216 TH STREET INTERCHANGE AND HIGHWAY 1 IMPROVEMENT PROJECT PROJECT UPDATE JULY 2019 Construction Update In April 2019, the Ministry of Transportation and Infrastructure (the Ministry) revised the project scope to upgrade the new general purpose travel lanes to HOV lanes from 200 th Street to 216 th Street. A key benefit of this upgrade will be the continuous HOV connection from Grandview Highway in Vancouver to 216 th Street in Langley. With this change to HOV lanes, the overall project is expected to be completed by winter 2020 instead of fall 2019 to allow for additional engineering, production of new overhead signs and the construction of large bases, poles, sign faces and protective barriers. This is the fourth project update for the 216 th Street Interchange and Highway 1 Improvement Project. Highway 1 east facing Guy Creek culvert installation 216 th Street north side sound wall Activities Completed The interchange footprint, including eastbound/westbound exit and entry ramps, have been constructed and have achieved final settlement to support further construction. All 38 bridge girders are in place on the bridge foundation. The north and middle section of Guy Creek and middle section of Yorkson Creek culverts have been installed. The absorptive sound wall across from École des Voyageurs school is complete.

Upload: others

Post on 22-Jun-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 216 STREET INTERCHANGE AND HIGHWAY 1 IMPROVEMENT PROJECT · Interchange and Highway 1 Improvement Project. Highway 1 east facing Guy Creek culvert installation 216th Street north

216TH STREET INTERCHANGE AND HIGHWAY 1 IMPROVEMENT PROJECT

PROJECT UPDATE JULY 2019

Construction UpdateIn April 2019, the Ministry of Transportation and

Infrastructure (the Ministry) revised the project scope to

upgrade the new general purpose travel lanes to HOV

lanes from 200th Street to 216th Street. A key benefit of

this upgrade will be the continuous HOV connection

from Grandview Highway in Vancouver to 216th Street

in Langley.

With this change to HOV lanes, the overall project is

expected to be completed by winter 2020 instead of

fall 2019 to allow for additional engineering, production

of new overhead signs and the construction of large

bases, poles, sign faces and protective barriers.

This is the fourth project update for the 216th Street

Interchange and Highway 1 Improvement Project.Highway 1 east facing

Guy Creek culvert installation

216th Street north side sound wall

Activities Completed• The interchange footprint, including

eastbound/westbound exit and entry

ramps, have been constructed and have

achieved final settlement to support further

construction.

• All 38 bridge girders are in place on the

bridge foundation.

• The north and middle section of Guy

Creek and middle section of Yorkson Creek

culverts have been installed.

• The absorptive sound wall across from

École des Voyageurs school is complete.

Page 2: 216 STREET INTERCHANGE AND HIGHWAY 1 IMPROVEMENT PROJECT · Interchange and Highway 1 Improvement Project. Highway 1 east facing Guy Creek culvert installation 216th Street north

Bridge Girder InstallationA major milestone in the project construction was completed. In May, a crane lifted the 38 girders, each 35 metres-long, to form the bridge deck

foundation. The two spans connect in the centre pier which is positioned in the median of Highway 1. The next stage of work includes pouring the

concrete bridge deck and constructing the vehicle travel lanes, as well as the 3.0 metre multi-use pathways on both sides of the deck.

Upcoming Activities for SummerHighway 1:

• Installing the south side section of Guy Creek culvert.

• Pouring and placing the overpass bridge deck on top of the bridge girders.

• Constructing the 5-metre concrete sound wall on the north side of Highway 1,

from west of the berm up to west of 208th Street.

• Installing the north and south side sections of Yorkson Creek culvert.

216th Street:

• Grading 216th Street north of the highway.

• Completing the curbs, sidewalk, boulevard, and paving south of the highway.

• Design updates for cyclists on 216th Street include (see map above):

− Installing a curb to separate vehicles from the cycle lanes on both sides of

216th Street, from 80th Avenue in the south to Telegraph Trail in the north.

− Installing a 1.5 metre wide curb separated shoulder on the east side of

216th Street between Telegraph Trail and École des Voyageurs.

LA

NOI

TCI

DSI

RUJLIM

IT

MoTIJURISDICTION

ToLJURISDICTION

88 AVEN

UE

TELEGRAPH TRAIL

TELE

GRA

PH T

RAIL

216 STREET

83 AVEN

UE

215 STREET

86A CRESCENT

ECOLE DESVOYAGEURSELEMENTARY

214 STREET

83B A

VENU

E

88 AVEN

UE

BER

M

-0.02 m/m

3.50 3.50

1.90

3.503.50

1.90

ME

DIA

N*

ME

DIA

N*

SH

OU

LDE

R B

IKE

LA

NE

1.80

TRA

VE

L LA

NE

TRA

VE

L LA

NE

TRA

VE

L LA

NE

TRA

VE

L LA

NE

-0.02 m/m

0.50

3.00

AS

PH

ALT

SID

EW

ALK

(MU

P)

+0.02 m/m1.5:1

2.30

2:1

SH

OU

LDE

R B

IKE

LA

NE

1.80VARIES

216 STREET TYPCIAL SECTION - NORTH1.8m BIKE LANE - 0.5m SEPARATION

125mm - ASPHALT PAVEMENT

400mm - 25mm WELL GRADED BASE COURSE

100mm - 25mm WELL GRADED BASE COURSE65mm - ASPHALT PAVEMENT

ToL MODIFIEDBARRIER CURB

0.50 3.00

2:1+0.02 m/m

65mm - ASPHALT PAVEMENT

0.3m ORGANIC STRIPPING (AVG.)

