage 

of  the  surfac

MP) will be retrol will be io the satisfa

d monitor e

e erosion of rses. This  is 

ts  from  di

lacement  ar

le and Sandyowever, somrted  around

and re‐usedks  (major  ann dirty runo

rol the flow be two types 

Banks  that  hwater runoffwill be maintang and reha

used  to  assist required inated slope wrequiremenwill be prov

ce water mo

eviewed and ncorporatedaction of MSC

rosion and s

41 

soil from achieved 

irty  and 

reas  and 

y Creeks. me of the d  mining 

 for dust nd minor ff on the 

of water of banks 

have  the f velocity ained for bilitation 

st  in  site  the long 

which will ts of the vided  for 

onitoring 

updated d into the C. 

sediment 

2016 An

 

3.6 S

3.6.1 There wduring tFinal Setsedimen The surfin Figure 

Site 

No 1 Vo

No 2 Vo

Dam 1/2

MCC7 – Upstrea

MCC8 – Downstr

MCC9 – 

MCC12 –

MCC23 –Dam Sou

MCC24 –Dam 

MCC25 –Dam No

MCC26 –

MCC27 –

ComprepH, EC, TNitrate, Hg, Se, T

Annual aQuarter

 

3.6.2 The surfgraphicamonitor 

MUSWELL

nnual Environ

URFACE W

ACTIVITIES Twere no  signthe reportingttling Dams nt control we

face water me 2. 

id 

id 

Muscle Creem 

Muscle Creeream 

Brickworks 

– Final Settli

– E. Emplaceuth 

– East Haul R

– E. Emplaceorth 

– Blues Crus

– Dam 3 

hensive anaTSS, HardnesOil and greaTPH, PAH 

analysis is unly analysis is

SURFACE Wface water pally  in  Figurring results a

LBROOK COAL

nmental Man

WATER MA

THIS REPORTificant changg period.   Mand the CHPere cleaned o

monitoring p

Table

M

M

A

M

A

M

A

ek  M

A

ek  M

A

Dam  Q

A

ng Dam  M

A

ement  Q

A

Road  Q

A

ement  Q

A

her Dam  Q

A

Q

A

lysis monitorss, Ca, Mg, Nase, Ammoni

ndertaken in undertaken

WATER MONIH, Electrical re  15  –  Figre provided 

L COMPANY L

nagement Re

NAGEMEN

TING PERIODges made  to

Minor  improvPP access roout as requir

rogram is sh

e 26: Surface

Monitoring F

Monthly 

Annually 

Monthly 

Annually 

Monthly 

Annually 

Monthly 

Annually 

Monthly 

Annually 

Quarterly 

Annually 

Monthly 

Annually 

Quarterly 

Annually 

Quarterly 

Annually 

Quarterly 

Annually 

Quarterly 

Annually 

Quarterly 

Annually 

rs for the folNa, K, Sulfatea, Dissolved 

 March each in June, Sep

TORING Conductivitygure  20.  Thein Appendix

IMITED

eport

NT 

D o  the  surfacvements weroad to redirered. 

hown in Tabl

e Water Mo

Frequency 

lowing: e, Chloride, F Fe, Total Fe

h year ptember and

y (EC) and Toe  data  and x 2.  

e water manre made to sect water  int

e 26.  The lo

nitoring Pro

Analy

pH, E

Comp

pH, E

Comp

pH, E

Comp

pH, E

Comp

pH, E

Comp

pH, E

Comp

pH, E

Comp

pH, E

Comp

pH, E

Comp

pH, E

Comp

pH, E

Comp

pH, E

Comp

louride, Carb, Mn, As, Ba,

d December e

otal Suspendthe  annua

nagement osome drainao the site da

ocations of th

gram 

ysis 

C, TSS 

prehensive 

C, TSS 

prehensive 

C, TSS 

prehensive 

C, TSS 

prehensive 

C, TSS 

prehensive 

C, TSS 

prehensive 

C, TSS 

prehensive 

C, TSS 

prehensive 

C, TSS 

prehensive 

C, TSS 

prehensive 

C, TSS 

prehensive 

C, TSS 

prehensive 

bonate, Bica, B, Cd, Cr, Cu

each year 

ed Solids (TSl  comprehe

or monitoringage areas aroams.   Dams 

hese sites ar

rbonate, u, Ni, Pb, Zn,

SS) results arnsive  surfac

42 

g  system ound the used for 

re shown 

re shown ce  water 

MS

No

No

MS

No

No

2016 An

pH The pH pH  levelreportinbackgro 

Location 

Dam 1/2 

MCC12 Final ettling Pond

o.2 Open CuVoid 

o.1 Open CuVoid 

MCC07 

MCC08 

MCC9 

MCC23 

MCC24 

MCC25 

MCC26 

MCC27 

 ElectricaTypicallysurrounenvironminfluenc As  showpreviouspredictio 

Location 

Dam 1/2 

MCC12 Final ettling Pond

o.2 Open CuVoid 

o.1 Open CuVoid 

MCC07 

MCC08 

MUSWELL

nnual Environ

levels at surls of 6.5 – 9ng  period  arund results o

2010‐20

7.6 

 8.1 

t 7.6 

t 7.7 

not sample

not sample

8.0 

8.9 

8.6 

8.0 

8.4 

8.5 

al Conductiviy,  EC  levelsding watercment  from Eced by rainfa

wn  in  Table s  reporting ons to comp

2010‐20

5,818 

 6,760 

t 5,285 

t 4,365 

not sample

not sample

LBROOK COAL

nmental Man

face water m.5 throughoue  consistentor Environm

Table 27: C

11  2011‐2

7.6

8.1

7.6

7.7

d no

samp

d no

samp

8.1

8.2

8.4

7.9

8.3

8.3

ity (EC)   for  mine  wcourses.    As EC  levels  in ll with highe

28  the  resuperiods.    Tare these re

Table 28: 

11  2011‐2

5,81

6,76

5,28

4,36

d no

samp

d no

samp

L COMPANY L

nagement Re

monitoring sut the report with  the  rental Assess

Comparison

2012  2012

6  7

1  8

6  7

7  7

t pled 

7

t pled 

7

1  8

2  8

4  8

9  no r

3  8

3  8

water  are  gmine watemine waterr levels durin

lts  from  thisThere  are sults to. 

Comparison

Electrical

2012  2012

18  5,

60  8,

85  5,

65  5,

t pled 

2,

t pled 

2,

IMITED

eport

sites were gerting period.results  fromment predic

 of pH Resul

pH Ann

2‐2013  20

7.8 

8.1 

7.9 

7.8 

7.8 

7.9 

8.3 

8.8 

8.3 

results 

8.4 

8.3 

greater  thanr  is  not  discr dams.   Theng dry period

s  reporting no  backgro

n of EC Resul

l Conductivit

2‐2013  20

,886 

,836 

,941 

,030 

,064 

,800 

enerally with As shown previous  re

ctions to com

lts to Histori

nual Average

013‐2014 

7.8 

8.3 

8.0 

7.7 

7.8 

7.8 

8.6 

8.6 

8.2 

7.5 

8.7 

8.2 

n  4,000μS/ccharged  off e EC  levels  ids and lower

period  are  cund  results 

ts to Histori

ty Annual Av

013‐2014 

5,975 

8,359 

6,267 

5,533 

2,843 

3,672 

hin the recomin Table 27 eporting  permpare these r

cal Results 

2014 

7.7 

8.3 

8.1 

no results 

7.8 

7.9 

8.7 

9.3 

8.0 

no results 

8.9 

8.4 

cm,  with  lowsite  there  in  surroundinr levels durin

consistent wor  Environ

cal Results 

verage (µS/c

2014  

6,133 

8,530 

6,465 

no results 

4,780 

5,207 

mmended ecthe results friods.    Thereresults to. 

2015 

7.7 

8.3 

7.9 

no results

7.9 

7.9 

8.7 

9.2 

7.7 

7.6 

8.3 

8.0 

wer  levels  fis  no  impacng watercoung wet perio

with  the  resunmental  Ass

cm) 

2015 

6,337 

7,523 

6,526 

no results

2,887 

3,185 

43 

cosystem from this e  are  no 

2016

7.9 

8.4 

8.0 

  no resul

8.0 

7.9 

8.4 

8.8 

7.8 

7.8 

8.4 

8.2 

found  in t  on  the urses are ds. 

ults  from sessment 

2016

6,511

7,514

6,683

  no resu

2,594

3,338

lts 

lt 

MS

No

No

2016 An

Location 

MCC9 

MCC23 

MCC24 

MCC25 

MCC26 

MCC27 

 Total SuTSS resuthis watwater daduring wfound du As  showpreviousthat wassince Mcompare 

Location 

Dam 1/2 

MCC12 Final ettling Pond

o.2 Open CuVoid 

o.1 Open CuVoid 

MCC07 

MCC08 

MCC9 

MCC23 

MCC24 

MCC25 

MCC26 

MCC27 

 

3.6.3 During tto  reflecWater to MCC wil

 

MUSWELL

nnual Environ

2010‐20

8,186 

8,192 

6,710 

3,703 

5,524 

8,950 

uspended Solults in site dater  is not disams.  The TSwet periods wuring “norm

wn  in  Table s reporting ps collected iarch 2016.   e these resu

2010‐20

16 

 19 

t 21 

t 86 

not sample

not sample

14 

34 

14 

41 

26 

ACTIVITIES Nthe next repoct  the  reviseo the satisfac

ll continue to

LBROOK COAL

nmental Man

11  2011‐2

4,83

2,76

3,47

1,83

5,64

7,76

ids (TSS) ams can be ischarged off SS levels in suwhere thereal” condition

29  the  resuperiods, withn March 201There are nlts to. 

Table 29: C

11  2011‐2

16

19

21

86

d no

samp

d no

samp

21

13

31

NEXT REPORorting perioded  consent  cction of MSC

o manage an

L COMPANY L

nagement Re

Electrical

2012  2012

33  4,

60  3,

75  5,

37  no r

43  6,

63  10

influenced bsite there  isurrounding we is runoff orns. 

lts  from  thish the except16 when theno backgrou

Comparison 

Total Sus

2012  2012

t pled 

t pled 

2

no r

RTING PERIOd the Water conditions.   C. 

nd monitor su

IMITED

eport

l Conductivit

2‐2013  20

,718 

,110 

,278 

results 

,300 

0,175 

by water movs no  impact watercourser during dry w

s  reporting tion of MCC9e water levelund  results o

of TSS Resu

spended Sol

2‐2013  20

13 

18 

18 

16 

14 

12 

10 

15 

21 

results 

16 

13 

OD ManagemenThe WMP w

urface water

ty Annual Av

013‐2014 

4,043 

1,953 

3,933 

1,740 

4,868 

9,588 

vements andon the envirs are influenwhen water 

period  are  c9.  The resull in the damor Environm

lts to Histor

ids Annual A

013‐2014 

14 

22 

20 

13 

16 

13 

11 

20 

13 

13 

15 

14 

nt Plan (WMwill be deve

r impacts in 

verage (µS/c

2014  

3,900 

2,080 

3,840 

no results 

6,615 

9,405 

d runoff stirrronment fronced by rainflevels are lo

consistent wt at MCC9 wwas dry.   Thental Assess

ical Results 

Average (mg/

2014 

16 

12 

no results 

11 

10 

18 

14 

no results 

42 

31 

MP) will be reeloped  in  co

accordance w

cm) 

2015 

4,985 

1,950 

3,940 

1,533 

4,133 

8,273 

ring up sedimm TSS  levelsfall with highow.  Lower le

with  the  resuwas from onehis site has sment predi

g/L) 

2015 

11 

18 

12 

no results

33 

eviewed and onsultation w

with the WM

44 

2016

12,400

1,970

2,740

3,413

4,660

8,623

ment.  As s  in mine her levels evels are 

ults  from e sample been dry ctions  to 

2016

31 

  no resul

608

22 

11 

15 

updated with DPI‐

MP. 

lts 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figuure 15: Monthly SSurface Water Moonitoring Results – pH 

4

 

45 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 116: Monthly Surfaace Water Resultss – Electrical Condductivity 

4

 

46 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 17: Monthly Surfaace Water Resultss – Total Suspended Solids 

4

 

47 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 18: Quarrterly Surface Waater Results – pH  

4

 

48 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 19: Quaarterly Surface WWater Monitoring Results – Electrical Conductivity

4

  

49 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 20: Quaarterly Surface Waater Monitoring RResults – Total Suuspended Solids

5

 

50 

2016 An

3.7 G

3.7.1 There wduring t The grouin Figure 

Site 

RDH607

RDH616

RDH617

RDH624

RDH650

MCC100

MCC100

MCC100

MCC101

MCC101

MCC101

ComprepH, EC, TNitrate, Hg, Se, T

Annual a

 Water groundwbetweendemonsBased ogroundw 

3.7.2 Ground 

The watand Figu24.    Thereportinchangesannual c 

MUSWELL

nnual Environ

GROUNDW

ACTIVITIES Twere  no  signhe reporting

undwater me 2. 

7/RDH529 

03 

05 

06 

15 

17 

18 

hensive anaTSS, HardnesOil and greaTPH, PAH 

analysis is un

Licence  20Bwater from en  alluvial  latrates that tn this informwater from e

GROUNDWAWater Moni

ter level, pH ure 23.  The wese  results  sng period.  Ths  are  consistcomprehensi

LBROOK COAL

nmental Man

WATER MAN

THIS REPORTnificant  chang period.   

onitoring pr

Tabl

M

M

A

M

M

M

M

M

A

M

A

M

A

M

A

M

M

lysis monitorss, Ca, Mg, Nase, Ammoni

ndertaken in

BL169014  hentering the nds  and  thehere has bee

mation there entering the 

ATER MONITitoring Resul

and Electricwater levels show  there here was a stent with  hiive groundw

L COMPANY L

nagement Re

NAGEMEN

TING PERIODnges made  t

ogram is sho

le 30: Groun

Monitoring F

Monthly 

Annually 

Monthly 

Monthly 

Monthly 

Monthly 

Monthly 

Annually 

Monthly 

Annually 

Monthly 

Annually 

Monthly 

Annually 

Monthly 

Monthly 

rs for the folNa, K, Sulfatea, Dissolved 

 March each

has  a  requimine workine mining  open no impacthas been nomine workin

TORING ts – Mining O

cal Conductivin groundwahas been mlight changestorical  chan

water monito

IMITED

eport

NT 

D o  the  groun

own in Table

ndwater Mon

Frequency 

lowing: e, Chloride, F Fe, Total Fe

h year 

rement  to ngs.  As showperations.   Mt on alluvial o requiremenngs. 

Operations

vity of the uater monitor

minimal  flucte in the watenges  in  the oring results a

ndwater man

e 30.  The lo

nitoring Prog

Analy

Dept

Comp

Dept

Dept

Dept

Dept

Dept

Comp

Dept

Comp

Dept

Comp

Dept

Comp

Dept

Dept

louride, Carb, Mn, As, Ba,

implement wn in Figure Monitoring  dgroundwatent to implem

nderground ring wells locuation  in waer levels in thundergrounare provided

nagement  o

ocations of th

gram 

ysis 

h, pH, EC 

prehensive 

h, pH, EC 

prehensive 

h, pH, EC 

prehensive 

h, pH, EC 

prehensive 

h, pH, EC 

prehensive 

bonate, Bica, B, Cd, Cr, Cu

measures 21 there is adata  presenter from MCC’ment measure

working arecated on siteater  levels ohe underground workings.d in Appendix

r monitoring

hese sites ar

rbonate, u, Ni, Pb, Zn,

to  preventa significant ted  in  Secti’s mining opes to preven

e shown in Fe are shown or quality duund working.    The  data x 2. 

51 

g  system 

re shown 

t  alluvial distance on  3.7.2 erations.  nt alluvial 

Figure 22 in Figure uring  the gs.  These and  the 

2016 An

As showpreviouswater  leEnvironm 

 Ground 

The alluopen cuare  presmonitor As showfrom prpredictio 

Location 

MCC1003 

MCC1005 

MCC1006 

MCC1015 

MCC1017 

MCC1018 

 

Location 

MCC1003 

MCC1005 

MCC1006 

MCC1015 

 

Location 

MCC1003 

MCC1005 

MCC1006 

MCC1015 

 

MUSWELL

nnual Environ

wn in Table 3s  reporting pevels  are  gemental Asses

Year 

2016 

2015 

2014 

2013‐201

2012‐201

Water Moni

vial and hardut footprint asented  in  Firing results a

wn in Table 3evious  repoons to comp

2010‐20

3.2 

7.2 

5.6 

3.6 

17.3 

17.5 

2010‐20

7.4 

7.4 

7.3 

7.3 

2010‐20

1,434 

2,635 

1,095 

2,417 

LBROOK COAL

nmental Man

31 the pH reperiods.   Eleenerally  consssment pred

Table 31: 

14 

13 

itoring Resul

d rock aquifeand no impaigure  25  –  Fre provided 

2 – Table 34rting periodare these re

Table 32

11  2011‐2

2.5

6.7

4.4

3.6

17.

17.

Table 33: C

11  2011‐2

7.3

7.4

7.3

7.1

Table 34: 

11  2011‐2

1,41

1,57

933

2,53

L COMPANY L

nagement Re

sults from thectrical Condsistent with dictions to co

Comparison

Average pH

7.5 

7.3 

7.3 

7.1 

7.6 

ts – Sandy Cr

ers in the Sacts have beeFigure  27.   in Appendix

4 the results fs.    There  arsults to. 

2: Compariso

2012   2012

5  3

7  7

4  5

6  3

0  1

0  1

Comparison

2012  2012

3  7

4  7

3  7

1  7

Comparison

Electrical

2012  2012

10  1,

79  1,

3  1,

31  2,

IMITED

eport

his reportingductivity  is  sprevious  re

ompare these

n of Undergr

 Ave(μ

Creek Area 

ndy Creek aren determinThe  data  anx 2. 

from this repre no backg

on of Depth 

Depth Annu

2‐2013  20

3.8 

7.3 

5.7 

3.8 

17.0 

16.6 

 of pH Resul

pH Ann

2‐2013  20

7.2 

7.1 

7.1 

7.1 

n of EC Resul

l Conductivit

2‐2013  20

,359 

,947 

,087 

,169 

g period are slightly higheesults.    There results to.

round Worki

erage EC μS/cm) 

6,482 

6,196 

5,525 

5,078 

5,711 

rea are a siged. Ground nd  the  annu

porting perioround  result

to Historica

ual Average (

013‐2014 

4.5 

7.8 

6.5 

3.6 

17.1 

16.7 

lts to Histori

nual Average

013‐2014 

7.3 

7.2 

7.2 

7.1 

ts to Histori

ty Annual Av

013‐2014 

1,480 

2,544 

1,117 

2,452 

consistent wer  than preve  are  no  ba

ng Results 

Relativ(AHD

11

12

nificant laterwater depthual  compreh

od are consists or  Environ

l Results 

(mbgl) 

2014  

5.8 

8.3 

no result 

3.7 

16.8 

16.8 

cal Results 

2014 

7.2 

7.2 

no result 

7.1 

cal Results 

verage (µS/c

2014  

1,701 

2,697 

no result 

2,402 

with the resuvious  resultsackground  r

ve Level (RL) D metres) 

114 

114 

116 

15‐117 

23‐146 

ral distance hs and qualithensive  grou

stent with thnmental Ass

2015 

3.6 

7.9 

no result 

3.7 

17.1 

17.3 

2015 

7.2 

7.1 

no result 

7.2 

cm) 

2015 

1,345 

2,768 

no result 

2,659 

52 

ults from  and  the esults  or 

from the ty results undwater 

he results sessment 

2016

3.9 

7.5 

5.6 

3.8 

17.1

17.6

2016

7.1 

7.2 

7.2 

7.2 

2016

1,471

2,170

982

2,100

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 21: Location of AAlluvial Land Compared to Mine WWorkings 

5

 

53 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 22: Waterr Level for Undergground Workingss

5

 

54 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figgure 23: Water Quuality Data in Undderground Workiings

5

  

55 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 24: Water Leveel for Groundwatter Monitoring onn Site 

5

 

56 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 25: Sandy Creek Groundwater Depth 

5

 

57 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 26: Saandy Creek Waterr Quality – pH 

5

 

58 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figuree 27: Sandy Creekk Water Quality –– Electrical Conduuctivity 

5

 

59 

2016 An

Trigger  lgroundwgreater period. that  is dElectricamonitorbaselinepH.   Thelevels folevels du 

Bore/

MCC

MCC

MCC

MCC

MCC

MCC

Bore/

MCC

MCC

MCC

MCC

Bore/

MCC

MCC

MCC

MCC

 A sectio28. To apressuripresenteSandy Cconnect 

MUSWELL

nnual Environ

levels have bwater  level  tthan 5%  froIn addition, deeper  thanal  Conductivring sites to e minimum ae  trigger  levor 3 continuouring the rep

T

/Well 

1003 

1005 

1006 

1015 

1017  H

1018  H

/Well 

1003 

1005 

1006 

1015 

/Well 

1003 

1005 

1006 

1015 

nal plan depassist  in detesation  in  thed  in Figurereek area duion between

LBROOK COAL

nmental Man

been establitrigger will bom  the histoto initiate th  the naturalvity  (EC)  andmonitor watand maximuels are  initiaous monthly porting perio

Table 35: San

Aquifer 

Alluvial 

Alluvial 

Alluvial 

Alluvial 

Hardrock 

Hardrock 

Aquifer 

Alluvial 

Alluvial 

Alluvial 

Alluvial 

Aquifer 

Alluvial 

Alluvial 

Alluvial 

Alluvial 

picting the loermining  if ahe  ground we 29. The  trauring the repn the alluvial

L COMPANY L

nagement Re

shed for selbe  initiated orical minimuhe trigger, thl variability d  pH  are  thter quality. Tum EC and ±ated  if monitresults. Tab

od. 

ndy Creek Gr

WA

Lower Trigger Lev

(m)TOC

2.17 

6.27 

4.00 

3.27 

14.71

14.10

Lower Trigger p

6.3 

5.9 

6.2 

6.3 

ELECTRICA

Lower Trigger E

876 

1,513

765 

1,494

ocation of theany reversal water  is  occuansect graphporting perio and hard ro

IMITED

eport

ected sites wif  the  grounum and maxhe reductionmeasured ae main  specThe trigger le±0.5pH units tored conditble 35 shows

roundwater 

ATER LEVELS

vel C 

LowTrig

Excee20

N

N

N

N

N

N

pH 

LowTrig

Excee20

N

N

N

N

AL CONDUCT

EC 

LowTrig

Excee20

N

N

N

N

e monitoringin ground wurring,  a  cath  clearly  indod.  Based onock aquifers.

with the trigndwater  leveximum  stand in water levcross all mocies  regularlevels are setfrom  the btions are ou that there w

Monitoring 

wer gger eded in 016 

Tr

No 

No 

No 

No 

No 

No 

wer gger eded in 016 

T

No 

No 

No 

No 

TIVITY 

wer gger eded in 016 

T

No 

No 

No 

No 

g sites in Sanwater gradientenary  transicates no  sign the monito

gger  levels shel  in  a piezoding water  level will also onitoring borly  analysed t at a variatioaseline minitside  the upwas no excee

Trigger Leve

Upper igger Level (m)TOC 

8.34 

11.46 

10.14 

13.97 

18.53 

19.69 

Upper Trigger pH 

8.8 

8.3 

8.1 

8.1 

Upper Trigger EC 

2,461 

7,533 

1,610 

3,726 

ndy Creek arent or other csect  has  beegn of a draworing data the

hown  in Tabometer  fluctevel over a need to be ares  for eachat  the  grouon of >15% imum and mpper or  loweedance of th

els 

Upper Trigger

Exceeded2016 

No 

No 

No 

No 

No 

No 

Upper Trigger

Exceeded2016 

No 

No 

No 

No 

Upper Trigger

Exceeded2016 

No 

No 

No 

No 

ea is shown consequenceen  developew‐down effeere appears 

60 

ble 35.   A uates  by 3 month at a level h aquifer.  undwater from the maximum er  trigger he trigger 

r d in 

r d in 

r d in 

in Figure es to de‐ed  and  is ct  in  the to be no 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 28: SSandy Creek Grouundwater Monitooring Network, Seectional Plan 

6

 

61 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 29: Sandy Creek Groundwater Level Catenary Traansect 

6

 

62 

2016 An

3.7.1 During tto  reflecWater to MCC wil 

3.8 CMCC havtested.  dumped 

3.9 F

3.9.1 During  twith the The obje

Iden

Outl

Esta

Detaenco

Deta

Defi

Deta

Defi No  treeremnant 

3.9.2 Inspectioduring t

Suga

Bat 

Bruswere

 

3.9.3 During  taccordaconditioincluded 

MUSWELL

nnual Environ

ACTIVITIES Nthe next repoct  the  reviseo the satisfac

ll continue to

ONTAMINve a BioremWhen the ted in the minin

LORA AND

ACTIVITIES Tthe  reportine Flora and F

ectives of the

ntify any stra

line the strat

ablish metho

ail  the proceountered; 

ail how micro

ne the post‐

ail how the p

ne the meas

e  clearing  wt vegetation

FLORA ANDons of nestihe reporting

ar Glider (2) 

(4) – not occ

shtail Possume observed. 

ACTIVITIES Nthe  next  rence  with  thons  there  is d in the MOP

LBROOK COAL

nmental Man

NEXT REPORorting perioded  consent  cction of MSC

o manage an

NATED LANediation Areest results inng areas. 

D FAUNA M

THIS REPORTg period MCauna Manag

e approved F

ategic habitat

tegic mitigat

ds to manag

ess  to be ad

o habitats w

‐mining lands

post‐mining f

sures to prot

as  undertak. 

 FAUNA MOng boxes arg period are s

– not occupi

cupied and n

m (2) – one  

NEXT REPORporting  perihe  Mining  Ono  longer  a

P. 

L COMPANY L

nagement Re

RTING PERIOd the Water conditions.   C. 

nd monitor g

ND ea where mandicate that t

MANAGEM

TING PERIODCC  continuedgement Plan 

FFMP are to:

t areas on sit

tion measure

ge remnant v

opted  if any

ill be recreat

scape; 

flora will be 

tect, monitor

ken  during  t

ONITORINGe performedshown below

ied and no si

o signs of ac

box was occ

RTING PERIOiod MCC  wiOperations  Pa  requireme

IMITED

eport

OD ManagemenThe WMP w

roundwater 

aterial contathe material

MENT 

D d  to manage(FFMP). 

:  

te; 

es to be adop

vegetation;

y  threatened

ted; 

established;

r and mainta

the  reportin

d every 6 mw.  

igns of sugar

ctivity were o

cupied in Oc

OD ill  continue Plan  (MOP).ent  for  a  FF

nt Plan (WMwill be deve

impacts in a

aminated wit is no longer

e  impacts o

pted in the F

d  flora or  fau

 and 

ain rehabilita

g  period  an

onths. Resul

r glider activ

observed. 

tober, other

to manage     In  accordFMP, with  a

MP) will be reeloped  in  co

accordance w

th hydrocarbr contaminat

n  flora and 

FMP; 

una not  iden

ation areas; 

nd  there  wa

lts of  the  ins

ity were obs

rwise no sign

impacts  ondance  with  tll  relevant m

eviewed and onsultation w

with the WM

bons is manated it is remo

fauna  in acc

ntified  in  the

s  no  disturb

spections co

served.  

ns of possum

n  flora  and the  revised management

63 

updated with DPI‐

MP. 

aged and oved and 

cordance 

e EIS are 

bance  to 

ompleted 

m activity 

fauna  in consent t  actions 

2016 An

3.10 W

3.10.1 During tthe Land The LMPand  conAuthorit Weed co

Prom

Min

Spra

Phys During tremovin A slashinduring  tRhodes was mospecies slashing MCC  weimplemeAssociat

 

3.10.2 During  taccordaconditioincluded Weed an 

3.11 B

3.11.1 There wreportin 

MembeService Muswel The  interequiremground v

MUSWELL

nnual Environ

WEEDS AND

ACTIVITIES Tthe reportingd Manageme

P contains antrolled  as ty, using a co

ontrol and er

motion of vig

imisation of 

aying with se

sical remova

the reportingng the weed 

ng program the  reportingGrass and tonitored in Spin  the  area  program. 

ere  involvedented  in  ction. 

ACTIVITIES Nthe next  repnce  with  thons  there  is d in the MOP

nd feral anim

BLASTING 

ACTIVITIES Twere no signing period.   

rs of the puLine where tlbrook Shire 

ent  of  best ments for eavibration, fu

LBROOK COAL

nmental Man

D FERAL AN

THIS REPORTg period MCent Plan (LM

 section on per  the  reqombination o

radication te

gorous pastu

area availab

elective herb

al by chipping

g period MCsource prior

to reduce thg period.   Ao encourage pring 2016 anoted.   On

d  in  a  dog onjunction 

NEXT REPORporting periohe  Mining  Ono  longer 

P. 

mal control w

THIS REPORTficant chang

blic are notithey hear a r Council We

practice  goaach blast. Thmes and odo

L COMPANY L

nagement Re

NIMALS 

TING PERIODCC continuedP). 

weed controquirements  oof control str

echniques us

ure growth to

ble for weed 

icides; and

g/slashing. 

CC undertook to the sprea

he amount oApproximatethe understoas part of thengoing monit

baiting  progwith  surro

RTING PERIOod MCC will Operations  Pa  requireme

will continue 

TING PERIODges made to 

fied of proprecorded mebsite. 

als  in  drill  ane use of besours from bla

IMITED

eport

D d to manage 

ol, and speciof  Local  Lanrategies.  

sed at MCC in

o out‐compe

infestation, 

k weed contading of the 

of Rhodes Gly 202ha of orey speciese Rehabilitattoring will  c

gram  duringunding  land

OD continue  toPlan  (MOP).ent  for  a  LM

to be under

D the blast m

posed blastinessage or by 

nd  blast  actst practice teasting activit

weeds and 

ifies that all nd  Services

nclude: 

ete weeds; 

through pro

trol on the totopsoil on th

rass on rehaarea was  sl

s to out comption Monitorcontinue  to 

g  the  reportdowners  th

o manage w    In  accordMP,  with  al

taken during

anagement 

ng times by looking at th

tivities  is  to echniques wties. 

feral animal

noxious weeand  the  Up

mpt reveget

opsoil stockphe rehabilitat

abilitation arlashed  to  repete the Rhoring programassess  the  e

ting  period. rough  the 

eed and  ferdance  with  tl  relevant  m

g the next re

or monitorin

contacting the “Blasting 

comply withwill reduce ai

s in accorda

eds will be mpper  Hunte

tation of bar

piles with thtion areas.   

reas was uneduce  the  voodes Grass.  Tm with an inceffectivenes

  This  progHebden  W

ral animal  imthe  revised management

eporting peri

ng system du

he Blast  InfoNotices” pag

h  the  fragmr blast overp

64 

nce with 

managed r  Weeds 

e areas; 

he aim of 

dertaken olume of This area crease  in ss  of  this 

ram  was Wild  Dog 

mpacts  in consent t  actions 

od. 

uring the 

ormation ge of the 

mentation pressure, 

2016 An

 Best pra

A hiachi

Use 

Corr

Regumay

Load

Prop

Effeexpl

Minexpl

Takethe 

Vide

Vibr 

3.11.2 All blastin accord The blas 

Ov

 The blas 

Blast Mo

B1 (Quee

B2 (Scho

B3 (99 Q

B4 (Nisbe

 During  toperatioperiod.  There w A  summmonitor

MUSWELL

nnual Environ

actice drill an

gh degree oeved using A

of water wh

rect selection

ular  inspectiy create a pat

ding of the e

per placeme

ctive  placemlosive produ

imise the slelosive mater

e  into accoublast and, if 

eo recording 

ration and ov

BLAST MONs are monitodance with t

sting criteria 

Vibration (m

10 

verpressure

115 

120 

st monitoring

onitor 

en St) 

ol) 

Queen St) 

et) 

the  reportinonal  through

was no exceed

mary  of  blasrs is shown in

LBROOK COAL

nmental Man

nd blast activ

of accuracy  iAutomatic Po

hen drilling to

n of bulk pro

ons of grouth for the pr

explosive mat

nt of decking

ment  of  gooct; 

eep time of ial; 

nt any advepossible, def

of blasts as 

verpressure 

NITORING ored by four the relevant 

that apply to

mm/s) 

 (dB(L)) 

g network is 

Location 

In the vic

At the M

At the no

Sandy Cr

ng  period,  1hout  the  rep

dance of crit

t monitoringn Appendix 3

L COMPANY L

nagement Re

vities at MCC

n the placemositioning Sy

o reduce dus

oduct in wet 

nd and hole remature rele

terial so that

g charges if r

od  quality  st

the blast pa

rse meteorofer or modify

a tool to com

monitoring f

automaticalstandards an

o MCC are sh

Table

5% o

5% o

provided in 

Table 37: Bl

cinity of the n

uswellbrook

orthern end o

eek Road, ap

105  blast  evporting  peri

teria during t

g  results  is 3.   

