Page 1: 2nd UPDATE - World Bank

UPDATE

August 2005

2nd

40333P

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

ed

Page 2: 2nd UPDATE - World Bank
Page 3: 2nd UPDATE - World Bank

COUNTRYPROCUREMENTASSESSMENT

REPORT

Phil ippines

Country Operations and Services UnitEast Asia and Pacific Region

August 2005

THE WORLD BANK

UPDATE2nd

Page 4: 2nd UPDATE - World Bank

Regional Vice President : Jemal-ud din Kassum, EAPCountry Director : Joachim von Amsberg, EACPF

Sector Director : Marisa Fernandez-Palacios, EAPCOTask Team Leader : Cecilia Vales, EAPCO

Page 5: 2nd UPDATE - World Bank

Contents

Foreword --------------------------------------------------------------------------------------------------- 9Introduction ------------------------------------------------------------------------------------------------ 11Big Achievements So Far ----------------------------------------------------------------------------- 12Assessment of Progress ------------------------------------------------------------------------------ 16Consolidated Agreed Actions ------------------------------------------------------------------------ 16Procurement Under Foreign Assisted Projects (FAPs) ---------------------------------------- 17Funding Requirement for Agreed Actions -------------------------------------------------------- 19

TableTable 1: Status of Completed, Ongoing and Open Agreed Actions ------------------------ 12Table 2: Procurement Under Foreign Assisted Projects (FAPs) ---------------------------- 17Table 3: Philippine Bidding Documents Harmonized with ADB, JBIC and the WB ----- 18Table 4: Amount of Threshold per Contract for Procurement Methods and Prior Reviews ----------------------------------------------------------------------------------------- 19

AppendicesAppendix 1 - List of CPAR 2nd Update Mission Participants ---------------------------------- 21Appendix 2 - Speech of Undersecretary Laura B. Pascua ----------------------------------- 23Appendix 3 - Summary of Achievements and Ongoing Agreed Actions ------------------ 25Appendix 4 - Status of Procurement Training and G-EPS Update ------------------------- 37Appendix 5 - Report on Progress of Reform in LGUs ----------------------------------------- 41Appendix 6 - Report on Progress of Reform in the Health Sector ------------------------- 47Appendix 7 - Report on Progress of Reform in the Education Sector --------------------- 50Appendix 8 - Baseline Indicator System Report ------------------------------------------------ 53Appendix 9 - Matrix of Weaknesses and Targeted Activities (as of November 2004) - 73Appendix 10 - Procurement Annex to the Loan Agreement --------------------------------- 77Appendix 11 - CPAR Update February 2004----------------------------------------------------- 79

Page 6: 2nd UPDATE - World Bank

Acronyms and AbbreviationsADB - Asian Development BankAIM - Asian Institute of ManagementAO - Administrative OrderBAC - Bids and Awards CommitteeBSP - Bangko Sentral ng PilipinasBOT - Build-Operate-and-TransferCIAP - Construction Industry Authority of the PhilippinesCDF - Countryside Development FundCIDA - Canadian International Development AgencyCOA - Commission on AuditCPAR - Country Procurement Assessment ReportCPPR - Country Portfolio Performance ReviewCSC - Civil Service CommissionDBM - Department of Budget and ManagementDepEd - Department of EducationDILG - Department of the Interior and Local GovernmentDOJ - Department of JusticeDOH - Department of HealthDPWH - Department of Public Works and HighwaysDTI - Department of Trade and IndustryEO - Executive OrderEPS - Electronic Procurement SystemGAAM - Government Accounting and Audit ManualGEF - Global Environment FacilityG-EPS - Government Electronic Procurement SystemGFI - Government-Financing InstitutionGOCC - Government-Owned and/or Controlled

CorporationGOP - Government of the PhilippinesGPIS - Government Procurement Information System

GPPB - Government Procurement Policy BoardGPRA - Government Procurement Reform ActICB - International Competitive BiddingINT - Department of Institutional IntegrityIRRs - Implementing Rules and RegulationsJBIC - Japan Bank for International CooperationLC - Letter of CreditLCE - Local Chief ExecutiveLGU - Local Government UnitLOI - Letter of InstructionsNBI - National Bureau of InvestigationNCB - National Competitive BiddingNGA - National Government AgenciesNGO - Non-Government OrganizationNEDA - National Economic and Development AuthorityOSG - Office of the Solicitor GeneralPCAB - Philippine Constructors Accreditation BoardPEAC - Pre-qualification, Evaluation and Awards CommitteePD - Presidential DecreePPB - Procurement Policy BoardPSB - Philippines Shippers’ BureauPS - Procurement ServicePWI - Procurement Watch, Inc.TIP - Transparency International PhilippinesTTL - Task Team LeaderTWG - Technical Working GroupWB - World BankWBOM - World Bank Office ManilaWG - Working Group

Page 7: 2nd UPDATE - World Bank

Acknowledgements

The Country Procurement Assessment Report(CPAR) Second Update report was prepared in No-vember 2004 by a Team led by Cecilia Vales (SeniorProcurement Specialist). The Team comprised JoelTurkewitz (Senior Public Procurement Specialist),Rene Sd. Manuel (Procurement Specialist), DominicAumentado (Procurement Specialist), Noel Sta. Ines(Procurement Specialist), Jose Luis Syquia (Consult-ant) and Evelyn Quirante (Program Assistant). TheTeam worked closely with representatives from theAsian Development Bank: Richard Ondrick, (ChiefCountry Officer), Jimmy Wu (Portfolio Manager) andCesar Valbuena (Procurement Specialist), and the Ja-pan Bank for International Cooperation: Izuru Kimura(Representative) and Flerida Chan (Project Officer).

The success of the CPAR process was largelyattributed to the ownership and commitment toprocurement reform demonstrated by theGovernment’s Procurement Policy Board (GPPB) andits Technical Support Office (TSO), led by LauraPascua (Undersecretary, Department of Budget andManagement) representing the GPPB Chairman andJose Martin Syquia (Executive Director, GovernmentProcurement Policy Board, Technical Services Office).GPPB representatives who participated were: ArcadioCuenco (Assistant Commissioner, Commision onAudit), Elmer Dorado (National Economic andDevelopment Authority), Antonio Molano, Jr.(Director, Department of Public Works andHighways), Aida Carpentero (Director, Department ofEducation), Ricardo San Andres (Assistant Secretary,Department of National Defense), Joselyn Alvarado(Assistant Secretary, Department of Science andTechnology, Loraine Sanchez (Director, Departmentof Finance), Ireneo Vizmonte (Director, Departmentof Trade and Industry) and Arturo Baloaloa (Director,Department of Energy).

We would also like to acknowledge the activeparticipation of other government officials:Constancia de Guzman (Chairperson, PresidentialAnti-Graft Commission), Teodoro Encarnacion(Presidential Assistant on Infrastructure Projects). Theprivate sector was represented by Manolito Madrasto(Philippine Constructors Association) and Aristo Mitra(Philippine Institute of Certified Public Accountants).Civil society organizations stalwarts providedenlightened discussion on governance, such asJosefina Esguerra (Executive Director, ProcurementWatch, Inc.), Jose Concepcion (Chairman,NAMFREL), Father Vicente Cajilig (Center forContextualized Theology and Ethics, University ofSanto Tomas and others who are named in Appendix1 – List of Participants.

This Report is a follow-up of the original CPAR, whichwas part of the Public Expenditures, Procurement andFinancial Management Review, and the CPAR Updatewhich was published in February 2004. The originalCPAR was prepared in June 2002 and published inMarch 2003, by a Team led by Christian A. Rey (TaskTeam Leader).

Publication review and advice were received fromLeonora Gonzales (External Relations Officer) whoalso acted as Communications Adviser. Overall designand layout of the Report was done by Horace Crowe(Consultant).

Chris HobanManager, Portfolio and OperationsManila, Philippines

Page 8: 2nd UPDATE - World Bank
Page 9: 2nd UPDATE - World Bank

Foreword

It has been three years since the comprehensive assess-ment of the Philippines public procurement system wascompleted and published in the Country ProcurementAssessment Report (CPAR) in June 2002. Substantialprogress has been made since major procurement re-form activities identified at that time were completedand are now being implemented. The CPAR processachieved its goal of being an analytical tool to help as-sess the public procurement system in the Philippinesand in the process helped to generate a dialogue withthe Government to improve procurement practices, andto help civil society and the private sector understandbetter the processes and procedures in place at that time.Following the significant progress reported in the No-vember 2003 CPAR Update, this Second Update aimsto: (a) record the status of agreed actions and analyzetheir relevance to existing priorities; (b) benchmark theprocurement reform progress against international stan-dards and in the process identify its strengths and weak-nesses; (c) discuss and agree on measures to addressthe weaknesses; and (d) review the status of harmoni-zation and/or alignment activities. This CPAR 2nd Up-date was also used to identify governance issuespertaining to procurement for input to the preparationof the World Bank’s Country Assistance Strategy for2006 to 2008.

This new Strategy supports reforms like these, whichare examples of “islands of good governance.” Thesereforms help fight corruption and support better gover-nance in the public sector, eventually resulting in im-proved services to the poor. While there are still manychallenges in implementing these reforms, the achieve-ments cited in this Report demonstrate that there arealso many successes that we can encourage, and em-power and enable others to build upon.

It is laudable that consistent Government ownership ofthe CPAR process, through the Technical Support Of-fice of the Government Procurement Policy Board, wasevident in this CPAR 2nd Update, and that the jointCPAR Mission from November 2 to 5, 2004 resulted ina fruitful dialogue as the Report presents. It is alsoremarkable that many development partner organiza-tions were able to participate, and civil society organi-zations and their members could air their issues,concerns and suggestions. The result is a documentthat truly captures the Philippines’ many achievementsin procurement reform, provides a benchmark on theprogress made compared with international standards,identifies strengths and weaknesses, and records theagreements in moving the reforms forward.

Finally, it is worth citing the significant achievementmade in the harmonization and alignment efforts in theuse of country systems. Foremost of these are theharmonization of the bidding documents for works,goods and consulting services across many governmentagencies and with the international developmentpartners policies and procedures. The documents arenow being used for all national public procurement byevery entity, including the Local Government Units.

We wish to commend the executive and legislativebranches of government for continuing to pursue a keygovernance measure that will reduce corruption in thelong term. Much now will depend on the ongoingimplementation, monitoring and enforcement of theseinstitutional and policy reforms to ensure theirsustainability in achieving good governance.

Joachim von AmsbergCountry Director, PhilippinesWorld Bank Office ManilaAugust 2005

Page 10: 2nd UPDATE - World Bank
Page 11: 2nd UPDATE - World Bank

11COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

I. Introduction

1. Overview

The Country Procurement Assessment Report(CPAR) process proved to be a successful mechanismin assessing the country’s public procurement system,identifying its strengths and weaknesses, andproviding an avenue for a dialogue among keystakeholders to address the weaknesses. The June2002 CPAR, and its subsequent first update inNovember 2003, resulted in an agreement to act uponsixty-six (66) activities to address the existingweaknesses in the country’s public procurementsystem. So far, as discussed in Section II of thisCPAR 2nd Update, ninety five percent (95%) wereeither completed or ongoing as of November 2004.On account of the improvements made, it is necessaryand critical therefore to follow-up the implementationof agreed actions in particular, and the overallprogress of the procurement reform in general. It isalso important to determine and assess the impact ofthe Reform thus far, its strengths and weaknesses,and again use the updated CPAR as a tool for dialogueon how to address the weaknesses uncovered. Alongthis line, a Joint CPAR 2nd Update Mission wasconducted from November 2 to 5, 2004, with thefollowing main objectives: (a) to assess the progressof procurement reform and identify priority areas forthe next three years; (b) review the status of thePhilippines’ Procurement Harmonization Programand identify next steps; (c) review internationalexperience on procurement monitoring andperformance measurement; and (d) firm up the rolesof civil society organizations and the private sectorto achieve sustainability.

2. Ownership

The procurement reform process on the part of theGovernment had been very strong since the originalJune 2002 CPAR, and that is evident in this 2nd

Update. The GPPB, through its TSO, participatedfully in defining the objectives and the variousactivities of the Mission, the identification of priorityareas, the execution of this second Mission and inthe formulation of the agreed actions and expectedlead times for completion. The improvements in thecountry’s procurement reform are, therefore, drivenby the Government. The development partners’assistance came in the form of funding resources andproviding expert advice on international procurementbest practices.

3. Mission Preparatory Activities andSchedule

The CPAR Team reviewed and updated the originalCPAR Agreed Action Plan in advance of the actualMission as detailed in Section II of this 2nd Update.The GPPB spearheaded two major activities thatdetermined the way forward: (a) a meeting ofprocurement experts on October 22, 2004 identifiedthe reforms’ next key priority areas; and (b) anassessment or benchmarking of the reforms’ progressusing the Baseline Indicator System (BIS) done by aTechnical Working Group composed of Ms. FleridaArias, Atty. Pia Zobel Ruiz and Atty. Jose LuisSyquia. Thus, these preparatory activities resultedin a compressed four-day Mission that coveredextensively the substantial areas of the

Page 12: 2nd UPDATE - World Bank

12COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

to the Public Works Sector as discussed in Section6 of this 2nd Update.

4. Completed Agreed Actions at theNational Level

The foundation of the reform lies in thepromulgation of the Government ProcurementReform Act (Republic Act No. 9184) in January2003 and the issuance of its Implementing Rulesand Regulations (IRRs) in September of the same

year, which covers allgovernment entities,including local governmentunits. Consultations withthe civil society at large andcomments from donorinstitutions strengthened

the reform measures mandated by the Law and itsIRRs. This was followed by concerted efforts todevelop harmonized bid documents and thus, thefollowing key reform measures are now in place andbeing implemented:

a. A single oversight body called the GovernmentProcurement Policy Board (GPPB);

b. Procurement planning and budget linkagethrough the Annual Procurement Plan;

c. Approved Budget for the Contract as ceiling forbid prices;

d. Use of Government Electronic ProcurementSystem becomes mandatory, including the post-ing of bid opportunities and awards of contracts;

e. Fixed responsibilities and accountabilities of theBids and Awards Committee (BAC), BAC Sec-retariats, Technical Working Groups, and thebidders;

f. A national and local training program for capac-ity building on the new procurement system, itsdocuments and forms – the Status of Procure-ment Training on the Laws, Rules and Regula-

progress of the Reform. In her welcome remarks,Undersecretary Pascua set the Mission’s and thereforms’ direction and reiterated the Government’sresolve in pushing procurement reform forward(Appendix 2).

II. Big Achievements So Far

Laudable achievements have been made since theJune 2002 CPAR, as listed in the Summary ofAchievements and Ongoing Agreed Actions inAppendix 3. Table 1 presents asummary status. The first updateto the CPAR recorded sixty-six(66) agreed actions. As ofNovember 2004, 42 or 64 %were completed, 19 or 29% wereongoing as of November 2004while only 5 or 7% were not yet started.

It is worth mentioning the reforms’ progress on thenational and local levels where forty-one agreedactions were completed and/or ongoing as ofNovember 2004, resulting in a 95% completionrecord. The two remaining actions not started werethose pertaining to: (a) development of a goodrecord-keeping system for LGUs and, (b) trainingof Government E-Procurement System staff and theCommission on Audit (COA) in the area of systemsecurity. On the other hand, the twenty (20) sectoralactions (Education, Health and Public Works)completed and/or ongoing agreed actions consistedof 87% of the total for the three sectors. Theremaining actions not started are those pertaining

National/Local Levels 27 14 2 43Sectoral Levels 15 5 3 23Total 42 19 5 66

Percent 64% 29% 7% 100%

Completed On-Going Open TOTAL

Table 1: Status of Completed, Ongoing and OpenAgreed Actions

The reforms’ progress on the nationaland local levels where forty-one agreedactions are completed and/or ongoingas of November 2004; resulting in a 95%completion record.

Page 13: 2nd UPDATE - World Bank

13COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

tions for the period October 2002 to December2004, and the status of the procurement trainingconducted by the Government ProcurementPolicy Board – Technical Support Office (GPPB-TSO) from October 2002 to December 2004 andstatus report on the G-EPS are shown in Appen-dix 4;

g. Move towards professionalization of procure-ment officials;

h. Use of standard bidding forms and manuals –the standard bidding documents for works, goodsand consulting services as harmonized with de-velopment partners institutions are discussed inSections 13 to 15 of this Report;

i. Standard bidding procedures using non-discre-tionary bid evaluation criteria;

j. Mandated lead-time for each procurement step;k. Stricter rules on alternative methods of procure-

ment;l. Clearly defined protest mechanism;m. Penal, civil and administrative sanctions against

erring procurement officers, bidders and contrac-tors;

n. Legal assistance and indemnification packagesfor BAC members who are subjected to harass-ment;

o. Strengthened involvement of civil society organi-zations, professional associations and non-gov-ernment organizations in policy formulation andreform implementation;

p. Harmonized standard bidding documents con-taining provisions on fraud and corruption, con-flict of interest and prohibition against relativeswithin the third civil degree of consanguinity andaffinity; and

q. Issuance of Rules for Blacklisting and Suspen-sion of Bidders, Constructors, Suppliers and Con-sultants.

