PERFORM. TRANSFORM
WE DO IT ALL
Building
Highway / Expressway
Railway Infrastructure
Water Supply
Electrification
1989 2012
Started Operations as M/s Patel Enterprises
Renamed as DEE VEE Projects Limited
Timeline
Leadership Team • Mr. Dinesh Kumar Patel (Promoter and Whole Time Director) • Mr. Vikas Ranjan Mahto (Promoter and Whole Time Director) • Mr. Navin Kumar Patel (Promoter and Whole Time Director) • Mr. Vivek Ranjan Mahto (Promoter and Whole Time Director) • Mr. Ashok Patel (Director) • Mr. Deepak Patel (Director) • Mr. Dheeraj Dubey (Director) • Mr. Ritesh Bhawnani (Director) • Mr. Gaurav Gupta (Independent Director) • Mr. Amit Sharma (Independent Director) • Mr. Anup Agarwal (President) • Mr. Sumit R Das (President) • Mr. Avinash Bansal (Vice President) • Mr. Deep Patel (Vice President) • Mr. Prashant Singh (Vice President) • Mr. Hitesh Luna (Vice President) • Mr. Satish Kumar Sarawgi (CFO) • Mr. N V Subrahmanyam (CGM)
Directors
Business Management & Administration Units Business Management & Administration Units
Operating Work Divisions
R&D
Core Management Group
Auditing Group
Roads and Highways Division
Building Division
Railway Division
Water Supply Division
Marketing Division
Procurement Division
Financing & Accounting Division
Human Resource Division
Electrification Division
Organization Structure
Human Resources
1%
32%
4% 1%
62%
Taxation Audit
Recruitment Salary Administration Statutory Compliance
Financial Highlights
INR 109.36 Cr
INR 129.79 Cr
NET WORTH 2017-18
2018-19
Financial Highlights
CRORE 660
0
100
200
300
400
500
600
700
800
2016 ‐ 2017 2017 ‐ 2018 2018 ‐ 2019
INR Cr
Average Annual Turnover (2017~2019)
INR
No Loss Certificate
Financial Highlights
Plant & Equipment
Equipment Description Qty
Batching Plant (30 &20 Cum / hr.)
Computerized and Fully Automatic Concrete Batching plant of 30Cum / hr. capacity with Cement Silos and manual feeding hoper 2 (two) days capacity with direct feeding
14 Nos.
Batching Plant (60 & 70 Cum / hr.)
Computerized and Fully Automatic Concrete Batching plant of minimum 60Cum / 70Cum hr capacity with direct feeding 04 Nos. (2+2)
Batching Plant (110Cum / hr)
Computerized and Fully Automatic Concrete Batching plant of minimum 112 Cum / hr capacity with direct feeding. 02 Nos.
Concrete Pump Concrete Pump with MS concrete Piping system for pumping. 25 Set
Transit Mixer Capacity – 6 Cum 77 Nos.
Crusher MESTO (80,200,220) TPH 04 No.
Wet Mix Macadam Plant WMM Plant ( 100 – 120 TPH) 02 Nos.
Weigh Bridge 100 MT Capacity 09 Nos.
Plant & Equipment (1/5)
Plant & Equipment (2/5)
Equipment Description Qty
Earthmovers and Excavators
Excavator (JCB/ Komatsu/ TATA Hitachi/ Hyundai/ Volvo/ CAT/ CASE) 33 Nos.
Backhoe Loader 33 Nos.
Grader (CASE/ VALVO/ CAT) 12 Nos.
ASPHALT PAVER FINISHER (Vogele/ Amman) 05 Nos.
Roller (CASE 770EXM) 02 Nos.
Soil Compactor (GREAVES/ VOVLO/ CASE/HAMM) 21 Nos.
BOBCAT 08 Nos.
ACE GRADER (AG176) 01 No.
Plant & Equipment (3/5)
Equipment Description Qty
Earthmovers and Excavators
Water Tanker 24 Nos.
HY. DUMP TRUCK 127 Nos.
