2040 transportation plan - otter tail county, mn...2019/10/22 · transportation plan because it...
TRANSCRIPT
Otter Tail County2040 Transportat ion Plan
Better roads for a better Otter Tail… our values, our priorities
Updated October, 2019
Otter Tail County 2040 Transportation Plan Update (2019)
i
Otter Tail County 2040 Transportation Plan Update (2019) INTRODUCTION .................................................................................................................................................................... 1
Overview ................................................................................................................................................................................................................... 1
Stakeholder Involvement Process .......................................................................................................................................................................... 1
EXISTING CONDITIONS ........................................................................................................................................................ 2
Functional Classification ......................................................................................................................................................................................... 2
Jurisdictional Classification ..................................................................................................................................................................................... 2
Pavement Age .......................................................................................................................................................................................................... 5
Pavement Condition Index ...................................................................................................................................................................................... 5
10 Ton Routes and Shoulder Widths...................................................................................................................................................................... 8
Traffic Volumes ......................................................................................................................................................................................................11
Roadway Capacity Analysis and Congestion ........................................................................................................................................................11
Safety and Crash Analysis .....................................................................................................................................................................................15
FUTURE MULTIMODAL SYSTEM ANALYSIS ....................................................................................................................... 19
Future Functional Classification ...........................................................................................................................................................................19
Future Jurisdictional Classification .......................................................................................................................................................................19
FINANCIAL & PERFORMANCE ANALYSIS ........................................................................................................................... 26
System Management .............................................................................................................................................................................................26
Transportation Funding .........................................................................................................................................................................................26
Current Investment Scenario ................................................................................................................................................................................26
Project Identification ..............................................................................................................................................................................................30
Otter Tail County 2040 Transportation Plan Update (2019)
ii
Figures Figure 1. Otter Tail County Existing Functional Classification .................................................................................................................................... 3 Figure 2. Otter Tail County Existing Jurisdictional Classification ................................................................................................................................ 4 Figure 3. Otter Tail County Age of Asphalt Pavement Surfaces ................................................................................................................................. 5 Figure 4. 2017 Pavement Condition ........................................................................................................................................................................... 6 Figure 5. 2017 Pavement Quality Index (PQI) ............................................................................................................................................................. 7 Figure 6. Otter Tail County Roadway Weight Limits .................................................................................................................................................... 9 Figure 7. Otter Tail County Roadway Shoulder Widths .............................................................................................................................................10 Figure 8. Otter Tail County Existing Average Daily Traffic Volumes (2015) .............................................................................................................12 Figure 9. Perham and Fergus Falls Existing Average Daily Traffic Volumes (2015) ...............................................................................................13 Figure 10. Traffic Congestion (Fergus Falls)..............................................................................................................................................................14 Figure 11. Otter Tail County Crashes 2014 – 2019 (Excluding Animal Crashes) ..................................................................................................16 Figure 12. Otter Tail County Fatal Crashes 2014 – 2019 .......................................................................................................................................17 Figure 13. Future Functional Classification ..............................................................................................................................................................20 Figure 14. Future Jurisdictional Classification ..........................................................................................................................................................21 Figure 15. Future Jurisdictional Classification (Cities) .............................................................................................................................................22 Figure 16. Annual Funding Levels..............................................................................................................................................................................27 Figure 17. Projected 2020 PQI by Tier ......................................................................................................................................................................28 Figure 18. Average PQI by Tier in 2028 .....................................................................................................................................................................28 Figure 19. Financial Gap Analysis ..............................................................................................................................................................................29 Figure 20. Otter Tail County 2019-2025 Transportation Program ..........................................................................................................................32
Otter Tail County 2040 Transportation Plan Update (2019)
iii
Tables Table 1. Otter Tail County Shoulder Widths ................................................................................................................................................................ 8 Table 2. Otter Tail County Planning Level Capacity Thresholds ...............................................................................................................................11 Table 3. Otter Tail County Crash Fatalities and Injuries, 2014 - 2019 ....................................................................................................................15 Table 4. Otter Tail County Fatal Crashes 2014 - 2019 ............................................................................................................................................18 Table 5. Jurisdictional Changes .................................................................................................................................................................................23 Table 6. Summary of Future Roadway /Bridge Preservation Projects ....................................................................................................................31 Table 7. Otter Tail County 2019-2025 Transportation Program ..............................................................................................................................33
Otter Tail County 2040 Transportation Plan Update (2019)
1
Introduction Overview The Otter Tail County 2040 Long Range Transportation Plan translates identified issues into specific, actionable initiatives and strategies. The Plan elements were coordinated with other County efforts and those of other key study partners, cities, townships, and the Minnesota Department of Transportation (MnDOT). The initial Plan document was adopted on July 21, 2015.
In an effort to document the most up to date information, Otter Tail County initiated an update in 2018 to their 2040 Long Range Transportation Plan. The goal of the update was to understand future project and funding needs in the County. The following sections were included in this update:
• Existing Conditions • Future Multimodal System Analysis • Financial & Performance Analysis
Stakeholder Involvement Process Public participation and agency coordination were important in seeking input on proposed system improvements and building support for the overall Transportation Plan update.
Project Management Team
A Project Management Team (PMT) was established to actively guide the development of the Plan. The team was composed of three County Highway staff. Several PMT meetings were held at strategic intervals throughout the planning process to review technical analyses and provide input on the Plan contents.
Open Houses
Four public open house meetings were held during the planning process. These meetings were conducted to provide stakeholders information on the Transportation Plan update and to seek input on planning or programming concepts. Display boards, presentations, and comment forms were used to engage the public at these meetings. Importantly, the open house format offered an informal venue for citizens, agency staff, and community leaders to ask questions and give their thoughts on the Plan findings and recommendations.
Otter Tail County 2040 Transportation Plan Update (2019)
2
Existing Conditions Functional Classification The functional classification system defines both the function and role of a roadway within the hierarchy of an overall roadway system. This system is used to create a roadway network that collects and distributes traffic from neighborhoods and ultimately to the state or interstate highway system. Functional classification planning works to manage mobility, access, and alignment of routes.
Since 2015, there have been minor adjustments to the functional classification of roads in the County. Going forward, the County will adjust the classification of roadways in the county as opportunities arise. Figure 1 displays the existing functional classification system for the County’s roadways.
Jurisdictional Classification The objective of appropriate road jurisdiction planning is to ensure that the management of each roadway is closely aligned with its function and the jurisdiction best suited to maintain it. The jurisdiction of roadways is an important component of the Transportation Plan because it defines the regulatory, maintenance, construction, and financial obligations of each governmental unit.
Since 2015, there have been updates to the jurisdictional classification in Otter Tail County. The City of Fergus Falls and the County agreed to swap municipal streets and County roads in the City to properly align management of the roadways with their intended function. This transfer consisted of 4 miles of city roads being transferred for four miles of county roads. CSAH 1 and CSAH 25 were swapped for MSAS 105, MSAS 104, and MSAS 137.
Figure 2 displays the current jurisdictional classification for the County’s roadways.
!"b$
!"b$
)r
)r)m
)m
?}A@
?}A@?}A@
?êA@
?êA@
?êA@
?}A@
?ÿA@
?ÂA@
?ÂA@
?ÂA@
?ÆA@
?aA@?aA@
?aA@
Becker County
Clay County
Wilki
n Cou
nty
Grant County Douglas County
Todd
Cou
ntyWa
dena
Cou
nty
G¢WX
GhWX
G£WX
Lake Lida
Otter Tail Lake
West Battle Lake
Rush Lake
Dead Lake
Big Pine Lake
Pelican Lake
Tenmile Lake
GyWX GyWX
GbWXGvWX
G|WXGuWX
GâWXGiWX
G|WX
GWX
GWX
)r
Sê
GaWX
GaWX
GoWX
GWX
G¥WXG¡WX G§WX
G§WXG©WX
G¹WX
GkWX
GÜWX
G§WXG³WX
GWX
GrWX
GnWXG¤WX
GÔWX
Sí
GÝWX
SïGdWX
GªWX
GdWX
GpWX
GªWX
SðGWXGÏWX
GÑWX
G±WX
G¬WX
G¬WX
GÅWX
GáWX
GeWX
GËWX
GÕWX
GÓWX
G¼WX
?aA@
G¼WX
?aA@ G¾WX
G×WX
GÇWX
GÀWXGÍWX
GnWX
GÕWX
GÖWX
GÎWXGsWX
GsWX
GÍWX
GgWXGgWX
G¿WX
GlWX
GÆWX
G½WX
G§WXGßWX
G¦WX
GWX
GqWX
GcWX
GcWX
G°WX
G»WXGÂWX
Fergus Falls
WadenaOttertail
Perham
Henning
Deer Creek
BlufftonRothsay
Vergas
Vining
Pelican Rapids
Frazee
Richville
Battle Lake
Urbank
New York Mills
Parkers Prairie
Erhard
Dent
Underwood
Elizabeth
Dalton
Clitherall
Maplewood
Glendalough
Inspiration Peak
Existing Functional ClassPrincipal ArterialMinor ArterialMajor CollectorMinor CollectorLocalCounty BoundaryRailroadsCentral Lakes State TrailState Aid CitiesNon-State Aid CitiesState Parks
2040 Transportation Plan
[0 5 102.5
Miles
Figure 1Existing FunctionalClassification
!"b$
!"b$
)r
)r)m
)m
?}A@
?}A@?}A@
?êA@
?êA@
?êA@
?}A@
?ÿA@
?ÂA@
?ÂA@
?ÂA@
?ÆA@
?aA@?aA@
?aA@
Becker County
Clay County
Wilki
n Cou
nty
Grant County Douglas County
Todd
Cou
ntyWa
dena
Cou
nty
G¢WX
GhWX
G£WX
Lake Lida
Otter Tail Lake
West Battle Lake
Rush Lake
Dead Lake
Big Pine Lake
Pelican Lake
Tenmile Lake
GyWX GyWX
GbWXGvWX
G|WXGuWX
GâWXGiWX
G|WX
GWX
GWX
)r
Sê
GaWX
GaWX
GoWX
GWX
G¥WXG¡WX G§WX
G§WXG©WX
G¹WX
GkWX
GÜWX
G§WXG³WX
GWX
GrWX
GnWXG¤WX
GÔWX
Sí
GÝWX
SïGdWX
GªWX
GdWX
GpWX
GªWX
SðGWXGÏWX
GÑWX
G±WX
G¬WX
G¬WX
GÅWX
GáWX
GeWX
GËWX
GÕWX
GÓWX
G¼WX
?aA@G¼WX
?aA@ G¾WX
G×WX
GÇWX
GÀWXGÍWX
GnWX
GÕWX
GÖWX
GÎWXGsWX
GsWX
GÍWX
GgWXGgWX
G¿WX
GlWX
GÆWX
G½WX
G§WXGßWX
G¦WX
GWX
GqWX
GcWX
GcWX
G°WX
G»WXGÂWX
Fergus Falls
WadenaOttertail
Perham
Henning
Deer Creek
BlufftonRothsay
Vergas
Vining
Pelican Rapids
Frazee
Richville
Battle Lake
Urbank
New York Mills
Parkers Prairie
Erhard
Dent
Underwood
Elizabeth
Dalton
Clitherall
Maplewood
Glendalough
Inspiration Peak
Existing Roadway JurisdictionInterstate HighwayUS HighwayState HighwayCounty RoadwaysTownshipCity or OtherCounty BoundaryRailroadsCentral Lakes State TrailState Aid CitiesNon-State Aid CitiesState Parks
2040 Transportation Plan
[0 5 102.5
Miles
Figure 2Existing JurisdictionalClassification
Otter Tail County 2040 Transportation Plan Update (2019)
5
Pavement Age Almost 60 percent of Otter Tail County’s asphalt roadways are more than 20 years old. According to industry standards, a highway should typically receive an overlay at approximately 15 to 20 years. In Otter Tail County, due to funding constraints, overlay work is spread out to an approximately 30-year average. Figure 3 shows the breakdown of asphalt pavements by age.
Figure 3. Otter Tail County Age of Asphalt Pavement Surfaces
Pavement Condition Index MnDOT State Aid data collection services were used to gather condition data on paved County State Aid Highways (CSAH) and County Highways (CH). This data is collected every two years and entered into the county pavement management data system. The most recently collected data for the County is from 2017.
Data collected and provided by MnDOT to the County includes a Ride Quality Index (RQI), Surface Rating (SR), and a Pavement Quality Index (PQI). The PQI is a composite score that combines the ride quality and surface rating and ranges between 0 and 4.5. The higher the number, the better the condition of the roadway. Otter Tail County uses a modified version of the PQI ratings that converts the range of 0 to 4.5 to a 0 to 100 scale. Using this numerical rating, 0 represents a failed roadway and 100 represents a newly surface roadway with no distress. Figure 4 shows the percent of the paved roadways that fell into each category in 2017. Figure 5 presents the 2017 PQI data by roadway segment across the County.
Beginning in 2017, MnDOT changed the way they perform pavement condition surveys. In previous survey years, a sampling procedure was followed in which approximately 10 percent of the pavement surface was reviewed manually. Distresses collected within that 10 percent were then extrapolated to the entire segment area. The new process includes a review of 100 percent of the pavement surface using an automated software program that detects surface distress. This change in procedure had an impact on the PQI data for Otter Tail County and the rest of the state. The data collected in 2017 showed an improvement in the PQI for many of the County’s roadways, despite maintenance work not being performed.
0 - 5 yrs, 14%
6 - 10 yrs, 11%
11 - 15 yrs, 6%16 - 20
yrs, 14%
21 - 25 yrs, 12%
26 - 30 yrs, 16%
> 30 yrs, 26%
Otter Tail County 2040 Transportation Plan Update (2019)
6
Moving forward, as MnDOT continues to follow the new rating procedure, the data will be used to determine if adjustments should be made to the County’s PQI goals, preservation strategies and future project list.
