bhogpurcsm.combhogpurcsm.com/group-b 2017-18.docx · web viewservicing of power turbine 1019 1mw...
TRANSCRIPT
![Page 1: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/1.jpg)
TENDER FORM/N.I.TTender form for supply of…..Computerized Calendaring & Development Software and Spares of computer
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email : [email protected] Mill Website:- www.bhogpurcsm.com
The General Manager, The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt Jalandhar.
Sub: Supply of …A.M.C. for Development/Maintenance and up-gradation of Computer software for cane department
In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.S.No. Description of Material/Items Rate 1 A.M.C. for Development/Maintenance and
up-gradation of Computer software for cane department for crushing season 2017-18
Scope of Work
a) Grower wise Survey, Bond Calendar, Nos. & Bank Account.
b) Preparations of Growers Bond V/s Cane supply details 85% Bond V/s cane supply.
c) Preparation of Bond Master
d) Process & Printing of R/slip
e) Cane calendaring of different groups
f) Preparation of stickers of earning bio-data of Bond cane areas and Nos. of purchases and bank
account.
g) Cane survey report group wise, variety wise, circle wise, Zone wise, total no. of registered
growers.
h) Preparations of cane payment group wise, loan deduction, bank wise etc. (day to day).
i) Automatic data entry for weight entry from electronic. Weigh-bridge connectivity with computer.
j) Sugar cane payment to growers through cheque/bank advice.
k) Automatic Loan deduction with interest calculation at the time of cane payment.
l) Automatic penalty retain and forfeit deduction.
m) Sugar permit issue to cane growers.
![Page 2: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/2.jpg)
n) M.I.S. reporting on the subject as per requirement of G.M./CCDO.
o) On line SMS facility regarding advance information of requisition slips and cane payment etc. for
growers on their mobile phone if required with SMS pack.
Note: Price list of computers spares to be submitted.
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 3: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/3.jpg)
Scope of Work
(a) Maintenance of Account books in the software provided by you.(b) Maintenance of general ledger, Journal and various sub ledger.(c) Maintenance/Preparation of income tax calculation of mill employers.(d) Maintenance/Preparation of form No.16 of income tax.(e) Maintenance/preparation salary ledger.(f) Maintenance/preparation of salary sheet (month wise).(g) Maintenance/preparation of retaining allowance.(h) Maintenance/preparation of overtime sheet of its record.(i) Maintenance/preparation of pf record of mill employed.(j) Maintenance/preparation of various store ledger.(k) Maintenance/preparation of daily stock store pf record.(l) Maintenance/preparation of store issue record.(m) Maintenance/preparation of store inventory (monthly).(n) Maintenance/preparation of store inventory (yearly).(o) Maintenance/preparation of store consumption (monthly).(p) Maintenance/preparation of MRIRS.(q) Maintenance/preparation of excise invoiced of sugar/molasses/press
mud/scrap.(r) Maintenance/preparation of daily stock position.(s) Maintenance/preparation of monthly stock position.(t) Maintenance/preparation of sugar/molasses/press mud day book.(u) Maintenance/preparation of customer ledger.(v) Maintenance/preparation of various statutory Excise record such RQ-1
molasses sugar.
Note: Price list of computes spares to be submitted
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 4: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/4.jpg)
Terms & Condition :- For Job1. The contract shall be valid from start of crushing season of 2017-18 till start
of next crushing season 2018-192. 50% payment of the software will be released after satisfactory installation
of the software before start of crushing season 2017-18and balance 50% after completion of crushing season 2017-18 on recommendation of concerned HOD.
3. You will be available around the clock during crushing season 2017-18 over telephone.
4. You will provide a trained computer operator from the start of crushing season 2017-18 till the end of crushing season to the mills on monthly salary of Rs. 8000/- per month so as to ensure smooth uninterrupted working for the software round the clock.
5. Your rate will be inclusive of EPF/Insurance etc. of your employees.6. T.D.S./Service Tax will be deducted from your bills as per law.7. Undersigned reserve the right to cancel your contract at any time without
assigning any reason.
![Page 5: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/5.jpg)
TENDER FORM/N.I.TTender form for supply of…..Computerized Calendaring & Development Software and Spares of computer Item Sr. No. B-1
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email : [email protected] Mill Website:- www.bhogpurcsm.com
The General Manager, The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt Jalandhar.
Sub: Work order of Computer Software/ Development/Maintenance and up-gradation in the mills.
In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.S.No. Description of Material/Items Rate 1 Software Development/Maintenance of
account, Store, Pay Roll (Salary), purchase, sale & General for the Financial year April 2016 to March 2017
Scope of Work
(a) Maintenance of Account books in the software provided by you.(b) Maintenance of general ledger, Journal and various sub ledger.(c) Maintenance/preparation of income tax calculation of mill employers.(d) Maintenance/preparation of form no. 16 of income tax.(e) Maintenance/preparation of salary ledger.(f) Maintenance/preparation of salary sheet (month wise).(g) Maintenance/preparation of retaining allowance.(h) Maintenance/preparation of overtime sheet of its record.(i) Maintenance/preparation of pf record of mill employed.(j) Maintenance/preparation of various store ledger.(k) Maintenance/preparation of daily stock store pf record.(l) Maintenance/preparation of store issue record.(m) Maintenance/preparation of store inventory (monthly).(n) Maintenance/preparation of store inventory (yearly).(o) Maintenance/preparation of store consumption ( monthly).(p) Maintenance/preparation of MRIRS.(q) Maintenance/preparation of excise invoiced of sugar/molasses/press mud/scrap.(r) Maintenance/preparation of daily stock position.
![Page 6: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/6.jpg)
(s) Maintenance/preparation of monthly stock position.(t) Maintenance/preparation of sugar/molasses/press mud day book.(u) Maintenance/preparation of customer ledger.(v) Maintenance/preparation of various statutory Excise record such RQ-1 molasses sugar.
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 7: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/7.jpg)
Terms & Condition :- For Job
1. The contract shall be valid from 01 April 2017 to 31 March 20182. 50% payment of the software will be released after satisfactory
installation/running of the software before 31 October 2017 and balance 50% after completion of Financial year 2017-18 on recommendation of concerned HOD.
3. You will be available around the clock during the year 2017-18 over telephone.
4. T.D.S./Service Tax will be deducted from your bills as per law.5. Undersigned reserve the right to cancel your contract at any time without
assigning any reason.
![Page 8: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/8.jpg)
TENDER FORM/N.I.T.Tender Form for the supply Jobs of …Winding of various Motors Item Sr. No…B-2a
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com _______________________________________________________________________________________The General Manager,The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.Sub: - Jobs of …Winding of various MotorsIn response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.
Sr.No. Description of Material/Items Units Qty. Rate Quoted (per Unit)
12.3.4.5.6.7.8.9.10.11.12.131415.16.17.
18
Winding of Electrical Motors with SE copper wire of HTP/Chetak/HWP/Asian, F-class insulation. 0.5 HP RPM-14403 HP RPM-14403 HP RPM-29005 HP RPM-14405 HP RPM-29007.5 HP RPM-14407.5 HP RPM-96010 HP RPM-144010 HP RPM-96015 HP RPM-144025 HP RPM-144040 HP RPM-144060 Hp rpm -1440 75 HP rpm 1440,2900 120 HP –rpm 960,1440 & 2900150 HP –rpm 5604-Speed Motor 80HP Jyoti MakeLabour rate of winding of stator of 50 & 250 RPM with wire/strip Labour rate of winding of stator of 750 & 1500 RPM with wire/strip Labour rate of winding of rotor of 4 speed motor 80 hp wire/stripReplacment of rotor shaft of above motorSlipring motor 180HP Higgs MakeLabour rate of winding of stator of 960RPM with
NorNorNorNorNorNorNorNorNorNorNorNorNor
Nor
Nos
Nos
Nos
Nos
1111111111111
1111111
11
1
![Page 9: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/9.jpg)
19
20
21
22
wire/strip Labour rate of winding of rotor of 960 RPM with wire/strip Slipring motor 120 HP Kirlosker MakeLabour rate of winding of stater of 1400 RPM with wire/strip Labour rate of winding of rotor of 1400 RPM with wire/strip Slipring motor 15HP Kirlosker/AEI MakeLabour rate of winding of stater of 960 RPM with wire/strip Labour rate of winding of rotor of 960 RPM with wire/strip 25 HP &20 HP motor 15HP &10 HP Kirlosker/AEI MakeLabour rate of winding of stater of 960 RPM with wire/strip Labour rate of winding of rotor of 960 RPM with wire/strip Slipring motor 250 HP Kirloshker /AEI MakeLabour rate of winding of stator of 580 RPM with wire/strip Labour rate of winding of rotor of 580 RPM with wire/strip
Nos
Nos
Nos
Nos
1
1
1
1
1
1
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 10: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/10.jpg)
TENDER FORM/N.I.T.
Tender Form for the supply Jobs of …Winding of various Motors Item Sr. No…B-2b
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com .________________________________________________________________________________________The General Manager,The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.
Sub: - Jobs of …Winding of Submersible motor 20 HP with Pump In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.
Sr.No. Description of Material/Items Units Qty. Rate Quoted (per Unit)
1Winding of Submersible motor 10 HP,15 HP &20 HP with Pump Labour charges of winding Charge of water seal Repairing of PumpCharges of G.M. Bush Charges of GM SleeveCharge of Neck Bush
Nos 4
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 11: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/11.jpg)
Terms & Conditions of Work Order for Contractor work in Mills
Last date of receipt of tender is 16.6.2017 upto 11.30 AMThe Press Tender should be submitted in the Prescribed NIT in the sealed envelope, subscribing the envelope “ Tender for Winding of various Motors Item Sr. No…B-2Negotiations, if required will be done with the lowest tenderer on same date.Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management.Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability. and rate quoted are inclusive of PF liability.In case the contractor’s rates are found less in any other Coop. sugar Mills the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________
The labour rate contract shall be valid for one year, on expiring the present rate contract , it can be extended at the discretion of General Manager for the period of one month. However, it can further be extended on the willingness of both the parties. It will be obligatory on the part of contractor to pay minimum wages to his labour as per Govt. rules and regulations. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer under various provision of the labour law i.e. ESI,EPF etc.The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.a) Income tax will be deducted from the contractor’s bills as applicable from time to time. b) Service tax as applicable shall be deducted from the contractor’s bills.Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar. The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor may request in writing to GM for the contract.In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
![Page 12: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/12.jpg)
Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative for excretion of the mills work.The contractor will have to carry out any other job related to the contract and assigned by Management from time to time. The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
sdGeneral Manager
Bhogpur coop sugar mills ltd.
![Page 13: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/13.jpg)
TENDER FORM/N.I.T.Tender Form for the purchase/jobs of Labour contract rate for feeding of bagasse Item Sr. No…B-3
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com The General Manager, The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.
Sub: - Jobs of … Laborer contract rate for feeding of bagasse In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.Sr.No.
Description of Material/Items Units Qty. Rate Quoted (per day)
1. Labour contract rate for feeding of bagasse/ wooden chips with tractor and driver during season 2017-18.
Scope of workFeeding of bagasse in RBC with your tractor and driver as per direction of concerned boiler attended/shift engineer round the clock during whole crushing season 2017-18 i.e. after clearance of process/house.
Note:- Tractor can be used for cane feeding and any other work also in free time if required.
day -
Contract Numbers Signature…………..Mobile…………… M/s…………………… Fax No……………. Office Address……………
![Page 14: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/14.jpg)
Terms & Conditions of Work Order for Contractor work in Mills
Last date of receipt of tender is 16.6.2017 upto 11.30 AMThe Press Tender should be submitted in the Prescribed NIT in the sealed envelope, subscribing the envelope “ Tender for Labour contract rate for feeding of bagasse Item Sr. No…B-3Negotiations, if required will be done with the lowest tenderer on same date.Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management.Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability. and rate quoted are inclusive of PF liability.In case the contractor’s rates are found less in any other Coop. sugar Mills the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________
The labour rate contract shall be valid for one year, on expiring the present rate contract , it can be extended at the discretion of General Manager for the period of one month. However, it can further be extended on the willingness of both the parties. It will be obligatory on the part of contractor to pay minimum wages to his labour as per Govt. rules and regulations. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer under various provision of the labour law i.e. ESI,EPF etc.The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.a) Income tax will be deducted from the contractor’s bills as applicable from time to time. b) Service tax as applicable shall be deducted from the contractor’s bills.Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar. The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor may request in writing to GM for the contract.In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other
![Page 15: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/15.jpg)
party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative for excretion of the mills work.The contractor will have to carry out any other job related to the contract and assigned by Management from time to time. The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
sdGeneral Manager
Bhogpur coop sugar mills ltd.
![Page 16: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/16.jpg)
TENDER FORM/N.I.T.Tender Form for the purchase/jobs of Labour contract rate for lifting of ash of boiler Item Sr. No B-4
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com _____________________________________________________________________________________________The General Manager,The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.
Sub: - Jobs of Labour contract rate for lifting of ash of boiler
In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.
Sr.No. Description of Material/Items Units Qty. Rate Quoted (per Unit/day)
1. Labour contract rate for lifting of ash of boiler and multi cyclone with tractor and driver during season 2017-18Scope of workLifting of ash of boiler & multi cyclone and dumped it the out side factory at appropriate placeby the contractor . Ash of the multi cyclone, to be removed by contractor. Labour work should be round the clock during complete crushing season 2017-18. i.e. after clearance of process/house.Note:-Work of Lifting of ash should be on daily basis positively for smooth running of boilers otherwise payment to be deducted accordingly .
par day
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 17: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/17.jpg)
Terms & Conditions of Work Order for Contractor work in Mills
Last date of receipt of tender is 16.6.2017 upto 11.30 AMThe Press Tender should be submitted in the Prescribed NIT in the sealed envelope, subscribing the envelope “ Tender for Laborer contract rate for lifting of ash of boiler Item Sr. No…B-4Negotiations, if required will be done with the lowest tenderer on same date.Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management.Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability. and rate quoted are inclusive of PF liability.In case the contractor’s rates are found less in any other Coop. sugar Mills the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________
The labour rate contract shall be valid for one year, on expiring the present rate contract , it can be extended at the discretion of General Manager for the period of one month. However, it can further be extended on the willingness of both the parties. It will be obligatory on the part of contractor to pay minimum wages to his labour as per Govt. rules and regulations. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer under various provision of the labour law i.e. ESI,EPF etc.The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.a) Income tax will be deducted from the contractor’s bills as applicable from time to time. b) Service tax as applicable shall be deducted from the contractor’s bills.Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar. The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor may request in writing to GM for the contract.In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
![Page 18: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/18.jpg)
Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative for excretion of the mills work.The contractor will have to carry out any other job related to the contract and assigned by Management from time to time. The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
sdGeneral Manager
Bhogpur coop sugar mills ltd.
![Page 19: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/19.jpg)
TENDER FORM/N.I.T.Tender Form for Contract Job to hire JCB Machine Item Sr.No. B-5
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] Mill web site: - www.bhogpurcsm.com ______________________________________________________________________________The General Manager The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (jalandhar)
Sub: Contract Job to hire JCB Machine
In response to above reference, I/we hereby quote my/our lowest rates for the following items subject to the mills terms & conditions overleafS.No. Description of material/Items Rate per
Hour1 Labour rate to hire the JCB Machine including Driver, Diesel and
other equipment related to job for 2017-18
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 20: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/20.jpg)
Terms & Conditions of Work Order for Contractor work in Mills
Last date of receipt of tender is 16.6.2017 upto 11.30 AMThe Press Tender should be submitted in the Prescribed NIT in the sealed envelope, subscribing the envelope “ Tender for Job to hire JCB Machine Item Sr. No…B-5Negotiations, if required will be done with the lowest tenderer on same date.Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management.Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability. and rate quoted are inclusive of PF liability.In case the contractor’s rates are found less in any other Coop. sugar Mills the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________
The labour rate contract shall be valid for one year, on expiring the present rate contract , it can be extended at the discretion of General Manager for the period of one month. However, it can further be extended on the willingness of both the parties. It will be obligatory on the part of contractor to pay minimum wages to his labour as per Govt. rules and regulations. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer under various provision of the labour law i.e. ESI,EPF etc.The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.a) Income tax will be deducted from the contractor’s bills as applicable from time to time. b) Service tax as applicable shall be deducted from the contractor’s bills.Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar. The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor may request in writing to GM for the contract.In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other
![Page 21: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/21.jpg)
party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative for excretion of the mills work.The contractor will have to carry out any other job related to the contract and assigned by Management from time to time. The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
sdGeneral Manager
Bhogpur coop sugar mills ltd.
![Page 22: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/22.jpg)
TENDER FORM/N.I.T.Tender Form for the purchase/jobs of…… Replacement of boiler tubes and Air Heater tube Item Sr. No B-6Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] Mill web site: - www.bhogpurcsm.com ____________________________________________________________________________________The General Manager, The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.Sub: - Jobs of … Replacement of boiler tubes. In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.Sr.No.
Description of Material/Items Units
Qty. Rate Quoted (per Unit/day)
A 1.
2
3.
Dismantling of boiler drum to drum tube back side size 82.55mm od x4.06 thickness as per drawing of John Thompson make boiler cap. 10Tons. Pressure 13.8 Kg/cm2
Dismantling of boiler drum to drum tube and bottom side circulation tube bottom side, size 82.55mm od x4.06 thickness x1.5 mtr as per drawing of John Thompson make boiler cap. 10Tons. Pressure 13.8 Kg/cm2
a) Fabrication and erection of Sr.no. 1 tubes as per drg.
b) Fabrication and erection of Sr. No. 2 Note:-1.Contractor having approval from Director of Boilers Punjab with IBR certificate can only quote.2. Approval letter of Director Of Boilers Punjab to be submitted with Quotation 3. Factory will pay only Statutory inspection fee of the boilers. It will be responsibility of the contractor to get the boiler passed after inspection4. Joints and Bends of tubes are to be done as per our existing fitting & radius and should strictly be as IBR Rules. 5. Other term & condition are attached.
No. 640
24
640 24
Contract Numbers Signature……………. mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 23: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/23.jpg)
TENDER FORM/N.I.T.Tender Form for the purchase/jobs of…… Replacement of boiler tubes Item Sr. No B-6
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] Mill web site: - www.bhogpurcsm.com ____________________________________________________________________________________The General Manager, The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.
Sub: - Jobs of … Replacement of boiler tubes. In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.
Sr.No.
Description of Material/Items Units
Qty. Rate Quoted (per Unit/day)
1.
2
3.
Air heater tubesDismantling of air heater old tube & tubes plate size . 63.5mm od x2.34mm thick 8’ length
Fabrication of new tube plate size .4.5mtrx 6mtr x 12mm thick as per sample at site Fitting of tube & tube plate at the position
Note:1 Drg. & design will be provided by the party 2 Party is fully responsible for the performance of air
heater and reduce the flue gas back in the boiler3 Mill having ID fan cap. 40 mt/hr and rpm 750
No.
