MtimaWoyera Catholic Parish
MINUTES OF A JOINT MEETING BETWEEN EXECUTIVEAND TECHNICAL
COMMITTEE OF 20TH JULY 2012
MEMBER PRESENT
1. Mr Kuphunda
2. Mr Chisenga
3. Mr Yona
4. Mr Ngoma
5. Mr Malota
6. Mr. Tembwe
7. Mr Rajabu
APOLOGIES
1. Mr. Malota
2. Mr. Mtipe
3. Fr. Zikomankhani
OPENING PRAYER
The meeting starts as we start good thing with a prayer and was given by Mr Rajabu
as the time striked 6:15 pm
OPENING REMARKS
Mr Tembwe chaired the meeting , therefore in the first place he thanked each and
every single person who attended the meeting and encouraged them to be vibrate
to contribute views that will be add something to the church project
1. MATTERS ARISING FROM THE PREVIOUS MEETING
It was so worthy to look into some of the assignment that was so far discussed
on 15th July and observed that the following have been done
7/31/2019 20th July 2015 Meeting
http://slidepdf.com/reader/full/20th-july-2015-meeting 2/3
MtimaWoyera Catholic Parish
1. The list of items to be purchased has been obtained from the
Contractor.
2. Measurement of the crane has been done and it noted that, the
height of the crane is 3.7m while the passage proposed that the
crane would been used is 3.5m. And the conclusion is that it’s notpossible to use a crane.
3. Mr Ngoma and Mr matambo worked on Tuesday the 17th as
proposed to find more mistakes previously made. Mr Ngoma
reported that more work has not been done.
4. Mr Matambo identified his casual labours and worked on Tuesday
and they were paid K 7, 000. The bad part was that one of the
casual labour got injured and one of the parish watchman was
asked to work on behalf of that injured person.
5. Mr Mpekamsambo was informed not to report for work.
2. MATTERS DISCUSED IN THE MEETING
i. After Mr Dzeredzere confirmed that, the methodology of crane can not
work. He propose that his next method is to use a pulley. Therefore the
previous quotation of K 2, 500 000 needs to be revised.
ii. As more mistakes have been identified, the meeting with Mr Kajanga
should be as quick as possible because this is a critical issue that needsan immediate reaction.
iii. It was agreed that there is no harm to forward a report to Mr Kajanga on
what has been identified. Time frame to complete the work in progress
is two to three weeks if resources are made available.
iv. In the meeting it was concluded that Mr Mpekasambo has been giving
the parish executive false hopes on how the project has been managed.
v. As it is difficult to tell Mr Mpekasambo to terminate the contract,
therefore member agreed to communicate this issue with Mr Kajanga.
vi. The meeting that Mr Kajanga will schedule to meet with Mr Mpekasambo
should also give a room for the parish executive, Technical team and
parish team to be available
vii. Mr Ngoma was asked to talk to Mr Kajanga thing to do with how drills
might be. Mr Chisenga the parish Chairperson suggested that the
7/31/2019 20th July 2015 Meeting
http://slidepdf.com/reader/full/20th-july-2015-meeting 3/3
MtimaWoyera Catholic Parish
sloting of the drills were meant for the reason that there is need for
smooth movement on trusses as already there is a crake.
viii. Mr Tembwe suggested the need for costing purpose on the given item
list to be purchased. Therefore Mr Chisenga accepted that
responsibilities and promised member to collect quotation by 21st
July.
3. ANY OTHER BUSINESS
i. Mr Yona made a no turning point, so that Mr Kajanga must put pressure
on Mr Mpekasambo and tell him frankly that he has failed the work.
ii. Mr Chisenga pointed out we should not do things by force but rather to
make sure that the work is perfectly done.
iii. We should work hand in grove to move forward with the Church project,
failure to do so, will pressurize the parish priest to do things that will not
be good as a whole.
4. CLOSURE REMARKS
Mr Chisenga the parish chairperson thanked Mr Tembwe for chairing the
meeting and thanked every member for the free deliberation discussion and
again for attending the meeting. The meeting was closed with a prayer and it
was given by Mr Kuphunda at 7:32 pm. Next meeting will be as soon as
possible.
Mr. Chisenga Mr Yona Mr Rajabu
Chairman Vice Chairman Vice
Secretary