  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    1/32

    Computer Aided ProcessPlanning(CAPP)

    By:Dhiman Johns

    M.E.(PIE),Thapar University, Patiala

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    2/32

    To understand CAPP, We must briefly

    discussabout ProcessPlanning

    Products and their components are designed to perform certainspecific functions.

    Every product has some design specifications which ensure itsfunctionality aspects.

    The task of manufacturing is to produce components such that they

    meet design specifications.

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    3/32

    Process planning acts as a bridge between design andmanufacturing by translating design specifications intomanufacturingprocessdetails.

    Process planning answers the questions regarding requiredinformation and activities involved in transforming raw materialsinto a finished product. The process starts with the selection of rawmaterial and endswith thecompletion of part.

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    4/32

    The development of process plans involvesmainly a set of followingactivities:

    Analysis of part requirements

    Selection of raw work piece

    Selection of manufacturing operations and their sequences

    Selection of machine tools

    Selection of tools, tool holding devices, work holding devices andinspection equipments

    Selection of manufacturing condit ions i.e. cutting speed, feed anddepth of cut

    Determination of manufacturing times

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    5/32

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    6/32

    Process Planning In Different Environments

    } In tool-room type manufacturing makepart asper drawing issufficient

    } In metal formingtypeoperations

    The process planning requirements are embedded directly intothe die.

    Processplanning is fairly trivial

    } Job shop type manufacturing requires most detailed processplanning Design of tools, jigs, fixtures and manufacturing sequence are

    dictated directly by theprocessplan.

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    7/32

    Two Methods of Process Planning are:

    a) The manual experience based planning method

    b) Computer Aided Process Planning

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    8/32

    The manual experience based planning method:

    Themanual experience based processplanningis most widely used.

    It is mainly based on a manufacturing engineer's experience andknowledge of production facilit ies, equipment, their capabilities,

    processesand tooling.

    The major problem with this approach is that it is time consumingand developed plansmay not beconsistent and optimum.

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    9/32

    The feasibility of developed process plan is dependant on manyfactors such as availability of machine tools, scheduling andmachineallocation etc.

    Modern industry is currently lacking skilled labor force to producemachined partsaswasdone in thepast.

    Computer Aided Process Planning is developed to overcome theseproblemsto some extent.

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    10/32

    Computer Aided Process Planning

    As we have already discussed, the primary purpose of processplanning is to translate the design requirements into manufacturingprocessdetails.

    Thus a system was developed in which design information isprocessed by the process planning system to generate

    manufacturingprocessdetails.

    CAPP is usually considered to be part of CAM, however this resultsCAM asastand alone system.

    Synergy of CAM can be achieved by integrating it with CADsystem andCAPPactsasaconnection between the two.

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    11/32

    Computer AidedDesign

    Computer AidedManufacturing

    CAPP

    Synergy results in when CAM is integrated with CAD to formCAD/CAM systems than a stand alone CAD or CAM systems. In

    such a system CAPP becomes a direct connection between designand manufacturing.

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    12/32

    Readymade CAPP systems are available today to prepare routesheets.

    CAPP integrates and optimizes system performance into the interorganizational flow.

    For example, when one changes the design, it must be able to fallback on CAPP module to generate manufacturing process and costestimatesfor these design changes.

    Similarly, in case of machine breakdown on the shop floor, CAPPmust generate the alternative actions so that most economicalsolutioncan beadopted in thegiven situation.

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    13/32

    When compared with manual experience basedprocess planning, CAPP offers followingadvantages: Systematic development of accurateand consistent processplans.

    Reduction of cost and lead time of processplanning.

    Reduced skill requirements and Increased productivity of processplanners.

    Higher level application programs such as cost and manufacturing

    lead time estimationand work standardscan be interfaced.

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    14/32

    Approaches to CAPP

    Retrieval or Variant CAPP System

    Generative CAPP System

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    15/32

    Retrieval or Variant Process Planning

    It is based on the principles of Group Technology (GT) and PartsClassification & Coding.

    In this a standard process plan is stored in the computer files foreach part code number.

    These standard route sheets are based on current part routings oron an ideal process plan that has been prepared for each partfamily.

    Development of the data base of these process plans requiressubstantial effort.

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    16/32

    New Part Design

    Derive GT Code No. for

    Part

    Search Part Family File

    For GT Code No.

    Retrieve StandardProcess Plan

    Edit existing or write anew plan

    Process Plan Formatter

    Process Plan (RouteSheet)

    Part Family File

    Standard Process PlanFile

    Other Application

    Program

    Select coding system &Form Part Families

    Prepare Standard

    Process Plans for PartFamilies

    GeneralGeneral procedureprocedure forfor usingusing oneone ofof thetheRetrievalRetrieval CAPPCAPP SystemsSystems

    Preparatory Stage

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    17/32

    Before the system can be used for process planning a significant

    amount of information must be compiled and entered into theCAPPdata files. Thisis referred to asthe PreparatoryStage.

    PreparatoryStage consistsof followingsteps:

    a) Selecting appropriate classification and coding scheme for company.

    b) Formingpart families for the partsproduced by the company.c) Preparing standard processplansfor the part families.

