PROJECT BACKGROUND
In 2004, Carnegie Library of Pittsburgh’s Downtown & Business branch moved into newly renovated office space at 612 Smithfield Street, occupying the first floor and lower level. With that space now out-grown, the Library investigated various downtown sites for relocation, and ultimately concluded that its best solution was to remodel at 612 Smithfield Street.
Concurrent with the investigation of various sites during 2017, L+K facilitated the development of a program for the Downtown branch which acknowledges a changing downtown community and an evolving role for the Library. That program was updated in 2018 with input by CLP staff, facilities, and administration, and is attached within this document for reference. Changes in the nature of its Down-town collections, expanded teen and children’s departments, new partnering opportunities, new image considerations and other goals were outlined. During programming sessions, it was clearly expressed that the library should have an important presence downtown.
Throughout the site selection and Schematic Design process, all Library staff have been engaged par-ticipants, thoughtful about the role of the library and enthusiastic about the potential of the new space.
Carnegie Library of Pittsburgh Participants:
Mary Francis Cooper President and DirectorRon Graziano Director, FacilitiesLinda Barsevich Director, Finances and AdministrationMary Monaghan Director for Public ServicesCarlton Stout Interim Library Services Administrator, Neighborhood LibrariesHolly Anderton Branch Manager, CLP DowntownLisa Dennis Collections CoordinatorErin Zambataro Youth and Family Services CoordinatorSarah Beasley Library Services Administrator, Collection Development
and many thanks to the input of CLP Downtown’s Librarian and Staff team
CLP Downtown Design Team:
Loysen + Kreuthmeier Architects ArchitectsWNA Engineering, Inc. HVAC, Electrical, Plumbing, Fire Protection ConsultantWhitney Bailey Cox and Magnani, LLC Structural Consultant
Corner of Smithfield and 6th Avenue, on Marathon Day 2019
Corner of Smithfield and 6th Avenue, before Alcoa, and with Alcoa under construction
Carnegie Library of Pittsburgh, Downtown: PDP PRESENTATION24 March 202
SCHEMATIC DESIGN NARRATIVE
With the goal of creating a vibrant presence for the downtown branch, one key consideration was to re-think the front façade and entry – that is, from the outside in.
• To create a more open, inviting façade, remove existing opaque spandrel glass and re-glaze the en-tire existing storefront with new clear glass, preferably with low iron, or other non-reflective, glass. Remove interior bulkheads along the windows to increase the opening height. • To create a more dynamic and visible entry, a new two-story vestibule is created with new glazing and storefront. The new storefront is angled to break the plane of the existing façade and enable sliding automatic doors to be used for entrance doors. Within this new angled entry is to be a large, lighted library logo – anticipated to be neon or LED, as an update to the large logo signs used to date.• Visible from the sidewalk and within the vestibule will be a new monumental stair (the original open-ing to the basement space will be closed in) and a new, machineroom-less elevator to the 2nd floor. These new vertical elements are anticipated to invite children, teen and partnering center users to their 2nd floor spaces.• Also visible from the sidewalk and vestibule will be the first bay of the library, dedicated to retail-like displays, all moveable, and pop-up activities or events.
On the interior, spaces are organized so that the primary adult collections as well window-shopping displays and grab-and-go collections are on the first floor. Staff work areas and book processing are also located on the first floor. For customer assistance, a hierarchy of options is provided:• I Can Help – first stop, aiming new customers in the right direction• Customer Services Desk – helping customers obtain a card, pay fees, or with other administra tive needs• Reference Desk – to help customers search for specific books or information • Partnering - places for help organizations to facilitate learning and research• Self-Service – book drop, self-serve reserves, self-check, self-serve printer/fax/copier, opac, & queue• Security Desks - two on the first floor and one on the second floor, with guards accustomed to fielding ad-hoc questions
Children’s and Teen’s spaces are located on the 2nd floor, along with Meeting Rooms and the new Partnering Center. Specific considerations for these include:
• All meeting rooms and programming rooms will have glass walls and doors for visibility• All meeting and programming rooms will have smart boards or tv screens• All desks will have access to power.• The Teen area includes a recording booth
Also located on the 2nd floor are the primary public toilets, which will have no doors, the Staff Lounge, and various back-of-house functions. A catering pantry serving the meeting rooms is located on the section floor.