Figure 4. 2017 Pavement Condition
25%
70%
5%
Very Good (80-100)
Good (60-79)
Fair (40-59)
!"b$
!"b$
)r
)r)m
)m
?}A@
?}A@?}A@
?êA@
?êA@
?êA@
?}A@
?ÿA@
?ÂA@
?ÂA@
?ÂA@
?ÆA@
?aA@?aA@
?aA@
Becker County
Clay County
Wilki
n Cou
nty
Grant County Douglas County
Todd
Cou
ntyWa
dena
Cou
nty
G¢WX
GhWX
G£WX
Lake Lida
Otter Tail Lake
West Battle Lake
Rush Lake
Dead Lake
Big Pine Lake
Pelican Lake
Tenmile Lake
GyWX GyWX
GbWXGvWX
G|WXGuWX
GâWXGiWX
G|WX
GWX
GWX
)r
Sê
GaWX
GaWX
GoWX
GWX
G¥WXG¡WX G§WX
G§WXG©WX
G¹WX
GkWX
GÜWX
G§WXG³WX
GWX
GrWX
GnWXG¤WX
GÔWX
Sí
GÝWX
SïGdWX
GªWX
GdWX
GpWX
GªWX
SðGWXGÏWX
GÑWX
G±WX
G¬WX
G¬WX
GÅWX
GáWX
GeWX
GËWX
GÕWX
GÓWX
G¼WX
?aA@
G¼WX
?aA@ G¾WX
G×WX
GÇWX
GÀWXGÍWX
GnWX
GÕWX
GÖWX
GÎWXGsWX
GsWX
GÍWX
GgWXGgWX
G¿WX
GlWX
GÆWX
G½WX
G§WXGßWX
G¦WX
GWX
GqWX
GcWX
GcWX
G°WX
G»WXGÂWX
Fergus Falls
WadenaOttertail
Perham
Henning
Deer Creek
BlufftonRothsay
Vergas
Vining
Pelican Rapids
Frazee
Richville
Battle Lake
Urbank
New York Mills
Parkers Prairie
Erhard
Dent
Underwood
Elizabeth
Dalton
Clitherall
Maplewood
Glendalough
Inspiration Peak
PQI RangeVery Good (80-100)Good (60-79)Fair (40-59)Poor (20-39)
Roadway JurisdictionStateCountyTownshipCity or OtherCounty BoundaryRailroadsCentral Lakes State TrailState Aid CitiesNon-State Aid CitiesState Parks
2040 Transportation Plan
[0 5 102.5
Miles
Figure 5Pavement Quality Index
Otter Tail County 2040 Transportation Plan Update (2019)
8
10 Ton Routes and Shoulder Widths Otter Tail County considers the weight capacity and roadway/shoulder width as an important metric when evaluation the condition and quality of their system. Both of these metrics greatly affect freight travel and safety throughout the County.
The roadway weight limits for the entire County system are shown in Figure 6. Since 2015, the County has upgraded portions of the following eleven county roadways to 10 Ton Routes:
• CSAH 1 • CSAH 4 • CSAH 8 • CSAH 9 (One Section is now a 9 Ton Route) • CSAH 10 • CSAH 12 • CSAH 16 • CSAH 24 • CSAH 27 • CSAH 35 • CSAH 67
Table 1 provides a summary of the shoulder widths for the County roadway system. Figure 7 shows the updated map of the shoulder widths for the County’s roadway system. The following is a list of the roadways with sections that have updated their shoulder widths since 2015:
• CSAH 1 • CSAH 8 • CSAH 9 • CSAH 27 • CSAH 35 • CSAH 38
Table 1. Otter Tail County Shoulder Widths
SHOULDER WIDTH (FEET)
PERCENT OF COUNTY SYSTEM
2' or Less 32%3' to 4' 52%5' to 6' 8%7' to 10' 7%Greater than 10' 1%
!"b$
!"b$
)r
)r)m
)m
?}A@
?}A@?}A@
?êA@
?êA@
?êA@
?}A@
?ÿA@
?ÂA@
?ÂA@
?ÂA@
?ÆA@
?aA@?aA@
?aA@
Becker County
Clay County
Wilki
n Cou
nty
Grant County Douglas County
Todd
Cou
ntyWa
dena
Cou
nty
G¢WX
GhWX
G£WX
Lake Lida
Otter Tail Lake
West Battle Lake
Rush Lake
Dead Lake
Big Pine Lake
Pelican Lake
Tenmile Lake
GyWX GyWX
GbWXGvWX
G|WXGuWX
GâWXGiWX
G|WX
GWX
GWX
)r
Sê
GaWX
GaWX
GoWX
GWX
G¥WXG¡WX G§WX
G§WXG©WX
G¹WX
GkWX
GÜWX
G§WXG³WX
GWX
GrWX
GnWXG¤WX
GÔWX
Sí
GÝWX
SïGdWX
GªWX
GdWX
GpWX
GªWX
SðGWXGÏWX
GÑWX
G±WX
G¬WX
G¬WX
GÅWX
GáWX
GeWX
GËWX
GÕWX
GÓWX
G¼WX
?aA@
G¼WX
?aA@ G¾WX
G×WX
GÇWX
GÀWXGÍWX
GnWX
GÕWX
GÖWX
GÎWXGsWX
GsWX
GÍWX
GgWXGgWX
G¿WX
GlWX
GÆWX
G½WX
G§WXGßWX
G¦WX
GWX
GqWX
GcWX
GcWX
G°WX
G»WXGÂWX
Fergus Falls
WadenaOttertail
Perham
Henning
Deer Creek
BlufftonRothsay
Vergas
Vining
Pelican Rapids
Frazee
Richville
Battle Lake
Urbank
New York Mills
Parkers Prairie
Erhard
Dent
Underwood
Elizabeth
Dalton
Clitherall
Maplewood
Glendalough
Inspiration Peak
Road Weight Limits10 Ton9 Ton8 Ton or LowerLocal RoadsCounty BoundaryRailroadsCentral Lakes State TrailState Aid CitiesNon-State Aid CitiesState Parks
2040 Transportation Plan
[0 5 102.5
Miles
Figure 6Weight Limits
!"b$
!"b$
)r
)r)m
)m
?}A@
?}A@?}A@
?êA@
?êA@
?êA@
?}A@
?ÿA@
?ÂA@
?ÂA@
?ÂA@
?ÆA@
?aA@?aA@
?aA@
Becker County
Clay County
Wilki
n Cou
nty
Grant County Douglas County
Todd
Cou
ntyWa
dena
Cou
nty
G¢WX
GhWX
G£WX
Lake Lida
Otter Tail Lake
West Battle Lake
Rush Lake
Dead Lake
Big Pine Lake
Pelican Lake
Tenmile Lake
GyWX GyWX
GbWXGvWX
G|WXGuWX
GâWXGiWX
G|WX
GWX
GWX
)r
Sê
GaWX
GaWX
GoWX
GWX
G¥WXG¡WX G§WX
G§WXG©WX
G¹WX
GkWX
GÜWX
G§WXG³WX
GWX
GrWX
GnWXG¤WX
GÔWX
Sí
GÝWX
SïGdWX
GªWX
GdWX
GpWX
GªWX
SðGWXGÏWX
GÑWX
G±WX
G¬WX
G¬WX
GÅWX
GáWX
GeWX
GËWX
GÕWX
GÓWX
G¼WX
?aA@
G¼WX
?aA@ G¾WX
G×WX
GÇWX
GÀWXGÍWX
GnWX
GÕWX
GÖWX
GÎWXGsWX
GsWX
GÍWX
GgWXGgWX
G¿WX
GlWX
GÆWX
G½WX
G§WXGßWX
G¦WX
GWX
GqWX
GcWX
GcWX
G°WX
G»WXGÂWX
Fergus Falls
WadenaOttertail
Perham
Henning
Deer Creek
BlufftonRothsay
Vergas
Vining
Pelican Rapids
Frazee
Richville
Battle Lake
Urbank
New York Mills
Parkers Prairie
Erhard
Dent
Underwood
Elizabeth
Dalton
Clitherall
Maplewood
Glendalough
Inspiration Peak
Shoulder Width (Feet)< 23 - 45 - 67 - 10> 10
Roadway JurisdictionStateCountyTownshipCity or OtherCounty BoundaryRailroadsCentral Lakes State TrailState Aid CitiesNon-State Aid CitiesState Parks
2040 Transportation Plan
[0 5 102.5
Miles
Figure 7 Shoulder Widths
Otter Tail County 2040 Transportation Plan Update (2019)
11
Traffic Volumes An evaluation of existing corridor operations was completed to gain a greater understanding of the key travel patterns and congested travel conditions within the County. In an effort to evaluate traffic operations within Otter Tail County, it is critical to understand existing traffic volumes on major roadways.
Figure 8 displays the existing average daily traffic (ADT) volumes on the County’s roadways and Figure 9 shows the ADT volumes in Perham and Fergus Falls, using the most recent data published by MnDOT (2015).
Roadway Capacity Analysis and Congestion Typical planning-level capacity thresholds, as shown in Table 2, were used to evaluate current roadway capacities for all facility types. An analysis of roadway segments with congestion or operational problems is critical in the identification of system needs and/or future roadway improvements.
The volume ranges and capacity thresholds are based on guidance from the Highway Capacity Manual and professional engineering judgment. ADT ranges are used to estimate the maximum capacity of roadway designs; however, it is important to note that a capacity threshold is a theoretical measure that can be affected by functional classification, peak traffic flows, access spacing, speed, and other roadway characteristics.
Congestion and operational problems were evaluated by determining the ratio of current traffic volume to roadway capacity (v/c ratio). Capacity is defined by the following:
• Approaching Capacity – Observed daily volumes exceed 85 percent of the daily capacity (v/c > 0.85)
• At or Exceeding Capacity – Observed daily volumes exceed 100 percent of the daily capacity (v/c > 1.0)
Based on current traffic volumes, there are a few roadways with in the City of Fergus Falls with capacity issues as shown in Figure 10
Table 2. Otter Tail County Planning Level Capacity Thresholds
!"b$
!"b$
)r
)r)m
)m
?}A@
?}A@?}A@
?êA@
?êA@
?êA@
?}A@
?ÿA@
?ÂA@
?ÂA@
?ÂA@
?ÆA@
?aA@?aA@
?aA@
Becker County
Clay County
Wilki
n Cou
nty
Grant County Douglas County
Todd
Cou
ntyWa
dena
Cou
nty
G¢WX
GhWX
G£WX
Lake Lida
Otter Tail Lake
West Battle Lake
Rush Lake
Dead Lake
Big Pine Lake
Pelican Lake
Tenmile Lake
GyWX GyWX
GbWXGvWX
G|WXGuWX
GâWXGiWX
G|WX
GWX
GWX
)r
Sê
GaWX
GaWX
GoWX
GWX
G¥WXG¡WX G§WX
G§WXG©WX
G¹WX
GkWX
GÜWX
G§WXG³WX
GWX
GrWX
GnWXG¤WX
GÔWX
Sí
GÝWX
SïGdWX
GªWX
GdWX
GpWX
GªWX
SðGWXGÏWX
GÑWX
G±WX
G¬WX
G¬WX
GÅWX
GáWX
GeWX
GËWX
GÕWX
GÓWX
G¼WX
?aA@
G¼WX
?aA@ G¾WX
G×WX
GÇWX
GÀWXGÍWX
GnWX
GÕWX
GÖWX
GÎWXGsWX
GsWX
GÍWX
GgWXGgWX
G¿WX
GlWX
GÆWX
G½WX
G§WXGßWX
G¦WX
GWX
GqWX
GcWX
GcWX
G°WX
G»WXGÂWX
Fergus Falls
WadenaOttertail
Perham
Henning
Deer Creek
BlufftonRothsay
Vergas
Vining
Pelican Rapids
Frazee
Richville
Battle Lake
Urbank
New York Mills
Parkers Prairie
Erhard
Dent
Underwood
Elizabeth
Dalton
Clitherall
Maplewood
Glendalough
Inspiration Peak
0
90
60
607560
60
85
280
710
320
570
200
460
190300
690510
460
550
990
215
260
670
330
240
495520
160600
120
235
650465
345
710
380
920
365210
240820
620
790
260
800470
390
750
690
250
205680
345610 380
630300
275
510
870155
610580640
250
320950
195195 115
250
215600
305
650 830315100
330
140
175
290
215140
810
360
185 600
440
185
135245
320
490
145 430
485 850295
160
170
285295
100
100
205210
170
205
110
300175
155
175560
170
195
710155
115270
410
150
600
425
170
235
105
230
140155
810355
540
980
980
680
740
520
600
530
730820
800290
770
530
345
4,000
1,300
1,100
3,1005,400
7,600
1,450
1,650
9,0003,100
1,250
3,0001,950
1,500
3,700
1,050
1,550
1,100
1,000
1,000
1,800
1,300
3,050
2,1501,450
1,5001,300
1,250
4,500
1,850
1,250
1,300
1,200
2,0001,300
1,150
8,000
1,100
1,300
1,150
2,700
17,100
18,200
2040 Transportation Plan
[0 5 102.5
Miles
Figure 8Traffic Volumes
Trunk Highways - 2017 County Roads/Highways - 2015
Roadway JurisdictionStateCountyTownshipCity or OtherCounty BoundaryRailroadsCentral Lakes State TrailState Aid CitiesNon-State Aid CitiesState Parks
Traffic Count Data
)m
G½WX
G¦WX
Perham
GgWX
GÚWX
8,000
6,7001,550
2,550
6,0003,250
2,250
Existing Traffic VolumeTraffic Count Data
Roadway JurisdictionStateCountyTownshipCity or OtherCounty BoundaryRailroadsCentral Lakes State TrailState Aid CitiesNon-State Aid CitiesState Parks
2040 Transportation Plan
[0 0.75 1.5
Miles
Figure 9Traffic Volume (2015)Perham and Fergus Falls
?}A@
G|WX
Fergus Falls
GâWX
GWX
18,200
2,200
195
17,100
5601,500
14,000
1,950
120
5,4003,100
4,000
7,200
0 1 2Miles
Fergus Falls
?}A@
G¡WX
GWX
GrWX
G|WXGâWX
?}A@
GàWX
GoWX
GWX
GzWX
GÜWXG¡WX
G¥WX
GzWX
!"b$
!"b$
(9,000)
(9,00
0)
(14,000)
(12,20
0)
Fir Ave
Union
Ave
Roadway JurisdictionStateCountyTownshipCity or OtherCounty BoundaryRailroadsCentral Lakes State TrailState Aid CitiesNon-State Aid CitiesState Parks
2040 Transportation Plan
[0 0.85 1.70.425
Miles
Approaching Capacity(0.85 - 1.0 V/C)Over Capacity(> 1.0 V/C)
Existing Congestion
Figure 10Traffic CongestionFergus Falls
Otter Tail County 2040 Transportation Plan Update (2019)
15
Safety and Crash Analysis Roadway safety is an important issue for County officials and a high priority for MnDOT, local agencies, and the public. In addition to the data provided in this update, Otter Tail County has a County Road Safety Plan that documents at-risk locations and identifies cost-effective safety improvement strategies that Otter Tail County can complete once funding becomes available.
Updated crash frequency and severity maps (see Figure 11 and 12) and tables (see Table 3 and 4) were completed using data provided by MnDOT for the most recently five-year period (2014-2019). The following are the key takeaways from this analysis:
• There were a total of 3,382 crashes recorded for all roadways within the County (not including animal crashes), 1,005 of these crashes resulted in an injury or fatality.
• There were 674 crashes located on a County Road (20 percent), 36 of these crashes resulted in an injury or fatality.