5. Implementation in Local GovernmentUnits

The Procurement Law repeals the procurementrelated sections of the Local Government Code,thereby making the new law and its IRRs mandatoryfor all LGUs. One of its major reforms is prohibitingthe Local Chief Executive being directly involved inthe bidding process, since it provides that the BACChairman should not be the head of the procuringentity. Conversely, training of LGUs’ staff on thenew procurement system are ongoing through theComposite Team of Regional Trainers, where eachTeam is comprised of trainers from DBM, DILG,COA, and the Philippine League of Local BudgetOfficers. As of December 2004, seventy-two (72)provinces, or 91% of the total number of provincialgovernments, one thousand one hundred seventy nine(1179) municipalities or 79% of the total number ofmunicipal governments, and one hundred nine (109)cities or 92% of the total number of city governments,were trained, accounting for 80% of the localgovernment units. Appendix 4 of this Report providesa detailed account of the training in the LGU level asof November 2004. While capacity building isunderway, remaining concerns are: (a) the need todevelop a mechanism to accredit procurementlecturers, organizations and training programs toensure that quality is maintained; (b) inadequatekeeping of procurement records in most LGUs; and(c) monitoring of actual procurement performance.A detailed report on progress of the reform in theLGUs is in Appendix 5.

6. Progress of the Reform in KeySectors

The results of the implementation of reform measuresover the three year period are exemplified in the threesectors that were subjected to institutional analysis.

Page 14: 2nd UPDATE - World Bank

14COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

Summaries on the progress made in each sector arepresented below:

Health. All agreed actions in the June 2002CPAR have been completed, except for the re-view and implementation of reforms in terms ofdecentralizing procurement. In this regard, De-partment Memorandum No. 74 was issued in-forming all Directors of the Centers for HealthDevelopment to: (a) constitute their Bids andAwards Committee (BAC); (b) institutionalizethe Annual Procurement Plan; and (c) institution-alize a procurement monitoring system that willensure adherence to the new law, its IRRs andstandard documents and forms. However, sup-port is needed in: (a) developing and conductingtraining programs on the new procurement sys-tem; and (b) the development of the Contract Dis-tribution System into a fully functional andeffective system that is utilized in all regions. Thedetailed report on the Health Sector is attached asAppendix 6.

Education. Almost all agreed actions identifiedin the June 2002 CPAR were accomplished, no-table of which was the adoption of the competi-tive bidding process for textbooks which resultedin greater efficiency and economy. The focus nowof the Department of Education (DepEd) is thecreation of its own Procurement Service Unit andthe operation of a national textbook delivery pro-gram to ensure that the books reach the students.It is necessary to support DepEd in its down-stream reform actions, such as the conduct oftraining sessions to build capacity on such mat-ters as procurement planning, database andrecords management, local and international pro-curement practices, and project management. ASpecial Report detailing the progress in this sectoris presented in Appendix 7.

Public Works. Agreed actions recorded in theCPAR that were completed include: (a) use of acomputerized registry for eligibility screening; (b)issuance of amendments to the Arbitration Law;(c) a report on capacity, quality and size of con-tracts for works under foreign assisted projects,including the mix of national and foreign fund-ing; (d) a report on bid prices/variation ordersrelative to engineer’s estimates in projects withand without fixed budget ceilings; (e) download-ing of bid documents from agency websites; and(f) the introduction of value engineering throughcase studies. However, there are agreed actionsthat remain incomplete or not started. These are:(a) rationalization of licensing procedures andharmonization with eligibility screening require-ments; (b) use of a computerized registry in allprojects including those procured in provincesand districts; (c) strengthening the quality assur-ance mechanism for design and supervision; and,(d) specialized training on cost estimation andanalysis of bid variances. A review of theseagreed actions resulted in new lead times for theircompletion.

7. Civil Society Observers

The need for civil society’s participation in theprocurement process was enabled by R.A. 9184 andits IRRs particularly by being “observers” in all stagesof the procurement process to enhance itstransparency and monitor the agencies’ compliancewith the Law, and implementing rules and regulations.In pursuing this objective, the GPPB arranged a

Civil Society Observers are “observers” inall stages of the procurement process toenhance its transparency and monitor theagencies’ compliance with the Law andIRRs.

Page 15: 2nd UPDATE - World Bank

15COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

meeting of the various civil society organizations(CSOs), professional associations (PAs), non-government organizations (NGOs), religious groups,and the academe who have been actively participatingin monitoring procurement activities and goodsdelivery. The participants recommendedestablishment of a CSO Alliance comprising PWI,as the secretariat, the Catholic Bishops’ Conferenceof the Philippines (CBCP), the University of SantoTomas Center for Contextualized Theology & Ethics(UST- CCTE) and Social Research Center (UST-SRC), National Movement for Free Elections(NAMFREL), Philippine Constructors Association(PCA), Confederation of Filipino ConsultingOrganizations Inc. (COFILCO), the Bishops-Businessmen’s Conference (BBC), and theTransparency and Accountability Network (TAN).The CSO Alliance proposed: (a) a massiveinformation campaign on the new public procurementsystem, its documents and forms; (b) institutionalizingthe standard monitoring system for BAC observersand a case-handling system linked to the Office ofthe Ombudsman; (c) screening and accreditingobservers; and (d) providing for an informationsupport system for trained CSOs.

8. Private Sector

Constructors, suppliers and consultants are importantpartners in the operation of the public procurementsystem and in the implementation of the reform. Theyrecognized that the new Government ProcurementReform Act provides more transparent and efficienttechnology and more objective standards. However,they have two main concerns: (a) insufficientknowledge and lack of understanding of the new lawand system; and (b) the stringent qualificationrequirements of foreign assisted contracts. To addressthese, they have a number of ongoing initiatives suchas: development of an accreditation system internalto their association, briefings and seminars on the law,

introduction of a professional indemnity insurance,and promotion of joint ventures with local and foreignpartners. However, it was felt that these initiativesare not enough and more resources are needed. Theyrecommended that Government should consider: (a)the inclusion of the private sector in the nationaltraining program; (b) 7adoption of a policy on valueengineering; (c) improving the validation process ofdocumentary submissions of constructors; and (d)rationalizing the foreign assisted contracts’requirements for average annual turnover (AAT), theexperience qualification for international competitivebidding (ICB) and the amount of threshold forNational Competitive Bidding (NCB).

9. Anti-corruption Program

The Government, in April 2001, issued a directivereconstituting and enlarging the powers of thePresidential Anti-Graft Commission (PAGC,formerly Presidential Commission Against Graft andCorruption). Chairperson Constancia De Guzmanadvised the meeting of its mandate and activities.Among its tasks is to strengthen the integration ofanti-corruption efforts in the entire bureaucracy thatincludes key agencies such as: the Commission onAudit, the Ombudsman, the Civil ServiceCommission, the National Bureau of Investigationand the Department of Justice. With the appointmentof Chairperson De Guzman, major policy andoperational changes are underway to reducecorruption. On procurement matters, the plan is tostrengthen the role of internal audit units in allagencies, which will serve as the monitoring andenforcement arm of the executive leadership inimplementing its anti-corruption program. The outputof internal audit units will bridge the critical gap fromimplementation to enforcement by COA and theOffice of the Ombudsman. The CPAR Teamrecommended that this program and its keyimplementer, PAGC, be supported.

Page 16: 2nd UPDATE - World Bank

16COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

III. Assessment of Progress

10. Baseline Indicator System

In her speech that opened the CPAR Mission,Undersecretary Pascua mentioned that the “BaselineIndicator System (BIS)” recently developed by theOECD-DAC/WB offers a systematic way ofbenchmarking the country’s procurement reformefforts against established indicators for achievingeconomy, efficiency, transparency and equalopportunity for bidders. As a pre-Mission activity, aBIS Technical Working Group was tasked to assessstructural performance and determine the progressof the Philippines’ public procurement system on fourkey areas consisting of twelve (12) indicators thatwere the core components of a good publicprocurement system. The Report as adopted by theCPAR Team is presented in Appendix 8. The BISdemonstrates that the components of an effectiveprocurement system have been put in place, and nowthe challenge is to manage those components toachieve improved outcomes. It was emphasizedduring the Mission by Mr. Joel Turkewitz of theBank’s Central Procurement Unit that the BIS needsa separate set of indicators to measure actualprocurement performance supported by a monitoringand data collection system from implementing unitsup to the oversight agency.

11. Strengths and Weaknesses

Applying the BIS result, the Philippines reformachievement garnered an overall score of 68%, whichtranslates to the percentage of the twelve indicatorswhere more than fifty percent (50%) of baselineelements have been substantially met. The reformachievements done so far account for passing thestandard in the following benchmarks: (a) legislative

and regulatory framework; (b) existence ofimplementing regulations and documentation; (c)mainstreaming procedures into public financialmanagement; (d) functional normative body at thecenter; (e) existence of contract administration anddispute resolution provisions; (g) presence of anappeals mechanism; and (h) structural, ethics andanti-corruption measures. However, there are fivespecific benchmarks where 50% or less of thebaseline elements are met. These are: (a) existenceof institutional development capacity; (b) efficientprocurement operations and practice; (c) functionalityof the public procurement market; (d) effective controland audit system; and (e) degree of access toinformation.

12. Matching of Agreed Actions

Having identified the lacking elements in the currentsystem, the Mission discussed the steps which areneeded to address the gap. Ongoing activities werematched to the specific elements and new activitieswere agreed on to ensure that the identified gaps areaddressed. This resulted in a consolidated agreedaction plan as discussed in the following paragraphs.

IV. Consolidated Agreed Actions

Based on the result of the BIS and the matching ofongoing and new activities to address the gap, theCPAR Team adopted a consolidated agreed actionplan (Matrix of Weaknesses and Targeted Activies(as of November 2004) as shown in Appendix 9.Amongst the key new actions are:

Inclusion of the private sector and the CSOs inthe national training program;Provision of administrative support to the CSOAlliance;

Page 17: 2nd UPDATE - World Bank

17COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

Replication of appropriate BIS for national agen-cies and LGUs to monitor actual performanceunder the law;Development of actual performance indicatorsand implementation of a system for data collec-tion and information analysis;Support for strengthening the role of PAGC, in-cluding through the internal audit units of eachagency; andIssuance of policies on value engineering and pro-curement security instruments.

IV. Procurement Under Foreign

Assisted Projects (FAPs)

In January 2003, the Government and its developmentpartners, ADB, JBIC and the World Bank agreed toharmonize six procurement areas to reducetransaction costs, simplify procedures, facilitatedecision-making and reduce capacity building costsfor foreign assisted contracts. The move towardsfurther reliance in the Philippine’s country systemswill depend largely on completion of theharmonization activities. Since then, four of theseareas are either ongoing or completed as shown inTable 2.

13. Philippine Bidding Documents(PBDs) Harmonized with ADB, JBIC and

Table 2: Procurement Harmonization as of June 30, 2005

Area

1. ImplementingRules andRegulations

2. Biddingdocuments forworks, goodsand consultingservices

3. Training andcertificationprogram

4. Procurementmanual

5. Procurementreportingformat

6. Registrationand licensingprocedureswith eligibility

Update as of June 30, 2005

Done. IRRs for domestic funded contractswere issued in September 2003. FAPsare covered by Sections 4 and 43 of theLaw.

Done in August 2004. Works and GoodsDocuments harmonized with ADB, JBICand WB. Consulting Service harmonizedwith WB.

Ongoing. Included in theprofessionalization study.

Ongoing. Procurement Manual draftedand will be harmonized simultaneous withissuance in January 2006. Seven (7)national agencies, one (1) GOCC, andone (1) LGU were selected as pilots.

Not yet started. To be donesimultaneously with ProcurementManual’s harmonization.

Not yet started.

Expected CompletionDate

Done

Done

June 2006

January 2005; pilot testingto start April 2005

June 2006

June 2005

FundingSupport

USAID andWB-IDF

WB

WB-IDF

USAID andASEM 2Grant

ASEM 2Grant

To proposefor a WB-IDF Grant

Page 18: 2nd UPDATE - World Bank

18COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

the WB

The country’s Procurement Harmonization Programtook a big leap forward with the issuance of GPPBResolution No. 10-2004 dated August 20, 2004, asamended by GPPB Resolution No. 01-2005 datedJanuary 24, 2005 requiring mandatory use, by July1, 2005, of the PBDs for Works and Goods asharmonized with ADB, JBIC and the World Bank,and the PBDs for Consulting Services as harmonizedwith the World Bank. The mandatory use of thedocuments is enforceable by law based on Section 6and Article VI thereof, providing as wellcorresponding penalties for violators. From the firstidentification of conflicting rules for each document,to workshops and discussion meetings, and then tofinal compromises to harmonize the conflicting rules,it took nineteen months to finish the initial editionwhich became the first harmonized biddingdocuments issued within the East Asia and PacificRegion. The magnitude of this achievement isdescribed in Table 3.

14. Differences with the World BankRules and Updating the LoanAgreement’s Annex to ProcurementSchedule

The Loan Agreement’s Annex to the ProcurementSchedule identifies unacceptable nationalprocurement rules that do not conform to procurementbest practices. Prior to the issuance of the HarmonizedBidding Documents, there were nineteen nationalrules for Works and Goods that were unacceptableto the Bank and were included in the NCBProcurement Annex to all Loan Agreements. Whilethe harmonization process was not 100%, its outcomedrastically reduced the differences from nineteen rulesto eight (8), a reduction of 60%, that are nowidentified in the NCB Procurement Annex. On the

Table 3: Harmonized Bidding DocumentsHarmonized with ADB, JBIC and the WB

BiddingDocuments

Original Numberof ConflictingParagraphs

HarmonizedParagraphs

RemainingUn-harmonizedParagraphs

PercentHarmonized (%)

Number of ConflictingParagraphs In:

ConsultingServices

171

162

9

95%

Works

128

101

27

79%

Goods

145

117

28

81%

other hand, the differences between the national rulesfor Consulting Services has been reduced from six(6) to four (4) rules; a reduction of 33%. Moreover,it is an evolving process since adoption of thedocuments will provide more avenues for furtherharmonization. The differences, which are the basisfor revising the standard Annex to the ProcurementSchedule of Loan Agreement are adopted by theGovernment. Affected Loan Agreements have beenamended accordingly. See Appendix 10 for the lateststandard Procurement Annex to Loan Agreement.

15. Threshold per Contract forProcurement Methods

With the progress in the harmonization effortsbetween the Government of the Philippines and donoragencies as shown by the positive rating attained byapplying the BIS, the number of agreed actionsongoing and concluded, and the current capacities ofcontractors and suppliers in terms of volume and sizeof contracts the amount of thresholds per contractfor the different types of procurement methods and

Page 19: 2nd UPDATE - World Bank

19COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

prior reviews requires a proportionate adjustment toproperly integrate the current state. Subject to theassessment of the procurement needs and content ofthe project, the revised threshold for each method ofprocurement is presented below in Table 4.

16. Prior Review Threshold

A Procurement Capacity Assessment will be appliedto each new project which will include the risk rating

for the project. The thresholds identified in Table 4and the prior review thresholds will be adopteddepending on the risk rating resulting from theAssessment.

V. Funding Requirement forAgreed Action

17. Possible Funding Sources

Aside from ADB, JBIC and the World Bank, otherdevelopment partner agencies such as: USAID,CIDA, EU, UNDP and AUSAID met with the CPARTeam to discuss the consolidated agreed actions andpossible funding resources. The EU has indicatedits readiness to fund the activities of standardizationof specification on commonly used items. The ADBagreed to review its possible funding on the expansionof the G-EPS. USAID proposed to revive the Anti-Corruption Summit for the Philippines. The WorldBank proposed for GPPB to fully utilize the IDFGrant on Procurement Oversight Agency and theASEM 2 Grant on Strengthening ProcurementInstitutions for Good Governance. The CPAR 2nd

Update Mission agreed to have a separate meetingto flesh out funding requirements.

The February 2004 CPAR can be found in Appendix11.