ORIGINAL GROUND

CONC.BARRIER CURB

(MMCD C5)

CONC.BARRIER CURB(MMCD C5)

AS

PH

ALT

SID

EW

ALK

(MU

P)

1:1

0.3m ORGANIC STRIPPING (AVG.)PRELOAD/EMBANKMENT

100mm - TOP SOIL

100mm - TOP SOIL0.60 0.40

GR

AV

EL

SH

OU

LDE

R

GR

AV

EL

SH

OU

LDE

R

100mm - 25mm WELL GRADED BASE COURSE

0.500.50

TURN LANE3.20

0.60

BO

ULE

VA

RD

(PR

OV

IDE

STR

EE

T TR

EE

S)

BO

ULE

VA

RD

(PR

OV

IDE

STR

EE

T TR

EE

S)

SEPARATION BUFFER

ToL MODIFIEDBARRIER CURB

SEPARATION BUFFER

0.50

2:1

100mm - 25mm WELL GRADED BASE COURSE65mm - ASPHALT PAVEMENT

ORIGINAL GROUND

1:1

0.3m ORGANIC STRIPPING (AVG.)PRELOAD/EMBANKMENT

100mm - TOP SOIL

GR

AV

EL

SH

OU

LDE

R

216

STR

EE

T

CL

VARIES

EX

IST.

RA

ISE

D /

PA

INTE

D M

ED

IAN

3.60

TRA

VE

L LA

NE

0.20

125mm - ASPHALT PAVEMENT400mm - 25mm WELL GRADED BASE COURSE

1:1

EX

IST.

E/PSA

WC

UT

LIN

E(0

.5m

FR

OM

EX

ISTI

NG

EP

)

0.30

GR

AV

EL

SH

OU

LDE

R

1.50

PA

VE

D S

HO

ULD

ER

216 STREET TYPICAL SECTION - NORTH (RIGHT)NEW CURB

ORIGINAL GROUND

216 STREET

T.L.C.A

T.L.C.A

EASEMENT

T.L.

C.A

S.R.

W.

T.L.

C.A

216TH STREET INTERCHANGE ANDHIGHWAY 1 IMPROVEMENT PROJECT

A

A

B

B

C

CAddition of 1.8 m wide curb separated bike lane on both sides of 216th St.from 80th Ave. in south to Telegraph Trail.

Addition of 3.0 m absorptive sound wallacross from École des Voyageurs.

Addition of 1.5 m wide curb separated shoulder (for cyclists and pedestrians)on east side of 216th St. between Telegraph Trail and École des Voyageurs.Bridge girder installation over Highway 1 Nighttime girder installation

Addition of 1.8 m wide curb separated bike lane on both sides of 216th St. from 80th Ave. in south to Telegraph Trail.

Addition of 1.5 m wide curb separated shoulder (for cyclists and pedestrians) on east side of 216th St. between Telegraph Trail and École des Voyageurs.

Addition of 3.0 m absorptive sound wall across from École des Voyageurs.

216TH STREET CYCLING DESIGN UPDATES

Page 3: 216 STREET INTERCHANGE AND HIGHWAY 1 IMPROVEMENT PROJECT · Interchange and Highway 1 Improvement Project. Highway 1 east facing Guy Creek culvert installation 216th Street north

Detour lanes on Highway 1, west facing

Project UpdatesThe Ministry of Transportation and Infrastructure is committed to keeping the public informed about the project. Updates with information about

ongoing activities and progress will be posted to the project website.

Please visit: http://www2.gov.bc.ca/gov/content/transportation/transportation-infrastructure/Projects/highway1-216th

If you would like to sign up for project e-updates, or have questions, please email the project team at: [email protected].

Please remember, the speed limit in construction zones is 80 km/hr.Protect site workers lives – and your wallet from expensive fines.Slow down, it’s safer for everyone.

What You Can Expect• Please be advised that nighttime construction activities may take place as the project progresses.

• East and westbound Highway 1 lanes will be continually shifted to the north and south to facilitate the culvert section installations for Guy and Yorkson Creek.

• Two lanes of traffic will be maintained eastbound and westbound during the day. There will be a single lane for each direction at night.

• Newly constructed lanes will be used to facilitate construction equipment and will not be opened to the public until the project is complete.

• Construction impacts may include lighting and vibration from equipment operating on-site, as well as some noise from vehicle engines, generators or safety backup signals.