2ehv susbattions psjg apr11

24
EHV AC Substations : Layout, Equipment, Bus arrangements 1.0 Contents: a) PURPOSE b) CLASSIFICATIONS c) VOLTAGE CLASS & RATINGS d) Bus switching schemes e) SLD & Lay outs f) SUBSTATION EQUIPMENTS. g) GIS 2.0 Purpose: 1.1 The substations are very much essential to a) Evacuate power from generating stations. b) Transmit to the load centers. c) Distribute to the utilities & ultimate consumers. 1.2. The Electrical power generation from Hydel, Thermal, Nuclear and other generating stations has to be evacuated to load centers. The generation voltage is limited to 15/18 KV due to the limitation of the rotating machinery. This bulk power has to be stepped up to higher voltages depending on quantum of power generated and distance to the load centers. Again the power has to be stepped down to different lower voltages for transmission and distribution. 1.3 In between the power houses and ultimate consumers a number of Transformation and switching stations have to be created. These are generally known as sub-stations 3.0 CLASSIFICATIONS

Upload: anurag-sarraf

Post on 16-Aug-2015

223 views

Category:

Documents


3 download

DESCRIPTION

ehv

TRANSCRIPT

EHV AC Substations : Layout, Equipment, Bus arrangements1.0 Contents:a) PURPOSEb) CLASSIFICATIONSc) VOLTAGE CLASS & RATINGSd) Bus switching schemese) SLD & La !utsf) SUBSTATION E"UIP#ENTS.g) GIS 2.0 Purpose:1.1The su$stati!ns a%e &e% much essentia' t! a) E&acuate (!we% )%!m gene%ating stati!ns* b) T%ansmit t! the '!a+ cente%s*c) Dist%i$ute t! the uti'ities & u'timate c!nsume%s*,*-* The E'ect%ica' (!we% gene%ati!n )%!m .+e'/ The%ma'/ Nuc'ea% an+ !the%gene%ating stati!ns has t! $e e&acuate+ t! '!a+ cente%s* The gene%ati!n &!'tage is 'imite+ t! ,01,2 3V +ue t! the 'imitati!n !) the %!tating machine%* This $u'4 (!we% has t! $e ste((e+ u( t! highe% &!'tages +e(en+ing !n 5uantum !) (!we% gene%ate+ an+ +istance t! the '!a+ cente%s*Again the (!we% has t! $e ste((e+ +!wn t! +i6e%ent '!we% &!'tages )!% t%ansmissi!n an+ +ist%i$uti!n* ,*7 In $etween the (!we% h!uses an+ u'timate c!nsume%s a num$e% !) T%ans)!%mati!n an+ switching stati!ns ha&e t! $e c%eate+*These a%e gene%a'' 4n!wn as su$8stati!ns 3.0 CLASSIFICATIONS 7*,* Acc!%+ing' the su$stati!ns a%e c'assi9e+ as a: Gene%ating su$stati!ns ca''e+ as ste( u( su$stati!ns $: G%i+ su$stati!nsc: Switching stati!ns+: Sec!n+a% su$stati!ns7*,* The gene%ating su$stati!ns a%e ste( u( stati!ns as the gene%ati!n &!'tage nee+s t! $este((e+ u( t! the (%ima% t%ansmissi!n &!'tage s! that huge $'!c4s !) (!we% can $e t%ansmitte+ !&e% '!ng +istances t! '!a+ cente%s* 7*-The g%i+ su$stati!ns a%e c%eate+ at suita$'e '!a+ cente%s a'!ng the (%ima% t%ansmissi!n 'ines* 7*7Switching stati!ns a%e (%!&i+e+ in $etween 'ength (%ima% t%ansmissi!n 'ines;a) T! a&!i+ switching su%ges* b) F!% eas seg%egati!n !) )au't * Sec!n+a% su$stati!ns a%e '!cate+ at actua' '!a+ (!ints a'!ng the sec!n+a% t%ansmissi!n 'ines whe%e the &!'tage is )u%the% ste((e+ +!wn t!;a) Su$ t%ansmissi!n &!'tagesb) P%ima% +ist%i$uti!n &!'tage*c) Dist%i$uti!n su$stati!ns a%e c%eate+ whe%e the su$8t%ansmissi!n &!'tage an+ (%ima% +ist%i$uti!n &!'tage a%e ste((e+ +!wn t! su((' &!'tage an+ )ee+ the actua' c!nsume%s th%!ugh a netw!%4 !) +ist%i$uti!n an+ se%&ice 'ine4.0.VOLTAGE CLASS AND RATINGSGene%a'' the )!''!wing &!'tage c'ass su$stati!ns (%e&ai'ing in In+iaa) ?*? 3V/ ,, 3V/ --3V*8888888888P%ima% +ist%i$uti!nV!'tageb) 77 4V/??3V/ ,,@1,7-3V/88888888.igh &!'tagec) --@1-7@3V / >@@ 3V/ A?0 4V8888888888E=t%a high V!'tage.0PLANNING OF S!"STATION INSTALLATION 0*,The (%!cess !) ('anning su$8stati!n insta''ati!ns c!nsists ina) Esta$'ishing the $!un+a% c!n+iti!ns*b) De9ning the ('ant c!nce(t/ t(e/ & P'anning (%inci('es*0*- The $!un+a% c!n+iti!ns a%e g!&e%ne+ $ )!''!wing en&i%!nmenta' ci%cumstances &a&ai'a$i'it !) the 'an+ in the %e5ui%e+ ('ace*a) L!ca' c'imatic )act!%sb) InBuence !) en&i%!nmentc) The !&e%a'' (!we% sstem &!'tage 'e&e'd) Sh!%t ci%cuit %atinge) A%%angement !) neut%a' (!intf) The )%e5uenc !) !(e%ati!ng) The %e5ui%e+ a&ai'a$i'it !% %e'ia$i'ith) Sa)et %e5ui%ementsi) S(eci9c !(e%ating c!n+iti!ns #.0. T$pes o% su&st't(ons:a) Out +!!%8 C!n&enti!na' Ai% insu'ate+ su$stati!ns CAIS:b)In +!!% su$stati!nsc:C!m(%esse+ Ai% insu'ate+d)Gas insu'ate+ su$stati!ns CGIS :?*, The t(es !) Su$ Stati!ns +e(en+s u(!n;a) The a&ai'a$i'it !) the 'an+ in the %e5ui%e+ ('ace*b) En&i%!nmenta' c!n+iti!ns*).0. Su&*St't(on En+(neer(n+. A*,*The Su$ Stati!n Enginee%ing c!m(%ises/a) Su$8stati!n site se'ecti!n b) Bus Switching schemes* c: Bus8Ba%;i. T(e*ii. Si