23 acceptance form

3
Acceptance Form For [Project Name] Acceptance Form PROJECT DETAILS Project Name: Project Manager: Name of the project that produced the deliverable Name of the Project Manager who was responsible for producing the deliverable ACCEPTANCE DETAILS Acceptance ID: Requested By: Date Requested: Unique identifier for this acceptance request Name of person who is requesting acceptance of the deliverable Date on which this form is completed Deliverable: Describe in detail the deliverable that the customer is being asked to accept. ACCEPTANCE CRITERIA Criteria: List the criteria against which the deliverable has been tested (as stated in the Procurement Plan ). Standards: List the standards against which the deliverable has been tested. (as stated in the Procurement

Upload: achraf-boudaya

Post on 09-Feb-2016

8 views

Category:

Documents


0 download

DESCRIPTION

Acceptance Form

TRANSCRIPT

Page 1: 23 Acceptance Form

 

  Acceptance FormFor [Project Name]     

 Acceptance Form  PROJECT DETAILS

Project Name:Project Manager: 

Name of the project that produced the deliverableName of the Project Manager who was responsible for producing the deliverable 

ACCEPTANCE DETAILS

Acceptance ID:Requested By:Date Requested: 

Unique identifier for this acceptance requestName of person who is requesting acceptance of the deliverableDate on which this form is completed 

Deliverable:  Describe in detail the deliverable that the customer is being asked to accept.  

ACCEPTANCE CRITERIA

Criteria:  List the criteria against which the deliverable has been tested (as stated in the Procurement Plan).  

Standards:  List the standards against which the deliverable has been tested. (as stated in the Procurement Plan).  

ACCEPTANCE RESULTS

Within the following table, list the criteria and standards used for testing and for

Page 2: 23 Acceptance Form

each, identify the following: Testing methods used

Reviewer who was responsible for undertaking the acceptance test

Date the test was completed

Overall result of the test (Failed, Passed or Exceeded the criteria / standard)

 Acceptance Method Reviewer Date ResultCriteria        

Criteria for Review Method used

Name of Reviewer

Date of Review

Result of Review

Standard        Standard for Review

Method used

Name of Reviewer

Date of Review

Result of Review

 

CUSTOMER APPROVAL

Supporting Documentation:  Reference any supporting documentation used to substantiate this acceptance request.  

Signature:_______________________

Date:___/___/____

PLEASE FORWARD THIS FORM TO THE CUSTOMER FOR APPROVAL

 

 © 2000 - 2006 Method123 Ltd. All rights reserved