GRADER (CAT / CASE 120 H) 09 Nos.
TRACKTOR GRADER (FARM TRACK-30 HERO) 02 Nos.
MANUAL PAVER (UNISTEEL) 01 Nos.
BABY TENDOM ROLLER 03 Nos.
CASE 50 DX MINI ROLLER 01 Nos.
Slip form Paver (Writgen SP-94/SP1200) 02 Nos.
Slip form Paver (GOMACO C-III) 02 Nos.
Plant & Equipment (4/5)
Equipment Description Qty
Crane and Hydra TOWER CRANE (POTAIN/DEAVOO ) 08 Nos.
MOBILE TOWER CRANE ACE 02 Nos.
Tractor & Tanker WATER & EQUIPMENT SHIFTING PURPOSE 18 Nos.
Wheel Loader HEAVY MATERIAL SHIFTING (3T/5T) 18 Nos.
Hydra Hydra 20 Nos.
Boom Placer Boom Placer – Putzmeister 04 Nos.
DG Set Diesel Generator (250/200/62/35KVA) 47 Nos
HDD Machine Goodeng 06 Nos.
Plant & Equipment (5/5)
Equipment Description Qty
Hoist BUILDING HOIST 8 Nos.
MONKEY HOIST SAFARI 45 Nos.
Tractor TRACTOR 11 Nos.
Site Vehicles SUV, MUV, INNOVA, VERNA,BOLERO, CAMPER Pick- up, RITZ, SCORPIO, ZEST
31 Nos.
Site Vehicle Bike ( Activa , Honda, TVS) 45 Nos.
Cement storage silo 100 & 150 MT with feeding system Cement and fly ash silo 23 Nos.
Chilling plant 90 Tr Chilled water supply to RMC @10000 liters per hour 2 Nos.
Certificate
ISO 9001:2015 Building, Roads, Highways, Mechanical, Electrical, Structural, & Civil Engineering Works.
Certificate
ISO 14001:2015 Building, Roads, Highways, Mechanical, Electrical, Structural, & Civil Engineering Works.
Certificate
OHSAS 18001:2017 Building, Roads, Highways, Mechanical, Electrical, Structural, & Civil Engineering Works.
Our Esteemed Clientele
and the list is growing..
Indore, Bhopal,
Shahdol, Singrauli
Dhanbad
Raipur, Korba, Bilaspur,
Ambikapur
Sambalpur, Sundergarh
Nagpur, Chandrapur,
Gondia, Amravati, Bhandara
Project Locations
Goa
Hyderabad
Office Locations
Offices : Head Office and Corporate Office Registered Office 1st Floor Vikas Complex, P.H Road, Korba ‐ 495677 (C.G.), Phone : +91 775 9245108 Corporate Office Dee Vee House , Maulshree Vihar, Raipur ‐ 492006 (C.G.), Phone : +91 771 2972580
Project Details
Electrification Building Works Roads and Highways Works
Railway Infrastructure
Water Supply
Synopsis of
EXISTING PROJECTS
Project Location Client Construction Period
Value (INR Cr)
Renovation Repair, Rehabilitation, Addition, Alteration and Aesthetic improvement and other misc. Civil & Electrical works at Hotel Janpath, Janpath Road, New Delhi.
