  • SPECTRUM

    Client: M/s NAVIN FLUORINE INTERNATIONAL LTD

    BOILER ( 850 kg/hr)

    MANUFACTURING PLANT NO.2 AT DEWAS

    TECHNICAL SPECIFICATION

  • TECHNICAL SPECIFICATION

    BOILER ( 850 KG/HR) PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D01 PAGE NO . PAGE 1 OF 12

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx

    Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    REVISION HISTORY

    REVISION EFFECTIVE DATE REASON FOR REVISION 00 02-01-2014 FIRST ISSUE

  • TECHNICAL SPECIFICATION

    BOILER ( 850 KG/HR) PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D01 PAGE NO . PAGE 2 OF 12

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx

    Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    TABLE OF CONTENTS

    1.0 APPROVAL SIGNATURES 3 2.0 OVERVIEW 4 3.0 INSPECTION, TESTING AND DISPATCH 4 4.0 DRAWINGS & DOCUMENTS 5 5.0 PACKING 5 6.0 SPARES 6 7.0 DATASHEET 6

  • TECHNICAL SPECIFICATION

    BOILER ( 850 KG/HR) PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D01 PAGE NO . PAGE 3 OF 12

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx

    Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    1.0 APPROVAL SIGNATURES

    This document is prepared by the SPCPL team for the project of NAVIN FLUORINE INTERNATIONAL LIMITED, DEWAS under the authority of their Project Manager. Hence this document before being effective shall be approved by the QA team of NAVIN FLUORINE INTERNATIONAL LIMITED, DEWAS, and authorized by the appropriate Project Authority.

    SPCPL

    Name Designation Signature Date

    Prepared By Rajesh Yerawar Sr. Executive - Mechanical

    Checked By Akhilesh Verma Manager - Mechanical

    Approved By Sanjay Katkade GM-Engineering

    CLIENT

    Name Designation Signature Date

    Approved By

    Authorized By

  • TECHNICAL SPECIFICATION

    BOILER ( 850 KG/HR) PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D01 PAGE NO . PAGE 4 OF 12

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx

    Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    2.0 OVERVIEW

    2.1 PROJECT INTRODUCTION

    Navin Flourine International Limited has envisioned setting up an Manufacturing plant No.2 facility at Dewas along with the necessary utilities. Nearest railway station : DEWAS Nearest airport : INDORE Ambient conditions:

    Summer ( DB / WB / % RH) 41.1 C / 25 C / 28 % Monsoon ( DB / WB / % RH) 32.2 C / 27.8 C / 70 % Winter ( DB / WB / % RH) 10 C / 7.2 C / 65 %

    2.2 PROJECT STANDARD

    The design, manufacturing, testing at factory of Boiler shall comply with the latest applicable IBR standards.

    3.0 INSPECTION, TESTING AND DISPATCH

    The Boiler will be subjected to inspection at manufacturers works in the presence of purchaser/consultant. During inspection following routine tests shall be carried out:

    Visual inspection for workmanship and verification with respect to specifications. Mechanical operation of valves etc. Functional test for control circuits. Tightness of screwed/bolted connections

    The vendor shall supply to purchaser 3 sets of the certificates of Internal routine tests.

  • TECHNICAL SPECIFICATION

    BOILER ( 850 KG/HR) PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D01 PAGE NO . PAGE 5 OF 12

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx

    Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    4.0 DRAWINGS & DOCUMENTS Vendor to submit following Drawing & Documents at various stages.

    4.1 Drawings (3 Sets) - GA Drawings, Engineering Drawings (For approval, Approved, As built, As installed) - Electrical Circuit Diagrams - System schematics

    4.2 Manuals and Procedures (3 Sets) - Operation and Maintenance manuals - Specialized procedures, if applicable (such as Calibration, Cleaning, etc.) - Specifications and sources of some important materials, if applicable (such as lubricants, cleaning

    agents, etc.) 4.3 Lists (3 Sets)

    - Equipment and Instrument list with component descriptions - Electrical component parts list with descriptions - Spare parts list with appropriate identification nos., if any - Change parts list with appropriate identification nos., if any

    4.4 Factory Acceptance Test Certificates (3 Sets) - Detailed list of modifications after contract &/or in final approved design - Material specifications and test certificates - Instrument Calibration certificates - Functional/ Factory acceptance certificates (such as weld inspection, passivation, pressure/

    vacuum holds, etc.) - Warranty certificates - Surface finish test reports - Food grade material certificate

    4.5 Site Acceptance Test (3 Sets) - Operational Qualification Protocol

    5.0 PACKING

    Equipment shall be dispatched to site packed in full wooden case (Sea Worthy). It shall be wrapped in polythene sheets before putting in cases and it shall be ensured that damage to the equipment does not occur during handling/transportation. Lifting hooks shall be provided for unloading at site.

  • TECHNICAL SPECIFICATION

    BOILER ( 850 KG/HR) PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D01 PAGE NO . PAGE 6 OF 12

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx

    Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    6.0 SPARES

    Commissioning Spares - The vendors shall include in the quoted price sufficient quantities of commissioning spares required for erection and commissioning of the equipment. These shall include such items as Bolts and other miscellaneous parts. Essential Spares - The vendor shall supply spares required for two years trouble free operation & furnish list of spare considered with offer.