IMITED

eport

C include: 

ment of drillystem (APS) o

st; 

blast holes t

 conditions tease of gase

t holes are n

required; 

temming  to

attern to min

ological condy the blast to

mpare actua

for all blastin

lly triggered nd calibrated

hown in Tab

e 36: Blast Cr

Al

of total numb

Al

of total numb

Table 37 an

ast Monitor

nearest non‐

k Public Scho

of Queen Str

pproximately

vents  occurriod,  with  10

the reporting

displayed  in

l holes so thor other surv

to prevent fu

to  identify aeous product

ot loaded in

  design  colu

nimise the p

ditions that mo accommod

l blast result

ng activities o

blast monitod annually. 

le 36. 

riteria 

llowable Exc

ber of blasts 

0%

llowable Exc

ber of blasts 

0%

d locations a

ring Network

‐company ow

ol, Roger Str

reet, North M

y 1.2km to th

red  at MCC.00%  of  data

g period. 

n  Figure  30

hat design spvey control; 

ume; 

any geologicas from explo

excess of th

umn  height 

potential for 

may be prevdate those co

s with predic

on site. 

ors. The mon

ceedance 

over a 12 mo

ceedance 

over a 12 mo

are displayed

wned residen

reet, North M

Muswellbroo

he north of M

.    All  four  b  captured  d

to  Figure  3

pacing and b

al abnormalosive materia

he design; 

for  contain

deterioratio

vailing at theonditions;  

cted outcom

nitors are ma

onth period 

onth period 

d in Figure 2.

nce 

Muswellbroo

ok 

MCC 

blast  monitoduring  the  r

33.  Blast  dat

65 

burden  is 

ities that al; 

nment  of 

on of the 

e time of 

mes; and 

aintained 

ok 

ors  were reporting 

ta  for  all 

2016 An

 During  tfrom  th114dB(Lduring t 

3.11.1 During treflect tDRE to t During  taccorda 

3.12 N

3.12.1 There wreportin The  maoperatioachieve 

Outl

Mai

Idencom

Defi

Deta

Detaexce

DetaInve

Spec  

MUSWELL

nnual Environ

the preparathe  mining  oL) and  the mhis reporting

ACTIVITIES Nthe next repohe revised cthe satisfacti

the  next  repnce with the

NOISE MAN

ACTIVITIES Twere no signing period.   

in  objectiveons on the ethis objectiv

line the mea

ntain a noise

ntify  the  rismpliance; 

ne the mech

ail the Comp

ail the manaeed the crite

ail  the  specestigations; a

cify the regu

LBROOK COAL

nmental Man

tion of enviroperation  wemaximum vibg period wer

NEXT REPORorting periodonsent condon of MSC. 

porting  perioe BMP. 

NAGEMENT

THIS REPORTficant chang

e  of  the  NMnvironment ve: 

asures to be 

e monitoring

sk  levels  at 

hanisms for c

plaint Handlin

gement mearion;  

ifications  anand 

latory repor

L COMPANY L

nagement Re

ronmental aere  calculatebration  level e below pred

RTING PERIOd the Blast Mditions.  The 

od MCC wil

TING PERIODges made to 

MP  is  to  maand nearby 

undertaken 

g program; 

which  min

community c

ng Procedure

asures to be 

nd  procedur

ting requirem

IMITED

eport

ssessments ed.    The  mwas 2.2mmdicted levels

OD ManagementBMP will be

l  continue  t

D the noise m

anage  and  mresidences. 

on site to m

ne  operation

consultation;

e; 

 undertaken

res  to  be  us

ments. 

predicted omaximum  prm/s  in North s and are con

t Plan (BMP) e developed 

to manage  a

anagement 

minimise  the The followi

itigate noise

ns  may  nee

 where the n

sed  for  the 

verpressure edicted  oveMuswellbronsistent with

will be reviein consultati

and monitor

or monitorin

e  impact  ofng actions w

 emissions; 

ed  to  be  m

noise levels a

purpose  of

and vibratioerpressure  leook. The blash previous re

ewed and upion with the 

r  blasting  im

ng system du

f  noise  fromwill be under

modified  to 

are demonst

f  Independe

66 

on  levels evel  was st results sults.  

pdated to EPA and 

mpacts  in 

uring the 

m  mining rtaken to 

manage 

trated to 

nt  Noise 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 30: Queeen Street Blast Moonitoring Results  

6

 

67 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 31: Scchool Blast Monittoring Results  

6

 

68 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

FFigure 32: 99 Queeen Street Blast MMonitoring Resultts

6

 

69 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 33: Nisbet Blast Monittoring Results

7

 

70 

2016 An

3.12.2 The  locaattendeattendeNight‐tim“  NSW Australiaspecifiedperiod.  Measureas  defincalibraticompletlevels, a The actu

The 

The 

Imp

Prev

Prev Attendenoise levby MCC  During operatioreportinnoise limthis surv 

 The noisprevious  

MUSWELL

nnual Environ

NOISE MONations of  thed noise survd noise  survme  periods Industrial  Nan  Standardd in the NMP

ements werened  in  AS12on as per mtion of meast each monit

ual noise leve

location of m

elevation of

acts from ot

vailing wind c

vailing meteo

ed noise monvels at the nmining oper

the  preparaon were  calcng period comits at all mvey are summ

se results dus results. 

LBROOK COAL

nmental Man

NITORING e noise monvey locationsvey  is  conduare monito

Noise  Policy”d  1055  “AcoP. Two six‐m

e taken in th259‐1990  “Aanufacturer’surements wtoring site, w

el received a

mining equip

f mining equ

her noise so

conditions; a

orological co

nitoring was nominated nrations.  

ation  of  envculated.    Thmplied with onitoring locmarised in Ta

S

uring this re

L COMPANY L

nagement Re

nitoring  sitess.  Monitorinucted over  ared.  All  nois”  (INP)  guideoustics,  Desconthly atten

hird‐octave bAcoustics  –’s instructionwith a Soundwere determ

at individual 

pment; 

ipment; 

urces; 

and 

onditions. 

conducted doise monitor

vironmental hese  noise  lethe day, evcations durinable 39.   

Table 38: 

Site 

R7 

R13 

R15 

R16 

R17 

R20 

porting perio

IMITED

eport

s are displayng is conducta  24‐hour pese  surveys  aelines,  the cription  and nded noise su

bands with aSound  Levens and calibrd Level Calibined. 

residences m

during May ring location

assessmentevels  are  shvening and nng the monit

Predicted No

Predic

od were bel

yed  in Figureted at these eriod  so  thaare  performPeriodic  NoMeasuremeurveys were

an instrumenel  Meters”. ration was abrator. The L

may vary as a

and Novembns and deter

ts  predictedhown  in  Tabnight LAeq(15mi

toring period

oise Levels

cted Noise Le

32 

38 

35 

35 

33 

34 

ow predicte

e 2.   MCC hsites on a 6t  each of  thed  in  accorise Monitorent  of  Envirundertaken 

nt that has TThe  instrumlso confirmeLAeq  (15‐min

a result of: 

ber 2016, tomine the pro

d  noise  leveble  38.    Noi

inute) and alsod. Noise mea

evels (dB) 

ed  levels and

as a networ6 monthly bahe Day,  Everdance with ring  programronmental  N during the r

Type 1 charament  had  aed prior to annute) noise 

o quantify thoportion con

els  from  these  levels  duo the night asurement r

d are consist

71 

rk of  five asis. Each ning  and the  EPA 

mme  and Noise”  as reporting 

cteristics   current nd at the emission 

e overall ntributed 

e  mining uring  the LA1(1minute) results of 

tent with 

2

MUSWE

2016 Annual Envir

Location Sta

DateTim

R7 25/015:

R7 25/020:

R7 25/022:

R13 25/015:

R13 25/020:

R13 25/022:

R15 25/014:

R15 25/019:

R15 25/023:

R17 25/014:

R17 25/019:

R17 25/022:

R20 25/013:

R20 25/018:

R20 25/022:

ELLBROOK COAL CO

ronmental Manag

art e and me 

Wind Speed (m/s) 

5/16 :25 

0.7 

5/16 :39 

0.0 

5/16 :00 

0.0 

5/16 :55 

3.0 

5/16 :20 

0.0 

5/16 :21 

0.0 

5/16 :45 

0.7 

5/16 :52 

0.0 

5/16 :14 

0.0 

5/16 :19 

2.7 

5/16 :28 

0.0 

5/16 :51 

1.1 

5/16 :33 

2.7 

5/16 :04 

0.0 

5/16 :01 

0.0 

OMPANY LIMITED

gement Report

VTC 0C/ 100m 

Cr

‐2.3 

3.5 

1.3 

‐1.8 

2.7 

2.7 

‐3.2 

4.7 

4.7 

‐2.7 

4.7 

3.7 

‐3.6 

0.2 

1.3 

Table 39

LAeq 15 Minut

iterion (dB) 

CriteriApplie

36  Yes

36  No

36  Yes

40  Yes

40  Yes

40  Yes

35  Yes

35  No

35  No

35  Yes

35  No

35  No

38  Yes

38  Yes

38  Yes

: Noise Monitorin

te 

ion es?1 

MCC LAeq (dB)2 

IA 

<25 

<25 

IA 

IA 

<25 

IA 

IA 

<25 

IA 

IA 

<30 

IA 

IA 

NM 

ng Results 

Exceedance3 

Nil 

NA 

Nil 

Nil 

Nil 

Nil 

Nil 

NA 

NA 

Nil 

NA 

NA 

Nil 

Nil 

Nil 

Criterion (dB) 

CriAp

‐‐‐ 

‐‐‐ 

44 

‐‐‐ 

‐‐‐ 

51 

‐‐‐ 

‐‐‐ 

46 

‐‐‐ 

‐‐‐ 

46 

‐‐‐ 

‐‐‐ 

48 

LA1 1 Minute

terion plies?1 

MCC LAeq (dB)2

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

Yes  <25 

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

Yes  <25 

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

No  32 

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

No  <30 

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

Yes  NM 

7

Exceedance3

‐‐‐ 

‐‐‐ 

Nil 

‐‐‐ 

‐‐‐ 

Nil 

‐‐‐ 

‐‐‐ 

NA 

‐‐‐ 

‐‐‐ 

NA 

‐‐‐ 

‐‐‐ 

Nil 

72 

2

N

MUSWE

2016 Annual Envir

Location Sta

DateTim

R7 22/117:

R7 22/119:

R7 22/122:

R13 22/117:

R13 22/119:

R13 22/122:

R15 22/116:

R15 22/118:

R15 22/123:

R17 22/116:

R17 22/118:

R17 22/123:

R20 22/115:

R20 22/119:

R20 22/123:

Notes:  1. Limits apply

ELLBROOK COAL CO

ronmental Manag

art e and me 

Wind Speed (m/s) 

1/16:02 

2.1 

1/16 :42 

2.1 

1/16 :34 

1.8 

1/16 :25 

2.4 

1/16 :20 

1.8 

1/16 :12 

1.3 

1/16 :29 

1.0 

1/16 :01 

2.7 

1/16 :22 

1.8 

1/16 :06 

1.9 

1/16 :28 

1.3 

1/16 :01 

0.3 

1/16 :33 

1.6 

1/16 :03 

1.8 

1/16 :52 

0.7 

y for winds up to 3m/s (

OMPANY LIMITED

gement Report

VTC 0C/ 100m 

Cr

‐2.5 

0.8 

2.3 

‐4.1 

‐1.8 

0.8 

‐3.3 

‐3.5 

1.7 

‐2.1 

‐3.6 

2.1 

‐2.4 

‐2.9 

1.8 

at a height of 10m abov

LAeq 15 Minut

iterion (dB) 

CriteriApplie

36  Yes

36  Yes

36  Yes

40  Yes

40  Yes

40  Yes

35  Yes

35  Yes

35  Yes

35  Yes

35  Yes

35  Yes

38  Yes

38  Yes

38  Yes

ve ground level); or tem

te 

ion es?1 

MCC LAeq (dB)2 

IA 

<25 

IA 

IA 

IA 

<30 

NM 

NM 

IA 

IA 

IA 

IA 

IA 

IA 

NM 

perature inversions of u

Exceedance3 

Nil 

Nil 

Nil 

Nil 

Nil 

Nil 

Nil 

Nil 

Nil 

Nil 

Nil 

Nil 

Nil 

Nil 

Nil 

up to 30C/100m; 

Criterion (dB) 

CriAp

‐‐‐ 

‐‐‐ 

44 

‐‐‐ 

‐‐‐ 

51 

‐‐‐ 

‐‐‐ 

46 

‐‐‐ 

‐‐‐ 

46 

‐‐‐ 

‐‐‐ 

48 

LA1 1 Minute

terion plies?1 

MCC LAeq (dB)2

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

Yes  IA 

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

Yes  <30 

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

Yes  IA 

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

Yes  IA 

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

Yes  NM 

7

Exceedance3

‐‐‐ 

‐‐‐ 

Nil 

‐‐‐ 

‐‐‐ 

Nil 

‐‐‐ 

‐‐‐ 

Nil 

‐‐‐ 

‐‐‐ 

Nil 

‐‐‐ 

‐‐‐ 

Nil 

73 

2

  

 3Db D  

MUSWE

2016 Annual Envir

2. These are r3. NA means a

3.12.3 ACTIVITIEDuring the next rebe developed in co

During the next re

ELLBROOK COAL CO

ronmental Manag

esults for MCC in the abatmospheric conditions 

S NEXT REPORTINeporting period thonsultation with t

eporting period M

OMPANY LIMITED

gement Report

bsence of all other mine outside conditions spec

NG PERIOD he Noise Managethe EPA to the sat

MCC will continue t

sources; and cified in development co

ment Plan (NMP)tisfaction of MSC.

to manage and m

onsent, criterion is not a

 will be reviewed. 

monitor noise relat

pplicable. 

 and updated to 

ted impacts in acc

reflect the revise

cordance with the

d consent conditi

e NMP. 

7

ions.  The NMP w

74 

will 

2016 An

3.13 VDuring  tLighting  The obje

To p

To p

To m

To o MCC’s  ooverbur During  tLighting revised c 

3.14 AThe obje

IdenMCC

Mitiequi

Conproc

Maicost

Dev MCC  haAborigin During tgroups. Commu As  part updatingsites.  

3.15 EThere arongoing 

3.16 S

3.16.1 The  maspontan

MUSWELL

nnual Environ

VISUAL, STRthe  reportinManagemen

ectives of the

provide suffic

provide lighti

minimise the

outline a pro

operations  aden emplace

the next  repand Landscconsent con

ABORIGINAectives for m

ntifying any cC operations

gating any cipment so th

sulting  withcesses and m

ntaining the ts; and 

eloping envi

as  successfunal cultural s

the reportingA member nity Consulta

of  the  ongog  them on  t

UROPEANre no Europeg manageme

PONTANEO

ACTIVITIES Tin  objective

neous combu

LBROOK COAL

nmental Man

RAY LIGHTng  period Mnt Plan (LiMP

e LiMP are: 

cient lighting

ing that is of

 impact of o

cess to addr

are  screenedement areas

porting perioaping Manaditions and w

AL HERITAGmanaging arc

cultural heris; 

cultural herithat impacts t

h  all  relevanmanagement

mine’s oper

ronmental p

lly  completeite located w

g period, no of  the Waative Commi

oing  consultthe status of

 HERITAGEean Heritagent. 

OUS COMB

THIS REPORTe  of  the  SCustion in: 

L COMPANY L

nagement Re

T MCC  continueP). 

g on‐site to f

f an appropri

n‐site lightin

ess light spil

d  from  direc, and the nat

od  lighting  imgement Planwill be prepa

GE haeology an

tage issues t

tage  risk duto cultural re

nt  Aboriginalactions; 

rational statu

procedures fo

ed  salvage  owithin the mi

ground distunaruah  Locaittee (CCC).

tation  procef  the current

E e sites locate

BUSTION

TING PERIODMP  is  to  m

IMITED

eport

ed  to manag

facilitate safe

iate standard

ng sources on

lage issues.

ct  view  of  retural topogr

mpacts will n (VALLMP). ared to the s

d cultural he

that arise be

e  to  the desesources are 

l  community

us, thus redu

or the manag

operations  aine lease bou

urbance opeal  Aborigina

ess with  Abot mining ope

ed within the

D minimise  the

ge  lighting  i

ety and secu

d and approp

n residents o

esidents  or aphy of the s

be  included  The VALLMatisfaction o

eritage at MC

ecause of the

sign and  insminimised;

y  representa

ucing any like

gement of h

and  continueundary.  

rations requl  Lands  Cou

original  grouerations and

e disturbanc

e  occurrence

impacts  in  a

rity to minin

priately direc

or road users

the  travellinsurrounding 

in  the updaMP will be upof MSC. 

CC include: 

e design and

tallation of 

atives  on  th

ely time dela

eritage sites 

es  to mainta

ired consultauncil  present

ps  a  letter d manageme

ce boundary 

e  and  mana

accordance 

g operations

cted; 

s; and 

ng  public  by area. 

ated Visual Apdated to re

d constructio

new mine p

he  plans,  ob

ay risks or im

s at MCC. 

ain  and  pro

ation with Atly  sits  on  t

is  sent  out ent of archa

at MCC tha

age  the  effe

75 

with  the 

s; 

y  existing 

Amenity, eflect the 

on of the 

plant and 

bjectives, 

mpacts on 

tect  one 

Aboriginal the MCC 

annually eological 

t require 

ect  from 

2016 An

Exist

Drill

Min

Min

Emp

Emp

Coa As part oidentifie

Examspon

Examdyin

Usin

Mea

Mea MCC  hacombust

Coo

Rem

Min

Reteimm

Sealingr

 Regular existing these prand comareas.   Four spoThe majareas  thareas wi 

MUSWELL

nnual Environ

ting open cu

ing and blas

ing of overb

ing of coal; 

placement of

placement of

l stockpiles. 

of preparatioed by: 

mining previntaneous co

mining  the  sng vegetation

ng infra‐red p

asuring bore

asuring surfa

as  successftion.  Metho

ling the heat

moval of the f

imisation of 

ention  of  5 mediately req

ing of remaess of oxyge

spontaneouand new incrocedures, emplaints rece

ontaneous cjority of affehat were  treithout active

ReM

J

F

M

A

M

J

LBROOK COAL

nmental Man

ut and underg

ting; 

urden; 

f overburden

f washery rej

on for minin

ous informambustion; 

surface  for  an and increas

photography

hole temper

ace temperat

ul  experienods used to m

ted area with

fuel by minin

areas of coa

metres  of quired for mi

ining unminn. 

us  combusticidents of speffectivenesseived. The re

ombustion rected areas weated each me control mea

Table 40

eporting Month  A

Jan‐16 

Feb‐16 

Mar‐16 

Apr‐16 

May‐16 

Jun‐16 

L COMPANY L

nagement Re

ground work

n; 

ject; and 

g of areas af

tion records

any  physicalsed surface t

y, where app

ratures for te

tures. 

ce  in  manmanage mini

h water befo

ng the coal;

al exposed to

overburdenining operati

ed undergro

on  reports ontaneous cs of actions, port also inc

reports werewere within month  are  sasures is pro

: Spontaneo

SpontaneouCombustionAreas Cappe

(m2) 

40 

20 

74 

32 

IMITED

eport

kings; 

ffected by sp

s, accumulate

l  effects  of temperature

propriate, to 

emperature 

naging  and ng in areas p

ore mining (w

o the air prio

n  above  woions; and 

ound workin

are  providecombustion, areas cappecludes a plan

e submitted the open cuhown  in Tabovided in Tab

ous Combust

us n ed

SpontCombAreas

(m

1

2

pontaneous c

ed over the 

spontaneouse; 

show areas 

increases; an

controlling prone to spo

water infusio

or to mining;

orkings  to  e

gs with clay 

ed  to  both mitigation ped, areas min showing th

to DRE and ut and overbble 40.   A hble 41. 

tion Report S

taneous bustion s Mined m2) 

W

12 

24 

combustion, 

last ten year

s  combustio

of increased

nd  

areas  pronntaneous co

on); 

exclude  oxyg

or  inert ma

DRE  and  EPprocedures aned, areas ue extent and

EPA during tburden empistorical  com

Summary 

Area UndeWater Infusi

(m2) 

26,900 

26,900 

38,500 

35,300 

32,600 

30,100 

 higher risk a

rs, for occurr

on  such  as  b

 temperatur

ne  to  sponombustion in

gen  from  a

aterial to pre

PA.  Reportsand improveunder waterd location of 

the reportingplacement armparison of 

er ion 

76 

areas are 

rences of 

brown  or 

re;  

ntaneous nclude: 

reas  not 

event the 

  identify ments to   infusion problem 

g period. reas. The affected 

Jan‐M

Apr‐J

Jul‐S

Oct‐D

YeaAver

2016 An

Note: Areaend of the 

 Ta

2007

Mar  6,694

Jun  25,54

Sep  37,2

Dec  3,91

rly age 

9,970

Note: These

 During ton an oDue  to active co 

3.16.2 During  treviewethe satis During accorda 

3.17 BManage(BFMP). The obje

To m

Cont

To p

To poutb

 There w

MUSWELL

nnual Environ

ReM

A

S

O

N

Ds capped and aremonth.  This area

able 41: Sum

7  2008 

4  1,726

46  661 

1  1,076

8  646 

0  1027 

e values are the v

the reportingngoing basisthe ongoingontrol decre

ACTIVITIES Nthe next  repd and updatsfaction of M

the  next  rence with the

BUSHFIRE ement of bu 

ectives of the

manage activ

tain fuel load

put in place h

put  in place break of fire 

were no bush

LBROOK COAL

nmental Man

eporting Month  A

Jul‐16 

Aug‐16 

Sep‐16 

Oct‐16 

Nov‐16 

Dec‐16 eas mined are tha may change du

mmary of Spo

Total Are

2009 

6  641 

187 

6  34 

70 

233 

values at the end

g period mins according tg managemeased during 

NEXT REPORporting perioted to reflecMSC. 

eporting  pee SCMP. 

shfire  risks a

e Bushfire M

vities on site 

ds to accepta

hazard mitiga

arrangemenoccur at MC

fire outbrea

L COMPANY L

nagement Re

SpontaneouCombustionAreas Cappe

(m2) 

50 

40 

4 he total of the arring the month.

ontaneous C

ea Affected b

2010 

40 

85 

135 

45 

76 

d of the respectiv

ning of spontto the severient of  spontathe reportin

RTING PERIOod  the  Spont the revised

riod  MCC  w

are underta

Management 

are to minim

able levels to

ation measu

nts  to  liaise wCC or threate

ks with the d

IMITED

eport

us n ed

SpontCombAreas

(m

2

3

2

reas treated duri

Combustion A

by Spontane

2011 

215 

95 

85 

64 

115 

ve reporting perio

taneous comity of the praneous  comng period. 

OD ntaneous Cod consent co

will  continu

ken  in accor

Plan are: 

mise the risk 

o moderate 

res to conta

with and suen MCC’s ope

development

taneous bustion s Mined m2) 

W

24 

36 

24 

4 ng that month.  

Affected Are

eous Combus

2012 

71 

53 

45 

57 

57 

od.  These areas m

mbustion areroblem and tmbustion on 

mbustion Monditions.  T

e  to  manag

rdance with 

of outbreak

fire intensity

in an outbre

pport  the Ruerations. 

t consent are

Area UndeWater Infusi

(m2) 

21,600 

5,000 

5,000 

17,900 

3,500 Area under wate

eas Without 

stion (m2) 

2013 

65 

57 

149 

45 

79 

may change durin

eas and watethe ability tosite,  the aff

anagement he SCMP wil

ge  spontane

the Bushfir

of fire; 

y; 

ak of fire sho

ural Fire Ser

ea during the

er ion 

er infusion is the

Active Cont

2014 

156 

177 

119 

151 

ng the reporting p

er infusion coo access thefected areas

Plan  (SCMPll be develop

eous  combu

re Managem

ould one occ

rvice  (RFS) s

e reporting p

77 

e area at the 

rol 

2015  2

145  2

232  1

190 

242 

203  1

period. 

ontinued se areas.  s without 

P) will be ped in to 

ustion  in 

ment Plan 

cur; and 

hould an 

period. 

2016 

248 

182 

48 

56 

133 

2016 An

 

3.18 HHydrocafacilitieshandlinghydroca

Abo

Was

Oily bun

Runoil/w

 

A BioremmanagepotentiaWaste Cwaste  itprior to  

3.19 MAs no uventilati 

3.20 PDuring tFences maintain A securi(Christm 

3.21 ONo incid

 

MUSWELL

nnual Environ

HYDROCARarbon  storags.  These  stog of  flammarbon contam

ve ground fu

ste oil from t

water  runoded; and 

off  from  thwater separa

mediation M  material  tally  contamiClassificationt  is disposeddisposal or i

METHANE Dnderground ion was requ

UBLIC SAFthe reportingsurroundingned. 

ity patrol  is cmas, shutdow

OTHER ISSUdents of dam

LBROOK COAL

nmental Man

RBON CONTge  facilities orage  facilitiable and commination incl

uel storage t

the worksho

off  from  the

e  hardstandator.  The co

Managementthat  is  potenated  is  testn Guidelines  on site.   If tt is taken off

DRAINAGEmining occu

uired. 

FETY g period, pubg  the  opera

conducted bwns, etc.) wh

UES AND Rage to surfa

L COMPANY L

nagement Re

TAMINATIwere  constes  comply  wmbustible  liqude: 

anks are self

p is stored in

e  re‐fuelling 

d  wash‐dowllected silt is

 Plan has beentially  contted with  thePart 1: Classthe materialf site for disp

E/VENTILATurred at MC

blic safety wational  areas

by a  local secen the site is

ISKS ce infrastruc

 

IMITED

eport

ON tructed  as  pwith  the  reuids. Activiti

f‐bunded to 

n a bunded w

bay  drains 

n  bay  passes routinely cle

een developtaminated  we  results beisifying Wastl  is classifiedposal. 

TION CC during  the

as managed s  and  along

curity firm os not manne

cture were re

part  of  the equirements ies undertak

contain any 

waste oil tan

into  an  abo

es  through eaned out.

ped by MCCwith  hydrocing  comparee (2014).  If d as contami

e  reporting 

in accordancg  property  b

over weekened.  

ecorded duri

workshop, of  AS1940 

ken on site  t

spillage whic

k and is remo

ove  ground 

a  three‐stag

to provide carbons.    Aed  to  the  limthe materianated  it  is e

period, no m

ce with curreboundaries  w

ds and othe

ing this repo

stores  and –  The  stor

to  reduce  th

ch may occu

oved as requ

sump which

ged  silt  trap

guidance onAny  materialmits  in  the Nl is classifiedeither treate

methane dra

ent MCC prowere  inspec

er nominated

orting period

78 

blasting rage  and he  risk of 

r; 

uired; 

h  is  fully 

p  and  an 

n how  to l  that  is NSW EPA d as solid d on site 

ainage or 

ocedures. cted  and 

d periods 

2016 An

4.0   CMCC  undiscussio(1800 60 

4.1 EMCC  opcommuncomplaifindingsContact Develop 94  comprovidedduring t 

 In  compreportinFigure 3

MUSWELL

nnual Environ

COMMUNndertakes  cons with com00 205). 

NVIRONMperates  a  tonicate their cnt,  take acti.  The  recorLine  is  con

pment Conse

plaints  wered  in Appendhe reporting

parison,  theng period co35.   

LBROOK COAL

nmental Man

NITY RELATcommunity mmunity me

MENTAL COoll  free  24‐hconcerns to ion  to  reducrding  of  envnducted  in ent Condition

e  received  ddix 4.    Tableg period. 

Type of Co

Odo

Bla

Du

Haul

Ligh

Noi

Visu

Oth

Tot

re  has  beenmpared to p

L COMPANY L

nagement Re

TIONS consultation

embers and o

OMPLAINTShour  Environsite personnce  impact asvironmental accordance ns.  

during  the  re 42  and  Fig

Table 42: S

omplaint 

our 

st 

st 

age 

ht 

se 

ual 

her 

tal 

n  an  increaprevious rep

IMITED

eport

n  through operating a t

S nmental  Connel. On reces  required ancomplaintswith  the  M

reporting  pegure 34 prov

Summary of 

Numb

78

3

10

1

0

0

2

0

94

ase  in  the  norting perio

the  Commtoll free 24‐h

ntact  Line  wiving a compnd  report ba  and  the  oMCC  Environ

eriod.   Morevide  a  summ

Complaints

ber  P

number  of  cds.   The com

unity  Consuhour Environ

where  commplaint, MCC sack  to  the cooperation  ofnmental  Pro

e  details  on mary of  the 

Percentage 

83% 

3% 

11% 

1% 

0% 

0% 

2% 

0% 

100% 

complaints  rmplaint histo

ultative  Comnmental Con

munity memstaff investigomplainant f  the  Envirootection  Lice

  the  complacomplaints 

received  duory chart  is s

79 

mmittee, ntact Line 

bers  can gates the with  the onmental ence  and 

aints  are received 

ring  this shown  in 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 34: Complaint Suummary

8

 

80 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figuree 35: Complaint HHistory 

8

 

81 

2016 An

4.2 CMCC peand dev Commuorganisa

YMC

Heb

Den

Mus

Scon

Mus

Mus

Scon

Mus

Mar

St Jo In additthis year 

4.3 CMCC’s Cthe  locarepresenrepresenthat memattersactively operatio8 Marchwas can

MUSWELL

nnual Environ

OMMUNITrsonnel maieloping stro

nity  supporations: 

CA – Swimat

den Wild Do

man Chamb

swellbrook R

ne Netball Cl

swellbrook R

swellbrook S

ne Bowling C

swellbrook S

rk Hughes Fo

oseph’s High

ion  to directr for the End

OMMUNITCommunity Cal  communitntatives  (incntatives. Theembers  of  th. CCC meetininvolved in tons through h 2016, 6 Secelled due to

LBROOK COAL

nmental Man

TY LIAISONntain contacng links with

rt  througho

hon Event 

og Associatio

er of Comme

Rotary – Ende

lub – team u

Race Club – M

hire Council 

Club – region

hire Council 

oundation 

 School 

t donations deavour Foun

TY CONSUConsultative ty.  The  CCCcluding  one e aim of the he  local  comngs are genethe review opresentationptember 201o lack of atte

L COMPANY L

nagement Re

N, SPONSOct with nearh the commu

out  the  rep

on 

erce – Uppe

eavour Grou

niform 

Melbourne C

– Bottoms U

nal bowls eve

– Fulcrum 3

from  the condation. 

LTATIVE COCommittee 

C  is  comprisfrom  the Wcommittee 

mmunity  haverally held qof environmens and site v16 and 13 Dendance. 

IMITED

eport

ORSHIPS ANby residentsunity. 

porting  peri

r Hunter Foo

Cup Race Day

Up Festival 

ent 

3D Wind Mod

ompany, MC

OMMITTE(CCC) provided  of  three

Wanaruah  Lois to provideve  adequateuarterly at tental monitoisits.  During

December 20

ND DONATs and are co

iod  included

od and Wine

delling Proje

CC employee

E des informatie  council  repcal Aborigine an effective  informationthe MCC offioring data ang the reportin016.   The me

TIONS mmitted to 

d  donations

Affair 

ct 

es and contr

ion regardingpresentativeal  Lands  Cove communicn  on miningice and comnd are kept ung period meeeting schedu

continually 

s  to  the  f

ractors  raised

g mine operes,  three  coouncil)  and  tcation mechg  and  enviromittee memup to date oeetings wereuled for 7 Ju

82 

fostering 

following 

d money 

ations to mmunity two MCC anism so onmental mbers are n mining e held on une 2016 

2016 An

5.0   RDuring tLand Ma The objefauna spand surr During twith theno longe Rehabili 

5.1 BNo build 

5.2 R

5.2.1 The reha

Shap

In th10cm

Cont

In th100 

Prio MCC’s  rSkelletaacross thincorporagricultu 

5.2.2 The natiarea priospecies  

MUSWELL

nnual Environ

REHABILITthe reportinganagement P

ectives of thepecies, implerounding are

the next repe Mining Opeer a requirem

tation is con

BUILDINGS dings were d

REHABILITA

REHABILITAabilitation pr

ping is condu

he areas whm. 

tour banks a

he areas whetonnes/ha. 

r to seeding,

rehabilitatior Ridge areahe lease areration of natural land suit

SPECIES SELive vegetatioor to miningin the final la

Botanic

Acacia 

Acacia 

Acacia 

Acacia 

Acacia 

Allocas

Brachy

LBROOK COAL

nmental Man

TATION g period MCPlan (LMP). 

e LMP are toement sustaieas.  

porting perioerations Planment for a LM

nducted in ac

emolished o

ATION OF D

ATION PROCErocess at MC

ucted in acco

ere trees ar

are construct

ere pasture 

, topsoil and

n  program as north anda creating a tive vegetatitability of the

LECTION on seed mix g and is baseandform is d

Table 43: Re

cal Name 

decora  

falcata 

implexa 

linearifolia 

paradoxa 

suarina luehm

ychiton popul

L COMPANY L

nagement Re

C continued

o reduce thenable land p

d MCC will cn (MOP).  In MP, with all r

ccordance w

r rehabilitate

DISTURBED

ESS CC is: 

ordance with

e the final v

ted in accord

is the final v

/or OGM are

aims  to  lind  south of  thviable wildlion areas to e site during

used at MCCd on the Cenependent on

ecommende

mannii 

lneus  

IMITED

eport

d to manage 

e impact of mpractices and

continue to accordance relevant man

ith the MOP

ed during th

D LANDS 

h the design 

vegetation to

dance with th

vegetation O

e incorporat

k  existing  rhe  lease arefe corridor. continue theg the reportin

C (Table 43) ntral Huntern availability

ed Species Li

C

W

S

H

N

K

B

K

land related

mining operad enhance ha

manage  lanwith the revnagement ac

.  

e reporting p

requirement

opsoil  is spre

he Erosion a

OGM is sprea

ed into the u

remnant  vega by plantinRehabilitatioe corridor.  Tng period. 

is based on r Grey Box‐Iry of seed. 

st for Native

Common Nam

Western Silve

Sally Wattle

Hickory Watt

Narrow‐leave

Kangaroo Tho

Bulloak 

Kurrajong 

d impacts in 

tions on exisabitat connec

d related  imvised consenctions includ

period. 

ts outlined in

ead to a dep

nd Sediment

ad at a rate o

underlying so

getation  in ng corridors on planning fThere has be

species thatronbark Woo

e Vegetation

me 

er Wattle 

le 

ed Wattle 

orn 

accordance 

sting native fctivity within

mpacts  in accnt conditionsed in the MO

n the MOP. 

pth of appro

t Control Pla

of approxim

oil.  

