28-08-2013 daily progress report chishtian grid
DESCRIPTION
28TRANSCRIPT
-
SUBJECT: 220 KV NEW SUB STATION CHISHTIAN AND VEHARI SUB STATION EXT. PROJECT (PACKAGE-I) To,
Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date
Excavation 1.0 12.0 12.0 25.0 10.0 0 21 21Lean Concrete 1.0 12.0 12.0 25.0 10.0 0 18 18Pad Concrete 1.0 12.0 12.0 25.0 10.0 3 18 18Pedestal 1.0Backfilling
Struc. Erection
Struc.insp.
Equip. Erec.
Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date
Excavation 27 27 40.0 140.0Lean Concrete 0 18 18 39.0 39.0 79.0 134.0Pad Concrete 31.0 92.0Pedestal 11.0 31.0 27.0Backfilling
Struc. Erection
Struc.insp.
Equip. Erec.
Remarks:
3. Excavation of Equipment foundations in progress.
Daily Progress ReportContractor: NEIE 220/132 kV New Sub Station Chishtian
NEIE
Project Coordinator
Dated: 28/08/2013
Asst.construction Manager(Zia Shafqat Ali)
TYPE-ii (45 m)
Power Transformer 10/13 MVA (1 No)
High Level Gantry (12 Nos)
Low Level Gantry (12 Nos)
Marshaling Kiosik (10+6=16 No)
1. Compaction of Base (water bound) for approach road in progress.2. Concrete pouring of cable trench covers in progress.
Draw Pit (4+3=7 Nos)
Bus/Line Isolator (20+8=28 Sets)
Post Insulator (9 Nos)
Circuit Breaker (10 Sets)
Trenches (m)
TYPE-iv (378 m)
Surge Arrestor (27 Nos)
132 kV Switch Yard
TYPE-iii (327.5 m)
Activities
ActivitiesC.V.T (26 Nos)
Current Trasnsformer (39 Nos)
-
To,
TodayThis
MonthTo Date Today
This Month
To Date TodayThis
MonthTo Date Today
This Month
To Date TodayThis
MonthTo Date Today
This Month
To Date TodayThis
MonthTo Date
Excavation 2.0 10.0 5.0 4.0 6.0Lean Concrete 2.0 10.0 5.0 4.0 2.0Pad Concrete 2.0 10.0 5.0 4.0 1.0Pedestal 2.0Backfilling
Struc. Erection
Struc.insp.
Equip. Erec.
TodayThis
MonthTo Date Today
This Month
To Date TodayThis
MonthTo Date Today
This Month
To Date TodayThis
MonthTo Date Today
This Month
To Date TodayThis
MonthTo Date
Excavation 9.0 6.0 15.0 70.0Lean Concrete 9.0 6.0 15.0 60.0Pad Concrete 8.0 6.0 15.0 57.0Pedestal 29.0 57.0Backfilling
Struc. Erection
Struc. Insp.
Equip. Erec.
Remarks:
6. Concrete pouring of Fire wall 5th lift (5 m) Completed.
NEIE
Project Coordinator
Daily Progress Report
Activities
Surge Arrestor (12 Nos)
High Level (Line Gantry) (5 Nos)
Auto Transformer 160 MVA (2 Nos)
Low Level (Bus Gantry) (10 Nos)
C.C.V.T Line (6 Nos)
SUBJECT: 220 KV NEW SUB STATION CHISHTIAN AND VEHARI SUB STATION EXT. PROJECT (PACKAGE-I)
Post Insulator (20 Nos)
Dated: 28/08/2013Contractor: NEIE 220/132 kV New Sub Station Chishtian
Asst.Construction Manager
High Level (Tower Gantry) (4 Nos)
TYPE-iv (230.5 m)
5. Concrete pouring of culvert slab for transformer way (3/3 Nos) Completed.4. RCC Concrete of path way (65 m Completed).3. PCC (1:4:8) of path way.(65 m Completed).2. RCC Topping of transformer way 11 Nos Pannel (190/250 m) completed.1. PCC (1:4:8) of transformer way (200/250 m) Completed.
zia shafqat ali
220 kV Switch Yard
ActivitiesIsolator (16 sets) C.V.T (4 Nos)
Circuit Breaker (6 Sets)
Trenches (m)Current Transformer (18 Nos) TYPE-iii (117 m)TYPE-ii (255 m)
-
To,
Sr. No
1
2
3
4
5
6
7
8
8
NOTE:
Asst.Construction Manager
Project Coordinator NEIE-AL-HUSSAIN
Contractor: NEIE
CompletedConcrete Pouring of 2nd Floor Roof Slab + Beams
Concrete Pouring of 1st Floor Roof Slab + Beams Completed
Completed
Status
Completed
Completed
Descripition of Activities
Form work of 2nd roof Beams & slab
NEIE
Daily Progress ReportControl House Building
SUBJECT: 220 KV NEW GRID STATION CHISHTIAN AND VEHARI GRID STATION EXT. PROJECT (PACKAGE-I)
Dated:28/08/2013
(zia shafqat ali)
Concrete pad of Cable trench in 11 kV switch room
Sub Structure (Lean,Footing,Footing Beam, Brick Work, DPCs, Columns up to plinth level,Plinth Beam & Backfilling under flooring)
Preparation for Flooring In progress
1. Fixing of fence frame & Cement plaster of switchyard fence wall column in progress.
Ground Floor Brick work of super structure In progress
Cutting, Bending & fixing reinforcement of roof slab & Beams Completed
RCC of cable trench walls in A/C , D/C room Completed
-
To,
Today This MonthTo Date Today This
MonthTo Date Today This
MonthTo Date Today This
MonthTo Date Today This
MonthTo Date Today This
MonthTo Date
Excavation 2.0 4.0 2.0 6.0 6.0 6.0 6.0 9.0 9.0Lean Concrete 2.0 4.0 2.0 6.0 6.0 6.0 6.0 9.0 9.0Pad Concrete 2.0 4.0 2.0 6.0 6.0 9.0 9.0Pedestal 2.0 2.0 3.0 4.0Backfilling
Struc. Erection
Struc.insp.
Equip. Erec.
Today This Month
To Date Today This Month
To Date Today This Month
To Date Today This Month
To Date Today This Month
To Date Today This Month
To Date
Excavation 18.0 18.0 9.0 9.0 12.0 12.0
Lean Concrete 16.0 16.0 9.0 9.0 12.0 12.0
Pad Concrete 16.0 16.0 9.0 9.0 12.0 12.0
Pedestal
Backfilling
Struc. Erection
Struc. Insp.
Equip. Erec.
Remarks:
Asst.Construction Manager
NEIE
Project Coordinator NEIE-AL-HUSSAIN
(zia shafqat ali)
Surge Arrestor (6 Nos)
Daily Progress Report
Line Gantry (4 Nos)
Tower Gantry (2 Nos)
C.C.V.T Line (2 Nos)
1. Form work & Steel reinforcement of Circuit Breaker & Isolator in progress.
Trenches (m)Activities
Isolator (24 Nos.) C.V.T (2 Nos) Circuit Breaker (9 Nos)
SUBJECT: 220 KV VEHARI SUB STATION EXT. PROJECT (PACKAGE-I)
Bus Gantry (2 Nos)
Dated: 28/08/2013
Current Transformer (12 Nos)
220 kV Switch Yard
Activities
Contractor: NEIE
Post Insulator (10 Nos)
Daily 132 kV ReportDaily 220 kV ReportDaliy CHB Report220 kv Vehari S.S