2017 Virginia Concrete Conference Inverted T-Beam Update - Next Phase March 3, 2017 Chris Lowe, P.E. Design Engineering Program Manager VDOT Central Office Structure & Bridge Division

Upload: others

Post on 01-Nov-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2017 Virginia Concrete Conference Inverted T-Beam Update

2017 Virginia Concrete Conference

Inverted T-Beam Update - Next Phase

March 3, 2017

Chris Lowe, P.E.

Design Engineering Program Manager

VDOT Central Office Structure & Bridge Division

Page 2: 2017 Virginia Concrete Conference Inverted T-Beam Update

Outline

Past Research

2015 Presentation by Professor Carin L. Roberts-Wollmann, PhD, P.E.

Background

Fabrication & Construction

Production

Erection

Post Construction

Future Research

Concrete Mixes to control shrinkage

Longer beams to increase spans

2

Page 3: 2017 Virginia Concrete Conference Inverted T-Beam Update

VDOT Std. Voided Slab

Background

French “Poutre-Dalle”

Minnesota Inverted T-Beam

Virginia Inverted T-Beam

What is it?

Page 4: 2017 Virginia Concrete Conference Inverted T-Beam Update

4

Background

Virginia Inverted T-Beam Cast-in-Place Deck

Prestressed Inverted

T-Beam

Page 5: 2017 Virginia Concrete Conference Inverted T-Beam Update

Background

VDOT Standard

Voided Slab Shear Key w/ Non-Shrink,

High Strength Grout

Page 6: 2017 Virginia Concrete Conference Inverted T-Beam Update

Background

Shear Key failures

cause leaks!

Page 7: 2017 Virginia Concrete Conference Inverted T-Beam Update

Background

Shear Key failures

cause leaks!

Page 8: 2017 Virginia Concrete Conference Inverted T-Beam Update

Background

Shear Key failures

cause leaks!

Page 9: 2017 Virginia Concrete Conference Inverted T-Beam Update

Background

Shear Key failures

cause leaks!

Page 10: 2017 Virginia Concrete Conference Inverted T-Beam Update

History of the Inverted T-Beam

• FHWA scanning tour

• Minnesota DOT (MNDOT)

• VDOT

Benefits

• Accelerate construction

• Improved performance of connection between adjacent beams.

10

Background

Poutre-Dalle System (Ralls et al., 2005)

Page 11: 2017 Virginia Concrete Conference Inverted T-Beam Update

Background

MNDOT Inverted T-Beam, Final Report 2012-30 (French, 2012)

Page 12: 2017 Virginia Concrete Conference Inverted T-Beam Update

History of the Inverted T-Beam (MNDOT)

• Developed a similar system with minor

changes

• Implemented on 12 bridges between 2005

and 2011 w/ numerous modifications to

improve performance

• Experienced reflective cracks and

shrinkage cracks

12

Background

Inverted T-Beam (Hagen et al., 2005)

Page 13: 2017 Virginia Concrete Conference Inverted T-Beam Update

13

Crack Map for Bridge No. 33008, Inspection No. 3 (Dimaculangan and Lesch, 2010)

Page 14: 2017 Virginia Concrete Conference Inverted T-Beam Update

14

Background

History of the Inverted T-Beam (VDOT)

• Lessons learned from MNDOT

• Applied for FHWA Innovative Bridge Research and Deployment

(IBRD) funds

• Invited precast industry for input

• Research (VTRC)

• Design (VDOT)

• Implementation

Page 15: 2017 Virginia Concrete Conference Inverted T-Beam Update

15

Background

Page 16: 2017 Virginia Concrete Conference Inverted T-Beam Update

16

Background

Route 360 Project

• 6 lanes divided over the Chickahominy River (no additional capacity)