Bells  Mounof native vefor MCC incleen no chang

t were preseodland.  Use

83 

with the 

flora and n the site 

cordance s there is OP. 

oximately 

n. 

ately 80‐

tain  and egetation udes the ge to the 

ent in the of these 

2016 An

 Pasture PerenniaMillet isinoculatapproximestablishfor the Con site e44. Use  

MUSWELL

nnual Environ

Botanic

Bursari

Calotis 

Cassini

Cheilan

Chloris 

Corymb

Cyperu

Desmo

Enchyla

Eremop

Eucalyp

Eucalyp

Eucalyp

Eucalyp

Geijera

Glycine

Gooden

Harden

Indigof

Loman

Loman

Loman

Myopo

Rytidos

Rytidos

Veronc

mixtures usal  Rye  Lucer added to thted and lime mately  200 hment recomCoal Mining experience aof these spe

Botani

Bromus

Cynodo

Festuca

Lolium 

Lolium 

Medica

Pennise

Phalari

Setaria

Trifoliu

LBROOK COAL

nmental Man

cal Name 

ia spinosa 

lappulacea 

ia aculeata  

nthes sieberi 

ventricosa 

bia maculata

us gracilis 

odium brachy

aena toment

phlia debilis 

ptus crebra  

ptus molucca

ptus punctat

ptus teretico

a parviflora 

e tabacina 

nia hederace

nbergia viola

fera australis

dra confertif

dra filiformis

dra multiflor

orum montan

sperma bipar

sperma racem

cia calycina 

sed  in rehabrne, Haifa Whe mix, whilscoated. Fertkg/Ha with mmendationIndustry (Hand monitoriecies in the fi

Table 4

cal Name 

s wildenowie

on dactylon  

a arundinace

perenne 

rigidum 

ago sativa 

etum clande

is aquatic 

a sphacelata 

um repens 

L COMPANY L

nagement Re

ypodum 

tosa 

ana 

ta 

ornis 

ea 

acea 

folia 

ra 

num 

rtitum 

mosum 

ilitation genWhite  Cloverst Oats are atilizer in the the  pastures for the Huannan, J.C., 1ng results.  Tnal landform

44: Recomm

ea 

stinum 

IMITED

eport

C

B

Y

D

P

P

S

S

T

R

W

N

G

G

F

W

F

F

A

M

M

M

W

W

W

H

erally consisr  and  sub‐cloadded duringform of Grae mix.  The  snter Valley i1995).  This sThe recommm is depende

mended Spec

Comm

Prairie

Couch

Tall Fe

Perenn

Annua

Lucern

Kikuyu

Phalar

Setaria

White 

Common Nam

Blackthorn 

Yellow Burr‐d

Dolly Bush 

Poison Rock F

Plump Windm

Spotted Gum

Slender Flat‐s

Tick‐trefoil 

Ruby Saltbush

Winter Apple

Narrow‐leave

Gum Topped 

Grey Gum 

Forest Red Gu

Wilga 

Forest Goode

False Sarsapa

Australian Ind

Mat‐Rush 

Mat‐Rush 

Mat‐Rush 

Western Boob

Wallaby Gras

Wallaby Gras

Hairy Speedw

st of Couch, over. Duringg the colder nulock 15 haspecies mix n the book Mseed mix hasended specieent on availa

cies List for P

mon Name 

e Grass (sown

escue 

nial Rye gras

al Rye grass 

ne  

u grass 

ris 

Clover  

me 

daisy 

Fern 

mill Grass 

sedge 

ed Ironbark 

Box 

um 

nia 

arilla 

digo 

bialla 

well 

Pioneer Falcg  the  summwinter montas been incohas  been  baMine Rehabis been modies list for pasbility of seed

Pasture 

n in Autumn 

cata, Wimmer months  Jths. The leguorporated at ased  on  theilitation: A Hfied over timsture shownd. 

only) 

84 

ena Rye, Japanese umes are a rate of 

e  pasture Handbook me based n in Table 

2016 An

 

5.2.3 During tmain are

264 with

Wesseed

No.2

BlueThisredurepo

 This is athe 2015 

The rehaTable 46 

MUSWELL

nnual Environ

Botani

Trifoliu

REHABILITAthe reportingeas were tar

Dump – bulh tree and pa

st  Crib Hut  –ding with tre

2 Open Cut –

es Road – bu area was duundant equiporting period

 variation fr5 AEMR.   

abilitation an6. 

LBROOK COAL

nmental Man

cal Name 

um subterran

ATION ACTIVg period MCgeted this re

k shaping, spasture specie

–bulk  shapinee and pastu

–bulk shaping

ulk shaping aue to be seepment the sed. 

om what wa

nd maintena

L COMPANY L

nagement Re

neum  

ITIES THIS RCC continuedeporting peri

preading of tes. 

ng,  spreadinre species. 

g activities, s

activities, aneded during teeding was n

as identified 

ance summa

 

IMITED

eport

Comm

Subter

EPORTING Pd to undertaiod with the 

topsoil and O

ng  of  topsoil

spreading of

nd commencthis reportinnot complet

in the MOP

ry for the re

mon Name 

rranean Clov

PERIOD ke rehabilitaactivities in 

Organic Grow

l  and Organ

f topsoil, and

cement of reng period bued.  This are

 but was con

eporting peri

er  

ation activitiethese areas 

wth Medium

ic Growth M

d seeding wit

emoval of ret due to a dea will be see

nsistent with

od can be fo

es around siincluding: 

m (OGM), and

Medium  (OG

th tree speci

edundant eqelay in remoeded during 

h what was s

ound in Tabl

85 

te.   Four 

d seeding 

GM),  and 

es. 

uipment.  oving the the next 

shown in 

e 45 and 

2016 An

  

MUSWELL

nnual Environ

MINE LEAS

A1 Ma

DISTURBED

B1  In

B2 A(e

B3 W(a

B4 T(a

B5 S(a

B6 T(v

ALL DISTUR

REHABILITA

C1 T(e

REHABILITA

D1  1

D2  G

SURFACE O

E1  P

E2  N

E3  P

E4 Oo

DE‐HAB ‐ d

F1  P

F2  N

SURFACE Chectares re

G1 PT

LBROOK COAL

nmental Man

AREA

SE AREA 

Mine Lease And ML1562 

D AREAS 

nfrastructure

Active Miningexcluding ite

Waste Emplaactive/unsha

ailing Emplaactive/unsha

haped Wastawaits final v

emporary Stvegetation a

RBED AREAS

ATION PROG

otal Rehabilexcept for m

ATION ON S

0 to 18 degr

Greater than 

OF REHABILIT

asture and g

Native forest

lantation an

Other (includutcomes) 

disturbed are

asture and g

Native forest

CONVERSIONeflected in Se

asture/Coverees 

L COMPANY L

nagement Re

Table 45: R

A AFFECTED /

Area: CCL 713

e Area 

g Area ms B3‐B5 be

cements aped/in or ou

acements aped/uncapp

te Emplacemvegetation) 

tabilisation rea for dust 

GRESS 

itation Areaaintenance)

LOPES 

rees 

18 degrees

TATED LAND

grasses 

/ecosystems

nd crops 

e non‐veget

eas previousl

grasses 

/ecosystems

N ‐ previouslyection E) 

er Crop areas

 

IMITED

eport

Rehabilitatio

/ REHABILIT

3, ML 1304 

elow) 

ut‐of‐pit) 

ped) 

ment 

control) 

a  

ative 

ly rehabilitat

y reported pa

s planted to

on Summary

TATED (hecta

To Dat

1788

48.7

71.1

113.1

0.0

2.3

0.0

235.2

377.5

45.7

0.0

245.2

137.0

0.0

0.0

ted, figures r

0.0

4.7

asture (cove

 0.0

ares) 

te Las

Repo

178

48.

88.

1  111

0.0

6.0

0.0

2  253

5  363

45.

0.0

2  238

0  124

0.0

0.0

eflected in Se

4.5

3.1

r crop) areas

0.0

st ort 

NRe(E

88  17

3  4

3  7

1.3  12

0  0

0  0

0  2

3.9  27

3.5  34

7  4

0  0

8.7  24

4.8  9

0  0

0  0

Section E 

5  0

1  4

s planted to 

0  0

86 

ext port Est.) 

788 

8.3 

7.9 

24.8 

0.0 

0.0 

6.7 

77.7 

40.1 

5.7 

0.0 

47.7 

2.9 

0.0 

0.0 

0.0 

0.4 

trees, 

0.0 

2016 An

 

NA

Additio(drainsprotect

Re‐cov(detail sealing

Soil Tre(detail etc.) 

Treatm(detail slashin

Re‐see(detail etc.) 

Advers(detail 

Feral A(detail trappin

 

5.2.4 The prowork  is rehabilit  

MUSWELL

nnual Environ

ATURE OF TR

onal erosions, re‐contourtion)  

vering  ‐ further topg etc.) 

eatment  ‐ fertiliser, li

ment / Mana‐ grazing, crog) 

ding / Repla‐ species de

sely Affected– type and t

Animal Contr– additionalng, shooting,

REHABILITAposed area to  comple

tation activit

LBROOK COAL

nmental Man

Table 46: 

REATMENT 

 control woring, rock 

psoil, subsoil

ime gypsum 

gement opping, 

anting nsity, season

d by Weeds treatment) 

rol   fencing, , baiting etc.)

ATION ACTIVfor rehabilitte  areas  thties are plann

L COMPANY L

nagement Re

Maintenanc

AREA 

RepoPerio

rks  0

  0

0

202

n  0

0

) Unkno

ITIES NEXT Ration duringhat  weren’t ned during th

IMITED

eport

ce Activities 

TREATED (H

ort od 

NexPerio

0

0

0

2  0

0

0

own  0

REPORTING g the next reseeded  duhe next repo

on Rehabilit

a) Com

xt od 

NA 

NA 

NA 

Slashin

NA 

NA 

Regionareas othe pro

PERIOD eporting perring  this  reorting period

tated Land 

mment / ConTreatme

ng to control 

al dog baitinof MCC land ogram 

iod  is shownporting  per. 

ntrol Strategent Detail 

Rhodes Gra

ng program wbeing includ

n on Figure riod.    No  a

87 

gies / 

ss 

with ded in 

36.   This dditional 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

FFigure 36: Propossed Activities Nexxt Reporting Periood 

8

 

88 

2016 An

5.3 R

5.3.1 A total oreportinrehabilitby indicapasture wider re Within  tEndangeSouth  WConservthree Re The  paswere est Table 47(PCT) (wFigure  3monitor  

MUSWELL

nnual Environ

REHABILITA

SITE SELECTof 18 permanng period.   Ttation areas ative locatiorehabilitatio

ehabilitation 

the woodlanered EcologiWales  Northation Act 19ehabilitation

sture  sites mtablished wit

7  lists  the  idwhere applica37  indicatesring equipme

LBROOK COAL

nmental Man

ATION MO

ION nent sites, nhis  incorporas per the rns with specon areas. Altareas.  

nd  sites,  threcal Communh  Coast  an995  (TSC Acts Blocks (A, B

monitored  inthin each of 

dentificationable), flora as  the  locatioent has been

L COMPANY L

nagement Re

NITORING

ine woodlanated sites  inequirementscific on grounthough sites 

ee  analoguenity  (EEC) Ced  Sydney  Bt). The  remaB and C).  

ncluded  threthe three Re

numbers  foassemblage pon  of  the  m set up.  

IMITED

eport

nd sites and n both remnas as set out nd sites chos were select

e  sites were entral HunterBasin  Bioregaining  six  loc

ee within  remehabilitation

or each monpresent, conmonitoring  s

nine pastureant (for purpin the MOP.sen randomlted randoml

establishedr Grey Box –gion  listed cations were

mnant  pastus Blocks (A, 

nitoring  locatdition and thsites  and  Fig

e sites, were pose of refer The localityy within desy they are r

 within  rem–  Ironbark Wunder  the e established

ure  areas  anB and C).  

tion,  the Plahe fauna mogure  38  ind

e surveyed durence/analoy of sites waignated woorepresentativ

mnant patcheWoodland  in Threatenedd within eac

nd  the  rema

ant Communonitoring unddicates  whe

89 

uring the gue) and as guided odland or ve of the 

es of  the the New 

d  Species ch of  the 

aining  six 

nity Type dertaken. re  fauna 

2

S

A

A

A

R

R

R

R

R

R

MUSWE

2016 Annual Envir

Site Category 

Analogue 

Analogue 

Analogue 

Rehabilitation 

Rehabilitation 

Rehabilitation 

Rehabilitation 

Rehabilitation 

Rehabilitation 

ELLBROOK COAL CO

ronmental Manag

T

Monitoring Site ID 

RWoodNew1 

RWoodNew2 

RWoodNew3 

RW1 

RW2 

RW3 

RW4 

RW5 

RW6 

OMPANY LIMITED

gement Report

Table 47: Flora As

Plant CommunitVegetation Com

PCT ‐ 1603 Narrow‐leaved Igrass open fores

PCT ‐ 1603 Narrow‐leaved Igrass open fores

PCT ‐ 1603 Narrow‐leaved Igrass open fores

Corymbia maculcanopy with an Aand weedy grou

A. saligna domin

C. maculata, E. ccanopy with spamidstorey and a

C. maculata, E. cwith a native/we

Stunted C. macumidstorey and a

C. maculata andAcacia dominateunderstorey 

ssemblage and Fa

ty Type (PCT) or Rmposition 

ronbark ‐ Bull Oast of the central a

ronbark ‐ Bull Oast of the central a

ronbark ‐ Bull Oast of the central a

lata and EucalyptAcacia saligna doundcover 

nated canopy and

crebra and Eucalyarse A. saligna anda weedy groundco

cladocalyx and C. eedy groundcove

ulata canopy witha weedy grass und

d C. citriodora stuned midstorey and

auna Monitoring 

Rehabilitation 

k ‐ Grey Box shrund lower Hunter

k ‐ Grey Box shrund lower Hunter

k ‐ Grey Box shrund lower Hunter

tus cladocalyx stuominated mid‐sto

d weedy groundco

yptus sp. stunted d Acacia sp. over 

citriodora canopyr 

h an Acacia dominderstorey 

nted canopy with a weedy grass 

for Rehabilitation

EEC Equiv

b ‐ Central HuIronbark WNew SouthCoast andBioregion

b ‐ Central HuIronbark WNew SouthCoast andBioregion

b ‐ Central HuIronbark WNew SouthCoast andBioregion

nted rey 

‐ 

over  ‐ 

‐ 

y  ‐ 

ated  ‐ 

 an  ‐ 

n Monitoring Site

alent 

unter Grey Box – Woodland in the h Wales North d Sydney Basin 

unter Grey Box – Woodland in the h Wales North d Sydney Basin 

unter Grey Box – Woodland in the h Wales North d Sydney Basin 

es 

Condition 

Moderate – Good 

Moderate – Good 

Moderate 

Low 

Low 

Low 

Moderate 

Low 

Low 

9

Fauna Monitorin

1 Remote Camer1 Songmeter 

1 Remote Camer1 Songmeter 

1 Remote Camer1 Songmeter 

1 Remote Camer1 Songmeter 

1 Remote Camer1 Songmeter 

1 Remote Camer1 Songmeter 

1 Songmeter 

1 Remote Camer1 Songmeter 

1 Remote Camer1 Songmeter 

90 

ng 

ra 

ra 

ra 

ra 

ra 

ra 

ra 

ra 

2

S

A

A

A

MUSWE

2016 Annual Envir

Site Category 

Analogue 

Analogue 

Analogue 

ELLBROOK COAL CO

ronmental Manag

Monitoring Site ID 

RPastNew1 

RPastNew2 

RPast03 

OMPANY LIMITED

gement Report

Plant CommunitVegetation Com

Disturbed remnanative grasses, sCymbopogon refDichelachne micLomandra filiforrush), Dicopogonrepens (White clCarthamus lanapubescens (Gale

Disturbed remnanative grasses, sCymbopogon refDichelachne micSporobolus crebfiliformis subsp. weed species incHypochaeris radLinum trigynum

Disturbed remnanative grasses arefractus (Barbe(Plumegrass) an(Rock fern). Wee(Scarlet pimpernBriza minors (Qu(Rhodes grass).

ty Type (PCT) or Rmposition 

ant pasture compsedges and desirafractus (Barbed‐wcrantha (Shorthairrmis subsp. filiformn sp. (Chocolate Llover). Weed spectus (Saffron thistlenia). 

ant pasture compsedges and desirafractus (Barbed‐wcrantha (Shorthairer (Western RatstFiliformis, Loliumcluding Plantago dicata (Flatweed) (French Flax). 

ant pasture compnd forbs includinged‐wire Grass), Dicd Cheilanthes siebed species includenel), Bromus molluaking grass) and 

Rehabilitation 

prising a mixture oble species includwire Grass), r Plumegrass), mis (Wattle mat‐Lily) and Trifoliumcies include e) and Galenia 

prising a mixture oble species includwire Grass), r Plumegrass), tail grass), Loman

m sp. (A Rye grass)lanceolata (Ribwoand 

prising a mixture og Cymbopogon chelachne sp. beri subsp. Siebere Anagallis arvensiformis (Soft BromChloris gayana 

EEC Equiv

of ding 

‐ 

of ding 

ndra  and ort), 

‐ 

of 

ri sis me), 

‐ 

alent  Condition 

Low – Moderate 

Low – Moderate 

Low – Moderate 

9

Fauna Monitorin

‐ 

‐ 

‐ 

91 

ng 

2

S

R

R

R

R

MUSWE

2016 Annual Envir

Site Category 

Rehabilitation 

Rehabilitation 

Rehabilitation 

Rehabilitation 

ELLBROOK COAL CO

ronmental Manag

Monitoring Site ID 

RP1 

RP2 

RP3 

RP4 

OMPANY LIMITED

gement Report

Plant CommunitVegetation Com

Rehabilitated paspecies includingMedicago minim(Tall windmill gr(Fireweed), TrifoTrifolium campespecies Trifolium

Rehabilitated paspecies includingMedicago minimarvense (Haresfo(Hop Clover). Th(White clover) is

Rehabilitated paspecies includingBromus mollifor(Quaking grass),melilotis indicus(Ribwort) and Trsmall amount of(Barbed‐wire Grsp. Is also prese

Rehabilitated paspecies includingTrifolium campe(Haresfoot CloveThe desirable spis also present.

ty Type (PCT) or Rmposition 

asture composed g melilotis indicusma (Woolly burr mrass), Senecio madolium arvense (Haestre (Hop Clover)m repens (White c

asture composed g Chloris gayana ma (Woolly burr moot Clover) and Trhe desirable specis also present. 

asture composed g Chloris gayana rmis (Soft Brome),, Hypochaeris radi (Sour clover), Plarifolium campestrf native Cymboporass) and the desint. 

asture composed g Medicago truncestre (Hop Clover)er) and Plantago lpecies Trifolium re

Rehabilitation 

primarily of weeds (Sour clover), medic) Chloris gaydagascariensis aresfoot Clover), ). The desirable clover) is also pres

primarily of weed(Tall windmill gramedic), Trifolium Trifolium campestres Trifolium repen

primarily of weed(Tall windmill gra, Briza maxima icata (Flatweed), antago lanceolatare (Hop Clover). Agon refractus rable species Loliu

primarily of weedcatula (Barrel clov), Trifolium arvenslanceolata (Ribwoepens (White clov

EEC Equiv

yana 

sent. 

‐ 

d ss), 

re ns 

‐ 

d ss), 

a  

um 

‐ 

d ver), se ort). er) 

‐ 

alent  Condition 

Low 

Low 

Low 

Low 

9

Fauna Monitorin

‐ 

‐ 

‐ 

‐ 

92 

ng 

2

S

R

R

  

MUSWE

2016 Annual Envir

Site Category 

Rehabilitation 

Rehabilitation 

ELLBROOK COAL CO

ronmental Manag

Monitoring Site ID 

RP5 

RP6 

OMPANY LIMITED

gement Report

Plant CommunitVegetation Com

Rehabilitated paspecies includinggayana (Tall winclover). The desis also present.

Rehabilitated paspecies includingSenecio madaga(Sour clover), Mand Medicago trspecies Lolium s(White clover) is

ty Type (PCT) or Rmposition 

asture composed g Galenia pubescendmill grass) and mirable species Loli

asture composed g Chloris gayana ascariensis (Firew

Medicago polymorpruncatula (Barrel sp. (A Rye grass) as also present. 

Rehabilitation 

largely of weed ens (Galenia), Chlmelilotis indicus (ium sp. (A Rye gra

primarily of weed(Tall windmill graeed), melilotis indphya (Burr medicclover). The desirnd Trifolium repe

EEC Equiv

oris Sour ass) 

‐ 

d ss), dicus ) rable ense 

‐ 

alent  Condition 

Low 

Low 

9

Fauna Monitorin

‐ 

‐ 

93 

ng 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figuure 37: Rehabilitaation Monitoring Program – Flora SSites

9

  

94 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 38: Rehabilitattion Monitoring PProgram – Fauna Sites

9

  

95 

2016 An

5.4 F

5.4.1 At each establishGPS  coorecordeddata bia 

 

5.4.2 Floristic This waseach ploAssessm 

MUSWELL

nnual Environ

LORA MON

PERMANENof the nine whed centred ordinates wed.  All plots wsed towards

FULL FLORISassessments a measureot the attribument Method

LBROOK COAL

nmental Man

NITORING 

T MONITORwoodland sitover a 50mere  taken  atwere establis vegetation 

STIC AND STRts  for  speciee of both  spute for nativdology 2014. 

50

L COMPANY L

nagement Re

METHODO

RING TRANSEtes, 20m x 5 transect mat  the  start  ashed across and soil char

Figure 39:

RUCTURE s  richness wecies presenve and exotic

 

 

 

IMITED

eport

OLOGY 

ECTS/PLOTS0m plots witarked using and  finish  pthe slope (aracteristics i

: Floristic Plo

were conducnce,  includinc species  is 

20

10

th a nested 2star pickets points  of  theapproximateln rip lines an

ot Diagram

cted within  tng  cover andrecorded  in 

0

10

20m x 20m fthe start ande  transect  aly 45 degreend/or planted

the 20m x 2d abundanceaccordance 

20

full floristic pd end of (Fignd  site  detaes) to avoid cd rows.  

 

20m plot  (Fige  (Table 48).with the Bio

96 

plot were gure 39).  ails were collecting 

gure 39). .   Within oBanking 

2016 An

Attribut

Stratum

Growth 

Species 

Cover 

Abundan

 All vascusamplesNew Souas prese In additiacross th 

5.4.3 Within tMethodalong thcover wregenera 

5.5 FTo demomonitorsites.     ‘rehabiliestablishmonitorprojecte 

5.5.1 The spebased  orehabilitthose  spIronbark The avethan  thaaverage monitor

MUSWELL

nnual Environ

Table 

te 

  

form 

name 

nce rating 

ular plants sps of unknownuth Wales (Hented on Plan

ion to this, the entire veg

BIOMETRIC the 20 m x 5ology (DECChe 50m transere recordedation (trees 

LORA MONonstrate comring survey reKey  comple

itation monihed are comring  reports ed foliage cov

SPECIES RICcies richnesson  the  averatation woodpecies  consik Woodland 

erage numbeat of native  native specring years sh

LBROOK COAL

nmental Man

48: Data Ga

Survey Requ

Stratum and

Growth form

Scientific na

A measure ospecies; recospecies is leestimated c

A relative mplot. Use the1,2,3,4,5,6,7required 

pecies were n species colHarden 1992ntNET (RBGD

the total numgetation zon

SURVEY 50 m plot, bC 2008).  Attrsect. Shrub cd every one less than 5cm

NITORING mpliance witesults was coetion  criteritoring  repor

mparative to confirm  thaver or are co

HNESS s measured age  number land sites.   Tidered  desircommunity 

er of native species preies richness ows an incre

L COMPANY L

nagement Re

thered for F

uirement 

d layer in wh

m for each re

ame and com

or estimate oorded from 1ss than 1% aover should 

measure of the following i7,8,9,10,20,5

recorded anlected for fu2; 1993; 2000DT 2012) and

mber of eace.  

iometric attributes includcover, grass metre.  Lengm DBH) was 

RESULTSth  the compompared to ia  in  the  Mrts confirm  tthe seed m

at  after  two omparable to

at each wooof  native  sThis relates ed  native  sin the remna

species pressent across across remnease in the n

IMITED

eport

Floristic Asse

ich each spe

ecorded spec

mmon name

of the appro1–5% and thand the specibe entered (

he number ofntervals; num50,100,500,1

nd identifiedurther identif0; 2002), andd other speci

h species re

ributes wereded canopy ccover, othegth of logs, noccurring w

pletion criterbenchmarks

MOP,  relevanthat after  twix and  the ryears  after 

o analogue s

odland monispecies  and to  the recompecies  consant sites.   

sent within the  rehabilinant and rehnumber of sp

essment of th

ecies occurs

cies 

priate cover hen to the neies is conside(e.g. 0.4) 

f individuals mbers above1000 or speci

 to the lowefication.  Nod any subseqific botanical

generating w

e recorded ucover and mr (herbs, fornumber of here all recor

ria  indicated s derived thront  to  this  mwo years  froespective anseeding weites’. 

toring site isweed  specimmended spistent  with 

the  remnantation woodhabilitation species record

he Woodlan

measure forearest 5%. If tered importa

or shoots ofe about 20 arify a number

st taxonomimenclature fquent recentl sources. 

was assessed

using the Bioid‐storey covbs, sedges) collow bearinded. 

in the MOPough the momonitoring  pm planting, nalogue siteseeds  represe

s representees  present pecies  list  inthe  Central 

t woodland dland  sites. Aites betweended across bo

nd Sites 

r each recordthe cover ofant, then the

f a species wre estimatesr greater tha

c level possifollowed thet taxonomic

d and record

obanking Assver every fivcover, exoticng trees and 

P  for woodlaonitoring of aprogram,  sta>80% of  thes’ and  ‘rehaent  less  than

ed in Figure 4within  remnn Table 43 aHunter  Gre

sites  is  fouA  comparison the 2015 aoth the rem

97 

ded f a e 

within the s only: n 1000 if 

ble, with e Flora of  changes 

ded from 

sessment e metres c species whether 

and sites, analogue ates  that e species bilitation n  20% of 

40 and is nant  and s well as ey  Box  – 

r greater on of  the and 2016 nant and 

2016 An

rehabilitadditionrehabilitspecies,  

 A compathe 201across  rRWoodNRWoodNweed spnine add 

MUSWELL

nnual Environ

tation  sites nal  14  spectation sites RRW5 one sp

arison of the5 and 2016 remnant  anNew1  had  oNew3  sevenpecies, RW2 ditional weed

LBROOK COAL

nmental Man

from  2015 cies,  RWoodRW1 had an pecies, and R

Figure 

e average wemonitoring 

nd  rehabilitaone  less  we  additional five speciesd species. 

Figure 41: C

L COMPANY L

nagement Re

to  2016.  IdNew2  fiveadditional tw

RW6 five add

40: Compar

eed species ryears showsation  sites  feed  species species. Acr, RW3 12 sp

omparison o

IMITED

eport

In  the  remne  species  awo species, ditional speci

rison of Aver

richness acros a general from  2015 present,  RW

ross  the  rehpecies, RW4

of Average N

nant  woodland  RWoodRW2 five spees. 

rage Native S

oss remnant increase  in  tto  2016.  InWoodNew2 abilitation  s14 species, 

Number of W

and  sites  RNew3  six  secies, RW3 s

Species 

and rehabilithe number n  the  remnhad  six  addites  RW1  haRW5 four sp

Weed Species

RWoodNew1 species.  Acrsix species, R

itation sites  of species nant  woodladitional  spead  an  additipecies, and R

98 

had  an ross  the RW4 four 

 

between recorded and  sites cies  and ional  ten RW6 had 

 

2016 An

5.5.2 Averageother cocover,  lirehabilit The  remhigher pmid‐storfour andunder twsimilar b 

 The dataincrease2015 anrehabilitto  that plant  (gGeneralhowevedown  toremainethere hacover haremnantbetweenslight de 

MUSWELL

nnual Environ

BIOMETRIC e percentageover was metter and bartation woodl

mnant woodproportion  inrey cover wad a half  timewo times grebetween bot

a gathered ded  in  remnannd 2016  (Figtation sites fof  the 2015round)  covely, exotic plar  there  has o 58%. Natived consistentas been a  slas remainedt  sites.  Litten 2015 and ecrease in ba

LBROOK COAL

nmental Man

DATA e of native oeasured  for re ground wland sites.   

land  sites  cn over‐storeyas only presees greater  ineater  in rehah site types.

during  the 2nt woodlandure 43).   Gefor both year5 data with  ter. Exotic oveant (ground)been  a  decve grass covt  for  rehabilight decreas consistent er  cover  has 2016. Bare are ground in

L COMPANY L

nagement Re

ver‐storey aremnant andere also rec

ontained  a y, grass coveent at rehabin  rehabilitatabilitation si 

Figure 42: B

2016 monitod sites and henerally, midrs. The data the exotic  cer‐storey an) cover has ncrease  in  theer has decrelitation  sitesse  in  cover abetween yearemained  cground  coven rehabilitati

IMITED

eport

 

nd mid‐stord rehabilitatcorded and p

greater  proer, shrub anilitation sitestion  sites as ites as comp

Biometric Da

oring period has remainedd‐storey covgathered thcover  separand mid‐storenot varied sie  rehabilitateased  slightls. Generally at  remnant ars  for rehaconsistent  acerage  is minon sites betw

ey cover andted woodlanprovide a co

portion  of  nd native oths and exotic compared  t

pared to rem

ata Averages

shows  that d similar acrver was consis year has bated  into exoey  is only pregnificantly bion  sites  froly between shrub coversites betweebilitation sitcross  both  rnimal at all  sween 2015 a

d native grasd sites  (Figumparison be

native  specieher cover. Exground coveto  remnant mnant sites a

the native mross rehabilitsistent acrosbeen displayeotic over‐stoesent withinbetween yeaom  70%  exoyears  for  rer  is  low acroen 2015 andes and has  iremnant  andsites, howevand 2016. 

ss, shrub, anure 42).   Exoetween remn

es  in  generaxotic over‐stoer was approsites.  Litter and bare gro

mid‐storey ctation sites ss both  remned slightly diorey, mid‐ston  rehabilitatiars for remnaotic  ground  cmnant  sites oss all  sites, d 2016. Natiincreased slid  rehabilitatver  there ha

99 

nd native otic plant nant and 

al with  a orey and oximately was  just 

ound was 

 

cover has between nant and ifferently orey  and ion  sites. ant sites, coverage and has however ive other ightly for tion  sites s been a 

2016 An

 

5.5.3 In  relatestablish49.    In woodlanweeds in 

Site 

RW1 

RW2 

RW3 

RW4 

RW5 

RW6 

 

5.5.4 There ha2015 mospecies species areas.  Itcurrentlare currMOP.  

MUSWELL

nnual Environ

COMPARISOtion  to  selehed native scomparison

nd sites (anan remnant w

Compltarget (

est

CONCLUSIOas been somonitoring evrichness  anthat are nott  is  unlikely y  stand  andrently under 

LBROOK COAL

nmental Man

Figure 4

ON TO COMPected  comppecies compn,  the  averaalogue sites) woodland site

Table 49: 

letion criteri(native specitablished) 

>80% 

>80% 

>80% 

>80% 

>80% 

>80% 

ONS me improvement. Generad  structural t locally endethat  the  re

d  adaptive mreview and 

L COMPANY L

nagement Re

43: Compari

PLETION CRIletion  criterposition and age  percentahas been caes weeds is 1

Rehabilitatio

a ies 

2016 result

19% 

29% 

37% 

35% 

25% 

38% 

ment in the splly these sitediversity.  Temic or reprhabilitation 

managementchanges to t

IMITED

eport

son of Biom

ITERIA ria,  the  resprojected foage  of  nativalculated at 713%.   

on Site Com

Target reached 

No 

No 

No 

No 

No 

No 

pecies richnees are still nThis  can  be resentative osites will m

t  approachestargets will b

metric Data A

sults  of  theoliage cover ve  species  e74%.  The av

mpletion Crite

Completiotarget 

projectedcov

<20

<20

<20

<20

<20

<20

ess at rehabnot comparaattributed  toof local vegemeet  the  coms  should bebe incorpora

Averages 

e  rehabilitatfor weeds  iestablished verage proje

eria Target 

on criteria (weed d foliage ver) 

0% 

0% 

0% 

0% 

0% 

0% 

ilitation wooble to the reo  previous  ptation commmpletion  critconsidered.

ated into the

 

tion  woodlas presented within  the ected foliage 

2016 result  ex

57% 

98% 

58% 

42% 

98% 

99% 

odland sites emnant sitespractices  of munities withteria  targets. Completione next revisio

100 

and  sites in Table remnant cover of 

Target xceeded

Yes 

Yes 

Yes 

Yes 

Yes 

Yes 

from the s  in both planting hin these s  as  they n  criteria on of the 

2016 An

From thpoor. Thto provisigns of pressurepasture pasture Trifolium 

5.6 FAFauna mspecies as  oppomonitorhabitat focused once ad 

5.6.1 Remote station  fremote MOP staend  of identifyi 

5.6.2 A new muse of sand useactivity each of locationwoodlansuitable  An ecolohas  usemonitor 

5.6.3 Songmefrequenwoodlanhour pe Call idenNew Sou

MUSWELL

nnual Environ

e perspectivhe majority cde ground cpasture deges and potenspecies  thusites there 

ms and Medi

AUNA MOmonitoring de(i.e. bird andosed  to  attering, evidencrecreation  ton collectinequate data 

REMOTE CAcameras wefilled with acamera was ated a total othe  week  oing the type 

BIRD CENSUmethodologyongmeters. ed  to  record were  capturthe woodlan of a songmend, however(comprising

ogist experieed  this,  in  cring, to comp

MICROCHIReters were incy bat calls. nd sites.   A triod from pr

ntifications wuth Wales (P

LBROOK COAL

nmental Man

ve of pasturecontain weedoverage. Thegradation anntially  long us  leading  thas been ancs since the 

ONITORINGesign and locd bat speciesempting  to mce of appropto areas adjang baseline dover subseq

AMERA SURVere placed a combinatioplaced on aof 3 nights, hof monitoringof animal ob

US y was underThe songmebird call actred at exactnd sites thuseter at RW4r it was consg greater dive

enced  in  ideonjunction  wpile a bird list

ROPTERAN BAstalled at ea All songmetime delay wior to dusk u

were made uPennay et al.

