22.02.2016 monpolyment group
TRANSCRIPT
![Page 1: 22.02.2016 monpolyment group](https://reader031.vdocuments.net/reader031/viewer/2022022201/5886540c1a28ab26598b4ae7/html5/thumbnails/1.jpg)
1
![Page 2: 22.02.2016 monpolyment group](https://reader031.vdocuments.net/reader031/viewer/2022022201/5886540c1a28ab26598b4ae7/html5/thumbnails/2.jpg)
MONPOLYMET GROUP
• Founded by Mrs.Garamjav
Tseden in 1992
• One of “MONGOLIAN TOP 100
INDUSTRY”, “BEST
REHABILITATING COMPANY”
from 2003 - 2015
• 23 years of successful
production and business
operations
• Has 4 subsidiaries
![Page 3: 22.02.2016 monpolyment group](https://reader031.vdocuments.net/reader031/viewer/2022022201/5886540c1a28ab26598b4ae7/html5/thumbnails/3.jpg)
MONCEMENT PROJECT MANAGEMENT
![Page 4: 22.02.2016 monpolyment group](https://reader031.vdocuments.net/reader031/viewer/2022022201/5886540c1a28ab26598b4ae7/html5/thumbnails/4.jpg)
MONPOLYMET GROUP IMPLEMENTER OF THE MONCEMENT PROJECT
![Page 5: 22.02.2016 monpolyment group](https://reader031.vdocuments.net/reader031/viewer/2022022201/5886540c1a28ab26598b4ae7/html5/thumbnails/5.jpg)
MONPOLYMET ONE OF THE LEADING MINING
COMPANIES IN MONGOLIA
![Page 6: 22.02.2016 monpolyment group](https://reader031.vdocuments.net/reader031/viewer/2022022201/5886540c1a28ab26598b4ae7/html5/thumbnails/6.jpg)
MONPOLYMET
“BEST REHABILITATING COMPANY” (2003 to 2015)
Recognized nationally
for leading the
industry’s standards for
land rehabilitation by
taking seriously the
environmental
responsibility of its
mining activities.
475 hectare (60%) area
was restored at the
780 hectare mined
area utilizing own
investments and in-
house professional
expertise. Technical
rehabilitation was done
on 705 ha (90%).
Ensures
environmentally
friendly work ethics by
training its staff and
building experience
each year with the help
of the latest technology
and qualified
professionals.
![Page 7: 22.02.2016 monpolyment group](https://reader031.vdocuments.net/reader031/viewer/2022022201/5886540c1a28ab26598b4ae7/html5/thumbnails/7.jpg)
MONCEMENT PROJECT
MAIN OUTCOME
![Page 8: 22.02.2016 monpolyment group](https://reader031.vdocuments.net/reader031/viewer/2022022201/5886540c1a28ab26598b4ae7/html5/thumbnails/8.jpg)
MONCEMENT PROJECT
DEVELOPING A CONSTRUCTION MATERIALS COMPANY
Integrated plant of Orgun Soum – Dornogobi
province
• Clinker 1750 tpd corresponding to 550 ktpy of
clinker, and up to 800 ktpy of cement
• Cement capacity 250 ktpy
Grinding station of
Ulaanbaatar
• Cement only
• Capacity 650 ktpy
520 km of Ulaanbaatar
180 km from the
Chinese border
Clinker &
cement plant
Cement plant
Head office in
Ulaanbaatar
1
1
1
![Page 9: 22.02.2016 monpolyment group](https://reader031.vdocuments.net/reader031/viewer/2022022201/5886540c1a28ab26598b4ae7/html5/thumbnails/9.jpg)
MONCEMENT PROJECT
MARKET STUDY
57% 59%
65%
77%
85%
79%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
0.0
0.5
1.0
1.5
2.0
2.5
2009 2010 2011 2012 2013 2014
Mill
ion
to
ns
of
cem
en
t
Local cement
Imported
Import ratio
![Page 10: 22.02.2016 monpolyment group](https://reader031.vdocuments.net/reader031/viewer/2022022201/5886540c1a28ab26598b4ae7/html5/thumbnails/10.jpg)
ORGUN SOUM
INTEGRATED PLANT PROJECT
