Page 1: 2018 Capital Design & Construction - Leduc - Kyle van Steenoven.pdf · Overview • 65 Avenue Interchange • New Infrastructure • Capital Road Rehabilitation Program • North

Title of Presentationwww.leduc.ca

2018 Capital Design &

Construction

Presented by:

Kyle van Steenoven, P.Eng.Manager, Capital Projects and Development

2018 CEA Edmonton Area

January 18, 2018

Page 2: 2018 Capital Design & Construction - Leduc - Kyle van Steenoven.pdf · Overview • 65 Avenue Interchange • New Infrastructure • Capital Road Rehabilitation Program • North

Insert Title HereThank you to our consultants throughout 2017

Page 3: 2018 Capital Design & Construction - Leduc - Kyle van Steenoven.pdf · Overview • 65 Avenue Interchange • New Infrastructure • Capital Road Rehabilitation Program • North

Insert Title Here

City of Leduc Engineering

Page 4: 2018 Capital Design & Construction - Leduc - Kyle van Steenoven.pdf · Overview • 65 Avenue Interchange • New Infrastructure • Capital Road Rehabilitation Program • North

Insert Title Here

Capital Projects and Development

• Design and construction of capital projects• Review, inspection and acceptance of new developments • Review, inspection and approval of residential, commercial and

industrial lot grading.

Page 5: 2018 Capital Design & Construction - Leduc - Kyle van Steenoven.pdf · Overview • 65 Avenue Interchange • New Infrastructure • Capital Road Rehabilitation Program • North

Insert Title Here

Infrastructure• Condition assessments• Functional, master and multi-jurisdictional

planning• Offsite Levy Model

Environmental• Environmental policies, initiatives and

projects• Curbside cart collection & recycling

program

Page 6: 2018 Capital Design & Construction - Leduc - Kyle van Steenoven.pdf · Overview • 65 Avenue Interchange • New Infrastructure • Capital Road Rehabilitation Program • North

Insert Title Here

Overview

• 65 Avenue Interchange

• New Infrastructure

• Capital Road Rehabilitation Program

• North Telford Reconstruction

• CDC Program

• Telford Lake Multiway and Parking Lot

• Capital Utility Program

• Master Plans

• Smart Traffic/Smart City Feasibility Study

• CRSWC

Page 7: 2018 Capital Design & Construction - Leduc - Kyle van Steenoven.pdf · Overview • 65 Avenue Interchange • New Infrastructure • Capital Road Rehabilitation Program • North

Insert Title Here

65 Avenue Interchange

• Detailed design procurement took place in 2017.

• Awarded to Stantec/Associated Engineering/McElhanney

• Designed expected to be completed by the end of 2019

• Construction is currently dependent on funding

• Additional design and construction projects will be required to support this project once a construction timeline has been established.

Page 8: 2018 Capital Design & Construction - Leduc - Kyle van Steenoven.pdf · Overview • 65 Avenue Interchange • New Infrastructure • Capital Road Rehabilitation Program • North

Insert Title Here

New InfrastructureNew major transportation and infrastructure projects are generally RFP’ed in individual projects. A recent example of this is the Southeast Boundary Road which was awarded to Al-Terra Engineering in 2017.

• Future new infrastructure projects may include:

• 65th Ave East

• 65th Ave West

• Grant MacEwan North

• Spine Road

Page 9: 2018 Capital Design & Construction - Leduc - Kyle van Steenoven.pdf · Overview • 65 Avenue Interchange • New Infrastructure • Capital Road Rehabilitation Program • North

Insert Title Here

• Two year contract that was awarded to Select Engineering Consultants in 2016

• Contract includes 2016/2017 design and corresponding 2017/2018 construction management.

• This program includes reconstruction, overlay and restoration of City roads, multiway and lanes.

• Separate request for proposals (RFPs) are issued for all new major transportation and infrastructure projects (Example: Southeast Boundary Road)

•Up for renewal in 2018/2019 depending on the duration of the North Telford Reconstruction.

