PEMBAGIAN METODE
TAMDATAMBANG DALAM / TAMBANG BAWAH
TANAH (UNDER GROUND MINE) terdiri dari3 (tiga) metode :
1. Metode Swa Sanggah(Non Supported/ OpenStope Methods) Menurut teknikpenambangannya dibagi 4 (empat) metode :
Gophering
Underground gloryhole Shrinkage Stoping
Sub Level Stoping
Saturday, December 13, 2014 2by : Meinarni Thamrin
-
8/10/2019 2_Metode Tambang Bawah Tanah
3/75
ModelModel
-
8/10/2019 2_Metode Tambang Bawah Tanah
4/75
SKETSA SWA
SANGGA
-
8/10/2019 2_Metode Tambang Bawah Tanah
5/75
BENTUK SWA
SANGGAH
-
8/10/2019 2_Metode Tambang Bawah Tanah
6/75
Sketsa Glory Hole
-
8/10/2019 2_Metode Tambang Bawah Tanah
7/75
Shrinkage Stoping
-
8/10/2019 2_Metode Tambang Bawah Tanah
8/75
Sub Level
Stoping
-
8/10/2019 2_Metode Tambang Bawah Tanah
9/75
Tambang Bawah
Tanah..2. Metode dengan Penyanggaan
(Supported Stope Methods) Menurutteknik penambangannya dibagi atas 4
(empat) metode :
Cut and Fill Stoping
Stull Stoping
Square Set Stoping
Shrink Fill Stoping
Saturday, December 13, 2014 9by : Meinarni Thamrin
-
8/10/2019 2_Metode Tambang Bawah Tanah
10/75
MODEL METODE
-
8/10/2019 2_Metode Tambang Bawah Tanah
11/75
MODEL-MODEL
PENYANGGAH
-
8/10/2019 2_Metode Tambang Bawah Tanah
12/75
MODEL-MODEL
STOPE/LOMBONG PADA TAMDA
-
8/10/2019 2_Metode Tambang Bawah Tanah
13/75
Metode Cut and Fill
-
8/10/2019 2_Metode Tambang Bawah Tanah
14/75
CUT AND
FILL
-
8/10/2019 2_Metode Tambang Bawah Tanah
15/75
Model Stull Stoping
-
8/10/2019 2_Metode Tambang Bawah Tanah
16/75
Model Square Set Stopping
-
8/10/2019 2_Metode Tambang Bawah Tanah
17/75
MODEL SQUARE STOPE
MINING
-
8/10/2019 2_Metode Tambang Bawah Tanah
18/75
Tambang Bawah
Tanah3. Metode Ambrukan (Caving Methods)
Terdiri dari 3 (tiga) metode, yaitu :
Top Slicing
SubLevel Caving
Block Caving
Saturday, December 13, 2014 18by : Meinarni Thamrin
-
8/10/2019 2_Metode Tambang Bawah Tanah
19/75
Sketsa
-
8/10/2019 2_Metode Tambang Bawah Tanah
20/75
MODEL SISTEM
AMBRUKAN
-
8/10/2019 2_Metode Tambang Bawah Tanah
21/75
SISTEM
AMBRUKAN
-
8/10/2019 2_Metode Tambang Bawah Tanah
22/75
Metode Ambrukan
(Top Slicing)
-
8/10/2019 2_Metode Tambang Bawah Tanah
23/75
Bentuk 3D Top Slicing
-
8/10/2019 2_Metode Tambang Bawah Tanah
24/75
Caving
S C
-
8/10/2019 2_Metode Tambang Bawah Tanah
25/75
Sketsa Blok Caving
Method
MODEL BLOCK
-
8/10/2019 2_Metode Tambang Bawah Tanah
26/75
MODEL BLOCK
CAVING
-
8/10/2019 2_Metode Tambang Bawah Tanah
27/75
MODEL BLOCK CAVING DI TAMDA
GRASBERG, PT.FREEPORT INDONESIA
MODEL ORE
-
8/10/2019 2_Metode Tambang Bawah Tanah
28/75
MODEL ORE
PASS
-
8/10/2019 2_Metode Tambang Bawah Tanah
29/75
Underground MiningEquipment