L COMPANY L

nagement Re

e condition ady grass spee remnant pd high weedperiods of  so  higher  wen  increase  in2015 monito

G METHODcation was gs).  The monimonitor  all riate fauna sacent  to  thedata, with mquent monito

VEY at seven of ton of oats, h tree trunk fhowever, an g  and  equipbserved at ea

taken  for coeters were ptivity. The betly  the  sames providing c. In 2015 theidered that ersity of euca

entifying birdwith  incident for the woo

ATS ch of the nineters were dwas programuntil midnigh

using regiona2004); and s

IMITED

eport

and productiecies that havasture sites d species comet  stocking eed  numbern the numbeoring event.

DOLOGY guided by theitoring progrspecies  founstructures we mining opemore rigorousoring years h

the nine woohoney and pefacing the ba additional npment  collecach site. 

ollecting birdplaced at eacenefits of use  time of moconsistency ae location wathe habitat alypts, shrub

d calls  from ntal  bird  ideodland sites 

ne woodlanddirected alonmmed such thht.   

al based guisouth‐east Q

vity the rehave likely beeare in bettemposition mthat has  redrs.  Across  ber and cover

e MOP and hram is focusend  on  site. 

were noted iferations.   Ats data analyshas been coll

odland sites,eanut butteait station fonight was recction.    Analy

d data acrosch of the ninsing  this meorning and aacross all siteas mid‐way dat the top obs and grasse

recordings  rentification across the M

d sites for foung a potentiahat the song

des to the eQueensland a

abilitation paen planted asr condition, 

most  likely duduced  the proth  remnanage of palat

has targeteded on key ind  In  conjuncf observed wt  this  stage, sis and testilected. 

, and comprr and placedr a total of focorded as thysis  of  came

s the MCC sne woodlandthod are  thaat  the  same es. One chandown the slof the hill at es) for prese

reviewed  thewhilst  condMCC site.  

ur nights andal flyway, wgmeters reco

cholocation and north‐ea

asture sites s a fast growhowever alsue to historiresence of pnt  and  rehatable species

d highly mobdicator faunaction with  thwhich may asfauna monng to be un

rised of a plad at ground our nights/dis coincided era  images 

site and  invod sites for foat  recording  temperaturnge was madope and withRW4 would ence of birds.

e data colleucting  reha

d used to rechere possiblorded calls fo

calls of micast New Sou

101 

are fairly wing crop o exhibit c grazing preferred bilitation s such as 

bile fauna a species he  fauna ssist with itoring  is dertaken 

astic bait level.   A ays.  The with the included 

olved the ur nights gs of bird re across de to the hin acacia be more . 

cted and bilitation 

cord high le,  in the or a four 

robats in th Wales 

2016 An

(ReinholNSW.    Bat  callcharactereliable 

Sear(Mc

Recolabe

Fouro o o o

Nyctiden

Sequand 

 Data ondefinite site.  

5.7 FA

5.7.1 The  resuindicatiothat acroreptiles rehabilitdecrease 

MUSWELL

nnual Environ

ld et al. 200

s  are  analyeristic  frequand accurate

rch phase  caKenzie et al.

ordings  contelled as short

r categories definite – idprobable – lpossible – munidentifiabspecies grou

tophilus sppntify this gen

uences not adon’t repres

n  the numbeand probab

AUNA MO

REMOTE CAults  of  the  ron of fauna soss the remnwere not retation  sites, ed, reptiles a

LBROOK COAL

nmental Man

1) and the a

sed  using  sency,  initial e results the

alls were use 2002)  

taining  less t (Law et al. 1

of confidencentity not inow probabil

medium to higble, poor or lup. 

. are difficultus to species

attributed  tosent microba

er of passes ble call passe

ONITORING

AMERA SURVremote  camspecies richnnant woodlaecorded for 2  the  numbeare absent as

L COMPANY L

nagement Re

accompanyin

pecies‐specislope  and  following pr

ed  in  the an

than  three 1999)  

ce in species  doubt  ity of confusgh probabilitow quality–

t to identify s level (Penn

o microbat eat activity at 

of each bates were used

G RESULTS

VEY mera  data  is ness at each and sites ma2016 and oner  of  mamms they were 

IMITED

eport

ng reference

ific  paramettime  betwerotocols (ada

nalysis,  rathe

pulses  wer

identificatio

sion with spety of confusicalls made b

confidently nay et al. 200

echolocationthe site.  

t  species ped to represe

presented  iwoodland simmals havene additionalmals  has  sliin 2015 and 

  library of o

ters  of  the een  calls  (Rinapted from L

er  than  cruis

e  not  analy

on were used

ecies of similaon with specby bats whic

from their ca04)  

n calls were 

r monitoringnt species c

in  Figure  44ite surveyed increased cl pest specieightly  increathe number

ver 200 calls

call  profile nehold  et  aLloyd et. al. 2

se phase  cal

sed  and  the

d (Mills et al.

ar calls  cies with simch cannot be

alls and no a

labelled as  j

g  site was  call activity a

4  and  Table in 2015 andonsiderably,es has been rased,  the  nuof pests has

s from north

such  as  cal.  2001).    T2006) were f

lls or  feedin

ese  sequenc

. 1996):  

milar calls  e identified t

attempt was 

junk or non‐

collated,  thoand presence

50  and  prod 2016.  Resu, birds have recorded. Acumber  of  bs remained c

102 

h‐eastern 

ll  shape, o  obtain followed:  

g buzzes 

ces  were 

to even a 

made to 

‐bat calls 

ugh only e at each 

ovides  an ults show doubled, cross the birds  has constant. 

2016 An

 

S

Macropus nec

Macrop(Eastern 

Macro(Comm

Tachyglo(E

Trichos(Brush

Oryctol(

Rattus ra

Vulpes

Gymno(Austra

Corcorax m(White 

 

5.7.2 Bird speand acroincreaseshowed  

MUSWELL

nnual Environ

Species 

rufogriseus ck Wallaby) 

pus giganteugrey kangar

opus robustumon Wallaroo

ossus aculeaEchidna) 

urus vulpecuhtail possum

lagus cunicul(Rabbit) 

attus (Black 

s vulpes (Fox

orhina tibicealian Magpie

melanorhamwing Choug

BIRD CENSUecies were idoss 2015 ande  in the avera notable in

LBROOK COAL

nmental Man

Figure 44: C

RW

(Red‐

us roo) 

us o) 

atus 

ula m) 

lus 

rat) 

x) 

en e) 

mphos gh) 

US dentified witd 2016 showrage bird spencrease in bir

L COMPANY L

nagement Re

Comparison 

Table 50: R

Rem

WoodNew1

 

 

 

 

h a comparisn in Figure 4ecies presentrd species pr

IMITED

eport

 of Average 

Remote Cam

mnant Wood

RWoodNew

 

 

 

 

 

son between45.  Across tht from 11  inresent with a

Fauna Speci

mera Results 

land Sites 

w2  RWoo

n remnant ahe remnant wn 2015 to 13an average o

es Richness 

 

odNew3 

 

 

nd rehabilitawoodland sitin 2016. Thf eight in 201

RehabilWoodlan

RW1  RW

x   

x   

   

x   

   

   

x  

   

ation woodltes there wae rehabilitat15 to 14 in 2

103 

 

itation nd Sites 

W4  RW6

 

 

 

 

 

 

 

and sites as a slight tion sites 2016.  

2016 An

One sign(Rainbow 

 

5.7.3 The  resuTable 51surveyedequipmebeing niRW2  anidentifieMiniopteChalinolBentwin 

MUSWELL

nnual Environ

nificant specw bee‐eater)

Figur

MICROCHIRults of  the M1  indicating d.   No bat  aent malfuncne, RWoodNnd  RW5  anded at  sites Rerus australilobus  dwyerng‐bat). 

LBROOK COAL

nmental Man

cies was iden). This specie

re 45: Bird Sp

ROPTERAN BAMicro‐bat  cethe presencactivity was tion.   RWooNew3 and RW  RWoodNewWoodNew1,is (Little Benri  (Large‐ea

L COMPANY L

nagement Re

ntified at remes is listed as

pecies Ident

ATS ensus using ce  (and numdetected  fo

odNew1 andW1 were belw2  and  RW3, RW1, RW2twing‐bat), Mred  Pied  B

IMITED

eport

mnant woods a Migratory

ified at Rem

songmeter mber of  callsor  rehabilitatd RW4 had  tlow this at si3  had  four 2, RW3, RW4MormopteruBat)  and  Mi

land site RWy under the E

mnant and Re

data  captures) of bat  spetion woodlathe highest nix species. Fispecies  reco4 and RW5. us setirostris iniopterus  s

WoodNew2 bEPBC Act. 

ehabilitation

e  is presentecies utilisinnd  site RW6number of bve bat speciorded.  ThreaThese  threaeleryi (Hairyschreibersii 

being Merops

n Sites 

ted  in  Figureg  the wood6 most  likelbat  species  ries were idenatened  specatened bats y‐nosed Freeoceanensis 

104 

s ornatus 

 

e  46  and land  site y due  to recorded ntified at ies were included etail Bat), (Eastern 

2016 An

Fig All  wooincreasinfrom onone to n 

MUSWELL

nnual Environ

gure 46: Num

odland  sites ng  from  foune to four spnine species (

Figu

LBROOK COAL

nmental Man

mber of Com

have  increr to nine sppecies, RWoo(seven comm

ure 47: Com

L COMPANY L

nagement Re

mmon and Th

ased  in  theecies  (sevenodNew3  incrmon and two

parison of B

IMITED

eport

hreatened Ba

e  number  on common areased fromo threatened

Bat Species R

at Species Re

of  bat  specind two thre five to six sd) (Figure 47)

Recorded at 

ecorded at W

es  recordedatened), RWspecies and ). 

Woodland S

Woodland Si

d  with  RWoWoodNew2  iRW4  increas

Sites 

105 

 ites 

oodNew1 ncreased sed from 

 

2

Spe

White‐StriB

Gould's W

Chocolate 

Little Bent(

Eastern B(

Large‐Ear(V

Eastern Ho

South‐EastB

Eastern F

Hairy‐nosBa

Inland BrB

Eastern BB

Long‐ea

**

MUSWE

2016 Annual Envir

ecies R

De

ped Freetail Bat 

Wattled Bat  2

Wattled Bat  2

‐Winged Bat (V) 

Bentwig Bat (V) 

red Pied Bat V) ** 

orseshoe Bat 

tern Freetail Bat 

Freetail Bat 

sed Freetail at (E) 

road‐nosed Bat 

road‐nosed Bat 

ared Bats 

* No recordings at R** Listed as vulnera

ELLBROOK COAL CO

ronmental Manag

RWoodNew1 

efinite  Probable 

11  2 

220  53 

281  81 

1  6 

4  1 

   

   

25  4 

3  2 

   

42  14 

15  6 

  1 

RW6 due to technicble under both Stat

OMPANY LIMITED

gement Report

Table 51: Bat

RWoodNew2 

Definite  Probable

   

3  2 

15  5 

   

   

   

   

   

   

   

21  8 

28  5 

   

cal issues with equipte and Federal legis

t Calls Identified 

RWoodNew3

Definite  Probab

8  1 

52  14

603  20

   

   

   

   

44  10

6  1 

   

   

   

   

pment slation 

at Remnant and R

RW1 

le  Definite  Prob

21  6

11  1

 

 

 

 

32  4

2  2

 

 

 

Rehabilitation W

RW2

bable  Definite  Pr

 

6  31 

1  90 

 

 

 

4  36 

2  9 

 

 

 

oodland Sites 

RW

robable  Definite 

   

12  1 

13  91 

  3 

  1 

   

   

4  14 

  1 

   

   

   

   

W3  R

Probable  Definite

  1 

1  5 

  55 

1   

  1 

  1 

  3 

  10 

   

   

   

   

   

10

RW4 

Probable  Definit

  1 

  17 

9  24 

   

   

1   

   

  32 

   

  2 

   

   

   

06 

RW5 

te  Probable 

 

 

 

 

 

 

 

2016 An

5.7.4 At  this subsequhabitat there  haacross bincluding Of  the  tconsiderbeen cotwo fox to be im 

5.8 SOAt each soil samof 5m in 

5.9 SO

5.9.1 The pH i5.8  in  2generall 

 The ave49). Witthere ha

MUSWELL

nnual Environ

CONCLUSIOstage,  faun

uent years, trfor a  range as  been  a  cboth the remg four bats a

three  introdred  to be a ollected and cubs presen

mplemented t

OIL MONITof the monitples were contervals along

OIL MONIT

WOODLANDin remnant w2015.  There y within the 

rage measurthin  the  rehas been an 

LBROOK COAL

nmental Man

ONS a  monitorinrends may bof highly m

considerable nant and rehand one migr

uced  vertebKey Threateoverall num

nt which showto try and lim

TORING Mtoring sites, ollected using each of the

TORING RE

D SITES woodland sitwas  little  vaverage ran

Figur

red electricahabilitation  sincrease  in  t

L COMPANY L

nagement Re

ng  is  focusebe found thatobile  fauna increase  in habilitation sratory bird is

brate  speciesening Procesmbers of  thisws that breemit breeding 

METHODOLincluding theg a soil coree 50m transe

ESULTS 

tes was slighvariation  in nge of the rem

re 48: Compa

l conductivitsites  the  avthe EC  reco

IMITED

eport

d  on  collect indicate wspecies. Bas  the  numbesites. The ides a positive r

s  identified sses  (KTP) us  species  is ueding is occu on site. 

LOGY e additional r and bulkedects.   

htly higher inwoodland  rmnant wood

arison of So

ty of soils in verage  electrrded across 

cting  baselinhether woodsed on  the der  and  varietentification oesult for the

within  the Mnder  the TSunknown, horring within 

5 sites withid using the st

n 2016 with arehabilitationdland sites (F

il pH – Wood

remnant worical  conducboth  remna

e  data.  Witdland sites adata collectety  of microbof four threaMCC site.  

MCC  site  onSC Act. No qowever datathe site.  Co

in the biodivtandard soils

an average on  sites  fromFigure 48).  

dland 

odland site wctivity  was  1ant and  reha

th  data  collare providinged  in 2016, gbat  and  birdatened fauna

nly V.  vulpesquantitative a captured  idontrol measu

versity offsets sampling te

of 6.3 compam  2015  and 

was 90μS/cm185μS/cm.  Gabilitation w

107 

ected  in g suitable generally d  species a species, 

s  (Fox)  is data has dentified res need 

t area, 10 echnique 

ared with all  were 

 

m (Figure Generally woodland 

2016 An

sites froof EC rec 

 The  ave(Figure 0.6meq/rehabilit 

 The avewoodlanlevel of 

MUSWELL

nnual Environ

om 2015 to 2corded at bo

Fig

erage  excha50).   All wo/100g.  Theretation sites f

rage sulphurnd sites weresulphur  rec

LBROOK COAL

nmental Man

2016. The sigoth RW4 and

gure 49: Com

ngeable  Potodland  rehae  has  been rom 2015 to

Figure 50

r measured e significantorded at bo

L COMPANY L

nagement Re

gnificant incrd RW6 which 

mparison of S

tassium  meabilitation  sitlittle  variat

o 2016. 

0: Compariso

in remnant wly higher at th RW4 and

IMITED

eport

rease in reha is represent

Soil Electrica

asured  at  rtes were gention  in  Pota

on of Soil Po

woodland si135 mg/kg. d RW6 which

abilitation sitted by the la

al Conductivi

remnant  wonerally withiassium  reco

otassium – W

tes was 35mThis  large vh  is  represen

tes is attriburge standard

ity – Woodla

oodland  sitein  this  rangerded  across

Woodland 

mg/kg (Figureariation  is atnted by  the 

uted to the hd error bar. 

and 

s  was  0.7me with an avs  both  remn

e 51).  Rehattributed to large standa

108 

high level 

 

meq/100g verage of nant  and 

 

bilitation the high ard error 

2016 An

bar.  Sulconsider 

 The averehabilitbeen  a Nitrate Nresult ofthe large 

 

MUSWELL

nnual Environ

phur  has  inrably for reh

rage measurtation sites wsmall  increaNitrogen in rf 50mg/kg. Ter overall av

LBROOK COAL

nmental Man

creased maabilitation si

Figure 5

red soil Nitritwere well abase  across  rrehabilitationThis outlying erage. 

Figure 52: C

L COMPANY L

nagement Re

rginally  betwites. 

51: Compari

te + Nitrate iove this withremnant won sites, howeresult is rep

Comparison 

IMITED

eport

ween  2015 

son of Soil S

in remnant wh an averageoodland  sitesever this is apresented by 

of Soil Nitrit

and  2016  fo

Sulphur – Wo

woodland site of 11.2 mg/s  and  a  signattributed tothe large sta

te + Nitrate –

or  remnant 

oodland 

tes was 3.2m/kg. Comparnificant  incre site RW3 haandard error

– Woodland

woodland  s

mg/kg (Figurered to 2015 tease  in  the aving hugelyr bar and con

109 

sites  and 

 

e 52).  All there has average 

y outlying ntributes 

 

2016 An

The  aveaverage there ha 

 The meaMatter woodlanrehabilit 

 

MUSWELL

nnual Environ

erage  soil  N Nitrogen atas been a dec

asured  soil across  the nd  sites  thetation woodl

LBROOK COAL

nmental Man

Nitrogen  in  rt rehabilitatiocrease acros

Figure 5

Organic Matrehabilitatio

ere  has  beeland sites in 

Figure 54: C

L COMPANY L

nagement Re

remnant  woon site fell bss both remn

53: Comparis

tter  in  remnon  sites  waen  a  slight comparison 

Comparison 

IMITED

eport

oodland  sitebelow this at nant and reha

son of Soil N

nant woodlaas  approximdecrease  into 2015. 

of Soil Orga

es  was  at  ap2,025mg/kgabilitation w

Nitrogen – W

and  site  is  amately  4.6% n  organic  m

anic Matter –

pproximatelyg (Figure 53)woodland site

oodland 

pproximatel(Figure  54

matter  and 

– Woodland 

y  2,166mg/.  Comparedes. 

y  5.9%.  Soil4).    Across a  slight  inc

110 

kg.    The d to 2015 

 

 Organic remnant crease  in 

 

2016 An

5.9.2 The avewas slig2015.  

 The  aveaverage change rehabilitscore at  

 

MUSWELL

nnual Environ

PASTURE SITrage pH in rhtly lower a

erage measu  for  rehabilibetween 20tation  sites b RP6 which i

F

LBROOK COAL

nmental Man

TES remnant past 6.0 (Figure

Figu

red electricatation sites 015 and 201between 20s indicated b

igure 56: Co

L COMPANY L

nagement Re

ture sites wae 55).  Gener

ure 55: Com

al  conductivwas well ab6  for  remna15 and 2016by the large s

omparison of

IMITED

eport

as 6.5 and trally the pH 

parison of S

vity of  soils  ibove  this at ant  sites and6. However, standard err

f Soil Electric

he average phas not vari

oil pH – Past

in  remnant 403µS/cm  (Fd a  significanthis  is attri

ror bar.   

cal Conducti

pH in rehabied greatly fr

ture 

pasture  site Figure 56). Tnt  increase  ibuted  to  the

vity – Pastur

ilitation pastrom that rec

e was 54µS/cThere has bein  the averae very  large 

re  

111 

ture sites corded in 

 

cm.   The een  little age EC  in outlying 

 

2016 An

The  aveRehabiliremnant2016.  

 The  averehabilitlarge ouno variarehabilit 

 

MUSWELL

nnual Environ

erage  exchatation  pastut  and  rehab

erage  sulphutation pasturutlying score ation of resutation sites d

LBROOK COAL

nmental Man

angeable  Poure  sites  habilitation  site

Figure 5

ur measuredre sites was at RP6 whic

ults across redue to the ou

Figure

L COMPANY L

nagement Re

otassium  med  an  averages  there was

57: Compari

d  in  remnanwell above tch is indicateemnant sitesutlier (RP6).

e 58: Compa

IMITED

eport

easured  at ge  of  0.7mes  little  varia

ison of Soil P

t  pasture  sithis at 339 med by the lars  from 2015 

rison of Soil

remnant  paeq/100g  (Figtion  betwee

Potassium –

ites was  9mmg/kg. Howege standard to 2016 and

 Sulphur – P

asture  sites gure  57).  Geen  results  re

Pasture 

mg/kg.    The ever this is aerror bar (Fd significant 

asture 

  was  1.2menerally  acroecorded  in  2

average  Sulttributed to Figure 57). Th variation w

112 

eq/100g. oss  both 2015  and 

 

phur  for the very here was 

within the 

 

2016 An

The avesites wethere hathere  isdemons 

 The aveNitrogenbetweenrecordeddecrease60).  

MUSWELL

nnual Environ

rage measurere consideraas been a sigs  considerabtrated by th

Fig

rage soil Nitn  at  rehabilin  remnant  pd  in  remnaned slightly fr

LBROOK COAL

nmental Man

red soil Nitritably lower wgnificant incrble  variabilite large stand

gure 59: Com

trogen in remitation  site  fpasture  sitesnt pasture  sirom 2015 an

L COMPANY L

nagement Re

te + Nitrate iwith an averaease across ty  in  Nitratdard error ba

mparison of S

mnant pastufell below  ths  from  2015tes  for bothd was slightl

 

IMITED

eport

in remnant page of 2.8mgboth remnate  Nitrogen ars. 

Soil Nitrite +

re sites washis  at  2,1165  to  2016  ah years. The ly lower than

pasture sitesg/kg (Figure 5nt and rehabrecorded  a

+ Nitrate (mg

 at approximmg/kg.   Genand  little  vaaverage  soin that record

was 5.2mg/59). In compbilitation pasacross  both 

g/kg) – Pastu

mately 3,000nerally  thereriation  betwl Nitrogen  inded for the r

/kg.  All rehaparison with sture sites. H  of  these 

ure 

0mg/kg.  Thee was  little ween  Nitrogen  rehabilitatremnant site

113 

bilitation last year However, areas  as 

 

e average variation en  levels tion  sites es (Figure 

2016 An

 The mearehabilitslight inc 

 

5.9.3 The  soilused forEC  resulmajorityproduct

MUSWELL

nnual Environ

asured soil Otation sites wcrease in org

CONCLUSIOs at  the mar the constrults  indicate  ty  of  rehabilition  of  orga

LBROOK COAL

nmental Man

Figure

Organic Matwas slightly lganic matter

Figure 61

ONS jority of  theuction of rehthat all  sitestation  sites nic matter 

L COMPANY L

nagement Re

 60: Compar

ter  in remnaower at 4.3% across both

: Compariso

e  rehabilitatihabilitated as are non‐saare  low  in relies  on  a 

IMITED

eport

rison of Soil 

ant pasture % (Figure 61h remnant an

n of Soil Org

ion monitoriareas. No maaline and noorganic matnumber  of 

Nitrogen – P

sites  is 7.5%).  Comparednd rehabilitat

ganic Matter

ing  sites areajor  issues aot  likely  to  intter,  howevefactors  rela

Pasture 

%. Soil Organd with last ytion pasture 

r – Pasture 

e  fairly  charare present renhibit  the  grer  this  is  to ating  to  the 

nic Matter acyear there hasites. 

acteristic of egarding soirowth of plabe  expectequality  of 

114 

 

cross the as been a 

 

the  soils il pH and ants. The ed  as  the the  soils 

2016 An

includingsoils fauof the nlimiting and sulp 

5.10 EIn conjueach  ofinstabilitpresent 

Rills

Fine

Hole

Loss

Loss

Hum

Roo

Bare In ordererosion the leve The  resmonitorat all 12first siterock andlarge baseedling 

RehabiliSite 

RW1 

MUSWELL

nnual Environ

g  soil  structuna such as eutrient poorfactors acrophur. 

ROSION Anction with f  the  rehabty.    The  folwithin and s

, gullies and 

e soil accumu

es through d

s in depth of 

s of topsoil d

mmocking an

t exposure. 

e patches wh

r to determiand 1 being l of erosion i

ults  from  thring sites are2 sites, howee located on d no topsoil are patch  in gs is also pres

Table 52

itation EroOccTyp

Lim

LBROOK COAL

nmental Man

ure and  its earthworms r overburdenoss rehabilita

ND LANDFthe rehabilitilitation  molowing  list  psurrounding 

tunnel inlet 

ulation or the

rainage stru

topsoil/grow

ue to wind a

nd pedestallin

here groundc

ne the severminimal) haidentified.  

he  erosion e presented iever there arthe upper slpresent. Thwhich  rill ersent here an

2: Evidence o

osion currence/ pe 

mited (1) 

L COMPANY L

nagement Re

potential  toand the typns is often thation, and  in

FORM STABtation monitnitoring  siteprovides  someach rehabil

and outlets.

e presence o

ctures. 

wth medium

and sheet flo

ng. 

cover vegeta

rity of erosioas been used

survey  undein Table 52. re two areasope comprishe second sitrosion  is occnd will aid in 

of Erosion at

Comment

No evidenvicinity ofthis is liketopsoil inidue to winnatural decover preserosive fe

IMITED

eport

o hold moistpe of vegetathe limiting fan some cases

BILITY toring, obseres  for  any me  of  the  flitation mon

of lag materia

  

ow  

ation has bee

on, a scoringd with manag

ertaken  at The survey 

s identified wses of a largete,  located  fcurring. Somestablishing

t Rehabilitat

ts 

nce of erosiof the site. Theely due to a nitially being and and/or shegeneration.sent which iseatures from

ure,  the pretion growingactor when s remnant s

rvations wersigns  of  soeatures  thatitoring site: 

al at the bott

en denuded.

g system frogement optio

each  of  thefound that twithin close pe bare patchfurther  towame natural  re soil stability

tion Woodla

on was obserere is limitednumber of faapplied, poteheet flow du. There is a fas likely to ass occurring. 

esence of vit. In mining srehabilitatinites  include 

e made in thil  erosion  ot were  to  b

tom of slope

m 1 to 10 (wons recomm

e  six  rehabihere is limitproximity to  of earth witards  the baseegeneration oy in the futur

nd and Past

rved at this sd topsoil prectors includientially somering establisair amount osist in the pr

tal  soil microsituations thng these areaphosphorus

he areas suror  obvious  lbe  recorded 

es or in depre

with 10 beinmended depe

litation  andted erosion o RP5 (Figureth considerae of  the hill of Eucalypture. 

ure Sites  

site, or withinsent, howeving limited e loss of tophment and of vegetativerevention of 

115 

obes and e quality as. Other , nitrate, 

rounding landform if  found 

essions. 

ng severe nding on 

  pasture occurring e 62), the ble sized is also a 

us crebra 

n the ver, 

soil 

2016 An

RehabiliSite 

RW2 

RW3 

RW4 

RW5 

RW6 

RP1 

MUSWELL

nnual Environ

itation EroOccTyp

Lim

Lim

Lim

Lim

Lim    Losdueandleaero

Lim

LBROOK COAL

nmental Man

osion currence/ pe 

mited (1) 

mited (1) 

mited (1) 

mited (1) 

mited at site 

ss of topsoil e to wind d sheet flow ding to Rill osion (2) 

mited 

L COMPANY L

nagement Re

Comment

No evidenvicinity ofthis is liketopsoil inidue to winnatural decover preserosive fe

No evidenvicinity ofthis is liketopsoil inidue to winnatural dewhich groof the sitepresent wfeatures f

No evidenvicinity ofsignificantthis is likeuse of rocloss of topestablishmof bare grhowever tcanopy coof erosive

No evidenlow‐modecanopy co

No  evidelimited toof  factorpotentiallduring estThe areaspatches ogrowth hamonitorinlocations 

No evidenlow‐modeis fairly hi

IMITED

eport

ts 

nce of erosiof the site. Theely due to a nitially being and and/or shegeneration.sent which iseatures from

nce of erosiof the site. Theely due to a nitially being and and/or shegeneration.ound layer coe has both grwhich is likelyfrom occurrin

nce of erosiof the site. Thet amount of ely due to limck during lanpsoil due to wment and naround in whithe site has aover presente features fro

nce of erosioerate level ofover is fairly 

nce  of  erosopsoil presens  including y some loss tablishment s of sloped laof bare earthas occurred hng. There arewith minor r

nce of erosioerate level ofgh. 

on was obserere is limitednumber of faapplied, poteheet flow du. There is a fas likely to ass occurring. 

on was obserere is limitednumber of faapplied, poteheet flow du. There are pover is not prround and cay to assist in ng. 

on was obserere is limitedbare ground

mited topsoil dform estabwind and/ortural degenech ground laa sparse gro which is likeom occurring

on was obserf topsoil preshigh. 

sion  was  obnt, however, limited  topof topsoil dand natural and in the vic, however cohere since the signs of toprill erosion o

on was obserf topsoil pres

rved at this sd topsoil prectors includientially somering establisair amount osist in the pr

rved at this sd topsoil prectors includientially somering establispatches of baresent, howeanopy vegetathe preventi

rved at this sd topsoil pred and rock prinitially beinlishment, por sheet flow deration. Therayer cover is und cover anely to assist ig. 

rved at this ssent and gro

served  at  ththis is likely psoil  initiallyue to wind adegeneratiocinity of site onsiderable vhe previous ypsoil loss in sccurring. 

rved at this ssent and gro

site, or withinsent, howeving limited e loss of tophment and of vegetativerevention of 

site, or withinsent, howeving limited e loss of tophment and are ground inever the majative cover ion of erosiv

site, or withinsent and a resent, howeng applied, thotentially somduring re are large anot present,nd moderaten the preven

site. There is ound layer an

his  site.  Thedue to a nuy  being  apand/or sheeton. RW6 shows vegetative year’s some small 

site. There is ound layer co

116 

n the ver, 

soil 

n the ver, 

soil 

n ority 

ve 

n the 

ever, he me 

areas , e ntion 

a nd 

ere  is mber plied, t flow 

a over 

2016 An

RehabiliSite 

RP2 

RP3 

RP4 

RP5 

RP6 

 Generalgood vesettleme 

MUSWELL

nnual Environ

itation EroOccTyp

Lim

Lim

Lim

Lim

Lim

ly across thegetative covent or subsid

LBROOK COAL

nmental Man

osion currence/ pe 

mited 

mited 

mited 

mited 

mited 

e rehabilitativer and maindence areas w

L COMPANY L

nagement Re

Comment

No evidenlow‐modesignificantis fairly hi

No evidenlow‐modeis fairly hi

No evidenlimited toGround la

No evidenlimited tosince last ground lay

No evidenlimited tosince last ground lay

ion sites  limntaining this were identif

IMITED

eport

ts 

nce of erosioerate level oft patches of gh. 

nce of erosioerate level ofgh. 

nce of erosioopsoil presenayer cover is 

nce of erosioopsoil presenyear’s monityer cover. 

nce of erosioopsoil presenyear’s monityer cover. 

ited erosioncover will limfied. 

on was obserf topsoil presbare ground

on was obserf topsoil pres

on was obsernt and modermoderately 

on was obsernt, however gtoring and co

on was obsernt, however gtoring and co

 was encounmit further e

rved at this ssent, howeved present. Gr

rved at this ssent and gro

rved at this srate patcheshigh. 

rved at this sgroundcoveromprises of 

rved at this sgroundcoveromprises of 

ntered. The erosion from

site. There is er there are round layer c

site. There is ound layer co

site. There is s of bare grou

site. There is r has increasa fairly high 

site. There is r has increasa fairly high 

majority of sm occurring. N

117 

cover 

a over 

und. 

ed 

ed 

sites had No major 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figgure 62: Erosion SSites 

11

 

18 

2016 An

5.11 CA

Carryingpasture the appr Carryingthe  examshow thhave theone cowpresente 

Sites 

RPastNe

RPastNe

RPast03

RP1 

RP2 

RP3 

RP4 

RP5 

RP6 

 

5.12 BIn additthe BiodBlock A 

MUSWELL

nnual Environ

ARRYING C

g capacity anrehabilitatioropriate futu

g capacity fomple of  a  4at the remne capacity tow per 6ha.   Ted in 2015. 

