2.5 planting plan services/document...march 24, 2015 hopewell stream mitigation site record drawings...

39

Upload: others

Post on 05-Feb-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

  • Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-C

    over

    Not

    es.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    Gen

    eral

    Not

    es a

    nd S

    ymbo

    ls

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    0.2

    Febr

    uary

    27,

    201

    5

    Property Line

    Right of Way

    Designed Major Contour

    Designed Minor Contour

    Designed Bankfull

    Trees Saved During Construction

    Power Pole

    Farm Road

    Conservation Easement

    As-Built Thalweg Alignment

    As-Built Bankfull

    As-Built Major Contour

    As-Built Minor Contour

    Designed Angle Log Drop

    Designed Rootwad

    Designed J-Hook

    Designed Cover Log

    Designed Constructed Riffle

    Designed Chunky Riffle

    Designed Rock and Roll Riffle

    Designed Woody Riffle

    As-Built Brush Mattress

    As-Built Brush Toe

    10+00

    100

    100

    PL PL

    CE CE

    Deviation from design shown in red.

    As-Built Angle Log Drop

    As-Built Rootwad

    As-Built J-Hook

    As-Built Cover Log

    As-Built Constructed RiffleDeviation from specified riffletype noted on plan sheets.

    Designed Brush Mattress

    Designed Brush Toe

    Designed Permanent Ford Crossing

    CR-NM

    CR-CH

    CR-RR

    CR-WD

    CR-NM

    CR-CH

    CR-RR

    CR-WD

  • 0' 150' 300' 450

    (HORIZONTAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ojec

    t Ove

    rvie

    w.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    Proj

    ect O

    verv

    iew

    - E

    ast S

    ide

    Stre

    am P

    lan

    and

    Pro

    file

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.0

    Febr

    uary

    27,

    201

    5

    N

    P

    L

    P

    L

    P

    L

    PL

    PL

    P

    L

    PL

    PL

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    PL

    PL

    P

    L

    P

    L

    P

    L

    PL

    PL

    PL

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    P

    L

    P

    L

    P

    L

    PL

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL PL

    PL

    PL

    PL

    PL

    PL

    PL

    P

    L

    P

    L

    P

    L

    P

    L

    PL

    PL

    PL

    PL

    PL

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    LITTL

    E RIV

    ER R

    EACH

    2 UT1B REACH 3

    UT1A REACH 1

    UT1A REACH 1

    UT1B REACH 2

    UT1B REACH 1

    LITTL

    E RI

    VER

    REAC

    H 1

    LITTLE RIVER REACH 2

    STA 131+57END LITTLE RIVER REACH 2ENHANCEMENT II

    STA 350+00BEGIN UT1B REACH 3ENHANCEMENT II

    STA 217+00BEGIN UT1A REACH 2PRESERVATION

    STA 305+67BEGIN UT1B REACH 2ENHANCEMENT II

    STA 200+00BEGIN UT1A REACH 1ENHANCEMENT II

    STA 100+00BEGIN LITTLE RIVER REACH 1PRESERVATION

    CE

    CE

    CE

    CECE

    CE

    CECE

    CE

    CECE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CECE

    CE

    CECECE

    CE

    CE

    CE

    CECE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CECE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CECE