Item

ICB

NCB

NationalConsultantShortlisting

Category Amount per Contract

Works Over $5,000,000Goods Over $1,000,000

Works Over $200,000to $5,000,000

Goods Over $100,000to $1,000,000

Consulting Not more thanServices $200,000

Amount of Threshold per Contract forProcurement Methods

Table 4: Amount of Threshold per Contract forProcurement Methods

Page 20: 2nd UPDATE - World Bank
Page 21: 2nd UPDATE - World Bank

21COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

Appendix 1 - List of CPAR 2nd Update Mission ParticipantsGovernment Procurement Policy Board

Laura Pascua, Undersecretary, DBMAntonio Molano, Jr., Director, DPWHCarlos Madamba, Jr., Senior Economic Development Specialist, NEDAArcadio Cuenco, Assistant Commissioner, COAIreneo Vizmonte, Director, DTIJoeelyn Alvarado, Assistant Secretary, DOSTAida Carpintero, Director III, DepEdLorraine Sanchez, Designated Head, DOFRicardo San Andres, Assistant Secretary, DNDTheresa Ann Diaz, Director III, DOHManuel Ocampo, Director of Information Technology and Management Services, DOERobert Martinez, Director DTIArturo Baloaloa, Director, DOE

Government Procurement Policy Board-Technical Staff Office

Jose Martin Syquia, Executive DirectorElmer Dorado, Assistant Executive DirectorDennis Nacario, StaffGenmaries Entredicho, StaffPia Zobel Ruiz, StaffDana Marie Casiano, StaffMila Manalastas, StaffAlvin Dellora, StaffMa. Lourdes Tuazon, ConsultantJeff Taylor, Consultant

Other Government Officials

Teodoro Encarnacion, Presidential Assistant, Office of the PresidentConstancia de Guzman, Chairperson, PAGCFiorello Estuar, Private Sector Member to GPPBArnaldo Reyes, Program Development Officer II, DOSTChristine Gulmatico, Administrative Officer V, DepEdMary Grace Quintano, State Counsel IV, DOJKenneth Ronquillo, Director, DOHJoel Lazo, Director, DOH

Civil Society Organizations

Josefina Esguerra, Chief Executive Officer and President, PWICipriano Ravanes, Executive Director, PWIJose Concepcion, Jr., National Chairman, NAMFRELNestor Malapajo, Jr., Officer-In-Charge, NAMFRELRev. Fr. Vicente Cajilig, OP, Director, UST-CCTEPablito Baybado, Assistant Professor, UST-CCTEJose Lugay, Chairman, Advocacy Against Graft & Corruption, CBCPEdgardo Tirona, Member Committee, CBCPMia Munoz Zafra, Member Committee, CBCPVictorino Guiterrez, Member Committee, CBCP

Page 22: 2nd UPDATE - World Bank

22COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

Private Sector

Manolito Madrasto, Executive Director, PCAArmando Alli, President, COFILCOCesar V. Tuason, Second Vice President, COFILCOAriston Mitra, Member, PICPA

Asian Development Bank

Richard Ondrik, Chief Country OfficerShouhua Wu, Senior Portfolio Management SpecialistCesar Valbuena, Procurement Specialist

Japan Bank for International Cooperation

Isuru Kimura, RepresentativeFlery Chan, Project Officer

Other Development Partners

Angus MacDonald, Counsellor, Development Cooperation, AusAIDGerard Belanger, Head of Aid, Canadian EmbassyChristina Pineda, Senior Program Officer, Canadian EmbassyMichael Yates, Mission Director, USAIDFrank Hess, Operations Counsellor, EUDeborah Landey, Resident Coordinator, UN

World Bank

Joel Turkewitz, Senior Public Procurement SpecialistCecilia Vales, Senior Procurement SpecialistNoel Sta. Ines, Procurement SpecialistDominic Aumentado, Procurement SpecialistRene Manuel, Procurement SpecialistEvelyn Quirante, Program AssistantAlice Tiongson, ConsultantJose Luis Syquia, ConsultantNoriel Sicad, Consultant

Page 23: 2nd UPDATE - World Bank

23COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

Appendix 2 - Speech of Undersecretary Laura B. Pascua

Good morning, on behalf of Secretary Boncodin whochairs the GPPB, let me welcome all of you to this2rd CPAR Mission. And let me thank the WorldBank (WB) for initiating and hosting this Mission.If I recall, our first CPAR was done in 2001-2002 inthe context of a bigger effort to review the financialmanagement, expenditure management and procure-ment reforms being pursued by government. Wewere still shepherding the Government ProcurementReforms Act in Congress and hence the agreed ac-tions then had to do with the successful passage ofthe law, preparing the IRRs, linking it with the newCOA Audit Manual, establishing the GPPB, and en-suring that important safeguards were put in placelike ensuring the LGUs and NGOs were consulted,setting up a national training program, making pro-curement planning mandatory, and ensuring thatthere would be no negotiations after determinationof best bid.

During the 2nd CPAR last year, as a result ofsuccessful passage of the law and the importantcompletion of IRR-A, and development of the guidefor local procurement, three out of five commitmentsthat I mentioned above were judged asaccomplished, including agency specific actions likeadoption of the pass/fail criteria in DPWH,standardization of estimated cost per bidding fortextbooks, and streamlining of textbooks’ contentevaluation, the review of the staffing of theProcurement and Logistics Server in DOH, and theDrug Price Monitoring System. During that 2nd

CPAR, 13 more emerging issues dealing withstrengthening Procurement Practices and Processeswere identified.

We meet today to look at Progress made on thesecommitments, 43 all in all, left uncompleted fromthe 1st and 2nd CPARs, to look at problems holdingup their accomplishment and to solve them oridentify the next steps in instances where substantialaccomplishment have been made. Today andtomorrow, we also look at the initial findings andprogress report made on technical assistanceprojects, which are being pursued as part of thisCPAR funded from the grants from the WB. Theseinclude the diagnostic study to strengthen the PS inthe light of the GEPS, the recommendation toprofessionalize the procurement function ingovernment, the study of the capacities of localcontractors and suppliers and the introduction ofValue Engineering to improve the design and costefficiency of proposed infrastructure projects.

This is why the GOP and the WB decided to expandthe participation to this CPAR Mission to includeall GPPB members of the Interagency BAC whohave approved these projects and, as majorprocurement departments, would have a stake inthese TAs as well as the pursuit of some of the 43commitments I mentioned above.

But the different donor organizations have a stakealso in these procurement reforms and we wouldlike to thank the USAID for helping us pass theprocurement law and helping finance the draftingof the procurement manual which is shortly to bepresented to the GPPB, the CIDA for financing thelast 3 years of the GEPS pilot using the MerksSystem and helping us ensure the properdevelopment of our own GEPS. And the EU and

Page 24: 2nd UPDATE - World Bank

24COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

WB for giving the grants by which we are able tofinance the training of all government procurementpersonnel in the NGA, GOCCs and LGUs in theGPRA and its IRRs and now in the SBDs. Theyalso financed the development of the HarmonizedBid Documents, the planned dissemination of whichwe talk about tomorrow as part of the Harmonizationeffort. We hope to interest the other donors fromthe ADB, and JBIC in the use of these PhilippineHarmonized Bid Documents as well as the draftingof Procurement Side Letters to facilitate the adoptionof common procedures and formats. Lastly, we haveincluded the PWI and the PCA in this Mission toalso contribute their expertise to make Procurementingovernment more transparent and accountable.

While we sometimes like to pat ourselves on theback with the progress made in setting in place thenew Procurement Law in government; disturbingdevelopments like the further downgrade we gotunder the quality of public and institutional worldcompetitiveness study, including that forgovernment procurement and the corruption issuein the military procurement finance management,make us realize that we have a long way to go inachieving the anti-corruption aspects ofprocurement.

The development of a Code of Ethics for CSO BACobservers, training of CSOs and development of theCSO network by PWI, the Round Table Discussionwith 10 CSOs including nationwide groups likeNAMFREL, CBCP TAN, PCA, and COFILCO offersome answers; as well as the meeting with seniorofficials last October 22 which included PAGC andthe Ombudsman. They point to the need to 1)develop an information system for greatertransparency, like the GEPS, 2) develop the InternalAudit Unit in departments to cover the Monitoringof Procurement, 3) strengthening the role of COAin enforcing compliance with the law, 4) furtherstrengthen the Oversight Committee on Procurementand,5) expand the role of CSOs and Media in reform.

We have much to tackle in the next four days andthe Baseline Indicator System developed by theOECD and the WB offers a systematic way ofbenchmarking the country’s procurement reformefforts against established indicators of achievingeconomy, efficiency, transparency, and equalopportunity for bidders. I therefore hope that byFriday, we as a group come to a consensus on howto cooperate and work together to realize more ofthe promise of procurement reform for improvingpublic services, identifying more savings for

Page 25: 2nd UPDATE - World Bank

Appe

ndix

3 -

Sum

mar

y of

Ach

ieve

men

ts a

nd O

ngoi

ng A

gree

d Ac

tions

com

plet

edon

goin

g

Key

Are

aA

ctiv

ity a

nd A

gree

d A

ctio

nR

espo

nsib

le A

genc

yTi

met

able

Stat

us a

s of

Oct

ober

31,

200

3

Fun

ding

PU

BLI

C P

RO

CU

RE

ME

NT

BY

NAT

ION

AL

AG

EN

CIE

S, G

over

nmen

t-Ow

ned-

and-

Con

trolle

d C

orpo

ratio

n an

d ot

her I

nstru

men

talit

ies

Stre

ngth

en1.

Pas

sage

and

pro

mul

gatio

n of

an

Dep

artm

ent o

f Bud

get

D

ecem

ber 2

002

Don

e.U

SAID

Lega

l and

Om

nibu

s La

w o

n Pr

ocur

emen

t.an

d M

anag

emen

tTh

e La

w w

as ip

asse

d on

Feb

ruar

yPo

licy

Fram

ewor

k10

, 200

3.

2. P

repa

re im

plem

entin

g ru

les

and

Gov

ernm

ent P

rocu

rem

ent

Don

e.U

SAID

/re

gula

tions

afte

r ena

ctm

ent o

f the

Polic

y Bo

ard

The

Impl

emen

ting

Rul

es a

ndAD

BLa

w a

nd p

repa

ratio

n of

Phi

lippi

nes

Reg

ulat

ions

-A w

as is

sued

Bidd

ing

Doc

umen

ts a

nd F

orm

s.Se

ptem

ber 2

3, 2

003

and

beca

me

effe

ctiv

e O

ctob

er8,

200

3.

3. U

pdat

e G

over

nmen

t Acc

ount

ing

Com

mis

sion

on

Audi

t

Dec

embe

r 200

3D

one.

Audi

t Man

ual t

o in

clud

e th

e ne

wG

over

nmen

t Pro

cure

men

t Ref

orm

Proc

urem

ent L

aw.

Act

circ

ular

ized

as

part

of A

udit

Rul

es.

4. D

evel

op a

trai

ning

pro

gram

for

Com

mis

sion

on

Audi

t

Dec

embe

r 200

3D

one.

audi

tors

on

the

Law,

its

Impl

emen

ting

Trai

ning

pro

gram

on

Law

/R

ules

and

Reg

ulat

ions

and

Pro

cure

men

tIm

plem

entin

g R

ules

and

Bidd

ing

Doc

umen

ts a

nd F

orm

s.R

egul

atio

ns d

evel

oped

; tra

inin

gof

aud

itors

(6 re

gion

s) c

ompl

eted

.C

ontin

uous

trai

ning

is b

eing

cond

ucte

d.

Stre

ngth

en5.

Est

ablis

h th

e G

over

nmen

t Pro

cure

men

tD

epar

tmen

t of B

udge

t

Jun

e 20

03D

one.

WB

-IDF

Org

aniz

atio

n an

dPo

licy

Boar

d.an

d M

anag

emen

tTh

e Bo

ard

was

con

vene

d on

Staf

fing

Febr

uary

4, 2

003

as m

anda

ted

by la

w.

6. C

ondu

ct a

stu

dy o

n th

e sc

ope

of w

ork

Dep

artm

ent o

f Bud

get

Don

e.of

the

Gov

ernm

ent P

rocu

rem

ent P

olic

yan

d M

anag

emen

t/Th

e G

over

nmen

t Pro

cure

men

tBo

ard.

Gov

ernm

ent P

rocu

rem

ent

Polic

y Bo

ard

esta

blis

hed

by th

ePo

licy

Boar

d -T

echn

ical

Law

whi

ch d

efin

es it

s fu

nctio

ns.

Serv

ices

Offi

ce

Page 26: 2nd UPDATE - World Bank

Key

Are

aA

ctiv

ity a

nd A

gree

d A

ctio

nR

espo

nsib

le A

genc

yTi

met

able

Stat

us a

s of

Oct

ober

31,

200

3Fu

ndin

g

PU

BLI

C P

RO

CU

RE

ME

NT

BY

NAT

ION

AL

AG

EN

CIE

S, G

over

nmen

t-Ow

ned-

and-

Con

trolle

d C

orpo

ratio

n an

d ot

her I

nstru

men

talit

ies

Stre

ngth

en7.

Est

ablis

h a

natio

nal t

rain

ing

prog

ram

Gov

ernm

ent P

rocu

rem

ent

J

une

2004

On-

goin

g.W

B-ID

FO

rgan

izat

ion

for t

he n

ew p

ublic

pro

cure

men

t sys

tem

.Po

licy

Boar

dR

egio

nal t

rain

ings

on

the

Law

(AS

EM

2an

d st

affin

gIn

-dep

th tr

aini

ng n

eeds

to b

e co

nduc

ted.

and

the

Impl

emen

ting

Rul

es a

ndG

rant

);R

egul

atio

ns b

eing

con

duct

ed b

y th

eG

over

nmen

tG

over

nmen

t Pro

cure

men

tto

pur

sue

Polic

y Bo

ard.

Firs

t rou

nd o

f tra

inin

gfu

ndin

g fro

mof

nat

iona

l age

ncie

s co

mpl

eted

;A

DB

intra

inin

g fo

r LG

Us

star

ted.

Tra

inor

’sD

ecem

ber

train

ing

for L

GU

s in

par

tner

ship

with

CPR

MU

Loca

l Gov

ernm

ent A

cade

my

acco

mpl

ishe

d on

Mar

ch 2

004.

GPP

B-TS

O h

as d

evel

oped

the

mod

ules

for

the

publ

ic P

rocu

rem

ent P

ract

ition

er’s

Dev

elop

men

t Pro

gram

in c

oord

inat

ion

with

the

Dev

elop

men

t Aca

dem

y of

the

Phi

lippi

nes

for N

GA

s, L

GU

s, G

OC

Cs

and

SUC

s to

cov

er H

arm

oniz

edBi

ddin

g D

ocum

ents

as

wel

l. Fu

lltra

inin

g to

be

acco

mpl

ishe

d by

Mar

ch20

05.

8. P

rofe

ssio

naliz

e th

e pr

ocur

emen

t fun

ctio

n:G

over

nmen

t Pro

cure

men

t

Dec

embe

r 200

3O

ngoi

ng.

WB

IDF;

Polic

y Bo

ard/

Civ

il Ser

vice

Con

tract

s w

ith d

omes

tic a

ndA

SE

M 2

Gra

nt

Prep

are

a St

udy

Com

mis

sion

inte

rnat

iona

l con

sulta

nts

have

bee

nw

ill co

ver 5

sign

ed b

y Se

cret

ary

Bonc

ondi

n. T

hepi

lot a

genc

ies

Im

plem

enta

tion

(NG

A)Pr

ofes

sion

al R

egul

atio

nsde

adlin

e fo

r the

acc

ompl

ishm

ent o

fC

omm

issi

onth

is a

ctiv

ity is

Apr

il 200

5.

9. S

tudy

to c

orpo

ratiz

e Pr

ocur

emen

tD

epar

tmen

t of B

udge

t and

J

une

2003

Ong

oing

.C

IDA

/WB

-IDF

Serv

ice

as in

depe

nden

t ent

ity.

Man

agem

ent-P

rocu

rem

ent

Con

tract

with

dom

estic

con

sulta

nt h

asSe

rvic

ebe

en s

igne

d by

Sec

reta

ry B

onco

din.

Proc

urem

ent S

ervi

ce is

impl

emen

ting

the

Gov

ernm

ent-E

lect

roni

cPr

ocur

emen

t Sys

tem

and

reen

gine

er-

ing

its s

yste

ms

and

proe

dure

s.C

ompl

etio

n of

the

stud

y by

Feb

ruar

y.20

05.

Impr

ove

Proc

urem

ent

10. E

nfor

ce th

e re

gula

tion

on tr

ansp

aren

cyC

omm

issi

on o

n Au

dit

D

ecem

ber 2

004

On-

goin

g.G

over

nmen

tPr

actic

es a

ndth

roug

h pr

ocur

emen

t aud

it.Tr

aini

ng o

n th

e La

w a

nd th

eto

pur

sue

Proc

esse

sIm

plem

entin

g R

ules

and

fund

ing

from

Reg

ulat

ions

. Tra

inin

ng o

nA

DB

inPr

ocur

emen

t Bid

ding

Doc

umen

tsD

ecem

ber

and

the

Proc

urem

ent M

anua

l will

CPR

MU

be re

quire

d fo

r aud

itors

.