The new design will create a more dynamic, three dimensional presence for the library entrance
Street view before Street view after
Carnegie Library of Pittsburgh, Downtown: PDP PRESENTATION24 March 202
existing floor plans, basement & first floors
Carnegie Library of Pittsburgh, Downtown: PDP PRESENTATION24 March 202
UP
17'-8
"
B
17'-8
"
C
17'-8
"
D
17'-8
"
E
17'-8
"
F
17'-8
"
G
A
reference
bookdrop
20'-11 7/8"
2
18'-4"
3
18'-4"
4
18'-4"
5
18'-4"
6
18'-4"
7
18'-4"
8
18'-4"
9
18'-2 1/8"
101
Vestibule
100a
Adult Collections
102
Manager's Office
103a
Workroom
103
Mini Offices
Janitor
107a
IT/ Server
107b
Unisex
106
Unisex
105
Elevator
Circ Rm
108
Pop-Up/Grab & Go
101
Stor
103c
Coats
103b
5 6
8 8
10 8
8 5
10
10
8
6
8
8 (5 Typ)
8
10
5
5
5
customer services
Computers
Reserves
display
I can help
overhead roll-down grille
security
security
stair up
automatic sliding door, typ of
two in vestibule
sloped entry floor
Pop-Up/Grab & Go
110
trucksbins
bw
trucks
staggered section
self check
copier
self check
catalog
Arcade Corr
100b
Corr
104
note: door to be readily openable from the egress
side w/o use of key, special knowledge or effort
12 March 2020
1ST FLOOR
Carnegie Library of Pittsburgh
Downtown Renovation612 Smithfield Street
Pittsburgh, PA 15222
IFC Set
PROJECT NORTH
12 March 2020
1ST FLOOR
Carnegie Library of Pittsburgh
Downtown Renovation612 Smithfield Street
Pittsburgh, PA 15222
IFC Set
GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
Codes: All work shall be done in strict accordance with applicable codes including but not limited
to ICC 2015 and City of Pittsburgh Amendments, and regulations and the highest written
standards specified by applicable trade associations.
Permits and Inspections: Building Permits and inspections shall be paid for and procured by the by
the Contractor.
Testing and Special Inspections: Concrete testing and other required testing or Special
Inspections are the responsibility of and shall be paid for by the Contractor.
Coordination: Contractors shall thoroughly familiarize themselves with existing conditions, finishes,
and materials prior to submitting proposals. Field confirmation shall include, but not be limited to,
critical dimensions, trueness of existing framing (where applicable) and critical substrates prior to
commencing work. Notify architect of any discrepancies or imperfections noted above that would
affect progress and/or installations of this contract.
Material & Equipment: The Contractor shall provide all materials, labor and equipment necessary
for completion of the work. Materials noted on one drawing are typical for all materials similarly
depicted. All materials shall be new unless specifically indicated otherwise. Materials damaged in
transport or during construction shall be replaced at no cost to the Owner.
Salvage Materials: The Contractor shall remove the existing windows, doors and trim and set
aside as directed by Owner for salvage by Owner. Where doors/door frames or door casings are
marked for salvage or re-use - patch & re-finish areas where ex'g hardware is to be removed or
where new hardware is to be set in holes or notches smaller than the original. Alternate- replace
door, frame or casing w/ new to match.
Cutting & Patching: All existing finishes disturbed during the course of this work shall be restored
to original condition. New finishes shall match existing, where adjacent, as closely as possible,
unless noted otherwise.
Blocking: Provide wood blocking for all wall-mounted equipment, accessories, handrails, etc. as
required for structural integrity.