700
Contract Numbers Signature……………. mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 24: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/24.jpg)
Terms & Conditions of Work Order for Contractor work in Mills
Last date of receipt of tender is 16.6.2017 upto 11.30 AMThe Press Tender should be submitted in the Prescribed NIT in the sealed envelope, subscribing the envelope “ Tender for B-6 contract for Replacement of boiler tubesNegotiations, if required will be done with the lowest tenderer on same date.Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management.Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability..In case the contractor’s rates are found less in any other Coop. sugar Mills the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________
The labour rate contract shall be valid for one year, on expiring the present rate contract , it can be extended at the discretion of General Manager for the period of one month. However, it can further be extended on the willingness of both the parties. It will be obligatory on the part of contractor to pay minimum wages to his labour as per Govt. rules and regulations. ll formalities and expenses under various labour laws as may be applicable form time to time. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer under various provision of the labour law i.e. ESI,EPF etc.The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.a) Income tax will be deducted from the contractor’s bills as applicable from time to time. b) Service tax as applicable shall be deducted from the contractor’s bills.Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar. The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor may request in writing to GM for the contract.
![Page 25: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/25.jpg)
In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative for excretion of the mills work.The contractor will have to carry out any other job related to the contract and assigned by Management from time to time. The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
sd General Manager
Bhogpur coop sugar mills ltd.
![Page 26: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/26.jpg)
TENDER FORM/N.I.T.Tender Form for the purchase/jobs of…… Replacement of boiler tubes Item Sr. No B-6bPress Tender Notice in the News Papers… – Mail today dt18.5.2017 – Jagbani dt.18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com ____________________________________________________________________________________The General Manager, The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.Sub: - Jobs of … Replacement of boiler tubes In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.Sr.No. Description of Material/Items Units Qty. Rate Quoted (per
Unit/day)1.
2.
Dismantling, & Erection of water tube of Boiler size 3 ¼’’OD as per drawing of John Thompson make boiler cap. 10Tons. Pressure 14 Kg/cm2
Dismantling, & Erection of water tube of Boiler size 3 ¼’’OD as per drawing of John Thompson make boiler cap. 10Tons. Pressure 14 Kg/cm2Reclamation of drum to drum tube size 82.5mm OD-3.66mm,Thick FOR boiler no. 1,2,3 & 4 Cap. 10 ton/hr pressure 14 Kg/cm2A) dismantling the old drum to drum tube including both end of bends fabrication of new bend from new boiler tube after that welding in old projection tube with hydraulic testing at ground level. Fitting of drum to drum tube with expending and finishing hydraulic testing at desire pressure.
Note:-1.Contractor having approval from Director of Boilers Punjab with IBR certificate can only quote.2. Approval letter of Director Of Boilers Punjab to be submitted with Quotation 3. Factory will pay only Statutory inspection fee of the boilers. It will be responsibility of the contractor to get the boiler passed after inspection4. Joints and Bends of tubes are to be done as per our existing fitting & radius and should strictly be as IBR Rules. 5. Other term & condition are attached.
No. 50
640
![Page 27: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/27.jpg)
Contract Numbers Signature……………. mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 28: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/28.jpg)
TENDER FORM/N.I.T.
Tender Form for the purchase/jobs of……labour rate of Internal Tube cleaning of boiler tubes Item Sr. No. B-7Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] Mill web site: - www.bhogpurcsm.com ____________________________________________________________________________________The General Manager, The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.
Sub: - Jobsof …labour rate of Internal Tube cleaning of boiler tubes In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.Sr.No.
Description of Material/Items Units Qty. Rate Quoted (per Unit)
1. (i) buAwielrW dIAW itaUbW AMdroN trk hY`f burSW nwl sPweI krnI[(ii)buAwielrW dIAW itaUbW bwhroN Aqy swry frMmW dI sPweI krnI[(iii)frMmW nUM AMdroN Aqy itaUbW nUM bwhroN pyNt krnw[(iv)swrI suAwh bwhr d`sI hoeI QW qy sutxI[
No 4
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 29: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/29.jpg)
Terms & Conditions of Work Order for Contractor work in Mills
Last date of receipt of tender is 16.6.2017 upto 11.30 AMThe Press Tender should be submitted in the Prescribed NIT in the sealed envelope, subscribing the envelope “ Tender for B-7 labour rate of Internal Tube cleaning of boiler tubesNegotiations, if required will be done with the lowest tenderer on same date.Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management.Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability..In case the contractor’s rates are found less in any other Coop. sugar Mills the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________
The labour rate contract shall be valid for one year, on expiring the present rate contract , it can be extended at the discretion of General Manager for the period of one month. However, it can further be extended on the willingness of both the parties. It will be obligatory on the part of contractor to pay minimum wages to his labour as per Govt. rules and regulations. ll formalities and expenses under various labour laws as may be applicable form time to time. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer under various provision of the labour law i.e. ESI,EPF etc.The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.a) Income tax will be deducted from the contractor’s bills as applicable from time to time. b) Service tax as applicable shall be deducted from the contractor’s bills.Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
![Page 30: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/30.jpg)
The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor may request in writing to GM for the contract.In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative for excretion of the mills work.The contractor will have to carry out any other job related to the contract and assigned by Management from time to time. The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
sd General Manager
Bhogpur coop sugar mills ltd.
![Page 31: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/31.jpg)
TENDER FORM /N.I.T.
Tender Form for ……..Boiler civil work Item No. B-8
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] Mill web site: - www.bhogpurcsm.com _________________________________________________________________________The General ManagerThe Bhogpur Coop. Sugar Mills Ltd;Bhogpur, Distt. Jalandhar.
Sub:- Boiler civil work.
In response to above reference, I/We hereby quote my/our rates for the following items subject to the Mill terms & conditions overleaf/attached.
S. No. Description of Material/Items Qty. Rate quoted1. Boiler civil work.
John Thompson make boiler cap. 10Tons. Pressure 14 Kg/cm2Scope of work Labour contract rate of following civil work of boiler
1. Dismantling of existing chamber & shifting the material in yard as per CE instruction
2. Erection of boiler chamber wall completely with standard fire brick & red brick as per existing
3. Dismantling and erection of civil work on roof tube after fitting the new roof tube
Note: 1. In spite of above if any work did not included to be done by the contractor2. During dismantling chamber of boiler in any furnace side portion damage by the contractor he will complete that free of cost
04 nos.
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 32: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/32.jpg)
Terms & Conditions of Work Order for Contractor work in Mills
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope, subscribing the envelope “ Tender for Boiler civil work Item No. B-8 3. Negotiations, if required will be done with the lowest tenderer on same date.
4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management. 5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
7. It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
8. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
9. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
10. The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
11. Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
12. a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
b) Service tax as applicable shall be deducted from the contractor’s bills.
![Page 33: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/33.jpg)
13. Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
14. The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
15. In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
18. Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
19. The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
20. The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
21. The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
22. The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
Sd/- General Manager
The Bhogpur Co-operative Sugar Mills
![Page 34: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/34.jpg)
TENDER FORM/N.I.T.Tender Form for the purchase/jobs of……Testing of various equipment Item no. B-9a
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com _____________________________________________________________________________________The General Manager,The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.Sub: - Jobsof … Testing of various equipment
In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.
Sr.No. Description of Material/Items Units Qty. Rate Quoted (per Unit/day)
12.34
Please quote the lowest of the following equipment Chain pulley block Wire rope pulley Received tank of air Compressor Crane Sugar cane unloaded
NO S6342
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 35: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/35.jpg)
TENDER FORM/N.I.T.Tender Form for the purchase/jobs of……Repairing/Service of 800 AMP ACB Item no. B-9b
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com ______________________________________________________________________________________The General Manager,The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.Sub: - Jobs of … Repairing/Service of 800 AMP ACB
In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.
Sr.No. Description of Material/Items Units Qty. Rate Quoted (per Unit/day)
1 Repair/Service of 800 AMP ACB Make- L & T NO 1
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 36: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/36.jpg)
TENDER FORM/N.I.T.Tender Form for the purchase/jobs of……Servicing of DG Set Item no. B-9c
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com _____________________________________________________________________________________The General Manager,The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.
Sub: - Jobs of … Servicing of DG Set In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.
Sr.No. Description of Material/Items Units Qty. Rate Quoted (per Unit/day)
1. Servicing of DG Set 320 KVA MAKE Cummins Indian Ltd..in every respect Note : spare parts given by Mill
NO
1
2. Servicing of DG Set 40 KVA MAKE.in every respect Note : spare parts given by Mill
NO
1
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 37: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/37.jpg)
TENDER FORM/N.I.T.Tender Form for the purchase/jobs of……Servicing of power turbine Item no. B-9d
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com The General Manager,The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.
Sub: - Jobs of … Servicing of power turbine In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.
Sr.No. Description of Material/Items Units Qty. Rate Quoted (per Unit/day)
1Servicing of power Turbine 1019 1MW Make balance Indian Ltd.Servicing & overhauling of power turbine in every respect Note : spare parts given by Mill
NO S1
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 38: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/38.jpg)
TENDER FORM/N.I.T.Tender Form for the purchase/jobs of……AMC of Auto cane feeding Item no. B-9e
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com The General Manager,The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.
Sub: - Jobs of … AMC of Auto cane feeding In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.
Sr.No. Description of Material/Items Qty. Rate Quoted (per Unit/day)
1. AMC of Auto cane feeding for smooth running of the mill during the crushing season 2017-18
1 No
2. Load card 2 No
3. Level card 2 No
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 39: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/39.jpg)
TENDER FORM/N.I.T.Tender Form for the purchase/jobs of……Testing of various equipment Item Sr. No…Engg B-9f
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com ______________________________________________________________________________________The General Manager,The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.
Sub: - Jobs of … Testing of various equipment
In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.
Sr.No. Description of Material/Items Units Qty. Rate Quoted (per Unit/day)
12.34.5.
Please quod the lowest of the following equipment Chain pulley block Wire rope pulley Received tank of air Compressor Crane Sugar cane unloaded
NO S63422
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 40: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/40.jpg)
TENDER FORM/NITTender Form for Chemical Tube cleaning of Boiler. Item no. B-9g
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com _______________________________________________________________________________The General ManagerThe Bhogpur Coop Sugar Mills Ltd. Bhogpur (Jalandhar)
Sub:- Job work of Chemical Tube cleaning of Boiler In response to above reference I/we here by quote my/our lowest rates for following items subject to the mills Terms & conditions overleaf.S.No Description of Material/Items Unit Qty. Rate quoted
per unit
1 Chemical tube cleaning of super heater of BoilerWorking pressure- 200Lb/per sq.inchTemp.- 240cCap. - 10T/Hr.Note: Required chemical and other material will be in the scope of contractor
Nos. 04
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 41: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/41.jpg)
TENDER FORM /N.I.T.
Tender Form for ……..Contract for Repair of cane carrier chain ITEM 9h
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com _________________________________________________________________________The General ManagerThe Bhogpur Coop. Sugar Mills Ltd;Bhogpur, Distt. Jalandhar.
Sub:- Contract for Repair of cane carrier chain
In response to above reference, I/We hereby quote my/our rates for the following items subject to the Mill terms & conditions overleaf/attached.S. No
Description of Material/Items Qty. Rate quoted
1 Scope of work1 dismantling of complete cane carrier chain from position(approx. 710 nos.of slats)2 All slats to be dismantled3 Complete chain to be dismantled 4 All rollers,pins,bushes to be separated5 All side links to be cleaned by steel wire brush & emery paper etc.6 All rollers,pins,bushes to be cleaned by motorized drum cleaner with sand/emery paper for rust free.7 chain to be assembled after greasing of roller,pin & bush. No under size pin,bush,roller will be used.8 All Sprockets to be replaced/build up by you. Welder & welding material will be provided by Mill.9 All spares of chain like pin,bush,roller, slats , split pin & nut bolts will be provided by the mills10 All consumable like diesel,grease,emery
710(1065 feet)approx
![Page 42: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/42.jpg)
paper ,cotton waste & graphited powder will be provided by the mills.11 For straitening & welding of old slats hamerman , welder will be provided by the mills12 Replacement of runner,angle & side plats or any fabrication job will be carried out by the mills13 Trial will be given by you.14 Any stoppage occurred during crushing season will be attended by you15 cleaning of chain links will be done in day shifts manually during the whole season (2017-18)Note:-1. 20% payment will be made after complete dismantling of chain & slats & separation of pin ,roller & bush2. 40% payment will be made after assembling of complete chain & slats at outside3. 20% payment will be made after trials4. 20% payment will be made after completion of crushing season
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 43: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/43.jpg)
TENDER FORM /N.I.T.
Tender Form for ……..Contract for Repair of valves item 9iPress Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] Mill web site: - www.bhogpurcsm.com _________________________________________________________________________The General ManagerThe Bhogpur Coop. Sugar Mills Ltd;Bhogpur, Distt. Jalandhar.
Sub:- Contract for Repair of valves In response to above reference, I/We hereby quote my/our rates for the following items subject to the Mill terms & conditions overleaf/attached.
S. No
Description of Material/Items Qty. Rate quoted
1
2
Scope of worka) Dismantling of valves size 2’’ to 6’’ from positionb) after dismantling of valves its body seats, wedge seats,nut & spindle to be checked. If any found damaged to be provided by the mills workshopc) valve seats lapping & scrapping will be done by youd) Hydraulic testing will be done by you at specific pressure as instructed by CE.e) Hydraulic machine & all consumable like diesel, grease, emery paper ,cotton waste, packing & jointing will be provided by the mills.a) Dismantling of valves size above 8’’ from positionb) after dismantling of valves its body seats, wedge seats,nut & spindle to be checked. If any found damaged to be provided by the mills workshopc) valve seats lapping & scrapping will be done by youd) Hydraulic testing will be done by you at specific pressure as instructed by CE.
20 each
15 each
![Page 44: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/44.jpg)
e) Hydraulic machine & all consumable like diesel, grease, emery paper ,cotton waste, packing & jointing will be provided by the mills
Note:50% payment will be made after repair & assembling of valves.50% payment will be made after hydraulic testing.
Contract Numbers Signature……………. Mobile…………… M/s………………….. Fax No……………. Office
Address…………………….
![Page 45: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/45.jpg)
TENDER FORM/N.I.T
Tender Form for the purchase/jobs of…… Repairing of GM liner of hydraulic Cap Item no.B- 9jPress Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] Mill web site: - www.bhogpurcsm.com ______________________________________________________________________The General Manager, The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.
Sub: - Jobs of Repairing of GM liner of hydraulic Cap.
In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf.Sr.No. Description of Material/Items Units Qty. Rate Quoted (per
Unit)1. CI/GM liner of hydraulic Cap OD-12’’
ID-10.5’’ length-11.25’’ lower side CI/GM Bush Ram Size-8.5’’ as per our existing fitting.Note:-if ram collar size is undersize the same is to maintained by welding
Nos. 3
Contract Numbers Signature……………………………….. Mobile……………
M/s………………………………………….... Fax No……………. Office Address…………………….
![Page 46: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/46.jpg)
Terms & Conditions of Work Order for Contractor work in Mills
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope, subscribing the envelope “ Tender for Testing of various equipment B-9 3. Negotiations, if required will be done with the lowest tenderer on same date.
4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management. 5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
7. It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
8. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
9. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
10.The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
11.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
![Page 47: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/47.jpg)
12 a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
b) Service tax as applicable shall be deducted from the contractor’s bills.
13 Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
14 The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
15 In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
16 Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
17 The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
18 The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
19 The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
20 The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
Sd/- General Manager
The Bhogpur Co-operative Sugar Mills
![Page 48: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/48.jpg)
T ENDER FORM/N.I.T. Tender Form for the Providing manpower skilled, semi skilled & unskilled Item Sr. No…B-10
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] web site: - www.bhogpurcsm.com .The General ManagerThe Bhogpur Coop. Sugar Mills Ltd;Bhogpur, Distt. Jalandhar.
Sub:- Providing men power skilled, semi skilled & unskilled In response to above reference, I/We hereby quote my/our rates for the following items subject to the Mill terms & conditions overleaf/attached.
S. No. Name of post No. of post
Minimum Qualification/Experience
Rate/MonthPer Person
1 Lab Chemist 03 Qualification/Experience as per staff strength list approved by sugarfed Punjab for all sr. nos.
The salary per Month Will be fixed by the Mills Committee for Skilled/Semi-skilled Manpower. The contractor should Quote service charges inclusive of insurance of employees per month per Manpower/semiskilled .The EPF of employer, TDS,Service tax if applicable will be paid by the mill
2 Evap. Operator 02
3 Pan Incharge 01
4 Pan Man 01
5 Asstt. Pan Man 01
6 Clarifier Attendant 03
7. Juice Heater Attendant 02
8. RVF Attendant 02
9. J.S. Attendant 03
10 S.S. Attendant 03
11 Centrifugal Mate 01
12 C/F Operator 13
13 Lab Boy 01
14 PH Recorder 04
15 Molder 1
16 Draft Man 1
![Page 49: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/49.jpg)
17 Turner 2
18 Electrician 3
19 Electrical helper 2
20 Boiler attd 1
21 Power turbine attd 3
22 Cane unloader attd 4
23 Fitter 3
24 Black Smith 01
25 JE Civil Engg 01
26 Mill Engine Driver 03
27 Oil Man 05
28 Sugar House Clerk 05
29 Computer Operator 02
30 Security Inspector 04
31 Security guard 15
32 Purchase Incharge 01
33 Head Time Keeper 01
Note :- Rate Should be Quoted Inclusive EPF and Insurance etc.
Contract Numbers Signature…………..Mobile…………… M/s…………Fax No……………. Office Address…………
![Page 50: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/50.jpg)
TENDER FORM/N.I.T.Tender Form for the Providing men power skilled, semi skilled & unskilled Item Sr. No…B-10bPress Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017E-mail: [email protected] web site: - www.bhogpurcsm.com .
The General Manager The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (Jalandhar
Sub:- Supply of Unskilled man power In response to above reference, I/we hereby quote my/our lowest rates for the following
items subject to the mills terms & conditions overleaf.S.No. Description Unit Qty. Rate
quoted per person
1. Supply of unskilled Man power
Nos 150
Minimum Wages as per the Payment of wages Act /the Minimum Wages Act will paid to the employees by the mills. The Contractor should Quote only the service charges inclusive of Insurance of employees .The Minimum Wages enclusive of employer's share of EPF ,TDS ,service tax if applicable etc.will be paid by the mills .
Contract Numbers. Signature…………....................
Mobile……………........... M/s…………...........................
Fax No…………….......... Office Address……………............
![Page 51: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/51.jpg)
Tenders for engagement of Common Cadre Staff on contract basis Tender No. B-10 (c )
Press Tender Notice published in the News papers – Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
E-mail. [email protected] Website-www.bhogpurcsm.com
Applications are invited for the followings Common Cadre Posts for the crushing season 2017-18 purely on contract basis on the consolidate salary prescribed by Sugarfed Punjab Chandigarh.
S.No
Name of the Post Department
No. of Posts
Required qualification and Experience
1 Assistant Cane Dev. Officer
Cane 01 M.Sc. Agriculture with 3 years experience in cane management OR B.Sc. Agriculture with 5 year experience in cane management of which 2 years as Cane Development Inspector
2 Assistant Accounts Officer
Acctts. 01 Inter CA /Inter ICWA or M.Com with 5 years experience in an industrial of commercial organization of repute OR B.Com with 10 years experience in an industrial or commercial organization of repute.
3 Assistant Engineer (Mech.)
Engg. 02 Degree in Mechanical Engineering with 2 years experience in Sugar Industries in Sugar Factory.
4 Instrument Engineer
Engg. 01 Bachelor Degree in instrumentation Technology with 2 year experience in maintenance and overhauling of process instruments. Preference will be given who has experience in Sugar Factory.