• There were a total of 24 crashes that resulted in a fatality within the County, six of these crashes were on a County Road.
Table 3. Otter Tail County Crash Fatalities and Injuries, 2014 - 2019
YEAR FATALITIES INJURIES2014 3 1912015 8 2052016 1 2302017 7 2232018 4 2092019 1 39
!"b$
!"b$
)r
)r)m
)m
?}A@
?}A@?}A@
?êA@
?êA@
?êA@
?}A@
?ÿA@
?ÂA@
?ÂA@
?ÂA@
?ÆA@
?aA@?aA@
?aA@
Becker County
Clay County
Wilki
n Cou
nty
Grant County Douglas County
Todd
Cou
nty
Wade
na C
ounty
G¢WX
GhWX
G£WX
Lake Lida
Otter Tail Lake
West Battle Lake
Rush Lake
Dead Lake
Big Pine Lake
Pelican Lake
Tenmile Lake
GyWX GyWX
GbWXGvWX
G|WXGuWX
GâWXGiWX
G|WX
GWX
GWX
)r
Sê
GaWX
GaWX
GoWX
GWX
G¥WXG¡WX G§WX
G§WXG©WX
G¹WX
GkWX
GÜWX
G§WXG³WX
GWX
GrWX
GnWXG¤WX
GÔWX
Sí
GÝWX
SïGdWX
GªWX
GdWX
GpWX
GªWX
Sð GWXGÏWX
GÑWX
G±WX
G¬WX
G¬WX
GÅWX
GáWX
GeWX
GËWX
GÕWX
GÓWX
G¼WX
?aA@
G¼WX
?aA@ G¾WX
G×WX
GÇWX
GÀWXGÍWX
GnWX
GÕWX
GÖWX
GÎWXGsWX
GsWX
GÍWX
GgWXGgWX
G¿WX
GlWX
GÆWX
G½WX
G§WXGßWX
G¦WX
GWX
GqWX
GcWX
GcWX
G°WX
G»WXGÂWX
Fergus Falls
WadenaOttertail
Perham
Henning
Deer Creek
BlufftonRothsay
Vergas
Vining
Pelican Rapids
Frazee
Richville
Battle Lake
Urbank
New York Mills
Parkers Prairie
Erhard
Dent
Underwood
Elizabeth
Dalton
Clitherall
Maplewood
Glendalough
Inspiration Peak
Crashes 2014-2019Fatal- 24Serious Injury- 87Minor Injury- 425Possible Injury- 469Property Damage- 2,377
Roadway JurisdictionStateCountyTownshipCity or OtherCounty BoundaryRailroadsCentral Lakes State TrailState Aid CitiesNon-State Aid CitiesState Parks
2040 Transportation Plan
[0 5 102.5
Miles
Figure 11Otter Tail County Crashes Since 2014 – 2019(Excluding Animal Crashes)
!"b$
!"b$
)r
)r )m
)m
?}A@
?}A@?}A@
?êA@
?êA@
?êA@
?}A@
?ÿA@
?ÂA@
?ÂA@
?ÂA@
?ÆA@
?aA@?aA@
?aA@
Becker County
Clay County
Wilki
n Cou
nty
Grant County Douglas County
Todd
Cou
ntyWa
dena
Cou
nty
G¢WX
GhWX G£WX
Lake Lida
Otter Tail Lake
West Battle Lake
Rush Lake
Dead Lake
Big Pine Lake
Pelican Lake
Tenmile Lake
GyWX GyWX
GbWXGvWX
G|WXGuWX
GâWXGiWX
G|WX
GWX
GWX
)r
Sê
GaWX
GaWX
GoWX
GWX
G¥WXG¡WX G§WX
G§WXG©WX
G¹WX
GkWX
GÜWX
G§WXG³WX
GWX
GrWX
GnWXG¤WX
GÔWX
Sí
GÝWX
SïGdWX
GªWX
GdWX
GpWX
GªWX
SðGWXGÏWX
GÑWX
G±WX
G¬WX
G¬WX
GÅWX
GáWX
GeWX
GËWX
GÕWX
GÓWX
G¼WX
?aA@G¼WX
?aA@ G¾WX
G×WX
GÇWX
GÀWXGÍWX
GnWX
GÕWX
GÖWX
GÎWXGsWX
GsWX
GÍWX
GgWXGgWX
G¿WX
GlWX
GÆWX
G½WX
G§WXGßWX
G¦WX
GWX
GqWX
GcWX
GcWX
G°WX
G»WXGÂWX
Fergus Falls
WadenaOttertail
Perham
Henning
Deer Creek
BlufftonRothsay
Vergas
Vining
Pelican Rapids
Frazee
Richville
Battle Lake
Urbank
New York Mills
Parkers Prairie
Erhard
Dent
Underwood
Elizabeth
Dalton
Clitherall
Maplewood
Glenda lough
Inspiration Peak
""X
""D
""E
""F""A
""M
""G
""T
""H""I
""N""U
""O
""V
""P
""Q
""R
""S
""B
""C""L
""W
""J
""K
Fatal Crash DataFatal- 24
Roadway JurisdictionStateCountyTownshipCity or OtherCounty BoundaryRailroadsCentral Lakes State TrailState Aid CitiesNon-State Aid CitiesState Parks
2040 Transportation Plan
[0 5 102.5
Miles
Figure 12Otter Tail CountyFatal Crashes 2014 – 2019
Fatal ID Route Month Day Year TimeNumber of Fatalities
Number of Vehicles
LocationWeather
ConditionsContributing Factor Crash Location
A US 10 September 29 2014 12:00 PM 1 1 Gorman Township Non-Collision-Overturn/Rollover Ran Off Road-Right Side Clear Unknown On Roadway
B CSAH 31 July 3 2014 8:37 PM 1 1 Dunn Township Non-Collision-Overturn/Rollover Ran Off Road-Right Side Unknown Chemical Impairment On Roadway
C I-94 May 10 2014 1:14 PM 1 2 Buse Township Non-Collision-Overturn/Rollover Other Cloudy No Clear Contributing Action On Roadway
D Tadpole Rd February 5 2015 9:27 AM 1 1 Corliss Township Non-Collision-Embank/Ditch/CRB Ran Off Road-Left Side Clear Over-correcting / Over Steering Off Roadway, Roadside
E E FIR AVE March 18 2015 4:18 PM 1 2 City of Fergus Falls Collision With-Motor Vehicle in Transport Head-On Rain Chemical Impairment On Roadway
F CSAH 4 August 9 2015 11:25 AM 1 2 Lida Township Collision With-Motor Vehicle in Transport Left Angle Clear Unknown On Roadway
G I-94 March 20 2015 2:47 PM 1 1 Fergus Falls Township Non-Collision-Overturn/Rollover Ran Off Road-Right Side Cloudy Inattentive/Distraction (Talking, Eating, etc.) On Roadway
H E 14th ST September 28 2015 7:26 AM 1 1 City of Fergus Falls Collision With-Pedestrian Head-On Clear No Clear Contributing Action On Roadway
I MN 210 October 14 2015 3:17 AM 1 2 Clitherall Township Collision With-Motor Vehicle in Transport Head-On Clear Improper Passing On Roadway
J MN 210 October 24 2015 5:42 AM 1 2 City of Fergus Falls Collision With-Motor Vehicle in Transport Left Turn Clear Failure to Yield Right-of-Way On Roadway
K I-94 June 23 2015 4:11 AM 2 1 Tumuli Township Non-Collision-Overturn/Rollover Ran Off Road-Left Side Clear Over-correcting / Over Steering On Median
L CSAH 65 June 28 2016 10:25 AM 1 1 Folden Township Non-Collision-Overturn/Rollover Other Clear No Clear Contributing Action On Roadway
M MN 29 February 5 2017 9:18 AM 2 2 Deer Creek Township Collision With-Motor Vehicle in Transport Front To Front Clear Operated Vehicle in Careless, Negligent, or Erratic Manner On Roadway
N CSAH 80 June 19 2017 2:35 AM 1 4 Perham Township Collision With-Motor Vehicle in Transport Rear To Side Clear Failed to Keep in Proper Lane On Roadway
O MN 29 November 1 2017 3:09 AM 1 2 Elmo Township Collision With-Motor Vehicle in Transport Front To Front Snow No Clear Contributing Action On Roadway
P 450TH ST August 26 2017 8:05 PM 1 1 Pine Lake Township Non-Collision-Overturn/Rollover Other Clear Operated Vehicle in Careless, Negligent, or Erratic Manner Off Roadway, Location Unknown
Q MN 210 April 13 2017 1:00 AM 1 2 Folden Township Collision With-Motor Vehicle in Transport Front To Front Fog/Smog/Smoke Operated Vehicle in Careless, Negligent, or Erratic Manner On Roadway
R US 10 April 26 2017 2:51 AM 1 1 City of Fergus Falls Non-Collision-Overturn/Rollover Other Cloudy Ran Off Road On Roadway
S CSAH 1 May 17 2017 6:55 AM 1 1 Buse Township Non-Collision-Overturn/Rollover Other Cloudy Ran Off Road On Roadside
T I-94 April 27 2018 12:38 AM 1 2 Tumuli Township Collision With-Motor Vehicle in Transport Front To Rear Clear No Clear Contributing Action On Roadway
U 470TH AVE December 19 2018 1:35 AM 1 1 Pine Lake Township Non-Collision-Overturn/Rollover Other Cloudy Over-correcting / Over Steering On Roadway
V I-94 September 11 2018 6:22 PM 1 1 City of Fergus Falls Non-Collision-Overturn/Rollover Other Clear Operated Vehicle in Reckless or Aggressive Manner On Median
W CR-111 July 28 2018 11:40 AM 1 1 Aurdal Township Non-Collision-Overturn/Rollover Other Clear Ran Off Road On Roadway
X MN 210 March 11 2019 12:59 AM 1 3 Carlisle Township Collision With-Parked Motor Vehicle Other Fog/Smog/Smoke Operated Vehicle in Careless, Negligent, or Erratic Manner On Roadway
Crash Type
Table 4. Otter Tail County Fatal Crashes 2014 - 2019
Otter Tail County 2040 Transportation Plan Update (2019)
19
Future Multimodal System Analysis Future Functional Classification The future functional classification analysis was developed to address Otter Tail County’s future system needs, especially as they pertain to system preservation issues. It was completed by evaluating the current functional classification system, assessing anticipated changes in land use and development patterns, addressing inconsistencies and misaligned routes related to established guidelines, and providing appropriate connections to adjacent counties.
The recommendations of the plan created in 2015 are being carried forward in this update as recommended updates to the functional classification. These changes will help to create a system that meets the goals of the community and provides for an optimal transportation system. Figure 13 shows the recommended 2040 functional classification of roadways throughout the County.
Future Jurisdictional Classification The goal of the Otter Tail County jurisdiction realignment analysis was to match the management of roadways with their intended future function and with the jurisdiction best suited to maintain them. The result is an efficient and economical use of citizen tax dollars and an appropriately aligned county highway system. Jurisdictional realignment (reducing county system size) was one of the specific system preservation strategies identified by the County Board that the Plan should investigate.
Jurisdictional transfers have been completed in Fergus Falls, but there are additional transfers suggested across the county. Additional transfers beyond these can help to right size the roadways throughout the County and allow the County to better manage and fund improvements. These suggested jurisdictional transfers are shown in Figure 14, Figure 15, and Table 5.