Fire Rated Construction: Any penetrations through existing fire rated construction are to be sealed
with appropriate fire-retardant sealants.
Do not scale the drawings. All Dimensions shall be field verified by the Contractor. Dimensions
not indicated on plan shall be verified with Architect prior to any construction.
Owner will abate any material required per the hazardous materials report where present in
accordance with the requirements of the authorities having jurisdiction. Clean all surfaces as
required to prep for new finish. ** Scrape paint and wallpaper from walls and columns to original
plaster. Notify Architect for inspection of original plaster prior to clear coating or painting for final
finished surface.
Abatement of Lead Paint: Remove all peeling paint concerning removal & abatement of lead paint
in compliance w/ all applicable codes and regulations of all authorities jurisdiction including those
of the Allegheny County Health Department.
Existing window caulking at windows to be removed may contain asbestos. Owner will
remove/abate ACM in compliance w/ all applicable codes and regulations of all authorities
jurisdiction including those of Allegheny County Health Department.
Areas disturbed through demolition are to be patched to match surrounding finish or condition
unless noted otherwise. New structural support to be provided to complete intended work
indicated.
Refer to Sheet A7.2 for scope of custom casework under separate contract. Coordinate with
casework by others.
KEYNOTES
1
Install new hardwood cased opening in shelving unit. Opening to be lit from the top.3
4 One-way reflective, fixed glass in partition wall to allow manager and staff to view public.
5
Install concealed wall brackets to support counters
6
7
9
New light weight concrete slab on metal deck, slope as required. Refer to structural drawings.
2 New raised concrete slab-on-deck. Raise 12"± in IT Room, and an addition 12"± in Janitor's
closet. Refer to structural drawings.
Install new fixed aluminum framed IG (insulated glass) window and sill to match existing
adjacent construction.
Install salvaged stainless steel semi-recessed fire extinguisher cabinet and extinguisher.
Interactive lighted wall by others8
Card access door10
Install new stainless steel semi-recessed AED cabinet, typ of (2) two, one per floor
AED devices by Owner
24 Jan 2020
ADDENDUM No.4: In Addendum Text
Carnegie Library of Pittsburgh, Downtown: PDP PRESENTATION24 March 202 12 March 2020
2ND FLOOR
Carnegie Library of Pittsburgh
Downtown Renovation612 Smithfield Street
Pittsburgh, PA 15222
IFC Set
B
C
D
E
F
G
A
bookdrop
2 3 4 5 6 7 8 9 101
Janitor
206e
Elevatorcustomer services
Women
207
Men
208
Info Blast
209
Meeting Room
212
Teens
201a
Teen Program
201b
Record'g
202
Storage
201c
Storage
204c
Mini
203
Children's Program
204b
Children's
204a
Family
205
Staff
206b
Staff
206c
Staff Lounge
206d
open
Open
Pantry
214
Copy/Fax
213
Meeting Storage
215
security
Building Storage
216
Tech Classroom
211
Study
210a
Study
210b
Study
210c
Study
210d
Exit
5 (4)
5 (4)
6 5
10 (3)
6 (4)
4
5 (5)
4 (4)
24 (4)
self check
Open
partnering librarian
teen librarian
children's librarian
8' cage partitions and lockable gates
bench seating w storage under
bench seating w storage under
pantry
ref
dw
trash
recyc
staff lockers
volu
ntee
r lo
cker
s
staggered section
pop-up
5 (5)
part
ner
files
programming general general general
Lobby
200a
Arcade Corridor
200b
Corridor
206a
Partnering
210
reading niche
2 (4)
PROJECT NORTH
GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
Codes: All work shall be done in strict accordance with applicable codes including but not limited
to ICC 2015 and City of Pittsburgh Amendments, and regulations and the highest written
standards specified by applicable trade associations.
Permits and Inspections: Building Permits and inspections shall be paid for and procured by the by
the Contractor.