5 Lab Incharge Mfg. 01 Degree in Science (Mathematics, Physics and Chemistry) with not less than 50% marks in aggregate and associate membership of the National Sugar Institute Kanpur OR equivalent qualification from Deccan Sugar Institute Pune. OR Guru
![Page 52: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/52.jpg)
Nanak Dev University Amritsar. OR Bachelor Degree in Chemical Engg. or Technology with 01 year apprentice in Sugar Factory.
6 Manufacturing Chemist
Mfg. 03 Degree in Science (Mathematics, Physics and Chemistry) with not less than 50% marks in aggregate and associate membership of the National Sugar Institute Kanpur OR equivalent qualification from Deccan Sugar Institute Pune. OR Guru Nanak Dev University Amritsar. OR Bachelor Degree in Chemical Engg. or Technology with 01 year apprentice in Sugar Factory.
7 Assistt Engineer (Elect.)
Engg. 02 Degree in Elect. Engineering with 2 years experience in Sugar Industries in Sugar Factory.
Terms & Conditions
1. The posts will be purely on contractual basis for the crushing season 2017-18 which may be extended for Off season 2018-19 as per requirements of the mills.
2. Consolidated salary will be paid as decided by Sugarfed Punjab Chandigarh.
3. Accommodation if available will be provided on chargeable basis.
General Manager
![Page 53: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/53.jpg)
Application Form
General Manager The Bhogpur Cooperative Sugar Mills Ltd. Bhogpur (Jalandhar)
Sub.:- Application for the post of ……………………………………………………………….
1. NAME
……………………………………………………………….
2. FATHER NAME
……………………………………………………………….
3. DATE OF BIRTH
……………………………………………………………….
4. CATEGORY GEN/SC/BC/EXM
………………………………………………………………..
5. POSTAL ADDRESS
……………………………………………………………….
………………………………………………………………..
………………………………………………………………..
6. QUALIFICATION
……………………………………………………………….
![Page 54: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/54.jpg)
7. EXPERIENCE
……………………………………………………………….
8. ANY OTHER
……………………………………………………………….
Date …………………………. Signature………………………………
Name …………………………………..
Contact No…………….……………….
![Page 55: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/55.jpg)
Terms & Conditions of Work Order for Contractor work in Mills
1. Last date of receipt of tender is 16.06-2017 Upto 11.30am. 2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope,
subscribing the envelope “ Tender for Providing man power skilled, semi skilled & unskilled Item Sr. No…B-10
3. Negotiations, if required will be done with the lowest tenderer on same date.4. Any damage done to the mill property during the working by the workers of contractor
shall be recovered from contractor after assessing the damage by the mills Management.
5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability..
6. In case the contractor’s rates are found less in any other Coop. the same rates will be applicable.
7. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________
8. The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
9. It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
10. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
11. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
12. The contractor shall be liable to discharge all or any liability arising out of this contract under any labour laws.
13. Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
14. a) Income tax will be deducted from the contractor’s bills as applicable from time to time. b) Service tax as applicable shall be paid as per Service Act.
![Page 56: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/56.jpg)
Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
15 The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the risk & cost of the contractor.16 In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility of the contractor. Extra expenditure thus incurred shall be recovered from the contractor.17 Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.18 The contractor will have to provide man power from time to time as per the
directions/instructions of the Chief Engineer/ Chief Chemist/Chief Cane Dev.Officer/Chief Accounts Officer/sGeneral Manager or his representative. For discharging of smooth working.
19 The contractor will have to carry out any other job related to the contract and as assigned by Management from time to time.
20 The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
21 The Purchase Committee of the Mills reserves the right to reject/accept any or all the tenders without assigning any reason, any time by giving an advance notice of 15
days.
General Manager
TENDER FORM/N.I.T.
Tender Form for the supply of ……… AMC of PLC Drive A Cfg.Machine Item Sr. No B-11
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com ____________________________________________________________________________The General Manager, The Bhogpur Co-op. Sugar Mills Ltd,
![Page 57: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/57.jpg)
Bhogpur, Distt. Jalandhar.
Sub: - Supply of…… AMC of PLC Drive A Cfg. Machine In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.Sr.No. Description of Material/Items Units Qty. Rate Quoted
(per Unit)1. Repairing & AMC of PLC controller for fully
automatic 2 nos. batch type centrifugal machine 700 kg/charge 4 speed AC motor for the season 2017-18.
Terms & conditions1. Party should registered with NSCSF/NCDC/ Sugarfed Punjab Chandigarh2. Successful bidder shall have to compensate the
loss if any caused by negligancy of bidder or his representative during the validity period
3. 10% payment will be made in advance with order, 25% after satisfaction repair/service report from CE, 25% after smooth functioning of system for one month and balance 40% after completion of crushing season and due submission of satisfactory performance report of contractor
4. Contract will valid till completion of crushing season 2017-18.
5. List of spares required will be submitted by party within 15 days of Award of contract.
6. The party will attend all complaints as expeditiously as possible and no case beyond 4 hrs of the information failing which 5% of balance payment will be forfeited his first act of negligence . The party will be liable for forfeiture of remaining amount of AMC.
7. Party will depute our expert/technical qualified person per month for supervision of overall working of system.
Lum sum
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 58: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/58.jpg)
Terms & Conditions of Work Order for Contractor work in Mills
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope,
subscribing the envelope “ Tender for AMC of PLC Drive A Cfg.Machine Item No B-11
3. Negotiations, if required will be done with the lowest tenderer on same date. 4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management.
![Page 59: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/59.jpg)
5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
7.It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
8. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
9. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
10 The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
11.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
12 a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
b) Service tax as applicable shall be deducted from the contractor’s bills.
13 Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
14 The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
![Page 60: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/60.jpg)
15 In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
16 Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
17 The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
18 The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
19 The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
20 The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
Sd/- General Manager
The Bhogpur Co-operative Sugar Mills
TENDER FORM/N.I.T.Tender Form for the purchase/jobs of…… Reconditioning of RVF Item Sr. No B-12
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] Mill web site: - www.bhogpurcsm.com_____________________________________________________________________________The General Manager, The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.Sub: - N.I.T. for the jobs of … Repair & Reconditioning of RVF In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.Sr.No Description of Material/Items Rate to be
![Page 61: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/61.jpg)
. Quoted lumpsum1.
23
Reconditioning of RVF ( 1 -no. )Scope of jobsDismantling & Fitting of circumferential SS stripes.Dismantling & fitting of all SS screen and Cleaning of all decking plates.Cleaning of section capillaries along with junction boxes.Dismantling & fitting of divisional strips if required.Dismantling & fitting and checking of decking plates and riveting along with and cleaning & painting of drum.Replacement of decking plates if required upto 7 platesHydraulic testing of vacuum filter to be done before refitting of SS screen and leaky pipes/junction boxes to be replaced(upto 7 five way complete set)Dismantling/refitting of nipples if required.Grinding & matching of high flow valves & bear plates of headers of both sides.Setting of High/low/zero vacuum zone through high flow valves of both sides’ headers. Water/vacuum trial.Proper setting of cake washing pipes & nozzles including fitting with water pipe lines .Setting of mud scrapper belt to be done Rate of replacement of one decking plateRate of replacement of 5 way SS pipe with junction box(complete one set)NOTE:- 1. quote to rate for repairs inclusive of SS screws & copper rivets.Other material will be arranged by Mill.Terms & conditions:- Rates should be quoted lump-sum wise40% payment running payment.30% payment on completion of job.30% payment after one month crushing season.Accommodation will be provided to your workers if availableFood will in scope of the party
Contract Numbers Signature……………. Mobile…………… M/s……………… Fax No……………. Office Address
![Page 62: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/62.jpg)
Terms & Conditions of Work Order for Contractor work in Mills
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope,
subscribing the envelope “ Tender for Reconditioning of RV Item Sr. No B-12
3. Negotiations, if required will be done with the lowest tenderer on same date. 4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management. 5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________
![Page 63: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/63.jpg)
Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
7. It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
8. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
9. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
10 The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
11 Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
12 a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
b) Service tax as applicable shall be deducted from the contractor’s bills.
13 Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
14 The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
15 In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
![Page 64: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/64.jpg)
16 Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
17 The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
18 The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
19 The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
20 The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
Sd/- General Manager
The Bhogpur Co-operative Sugar Mills
TENDER FORM/N.I.T.Tender Form for the purchase/jobs of…… Servicing of Air Compressor Item no. B-13
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] Mill web site: - www.bhogpurcsm.com The General Manager,The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.Sub: - Jobs of … Servicing of Air CompressorIn response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.
Sr.No. Description of Material/Items Units Qty. Rate Quoted (per Unit/day)
![Page 65: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/65.jpg)
1.2.
(a) To remove the ovalty in the body of Air Compressor(a) Fitting the rotor of the above size after remover of ovalty (b) Fitting the side gear Terms & conditions:-Rates should be quoted lump-sum wise60% payment running payment.40% payment after one month crushing season
NO S 5
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
Terms & Conditions of Work Order for Contractor work in Mills
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope, subscribing the envelope “ Tender for Servicing of Air Compressor Item no. B-13 3. 3Negotiations, if required will be done with the lowest tenderer on same date.
4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management. 5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be
![Page 66: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/66.jpg)
applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
7. It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
8. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
9. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
10 The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
11.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
12 a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
b) Service tax as applicable shall be deducted from the contractor’s bills.
13 Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
14 The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
15 In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some
![Page 67: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/67.jpg)
other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
16 Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
17 The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
18 The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
19 The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
20 The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
Sd/- General Manager
The Bhogpur Co-operative Sugar Mills
TENDER FORM/N.I.T.
Tender Form for the purchase/jobs of…… Dynamic Balancing At Site Item Sr. No B-14
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com _________________________________________________________________________The General Manager,The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.
Sub: - Jobs of … Dynamic Balancing At Site
![Page 68: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/68.jpg)
In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf.
Sr.No. Description of Material/Items Units Qty. Rate Quoted (per Unit)
1. I.D.Fan Nos. 01
2. F.D.Fan Nos. 01
3 Cane Cutter Nos. 02
4 Bagasscillo Blower Nos. 01
5 Dynamic balancing of basket of fully automatic c/f machine size 48’’ x 30’’ MAKE WIL
Nos. 02
6 Dynamic balancing of basket of c/f machine size NK-1100 MAKE NHEC
Nos. 02
7 Dynamic balancing of basket of c/f machine size DC-10 MAKE WIL
Nos. 02
8 Dynamic balancing of DISTRIBUTION CUP of c/f machine size NK-1100 MAKE NHEC
Nos. 02
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
Terms & Conditions of Work Order for Contractor work in Mills
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope, subscribing the envelope “ Tender for Dynamic Balancing At Site Item Sr. No B-14 3. Negotiations, if required will be done with the lowest tenderer on same date.
4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management. 5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be
![Page 69: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/69.jpg)
applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
7.`It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
8. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
9. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
10 The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
11.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
12 a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
b) Service tax as applicable shall be deducted from the contractor’s bills.
13 Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
14 The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
15 In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some
![Page 70: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/70.jpg)
other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
16 Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
17 The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
18 The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
19 The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
20 The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
Sd/- General Manager
The Bhogpur Co-operative Sugar Mills
![Page 71: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/71.jpg)
TENDER FORM/N.I.T.Tender Form for the purchase/jobs of…… ultra sonic testing of various equipments Item Sr. No B-15
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] Mill web site: - www.bhogpurcsm.com .____________________________________________________________________________________The General Manager,The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.Sub: - Jobs of … ultra sonic& thincness testing of various equipments In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.
Sr.No. Description of Material/Items Units Qty. Rate Quoted (per Unit/day)
1. Labour rate for ultra sonic & thickness of the following items:-Mill head stock Shaft mill roller Shaft of cane cutterShaft of transmissionShaft of FD & ID fanShafts of cane carrier, inter carrier and baggass carrier & other itemsLabour rate for ultra sonic on day bases of the above itemsNote: - Qty. may be varying at the time of work order and rate should be on daily basis.
No. 10
101
8225
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 72: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/72.jpg)
Terms & Conditions of Work Order for Contractor work in Mills
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope, subscribing the envelope “ Tender for ultra sonic testing of various equipments Item Sr. No B-15 3. Negotiations, if required will be done with the lowest tenderer on same date.
4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management. 5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
7 It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
8. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
9. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
10 The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
![Page 73: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/73.jpg)
11.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
12 a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
b) Service tax as applicable shall be deducted from the contractor’s bills.
13 Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
14 The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
15 In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
16 Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
17 The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
18 The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
19 The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
20.The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
Sd/- General Manager
The Bhogpur Co-operative Sugar Mills
![Page 74: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/74.jpg)
TENDER FORM/N.I.T
Tender Form for job of AMC of Electronic/Mechanical weighing scale: (Item Sr. No B-16
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] Mill web site: - www.bhogpurcsm.com ___________________________________________________________________________________The General Manager The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (Jalandhar)
Sub:- Job of AMC of Electronic/Mechanical weighing scale
In response to above reference, I/we hereby quote my/our lowest rates for the following items subject to the mills terms & conditions overleaf.
S.No. Description of material Qty. Rate1 Annual maintenance contract of electronic weighing scale
and weigh bridgeCap. 300 kg Make ATCO–do- 120 kg -do- -do- 100 kg. make advance -do- 60 kg. –do- -do- 05 kg. –do- Electronic weigh bridge 60 ton Electronic weigh bridge 5 tonMechanical ‘’ 3 tonMechanical weighing scale 5 kg Manual weighing scale 100 kg Note:1.You will depute your mechanical/technical person at least twice a month during the crushing operation.However in case of any problem your mechanic will visit free of cost.2. Passing (stamping) from weight and measure Govt. deptt. Will be borne by you.3. You will depute a trained fitter/supervisor during the whole crushing operation 2017-18 for smooth functioning of above. You will responsible for smooth functioning of above for one year4. Provide the list of spare part of mechanical & electronic
3 nos.0101010202
01010101
![Page 75: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/75.jpg)
weighing scale Contract Numbers
Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 76: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/76.jpg)
Terms & Conditions of Work Order for Contractor work in Mills
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope, subscribing the envelope “ Tender for of Electronic/Mechanical weighing scale Item No B-16 3. Negotiations, if required will be done with the lowest tenderer on same date.
4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management. 5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
7. It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
8. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
.9. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
10 The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
![Page 77: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/77.jpg)
11.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
12 a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
b) Service tax as applicable shall be deducted from the contractor’s bills.
13 Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
14 The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
15 In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
16 Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
17 The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
18 The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
19 The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
20 The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
Sd/- General Manager
The Bhogpur Co-operative Sugar Mills
![Page 78: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/78.jpg)
TENDER FORM/N.I.T
Tender Form for AMC of operation and maintenance of all CCTV camera and internet Item Sr.No.: B-17Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] Mill web site: - www.bhogpurcsm.com ___________________________________________________________________________________The General Manager The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (jalandhar)
Sub:- AMC of operation and maintenance of all CCTV Camera and Internet .
In response to above reference, I/we hereby quote my/our lowest rates for the following items subject to the mills terms & conditions overleaf
S.No. Description of Jobs/Items Rate
1. AMC for smooth running of all CCTV Camera installed in offices & factory and to be seen through Internet for the year 2017-18. Provide list of spare parts.
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 79: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/79.jpg)
Terms & Conditions of Work Order for Contractor work in Mills
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope, subscribing the envelope “ Tender for CCTV camera and internet Item Sr.No. B-17 3. Negotiations, if required will be done with the lowest tenderer on same date.
4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management. 5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
7. It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
8. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
9. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
10 The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
![Page 80: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/80.jpg)
11.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
12 a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
b) Service tax as applicable shall be deducted from the contractor’s bills.
13 Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
14 The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
15 In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
16 Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
17 The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
18 The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
19 The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
20 The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
Sd/- General Manager
The Bhogpur Co-operative Sugar Mills
![Page 81: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/81.jpg)
TENDER FORM/N.I.T.Tender Form for the purchase/jobs of……labour Contract for thermo insulations Item Sr. No… B-18
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] Mill web site: - www.bhogpurcsm.com ________________________________________________________________________________________The General Manager,The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.Sub: - Jobs of … labour Contract for thermo insulations In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.
Sr.No. Description of Material/Items Units Qty. Rate Quoted (per Unit)
1. Glass wool lagging 3690-1974 type-2 ISI wrapping on pipes, tanks and vessels etc. including wire netting of 24 SWG , plaster coating. Hessian Cloth 12075 covering and finally applying a coat of weather proof paint .a) 50 mm thicknessb) 75 mm thicknessNote:- Material will be provided by Mill.
M2
Appox.1000 Appox.800
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 82: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/82.jpg)
Terms & Conditions of Work Order for Contractor work in Mills
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope,
subscribing the envelope “ Tender for Contract for thermo insulations Item Sr. No… B-18
3. Negotiations, if required will be done with the lowest tenderer on same date. 4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management. 5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
7. It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
8. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
9. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
10 The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
![Page 83: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/83.jpg)
11.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
12 a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
b) Service tax as applicable shall be deducted from the contractor’s bills.
13 Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
14 The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
15 In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
16 Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
17 The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
18 The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
19 The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
20 The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
Sd/- General Manager
The Bhogpur Co-operative Sugar Mills
![Page 84: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/84.jpg)
TENDER FORM/N.I.T.
Tender Form for the Press Mud handing Item Sr. No… b-19
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] Mill web site: - www.bhogpurcsm.com ____________________________________________________________________________________________The General Manager The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (Jalandhar)Sub:- Press Mud handing for the Season 2017-18
In response to above reference, I/we hereby quote my/our lowest rates for the following items subject to the mills terms & conditions overleaf.S.No. Description of work Qty . Rate
(Per qtls.)
1 Press Mud handing & dumping at suitable place as per direction of mill management
60000 qtl.
12.
3.4.
5.6.7.8.9.
10.
11.12.13.
Term & conditions:Lifting of Press Mud “AS IS WHERE IS BASIS”Transportation, loading/unloading/Diesel and driver etc. will be arranged & borne by contractorDumping of press mud will be on directed place, on open land outside of mills with radius of 5 km.Lifting of press mud from the mud conveyor belt should be round ‘O’ clock.Earnest money is Rs. 20000/- refundable basis after satisfactory lifting of whole press mud and end of crushing operation 2017-18Rate should be quoted per quintal basisEngage sufficient labour for the job.Preference will be given to hydraulic lifter trolley.If the mill stopped due to non-lifting of mud, entire responsibility shall be of contractor.Payment will be made fortnightly.80% payment may release against work done and 20% after satisfactory completion of job and your earnest money will release
![Page 85: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/85.jpg)
14.15.
also after end of crushing operation.Tractor should be in good conditions and with all related documents.Mill will not be responsible for any mis-happening.During long stoppage and general cleaning your tractor trolley will be at disposal of concern head of department.Undersigned reserves the right to cancel your tender/contract any time, without assigning any reason.
Contract Numbers
Signature…………….
Mobile…………… M/s………………….
Fax No……………. Office Address
Terms & Conditions of Work Order for Contractor work in Mills
![Page 86: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/86.jpg)
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope,
subscribing the envelope “ Tender for Press Mud handing Item Sr. No… b-19 3. Negotiations, if required will be done with the lowest tenderer on same date.
4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management. 5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
7. It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
8. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
9. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
10 The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
11.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
12 a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
![Page 87: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/87.jpg)
b) Service tax as applicable shall be deducted from the contractor’s bills.
