28-08-2013 daily progress report chishtian grid

4
SUBJECT: 220 KV NEW SUB STATION CHISHTIAN AND VEHARI SUB STATION EXT. PROJECT (PACKAGE-I) To, Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Excavation 1.0 12.0 12.0 25.0 10.0 0 21 21 Lean Concrete 1.0 12.0 12.0 25.0 10.0 0 18 18 Pad Concrete 1.0 12.0 12.0 25.0 10.0 3 18 18 Pedestal 1.0 Backfilling Struc. Erection Struc.insp. Equip. Erec. Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Excavation 27 27 40.0 140.0 Lean Concrete 0 18 18 39.0 39.0 79.0 134.0 Pad Concrete 31.0 92.0 Pedestal 11.0 31.0 27.0 Backfilling Struc. Erection Struc.insp. Equip. Erec. Remarks: 3. Excavation of Equipment foundations in progress. Daily Progress Report Contractor: NEIE 220/132 kV New Sub Station Chishtian  NEIE  际电力工 有限  Project Coordinator Dated: 28/08/2013 Asst.construction Manager (Zia Shafqat Ali) TYPE-ii (45 m) Power Transformer 10/13 MVA (1 No) High Level Gantry (12 Nos) Low Level Gantry (12 Nos) Marshaling Kiosik (10+6=16 No) 1. Compaction of Base (water bound) for approach road in progress. 2. Concrete pouring of cable trench covers in progress. Draw Pit (4+3=7 Nos) Bus/Line Isolator (20+8=28 Sets) Post Insulator (9 Nos) Circuit Breaker (10 Sets) Trenches (m) TYPE-iv (378 m) Surge Arrestor (27 Nos) 132 kV Switch Yard TYPE-iii (327.5 m) Activities Activities C.V.T (26 Nos) Current Trasnsformer (39 Nos)

Upload: yaser-majeed

Post on 14-Oct-2015

16 views

Category:

Documents


0 download

DESCRIPTION

28

TRANSCRIPT

  • SUBJECT: 220 KV NEW SUB STATION CHISHTIAN AND VEHARI SUB STATION EXT. PROJECT (PACKAGE-I) To,

    Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date

    Excavation 1.0 12.0 12.0 25.0 10.0 0 21 21Lean Concrete 1.0 12.0 12.0 25.0 10.0 0 18 18Pad Concrete 1.0 12.0 12.0 25.0 10.0 3 18 18Pedestal 1.0Backfilling

    Struc. Erection

    Struc.insp.

    Equip. Erec.

    Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date

    Excavation 27 27 40.0 140.0Lean Concrete 0 18 18 39.0 39.0 79.0 134.0Pad Concrete 31.0 92.0Pedestal 11.0 31.0 27.0Backfilling

    Struc. Erection

    Struc.insp.

    Equip. Erec.

    Remarks:

    3. Excavation of Equipment foundations in progress.

    Daily Progress ReportContractor: NEIE 220/132 kV New Sub Station Chishtian

    NEIE

    Project Coordinator

    Dated: 28/08/2013

    Asst.construction Manager(Zia Shafqat Ali)

    TYPE-ii (45 m)

    Power Transformer 10/13 MVA (1 No)

    High Level Gantry (12 Nos)

    Low Level Gantry (12 Nos)

    Marshaling Kiosik (10+6=16 No)

    1. Compaction of Base (water bound) for approach road in progress.2. Concrete pouring of cable trench covers in progress.

    Draw Pit (4+3=7 Nos)

    Bus/Line Isolator (20+8=28 Sets)

    Post Insulator (9 Nos)

    Circuit Breaker (10 Sets)

    Trenches (m)

    TYPE-iv (378 m)

    Surge Arrestor (27 Nos)

    132 kV Switch Yard

    TYPE-iii (327.5 m)

    Activities

    ActivitiesC.V.T (26 Nos)

    Current Trasnsformer (39 Nos)

  • To,

    TodayThis

    MonthTo Date Today

    This Month

    To Date TodayThis

    MonthTo Date Today

    This Month

    To Date TodayThis

    MonthTo Date Today

    This Month

    To Date TodayThis

    MonthTo Date

    Excavation 2.0 10.0 5.0 4.0 6.0Lean Concrete 2.0 10.0 5.0 4.0 2.0Pad Concrete 2.0 10.0 5.0 4.0 1.0Pedestal 2.0Backfilling

    Struc. Erection

    Struc.insp.

    Equip. Erec.

    TodayThis

    MonthTo Date Today

    This Month

    To Date TodayThis

    MonthTo Date Today

    This Month

    To Date TodayThis

    MonthTo Date Today

    This Month

    To Date TodayThis

    MonthTo Date

    Excavation 9.0 6.0 15.0 70.0Lean Concrete 9.0 6.0 15.0 60.0Pad Concrete 8.0 6.0 15.0 57.0Pedestal 29.0 57.0Backfilling

    Struc. Erection

    Struc. Insp.