Page 27: 2nd UPDATE - World Bank

Key

Are

aA

ctiv

ity a

nd A

gree

d A

ctio

nR

espo

nsib

le A

genc

yTi

met

able

Stat

us a

s of

Oct

ober

31,

200

3Fu

ndin

g

PU

BLI

C P

RO

CU

RE

ME

NT

BY

NAT

ION

AL

AG

EN

CIE

S, G

over

nmen

t-Ow

ned-

and-

Con

trolle

d C

orpo

ratio

n an

d ot

her I

nstru

men

talit

ies

11. E

nfor

ce p

roce

ssin

g le

ad ti

me

thro

ugh

Com

mis

sion

on

Audi

t

Jun

e 20

04D

one.

IFIs

will

appl

icat

ion

of s

anct

ions

and

mon

itorin

gSe

ctio

n 38

of t

he L

aw m

anda

tes

cond

uct

thro

ugh

proc

urem

ent a

udit

(Adm

inis

trativ

ele

adtim

e fo

r key

ste

ps. C

omm

issi

onbr

ief i

ng w

ithO

rder

129

).Au

dit P

roce

dure

.C

omm

issi

onon

Aud

itau

dito

rsle

adtim

es fo

rFo

reig

n-As

sist

edPr

ojec

tsPr

ocur

emen

t

12. T

he Im

plem

entin

g R

ules

and

Dep

artm

ent o

f Bud

get

June

200

3D

one.

Reg

ulat

ions

of t

he la

w s

houl

d pr

ohib

itan

d M

anag

emen

t-Pro

cure

men

tTh

e La

w d

oes

not a

llow

for

nego

tiatio

n of

pric

e an

d co

ntra

ct a

mou

ntSe

rvic

esne

gotia

tion

of p

rice

and

cont

ract

(goo

ds a

nd w

orks

) afte

r bid

ope

ning

(IR

R).

amou

nt.

13. D

evel

op a

fram

ewor

k an

d gu

idel

ines

Dep

artm

ent o

f Int

erio

r and

D

ecem

ber 2

002

Don

e.AS

EM G

rant

for C

ongr

essi

onal

inse

rtion

s an

dLo

cal G

over

nmen

t/Dep

artm

ent

Stud

y an

d fra

mew

ork

subm

itted

by

Con

stitu

ency

Dev

elop

men

t Fun

d.of

Bud

get a

nd M

anag

emen

t/co

nsul

tant

s. N

eeds

follo

w-u

pLe

ague

of C

ities

activ

ities

to e

xplo

re p

ossi

bilit

y

Term

s of

Ref

eren

ce p

repa

red

of e

nhan

cing

aud

it by

the

and

subm

itted

by

Dep

artm

ent

Com

mis

sion

on

Audi

t and

of In

terio

r and

Loc

al G

over

nmen

tm

onito

ring

by th

e Pr

ocur

emen

tW

atch

, Inc

./Gov

ernm

ent-w

atch

/Ph

ilippi

ne C

ente

r for

Inve

stig

ativ

eJo

urna

lism

/oth

er N

GO

s.

14. P

rice

mon

itorin

g to

be

incl

uded

as

anG

over

nmen

t Pro

cure

men

t

Jun

e 20

03O

ngoi

ng.

impo

rtant

func

tion

of O

vers

ight

Boa

rd (I

RR

).Po

licy

Boar

d-Te

chni

cal S

ervi

ces

PS re

gula

rly m

onito

rs c

omm

only

-O

ffice

/Pro

cure

men

t Ser

vice

used

sup

plie

s. T

he G

-EPS

will

have

apr

ice

mon

itorin

g fe

atur

e fo

r non

com

mon

-use

sup

plie

s; to

be

com

plet

ed b

y M

arch

200

5.

15. T

he C

ivil S

ervi

ce C

omm

issi

on o

r the

Dep

artm

ent o

f Bud

get a

nd

Jun

e 20

03D

one.

Offi

ce o

f the

Sol

icito

r Gen

eral

to p

rovi

deM

anag

emen

tTh

e La

w p

rovi

des

for l

egal

supp

ort t

o m

embe

rs o

f the

Bid

and

assi

stan

ce a

nd in

dem

nific

atio

n of

Awar

ds C

omm

ittee

/Pro

cure

men

t Eva

luat

ion

Bids

and

Aw

ards

Com

mitt

eean

d Aw

ards

Com

mitt

ee s

ubje

cted

tom

embe

rs.

hara

ssm

ent.

16. D

evel

op o

n de

man

d sa

tisfa

ctor

yW

orld

Ban

k

Dec

embe

r 200

3D

one.

secu

ritie

s to

be

issu

ed b

y no

n-ba

nkin

gAr

ticle

XXI

of R

.A. 9

184

prov

ides

for

inst

itutio

ns. I

mpr

ove

pena

litie

s in

lieu

of b

idfo

r pen

al s

anct

ions

. The

Sec

uriti

esse

curit

y fo

r sm

all c

ontra

cts.

Rep

ort c

ompl

eted

on

June

200

4.

Page 28: 2nd UPDATE - World Bank

PU

BLI

C P

RO

CU

RE

ME

NT

BY

NAT

ION

AL

AG

EN

CIE

S, G

over

nmen

t-Ow

ned-

and-

Con

trolle

d C

orpo

ratio

n an

d ot

her I

nstru

men

talit

ies

17. R

epla

ce s

uret

y bo

nd w

ith B

ank

Gov

ernm

ent P

rocu

rem

ent

J

une

2003

Don

e.gu

aran

tee/

Lete

rs o

f Cre

dit/o

ther

form

s.Po

licy

Boar

dTh

e Im

plem

entin

g R

ules

and

Reg

ulat

ions

spe

cify

opt

ions

.

Enha

nce

18. P

ush

for 6

0% im

plem

enta

tion

by a

llD

epar

tmen

t of B

udge

t and

D

ecem

ber 2

003

Ong

oing

.Tr

ansp

aren

cyag

enci

es o

f Gov

ernm

ent E

lect

roni

cM

anag

emen

t/Pro

cure

men

tA

s of

Aug

ust 3

1, 2

004,

77%

for

Proc

urem

ent S

yste

ms.

Serv

ices

Nat

iona

l Gov

ernm

ent A

genc

ies:

38%

for G

over

nmen

t-Ow

ned

and

Con

trolle

d C

orpo

ratio

ns w

ith a

llG

OC

Cs

in N

CR

(hea

d of

fices

regi

ster

ed):

92%

of S

tate

Uni

vers

ities

and

Col

lege

s: a

nd a

llci

ties,

68%

of p

rovi

nces

, 22%

of

mun

icip

aliti

es a

nd 9

bar

anga

ysw

ere

regi

ster

ed. T

o be

com

plet

edin

acc

orda

nce

with

the

Impl

emen

ting

Rul

es a

nd R

egul

atio

ns. T

heG

over

nmen

t Pro

cure

men

t Pol

icy

Boar

d to

mon

itor a

nd re

port

onco

mpl

ianc

e qu

arte

rly.

19. E

ncou

rage

gui

delin

es a

nd tr

aini

ng o

fPr

ocur

emen

t Wat

ch, I

nc./

D

ecem

ber 2

002

Ong

oing

.In

itial

fund

ing

civi

l soc

iety

’s p

artic

ipat

ion

in p

rocu

rem

ent

Tran

spar

ency

Inte

rnat

iona

l Phi

ls.

Proc

urem

ent W

atch

, Inc

.,is

bei

ngby

ASE

Mat

all l

evel

s.in

vite

d to

obs

erve

pro

cure

men

tpr

oces

ses

in a

t lea

st tw

enty

-five

(25)

agen

cies

in th

e N

CR

. Hig

h de

man

dre

quire

s ad

ditio

nal s

taff

and

train

ing

with

wor

ksho

ps (f

unds

). To

be

com

plet

ed b

y D

ecem

ber 2

004.

20. D

evel

op g

uide

lines

and

trai

ning

of

Proc

urem

ent W

atch

, Inc

./

Dec

embe

r 200

2D

one.

WB

-IDF

Nat

iona

l Gov

ernm

ent O

rgan

izat

ions

and

Tran

spar

ency

Inte

rnat

iona

l Phi

ls.

As o

f Aut

ust 3

1, 2

004,

Pro

cure

men

tC

ivil S

ocie

ty.

Wat

ch, I

nc. d

evel

oped

a B

ACO

bser

ver C

ode

of E

thic

s, a

trai

ning

pack

age

for C

ivil S

ocie

ty O

rgan

iza-

tions

and

Pro

fess

iona

l Ass

ocia

tions

,as

wel

l as

a pu

blic

bid

ding

che

cklis

t.Pr

ocur

emen

t Wat

ch, I

nc. t

rain

ed 3

4C

ivil S

ocie

ty O

rgan

izat

ions

nat

ion-

wid

e, w

ith 1

8 si

gnin

g a

MO

A w

ith it

for p

urpo

ses

of o

bser

ving

pub

licbi

ddin

g. P

rocu

rem

ent W

atch

, Inc

.,al

so d

evel

oped

a w

eb-b

ased

cen

tral

repo

rting

/info

rmat

ion

shar

ing

and

diss

emin

atio

n sy

stem

for M

OA

partn

ers.

Key

Are

aA

ctiv

ity a

nd A

gree

d A

ctio

nR

espo

nsib

le A

genc

yTi

met

able

Stat

us a

s of

Oct

ober

31,

200

3Fu

ndin

g

Page 29: 2nd UPDATE - World Bank

Key

Are

aA

ctiv

ity a

nd A

gree

d A

ctio

nR

espo

nsib

le A

genc

yTi

met

able

Stat

us a

s of

Oct

ober

31,

200

3Fu

ndin

g

LOC

AL

GO

VE

RN

ME

NT

UN

IT P

RO

CU

RE

ME

NT

Publ

ic21

. Ens

ure

that

Loc

al G

over

nmen

t Uni

ts’

D

ecem

ber 2

002

Don

e.Pr

ocur

emen

tpr

ocur

emen

t is

adeq

uate

ly c

over

ed in

prop

osed

Pro

cure

men

t Bill.

22. L

ocal

Gov

ernm

ent U

nits

’ con

cern

s/D

epar

tmen

t of I

nter

ior a

nd

Dec

embe

r 200

2D

one.

view

s w

ill be

repr

esen

ted

in th

e fo

rmul

atio

nLo

cal G

over

nmen

t/Lea

gue

ofof

the

Impl

emen

ting

Rul

es a

nd R

egul

atio

nsC

ities

once

the

Bill i

s en

acte

d.

23. L

ocal

Chi

ef E

xecu

tives

sho

uld

not

Dep

artm

ent o

f Bud

get a

nd

Dec

embe

r 200

2D

one.

chai

r the

Bid

ding

and

Aw

ards

Com

mitt

ees.

Man

agem

ent

The

Law

pro

hibi

ts a

ppro

ving

auth

ority

to b

e ch

air o

f the

Bid

san

d Aw

ards

Com

mitt

ee.

24. M

ake

the

impl

emen

tatio

n of

Ann

ual

Dep

artm

ent o

f Bud

get a

nd

Jun

e 20

03D

one.

Proc

urem

ent P

lan

by th

e Lo

cal

Man

agem

ent C

ircul

arSe

ctio

n 7

of th

e La

w re

quire

sG

over

nmen

t Uni

ts m

anda

tory

.An

nual

Pro

cure

men

t Pla

n lin

ked

to B

udge

t.

25. P

rofe

ssio

naliz

e th

e pr

ocur

emen

tG

over

nmen

t Pro

cure

men

t

Dec

embe

r 200

3O

ngio

ng.

WB

-IDF

func

tion

and

build

Loc

al G

over

nmen

t Uni

ts-

Polic

y Bo

ard/

Dep

artm

ent o

fTh

is is

par

t of t

he P

rofe

ssio

naliz

atio

nle

vel p

rocu

rem

ent c

apac

ity.

Inte

rior a

nd L

ocal

Gov

ernm

ent

Stud

y in

Act

ivity

No.

8; t

o be

com

plet

ed in

Mar

ch 2

005.

Dev

elop

a S

tudy

Im

plem

enta

tion

26. R

atio

naliz

e m

etho

d of

pro

cure

men

t and

Dep

artm

ent o

f Bud

get a

nd

60

days

from

Don

e.ex

pedi

te p

aym

ent t

o co

ntra

ctor

s an

dM

anag

emen

t/Gov

ernm

ent/

a

ppro

val o

f New

Rul

es o

n al

tern

ativ

e m

etho

ds o

fsu

pplie

rs (t

o be

dea

lt w

ith in

the

Impl

emen

ting

Proc

urem

ent P

olic

y Bo

ard

P

rocu

rem

ent L

awpr

ocur

emen

t pro

vide

d in

Sec

tion

Rul

es a

nd R

egul

atio

ns).

48 o

f Im

plem

entin

g R

ules

and

Reg

ulat

ions

.

Upd

ate

the

Gov

ernm

ent

Com

mis

sion

on

Audi

t

Dec

embe

r 200

3G

over

nmen

t Pro

cure

men

t Ref

orm

Acco

untin

g an

d Au

dit M

anua

lAc

t and

Impl

emen

ting

Rul

es a

ndR

egul

atio

ns c

ircul

ariz

ed a

sAu

dit R

ules

.

Dev

elop

and

impl

emen

t tra

inin

gC

omm

issi

on o

n Au

dit

J

une

2003

Ong

oing

; to

be c

ompl

eted

by

prog

ram

on

proc

urem

ent a

udit

Dec

embe

r 200

4.

Page 30: 2nd UPDATE - World Bank

Key

Are

aA

ctiv

ity a

nd A

gree

d A

ctio

nR

espo

nsib

le A

genc

yTi

met

able

Stat

us a

s of

Oct

ober

31,

200

3Fu

ndin

g

LOC

AL

GO

VE

RN

ME

NT

UN

IT P

RO

CU

RE

ME

NT

27. D

evel

op a

goo

d re

cord

kee

ping

sys

tem

Gov

ernm

ent P

rocu

rem

ent

for:

Polic

y Bo

ard/

Dep

artm

ent o

fPu

blic

Wor

ks a

nd H

ighw

ays/

Pr

ovin

ces/

citie

s (p

ilot p

hase

)D

epar

tmen

t of I

nter

ior a

nd

Dec

embe

r 200

4To

be

com

plet

ed b

y D

ecem

ber 2

004.

Loca

l Gov

ernm

ent

M

unic

ipal

ities

(ful

l impl

emen

tatio

n)

Dec

embe

r 200

4To

be

com

plet

ed b

y D

ecem

ber 2

004.

Page 31: 2nd UPDATE - World Bank

Key

Are

aA

ctiv

ity a

nd A

gree

d A

ctio

nR

espo

nsib

le A

genc

yTi

met

able

Stat

us a

s of

Oct

ober

31,

200

3Fu

ndin

g

PU

BLI

C W

OR

KS

SE

CTO

R

Polic

ies

and

28. F

orei

gn c

ontra

ctor

s sh

ould

be

allo

wed

DP

WH

/CIA

P

J

une

2003

The

Con

tract

ors

Lice

nsin

g La

wPr

oced

ures

to b

id w

ithou

t PC

AB lic

ense

but

will

need

proh

ibits

this

. How

ever

, the

pro

cess

to p

rese

nt th

e lic

ense

prio

r to

awar

d.is

bei

ng s

tream

lined

. Fu

rther

elab

orat

ion

requ

ired

to fa

cilit

ate

parti

cipa

tion

of b

idde

rs.

Lega

l29

. Rev

iew

the

law

on

arbi

tratio

n to

CIA

P/D

PW

H

J

une

2003

Enha

ncem

ent o

f exi

stin

g La

wFr

amew

ork

alig

n it

with

inte

rnat

iona

l pra

ctic

e.ba

sed

on U

NC

ITR

AL m

odel

isbe

ing

cons

ider

ed. T

his

requ

ires

in-d

epth

stu

dy. N

eeds

tech

nica

las

sist

ance

for t

he s

tudy

.

Impr

ove

30. S

tudy

on

regi

stra

tion

and

licen

sing

GP

PB

/DP

WH

/CIA

P-P

DC

B

Ju

ne 2

003

To b

e co

mpl

eted

. N

eeds

Proc

urem

ent

of c

ontra

ctor

s; d

esig

n an

d im

plem

ent a

nas

sist

ance

to s

tream

line.

Prac

tices

and

actio

n pl

an to

stre

amlin

e pr

oces

ses

for

Proc

esse

sre

gist

ratio

n an

d lic

ensi

ng o

f con

tract

ors.

Eval

uatio

n of

31. A

dopt

the

stan

dard

pas

s or

fail c

riter

iaD

PW

H/A

DB

June

200

3D

one.

Bid

Aw

ards

for a

ll pro

cure

men

t exc

ept p

re-q

ualif

icat

ion

of A

DB-

fund

ed p

roje

cts

whi

ch w

ill al

so b

esc

hedu

led

to a

dopt

pas

s or

fail c

riter

ia in

2002

.