Locomotives Drills
Coal Scoops
Loaders
Slushers (Scrappers) Rock Dusters
Mine Hoists
LHDs (Load Haul Dumps)
Jumbos-
Roof Bolters
Longwall Equipment
Tunnel/Raise Borers-
Ventilation Equipment
Continuous Mining Systems
and more
Saturday, December 13, 2014 by : Meinarni Thamrin 29
-
8/10/2019 2_Metode Tambang Bawah Tanah
30/75
Saturday, December 13, 2014 by : Meinarni Thamrin 30
-
8/10/2019 2_Metode Tambang Bawah Tanah
31/75
Saturday, December 13, 2014 by : Meinarni Thamrin 31
Load Haul Dump at Kiruna Mining Swedia
-
8/10/2019 2_Metode Tambang Bawah Tanah
32/75
Saturday, December 13, 2014 by : Meinarni Thamrin 32
Load Haul Dump at Kiruna Mining, Swedia
-
8/10/2019 2_Metode Tambang Bawah Tanah
33/75
Saturday, December 13, 2014 by : Meinarni Thamrin 33
Diesel Locomotive model DHD25, Capacities 1 to 600+ tons per Train
-
8/10/2019 2_Metode Tambang Bawah Tanah
34/75
Saturday, December 13, 2014 by : Meinarni Thamrin 34
Hand Dump Rail Cars,
Mechanical Dump
-
8/10/2019 2_Metode Tambang Bawah Tanah
35/75
Saturday, December 13, 2014 by : Meinarni Thamrin 35
Underground Haul Truck
-
8/10/2019 2_Metode Tambang Bawah Tanah
36/75
Saturday, December 13, 2014 by : Meinarni Thamrin 36
-
8/10/2019 2_Metode Tambang Bawah Tanah
37/75
Saturday, December 13, 2014 by : Meinarni Thamrin 37
-
8/10/2019 2_Metode Tambang Bawah Tanah
38/75
Saturday, December 13, 2014 by : Meinarni Thamrin 38
Motor Grader for Underground Mining
-
8/10/2019 2_Metode Tambang Bawah Tanah
39/75
Saturday, December 13, 2014 by : Meinarni Thamrin 39
-
8/10/2019 2_Metode Tambang Bawah Tanah
40/75
Saturday, December 13, 2014 by : Meinarni Thamrin 40
Equipment for Cable Bolt
-
8/10/2019 2_Metode Tambang Bawah Tanah
41/75
Saturday, December 13, 2014 by : Meinarni Thamrin 41
Equipment for Cable Bolt
-
8/10/2019 2_Metode Tambang Bawah Tanah
42/75
Saturday, December 13, 2014 by : Meinarni Thamrin 42
Equipment for Cable Bolt
-
8/10/2019 2_Metode Tambang Bawah Tanah
43/75
Saturday, December 13, 2014 by : Meinarni Thamrin 43
-
8/10/2019 2_Metode Tambang Bawah Tanah
44/75
Saturday, December 13, 2014 by : Meinarni Thamrin 44
The S1-PCEXPL explosives cassette, mounted on DuxsS1 Porter
chassis
-
8/10/2019 2_Metode Tambang Bawah Tanah
45/75
Saturday, December 13, 2014 by : Meinarni Thamrin 45
Lift Vehicle
-
8/10/2019 2_Metode Tambang Bawah Tanah
46/75
Saturday, December 13, 2014 by : Meinarni Thamrin 46
-
8/10/2019 2_Metode Tambang Bawah Tanah
47/75
Saturday, December 13, 2014 by : Meinarni Thamrin 47
The Paus RL 852 TSL scaler
-
8/10/2019 2_Metode Tambang Bawah Tanah
48/75
Sketsa
T b B h T h t k
-
8/10/2019 2_Metode Tambang Bawah Tanah