New Delhi CPWD Mar’2020 – Jul’2020 74.33
Construction of Civil Aviation Research Organization (CARO)Complex at Begumpet Airport, Hyderabad – Phase‐I Hyderabad, TS Airport Authority of India Jan’2020 ‐ Dec’2021 296.00
Construction of All India Institute of Ayurveda (AIIA) at VillageDhargal in Pernem Taluka, Goa Goa NBCC Nov’2019 ‐ Apr’2021 206.11
Rehabilitation and Upgradation of Four Laning with PavedShoulders of Talibani to Sambalpur Section (KM 493.300 to KM521.825 & KM 545.176 to KM 567.400) of NH‐6 in the State ofOdisha Under NHDP Phase IV on EPC Mode
Sambalpur, OR NHAI / Punj Lloyd Aug'2019 ‐ Mar'2021 260.49
Medical College Building at Ambikapur, CG Ambikapur, CG CG‐PWD Mar'2019 ‐ Mar'2021 336.42
Civil & associated Works of Road Works for 4 Lane with pavedshoulder configuration of Bilaspur to Pathrapali (Km 00+000 To Km23+015) Section Of NH 111 (New NH‐130) in the State OfChhattisgarh, India
Bilaspur, CG ADANI Infra Feb'2019 ‐ Aug'2020 215.00
Face Lifting and Renovation of ‘F' Type Buildings (87 Buildings) inColony at CSTPS, Chandrapur, MH Chandrapur, MH MSPGCL, MH Jan'2019 ‐ Jul'2020 37.32
Face Lifting and Renovation of ‘E' Type Buildings (116 Buildings) inColony at CSTPS, Chandrapur, MH Chandrapur, MH MSPGCL, MH Jan'2019 ‐ Jul'2020 34.46
Synopsis of Existing Projects (1/5)
Synopsis of Existing Projects (2/5)
Project Location Client Construction Period
Value (INR Cr)
Execution of Casting of Precast RCC Boxes and making themavailable near the Bridges at nominated places in connection withrebuilding of Stone Slab Bridges in KBJ‐LAE Section Of E.CO.Railway in Chhattisgarh and Odisha State, India
Raipur, CG DGM, Raipur, CG Dec'2018 ‐ Mar'2020 16.82
Balance Civil Renovation Work for Mining Engineering, CentralLibrary, Metallurgical & Chemical Engineering, Civil Engineering,Electronics & Communication Engineering, MechanicalEngineering, Admin Block, Deshpande Auditorium, ElectricalSubstation, (Hostel 1‐6), Rain Water Harvesting System,Horticulture & Landscaping, Road, (Package‐I) at B.I.T. Sindri,Dhanbad, Jharkhand
Dhanbad, JH Engineering Projects (I) LTD Oct'2018 ‐ Feb’2020 23.04
Beautification of Ranisagar and Bhuthsagar Lake at Rajnandgaon,CG Rajnandgaon, CG
Municipal Corporation, Rajnandgaon,
CG Sept'2018 ‐ Mar'2020 17.04
Construction of 118 Nos. Sr. HIG (Duplex), 38 Nos. HIG (Duplex), 54Nos. Jr. HIG (Duplex), 123 Nos. Sr. MIG (Duplex), & 122 Nos. Jr.MIG (Duplex) at Sector‐12, Naya Raipur i/c External DevelopmentWorks at Sector‐12, Naya Raipur (Phase‐I), CG
Raipur, CG CGHB Aug'2018 ‐ Feb'2021 149.82
Construction of House and Development of Infrastructure forIdentified Slum Localities in Indore, M.P. under PMAY at Rau NearSilicon City, MP
Indore, MP Municipal Corporation, MP Jul'2018 ‐ Jul'2020 388.30
Synopsis of Existing Projects (3/5)
Project Location Client Construction Period
Value (INR Cr)
Construction of Dipka‐Jawali‐Chakabuda Road in KM 1/2 To KM15/2 (100) = 14.10 KM i/c Hume Pipe Culverts Korba, CG CGPWD Jul'2018 ‐ Jan'2020 33.31
Construction of 50 HIG Duplex ,18 Sr. MIG Duplex, 31 Jr. MIGDuplex, 52 LIG Duplex & 160 EWS (G+3) Flats i/c internal W/S, S/F,E/F & all related Infrastructure Development Work & ExternalDevelopment Work under Atal Vihar Yojna at Jhagarha, KorbaDistrict, CG