    CE

    CE

    CE

    CE

    CE

    CECE

    CECE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CECE

    STA 300+87BEGIN UT1B REACH 1ENHANCEMENT I

    STA 308+25END UT1B REACH 2

    ENHANCEMENT II

    1.10

    1.26

    1.2

    1.3

    1.4

    1.5

    1.27

    1.28

    1.8

    1.29

    1.30

    1.31

    1.6

    1.7

    STA 107+04BEGIN LITTLE RIVER REACH 2

    ENHANCEMENT II

  • 0' 150' 300' 450

    (HORIZONTAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ojec

    t Ove

    rvie

    w.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    Proj

    ect O

    verv

    iew

    - W

    est S

    ide

    Stre

    am P

    lan

    and

    Pro

    file

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.1

    Febr

    uary

    27,

    201

    5

    N

    P

    L

    PL

    PL

    PL

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    PL

    PL

    P

    L

    PL

    PL

    P

    L

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PLPL

    PL

    PL

    P

    L

    P

    L

    PL

    PL

    PL

    PL

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    P

    L

    P

    L

    P

    L

    PL

    PL

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    PL

    PL PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    LITTL

    E RIV

    ER R

    EACH

    2

    STA 700+00BEGIN UT2C REACH 1

    ENHANCEMENT II

    UT2C REACH 1

    STA 600+00BEGIN UT2B REACH 1

    ENHANCEMENT II

    UT2B REACH 1

    STA 608+48BEGIN UT2B REACH 2

    RESTORATION

    STA 500+39BEGIN UT2A REACH 1ENHANCEMENT I

    STA 504+25BEGIN UT2A REACH 2RESTORATION

    UT2A REACH 2

    UT2

    REAC

    H 1

    UT2 REACH 2

    STA 400+00BEGIN UT2 REACH 1

    RESTORATION

    STA 417+65BEGIN UT2 REACH 2RESTORATION

    STA 712+50BEGIN UT2C REACH 2

    RESTORATION

    STA 800+00BEGIN UT2C REACH 3

    RESTORATION

    CE

    CE

    CE

    CE

    CECE

    CE

    CE

    CE

    CECE

    CE

    CE

    CE

    CE

    CE

    CECE

    CECE

    CE

    CE

    CECE

    CECE

    CE

    CE

    CE

    CECE

    CE

    CECECE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CECE

    CE

    CE

    CE CECE

    CE

    CECE

    CECE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CECE

    CE

    CE

    CE

    CE

    CE

    CE

    STA 713+60END UT2C REACH 2

    RESTORATION

    STA 423+16END UT2 REACH 2RESTORATION

    UT2A REACH 11.18

    1.19

    1.14

    1.20 1.15

    1.16

    1.171.21

    1.221.23

    1.24

    1.13

    1.12

    1.11

    1.10

    1.9

    1.25

    1.31

    UT2C REACH 2

  • 0' 20' 40' 60'

    (HORIZONTAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.2

    Febr

    uary

    27,

    201

    5

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    UT

    1ASt

    ream

    Pla

    n an

    d P

    rofi

    le

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CECECECECECECECE

    CECECECE

    CECE

    CECE

    CECE

    CECECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE CE CE CE CE CE CE CE CE CE CE CE

    CE

    CE

    CE

    CE

    CE

    CE

    STA 200+00BEGIN UT1A REACH 1ENHANCEMENT II

    UT1A REACH 1

    200+00

    201+00

    202+00203+00

    204+00

    205+00

    206+00

    MAT

    CH LI

    NE -

    STA

    205+

    30

  • 0' 20' 40' 60'

    (HORIZONTAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.3

    Febr

    uary

    27,

    201

    5

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    UT

    1ASt

    ream

    Pla

    n an

    d P

    rofi

    le

    CE

    CE

    CE

    CE

    CE

    CE

    CECE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CECECECECECECECECECECECE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE CE CE CE CE CE CE CE CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    UT1A REACH 1

    205+00

    206+00

    207+00

    208+00

    209+00

    210+

    00

    211+00

    212+00

    MAT

    CH L

    INE

    - STA

    205

    +30

    MATCH LINE - STA 210+80

  • 0' 20' 40' 60'

    (HORIZONTAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.4

    Febr

    uary

    27,

    201

    5

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    UT

    1ASt

    ream

    Pla

    n an

    d P

    rofi

    le

    CECE

    CECECECECECECECECECECECECE

    CECECE

    CECECE

    CECECE

    CECE

    CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CECE

    CECE

    CECE

    CECE

    UT1A REACH 1

    211+00212+00

    213+00

    214+00

    215+00

    216+00

    MAT

    CH L

    INE

    - STA

    210

    +80

    MAT

    CH L

    INE

    - STA

    216

    +00

  • 0' 20' 40' 60'

    (HORIZONTAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.5

    Febr

    uary

    27,

    201

    5

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    UT

    1ASt

    ream

    Pla

    n an

    d P

    rofi

    le

    CECE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CECE

    CECE

    CE

    CE CECE CE

    CE CECE CE

    CE CECE

    CECE

    CE

    UT1A REACH 2

    LITTLE RIV

    ER REACH

    1

    STA 218+17END UT1A REACH 2

    UT1A REACH 1STA 217+00END UT1A REACH 1BEGIN UT1A REACH 2PRESERVATION

    104+00

    105+00

    106+

    00

    107+

    00

    218+17

    216+00

    217+00

    218+00

    MAT

    CH L

    INE

    - STA

    216

    +00

  • 0' 20' 40' 60'

    (HORIZONTAL)

    0' 2' 4' 6'

    (VERTICAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    UT

    1BSt

    ream

    Pla

    n an

    d P

    rofi

    le

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.6

    Febr

    uary

    27,

    201

    5

    758

    760

    765

    770

    758

    760

    765

    770

    300+87 301+00 301+50 302+00 302+50 303+00 303+50 304+00 304+30

    DESIGN GRADE

    AS-BUILT GRADE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CECE

    CECE

    CECE

    CECE

    CECE

    CE

    CECE

    CECE

    CECE

    CE

    CECE

    CECE

    CECE

    CECE

    CECE

    CE

    CR-CHCR-RR CR-CH

    CR-WD

    CR-WD

    CR-NM

    CR-NM

    UT1B REACH 1STA 300+87BEGIN UT1B REACH 1

    ENHANCEMENT I

    300+00

    301+00

    302+00

    303+00

    304+00

    305+00

    MATC

    H LINE

    - STA

    304+

    30

  • 0' 20' 40' 60'