!"b$
!"b$
)r
)r)m
)m
?}A@
?}A@?}A@
?êA@
?êA@
?êA@
?}A@
?ÿA@
?ÂA@
?ÂA@
?ÂA@
?ÆA@
?aA@?aA@
?aA@
Becker County
Clay County
Wilki
n Cou
nty
Grant County Douglas County
Todd
Cou
ntyWa
dena
Cou
nty
G¢WX
GhWX
G£WX
Lake Lida
Otter Tail Lake
West Battle Lake
Rush Lake
Dead Lake
Big Pine Lake
Pelican Lake
Tenmile Lake
GyWX GyWX
GbWXGvWX
G|WXGuWX
GâWXGiWX
G|WX
GWX
GWX
)r
Sê
GaWX
GaWX
GoWX
GWX
G¥WXG¡WX G§WX
G§WXG©WX
G¹WX
GkWX
GÜWX
G§WXG³WX
GWX
GrWX
GnWXG¤WX
GÔWX
Sí
GÝWX
SïGdWX
GªWX
GdWX
GpWX
GªWX
SðGWXGÏWX
GÑWX
G±WX
G¬WX
G¬WX
GÅWX
GáWX
GeWX
GËWX
GÕWX
GÓWX
G¼WX
?aA@
G¼WX
?aA@ G¾WX
G×WX
GÇWX
GÀWXGÍWX
GnWX
GÕWX
GÖWX
GÎWXGsWX
GsWX
GÍWX
GgWXGgWX
G¿WX
GlWX
GÆWX
G½WX
G§WXGßWX
G¦WX
GWX
GqWX
GcWX
GcWX
G°WX
G»WXGÂWX
Fergus Falls
WadenaOttertail
Perham
Henning
Deer Creek
BlufftonRothsay
Vergas
Vining
Pelican Rapids
Frazee
Richville
Battle Lake
Urbank
New York Mills
Parkers Prairie
Erhard
Dent
Underwood
Elizabeth
Dalton
Clitherall
Maplewood
Glendalough
Inspiration Peak
37
22
40
25
4
8
39
24
273
21
29
35
3630
2
31
15
12
14
19
23
5
7
28
18
26
33
38 13
32
17
16
34
11
9
1
20
10
6
Future FunctionalClassification by 2040
Principal ArterialMinor ArterialMajor CollectorMinor CollectorLocalProposed Changes
County BoundaryRailroadsCentral Lakes State TrailState Aid CitiesNon-State Aid CitiesState Parks
2040 Transportation Plan
[0 5 102.5
Miles
# Route Identification
Figure 13Future Functional Classification
!"b$
!"b$
)r
)r)m
)m
?}A@
?}A@?}A@
?êA@
?êA@
?êA@
?}A@
?ÿA@
?ÂA@
?ÂA@
?ÂA@
?ÆA@
?aA@?aA@
?aA@
Becker County
Clay County
Wilik
in Co
unty
Grant County Douglas County
Todd
Cou
nty
Wade
na C
ounty
G¢WX
GhWX
G£WX
Lake Lida
Otter Tail Lake
West Battle Lake
Rush Lake
Dead Lake
Big Pine Lake
Pelican Lake
Tenmile Lake
GyWX GyWX
GbWXGvWX
G|WXGuWX
GâWXGiWX
G|WX
GWX
GWX
)r
Sê
GaWX
GaWX
GoWX
GWX
G¥WXG¡WX G§WX
G§WXG©WX
G¹WX
GkWX
GÜWX
G§WXG³WX
GWX
GrWX
GnWXG¤WX
GÔWX
Sí
GÝWX
SïGdWX
GªWX
GdWX
GpWX
GªWX
Sð GWXGÏWX
GÑWX
G±WX
G¬WX
G¬WX
GÅWX
GáWX
GeWX
GËWX
GÕWX
GÓWX
G¼WX
?aA@
G¼WX
?aA@ G¾WX
G×WX
GÇWX
GÀWXGÍWX
GnWX
GÕWX
GÖWX
GÎWXGsWX
GsWX
GÍWX
GgWXGgWX
G¿WX
GlWX
GÆWX
G½WX
G§WXGßWX
G¦WX
GWX
GqWX
GcWX
GcWX
G°WX
G»WXGÂWX
Fergus Falls
WadenaOttertail
Perham
Henning
Deer Creek
BlufftonRothsay
Vergas
Vining
Pelican Rapids
Frazee
Richville
Battle Lake
Urbank
New York Mills
Parkers Prairie
Erhard
Dent
Underwood
Elizabeth
Dalton
Clitherall
Maplewood
Glendalough
Inspiration Peak
52
23
9
27 18
25
12
19
16
28
17
21
22
26
24
6
38
10
36
14
41
37
50
29
32
20
4049
34
11
15
43
5
44
53
5113
33
42
45
31
7
30
39
4 35
8
Future RoadwayJurisdiction by 2040
Interstate HighwayUS HighwayState HighwayCounty RoadwaysTownshipCity or OtherLocalProposed Change
County BoundaryRailroadsCentral Lakes State TrailState Aid CitiesNon-State Aid CitiesState Parks
2040 Transportation Plan
[0 5 102.5
Miles
# Route Identification
Figure 14Future JurisdictionalClassification
GhWX
?aA@
)r
2528
Future RoadwayJurisdiction by 2040
Interstate HighwayUS HighwayState HighwayCounty RoadwaysTownshipCity or OtherLocalProposed Change
County BoundaryRailroadsCentral Lakes State TrailState Aid CitiesNon-State Aid CitiesState Parks
2040 Transportation Plan
[0 0.6 1.20.3
Miles
# Route Identification
?}A@
G¡WX
!"b$
GoWX
?}A@
GâWX G|WX
GWX
GWX
-T111
)mGÍWX
GÂWX
18
1723
)m
?êA@
G½WX
G¦WX
GgWX
26 614
15
Figure 15Future Jurisdictional Classification (Cities)
Pelican Rapids Fergus Falls
New York Mills Perham
Existing Jurisdiction
Future Jurisdiction
State County Township CityExisting
Functional ClassFuture
Functional Class
1 CSAH 1 CSAH MSAS 1.2 -1.2 1.2 Minor Arterial Minor Arterial 3,850 7 Transfer to be completed in 2019
2 CSAH 1 CSAH MSAS 1.8 -1.8 1.8 Minor Arterial Minor Arterial 6,500 9 Transfer to be completed in 2019
3 CSAH 25 CSAH MSAS 1.1 -1.1 1.1 Minor Arterial Minor Arterial 4,450 9 Transfer to be completed in 2019
4 CH 121 CSAH Western Township 5.0 -5.0 5.0 Rural Local Rural Local 60 7 Short route / No continuity / Low ADT
5 CSAH 48 CSAH Woodside Township 3.0 -3.0 3.0 Rural Local Rural Local 85 7 Short route / Limited continuity / Low ADT
6 CSAH 51 CSAH City of Perham 0.1 -0.1 0.1 Minor Collector Minor Collector 1,600 - Short route / Limited connectivity / Route spans less than one mile
7 CSAH 58 CSAHHomestead & Blowers
Township9.1 -9.1 9.1 Rural Local Rural Local 140 7 Limited east-west connectivity / indirect, circuitous route
8 CSAH 62 CSAH Butler & Paddock Township 4.9 -4.9 4.9 Rural Local Rural Local 190 7 Limited east-west connectivity
9 CSAH 65 CSAH City of Henning 0.8 -0.8 0.8 Rural Local Rural Local 840 - Limited north-south connectivity
10 CSAH 67 CSAH City of Henning 1.5 -1.5 1.5 Rural Local Rural Local 1,050 7 Limited local connectivity / Short route
11 CSAH 71 CSAH Eastern Township 1.9 -1.9 1.9 Rural Local Rural Local 200 7 Short route / indirect, circuitous route
12 CSAH 77 CSAH City of Bluffton 0.3 -0.3 0.3 Minor Collector Minor Collector 310 9 Low ADT / Limited connectivity / Serves local trips / Route spans less than one mile
13 CSAH 79 CSAH Parkers Prairie Township 3.3 -3.3 3.3 Rural Local Rural Local 155 7 Short route / Limited continuity / Low ADT
14 CSAH 80 CSAH City of Perham 1.7 -1.7 1.7 Major Collector Major Collector 8,800 10 Limited connectivity / Serves local trips
15 CSAH 80 CSAH Perham Township 4.2 -4.2 4.2 Major Collector Major Collector 3,550 10 Limited connectivity / Serves local trips
16 CSAH 81 CSAH Eagle Lake Township 6.1 -6.1 6.1 Rural Local Rural Local 175 7 Segment provides limited connectivity / Low ADT
17 CSAH 84 CSAH Newton Township 1.3 -1.3 1.3 Rural Local Rural Local 1,300 10 Limited connectivity / Serves local trips / Short segment
18 CSAH 84 CSAH City of New York Mills 1.0 -1.0 1.0 Rural Local Rural Local 2,300 10 Limited connectivity / Serves local trips
19 CSAH 89 CSAH City of Battle Lake 1.3 -1.3 1.3 Rural Local Rural Local 1,100 7 Limited local connectivity / Short route
20 CSAH 89 CSAH Everts Township 0.4 -0.4 0.4 Rural Local Rural Local 205 7 Limited local connectivity / Short route / Route spans less than one mile
21 CSAH 90 CSAH City of Battle Lake 0.3 -0.3 0.3 Rural Local Rural Local 650 - Limited local connectivity / Short route / Route spans less than one mile
22 CSAH 91 CSAH City of Dent 0.1 -0.1 0.1 Rural Local Rural Local 570 - Limited local connectivity / Short route / Route spans less than one mile
23 CSAH 94 CSAH City of New York Mills 0.1 -0.1 0.1 Rural Local Rural Local 920 - Limited local connectivity / Short route / Route spans less than one mile
24 CSAH 95 CSAH City of Parkers Prairie 0.1 -0.1 0.1 Rural Local Rural Local 580 - Limited local connectivity / Short route / Route spans less than one mile
Table 5. Otter Tail County Proposed Future Roadway Jurisdiction Changes
Weight Limit (Tons)
Rationale# Route
Jurisdiction
Length
Net Miles Gained/Lost Functional ClassificationExisting
ADT
Transfer from County to Fergus Falls
Transfer from County (CSAH) to City/Township
Existing Jurisdiction
Future Jurisdiction
State County Township CityExisting
Functional ClassFuture
Functional Class
Table 5. Otter Tail County Proposed Future Roadway Jurisdiction Changes
Weight Limit (Tons)
Rationale# Route
Jurisdiction
Length
Net Miles Gained/Lost Functional ClassificationExisting
ADT
25 CSAH 96 CSAH City of Pelican Rapids 0.2 -0.2 0.2 Rural Local Rural Local 1,600 - Limited local connectivity / Short route / Route spans less than one mile
26 CSAH 98 CSAH City of Perham 0.2 -0.2 0.2 Rural Local Rural Local 2,000 - Limited local connectivity / Short route / Route spans less than one mile
27 CSAH 99 CSAH City of Richville 0.1 -0.1 0.1 Rural Local Rural Local 375 - Limited local connectivity / Short route / Route spans less than one mile
28 CSAH 100 CSAH City of Pelican Rapids 0.3 -0.3 0.3 Rural Local Rural Local 650 - Short route / Limited continuity / Low ADT / Route spans less than one mile
29 CSAH 22 CSAH Elizabeth Township 3.4 -3.4 3.4 Rural Local Rural Local 650 - Limited local connectivity / Short route
30 CH 110 CH Aastad Township 5.0 -5.0 5.0 Rural Local Rural Local 95 7 Short route / No continuity / Low ADT
31 CH 112 CH Western & Aastad Township 3.9 -3.9 3.9 Rural Local Rural Local 135 7 Short route / indirect, circuitous route
32 CH 117 CH St. Olaf Township 5.0 -5.0 5.0 Rural Local Rural Local 185 7 Short route / indirect, circuitous route
33 CH 118 CH Oscar & Elizabeth Township 3.4 -3.4 3.4 Rural Local Rural Local 130 7 Short, discontinuous east-west route
34 CH 123 CH Edna Township 2.9 -2.9 2.9 Rural Local Rural Local 205 7 Short route / No continuity / Low ADT
35 CH 126 CH St. Olaf & Eagle Lake Township 4.2 -4.2 4.2 Rural Local Rural Local 105 9 Short route / indirect, circuitous route
36 CH 130 CH Candor Township 1.6 -1.6 1.6 Rural Local Rural Local 260 7 Short, discontinuous east-west route
37 CH 131 CH Edna Township 1.5 -1.5 1.5 Rural Local Rural Local 100 - Short route / Limited continuity / Low ADT
38 CH 134 CHElmo, Folden, Henning & Inman
Townships7.0 -7.0 7.0 Rural Local Rural Local 130 7 Short route / Limited continuity / Low ADT
39 CH 135 CH Newton & Deer Creek Township 3.1 -3.1 3.1 Rural Local Rural Local 115 9 Short route / Limited continuity / Low ADT
40 CH 136 CH Elmo Township 7.4 -7.4 7.4 Rural Local Rural Local 105 7 Low ADT / Limited connectivity / Serves local trips
41 CH 138 CHWoodside, Eastern & Parkers
Prairie Township7.2 -7.2 7.2 Rural Local Rural Local 115 7 Short route / No continuity / Low ADT
42 CH 139 CH Parkers Prairie Township 0.7 -0.7 0.7 Rural Local Rural Local 40 7 Short route / No continuity / Low ADT
43 CH 140 CH Inman Township 4.2 -4.2 4.2 Rural Local Rural Local 145 7 Short route / Limited continuity / Low ADT
44 CH 146 CH Corliss Township 3.0 -3.0 3.0 Rural Local Rural Local 95 5 Limited east-west connectivity / indirect, circuitous route / low weight limit
45 CH 148 CH Butler Township 1.8 -1.8 1.8 Rural Local Rural Local 100 7 Short, discontinuous east-west route / low ATD
Transfer from County (CR) to Township
Existing Jurisdiction
Future Jurisdiction
State County Township CityExisting
Functional ClassFuture
Functional Class
Table 5. Otter Tail County Proposed Future Roadway Jurisdiction Changes
Weight Limit (Tons)
Rationale# Route
Jurisdiction
Length
Net Miles Gained/Lost Functional ClassificationExisting
ADT
46 MSAS 125 MSAS CSAH 2.0 2.0 -2.0 Local/Minor Arterial Local/Minor Arterial 6,900 - Transfer to be completed in 2019
47 MSAS 104 MSAS CSAH 1.3 1.3 -1.3 Minor Arterial Minor Arterial 4,450 10 Transfer to be completed in 2019
48 MSAS 137 MSAS CSAH 1.0 1.0 -1.0 Minor Arterial Minor Arterial 9,300 10 Transfer to be completed in 2019
49 170th Street Buse Township CH 4.3 4.3 -4.3Rural Minor
CollectorRural Minor
Collector- 7 Creates continuous, sub-regional east-west route
50 250th StreetSverdrup & Everts
TownshipCH 2.6 2.6 -2.6
Rural Minor Collector
Rural Minor Collector
- 0 Creates continuous, sub-regional east-west route
51 625th Avenue Eastern Township CSAH 1.2 1.2 -1.2 Rural LocalRural Minor
Collector- 7 Creates sub-regional north-south mobility / provides more direct route
52 Jewett Lake Road Elizabeth Township CSAH 1.8 1.8 -1.8 Rural LocalRural Minor
Collector- 0 Creates sub-regional east-west mobility / provides more direct route
53 Reed Creek Road Elizabeth Township CSAH 2.2 2.2 -2.2 Rural LocalRural Minor
Collector- 0 Creates sub-regional east-west mobility / provides more direct route
Transfer from Township to County (CSAH)
Transfer from Fergus Falls to County (CSAH)
Transfer from Township to County (CR)
Otter Tail County 2040 Transportation Plan Update (2019)
26
Financial & Performance Analysis The main objective of this analysis was to determine how the County’s maintenance practices and current level of funding would affect the condition of the system over time.
System Management Pavement management is the process of timing roadway maintenance to prolong pavement life and optimize funding. Current pavement conditions were evaluated to gain a better understanding of current pavement conditions to aid in the identification of potential needs.
Since the completion of the Transportation Plan in 2015, Otter Tail County implemented a tiered preservation system to optimize how funding is allocated for their paved roadways. The system priorities include: preventing “fair” condition roads from falling into “poor condition” by avoiding a worst-first approach and to prioritize preservation strategies over reconstruction fixes. The tiered preservation system has helped optimize funding for highly used roads throughout the County, however there are roads in the system that are below their pavement quality goals.
Transportation Funding Since the completion of the Transportation Plan in 2015, Otter Tail County has implemented a wheelage tax and a local option sales tax. Funds from both sources are used for pavement preservation and management.
Additionally, Otter Tail County is seeking new funding opportunities and continues to review future projects on an annual basis.
Current Investment Scenario The County currently spends approximately $14.4 million (average over the next 10 years) per year for the reconstruction and maintenance of the pavement network. At this level of funding, the overall average Pavement Quality Index (PQI) is expected to decay from an average of 73 to an average of 61 in 10 years.
Figure 16 provides a graphical depiction of the County’s current annual funding, plus funding generated by the wheelage and sales tax options. In 2020, the county is projected to have $28.3 million in funding for all pavement preservation and reconstruction projects. This drops to $13.3 million in 2021 because funding from bonds are no longer contributing to the program and there is less state aid money available.
Otter Tail County 2040 Transportation Plan Update (2019)
27
Figure 16. Annual Funding Levels
$0
$4,000,000
$8,000,000
$12,000,000
$16,000,000
$20,000,000
$24,000,000
$28,000,000
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039
State Aid Wheelage Tax Sales Tax (double by 2039) Bonding Federal Aid Bridge
Otter Tail County 2040 Transportation Plan Update (2019)
28
Current Pavement Condition by Tier
As mentioned previously, the County funds its preservation projects based on its Tiered Preservation System. The County has set PQI goals for each tier within the Tiered Preservation System. The projected 2020 PQI for each tier is shown in Figure 17 along with the goal established for each tier. Overall, the system is projected to be very close to its goals for each tier in 2020.
