228 bernhard rd - fayette county, georgia
TRANSCRIPT
228 Bernhard Rd
Total Cost: $46,257
Const Start Date: 3/7/2016
Completion Date: 3/14/2016
Est. Project Length: 1 Week
Current Status: Complete
Date Updated: 7/12/2016
Construction: Compete
Right Of Way:
Preliminary Eng:
Utilities:
Property Access:
Contractor: McCoy Grading
Cost Estimate: $5,520.98
Post Construction Photo
Problem: Washout around an undersized 36 in. diameter corrugated metal pipe inlet caused shoulder and pipe failure.
Construction Photo
Pre-construction Photo
Percent Complete: 100
Construction: Compete
Propsed Solution: Replace the current pipe with a 42 in.reinforced concrete pipe and headwalls.
Wednesday, July 13, 2016 Page 1 of 1
Brittany Way
Total Cost: $67,432
Const Start Date: 5/27/2014
Completion Date: 9/14/2014
Est. Project Length: 3 Weeks
Current Status: Complete
Date Updated: 7/13/2016
Construction: In-House
Right Of Way:
Preliminary Eng: Complete
Utilities: Complete
Property Access: Complete
Contractor: Fayette County
Cost Estimate: $75,000.00
Post Construction Photo
Problem: Road floods during the 2-year storm event.
Construction Photo
Pre-construction Photo
Percent Complete: 100
Construction: In-House
Propsed Solution: Install a 3'x6' concrete box culvert 60' long under Brittany Way.
Wednesday, July 13, 2016 Page 1 of 1
105 Canterbury Ln
Total Cost: $101, 636
Const Start Date: 12/24/2015
Completion Date: 12/31/2015
Est. Project Length: 1 Week
Current Status: Completed
Date Updated: 7/11/2016
Construction: Complete
Right Of Way:
Preliminary Eng:
Utilities:
Property Access:
Contractor: Brent Scarbrough and Company
Cost Estimate: $24,671.06
Post Construction Photo
Problem: On 12/24/15, approximately 60 homes within the Chanticleer Subdivision were without water and had no access to and from their homes when a 72-inch diameter corrugated metal pipe failed, collapsing the road.
Construction Photo
Pre-construction Photo
Percent Complete: 100
Construction: Complete
Propsed Solution: 1 - 72-inch RCP pipe with headwall
Wednesday, July 13, 2016 Page 1 of 1
110 Lawson Ln
Total Cost: $94,509
Const Start Date: 7/1/2015
Completion Date: 8/15/2015
Est. Project Length: 3 Weeks
Current Status: Completed
Date Updated: 7/12/2016
Construction: Complete
Right Of Way:
Preliminary Eng: Complete
Utilities: Complete
Property Access: Complete
Contractor: Fayette County
Cost Estimate: $65,000.00
Post Construction Photo
Problem: Undersized pipes in Northridge Subdivision results in flooding of road, lots and several homes along Lawson Lane. Project would replace existing pipe and add additional drainage structures.
Construction Photo
Pre-construction Photo
Percent Complete: 100
Construction: Complete
Propsed Solution: Replace existing pipe and add additional drainage structures.
Wednesday, July 13, 2016 Page 1 of 1
144 Lowery Rd
Total Cost: $44,523
Const Start Date: 3/12/2016
Completion Date: 3/18/2016
Est. Project Length: 1 Week
Current Status: Complete
Date Updated: 7/11/2016
Construction: Complete
Right Of Way:
Preliminary Eng: Complete
Utilities: Complete
Property Access: Complete
Contractor: McCoy Grading
Cost Estimate: $23,543.16
Post Construction Photo
Problem: Washout around the 54 in. diameter corrugated metal pipe caused shoulder and pipe failure.
Construction Photo
Pre-construction Photo
Percent Complete: 100
Construction: Complete
Propsed Solution: Replaced the current pipe with a 60 in. reinforced concrete pipe and headwalls.
Wednesday, July 13, 2016 Page 1 of 1
456 Mcbride Rd
Total Cost: $41,820
Const Start Date: 3/1/2016
Completion Date: 3/4/2016
Est. Project Length: 1 week
Current Status: Completed
Date Updated: 7/12/2016
Construction: Complete
Right Of Way:
Preliminary Eng:
Utilities:
Property Access:
Contractor: McCoy Grading
Cost Estimate: $6,127.50
Post Construction Photo
Problem: Washout around the 54 in. diameter corrugated metal pipe caused complete road failure.
Construction Photo
Pre-construction Photo
Percent Complete: 100
Construction: Complete
Propsed Solution: Install a 54 in. reinforced concrete pipe and headwalls.
Wednesday, July 13, 2016 Page 1 of 1
155 Westbridge Cir
Total Cost: $68,419
Const Start Date: 1/12/2016
Completion Date: 1/14/2016
Est. Project Length: 1 week
Current Status: Completed
Date Updated: 7/13/2016
Construction: Complete
Right Of Way:
Preliminary Eng:
Utilities:
Property Access:
Contractor: Brent Scarbrough and Company
Cost Estimate: $3,846.48
Post Construction Photo
Problem: During the 2015 Christmas and New Years flooding events two-36 in. diameter corrugated metal pipes failed causing immanent road failure.
Construction Photo
Pre-construction Photo
Percent Complete: 100
Construction: Complete
Propsed Solution: Replace with two-36 in. diameter reinforced concrete pipes and headwalls.
Wednesday, July 13, 2016 Page 1 of 1