13 Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
14 The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
15 In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
16 Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
17 The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
18 The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
19 The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
20 The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
Sd/- General Manager
The Bhogpur Co-operative Sugar Mills
![Page 88: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/88.jpg)
TENDER FORM/N.I.T
Tender Form for material & Labour contract for various civil work. Press Tender Notice in the News Papers… –
Email: [email protected] Mill web site: - www.bhogpurcsm.com ___________________________________________________________________________________________The General Manager The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (Jalandhar)
Sub:- Jobs of Raising the height of roof of family Quarters in Mill Colony. In response to above reference, I/we hereby quote my/our lowest rates for the following
items subject to the mills terms & conditions overleaf.
S.No. Description of material Appox. Qty.
Rate of material / Labour
1 Labour rate of to dismantle existing roof & raising wall upto 1 ft height and re slab steel shuttering including tile terracing with old tiles, construction of parapet & plastering both side with electric & white washing inside
05 nos.
2 Supply of following material for one quarter of size 400 sq.ft. appx.
1. Ist class bricks 2. ACC cement3. Buzzri 12.5mm -- 20mm4. Course sand5. Fine sand6. Ms tor steel 10mm dia
1100 nos.40 bag200 cft150 cft150 cft3.5 qtl
Contract Numbers Signature…………….
Mobile…………… M/s………………….. Fax No……………. Office Address
Terms & conditions
![Page 89: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/89.jpg)
Civil contract job for roof of family quarters
1. All the material Cement, fine sand, course sand & steel will be supplied by contractor as per IS specification of civil material. Electric wiring & white washing oil bound distemper will also be of contractor.
2. The job should be completed within 60 days from the receipt of order.3. Brick will be provided by factory @ Rs. 4000/-per thousand. The cleaning and
transportation of brick will be done by contractor.a. payment for material - 70% payment will be made against receipt of material and after start of the job . 20% payment will be made after completion of job and after verification by Chief Engineer. 10% payment will be made after three month of completion of job.
b. payment for job - 70% running payment as per job completed. 20% payment will be made after completion of job and after verification by Chief Engineer. 10% payment will be made after one month of completion of job. 4. GST/tax shall be extra as applicable 5. Responsibility of PF of your labour shall be yours. . You will provide EPF code and challan showing deposited PF before taking next payment .6 All tools & tackle, RCC mixture machine and other machine etc will arranged by contractor7. Material should be used as per proportion mentioned in NIT.8. Factory will not responsible for any mishap. Any damaged of mill quarter on your part will be recovered from you.9.. You will responsible for any defect /cracks etc at least for one year. Replacement of damaged material will be done by you at free of cost10. All legal obligation of labour engaged by contractor will be borne by him.11. Contractor is not authorize to transfer his job to any other sub Contractor12 All the consumable material will be ISI Marked.13. Qty. of job may be increased or decreased as per requirement.14. The contrator will get adequate insurance e cover of the labour employed by him in the mills which will be shown to CE/Factory Manager before their entry in the mills\15. You will have to submit the following information:-
i) Permanent Account Number (PAN)(ii) EPF code No.iii) GST Numberiv) Contractor Reg.Number with ALC under the provision of Regulation Act.
16 Provident Fund of contrator labour shall be responsibility of the contractor.17. Undersigned reserve the right to cancel your contract any time without
resigning any reason.Other terms & condition of NIT.
General Manager
![Page 90: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/90.jpg)
TENDER FORM/N.I.T
Tender Form for Labour contract for various civil work. Press Tender Notice in the News Papers… –
Email: [email protected] Mill web site: - www.bhogpurcsm.com ______________________________________________________________________________The General Manager The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (Jalandhar)
Sub:- Jobs of spray pondIn response to above reference, I/we hereby quote my/our lowest rates for the following items subject to the mills terms & conditions overleaf.
S.No. Description of material Appox. Qty. Unit Rate1 Earth work in excavation in all kind of soil
upto 1 mtr depth 60.00 cum
2 Providing and laying P.C.C 1:5:10 in found of wall and channel.
20.00 Cum
3 Brick with cement sand motar 1:5 55.00 Cum
4 Providing and laying M-20 concrete in channel
10.00 Cum
5 Plastering work with 1:4 200.00 Cum6 P/L rendering coat 1 mm thick on plaster 200.00 Cum
NOTE :- (i) Dismantling material should be removed from site . (ii) Bricks will be provided by mill
Contract Numbers Signature……………. Mobile…………… M/s………………….. Fax No……………. Office Address
Terms & Conditions.
![Page 91: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/91.jpg)
Repair of spray pond civil structure
1. Brick will be provided by factory @ Rs. 4/-each brick. The cleaning of brick and transportation of brick will be done by contractor.
2. All damaged material of channel adjacent to damaged wall will be removed by factory.3. All the job should be completed as per IS specification of civil job and material to be supplied
as per IS specification.4. Job should be completed within one month from date of order5. 70% payment will be made as per job completed. 20% payment will be made after completion
of job and after verification by Chief Engineer. 10% payment will be made after one month of start of crushing season 2017-18.
6. Tax shall be extra as applicable.7. Material should be used strictly as per proportion mentioned in order.8. All legal obligation of your labour borne by you.9. Factory will not responsible for any mishap. Any damaged of the mill on your part will be
recovered by you. .10. Responsibility of PF of your labour shall be yours. . You will provide EPF code and challan
showing deposited PF before taking next payment .11. All the tool & tackle, machines will be arranged by contractor. Factory will not provide any
material. The rates are inclusive material e.g. cement, sand gravet etc.12. Contractor is not authorize to transfer his job to any other sub Contractor13. Qty. of job may be increased or decreased as per requirement. 14. The contrator will get adequate insuranc e cover of the labour employed by him in the mills
which will be shown to CE/Factory Manager before their entry in the mills16. Contractor shall have to abide by Rule and Regulation of the mill and shall be responsible for all Govt.Rules & Regulation with regard to the labour engage by you. In case mishap/accident etc.you will be fully responsible for total compensation, Medical Treatment etc.of the labour engaged by you. 17. You will have to submit the following information:-
i) Permanent Account Number (PAN)(ii) EPF code No.(iii) GST Regd.No.iv) Contractor Reg.Number with ALC under the provision of Regulation Act.
18. Provident Fund of contractor labour shall be responsibility of the contractor. 19. Undersigned reserve the right to cancel your contract any time without
resigning any reason.Other terms & condition of NIT.
General Manager
TENDER FORM/N.I.T
Tender Form for material & Labour contract for various civil work.
![Page 92: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/92.jpg)
Press Tender Notice in the News Papers… –
Email: [email protected] Mill web site: - www.bhogpurcsm.com
The General Manager The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (Jalandhar)Sub:- laying Interlock Tiles and glazzed Tiles in Drier House
In response to above reference, I/we hereby quote my/our lowest rates for the following items subject to the mills terms & conditions overleaf.
S.No Description of material Unit Qty. Rate p.unit
A Supply of Material1. Supply & lying ISI Mark Interlock
tiles 80mm for 6000 sq. ft. area, 03 tiles in one sq.ft. area
Nos. 18000
2. White Sand Cubic.ft.
1600
3. Cement ACC Bags 50B Labour Job.
Labour job including fixation of tiles after laying of sand & cement in ratio of 5:1 and after fixing, filling up gapes of tiles with 4:1 sand & cement ratio
sq.ft. 6000
Contract Numbers Signature…………….
Mobile…………… M/s………………….. Fax No……………. Office Address
Terms & conditions
Interlocking of stone in drier house
![Page 93: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/93.jpg)
1. You will supply all the material interlocking tiles. Cement, sand etc as per IS specification
2. The job should be completed within 20 days from the receipt of order.3. Proper leveling of floor and arrangement of drainage of water will be done by you.4. The cost of damaged interlocking tiles during the job will be deducted from your bill.5. You will responsible for any defect /damage of tiles for at least one year and you will
replace the damaged/crack/defective tiles/sand/cement etc at free of cost.6. All the material interlocking tiles, and, cement, machines tool & tackle etc will be
arranged by you. 7. Responsibility of PF of your labour shall be yours. You will provide EPF code and
challan showing deposited PF before taking next payment8. Proper boundary of tiles floor will be done by you. Brick will be provided by factory.
Transportation of brick from one place to other inside mill premises will be done by you.
9. Proportion of material eg. Cement sand is to be strictly maintained as per your order and maintain the record of cement.
10.70% running payment will be made as per job completed. 20% payment will be made after completion of job and after verification by Chief Engineer. 10% payment will be made after completion of crushing season 2017-18.
11.All legal obligation of your labour is your responsibility.12.General Manager has right to reject the contract at any time without any notice.13.Contractor is not authorize to transfer the Contractor to any other sub Contractor.14.Qty.of job may be increased or decreased as per requirement.15.GST will be extra applicable for all items .16.Payment for the material will be done on actual consumption and balance material will
be return to the party.17.Qty.of job may be increase or decrease as per requirement.18.Qty. of material Sr.No.2 & 3 may increase or decrease depending upon levelling of
tiles. 19. You will have to submit the following information:-
i) Permanent Account Number (PAN)(ii) EPF code No.(iii) GST Regd.No.iv) Contractor Reg.Number with ALC under the provision of Regulation Act.
20.Provident Fund of contractor labour shall be responsibility of the contractor. 21.Undersigned reserve the right to cancel your contract any time without
resigning any reason.Other terms & condition of NIT.
TENDER FORM/N.I.T
![Page 94: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/94.jpg)
Tender Form for Labour contract for Laying paver tiles on road. (Item Sr. No. B-20a)
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] Mill web site: - www.bhogpurcsm.com ________________________________________________________________________________The General Manager The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (Jalandhar)
Sub:- Jobs of Laying paver tiles on road to colony at sugar mill Bhogpur.
In response to above reference, I/we hereby quote my/our lowest rates for the following items subject to the mills terms & conditions overleaf.
S.No Description of material units Apx.Qty.
Rate
1 Providing and laying 80mm thick factory made cement concrete interlocking paver block of M-40 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in dark fast color and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc, all complete as per directions of engineer-in-charge for medium traffic areas such as city streets, small & medium market roads, low volume roads, utility cuts on arterial roads etc.
sq.mtr 945.00
2 Earth work excavation in ordinary soil, exclusive of compensation of earth in
a) Kassi work undressed involving an average horizontal throw up to 2.0 meters and an average vertical lift up to 0.5 meter including breaking of clods.
Cu.m 60.00
3 Cement concrete 1:2:4 with stone ballast or shingle
Cu.m 50.00
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address……………………….
![Page 95: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/95.jpg)
TENDER FORM/N.I.TTender Form for Labour contract for laying paver/kota stone in drier house (Item Sr. No. B-20b) Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] Mill web site: - www.bhogpurcsm.com___________________________________________________________________________________________The General Manager The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (Jalandhar)Sub:- Jobs of 1. laying paver tiles in drier house(36500x15000) 2. laying kota stone in drier house(36500x15000) 3 Fixing glazed tiles on walls of drier house extension(36500x19000)
In response to above reference, I/we hereby quote my/our lowest rates for the following items subject to the mills terms & conditions overleaf/attached
S.No. Description of material units Apx.Qty.
Rate
1 Sand filling under floor Cu.m 115.002 Cement concrete 1:4:4 with stone ballast of size
(b) 40mm gaugeCu.m 115.00
3 Cement concrete 1:4:8 with stone ballast or shingle
Cu.m 30.00
4 Providing and laying 80mm thick factory made cement concrete interlocking paver block of M-40 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in dark fast color and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc, all complete as per directions of engineer-in-charge for medium traffic areas such as city streets, small & medium market roads, low volume roads, utility cuts on arterial roads etc.
sq.m 550.00
5 Kota stone tile flooring 20mm to 30mm thick over 12.5mm thick base of cement mortar 1:3(1 cement, 3 sand)laid and jointed with neat cement slurry, mixed with pigment to match the shade of stone including rubbing and polishing
sq.m 550.00
6 Colored glazed tiles20cmx20cm and 5mm thick in skirting and dado on 12mm thick cement plaster 1:3 in base an joined with white cement slurry in joints including beveled corners
sq.m 170.00
7 Extra for mechanical mixer used by the contractor at his own cost
Cu.m 140.00
![Page 96: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/96.jpg)
Contact Numbers Signature………….. Mobile…………… M/s…………………… Fax No……………. Office Address……………
![Page 97: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/97.jpg)
TENDER FORM/N.I.T
Tender Form for Labour contract for civil work of injection channel (Item Sr. No. B-20c) Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] Mill web site: - www.bhogpurcsm.com___________________________________________________________________________________________The General Manager The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (Jalandhar)Sub:- Jobs of strengthening of injection water channel at sugar mill Bhogpur
In response to above reference, I/we hereby quote my/our lowest rates for the following items subject to the mills terms & conditions overleaf/attached
S.No. Description of material units Apx.Qty.
Rate
1 Dismantling brick work tile masonry or tile lining(b)in cement
Cu.m 25.00
2 Reinforced cement concrete M-20 with cement @ 375/kg per cum hand mixed but excluding steel reinforcement centering and shuttering in foundation and plinth
Cu.m 12.00
3 Cold twisted deformed(ribbed/for steel)bars Fe 415 grade as per IS 1786-1985 for RCC works, where not included in the complete rate of RCC including bending, binding and placing in position complete
Qtl 12.00
4 Extra for mechanical mixer used by the contractor at his own cost
Cu.m 12.00
5 Extra for vibrator used by the contractor at his own cost
Cu.m 12.00
6 Centering and shuttering for faces of walls, partitions, retaining walls and like (vertical or bartering including attached pilasters buttresses etc
sq.m 95.00
7 First class burnt brick work laid in cement sand mortar 1:5 in first story up to 4 mt. above plinth level.
In wall In buttresses
Cu.m 19.00
8 12.5mm thick cement plaster 1:4 sq.m 235.00 Contact Numbers Signature…………..
![Page 98: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/98.jpg)
Mobile…………… M/s…………………… Fax No……………. Office Address……………
![Page 99: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/99.jpg)
TENDER FORM/N.I.TTender Form for Labour contract for civil work of Spray Pond (Item Sr. No. B-20d)Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] Mill web site: - www.bhogpurcsm.com___________________________________________________________________________________________The General Manager The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (Jalandhar)Sub:- Jobs of of Spray Pond.
In response to above reference, I/we hereby quote my/our lowest rates for the following items subject to the mills terms & conditions overleaf/attached
S.No. Description of material units Apx.Qty.
Rate
1 Dismantling concrete or precast concreteb. cement concrete plain 1:4:8 or 1:5:10d. cement concrete plain 1:2:4
Cu.mCu.m
12.008.00
2 Dismantling brick work tile masonry or tile lining(b)in cement
Cu.m 35.00
3 First class burnt brick work laid in cement sand mortar 1:5 in first story up to 4 mtr. above plinth level.
In wall In buttresses
Total
Cu.mCu.mCu.m
35.0018.0053.00
4 Reinforced cement concrete M-20 with cement @ 375/kg per cum hand mixed but excluding steel reinforcement centering and shuttering in foundation and plinth
Cu.m 42.00
5 Extra for mechanical mixer used by the contractor at his own cost
Cu.m 42.00
6 Extra for vibrator used by the contractor at his own cost
sq.m 42.00
7 Cement concrete 1:4:8 with stone ballast of size (b) 40mm gauge
Cu.m 14.00
8 Cement concrete 1:2:4 with stone ballast or shingle
In wall and channels In spray pond
Total
Cu.mCu.mCu.m
08.00140.00148.00
9 Cold twisted deformed(ribbed/for steel)bars Fe 415 grade as per IS 1786-1985 for RCC works,
Qtl. 46.00
![Page 100: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/100.jpg)
where not included in the complete rate of RCC including bending, binding and placing in position complete
10 Centering and shuttering for faces of walls, partitions, retaining walls and like (vertical or bartering including attached pilasters buttresses etc
sq.m 100.00
11 12.5mm thick cement plaster 1:4 sq.m 325.00 Contact Numbers Signature………….. Mobile…………… M/s…………………… Fax No……………. Office Address………
TENDER FORM/N.I.T
Tender Form for Labour contract work for Colony quarters(Item Sr. No. B-20e) Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] Mill web site: - www.bhogpurcsm.com___________________________________________________________________________________________The General Manager The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (Jalandhar)
Sub:- Jobs of Colony quarters
In response to above reference, I/we hereby quote my/our lowest rates for the following items subject to the mills terms & conditions overleaf/attached
S.No.
Description of material units Apx.Qty.
Rate
1 DismantlingBrick work tile masonry in cementRemoving RC battens from roofsStripping and stacking slate or tiles of a roofCement concrete plain 1:2:4Stripping and stacking sheets of a roof including ridging, flashing, eaves boards gutter and down pipes
Cu.mCu.msq.mCu.msq.m
15.0015.00815.0030.00190.00
2 Centering and shuttering for flat surface such as suspended floors roof etc.
sq.m 815.00
3 Cold twisted deformed bars Fe 415 grade for RCC works, including bending, binding and placing in position complete where not included in the rate of RCC
Qtl 95.00
![Page 101: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/101.jpg)
4 RCC M-20 grade excluding cost of steel reinforcement and shuttering in super structure.
Cu.m 95.00
5 Extra for mechanical mixer used by the contractor at his own cost
95.00
6 Extra for vibrator used by the contractor at his own cost
95.00
7 First class burnt brick work in cement mortar 1:5 in first story up to 4 mtr of height
Cu.m 30.00
8 12.5mm thick cement plaster with cement mortar 1:4
sq.m 125.00
Contact Numbers Signature………….. Mobile…………… M/s…………………… Fax No……………. Office Address……………
TENDER FORM/N.I.T.
Tender Form for the purchase/jobs of ………………. Building plans (Item Sr. No. B-20 f )
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com .
The General Manager,The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.
Sub: -Job work of Building plans.
In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.
Sr.No. Description of Material/Items Qty. Amount Rs.(lump sum)
![Page 102: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/102.jpg)
1 Preparation, submission and approval of building plan including issuing of stability certificate of buildings of The Bhogpur coop. sugar mills ltd. Bhogpur distt. Jalandhar under factory Act 1948 and rules. All the follow up/liaison work with the Director of Factories Punjab will be made by cont. including approval of drawing etc.Terms & conditions:
1. Work should be completed up to 30 days
2. Old drawings for reference will be provided by mills
3. Tax – extra as applicable4. TDS will be deducted as
applicable5. 30% against counter cheque
balance 70% will be made after the approval of drawing.
Contract Numbers Signature…………..Mobile…………… M/s…………Fax No……………. Office Address……………
Terms & Conditions of Work Order for Contractor work in Mills
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope,
subscribing the envelope “ Tender for Labour contract for various civil work. (Item Sr. No. B-20a)
3. Negotiations, if required will be done with the lowest tenderer on same date. 4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management. 5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.
![Page 103: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/103.jpg)
Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
13. It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
14. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
15. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
16. The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
17. Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
18. a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
b) Service tax as applicable shall be deducted from the contractor’s bills.
16. Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
17. The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
18. In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
23. Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
24. The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
![Page 104: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/104.jpg)
25. The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
26. The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
27. The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
Sd/- General Manager
The Bhogpur Co-operative Sugar Mills
![Page 105: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/105.jpg)
TENDER FORM/N.I.T.