Testing and Special Inspections: Concrete testing and other required testing or Special
Inspections are the responsibility of and shall be paid for by the Contractor.
Coordination: Contractors shall thoroughly familiarize themselves with existing conditions, finishes,
and materials prior to submitting proposals. Field confirmation shall include, but not be limited to,
critical dimensions, trueness of existing framing (where applicable) and critical substrates prior to
commencing work. Notify architect of any discrepancies or imperfections noted above that would
affect progress and/or installations of this contract.
Material & Equipment: The Contractor shall provide all materials, labor and equipment necessary
for completion of the work. Materials noted on one drawing are typical for all materials similarly
depicted. All materials shall be new unless specifically indicated otherwise. Materials damaged in
transport or during construction shall be replaced at no cost to the Owner.
Salvage Materials: The Contractor shall remove the existing windows, doors and trim and set
aside as directed by Owner for salvage by Owner. Where doors/door frames or door casings are
marked for salvage or re-use - patch & re-finish areas where ex'g hardware is to be removed or
where new hardware is to be set in holes or notches smaller than the original. Alternate- replace
door, frame or casing w/ new to match.
Cutting & Patching: All existing finishes disturbed during the course of this work shall be restored
to original condition. New finishes shall match existing, where adjacent, as closely as possible,
unless noted otherwise.
Blocking: Provide wood blocking for all wall-mounted equipment, accessories, handrails, etc. as
required for structural integrity.
Fire Rated Construction: Any penetrations through existing fire rated construction are to be sealed
with appropriate fire-retardant sealants.
Do not scale the drawings. All Dimensions shall be field verified by the Contractor. Dimensions
not indicated on plan shall be verified with Architect prior to any construction.
Owner will abate any material required per the hazardous materials report where present in
accordance with the requirements of the authorities having jurisdiction. Clean all surfaces as
required to prep for new finish. ** Scrape paint and wallpaper from walls and columns to original
plaster. Notify Architect for inspection of original plaster prior to clear coating or painting for final
finished surface.
Abatement of Lead Paint: Remove all peeling paint concerning removal & abatement of lead paint
in compliance w/ all applicable codes and regulations of all authorities jurisdiction including those
of the Allegheny County Health Department.
Existing window caulking at windows to be removed may contain asbestos. Owner will
remove/abate ACM in compliance w/ all applicable codes and regulations of all authorities
jurisdiction including those of Allegheny County Health Department.
Areas disturbed through demolition are to be patched to match surrounding finish or condition
unless noted otherwise. New structural support to be provided to complete intended work
indicated.
Refer to Sheet A7.2 for scope of custom casework under separate contract. Coordinate with
casework by others.
KEYNOTES
1
Install new hardwood cased opening in shelving unit. Opening to be lit from the top.3
4 One-way reflective, fixed glass in partition wall to allow manager and staff to view public.
5
Install concealed wall brackets to support counters
6
7
9
New light weight concrete slab on metal deck, slope as required. Refer to structural drawings.
2 New raised concrete slab-on-deck. Raise 12"± in IT Room, and an addition 12"± in Janitor's
closet. Refer to structural drawings.
Install new fixed aluminum framed IG & T (insulated & tempered glass) window and sill to
match existing adjacent construction. Exact measurements to be verified following demolition.
Install salvaged stainless steel semi-recessed fire extinguisher cabinet and extinguisher.
Interactive lighted wall by others8
Card access door10
Install new stainless steel semi-recessed AED cabinet, typ of (2) two, one per floor
AED devices by Owner
24 Jan 2020
ADDENDUM No.4: In Addendum Text
11 Existing windows to be re-glazed with IG & T (insulated & tempered glass). Verify existing
window sizes before replacing.
Carnegie Library of Pittsburgh, Downtown: PDP PRESENTATION24 March 202
Carnegie Library of Pittsburgh, Downtown: PDP PRESENTATION24 March 202
Carnegie Library of Pittsburgh, Downtown: PDP PRESENTATION24 March 202
Coming Soon.....!