    7.0 DATASHEET

    DESIGN PARAMETERS REQUIRED SPECIFICATIONS 1 GENERAL

    Tag No. SB-102,103 Capacity (from & at 100C), Kg/hr 850 Kg/Hr Maximum continuous rating at 30C Vendor to Specify Maximum Pressure rating, Bar 10.54

    Quantity, No(s) 2 (2 W)

    Type Coil type, Semi-IBR Fuel LDO ( suitable for conversion to Gas firing ) Water Quality MIDC Water Posture Vertical

    Steam Dryness Factor at the outlet of Steam Separator Min 0.9 At the outlet of Steam Separator

    Boiler Efficiency based on Net Calorific Value (as Per BS 845 Part I) Vendor to Specify

    Fuel consumption Vendor to Specify Burner control ON-OFF

    Time required to achieve full steam output from cold start Vendor to Specify

    Electrical Supply 440 V / 3 phase + N / 50 Hz /AC Initial Blow-Down Time Vendor to Specify Maximum allowable Blow-Down Time Vendor to Specify Model Vendor to Specify

  • TECHNICAL SPECIFICATION

    BOILER ( 850 KG/HR) PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D01 PAGE NO . PAGE 7 OF 12

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx

    Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    DESIGN PARAMETERS REQUIRED SPECIFICATIONS

    Design Code IBR Latest version

    Overall Dimensions (L x W x H), Mtr Vendor to Specify

    2 MAIN BOILER

    Construction Vertical cylindrical

    Pressure parts fabricated out of high temperature resistant boiler quality Steel Tubes forming radiant & convective heat transfer zone

    Pipes of Standard BS 3059 CDW pipe, hydraulically tested for 25 Bar press Plates as per IS 2002 Gr. II

    Mounting arrangement for Blower Motor assembly, Feed Water Pump assembly, Control panel & Access Ladder

    To be provided

    Top closer plate Refractory lined with fire cone, burner rod & photocell mounting arrangement and view glass. - Yes

    Type of fire cone Vendor to Specify

    Coil heat transfer area Vendor to Specify

    Coil tube diameter Vendor to Specify

    Shell Insulation To be provided

    3 BLOWER & MOTOR ASSEMBLY

    Type Centrifugal, MOC Vendor to Specify Type of coupling between Motor &Blower Direct coupled

    Make of Blower Vendor to Specify

    H.P. of Motor Vendor to Specify Make of Motor Vendor to Specify Electrical Protection Class IP 55 Inlet Damper Vendor to Specify Dynamic Balancing To be provided

    4 FEED WATER STRAINER

    Type Y Type Mesh 80 Mesh

  • TECHNICAL SPECIFICATION

    BOILER ( 850 KG/HR) PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D01 PAGE NO . PAGE 8 OF 12

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx

    Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    DESIGN PARAMETERS REQUIRED SPECIFICATIONS MOC Vendor to Specify Make Vendor to Specify

    5 FEED WATER PUMP & MOTOR ASSEMBLY

    Type Electrically driven vertical Centrifugal Multistage Pumps Capacity Vendor to Specify

    Head Vendor to Specify

    Number of Pumps 1 Working + 1 Stand-by MOC Vendor to Specify Type of Coupling between Motor &Pump Vendor to Specify

    Make of Pump Vendor to Specify

    H.P. of Motor Vendor to Specify

    Make of Motor Vendor to Specify Electrical Protection class IP55 Dynamic Balancing To be provided

    6 STRAINER FOR LDO

    Capacity Vendor to Specify Mesh Vendor to Specify MOC Vendor to Specify Make Vendor to Specify

    7 LDO PUMP & MOTOR ASSEMBLY

    Type Gear Capacity Vendor to Specify MOC Vendor to Specify

    Number of Pumps 1 Working + 1 Stand-by Type of coupling between Motor &Pump Vendor to Specify Make of Pump Vendor to Specify H.P. of Motor Vendor to Specify

  • TECHNICAL SPECIFICATION

    BOILER ( 850 KG/HR) PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D01 PAGE NO . PAGE 9 OF 12

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx

    Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    DESIGN PARAMETERS REQUIRED SPECIFICATIONS Make of Motor Vendor to Specify Electrical Protection Class IP 55 Dynamic Balancing To be provided

    8 ON LINE FO/LDO FILTER ( Requirement to be confirmed by vendor)

    Type Duplex Mesh Vendor to Specify MOC Vendor to Specify Make Vendor to Specify

    9 BURNER ASSEMBLY ( Should be suitable to convert into gas firing)

    Type

    Oil fired (LDO). Fully automatic pressure atomized, Complete circulation of Fuel through burner, inbuilt ON-OFF, solenoid valve with suitable spray nozzle.

