2019 waters oak valley design - pittsfield-mi.gov

8

Upload: others

Post on 04-Apr-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

37'-7"

33'-1"64"

64"56"48"

TRANSFER STATIONW/SAFETY RAILS

200202562

DBL WIDEPLASTIC SLIDE

200006976

WINDOWPANEL

200007115

SAFETY PANEL200007049

SNAKEPOLE

200006999

DBL WIDEPLASTIC SLIDE

200006977

SPIRALSLIDE

200200264

LEG LIFTBAR

200079019

POSTWHEEL PLASTIC

907718P

INVERTED ARCHCLIMBER

200007012

CURLYCLIMBER

20020026811.3 11.3 12.3

12.3

12.3

11.3 11.3

12.3

12.3

168

This playground design meets thefinal Access Board Regulations.Compliance:

Playground LayoutPlayground Safety

CPSC Handbook for Public

ASTM F1487 - PlaygroundEquipment for Public Use.

to the requirements of ASTM F1487.layout of these components conformplan are IPEMA certified.The use and The play components identified in this

Drawn by:Date:DWG Name:

LTCPS - Farmington878 East Highway 60Monett, Missouri 65708Voice: 1-800-325-8828Fax: 417-354-2273

Project:

LTCPS rep:

LEED points forthis structure

Ground Space:Protective Area:

lengths, i.e. 96 represents a 96 inch post.All post lengths are identified by text showing the post

tripping or collision hazards (i.e. roots, rocks, borderplaystructure is shown. This zone is to be free of allThe minimum recommended fall zone around the entirearound all play equipment.Fall absorbing ground cover is required under andAll deck heights are measured from top of ground cover.existing play components.playground may be in compliance when consideringappropriate number of ground level events, the actualthe proposed Access Board Regulations in regards to theAlthough a particular playground design may not meetaccessible surfacing must be utilized in applicable areas.For playground equipment to be considered accessible,counsel to determine if the ADA applies to you.when viewed in its entirety. Please consult your legalthat you make your park and/or playground accessibleThe Americans with Disabilities Act (ADA) may require

Supervision is required.Not all equipment may be appropriate for all children.8.

7.

6. 5.

material, etc.).

4.

3. 2.

1.

Age GroupGeneral Notes:

2-5yrs 2-12yrs5-12 yrs 13+ yrs

26'-6" x 22'-6"38'-0" x 33'-6"

DONNA FRIEDMAN

573-915-7740Playpower

MONETT, MOKB19-071318

0000_42639470006

Donna Friedman11/8/2018

2

ELEVATED PLAY ACTIVITIES - TOTAL:ELEVATED PLAY ACTIVITIES ACCESIBLE BY TRANSFER:ELEVATED PLAY ACTIVITIES ACCESIBLE BY RAMP:GROUND LEVEL ACTIVITY TYPE:GROUND LEVEL QUANTITY:

REQ'DREQ'DREQ'DREQ'D

AGE GROUP: 2-5

22

30

6

2206

59'-1"

41'-0 1/2"

DRIVINGPANEL

200200250

DUAL STEELSEAT PANEL

BELOW DECK200200695

TELESCOPEPANEL

200200663

STEEL TIC-TAC-TOEPANEL

BELOW DECK200110097

HANGOUT

200202304

POSTWHEEL PLASTIC

200200424

1-STEPDECK

200006950

SAFETYLOOP

200013924TREEHOUSE

SAFETY PANEL200202397

TREEHOUSESAFETY PANEL

200202397

GEARREACH PANEL

200200506

1-STEPDECK

200006950

VEHICLEREACH PANEL

200200503

9 BARSAFETY RAIL200109865

SAFETYLOOP

200013924

NU-EDGE X TOWER F/KB W/MORPHOUS200203432

PLANKBRIDGE

200202961

CATWALK BRIDGE200098030

96",96"

MATCHINGGAME PANEL200200725

SILOCLIMBER

200202420

DECK TO DECKSTEPS

200200402

64"

56" 48"

64"