Figure 17. Projected 2020 PQI by Tier
Projected Pavement Condition by Tier
The 2028 average PQI by tier as compared to the goal set for each is presented in Figure 18. As shown, only the platinum roadways will meet their set PQI goal under the current investment scenario. In order to meet the PQI goals for all roadway tiers, additional funding is necessary or an adjustment to the tiered preservation strategy is needed.
Figure 18. Average PQI by Tier in 2028
Financial Gap
As shown above, the PQI goals established by the County will not be met under the current investment scenario. In order to meet these goals, it was estimated that an additional $7 million is needed each year, on average, for the next 10 years. This is displayed in Figure 19.
It should also be noted that the 2017 PQI data for the County showed an overall improvement in the system due to the new rating process being used by MnDOT. Following MnDOT’s two-year survey cycle, the County will be receiving 2019 PQI data from MnDOT sometime in 2020. That data set will provide a second condition data point that follows the new rating process. This will provide a better understanding of the current rating process and pavement condition trends within the County. Depending on that data, the funding gap may or may not be larger than currently shown. However, it should be noted that the gap will continue to increase each year as pavement conditions deteriorate and the cost of preservation projects increases.
63 (Goal 60)
69 (Goal 70)
74 (Goal 75)
77 (Goal 80)
0 20 40 60 80 100
Bronze
Silver
Gold
Platinum
40 (Goal 60)
51 (Goal 70)
66 (Goal 75)
83 (Goal 80)
0 20 40 60 80 100
Bronze
Silver
Gold
Platinum
Otter Tail County 2040 Transportation Plan Update (2019)
29
Figure 19. Financial Gap Analysis
$-
$5,000
$10,000
$15,000
$20,000
$25,000
$30,000
$35,000
$40,000
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039
Current Funding $K Gap $K
Otter Tail County 2040 Transportation Plan Update (2019)
30
Project Identification During the creation of the Transportation Plan in 2015, a number of future system improvements were identified for Otter Tail County. Many of these projects were completed and the remaining projects identified in the plan are recommended for completion in this update. The current County Improvement Plan (CIP) goes through 2025 and a summary of this plan is in Table 6. Projects were categorized as either a bridge, reconstruction, resurfacing, or seal coat project.
Multimodal Transportation
Multimodal transportation projects, including bicycling, walking and others, are identified and planned in the 2017 County-Wide Trail Master Plan. The Plan will recommend and prioritize trail projects for future programming decisions, either as independent projects, or in concert with scheduled and appropriate highway projects.
Future Program of Projects
Using the tiered preservation system, established performance targets, the County’s pavement management system, the previously identified list of project needs and updated revenue forecasts, County staff prioritized various pavement, bridge, safety, etc. projects. This program of projects is expected to be implemented over the next seven years.
It is understood that the County staff and County Board will annually review the program’s progress, evaluate the current funding situation, and prepare both an annual and an updated long-term CIP. The prioritization process, the draft CIP and project maps will be presented to the public for comment and revisions prior to each programming year. The current Transportation Program project list is illustrated on Figure 20 and shown in Table 7.
Otter Tail County 2040 Transportation Plan Update (2019)
31
Table 6. Summary of Future Roadway /Bridge Preservation Projects
PROGRAM COST BY TYPE OF WORK ($1,000)
YEAR
2019 2020 2021 2022 2023 2024 2025
PLA
TIN
UM
BRIDGE $710 $1,490 RECONSTRUCTION $8,930 $8,364 $3,905 $4,821 $3,854 RESURFACING $3,081 $4,619 $4,788 $4,559 $4,081 $7,950 $7,587
SEAL COST $823 $641 $541 $695 $878 $1,484 $937
GO
LD
BRIDGE $317
RECONSTRUCTION $4,497 $1,721
RESURFACING $1,099 $4,844 $3,066 SEAL COST $646 $567 $218 $624 $411
SIL
VE
R
BRIDGE $1,071 $750 $500
RECONSTRUCTION $461 $2,137
RESURFACING $725 SEAL COST $111 $319 $4 $54 $86
BR
ON
ZE
BRIDGE RECONSTRUCTION RESURFACING $748 $2,979 SEAL COST $32 $216
!"b$
!"b$
)r
)r)m
)m
?}A@
?}A@?}A@
?êA@
?êA@
?êA@
?}A@
?ÿA@
?ÂA@
?ÂA@
?ÂA@
?ÆA@
?aA@?aA@
?aA@
Becker County
Clay County
Wilki
n Cou
nty
Grant County Douglas County
Todd
Cou
ntyWa
dena
Cou
nty
G¢WX
GhWX
G£WX
Lake Lida
Otter Tail Lake
West Battle Lake
Rush Lake
Dead Lake
Big Pine Lake
Pelican Lake
Tenmile Lake
GyWX GyWX
GbWXGvWX
G|WXGuWX
GâWXGiWX
G|WX
GWX
GWX
)r
Sê
GaWX
GaWX
GoWX
GWX
G¥WXG¡WX G§WX
G§WXG©WX
G¹WX
GkWX
GÜWX
G§WXG³WX
GWX
GrWX
GnWXG¤WX
GÔWX
Sí
GÝWX
SïGdWX
GªWX
GdWX
GpWX
GªWX
SðGWXGÏWX
GÑWX
G±WX
G¬WX
G¬WX
GÅWX
GáWX
GeWX
GËWX
GÕWX
GÓWX
G¼WX
?aA@
G¼WX
?aA@ G¾WX
G×WX
GÇWX
GÀWXGÍWX
GnWX
GÕWX
GÖWX
GÎWXGsWX
GsWX
GÍWX
GgWXGgWX
G¿WX
GlWX
GÆWX
G½WX
G§WXGßWX
G¦WX
GWX
GqWX
GcWX
GcWX
G°WX
G»WXGÂWX
Fergus Falls
WadenaOttertail
Perham
Henning
Deer Creek
BlufftonRothsay
Vergas
Vining
Pelican Rapids
Frazee
Richville
Battle Lake
Urbank
New York Mills
Parkers Prairie
Erhard
Dent
Underwood
Elizabeth
Dalton
Clitherall
Maplewood
Glendalough
Inspiration Peak
Bridge Projects (Year)20202021202220232025
Road Projects (Year)2019202020212022202320242025
Type of WorkReconstructionResurfacingSeal CoatCounty BoundaryRailroadsState Aid CitiesNon-State Aid CitiesState Parks
2040 Transportation Plan
[0 5 102.5
Miles
Figure 20Otter Tail County2019-2025Transportation Program
GISID Year Route From To Tier Length (mi) Type of WorkUpdated Cost
$KCurrent ADT (2015)
601-030 2019 CSAH 1 I 94 0.2 MI N Platinum 0.2 Seal Coat $4.01 2,500
125-003 2019 CSAH 1 TOWER ROAD - CSAH 15 WESTSIDE DRIVE Platinum 0.2 Seal Coat $4.53 4,500
125-004 2019 CSAH 1 WESTSIDE DRIVE OTTERTAIL DRIVE Platinum 0.2 Seal Coat $5.03 4,500
125-005 2019 CSAH 1 TOWER ROAD - OTTERTAIL DRIVE WESTERN AVE. Platinum 0.2 Seal Coat $7.30 4,500
125-007 2019 CSAH 1 TOWER ROAD - WESTERN AVE. LINCOLN AVE. Platinum 0.1 Seal Coat $3.07 4,500
104-110 2019 CSAH 1 FIR AVE. - TOWER ROAD TH297 (WEST JCT.) Platinum 0.4 Resurfacing $200.75 4,350
104-100 2019 CSAH 1 TH297 (WEST JCT.) UNION AVE. Platinum 0.1 Resurfacing $55.76 6,400
601-160 2019 CSAH 1 0.1 MI E OF CSAH 10 CSAH 35 Platinum 5.7 Reconstruction $6,565.74 2,400
601-180 2019 CSAH 1 1.9 M S OF AMOR 0.8 MI E JCT CSAH 14 Platinum 5.0 Seal Coat $88.52 1,300
608-050 2019 CSAH 8 CSAH 53 0.1 M E OF CSAH 53 Platinum 0.1 Seal Coat $1.63 640
608-051 2019 CSAH 8 0.1 MI E CSAH 53 CSAH 67 Platinum 4.9 Seal Coat $79.69 640
608-060 2019 CSAH 8 CSAH 67 CSAH 19 W JCT Platinum 4.6 Seal Coat $81.61 610
608-070 2019 CSAH 8 W JCT OF CSAH 19 E CO LINE Platinum 4.7 Seal Coat $83.38 950
609-010 2019 CSAH 9 TH 59 N LIM OF PELICAN RAPIDS Platinum 0.5 Seal Coat $7.32 2,000
609-020 2019 CSAH 9 NO LIM PELICAN RAPIDS TH 34 Platinum 5.0 Seal Coat $88.70 1,300
625-023 2019 CSAH 25 0.3 MI S OF INT 94 INT 94 Silver 0.3 Seal Coat $6.21 335
631-040 2019 CSAH 31 TH 59 1.7 MI NORTH Platinum 1.7 Seal Coat $27.65 400
631-050 2019 CSAH 31 1.7 MI N OF TH 59 CSAH 20 Platinum 1.4 Seal Coat $22.77 790
646-020 2019 CSAH 46 SOO LINE RR 0.16 MI E Platinum 0.2 Resurfacing $40.89 800
646-030 2019 CSAH 46 0.16 MI E OF SOO LINE RR E LIM PARKERS PRAIRIE Platinum 0.1 Resurfacing $23.00 800
Table 7. Otter Tail County 2019-2025 Transportation Program
2019
Page 1 of 18
GISID Year Route From To Tier Length (mi) Type of WorkUpdated Cost
$KCurrent ADT (2015)
Table 7. Otter Tail County 2019-2025 Transportation Program
646-040 2019 CSAH 46 E LIM PARKERS PRAIRIE 3.1 MI E Platinum 3.1 Resurfacing $792.21 800
646-050 2019 CSAH 46 3.1 MI 3.7 MI E OF E LIM PARKERS PRAIRIE Platinum 0.6 Resurfacing $174.24 590
646-060 2019 CSAH 46 3.7 MI E OF E LIM PARKERS PRAIRIE CSAH 69 Platinum 1.7 Resurfacing $434.44 300
646-070 2019 CSAH 46 CSAH 69 E CO LINE Gold 4.3 Resurfacing $1,098.87 300
661-010 2019 CSAH 61 CSAH 16 5.9 MI NORTH Silver 5.9 Seal Coat $104.67 160
682-040 2019 CSAH 82 N RAMP FAI 94 S LIMS FERGUS FALLS Platinum 2.6 Seal Coat $103.78 2,200
682-050 2019 CSAH 82 S LIMS FERGUS FALLS TH 210 Platinum 2.0 Seal Coat $125.16 5,200
104-120 2019 CSAH 88 FIR AVE. - TOWER ROAD INDUSTRIAL PARK BLVD. Platinum 0.4 Resurfacing $238.31 4,350
104-130 2019 CSAH 88 FIR AVE. - INDUSTRIAL PARK BLVD. MARYLAND LANE Platinum 0.3 Resurfacing $188.18 4,350
104-140 2019 CSAH 88 FIR AVE. - MARYLAND LANE NORTH CITY LIMITS Platinum 0.1 Resurfacing $69.02 4,350
688-010 2019 CSAH 88 LIMS FERGUS FALLS W RAMP FAI 94 Platinum 3.1 Resurfacing $864.23 2,800
688-020 2019 CSAH 88 FAI 94 JCT CSAH 10 Platinum 5.0 Seal Coat $88.70 600
689-010 2019 CSAH 89 TH 78 0.94 MI N Platinum 0.9 Reconstruction $1,939.97 820
689-020 2019 CSAH 89 0.94 MI N OF TH 78 N LIM BATTLE LAKE Platinum 0.3 Reconstruction $424.28 230
689-030 2019 CSAH 89 N LIM BATTLE LAKE CSAH 16 Silver 0.4 Reconstruction $460.75 230
137-010 2020 CSAH 1 FIR AVE.- UNION TH 297 (EAST JCT.) Platinum 0.1 Seal Coat $2.99 310
137-020 2020 CSAH 1 FIR AVE.- TH 297 PARK ST. Platinum 0.1 Seal Coat $2.34 9,000
137-030 2020 CSAH 1 FIR AVE.- PARK CLEVELAND Platinum 0.3 Seal Coat $8.98 9,000
137-040 2020 CSAH 1 CLEVELAND FRIBERG AVE. Platinum 0.7 Seal Coat $23.03 6,200
601-190 2020 CSAH 1 0.8 MI E JCT CSAH 14 N LIM OTTERTAIL CITY Platinum 4.6 Resurfacing $1,347.29 1,450