    (HORIZONTAL)

    0' 2' 4' 6'

    (VERTICAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    UT

    1BSt

    ream

    Pla

    n an

    d P

    rofi

    le

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.7

    Febr

    uary

    27,

    201

    5

    752

    755

    760

    765

    752

    755

    760

    765

    304+30 304+50 305+00 305+50 305+70

    DESIGN GRADE

    AS-BUILT GRADE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE CE

    CECE

    CECE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CECECE

    CECECECE

    CECECECE

    CECE

    CECE

    CECE

    CECE

    RIFFLE NOTINSTALLED DUETO BEDROCK INCHANNEL

    CR-CH

    CR-WD

    CR-WD CR-NM

    CR-RR

    CR-NM

    STA 305+67END UT1B REACH 1 ENHANCEMENT IBEGIN ENHANCEMENT II

    UT1B REACH 2

    STA 308+25END UT1B REACH 2ENHANCEMENT II

    304+00

    305+00

    306+00

    307+00

    308+00

    308+

    55

    MAT

    CH LI

    NE -

    STA

    304+

    30

  • 0' 20' 40' 60'

    (HORIZONTAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.8

    Febr

    uary

    27,

    201

    5

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    UT

    1BSt

    ream

    Pla

    n an

    d P

    rofi

    le

    CECECECECECECECE

    CECE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CECECE

    CECE

    CECE

    CECE

    CECE CE CE CE

    CE CE CE CECE CE CE CE

    CE

    CE

    CE

    CE CE CE CE CE CE

    STA 353+17END UT1B REACH 3

    LITTLE RIVER REACH 2

    UT1B REACH 3

    STA 350+00BEGIN UT1B REACH 3

    ENHANCEMENT II

    117+

    00

    118+00

    119+00

    350+00

    351+

    00

    352+00

    353+00

    353+

    17

  • 0' 20' 40' 60'

    (HORIZONTAL)

    0' 2' 4' 6'

    (VERTICAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    UT

    2St

    ream

    Pla

    n an

    d P

    rofi

    le

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.9

    Febr

    uary

    27,

    201

    5

    713

    715

    720

    725

    713

    715

    720

    725

    399+90 400+00 400+50 401+00 401+50 402+00 402+50 403+00 403+50 404+00 404+30

    AS-BUILT GRADE

    DESIGN GRADECE

    CE

    CECE

    CECE

    CECE

    CECE

    CECE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CECE

    CECE

    CECE

    CECE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CECE

    CECE

    CECE

    CECE

    CE

    CR-WD

    CR-WD

    CR-WD

    CR-WD

    CR-W

    D

    CR-NM

    CR-N

    M

    CR-WD

    UT2 REACH

    1STA 400+00BEGIN UT2 REACH 1

    RESTORATION

    399+97400+00

    401+00

    402+00

    403+00

    404+

    00

    MAT

    CH LI

    NE -

    STA

    404+

    30

  • 0' 20' 40' 60'

    (HORIZONTAL)

    0' 2' 4' 6'

    (VERTICAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    UT

    2St

    ream

    Pla

    n an

    d P

    rofi

    le

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.10

    Febr

    uary

    27,

    201

    5

    710

    715

    720

    710

    715

    720

    404+30 404+50 405+00 405+50 406+00 406+50 407+00 407+50 408+00 408+50 408+80

    AS-BUILT GRADE

    DESIGN GRADE

    CECECECE

    CECECECE

    CECECECE

    CECECECE

    CECECECE

    CECECE

    CECE

    CECE

    CECE

    CE CE CE CE CECE CE CE C

    E CE CE CECE CE CE CE

    CE

    BRUSH TOE NOT INSTALLED TOAVOID TREE IMPACTS

    CR-WD

    CR-NM

    CR-WD

    CR-WD CR-RR

    CR-WDCR

    -CH CR-RRUT2 R

    EACH 1

    404+00

    405+00

    406+00

    407+00

    408+00

    409+00

    MAT

    CH LI

    NE -

    STA

    404+

    30

    MAT

    CH LI

    NE -

    STA

    408+

    80

  • 0' 20' 40' 60'

    (HORIZONTAL)

    0' 2' 4' 6'

    (VERTICAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    UT

    2St

    ream

    Pla

    n an

    d P

    rofi

    le

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.11

    Febr

    uary

    27,

    201

    5

    705

    710

    715

    705

    710

    715

    408+80 409+00 409+50 410+00 410+50 411+00 411+50 412+00 412+50 413+00 413+50 413+60

