Supporting

European

Aviation

2020 LSSIP Event

New in the 2020 LSSIP cycle & Best Practices

Véronique Martou

Outline of this presentation

3

The LSSIP Expert Group

Best Practices - Roadmap

What is new in the 2020 LSSIP Working Instructions?

What is new in the 2020 LSSIP Template?

Conclusions

The 2020 Awareness Webinar for NewComers

What is new in the 2020 LSSIP Template (1)

4

• Updated version of cover with flag

What is new in the 2020 LSSIP Template (2)

5

• Executive

Summary:

• The Graphic of Progression per

SESAR Phases: grouping of

objectives per “Essential

Operational Changes”

• ICAO progress

will take into

account the new

GANP 2019

structure

What is new in the 2020 LSSIP Template (3)

6

• Executive Summary:

• High Level Summary table

What is new in the 2020 LSSIP Template (4)

7

• Chapter 1: National ATM Environment - no change (except the removal of the U-

space Info)

• Chapter 2: Traffic and Capacity – provided by our colleagues from the Operations Planning Unit

• Capacity requirements and delay breakdown: Not included as the performance targets for

RP3 are not agreed yet

• Capacity plans: only the plans for Summer 2021

• Chapter 3: Implementation Projects - no change (except the removal of the U-space

Projects)

• At the freezing of the DB, it is still possible to update the description and progress status of

the projects but not their numbers and name.

• Chapter 4: Cooperation activities - no change

What is new in the 2020 LSSIP Template (5)

8

• Chapter 5:

Implementation Objectives Progress

What is new in the 2020 LSSIP Template (6)

9

• Chapter 5:

Implementation Objectives Progress

• ICAO objective progress

will take into account the

new GANP 2019

structure and granularity

What is new in the 2020 LSSIP Template (7)

10

• Annex A : Specialists involved in the ATM implementation - LSSIP FPs : no change

• Annex B: National stakeholders organisation charts: no change

• Annex C: Implementation Objectives’ links with other plans

• for each implementation objective, mapping to the corresponding SESAR, ICAO, SDM, EASA,

NM, AAS, KF

• Annex D: SESAR Solutions implemented in a voluntary way

• Solutions are now grouped by EOC instead of KF

• 3 solutions/objectives considered as initial and not monitored in the LSSIP DB are added

• #18 - Calculated take-off time (CTOT) and target time of arrival (TTA) (linked to FCM07)

• #34 - Digital integrated briefing (INF09)

• #55 - Precision approaches using GBAS CAT II/III (NAV11)

• 34 additional new solutions added – contextual notes with scope on LSSIP SP

What is new in the 2020 LSSIP Template (8)

11

• Annex E: A new annex on Surveillance Data will be added to the LSSIP 2020.

• Surveillance info, related to projects, sensors and data integration, previously collected

through SUR working arrangements

• Inclusion in the LSSIP process aims to consolidate the data collection process and

increase efficiency by avoiding parallel surveys

• Info prefilled by the CP

What is new in the 2020 LSSIP Template (9)

12

• Annex F: Glossary of abbreviations

• Acronyms: on one page only with referral to the ARIAL website

• The Implementation of U-Space Services Annex will not be shown in

the LSSIP Document in 2020 as the final U-Space report was just

published and it is now too short to start the new U-Space cycle at

the same time of LSSIP.

• The Questionnaire for States Military Organisations on infrastructure

Annex for EDA and NATO will not be shown in the LSSIP Document

in 2020, to avoid double reporting as NATO/EDA in cooperation with

EUROCONTROL/PAS have decided to use the NATO 2 years’ cycle

CEDAR exercise to capture the sensible data.

2020 LSSIP Template - Deadlines

13

• The pre-filled LSSIP documents (Initial Draft, in Word) will be

delivered to the States via the LSSIP SharePoint by the 13th

November 2020.

• The Executive summary graphics, the Chapter 3 Implementation

Projects data, the Chapter 5 Implementation Objectives Progress

(graphics and Objectives data) require the freezing of the DB on

14 February 2021 and will be then updated by the LSSIP team

as soon as possible after that date.

• The Working Level Agreed (WLA) Document shall be reached by

the 1st March 2021.

• The signed LSSIP final document shall be reached by 31 March

2021 – for the publication of the data in the European ATM Portal

(working).

2020 LSSIP Working Instructions (1)

14

20

20

LS

SIP

Wo

rkin

g In

str

uctio

ns LSSIP roles and responsibilities

Production of LSSIP document

Determination of Implementation Progress

LSSIP Database User Guide

LSSIP SharePoint User Guide

Ge

ne

ric in

tro

ductio

n f

or all

chap

ters Available on the

LSSIP SharePoint website

2020 LSSIP Working Instructions (2)

15

20

20

LS

SIP

Wo

rkin

g In

str

uctio

ns LSSIP roles and responsibilities

• Developed in cooperation with LSSIP

EG on request of the States.