- do

-32

. Sta

ndar

d es

timat

ed c

ost p

er c

lass

room

,D

PW

H

Ju

ne 2

003

Don

e.fo

r bud

geta

ry p

urpo

ses,

sho

uld

not b

e a

limita

tion

to th

e re

sulti

ng b

id p

rice.

Del

iver

y,33

. Pro

vide

/stre

ngth

en q

ualit

y as

sura

nce

DP

WH

June

200

4O

ngoi

ng.

Insp

ectio

n,m

echa

nism

for d

esig

n an

d su

perv

isio

n.D

PWH

has

an

upda

ted

and

Paym

ent

stre

ngth

ened

5-y

ear Q

ualit

yAs

sura

nce

Prog

ram

, whi

ch in

volv

esof

add

ition

al Q

ualit

y As

sura

nce

Uni

ts

Enha

nce

Tran

spar

ency

34. U

se o

f com

pute

rized

regi

stry

by

all

DP

WH

D

ecem

ber 2

004

Ong

oing

.pr

ojec

ts fo

llow

ing

prog

ress

of

Pilo

t tes

t on

two

WB-

fund

edof

com

pute

rizat

ion.

proj

ects

und

er im

plem

enta

tion,

and

succ

essf

ul. T

rain

ing

prog

ram

for

on th

e us

e of

ele

ctro

nic

regi

stry

for

roll o

ut to

the

regi

ons

has

been

deve

lope

d an

d w

ill be

impl

emen

ted

by D

ecem

ber 2

004

Page 32: 2nd UPDATE - World Bank

Key

Are

aA

ctiv

ity a

nd A

gree

d A

ctio

nR

espo

nsib

le A

genc

yTi

met

able

Stat

us a

s of

Oct

ober

31,

200

3Fu

ndin

g

ED

UC

ATI

ON

SE

CTO

R

Lega

l Fra

mew

ork

35. R

evis

e Se

ctio

n 1-

A, R

ule

IV o

fD

epED

Dec

embe

r 200

3D

one.

and

Polic

yR

A 80

47 a

nd G

ener

al P

olic

y N

o. 5

of

the

Nat

iona

l Boo

k Po

licy

to re

lax

itsre

quire

men

ts o

n im

porta

tion

of ra

wm

ater

ials

for t

extb

ooks

.

- do

-36

. Am

endm

ent o

f the

law

to a

llow

Dep

ED

Dec

embe

r 200

4Be

caus

e of

the

new

cur

ricul

um,

text

book

s of

fore

ign

auth

ors

to c

ompe

teth

is a

ctiv

ity n

eeds

to b

e pu

rsue

d.lo

cally

for S

cien

ce, M

ath

and

Engl

ish

text

book

s.

- do

-37

. Stre

amlin

e th

e po

licy

on te

xtbo

okD

epED

Don

e.co

nten

t eva

luat

ion.

Furth

er im

prov

emen

ts w

ithth

e ne

w te

xtbo

ok p

olic

y (E

nglis

h,M

ath

and

Scie

nce)

.

Org

aniz

atio

n38

. Tra

inin

g an

d em

pow

erm

ent o

f the

bid

DO

H/S

EMP2

/All A

genc

ies

Dec

embe

r 20

03D

one.

com

mitt

ee m

embe

rs (p

roffe

ssio

naliz

atio

n).

BAC

mem

bers

to A

IMpr

ocur

emen

t tra

inin

g.

Plan

ning

and

39. D

evel

op a

n ef

fect

ive

proc

urem

ent

Dep

ED

Ju

ne 2

003

On-

goin

g w

ith im

plem

enta

tion

ofM

onito

ring

plan

ning

and

inve

ntor

y m

onito

ring

syst

emsy

stem

at a

ll lev

els

(exc

ept s

choo

l)at

the

Reg

iona

l, D

ivis

ion,

Dis

trict

and

Sch

ool

to b

e co

mpl

eted

in D

ecem

ber 2

004.

Leve

ls.

Proc

urem

ent p

roce

ss a

t “sc

hool

”le

vel is

“ope

n”. N

atio

nwid

e Tr

aini

ngse

min

ar fo

r sup

ply

offie

rs a

t the

Reg

iona

l and

Div

isio

n le

vels

is b

eing

unde

rtake

n.

Cap

acity

Bui

ldin

g40

. Stre

ngth

en D

epEd

’s p

rocu

rem

ent

Dep

ED

Ju

ne 2

003

Ong

iong

.ca

paci

ty.

Nat

ionw

ide

train

ing

sem

inar

for

supp

ly o

ffice

rs a

t the

Reg

iona

l and

and

Div

isio

n le

vels

is b

eing

unde

rtake

n. P

rocu

rem

ent S

ervi

ceun

it es

tabl

ishe

d on

Dec

embe

r 200

3,bu

t stil

l nee

ds to

be

fully

sta

ffed.

Page 33: 2nd UPDATE - World Bank

Key

Are

aA

ctiv

ity a

nd A

gree

d A

ctio

nR

espo

nsib

le A

genc

yTi

met

able

Stat

us a

s of

Oct

ober

31,

200

3Fu

ndin

g

HE

ALT

H S

EC

TOR

Org

aniz

atio

n41

. Rev

iew

and

impl

emen

t Dep

artm

ent o

fD

epar

tmen

t of H

ealth

Dec

embe

r 200

3O

ngoi

ng.

Hea

lth re

form

s in

term

s of

dec

entra

lizat

ion

of p

rocu

rem

ent.

Adve

rtise

men

t42

. Dev

elop

a m

echa

nism

to e

nsur

e w

ider

Dep

artm

ent o

f Hea

lth/S

ocia

l

D

ecem

ber 2

003

Don

e.pa

rtici

patio

n an

d co

mpe

titio

nEx

pend

iture

and

Man

agem

ent

Reg

istra

tion

inst

ead

of a

ccre

dida

tion

Proj

ect 2

and

wid

er n

otifi

catio

n.

Cap

acity

Bui

ldin

g43

. Stre

ngth

en B

urea

u of

Foo

d an

d D

rug’

sD

epar

tmen

t of H

ealth

June

200

3D

one.

capa

city

to s

horte

n th

e re

gist

ratio

n pr

oces

s.In

stea

d of

up

to 6

mon

ths,

now

2-3

wee

ks.

- do

-44

. Tra

inin

g an

d em

pow

erm

ent o

f the

bid

Dep

artm

ent o

f Hea

lth/S

ocia

l

D

ecem

ber 2

003

Don

e.co

mm

ittee

mem

bers

(pro

fess

iona

lizat

ion)

.Ex

pend

iture

and

Man

agem

ent

Staf

f sen

t to

AIM

trai

ning

.Pr

ojec

t 2/A

ll Age

ncie

s

Proc

edur

es a

nd45

. Stre

amlin

e th

e pr

oced

ure

for c

ontra

ctD

epar

tmen

t of H

ealth

/Soc

ial

Dec

embe

r 200

3D

one.

Prac

tices

revi

ew b

y Le

gal S

ervi

ces

Div

isio

n.Ex

pend

iture

and

Man

agem

ent

One

wee

k in

stea

d of

one

mon

th.

Proj

ect 2

- do

-46

. Stre

amlin

e th

e ca

sh a

lloca

tion

proc

ess

Dep

artm

ent o

f Hea

lth/S

ocia

l

D

ecem

ber 2

003

Don

e.an

d ap

prov

al p

roce

ss to

avo

id d

elay

.Ex

pend

iture

Man

agem

ent

Proj

ect 2

Mon

itorin

g47

. Dev

elop

a m

ecah

nism

to m

onito

r and

Dep

artm

ent o

f Hea

lth/S

ocia

l

Jun

e 20

03D

one

for s

uppl

iers

; for

eval

uate

the

perfo

rman

ce o

f the

sup

plie

rs, a

ndEx

pend

iture

Man

agem

ent

cons

truct

ors/

cons

ulta

nts

still

cons

truct

ors/

cons

ulta

nts.

Proj

ect 2

unde

r pre

para

tion.

Org

aniz

atio

n an

d48

. Rev

iew

the

staf

fing

of P

rocu

rem

ent

Dep

artm

ent o

f Hea

lth/S

ocia

l

D

ecem

ber 2

002

Don

e Au

gust

200

2.St

affin

gan

d Lo

gist

ics

Serv

ice.

Expe

nditu

re M

anag

emen

tPr

ojec

t 2

Syst

ems

and

49. E

stab

lish

a N

atio

nal D

rug

Pric

eD

epar

tmen

t of H

ealth

/Soc

ial

J

une

2003

Don

e N

ovem

ber 2

002.

Proc

edur

esM

onito

ring

Syst

em.

Expe

nditu

re M

anag

emen

tPr

ojec

t 2

- do

-50

. Con

duct

a s

tudy

on

pric

e of

Dep

artm

ent o

f Hea

lth/S

ocia

l

D

ecem

ber 2

003

Don

e Au

gust

200

3.ph

arm

aceu

tical

s.Ex

pend

iture

Man

agem

ent

Proj

ect 2

Page 34: 2nd UPDATE - World Bank

Emer

ging

Issu

es/P

riorit

ies

Key

Are

aA

ctiv

ity a

nd A

gree

d A

ctio

nR

espo

nsib

le A

genc

yTi

met

able

Sta

tus

as o

f Aug

ust 3

1, 2

004

Pro

pose

d

F

undi

ng

Stre

ngth

en1.

Pre

pare

impl

emen

tatio

n pl

an fo

r Mon

itorin

gG

over

nmen

t Pro

cure

men

t

Jun

e 20

04O

ngio

ng.

WB

-IDF/

Org

aniz

atio

nal

and

Eval

uatio

n ca

pabi

lity

of th

ePo

licy

Boar

dTh

e G

PP

B-T

SO

has

a to

ol to

ASEM

2C

apac

ityG

over

nmen

t Pro

cure

men

t Pol

icy

Boar

d-ev

alua

te a

genc

ies’

com

plia

nce

Tech

nica

l Ser

vice

s O

ffice

with

resp

ect t

ow

ith th

e G

over

nmen

t Pro

cure

men

ten

forc

emen

t of t

he G

over

nmen

tR

efor

m A

ct, a

s w

ell a

s ef

fect

ivity

Proc

urem

ent R

efor

m A

ct/Im

plem

entin

gof

the

Law,

kno

wn

as th

eR

ules

and

Reg

ulat

ions

.Pr

ocur

emen

t Ref

orm

Impa

ctM

onth

ly E

valu

atio

n R

epor

t. An

onlin

e m

onito

ring/

surv

ey s

yste

mw

ill be

dev

elop

ed b

y N

ovem

ber

2004

.

2. D

isse

min

ate

info

rmat

ion

on G

over

nmen

tG

over

nmen

t Pro

cure

men

t

M

arch

200

4D

one.

WB

-IDF;

Proc

urem

ent R

efor

m A

ct/Im

plem

entin

gPo

licy

Boar

d/D

epar

tmen

t of

Upo

n th

e re

ques

t of t

he G

PPB

Gov

ernm

ent

Rul

es a

nd R

egul

atio

ns to

Loc

alIn

terio

r and

Loc

al G

over

nmen

tD

ILG

issu

ed a

circ

uall t

o in

form

to p

ursu

eal

l LG

Us

of th

e G

over

nmen

tad

ditio

nal

Proc

urem

ent R

efor

m A

ct a

nd it

sfu

ndin

g fro

mIR

R-A

.AD

B

3. I

mpl

emen

t E-P

rocu

rem

ent a

s a

Gov

ernm

ent P

rocu

rem

ent

D

ecem

ber 2

004

G-E

PS c

ontra

cdt w

ith p

rivat

eG

over

nmen

t ttra

nsac

tiona

l tool

.Po

licy

Boar

d/Pr

ocur

emen

tse

rvic

e pr

ovid

er w

as s

igne

d on

to p

ursu

eSe

rvic

eAp

ril 6

, 200

4 an

d N

otic

e to

fund

ing

with

Proc

eed

was

issu

ed o

n Ap

ril 1

3,AD

B20

04. F

ull im

plem

enta

tion

ofP

hase

I of

the

G-E

PS

Pro

ject

will

be b

y M

any

26, 2

0005

; Pha

ses

II,III

, IV,

and

V w

ill be

dev

elop

edfro

m S

epte

mbe

r 1 to

Sep

tem

ber

15, 2

005.

4. T

rain

ing

Gov

ernm

ent E

-Pro

cure

men

tC

omm

issi

on o

n Au

dit/

D

ecem

ber 2

004

syst

ems

staf

f and

Com

mis

sion

on

Audi

tPr

ocur

emen

t Ser

vice

audi

tors

in th

e ar

ea o

f sys

tem

sec

urity

.

Impr

ove

5. P

repa

re a

repo

rt on

cap

acity

, qua

lity

and

Inte

rnat

iona

l Fin

anci

ng

Mar

ch 2

004

Don

e.W

BPr

ocur

emen

tsi

ze o

f con

tract

s fo

r wor

ks u

nder

For

eign

Inst

itutio

nsR

epor

t of c

onsu

ltant

s di

scus

sed

Prac

tices

and

Assi

sted

Pro

ject

s, in

clud

ing

the

mix

of

durin

g th

e C

PAR

Sec

ond

Upd

ate

Proc

esse

sna

tiona

l and

fore

ign

fund

ing.

Mis

sion

. Rec

omm

enda

tions

are

bein

g ac

ted

upon

.

Page 35: 2nd UPDATE - World Bank

Key

Are

aA

ctiv

ity a

nd A

gree

d A

ctio

nR

espo

nsib

le A

genc

yTi

met

able

Sta

tus

as o

f Aug

ust 3

1, 2

004

Pro

pose

d

F

undi

ng

6. T

rain

ing

on H

arm

oniz

ed B

iddi

ngG

over

nmen

t Pro

cure

men

t

Dec

embe

r 200

4O

ngoi

ng.

WB

-IDF/

Doc

umen

ts a

t all l

evel

s in

clud

ing

natio

nal

Polic

y Bo

ard

GPP

B-TS

O h

as d

evel

oped

the

AS

EM

2ag

enci

es, l

ocal

gov

ernm

ent,

priv

ate

sect

orth

e m

odul

es fo

r the

Pub

lican

d ci

vil s

ocie

ty.

Proc

urem

ent P

ract

ione

r’sD

evel

opm

ent P

rogr

am in

coor

dina

tion

with

the

Dev

elop

men

t Aca

dem

y of

the

Phi

lippi

nes

for N

GA

s, L

GU

s,G

OC

Cs,

and

SU

Cs

to c

over

Har

mon

ized

Bid

ding

Doc

umen

tsas

wel

l. Fu

ll tra

inin

g to

be

acco

mpl

ishe

d by

Mar

ch 2

005.

7. P

repa

re a

repo

rt on

bid

pric

es/v

aria

tion

Gov

ernm

ent P

rocu

rem

ent

S

epte

mbe

r 200

4D

one.

Gov

ernm

ent

orde

rs re

lativ

e to

Eng

inee

r’s E

stim

ates

inPo

licy

Boar

d/D

epar

tmen

t of

The

repo

r of t

he c

onsu

ltant

slw

ill re

ques

proj

ects

with

and

with

out f

ixed

bud

get

Publ

ic W

orks

and

Hig

hway

s/w

as d

iscu

ssed

dur

ing

the

CPA

RJa

pan

Bank

for

ceilin

gs.

Com

mis

sion

on

Audi

tSe

cond

Upd

ate

Mis

sion

.In

tern

atio

nal

Rec

omm

enda

tions

wer

eC

oope

ratio

nco

nsid

ere.

8. P

ilot t

estin

g of

the

Proc

urem

ent M

anua

lG

over

nmen

t Pro

cure

men

t

Sep

tem

ber 2

004

Ong

oing

.A

SE

M 2

in a

t lea

st n

ine

(9) a

genc

ies/

Loca

l Gov

ernm

ent

Polic

y Bo

ard/

All A

genc

ies/

Term

s of

Ref

eren

ce s

till t

o be

Gra

ntU

nits

.Lo

cal G

over

nmen

t Uni

tsfin

aliz

ed. M

anua

ls s

till t

o be

revie

wed

.

9. D

ownl

oadi

ng o

f bid

ding

doc

umen

tsG

over

nmen

t Pro

cure

men

t

D

ecem

ber 2

004

Don

e.fro

m th

e Pr

ocur

emen

t Ser

vice

s or

Polic

y Bo

ard/

Dep

artm

ent o

fG

-EPS

has

full c

apab

ility

agen

cy w

ebsi

te.

Hea

lth o

r Dep

artm

ent o

f Pub

licto

allo

w d

ownl

oadi

ng o

fW

orks

and

Hig

hway

sbi

ddin

g do

cum

ents

.

10. I

mpr

ovem

ent o

f ski

lls in

est

imat

ing

Gov

erm

ent P

rocu

rem

ent

Sept

embe

r 200

4O

ngio

ng.

WB

-IDF

pric

es a

nd a

naly

zing

bid

var

ianc

es.