Capital Road Rehabilitation Program

Page 10: 2018 Capital Design & Construction - Leduc - Kyle van Steenoven.pdf · Overview • 65 Avenue Interchange • New Infrastructure • Capital Road Rehabilitation Program • North

Insert Title Here

Underground Utilities

• 720 meters of Water Main Replacement

• 15 Manhole Replacements

• 150 Meters of Main Line CIPP

• 15 Service Lateral Liners

Road Construction

• 16,000 m2 of Reconstruction

• 3,200 m of Curb Replacement

• 1,500 m of Separate-walk Replacement

• 550 m of Mono-walk Replacement

North Telford Reconstruction

Page 11: 2018 Capital Design & Construction - Leduc - Kyle van Steenoven.pdf · Overview • 65 Avenue Interchange • New Infrastructure • Capital Road Rehabilitation Program • North

Insert Title Here

• Two year contract that was awarded to Associated Engineering in 2017

• Contract includes 2017/2018 design and corresponding 2018/2019 construction management.

• This program includes community driven projects such as park upgrades, art installations, and multiway.

Community Development and

Culture (CDC) Program

Page 12: 2018 Capital Design & Construction - Leduc - Kyle van Steenoven.pdf · Overview • 65 Avenue Interchange • New Infrastructure • Capital Road Rehabilitation Program • North

Insert Title Here

Telford Lake Multiway and Parking Lot2,700 meters of asphalt trail construction within environmentally sensitive land along the Telford Lake

Construction of a trail over top of the Telford Lake control weir.Rowing Club Parking Lot• 170 meters of concrete walks• 3,575 m2 asphalt paving

Minor Collector Road Construction• 8,000 m2 of New Road Construction• 1,100 m of Rural Road Ditching• 60 m of Culvert Installation• 750 m of Curb Installation• Construction of approx. 200 stalls

Page 13: 2018 Capital Design & Construction - Leduc - Kyle van Steenoven.pdf · Overview • 65 Avenue Interchange • New Infrastructure • Capital Road Rehabilitation Program • North

Insert Title Here

Capital Utility Program

• This contract is up for renewal for 2018/2019 design and construction management. The RFP is expected to be posted in the Spring 2018

•This program includes any upgrade and repairs required to the City of Leduc’s storm, sanitary and water networks.

• The successful proponent will be responsible for helping the City develop a 5 year plan for infrastructure renewal based on provided condition assessments

Page 14: 2018 Capital Design & Construction - Leduc - Kyle van Steenoven.pdf · Overview • 65 Avenue Interchange • New Infrastructure • Capital Road Rehabilitation Program • North

Insert Title Here

Transportation Master Plan

• Currently underway by Castleglenn Consultants with completion targeted in 2018• Intended to create a document that will support and guide future growth decision, priorities and initiatives• Will provide valuable background information for completing and reviewing development plans and traffic impact assessments

Sanitary Master Plan

• Currently underway by Cole Engineering with completion targeted in 2018• Intended as an update to the 2013 Sanitary Master Plan

Water Master Plan

• Completion of a new Water Master Plan• Expected to begin in 2019

Storm Master Plan

• Creation of the City’s first Storm Water Master Plan• Expected to begin in 2019 or 2020 depending on initial information required

All master plans are on a 5 year update/renewal rotation.

Engineering Master Plans

Page 15: 2018 Capital Design & Construction - Leduc - Kyle van Steenoven.pdf · Overview • 65 Avenue Interchange • New Infrastructure • Capital Road Rehabilitation Program • North

Insert Title Here

Smart Traffic/Smart City

Feasibility Study

The City of Leduc is currently looking at the shift towards Smart Cities and as a starting point we are looking at the feasibility of different forms of smart traffic systems throughout the City and the associated benefits.

This initial study has the potential of helping the City better defined what Smart Traffic and Smart Cities will look like for the City of Leduc.

The RFP for this study is expected to be out in late Spring

Page 16: 2018 Capital Design & Construction - Leduc - Kyle van Steenoven.pdf · Overview • 65 Avenue Interchange • New Infrastructure • Capital Road Rehabilitation Program • North

Insert Title Here

Capital Region

Southwest Water

Commission

• The City of Leduc currently manages the Capital Region Southwest Water Commission.

• Currently in the process of procuring a consultant to act as the Commission Engineer for the next 2 years

• Scope includes updating the commission master plan and providing technical support for day to day operations as required

• RFP is currently out and closes on January 22, 2018

Page 17: 2018 Capital Design & Construction - Leduc - Kyle van Steenoven.pdf · Overview • 65 Avenue Interchange • New Infrastructure • Capital Road Rehabilitation Program • North

Insert Title Here

Questions?