Table 53: 

Pastu

ew1 Nativfertiladde

ew2 Nativfertiladde

 Nativfertiladde

Nativ(domspeci

Nativ(domspeci

Nativfertiladde

Nativfertiladde

Nativ(dominclud

Nativfertiladde

BIODIVERSIion to the 1diversity Off(Figure 63).

LBROOK COAL

nmental Man

CAPACITY 

nd pasture con sites.  Theure stocking 

r each of the450kg  dry  stoant pasture o stock 1 cowThe 2016  re

Estimated C

ure Type 

ve unimproveity (no seed d) 

ve unimproveity (no seed d) 

ve unimproveity (no seed d) 

ve unimproveminated by unes) 

ve unimproveminated by unes) 

ve unimproveity (no seed d) 

ve unimproveity (no seed d) 

ve unimproveminated by unding Galenia

ve unimproveity (no seed d) 

ITY OFFSET8 permanenfset  site own Plots were 

L COMPANY L

nagement Re

AND PAST

ondition moe data gatherates (carryi

e remnant aock  (non‐lacsites have thw per 2ha, Results  for est

Carrying Capa

ed – moderaor fertiliser 

ed – moderaor fertiliser 

ed – moderaor fertiliser 

ed – low fertndesirable 

ed – low fertndesirable 

ed – moderaor fertiliser 

ed – moderaor fertiliser 

ed – low fertndesirable spa pubescens)

ed – moderaor fertiliser 

T AREA nt sites survened by MCCundertaken 

IMITED

eport

TURE COND

onitoring weered is used tng capacity) 

nd rehabilitactating, non‐he ability to P1 and RP2timated carr

acity for Rem

R(DS

ate 1.

ate 1.

ate 1.

tility 1.

tility 1.

ate 1.

ate 1.

tility pecies  1.

ate 1.

eyed,  five neC.  This offsetusing the sa

DITION 

re conducteto inform paof the rehab

ation pasture‐pregnant  costock one cocould only srying capacit

mnant and R

Range SE/ha) 

E

(

.5‐4.0 

.5‐4.0 

.5‐4.0 

.0‐2.5 

.0‐2.5 

.5‐4.0 

.5‐4.0 

.0‐2.5 

.5‐4.0 

ew permanet  site  is  locaame method

d at pastureasture conditbilitation are

e sites has bow).    The  reow per 1.5hatock one cowty have not 

Regrowth Pa

stimated Value DSE/ha) 

1.5 

1.5 

ent sites werated north‐eds as those u

e reference stion and to ieas. 

been calculatesults  from  Ta.  Sites RP3w per 4ha analtered  from

sture Sites 

Estimated ccapacity (4

dry sto

1 cow per 

1 cow per 

1 cow per 

1 cow pe

1 cow pe

1 cow pe

1 cow pe

1 cow pe

1 cow pe

re establisheeast of  rehaused across 

119 

sites and nfluence 

ted using Table  53 and RP4 nd RP5 is m  results 

carrying 450kg ck) 

1.5ha 

1.5ha 

1.5ha 

r 4ha 

r 4ha 

r 2ha 

r 2ha 

r 6ha 

r 2ha 

ed within bilitation remnant 

2016 An

and  rehacross th The  biodvegetatiin  the  rinformat 

T

Site Categor

BiodiverOffset 

BiodiverOffset 

BiodiverOffset 

BiodiverOffset 

BiodiverOffset 

  

MUSWELL

nnual Environ

abilitation  she site. 

diversity offion communremnant  andtion present

Table 54: Bio

y MonSite 

rsity  O‐1 

rsity  O‐2 

rsity  O‐3 

rsity  O‐4 

rsity  O‐5 

LBROOK COAL

nmental Man

ites and we

fset  site  comnities. Permad  rehabilitatted in Figure 

odiversity Of

nitoring ID 

Pla

PCNaNafoup

PCGrraigoVaBio

PCNaOaopan

PCNa‐ MfoovHuSoBa

PCRoBlaleaGufersoBioreg

L COMPANY L

nagement Re

ere  located  i

mprised  of  cnent plots wtion monito64 and Tabl

ffset Site PCT

ant Commun

CT ‐ 1605 arrow‐leavedative Olive shrest of the cepper Hunter

CT ‐ 616 rey Myrtle ‐ Rinforest in saorges of the ualley, mainly oregion 

CT ‐ 1603 arrow‐leavedak ‐ Grey Boxpen forest of nd lower Hun

CT – 617 arrow‐leavedMock Olive shrest mainly over sandstoneunter Valley, outh Bioregioasin Bioregio

CT – 481 ough‐barked akely's Red Gaved Stringybum sandstonrn open foreuthern Brigaoregion and gion 

IMITED

eport

n  vegetation

leared pastuwere establisring.  Five  vele 54. 

T Classificat

nity Type (PC

d Ironbark ‐ hrubby openentral and 

Rusty Fig dryandstone upper HunteSydney Basi

d Ironbark ‐ Bx shrub ‐ grasthe central 

nter 

d Ironbark ‐ bhrubby openon basalt sloe in the uppe Brigalow Beon and Sydnen 

Apple ‐ Gum ‐ Narrowbark +/‐ Grene riparian grest on in the alow Belt SouUpper Hunt

n  communit

ure  land,  regshed using thegetation  co

ion, EEC Equ

CT)  EEC Eq

Centra– Ironbthe NeNorth Basin B

er n 

‐ 

Bull ss 

Centra– Ironbthe NeNorth Basin B

box n pes er elt ey 

‐ 

w‐y rass 

uth er 

‐ 

ies  represen

generating phe same metommunities 

uivalencies a

quivalent 

al Hunter Grebark Woodlaew South WaCoast and SyBioregion 

al Hunter Grebark Woodlaew South WaCoast and SyBioregion 

ntative of  ve

pasture  sitesthodology awere  samp

and Conditio

Co

ey Box and in ales ydney 

M

Go

ey Box and in ales ydney 

M

Mgo

M

120 

egetation 

s  and  six s utilised pled  with 

ondition 

oderate 

ood 

oderate 

oderate‐ood 

oderate 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 63: Bioddiversity Offset MMonitoring Sites  

12

 

21 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 664: Vegetation Coommunities Within Biodiversity Offfset Site 

12

 

22 

2016 An

The  biodconditiodry  rainEndangeWales N– Bulloaopen for There  aOverall continuethe  souboundar The ecosite  couincluded The majnaturallypreviousboundarprevent  

5.13 FAn unplaof Blockresilienclocationthe  areaestablishtime shoburn occ At moniAcacia psuch as (Flatweespecies s At moniAcacia ssuch as T. campA few na No  actiowhetherShould treplace 

MUSWELL

nnual Environ

diversity  offons. Of particforest  in guered  EcologiNorth Coast aak –Grey Boxrest. 

re  areas  of there  is  vere  to regenerthern  and  wry (Figure 64

logists undeld be underd in the next 

jority  of  they. The bouns  land  owneries. MCC wgrazing and 

IRE AFFECTanned fire ok C. Two moce of  rehabils photos wea  was  recorhed.  In  subsowing the recurring so no

itoring  pointparadoxa  (KaSenecio maed), Sida rhosuch as Wah

itoring  pointsaligna (GoldS. madagascestre, Setariative species

on  needs  tor the fire hasthe Acacia pthose lost in

LBROOK COAL

nmental Man

fset  site  is  qcular note  islly’s of  the  scal Communand Sydney Bx  shrub  ‐ gra

cleared  landry  little weerate naturallwestern  bou4). 

rtaking this rtaken on a revision of t

e  site  is  in  gndary of  thisership  bounill review thallow regen

TED REHABccurred on tnitoring poinlitation  to  imere taken frorded,  includsequent yearecovery of spo data is avai

t  1,  no  canoangaroo  thoadagascarienombifolia  (Pahlenbergia co

t  2,  no  canoden wreath wcariensis, Chia sp., Trifolius such as W. 

o  be  undertas had a signifparadoxa notn the fire. 

L COMPANY L

nagement Re

quite  diverses the presencsite and prenity Central Basin Bioregiass open  for

d with  somed  species  py with  the eundary,  how

monitoring hthree  yearlythe MOP.  

good  conditi  site  is not dary  fences e fencing reeration of pa

BILITATIONhe 14 Decemnts have beempacts of  firm north, easing  noting  srs  these mopecies. It is nilable for the

opy  species orn), Groundnsis  (Fireweeaddy's Lucerommunis (Tu

opy  species wattle. Grouloris gayanaum arvense communis w

aken  at  this ficant impact recover an

IMITED

eport

e  and  contace of pocketesence of  twHunter Greyions. These trest and Nar

e  showing  vresent  on  thexclusion of wever  this  d

have suggesty  cycle  to  ca

ion  and  thocurrently depresent,  pa

equirements addock sites

N SITE mber 2015 wen set up tore. These post, south andspecies  regenitoring poinnoted that ne location pre

are  presentd  layer  specied), Chloris grne) and Trifufted bluebe

are  presentnd layer spea, H. radicata(Hare’s foot were also pre

location. Mct. Initial obsnd put on ne

ins  a  varietyts of good cowo community Box‐Ironbawo communrrow‐leaved 

very  good  rehe  site  and grazing animoes  not  see

ted that monapture any  c

se  cleared  aelineated byarticularly  ato the sout

s to occur. 

within the wemonitor the

oints were  red west direcenerating  annts can be  rno photos of e‐burn. 

t  in  the  locaes  consistedgayana  (Chlofolium campll) were also 

t  in  the  locaecies consistea, Sonchus sclover) and 

esent. 

Monitoring  inervations indew growth,  it

y  of  vegetatondition Greties which aark Woodlannities are NarIronbark – N

egeneration it  is  likely  tmals. Some  fem  to match

nitoring of thchanges ove

areas  are  stafencing andlong  the  soh and west o

estern and soe area  in ordecorded usintions (Figurend  any  weerevisited witthe site we

ality.  Shrub d of a majororis grass), Hestre  (Hop Cpresent.  

ality.  Shrub ed of a majop., V. bonariCirsium. vul

n  subsequendicate the sitt  is suggeste

tion  types  iney‐Myrtle – Rare equivalennd  in  the Nerrow‐leaved Native Olive

of  eucalyptsthat  these  afencing occuh  that  of  th

he biodiverser  time.   Thi

arting  to  regd  there  seemuthern  and of the offset

outh‐westerder to documng GPS and e 6). The coned  species  bh photos  tare taken prio

species  conrity of exoticHypochaeris Clover). A  fe

species  conority of exotiiensis, S. rholgare (Scotch

nt  years will te is recovered plantings 

123 

n  varying Rusty Fig nt  to  the ew  South Ironbark   shrubby 

s/shrubs. reas will urs along he  offset 

ity offset s will be 

generate ms  to be western t area to 

n section ment the at  these 

ndition of becoming ken over or to the 

sisted  of c  species radicata w native 

sisted  of c species mbifolia, h thistle). 

indicate ring well. occur to 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 65: FFire Affected Monnitoring Sites 

12

 

24 

2016 An

 

5.14 RMCC are 

5.15 FAs  part improveall sloperemain, and/or b 

MUSWELL

nnual Environ

REHABILITAe not current

URTHER Dof  the mod

ements madees, including in Open Cuberms, as we

LBROOK COAL

nmental Man

ATION TRIAtly undertaki

DEVELOPMdification  toe to the finafinal void ba

ut 2, which well as capping

L COMPANY L

nagement Re

ALS AND Ring any trials

ENT OF TH  the  develoal  landform. atters, wouldwill be approg of exposed 

IMITED

eport

RESEARCHs within the r

HE FINAL Ropment  consThe revisedd be equal topriately  tred coal seams.

rehabilitatio

EHABILITAsent  the  fin final  landfoo or less thaeated with  t. 

n areas. 

ATION PLANal  landform orm has beenan 14 degreehe  installatio

N   was  reviewn modified ses. One high on of a  safe

125 

wed  with such that wall will 

ety  fence 

2016 An

6.0   ADuring t

Enviwith

The Plan

Mai  

MUSWELL

nnual Environ

ACTIVITIESthe next repo

ironmental Mh the change

revised comn will be impl

ntenance ac

LBROOK COAL

nmental Man

S PROPOSorting period

Managemenes to the deve

mmitments  inlemented. 

tivities on th

L COMPANY L

nagement Re

SED IN THd, the followi

t Plans and elopment co

n the Enviro

he rehabilitat

IMITED

eport

E NEXT Aing activities

the Mining onsent grante

onmental Ma

tion areas w

EMR PERIs are planned

Operations ed in Octobe

anagement P

ill continue.

IOD d: 

Plan will beer 2016. 

Plans and th

e updated  to

e Mining Op

126 

o comply 

perations 

2016 An

MUSWELL

nnual Environ

App

LBROOK COAL

nmental Man

pendix 1

L COMPANY L

nagement Re

1: Air Q

IMITED

eport

Quality MMonitorring Ressults 

127 

2

MUSWE

2016 Annual Envir

1

Ba

c = Caver

NR =

ELLBROOK COAL CO

ronmental Manag

DATE 

Jan‐16 

Feb‐16 

Mar‐16 

Apr‐16 

May‐16 

Jun‐16 

Jul‐16 

Aug‐16 

Sep‐16 

Oct‐16 

Nov‐16 

Dec‐16 

2‐month Rolling

ackground Avera2009) 

Contaminated resurages. 

= No result. Include

OMPANY LIMITED

gement Report

g Average 

age (2005‐

lt due to the presen

es broken or missing

DEPOSI

DM7  DM17

0.9  3.8

1.4  3.7

1.5  3.5

0.6  2.6

0.6  3.0

0.4  1.0

0.5  1.6

0.8  0.7

0.5  0.9

1.2  1.4

0.8  2.1

2.1  3.7

0.9  2.3

1.1  1.7

nce of bird droppin

g bottles. 

TIONAL DUST R

7  DM18 

1.7 

2.1 

2.9 

1.7 

0.8 

2.3 

5.3 

0.8 

0.7 

1.1 

1.7 

3.4 

2.0 

1.1 

gs, insects, or vege

     

RESULTS 

*DM19  DM2

3.8  1.2

0.9  1.3

1.7  1.4

c3.5  1.6

0.8  1.6

1.3  1.0

c4.6  1.5

c5.7  1.4

2.7  1.4

c5.4  1.6

1.9  1.6

c8.3  2.4

1.9  1.5

2.5  1.9

tation in sample. C

  

22  *DM24 

2  4.2 

3  3.1 

4  3.9 

6  0.9 

6  1.2 

0  0.7 

5  0.7 

4  0.9 

4  0.8 

6  2.5 

6  2.2 

4  4.0 

5  2.1 

9  1.8 

ontaminated result

  

DM26  *DM

NR  1.

1.4  2.

1.7  1.

2.6  1.

3.9  0.

1.7  0.

1.4  0.

1.9  0.

1.4  0.

c2.9  1.

2.4  3.

2.8  c3

2.1  1.

1.8  1.

ts excluded from 

     

12

M29 

.8 

.0 

.7 

.0 

.7 

.6 

.6 

.6 

.6 

.6 

.2 

3.6 

.3 

.5 

28 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

 

12

 

29 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report 13

 

30 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report 13

 

31 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

 

13

 

32 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

 

13

 

33 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report 13

 

34 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

 

13

 

35 

2

MUSWE

2016 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report 13

 

36 

2016 An

MUSWELL

nnual Environ

D

06‐J

12‐J

18‐J

24‐J

30‐J

05‐F

11‐F

17‐F

23‐F

29‐F

06‐M

12‐M

18‐M

24‐M

30‐M

05‐A

11‐A

17‐A

23‐A

29‐A

05‐M

11‐M

17‐M

23‐M

29‐M

04‐J

10‐J

16‐J

22‐J

28‐J

04‐J

10‐J

16‐J

22‐J

28‐J

03‐A

09‐A

15‐A

21‐A

27‐A

02‐S

08‐S

14‐S

20‐S

26‐S

02‐O

08‐O

14‐O

20‐O

26‐O

01‐N

07‐N

LBROOK COAL

nmental Man

ate N

an‐16 

an‐16 

an‐16 

an‐16 

an‐16 

Feb‐16 

Feb‐16 

Feb‐16 

Feb‐16 

Feb‐16 

Mar‐16 

Mar‐16 

Mar‐16 

Mar‐16 

Mar‐16 

Apr‐16 

Apr‐16 

Apr‐16 

Apr‐16 

Apr‐16 

May‐16 

May‐16 

May‐16 

May‐16 

May‐16 

un‐16 

un‐16 

un‐16 

un‐16 

un‐16 

Jul‐16

Jul‐16

Jul‐16

Jul‐16

Jul‐16

Aug‐16 

Aug‐16 

Aug‐16 

Aug‐16 

Aug‐16 

Sep‐16 

Sep‐16 

Sep‐16 

Sep‐16 

Sep‐16 

Oct‐16 

Oct‐16 

Oct‐16 

Oct‐16 

Oct‐16 

Nov‐16 

Nov‐16 

L COMPANY L

nagement Re

HVAS MONisbet PM10

12 

19 

17 

18 

20 

30 

25 

47 

47 

29 

29 

45 

18 

52 

14 

29 

36 

39 

31 

30 

12 

15 

36 

15 

12 

16 

15 

11 

33 

16 

24 

18 

17 

24 

18 

29 

18 

IMITED

eport

ONITORINGSite 1 TSP

11

61

29

30

36

52

36

62

62

30

48

57

27

57

35

37

49

48

44

31

17

11

16

37

7

10

7

16

4

1

26

12

19

5

4

19

9

35

8

14

6

34

9

13

16

12

33

32

40

23

56

33

 RESULTS P Site 2 T

14

58

31

28

38

54

45

58

58

29

40

59

35

52

32

34

39

45

39

38

16

18

17

37

7

8

4

15

5

1

33

11

17

7

4

17

10

33

7

19

9

31

8

29

15

12

47

45

58

42

51

40

TSP Site 

1

7

7

3

3

5

5

1

1

5

4

7

4

8

3

3

4

5

4

1

1

1

1

3

1

1

3

1

2

1

1

5

1

1

3

1

2

1

1

4

4

4

2

4

3

3 TSP 

18 

73 

75 

35 

36 

59 

51 

119 

118 

55 

44 

72 

46 

82 

33 

37 

44 

51 

41 

119 

16 

11 

17 

32 

12 

14 

38 

14 

22 

17 

10 

51 

13 

17 

38 

10 

25 

13 

11 

42 

41 

47 

25 

48 

33 

137 

2016 An

MUSWELL

nnual Environ

D

13‐N

19‐N

25‐N

01‐D

07‐D

13‐D

19‐D

25‐D

31‐D

LBROOK COAL

nmental Man

ate N

Nov‐16 

Nov‐16 

Nov‐16 

Dec‐16 

Dec‐16 

Dec‐16 

Dec‐16 

Dec‐16 

Dec‐16 

L COMPANY L

nagement Re

Nisbet PM10

18 

48 

20 

18 

19 

26 

10 

34 

IMITED

eport

Site 1 TSP

35

43

46

34

14

26

36

14

48

 

P Site 2 T

42

52

52

35

17

32

36

14

55

TSP Site 

3

4

4

3

2

3

3

1

5

3 TSP 

33 

47 

46 

39 

26 

31 

39 

14 

51 

138 

2

R

 

MUSWE

2016 Annual Envir

REAL‐TIME PM1

SAMPLE 

DATESITE 1

01‐Jan‐16 13.0

02‐Jan‐16 16.7

03‐Jan‐16 14.2

04‐Jan‐16 7.9

05‐Jan‐16 3.7

06‐Jan‐16 3.9

07‐Jan‐16 10.3

08‐Jan‐16 15.3

09‐Jan‐16 21.9

10‐Jan‐16 16.0

11‐Jan‐16 15.3

12‐Jan‐16 21.0

13‐Jan‐16 29.1

14‐Jan‐16 24.5

15‐Jan‐16 2.8

16‐Jan‐16 9.5

17‐Jan‐16 7.5

18‐Jan‐16 6.6

19‐Jan‐16 9.6

20‐Jan‐16 11.8

21‐Jan‐16 14.8

22‐Jan‐16 10.8

23‐Jan‐16 7.1

24‐Jan‐16 17.1

25‐Jan‐16 25.4

26‐Jan‐16 13.4

27‐Jan‐16 13.1

28‐Jan‐16 8.9

29‐Jan‐16 10.0

30‐Jan‐16 13.8

31‐Jan‐16 28.6

Janua

ELLBROOK COAL CO

ronmental Manag

10 MONITORING

 

SITE 2 SITE 3

13.7 10.4

18.6 21.0

15.6 12.3

8.7 6.2

3.9 2.3

3.8 2.5

12.5 14.4

17.2 14.0

25.2 19.8

23.9 28.0

26.0 29.4

30.3 32.8

39.3 34.4

34.4 14.5

1.7 11.0

13.7 7.7

9.3 5.5

12.2 8.6

10.0 11.5

12.4 13.6

16.8 13.8

13.1 10.0

8.7 12.6

18.9 21.8

26.8 18.3

14.3 13.2

14.3 10.6

10.4 8.6

12.2 8.2

14.1 11.7

30.5 25.2

ary 2016

OMPANY LIMITED

gement Report

G RESULTS 

3SAMPLE 

DATES

01‐Feb‐16

02‐Feb‐16

03‐Feb‐16

04‐Feb‐16

05‐Feb‐16

06‐Feb‐16

07‐Feb‐16

08‐Feb‐16

09‐Feb‐16

10‐Feb‐16

11‐Feb‐16

12‐Feb‐16

13‐Feb‐16

14‐Feb‐16

15‐Feb‐16

16‐Feb‐16

17‐Feb‐16

18‐Feb‐16

19‐Feb‐16

20‐Feb‐16

21‐Feb‐16

22‐Feb‐16

23‐Feb‐16

24‐Feb‐16

25‐Feb‐16

26‐Feb‐16

27‐Feb‐16

28‐Feb‐16

29‐Feb‐16

F

ITE 1 SITE 2

14.4 13.4

18.4 17.8

21.2 23.0

13.3 15.7

17.7 21.1

11.5 13.0

17.0 18.1

14.2 14.8

14.9 16.6

15.1 15.6

14.7 17.3

13.0 14.3

16.2 18.0

17.0 17.0

24.2 28.4

23.5 23.4

25.4 27.7

26.7 31.2

25.1 27.9

27.7 29.3

15.9 16.1

14.7 15.1

20.5 19.8

19.5 23.2

21.5 28.3

33.6 35.5

20.8 21.5

16.1 16.2

13.0 12.8

February 2016

SITE 3SAMPLE

DATE

11.1 01‐Mar‐1

14.8 02‐Mar‐1

19.2 03‐Mar‐1

12.5 04‐Mar‐1

17.5 05‐Mar‐1

11.5 06‐Mar‐1

16.5 07‐Mar‐1

23.1 08‐Mar‐1

15.7 09‐Mar‐1

12.8 10‐Mar‐1

26.3 11‐Mar‐1

12.8 12‐Mar‐1

18.4 13‐Mar‐1

14.4 14‐Mar‐1

23.3 15‐Mar‐1

20.5 16‐Mar‐1

25.0 17‐Mar‐1

22.7 18‐Mar‐1

23.2 19‐Mar‐1

27.0 20‐Mar‐1

16.3 21‐Mar‐1

16.5 22‐Mar‐1

24.5 23‐Mar‐1

22.2 24‐Mar‐1

18.2 25‐Mar‐1

32.5 26‐Mar‐1

20.6 27‐Mar‐1

17.0 28‐Mar‐1

17.3 29‐Mar‐1

30‐Mar‐1

31‐Mar‐1

E SITE 1 SITE

16 11.8 16.

16 18.8 26.

16 16.8 23.8

16 13.0 17.8

16 14.1 18.0

16 14.9 19.

16 14.8 20.0

16 16.4 23.

16 11.1 17.8

16 20.6 26.9

16 19.5 24.

16 19.1 27.

16 18.4 24.8

16 17.8 26.

16 14.3 18.

16 10.7 12.

16 11.4 12.

16 14.5 16.

16 12.3 13.

16 13.7 15.8

16 9.3 9.5

16 11.4 12.

16 19.2 22.9

16 24.8 27.4

16 20.3 24.9

16 22.4 26.

16 22.9 29.

16 23.7 30.

16 22.9 32.

16 12.0 11.

16 20.6 24.

March 2016

E 2 SITE 3S

6 15.4 0

1 20.9 0

8 22.2 03

8 14.1 04

0 13.8 05

2 14.3 06

0 18.1 07

5 19.6 08

8 7.0 09

9 no data 10

7 no data 1

1 no data 1

8 no data 13

3 no data 14

3 no data 15

3 no data 16

5 no data 17

6 no data 18

2 no data 19

8 no data 20

5 no data 2

7 no data 2

9 no data 23

4 no data 24

9 no data 25

1 no data 26

1 no data 27

7 no data 28

1 no data 29

1 no data 30

1 no data

6SAMPLE 

DATESITE 1

1‐Apr‐16 15.3

2‐Apr‐16 26.0

3‐Apr‐16 33.7

4‐Apr‐16 25.2

5‐Apr‐16 18.4

6‐Apr‐16 19.4

7‐Apr‐16 28.4

8‐Apr‐16 20.4

9‐Apr‐16 21.3

0‐Apr‐16 21.7

1‐Apr‐16 23.9

2‐Apr‐16 27.4

3‐Apr‐16 16.2

4‐Apr‐16 12.4

5‐Apr‐16 13.0

6‐Apr‐16 19.2

7‐Apr‐16 26.5

8‐Apr‐16 16.2

9‐Apr‐16 14.5

0‐Apr‐16 18.0

1‐Apr‐16 21.9

2‐Apr‐16 24.3

3‐Apr‐16 15.0

4‐Apr‐16 17.2

5‐Apr‐16 19.0

6‐Apr‐16 11.3

7‐Apr‐16 10.7

8‐Apr‐16 12.1

9‐Apr‐16 16.1

0‐Apr‐16 17.4

April 

13

SITE 2 SITE 3

16.7 no data

23.9 no data

36.4 no data

27.7 no data

19.2 no data

19.7 no data

30.3 28.2

21.1 20.7

24.0 23.1

23.0 24.2

25.9 21.6

28.9 24.4

16.3 15.0

12.8 10.7

12.3 16.7

19.8 15.4

25.3 21.1

17.3 17.2

15.7 16.7

18.8 17.1

25.4 33.1

22.9 25.4

14.3 14.5

19.0 17.0

19.0 18.4

11.6 15.4

14.8 10.6

14.0 10.6

20.3 11.7

16.9 25.2

2016

39 

 

2

 

MUSWE

2016 Annual Envir

SAMPLE 

DATESITE 1

01‐May‐16 5.2

02‐May‐16 7.2

03‐May‐16 6.0

04‐May‐16 9.7

05‐May‐16 12.1

06‐May‐16 14.3

07‐May‐16 25.2

08‐May‐16 24.3

09‐May‐16 20.7

10‐May‐16 8.7

11‐May‐16 9.8

12‐May‐16 10.6

13‐May‐16 7.4

14‐May‐16 12.0

15‐May‐16 14.4

16‐May‐16 17.2

17‐May‐16 13.9

18‐May‐16 13.6

19‐May‐16 16.5

20‐May‐16 17.1

21‐May‐16 no data

22‐May‐16 no data

23‐May‐16 no data

24‐May‐16 no data

25‐May‐16 no data

26‐May‐16 13.8

27‐May‐16 9.9

28‐May‐16 6.4

29‐May‐16 5.0

30‐May‐16 11.6

31‐May‐16 17.4

May

ELLBROOK COAL CO

ronmental Manag

SITE 2 SITE 3

6.0 14.7

7.3 2.8

6.7 5.3

9.7 4.7

12.1 7.5

18.3 10.3

24.6 13.4

24.4 20.1

20.7 18.0

10.4 7.4

11.7 7.1

11.6 8.1

7.6 5.4

12.1 8.9

14.6 10.9

18.3 14.1

15.0 11.7

13.7 9.2

20.2 12.6

18.3 12.0

29.7 no dat

26.7 no dat

19.5 16.2

13.5 9.3

13.9 11.0

13.5 9.0

7.2 5.0

5.9 4.4

5.4 4.0

13.5 10.6

17.8 16.0

y 2016

OMPANY LIMITED

gement Report

3SAMPLE 

DATES

01‐Jun‐16

02‐Jun‐16

03‐Jun‐16

04‐Jun‐16

05‐Jun‐16

06‐Jun‐16

07‐Jun‐16

08‐Jun‐16

09‐Jun‐16

10‐Jun‐16

11‐Jun‐16

12‐Jun‐16

13‐Jun‐16

14‐Jun‐16

15‐Jun‐16

16‐Jun‐16

17‐Jun‐16

18‐Jun‐16

19‐Jun‐16

20‐Jun‐16

ta 21‐Jun‐16

ta 22‐Jun‐16

23‐Jun‐16

24‐Jun‐16

25‐Jun‐16

26‐Jun‐16

27‐Jun‐16

28‐Jun‐16

29‐Jun‐16

30‐Jun‐16

ITE 1 SITE 2

14.1 15.2

15.3 16.7

16.6 16.0

6.9 7.2

2.5 2.4

7.4 6.9

6.6 7.2

5.7 6.8

7.0 8.2

5.7 5.5

6.2 5.5

13.9 14.2

17.7 17.3

9.4 7.9

11.5 11.6

10.3 10.1

12.6 12.1

10.2 9.5

7.6 9.0

3.8 3.4

5.0 5.0

5.3 5.4

6.0 7.0

5.1 3.9

5.8 5.4

11.6 10.0

6.4 6.6

6.1 6.3

7.9 7.2

6.9 7.8

June 2016

SITE 3SAMPLE

DATE

13.6 01‐Jul‐16

13.6 02‐Jul‐16

13.5 03‐Jul‐16

7.0 04‐Jul‐16

2.2 05‐Jul‐16

4.5 06‐Jul‐16

5.2 07‐Jul‐16

4.0 08‐Jul‐16

4.5 09‐Jul‐16

3.6 10‐Jul‐16

4.3 11‐Jul‐16

14.6 12‐Jul‐16

17.2 13‐Jul‐16

6.3 14‐Jul‐16

6.3 15‐Jul‐16

9.3 16‐Jul‐16

7.5 17‐Jul‐16

9.1 18‐Jul‐16

10.0 19‐Jul‐16

8.7 20‐Jul‐16

2.3 21‐Jul‐16

3.6 22‐Jul‐16

3.5 23‐Jul‐16

3.9 24‐Jul‐16

3.3 25‐Jul‐16

4.5 26‐Jul‐16

6.6 27‐Jul‐16

4.9 28‐Jul‐16

4.5 29‐Jul‐16

4.8 30‐Jul‐16

31‐Jul‐16

E SITE 1 SITE

6 6.5 7.1

6 5.3 5.7

6 7.4 7.3

6 14.5 15.9

6 10.6 10.

6 3.9 4.3

6 10.4 9.9

6 6.7 7.0

6 9.9 10.8

6 9.7 9.6

6 10.2 10.

6 8.1 6.9

6 9.1 9.2

6 8.3 8.0

6 13.1 14.0

6 14.2 16.0

6 13.4 11.

6 6.9 7.4

6 14.6 17.

6 12.3 9.3

6 8.4 15.

6 3.9 9.4

6 8.6 8.3

6 7.0 8.1

6 6.8 8.1

6 7.2 8.1

6 7.6 8.7

6 5.8 5.6

6 5.0 6.3

6 9.8 12.4

6 10.0 11.