Korba, CG CGHB May'2018 ‐ May'2020 40.95
Construction of Head Office Building of Chhattisgarh Rajya GraminBank at Naya Raipur, CG Naya Raipur, CG CGRB Apr'2018 ‐ Mar’2020 4.74
Demolition, Land Development & Boundary Wall Repair Works(Package‐I) at Sindri, Jharkhand Sindri, JH PDIL Feb'2018 ‐ Jan’2020 55.19
Construction of Education Hub Phase‐II i/c Development Work atBlock Katghora, CG Korba, CG CGHB Jan'2018 ‐ Jun'2020 63.53
Construction of GAD Houses i/c Development Work for Govt.Officers and Employees at various 5 Block level offices For DistrictKorba, CG
Korba, CG CGHB Aug'2017 ‐ Jan’2020 23.93
Synopsis of Existing Projects (4/5)
Project Location Client Construction Period
Value (INR Cr)
Construction Of GAD Houses i/c Development Work for Govt.Officers and Employees at All Block Head Quarters of DistrictKoriya, CG
Koriya, CG CGHB Jul'2017 ‐ Apr’2020 24.18
Rehabilitation and Up‐gradation Of NH‐111 (New NH‐130) fromKM 163.400 to KM 215.800 (Shivnagar to Ambikapur) to 2‐Lanewith Paved Shoulder (Value 223.89 Cr, DEE VEE 49% = 109.70 Cr &GAWAR 51% = 114.18 Cr)
Shivnagar‐Ambikapur, CG National Highway Zone
PWD, Raipur, CG
Jun'2017 ‐ Jun’2020 109.70
Construction of 674 EWS, 436 MIG and 108 HIG ResidentialTenements on land bearing survey No. 47, 57 and 58 at MaujaAkoli, Dist.‐Amravati, MH
Amravati, MH AHAADB, Amravati, MH Jun'2017 ‐ Jun’2020 139.83
Construction & External Development of Inter State Bus Terminalat Raipur, CG Raipur, CG UADD, CG Mar'2017 ‐ Dec'2019 43.21
Two Laning with hard shoulder of Tara‐Premnagar‐ Ramanujnagarroad section from existing chainage KM 0.000 To KM 50.312(Design Chainage From Km 0.000 To Km 50.242) in the State ofChhattisgarh on EPC Mode. (GAWAR ‐ Rs. 54.18 Cr & DEE VEE ‐ Rs.50.29 Cr)
Tara‐ Premnagar‐Ramanujnagar, CG CGRDC Feb'2017 ‐ May’2020 50.29
Construction of Art & Cultural Centre and Conventional Hall atKorba, CG Korba, CG CGHB Feb'2017 ‐ Apr’2020 14.97
Synopsis of Existing Projects (5/5)
Project Location Client Construction Period
Value (INR Cr)
Construction of Houses and Development of Infrastructure underPMAY, Singrauli Municipal Corporation, MP Singrauli, MP Municipal Corporation Singrauli, MP Dec'2016 ‐ Mar’2020 197.16
Renovation work for various building (Pkg‐III) at B.I.T. Sindri,Dhanbad, Jharkhand Dhanbad, JH Engineering Projects (I) LTD Nov'2016 ‐ Feb’2020 19.93
Construction of Engineering College at Chatwai, Distt ‐ Shahdol, MPi/c Water Supply, Sanitary Fitting and Electrification Shahdol, MP MPPWD Sept'2016 ‐ Dec’2020 30.37
Synopsis of
COMPLETED PROJECTS
Synopsis of Completed Projects (1/6)
Project Location Client Construction Period
Value (INR Cr)
Township Package for Darlipali Super Thermal Power Project,Stage‐ I (2X800 MW) near Jharsuguda, Odisha Darlipali, OR NTPC LTD Aug'2016 ~ Nov'2019 157.45
Construction of Head Quarter Building, Western Region‐II, NTPCLtd. at Sector‐24, Naya Raipur, CG Naya Raipur, CG NRDA, CG Jun'2018 ~ Oct'2019 70.07
Construction of New Medical College and up‐gradation of Hospitalat Shahdol, MP Shahdol, MP MPRDC Jan'2016 ~ Aug'2019 277.40