TRANSFER STATIONW/SAFETY RAILS

200202562

QUANTUM II SLIDE200203303

QUANTUM IIENTRY00ENT

QUANTUM IIENTRY00ENT

QUANTUM IIRIGHT00RGT

QUANTUM IIEXIT

001QEXT

QUANTUM IILEFT

00LEFTQUANTUM II

EXIT001QEXT

X-CLIMBER200202802

NU-EDGEROCKWALL

200202820

TALKTUBE

200058823

TALKTUBE

200202025Z

POSTWHEEL PLASTIC

200200424

ROOF200202810

ROOF200202810

ROOF200202750

24/96/168 12.3

180

180

5

15.5 12.3

15.5 12.315.5

15.5

188

188

16

8

This playground design meets thefinal Access Board Regulations.Compliance:

Playground LayoutPlayground Safety

CPSC Handbook for Public

ASTM F1487 - PlaygroundEquipment for Public Use.

to the requirements of ASTM F1487.layout of these components conformplan are IPEMA certified.The use and The play components identified in this

Drawn by:Date:DWG Name:

LTCPS - Farmington878 East Highway 60Monett, Missouri 65708Voice: 1-800-325-8828Fax: 417-354-2273

Project:

LTCPS rep:

LEED points forthis structure

Ground Space:Protective Area:

lengths, i.e. 96 represents a 96 inch post.All post lengths are identified by text showing the post

tripping or collision hazards (i.e. roots, rocks, borderplaystructure is shown. This zone is to be free of allThe minimum recommended fall zone around the entirearound all play equipment.Fall absorbing ground cover is required under andAll deck heights are measured from top of ground cover.existing play components.playground may be in compliance when consideringappropriate number of ground level events, the actualthe proposed Access Board Regulations in regards to theAlthough a particular playground design may not meetaccessible surfacing must be utilized in applicable areas.For playground equipment to be considered accessible,counsel to determine if the ADA applies to you.when viewed in its entirety. Please consult your legalthat you make your park and/or playground accessibleThe Americans with Disabilities Act (ADA) may require

Supervision is required.Not all equipment may be appropriate for all children.8.

7.

6. 5.

material, etc.).

4.

3. 2.

1.

Age GroupGeneral Notes:

2-5yrs 2-12yrs5-12 yrs 13+ yrs

45'-6" x 29'-6"59'-0" x 41'-6"

DONNA FRIEDMAN

573-915-7740PPLT

MONETT, MONE19-071030 2019 CATALOG

0000_42975342641

Donna Friedman8/28/2017

0

ELEVATED PLAY ACTIVITIES - TOTAL:ELEVATED PLAY ACTIVITIES ACCESIBLE BY TRANSFER:ELEVATED PLAY ACTIVITIES ACCESIBLE BY RAMP:GROUND LEVEL ACTIVITY TYPE:GROUND LEVEL QUANTITY:

REQ'DREQ'DREQ'DREQ'D

AGE GROUP: 5-12

63

90

17

9609

Conceptual X Project Number: 2075140800Preliminary Prepared By: JELFinal (As Bid) Checked By:

Date: April 17, 2019

QUANT. UNIT UNITCOST

TOTALCOST

1 1 LSUM $10,000.00 $10,000

2 1 LSUM $7,500.00 $7,500

3 Import subbase soil, 21" turf and pollinator area , 5 mile haul, no compaction 2,264 Cyd $40.00 $90,560

4 323 Cyd $30.00 $9,690

5 Place topsoil, fine grade, 323 Cyd $20.00 $6,460

6 Remove existing sod layer, turf and pollinator area only 35 MSF $30.00 $1,050

7 862 Cyd $45.00 $38,790

8 Geotextile, Separator - under turf and pollinator areas 4,000 Syd $1.00 $4,000

9 3,262 Syd $2.50 $8,155

10 618 Syd $5.00 $3,090

11 240 EA $25.00 $6,000

12 1 EA $5,000.00 $5,000

13

14 879 Ft $1.50 $1,319

15 Mudmat Access Road 1 LSUM $5,000.00 $5,000

16 254 TON $25.00 $6,350

17 515 Cyd $50.00 $25,750

18 Contaminated Soil Disposal Allowance 1 LSUM $10,000.00 $10,000

19 1 EA $96,700.00 $96,700

20 1 Ea $20,000.00 $20,000

21 1 Ea $21,400.00 $21,400

22 1 Ea $10,000.00 $10,000

23 1 EA $4,200.00 $4,200

24 2 EA $500.00 $1,000

25 Playground: SuperScoop 2 EA $1,000.00 $2,000

26 4,614 SF $30.00 $138,420

27 Playground: play sand for SuperScoop, 24" deep x 50 sf 4 Cyd $50.00 $200

28 Playground: concrete edge adjacent path, 8" wide, 42" deep, poured 109 Ft $25.00 $2,725

29 150 Ft $25.00 $3,750

30 434 SF $50.00 $21,700

31 3 EA $500.00 $1,500

32 3 EA $300.00 $900

33 1 Ea $1,000.00 $1,000

34 20 EA $500.00 $10,000

35 284 LF $18.00 $5,112

$579,000

20% $116,000

$695,000

$260,000

$30,000

$985,000NOTE: The ENGINEER has no control over the cost of labor, materials, equipment, or services furnished by others, or over the Contractor's method of determining prices, or over

competitive bidding or market conditions. Opinions of probable project costs and construction costs provided herin are made on the basis of the ENGINEER'S professionaljudgement and experience. The ENGINEER cannot and does not guarantee that proposals, bids or actual project or construction costs will not vary from the prepared opinionof probable cost.

TOTAL ESTIMATED FINAL CONSTRUCTION COST

CONSTRUCTION CONTINGENCIES

SUBTOTAL ESTIMATE

TOTAL ESTIMATED FINAL CONSTRUCTION COST NORTH

TOTAL ESTIMATED FINAL CONSTRUCTION COST MIDDLE

TOTAL ESTIMATED FINAL CONSTRUCTION COST SOUTH

Sculpture benches

4" Underdrain in rubber surface play area

Playground: swings (3-bay, 2 swings, 1 wheelchair swing) Bluegrass or equal

Pollinator seed bed prep, weed seed eradication, invasive removals

Erosion Control, Silt Fence, project perimeter

Playground: 2-5 yrs product

Limestone screens for gravel path, 6876 sf, 6" depth, 127 cy

Playground: 5-12 yrs product

Bench

Bike Rack

Trash Can

Playground: 5-12 yrs labor, 15 holes

Playground: swings labor

Playground: poured rubber surface, 4" thick black, 2" thick topping with colors

Playground: concrete wall adjacent turf, 8" wide, 217' long, 2' tall

DESCRIPTION

Construction Staking

Remove existing soil, $30 + $15 for contaminants

Seed, straw, fertilize - turf areas

Pollinator plants, 2 gallon, random placement throughout pollinator area, 5'x5' spacing rate

Import topsoil, 3" turf and pollinator areas, 5 mile haul, fine grade

Seed pollinator areas,

STANTEC CONSULTING MICHIGAN - ENGINEER'S OPINION OF CONSTRUCTION COST

Pittsfield Charter Township

Waters / Oak Valley Park north of streamNorth 1/3 of site (north of stream)

Playground: concrete edge adjacent turf, 8" wide, 42" deep, poured

Playground: 2-5 yrs labor, 10 holes

Work By Contractor

Mobilization: signage, staging, bonds, etc.

Import subbase soil under path, compact to 95% density, 6953 sf, 24" deep

north V:\2075\active\2075140800\Water oak valey park MI\cost\2019 4 15 water park EOC.xlsx

Conceptual X Project Number: 2075140800Preliminary Prepared By: JELFinal (As Bid) Checked By:

Date: April 15, 2019

QUANT. UNIT UNITCOST

TOTALCOST

1 1 LSUM $10,000.00 $10,000

2 1 LSUM $7,500.00 $5,000

3 Import subbase soil, 21" turf area , 5 mile haul, no compaction 2,594 Cyd $40.00 $103,760

4 370 Cyd $30.00 $11,100

5 Place topsoil, fine grade, 370 Cyd $20.00 $7,400

6 Remove existing sod layer, turf area only 40 MSF $30.00 $1,200

7 521 Cyd $30.00 $15,630

8 Contaminated Soil Disposal Allowance 1 LSUM $10,000.00 $10,000

9 Geotextile, Separator - under turf 4,448 Syd $1.00 $4,448

10 4,448 Syd $2.50 $11,120

11

12 882 Ft $1.50 $1,323

13 Mudmat Access Road 1 LSUM $5,000.00 $5,000

14 186 TON $25.00 $4,650

15 372 Cyd $50.00 $18,600

16 186 Cyd $30.00 $5,580

17 3 EA $500.00 $1,500

18 3 EA $300.00 $900

19

$217,000

20% $43,000

$260,000

NOTE: The ENGINEER has no control over the cost of labor, materials, equipment, or services furnished by others, or over the Contractor's method of determining prices, or overcompetitive bidding or market conditions. Opinions of probable project costs and construction costs provided herin are made on the basis of the ENGINEER'S professionaljudgement and experience. The ENGINEER cannot and does not guarantee that proposals, bids or actual project or construction costs will not vary from the prepared opinionof probable cost.

Trash Can

SUBTOTAL ESTIMATE

CONSTRUCTION CONTINGENCIES

TOTAL ESTIMATED FINAL CONSTRUCTION COST

Bench

Work By Contractor

Mobilization: signage, staging, bonds, etc.

Construction Staking

Import topsoil, 3" turf areas, 5 mile haul, fine grade

Remove existing soil under turf areas adjacent path and woods

Seed, straw, fertilize - turf areas

Erosion Control, Silt Fence, project perimeter

Limestone screens for gravel path, 5024 sf, 6" depth, 92cy

Import subbase soil under path, compact to 95% density, 5024sf, 24" deep

Remove toposil under path, 5024, 12" dep

DESCRIPTION

STANTEC CONSULTING MICHIGAN - ENGINEER'S OPINION OF CONSTRUCTION COST

Pittsfield Charter Township

Waters / Oak Valley ParkMiddle 1/3 of site (south of stream, north of woods)

middle V:\2075\active\2075140800\Water oak valey park MI\cost\2019 4 15 water park EOC.xlsx

Conceptual X Project Number: 2075140800Preliminary Prepared By: JELFinal (As Bid) Checked By:

Date: April 15, 2019

QUANT. UNIT UNITCOST

TOTALCOST

1 1 LSUM $10,000.00 $2,000

2 1 LSUM $7,500.00 $3,000

3 125 Cyd $30.00 $3,750

4 Contaminated Soil Disposal Allowance 1 LSUM $5,000.00 $5,000

5

6 Mudmat Access Road 1 LSUM $5,000.00 $5,000

7 124 TON $25.00 $3,100

8 124 Cyd $15.00 $1,860

9 1 EA $500.00 $500

10 1 EA $300.00 $300

11

$25,000

20% $5,000

$30,000

NOTE: The ENGINEER has no control over the cost of labor, materials, equipment, or services furnished by others, or over the Contractor's method of determining prices, or overcompetitive bidding or market conditions. Opinions of probable project costs and construction costs provided herin are made on the basis of the ENGINEER'S professionaljudgement and experience. The ENGINEER cannot and does not guarantee that proposals, bids or actual project or construction costs will not vary from the prepared opinionof probable cost.

TOTAL ESTIMATED FINAL CONSTRUCTION COST

Trash Can

SUBTOTAL ESTIMATE

Bench

compact to 95% density, import not needed in south section

Limestone screens for gravel path, 3373 sf, 6" depth, 62cy

CONSTRUCTION CONTINGENCIES

Work By Contractor

Mobilization: signage, staging, bonds, etc.

Construction Staking

Remove existing soil under path

STANTEC CONSULTING MICHIGAN - ENGINEER'S OPINION OF CONSTRUCTION COST

Pittsfield Charter Township

Waters / Oak Valley ParkSouth 1/3 of site (south of woods)

DESCRIPTION

south V:\2075\active\2075140800\Water oak valey park MI\cost\2019 4 15 water park EOC.xlsx