• 4 bridges structurally deficient

• 2 are identical in size and type

• Maintain existing profile grade line

• Maintain low chord for hydraulics

Page 17: 2017 Virginia Concrete Conference Inverted T-Beam Update

17

Fabrication & Construction

Test Slab/beam acting monolithically

Page 18: 2017 Virginia Concrete Conference Inverted T-Beam Update

18

Fabrication & Construction

Test Slab/beam acting monolithically

Page 19: 2017 Virginia Concrete Conference Inverted T-Beam Update

19

Fabrication & Construction

Test Slab/beam acting monolithically

Page 20: 2017 Virginia Concrete Conference Inverted T-Beam Update

20

Fabrication & Construction

Test beam flexure crack in CIP deck

Flexure cracks

Page 21: 2017 Virginia Concrete Conference Inverted T-Beam Update

21

Fabrication & Construction

Test beam flexure crack in CIP deck

Page 22: 2017 Virginia Concrete Conference Inverted T-Beam Update

22

Fabrication & Construction

Test beam flexure crack in CIP deck

Page 23: 2017 Virginia Concrete Conference Inverted T-Beam Update

23

Fabrication & Construction

Inverted T-Beam formwork

Page 24: 2017 Virginia Concrete Conference Inverted T-Beam Update

24

Fabrication & Construction

Live Load Test

Page 25: 2017 Virginia Concrete Conference Inverted T-Beam Update

25

Fabrication & Construction

LIDAR Scan

Page 26: 2017 Virginia Concrete Conference Inverted T-Beam Update

26

Fabrication & Construction

Welded Flange Connection

C

C

Page 27: 2017 Virginia Concrete Conference Inverted T-Beam Update

27

Fabrication & Construction

Post Construction

Voided Slabs

• Longitudinal cracking evident in B601 & B606

Inverted T-beams

• No visible cracks detected upon recent visual inspection

Page 28: 2017 Virginia Concrete Conference Inverted T-Beam Update

28

Post Construction

Deck crack on B606

Page 29: 2017 Virginia Concrete Conference Inverted T-Beam Update

29

Post Construction

Deck crack on B606

Page 30: 2017 Virginia Concrete Conference Inverted T-Beam Update

30

Post Construction

Deck cracks on B601

Page 31: 2017 Virginia Concrete Conference Inverted T-Beam Update

31

Post Construction

Deck cracks on B601

Page 32: 2017 Virginia Concrete Conference Inverted T-Beam Update

Future Research

Concrete Deck Mix Design

Reduce Shrinkage Strains

• Control (regular A4)

• Fly Ash

• Slag

• Shrinkage Reducing Admixture

• Lightweight Coarse Aggregate

• Lightweight Fine Aggregate w/ Normal weight Coarse Aggregate

Page 33: 2017 Virginia Concrete Conference Inverted T-Beam Update

Future Research

Concrete Deck Mix Design

Goals

• Control Deck Cracking

–Reduce/eliminate shrinkage cracks

–Reduce restrained shrinkage with a high creep mix

–Cost effective

Page 34: 2017 Virginia Concrete Conference Inverted T-Beam Update

Future Research

Concrete Beam Design

Extend Span Length w/ existing 18” section

Use lightweight beam and deck

Focus on ease of fabrication/construction

•Eliminating horizontal shear reinforcing

•Lightweight beams (smaller cranes)

•Custom bridge widths

–Currently, 6n+2 (14’, 20’, 26’, 30’...)

Page 35: 2017 Virginia Concrete Conference Inverted T-Beam Update

35

Future Research

Ability to Customize Beam Widths

Page 36: 2017 Virginia Concrete Conference Inverted T-Beam Update

36

Developing Standards

Concrete Beam Design

Goals

Determine max. Span length using same 18” deep beam

• Deflection limited conditions

Customize bridge widths

Extend details to bridges with low skew angles (less than 30 deg)

Finalize LL distribution factors

Page 37: 2017 Virginia Concrete Conference Inverted T-Beam Update

37

Future Research

Concrete Beam Design

Goals

Eliminate the welded flange connection

Eliminate horizontal shear reinforcing by optimizing interface shear surface roughening

Optimize lightweight concrete mix to minimize cracking (deck and beam)

Extend details to bridges with high skew angles (greater than 30 deg.)

Page 38: 2017 Virginia Concrete Conference Inverted T-Beam Update

38

Acknowledgements

FHWA/VTRC Report by;

Fatmir Menkulasi, Ph.D., P.E.

Carin L. Roberts-Wollmann, Ph.D., P.E.

Thomas Cousins, Ph.D., P.E.

Research Project Manager

Michael Brown, Ph.D., P.E.

VDOT Central Office

Andrew Zickler, P.E.

VDOT Construction Manager

Doug Kisamore

Corman Construction

Chris Rutkai, P.E.

Assistant Professor, Wayne State University

Professor, Virginia Tech

Professor, Clemson University

Former Associate Director, VTRC

Complex Bridge Program Manager

Construction Manager/LAP

Construction Project Manager