Tender Form for the purchase of spares/jobs of…… Fabrication & Erection With Material Item Sr. No… B-21a
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com ._______________________________________________________________________________The General Manager, The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.
Sub: - N.I.T. for the supply of spares /jobs of … Fabrication & Erection With Material In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.
Sr.No.
Description of job Units Qty. Rate Quoted (per Unit)
1 Dismantling, Fabrication and Erection of Cutter Hood.
L.S.
2 Dismantling, Fabrication and erection of worn-out Juice tray at mill house from 10/12 mm plate
P.M.T.
3 Dismantling, Fabrication and erection of worn-out trough of RBC, Bagasse Elevator from 5/6 MM MS PLATE.
P.M.T.
4 Dismantling, Fabrication and Erection of boiler bagasse feeding mouth piece from 16 to 20 mm plate.
P.M.T.
5 Dismantling, Fabrication and Erection of boiler bagasse feeding chute between boiler furnance and RBC from plate from 6 mm plate
P.M.T.
6 Dismantling,Fabrication & Erection of cyclones of APCD of boiler Including base plate
L.S.
7 Dismantling, Fabrication & Erection of side plates of APCD.
L.S
8. Patch work of boiler ducting between boiler to chimney
PerSq M.T.
9 Dis,feb,& errection of boiler flue gas ducting between I.D. fan & chimney from 6mm/8mm plate.
P.M.T.
10 Dismantling, Fabrication & Erection of bend of boiler flue gas ducting between ID FAN and chimney from 6/8mm thick plate.
P.M.T.
![Page 106: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/106.jpg)
11. Dis. Fab and Erection of shute of APCD L.S
12 Dis. Fab & erection of the tubes plate of Air Pre heater tubes and side plates to be reused.
L.S
13 Dis. Fab & erection of the tubes(approx. 2-4feet) of air pre heater or as per direction of CE
L.S
14 Dismantling fabrication & erection of MS chimneyBase dia 4.75 mtr, top dia 2.75 mtr,length 41 mtrScope of work1 Dismantling of chimney as per directions of CE2 fabrication of chimney from MS plateSize 6/10mm 3 erection of chimney Note: All the scaffolding material will be arranged by the contractorCrane for Dismantling & erection of chimney will be arranged by the contractor
01 No.
15 Replacement of juice heater tube plate as per direction of CE/CC
1 no.
16 Repairing of juice heater partition plate/ box by welding to prevent from leakage/short circuit of Juice Heater.
Per sq feet
17 Dis., Fab,& erection of J.H. compartments bottom side from 10/12 mm plate
L.S.
18 Dis,feb,& erection of J.H. compartments top side from 10/12 mm plate
L.S.
19 Replacement of complete body shell of Juice Heater/CJH heater/VLJH from 10/12mm plate V to be madeScope to work.For better/smooth welding with tube plates & shell joints.
L.S.
20 Dis Fab. Erection of body of Juice sylphiter21 Dismantling, Fabrication and Erection and
hydraulically testing at 100 PSIG of sulphur melter from 10/12 MS PLATE.
L.S.
22 Dis,feb,& errection of So2 gas furnace complete from 20 mm plate.
L.S.
23 Dismantling,fabrication & erection of juice clarifier shell from MS plate 8/10mm
M.T.
24 Dismantling,fabrication & erection of bagacillo cyclone
L.S.
25. Dis,feb,& erection of high & low vacuum tank of RVF along with its flanges & covers.
L.S.
26. Dis.Feb. & erection of mud screw conveyor P.M.27 Dis. Feb. & erection of mud screw conveyor
troughL.S.
28 Dis. Feb. & erection of mud tray of RVF L.S.
![Page 107: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/107.jpg)
29. Dis, feb, & errection of of Bagacillo pipe line from 6mm/8mm plate.
P.M.
30 Dis, feb, & errection of vaccum filter condenser from 8mm plate.
L.S.
31 Dismantling, Fabrication & Erection of flash tank of dorr from 8mm thick plate.
lump-sum
32 Dismantling, Fabrication & Erection of dorr compartment 8-mm thick plate.
L.S.
33. Dismantling, Fabrication & Erection of mud Boot of door clarifier from 8 mm thick plate.
L.S.
34 Dis. Fab. Of erection of top plate 6/8mm of juice clarification
PMT
35 Dis. Fab. Of erection of bottom plate of juice clarification
L.S.
36 Febrication & Erection of Lime hopper as per drawing & direction of CE/CC. All material Will be supplied by the mills.Civil work will be done by the Mills.
L.S.
37 Contract Rates for the following work. a) Dismantling of brass/ss tubes of quard body.b) Cleaning and painting to calendria.c) Fitting of new brass/ss tubes and hydraulically tested at 80 PSIG.
Per tube
38 Dismantling, Fabrication & Erection of save all of quard body
Lump-sum
39 Dis,feb,& errection of umbrella of quad along with its supports.
L.S.
40 Dis,feb,& errection of umbrella of pan along with its supports.
L.S.
41 Dismantling, Fabrication and Erection of pan saveall from 8/10 MS Plate as per Drawing/instruction given by CC/CE of the Mill.
L.S.
42 Dismantling, Fabrication & Erection of vapour pipe 700mm and 900mm & 1000 mm from 8/10mm thick plate.
PMT
43 Dis,feb,& errection of Pan Body shell above tube plate Including taper portion .As per drawing or as per direction CE/CC.
L.S.
44 Dismentaling ,Febrication & Erection of pan Body shell above tube plate & taper portion from Front side approximate 3mtr in circumference asPer directions of CE/CC from 12mm plate.
L.S.
45 Dis,feb,& errection of sugar melter along with its drive arrangement & all connection.
L.S.
46 Dismentling,Febrication & Erection of molasses separation Of C/F machine DC-10 from M.S 6/8mm plate or S.S.3mmPlate.
L.S.
47 Dismantling, Fabrication & Erection of sugar hopper alongwith its trays from ms plate. Trail should be given by party and run in straight line.
Per running meter
48 Dis.Fab. and erection of worn out portion of Hopper
L.S.
49 Dis.Fab. and erection of blower of Hopper L.S.50 Dismentalling of butter fly gate valve of
A-Pig Mill to c/f machineLumsum each
![Page 108: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/108.jpg)
51. Erection of butter fly valve with actuator at A-Pig Mill
Lumsum each
52. RMP pipes & clusters replacement of spray pond. Pipe ClusterReducerBlind
PID.per ft.L.S.PID.PID..
53 Replacement worn out plate of Molasses storage tank at pan station
Per sq.mtr
54 Patch work of chimney Per sq.mtr55 Dismantling of coil of vertical crystallizer
Fabrication of coil of vertical crystallizer Erection of coil of vertical crystallizer
Per coilPer coilPer coil
56 Fabrication & erection of stirrer & drive arrangement at ETP clarifier
L.S.
57 Fabrication & erection of blower as per existing/modified as per direction of CE/CC
L.S.
58 Dismantling, Fab. & erection of syrup header of pans from MS plate 10/12 mm
L.S.
59. Dismentling,Fabrication Erection and commissioning Cane unloader Trolly No.2
L.S.
60. Replacing of bridge beam, fixing sqare bar and spot.
L.S.
61. Platform of EOT crane L.S.62. Dis,Fab,and erection of machanical grab L.S.63. Dis.of VLJH L.S64. Erection of new VLJH L.S.65. Dismentling of Bottom and Top tube plate
of quad bodyL.S.
66. Erection and commissioning Top and bottom tube plate
L.S.
67. Dismentling of S.S. tube from VLJH and quade body
per tube
68. Fitting of S.S.tube VLJH and Quad No.1 body
per tube
69 Dis.of saveall of qude body L.S.70. Feb.Errection of new saveall Quad No.1 L.S.71. Strenthing of v.cell top saveall by welding
inside of thread and providing stiffners as per CE/CC
72 Strenthing of Pan No.5l top saveall by welding inside of thread and providing stiffners as per CE/CC
L.S.
73. Dis.of saveall of Pan No.6 L.S.74 Feb.Errection of new saveall Pan No.6 L.S.
![Page 109: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/109.jpg)
75. Dis.of overhead Water tank L.S.76. Feb.Erection of overhead Water tank L.S.77 Dis.of overhead Molasses/Syrup tank L.S.78 Feb.Erection of overheead Molasses/Syrup
tankL.S.
note only those contractor will submit in quotation fabrication ,erection rate whose having minimum Five year experiance in Sugar Industry for above work. Contract Numbers Signature…………..
Mobile…………… M/s…………
Fax No……………. Office Address……………
TENDER FORM/N.I.T.
![Page 110: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/110.jpg)
Tender Form for the purchase of spares/jobs of…… Fabrication & Erection With Material Item Sr. No B-21b
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] Mill web site: - www.bhogpurcsm.com .________________________________________________________________________The General Manager, The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.
Sub: - N.I.T. for the supply of spares /jobs of … Fabrication & Erection With Material In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.
Sr.No.
Description of Material/Items Units Qty. Rate Quoted (per Unit)
1. Dismantling and Erection of various sizes of MS and GI PIPE lines up to 1 3/4” dia.
Per Inch dia per mtr
2. Dismantling and Erection of various sizes of MS/GI PIPE lines from 2’’to 12” dia.
Per Inch dia per mtr
3. Dismantling and Erection of various sizes of CI PIPE lines above 3’’ dia
Per Inch dia per mtr
4. Dismantling and Fitting of C.I Bend, C.I ConCI cross, CI tee etc. size above 3’’
Per Inch dia per pcc
5. Dismantling, Fabrication and Erection of MS pipe above 12’’ dia from MS PLATE and shifting /dragging it as per direction.
P.M.T.
6. Fab.and fitting of MS flange complete with holes by drilling up to 12’’dia
Per Inch dia per pcs
7.. Fab.and fitting of MS flange complete with holes by drilling above 12’’ dia
Per Inch dia per pcs
8 Dis. And cleaning of MS FLANGE from old pipe lines.
Per Inch dia per pc
9. Fabrication and Erection of following items from MS pipe up to 12” dia.a) MS NIPPLE b) MS BENDc) MS TEEd) MS CROSSe) MS REDUCERf) MS CONE
Per Inch dia per pcs
10. Fabrication and Erection of following items from MS plate above 12” dia.a) MS NIPPLE b) MS BENDc) MS TEEd) MS CROSSe) MS REDUCERf) MS CONE
Per Inch dia per pcs
11. Fitting of valve Per Inch dia per pc
12. Dismantling and fitting of GI/ACC sheet. Per sheet
![Page 111: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/111.jpg)
DismantlingFitting
13. Dismantling of machinery and structure as instruction of CE
P.M.T.
14. Fabrication and Erection of machinery and structure.
P.M.T.
15. Erection of Machinery P.M.T.16. Repairing Of Cane Yard And Factory Stairs &
Railing.DismantlingFabrication Erection
Per running meter
17 Contract rates of round ,square and rectangular tank from MS PLATE 8/10 MM with flat ,round and square bottom size above 24’’. DismantlingFabrication Erection with conical buttons
P.M.T.
18. WITH Chemical Bottom 19 Patch work of different equipments such as
cane carrier,RBC,Bagasse Elevator and inter carrier.
Per sq. mtrs
20 Dismantling and erection of worn-out runners of cane carrier, RBC, Bagasse Elevator and inter carrier.
Per running meter
21 Replacement of sq. bar of cane unloader. Per running meter
22 Patch work of boiler flue gas between boiler and ID Fan
Per sq. mtrs
23 Dismantling, Fabrication and Erection of complete foot valve of injection and spray pump.
L.S.
24 Dismantling, Fabrication and Erection of platforms. Dismantling Fabrication Erection
P.M.T.
25 To straight the old damaged vapour pipe and round tank for platform.
P.M.T.
26 Dismantling, Fabrication & Erection of worn-out bottom/side MS plate of Molasses/Syrup Tanks with New MS plate 8-10 mm as per requirement.
Per Mtr. Square
27 Dis,feb,& errection of Steam coil of molasses storage tank at pan station size 1” to 2”.
PID/.ft.
28 Dis, feb, & errection of juice coil of juice clarifier size 4”,5” & 6” alongwith its nipple.
P.I.D./Feet.
29 Dis, feb, & errection of open & closed crystallizers arms.
L.S.Per. Arm.
30 Dismantling, Fabrication and Erection of water and molasses gutter having approx.size 1’ x1’x1’x 3 mm thickness MSPLATE. Dismantling Fabrication Erection
Per running meter
![Page 112: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/112.jpg)
31. Dis.Feb & Eraction of Wt. Juice Sulphited Juice stainer
L.S
32 a) Dismantling of old scrubber & shift in the yard
b) Fab. & Erection of scrubber c) Fab. & erection of MS jali & gas
pipe in all respect
P.M.T
L.S.L.S.
33 Dismantling, fab. & erection of SS pipe up to 12’’
per inch dia per mtr
34 Dismantling, fab. & erection of following items upto 12’’ of SS SS nipple, SS bend, SS tee, SS cross, SS reducer SS cone
per inch dia per pc
35 Dismantling, fab. & erection of MS Jali for juice sulphiter
L.S.
36 Dismantling, fab. & erection of MS angle & channel
R/M
37 Dismantling, fab. & erection of MS flat (runner), cane carrier, RBC chain etc.
‘’
38 Dismantling, fab. & erection of motor bed with alignment
L.S.
39 Dismantling, fab. & erection of perling /stress hannel 100x50
Per R/M
40 Dismantling of exhaust line oil catcher PMT41 Fab. & erection of exhaust line oil
catcher with chain parlen plate, cone, angle & flat etc.
L.S
42 Replacement bagacillo pipe Per mtr43 Replacement of hot air, cold air &
bagacillo blower etc. L.S.
44 Replacement of ID fan & FD fan casing L.S.45 Shifting of ID fan
A. Dismantling of old ID fanB. Erection of old ID fan with casing
of foundation in all respectC. Dismantling of multi cyclone from
the position & shifting in the yard
PMT L.S.
L.S.
Note - only those contractor will submit in qoutaion fabrication ,erection rate whose having minimum five year experiance in Sugar Industry for above work
![Page 113: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/113.jpg)
Contract Numbers Signature……………. Mobile…………… M/s………………….. Fax No……………. Office Address
Terms & Conditions of Work Order for Contractor work in Mills
1. Last date of receipt of tender is 16.06.2017 Upto 11.30am.
![Page 114: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/114.jpg)
2. The enveloped tender should be super scribed a tender…B-21 fabrication & erection with material(consumable)
3. Negotiations, if required will be done with the lowest tenderer on same date.4. Any damage done to the mill property during the working by the workers of contractor shall be
recovered from contractor after assessing the damage by the mills Management.5. Provident fund of the contractor’s labour shall be the responsibility of the contractor.6. In case the contractor’s rates are found less in any other Coop. the same rates will be
applicable. 7. The contractor will have to quote the following and shall provide proof of the same at the time
of negotiation.
i. Permanent Account Number (PAN)____________ii. EPF Code No._____________________________
iii. Service Tax Regn. No.______________________iv. Div./ Commission rate_______________________
8. The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
9. It will be obligatory on the part ofr contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
10. And contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
11. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.etc.
12. The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws and in the event of any liability alleged or created against the General Manager, CSM Bhogpur or his representative or his seniors of CSM Bhogpur shall be indemnified discharges by contractors in addition to the expenses incurred in any proceeding.
13. Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
14. a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
b) Service tax as applicable shall be deducted from the contractor’s bills.
15. Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar. 16. The contract is non-transferable. However, if General Manager is satisfied that the contractor
is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
17. In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other
![Page 115: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/115.jpg)
party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
18. Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
19. The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
20. The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
21. Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
22. The Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
General Manager
![Page 116: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/116.jpg)
TENDER FORM/N.I.T.
Tender Form for the purchase/jobs of……Reboring of sleeve of Mill Engine Cylinder Item Sr. No…B-22aPress Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] Mill web site: - www.bhogpurcsm.com ______________________________________________________________________________The General Manager, The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.
Sub: - Jobs of … Reboring of sleeve of Mill Engine Cylinder In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.Sr.No.
Description of Material/Items Units Qty. Rate Quoted (per Unit/day)
1. Reboring of sleeve of Mill Engine Cylinder & Cross Head Guide Scope of WorkReboring of sleeve of cylinder of mill engine & cross head guide at site and polishing with polish tool. Bore of the cylinder shall be uniformed machined to the true size. casting of white metal on cross head sleeper & machining to the true axis of cross head guide. Machining chips of the white metal & other scrap to be return to the mills.
No. 2
2 Grinding of piston shaft for its uniform size ,, 1
3 Grinding of little end pin ,, 2
4 Grinding of guenon pin ,, 2
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 117: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/117.jpg)
TENDER FORM/N.I.T.
Tender Form for the purchase/jobs of…… Repairing & overhauling of the engine Item Sr. No B-22b
Press Tender Notice in the News Papers… – Mail today dt 18.5.2017 – Jagbani dt.18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com __________________________________________________________________________The General Manager, The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.Sub: - Jobs of … Repairing & overhauling of the engine (2016-17)
In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.Sr.No.
Description of Material/Items Units Qty. Rate Quoted (per Unit/day
1. Repairing & overhauling of the engine Scope of WorkRepairing & overhauling of the engine For smooth running of the engineFollowing work to be done 1 Assembling of piston alongwith new piston ring 2 Assembling of the sleeper & connecting rod 3 Repairing & assembling of live & exhaust steam valves of engine alongwith all other steam,exhaust & drain valves etc.4 Checking & repairing of cam & timing shaft 5 Checking of timing gears 6 Checking & setting of connecting rods for opening exhaust & steam valves of the engine7 Repairing/assembling & fitting of main white metal bearings/journal etc.8 Governor of the engine put in operation which is lying idle. Inspite of any work not covered in above should be included for smooth running of mill engine
No
2
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 118: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/118.jpg)
Terms & Conditions of Work Order for Contractor work in Mills
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope,
subscribing the envelope “ Tender for Reboring of sleeve of Mill Engine Cylinder Item Sr. No…B-22 3. Negotiations, if required will be done with the lowest tenderer on same date. 4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management. 5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
7. It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
8. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
9. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
10 The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
11.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
![Page 119: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/119.jpg)
12 a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
b) Service tax as applicable shall be deducted from the contractor’s bills.
13 Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
14 The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
15 In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
16 Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
17 The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
18 The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
19 The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
20 The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
Sd/- General Manager
The Bhogpur Co-operative Sugar Mills
![Page 120: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/120.jpg)
TENDER FORM/N.I.T.
Tender Form for the Checking & re-alignment of mills Item Sr. No…B-23aPress Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] Mill web site: - www.bhogpurcsm.com ______________________________________________________________________________The General Manager,The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.
Sub: - Checking & re-alignment of mills In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.
Sr.No. Description of Material/Items Units Qty. Rate Quoted (per Unit)
1. Checking & re-alignment of millsScope of workChecking & re-alignment of mills from mill Engine and Slow Motion Gearing to mill head stocks including checking of all levels gear boxes, bearing pedestals, mill gearing shaft levels, lifting height of master shafts to mill top roller centre, checking of bearing bore clearness respective shaft & maintain proper clearances, maintain proper centre distances as per design, proper coupling alignment for smooth running in the season. NOTE ::Required electrodes and welding wherever required, is to be carried out by contractor at his own cost.
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 121: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/121.jpg)
TENDER FORM/N.I.T.