    Step b & c are repeated asnew partsare designed and added tothecompanysdesign database.

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    18/32

    After the preparatory phase is completed, the system is ready for

    use.

    Now assume a new component for which the process plan is to bedetermined, the first step is to derive the GT Code number for thepart.

    With this code no., a search is made in the part family file todetermine if a standard route sheet exists for the given part code, ifa standard route sheet exists for the part, it is retrieved from thedatabase. Hence theword Retrieval for this CAPPSystem.

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    19/32

    The standard process plan is examined to determine whether anymodifications are necessary. Modifications to be made may be

    minor or major. Theuser edits thestandard plan accordingly.

    This ability to edit the standard plan is what gives the retrievalsystem itsalternativename: Variant CAPPSystem.

    If the file does not contain a standard process plan for the givencode number, the user may search the computer file for a similar orrelated code number for which a standard route sheet does existand edit that processplan accordingto hisrequirements.

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    20/32

    Even if the user does not find any related file than he may startfrom scratch, thus the user prepares the route sheet for the new

    part and this route sheet becomes the standard for the new partcodenumber.

    The process planning session concludes with the Process PlanFormatter, which prints out thesheet in theproper format.

    Theformatter may call other application programsinto use.

    for example: to determine machining conditions for the various

    machine tool operations in the sequence, to calculate standard times forthe operations, etc.

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    21/32

    Advantagesand limitations of Variant CAPP

    Investment in hardware and software isnot much.

    The system offers a shorter development time and lowermanpower consumption to develop processplan.

    The system is very reliable and reasonable in real production

    environmentsfor small and medium size companies. Quality of process plan depends on knowledge and background of

    processplanner

    Example of Retrieval CAPP system is MultiCAPP, from

    OIR, the Organization for Industrial Research.

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    22/32

    Generative Process Planning

    It isan alternativeapproach to automated processplanning.

    Instead of retrieving and editing an existing plan contained in

    a computer database, a generative system creates the process

    plan by means of decision logics, formulas, algorithms andgeometry based data that are built or fed as input to the

    system.

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    23/32

    Format of input may be:a) Text input (interactive)

    b) Graphical input (from CADmodels)

    A fully Generative CAPPSystem would produce a route sheet

    without any human assistance and without a set ofpredefined standard plans.

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    24/32

    Ingredients Required In A FullyIngredients Required In A FullyGenerative CAPP SystemGenerative CAPP System

    First ingredient is technical knowledge of manufacturing.

    This CAPP system requires an expert system which can

    convert the logic used by successful process planners into acomputer program by using certain codes. Such an expert

    system generatesa knowledge base.

    This knowledge base is used by Generative CAPP System to

    solve processplanningproblems(i.e.- to create route sheets)

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    25/32

    Second Ingredient is a computer compatible description ofthe part to be produced. This description contains all of the

    dataand information needed to plan theprocesssequence.

    Two waysof providingthisdescription are:

    a) Geometric model of the part that is developed on a CAD system

    during product design.

    b) A GT code number of the part that defines the part features insignificant detail.

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    26/32

    The third ingredient is the capability to apply

    the process knowledge and planning logiccontained in the knowledge base to a givenpart description.

    In brief we can say that, Generative CAPPsystem uses its knowledge base to solve aspecific problem, i.e.- planning the process.This system synthesizes a new process planfrom scratch for each new part that has beenpresented to it.

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    27/32

    Advantages and limitations of Generative

    CAPP System

    The generative CAPP has all the advantages of Variant CAPPhowever it has an additional advantage that it is fullyautomatic and a up-to-date process plan is generated at each

    time.

    It requires major revisions if a new equipment or processingcapabilit iesbecame available.

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    28/32

    Some FactsAbout CAPPTechnology:

    Many CAPP systems have so far been developed andcommercialized. New systems adopt many advanced techniquesand approaches such as feature-based modelling, object orientedprogramming, utilizes advanced computing methods includingexpert system and art ificial intelligence.

    The implementation of CAPP systems in industry lags behind therate of development of new systemsand introduction of new ideasin the field. Though tremendous effort has been made indeveloping CAPPsystems, the effectiveness of these systems is notfully satisfactory.

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    29/32

    In spite of the benefits promised by the various developed CAPPsystems, their adaptation by industry ispainfully slow.

    Today, when companies use CAPP systems, it is mostly done inisolation from the product design as well as the productionplanningand control activities.

    It is also becoming increasingly essential to feedback theinformation from process planning to assist the designer at anearly stage in assigning various design features not only fromfunctional point of view but also regarding manufacturability andeconomicpoint of view.

  • 8/2/2019 26938916 Computer Aided Process Planning CAPP

    30/32

    References:1. Automation, Production Systems and Computer Integrated

    ManufacturingBy Mikell P. Groover

    2. Proceedings of the 7th Annual Paper Meet and 2nd

    InternationalConference, The Institution of Engineers, Bangladesh (MechanicalEngineeringDivision) 25-27 October, 2001(Paper No. 10 pages81-92)