July 2016

E 2 SITE 3S

1 4.9 01

7 4.7 02

3 3.0 03

9 5.4 04

5 14.8 05

3 9.3 06

9 2.3 07

0 6.8 08

8 6.2 09

6 14.3 10

5 9.5 11

9 6.9 12

2 6.3 13

0 7.3 14

0 5.8 15

0 10.8 16

2 11.7 17

4 11.4 18

5 5.0 19

3 12.2 20

7 1.0 21

4 3.0 22

3 8.0 23

1 5.6 24

1 5.1 25

1 6.7 26

7 6.8 27

6 4.4 28

3 4.6 29

4 7.3 30

7 7.7 31

SAMPLE 

DATESITE 1

1‐Aug‐16 12.6

2‐Aug‐16 13.8

3‐Aug‐16 9.2

4‐Aug‐16 9.8

5‐Aug‐16 11.8

6‐Aug‐16 9.6

7‐Aug‐16 11.2

8‐Aug‐16 12.5

9‐Aug‐16 8.7

0‐Aug‐16 13.1

1‐Aug‐16 8.1

2‐Aug‐16 6.6

3‐Aug‐16 9.4

4‐Aug‐16 12.9

5‐Aug‐16 19.6

6‐Aug‐16 16.7

7‐Aug‐16 11.9

8‐Aug‐16 12.7

9‐Aug‐16 13.8

0‐Aug‐16 6.4

1‐Aug‐16 6.8

2‐Aug‐16 14.6

3‐Aug‐16 9.1

4‐Aug‐16 9.1

5‐Aug‐16 4.6

6‐Aug‐16 8.0

7‐Aug‐16 9.9

8‐Aug‐16 6.6

9‐Aug‐16 15.1

0‐Aug‐16 22.8

1‐Aug‐16 16.5

August

14

SITE 2 SITE 3

13.2 9.8

14.5 14.2

9.4 7.5

9.9 8.4

11.5 8.8

9.0 7.8

12.0 11.1

10.6 7.3

9.5 6.6

13.7 10.1

8.2 6.9

7.0 5.3

8.9 6.1

12.8 12.0

18.0 18.5

14.2 10.9

12.2 9.5

12.7 10.4

14.2 10.3

7.5 6.2

7.2 5.3

14.9 12.4

8.8 9.0

9.0 6.8

5.1 4.3

7.8 6.9

10.4 8.0

7.5 5.3

15.0 15.0

23.8 19.1

16.2 12.8

t 2016

40 

2

MUSWE

2016 Annual Envir

SAMPLE 

DATESITE 1

01‐Sep‐16 8.1

02‐Sep‐16 9.5

03‐Sep‐16 6.8

04‐Sep‐16 5.5

05‐Sep‐16 9.7

06‐Sep‐16 no data

07‐Sep‐16 no data

08‐Sep‐16 19.6

09‐Sep‐16 14.5

10‐Sep‐16 5.3

11‐Sep‐16 6.3

12‐Sep‐16 13.2

13‐Sep‐16 21.1

14‐Sep‐16 7.4

15‐Sep‐16 4.2

16‐Sep‐16 5.9

17‐Sep‐16 8.2

18‐Sep‐16 no data

19‐Sep‐16 no data

20‐Sep‐16 no data

21‐Sep‐16 no data

22‐Sep‐16 9.6

23‐Sep‐16 8.4

24‐Sep‐16 11.1

25‐Sep‐16 no data

26‐Sep‐16 10.3

27‐Sep‐16 11.2

28‐Sep‐16 11.2

29‐Sep‐16 18.3

30‐Sep‐16 12.3

Septem

ELLBROOK COAL CO

ronmental Manag

SITE 2 SITE 3

6.6 3.9

11.2 12.5

7.6 6.7

5.9 4.6

9.0 7.2

9.3 6.4

16.8 14.7

16.1 16.0

14.4 11.1

5.9 6.7

6.4 5.6

12.4 10.8

19.1 17.6

8.0 5.6

5.4 4.0

6.2 3.4

7.9 5.2

13.6 12.4

5.7 4.1

11.5 no dat

9.6 8.0

7.9 4.7

10.1 5.1

7.6 9.1

6.2 4.5

6.8 5.4

12.8 8.1

11.0 8.6

17.5 13.4

12.7 10.6

mber 2016

OMPANY LIMITED

gement Report

3SAMPLE 

DATES

01‐Oct‐16

02‐Oct‐16

03‐Oct‐16

04‐Oct‐16

05‐Oct‐16

06‐Oct‐16

07‐Oct‐16

08‐Oct‐16

09‐Oct‐16

10‐Oct‐16

11‐Oct‐16

12‐Oct‐16

13‐Oct‐16

14‐Oct‐16

15‐Oct‐16

16‐Oct‐16

17‐Oct‐16

18‐Oct‐16

19‐Oct‐16

ta 20‐Oct‐16

21‐Oct‐16

22‐Oct‐16

23‐Oct‐16

24‐Oct‐16

25‐Oct‐16

26‐Oct‐16

27‐Oct‐16

28‐Oct‐16

29‐Oct‐16

30‐Oct‐16

31‐Oct‐16

O

ITE 1 SITE 2

8.3 10.2

8.0 8.8

9.3 9.8

8.7 11.0

9.6 11.2

13.5 14.9

13.5 14.7

18.1 19.6

18.0 19.8

23.9 25.4

6.7 7.0

7.9 8.8

15.9 15.5

13.4 13.9

11.6 11.6

15.3 18.2

13.0 15.5

6.5 9.2

12.9 15.1

21.0 21.7

19.0 20.0

4.4 5.5

12.6 13.5

11.2 10.6

13.1 13.0

11.0 14.4

17.8 19.0

16.3 16.6

19.0 21.7

15.7 16.6

12.9 14.2

October 2016

SITE 3SAMPLE

DATE

10.4 01‐Nov‐1

6.2 02‐Nov‐1

5.0 03‐Nov‐1

5.0 04‐Nov‐1

6.8 05‐Nov‐1

7.4 06‐Nov‐1

8.8 07‐Nov‐1

10.1 08‐Nov‐1

13.3 09‐Nov‐1

17.2 10‐Nov‐1

17.3 11‐Nov‐1

7.4 12‐Nov‐1

5.7 13‐Nov‐1

15.8 14‐Nov‐1

12.1 15‐Nov‐1

6.9 16‐Nov‐1

13.7 17‐Nov‐1

9.4 18‐Nov‐1

4.5 19‐Nov‐1

12.5 20‐Nov‐1

15.1 21‐Nov‐1

14.3 22‐Nov‐1

6.0 23‐Nov‐1

10.2 24‐Nov‐1

8.8 25‐Nov‐1

8.3 26‐Nov‐1

7.4 27‐Nov‐1

22.8 28‐Nov‐1

20.9 29‐Nov‐1

16.3 30‐Nov‐1

13.2

E SITE 1 SITE

16 18.8 15.

16 16.3 14.

16 10.7 10.

16 12.2 13.

16 19.7 23.

16 18.7 18.8

16 16.9 16.

16 22.3 23.

16 14.3 16.

16 16.8 19.

16 22.7 23.

16 11.3 13.

16 14.2 16.

16 9.1 10.

16 11.9 14.8

16 15.7 16.

16 14.2 15.0

16 14.4 14.

16 23.8 25.4

16 25.5 28.4

16 24.5 25.

16 34.4 29.9

16 31.8 36.

16 18.8 15.

16 15.9 17.8

16 24.1 25.

16 26.2 32.

16 28.1 26.

16 24.7 28.4

16 16.2 19.4

November 20

E 2 SITE 3S

5 9.7 01

1 15.0 02

3 8.8 03

7 7.8 04

7 13.0 05

8 19.2 06

7 11.8 07

6 12.0 08

5 21.0 09

3 14.2 10

3 19.9 11

2 17.3 12

2 10.0 13

5 10.9 14

8 9.5 15

7 13.8 16

0 14.3 17

6 13.0 18

4 11.2 19

4 27.1 20

6 22.0 21

9 no data 22

3 no data 23

5 no data 24

8 no data 25

1 no data 26

3 no data 27

2 no data 28

4 no data 29

4 no data 30

31

016SAMPLE 

DATESITE 1

1‐Dec‐16 14.4

2‐Dec‐16 23.2

3‐Dec‐16 27.8

4‐Dec‐16 20.7

5‐Dec‐16 25.9

6‐Dec‐16 21.9

7‐Dec‐16 6.2

8‐Dec‐16 14.5

9‐Dec‐16 17.1

0‐Dec‐16 18.1

1‐Dec‐16 23.6

2‐Dec‐16 15.0

3‐Dec‐16 16.3

4‐Dec‐16 31.1

5‐Dec‐16 7.3

6‐Dec‐16 10.6

7‐Dec‐16 11.7

8‐Dec‐16 27.3

9‐Dec‐16 23.5

0‐Dec‐16 19.6

1‐Dec‐16 18.4

2‐Dec‐16 18.6

3‐Dec‐16 22.2

4‐Dec‐16 14.0

5‐Dec‐16 8.6

6‐Dec‐16 10.4

7‐Dec‐16 14.2

8‐Dec‐16 17.4

9‐Dec‐16 13.8

0‐Dec‐16 23.7

1‐Dec‐16 32.1

Decemb

14

SITE 2 SITE 3

15.4 34.0

21.4 20.1

29.4 23.4

23.6 22.6

30.0 27.0

25.5 24.2

7.3 13.8

18.3 13.0

18.2 16.4

21.9 16.2

29.1 24.0

17.5 18.4

17.7 11.7

15.7 14.5

9.0 16.0

11.4 11.7

12.2 15.6

28.8 no data

20.7 24.2

21.1 10.6

19.8 no data

19.2 no data

23.3 no data

17.7 no data

10.2 no data

11.1 no data

13.8 no data

18.4 no data

13.8 8.9

26.8 16.1

31.8 24.3

ber 2016

41 

2016 An

MUSWELL

nnual Environ

A

LBROOK COAL

nmental Man

Appendi

L COMPANY L

nagement Re

ix 2: Wa

IMITED

eport

ater Moonitoringg Resultts 

142 

2016 An

MONTH

DATE

20‐Jan‐1

18‐Feb‐

16‐Mar‐

15‐Apr‐1

13‐May‐

23‐Jun‐1

25‐Jul‐1

19‐Aug‐

22‐Sep‐

20‐Oct‐1

23‐Nov‐

21‐Dec‐

Blank ce MONTH

DATE

20‐Jan‐1

18‐Feb‐

16‐Mar‐

15‐Apr‐1

13‐May‐

23‐Jun‐1

25‐Jul‐1

19‐Aug‐

22‐Sep‐

20‐Oct‐1

23‐Nov‐

21‐Dec‐

Blank ce MONTH

DATE

20‐Jan‐1

18‐Feb‐

16‐Mar‐

15‐Apr‐1

13‐May‐

23‐Jun‐1

MUSWELL

nnual Environ

HLY SURFAC

  Dam 1

16  7.73

16  8.03

16  8.07

16  8.05

‐16  7.72

16  8.03

16  8.08

16  7.62

16  8.02

16  8.09

16  7.67

16  8.17

ells indicate t

HLY SURFAC

  Dam 1

16  6,51

16  6,44

16  6,63

16  6,34

‐16  7,10

16  6,38

16  6,23

16  6,22

16  6,62

16  6,83

16  6,19

16  6,64

ells indicate t

HLY SURFAC

  Dam 1

16  8 

16  9 

16  6 

16  8 

‐16  <5 

16  9 

LBROOK COAL

nmental Man

E WATER M

1/2 

MCCFin

SettPon

3  8.2

3  8.3

7  8.3

5  8.4

2  8.4

3  8.3

8  8.3

2  8.4

2  8.3

9  8.3

7  8.3

7  8.3

that no samp

E WATER M

1/2 

MCCFin

SettPon

10  2,5

40  6,8

30  9,4

40  11,3

00  10,0

80  6,1

30  6,2

20  7,3

20  6,5

30  8,4

90  7,1

40  8,1

that no samp

E WATER M

1/2 

MCCFin

SettPon

13

10

5

<5

<5

17

L COMPANY L

nagement Re

MONITORING

C12 nal ling nd 

NOpe

Vo

20  8

37  8

35  8

45  7

48  7

34  7

35 

45  7

33  8

30  8

33 

30  8

ple was colle

MONITORING

C12 nal ling nd 

NOpe

Vo

80  6,

10  6,

80  6,

300  6,4

000  7,

60  6,

30  6,4

50  6,

30  6,

60  6,

10  6,

60  6,

ple was colle

MONITORING

C12 nal ling nd 

NOpe

Vo

35  1

5  1

5  <

IMITED

eport

G RESULTS ‐

o.2 en Cut oid 

NOp

V

.08 

.21 

.07 

.92 

.98 

.96 

.91 

.12 

.07 

.05 

ected 

G RESULTS –

o.2 en Cut oid 

NOp

V

850 

760 

850 

440 

250 

540 

440 

330 

660 

880 

350 

850 

ected 

G RESULTS –

o.2 en Cut oid 

NOp

V

10 

10 

<5 

‐ pH 

No.1 pen Cut Void 

M

 

 

 

 

 

 

 

 

 

 

 

 

– ELECTRICA

No.1 pen Cut Void 

M

 

 

 

 

 

 

 

 

 

 

 

 

– TOTAL SUS

No.1 pen Cut Void 

MMC

up

 

 

 

 

 

 

MCC07 

7.95 

8.22 

8.03 

8.07 

7.95 

7.9 

7.83 

7.84 

7.96 

7.93 

7.86 

7.86 

AL CONDUCT

MCC07 

934 

2,100 

4,030 

4,770 

4,390 

2,380 

987 

1,590 

1,010 

1,840 

2,670 

4,430 

SPENDED SO

MCC07 Muscle Creek ‐ pstream 

d

<5 

<5 

<5 

<5 

MCC08 

7.95 

8.22 

7.98 

8.03 

7.98 

7.19 

7.86 

7.81 

7.99 

7.95 

7.72 

7.89 

TIVITY 

MCC08 

1,120 

2,970 

5,240 

5,410 

5,580 

3,350 

1,530 

2,230 

1,110 

2,560 

3,760 

5,200 

OLIDS 

MCC08 Muscle Creek ‐ 

downstream 

<5 

<5 

10 

<5 

143 

2016 An

DATE

25‐Jul‐1

19‐Aug‐

22‐Sep‐

20‐Oct‐1

23‐Nov‐

21‐Dec‐

Blank ce QUARTE

DATE

16‐Mar‐

23‐Jun‐1

22‐Sep‐

21‐Dec‐

Blank ce QUARTE

DATE

16‐Mar‐

23‐Jun‐1

22‐Sep‐

21‐Dec‐

Blank ce QUARTE

DATE

16‐Mar‐

23‐Jun‐1

22‐Sep‐

21‐Dec‐

Blank ce

MUSWELL

nnual Environ

  Dam 1

16  9 

16  17 

16  10 

16  6 

16  9 

16  <5 

ells indicate t

ERLY SURFA

  MCC

16  8.41

16 

16 

16 

ells indicate t

ERLY SURFA

  MCC

16  12,40

16   

16   

16   

ells indicate t

ERLY SURFA

  MCC

16  608

16   

16   

16   

ells indicate t

LBROOK COAL

nmental Man

1/2 

MCCFin

SettPon

18

35

11

<5

20

<5

that no samp

ACE WATER 

C9  MCC

1 9.1

8.59.18.1

that no samp

ACE WATER 

C9  MCC

00  1,8

2,0

1,6

2,3

that no samp

ACE WATER 

C9  MCC

8  41

8

10

30

that no samp

L COMPANY L

nagement Re

C12 nal ling nd 

NOpe

Vo

5  1

1  1

0  1

5  1

ple was colle

MONITORIN

C23  MC

18

55 15 716

ple was colle

MONITORIN

C23  MC

80 

20 

80  2,

00 

ple was colle

MONITORIN

C23  MC

0  1

ple was colle

IMITED

eport

o.2 en Cut oid 

NOp

V

10 

10 

10 

12 

ected 

NG RESULTS

CC24  M

.84

ected 

NG RESULTS

CC24  M

  3

  2

740  3

4

ected 

NG RESULTS

CC24  M

 

 

11 

ected 

No.1 pen Cut Void 

MMC

up

 

 

 

 

 

 

S – pH 

MCC25  M

7.81

7.88 7.61 7.90

S – ELECTRIC

MCC25  M

3,060 

2,900 

3,330 

4,360 

S – TOTAL S

MCC25  M

10 

<5 

10 

MCC07 Muscle Creek ‐ pstream 

d

16 

<5 

<5 

<5 

MCC26 

8.28

8.21 8.75 8.45

CAL CONDU

MCC26 

6,780 

2,910 

2,230 

6,720 

USPENDED 

MCC26 

MCC08 Muscle Creek ‐ 

downstream 

<5 

<5 

<5 

MCC27 

8.03

8.19 8.28 8.41

CTIVITY 

MCC27 

11,000 

7,200 

6,540 

9,750 

SOLIDS 

MCC27 

<5 

24 

<5 

144 

2

AS

Ha(

C

Bic

Su

Ch

C

M

S

Po

Ir

A

MUSWE

2016 Annual Envir

ANNUAL SURFACSampled 16 March

ANALYTE 

pH 

EC (µS/cm) 

TDS (mg/L) 

TSS (mg/L) 

ardness ‐ total (calculation ‐ 

mg/L) 

Alkalinity ‐ arbonate (mg CaCO3/L) 

Alkalinity ‐ carbonate (mg CaCO3/L) 

lphates (mg/L) 

hloride (mg/L) 

Calcium ‐ total (mg/L) 

Magnesium ‐ total (mg/L) 

Sodium ‐ total (mg/L) 

otassium ‐ total (mg/L) 

ron‐ filterable (mg/L) 

Arsenic (mg/L) 

ELLBROOK COAL CO

ronmental Manag

CE WATER MONITh 2016 

Dam 1/2 

MCFin

SettPo

8.07  8.3

6630  94

 

6  5

3110  50

<1  1

251  20

2220  39

598  75

577  50

405  91

497  81

36  4

<0.05  <0

<0.001  0.0

OMPANY LIMITED

gement Report

TORING RESULTS

C12 nal tling ond 

No.1 Open 

Cut Void

35  Dry 

480   

   

5   

000   

10   

06   

940   

54   

00   

11   

12   

40   

.05   

001   

No.2 Open 

Cut Void M

8.07  8

6850  4

 

3340  8

<1 

222  2

2280  3

586  8

580  1

459 

529  4

41 

<0.05  <0

<0.001  0

MCC7  MCC8

8.03  7.98 

4030  5240 

   

<5  5 

887  1310 

<1  <1 

292  329 

391  773 

835  965 

192  266 

99  158 

468  646 

4  3 

0.05  <0.05

.002  0.002

MCC9  M

8.41 

12400 

 

608 

4900 

22 

426 

4080 

1400 

200 

1070 

1340 

59 

<0.05  <

0.023  0

MCC23  MCC24

9.18  Dry

1880 

   

41 

699  

27  

37  

812 

103 

92  

114  

140  

16  

<0.05  

0.005 

4  MCC25 

7.81 

3060 

 

10 

862 

<1 

217 

457 

488 

134 

128 

316 

<0.05 

0.002 

14

MCC26  MCC2

8.28  8.03

6780  1100

   

6  <5 

3440  4460

<1  <1 

237  202

2430  4030

344  972

205  400

712  841

472  1130

19  27 

<0.05  <0.0

0.001  0.00

45 

27 

00 

2

B

Ca

Ch

C

N

Mfilt

Se

B

Iro

M

F

A

Nit

ToH

B

 

MUSWE

2016 Annual Envir

ANALYTE 

Barium (mg/L) 

admium (mg/L) 

romium (mg/L) 

opper  (mg/L) 

Nickel (mg/L) 

Lead (mg/L) 

Zinc (mg/L) 

Manganese ‐ terable (mg/L) 

elenium (mg/L) 

Boron (mg/L) 

n ‐ total (mg/L) 

Mercury (mg/L) 

luoride ‐ total (mg/L) 

Nitrogen Ammonia (mg 

N/L) 

trates (mg N/L) 

Oil & Grease (mg/L) 

PAH (mg/L) 

otal Petroleum Hydrocarbons 

(mg/L) 

Blank cells indicate

ELLBROOK COAL CO

ronmental Manag

Dam 1/2 

MCFin

SettPo

0.038  0.0

<0.0001  <0.0

<0.001  <0.0

0.002  0.0

<0.001  <0.0

0.219  0.0

0.056  0.0

<0.01  <0

0.008  <0.0

0.66  0

0.38  0

<0.0001  <0.0

0.7  1

1.64  0.0

1.94  0.0

<5  <

<0.5  <0

<70  <7

e that no sample 

OMPANY LIMITED

gement Report

C12 nal tling ond 

No.1 Open 

Cut Void

033   

0001   

001   

002   

001   

064   

015   

.01   

005   

.6   

.2   

0001   

.1   

08   

04   

<5   

0.5   

70   

was collected 

No.2 Open 

Cut Void M

0.035  0

<0.0001  <0

<0.001  <0

0.002  0

<0.001  <0

0.289  0

0.084  <0

<0.01  <0

0.008  <0

0.68  0

0.1  0

<0.0001  <0

0.8  0

0.94  <0

2.62  <0

<5 

<0.5  <

<70  <

MCC7  MCC8

.075  0.073

.0001  <0.0001

0.001  <0.001

.002  <0.001

0.001  <0.001

.072  0.084

0.001  <0.001

0.01  <0.01

0.005  <0.005

0.11  0.11 

0.07  0.11 

.0001  <0.0001

0.3  0.4 

0.01  <0.01

0.01  <0.01

<5  <5 

<0.5  <0.5 

<70  <70 

MCC9  M

0.231  0

  <0.0001  <0

0.03  <

0.014  0

0.012  <

3.65  0

0.041  0

<0.01  <

0.062  0

0.69  <

26 

  <0.0001  <0

0.8 

0.17 

<0.01  <

15 

<0.5 

<70 

MCC23  MCC24

0.097 

0.0001 

<0.001 

0.002 

<0.001 

0.017 

0.006 

<0.01  

0.008 

<0.05 

1.03 

0.0001 

0.6  

0.05  

<0.01 

<5  

<0.5 

<70  

4  MCC25 

0.086 

<0.0001  <

<0.001 

<0.001 

<0.001 

0.835 

0.003 

<0.01 

<0.005 

0.06 

1.12 

<0.0001  <

0.3 

0.08 

<0.01 

<5 

<0.5 

<70 

14

MCC26  MCC2

0.03  0.01

<0.0001  <0.00

<0.001  <0.00

0.001  0.00

<0.001  <0.00

0.043  0.05

0.004  0.00

<0.01  <0.0

<0.005  <0.00

0.11  0.27

0.13  0.12

<0.0001  <0.00

0.8  0.6

0.06  0.13

<0.01  0.01

<5  <5 

<0.5  <0.5

<70  <70

46 

27 

01 

01 

01 

05 

01 

 

2

G

MUSWE

2016 Annual Envir

GROUND WATER

DATE 

Jan‐16 

Feb‐16 

Mar‐16 

Apr‐16 

May‐16 

Jun‐16 

Jul‐16 

Aug‐16 

Sep‐16 

Oct‐16 

Nov‐16 

Dec‐16 

AVERAGE 

ELLBROOK COAL CO

ronmental Manag

R MONITORING R

Relative Lev(mAHD) 

BORE 

113.72 

113.73 

113.74 

113.71 

113.71 

113.72 

113.73 

113.68 

113.72 

116.62 

116.44 

113.89 

113.72 

OMPANY LIMITED

gement Report

RESULTS – MININ

vel pH 

RDH650 

7.4 

7.8 

no result

8.0 

7.3 

no result

no result

7.3 

no result

no result

no result

no result

7.6 

NG AREAS 

Electrical Conductivit(µS/cm)

6,600 

6,380 

t  no result

6,350 

7,020 

t  no result

t  no result

6,060 

t  no result

t  no result

t  no result

t  no result

6,482 

ty 

RDH61

53.92

55.94

56.08

57.22

57.08

54.59

53.86

54.9

54.48

55.45

55.07

55.23

55.32

 

Depth(

16  RD

8  4

2  4

8  4

9  4

6  4

4

8  4

5  4

7  4

3  4

2  4

h to Water mbgl) 

DH617 

48 

49.1 

49.39 

49.76 

49.71 

48.12 

47.89 

48.39 

48.01 

48.39 

48.25 

48.25 

48.61 

RDH624 

33.9 

33.92 

33.96 

34 

34.02 

34.07 

34.1 

33.13 

34.18 

34.2 

34.22 

34.26 

34.00 

1447 

2016 An

ANNUASampled

 

MUSWELL

nnual Environ

AL GROUNDWd 13 May 201

Hardness 

Alkalinity 

Alkalinity ‐

S

Ca

Mag

So

Pota

Iro

C

Manga

I

Flu

Nitrog

N

O

Total Petro

LBROOK COAL

nmental Man

WATER MO16 

ANALYTE

pH 

EC (µS/cm

TSS (mg/

‐ total (calcu

‐ Carbonate

‐ Bicarbonate

Sulphates (m

Chloride (m

lcium ‐ total 

nesium ‐ tot

odium ‐ total 

assium ‐ tota

on‐ filterable 

Arsenic (mg

Barium (mg

Cadmium (m

Chromium (m

Copper  (mg

Nickel (mg

Lead (mg/

Zinc (mg/

anese ‐ filtera

Selenium (m

Boron (mg

ron ‐ total (m

Mercury (m

uoride ‐ total

gen Ammoni

Nitrates (mg

Oil & Grease (

PAH (mg/

oleum Hydro

L COMPANY L

nagement Re

NITORING R

m) 

/L) 

ulation ‐ mg/

 (mg CaCO3/

e (mg CaCO3/

mg/L) 

g/L) 

(mg/L) 

tal (mg/L) 

(mg/L) 

al (mg/L) 

(mg/L) 

g/L) 

g/L) 

mg/L) 

mg/L) 

g/L) 

g/L) 

/L) 

/L) 

able (mg/L)

mg/L) 

g/L) 

mg/L) 

mg/L) 

 (mg/L) 

a (mg N/L) 

g N/L) 

(mg/L) 

/L) 

ocarbons (mg

IMITED

eport

RESULTS – M

/L) 

/L) 

3/L) 

g/L) 

MINING ARE

RDH

7.3

70

<

31

<

32

28

61

59

40

53

4

3.7

<0.0

0.0

<0.0

<0.0

0.0

0.0

0.0

0.3

0.6

<0.

0.7

3.7

<0.0

0.

6.

0.0

<

<0

<7

EAS 

H607 

32 

20 

80 

23 

00 

10 

98 

09 

37 

73 

001 

039 

0001 

001 

098 

01 

048 

383 

647 

.01 

73 

78 

0001 

.7 

.3 

01 

0.5 

70 

148 

2

G

1

1

2

 

MUSWE

2016 Annual Envir

GROUND WATER

Date Sampled  Dep

(mb

20‐Jan‐16  3.3

18‐Feb‐16  3.2

16‐Mar‐16  3.7

15‐Apr‐16  5.2

13‐May‐16  5.0

23‐Jun‐16  5.7

20‐Jul‐16  6.0

19‐Aug‐16  2.5

22‐Sep‐16  2.2

20‐Oct‐16  2.4

23‐Nov‐16  3.1

16‐Dec‐16  3.4

ELLBROOK COAL CO

ronmental Manag

R MONITORING R

MCC 1003 

pth bgl) 

pH (µ

36  7.1  1

27  7.0  1

79  7.0  1

22  7.1  1

04  7.6  1

72  7.1  1

08  7.2  1

52  7.3  1

29  7.1  1

46  7.1  1

10  7.0  1

45  7.1  1

OMPANY LIMITED

gement Report

RESULTS – SANDY

EC µS/cm) 

Depth (mbgl) 

1,508  7.55 

1,673  7.61 

1,383  7.75 

1,592  7.90 

1,700  8.00 

1,641  no acc

1,666  8.03 

1,078  7.19 

1,304  6.90 

1,426  7.08 

1,304  7.30 

1,377  7.56 

Y CREEK 

MCC 1005 

pH EC 

(µS/cm

7.1  1,966

7.0  1,927

7.1  1,609

7.1  1,994

7.7  2,260

cess – gate locked

7.3  1,959

7.2  2,250

7.1  2,780

7.1  2,480

7.0  2,350

7.0  2,300

MCC

m) Depth (mbgl) 

p

6  5.43  7

7  5.17  7

9  5.57  7

4  6.11  7

0  6.66  7

  7.37 

9  d

0  d

0  5.07  7

0  4.81  7

0  4.96  7

0  5.26  7

C 1006 

pH EC 

(µS/cm) 

.2  1,013 

.0  1,024 

.2  935 

.1  1,023 

.7  1,060 

too low to sample 

dry 

dry 

.2  1,010 

.2  940 

.1  901 

.2  928 

MCC 1015

Depth (mbgl) 

pH 

3.64  7.1 

3.66  7.0 

4.76  7.0 

3.82  7.2 

3.98  7.7 

4.04  7.3 

3.84  7.2 

3.69  7.3 

3.56  6.9 

3.62  7.0 

3.69  7.0 

3.68 too lsam

5  MCC 

EC (µS/cm) 

Dep(mb

2,660  3.6

2,350  3.6

2,280  4.7

2,270  3.8

2,320  3.9

1,758  4.0

1,676  3.8

1,570  3.6

1,792  3.5

1,997  3.6

2,430  3.6

ow to mple 

3.6

14

1017  MCC 1018

pth bgl) 

Depth (mbgl) 

64  17.41 

66  17.41 

76  17.42 

82  17.57 

98  17.57 

04  17.56 

84  17.65 

69  17.66 

56  17.62 

62  17.73 

69  17.67 

68  17.73 

49 

2016 An

ANNUASampled

 

MUSWELL

nnual Environ

AL GROUNDWd 13 May 201

Hardness

Alkalini

Alkalinit

Su

Ch

Calci

Magne

Sodiu

Potass

Iron‐

A

B

Ca

Ch

C

Mang

N

Se

B

Iro

M

Fluor

Am

Ni

Ni

Oil &

ToHydr

LBROOK COAL

nmental Man

WATER MO16 

Analyte 

pH 

EC (µS/cm) 

TSS (mg/L) 

s ‐ total (calcmg/L) 

ity ‐ CarbonaCaCO3/L) 

ty ‐ BicarbonCaCO3/L) 

lphates (mg/

hloride (mg/

um ‐ total (m

esium ‐ total 

um ‐ total (m

sium ‐ total (

‐ filterable (m

Arsenic (mg/L

Barium (mg/L

admium (mg/

romium (mg

opper  (mg/L

Lead (mg/L)

ganese ‐ filte(mg/L) 

Nickel (mg/L

elenium (mg/

Zinc (mg/L) 

Boron (mg/L

n ‐ total (mg

Mercury (mg/

ride ‐ total (m

mmonia (mg/

itrite (mg N/

trate (mg N/

& Grease (m

PAH (mg/L) 

otal Petroleurocarbons (m

L COMPANY L

nagement Re

NITORING R

M

culation ‐ 

ate (mg 

ate (mg 

/L) 

/L) 

mg/L) 

(mg/L) 

mg/L) 

(mg/L) 

mg/L) 

L) 

L) 

/L) 

g/L) 

/L) 

 

erable 

/L) 

g/L) 

/L) 

mg/L) 

/L) 

/L) 

/L) 

g/L) 

um mg/L) 

IMITED

eport

RESULTS – S

MCC1003 M

7.57 

1700 

<5 

426 

<1 

249 

149 

294 

93 

47 

179 

<0.05 

<0.001 

0.049 

<0.0001 

<0.001 

<0.001 

<0.001 

0.002 

<0.001 

<0.01 

0.008 

0.13 

0.16 

<0.0001 

0.3 

0.03 

<0.01 

0.43 

<5 

<0.5 

<70 

SANDY CREE

MCC1005 M

7.66 

2260 

<5 

455 

<1 

277 

165 

425 

85 

59 

282 

0.05 

<0.001 

0.023 

<0.0001 

<0.001 

<0.001 

<0.001 

0.13 

<0.001 

<0.01 

0.026 

0.06 

0.32 

<0.0001 

0.3 

1.32 

0.03 

0.37 

<5 

<0.5 

<70 

MCC1006 M

7.65 

1060 

11 

272 

<1 

201 

73 

169 

58 

31 

111 

<0.05 

<0.001 

0.039 

<0.0001 

<0.001 

<0.001 

<0.001 

0.004 

<0.001 

<0.01 

0.01 

0.1 

0.43 

<0.0001 

0.3 

0.04 

<0.01 

0.34 

<5 

<0.5 

<70 

MCC1015 

7.72 

2320 

42 

529 

<1 

332 

265 

376 

108 

63 

266 

0.06 

0.002 

0.076 

0.0002 

<0.001 

0.004 

0.003 

1.04 

0.001 

<0.01 

0.082 

0.13 

2.14 

<0.0001 

0.4 

0.26 

0.01 

0.16 

<5 

<0.5 

<70 

150 

2016 An

MUSWELL

nnual Environ

LBROOK COAL

nmental Man

Appen

L COMPANY L

nagement Re

ndix 3: B

IMITED

eport

Blast Moonitorinng Data 

151 

2

MUSWE

2016 Annual Envir

Date

12‐Jan‐

13‐Jan‐

19‐Jan‐

22‐Jan‐

25‐Jan‐

29‐Jan‐

2‐Feb‐

5‐Feb‐

10‐Feb

12‐Feb

16‐Feb

17‐Feb

19‐Feb

3‐Mar‐

4‐Mar‐

10‐Mar

16‐Mar

17‐Mar

22‐Mar

1‐Apr‐

6‐Apr‐

7‐Apr‐

12‐Apr

14‐Apr

19‐Apr

20‐Apr

22‐Apr

29‐Apr

ELLBROOK COAL CO

ronmental Manag

e  Time 

‐16  12:46 

‐16  14:40 

‐16  12:42 

‐16  13:34 

‐16  15:48 

‐16  12:19 

‐16  13:33 

‐16  13:21 

‐16  14:31 

‐16  13:21 

‐16  13:14 

‐16  12:44 

‐16  12:50 

‐16  13:00 

‐16  14:09 

r‐16  12:46 

r‐16  12:49 

r‐16  12:54 

r‐16  15:06 

‐16  12:40 

‐16  14:04 

‐16  10:14 

‐16  12:46 

‐16  14:17 

‐16  16:17 

‐16  14:16 

‐16  13:16 

‐16  13:04 

OMPANY LIMITED

gement Report

Queen Street 

Overpressure dB(L) 