    AS-BUILT GRADE

    DESIGN GRADE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECECE

    CECE

    CECE

    CE

    CE CE CE CE CE CE CE CE CE CE CE CE CECE

    CECE

    CECE

    CECE

    CECE

    CE

    CECE

    CECE

    CECE

    CE

    CR-C

    H

    CR-RR

    CR-RR CR-WD

    CR-RR

    CR-CH

    CR-R

    R

    CR-RR

    UT2 REA

    CH 1409+00

    410+00

    411+00

    412+00

    413+

    00

    414+00

    MAT

    CH L

    INE

    - STA

    408

    +80

  • 0' 20' 40' 60'

    (HORIZONTAL)

    0' 2' 4' 6'

    (VERTICAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    UT

    2St

    ream

    Pla

    n an

    d P

    rofi

    le

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.12

    Febr

    uary

    27,

    201

    5

    702

    705

    710

    715

    702

    705

    710

    715

    413+60 414+00 414+50 415+00 415+50 416+00 416+50 417+00 417+50 418+00 418+40

    AS-BUILT GRADE

    DESIGN GRADE

    AS-BUILT 24.5' X 30" RCP

    CE

    CECE

    CECE

    CECE

    CE

    CECE

    CECE

    CE

    CE

    CECE

    CE

    CECE

    CECE

    CECE

    CE

    CE

    CE

    CECEC

    ECE

    CR-RR

    CR-W

    D

    CR-RR

    CR-RR

    CR-R

    R

    CR-CHCR-CH

    CR-CH

    CR-CH

    UT2 R

    EACH

    1

    STA 417+65BEGIN UT2 REACH 2

    UT2

    A RE

    ACH

    2

    518+

    00

    518+68

    414+00

    415+

    00

    416+00

    417+

    00418+00

    419+00

    MAT

    CH L

    INE

    - STA

    413

    +58

    MATCH LINE - STA 418+36

  • 0' 20' 40' 60'

    (HORIZONTAL)

    0' 2' 4' 6'

    (VERTICAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    UT

    2St

    ream

    Pla

    n an

    d P

    rofi

    le

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.13

    Febr

    uary

    27,

    201

    5

    695

    700

    705

    695

    700

    705

    418+40 418+50 419+00 419+50 420+00 420+50 421+00 421+50 422+00 422+50 423+00 423+16

    AS-BUILT GRADE

    DESIGN GRADE

    CECE

    CECE

    CECE

    CECE

    CE

    CE

    CE

    CE

    CE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CECE

    CE

    STA 800+90BRUSH TOE NOT

    INSTALLED

    STA 423+10RIFFLE NOTINSTALLED DUETO BACKWATERFROM OFFSITE

    STA 420+50DEVIATION TOEXISTING CHANNELDUE TO BEDROCK

    STA 421+60END CHANNEL

    DEVIATION

    ROOTWADSREPLACED WITHBRUSH TOE DUETO AVAILABILITY

    OF MATERIALS

    CR-W

    D

    CR-C

    H

    CR-RR

    CR-C

    H

    CR-CH

    CR-R

    R

    CR-CH

    CR-CH

    CR-RR

    CR-CH

    CR-CH

    STA 417+65BEGIN UT2 REACH 2

    UT2 REACH 2

    UT2

    C RE

    ACH

    2

    STA 801+37END UT2C REACH 3

    STA 423+16END UT2 REACH 2RESTORATION

    801+00

    801+

    37

    423+16

    418+00

    419+00

    420+

    00

    421+00

    422+00

    423+00MAT

    CH L

    INE

    - STA

    418

    +36

  • 0' 20' 40' 60'

    (HORIZONTAL)

    0' 2' 4' 6'

    (VERTICAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    UT

    2ASt

    ream

    Pla

    n an

    d P

    rofi

    le

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.14

    Febr

    uary

    27,

    201

    5

    715

    720

    725

    715

    720

    725

    500+00 500+50 501+00 501+50 502+00 502+50 503+00 503+50 504+00 504+30

    AS-BUILT GRADE

    DESIGN GRADE

    CE

    CECE

    CECECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CE

    CECE

    CECE

    CECE

    CE

    CECE

    CECE

    CECE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CR-WD

    CR-RR CR-N

    M

    CR-CH

    CR-R

    R

    CR-NM

    CR-R

    R

    CR-N

    M

    CR-C

    H

    CR-R

    R

    CR-RR

    UT2A REACH 1

    STA 504+25END UT2A REACH 1

    BEGIN UT2A REACH 2

    UT2B

    REA

    CH 2

    STA 500+39BEGIN UT2A REACH 1RESTORATION

    500+00

    501+00

    502+00

    503+00

    504+

    00

    505+00

    610+00

    610+

    46

    MATCH LINE - STA 504+40

  • 0' 20' 40' 60'

    (HORIZONTAL)

    0' 2' 4' 6'