Tender Form for …… Checking & re-alignment of mills Item Sr. No… B-23b
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com ______________________________________________________________________________The General Manager,The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.
Sub: - REPAIRS & RECONDITIONING OF PIN HOLES OF SIDE COVER MILL HEAD STOCK
In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.
Sr.No. Description of Material/Items Units Qty. Rate Quoted (per Unit)
1. REPAIRS & RECONDITIONING OF PIN HOLES OF SIDE COVER MILL HEAD STOCKScope of work
Repairs of pin holes by reboring of pin holes Mill Head StockFitting of new suitable M. S. Sleeves to pin hole after each boring. Bore size of ms sleeve should be the equal size of the pin after grindingNote: 1 welding material borne by the contractor2 50% payment against running bill 3 Balance 50% after completion of work4 Remaining 20% after 1st cleaningOther terms & conditions are attached
Nos. 40
2 Reconditioning of wear plate fitting portion of top bearing of top rollerScope of workReconditioning of wear plate fitting portion of
Nos. 10
![Page 122: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/122.jpg)
top half bearing of top roller which is worn out by machining at site.
3 Reconditioning of bottom portion of bearing of top roller.
Scope of work
Reconditioning of bottom portion of bearing of top roller. The worn out portion to be welded by special quality SS-304 After welding and machining half round portion should be maintained as per original size and accuracy.
Nos. 10
4 Reconditioning of Horizontal portion og mill side rollerScope of work
Reconditioning of Horizontal portion corresponding to bottom roller bearing fitting portion of Mill side roller. The existing bearing portion to be machined before welding and then to be welded with special quality electrodes SS-304. After the welding work machining job should be attended. After machining both head stock bearing fitting portion level should be equal and check by straight edge and master level maintaining 0-0 level. Both head stock fitting portion (bearing base) also should be maintained 0-0 level
Nos. 20
5 MILL BASE FRAME (HEAD STOCK FITTING PORTION) Machining of Mill Base Frame (Head Stock fitting portion) wear out portion by welding with SS-304 special quality electrode by you).
Before welding light machining cut to be machined for welding. After welding finish machining done at both side. (Head stocks left & right side) maintaining fine accuracy and
Nos. 10
![Page 123: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/123.jpg)
fine finish with 0-0 level as per our original standard with straight edge.After the machining of base frame at head stock bottom portion welding by special quality electrodes before the welding light machine cut machining for welding after the welding head stock bottom portion machining seat for base frame & head stock bottom machining portion after machining of the both bottom base of the Head Stock & base frame face after installation of both side head stocks maintaining 0-0 level with straight edge at the top of head stock.
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 124: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/124.jpg)
TENDER FORM/N.I.T
Tender Form for Contract Job for Mill Head stock & Transmission gear alignment Item Sr.No.B-23c Press Tender Notice in the News Papers… – Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com ______________________________________________________________________________The General Manager The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (Jalandhar)
Sub: .Contract Job for Mill Head stock & Transmission gear alignment .
In response to above reference, I/we hereby quote my/our lowest rates for the following items subject to the mills terms & conditions overleaf.
S.No. Description of material/Items Rate1 im`l nM: 4 Aqy 5 dy trWmISn igAr dI
AlweInmYNt krnw2 im`l nM: 4 Aqy 5 dy bys Prym ifsmYNtl krnw
Aqy shI qrIky nwl grnIitMg krnI 3 im`l nM: 4 Aqy 5 dy hYf` stOk dw trWmISn igAr
nwl AlweInmYNt krnI4 im`l nM: 1,2 Aqy 3 dI trWmISn igAr nwl
AlweInmYNt cYk` krnw Aqy loV pYx qy shI krnwnot: ies kMm nUM krn vwly iPtr dI AlweInmYNt krn dw G`to G`t 10 swl dw qzrbw hoxw cwhIdw hY[
Contract Numbers Signature…………..
Mobile…………… M/s…………
Fax No……………. Office Address……………
Terms & Conditions of Work Order for Contractor work in Mills
![Page 125: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/125.jpg)
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope, subscribing the envelope “ Tender for Checking & re-alignment of mills Item Sr. No… B-23 3. Negotiations, if required will be done with the lowest tenderer on same date.
4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management. 5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
7. It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
8. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
9. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
10 The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
11.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
12 a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
![Page 126: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/126.jpg)
b) Service tax as applicable shall be deducted from the contractor’s bills.
13 Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
14 The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
15 In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
16 Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
17 The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
18 The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
19 The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
20 The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
Sd/- General Manager
The Bhogpur Co-operative Sugar Mills
TENDER FORM/N.I.T
![Page 127: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/127.jpg)
Tender Form for Labour contract for mill house civil work. Item NO. B-24
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com ___________________________________________________________________________________________The General Manager The Bhogpur Coop Sugar Mills Ltd., Bhogpur (Jalandhar)
Sub:- Jobs of Roof Slab of Quarters in Mill Colony. In response to above reference, I/we hereby quote my/our lowest rates for the following items subject to the mills terms & conditions overleaf.
S.No. Description of material units Rate
A labour rate for RCC slab Scope of work:Labour contract rate for RCC of mill foundation as per drg. No./instructions of mill management
Per cub mtrs.
2. labour rate for Scope of work:Labour contract rate bricks work of mill foundation as per drg. No./instructions of mill management
Per cub mtrs.
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
Terms & Conditions of Work Order for Contractor work in Mills
![Page 128: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/128.jpg)
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope,
subscribing the envelope “ Tender for Labour contract for mill house civil work. Item NO. B-24
3. Negotiations, if required will be done with the lowest tenderer on same date. 4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management. 5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
7. It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
8. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
9. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
10 The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
11.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
12 a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
![Page 129: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/129.jpg)
b) Service tax as applicable shall be deducted from the contractor’s bills.
13 Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
14 The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
15 In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
16.Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
17 The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
18 The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
19 The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
20 The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
Sd/- General Manager
The Bhogpur Co-operative Sugar Mills
![Page 130: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/130.jpg)
TENDER FORM/N.I.TTender Form for Labour contract for cleaning /Brushing ,fitting of tarfelt & pasting on sugar godown and molass tank roof. Item no B-25
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com __________________________________________________________________________________________The General Manager The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (Jalandhar)
Sub:-Labour Labour contract for cleaning /Brushing ,fitting of tarfelt & pasting on sugar godown and molass tank roof In response to above reference, I/we hereby quote my/our lowest rates for the following items subject to the mills terms & conditions overleaf.
S.No. Description of material Rate per Roll
123.4.5.6..
Cleaning of roof surface & dismentling of previous old tarfeltingSprinkling of BituminFixing of tarfeltPainting of bitumen on tarfelt.Fixing of tarfelt in rain gutter.Rates should be quoted per roll.(1 mtrs x20 mtrs.).
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
Terms & Conditions of Work Order for Contractor work in Mills
![Page 131: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/131.jpg)
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope,
subscribing the envelope “ Tender for Labour contract for cleaning /Brushing ,fitting of tarfelt & pasting on sugar godown and molass tank roof. Item no B-25
3. Negotiations, if required will be done with the lowest tenderer on same date. 4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management. 5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
7. It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
8. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
9. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
10 The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
11.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
![Page 132: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/132.jpg)
12 a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
b) Service tax as applicable shall be deducted from the contractor’s bills.
13 Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
14 The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
15 In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
16 Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
17 The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
18 The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
19 The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
20 The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
Sd/- General Manager
The Bhogpur Co-operative Sugar Mills
TENDER FORM/N.I.T.
![Page 133: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/133.jpg)
Tender Form for the Job work of cleaning/painting/oiling of boiling house eqpts.& MachineriesItem Sr. No…B-26
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] Mill web site: - www.bhogpurcsm.com _________________________________________________________________________________________The General Manager The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (jalandhar)
Sub:- Job work of cleaning/painting/oiling of boiling house eqpts.& Machineries
In response to above reference, I/we hereby quote my/our lowest rates for the following items subject to the mills terms & conditions overleaf.S. No.
Description Jobs Rate quoted (Lumsum)
1.
2.
3
4
5
6
im`l hwaUs dIAW jUs tYNkIAW dI AMdrUnI sPweI, quly hoey jUs Aqy pwxI dIAW tYNkIAW dI AMdrUnI Aqy bwhrlI sPweI Aqy rMg/cUnw/qyl Awid krnW[ iehnW tYNkIAW nwl sbMDq jUs pMpW dy stynr dI sPweI Aqy rMg bgYrw krnw[jUs hItrW (5 nM.) dy KwinAW dIAW plytW dI sPweI, F`kx dI sPweI, fbl bIf vwlvW dI AMdrUnI sPweI, rMg/cUnw/qyl Awid krnw[
slPr B`TIAw dI AMdrUnI sPweI, mYltrW dI AMdrUnI sPweI, mYltrW dI AMdrUnI sPweI, skrbr dI AMdrUnI sPweI, (ie`tW bhr k`Fky swP krnw Aqy dobwrw ie`tW dI BrweI) gYs pweIp lweInW dI AMdrUnI sPweI Awid krnw[
lweIm slykr,lweIm klwsIPweIr dI sPweI, imlk AwP lwiem dIAW tYNkIAW dI sPweI, vweIbrytr dI sPweI,cUny dy pMpW dI Awly-duAwly smyq sPweI krnI[sbMDq cUnW lweInW dI sPweI,stySn qy peI lweIm gir`t cukky inrdyS muqwibk bwhr su`txI[ cUnw gfwaUn dI sPWeI krnI Aqy ibKry pey cUny Aqy KwlI borIAW nMU inrdySW muqwibk bwhr su`txw Awid[ cUnw gfwaUn nMU auproN iqrpwl Awid nwl F`kxw[
vYikXUm PIltr frm dI AMdrUnI sPweI, jUs tryA smyq AYjItytr dI ANdrUnI sPweI Aqy rMg/cUnw/qyl Awid krnw[ sweIklon dI sPweI Aqy kMfYNsrW dI AMdrUnI sPweI Aqy rMg/cUnw/qyl Awid krnw[
jmIn qy ip`t dI sPweI Aqy rMg/cUnw/qyl Awid krnw[ m`f
![Page 134: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/134.jpg)
7
8
9
10
11
12
13
14
15
tYNk dI AMdrUnI sPweI Aqy rMg/cUnw/qyl Awid krnw[ im`l hwaUs qy mOjUd bYgwislo jwlIAW dI sPweI krnw Awid[
klYrIPweIr smyq sMp tYNk dI AMdrUnI sPWeI Aqy rMg dono (prweImr Aqy ifaUroglyz) krny[ swry jUs Aqy m`f bkisAW dI sPweI Aqy donoN rMg krny[ klIAr jUs Aqy m`f lweInW dI AMdrUnI sPweI krnI[
jUs slPweItr dI AMdrUnI sPweI Aqy dono0 iksm dy rMg krnw[ Q`ly vwly rsIivMg tYNk dI sPweI krnw, rMg/cUnw/qyl Awid krnw[ sbMDq cUnw bOks Aqy lweInW dI sPweI krnI[ slPweItf jUs pMpW dy stynrW dI sPweI krnw[ rMg/cUnw/qyl Awid krnw[
ievYporytr bweIz (smyq vYpr sY`l) dI AMdrUnI sPweI,itaUb plyt (dono qrP) dI sPweI,vypr sYl Pst Aqy sYkMf bwfI dy AMdr qyl lgwauxw, swry syv Awl swP krny Aqy rMg/ qyl Awid lgwauxw[swrIAW sbMDq isrp Aqy jUs pweIpW dI AMdrUnI sPweI Aqy rMg/qyl lgwauxw[ sbMDq kfYNsr dI AMdrUnI sPweI,isrp rsIivMg tYNk dI AMdrUnI sPweI Aqy rMg krnw Aqy isrp pMp dI filvrI lweIn dI AMdrUnI sPweI krnI[ eyvwporytr bwfIz sbMDq AmonIAw pweIpW nMU AlUmInIAm pyNt krnw kMfnsyt boqlW nMU bwhroN cUnw pqweI krnw[ Q`ly Awiel kYcrW dI sPweI krnw[
isrp slPweItr Aqy iesdy twvr dI AMdrUnI sPweI Aqy rMg krnw Aqy ies qoN pYnW q`k isrp lweInW dI sPweI krnw[
pYn bwfIz sbMDq syv Awlz Aqy vypr pweIpz dI AMdrUnI sPweI Aqy qyl lgwauxw[ swry sbMDq kMfYNsrW dI AMdrUnI sPweI krnw[pYn gtrW dI AMdrUnI sPweI, rMg/cUnw/qyl Awid krnw[ AmonIAw pweIpW nMU AYlUmInIAm pyNt krnw[ pYn bwfIAW nMU bwhroN cUnw rMgweI krnw Awid[
pYn stySn vwly molwiss,isrp,mYlt Aqy ey-lweIt vwly tYNkW (13 nM.) Aqy gtr dI AMdrUnI sPweI krnw[ rMg/cUnw Aid krnw[ molwiss kMfISnr dI AMdrUnI sPweI Aqy rMg/cUnw/qyl Awid krnw[
vrtIkl kirstylweIjrW dI AMdrUnI sPweI (koielW smyq) Aqy prweImr kot krnw[ bwhr vwlI grm pwxI dI tYNkI nMU AMdroN swP krnw Aqy prweImr kot krnw sbMDq mYisikaUt lweInW AMdroN swP krnw[ PweInl molwisj qol stySn dIAW swrIAW tYNkIAW dI AMdrUnI sPweI rMg/cUnw/qyl Awid krnw[
![Page 135: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/135.jpg)
16
17
18
19
20
ieMjYkSn pMpW dIAW sYkSn lweInW dI dono qrP sPweI Aqy rMg/qyl Awid lgwauxw[ Pu`t vwlvW dI AMdroN sPweI Aqy rMg/cUnw Awid krnw[
frweI sIf,vYkXUm (2 nM.) kirstylweIjr Aqy dUsry kirstylweIjr (11 nM.) dI AMdrUnI sPweI Aqy cUnw rMgweI Awid krnw Aqy mYsikaUt pMpW dI sPweI Awid krnw[
ey-mSInW dy bwskt holz dI sPweI,bwskt dI sPweI Aqy rMg krnw, monItr kyisMg dI AMdrUnI sPweI Aqy rMg krnw,Q`ly vwly ifscwrj SutW dI sPweI Aqy rMg krnw, p`g im`l dI AMdrUnI sPweI Aqy rMg krnw[ supr hItr itaUbW dI AMdrUnI sPweI krnw[
bI./sI. mSInW dI bwskt dI sPweI,monItr kyisMg dI sPweI Aqy rMgweI[ p`g im`lW Aqy Q`ly vwly mSInW dy SUtW dI AMdrUnI sPweI Aqy rMg krnw[ trWjIAYNt hItrW dIAW itaUbW dI AMdrUnI sPweI krnw[
mYgmW imksr,molwiss tYNk,mSInz,gtrz,SUgr mYltr dI AMdrUnI sPweI Aqy rMg krnw[ sbMDq PwaUfySnW dI cUnw pqweI krnw[ sbMDq lweInW dI AMdrUnI sPweI krnw[ hOt eyAr bloAr dI AMdrUnI sPweI krnw[
hwpr dI sPweI Aqy rMg krnw[ gryfr dI AMdrUnI sPweI Aqy DulweI krnw[ SUgr Aqy frweIsIf AYlIvytrW dI cyn dI sPweI Aqy DulweI Aqy bktW nMU swP Aqy Do ky rMg krnw[ donoN AYlIvytrW dI kyisMg dI sPweI Aqy DulweI krnw[ hwpr dy PwauNfySn dI cUnw rMgweI krnw[
frwier hwaUs dI sPweI,DulweI Aqy sbMDq dIvwrW nMU cUnw pqweI krnI[ Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 136: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/136.jpg)
Terms & Conditions of Work Order for Contractor work in Mills
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope,
subscribing the envelope “ Tender for cleaning/painting/oiling of boiling house eqpts.& MachineriesItem Sr. No…B-26
3. Negotiations, if required will be done with the lowest tenderer on same date. 4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management. 5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
7. It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
8. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
![Page 137: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/137.jpg)
9. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
10 The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
11.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
12 a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
b) Service tax as applicable shall be deducted from the contractor’s bills.
13 Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
14 The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
15 In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
16 Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
17 The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
18 The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
19 The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
20 The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
Sd/-
![Page 138: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/138.jpg)
General Manager The Bhogpur Co-operative Sugar Mills
TENDER FORM/N.I.T
Tender for Cleaning of spray and ETP & Drains. Item Sr.No.: B-27Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com ______________________________________________________________________________The General Manager The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (jalandhar)
Sub:- Cleaning of spray and ETP & Drains.In response to above reference,I/we hereby quote my/our lowest rates for the following items subject to the mills terms & conditions overleave.
S. No.
Description Jobs Rate quoted (Lumsum)
1 XU.jI.Awr. (F`ikAw Aqy AnF`ikAw) tYNkW dI AMdrUnI sPweI Aqy cUnw pqweI krnI[
2 XU.jI.Awr. tYNkW dy Awly-duAwly Gwh k`txw/ JwV-bUJ swP krnw (cUnw stySn qoN gfwaUn nM. 1 dI dIvwr q`k Aqy tYNkW nMU jWdy rsqy ivckwr)
3 Im`l dy swry frynW dI sPweI krnI ijs ivc swry grIs ipt Aqy Awiel kYcr Swiml hn[
4 donW spry pONfW dI AdrUnI sPweI (ip`lrW smyq) Aqy cUnw pqweI krnI[
5 Swry spry vwtr cYnlW dI sPweI Aqy cUnW pqweI krnI[
6 donW spry poNfz Aqy spry cYnlW dy Awly-duAwly G`to-G`t 3-3 P`ut q`k Gwh k`txw Aqy hor JwV-bUJ swP krny[
7 eI.tI.p[I. dy swry tYNk (sMp tYNk, iekolweIjySn tYNk, eyrIeySn tYNk, klYrIPwier Aqy sl`j bYNfW dI sPweI Aqy cUnw pqweI krnI[
![Page 139: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/139.jpg)
8 eI.tI.pI. dy bwhr jwx vwly cYnlW dI sPweI Aqy cUnW pqweI (ijQoN q`k p`kw cYnl hY) krnI Aqy 3-3 P`ut q`k Gwh Aqy JwV-bUJ swP krny[
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Addre
Terms & Conditions of Work Order for Contractor work in Mills
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope, subscribing the envelope “ Tender for Cleaning of spray and ETP & Drains. Item Sr.No.: B-27 3. Negotiations, if required will be done with the lowest tenderer on same date.
4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management. 5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
7. It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
8. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
![Page 140: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/140.jpg)
9. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
10 The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
11.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
12 a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
b) Service tax as applicable shall be deducted from the contractor’s bills.
13 Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
14 The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
15 In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
16 Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
17 The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
18 The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
19 The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
20 The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
Sd/-
![Page 141: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/141.jpg)
General Manager The Bhogpur Co-operative Sugar Mills
TENDER FORM/NIT
Tender Form for Labour rate of White washing Item Sr.No. B-28Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com .________________________________________________________________________
____The General ManagerThe Bhogpur Coop Sugar Mills Ltd. Bhogpur (Jalandhar)Sub:-.Job work for white washing/distempering during the year. In response to above reference I/we here by quote my/our lowest rates for following items subject to the mills Terms & conditions overleaf.S.No Description of Material/Items Rate To be quoted
per person per day
.1.2.