49/75
Tambang Bawah Tanah untuk
Batubara
Khusus Tambang Dalamuntuk Batubara
digunakan 3 (dua) metode, yaitu :
Room and Pillar Methods
Long Wall Methods
Short Wall Methods
Saturday, December 13, 2014 49by : Meinarni Thamrin
-
8/10/2019 2_Metode Tambang Bawah Tanah
50/75
R d
-
8/10/2019 2_Metode Tambang Bawah Tanah
51/75
Room and
Pillar
BAGIAN UTAMA SISTEM ROOM AND
-
8/10/2019 2_Metode Tambang Bawah Tanah
52/75
BAGIAN UTAMA SISTEM ROOM AND
PILLAR PADA TAMDA BATUBARA
BAGIAN UTAMA LONG WALL
-
8/10/2019 2_Metode Tambang Bawah Tanah
53/75
BAGIAN UTAMA LONG WALL
MINING PADA BATUBARA TAMDA
-
8/10/2019 2_Metode Tambang Bawah Tanah
54/75
Long Wall
-
8/10/2019 2_Metode Tambang Bawah Tanah
55/75
Sketsa Long Wall
Penampang LW dan Shearer
-
8/10/2019 2_Metode Tambang Bawah Tanah
56/75
Penampang LW dan ShearerCutter (alat pemotong
batubara)
Perangkat Tiang Penyangga
-
8/10/2019 2_Metode Tambang Bawah Tanah
57/75
Perangkat Tiang Penyangga
Baja pada Long Wall BB
-
8/10/2019 2_Metode Tambang Bawah Tanah
58/75
Long Wall Methods
ALAT PEMOTONG TIANG PENYANGGAH
-
8/10/2019 2_Metode Tambang Bawah Tanah
59/75
MODEL-MODEL /SKETSA
PEMBUATAN TEROWONGAN
-
8/10/2019 2_Metode Tambang Bawah Tanah
60/75
PEMBUATAN TEROWONGAN
PADA TAMDA
SHAFT HOIST PADA
-
8/10/2019 2_Metode Tambang Bawah Tanah
61/75
SHAFT HOIST PADA
TAMDA
-
8/10/2019 2_Metode Tambang Bawah Tanah
62/75
MINERS PADA TAMDA
PT.FREEPORT, PAPUA
PEMBORAN PADA
-
8/10/2019 2_Metode Tambang Bawah Tanah
63/75
O
TAMDA
CRUSHER (ALAT PEMECAH
-
8/10/2019 2_Metode Tambang Bawah Tanah
64/75
CRUSHER (ALAT PEMECAH
BATUAN) PADA TAMDA
PT. FREEPORT, GRASBERG
LOAD HAUL DUMP(LHD) ALAT
-
8/10/2019 2_Metode Tambang Bawah Tanah
65/75
LOAD HAUL DUMP(LHD) ALAT
MUAT PADA TAMDA
MODEL SISTEM PENAMBANGAN DI
-
8/10/2019 2_Metode Tambang Bawah Tanah
66/75
MODEL SISTEM PENAMBANGAN DI
GRASBERG, PT.FREEPORT INDONESIA
LIFT UNTUK ALAT ANGKUT
-
8/10/2019 2_Metode Tambang Bawah Tanah
67/75
KARYAWAN PADA VERTIKAL
SHAFT
MODEL
-
8/10/2019 2_Metode Tambang Bawah Tanah
68/75
MODEL
STOPE/LOMBONG
ALAT BOR UNTUK
-
8/10/2019 2_Metode Tambang Bawah Tanah
69/75
ALAT BOR UNTUK
TUNNELING
-
8/10/2019 2_Metode Tambang Bawah Tanah
70/75
PEMBUATAN TUNNEL
MODEL-MODEL
-
8/10/2019 2_Metode Tambang Bawah Tanah
71/75
TEROWONGAN BAWAH
TANAH
ALAT JACK BOR PADATAMDA
-
8/10/2019 2_Metode Tambang Bawah Tanah
72/75
TAMDA
TIANG PENYANGGA PADA
-
8/10/2019 2_Metode Tambang Bawah Tanah
73/75
TIANG PENYANGGA PADA
TAMBANG BAWAH TANAH
LIVING ROOM KARYAWAN
-
8/10/2019 2_Metode Tambang Bawah Tanah
74/75
LIVING ROOM KARYAWAN
PADA TAMDA
-
8/10/2019 2_Metode Tambang Bawah Tanah
75/75