    (VERTICAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    UT

    2ASt

    ream

    Pla

    n an

    d P

    rofi

    le

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.15

    Febr

    uary

    27,

    201

    5

    713

    715

    720

    725

    713

    715

    720

    725

    504+30 504+50 505+00 505+50 506+00 506+50 507+00 507+50 508+00 508+50 508+80

    AS-BUILT GRADE

    DESIGN GRADE

    CECECECECECECECE

    CECE

    CECE

    CECE

    CECE

    CE

    CE

    CE

    CE

    CE

    CECE CE CE CE CE

    CE CE CE CE CECE CE CE CE CE

    CE CECE

    CR-CH

    CR-R

    R

    CR-RR

    CR-N

    M

    CR-NM

    CR-W

    D

    CR-WD CR-N

    M

    CR-C

    H

    UT2A REACH 2

    UT2B

    REA

    CH 2

    505+00

    506+00

    507+00

    508+

    00

    509+00

    610+

    46

    MAT

    CH L

    INE

    - STA

    504

    +40

    MAT

    CH LI

    NE -

    STA

    508+

    80

  • 0' 20' 40' 60'

    (HORIZONTAL)

    0' 2' 4' 6'

    (VERTICAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    UT

    2ASt

    ream

    Pla

    n an

    d P

    rofi

    le

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.16

    Febr

    uary

    27,

    201

    5

    710

    715

    720

    710

    715

    720

    508+80 509+00 509+50 510+00 510+50 511+00 511+50 512+00 512+50 513+00 513+40

    AS-BUILT GRADE

    DESIGN GRADE

    CECECECECECECECECECECECECECECECECECECECECE

    CE

    CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CECE

    CE

    CR-N

    M

    CR-CH

    CR-RR

    CR-WD CR

    -CH CR-CH CR-CH

    CR-NM

    CR-RR

    UT2A

    REACH

    2

    509+

    00

    510+

    00

    511+00

    512+00

    513+00

    MAT

    CH L

    INE

    - STA

    508

    +80

    MAT

    CH L

    INE

    - STA

    513

    +40

  • 0' 20' 40' 60'

    (HORIZONTAL)

    0' 2' 4' 6'

    (VERTICAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    UT

    2ASt

    ream

    Pla

    n an

    d P

    rofi

    le

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.17

    Febr

    uary

    27,

    201

    5

    702

    705

    710

    715

    702

    705

    710

    715

    513+40 513+50 514+00 514+50 515+00 515+50 516+00 516+50 517+00 517+50 518+00 518+50 518+70

    AS-BUILT GRADE

    DESIGN GRADE

    24.5' X 30" RCP

    BEDROCK IN CHANNEL

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CE

    CE

    CE

    CE

    CECE

    CE

    CE CECE CE

    CE CECE CE

    CE CECE

    CE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE

    UT2 REACH 1

    UT2A R

    EACH 2

    STA 518+68END UT2A REACH 2

    CR-WD

    STA 517+75ROCK TOEINSTALLED,NOT BRUSHTOE

    CR-CH

    CR-CH

    CR-WD

    CR-CH

    CR-CHCR-RR

    CR-R

    R

    CR-RR

    CR-R

    R

    CR-CH

    CR-CH

    514+00

    515+00

    516+00

    517+00 5

    18+0

    0

    518+68

    417+00

    418+00

    MAT

    CH L

    INE

    - STA

    513

    +40

  • 0' 20' 40' 60'

    (HORIZONTAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    UT

    2BSt

    ream

    Pla

    n an

    d P

    rofi

    le

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.18

    Febr

    uary

    27,

    201

    5

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CECECECECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE CE CE CECE

    CE

    CE

    CECE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    UT2B REACH 1

    STA 600+00BEGIN UT2B REACH 1ENHANCEMENT II

    600+00

    601+00

    602+00603

    +00

    604+00

    605+00

    MATCH LINE - STA 604+30

  • 0' 20' 40' 60'

    (HORIZONTAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    UT

    2BSt

    ream

    Pla

    n an

    d P

    rofi

    le

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.19

    Febr

    uary

    27,

    201

    5

    CECE

    CECECECECECECECECE

    CECE

    CECE

    CECE

    CECE

    CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE

    UT2B REACH 1

    604+00

    605+00

    606+

    00

    607+

    00

    608+00

    MAT

    CH L

    INE

    - STA

    604

    +30

    MAT

    CH L

    INE

    - STA

    608

    +10

  • 0' 20' 40' 60'

    (HORIZONTAL)

    0' 2' 4' 6'

    (VERTICAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    UT

    2BSt

    ream

    Pla

    n an

    d P

    rofi

    le

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.20

    Febr

    uary

    27,

    201

    5

    718

    720

    725

    730

    718

    720

    725

    730

    608+10 608+50 609+00 609+50 610+00 610+50

    AS-BUILT GRADE

    DESIGN GRADE

    CECE

    CECECECECECECECECECECECE

    CECE

    CECE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CECE

    CECE

    CECE

    UT2A

    REAC

    H 1

    STA 608+48END UT2B REACH 1ENHANCEMENT IIBEGIN UT2B REACH 2RESTORATION

    UT2B REACH 2

    STA 610+46END UT2B REACH 2

    UT2A REACH 2

    CR-RR

    CR-NM

    CR-CH

    CR-RR

    CR-RR

    CR-RR

    CR-NM

    CR-CHCR-RRCR-RRCR-NM

    CR-W

    D

    503+

    00

    504+00

    505+00

    608+00

    609+00

    610+00 610+46

    MAT

    CH L

    INE

    - STA

    608

    +10

  • 0' 20' 40' 60'