![Page 11: 22.02.2016 monpolyment group](https://reader031.vdocuments.net/reader031/viewer/2022022201/5886540c1a28ab26598b4ae7/html5/thumbnails/11.jpg)
Quality specification for cement
OPC 10% 42.5 MNS 974:2008
Advantages of Moncement plant
with dry-method technology
Water consumption is 4-5 times less than
wet-method technology
Power consumption is 30% less than that of
wet-method technology
Dust level is 30mg/Hm3 NOx, Sox –
negligible amount
WHR system produces 5MW of
power by using waste heat
Fuel consumption is 2 times less than that of
wet-method technology
90% of living and industrial used water is
recycled and re-used
Mineral additive – 10% zeolite
Grinding rate – R008% < 3
Blaine S cm2/g > 3200
Uneven fluctuation in volume – No
Compressive strength after 28 days – 47.5 mPa
Creeping rate after 28 days – 7.8 kg/cm2
MONCEMENT PLANT TECHNOLOGY
![Page 12: 22.02.2016 monpolyment group](https://reader031.vdocuments.net/reader031/viewer/2022022201/5886540c1a28ab26598b4ae7/html5/thumbnails/12.jpg)
URGON SOUM INTEGRATED PLANT
The site in July 2013
![Page 13: 22.02.2016 monpolyment group](https://reader031.vdocuments.net/reader031/viewer/2022022201/5886540c1a28ab26598b4ae7/html5/thumbnails/13.jpg)
URGON SOUM INTEGRATED PLANT
The site in September 2015
![Page 14: 22.02.2016 monpolyment group](https://reader031.vdocuments.net/reader031/viewer/2022022201/5886540c1a28ab26598b4ae7/html5/thumbnails/14.jpg)
![Page 15: 22.02.2016 monpolyment group](https://reader031.vdocuments.net/reader031/viewer/2022022201/5886540c1a28ab26598b4ae7/html5/thumbnails/15.jpg)
ENGINEERING OF THE PLANT
• Implementation of the BAT for all process (dust and gas emissions)
• Continuous monitoring of the emissions
• No solid wastes
• Waste water rejects are treated and meet the Mongolian standards
• Energy saving (Plant performance and WHGG)
• Water saving and recycling
ENVIRONMENTAL & SOCIAL ACTION PLAN
ENVIRONMENTAL STEWARDSHIP
OTHER IMPORTANT ACTIONS
• Hydrogeology study and monitoring
• Biodiversity study and monitoring
![Page 16: 22.02.2016 monpolyment group](https://reader031.vdocuments.net/reader031/viewer/2022022201/5886540c1a28ab26598b4ae7/html5/thumbnails/16.jpg)
ENVIRONMENTAL & SOCIAL ACTION PLAN
SUPPORT TO THE LOCAL COMMUNITY
![Page 17: 22.02.2016 monpolyment group](https://reader031.vdocuments.net/reader031/viewer/2022022201/5886540c1a28ab26598b4ae7/html5/thumbnails/17.jpg)
JUNE 26TH, FIRST DELIVERIES OF
MATERIALS FOR CEMENT LINE TESTING
17
![Page 18: 22.02.2016 monpolyment group](https://reader031.vdocuments.net/reader031/viewer/2022022201/5886540c1a28ab26598b4ae7/html5/thumbnails/18.jpg)
ULAANBAATAR GRINDING STATION
PROJECT ESSENTIALS
A grinding station in Ulaanbaatar
corresponds to our commercial
strategy
• Cement terminal for direct
sales
• The biggest cement storage
in UB: customers request
• Optimization of logistics &
investment
Technical data
• Connected to the railroad
• 650 ktpy
• EPC contract awarded to
CEIEC
Schedule & progress
• Civil works in progress
• Commissioning Q3 2016
![Page 19: 22.02.2016 monpolyment group](https://reader031.vdocuments.net/reader031/viewer/2022022201/5886540c1a28ab26598b4ae7/html5/thumbnails/19.jpg)
19
www.monpolymet.mn/eng/