  • 8/12/2019 23-08-2013 Daily Progress Report Chishtian Grid

    1/4

    SUBJECT: 220 KV NEW SUB STATION CHISHTIAN AND VEHARI SUB STATION EXT. PROJECT (PACKAGE-I)

    To,

    TodayThis

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date

    Excavation 1.0 12.0 12.0 25.0 10.0 0 21 21

    Lean Concrete 1.0 12.0 12.0 25.0 10.0 0 18 18

    Pad Concrete 1.0 12.0 12.0 25.0 10.0 0 6 6

    Pedestal 1.0

    Backfilling

    Struc. Erection

    Struc.insp.

    Equip. Erec.

    TodayThis

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date

    Excavation 27 27 40.0 140.0

    Lean Concrete 0 18 18 40.0 134.0

    Pad Concrete 31.0 92.0

    Pedestal 11.0 31.0 27.0

    Backfilling

    Struc. Erection

    Struc.insp.Equip. Erec.

    Remarks:

    3. Excavation of Equipment foundations in progress.

    132 kV Switch Yard

    TYPE-iii (327.5 m)

    Activities

    ActivitiesC.V.T (26 Nos)

    Current Trasnsformer

    (39 Nos)

    Asst.construction Manager(Zia Shafqat Ali)

    TYPE-ii (45 m)

    Power Transformer

    10/13 MVA (1 No)

    High Level Gantry

    (12 Nos)

    Low Level Gantry

    (12 Nos)

    Marshaling Kiosik

    (10+6=16 No)

    1. Compaction of Base (water bound) for approach road in progress.2. Concrete pouring of cable trench covers in progress.

    Draw Pit

    (4+3=7 Nos)

    Bus/Line Isolator

    (20+8=28 Sets)

    Post Insulator

    (9 Nos)

    Circuit Breaker

    (10 Sets)

    Trenches (m)

    TYPE-iv (378 m)

    Surge Arrestor

    (27 Nos)

    Daily Progress ReportContractor: NEIE 220/132 kV New Sub Station Chishtian

    NEIE Project Coordinator

    Dated: 23/08/2013

  • 8/12/2019 23-08-2013 Daily Progress Report Chishtian Grid

    2/4

    To,

    TodayThis

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date

    Excavation 2.0 10.0 5.0 4.0 6.0

    Lean Concrete 2.0 10.0 5.0 4.0 2.0

    Pad Concrete 2.0 10.0 5.0 4.0 1.0

    Pedestal 2.0

    Backfilling

    Struc. Erection

    Struc.insp.

    Equip. Erec.

    TodayThis

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date

    Excavation 9.0 6.0 15.0 70.0

    Lean Concrete 9.0 6.0 15.0 60.0

    Pad Concrete 8.0 6.0 15.0 57.0

    Pedestal 29.0 57.0

    Backfilling

    Struc. Erection

    Struc. Insp.

    Equip. Erec.

    Remarks:

    6. Concrete pouring of Fire wall 4th lift (4 m) Completed.

    220 kV Switch Yard

    ActivitiesIs ol ator (16 se ts) C.V.T ( 4 Nos)

    Circuit Breaker

    (6 Sets)

    Trenches (m)Current Transformer(18 Nos) TYPE-iii (117 m)TYPE-ii (255 m)

    Asst.Construction Manager

    High Level

    (Tower Gantry) (4 Nos)

    TYPE-iv (230.5 m)

    5. Concrete pouring of culvert slab for transformer way (3/3 Nos) Completed.

    4. RCC Concrete of path way 4 Nos. Pannel (60 m Completed).

    3. PCC (1:4:8) of path way 4 Nos. Pannel (60 m Completed).2. RCC Topping of transformer way 10 Nos Pannel (175/250 m) completed.