    (HORIZONTAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    UT

    2CSt

    ream

    Pla

    n an

    d P

    rofi

    le

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.21

    Febr

    uary

    27,

    201

    5

    CE CECE CE

    CE CECE CE

    CE CECE CE

    CE CE CE CE CE CECE CE

    CECECECECECECECECECECECECECE

    CECECECE

    CECECE

    CECE

    CECE

    CECE

    CE

    UT2C REACH

    1

    STA 700+00BEGIN UT2C REACH 1ENHANCEMENT II

    700+00

    701+00

    702+

    00

    703+00

    704+00

    MAT

    CH LI

    NE -

    STA

    704+

    30

  • 0' 20' 40' 60'

    (HORIZONTAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    UT

    2CSt

    ream

    Pla

    n an

    d P

    rofi

    le

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.22

    Febr

    uary

    27,

    201

    5

    CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE

    CE

    CE

    CECECECECECECECECECECECECECECECECECECECECECECE

    UT2C REACH 1704+00

    705+00

    706+00707+00

    708+00

    709+

    00

    MAT

    CH L

    INE

    - STA

    704

    +30

    MAT

    CH L

    INE

    - STA

    708

    +80

  • 0' 20' 40' 60'

    (HORIZONTAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    UT

    2CSt

    ream

    Pla

    n an

    d P

    rofi

    le

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.23

    Febr

    uary

    27,

    201

    5

    CECE

    CE

    CE

    CE

    CECE

    CECE

    CECE

    CECE

    CECE

    CE

    CE

    CECECECECECE

    CE

    CE

    CE

    CE

    CECECE

    CECE

    CECE

    UT2C REACH 1

    END UT2C REACH 1 - ENHANCEMENT II

    BEGIN UT2C REACH 2 - RESTORATION

    709+00

    710+

    00

    711+00

    712+00M

    ATCH

    LIN

    E - S

    TA 7

    08+8

    0 MAT

    CH L

    INE

    - STA

    711

    +80

  • 0' 20' 40' 60'

    (HORIZONTAL)

    0' 2' 4' 6'

    (VERTICAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    UT

    2CSt

    ream

    Pla

    n an

    d P

    rofi

    le

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.24

    Febr

    uary

    27,

    201

    5

    702

    705

    710

    715

    702

    705

    710

    715

    711+80 712+00 712+50 713+00 713+50 713+60

    DESIGN GRADE

    AS-BUILT GRADE

    CE

    CECE

    CECE

    CECE

    CECE

    CECE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CR-NM

    CR-W

    D

    CR-RRCR-

    WDCR-CH

    STA 712+50END UT2C REACH 1 - ENHANCEMENT II

    BEGIN UT2C REACH 2 - RESTORATION

    UT2C REACH 2

    STA 713+60END UT2C REACH 2RESTORATION

    711+

    00

    712+00

    713+00 713+60

    MATCH LINE - STA 711+80

  • 0' 20' 40' 60'

    (HORIZONTAL)

    0' 2' 4' 6'

    (VERTICAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    UT

    2CSt

    ream

    Pla

    n an

    d P

    rofi

    le

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.25

    Febr

    uary

    27,

    201

    5

    695

    700

    705

    695

    700

    705

    800+00 800+50 801+00 801+37

    DESIGN GRADE

    AS-BUILT GRADE

    CECE

    CECE

    CECE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    UT2 R

    EACH

    2

    UT2C REACH 3

    STA 801+37END UT2C REACH 3

    STA 423+10RIFFLE NOT INSTALLED

    DUE TO BACKWATERFROM ONSITE

    STA 800+90BRUSH TOE NOT

    INSTALLED

    STA 800+00BEGIN UT2C REACH 3

    RESTORATION

    CR-CH

    CR-RR

    CR-CH

    CR-RR

    CR-CHCR-CH

    800+

    00

    801+00

    801+37

    423+16

    422+00

    423+

    00

  • 0' 20' 40' 60'

    (HORIZONTAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.26

    Febr

    uary

    27,

    201

    5

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    Lit

    tle

    Riv

    erSt

    ream

    Pla

    n an

    d P

    rofi

    le

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CECE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CE

    LITTLE RIVER

    REACH 1

    LITTLE RIVER REACH 1STA 100+00BEGIN LITTLE RIVER REACH 1PRESERVATION

    100+00

    101+00

    102+00

    103+00

    104+00

    105+00

    216+00

    MAT

    CH L

    INE

    - STA

    105

    +30

  • 0' 20' 40' 60'

