Page 1: 26 September 2000 Wire Procurement and Wire Joint Production Jack Fowler

26 September 2000

Wire Procurementand

Wire Joint Production

Jack Fowler

Page 2: 26 September 2000 Wire Procurement and Wire Joint Production Jack Fowler

26 September 2000Fowler Duke HEP

Sense Wire Procurement

Luma, Osram and Toshiba wires were evaluated Toshiba was considered the highest quality from initial

test Two pre-series of wire have been procured from

Toshiba Both have been evaluated One has been approved and is being used in production Full production order being submitted Audit of facility tentatively scheduled for Oct 2000

Page 3: 26 September 2000 Wire Procurement and Wire Joint Production Jack Fowler

26 September 2000Fowler Duke HEP

Evaluate Cleaning Effects

Evaluate the affects of cleaning the wire in ultrasonic cleaner after wire joint process

First evaluate any damage to the wire due to the cleaning

Second evaluate the effectiveness of the cleaning process

Samples were evaluated uncleaned, after 30 seconds, 1 minute, 5 minutes, and 10 minutes

30 seconds was found to be as effective as longer cleanings

Page 4: 26 September 2000 Wire Procurement and Wire Joint Production Jack Fowler

26 September 2000Fowler Duke HEP

Cleaning Results

Uncleaned 30 seconds

Page 5: 26 September 2000 Wire Procurement and Wire Joint Production Jack Fowler

26 September 2000Fowler Duke HEP

Cleaning Results

1 minute 5 minutes

Page 6: 26 September 2000 Wire Procurement and Wire Joint Production Jack Fowler

26 September 2000Fowler Duke HEP

Cleaning Results

10 minutes Analysis of dark area

Page 7: 26 September 2000 Wire Procurement and Wire Joint Production Jack Fowler

26 September 2000Fowler Duke HEP

Mass Spectrograph of “Dark Area”

Page 8: 26 September 2000 Wire Procurement and Wire Joint Production Jack Fowler

26 September 2000Fowler Duke HEP

Diameter Analysis

Page 9: 26 September 2000 Wire Procurement and Wire Joint Production Jack Fowler

26 September 2000Fowler Duke HEP

Evaluate Wire for Damage

Evaluate any damage of wire outside of the glass bead during the fusing process

No damage has been detected Further testing will follow Also evaluating the

cleanliness of wire after the production process

Page 10: 26 September 2000 Wire Procurement and Wire Joint Production Jack Fowler

26 September 2000Fowler Duke HEP

Production and Wire Analysis Results

Actual Wire Joints produced - 4606 single, 270 double Planned Wire Joints - 6500 single, 600 double Second wire joint station online in November 2000 Production goal 120 to 150 daily Wire meets specification based on our testing More studies on cleanliness after production planned