    Equip. Erec.

    Remarks:

    6. Concrete pouring of Fire wall 5th lift (5 m) Completed.

    NEIE

    Project Coordinator

    Daily Progress Report

    Activities

    Surge Arrestor (12 Nos)

    High Level (Line Gantry) (5 Nos)

    Auto Transformer 160 MVA (2 Nos)

    Low Level (Bus Gantry) (10 Nos)

    C.C.V.T Line (6 Nos)

    SUBJECT: 220 KV NEW SUB STATION CHISHTIAN AND VEHARI SUB STATION EXT. PROJECT (PACKAGE-I)

    Post Insulator (20 Nos)

    Dated: 28/08/2013Contractor: NEIE 220/132 kV New Sub Station Chishtian

    Asst.Construction Manager

    High Level (Tower Gantry) (4 Nos)

    TYPE-iv (230.5 m)

    5. Concrete pouring of culvert slab for transformer way (3/3 Nos) Completed.4. RCC Concrete of path way (65 m Completed).3. PCC (1:4:8) of path way.(65 m Completed).2. RCC Topping of transformer way 11 Nos Pannel (190/250 m) completed.1. PCC (1:4:8) of transformer way (200/250 m) Completed.

    zia shafqat ali

    220 kV Switch Yard

    ActivitiesIsolator (16 sets) C.V.T (4 Nos)

    Circuit Breaker (6 Sets)

    Trenches (m)Current Transformer (18 Nos) TYPE-iii (117 m)TYPE-ii (255 m)

  • To,

    Sr. No

    1

    2

    3

    4

    5

    6

    7

    8

    8

    NOTE:

    Asst.Construction Manager

    Project Coordinator NEIE-AL-HUSSAIN

    Contractor: NEIE

    CompletedConcrete Pouring of 2nd Floor Roof Slab + Beams

    Concrete Pouring of 1st Floor Roof Slab + Beams Completed

    Completed

    Status

    Completed

    Completed

    Descripition of Activities

    Form work of 2nd roof Beams & slab

    NEIE

    Daily Progress ReportControl House Building

    SUBJECT: 220 KV NEW GRID STATION CHISHTIAN AND VEHARI GRID STATION EXT. PROJECT (PACKAGE-I)

    Dated:28/08/2013

    (zia shafqat ali)

    Concrete pad of Cable trench in 11 kV switch room

    Sub Structure (Lean,Footing,Footing Beam, Brick Work, DPCs, Columns up to plinth level,Plinth Beam & Backfilling under flooring)

    Preparation for Flooring In progress

    1. Fixing of fence frame & Cement plaster of switchyard fence wall column in progress.

    Ground Floor Brick work of super structure In progress

    Cutting, Bending & fixing reinforcement of roof slab & Beams Completed

    RCC of cable trench walls in A/C , D/C room Completed

  • To,

    Today This MonthTo Date Today This

    MonthTo Date Today This

    MonthTo Date Today This

    MonthTo Date Today This

    MonthTo Date Today This

    MonthTo Date

    Excavation 2.0 4.0 2.0 6.0 6.0 6.0 6.0 9.0 9.0Lean Concrete 2.0 4.0 2.0 6.0 6.0 6.0 6.0 9.0 9.0Pad Concrete 2.0 4.0 2.0 6.0 6.0 9.0 9.0Pedestal 2.0 2.0 3.0 4.0Backfilling

    Struc. Erection

    Struc.insp.

    Equip. Erec.

    Today This Month

    To Date Today This Month

    To Date Today This Month

    To Date Today This Month

    To Date Today This Month

    To Date Today This Month

    To Date

    Excavation 18.0 18.0 9.0 9.0 12.0 12.0

    Lean Concrete 16.0 16.0 9.0 9.0 12.0 12.0

    Pad Concrete 16.0 16.0 9.0 9.0 12.0 12.0

    Pedestal

    Backfilling

    Struc. Erection

    Struc. Insp.

    Equip. Erec.

    Remarks:

    Asst.Construction Manager

    NEIE

    Project Coordinator NEIE-AL-HUSSAIN

    (zia shafqat ali)

    Surge Arrestor (6 Nos)

    Daily Progress Report

    Line Gantry (4 Nos)

    Tower Gantry (2 Nos)

    C.C.V.T Line (2 Nos)

    1. Form work & Steel reinforcement of Circuit Breaker & Isolator in progress.

    Trenches (m)Activities

    Isolator (24 Nos.) C.V.T (2 Nos) Circuit Breaker (9 Nos)

    SUBJECT: 220 KV VEHARI SUB STATION EXT. PROJECT (PACKAGE-I)

    Bus Gantry (2 Nos)

    Dated: 28/08/2013

    Current Transformer (12 Nos)

    220 kV Switch Yard

    Activities

    Contractor: NEIE

    Post Insulator (10 Nos)

    Daily 132 kV ReportDaily 220 kV ReportDaliy CHB Report220 kv Vehari S.S