GV

103.0 

93.1 

93.1 

105.4 

103.0 

98.5 

99.7 

109.4 

95.3 

97.0 

98.5 

103.8 

95.3 

94.3 

103.4 

95.3 

114.9 

97.0 

106.3 

105.4 

100.3 

107.1 

104.1 

111.2 

100.3 

98.5 

96.2 

94.3 

BLAST 

(B1) 

Ground Vibration mm/s 

OverprdB

0.21  10

0.17  92

0.25  91

0.19  10

0.14  89

0.17  97

0.17  95

0.13  10

0.19  94

0.20  93

0.20  99

0.12  91

0.43  92

0.28  91

0.24  10

0.32  97

0.17  11

0.18  93

0.20  10

0.31  10

0.20  99

0.23  10

0.15  10

0.19  10

0.18  99

0.15  95

0.20  93

0.21  93

MONITORING R

School (B2) 

ressure B(L) 

GroundVibratiomm/s

3.8  0.12

2.4  0.09

1.1  0.15

4.4  0.09

9.5  0.08

7.1  0.09

5.5  0.11

8.4  0.08

4.6  0.11

3.6  0.12

9.6  0.12

1.1  0.08

2.4  0.13

1.1  0.13

1.9  0.14

7.8  0.16

1.6  0.12

3.6  0.09

4.1  0.21

1.9  0.15

9.6  0.15

0.1  0.11

0.6  0.09

3.8  0.13

9.6  0.12

5.5  0.11

3.6  0.12

3.6  0.13

RESULTS 

99 Queen 

d on 

OverpressuredB(L) 

100.6 

91.9 

93.1 

105.9 

91.9 

95.0 

98.5 

110.4 

95.8 

96.6 

99.1 

89.0 

94.1 

93.1 

102.2 

96.6 

114.9 

91.9 

105.1 

103.9 

96.6 

105.1 

105.9 

105.9 

102.6 

101.4 

95.8 

93.1 

Street (B3) 

e Ground Vibrationmm/s 

O

0.25 

0.13 

0.20 

0.16 

0.09 

0.11 

0.12 

0.07 

0.14 

0.14 

0.13 

0.07 

0.23 

0.15 

0.29 

0.19 

0.17 

0.11 

0.20 

0.24 

0.11 

0.17 

0.10 

0.23 

0.14 

0.16 

0.15 

0.18 

Nisbet (B4)

Overpressure dB(L) 

GVi

104.3 

96.5 

98.3 

105.8 

99.3 

94.2 

103.1 

108.3 

104.0 

103.1 

105.8 

93.3 

99.3 

95.8 

109.9 

102.8 

111.6 

95.0 

109.6 

109.5 

97.7 

105.6 

107.4 

106.2 

105.3 

108.2 

102.5 

97.1 

15

Ground ibration mm/s 

0.36 

0.27 

0.49 

0.22 

0.19 

0.22 

0.25 

0.15 

0.26 

0.24 

0.19 

0.15 

0.45 

0.31 

0.47 

0.27 

0.50 

0.17 

0.30 

0.61 

0.18 

0.27 

0.24 

0.82 

0.29 

0.40 

0.31 

0.27 

52 

2

MUSWE

2016 Annual Envir

Date

4‐May‐

4‐May‐

6‐May‐

11‐May

13‐May

18‐May

19‐May

20‐May

26‐May

30‐May

31‐May

1‐Jun‐

3‐Jun‐

7‐Jun‐

10‐Jun‐

14‐Jun‐

15‐Jun‐

16‐Jun‐

17‐Jun‐

22‐Jun‐

27‐Jun‐

28‐Jun‐

29‐Jun‐

30‐Jun‐

30‐Jun‐

1‐Jul‐1

4‐Jul‐1

7‐Jul‐1

14‐Jul‐

ELLBROOK COAL CO

ronmental Manag

e  Time 

‐16  13:20 

‐16  13:27 

‐16  13:56 

y‐16  11:22 

y‐16  12:41 

y‐16  14:32 

y‐16  12:43 

y‐16  12:25 

y‐16  12:51 

y‐16  12:42 

y‐16  12:49 

16  12:48 

16  12:48 

16  15:07 

‐16  13:27 

‐16  12:46 

‐16  15:08 

‐16  12:43 

‐16  12:26 

‐16  14:40 

‐16  13:50 

‐16  12:49 

‐16  12:44 

‐16  15:38 

‐16  15:54 

16  9:28 

16  12:46 

16  13:32 

‐16  12:46 

OMPANY LIMITED

gement Report

Queen Street 

Overpressure dB(L) 

GV

98.5 

101.8 

104.5 

102.2 

98.4 

106.2 

108.8 

88.8 

113.1 

110.4 

103.2 

109.5 

106.8 

105.7 

98.5 

98.5 

107.0 

107.6 

106.0 

96.6 

100.4 

100.8 

91.3 

106.4 

105.7 

104.2 

101.6 

105.2 

110.8 

(B1) 

Ground Vibration mm/s 

OverprdB

0.26  96

0.13  87

0.18  10

0.17  96

0.30  94

0.20  10

0.37  10

0.13  91

0.17  10

0.31  10

0.19  10

0.19  10

0.21  10

0.19  91

0.17  95

0.16  93

0.25  10

0.23  10

0.22  10

0.20  10

0.19  96

0.27  97

0.21  90

0.16  10

0.19  10

0.20  10

0.17  10

0.15  10

0.19  10

School (B2) 

ressure B(L) 

GroundVibratiomm/s

6.3  0.14

7.5  0.07

1.9  0.11

6.3  0.09

4.6  0.15

1.1  0.11

4.4  0.18

1.1  0.10

4.4  0.10

5.3  0.16

1.5  0.09

5.3  0.10

8.8  0.11

1.1  0.09

5.5  0.08

3.6  0.10

4.5  0.16

6.8  0.14

7.5  0.13

2.8  0.15

6.0  0.13

7.5  0.15

0.8  0.11

7.7  0.11

6.6  0.11

8.5  0.17

3.5  0.11

1.3  0.10

8.3  0.11

99 Queen 

d on 

OverpressuredB(L) 

96.6 

93.1 

103.9 

99.1 

94.1 

103.6 

105.6 

87.0 

100.6 

108.8 

103.9 

109.1 

106.4 

106.1 

98.5 

97.3 

106.4 

107.1 

107.1 

92.8 

98.8 

97.9 

90.8 

94.3 

100.4 

99.6 

102.3 

103.9 

109.7 

Street (B3) 

e Ground Vibrationmm/s 

O

0.25 

0.07 

0.16 

0.11 

0.25 

0.13 

0.27 

0.06 

0.16 

0.23 

0.17 

0.14 

0.18 

0.11 

0.16 

0.12 

0.33 

0.19 

0.22 

0.25 

0.19 

0.25 

0.18 

0.12 

0.19 

0.16 

0.20 

0.14 

0.14 

Nisbet (B4)

Overpressure dB(L) 

GVi

105.3 

102.5 

104.3 

106.2 

103.4 

111.5 

111.1 

97.1 

102.1 

113.0 

108.3 

109.7 

108.7 

100.2 

103.1 

101.8 

104.0 

106.2 

101.0 

103.7 

101.4 

101.4 

91.1 

99.8 

104.8 

105.5 

98.8 

103.7 

103.1 

15

Ground ibration mm/s 

0.55 

0.15 

0.38 

0.24 

0.41 

0.29 

0.67 

0.12 

0.28 

0.42 

0.27 

0.29 

0.27 

0.19 

0.25 

0.19 

0.37 

0.29 

0.38 

0.36 

0.29 

0.37 

0.29 

0.22 

0.24 

0.29 

0.28 

0.17 

0.22 

53 

2

MUSWE

2016 Annual Envir

Date

15‐Jul‐

18‐Jul‐

19‐Jul‐

22‐Jul‐

25‐Jul‐

26‐Jul‐

29‐Jul‐

29‐Jul‐

1‐Aug‐

5‐Aug‐

9‐Aug‐

10‐Aug

12‐Aug

15‐Aug

18‐Aug

26‐Aug

29‐Aug

1‐Sep‐

2‐Sep‐

8‐Sep‐

13‐Sep

16‐Sep

20‐Sep

28‐Sep

28‐Sep

4‐Oct‐

5‐Oct‐

11‐Oct

12‐Oct

ELLBROOK COAL CO

ronmental Manag

e  Time 

‐16  15:30 

‐16  14:40 

‐16  14:31 

‐16  11:57 

‐16  15:40 

‐16  14:20 

‐16  12:49 

‐16  13:09 

‐16  13:36 

‐16  13:30 

‐16  12:39 

g‐16  12:11 

g‐16  13:37 

g‐16  12:48 

g‐16  12:51 

g‐16  12:59 

g‐16  15:10 

‐16  12:44 

‐16  9:44 

‐16  12:46 

‐16  14:10 

‐16  12:48 

‐16  12:51 

‐16  15:21 

‐16  15:35 

16  13:23 

16  9:55 

‐16  15:03 

‐16  12:46 

OMPANY LIMITED

gement Report

Queen Street 

Overpressure dB(L) 

GV

106.2 

95.9 

97.9 

108.2 

109.5 

95.9 

103.6 

96.6 

103.3 

98.4 

102.7 

110.2 

99.0 

97.3 

92.4 

97.9 

110.2 

101.6 

94.4 

98.4 

102.0 

110.9 

99.0 

91.3 

104.5 

110.1 

104.5 

104.5 

102.3 

(B1) 

Ground Vibration mm/s 

OverprdB

0.24  10

0.20  95

0.36  94

0.20  97

0.19  10

0.15  99

0.22  10

0.16  90

0.18  10

0.28  95

0.20  96

0.17  10

0.17  97

0.17  95

0.17  92

0.20  94

0.21  10

0.20  99

0.13  92

0.17  96

0.24  10

0.20  10

0.23  95

0.29  89

0.29  10

0.24  10

0.18  99

0.18  10

0.40  99

School (B2) 

ressure B(L) 

GroundVibratiomm/s

4.5  0.14

5.2  0.14

4.3  0.17

7.5  0.10

0.8  0.13

9.8  0.10

3.5  0.17

0.8  0.10

2.1  0.12

5.2  0.11

6.1  0.12

3.9  0.10

7.5  0.11

5.2  0.11

2.1  0.11

4.3  0.12

6.8  0.13

9.3  0.13

2.1  0.09

6.8  0.15

0.3  0.12

7.5  0.14

5.2  0.11

9.2  0.13

0.8  0.13

9.2  0.17

9.8  0.12

0.9  0.19

9.0  0.31

99 Queen 

d on 

OverpressuredB(L) 

107.1 

92.8 

96.8 

90.8 

102.9 

92.8 

105.2 

92.8 

103.9 

97.9 

99.6 

102.9 

94.3 

96.8 

96.8 

95.7 

109.9 

98.8 

95.7 

94.3 

101.7 

108.6 

94.3 

92.8 

103.4 

107.1 

101.1 

101.1 

96.8 

Street (B3) 

e Ground Vibrationmm/s 

O

0.20 

0.19 

0.26 

0.18 

0.17 

0.11 

0.23 

0.12 

0.15 

0.22 

0.18 

0.12 

0.17 

0.14 

0.12 

0.21 

0.21 

0.25 

0.10 

0.13 

0.19 

0.19 

0.21 

0.25 

0.24 

0.31 

0.19 

0.16 

0.61 

Nisbet (B4)

Overpressure dB(L) 

GVi

110.4 

100.6 

96.5 

106.2 

107.4 

94.2 

107.6 

89.7 

100.6 

97.7 

98.3 

101.8 

95.9 

95.8 

94.2 

97.1 

104.3 

96.5 

97.1 

95.8 

100.2 

102.5 

103.4 

93.3 

101.8 

108.3 

101.0 

101.0 

98.8 

15

Ground ibration mm/s 

0.45 

0.30 

0.65 

0.18 

0.50 

0.13 

0.56 

0.15 

0.19 

0.39 

0.23 

0.12 

0.25 

0.18 

0.14 

0.32 

0.38 

0.38 

0.12 

0.17 

0.47 

0.53 

0.28 

0.39 

0.75 

0.54 

0.48 

0.22 

1.56 

54 

2

 

 

MUSWE

2016 Annual Envir

Date

14‐Oct

18‐Oct

20‐Oct

24‐Oct

26‐Oct

27‐Oct

31‐Oct

2‐Nov‐

11‐Nov

11‐Nov

18‐Nov

23‐Nov

24‐Nov

30‐Nov

2‐Dec‐

5‐Dec‐

12‐Dec

14‐Dec

16‐Dec

ELLBROOK COAL CO

ronmental Manag

e  Time 

‐16  14:32 

‐16  12:47 

‐16  12:51 

‐16  12:53 

‐16  12:42 

‐16  13:17 

‐16  12:55 

‐16  12:48 

v‐16  13:28 

v‐16  13:50 

v‐16  13:22 

v‐16  12:48 

v‐16  10:40 

v‐16  16:11 

‐16  12:48 

‐16  12:46 

c‐16  12:44 

c‐16  12:44 

c‐16  10:51 

OMPANY LIMITED

gement Report

Queen Street 

Overpressure dB(L) 

GV

101.2 

103.3 

107.4 

107.2 

110.1 

109.9 

109.5 

106.2 

94.4 

108.2 

89.9 

107.8 

91.3 

111.7 

99.0 

99.9 

89.8 

105.5 

108.0 

(B1) 

Ground Vibration mm/s 

OverprdB

0.19  96

0.20  10

0.21  10

0.18  10

0.27  10

0.22  10

0.21  10

0.35  10

0.19  96

0.29  10

0.18  89

0.31  10

0.17  90

0.25  10

0.21  96

0.18  97

0.18  89

0.22  10

0.15  10

School (B2) 

ressure B(L) 

GroundVibratiomm/s

6.5  0.18

0.9  0.18

3.9  0.21

3.9  0.18

7.2  0.25

7.0  0.21

7.2  0.23

3.5  0.27

6.8  0.08

5.3  0.10

9.2  0.05

5.1  0.11

0.8  0.08

8.9  0.08

6.8  0.05

7.5  0.06

9.2  0.08

0.3  0.09

6.4  0.06

99 Queen 

d on 

OverpressuredB(L) 

96.8 

102.9 

108.9 

108.3 

107.4 

109.4 

105.2 

108.0 

92.8 

103.9 

90.8 

106.4 

90.8 

112.0 

98.9 

100.0 

88.8 

101.7 

109.0 

Street (B3) 

e Ground Vibrationmm/s 

O

0.16 

0.20 

0.24 

0.24 

0.42 

0.25 

0.25 

0.37 

0.15 

0.27 

0.15 

0.25 

0.12 

0.17 

0.13 

0.12 

0.08 

0.15 

0.14 

Nisbet (B4)

Overpressure dB(L) 

GVi

96.5 

102.5 

108.7 

108.3 

109.3 

110.8 

107.8 

105.5 

91.1 

107.8 

92.2 

103.4 

95.0 

106.2 

98.8 

103.1 

93.3 

108.7 

107.8 

15

Ground ibration mm/s 

0.18 

0.40 

0.50 

0.58 

0.95 

1.30 

0.54 

0.78 

0.21 

0.53 

0.22 

0.51 

0.19 

0.35 

0.23 

0.21 

0.12 

0.21 

0.30 

55 

2016 An

MUSWELL

nnual Environ

LBROOK COAL

nmental Man

Appen

L COMPANY L

nagement Re

ndix 4: C

IMITED

eport

Complaints Summmary 

156 

2

S

C

1

2

2

MUSWE

2016 Annual Envir

SUMMARY OF C

Date of Complaint 

TimeCompl

1‐Jan‐16  1:03 P

1‐Jan‐16  5:59 P

9‐Jan‐16  8:26 A

ELLBROOK COAL CO

ronmental Manag

COMPLAINTS 

e of laint 

Date of Incident 

M 11‐Jan‐16 

M Various 

AM Various 

OMPANY LIMITED

gement Report

Time of Incident 

L

8:00 AM WoRidg

Various Mu

Various WoRidg

Location TypCom

oodlands ge 

Odou

scle Creek Odou

oodlands ge 

Odou

pe of mplaint 

Mode Conta

ur Email fromEPA 

ur Direct calOCE 

ur EnvironmHotline ‐ nurgent 

of ct 

NaturCompl

m  Odour smehouse.  Theconcerned health impaDust was vfrom coal loactivities. 

l to  Strong odospontaneoucombustionhad been sweek. 

ental non 

General enabout the s

re of laint 

ell at ey are about acts. isible oading 

The nigcomplaoutbreaprevenoutbreaoutbreafrom thin opersite obsdust beactivitieto the E

our from us n that trong all 

There wthe cominspectspontaThere wsmoke the arespoke wdiscussand he

quiry smell 

Attempdiscussunsucc

Action Ta

ght before and the maint, MCC were manaks of spontaneoust them from becomaks.  This involved cak and digging out he other outbreak.  ration at the coal loservations confirmeeing generated fromes. This informationEPA. 

were no mining actmplaint due to shiftted the operation foneous combustion was a hot spot that with activities undeea.  The Environmenwith the complainased their concerns ralth impacts. 

pts to contact the cs the complaint furtessful. 

15

aken

morning of the naging two small s combustion to ming larger covering one the hot material The water cart wasading activities anded that there was nm coal loading n was communicate

ivities at the time ot change.  The OCE or fresh outbreaks owith none identifiewas creating someertaken to cool downtal Coordinator nt the next day andregarding the smell 

omplainant to ther have been 

57 

s d no 

ed 

of 

of ed.  e wn 

2

C

1

1

2

1

MUSWE

2016 Annual Envir

Date of Complaint 

TimeCompl

3‐Feb‐16  9:51 A

5‐Feb‐16  7:04 P

6‐Feb‐16  7:01 A

0‐Mar‐16  9:31 A

ELLBROOK COAL CO

ronmental Manag

e of laint 

Date of Incident 

AM 13‐Feb‐16 

M 15‐Feb‐16 

AM 26‐Feb‐16 

AM 10‐Mar‐16 

OMPANY LIMITED

gement Report

Time of Incident 

L

7:30 AM NorMu

7:04 PM NorMu

7:01 AM Mu

Morning Mu

Location TypCom

rthswellbrook 

Odou

rthswellbrook 

Odou

scle Creek Odou

scle Creek Odou

pe of mplaint 

Mode Conta

ur EnvironmHotline anEmail fromEPA 

ur EnvironmHotline ‐ nurgent 

ur EnvironmHotline ‐ nurgent 

ur EnvironmHotline ‐ nurgent 

of ct 

NaturCompl

ental nd m 

Smoke polland odour

ental non 

Concerning

ental non 

Odour comthe mine folast 2 days

ental non 

Strong smesulphur 

re of laint 

ution  At the toperatiproducwas covthe sitenothingAttempunsuccoperatithe OC

g smell Miningstorm. materiasprays targetinCompla

ming from or the 

Infusioelectrichighestlater thto covedump. 

ell of  Normathree infoggy ccomplawho cogettingSpontapracticecompla2016 ansponta

Action Ta

time of the complaions were moving bction following a fogvered in a thick haze and the boundaryg blowing towards Qpts to contact the cessful. The EPA wasions at the time of tE's observations."

 activities were res No mining or procal or coal was occurwere running and wng areas of heatingainant didn't want a

n wasn't operationcal fault.  Repair of tt priority on site anhat day.  Extra dozeer the spontaneous  Complainant didn'

l mining operationsnfusion sprays operconditions in the moaint was discussed wommented that the g worse over the lasneous combustion es were discussed. aint location at 10:0nd couldn't detect neous combustion 

15

aken

int, mining back into full g delay.  The Valley ze.  The OCE checkey and could see Queen Street.  omplainant were s advised of the the complaint and 

uming following a essing of hot rring.  Infusion water carts were  in Strips 14 and 15a call back. 

al due to an the pump was gived was operational rs were operationacombustion at the't want a call back. 

s were occurring wirational.  There werorning.  The with the complainasmell has been st couple of monthsmanagement  The EC visited the 00am on 10 March any odour relating at this time. 

58 

ed 

5. 

al  

ith re 

nt 

s.  

to 

2

C

1

2

2

MUSWE

2016 Annual Envir

Date of Complaint 

TimeCompl

4‐Mar‐16  8:27 A

1‐Mar‐16  3:24 P

8‐Mar‐16  8:00 P

ELLBROOK COAL CO

ronmental Manag

e of laint 

Date of Incident 

AM Week prior to 14 March16 

M 21‐Mar‐16 

M 28‐Mar‐16 

OMPANY LIMITED

gement Report

Time of Incident 

L

h   McC

3:15 PM McC

8:00 PM McC

Location TypCom

Cully's Gap Dust

Cully's Gap Dust

Cully's Gap Dust

pe of mplaint 

Mode Conta

Direct calMCC officEC respon

Direct calMCC officEC respon

Direct calOCE phonOCE responde

of ct 

NaturCompl

l to ce ‐ nded 

Black dust covering thand the skycovered in film 

l to ce ‐ nded 

Dust cloudsfrom opera

l to ne ‐ 

Can smell oand see du

re of laint 

is heir roof ylight is a fine 

Dust mthe comhad beof the wup to 1the 24 highestcriteria

s coming ation 

The duspontaactivitieto cool the dirtThis proand no was po

odour st 

Removgenerawater ccoolingFollowidown athe dig diggingcriteriavisible 

Action Ta

management contromplainant.  Normal en occurring duringweather and PM10 14 March was undehour PM10 results t results being 27.1 of 50ug/m3. 

st clouds were beinneous combustion es in OC2.  The sprathe area down wet to give way generocess required 24‐4further action to c

ossible. 

al of hot material inting more dust thancart was in operatiog the dig face prior ting the complaint tand a second waterface down before 

g operations.  Dust l and OCE's observadust was leaving sit

15

aken

l was discussed witmining operations g this time.  A revielevels for the weekrtaken.  Generally <25ug/m3 with theug/m3 against a 

ng generated from management ays recently installere causing some of ating clouds of dus48 hours to settle ontrol the situation

n Strip 14 was n expected.  One on to assist with to the complaint.  he digger was shut r cart assisted to corecommencing levels were below ations were that note. 

59 

th 

w k 

ed 

t.  

ol 

 

2

C

0

0

0

1

MUSWE

2016 Annual Envir

Date of Complaint 

TimeCompl

4‐Apr‐16  3:51 P

6‐Apr‐16  5:49 P

6‐Apr‐16  7:53 P

3‐Apr‐16  7:22 A

ELLBROOK COAL CO

ronmental Manag

e of laint 

Date of Incident 

M 23‐Mar‐16 

M 06‐Apr‐16 

M 06‐Apr‐16 

AM 13‐Apr‐16 

OMPANY LIMITED

gement Report

Time of Incident 

L

11:54 AM 

NorMu

Various WoRidg

7:53 PM WoRidg

7:22 AM Unk

Location TypCom

rthswellbrook 

Odou

oodlands ge 

Odou

oodlands ge 

Odou

known Haula

pe of mplaint 

Mode Conta

ur Email fromEPA 

ur EnvironmHotline ‐ urgent.  Oresponde

ur Direct calOCE mobiOCE responde

age Direct calOCE mobiOCE responde

of ct 

NaturCompl

m  Affected byodour of bucoal, there blue haze i

ental 

OCE d 

Spontaneocombustiondust 

l to ile ‐ 

Strong Odo

l to ile ‐ 

Coal haulagfalling fromtrucks on proads 

re of laint 

y strong urning is also a n the sky 

MCC wcombucomplaassist wspontaactivitiewinds wcomplacommu

us n and 

At the toperaticarts hainfusionwater cheatedlarge grAberde1:57pmthe comdiscuss

our Hot coaprocessin OC1.Muswe

ge ‐ coal m road public 

Phone investigconduc

Action Ta

were actively managstion outbreak in Oaint.  Water sprays wwith cooling the areneous combustion es were occurring iwere present on thaint.  This informatiunicated to the EPA

time of the complaional due to shift chad been operationan sprays operating cart was present on coal in ROM stockrassfire between Meen.  A return phonm on 07/04/16 withmplainant to call bas the complaint furt

al on ROM was beinsing.  Water carts w. There was a large ellbrook and Aberde

call was communicgated the issue.  Racted by MCC person

16

aken

ging a spontaneous OC2 on the day of thwere being used toea.  Normal management n OC1.  Light SW e day of the on was A. 

int the pit was not hange.  Two water al all shift with in OC1.  From 6pm n ROM cooling piles.  There was a 

Muswellbrook and e call was made at  a message left for ack if they wished tother. 

ng targeted for were cooling hot aregrassfire between een.  

cated to Daracon whandom audits were nnel 

60 

he o 

 a 

ea 

ho 

2

C

1

1

2

2

2

MUSWE

2016 Annual Envir

Date of Complaint 

TimeCompl

9‐Apr‐16  6:59 A

9‐Apr‐16  11:51 A

3‐Apr‐16  10:06 

8‐Apr‐16  8:08 A

8‐Apr‐16  9:09 A

ELLBROOK COAL CO

ronmental Manag

e of laint 

Date of Incident 

AM 19‐Apr‐16 

AM Various 

PM Various 

AM 28‐Apr‐16 

AM Various 

OMPANY LIMITED

gement Report

Time of Incident 

L

6:59 AM Mu

Various Abe

Various Sco

6:00 AM WoRidg

Various Abe

Location TypCom

scle Creek Odou

erdeen Odou

one Odou

oodlands ge 

Dust

erdeen Odou

pe of mplaint 

Mode Conta

ur EnvironmHotline ‐ nurgent 

ur EnvironmHotline ‐ nurgent 

ur Direct calOCE phonOCE responde

Email fromEPA 

ur Email fromEPA 

of ct 

NaturCompl

ental non 

Offensive svery sulphu

ental non 

Last couplemonths fresmelling strsmell of su

l to ne ‐ 

Sulphur smcoming frolast couple months 

m  Dust in the

m  Strong smesulphur alocoal dust afcomplainan

re of laint 

smell ‐ury 

Ongoinmanagerain yesmorningenerano odocomplaon 19/0there wcould doperatimanagewere dapprec

e of equently rong lphur 

The comcomingcontribspontaoperatiUHAQMcompla

mell m MCC of 

Only eqloader aroundEC discsourceswas ap

 air Informaspontadust lev

ell of ong with ffecting nt 

Informaspontadust lev

Action Ta

ng mining operationement occurring atsterday with cloudyng.  The EC observedl area of the complur being detected aaint was discussed w04/16.  They wantewas a problem and tdo about it.  Weatheions activities, sponement as well as thiscussed.  The comiative of the call ba

mplainant has beeng from MCC.  The smbute to headaches.  neous combustion ional activities wereM network was discainant. 

quipment operatingon the ROM.  The Od and could not deteussed the sulphur ss with the complainpreciative of the ca

ation on operationaneous combustion vels provided to EP

ation on operationaneous combustion vels provided to EP

16

aken

ns and spontaneoust MCC.  There was y conditions this d odour in the aint at ~7:40am witat this time.  The with the complainaed to let us know to see what we er impacts, ntaneous combustiohe EC observations plainant was ck. 

n told the odour is mell is starting to General management and e discussed.  The cussed with the 

g on site was the coOCE did a drive ect any sulphur.  Thsmell and potentialnant.  Complainant all back. 

al activities, management and 

PA. 

al activities, management and 

PA. 

61 

th 

nt 

on 

oal 

he  

2

C

2

2

2

2

0

MUSWE

2016 Annual Envir

Date of Complaint 

TimeCompl

8‐Apr‐16  11:07 A

8‐Apr‐16  11:21 A

8‐Apr‐16  11:53 A

8‐Apr‐16  11:56 A

9‐May‐16  1:40 P

ELLBROOK COAL CO

ronmental Manag

e of laint 

Date of Incident 

AM Last three days 

AM 28‐Apr‐16 

AM 28‐Apr‐16 

AM Various 

M Various 

OMPANY LIMITED

gement Report

Time of Incident 

L

Last three days 

McC

Morning McC

11:53 AM 

McC

Various Abe

Various WoRidg

Location TypCom

Cully's Gap Odou

Cully's Gap Odou

Cully's Gap Odou

erdeen Odou

oodlands ge 

Odou

pe of mplaint 

Mode Conta

ur Direct calOffice ‐ Oresponde

ur Direct calOffice ‐ ECresponde

ur Email fromEPA 

ur Email fromEPA 

ur EnvironmHotline ‐ nurgent 

of ct 

NaturCompl

l to CE d 

Odour and over the lasdays 

l to C d 

Odour smehaze 

m  Smoke andcoming fromine as westrong odo

m  Odour of coblack sticky

ental non 

Ongoing odfrom MuswCoal 

re of laint 

haze st three 

Two wainfusionThe comthe comcall. 

ell and  Two wainfusion

d dust m the ell as a ur 

Informaspontadust lev

oal and y dust 

Informaspontadust lev

dour wellbrook 

OngoinmanageThe EC manageThe proregardidiscuss

Action Ta

ater carts were in on sprays operating mplaint's concerns mplainant at the tim

ater carts were in on sprays operating 

ation on operationaneous combustion vels provided to EP

ation on operationaneous combustion vels provided to EP

ng spontaneous comement is occurring discussed spontanement activities witocess for making a sing the Continuatiosed with the compla

16

aken

operation with in OC1 and OC2.  were discussed witme of their original 

operation with in OC1 and OC2. 

al activities, management and 

PA. 

al activities, management and 

PA. 

mbustion in OC1 and OC2.  eous combustion th the complainantsubmission to MSCon Project was ainant. 

62 

th 

t.   

2

C

1

1

1

1

MUSWE

2016 Annual Envir

Date of Complaint 

TimeCompl

2‐May‐16  2:32 P

3‐May‐16  8:33 A

4‐May‐16  10:00 A

8‐May‐16  2:19 P

ELLBROOK COAL CO

ronmental Manag

e of laint 

Date of Incident 

M 12‐May‐16 

AM 13‐May‐16 

AM 14‐May‐16 

M Various 

OMPANY LIMITED

gement Report

Time of Incident 

L

1:30 PM onwards 

WoRidg

8:30 AM WoRidg

overnight 

WoRidg

Various Mu

Location TypCom

oodlands ge 

Odou

oodlands ge 

Odou

oodlands ge 

Odou

scle Creek DRIV

pe of mplaint 

Mode Conta

ur EnvironmHotline ‐ urgent.  Eresponde

ur Direct calMCC OfficEC respon

ur EnvironmHotline ‐ urgent.  Oresponde

VING Direct calMCC OfficEC respon

of ct 

NaturCompl

ental 

C d 

Complainansee coal trumoving coaROM and wconcerned odour beingenerated activity. 

l to ce ‐ nded 

Smell and dmorning is concern.  Tconcerned affecting thchildren's a

ental 

OCE d 

Ongoing susmell and shaze 

l to ce ‐ nded 

People not stopping atsign comingmine acces

re of laint 

nt could ucks al to was about g from this 

The EC managethe souvariety inspectthe sitewas deabout hoffer wsite to manageEPA witregardicompla

dust this a 

They are it is he asthma 

The EC manageis a lonwas mareview manageEPA witregardicompla

ulphur smoke 

The OCmanagemateriaoperatiareas wbeing m

t stop g out of ss road 

Commucontracstoppin

Action Ta

discussed spontanement with the comurce of the odour coof sources.  The OCtion and monitorede and the complainatected.  Complainahealth impacts on twas made for the coreview the spontanement.  The complath a response proviing activities at the aint. 

discussed spontanement with the comg‐term strategy to ade for the complaithe spontaneous cement. The complath a response proviing activities at the aint. 

CE discussed spontaement with the comal was being mineding in OC1 and OC2was in progress withmined. 

unication provided ctors regarding safeng at this stop sign.