Polic

y Bo

ard/

Dep

artm

ent o

fTe

rms

of R

efer

ence

hav

e be

enPu

blic

Wor

ks a

nd H

ighw

ays

draf

ted

11. I

nclu

de p

rocu

rem

ent m

etho

d fo

r sm

all

Gov

ernm

ent P

rocu

rem

ent

June

200

4D

one.

wor

ks in

the

Impl

emen

ting

Rul

es a

ndPo

licy

Boar

dG

uide

lines

for I

mpl

emen

tatio

nR

egul

atio

ns o

r pro

cure

men

t man

ual.

of P

roje

cts

by A

dmin

istra

tion

appr

oved

by

Res

olut

ion

No.

Page 36: 2nd UPDATE - World Bank

12. I

ntro

duce

a s

yste

m o

f val

ueG

over

nmen

t Pro

cure

men

t

Ju

ne 2

004

Don

e.W

B w

illen

gine

erin

g an

alys

is o

n a

pilo

t bas

is, t

oPo

licy

Boar

d/D

epar

tmen

t of

Initi

al in

trodu

ctio

n of

the

prov

ide

fund

ing

chec

k th

at d

esig

ns a

nd c

ost e

stim

ates

Publ

ic W

orks

and

Hig

hway

sco

ncep

t of v

alue

eng

inee

ring

for t

rain

eren

sure

bes

t val

ue fo

r mon

ey. B

egin

with

by a

fore

ign

expe

rt w

asth

ree

sele

cted

pro

ject

s an

d in

vite

fore

ign

cond

ucte

d on

Jun

e 14

, 15

expe

rts to

sha

re in

tern

atio

nal e

xper

ienc

e.an

d 18

, 200

4 at

the

Wor

ld B

ank.

The

GP

PB

and

DP

WH

will

stil

lha

ve to

und

erta

ke th

e pi

lot p

roje

ct.

13. P

ilot “

desi

gn a

nd b

uild

” pro

cure

men

tG

over

nmen

t Pro

cure

men

t

Ju

ne 2

004

Don

e.sc

hem

es in

at l

east

one

con

tract

.Po

licy

Boar

d/D

epar

tmen

t of

A nu

mbe

r of w

ater

sup

ply

and

was

tePu

blic

Wor

ks a

nd H

ighw

ays

man

agem

ent p

roje

cts

are

unde

rD

esig

n an

d Bu

ild p

rocu

rem

ent.

Enha

nce

Tran

spar

ency

14. C

apac

ity b

uild

ing

of C

ivil S

ocie

tyG

over

nmen

t Pro

cure

men

t

Ju

ne 2

005

Ong

oing

.A

SE

M 2

Gra

ntO

rgan

izat

ions

as

Gov

ernm

ent’s

Polic

y Bo

ard

This

will

be d

one

with

the

new

lypa

rtner

s an

d Bi

d an

d Aw

ards

crea

ted

Allia

nce

of C

SO

s w

ith P

WI

Com

mitt

ee o

bser

vers

.as

the

Secr

etar

iat.

15. D

efin

e th

e qu

alifi

catio

n cr

iteria

toG

over

nmen

t Pro

cure

men

t

Ju

ne 2

004

Don

e in

the

bidd

ing

docu

men

tsm

atch

bid

ding

requ

irem

ents

in th

ePo

licy

Boar

d/D

epar

tmen

t of

for w

orks

har

mon

ized

with

AD

B,pr

ocur

emen

t man

ual.

Publ

ic W

orks

and

Hig

hway

sJB

IC a

nd W

B.

16. C

olle

ct a

nd d

isse

min

ate

data

on

actu

alG

over

nmen

t Pro

cure

men

t

Ju

ne 2

004

Ong

oing

.bi

d pr

ices

of c

omm

on p

rocu

rem

ent i

tem

s,Po

licy

Boar

d/C

omm

issi

on o

nG

-EP

S is

mon

itorin

g bi

d pr

ices

of

e.g.

cla

ssro

oms,

road

s, m

edic

al s

uppl

ies,

Audi

t/Pro

cure

men

t Wat

ch,

com

mon

ly u

sed

item

s. A

sta

ndal

one

wat

er s

uppl

y, a

nd b

ooks

pro

cure

d by

diff

eren

tIn

corp

orat

edst

udy

will

be d

one

for s

elec

ted

item

s.

Key

Are

aA

ctiv

ity a

nd A

gree

d A

ctio

nR

espo

nsib

le A

genc

yTi

met

able

St a

tus

as o

f Aug

ust 3

1, 2

004

Pro

pos e

d

F

undi

ng

Page 37: 2nd UPDATE - World Bank

37COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

Appendix 4 - Status of Procurement Training and G-EPS Update

Agencies

National GovernmentAgencies (NGAs) Main/Regional Offices Bureaus Attached Agencies

Local GovernmentUnits (LGUs)(excluding barangays) Provinces Cities Municipalities

Government-Owned orControlledCorporations (GOCCs)and other GovernmentCorporate Entities(GCEs) Chartered GOCCs Non-Chartered GCEs GOCCs by Judicial Decisions

State Universities andColleges (SUCs) SUCs in NCR SUCs in other regions Other attached SUCs

TOTAL

No. of Existing Agencies

7391

435 145 159

1,6922

79 119 1,494

7233

76 57 590

1124

8 102 2

3,266

No. of Trained Agencies

549

404 48 97

1,228

66 91 1,071

167

61 14 92

112

8 102 2

2,056

Percentage ofAgencies Trained

62.32%

92.87% 33.10% 61%

77.23 %

83.54% 76.47% 71.68%

40.14 %

80.26% 24.56% 15.6%

100%

100% 100% 100%

70%

Status of Procurement Training on Procurement Laws, Rules and Regulations (October2002 – December, 2004)

1 Source: Department of Budget and Management (DBM) Directory, Organization and Productivity Information Bureau (OPIB) –DBM, Agencies’ Main Offices, Agencies’ Website2 Source: Department of Interior and Local Government3 Source: Department of Finance4 Status Report on G-EPS (2001-December 2004)

Page 38: 2nd UPDATE - World Bank

Status Report on G-EPS (2001-December 2004)5

5 Source: Office of Philippine Government Electronic Procurement System (PhilGEPS)

Total

3,558

2,993

75,842

3,531

10,529

Agency

No. of Agencies Registeredw/G-EPS

No. of Agencies Trained onG-EPS

No. of Notices Posted

No. of Agencies who Postedon G-EPS

No. of Awards Posted

Total

3,186

11,176

6,734

16,536

59,064

Supplier

No. of SuppliersTrained

No. of RegisteredSuppliers

No. of Suppliers thatDownloaded Notices

No. of Notices Downloaded bySuppliers

No. of Downloaded Noticesby Suppliers

0

200

400

600

800

1000

1200

4th Qtr. 2002 2003 2004

Agencies

Page 39: 2nd UPDATE - World Bank

05000

1000015000200002500030000350004000045000

2001 2002 2003 2004

AGENCY

No. of Agencies Registered w/G-EPSNo. of Agencies Trained on G-EPSNo. of Notices Posted

No. of Agency who Posted on G-EPSNo. of Awards Posted

0

5000

10000

15000

20000

25000

30000

2001 2002 2003 2004

SUPPLIER

No. of Suppliers Trained

No. of Registered Suppliers

No. of Suppliers thatDownloaded Notices

No. of Notices Downloaded bySuppliers

No. of Downloaded Notices bySuppliers

Page 40: 2nd UPDATE - World Bank
Page 41: 2nd UPDATE - World Bank

41COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

Appendix 5 - Report on Progress of Reforms in LGUs

1. In line with the thrust to fully disseminate the new procurement procedures, the Government ProcurementPolicy Board (GPPB) spearheaded a move to create an efficient and expeditious system of rolling outtraining of Republic Act (R.A.) 9184, otherwise known as the "Government Procurement Reform Act,"and its Implementing Rules and Regulations Part A (IRR-A) to more than 48,000 local government units.The Department of Budget and Management (DBM) tasked the Local Government Academy (LGA), thetraining arm of the Department of Interior and Local Government (DILG), to bring together a team ofnational trainors and to assist in advocating the new law through the conduct of training for a pool oftrainors from every region who, in turn, will handle the training of procurement officials - such as themembers of the Bids and Awards Committee (BAC), BAC Secretariat and the Technical Working Group(TWG) - in the respective Local Government Units (LGUs) located in their own regions. The pool oftrainors consisted of a Composite Team of Regional Trainors for each region. Each team was comprised ofrepresentatives from DBM, DILG, Commission on Audit (COA), and the Philippine League of Local BudgetOfficers (PHILLBO).1 The objective was to bring together different departments dealing with differentfacets of local government so that together they could answer all possible questions and resolve issues plusprovide information to LGUs. The goal of the entire program was to train all LGUs in the country on thebasic provisions of R.A. 9184. The strategy includes the standardization of all materials for the trainingand the distribution of Frequently Asked Questions (FAQs) from concluded training on R.A. 9184 to theparticipants.

2. After having trained the trainors, the Government Procurement Policy Board Technical Support Office(GPPB-TSO) then entered into a Memorandum of Agreement (MOA) with the PHILLBO for theorganization, arrangement, management and administration of the procurement training to be conductedby the Composite Team for LGUs in all the regions with DBM acting as the lead agency and over allcoordinator of the Team. The methodology of the LGU training programs generally utilized lecture-discussions, open forums, and workshops using case analyses and mock biddings, and pre-training andpost-training evaluation sheets.

3. Table 1 shows the status report on the training of LGUs conducted by the Composite Teams from Aprilto December 2004. This table is based on those reports that have been sufficiently documented by theGPPB-TSO. It has to be mentioned as well that, prior to the creation of the Composite Teams, the GPPB-TSO had initially conducted regional training on the new procurement law, and that this training includedLGU participants composed of Local Government Officials, Local Budget Officers, Engineers, MunicipalTreasurers, BAC Members/Secretariat and Procurement/Supply Officers. The training was conducted inRegions II, III, IV, V, VI, VII, VIII, IX, X, XI, NCR, and the Cordillera Autonomous Region (CAR) withina period from October 2002 until December 2003. Using the same GPPB-TSO pool of speakers, a similar

1 The PHILLBO is a private organization whose membership consists of local budget officers throughout the country and whosepurpose is to constantly build up, improve and strengthen the capacities of its members in LGUs through appropriateinterventions responsive to the changing demands and opportunities of the times.

Page 42: 2nd UPDATE - World Bank

42COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

Region

II

III

III

IV - A2

V

VI

VII

VIII

IX

X

XI

XII

XIII

CAR

NationalCapital Region(NCR)

AutonomousRegion of MuslimMindanao(ARMM)

Total

Participants (LGUs)

Percentage ofLGUs Trained

125/12996.90%

93/9394.90%

120/13787.59%

119/14880.41%

85/12369.11%

139/139100%

130/13695.59%

139/14993.29%

52/7470.27%

98/98100%

46/5288.46%

47/5487.04%

56/7772.73%

58/8369.90%

15/1788.24%

38/10038%

1,360/1,69280.38%

Province

4 trained/4 P100%

5 trained/5 P100%

7 trained/7 P100%

5 trained/5P100%

6 trained/6 P100%

6 trained/6 P100%

4 trained/4 P100%

6 trained/6 P100%

3 trained/3 P100%

5 trained/5 P100%

4 trained/4P100%

4 trained/4 P100%

4 trained/4 P100%

6 trained/6 P100%

3 trained/5 P60%

72 trained/79 P91.14%

Municipality

113 trained/117 M96.58%

85 trained/90 M94.44%

103 trained/118 M87.29%

103 trained/132 P78.03%

73 trained/107 M68.22%

117 trained/117 M100%

114 trained/120 M95%

129 trained/139 M92.81%

44 trained/66 M66.67%

85 trained/85 M100 %

38 trained/43 M28.37%

38 trained/45 M84.44%

49 trained/70 M70%

51 trained/76 M67.11%

3 trained/4 M75%

34 trained/94 M36.17%

1,179 trained/1,494 M78.92%

City

8 trained/8 C100%

3 trained/3 P100%

10 trained/12 C83.33%

11 trained/11 P100%

6 trained/10 C60%

16 trained/16 C100%

12 trained/12 C100%

4 trained/4C100%

5 trained/5 C100%

8 trained/8 C100%

4 trained/5 C80%

5 trained/5 C100%

3 trained/3 C100%

1 trained/1 C100%

12 trained/13 C92.31%

1 trained/1 C100%

109 trained/119 C91.60%

Table 1: Summary Status Report of the Training for Local Government Units (period covering April to December2004)

1 For Region IV-B, training was handled by the Commission on Audit.

Page 43: 2nd UPDATE - World Bank

43COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

program was also conducted by the PHILLBO in November and December 2003, at Tagaytay City, IloiloCity and Davao City, covering the three island clusters of Luzon, Visayas and Mindanao, respectively.These special PHILLBO training seminars had a total of two thousand two hundred and sixty-two (2,262)participants, composed of Local Government Officials, Local Budget Officers, Engineers and MunicipalTreasurers.

4. The GOP, through the DBM-Procurement Service (PS), has also been actively marketing the G-EPS tothe LGUs, by conducting regional seminars and hands-on trainings for LGUs on its use. Table 2 showshow many LGUs have already undergone hands-on training on the G-EPS beginning in October 2002,while Table 6 shows the number of LGUs registered with the G-EPS, vis-à-vis the total number of existingLGUs.

Table 2: Number of LGUs Trained (hands-on) on the G-EPS (period covering October 1, 2002 to December 31,2004)

Table 3: Total Number of LGUs v. LGUs Registered with G-EPS (as of December 31, 2004)

5. From the above, it can be said that the GOP has been undertaking a vigorous program to disseminate andmarket the new procurement law and the G-EPS to the LGUs. Moreover, despite a low number of hands-on training on the use of the G-EPS, there appears to be a high rate of LGU registration with the G-EPS atthe provincial and city government levels. This high rate of registration appears to spring from the continuousinformation campaigns of the GPPB-TSO on the new procurement law, because the training invariablyidentifies the G-EPS as one of the mandatory features of the reform. As such, registration with the G-EPSmay, in fact, be considered as one of the indicators of the impact of R.A. 9184, and given the high rate ofregistration in the Provincial and City Governments, it becomes apparent that LGUs at this level areincreasingly becoming aware of the law and adopting it. On the other hand, the low rate of G-EPS registrationin Barangays may be attributed to a lack of training at that level and sheer lack of infrastructure.

4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr2002 2003 2003 2003 2003 2004 2004 2004 2004 Total

LGUs 90 33 22 0 81 34 11 18 54 343

Total Number of LGUs

79

119

1,494

41,975

43,667

Provincial Government

City Government

Municipal Government

Barangay

Total

Total Registered with G-EPS

60

107

438

41

646

1 GPPB-TSO2 Id.

Page 44: 2nd UPDATE - World Bank

44COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

6. To further elucidate on the impact of R.A. 9184 on the LGUs, the survey of the GPPB-TSO on LGUcompliance with the Annual Procurement Plan (APP) BAC requirements may prove to be helpful. Thissurvey was conducted by the GPPB-TSO in twenty-seven LGUs – comprising twenty-three cities/municipalities and thirteen provinces – representing the CAR, Regions I, III, IVA, IV-B, V, VI, VII, IX, XI,and the National Capital Region (NCR), from June to December 2004. First of all, it showed that all therespondents affirmed that they adopted a centralized system of procurement, which means that these LGUsare able to consolidate procurement requirements at either the Provincial, City or Municipal levels; therebyfacilitating the introduction of reforms, as most efforts may be focused on only one main and central office.

Secondly, looking at the APP and BAC provisions of R.A. 9184, Table 4 shows the percentage of complianceby the respondent LGUs with essential provisions of the law on the preparation and use of the APP, and theformation of the BAC. It should be noted, however, that some assertions contained therein may be self-serving and would have to be validated. At any rate, the results of the survey may be sufficient to justify theassertion that the reforms in the new procurement law may effectively be implemented at the Provincial,City and Municipality levels.

