22c33d~1.pdf
TRANSCRIPT
-
Ove Arup & Partners Hong Kong Ltd. Job No. Sheet No. Rev.Calculation Sheet
Member / Location 22nd Floor - Slab S28 - Strip Y2 Top.
Job Title Residential Development At Ho Man Tin Drg. Ref.
Typical 1-way Slab Design - Tower 2 Made by T.V. Date Chd. N.T.
Design Information:
Flange width, bf = mm
Web width, bw = mm
Section depth, D = mm
Flange depth, hf = mm
Top clear cover = mm
Bottom clear cover = mm
Concrete strength = Mpa
Rebar strength = MPa
Design Moment = kNm
Tensile Reinfrocement Compression Reinforcement (Not required)
As, req. = sq.mm > As, min
< As, max = sq.mm
Provide Provide
1st Layer = T 10 - 8 1st Layer = T 0 - 5
Spacing = mm Spacing = mm
2nd Layer = T 0 - 5 2nd Layer = T 0 - 5
Spacing = mm Spacing = mm
3rd Layer = T 0 - 5 3rd Layer = T 0 - 5
Spacing = mm Spacing = mm
4th Layer = T 0 5 As, prov. = sq. mm > As, req.
Spacing = mm = %
==> OK
As, prov. = sq. mm > As, req.
= %
==> OK
Shear Reinforcement
Design Element = (e.g. Slab or Beam) 1
With shear reinfrocement = (e.g. Yes or No)
vc = N/mm2
vmax. = N/mm2 OK!
Location =
av =
Shear froce =
v =
Enhanced vc =
Asv/sv, req. =
Bar size = T - 10 NO SHEAR LINKS IS REQUIRED
47.0
ARUP214807
3-Nov-12
1000
1000
250
0
40
35
45
460
200 200
618
10000
125 200
slab
200 200
0
200 0
628
0.251
no
0.622
5.367
1 2 3 4 5 6 7 8
0 500 1000 1500 2000 2500 3000 3500
1050.0 120.0 0 0 0 0 0 0
0.000 0.000
0.622 0.622 0.622
5.250 0.600 0.000 0.000 0.000 0.000
5.367 0.622 0.622 0.622 0.622
0.000 0.000 0.000 0.000 0.000 0.0000.000 0.000