2020
Page 2 of 18
GISID Year Route From To Tier Length (mi) Type of WorkUpdated Cost
$KCurrent ADT (2015)
Table 7. Otter Tail County 2019-2025 Transportation Program
601-200 2020 CSAH 1 N LIM OTTERTAIL CITY TH 78 Platinum 0.8 Resurfacing $405.42 1,850
605-010 2020 CSAH 5 JCT CSAH 38 180th ST Silver 6.8 Seal Coat $129.56 270
605-015 2020 CSAH 5 180th ST NEW TH 210 Platinum 3.2 Seal Coat $60.52 680
605-020 2020 CSAH 5 JCT NEW TH 210 N OLD TH 210 Platinum 0.1 Resurfacing $14.45 270
605-030 2020 CSAH 5 OAK ST FROM OLD TH 210 CEDAR ST Platinum 0.3 Resurfacing $72.55 740
605-040 2020 CSAH 5 ON MAIN - CEDAR CENTRAL AVE Platinum 0.2 Resurfacing $69.65 740
605-050 2020 CSAH 5 CENTRAL AVE N LIM CLITHERALL Platinum 0.1 Resurfacing $15.96 740
605-060 2020 CSAH 5 NO LIM OF CLITHERALL 1.7 MI NO Gold 1.7 Resurfacing $452.21 740
605-061 2020 CSAH 5 1.7 MI NO 2.7 MI NO OF NO LIM CLITHERALL Gold 1.0 Resurfacing $266.01 710
605-062 2020 CSAH 5 2.7 MI NO OF NO LIM CLITHERALL CSAH 16 Gold 2.0 Resurfacing $532.01 430
606-020 2020 CSAH 6 CSAH 65 TH 29 Gold 4.1 Seal Coat $71.44 580
608-030 2020 CSAH 8 Bridge 56501 Platinum 0.0 Bridge $709.82 2,250
609-030 2020 CSAH 9 TH 34 3.0 MI NO Platinum 3.0 Seal Coat $57.02 810
609-040 2020 CSAH 9 3.0 MI NO OF TH 34 400' NO OF CSAH 20 Platinum 1.7 Seal Coat $32.31 1,150
609-050 2020 CSAH 9 400' NO CSAH 20 NO CO LINE Platinum 0.5 Seal Coat $9.50 1,350
610-070 2020 CSAH 10 E LIMS ELIZABETH O.2 MI W CSAH 3 Platinum 6.2 Seal Coat $108.03 920
610-071 2020 CSAH 10 0.2 MI W CSAH 3 CSAH 1 Platinum 0.3 Seal Coat $5.70 920
611-040 2020 CSAH 11 CSAH 88 FAI 94 Platinum 0.3 Seal Coat $8.62 1,650
611-041 2020 CSAH 11 FAI 94 NO CORP LIMITS OF ROTHSAY Platinum 0.2 Seal Coat $2.85 360
613-005 2020 CSAH 13 CSAH 8 CSAH 60 Platinum 1.5 Resurfacing $439.68 860
Page 3 of 18
GISID Year Route From To Tier Length (mi) Type of WorkUpdated Cost
$KCurrent ADT (2015)
Table 7. Otter Tail County 2019-2025 Transportation Program
613-010 2020 CSAH 13 CSAH 60 NORTH COUNTY LINE Gold 3.6 Resurfacing $1,040.28 860
615-030 2020 CSAH 15 Bridge 7267 Silver 0.0 Bridge $1,070.90 600
616-051 2020 CSAH 16 CSAH 55 0.8 M EAST of CSAH 55 Platinum 0.8 Seal Coat $25.30 850
616-052 2020 CSAH 16 0.8 M EAST OF CSAH 55 TH 108 Platinum 3.3 Seal Coat $104.54 850
619-040 2020 CSAH 19 CSAH 76 CSAH 8 Silver 8.9 Seal Coat $169.17 325
624-090 2020 CSAH 24 CSAH 3 CSAH 41 Gold 7.4 Seal Coat $146.52 365
634-010 2020 CSAH 34 CSAH 35 3.2 MILES EAST Platinum 3.2 Reconstruction $3,378.86 730
634-020 2020 CSAH 34 3.2 MI E OF CSAH 35 2.3 MI W OF W LIM PERHAM Platinum 1.3 Reconstruction $1,372.66 1,150
634-021 2020 CSAH 34 2.3 MI W 0.3 MI W OF W LIM PERHAM Platinum 2.0 Reconstruction $2,111.79 1,550
635-110 2020 CSAH 35 CSAH 1 0.1 MI N OF CO RD 115 Platinum 6.6 Resurfacing $1,915.25 1,050
635-120 2020 CSAH 35 0.1 MI N CO RD 115 CSAH 41 Platinum 1.0 Resurfacing $338.55 900
638-051 2020 CSAH 38 CSAH 59 TH 29 Gold 10.0 Seal Coat $349.42 370
651-042 2020 CSAH 51 W JCT E JCT CSAH 60 Platinum 1.0 Seal Coat $19.80 610
651-050 2020 CSAH 51 CSAH 60 1.4 MI NORTH Gold 1.4 Seal Coat $26.61 345
651-060 2020 CSAH 51 1.4 MI N OF CSAH 60 N CO LINE Gold 2.0 Seal Coat $38.02 210
654-010 2020 CSAH 54 TH 78 CH 127 Gold 2.0 Resurfacing $580.40 690
665-020 2020 CSAH 65 CSAH 40 3.1 MI NORTH Platinum 3.1 Seal Coat $58.92 455
665-030 2020 CSAH 65 3.1 M N CSAH 40 S LIM HENNING Platinum 2.2 Seal Coat $45.30 455
665-040 2020 CSAH 65 S LIM HENNING CSAH 67 Platinum 0.5 Seal Coat $11.12 600
667-040 2020 CSAH 67 CSAH 50 CSAH 52 Gold 2.5 Resurfacing $725.47 290
Page 4 of 18
GISID Year Route From To Tier Length (mi) Type of WorkUpdated Cost
$KCurrent ADT (2015)
Table 7. Otter Tail County 2019-2025 Transportation Program
667-050 2020 CSAH 67 CSAH 52 CSAH 54 Gold 3.0 Resurfacing $870.57 600
670-010 2020 CSAH 70 CSAH 75 E CO LINE Silver 1.0 Seal Coat $19.80 200
672-010 2020 CSAH 72 TH 78 1.0 MI NW Platinum 1.0 Seal Coat $17.42 1,250
672-020 2020 CSAH 72 1.0 MI 1.5 MI NW TH 78 Platinum 0.5 Seal Coat $9.50 1,250
672-030 2020 CSAH 72 1.5 MI NW OF TH 78 2.5 MI NW OF TH 78 Platinum 1.0 Seal Coat $17.42 650
672-040 2020 CSAH 72 2.5 MI NW TH 78 CSAH 83 Gold 0.8 Seal Coat $13.94 650
688-050 2020 CSAH 88 CSAH 24 0.20 MI N Platinum 0.2 Seal Coat $4.75 485
694-010 2020 CSAH 94 ON MAIN ST FROM FRONT ST PARK ST Platinum 0.1 Seal Coat $3.22 920
695-010 2020 CSAH 95 VARIOUS STREETS IN PARKERS PRAIRIE Platinum 0.1 Reconstruction $349.27 640
696-010 2020 CSAH 96 1ST ST IN PELICAN RPDS Platinum 0.1 Reconstruction $307.36 1,500
696-020 2020 CSAH 96 MILL AVE IN PELICAN RPDS Platinum 0.1 Reconstruction $187.61 1,150
700-010 2020 CH 100 BROADWAY GRANT Platinum 0.1 Reconstruction $140.71 740
700-020 2020 CH 100 GRANT OTTERTAIL TO BROADWAY Platinum 0.2 Reconstruction $515.92 660
116-011 2020 CH 116 170TH AVE TH 210 Platinum 1.4 Seal Coat $26.61 1,150
127-010 2020 CH 127 JCT TH 108 JCT CSAH 54 Silver 2.5 Resurfacing $725.47 330
129-010 2020 CH 129 JCT CSAH 38 JCT CSAH 6 Bronze 1.7 Seal Coat $32.12 170
603-010 2021 CSAH 3 CSAH 10 1.15 MILES NORTH Platinum 1.2 Seal Coat $23.32 710
603-011 2021 CSAH 3 1.15 1.55 MI N OF CSAH 10 Platinum 1.3 Seal Coat $25.34 710
603-012 2021 CSAH 3 1.55 MI N CSAH 10 0.25 MI N CSAH 22 Platinum 2.7 Seal Coat $50.18 380
603-020 2021 CSAH 3 0.25 MI N CSAH 22 1.5 M N CSAH 22 Platinum 6.5 Seal Coat $120.81 520
2021
Page 5 of 18
GISID Year Route From To Tier Length (mi) Type of WorkUpdated Cost
$KCurrent ADT (2015)
Table 7. Otter Tail County 2019-2025 Transportation Program
603-030 2021 CSAH 3 1.5 M N CSAH 22 CSAH 24 Platinum 1.0 Seal Coat $20.28 520
604-010 2021 CSAH 4 TH 59 CSAH 31 Platinum 4.2 Seal Coat $84.22 1,300
604-020 2021 CSAH 4 W LIM OF VERGAS 0.08 MI E Platinum 0.1 Seal Coat $1.62 1,300
604-021 2021 CSAH 4 0.08 MI E OF W CORP LIM PILICAN AVE Platinum 0.5 Seal Coat $9.53 2,600
604-030 2021 CSAH 4 PILICAN AVE SECOND AVE Platinum 0.3 Seal Coat $12.27 2,700
604-040 2021 CSAH 4 SECOND AVE MAIN ST VERGAS Platinum 0.1 Seal Coat $4.83 2,350
604-050 2021 CSAH 4 CSAH 60 E LIM VERGAS Platinum 0.0 Seal Coat $0.81 1,200
604-051 2021 CSAH 4 E LIM VERGAS 2.0 MI NORTH Platinum 2.0 Seal Coat $40.55 1,100
604-060 2021 CSAH 4 2.0 MI N 2.6 MI N OF E LIM VERGAS Platinum 0.6 Seal Coat $12.17 1,100
604-070 2021 CSAH 4 2.6 MI N OF E LIM VERGAS N CO LINE Platinum 2.3 Seal Coat $46.63 1,100
608-010 2021 CSAH 8 NW JCT CSAH 80 (MAIN ST) 2ND ST Platinum 0.1 Resurfacing $67.86 5,300
608-020 2021 CSAH 8 2ND ST KING ST Platinum 0.5 Resurfacing $271.43 4,900
608-029 2021 CSAH 8 KING ST NO LIM PERHAM Platinum 1.0 Resurfacing $301.59 3,650
608-030 2021 CSAH 8 NO CORP LIM PERHAM 1.9 MI NE OF PERHAM Platinum 1.9 Resurfacing $573.03 2,250
608-031 2021 CSAH 8 1.9 M N OF N LIM PERHAM 2.0 M N OF N LIM PERHAM Platinum 0.1 Resurfacing $60.32 1,800
608-032 2021 CSAH 8 2.0 M N OF N LIM PERHAM CSAH 13 Platinum 1.0 Resurfacing $452.39 1,800
608-040 2021 CSAH 8 CSAH 13 0.4 MI E Platinum 0.4 Resurfacing $120.64 1,250
608-041 2021 CSAH 8 0.4 MI E OF CSAH 13 CSAH 53 Platinum 2.6 Resurfacing $849.49 1,250
619-010 2021 CSAH 19 TH 10 ON PROSPECT ST 0.06 MI N OF 4TH ST Gold 0.2 Seal Coat $8.55 630
619-020 2021 CSAH 19 PROSPECT ST 0.32 MI NO Gold 0.3 Seal Coat $7.57 630
Page 6 of 18
GISID Year Route From To Tier Length (mi) Type of WorkUpdated Cost
$KCurrent ADT (2015)
Table 7. Otter Tail County 2019-2025 Transportation Program
624-010 2021 CSAH 24 CSAH 88 E LIM ROTHSAY Gold 0.3 Seal Coat $6.69 380
624-020 2021 CSAH 24 E CORP LIM ROTHSAY 2.3 MI EAST Gold 2.3 Seal Coat $46.63 380
624-021 2021 CSAH 24 2.3 MI 2.9 MI E OF ROTHSAY Gold 0.6 Seal Coat $12.17 380
624-022 2021 CSAH 24 2.9 MI E OF ROTHSAY 3.4 MI EAST Gold 0.5 Seal Coat $10.14 370
624-030 2021 CSAH 24 3.4 MI E OF ROTHSAY 3.8 MI EAST Gold 0.4 Seal Coat $8.79 370
624-040 2021 CSAH 24 3.8 MI E OF ROTHSAY WEST LIMITS ERHARD Gold 5.2 Seal Coat $114.22 370
624-050 2021 CSAH 24 W LIM ERHARD 0.1 MI E Gold 0.1 Seal Coat $2.20 530
624-051 2021 CSAH 24 537.8' E OF W CORP LIM LAKESIDE DRIVE Gold 0.1 Seal Coat $2.42 530
624-060 2021 CSAH 24 LAKESIDE AVE TH 59 Gold 0.1 Seal Coat $3.35 530
635-080 2021 CSAH 35 SO LIM UNDERWOOD CLEVELAND AVE Platinum 0.2 Seal Coat $4.87 2,700
635-090 2021 CSAH 35 CLEVELAND N LIMS UNDERWOOD Platinum 0.5 Seal Coat $19.01 1,900
635-100 2021 CSAH 35 N LIMS UNDERWOOD CSAH 18 Platinum 3.0 Reconstruction $3,425.56 1,300
635-110 2021 CSAH 35 Bridge 56505 Platinum 0.0 Bridge $1,215.40 1,050
644-010 2021 CSAH 44 CSAH 35 2.0 MI SOUTH Gold 2.0 Seal Coat $40.55 385
644-020 2021 CSAH 44 2.0 MI S CSAH 35 CSAH 14 Gold 3.4 Seal Coat $68.94 385
646-010 2021 CSAH 46 SOO LINE RR ON MAIN - TH 29 Platinum 0.2 Reconstruction $479.58 1,100
653-010 2021 CSAH 53 TH 10 3.7 MI N Gold 3.7 Seal Coat $75.02 510
653-020 2021 CSAH 53 3.7 MI N TH 10 CSAH 8 Gold 4.3 Seal Coat $87.18 300
667-060 2021 CSAH 67 CSAH 54 0.1 MI S OF S LIM NEW YORK MILLS Gold 3.6 Seal Coat $72.99 1,300
667-120 2021 CSAH 67 CSAH 58 S CSAH 67 Platinum 5.4 Resurfacing $1,764.32 870
Page 7 of 18
GISID Year Route From To Tier Length (mi) Type of WorkUpdated Cost
$KCurrent ADT (2015)
Table 7. Otter Tail County 2019-2025 Transportation Program
667-130 2021 CSAH 67 S JCT CSAH 67 CSAH 8 Platinum 1.0 Resurfacing $326.73 580
674-010 2021 CSAH 74 CSAH 35 1.9 MI E Platinum 1.9 Seal Coat $41.73 495
674-020 2021 CSAH 74 1.9 MI E 2.1 MI E CSAH 35 Platinum 0.2 Seal Coat $4.39 495
674-030 2021 CSAH 74 2.1 MI E 2.5 MI E CSAH 35 Platinum 0.4 Seal Coat $8.79 495