.Labour rate white washing/distempering per 100 sq ftLabour rate for white washing.Labour rate for distempering/Painting.
Note: 1.Rate should be quoted inclusive EPF ,Insurance etc.2.Material /consumable will be provided by mill
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 142: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/142.jpg)
Terms & Conditions of Work Order for Contractor work in Mills
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope,
subscribing the envelope “ Tender for Labour rate of White washing Item Sr.No. B-28 3. Negotiations, if required will be done with the lowest tenderer on same date.
4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management. 5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
7. It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
![Page 143: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/143.jpg)
8. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
9.. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
10.The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
11 Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
12 a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
b) Service tax as applicable shall be deducted from the contractor’s bills.
13.Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
14.. The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
15.. In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
16 Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
17 The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
18.The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
19 The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
![Page 144: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/144.jpg)
20.The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
Sd/- General Manager
The Bhogpur Co-operative Sugar Mills
TENDER FORM/N.I.T NIT for cleaning & painting of molasses storage tank No. 2 Sr no B-29Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] Mill web site: - www.bhogpurcsm.com_____________________________________________________________________________The General Manager,The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (Jalandhar) Sub: Cleaning and painting of molasses storage tanks no 2
In response to above reference, I/we hereby quote my/our lowest rates for thefollowing items subject to the mills terms & conditions overleaf
S.No. Description of Jobs/Items Rate quoted Lump-Sum.
1 Cleaning and derusting of molasses tank inside surface including bottom top roof completely with wire brush, waste cotton waste & emery paper and single coating of Epoxy primer inside the molasses tank No. 1
2 Double coating of Epoxy paint inside the molasses tank
3 Cleaning and derusting of molasses tank external surface with wire brush, waste cotton and emery paper and single coat primer paint and Double coating of Aluminum paint at external surface of molasses tank.NB:1 Paint will done only after satisfactory cleaning of surface and got checked by Chief Chemist2 Painting should be uniform and as per direction of Chief Chemist
![Page 145: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/145.jpg)
3 Proper drying time is required for double coating and as per direction of Chief Chemist4 Rates should be quoted separately for each sl.5 payment will be made as per work done6 Paints, painting brush ,emery paper, cotton waste, ladder will be provided by the mills 7 Job should be completed within three weeks
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
Terms & Conditions of Work Order for Contractor work in Mills
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope, subscribing the envelope “ Tender for cleaning & painting of molasses storage tank No. 2 Sr no B-29 3. Negotiations, if required will be done with the lowest tenderer on same date.
4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management. 5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
7. It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
8. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour
![Page 146: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/146.jpg)
engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
9.Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
10 The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
11.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
12 a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
b) Service tax as applicable shall be deducted from the contractor’s bills.
13 Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
14 The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
15 In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
16 Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
17 The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
18 The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
19 The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
20 The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
![Page 147: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/147.jpg)
Sd/- General Manager
The Bhogpur Co-operative Sugar Mills
TENDER FORM/NIT
Tender Form for Labour rate of Grooving of scrapper & trash plate Sr no B-30c Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] Mill web site: - www.bhogpurcsm.com ________________________________________________________________________________The General ManagerThe Bhogpur Coop Sugar Mills Ltd. Bhogpur (Jalandhar)
Sub: Grooving of scrapper & trash plate
In response to above reference I/we here by quote my/our lowest rates for following items subject to the mills Terms & conditions overleaf.S.No Description of Material/Items Qty Rate /unit
1
2
3.
4
Grooving of top C.I scrapper as per drawing No.
Grooving of Discharge C.I scrapper as per drawing NoGrooving of C.S Trash plate as per drawing No.
5 Nos.
5 Nos.
5 Nos.
Contract Numbers Signature……………. Mobile…………… M/s………………….. Fax No…………….
![Page 148: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/148.jpg)
Office Address
TENDER FORM/NIT
Tender Form for Labour rate of Repairing & reinforcement of Molasses storage Tank No. 2 Sr no B-30b Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com ________________________________________________________________________________The General ManagerThe Bhogpur Coop Sugar Mills Ltd. Bhogpur (Jalandhar)
Sub: Job work of Repairing & reinforcement of Molasses storage Tank No. 2
In response to above reference I/we here by quote my/our lowest rates for following items subject to the mills Terms & conditions overleaf.
S.No Description of Material/Items Qty Rate /unit
1 Replacement of damaged roof of tank with MS plate of thickness 5mm alongwith repair/replacement of structure- job to be completed as per direction of Chief Engineer/Chief Chemist- Testing of complete molasses tank to be done by filling of water
18 ton
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 149: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/149.jpg)
TENDER FORM/NIT
Tender Form for Labour rate of Repairing & reinforcement of Molasses storage Tank No. 2 Sr no B-30a Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com ________________________________________________________________________________The General ManagerThe Bhogpur Coop Sugar Mills Ltd. Bhogpur (Jalandhar)
Sub: Job work of Repairing & reinforcement of Molasses storage Tank No. 2
In response to above reference I/we here by quote my/our lowest rates for following items subject to the mills Terms & conditions overleaf.
S.No Description of Material/Items Qty Rate /unit
1 All old welding joints are to be restrengthening and properly welded with MS welding electrodes of radiographic quality No. 28 ESAB make. Plates should have V cut as per thickness of plates with suitable current of welding. All the joints are to be grinded properly before welding and welding to be done from both sides of plate joints. - job to be completed as per direction of Chief Engineer/Chief Chemist- Testing of complete molasses tank to be done by filling of water
1800 mtr
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
![Page 150: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/150.jpg)
Fax No……………. Office Address
Terms & Conditions of Work Order for Contractor work in Mills
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope,
subscribing the envelope “ Tender for Repairing & reinforcement of Molasses storage Tank No. 2 Sr no B-30
3. Negotiations, if required will be done with the lowest tenderer on same date. 4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management. 5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
7. It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
8. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
![Page 151: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/151.jpg)
9. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
10 The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
11.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
12 a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
b) Service tax as applicable shall be deducted from the contractor’s bills.
13 Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
14 The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
15 In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
16 Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
17 The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
18 The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
19 The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
20 The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
Sd/-
![Page 152: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/152.jpg)
General Manager The Bhogpur Co-operative Sugar Mills
Terms & Conditions Last date of receipt of tender is 16.06.2017 Upto 11.30amThe Press Tender should be submitted in the Prescribed NIT in the sealed envelope, subscribing the envelope “Tender for B-30 Repairing & reinforcement of Molasses storage Tank No. 2 Negotiations, if required will be done with the lowest tendered on same date.Tender must reach within due date in the prescribed NIT form of Mills only.Material offered should be strictly as per specifications, otherwise your offer may not be considered.Rate should be quoted F.O.R. Mills only.Excise duty and other taxes, if applicable should be mentioned clearly. CENVAT/VAT documents to be provided.Mention minimum delivery period.Valid Authorization Certificate of Dealership should be enclosed with the tender.Inspection of material will be made at Mills site or as decided by The Purchase Committee80% payment will be made after receipt of material and balance 20% after inspection within 10 days or as decided by the purchase The Purchase Committee at the time of negotiation.Penalty for late supplies will be charged as decided by the The Purchase Committee during negotiation.In case, your rates are found less in any other Co-op. Sugar Mills in Punjab, the same will applicable to our Mills also.Quantity can be increased/decreased at the time of placing order.In case the supplier is unable to supply the material in time, the General Manager shall have absolute the power to purchase the material at the risk and cost of supplier.The supplier shall be liable to replace defective/ rejected material if any at his cost.No escalation what so ever in nature whether the increase in octroi, duty, sale tax etc will be entertained.The price given in the tender must be valid for one crushing season.Any other condition laid down by the tendered may not be accepted.Tenderers must quote:-CST No……………………….. Date…………………………….TIN No………………………… Date…………………………….Service Tax Regd. No……………..Dated………………………Excise Code No……………………………Range………………………………………………………………Div./Commission rate…………………………………………….The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason.
sd General Manager The Bhogpur Co-operative Sugar Mills
![Page 153: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/153.jpg)
TENDER FORM/N.I.T
Tender Form for job the work of operation of ETP & APCD without operator Item Sr.No B-31
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] Mill web site: - www.bhogpurcsm.com _________________________________________________________________________________The General Manager The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (jalandhar)
Sub:. job the work of operation of ETP & APCD without operator
In response to above reference, I/we hereby quote my/our lowest rates for the following items subject to the mills terms & conditions overleaf
.S.No. Description of material/Items Rate quoted1. Operation of ETP & APCD
without operator.Per month
Terms & conditions:
Mills responsibilities
![Page 154: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/154.jpg)
Supply of chemicals & other material required to run ETP.Repair of machinery electrical fitting & civil work as required.To provide the one unskilled person in each shiftFree accommodation for Supervisor only..
Contractor’s responsibilties.To start seeding and developing of biological culture round the clock one month prior to start of crushing season.Your supervisor will visit at least once a week or as & when required by the Mills to supervise operation of ETP & APCD.To ensure that treated pollutants(Air & water confirms to the prescribed normsTo maintain regular inlet & outlet flow of untreated & treated water.Supervisor will ensure that logbook for ETP is property maintained.You will submit the Environment Audit report as per requirement of PPCBSelf monitoring (monthly) will be done for both APCD & ETP as per requirement of PPCB.If any consent i.e. of water & Air will be revoked due to any lapse on part of party, then the party will be responsible for this.The above rates are valid for the crushing season 2017-18Result of on line monitoring system round o clock should be within norms otherwise penalty may be deducted up to 50% of bill.
Condition of payment50% payment after each monthly operation and 50% to be released after close of season,subject to the following:-Sample of Air & Water collected by the PPCB Authorities conform to the prescribed parameters,In case Board Authorities do not collect the sample during crushing season operations, full payment will be released to the contractor after submission of the Enviornmental Audit Report as requirement of PPCB.Payment for monthly operation shall be made on pro-rata basis if the working is less than 30 days for a particular month.
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 155: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/155.jpg)
TENDER FORM/N.I.T.
Tender Form for Tube cleaning of Quad and Pans Item No.B-32Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com
www.bhohpurcsm.com______________________________________________________________________________The General ManagerThe Bhogpur Coop Sugar Mills Ltd. Bhogpur (Jalandhar)
Sub:- Tubes cleaning with tool Head cutter and Turk Head brush during General cleaning
In response to above reference I/we here by quote my/our lowest rates for following items subject to the mills Terms & conditions overleaf.S.No Description of Material/Items Rate per item/body
Cleaning of brass/SS tubes by mechanical means ie by flexible shaft and tool head cutter/brushes during General cleaning 2017-18.I Vapour cell2. Ist body of quad3. 2nd body of quad4. 3rd body of quad 5. 4rd body of quad 6. Pans(06nos.
All the material required will be supplied by the millsRate should be quoted separately for each body.
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 156: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/156.jpg)
Terms & Conditions of Work Order for Contractor work in Mills
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope, subscribing the envelope “ Tender for Tube cleaning of Quad and Pans Item No.B-32 3. Negotiations, if required will be done with the lowest tenderer on same date.
4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management. 5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
7. It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
8. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
9. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
10 The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
![Page 157: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/157.jpg)
11.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
12 a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
b) Service tax as applicable shall be deducted from the contractor’s bills.
13 Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
14 The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
15. In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
16 Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
17.The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
18 The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
19 The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
20 The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
Sd/- General Manager
The Bhogpur Co-operative Sugar Mills
![Page 158: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/158.jpg)
TENDER FORM/N.I.T.Tender Form for the purchase/jobs of……Tube cleaning of Evaporator bodies, juice heater and pan Item Sr. No B-33
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com ____________________________________________________________________________________The General Manager, The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.
Sub: - Jobs of … Mechanical tube cleaning of Evaporator bodies, juice heater and pans In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.Sr.No.
Description of Material/Items Units
Qty. Rate Lum sum
1 Mechanical tube cleaning with tool head cutter/turk bead brush of evaporator bodies, juice heaters and pans during off season 2017-18Terms & conditionsTube cleaning to be done as per satisfaction of HOD 80% payment will be done on the basis of work done20% payment will be done after and satisfaction of HODTools and tackle will be provided by mills
No. 01
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 159: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/159.jpg)
Terms & Conditions of Work Order for Contractor work in Mills
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope, subscribing the envelope “ Tender for Tube cleaning of Evaporator bodies, juice heater and pans 3. Negotiations, if required will be done with the lowest tenderer on same date.
4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management. 5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
7. It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
8. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
9. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
10.The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
![Page 160: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/160.jpg)
11.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
12 a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
b) Service tax as applicable shall be deducted from the contractor’s bills.
13 Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
14.The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
15 In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
16 Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
17 The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
18 The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
19 The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
20 The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
Sd/- General Manager
The Bhogpur Co-operative Sugar Mills
![Page 161: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/161.jpg)
tYfr Pwrm/AYn.AweI.tI
tYNfr:- cMgI iksm dw guV bxwaux leI lybr ryt (AweItm lVI nM: bI-34)
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017Email: [email protected] Mill web site: - www.bhogpurcsm.com __________________________________________________________________jnrl mYnyjrdI Bogpur sihkwrI KMf im`lj ilm:Bogpur ijlw jlMDr[
ivSw:- cMgI iksm dw guV bxwaux leI lybr ryt
auprokq ivSy dy sbMD ivc nwl ilKIAw Srqw Anuswr mY/AsI G`t qo G`t ryyt dy rhy hw:lVI nM: kMm dw vyrvw ryt pRqI kivMtl1 cMgI kuvwltI dw guV
bxwauxw [
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
SrqW:Tykydwr Awpxy ryt swry tYksW smyq jy kr koeI lgdw hovygw dyvygw[bwlx dw ieMqjwm, im`Tw sofw,sro dw qyl bgYrw Tykydwr dw hovygw[hr 15 idnW bwAd bxy hoey guV dy ADwr qy 80% pymYt kIqI jwvygI[ ijs dI kuAwltI im`l dy cIP kYimst v`lo pws kIqI jwvygI[ pws kIqw igAw cMgI kuAwltI dw guV qusI cIP kYimst nUM spurd krogy Aqy rihMdI bwkI 20% pymYNt sIzn Kqm hox auprMq stor by-bwkI srtIPIkyt lYx Aqy mu`K gMnw ivkws APsr Aqy cIP kYimst dI isPwrS qy kIqI jwvygI[quhwfy v`lo guV bxwaux dw kMm im`l dy cIP kYimst dI ingrwnI hyT hovygw[auh guV dI kuAwltI pws krngy,jykr quhwfy v`lo bxwieAw igAw guV GtIAw kuuAwltI dw hoieAw jW bYT igAw qW iesdI juMmyvwrI quhwfI hovygI[GtIAw kuAwltI/bYT gey guV dI GtI hoeI kImq quhwfy bcdy 20% bkwey iv`co k`t leI jwvygI[mSInrI dI irpyAr Aqy myntInYNs dI juMmyvwrI im`l dI hovygI Aqy mSInrI dI sWB sMBwl Tykydwr dI hovygI[guV inrol AwrgYink qrIky nwl bxwieAw jwvygw Aqy guV bxwauNdy smyN guV iv`c koeI PwlqU kYimkl nhI pwieAw jwvygw[guV bxwaux vwly brqn Aqy kVwhy vgYrw dI swP sPweI dw Kws iDAwn r`iKAw jwvygw[
![Page 162: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/162.jpg)
im`l mYnyzmYNt dI iezwzq qoN vgYr iksy nUM vI guV nhI id`qw jwvygw[krYSr aupr kMm kr rhy quhwfy krmcwrIAw dy iksy iksm dy nukswn/durGtnw dI juMmyvwrI Tykydwr dI hovygI Aqy ausdI ieMSorYNs vgYrw Tykydwr dI hovygI[bxy hoey guV dw ihswb ikqwb ie`k rijstr iv`c drj kIqw jwvygw Aqy ausnUM im`l dy AiDkwrIAW duAwrw iksy smy vI cYk kIqw jw skdw hY[krYSr dw QVw Aqy ausdw Awlw duAwlw Aqy guV bxwaux vwlI jgw Aqy bxy guV nMU swP suQrw r`Kxw quhwfI juMmyvwrI hovygI[quhwfy v`lo pRwpq gMny dI mwqrw Aqy aus qo bxy guV dw ihswb ikqwb pRqI ku:/pRqI trwlI mu`K gMnw ivkws APsr qoN AglI gMny dI mwqrw lYx qoN pihlw dyxw hovygw[guV nMU bxwaux leI cMgw Aqy swP suQrw Aqy cMgI iksm dw gMnw im`l dy muK gMnw ivkws APsr vlo quhwfI mMg Anuswr muh`eIAw krwieAw jwvygw [ ies sbMDI qusI iek idn pihlW dsogy[
jnrl mYnyjrdI Bogpur sihkwrI KMf im`l Bogpur(jlMDr)
![Page 163: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/163.jpg)
Terms & Conditions Last date of receipt of tender is 16.06.2017 Upto 11.30amThe Press Tender should be submitted in the Prescribed NIT in the sealed envelope, subscribing the envelope “Tender for B-34 cMgI iksm dw guV bxwaux leI lybr rytNegotiations, if required will be done with the lowest tendered on same date.Tender must reach within due date in the prescribed NIT form of Mills only.Material offered should be strictly as per specifications, otherwise your offer may not be considered.Rate should be quoted F.O.R. Mills only.Excise duty and other taxes, if applicable should be mentioned clearly. CENVAT/VAT documents to be provided.Mention minimum delivery period.Valid Authorization Certificate of Dealership should be enclosed with the tender.Inspection of material will be made at Mills site or as decided by The Purchase Committee80% payment will be made after receipt of material and balance 20% after inspection within 10 days or as decided by the purchase The Purchase Committee at the time of negotiation.Penalty for late supplies will be charged as decided by the The Purchase Committee during negotiation.In case, your rates are found less in any other Co-op. Sugar Mills in Punjab, the same will applicable to our Mills also.Quantity can be increased/decreased at the time of placing order.In case the supplier is unable to supply the material in time, the General Manager shall have absolute the power to purchase the material at the risk and cost of supplier.The supplier shall be liable to replace defective/ rejected material if any at his cost.No escalation what so ever in nature whether the increase in octroi, duty, sale tax etc will be entertained.The price given in the tender must be valid for one crushing season.Any other condition laid down by the tendered may not be accepted.Tenderers must quote:-CST No……………………….. Date…………………………….TIN No………………………… Date…………………………….Service Tax Regd. No……………..Dated………………………Excise Code No……………………………Range………………………………………………………………Div./Commission rate…………………………………………….The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason.
sd General Manager The Bhogpur Co-operative Sugar Mills
![Page 164: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/164.jpg)
TENDER FORM/N.I.T
Tender Form for various labour contract jobs in mfg dept Item Sr.No. B-35a
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com ______________________________________________________________________________The General Manager The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (jalandhar)
Sub:- Job work for repair/overhauling of polarimeter
In response to above reference, I/we hereby quote my/our lowest rates for the following items subject to the mills terms & conditions overleafS.No. Description of Jobs/Items Rate quoted1 Repair and overhauling of polari meter Model SPS
879 cost of spare parts will be extra. Rate list of spare parts should be submitted along with Tender form
Lum-Sum
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 165: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/165.jpg)
TENDER FORM/N.I.TTender Form. various labour contract jobs in mfg dept. Item Sr.No. B-35b
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com ______________________________________________________________________________The General Manager The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (jalandhar)
Sub : Juice Heater cleaning
In response to above reference, I/we hereby quote my/our lowest rates for the following items subject to the mills terms & conditions overleaf
S.No. Description of material/Items Rated quoted
1 Liquidation and to open both the cover of juice heater mechanical cleaning of tube by manually/flexible shaft and scrapper/turk head brush/tool head cutter inspections & setting the rubber stips at right place and tightening both cover and checking for cover leakage by filling the water
NOTE;-Tool tackle will be given by Mill..