16

aken

eous combustion mplainant and that ould be from a CE completed a sited gas levels betweenant’s house ‐ no gasnt is concerned heir children.  An omplainant to visit neous combustion ainant also rang theided to the EPA time of the 

eous combustion mplainant and that manage.  An offer inant to visit site toombustion ainant also rang theided to the EPA time of the 

aneous combustionmplainant.  No hot  with infusion spray2.  Capping of hot h no hot material 

to employees and e driving and 

63 

e n s 

it 

 

ys 

2

C

1

2

2

2

2

2

2

MUSWE

2016 Annual Envir

Date of Complaint 

TimeCompl

9‐May‐16  12:47 

0‐May‐16  8:33 A

4‐May‐16  8:49 A

0‐May‐16  8:33 A

4‐May‐16  8:49 A

4‐May‐16  8:49 A

4‐May‐16  8:49 A

ELLBROOK COAL CO

ronmental Manag

e of laint 

Date of Incident 

PM 19‐May‐16 

AM 14‐May‐16 

AM 19‐May‐16 

AM 15‐May‐16 

AM 19‐May‐16 

AM 19‐May‐16 

AM 20‐May‐16 

OMPANY LIMITED

gement Report

Time of Incident 

L

12:43 PM 

NorMu

9:25 AM WoRidg

8:37 AM WoRidg

7:08 PM WoRidg

1:48 PM WoRidg

4:50 PM WoRidg

9:28 PM WoRidg

Location TypCom

rthswellbrook 

Blast

oodlands ge 

Odou

oodlands ge 

Odou

oodlands ge 

Odou

oodlands ge 

Dust

oodlands ge 

Dust

oodlands ge 

Odou

pe of mplaint 

Mode Conta

t EnvironmHotline ‐ urgent.  Eresponde

ur Email fromEPA 

ur Email fromEPA 

ur Email fromEPA 

Email fromEPA 

Email fromEPA 

ur Email fromEPA 

of ct 

NaturCompl

ental 

C d 

Blast shookhouse 

m  Strong odoand haze 

m  Sulphur sm

m  Strong odosulphur 

m  Dust from m

m  Dust from m

m  Sulphur sm

re of laint 

k their  Resultswere 0complaresponblast re

our smell  Informaspontaweatheprovide

mell Informaspontaweatheprovide

our like  Informaspontaweatheprovide

mine Informaspontamanagelevels w

mine Informaspontamanagelevels w

mell Informaspontaweatheprovide

Action Ta

s from closest moni.37mm/s and 108.8ainant also rang these provided to the esults. 

ation on operationaneous combustion er conditions and ded to EPA. 

ation on operationaneous combustion er conditions and ded to EPA. 

ation on operationaneous combustion er conditions and ded to EPA. 

ation on operationaneous combustion ement, weather cowere provided to EP

ation on operationaneous combustion ement, weather cowere provided to EP

ation on operationaneous combustion er conditions and ded to EPA. 

16

aken

tor to complainant8dB. The e EPA with a EPA regarding the 

al activities, management, ust levels were 

al activities, management, ust levels were 

al activities, management, ust levels were 

al activities, management, dustnditions and dust PA. 

al activities, management, dustnditions and dust PA. 

al activities, management, ust levels were 

64 

 

2

C

2

2

2

2

2

MUSWE

2016 Annual Envir

Date of Complaint 

TimeCompl

5‐May‐16  10:05 A

6‐May‐16  3:04 P

6‐May‐16  3:04 P

9‐May‐16  8:37 P

9‐May‐16  9:08 P

ELLBROOK COAL CO

ronmental Manag

e of laint 

Date of Incident 

AM 25‐May‐16 

M 24‐May‐16 

M 25‐May‐16 

M 29‐May‐16 

M 29‐May‐16 

OMPANY LIMITED

gement Report

Time of Incident 

L

10:05 AM 

WoRidg

7:09 PM WoRidg

8:42 AM WoRidg

8:37 PM WoRidg

9:08 PM WoRidg

Location TypCom

oodlands ge 

Odou

oodlands ge 

Odou

oodlands ge 

Odou

oodlands ge 

Odou

oodlands ge 

Odou

pe of mplaint 

Mode Conta

ur Direct calMCC OfficEC respon

ur Email fromEPA 

ur Email fromEPA 

ur EnvironmHotline ‐ urgent.  Oresponde

ur EnvironmHotline ‐ nurgent 

of ct 

NaturCompl

l to ce ‐ nded 

Odour and 

m  Sulphur sm

m  Offensive o

ental 

OCE d 

Sulphur smtaste 

ental non 

Sulphur sm

re of laint 

haze The EC combucomplaon sponcomplaand wainformeseriousissue bcomplawas prosponta

mell Informaspontaweatheprovide

odour Informaspontamanagelevels w

mell and  No hot infusionrunningmining complaactivitie

mell No hot infusionrunningmining was lefcall bac

Action Ta

discussed the currestion managementainant and the impantaneous combustiainant has had enouants it resolved.  Thed that MCC are tasly and are working ut it is not a quick fainant also rang theovided to the EPA rneous combustion 

ation on operationaneous combustion er conditions and ded to EPA. 

ation on operationaneous combustion ement, weather cowere provided to EP

coal on ROM or ben sprays running ing and one drill operactivities were occainant was aware ofes being undertake

coal on ROM or ben sprays running ing and one drill operactivities were occft with the complainck if they wished to

16

aken

ent spontaneous  activities with the act weather can havion.  The ugh of the situatione complainant was king the issue on managing the fix solution.  The e EPA and a responsregarding management. 

al activities,management, ust levels were 

al activities, management, dustnditions and dust PA. 

eing processed and OC1 and OC2.  CHPrating.  No other curring.  The f the management en on site. 

eing processed and OC1 and OC2. CHPrating.  No other curring.  A message nant asking them to discuss further. 

65 

ve 

se 

PP 

PP 

2

C

3

2

2

2

2

MUSWE

2016 Annual Envir

Date of Complaint 

TimeCompl

0‐May‐16  10:16 A

8‐Jun‐16  1:13 P

8‐Jun‐16  1:13 P

8‐Jun‐16  1:13 P

8‐Jun‐16  1:13 P

ELLBROOK COAL CO

ronmental Manag

e of laint 

Date of Incident 

AM 30‐May‐16 

M 13‐Jun‐16 

M 14‐Jun‐16 

M 14‐Jun‐16 

M 14‐Jun‐16 

OMPANY LIMITED

gement Report

Time of Incident 

L

During the morning 

Mu

7:50 AM Mu

7:06 AM Mu

7:15 AM WoRidg

8:20 AM WoRidg

Location TypCom

scle Creek Odou

scle Creek Odou

scle Creek Odou

oodlands ge 

Odou

oodlands ge 

Odou

pe of mplaint 

Mode Conta

ur EnvironmHotline ‐ nurgent 

ur Email fromEPA 

ur Email fromEPA 

ur Email fromEPA 

ur Email fromEPA 

of ct 

NaturCompl

ental non 

Cloud of smsmell of od

m  Strong smesulphur, lowplume overproperty, rissue.  Start7am this m

m  Strong sulpsmell comiMuswellbrosince 5:40a

m  Odour fromMuswellbroat 6:00am tmorning.  Odescribed aburning rotsulphur smputrid and strong. 

m  Strong smesulphur (rogas) in the described achemical sm

re of laint 

moke and our 

The EC manageoffer wthe sitebeing uback tocomplataking tmanagsolutio

ell of w fog r ecurring ted at 

morning. 

Informaspontamanageand du

phur ng from ook Coal am 

Informaspontamanageand du

m ook Coal this Odour as tten ell, very very 

Informaspontamanageand du

ell of otten egg air as a mell 

Informaspontamanageand du

Action Ta

discussed spontanement with the com

was made for the coe so they could visuundertaken.  The coo MCC about the sitainant was informedthe issue seriously ing the issue but it n. 

ation on operationaneous combustion ement, weather cost levels were prov

ation on operationaneous combustion ement, weather cost levels were prov

ation on operationaneous combustion ement, weather cost levels were prov

ation on operationaneous combustion ement, weather cost levels were prov

16

aken

eous combustion mplainant and an omplainant to visit alise the activities omplainant will be te visit.  The d that MCC are and are working onis not a quick fix 

al activities, management, dustnditions, gas levelsided to EPA. 

al activities, management, dustnditions, gas levelsided to EPA. 

al activities, management, dustnditions, gas levelsided to EPA. 

al activities, management, dustnditions, gas levelsided to EPA. 

66 

t s 

t s 

t s 

t s 

2

C

2

2

0

0

1

MUSWE

2016 Annual Envir

Date of Complaint 

TimeCompl

8‐Jun‐16  1:13 P

8‐Jun‐16  1:13 P

1‐Jul‐16  4:13 P

4‐Jul‐16  8:20 P

5‐Jul‐16  11:16 A

ELLBROOK COAL CO

ronmental Manag

e of laint 

Date of Incident 

M 14‐Jun‐16 

M 14‐Jun‐16 

M 01‐Jul‐16 

M 04‐Jul‐16 

AM 12‐Jul‐16 

OMPANY LIMITED

gement Report

Time of Incident 

L

8:49 AM WoRidg

7:10 AM WoRidg

3:00 PM WoRidg

8:20 PM Abe

5:00 PM WoRidg

Location TypCom

oodlands ge 

Odou

oodlands ge 

Odou

oodlands ge 

Dust

erdeen Odou

oodlands ge 

Odou

pe of mplaint 

Mode Conta

ur Email fromEPA 

ur Email fromEPA 

Email fromEPA 

ur Direct calOffice ‐ Oresponde

ur Email fromEPA 

of ct 

NaturCompl

m  Sulphur odthe area.  Owere notice7:30am andpresent at Odours havinside the h

m  Burning coaPutrid smeClinging to Affecting chbreathing.

m  Dust blowinMuswellbroMine 

l to CE d 

Visual impaDartbrook and odour home 

m  Sulphur smarea 

re of laint 

ours in Odours ed at d still 8:50am.  ve gone house 

Informaspontamanagelevels w

al odour.  ll.  clothes.  hildren's 

Informaspontamanagelevels w

ng off ook Coal 

As partmanagesprays outbreaorder tpush sowindro3:00pmobserviactivitiewas pro

acts from Road smell at 

Water pit.  ThCut 1 anew ou

mell in the  A stronof the mthat theoperatithe EPA

Action Ta

ation on operationaneous combustion ement, weather cowere provided to EP

ation on operationaneous combustion ement, weather cowere provided to EP

t of MCC's spontaneement activities onwere being installeak of spontaneous o install these spraome material off thow.  These activitiesm and 3:30pm with ing that the dust cloes dissipated quicklovided to the EPA.

sprays and water cae OCE conducted and Open Cut 2 andutbreaks of spontan

ng NW wind was premining operations aere was no haze visions.  This informatA. 

16

aken

al activities, management, dustnditions and dust PA. 

al activities, management, dustnditions and dust PA. 

eous combustion n site new water ed to control a smalcombustion.  In ys a dozer needed te top of a s occurred betweensite personnel oud from these ly.  This information

arts operational in n inspection of Opedid not identify an

neous combustion. 

esent.  An inspectioat ~4:00pm indicatesible from the tion was provided t

67 

to 

en y  

on ed 

2

C

1

1

1

MUSWE

2016 Annual Envir

Date of Complaint 

TimeCompl

5‐Jul‐16  11:16 A

5‐Jul‐16  11:16 A

6‐Jul‐16  10:04 A

ELLBROOK COAL CO

ronmental Manag

e of laint 

Date of Incident 

AM 14‐Jul‐16 

AM 15‐Jul‐16 

AM 16‐Jul‐16 

OMPANY LIMITED

gement Report

Time of Incident 

L

8:00 AM WoRidg

10:00 AM 

WoRidg

From 6:00 AM 

Mu

Location TypCom

oodlandsge 

Odou

oodlands ge 

Odou

scle Creek Odou

pe of mplaint 

Mode Conta

ur Email fromEPA 

ur Email fromEPA 

ur EnvironmHotline ‐ nurgent 

of ct 

NaturCompl

m  Odour of bcoal (sulphodour) 

m  Dust and o

ental non 

Strong smesulphur andhanging ov

re of laint 

urning ur 

A light was a vobservait was cno odoarea atprovide

dour A light was a vobservait was cno odoarea atprovide

ell of d fog er area 

InfusioOC2, wspontaObservgeneraodour fsmoke complais healta quickthat MCcomplato the E

Action Ta

NW wind was presvisible haze from thations by site persoclear in Woodlands ur present in the W ~7:30am.  This infoed to the EPA. 

NW wind was presvisible haze from thations by site persoclear in Woodlands ur present in the W ~7:50am.  This infoed to the EPA. 

n sprays were operwater carts were woneous combustion vations by site persol area of complaintfrom spontaneous cwas detectable.  Thainant on 18/07/16th impacts.  They ark fix to the problem CC are working on ained to EPA with a EPA. 

16

aken

ent.  While there e operation, onnel indicated thatRidge and there w

Woodlands Ridge ormation was 

ent.  While there e operation, onnel indicated thatRidge and there w

Woodlands Ridge ormation was 

rating in OC1 and orking on management.  onnel at ~8:15am in did not indicate ancombustion, wood he EC rang the .  Their main concere aware there is nobut are appreciativit.  Complainant alsresponse provided

68 

t as 

t as 

n n 

rn ot ve so d 

2

C

1

1

2

2

MUSWE

2016 Annual Envir

Date of Complaint 

TimeCompl

8‐Jul‐16  4:07 P

9‐Jul‐16  4:30 P

0‐Jul‐16  9:52 A

2‐Jul‐16  9:41 A

ELLBROOK COAL CO

ronmental Manag

e of laint 

Date of Incident 

M 16‐Jul‐16 

M 19‐Jul‐16 

AM 20‐Jul‐16 

AM 22‐Jul‐16 

OMPANY LIMITED

gement Report

Time of Incident 

L

8:00 AM WoRidg

4:30 PM McC

9:30 AM NorMu

From 8:00 AM 

Mu

Location TypCom

oodlands ge 

Odou

Cully's Gap Odou

rthswellbrook 

Odou

scle Creek Odou

pe of mplaint 

Mode Conta

ur Email fromEPA 

ur Direct calOffice ‐ MaintenaSupervisoresponde

ur EnvironmHotline ‐ nurgent 

ur EnvironmHotline ‐ nurgent 

of ct 

NaturCompl

m  Sulphur smlayer of haz

l to 

nce or d 

Sulphur sm

ental non 

SpontaneocombustionAppears tosmoke but tell due to cloud. 

ental non 

Sulphur sm

re of laint 

mell and ze/smog 

InfusiooperatispontaAccess Observgeneraodour finforma

mell The EC discussfrequenspontaactivitiediscuss

us n smell.   be hard to low 

There wOCE oboperatianythinand surnot detcomplathat the

mell Dams wwith tharea, weffectivsteam wwith thcommitavailabacceptealso coprovide

Action Ta

n sprays and K‐line ional and dozers weneous combustion to a hot area was bvations by site persol area of complaintfrom spontaneous cation was provided

rang the complainas their concerns.  Thntly but yesterday wneous combustion es and weather impsed. 

was wet weather anbserved odour at thion at ~10:40am anng.  The EC observerrounding area at ~tect odour.  The EC ainant at ~11:00am e odour had gone a

were being dewaterhe water being usedwhich was hot.  The ve at cooling down was being generatehe complainant on 2tment made for soble) next time they sed by the complainmplained to the EPed to the EPA. 

16

aken

sprays were ere working on management.  being developed. onnel at ~7:50am in did not indicate ancombustion. This  to the EPA. 

ant on 20/07/16 tohey do smell odour was very bad.  The management pacts were 

nd low pressure.  The edge of the nd could not smell d odour in Queen S~11:00am and couldspoke with the and they confirmeaway. 

red after recent raid to cool the goaf water was very the area but a lot oed.  The EC spoke 22/07/16 with a meone to visit (if smelt it.  This was ant.  Complainant PA with a response 

69 

n n 

he 

St d 

ed 

of 

2

C

2

0

0

0

MUSWE

2016 Annual Envir

Date of Complaint 

TimeCompl

2‐Jul‐16  3:07 P

1‐Aug‐16  12:15 

1‐Aug‐16  9:46 A

2‐Aug‐16  8:17 A

ELLBROOK COAL CO

ronmental Manag

e of laint 

Date of Incident 

M 20‐Jul‐16 

PM 29‐Jul‐16 

AM 01‐Aug‐16 

AM 02‐Aug‐16 

OMPANY LIMITED

gement Report

Time of Incident 

L

9:51 AM NorMu

8:30 AM WoRidg

9:46 AM Mu

8:17 AM Mu

Location TypCom

rthswellbrook 

Odou

oodlands ge 

Odou

scle Creek Odou

scle Creek VISUA

pe of mplaint 

Mode Conta

ur Email fromEPA 

ur Email fromEPA 

ur EnvironmHotline ‐ urgent.  Eresponde

AL EnvironmHotline ‐ urgent.  Eresponde

of ct 

NaturCompl

m  Odour fromspontaneoucombustion

m  Odour and from coal m

ental 

C d 

Strong smesulphur andplume hangtheir prope

ental 

C d 

Huge Fog/S

re of laint 

m us n 

There wOCE oboperatianythinand surnot detprovide

dust mine 

Spontaand OCwere thoperatithe WoregardiEPA. 

ell of d a ging over erty 

Spontaand OCthe envdetect the EC propertdiscussodour wand EAcomplavisible. EPA an

Smoke Spontaand OCthe comthe comdetectecomplathe smtheir re

Action Ta

was wet weather anbserved odour at thion at ~10:40am anng.  The EC observerrounding area at ~tect odour.  This infed to the EPA. 

neous managemenC2 were in place.  Sihat a haze was visibion but was not direoodlands Ridge areaing the complaint w

neous managemenC2 were in place. Thvironment at ~7:30any odour.  Followand EA visited the cty to make some obs the complainant's was no longer dete arrived, which wasainant.  There was s The complainant ad a response was p

neous managemenC2 were in place. Thmplainant's residenmplaint.  No odour ed at the complainaainant later confirmoke while driving aesidence rather tha

17

aken

nd low pressure.  The edge of the nd could not smell d odour in Queen S~11:00am and couldformation was 

nt activities in OC1 ite observations ble from the ectly impacting on a.  Information was provided to the

nt activities in OC1 he EC had observedam and did not ing the complaint complainant's bservations and to concerns.  The ctable when the ECs confirmed by the still a slight haze also contacted the provided to the EPA

nt activities in OC1 he EC and EA visitednce ~20 minutes aftor smoke was ant's residence.  Thmed that they noticelong the road near t at their residence

70 

he 

St d 

 

A. 

d er 

e ed 

e. 

2

C

0

0

0

0

0

1

2

MUSWE

2016 Annual Envir

Date of Complaint 

TimeCompl

5‐Aug‐16  11:42 A

5‐Aug‐16  11:42 A

5‐Aug‐16  11:42 A

8‐Aug‐16  9:23 A

8‐Aug‐16  11:15 A

7‐Aug‐16  7:17 A

3‐Aug‐16  11:44 A

ELLBROOK COAL CO

ronmental Manag

e of laint 

Date of Incident 

AM 03‐Aug‐16 

AM 04‐Jul‐16 

AM 04‐Jul‐16 

AM 08‐Aug‐16 

AM 08‐Aug‐16 

AM 17‐Aug‐16 

AM 17‐Aug‐16 

OMPANY LIMITED

gement Report

Time of Incident 

L

11:30 AM 

Sco

12:45 PM 

WoRidg

12:45 PM 

WoRidg

8:23 AM Mu

9:30 AM Mu

7:17 AM Mu

8:00 AM WoRidg

Location TypCom

one Odou

oodlands ge 

Blast

oodlands ge 

Blast

scle Creek Odou

scle Creek Odou

scle Creek Odou

oodlands ge 

Odou

pe of mplaint 

Mode Conta

ur Email fromEPA 

t Email fromEPA 

t Email fromEPA 

ur Direct calOCE phonOCE responde

ur In person EnvironmAdvisor 

ur EnvironmHotline ‐ urgent.  Eresponde

ur Email fromEPA 

of ct 

NaturCompl

m  Strong acridsulphur sm

m  Blast causeto shake anbrown plumvisible folloblast 

m  Blast causeto shake anwindows to

l to ne ‐ 

Could see sand smell s

to ental 

Odour smeproperty 

ental 

A d 

Whole stre

m  Burning coa

re of laint 

d ell 

Spontaand OCpresentwas pro

ed house nd a me was owing the 

All blaslimits.  was pro

ed house nd o rattle 

All blaslimits.  was pro

smoke sulphur 

A spraythe goagenerawith a sdetecte

ell at  A spraythe goageneracomplatheir ya

eet smells Spontaand OCcomplaagreemdetectoa limite

al smell Spontaand OCarea atA respo

Action Ta

neous managemenC2 were in place.  Stt.  Information regaovided to the EPA.

st results complied wInformation regardovided to the EPA.

st results complied wInformation regardovided to the EPA.

y had been placed oaf area and a lot of ted.  The EA visitedsite gas monitor aned. 

y had been placed oaf area and a lot of ted. With agreemeainant a gas detectoard for a limited tim

neous managemenC2 were in place.  Thainant and could smment from the compor has been placed ed time. 

neous managemenC2 were in place.  Th ~7:10am and couldonse was provided t

17

aken

nt activities in OC1 trong SE winds werarding the complain

with allowable ding the complaint 

with allowable ding the complaint 

on hot material in steam was being d the complainant nd no gas was 

on hot material in steam was being nt from the or has been placed me. 

nt activities in OC1 he EA visited the mell odour.  With plainant a gas near their house fo

nt activities in OC1 he EA was in the d not detect odourto the EPA. 

71 

e nt 

in 

or 

.  

2

C

2

2

2

2

1

1

1

MUSWE

2016 Annual Envir

Date of Complaint 

TimeCompl

3‐Aug‐16  11:44 A

3‐Aug‐16  11:44 A

4‐Aug‐16  11:07 A

6‐Aug‐16  8:39 P

2‐Sep‐16  7:21 A

2‐Sep‐16  7:53 A

3‐Sep‐16  6:33 A

ELLBROOK COAL CO

ronmental Manag

e of laint 

Date of Incident 

AM 19‐Aug‐16 

AM 22‐Aug‐16 

AM 24‐Aug‐16 

M 26‐Aug‐16 

AM 12‐Sep‐16 

AM 12‐Sep‐16 

AM 13‐Sep‐16 

OMPANY LIMITED

gement Report

Time of Incident 

L

12:40 PM 

WoRidg

5:00 AM ‐ 12:00 Noon 

WoRidg

9:00 AM Sco

8:39 PM SouMu

7:21 AM Mu

7:53 AM Mu

6:33 AM Mu

Location TypCom

oodlands ge 

Dust

oodlands ge 

Odou

one Odou

uthswellbrook 

Visua

scle Creek Odou

scle Creek Odou

scle Creek Odou

pe of mplaint 

Mode Conta

Email fromEPA 

ur Email fromEPA 

ur Email fromEPA 

al Direct calOCE phonOCE responde

ur EnvironmHotline ‐ urgent.  Eresponde

ur EnvironmHotline ‐ urgent.  Eresponde

ur EnvironmHotline ‐ urgent.  Eresponde

of ct 

NaturCompl

m  Excessive dcoming frooperation

m  Spontaneocombustion

m  Odour fromDrayton or Muswellbro

l to ne ‐ 

Could see aof smoke ocoming frooperations

ental 

A d 

Sulphur Od

ental 

A d 

Horrendouof sulphur aplume hangvalley 

ental 

A d 

There was the house

re of laint 

dust m the 

Dust lewas pro

us n odour 

Spontaand OCarea atA respo

m either 

ook Coal 

Spontaand OCprovide

a plume or steam m the 

Spontaand OCmined OC1 wa

dour Spontaand OCcomplacomplawere vithe odo

s smell and ging over 

Spontaand OCcomplacomplawere vithe odo

odour at  Spontaand OCvisited the comwere vithe odo

Action Ta

vels were below crovided to the EPA.

neous managemenC2 were in place.  Th ~7:40am and couldonse was provided t

neous managemenC2 were in place. A ed to the EPA. 

neous managemenC2 were in place. Hoat the time of the cas suspended until 

neous managemenC2 were in place. Thainant location shoraint and observed tisible.  The odour raour was patchy. 

neous managemenC2 were in place. Thainant location shoraint and observed tisible.  The odour raour was patchy. 

neous managemenC2 were in place. Ththe complainant lomplaint and observeisible.  The odour raour was irregular. 

17

aken

iteria.  A response 

nt activities in OC1 he EA was in the d not detect odourto the EPA. 

nt activities in OC1 response was 

nt activities in OC1 ot material was beicomplaint.  Mining the plume cleared.

nt activities in OC1 he EA visited the rtly after the hat haze and fog anking was 1/6 and

nt activities in OC1 he EA visited the rtly after the hat haze and fog anking was 1/6 and

nt activities in OC1 he EA and SOM ocation shortly aftered that haze and foanking was 1/6 and

72 

.  

ng in  

r og d 

2

C

1

1

2

2

0

0

MUSWE

2016 Annual Envir

Date of Complaint 

TimeCompl

3‐Sep‐16  7:24 A

7‐Sep‐16  9:12 A

4‐Sep‐16  8:09 A

8‐Sep‐16  8:52 A

4‐Oct‐16  10:29 A

7‐Oct‐16  7:05 A

ELLBROOK COAL CO

ronmental Manag

e of laint 

Date of Incident 

AM 13‐Sep‐16 

AM 17‐Sep‐16 

AM 24‐Sep‐16 

AM 28‐Sep‐16 

AM 21‐Sep‐16 

AM 07‐Oct‐16 

OMPANY LIMITED

gement Report

Time of Incident 

L

7:24 AM Mu

9:12 AM Mu

8:09 AM Mu

8:52 AM Mu

12:10 PM 

WoRidg

7:05 AM Mu

Location TypCom

scle Creek Odou

scle Creek Odou

scle Creek Odou

scle Creek Odou

oodlands ge 

Dust

scle Creek Odou

pe of mplaint 

Mode Conta

ur EnvironmHotline ‐ urgent.  Eresponde

ur EnvironmHotline ‐ urgent.  Oresponde

ur EnvironmHotline ‐ nurgent.  Oresponde

ur EnvironmHotline ‐ urgent.  Eresponde

Email fromEPA 

ur EnvironmHotline ‐ urgent.  Eresponde

of ct 

NaturCompl

ental 

A d 

Sulphur smhouse 

ental 

OCE d 

Odour and 

ental non OCE d 

Sulphur Odstrong 

ental 

A d 

Strong odofog 

m  Dust leavin

ental 

A d 

Sulphur od

re of laint 

mell at  Spontaand OCvisited the comwere vithe odo

haze Spontaand OCconstrugoaf arcompla

dour very  Spontaand OCgeneraany odocomplaperform

our and  Spontaand OCcomplawas visyard ofthe EPAto the E

ng site Dust mno excewas pro

our Spontafocusinclay.  Mwith th

Action Ta

neous managemenC2 were in place. Ththe complainant lomplaint and observeisible.  The odour raour was irregular. 

neous managemenC2 were in place. Anucted for sealing of rea.  Attempts by thainant to discuss we

neous managemenC2 were in place. Obl area at approx. 7:our.  During a followainant commented mance has improve

neous managemenC2 were in place. Thainant following thesible and the odour f residence.  The coA as well and a respEPA. 

management activitieedance of dust critovided to the EPA.

neous combustion ng on plugging a roaManagement activithe complainant. 

17

aken

nt activities in OC1 he EA and SOM ocation shortly aftered that haze and foanking was 1/6 and

nt activities in OC1 n inert seal was beinthe high wall in the

he OCE to contact there unsuccessful. 

nt activities in OC1 bservations in the 15am did not detecw up phone call thethat the mine ed recently. 

nt activities in OC1 he EA visited the e complaint.  Haze ranked 1/6 in frontmplainant contacteponse was provided

es were in place witeria.  A response 

activities were adway in OC1 with ies were discussed 

73 

r og d 

ng e he 

ct e 

t ed d 

ith 

2

C

0

1

1

1

1

0

0

0

MUSWE

2016 Annual Envir

Date of Complaint 

TimeCompl

7‐Oct‐16  10:25 A

4‐Oct‐16  9:31 A

5‐Oct‐16  8:33 A

7‐Oct‐16  11:44 A

7‐Oct‐16  11:44 A

1‐Nov‐16  8:09 A

1‐Nov‐16  9:02 A

7‐Nov‐16  8:19 A

ELLBROOK COAL CO

ronmental Manag

e of laint 

Date of Incident 

AM 07‐Oct‐16 

AM 13‐Oct‐16 

AM 15‐Oct‐16 

AM 15‐Oct‐16 

AM 15‐Oct‐16 

AM 01‐Nov‐16 

AM 01‐Nov‐16 

AM 07‐Nov‐16 

OMPANY LIMITED

gement Report

Time of Incident 

L

Unknown 

WoRidg

8:00 AM Sco

8:33 AM Mu

8:00 AM WoRidg

8:30 AM WoRidg

8:09 AM Mu

7:30 AM WoRidg

8:19 AM Mu

Location TypCom

oodlands ge 

Odou

one Odou

scle Creek Odou

oodlands ge 

Odou

oodlands ge 

Odou

scle Creek Odou

oodlands ge 

Odou

scle Creek Odou

pe of mplaint 

Mode Conta

ur Email fromEPA 

ur Email fromEPA 

ur EnvironmHotline ‐ urgent.  Eresponde

ur Email fromEPA 

ur Email fromEPA 

ur EnvironmHotline ‐ urgent.  Oresponde

ur Email fromEPA 

ur EnvironmHotline ‐ urgent.  Oresponde

of ct 

NaturCompl

m  Odour

m  Odour of sufrom an unsource 

ental 

A d 

Sulphur od

m  Sulphur odburning coa

m  Sulphur odburning coadust 

ental 

OCE d 

Strong odoslight smok

m  Smell of bucoal 

ental 

OCE d 

Very strongand fumes 

re of laint 

Spontafocusinclay.  Mwith thprovide

ulphur known 

Spontaand OCprovide

our Spontaand OCundertaof the cdetectacomplawere d

our from al 

Spontaactivitierespon

our from al and 

Spontaactivitierespon

our and ke flume 

Spontaactivitiecomplabeing u

urning  Spontaand OCrespon

g sulphur in the air 

SpontaactivitieAttempunsucclocatioodour.

Action Ta

neous combustion ng on plugging a roaManagement activithe complainant anded to the EPA. 

neous managemenC2 were in place. A ed to the EPA. 

neous managemenC2 were in place. Odaken by site personcomplaint indicatedable in the areas obainant was contacteiscussed further. 

neous combustion es in OC1 and OC2 se was provided to

neous combustion es in OC1 and OC2 se was provided to

neous combustion es in OC1 and OC2 ainant was advised undertaken on site.

neous managemenC2 were in place. Thse was not required

neous combustion es in OC1 and OC2 pts to contact the cessful.  The EA visitn at 8:35am and co

17

aken

activities were adway in OC1 with ies were discussed  a response was 

nt activities in OC1 response was 

nt activities in OC1 dour observations nnel around the timd that odour wasn'tbserved.  The ed and their concer

management were in place. A  the EPA. 

management were in place. A  the EPA. 

management were in place.  Theof the activities 

nt activities in OC1 he EPA advised thatd. 

management were in place.  omplainant were ted the complainanould not detect any 

74 

me t 

rns 

 

t a 

2

C

1

0

1

1

2

MUSWE

2016 Annual Envir

Date of Complaint 

TimeCompl

6‐Nov‐16  7:39 A

5‐Dec‐16  1:14 P

4‐Dec‐16  11:09 A

9‐Dec‐16  1:39 P

6‐Dec‐16  7:33 P

ELLBROOK COAL CO

ronmental Manag

e of laint 

Date of Incident 

AM 16‐Nov‐16 

M 27‐Nov‐16 

AM 13‐Dec‐16 

M 17‐Dec‐16 

M 26‐Dec‐16 

OMPANY LIMITED

gement Report

Time of Incident 

L

7:00 AM Mu

11:30 PM 

Sco

7:20 AM WoRidg

6:05 AM WoRidg

7:33 PM NorMu

Location TypCom

scle Creek Odou

one Odou

oodlands ge 

Odou

oodlands ge 

Odou

rthswellbrook 

Odou

pe of mplaint 

Mode Conta

ur EnvironmHotline ‐ urgent.  Oresponde

ur Email fromMSC 

ur Email fromEPA 

ur Email fromEPA 

ur Direct calOCE phonOCE responde

 

of ct 

NaturCompl

ental 

OCE d 

Strong sulpsmell 

m  Odour thatlike spontacombustion

m  Strong coal

m  Thick smoksulphur sm

l to ne ‐ 

Could not soutside thedue to the 

re of laint 

phur  Spontaactivitiecomplabeing uthey co

t smells neous n 

Spontaplace. Mreceivinnot req

l smell Spontaactivitieapproxdid notrespon

ke and ell 

Spontaactivitieapproxdetecteamounto the rwas pro

sit eir house smell 

No minChristmrunningdiscussmanage

Action Ta

neous combustion es in OC1 and OC2 ainant was advised undertaken on site. ould smell the odou

neous combustion MSC advised due tong the complaint thquired. 

neous combustion es were in place. Oximately 1 hour befot detect any odour ise was provided to

neous combustion es were in place. Oximately 1.5 hours aed very weak odourts of steam were brain from the night ovided to the EPA.

ning equipment wasmas shutdown.  Infug.  OCE spoke with sed the spontaneouement activities oc

17

aken

management were in place.  Theof the activities  They commented 

ur inside the house.

management was o the delay in hat a response was 

management dour observations ore the complaint in the area.  A  the EPA. 

management dour observations after the complaint r in the area.  Minoeing generated duebefore.  A respons

s operating due to usion sprays were the complainant anus combustion curring on site. 

75 

 

 

in 

or e e 

nd