• Describes in details roles and

responsibilities of the States, LSSIP

FPs and CPs.

• To support the organization of the

national LSSIP process in case of new

States/ problems within the State.

• Reference to the NETSYS Working

Instructions added.

2020 LSSIP Working Instructions (3)

16

20

20

LS

SIP

Wo

rkin

g In

str

uctio

ns

Production of LSSIP document

• Who does what and when to produce the LSSIP document.

• Deadlines:• 14 February (freezing of DB), 31 March (publication of data).

20

20

LS

SIP

Wo

rkin

g In

str

uctio

ns

2020 LSSIP Working Instructions (4)

17

20

20

LS

SIP

Wo

rkin

g In

str

uctio

ns

2020 LSSIP Working Instructions (5)

18

2020 LSSIP Working Instructions (6)

19

20

20

LS

SIP

Wo

rkin

g In

str

uctio

ns

Determination of Implementation Progress

• How to establish progress for Objectives at all levels (Checkpoint, SLoA,

Stakeholder, State)

• Clarification on inclusion and/or exclusion in the applicability area

Local Scope: if there are more than one organisational unit (Local Scope)

within the same organisation (for example several ACCs), an individual ‘’Local

Scope’’ shall be created properly for each of them within the applicable SLoA.

2020 LSSIP Working Instructions (7)

20

20

LS

SIP

Wo

rkin

g In

str

uctio

ns

LSSIP Database User Guide

• Introduction to the LSSIP DB

• Regularly updated with the new

features, and better clarification of

certain functionalities

• New: the LSSIP DB tutorial

20

2020 LSSIP Working Instructions (8)

21

20

20

LS

SIP

Wo

rkin

g In

str

uctio

ns

LSSIP SharePoint User Guide

• Introduction to the LSSIP SharePoint

• Regularly updated

• New: the LSSIP SP tutorial 2020

2020 LSSIP Working Instructions (9)

Your Ways of cooperation for LSSIP

• Your CP(s)

• The LSSIP Expert Group representatives

• The LSSIP Support Team: [email protected]

22

2020 Awareness Webinar for NewComers

23

It took place on the 13th October 2020

It gives an introduction to the European ATM Master Plan Level 3 &

the Local Single Sky ImPlementation (LSSIP) reporting.

The aim of the webinar session is to facilitate the LSSIP related

work of the stakeholders and in particular of the new comers during

the 2020 cycle.

The webinar was presented under 6 modules which were recorded

that are available on our LSSIP SP website.

The LSSIP Expert Group

• LSSIP EG is your sounding board for all LSSIP related items

• What are the Main activities of the LSSIP EG?

• 3 standard meetings / correspondences scheduled

• For setting up of new cycle (before summer holidays)

• Review of satisfaction survey results after the LSSIP Event,

• Involvement in developments for LSSIP cycle,

• LSSIP Event Dry Run (after summer holidays)

• Involvement in preparation of LSSIP Event

(including development of Agenda and Dry Run),

• Support to update of LSSIP Template and Working Instructions

• Mid-term meeting to check on cycle progress (winter)

• Other (Webex) meetings on request whenever new ideas/changes to

the process appear

24

LSSIP Expert Group: Your current representatives

Do you want to join us?

• smooth and minimal efforts from members: it will enable YOU to ensure the LSSIP is fully fit -for-your-purposes

• All welcome!!

Contact: your CP or [email protected] or [email protected] or [email protected]

Members of LSSIP EG Representing Stakeholders group

André MUEHLIG DE - NSA NSA

Stéphane LAFOURCADE FR - DGAC NSA

Eric CHAMBROY (from 07/2020) FR - DGAC NSA

Anca CIREASA - IRMIE RO - RCAA NSA

Craig KING (until 05/2020) UK - CAA NSA

Markos KALLIAS UK - CAA NSA

Lieutenant Colonel Jose Javier CHUECA IBANEZ ES - Ministry of Defence MIL

Pedro REIS PT - ANA APO

Martin STIEBER AT – Austro Control ANSP

Ralf REISER (alternate - Annette BREMES) DE - DFS ANSP

Estibaliz SALAZAR FERNANDEZ ES - ENAIRE ANSP

Andrea RUZZOLINI IT - ENAV ANSP

Šarunas MURAUSKAS LT - SE "Oro navigacija" ANSP

Michael FIDOM NL - LVNL ANSP

Virginia COMAN RO - ROMATSA ANSP

25

Conclusions – 2020 LSSIP cycle

What’s in it for you?

• The requests of our stakeholders are the driving force for changes,

• Improvements in the Template (EOC and High Level Summary Table) + new SUR Annex –

EDA/NATO and U-space Annexes

• No change in the methodology, BUT precision on the applicability area and the Local scope

• The burden for the States is reduced to minimal – full support of EUROCONTROL NM/INF/PAS Team.

26

More during your bilateral meetings with your EUROCONTROL Contact Person

Do you have any questions?

Thank you for your attention

27