Table 4: LGU Compliance with APP and the BAC Requirements (as of December 31, 2004)1

Percentage of Compliance

89.8%

100%

100%

69.6%

75.2%

48.4%

45.75%

APP Requirement

Preparation of the Annual Strategic Plan

Approval of APP by Head of Procuring Entity or 2nd RankingOfficial, duly designated

APP is consistent with yearly-approved budget

APP has provisions on foreseeable emergencies, based onhistorical records

APP includes a Project Procurement Management Plan(PPMP) for each individual project

Existence of PMO that is supposed to be responsible forpreparing and updating the PPMP

BAC Secretariat is responsible for the consolidation of thePPMPs into an APP

1 GPPB-TSO

Page 45: 2nd UPDATE - World Bank

45COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

Recommendations

7. Accrediting Procurement Training Programs. As pointed out above, the nationwide procurement trainingprogram of the GPPB-TSO is considered by almost all participants as both effective and advantageous.However, with the onset of this program, various groups have reportedly been undertaking their own seminarsand training programs on the new law for both NGAs and LGUs - sometimes charging hefty amounts.While the initiatives of these groups and organizations may be a welcome sign of an increased demand forknowledge on the law, the quality of these programs have sometime been questioned, and the danger ofmisinformation has been raised. In fact, it has been reported that some speakers would merely use thepresentations of the GPPB-TSO designated trainors but would not be able to explain the contents thereof.It should be noted that the GPPB has been training a national composite team of trainors specifically for thepurpose of ensuring that the new procurement law would be rolled-out to the regions with the appropriatequality checks. These composite teams are also the same groups that are currently being trained on the newharmonized Philippine Bidding Documents, so that they may likewise conduct the next level of training inthe regions. Despite this, it is recognized that these composite teams are still insufficient to cope with thepresent demand for training - discounting even the private sector. As such, although independent groupsand organizations may be allowed to conduct their own training programs on the new procurement law, itis highly recommended that the GPPB develop a mechanism to accredit procurement lecturers and theorganizations that seek to conduct public procurement training seminars, to ensure the quality of both,including that of the entire program. Although the accreditation system may not necessarily include in-house training programs, agencies seeking qualified speakers therefore may simply refer to the list ofaccredited lecturers maintained by the GPPB. This accreditation system may also be linked to the GOP'sefforts to develop a certificate program and professionalize the public procurement practice.

8. Record Keeping and Maintaining of LGU Performance. To support the training programs and as a"follow-through" for capacity building efforts at the LGU level, there is a need to strengthen the LGUs'capacity to to manage and maintain procurement records. These records will, in turn, serve as critical inputfor micro-level maintenance of LGU procurement performances.

Page 46: 2nd UPDATE - World Bank
Page 47: 2nd UPDATE - World Bank

47COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

1. As provided in the November to December 2003 Country Procurement Assessment Report (CPAR) Update,all the activities and agreed actions in the March 2003 CPAR for the Health Sector have been completed,except for the review and implementation of reforms in terms of decentralization of procurement. In thisregard, Department Memorandum No. 74, dated June 19, 2003, was issued by the Secretary of Health,directing all Directors of the Centers for Health Development (CHDs) (the equivalent of the Regional Offices)to: (i) constitute/reconstitute their Bids and Awards Committees (BACs) in accordance with Republic Act(R.A.) 9184, otherwise known as the “Government Procurement Reform Act;” (ii) institutionalise thepreparation of the Annual Procurement Plan (APP); and (iii) institutionalise a procurement monitoring systemthat will ensure adherence to the procurement timelines provided in R.A. 9184. However, there is still a needfor developing the capacities of the BACs in the various regions through training programs and seminars onprocurement. Moreover although the decentralized BACs were created by Department Memorandum No.74, the Department of Health (DOH) maintains a centralized distribution system for essential drugs.1 Itshould be noted that a Contract Distribution System (CDS) was developed by the DOH with assistance fromthe World Bank for the purpose of monitoring the demand and consumption of essential drugs. But, untilnow, this is being fully implemented only in one region, i.e., Region VI. Among the barriers to the fullimplementation of the CDS are misconceptions in the regions regarding the payment of distributors, issueson the procurement of drugs at the CHD level, warehousing, the need to upgrade facilities, and problems inmanaging the supply chain.2

2. As part of organizational reforms, by virtue of Department Order No. 210-E, dated August 2002, the DOHrestructured its Procurement and Logistics Service, by dividing it into two divisions, the Procurement Divisionand the Materials Management Division, each headed by a Director. The former acts as the Secretariat forthe Central Office Bids and Awards Committee (COBAC) and is responsible for requirements planning,sourcing and ordering, while the latter is responsible for receipt of goods, preparation of payment documents,storage and distribution. Thus, by separating logistics from the actual procurement activities, there is anincreased check and balance in the new organizational set-up.

3. With the DOH dividing its Procurement and Logistics Service into the Procurement Division and theMaterials Management Division, it has established an internal oversight committee, the ProcurementCommittee, to ensure effective operation and proper coordination between these two offices as well as thefinance units. However, a lot more has to be done on the logistics side, particularly in distribution , as therehave been problems in recent deliveries. In the case of SEMP2, while procurement (through UN agencies)

Appendix 6 - Progress of Reforms in the Health Sector

1 Based on an interview with Department of Health Undersecretary Alexander A. Padilla, Engr. Joel N. Lazo, Chief of theProcurement Division, Department of Health, and Dr. Maria Virginia Guzman-Ala, Chief, Project Management Division,Department of Health (October 4, 2004).2 Id.

Page 48: 2nd UPDATE - World Bank

48COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

and deliveries up to central warehouses have improved a lot, the on-ward distribution to the end-points (fieldoffices) in the system is a concern. Often, vaccines and drugs are distributed to the end points with only ashort time remaining before their expiry dates. The problems have become critical recently because of alogjam in the contract of a forwarder that is effecting the distribution of vaccines and drugs.

4. The November to December 2003 CPAR Update noted the strengthening of the capacity of the Bureau ofFood and Drugs (BFAD) so that the registration process has been shortened from six (6) months to two (2) tothree (3) weeks. Recently, the BFAD bid out the development of an Automated Total Solution that is intendedto further speed up the process. The project is fully locally funded and covers the purchase of equipment,system design, network installation and internet services. Hardware delivery will be completed early thisyear to allow the Design Phase and Pilot Testing to be accomplished in 2005, and the full implementation ofthe system is planned for 2006.

Recommendations

5. Supporting DOH Reforms. The DOH may need technical assistance to further develop the CDS into afully functional and effective system that is utilized in all regions. This may require addressing such issues asthe authority of CHDs to procure drugs, the upgrade of existing facilities, and a review of the DOH’s entirecentralized logistics network for drugs, i.e., not only from planning to contracting, but including warehousingand distribution.

Page 49: 2nd UPDATE - World Bank

49COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

1. Among the activities and agreed actions in the March 2003 Country Procurement Assessment Report(CPAR) for the Education Sector are the development of an effective procurement planning and inventorymonitoring system at the Regional, Division, District and School levels, and the strengthening of the Departmentof Education’s (DepEd’s) procurement capacity. To this end, DepEd, has focused much attention to twomajor areas of reform, namely the National Textbook Delivery Program (Textbook Count) and the creation ofits very own Procurement Service (PS).

2. In 2003, the DepEd undertook its first Textbook Count program, involving the procurement and delivery ofthirty seven million (37 Million) textbooks and teachers’ manuals under the 2nd Social Expenditure ManagementProject (SEMP2)/Third Elementary Education Project (TEEP), amounting to One Billion Three HundredMillion Pesos (Php1.3 Billion), awarded to six publisher/printer groups. This involved five thousand sixhundred twenty-three (5,623) delivery sites and over thirty thousand (30,000) separate deliveries nationwide.

3. The problems addressed under the 2003 Textbook Count were over-pricing, unqualified bidders winningbids, long delays in delivering textbooks, under-deliveries and substandard quality of textbook printing, bindingand packaging. Under previous findings of the Philippine Center for Investigative Journalism (PCIJ), in 1998and 1999, the average delivery period was twenty-four months and the average price per textbook was NinetyPesos (Php90.00).1 Now, by virtue of the 2003 Textbook Count, the opening of bids up to awarding ofcontract were undertaken from November 13, 2002 to January 2003, so that the contracts were awarded onMarch 2003, at an average price of Forty-one Pesos (Php41.00) per textbook (with Lesson Guides). Moreover,deliveries were completed by the end of November 2003 – translating to a completed procurement cyclewithin twelve months.2 This program also helped achieve a textbook to pupil ratio of 1:1 (except for Math 3textbooks for elementary and Math IV textbooks for high school),3 from previous ratios of 1:6 at the elementarylevel and 1:8 at the high school level.4 These results were achieved through: (i) the conduct of transparentbidding procedures that were publicly-viewed, taped and conducted with non-governmental organization(NGO) observers, all in accordance with Republic Act (R.A.) 9184; (ii) two-level, mutually exclusive, technicalevaluation process (involving financial and content evaluation); (iii) planned and surprise plant visits withCivil Service Organization (CSO)/NGO partners to check on quality; (iv) the use of a common deliveryschedule set by the DepEd as the client and not by the publishers/suppliers; (v) the use of CSOs and NGOsto monitor and inspect deliveries; (vi) detailed and full disclosure of deliveries to principals and district

1 Presentation delivered by Department of Education Undersecretary Juan Miguel Luz, during the Combating Corruption Conference, Manila,Philippines, entitled “National Textbook Delivery Program (Textbook Count) – Libro Ko, Kinabukasan Ko” (September 21, 2004).2 Id.3 Based on an interview with Department of Education Undersecretary Juan Miguel Luz and Ms. Aida Carpentero, Director of the ProcurementService, Department of Education (September 20, 2004).4 See Philippine Center for Investigative Journalism, Betrayals of the Public Trust: Investigative Reports on Corruption, at 65 (2000).

Appendix 7 - Progress of Reforms in the Education Sector

Page 50: 2nd UPDATE - World Bank

50COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

supervisors through individual letters; (vii) published school-by-school delivery schedules in local newspapers,with actual textbook numbers and range of delivery dates; and (viii) radio advertisements to announce textbookdeliveries to the general public.5

4. The DepEd has also successfully undertaken its 2nd National Textbook Delivery Program for 2004 (TextbookCount 2), involving thirteen million six hundred thousand (13.6 Million) textbooks amounting to Six HundredSixty Million Pesos (Php660 Million), to over thirty-five thousand (35,000) delivery sites nationwide, fromJuly through November 2004. Similar to the 1st Textbook Count, the 2nd Textbook Count involved partneringwith an even larger number of CSOs and NGOs (18), as well as the Government Procurement Policy Board(GPPB); but, this time, the program also taps the Boy Scouts and Girl Scouts of the Philippines organized ateach of the school sites. Aside from the World Bank financed SEMP2 and TEEP projects, textbooks from theAsian Development Bank’s Secondary Education Development and Improvement Project (SEDIP) wereincluded in the textbook delivery program for the first time. This necessitated better coordination within andoutside of DepED in view of the number of projects, suppliers/forwarder and delivery sites involved.

5. Using the provisions of Section 14 of R.A. 9184 and its Implementing Rules and Regulations Part A (IRR-A), which provides for the creation of a Secretariat in the procuring entity to support the Bids and AwardsCommittee (BAC), the DepEd created the PS. The creation of the PS was also committed to by the GOP tothe World Bank under the SEMP loan, which provides for the improvement of the performance and efficiencyof DepEd procurement systems, financial management and information communication systems.

6. The PS is tasked to act as BAC Secretariat at the central office in all biddings costing Two Hundred FiftyThousand Pesos (Php250,000) and above, as well as provide technical support in the evaluation of bids, theimplementation of a procurement tracking system, and the overseeing of contract administration, amongothers. All procurements below the Php250,000 threshold are handled by the Property Division.

The PS is headed by a Director III, and has a staffing complement of sixteen. All the positions available havebeen filled from internal and external recruitments.

7. The general functions of the PS cover the acquisition of goods and consulting services, and the contractingfor infrastructure projects; secretariat and support services to the BAC; the provision of efficient recordsmanagement of procurement documents; and contract administration. Its special functions are:

• Formulate plans, policies, standards and guidelines pursuant to R.A. 9184 and other relevant laws,rules and regulations.

5 Supra note 1.

Page 51: 2nd UPDATE - World Bank

51COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

• Procure goods and consulting services and contract for infrastructure projects, including lease ofgoods and real estate, through local or international competitive bidding, or when necessary, any ofthe alternative methods of procurement.

• Maintain the procurement database and records management.

• Liaise with the GPPB-Technical Support Office (TSO).

• Provide opportunities for the training of personnel to professionalize the procurement service and theprocurement functions within DepEd.

• Advise the Secretary of Education on procurement matters.

Recommendations

8. Supporting DepEd Reforms. The initiative of the DepEd to institutionalize internal procurement reformsthrough the creation of its PS has to be supported. In particular, now that the PS is fully staffed, it would needto undergo training sessions to build its capacity on database and records management, project management,local and international procurement procedures, and effective planning, among others. It would have toestablish an effective partnership with the GPPB-TSO to be kept abreast with updates on the GOP’s overallprocurement reform program. It would also need to institutionalize its arrangements with CSOs/NGOs for acontinued effective partnership in procurement and contract administration undertakings.

Page 52: 2nd UPDATE - World Bank
Page 53: 2nd UPDATE - World Bank

53COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

Appendix 8 - Baseline Indicator System ReportBaseline Indicator System with Weights

The assessment of the Philippines’ public procurement system was conducted on the basis of four (4) keyareas called “Pillars,” which are composed of twelve (12) Indicators that have been identified as the corecomponents of a public procurement system. These twelve (12) Indicators are, in turn, composed of Baselinesthat are considered the desirable standards against which the existing elements of the Philippines’ publicprocurement system may be assessed. The table below provides for the descriptive analysis of the ratingas to where, how and why the Philippines fully or fails to achieve this standard.

For the assessment, points were given to each Baseline, the total of which corresponds to weights assignedto each of the Indicators. In turn, the weights of these Indicators comprise the total score for each of thefour (4) Pillars. To reflect their equal importance, each of the Pillars was given a weight of twenty-fivepercent (25%) each, amounting to a grand total of one hundred percent (100%). The distribution of pointswas based upon the importance and relevance of each of the Baselines and Indicators involved, in relationto the Philippines’ public procurement reform program.

Baselines

• Baseline (a) – Scope of application and coverage of thelegislative and regulatory framework (20% of Indicator)

1. Contracting entities at all levels, including governmentauthorities, municipalities, regional authorities and utilities/state-owned enterprise, are covered (5%)

2. All areas of procurement; works, goods and consultingservices are included (5%)

3. Procurement using public funds, irrespective of contractvalue, is included (5%)

4. The applicable legislative and regulatory framework isstructured, consistent, and accessible to users and allinterested stakeholders (5%)

Answers/Comments

• Yes. Sec. 4, R.A.9184.

• Yes. Sec. 4, R.A.9184.

• Yes. Sec. 1, IRR-A, R.A. 9184.

• Yes. R.A. 9184.provides for openand competitivebidding.

Indicators

• Indicator 1 – Publicprocurementlegislative andregulatory frameworkachieves the agreedstandards andcomplies withapplicable obligations(15%)

PILLAR I – THE LEGISLATIVE AND REGULATORY FRAMEWORK (25%)

Page 54: 2nd UPDATE - World Bank

Baselines

• Baseline (b) – Procurement methods (15% of Indicator)

1. Stated preference for the use of open, competitiveprocurement unless otherwise justified in accordance withthe legislative and regulatory framework (3.75%)

2. International competitive tendering methods defined forspecified contracts (e.g. where monetary thresholds exist)that are consistent with international standards (3.75%)

3. Defined basis for the procurement method, if other thanopen competition (3.75%)

4. Negotiated procedures and direct purchasing only underwell defined and justified circumstances, subject to controls(3.75%)

· Baseline (c) – Advertising rules and time limits (10% of Indicator)

1. Mandatory and accessible publication of opportunities forcompetitive procurement (3.33%)

2. Mandatory publication of result information on contractawards based on defined thresholds (3.33%)

3. Minimum time limits for submission of tenders andapplications, which should be consistent with methods ofprocurement, national conditions and when applicable,international requirements (3.33%)

· Baseline (d) – Rules on participation and qualitative selection(15% of Indicator)

1. Fair, predictable and defined rules for participation that relyon qualifications and ability to perform the requirement(3.75%)

2. Limited and controlled use of price preferential clauses(3.75%)

3. Debarment process if covered, on defined basis, allowingfor due process and appeal (3.75%)

4. Rules for participation of government-owned enterprise thatprovide for equal treatment in competitive procurement(3.75%)

·

Answers/Comments

• Yes. Sec. 10, R.A.9184.

• No. R.A. 9184 isgenerally not opento foreigncompetition, butexceptions exist.

• Yes. Secs. 48 to 54,R.A. 9184.

• Yes. Secs. 50, 52and 53, R.A. 9184.

• Yes. Sec. 21, R.A.9184.

• Yes. Postingrequirement in G-EPS.

• Yes. Annex C, IRR-A, R.A. 9184.

• Yes. Secs. 23 and24, R.A. 9184.

• Yes. R.A. 9184 hasclear conditions.

• Yes. R.A. 9184 hasblacklisting andprotest mechanismsand.

• Yes. R.A. 9184allows GOCCs to bidcompetitively.

