268 MW COMBINED CYCLE POWER PLANT PURCHASE AND
RELOCATION
CONFIDENTIAL
COMBINEDCYCLEPOWERPLANT
LOCATION: RussianFederation
POWEROUTPUT: 268MW
THERMALOUTPUT: 87Gcal/h
FUELTYPES: HeavyFuelOiland/orNaturalGas
STATUS: EquipmentforthisplantcurrentlystoredinRussianFederationinheatedstorageunit;constructionhaltedin2013becausebuyerwentbankruptandfinancingwasdiscontinued;availableforimmediateshipmentandpurchase.
OWNER: Czechbank
MainEquipmentList: 2xGASTURBINESV93/2bySiemens(older,rarelyused,stand-byequipment,lessthan500hoursinoperation,1980)1xSGT-600bySiemens(newequipment,2011)1xSKODASteamTurbineMTD40C(newequipment,2012)2xSteamHRSGBabcockBorsig(newequipment,2011)3Waterheatingboilers(41,7MWt+2*22,5MWt,2012)
AuxiliaryEquipmentList Available
Balance of Plant 95% is available: ACC, water supply, water treatment, districtheating, feed water system, fuel supply facilities, transformers,diesel fuel tanks will be part of Balance of Plant; some piping andelectrical parts are missing
PlantDesign: GeneralLayoutDesignavailable
Warranties: NowarrantiesonequipmentavailablebuttheequipmentisbeingstoredaspertheOEMinstructionsinHeatedStorage;However,forSGT-600,Siemenscanconditionallyextendwarranty
Inspection: FullInspectionReportcarriedoutbySGSinDec2017,whichisavailabletointerestedparties
PricingInformation: Euro25millionforEquipment
PROJECTPRINCIPLES
Transporttothirdcountry;EPCconstructionatmosteconomicalcostincomparisonwiththecurrentmarket
BENEFITS• Lowpriceofequipment• Europeanqualityequipment• Availableimmediately;savestimefordesignand
manufacturing.
RISKS6month“window”fortransport(weather)
PHOTOS
PIDofthepowerisland- youcanseeseparately27MWe,45MWtSGT600ontheleft.ThenthetwoV93.2withHRSGsandone85,899MWsteamturbineinthemiddle
GENERALLAYOUT