674-040 2021 CSAH 74 2.5 MI E CSAH 35 0.1 MI E CSAH 45 Platinum 0.1 Seal Coat $2.20 495
675-071 2021 CSAH 75 Bridge L0923 Platinum 0.0 Bridge $275.00 670
677-040 2021 CSAH 77 TH 10 CENTER ST Platinum 0.2 Seal Coat $4.46 520
677-050 2021 CSAH 77 CENTER ST PROSPECT ST Platinum 0.1 Seal Coat $2.60 520
131-010 2021 CH 131 CSAH 35 CSAH 35 Bronze 2.3 Resurfacing $748.07 100
601-020 2022 CSAH 1 CSAH 2 INT 94 Platinum 4.1 Reconstruction $4,821.47 1,050
104-110 2022 CSAH 1 FIR AVE. - TOWER ROAD TH297 (WEST JCT.) Platinum 0.4 Seal Coat $14.60 4,350
104-100 2022 CSAH 1 TH297 (WEST JCT.) UNION AVE. Platinum 0.1 Seal Coat $4.06 6,400
612-030 2022 CSAH 12 CEDAR ST CSAH 35 Silver 0.1 Seal Coat $4.46 1,300
627-032 2022 CSAH 27 0.5 MI N OF LIM FERGUS FALLS CSAH 10 Platinum 4.0 Seal Coat $81.10 2,200
631-010 2022 CSAH 31 CSAH 4 1.2 MI N Platinum 1.2 Seal Coat $24.33 550
631-020 2022 CSAH 31 1.2 MI 2.5 MI N CSAH 4 Platinum 1.3 Seal Coat $26.36 620
631-030 2022 CSAH 31 2.5 MI N CSAH 4 TH 59 Platinum 2.7 Seal Coat $54.74 620
635-040 2022 CSAH 35 CSAH 82 ANDERSON ST Platinum 0.3 Seal Coat $9.80 1,150
635-050 2022 CSAH 35 ANDERSON ST 0.16 MI N Platinum 0.2 Seal Coat $5.41 1,000
635-060 2022 CSAH 35 0.16 MI N ANDERSON ST N LIM OF DALTON Platinum 0.1 Seal Coat $1.67 840
2022
Page 8 of 18
GISID Year Route From To Tier Length (mi) Type of WorkUpdated Cost
$KCurrent ADT (2015)
Table 7. Otter Tail County 2019-2025 Transportation Program
635-130 2022 CSAH 35 CSAH 41 2.7 MI S OF CSAH 44 Platinum 5.5 Seal Coat $130.10 650
635-140 2022 CSAH 35 2.7 MILES SOUTH OF CSAH 44 CSAH 44 Platinum 2.7 Seal Coat $63.87 650
635-150 2022 CSAH 35 CSAH 44 S LIMITS DENT Platinum 1.1 Seal Coat $22.30 1,300
635-151 2022 CSAH 35 S LIM OF DENT 0.15 MI N Platinum 0.2 Seal Coat $5.58 1,300
635-160 2022 CSAH 35 0.15 M N OF S LIM OF DENT 3RD AVE Platinum 0.2 Seal Coat $8.18 1,300
635-170 2022 CSAH 35 3RD AVE 1ST AVE Platinum 0.2 Seal Coat $6.08 1,300
635-180 2022 CSAH 35 ON 1ST AVE - MAIN ST TH 108 Platinum 0.3 Seal Coat $11.35 1,150
635-190 2022 CSAH 35 TH 108 N LIM DENT 2.9 MI N Platinum 2.9 Resurfacing $949.34 470
635-200 2022 CSAH 35 2.9 MI 7.1 MI NW OF TH 108 Platinum 4.2 Resurfacing $1,319.92 750
635-210 2022 CSAH 35 7.1 MI NW OF TH 108 0.2 MI S OF S LIM OF VERGAS Platinum 3.5 Resurfacing $1,145.76 1,300
646-020 2022 CSAH 46 SOO LINE RR 0.16 MI E Platinum 0.2 Seal Coat $2.97 800
646-030 2022 CSAH 46 0.16 MI E OF SOO LINE RR E LIM PARKERS PRAIRIE Platinum 0.1 Seal Coat $1.67 800
646-040 2022 CSAH 46 E LIM PARKERS PRAIRIE 3.1 MI E Platinum 3.1 Seal Coat $57.62 800
646-050 2022 CSAH 46 3.1 MI 3.7 MI E OF E LIM PARKERS PRAIRIE Platinum 0.6 Seal Coat $12.67 590
646-060 2022 CSAH 46 3.7 MI E OF E LIM PARKERS PRAIRIE CSAH 69 Platinum 1.7 Seal Coat $31.60 300
646-070 2022 CSAH 46 CSAH 69 E CO LINE Gold 4.3 Seal Coat $79.92 300
655-010 2022 CSAH 55 CSAH 16 3.3 MI N Gold 3.3 Seal Coat $66.91 295
655-011 2022 CSAH 55 3.3 MI N 5.7 MI N OF CSAH 16 Gold 2.4 Seal Coat $50.69 295
655-012 2022 CSAH 55 5.7 MI N OF CSAH 16 SOUTH LIM OTTERTAIL Gold 1.0 Seal Coat $20.28 295
655-020 2022 CSAH 55 S LIMS OTTERTAIL TH 108 Platinum 1.0 Seal Coat $20.28 480
Page 9 of 18
GISID Year Route From To Tier Length (mi) Type of WorkUpdated Cost
$KCurrent ADT (2015)
Table 7. Otter Tail County 2019-2025 Transportation Program
658-010 2022 CSAH 58 CSAH 67 CSAH 19 Bronze 9.1 Resurfacing $2,978.98 225
667-008 2022 CSAH 67 CSAH 65 IN HENNING E CITY LIM JCT Platinum 1.3 Resurfacing $414.83 1,000
667-009 2022 CSAH 67 E LIM OF HENNING TH 210 Platinum 0.2 Resurfacing $62.85 530
667-040 2022 CSAH 67 Bridge 92516 Gold 0.0 Bridge $316.71 290
104-120 2022 CSAH 88 FIR AVE. - TOWER ROAD INDUSTRIAL PARK BLVD. Platinum 0.4 Seal Coat $17.33 4,350
104-130 2022 CSAH 88 FIR AVE. - INDUSTRIAL PARK BLVD. MARYLAND LANE Platinum 0.3 Seal Coat $13.69 4,350
104-140 2022 CSAH 88 FIR AVE. - MARYLAND LANE NORTH CITY LIMITS Platinum 0.1 Seal Coat $5.02 4,350
688-010 2022 CSAH 88 LIMS FERGUS FALLS W RAMP FAI 94 Platinum 3.1 Seal Coat $62.85 2,800
111-010 2022 CH 111 JCT 1 N LIMITS FERGUS FALLS Platinum 0.5 Resurfacing $163.42 2,500
111-011 2022 CH 111 NO LIM FERGUS FALLS 1.6 MI NO Platinum 1.6 Resurfacing $502.82 960
601-010 2023 CSAH 1 SOUTH COUNTY LINE CH 112 Platinum 4.0 Seal Coat $107.71 710
601-015 2023 CSAH 1 CH 112 CSAH 2 Platinum 3.0 Seal Coat $74.97 710
601-160 2023 CSAH 1 0.1 MI E OF CSAH 10 CSAH 35 Platinum 5.7 Seal Coat $122.79 2,400
601-190 2023 CSAH 1 0.8 MI E JCT CSAH 14 N LIM OTTERTAIL CITY Platinum 4.6 Seal Coat $100.02 1,450
601-200 2023 CSAH 1 N LIM OTTERTAIL CITY TH 78 Platinum 0.8 Seal Coat $30.10 1,850
613-005 2023 CSAH 13 CSAH 8 CSAH 60 Platinum 1.5 Seal Coat $32.64 860
613-010 2023 CSAH 13 CSAH 60 NORTH COUNTY LINE Gold 3.6 Seal Coat $77.23 860
614-040 2023 CSAH 14 TH 78 2.2 MI E Gold 2.2 Resurfacing $749.23 1,000
614-041 2023 CSAH 14 2.2 MI E 2.4 MI E OF TH 78 Gold 0.2 Resurfacing $119.88 1,000
614-042 2023 CSAH 14 2.4 MI E 2.9 MI E OF TH 78 Gold 0.5 Resurfacing $170.28 1,000
2023
Page 10 of 18
GISID Year Route From To Tier Length (mi) Type of WorkUpdated Cost
$KCurrent ADT (2015)
Table 7. Otter Tail County 2019-2025 Transportation Program
614-050 2023 CSAH 14 2.9 MI E OF TH 78 4.1 MI W OF CSAH 67 Gold 2.1 Resurfacing $686.57 470
614-051 2023 CSAH 14 4.1 MI W CSAH 67 Gold 4.1 Resurfacing $1,340.44 470
621-060 2023 CSAH 21 CSAH 30 N CO LINE Gold 1.5 Seal Coat $32.31 230
634-010 2023 CSAH 34 CSAH 35 3.2 MILES EAST Platinum 3.2 Seal Coat $63.19 730
634-020 2023 CSAH 34 3.2 MI E OF CSAH 35 2.3 MI W OF W LIM PERHAM Platinum 1.3 Seal Coat $25.67 1,150
634-021 2023 CSAH 34 2.3 MI W 0.3 MI W OF W LIM PERHAM Platinum 2.0 Seal Coat $39.49 1,550
635-030 2023 CSAH 35 FAI 94 SO LIM DALTON Platinum 2.1 Resurfacing $629.35 970
635-105 2023 CSAH 35 CSAH 18 CSAH 1 Platinum 3.0 Reconstruction $3,854.19 860
635-110 2023 CSAH 35 CSAH 1 0.1 MI N OF CO RD 115 Platinum 6.6 Seal Coat $142.18 1,050
635-120 2023 CSAH 35 0.1 MI N CO RD 115 CSAH 41 Platinum 1.0 Seal Coat $25.13 900
636-010 2023 CSAH 36 CSAH 35 SOUTH LIMITS VERGAS Gold 0.4 Seal Coat $8.69 295
636-020 2023 CSAH 36 SO LIM VERGAS 1.0 MI SE Gold 1.0 Seal Coat $19.75 295
636-030 2023 CSAH 36 1.0 MI SE OF VERGAS CSAH 60 Gold 5.3 Seal Coat $114.17 295
645-020 2023 CSAH 45 Bridge 7266 Silver 0.0 Bridge $750.20 275
650-050 2023 CSAH 50 TH 106 TH 29 Gold 0.3 Seal Coat $11.85 910
650-060 2023 CSAH 50 TH 29 E LIM DEER CREEK Gold 0.7 Seal Coat $14.22 340
650-070 2023 CSAH 50 E LIM CSAH 73 Gold 2.4 Seal Coat $47.39 340
651-020 2023 CSAH 51 CSAH 80 0.06 MI EAST Platinum 0.1 Resurfacing $32.69 2,000
651-021 2023 CSAH 51 0.06 MI E CSAH 80 0.11 MI S NEW W LIM PERHAM Platinum 0.5 Resurfacing $277.90 2,300
651-022 2023 CSAH 51 0.11 MI S OF NEW W CORP LIM PERHAM NEW W CORP LIM PERHAM Platinum 0.1 Resurfacing $32.97 2,300
Page 11 of 18
GISID Year Route From To Tier Length (mi) Type of WorkUpdated Cost
$KCurrent ADT (2015)
Table 7. Otter Tail County 2019-2025 Transportation Program
651-030 2023 CSAH 51 NEW W CORP LIM PERHAM N LIM PERHAM Platinum 1.2 Resurfacing $350.64 2,300
651-031 2023 CSAH 51 N LIM PERHAM 1.0 MI N Platinum 1.0 Resurfacing $299.69 2,300
651-032 2023 CSAH 51 1.0 MI N 1.8 MI N OF LIM PERHAM Platinum 0.8 Resurfacing $272.45 2,300
651-040 2023 CSAH 51 1.8 MI N 2.9 MI N OF N LIM PERHAM Platinum 1.1 Resurfacing $329.66 610
651-041 2023 CSAH 51 2.9 MI N OF N LIM PERHAM W JCT CSAH 60 Platinum 0.3 Resurfacing $89.91 610
660-010 2023 CSAH 60 TH 10 CSAH 51 Platinum 3.4 Resurfacing $1,111.59 570
660-030 2023 CSAH 60 CSAH 51 1.7 MI E Platinum 1.7 Resurfacing $555.79 2,300
660-040 2023 CSAH 60 1.7 MI E 1.9 MI E CSAH 51 Platinum 0.2 Resurfacing $65.39 380
660-050 2023 CSAH 60 1.9 MI E CSAH 51 CSAH 13 Platinum 0.1 Resurfacing $32.69 380
673-020 2023 CSAH 73 TH 210 TH 29 Gold 6.6 Seal Coat $142.18 230
683-010 2023 CSAH 83 LAKE AVE OLAF ST BATTLE LAKE Gold 0.3 Seal Coat $11.85 730
683-020 2023 CSAH 83 OLAF ST W LIM BATTLE LAKE Platinum 0.4 Seal Coat $8.83 730
683-030 2023 CSAH 83 W LIM BATTLE LAKE CO RD 122 Platinum 2.1 Seal Coat $45.24 550
683-040 2023 CSAH 83 JCT CO RD 122 3.6 MI S OF CSAH1 Platinum 2.8 Seal Coat $60.32 275
683-050 2023 CSAH 83 3.6 MI S CSAH 1 1.5 MI S CSAH 1 Gold 2.1 Seal Coat $45.24 275
683-051 2023 CSAH 83 1.5 MI S OF CSAH 1 CSAH 72 Gold 1.5 Seal Coat $32.31 275
683-060 2023 CSAH 83 CSAH 72 CSAH 1 Gold 0.1 Seal Coat $2.24 275
127-010 2023 CH 127 JCT TH 108 JCT CSAH 54 Silver 2.5 Seal Coat $53.86 330
135-020 2023 CH 135 JCT CH 142 JCT CSAH 84 Gold 3.0 Seal Coat $64.41 410
Page 12 of 18
GISID Year Route From To Tier Length (mi) Type of WorkUpdated Cost
$KCurrent ADT (2015)
Table 7. Otter Tail County 2019-2025 Transportation Program
601-140 2024 CSAH 1 FIR AVE LENORE WAY Platinum 0.3 Seal Coat $13.34 9,000
601-141 2024 CSAH 1 LENORE WAY LAKEVIEW DR Platinum 0.9 Seal Coat $30.10 6,700
601-150 2024 CSAH 1 LAKEVIEW DR LAKEWOOD DR Platinum 0.1 Seal Coat $5.07 5,400
601-150 2024 CSAH 1 LAKEVIEW DR LAKEVIEW DR E Platinum 0.1 Seal Coat $5.07 5,400
601-151 2024 CSAH 1 LAKEWOOD DR 0.40 MI E Platinum 0.4 Seal Coat $13.69 3,750
601-152 2024 CSAH 1 0.4 MI E OF LAKEWOOD DR 0.10 MI NO CSAH 18 Platinum 2.2 Seal Coat $50.88 3,750
601-153 2024 CSAH 1 0.1 MI N CSAH 18 0.1 MI E CSAH 10 Platinum 3.3 Seal Coat $75.41 2,500
601-161 2024 CSAH 1 CSAH 35 CSAH 45 Platinum 2.6 Seal Coat $98.84 1,500
601-165 2024 CSAH 1 CSAH 45 0.3 MI W OF CSAH 83 Platinum 2.1 Seal Coat $47.79 1,500