    (HORIZONTAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.27

    Febr

    uary

    27,

    201

    5

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    Lit

    tle

    Riv

    erSt

    ream

    Pla

    n an

    d P

    rofi

    le

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CECECECECECECECECECECECE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CECE

    CECE

    CE

    CECE

    CECE

    CECE

    CECE CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    UT1

    A RE

    ACH

    2

    LITTLE RIVER REACH 2

    STA 218+17END UT1A REACH 2

    LITTLE RIVER REACH 1

    STA 107+04BEGIN LITTLE RIVER REACH 2ENHANCEMENT II

    105+00

    106+00

    107+00

    108+00 109+00

    110+

    00

    111+

    00

    218+

    17

    217+

    00

    218+

    00

    MAT

    CH LI

    NE -

    STA

    105+

    30

    MATCH LINE - STA 110+80

  • 0' 20' 40' 60'

    (HORIZONTAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.28

    Febr

    uary

    27,

    201

    5

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    Lit

    tle

    Riv

    erSt

    ream

    Pla

    n an

    d P

    rofi

    le

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CECECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    LITTLE R

    IVER REA

    CH 2

    111+00

    112+00

    113+00

    114+00

    115+00

    116+00

    117+00

    MAT

    CH LI

    NE -

    STA

    110+

    80

    MATCH

    LINE -

    STA 11

    6+30

  • 0' 20' 40' 60'

    (HORIZONTAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.29

    Febr

    uary

    6, 2

    015

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    Lit

    tle

    Riv

    erSt

    ream

    Pla

    n an

    d P

    rofi

    le

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CECE

    CECE

    CE

    CE

    CE

    CE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CE

    CE

    UT1B REACH 3

    LITTLE RIVER REACH 2

    STA 353+17END UT1B REACH 3

    116+

    00

    117+

    00118+00

    119+00

    120+00

    121+00

    122+00

    351+

    00

    352+00

    353+00

    353+

    17

    MATCH LINE - STA 116+30

    MAT

    CH L

    INE

    - STA

    121

    +80

  • 0' 20' 40' 60'

    (HORIZONTAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.30

    Febr

    uary

    27,

    201

    5

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    Lit

    tle

    Riv

    erSt

    ream

    Pla

    n an

    d P

    rofi

    le

    CECE

    CECE

    CE

    CE

    CE

    CE

    CE

    CECECE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CECE

    CECE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    LITTLE RIVER REACH 2

    121+00

    122+00

    123+00

    124+00 125+

    00

    126+00

    127+00

    128+

    00

    MAT

    CH LI

    NE -

    STA

    121+

    80

    MATCH LINE - STA 126+20

  • 0' 20' 40' 60'

    (HORIZONTAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    1.31

    Febr

    uary

    27,

    201

    5

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    0213

    3-A

    b-Pr

    ofile

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    Lit

    tle

    Riv

    erSt

    ream

    Pla

    n an

    d P

    rofi

    le

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CECECECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CECE

    CE

    CECE

    CECE

    CECE

    CECE CE

    CE CECE CE

    CE CECE CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CE

    CECECECECECECECECE

    LITTLE RIVER REACH 2

    STA 131+57END LITTLE RIVER REACH 2

    ENHANCEMENT II

    131+57126+

    00

    127+00 128+00

    129+00

    130+00

    131+00

    MAT

    CH LI

    NE -

    STA

    126+

    20

  • Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    Plan

    ting

    Not

    es &

    Veg

    etat

    ion

    Tab

    les

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    Febr

    uary

    27,

    201

    5

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    Ref

    eren

    ce\0

    2133

    -Pla

    ntin

    g N

    otes

    & V

    eg T

    able

    s.d

    wg

    Mar

    ch 2

    4, 2

    015

    Zone 1 - Streambank Planting Zone

    Zone 2 - Buffer Planting Zone

    Zone 3 - Vernal Pool Planting Zone

    Zones 1 - 3

    Zones 1 - 3

    Streambank Planting Zone

    Live Stakes and Herbacous Plugs

    Species Common NameMax

    SpacingIndiv.

    Spacing Min. Size Stratum # of Stems

    Cornus amomum Silky Dogwood 8 ft. 2-8 ft. Shrub 50%

    Salix sericea Silky Willow 8 ft. 2-8 ft. Shrub 50%

    Juncus effusus Common Rush 5 ft. 3-5 ft. Herb N\A

    100%

    Buffer Planting Zone

    Bare Root

    Species Common NameMax

    SpacingIndiv.

    SpacingMin.

    CaliperSize

    Stratum # of Stems

    Quercus rubra Northern RedOak 12 ft. 6-12 ft.