    Type of Spray Nozzle Vendor to Specify

    Turn Down Ratio Min 1:3 Ignition Electrode To be provided Photocell To be provided Ignition Transformer To be provided Spray Diffuser To be provided Cooling arrangement for photocell To be provided Make of Photocell Vendor to Specify Make of ignition electrode Vendor to Specify Make of ignition transformer Vendor to Specify

    10 BLOW DOWN SYSTEM

    Type Manual

    Quantity of Blow Down Vendor to Specify

    Others

  • TECHNICAL SPECIFICATION

    BOILER ( 850 KG/HR) PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D01 PAGE NO . PAGE 10 OF 12

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx

    Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    DESIGN PARAMETERS REQUIRED SPECIFICATIONS Overall Dimensions (L x B x H) Vendor to Specify Dry weight Vendor to Specify

    11 INSTRUMENTS

    Main Boiler

    Steam Pressure Gauge mounted on Control Panel with isolating needle valve & necessary copper tubing

    To be provided Make - Vendor to Specify

    Steam Temperature Indicator & controller with overheating protection to be provided in control panel.

    To be provided Make - Vendor to Specify

    Boiler Efficiency Monitor Not Required

    Make - Vendor to Specify

    Safety Valve for outlet Steam To be provided

    Make - Vendor to Specify

    Low Steam Pressure Switch To be provided

    Make - Vendor to Specify

    High Steam Pressure Switch To be provided

    Make - Vendor to Specify

    Feed Water Pump

    Safety Valve To be provided

    Make - Vendor to Specify

    Water Pressure Gauge mounted on Control Panel with isolating Needle Valve & necessary Copper tubing

    To be provided Make - Vendor to Specify

    LDO Pumping System

    Pressure switch for Fuel line To be provided

    Make - Vendor to Specify

    Burner Assembly

    Photocell for detection of Fuel fire To be provided

    Make - Vendor to Specify

    Burner Pre Purge Timer To be provided

    Make - Vendor to Specify

  • TECHNICAL SPECIFICATION

    BOILER ( 850 KG/HR) PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D01 PAGE NO . PAGE 11 OF 12

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx

    Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    DESIGN PARAMETERS REQUIRED SPECIFICATIONS

    12 SAFETY INTERLOCKS

    Control Panel Box to house all necessary &Electrical &Instrumentation to perform said safety interlocks & indications

    Sturdy Mild Steel fabricated with three coats of primers & epoxy painting oven backed rubber sealing for dustproof enclosure of instruments as per standard norms.

    Flame Failure Safety &Indication To be provided Boiler Overheating & Indication To be provided Boiler Set Pressure cut off &Indication To be provided Boiler Set Temperature cut off &Indication To be provided No Water Cut Off &Indication To be provided Low Steam Pressure cut off & trip To be provided High Steam Pressure cut off & trip To be provided Blow Down cut off &Indication To be provided Low Fuel Pressure cut off &Indication To be provided Fuse for Control Circuit To be provided

    Ignition transformer To be provided 13 CONTROL PANEL

    Control Panel Box to house all necessary & electrical & instrumentation to perform said safety interlocks & indications

    Sturdy Mild Steel fabricated with three coats of primers & epoxy painting oven backed rubber sealing for dustproof enclosure of instruments as per standard norms.

    Panel Isolation Switch To be provided

    Boiler Start/Stop/Fill/Cooling mode selection rotary switch To be provided

    Fuel circulation inching press button To be provided

    Indicating bulbs with name plates for visual indication of various control modes mentioned above, mounted on panel front

    To be provided

    Wiring completely made from solid conductor single core for systematic layout of wiring To be provided

    Electric Wire Protection Pipes to protect various connections going to Motors, Instruments, etc. To be provided

    Audio Alarm To be provided

  • TECHNICAL SPECIFICATION

    BOILER ( 850 KG/HR) PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D01 PAGE NO . PAGE 12 OF 12

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx

    Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    DESIGN PARAMETERS REQUIRED SPECIFICATIONS

    Contractor and Overload protection relays for pump motor and blower motor To be provided

    Burner prepurge timer To be provided

    Rotary selector switches To be provided

    14 ACCESSORIES

    Steam headers with Main Stream Stop Valve, Steam Safety Valve, Steam Auxiliary Bypass Stop Valve, and Steam Pressure Gauge

    All Valves of SS internals, Heavy Duty Cast Steel Body

    Super Heater Not required Standard Tool Kit To be provided Fuel pressure guage mounted on oil filter. To be provided Fuel piping between oil filter ,fuel pump and Burner To be provided

    Water piping connecting feed water to inlet of boiler with in-line non-return valve, blow down valve with limit switch.

    To be provided

    Steam and oil pressure sencing line of copper tubing and its hardware.

    To be provided

    ADDITIONAL SCOPE

    Installation Assistance To be included in scope

    Commissioning Assistance To be included in scope

    Training To be included in scope

    STATUTORY REQUIREMENT

    Boiler Certification As per Boiler Regulations of India (IBR) set of relevant documents and certificates, to be provided for each boiler.

    Boiler registration

    All preparations for hydraulic test, open inspection and other formalities to be completed for registration by the boiler inspectors of the concerned state would be Included in scope of Vendor.