601-170 2024 CSAH 1 0.3 MI W OF CSAH 83 1.9 MI S OF CSAH 74 Platinum 1.6 Seal Coat $35.49 1,030
603-040 2024 CSAH 3 CSAH 24 6.5 MILES NORTH Platinum 6.5 Seal Coat $148.26 820
603-050 2024 CSAH 3 6.5 M N CSAH 24 TH 59 Platinum 1.0 Seal Coat $21.10 820
608-010 2024 CSAH 8 NW JCT CSAH 80 (MAIN ST) 2ND ST Platinum 0.1 Seal Coat $5.13 5,300
608-020 2024 CSAH 8 2ND ST KING ST Platinum 0.5 Seal Coat $20.53 4,900
608-029 2024 CSAH 8 KING ST NO LIM PERHAM Platinum 1.0 Seal Coat $22.81 3,650
608-030 2024 CSAH 8 NO CORP LIM PERHAM 1.9 MI NE OF PERHAM Platinum 1.9 Seal Coat $43.34 2,250
608-031 2024 CSAH 8 1.9 M N OF N LIM PERHAM 2.0 M N OF N LIM PERHAM Platinum 0.1 Seal Coat $4.56 1,800
608-032 2024 CSAH 8 2.0 M N OF N LIM PERHAM CSAH 13 Platinum 1.0 Seal Coat $34.21 1,800
608-040 2024 CSAH 8 CSAH 13 0.4 MI E Platinum 0.4 Seal Coat $9.12 1,250
608-041 2024 CSAH 8 0.4 MI E OF CSAH 13 CSAH 53 Platinum 2.6 Seal Coat $64.25 1,250
2024
Page 13 of 18
GISID Year Route From To Tier Length (mi) Type of WorkUpdated Cost
$KCurrent ADT (2015)
Table 7. Otter Tail County 2019-2025 Transportation Program
610-050 2024 CSAH 10 TH 59 0.13 MI E Platinum 0.1 Seal Coat $5.93 1,200
610-060 2024 CSAH 10 0.13 MI E OF TH 59 E LIM ELIZABETH Platinum 0.4 Seal Coat $9.81 1,200
614-010 2024 CSAH 14 CSAH 1 N 0.1 MI Platinum 0.1 Resurfacing $35.38 470
614-011 2024 CSAH 14 .1 MI 2.7 MI N OF CSAH 1 Platinum 2.6 Resurfacing $882.98 470
614-012 2024 CSAH 14 2.7 MI N 2.8 MI N OF CSAH 1 Platinum 0.1 Resurfacing $33.96 600
614-013 2024 CSAH 14 2.8 MI N OF CSAH 1 W LIM RICHVILLE Platinum 5.2 Resurfacing $1,765.97 850
614-020 2024 CSAH 14 W LIM RICHVILLE E 0.25 MILES Platinum 0.3 Resurfacing $155.65 1,100
614-021 2024 CSAH 14 0.25 MI E OF W LIM 0.66 MI E OF W LIM RICHVILLE Platinum 0.4 Resurfacing $261.07 1,100
614-022 2024 CSAH 14 0.66 MI E OF W LIM E LIM RICHVILLE Platinum 0.4 Resurfacing $129.05 980
614-030 2024 CSAH 14 E LIM RICHVILLE TH 78 Platinum 2.0 Resurfacing $679.22 1,050
615-041 2024 CSAH 15 0.1 MI E OF OTTER TAIL RIVER 0.4 MI W OF CSAH 1 Platinum 0.9 Seal Coat $20.53 1,300
615-050 2024 CSAH 15 0.4 M W CSAH 1 Platinum 0.4 Seal Coat $9.12 1,300
619-021 2024 CSAH 19 0.32 MI NO OF PROSPECT ST NO CORP LIM Gold 0.8 Seal Coat $22.09 630
619-030 2024 CSAH 19 N LIM BLUFFTON CSAH 76 Gold 1.0 Seal Coat $26.61 630
620-010 2024 CSAH 20 CSAH 9 1.5 MI E Platinum 1.5 Resurfacing $573.09 1,150
620-020 2024 CSAH 20 1.5 M E CSAH 9 SENNS PT ROAD Platinum 0.5 Resurfacing $191.03 950
620-021 2024 CSAH 20 0.9 MI 0.7 MI WEST CSAH 31 Platinum 0.2 Resurfacing $76.41 760
620-030 2024 CSAH 20 0.7 MI W OF CSAH 31 CSAH 31 Platinum 0.7 Resurfacing $237.73 1,100
620-040 2024 CSAH 20 CSAH 31 2.0 MILES EAST Platinum 2.0 Resurfacing $622.62 1,100
620-050 2024 CSAH 20 2.0 M E OF CSAH 31 TH 59 Platinum 0.2 Resurfacing $67.92 1,100
Page 14 of 18
GISID Year Route From To Tier Length (mi) Type of WorkUpdated Cost
$KCurrent ADT (2015)
Table 7. Otter Tail County 2019-2025 Transportation Program
621-010 2024 CSAH 21 TH 210 CSAH 88 Gold 6.2 Seal Coat $141.42 235
622-020 2024 CSAH 22 CSAH 3 CSAH 35 Gold 6.1 Seal Coat $139.14 345
650-020 2024 CSAH 50 CSAH 67 W LIMS DEER CREEK Gold 3.0 Reconstruction $3,854.19 600
650-030 2024 CSAH 50 W LIM DEER CREEK 0.50 MI E Gold 0.5 Reconstruction $642.36 600
667-060 2024 CSAH 67 CSAH 54 0.1 MI S OF S LIM NEW YORK MILLS Gold 3.6 Seal Coat $82.11 1,300
667-120 2024 CSAH 67 CSAH 58 S CSAH 67 Platinum 5.4 Seal Coat $133.44 870
667-130 2024 CSAH 67 S JCT CSAH 67 CSAH 8 Platinum 1.0 Seal Coat $24.71 580
677-030 2024 CSAH 77 0.81 MI N OF S CORP LIM TH 10 Silver 0.3 Seal Coat $6.16 315
680-010 2024 CSAH 80 NW JCT TH 10 N CITY LIM PERHAM Platinum 2.2 Resurfacing $747.14 3,000
680-020 2024 CSAH 80 N CITY LIM PERHAM CSAH 8 Platinum 0.8 Resurfacing $566.58 5,500
680-022 2024 CSAH 80 CSAH 8 E CITY LIM Platinum 0.4 Resurfacing $309.04 6,300
680-030 2024 CSAH 80 E CITY LIM OF PERHAM SE JCT TH 10 Platinum 1.6 Resurfacing $543.38 6,300
682-010 2024 CSAH 82 S CO LINE S LIM DALTON Platinum 6.1 Seal Coat $162.33 790
682-020 2024 CSAH 82 S LIM W LIM DALTON Platinum 0.3 Seal Coat $7.98 790
682-021 2024 CSAH 82 W LIM DALTON 1.0 MI W Platinum 1.0 Seal Coat $26.61 1,300
682-030 2024 CSAH 82 1.0 MI W OF W LIM DALTON TH 59 Platinum 4.5 Seal Coat $111.20 1,300
688-030 2024 CSAH 88 CSAH 10 S LIM OF ROTHSAY Platinum 7.0 Seal Coat $159.67 485
688-040 2024 CSAH 88 S LIM ROTHSAY CSAH 24 Platinum 0.1 Seal Coat $2.05 485
699-010 2024 CSAH 99 ON MAIN 2ND AVE CSAH 14 RICHVILLE Platinum 0.1 Resurfacing $71.32 345
114-030 2024 CH 114 1.5 M S OF N JCT CSAH 15 N JCT CSAH 15 Silver 1.5 Seal Coat $34.21 260
Page 15 of 18
GISID Year Route From To Tier Length (mi) Type of WorkUpdated Cost
$KCurrent ADT (2015)
Table 7. Otter Tail County 2019-2025 Transportation Program
120-010 2024 CH 120 JCT CSAH 29 0.6 M EAST Platinum 0.6 Seal Coat $13.69 560
120-020 2024 CH 120 0.6 MI EAST JCT CSAH 29 CSAH 33 Platinum 1.1 Seal Coat $25.09 560
132-010 2024 CH 132 JCT CSAH 61 TH 108 Silver 2.0 Seal Coat $45.85 140
145-010 2024 CH 145 CSAH 72 CSAH 1 Platinum 1.0 Seal Coat $22.81 630
601-030 2025 CSAH 1 I 94 0.2 MI N Platinum 0.2 Seal Coat $5.16 2,500
608-007 2025 CSAH 8 JCT TH 10 S CITY LIMS PERHAM Platinum 0.2 Seal Coat $4.56 8,000
608-008 2025 CSAH 8 S CITY LIMS OF PERHAM 4TH ST Platinum 0.4 Seal Coat $15.97 8,000
608-009 2025 CSAH 8 4TH ST S E JCT CSAH 80 IN PERHAM Platinum 0.2 Seal Coat $10.45 8,300
610-030 2025 CSAH 10 W LIM ELIZABETH BAURAU ST Gold 0.5 Reconstruction $728.64 680
610-040 2025 CSAH 10 BAURAU ST TH 59 ELIZABETH Gold 0.2 Reconstruction $992.16 770
619-040 2025 CSAH 19 Bridge 92517 Silver 0.0 Bridge $500.00 260
624-061 2025 CSAH 24 TH 59 EAST 0.15 MI Platinum 0.2 Resurfacing $97.23 770
624-070 2025 CSAH 24 0.15 MI E OF TH 59 E LIM ERHARD Platinum 0.3 Resurfacing $109.60 770
624-080 2025 CSAH 24 E LIM ERHARD CSAH 3 Platinum 4.8 Resurfacing $1,697.03 490
627-010 2025 CSAH 27 FIR AVE FERGUS FALLS 0.19 MI N Platinum 0.2 Seal Coat $7.95 3,200
627-020 2025 CSAH 27 0.19 MI NO OF FIR AVE NO CORP LIM FERGUS FALLS Platinum 0.3 Seal Coat $7.07 3,200
627-030 2025 CSAH 27 N LIM OF FERGUS FALLS 0.2 MI N Platinum 0.2 Seal Coat $4.56 3,200
627-031 2025 CSAH 27 0.2 MI N 0.5 MI N OF N LIM FERGUS FALLS Platinum 0.3 Seal Coat $6.84 3,200
631-010 2025 CSAH 31 CSAH 4 1.2 MI N Platinum 1.2 Resurfacing $424.26 550
631-020 2025 CSAH 31 1.2 MI 2.5 MI N CSAH 4 Platinum 1.3 Resurfacing $459.61 620
2025
Page 16 of 18
GISID Year Route From To Tier Length (mi) Type of WorkUpdated Cost
$KCurrent ADT (2015)
Table 7. Otter Tail County 2019-2025 Transportation Program
631-030 2025 CSAH 31 2.5 MI N CSAH 4 TH 59 Platinum 2.7 Resurfacing $954.58 620
634-022 2025 CSAH 34 0.3 MI W W CORP LIM PERHAM Platinum 0.3 Seal Coat $6.27 2,100
634-023 2025 CSAH 34 W CORP LIM PERHAM 2ND ST SW Platinum 0.2 Seal Coat $5.02 2,100
634-030 2025 CSAH 34 2ND ST SW CSAH 80 Platinum 0.1 Seal Coat $2.72 2,100
635-070 2025 CSAH 35 N LIM OF DALTON S LIM UNDERWOOD Platinum 8.4 Seal Coat $175.63 930
635-100 2025 CSAH 35 N LIMS UNDERWOOD CSAH 18 Platinum 3.0 Seal Coat $62.73 1,300
635-190 2025 CSAH 35 TH 108 N LIM DENT 2.9 MI N Platinum 2.9 Seal Coat $68.90 470
635-200 2025 CSAH 35 2.9 MI 7.1 MI NW OF TH 108 Platinum 4.2 Seal Coat $95.80 750
635-210 2025 CSAH 35 7.1 MI NW OF TH 108 0.2 MI S OF S LIM OF VERGAS Platinum 3.5 Seal Coat $83.16 1,300
646-010 2025 CSAH 46 SOO LINE RR ON MAIN - TH 29 Platinum 0.2 Seal Coat $8.78 1,100
652-010 2025 CSAH 52 TH 108 CSAH 67 Platinum 3.2 Resurfacing $1,131.36 940
652-020 2025 CSAH 52 JCT CSAH 67 0.10 MI EAST Platinum 0.1 Resurfacing $35.35 940
652-021 2025 CSAH 52 0.1 MI E OF CSAH 67 CH 135 Platinum 1.8 Resurfacing $583.36 940
652-022 2025 CSAH 52 CH 135 TH 106 Platinum 2.1 Resurfacing $680.58 940
652-030 2025 CSAH 52 TH 106 TH 29 Platinum 4.0 Resurfacing $1,414.20 650
658-010 2025 CSAH 58 CSAH 67 CSAH 19 Bronze 9.1 Seal Coat $216.22 225
661-020 2025 CSAH 61 5.9 MI N OF CSAH 16 0.1 MI S OF TH 108 Silver 1.5 Reconstruction $2,003.76 360
661-030 2025 CSAH 61 0.1 MI S TH 108 Silver 0.1 Reconstruction $133.58 360
667-008 2025 CSAH 67 CSAH 65 IN HENNING E CITY LIM JCT Platinum 1.3 Seal Coat $30.11 1,000
667-009 2025 CSAH 67 E LIM OF HENNING TH 210 Platinum 0.2 Seal Coat $4.56 530
667-071 2025 CSAH 67 S LIM NEW YORK MILLS 0.23 MI N Platinum 0.2 Seal Coat $9.62 1,700
Page 17 of 18
GISID Year Route From To Tier Length (mi) Type of WorkUpdated Cost
$KCurrent ADT (2015)
Table 7. Otter Tail County 2019-2025 Transportation Program
667-080 2025 CSAH 67 0.23 MI N OF S LIM NEW YORK MILLS CSAH 84 Platinum 0.4 Seal Coat $15.05 2,350
667-090 2025 CSAH 67 BROADWAY - OLD TH 10 GILMAN ST Platinum 0.3 Seal Coat $12.24 3,300
667-100 2025 CSAH 67 GILLMAN ST N LIM NEW YORK MILLS Platinum 0.5 Seal Coat $24.63 3,550
667-110 2025 CSAH 67 N LIM NEW YORK MILLS CSAH 58 Platinum 2.2 Seal Coat $54.36 1,300
675-050 2025 CSAH 75 CSAH 50 TH 29 Platinum 3.3 Seal Coat $75.27 830
675-060 2025 CSAH 75 TH 29 TH 10 Platinum 1.1 Seal Coat $25.09 1,150
675-070 2025 CSAH 75 TH 10 0.8 MI NORTH Platinum 0.8 Seal Coat $18.25 670
675-071 2025 CSAH 75 0.8 MI N 1.0 MI N OF TH 10 Platinum 0.2 Seal Coat $4.56 670
675-072 2025 CSAH 75 1.0 MI N OF TH 10 CSAH 76 Platinum 1.9 Seal Coat $43.34 670
111-010 2025 CH 111 JCT 1 N LIMITS FERGUS FALLS Platinum 0.5 Seal Coat $11.86 2,500
111-011 2025 CH 111 NO LIM FERGUS FALLS 1.6 MI NO Platinum 1.6 Seal Coat $36.50 960