Construction of Degree Collage Shahdol to University Shahdol,Distt Shahdol, MP i/c Water Supply, Sanitary Fitting andElectrification
Shahdol, MP MPPWD Sept'2016 ~ Jun'2019 40.89
Integrated Infrastructure Development work for Sector‐24 (Part‐APhase‐II) Naya Raipur, CG Naya Raipur, CG NRDA, CG Dec'2016 ~ Apr'2019 72.69
Construction of Directorate Health Department Building at Sector19, North Block, Naya Raipur Naya Raipur, CG NRDA, CG Oct’2014 ~ Apr’2019 23.37
Airport Highway (V.I.P. Road) Widening Contract, Raipur, CG Raipur, CG UADD, CG May'2016 ~ Sept'2018 55.12
Construction of Girls Hostel for IIIT at Naya Raipur, CG Naya Raipur, CG NRDA, CG Nov'2017 ~ Aug'2018 7.25
Synopsis of Completed Projects (2/6)
Project Location Client Construction Period
Value (INR Cr)
Construction of Commercial Retail (Formal & Informal) i/c Buildingsand Services on Plot No. E04, E05, E09 & E10 of Phase‐1, CBDComplex, Sector 21 at Naya Raipur, CG
Naya Raipur, CG NRDA, CG Dec'2014 ~ Jul'2018 128.20
Supply and Stacking of balance quantity of Ballast betweenTitlagarh‐Lakhna Section of Sambalpur Division of E.Co.R in Odisha,India, in connection with Raipur‐Titlagarh Doubling.
Titlagarh‐Lakhna Sec. of Sambalpur Div., OR RVNL Oct'2016 ~ Jun'2018 18.45
Construction of Civil Works i/c Earthwork in formation forEmbankment and Cutting, Blanketing, Culverts, Major & MinorBridges and other Ancillary Works from KM 98.860 to KM 134.660and Flyover Line from KM 128.000 to KM 135.200 (Pkg‐I) inconnection with the construction of New BG Electrified DoubleLine in the State of Chhattisgarh over SECR East‐West Corridor–Gevra Road‐Pendra Road via Dipka, Kathghora, Sendurgarh andPasan. (DEE VEE‐GAWAR (JV)) (Value 197.54 Cr, DEE VEE:70%=138.28 Cr & GAWAR: 30%=59.26 Cr)
Gevra Road‐Pendra Road, CG IRCON Jul'2016 ~ Jun'2018 56.68 (Fore Closure)
Execution of all P. Way works (Excluding PF shelter & FOB), Supplyof Ballast and misc. Civil works i/c supply and transporting of P.Way material in ARN (Ex)‐BLSN (in) section and ANMD yard ofSambalpur division of E.Co.R. in the State of Chhattisgarh, India, inconnection with Raipur‐Titlagarh Doubling Project.
Raipur, CG RVNL Nov'2016 ~ May'2018 25.10
Synopsis of Completed Projects (3/6)
Project Location Client Construction Period
Value (INR Cr)
Rehabilitation and up‐gradation of NH‐43 from KM 241.00 to KM298.00 (Dahikonda to Jagdalpur ) in the State of Chhattisgarh toTwo‐lanes with Paved Shoulders under NHDP‐IV on EPC Basis.(Barbric‐DEE VEE (JV) Total Amount 175.99 Cr. DEE VEE‐60%=105.5Cr & Barbric‐40%=70.39 Cr)
Dahikonda to Jagdalpur, CG NHDP Mar'2015 ~ May'2018 105.62
Construction of Commercial Office Campus i/c buildings andservices on Plot No. C03 of Phase‐1, CBD Complex, Sector 21 atNaya Raipur, CG
Naya Raipur, CG NRDA, CG Dec'2014 ~ Apr'2018 154.42
Construction of Chhattisgarh State Judicial Academy Bhawan atHigh Court, Bodri, Bilaspur, CG Bilaspur, CG PWD, Bilaspur, CG Aug'2014 ~ Mar'2018 20.11
Construction of New Civil at Visveswaraya National Institute ofTechnology, Nagpur, MH Nagpur, MH NBCC Sept'2015 ~ Feb'2018 189.86
Construction of 1 no. ROB and 5 no. RUB (full height and limitedheight) and allied work in connection with construction of New RailLine between Mandirhasaud‐Nayaraipur‐ Kendri, CG