Per juice heater
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 166: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/166.jpg)
TENDER FORM/N.I.TTender Form for various labour contract jobs in mfg dept Item Sr.No. B-35c
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com______________________________________________________________________________The General Manager The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (jalandhar)Sub:- contract for lime and sulphur handlingIn response to above reference, I/we hereby quote my/our lowest rates for the following items subject to the mills terms & conditions overleafS.No. Description of Jobs/Items Rate per
day1 Bringing the un slaked lime from lime godown to lime
station2 reparation of milk of lime of desired baume as per
direction of shift Incharge3 To keep watch the proper running of lime pump to feed
the required lime dose4 Cleaning of lime station unit as and when required5 To shift the grit as per direction6 Rate should be quoted per day basis round ‘O’clock7 Contractor will deposit Rs.2000/- as security with the
tender which will be released after completion of crushing season
8 Contractor will provide at least two workers in each shift & performance will be verified by Shift Chemist.
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 167: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/167.jpg)
TENDER FORM/NIT
Tender Form for various labour contract jobs in mfg dept Item Sr.No. B-35d
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com ______________________________________________________________________________The General ManagerThe Bhogpur Coop Sugar Mills Ltd. Bhogpur (Jalandhar)
Sub:-. Job work for Handling of Dry Seed & sweeting / rogri sugar during season 2017-18
In response to above reference I/we here by quote my/our lowest rates for following items subject to the mills Terms & conditions overleaf.S.No Description of Job Items Rate quoted per day per shift1. Feeding of dry seed round ‘O’ clock through
.2. sugar elevator to seed crystallizer at pan floor.
Remelting of sweeping sugar/Rori sugar and powder from drier House and mills sanitation.Note:- Atleast 4 Nos. person will be deployed in each shift
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 168: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/168.jpg)
TENDER FORM/N.I.TTender Form for various labour contract jobs in mfg dept Item Sr.No. B-35e
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com ______________________________________________________________________________The General Manager The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (Jalandhar)
Sub:- Reprocessing of Brown Sugar/Damaged Sugar. In response to above reference, I/we hereby quote my/our lowest rates for the following items subject to the mills terms & conditions overleaf.
S.No. Description of material Rate quoted per bag.
1 800 borIAW brwaUn SUgr sIzn 2017-18 dOrwn glweIkrnI[Bwr pRqI borI 50 iklo [ ryt pRqI borI dy ihswb nwl id~qw jwvy[
2. ipCly sIzn dy auqpwdkw ivcoN nw vrqnXOg KMf dIAW borIAW sIzn 2017-18 dOrwn glweI krnI[Bwr pRqI borI 50 iklo[ ryt pRqI borI dy ihswb nwl id~qw jwvy[
3. kirstylweIjr nM;4 ivc peI skrYp SUgr dI glweI krnI[ryt aukw pu~kw id~qw jwvy[
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 169: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/169.jpg)
TENDER FORM/N.I.TTender Form for “various labour contract jobs in mfg dept Item Sr.No. B-35f
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com _________________________________________________________________________The General Manager The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (Jalandhar)Sub:- Contract for scrapping and washing of Boiling House,Centrifugal House & Drier House after closing of the season 2017-18
In response to above reference, I/we hereby quote my/our lowest rates for the following items subject to the mills terms & conditions overleaf.
S.No. Description of material Rate
1 Contract work for scrapping of sugar from pans along with dropping gutters, syrup molasses tanks,vacuum/seed crystallizers , open air cool & vertical crystallizers along with gutters . Scraped sugar to be collected in crystallizers.Contract work for scrapping of sugar from pugmul ,magma mixtures,c/f machines,sugar melter,seed & sugar elevator hoppers sugar graders. Scraped sugar to be collected in crystallizers.Contract work washing of inside juice weight scale,juice sulhiter, milk of lime tanks.lime salker,juice heaters,juice clarifier,syrup sulphter,sulphure furnace ,vacuume filter along with under groundiltrate tanks,injection house& whole of clarification section, Boiling House, Centrifugal machine & Drier House along with roofs .Contact work for washing pan station open /vacuum/seed crystallizers,c/f station complete including sugar graders & entire drier housealong with roof.Contact work for washing Columns& floors of whole boiling & c/f house.
Lum Sum
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
![Page 170: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/170.jpg)
Fax No……………. Office Address
TENDER FORM/N.I.TTender Form for various labour contract jobs in mfg dept Item Sr.No. B-35g
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com ____________________________________________________________________________The General Manager The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (jalandhar)
Sub: Labour Rate for unloading of Mill Store material for the Season 2017-18In response to above reference, I/we hereby quote my/our lowest rates for the following items subject to the mills terms & conditions overleaf.S.No. Description of material/Items Rate/unit1 Unloding/loading from/to Truck Sulphur (Qtl)2 Unloding/loading from/to Truck Lime (Qtl)3. Unloding/loading from/to Truck Loose Bagasse (Qtl)4 Unloding/loading from/to Truck Polyliner Bags (Qtl)5 Unloding/loading from/to Truck PVC drum of 50 Ltrs6 Unloding/loading from/to Truck Polythene Sheet (Qtl)7 Unloding/loading from/to Truck 200 Ltrs Lubricant
Barrel8 Unloding/loading from/to Truck Caustic Soda (Qtl)Terms & Conditions:-Above rates are only valid for 2017-18Above rates are abour unloading rates at Mill store and as directed.You will arrange sufficient nos of labours for discharging of work around O clock during the operation or as directed.Payment will be made after verification of Bill by Store Keeper and concerned and HOD
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 171: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/171.jpg)
TENDER FORM/N.I.T.
Tender Form for the supply of…… various labour contract jobs in mfg dept Item Sr.No. B-35h
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com _______________________________________________________________________The General Manager The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.
Sub: - Contract for Mill Sanitation during crushing season 2017-18In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.S.No. Description of material/Items Rate/unit1 Cleaning of MJ weighing scale complete with hot water and
spraying of Biocide/Bleaching Powder
2 Cleaning of check weigh bridge with hot water and spraying of Biocide/Bleaching Powder
3 Cleaning of under around Pit of filterate Juice with hot water and spraying of Biocide/Bleaching Powder
4 Cleaning of all parapit of Juice syrup Molasses etc. and spraying of Bleaching Powder.
5 Cleaning of all mill house tanks with hot water and spraying of Biocide.
6 Cleaning of DSM Screen with wire brush and hot water, spraying of chemical/Biocide
7 Cleaning of all 5Mills including cane carrier with hot water and spraying of Biocide/Bleaching Powder
8 N.B.You will employ 2 workers in general shift and will work as per direction of Chief Chemist
Contract Numbers Signature…………….
![Page 172: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/172.jpg)
Mobile…………… M/s…………………. Fax No…………. Office Address
TENDER FORM/N.I.TTender Form for various labour contract jobs in mfg dept Sr B-35iPress Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com ______________________________________________________________________________The General Manager The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (jalandhar)
Sub: Operator for ETP for season 2017-18In response to above reference, I/we hereby quote my/our lowest rates for the following items subject to the mills terms & conditions overleafS.No. Description of material/Items Rate quoted
Lum-Sum.1. The contract shall be valid for whole crushing season
2017-182. The contractor will engage operators round ‘O’ clock
& will be responsible to operate monitor the working of ETP in efficient manner as per PPCB requirement
3. The contractor will also maintain log book for the operational parameters
4. Cleaning of grease trap will be contractor responsibility
5. Rates quoted should be on monthly basis6. 80% monthly payment will be made to the contractor
after recommendation of concerned HOD and 20% payment after close of season on successful completion of job.
7. To bring and seeding of cow dung will be the responsibility of contractor. The tractor/Trolly will be provided by mills required.
8 Working of on line monitoring system will be responsibility otherwise penalty will be deducted accordingly
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 173: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/173.jpg)
TENDER FORM/NIT
Tender Form for various labour contract jobs in mfg dept Item Sr.No.B-35j
Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com _____________________________________________________________________________The General ManagerThe Bhogpur Coop Sugar Mills Ltd. Bhogpur (Jalandhar)
Sub:-.Lifting of Lime grit during the off season 2017-18In response to above reference I/we here by quote my/our lowest rates for following items subject to the mills Terms & conditions overleaf.
S.No Description of Job Items Rate quoted
1. Lifting of lime grit which is lying at near lime godown and also shifting at suitable place as per direction of Chief Chemist.Note: Tool Tackles and tractor trolly will be provided by Mill.
Lum-Sum
Contract Numbers Signature…………….
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 174: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/174.jpg)
TENDER FORM/N.I.T
Tender Form for cleaning & washing of molasses tank no. 2 Sr.No.35 kPress Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com
The General Manager The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (jalandhar)
Sub:- Job work for cleaning & washing of molasses tank no. 2
In response to above reference, I/we hereby quote my/our lowest rates for the following items subject to the mills terms & conditions overleaf
S.No. Description of material/Items Rate Lum sum1 Shifting of approx. 1’ ht. of molasses from molasses tank no. 2
to molasses tank no. 1, cleaning & washing of molasses tank no. 2 internally thoroughly for carrying out the repair workNote:i . Job should be completed withing 20 days as per satisfaction of chief Chemist.ii. Tools & tackles will be provided by the mills.iii. Mills will not responsible for any mishap.
Contract Numbers Signature……………
Mobile…………… M/s…………………..
Fax No……………. Office Address
![Page 175: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/175.jpg)
Terms & Conditions of Work Order for Contractor work in Mills
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope, subscribing the envelope “ Tender for various labour contract jobs in mfg dept 3. Negotiations, if required will be done with the lowest tenderer on same date.
4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management. 5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
7. It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
8. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
9. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
10 The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
11.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
![Page 176: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/176.jpg)
12 a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
b) Service tax as applicable shall be deducted from the contractor’s bills.
13 Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
14 The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
15 In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
16 Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
17 The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
18 The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
19 The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
20 The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
Sd/- General Manager
The Bhogpur Co-operative Sugar Mills
![Page 177: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/177.jpg)
TENDER FORM/N.I.T
Tender Form for Contract Job for Labour Charges of packing the sugar in 5 kg, 10kg and 25kg bags Item Sr.No.B-36 Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com ______________________________________________________________________________The General Manager The Bhogpur Coop Sugar Mills Ltd.,Bhogpur (Jalandhar)
Sub: .Contract Job for Labour Charges of packing the sugar of different weight in HDPE bags .
In response to above reference, I/we hereby quote my/our lowest rates for the following items subject to the mills terms & conditions overleaf.
S.No. Description of material/Items Rate/100 Bags1 Filling and packing of 5 kg sugar in HDPE bags of
size 12” x 17”2 Filling and packing of 10 kg sugar in HDPE bags of
size 15” x 18”3 Filling and packing of 25 kg sugar in HDPE bags of
size 22” x 27”NB -Proper attention for cleanliness and take hygienic care is required while packing of sugar.
Contract Numbers Signature…………..
Mobile…………… M/s…………
Fax No……………. Office Address……………
![Page 178: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/178.jpg)
Terms & Conditions of Work Order for Contractor work in Mills
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope, subscribing the envelope “ Tender for Labour Charges of packing the sugar 3. Negotiations, if required will be done with the lowest tenderer on same date.
4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management. 5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
7. It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
8. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
9. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
10 The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
11.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
![Page 179: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/179.jpg)
12 a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
b) Service tax as applicable shall be deducted from the contractor’s bills.
13 Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
14 The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
15 In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
16 Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
17 The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
18 The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
19 The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
20 The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
Sd/- General Manager
The Bhogpur Co-operative Sugar Mills
![Page 180: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/180.jpg)
TENDER FORM/N.I.T.
Tender Form for the supply of………………. Dynamic balancing of basket Item Sr no B-37Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com .
The General Manager,The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.
Sub: -Supply of Dynamic balancing of basket.
In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.
Sr.No. Description of Material/Items Qty. Rate Quoted (per Unit)
1. To carry out the dynamic balancing of MS basket of batch type machine including break drum. Ultrasonic of shaft also be done. Approx. weight of the basket 1100 kg.
2 nos.
Contract Numbers Signature…………..Mobile…………… M/s…………Fax No……………. Office Address……………
![Page 181: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/181.jpg)
Terms & Conditions of Work Order for Contractor work in Mills
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope,
subscribing the envelope “ Tender for Dynamic balancing of basket Item Sr no B-1
3. Negotiations, if required will be done with the lowest tenderer on same date. 4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management. 5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
7. It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
8. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
9. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
10 The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
![Page 182: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/182.jpg)
11.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
12 a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
b) Service tax as applicable shall be deducted from the contractor’s bills.
13 Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
14 The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
15 In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
16 Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
17 The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
18 The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
19 The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
20 The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
Sd/- General Manager
The Bhogpur Co-operative Sugar Mills
![Page 183: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/183.jpg)
TENDER FORM/N.I.T.
Tender Form for the supply of………………. Remove the ovality of head stock.Item Sr no B-38Press Tender Notice in the News Papers…–
Email: [email protected] Mill web site: - www.bhogpurcsm.com .
The General Manager,The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.
Sub: -Supply of remove the ovality of head stock.
In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.
Sr.No. Description of Material/Items Qty. Rate Quoted (per Unit)
1
2
Rate for key way one mill (Rate/key way)Side caps hole with SS 304 sleeve (per hole with sleeve)The remove of ovality for mill head stock Scope of work1 . Feed roller side cap , pin holes bore to be correct at mill site.2. . Discharge roller side cap , pin holes bore to be correct at mill site.3. Top roller hydraulic cap of key way to be set right at mill site 4. Feed roller and discharge roller after remove ovality at site SS 304 sleeve to be fitted
4.nos
8.nos
Contract Numbers Signature…………..Mobile…………… M/s…………Fax No……………. Office Address……………
![Page 184: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/184.jpg)
Terms & Conditions of Work Order for Contractor work in Mills
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope,
subscribing the envelope “ Tender for Dynamic balancing of basket Item Sr no B-1
3. Negotiations, if required will be done with the lowest tenderer on same date. 4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management. 5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
7. It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
8. Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
9. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
![Page 185: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/185.jpg)
10.The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
11.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
12 a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
b) Service tax as applicable shall be deducted from the contractor’s bills.
13 Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
14 The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
15 In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
16 Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
17 The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
18 The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
19 The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
20 The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
Sd/- General Manager
The Bhogpur Co-operative Sugar Mills
![Page 186: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/186.jpg)
TENDER FORM/N.I.T.
Tender Form for the purchase/jobs of ………………. Repair of lathe machine..Item Sr no B-39Press Tender Notice in the News Papers…– Mail today dt 18.5.2017 – Jagbani dt. 18.5.2017
Email: [email protected] Mill web site: - www.bhogpurcsm.com .
The General Manager,The Bhogpur Co-op. Sugar Mills Ltd,Bhogpur, Distt. Jalandhar.
Sub: -Job of Repair of lathe machine
In response to above reference, I/We hereby quote my/our lowest rates for the following items subject to the Mill terms & conditions overleaf/attached.
Sr.No. Description of Material/Items Qty. Rate Quoted (per Unit)
1 Repair of lathe machine 12’x24’ Nos.01
2 Repair of sapear machine Nos.01
3 Repair of drill machine Nos.01
Contract Numbers Signature…………..Mobile…………… M/s…………Fax No……………. Office Address……………
![Page 187: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/187.jpg)
Terms & Conditions of Work Order for Contractor work in Mills
1. Last date of receipt of tender is 16.6.2017 upto 11.30 AM2. The Press Tender should be submitted in the Prescribed NIT in the sealed envelope,
subscribing the envelope “ Tender for Dynamic balancing of basket Item Sr no B-1
3. Negotiations, if required will be done with the lowest tenderer on same date. 4 . Any damage done to the mill property during the working by the workers of contractor shall be recovered from contractor after assessing the damage by the mills Management. 5. Provident fund of the contractor’s labour shall be the responsibility of the contractor and rate quoted are inclusive of PF liability.. 6. In case the contractor’s rates are found less in any other Coop. the same rates will be applicable. The contractor will have to quote the following and shall provide proof of the same at the time of negotiation.Permanent Account Number (PAN)____________EPF Code No._____________________________Service Tax Regn. No.______________________Div./ Commission rate_______________________The labour rate contract shall be valid for one year, on expiring the present rate contract, it can be extended at the discussion on General Manager for the period of one month. However, it can further be extended on the willingness of both the parties.
7.It will be obligatory on the part of contractor to pay minimum wages to his labour at per Govt. rules and regulations. The contractor will be fully responsible for accidental damage/ losses involving his employee shall be responsible for observance of all formalities and expenses under various labour laws as may be applicable form time to time.
8.Contractor shall have to abide by Rules & Regulations of the Mills and shall be responsible for observation of all Govt. Rules & Regulations with regard to the labour engaged by him. In case of any accident etc. he will be fully responsible for total compensation, medical treatment etc. of the labour so engaged by him.
9. Labour contractor shall be fully responsible for all expenses/contribution in respect of his employees as required to be payable by employer payable under various provision of the labour law i.e. ESI,EPF etc.
10 The contract shall be liable to discharge all or any liability arising out of this contract under any labour laws.
![Page 188: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/188.jpg)
11.Labour contractor should obtain required license from labour department and a copy of that should be given in this office within two months period of allotment of annual labour rate contract for record purpose.
12 a) Income tax will be deducted from the contractor’s bills as applicable from time to time. He also provided for deduction of income tax. If any.
b) Service tax as applicable shall be deducted from the contractor’s bills.
13 Any dispute arising out of this contract shall be subject to jurisdiction of court-Jalandhar.
14 The contract is non-transferable. However, if General Manager is satisfied that the contractor is not in a position to continue with the contract and wishes to transfer to another genuine contractor at the request of the contractor.
15 In case the contractor fails to execute the contract in accordance with the terms and conditions of the agreement/order we reserve the right to get the work done from some other party at his risk, cost and responsibility. Extra expenditure thus incurred shall be recovered from the contractor.
16 Any extra expenditure incurred/ loss suffered by the plant due to non- execution of work within the stipulated time or loss caused to the property will also be recoverable from the contractor.
17 The contractor will have to provide man power from time to time as per the directions/instructions of the Chief Engineer/General Manager or his representative. For discharging of smooth working.
18 The contractor will have to carry out any other job related to the contract and assigned by Management from time to time.
19 The Purchase Committee of the Mills reserves the right to alter any terms & conditions of the tender if required.
20 The Purchase Committee of the Mills reserves the right to reject/accept any tender without assigning any reason, any time by giving an advance notice of 15 days.
Sd/- General Manager
The Bhogpur Co-operative Sugar Mills
![Page 189: bhogpurcsm.combhogpurcsm.com/Group-B 2017-18.docx · Web viewServicing of power Turbine 1019 1MW Make balance Indian Ltd. Servicing & overhauling of power turbine in every respect](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ac0c70c7f8b9a4e7c8c4160/html5/thumbnails/189.jpg)