    1. PCC (1:4:8) of transformer way (200/250 m) Completed.

    zia shafqat ali

    NEIE Project Coordinator

    Daily Progress Report

    Activities

    Surge Arrestor

    (12 Nos)

    High Level

    (Line Gantry) (5 Nos)

    Auto Transformer

    160 MVA (2 Nos)

    Low Level

    (Bus Gantry) (10 Nos)

    C.C.V.T Line

    (6 Nos)

    SUBJECT: 220 KV NEW SUB STATION CHISHTIAN AND VEHARI SUB STATION EXT. PROJECT (PACKAGE-I)

    Post Insulator

    (20 Nos)

    Dated: 23/08/2013

    Contractor: NEIE 220/132 kV New Sub Station Chishtian

  • 8/12/2019 23-08-2013 Daily Progress Report Chishtian Grid

    3/4

    To,

    Sr. No

    1

    2

    3

    4

    5

    6

    7

    8

    8

    NOTE:

    (zia shafqat ali)

    Concrete pad of Cable trench in 11 kVswitch room

    Sub Structure (Lean,Footing,Footing Beam, Brick Work, DPCs, Columns up to plinth

    level,Plinth Beam & Backfilling under flooring)

    Preparation for Flooring In progress

    1. Fixing of fence frame &Cement plaster of switchyard fence wall columnin progress.

    Ground Floor Brick work of super structure In progress

    Cutting, Bending & fixing reinforcement of roof slab & Beams Completed

    Form work of cable trench walls in A/C , D/C room In progress

    NEIE

    Daily Progress Report

    Control House Building

    SUBJECT: 220 KV NEW GRID STATION CHISHTIAN AND VEHARI GRID STATION EXT. PROJECT (PACKAGE-I)

    Dated:23/08/2013

    Asst.Construction Manager

    Project Coordinator

    NEIE-AL-HUSSAIN

    Contractor: NEIE

    CompletedConcrete Pouring of 2nd Floor Roof Slab + Beams

    Concrete Pouring of 1st Floor Roof Slab + Beams Completed

    Completed

    Status

    Completed

    Completed

    Descripition of Activities

    Form work of 2nd roof Beams & slab

  • 8/12/2019 23-08-2013 Daily Progress Report Chishtian Grid

    4/4

    To,

    TodayThis

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date

    Excavation 2.0 4.0 2.0 6.0 6.0 6.0 6.0 9.0 9.0

    Lean Concrete 2.0 4.0 2.0 6.0 6.0 6.0 6.0 9.0 9.0

    Pad Concrete 2.0 4.0 2.0 6.0 6.0 9.0 9.0

    Pedestal 2.0 2.0 3.0 4.0

    Backfilling

    Struc. Erection

    Struc.insp.

    Equip. Erec.

    TodayThis

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date Today

    This

    MonthTo Date

    Excavation 18.0 18.0 9.0 9.0 12.0 12.0

    Lean Concrete 16.0 16.0 9.0 9.0 12.0 12.0

    Pad Concrete 16.0 16.0 9.0 9.0 12.0 12.0

    Pedestal

    Backfilling

    Struc. Erection

    Struc. Insp.Equip. Erec.

    Remarks:

    Asst.Construction Manager

    SUBJECT: 220 KV VEHARI SUB STATION EXT. PROJECT (PACKAGE-I)

    Bus Gantry

    (2 Nos)

    Dated: 23/08/2013

    Current Transformer

    (12 Nos)

    220 kV Switch Yard

    Activities

    Contractor: NEIE

    Post Insulator

    (10 Nos)

    NEIE

    Project Coordinator

    NEIE-AL-HUSSAIN

    (zia shafqat ali)

    Surge Arrestor

    (6 Nos)

    Daily Progress Report

    Line Gantry

    (4 Nos)

    Tower Gantry

    (2 Nos)

    C.C.V.T Line

    (2 Nos)

    1. Form work & Steel reinforcement of Circuit Breaker & Isolator in progress.

    Trenches (m)Activities

    I solator (2 4 Nos .) C.V.T ( 2 Nos )Circuit Breaker

    (9 Nos)