Mandirhasaud‐ Naya Raipur‐Kendri, CG SECR‐Bilaspur Apr'2016 ~ Oct'2017 18.84
Rehabilitation and up‐gradation of NH‐43 from KM 81.50 to KM130.00 (Dhamtari to Kanker) in the State of Chhattisgarh to Two‐lanes with Paved Shoulders under NHDP‐IV on EPC. (Barbric‐DEEVEE (JV)) (Value 135.99 Cr, DEE VEE: 40%=54.40 Cr & Barbric:60%=81.59 Cr)
Dhamtari to Kanker, CG NHDP Mar'2015 ~ Jun'2017 54.39
Synopsis of Completed Projects (4/6)
Project Location Client Construction Period
Value (INR Cr)
Construction of 12 HIG Type‐II, 47 Sr. MIG Type‐II, 57 Jr. MIG Type‐II, 150 LIG Type‐II, & 272 EWS Type‐I for Atal Vihar Yojna at Chilhati,Bilaspur, CG
Chilhati, CG CGHB Jul'2014 ~ Mar'2017 30.80
Construction of Forest Department building at North block, Sector‐19 of Naya Raipur, CG Raipur, CG NRDA, CG Feb' 2015 ~ Feb'2017 38.92
C.G.H.B. 30 Acre Land Development Work at Urga, Dist‐Korba, CG Korba, CG CGHB Sept'2013 ~ Apr'2016 12.31
Construction of Paryavas Bhawan (Composite Building) of Sector‐19at Naya Raipur, CG Naya Raipur, CG NRDA, CG Mar'2013 ~ Apr'2016 61.59
Construction of 24 No. HIG ‐II, 131 No. Sr. MIG‐II, 131 No. Jr. MIG‐II,90 No. LIG‐II & 432 No. EWS (G+3), Total 808 No. Houses i/c W/S,S/F, Electrification Works at Atal Vihar Urga, Korba, CG
Korba, CG CGHB Sept'2013 ~ Mar'2016 39.98
Construction of Cement Concrete road in KM 1 to 23/4 = 22.40 KMof Dipka to Pali Road i/c Bridge and Culverts, CG Dipka to Pali, CG PWD, Korba, CG Aug'2013 ~ Dec'2015 61.89
Construction of 688 EWS and 510 LIG houses dwelling unit with RCCFramed Structure under Atal Vihar Yojana at Parsada Kumhari, Disst.Durg, CG
Durg, CG CGHB Sept'2013 ~ Oct'2015 33.39
Synopsis of Completed Projects (5/6)
Project Location Client Construction Period
Value (INR Cr)
Construction of 34 No. HIG (Premium), 144 No. HIG (Duplex), 176No. Sr. MIG, 176 No. Jr. MIG, 320 No. EWS (G+3), 432 No. LIG(S+6), 144 No. HIG (S+6), Commercial Complex (G+4) & ClubHouse, Water Supply i/c Electrification Work at Sector‐29, NayaRaipur, CG (Group‐A)
Naya Raipur, CG CGHB Feb' 2012 ~ Apr'2015 209.19
Construction of Cement Concrete Road in KM 9/2 to 13/10 = 5.00KM on Ring Road Korba (Godhi To Risdhi), Korba, CG Korba, CG PWD, Korba, CG Sept'2013 ~ Jan'2015 9.09
Construction of Police Head Quarter at Naya Raipur, CG Naya Raipur, CG NRDA, CG Nov'2012 ~ Dec'2014 49.63
Construction of Cement Concrete Road in KM 1 to KM 8 = 8.00 KMon Barbaspur to Godhi Road (Ring Road Korba) i/c Hume PipeCulverts, CG
Korba, CG PWD, Korba, CG Mar'2013 ~ Dec'2014 19.31
Construction of 35 HIG‐I Delux Duplex, 20 HIG‐II Delux Duplex, 64HIG‐ II Std., 38 MIG Duplex, 7 MIG, 65 LIG (Total 229) House atHasdev Vihar Janjgir i/c Water Supply, Internal Electrification&Balance Development Work, Korba, CG
Korba, CG CGHB Sept'2012 ~ Aug'2014 26.61
Construction of 32 HIG (Duplex), 63 Sr. MIG (Duplex), 576 MIG(S+6), 144 HIG (S+6) & Commercial Complex under CompositeHousing Scheme at Sector‐29 Naya Raipur, CG (Group‐B)
Naya Raipur, CG CGHB Dec'2011 ~ Jun'2014 125.22
Synopsis of Completed Projects (6/6)
Project Location Client Construction Period
Value (INR Cr)