    Canopy 15%

    Quercus phellos Willow Oak 12 ft. 6-12 ft. Canopy 15%

    Plantusoccidentalis

    Sycamore 12 ft. 6-12 ft. Canopy 20%

    Betula nigra River Birch 12 ft. 6-12 ft. Canopy 10%

    Liriodendrontulipifera Tulip Poplar 12 ft. 6-12 ft. Canopy 10%

    Quercusmichauxii

    Swamp ChestnutOak 12 ft. 6-12 ft.

    Canopy 10%

    Fraxinuspennsylvanica Green Ash 12 ft. 6-12 ft. Canopy 20%

    100%

    Vernal Pool Planting Zone

    Plugs (2 ft on center)

    Species Common Name Min. Size # ofStems

    Acorussubcordatum

    Sweetflag 4 in3 30%

    Juncus effusus Common Rush 4 in3 40%

    Peltandravirginica Quill Sedge 4 in3 30%

    100%

    Temporary Seeding

    Pure Live Seed

    Approved Date Species Name Common Name Stratum Density(lbs/acre)

    Aug 15 - May 1 Secale cereale Rye Grain Herb 140

    May 1 - Aug 15 Setaria italica German Millet Herb 50

    Permanent Riparian Seed Planting ZonePure Live Seed (22 lbs/ acre)

    ApprovedDate

    Species Name Common Name Stratum Density(lbs/acre)

    All YearPanicumrigidulum Redtop Panicgrass Herb 3.0

    All Year Agrostis hyemalis Winter Bentgrass Herb 3.0

    All YearChasmanthium

    latifolium Indian Wood Oats Herb 3.0

    All Year RudbeckiasubtomentosaBlackeyed Susan Herb 2.0

    All Year PanicumclandestinumDeer tongue Herb 4.0

    All Year Carex vulpinoidea Fox Sedge Herb 3.0

    All Year CoreopsislanceolataLanceleafCoreopsis Herb 2.0

    All Year Elymus virginicus Virginia WildRye Herb 2.0

  • Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    Plan

    ting

    Ove

    rvie

    wPl

    anti

    ng

    0' 200' 400' 600'(HORIZONTAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    2.2

    Febr

    uary

    27,

    201

    5

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    Ref

    eren

    ce\0

    2133

    -Pla

    ntin

    g O

    verv

    iew

    .dw

    gM

    arch

    24,

    201

    5

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    PL

    P

    L

    PL

    PL

    PL

    PL

    P

    L

    PL

    P

    L

    PL

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    PL

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    PL

    PL

    PL

    PL

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    PL

    PL

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    PL

    PL

    PL

    PL

    PL

    P

    L

    P

    L

    PL

    PL

    P

    L

    P

    L

    P

    L

    PL

    PLPL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    P

    L

    P

    L

    P

    L

    PL

    PL

    PL

    PL

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    PL

    PL

    PL

    PL

    PL

    P

    L

    P

    L

    PL

    PL

    P

    L

    P

    L

    P

    L

    PL

    PLPL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    P

    L

    P

    L

    P

    L

    PL

    PL

    PL

    PL

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    Mac

    k Ro

    ad (S

    R 11

    44)

    SHEET 2.2

    SHEET 2.3

    SHEET 2.4

  • Hop

    ewel

    l Str

    eam

    Mit

    igat

    ion

    Site

    Rec

    ord

    Dra

    win

    gsR

    and

    olph

    Cou

    nty,

    Nor

    th C

    arol

    ina

    Plan

    ting

    Pla

    n

    0' 100' 200' 300'(HORIZONTAL)

    Shee

    t

    Chec

    ked

    By:

    Job

    Num

    ber:

    Draw

    n By

    :Pr

    ojec

    t Eng

    inee

    r:

    1430

    S. M

    int S

    tree

    t, St

    e 10

    4Ch

    arlo

    tte,

    NC

    282

    03Te

    l: 7

    04.3

    32.7

    754

    Fax:

    704

    .332

    .330

    6Fi

    rm L

    icen

    se N

    o. F

    -083

    1

    Date

    :Re

    visio

    ns:

    005-

    0213

    3

    RPH

    KY

    G

    JNK

    2.3

    Febr

    uary

    27,

    201

    5

    T:\

    AC

    TIV

    E P

    RO

    JEC

    TS

    (NC

    )\00

    5-02

    133

    Hop

    ewel

    l Mit

    igat

    ion

    FDP\

    Mon

    itor

    ing\

    Bas

    elin

    e M

    onit

    orin

    g\Pl

    ans\

    Ref

    eren

    ce\0

    2133

    -Pla

    ntin

    g.d

    wg

    Mar

    ch 2

    4, 2

    015

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    CE

    CE

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    CE

    CE

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    CE

    CE

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    P

    L

    P

    L

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    PL

    PL

    PL

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    P

    L

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    CE

    C

    E

    C

    E

    C

    E

    C

    E

    C

    E

    C