Construction of Naya Raipur Capital Complex‐Lake (Rakhi) frontdevelopment under Conservation & Development of Water Bodiesunder the Head of 13th Finance Commission
Naya Raipur, CG NRDA, CG Apr'2012 ~ Mar'2014 26.02
Construction of 52 No. HIG (Duplex), 152 No. Sr. MIG, 72 No. HIG(S+6), 256 No. HIG (S+8) and Commercial Complex (G+2) andCommunity Hall i/c Water Supply and Internal Electrification atSector‐29 Naya Raipur, CG (Group‐C)
Naya Raipur, CG CGHB Dec'2011 ~ Feb'2014 124.8
Construction of New Composite Building at Bilaspur, CG Bilaspur, CG PWD, Bilaspur, CG Jun'2012 ~ Dec'2013 14.82
Construction of 168 (G+2) Deendayal Awas House and 84 EWS(G+2) at Kharmora, Korba, CG Korba, CG CGHB Apr'2012 ~ Sept'2013 7.89
Construction of Institute of Technology Building at Korba i/c WaterSupply, Sanitary fitting, Electrification with Approach Road, Korba,CG
Korba, CG PWD, Korba, CG Jan'2011 ~Sept'2012 26.94
Quality Policy
VISION To be the preferred source of quality construction services while building a most favorable and successful organization. MISSION • To specialize in all segments of construction activities. • To provide quality project supervision and workmanship through recruitment, training and systems support. • To foster a corporate culture where our employees have a safe, respectful and rewarding work environment. • To deliver projects on schedule and on budget • To maximize the utilization of resources • To seek business opportunities that optimize our multi-disciplinary capabilities. QUALITY STATEMENT We are committed to providing quality work to our customers that meets the project standards and specifications for materials, workmanship, schedules while maintaining Profitability and competitiveness. We seek to achieve quality by instilling the principle of “Trust to Last” in the efforts of all levels of staff. We ensure continual improvement through quality processes which are directed by a strong management team.
HSE Policy
STATEMENT OF POLICY It is the policy of our company to perform work in the safest possible manner consistent with the Health & Safety Act and Regulations for Construction Projects. It is our belief that every employee in the construction industry is entitled to work in a safe and healthy construction environment. Every reasonable precaution shall be taken to provide such an environment. Our goal is to eliminate or minimize the hazards that cause accidents and injuries. Any accident in this company shall be viewed as a serious matter and shall be thoroughly investigated. POLICY COMMITMENT Copies of this policy must be posted, distributed and explained to all workers. Compliance with this policy will be reviewed regularly at all employee levels. Violations will be recorded. Repeated disregard or willful violations of this policy by any subcontractor or employee at any level may be considered cause for discipline in accordance with the Company Rules and existing laws.
PROJECTS GLIMPSES
If one needs to succeed in the construction industry, one needs to be committed & pay attention to detail. There is also a need to be resolute in one's work ethic.
Constructing Success Committed to Superior Quality, Safety and Timely Completion.
Visit us at www.dvplindia.in