Indicators

• Indicator 1 – Publicprocurementlegislative andregulatory frameworkachieves the agreedstandards andcomplies withapplicable obligations(15%)

Page 55: 2nd UPDATE - World Bank

Baselines

• Baseline (e) – Tender documentation and technical specifications(5% of Indicator)

1. The minimum content of the tender documentation isspecified (2.5%)

2. Neutral technical specification with reference tointernational standards where possible (2.5%)

• Baseline (f) – Tender evaluation and award criteria (15% ofIndicator)

1. Objective, fair and pre-disclosed criteria for evaluation andaward of contracts (7.5%)

2. Clear methodology for evaluation of tenders based on priceand other fully disclosed factors leading to award ofcontract (7.5%)

• Baseline (g) – Submission, receipt and opening of tenders (15%of Indicator)

1. Public opening of tenders in a defined manner that ensuresthe regularity of the proceedings (5%)

2. Clear requirement to maintain records of proceedings andprocess that are available for review/audit (5%)

3. Requirement to maintain security and confidentiality oftenders prior to bid opening (5%)

• Baseline (h) – Complaint review procedures (5% of Indicator)

1. Inclusion of complaint and remedy procedures that providefor fair, independent and timely implementation (5%)

·

Answers/Comments

• Yes. R.A. 9184provides forminimumrequirements.

• Yes. R.A. 9184prohibits use ofbrand names.

• Yes. Secs. 32 and33 of R.A. 9184.

• Yes. Secs. 32 and33 of R.A. 9184.

• Yes. Sec. 29, R.A.9184.

• Yes. BACSecretariat requiredto keep records ofbidding.

• Yes. Confidentialityclause and penalprovisions in R.A.9184.

• Yes. Art. XVII, R.A.9184.

Indicators

• Indicator 1 – Publicprocurementlegislative andregulatory frameworkachieves the agreedstandards andcomplies withapplicable obligations(15%)

Page 56: 2nd UPDATE - World Bank

Baselines

• Baseline (a) – The existence and availability of implementingregulation that provides defined processes and procedures notincluded in higher level legislation (20% of Indicator)

• Baseline (b) – The existence and availability of model tenderdocuments for goods, works and services (20% of Indicator)

• Baseline (c) – The existence and availability of procedures forpre-qualification (10% of Indicator)

• Baseline (d) – The existence and availability of proceduressuitable for contracting for services or other requirements wheretechnical capacity is a key criteria (10% of Indicator)

• Baseline (e) – The existence and availability of user’s guideor manual for contracting entities (20% of Indicator)

• Baseline (f) – The existence and availability of GeneralConditions of Contracts for public sector contracts coveringgoods, works and services consistent with nationalrequirements and international requirements whenapplicable (20% of Indicator)

·

Answers/Comments

• Qualified Yes. IRR-A, R.A. 9184 coverslocally-fundedprojects, whileForeign-AssistedProjects are coveredby Secs. 4 and 43 ofthe law.

• Yes. Sec. 6, R.A.9184 andHarmonizedPhilippine BiddingDocuments.

• Yes. Eligibility isequivalent toprequalification.

• Yes. R.A. 9184allows QBSprocedures forconsulting services.

• Qualified Yes.ProcurementManuals have beendrafted and ready forissuance.

• Yes. In theHarmonizedPhilippine BiddingDocuments.

Indicators

• Indicator 2 –Existence of ImplementingRegulations andDocumentation (10%)

Page 57: 2nd UPDATE - World Bank

Baselines

• Baseline (a) – Procurement planning and data on costing is partof the budget formulation process and contributes to multi-yearplanning (30% of Indicator)

• Baseline (b) – Budget Law supports timely procurement, contractexecution and payment (10% of Indicator)

• Baseline (c) – No initiation of procurement actions withoutexisting budget appropriations (20% Indicator)

• Baseline (d) – Contract execution is subject to budgetarycontrols to ensure sufficient funding for contract (20% Indicator)

• Baseline (e) – Budgeting system provides for timelyrelease of funds to make payments against contractualobligations (20% of Indicator)

• Baseline (a) – The status and basis for the functional normativebody at the centre (the Body) is covered in the legislative andregulatory framework (30% of Indicator)

• Baseline (b) – The responsibilities of the Body address a definedset of functions which include, but are not limited to: theprovisions of advise to contracting entities; drafting amendmentsto the legislative and regulatory framework and implementingregulations; providing monitoring of public procurement;providing procurement information; reporting on procurement toother parts of government; developing and supportingimplementation of initiatives for improvements of thedevelopment of implementing staff (20% of Indicator)

• Baseline (c) – Organization and staffing of the Body and thelevel of independence and authority (formal power) of the bodyto exercise its duties is sufficient and consistent with theresponsibilities (30% of Indicator)

• Baseline (d) – Responsibilities of the Body provide for separationand clarity so as to avoid conflict of interest (20% of Indicator)

·

Answers/Comments

• Yes. Art. II, R.A.9184 and P.D. 1177.

• Yes. P.D. 1177 andin GAA.

• Yes. R.A. 9184provides forApproval Budget forthe Contract prior toprocurement.

• Yes. R.A. 9184, P.D.1177, P.D. 1445.

• Qualified No.Delayed release offunds at times, butthere is a pilotpayment systemthrough the banksfor DPWH.

• Yes. Art. XX, R.A.9184.

• Yes. Art. XX, R.A.9184.

• Yes. Art. XX, R.A.9184 provides forcabinet-levelrepresentation and aTechnical SupportOffice.

• Yes. Art. XX, R.A.9184 provides for anindependent inter-agency body.

Indicators

• Indicator 3 –MainstreamingProcedures intoPublic FinancialManagement (9%)

• Indicator 4 –Functional NormativeBody (the Body) at theCentre (8%)

PILLAR II – CENTRAL INSTITUTIONAL FRAMEWORK AND CAPACITY (25%)

Page 58: 2nd UPDATE - World Bank

Baselines

• Baseline (a) – A system exists for collection and dissemination ofprocurement information, including tender invitations, request forproposals and contract award information (15% of Indicator)

• Baseline (b) – A sustainable strategy exists to provide trainingadvice and assistance to develop the capacity of governmentand private sector participants to understand the rules andregulations and how they should be implemented (30% ofIndicator)

• Baseline (c) – Systems and procedures exist for collection andmonitoring of national procurement statistics (25% of Indicator)

• Baseline (d) – Quality control standards are disseminated andused to evaluate performance of staff and address capacitydevelopment issues (30% of Indicator)

·

Answers/Comments

• Qualified Yes. Acentral portal existsbut contract awardinformation is not yetaccessible.

• Qualified Yes. Sec.16, R.A. 9184 andprogram toprofessionalizepublic procurement,but private sector isnot included.

• No. Rudimentarysystem which has tobe developedfurther.

• No. Quality controlstandards still haveto be developed.

Indicators

• Indicator 5 –Existence ofInstitutionalDevelopmentCapacity (8%)

Page 59: 2nd UPDATE - World Bank

Baselines

• Baseline (a) – At the contracting entity level, the level ofprocurement competence among government officialswithin the entity is consistent with their procurementresponsibilities (25% of Indicator)

• Baseline (b) – At the contracting entity level, theprocurement training and information programmesimplemented for government officials, as well as for privatesector participants is consistent with demand (25% ofIndicator)

• Baseline (c) – At the contracting entity level, the existence ofadministrative systems for public procurement operations, andinformation databases to support monitoring of performance andreporting to and responding to the needs of other relatedgovernment systems (25% of Indicator)

• Baseline (d) – At the contracting entity level, the existence andimplementation of internal control mechanisms for theundertaking of procurement operations at the contracting level,including a code of conduct, separation of responsibilities as acheck/balance mechanism and oversight/control of signature/approval authority (25% of Indicator)

·

Answers/Comments

• No. Professionalprogram is not yet infull swing.

• No. The demand ofpublic and privatesector participantsstill has to be met.

• Qualified Yes.Administrativesystems exist, butthese have to beimproved becausethey do not yetadequately supportmonitoringperformance.Although someagencies havesuccessfullydevelopedprocurementsystems andinformationdatabases to supportmonitoring activities.

• Qualified Yes. E.O.109-A provides forsigning authorities,and various laws andexecutive orders tostrengthen internalcontrol mechanismshave been issued.Although mostagencies haveinternal audit unitsand/or internalcontrol systems, thishas not beeninstitutionalized on anationwid scale.

Indicators

• Indicator 6 – EfficientProcurementOperations andPractice (10%)

PILLAR III – PROCUREMENT OPERATIONS AND PUBLIC PROCUREMENT MARKETPERFORMANCE (25%)

Page 60: 2nd UPDATE - World Bank

Baselines

• Baseline (a) – The public procurement market in the country hassufficient numbers of producers/suppliers to provide forcompetition and comparative pricing for goods, works andservices when compared to prices paid for similar requirementsin local, regional or international markets as applicable (30% ofIndicator)

• Baseline (b) – The quality and consistency of submissions by theprivate sector to the government enables the application of theprocess leading to the award and completion of contracts (20%of Indicator)

• Baseline (c) – The participation rate of tenderers in response tocompetitive tender invitations is consistent with the capacity ofthe marketplace (20% of Indicator)

• Baseline (d) – The private sector confidence in the legal andregulatory framework governing the procurement process isevidenced by their use of complaints or protests mechanisms(30% of Indicator)

• Baseline (a) – Procedures are defined for undertaking contractadministration responsibilities to include inspection andacceptance procedures, quality control procedures and methodsto review and issue contract amendments in a timely manner(50% of Indicator)

• Baseline (b) – Dispute resolution procedures are included in thecontract document providing for an efficient and fair process toresolve disputes arising during the performance of the contract(25% of Indicator)

• Baseline (c) – Procedures exist to enforce the outcome of thedispute resolution process (25% of Indicator)

Answers/Comments

• Yes. Sufficientenough to conduct acompetitive biddingfor most items andworks.

• Yes. Private sectoris generally capableof complying withbiddingrequirements.

• No. Politicalinterventions distortcompetition andparticipation rate.There are privatesector companiesthat have not beenparticipating.

• No. Few complaintsreceived.Information onconfidence level islacking becauseR.A. 9184 isrelatively new.

• Yes. R.A. 9184provides for contractadministration,variation orders/amendments andwarranties.

• Yes. Art. XVIII ofR.A. 9184.

• Yes. Arbitration Lawprovides for this.

Indicators

• Indicator 7 –Functionality of thePublic ProcurementMarket (10%)

• Indicator 8 – Existenceof ContractAdministration andDispute ResolutionProvisions (5%)

Page 61: 2nd UPDATE - World Bank

Baselines

• Baseline (a) – A legal framework, organization, policy andprocedures for internal and external control and audit of publicprocurement operations exists and operates to provide afunctioning control framework (25% of Indicator)

• Baseline (b) – Enforcement and follow-up on findings andrecommendations of the control framework provide anenvironment that fosters compliance (20% of Indicator)

• Baseline (c) – The internal control system provides timelyinformation on compliance to enable management action (20% ofIndicator)

• Baseline (d) – The internal control systems are sufficientlydefined to enable performance audits to be conducted (10% ofIndicator)

• Baseline (e) – Auditors are sufficiently informed aboutprocurement requirements and controls systems to conductquality audits that contribute to compliance (25% of Indicator)

·

Answers/Comments

• Qualified Yes. Lawssuch as P.D. 1445and R.A. 3456govern thesematters. Existingsystems in mostagencies have to beimproved. Mostagencies have nointernal audit units/internal controlsystems.

• No. There is lack ofenforcement.

• No. Weak internalcontrol in mostagencies.

• Yes. Internal controlsystem existing areclearly defined.

• Qualified Yes. Someauditors are notsufficiently informedof procurementrequirements. Thereare complaints aboutconflicting COAinterpretations ofprocurement law.

Indicators

• Indicator 9 – EffectiveControl and AuditSystem (8%)

PILLAR III – THE INTEGRITY AND TRANSPARENCY OF THE PUBLIC PROCUREMENT SYSTEM(25%)

Page 62: 2nd UPDATE - World Bank

Baselines

• Baseline (a) – The existence and operation of a complaint reviewsystem that gives participants in the public procurement processa right to file a complaint within the framework of anadministrative and judicial review procedure (25% of Indicator)

• Baseline (b) – Decisions are deliberated on the basis of availableinformation and the final decision can be reviewed and ruledupon by a body with judicial capacity under the law (15% ofIndicator)

• Baseline (c) – The complaint review system has the capacity tohandle lodged complaints efficiently and a means to enforce theremedy imposed (25% of Indicator)

• Baseline (d) – The system operates in a fair manner, withoutcomes of decisions balanced and justified on the basis ofavailable information (10% of Indicator)

• Baseline (e) – Decisions are published and made available to thepublic (15% of Indicator)

• Baseline (f) – Administrative review body is separate from theregulatory body (10% of Indicator)

• Baseline (a) – Access to information is supported by publicationand distribution of information through available media withsupport from information technology when feasible (50% ofIndicator)

• Baseline (b) – Systems exist to collect key data related toperformance of the procurement system and to report regularly(25% of Indicator)

• Baseline (c) – Records are maintained to validate data (25% ofIndicator)

Answers/Comments

• Yes. Art. XVII ofR.A. 9184.

• Yes. Art. XVII ofR.A. 9184.

• Yes. There areadministrative, civiland criminalliabilities in R.A.9184.

• No. No sufficientinformation exists inthis area.

• No. There is norequirement topublish decisions.

• No. There is nocentraladministrativereview body.

• Qualified No. R.A.9184 requirespublication/ postingin generalnewspapers,websites and the G-EPS, but full accessof information is notfully institutionalized.

• Qualified No.Although someagencies havesystems, the keydata actually needsto be identified.

• Qualified Yes.Agencies maintainrecords. Contents ofthe records have tobe defined.

Indicators

• Indicator 10 –Efficiency of AppealsMechanism (5%)

• Indicator 11 – Degreeof Access toInformation (4%)

Page 63: 2nd UPDATE - World Bank

Baselines

• Baseline (a) – The legal and regulatory framework forprocurement, including tender and contract documents, includesprovisions addressing the issues of corruption, fraud, conflict ofinterest and unethical behaviour and states actions which can betaken with regard to such behaviour (either directly or byreference to other laws) (50% of Indicator)

• Baseline (b) – Special measures by the government to preventand detect potential fraud and corruption in public procurementis addressed in an anti-corruption programme (25% of Indicator)

• Baseline (c) – Stakeholders (private sector and civil society)support the creation of a procurement market known for itsintegrity and ethical behaviour (25% of Indicator)

Answers/Comments

• Yes. R.A. 9184includes provisionson all these matters.Other laws alsoaddress these, e.g.,R.A. 3019 and 6713.

• Qualified Yes. Thereis an anti-corruptionprogram thatinvolves CSOs, butit needs furtherdevelopment toaddresseffectiveness.

• Yes. There is strongCSO involvement,which finds supportin Secs. 13 and 64of R.A. 9184.

Indicators

• Indicator 12 – Ethicsand Anti-corruptionMeasures (8%)

Assessment Ratings

The following Assessment Ratings per Indicator shall be used to determine the level of achievement met bythe Philippines, to provide a profile or mapping of its existing public procurement system. The AssessmentRatings are based upon the points garnered for each Baseline.

Level of Achievement

0 – 20% of Indicator 21 – 50% of Indicator 51 – 80% of Indicator 81 – 100% of Indicator

Legend:

NA – No Baseline elements substantially metPA – Less than 50% of Baseline elements substantially metSA – More than 50% of Baseline elements substantially metFA – All baseline elements are substantially met

Application

Applying the BIS weights upon the Philippines’ national procurement system, a Grand Total Score of67.29% was garnered as a result of the scores achieved by the Philippines in the attached BIS Rating Sheetand Charts. Adopting the above Assessment Ratings for the Indicators, this translates to a Level ofAchievement whereby more than fifty percent (50%) of ALL Baseline elements have been substantiallymet (SA).

NA PA SA FA

Page 64: 2nd UPDATE - World Bank

BIS

Ratin

g Sh

eet

25.0

0%22

.44%

89.7

4%FA

15%

14.4

4%96

.24%

FA

0.20

00.

200

3.00

%0.

050

0.05

00.

050

0.05

00.

050

0.05

00.

050

0.05

00.

150

0.11

31.

69%

0.03

80.

038

0.03

80.

000

0.03

80.

038

0.03

80.

038

0.10

00.

100

1.50

%0.

033

0.03

30.

033

0.03

3

0.03

30.

033

0.15

00.

150

2.25

%0.

038

0.03

80.

038

0.03

80.

038

0.03

8

0.03

80.

038

0.05

00.

050

0.75

%0.

025

0.02

5

0.02

50.

025

0.15

00.

150

2.25

%0.

075

0.07

50.

075

0.07

50.

150

0.15

02.

25%

0.05

00.

050

0.05

00.

050

0.05

00.

050

0.05

00.

050

0.75

%

0.05

00.

050

Leve

l of A

chie

vem

ent

Pilla

rs/In

dica

tors

/Bas

elin

es

2. In

tern

atio

nal c

ompe

titiv

e pr

oced

ures

Base

line

(d) R

ules

on

parti

cipa

tion

and

qual

itativ

e se

lect

ion

1. M

anda

tory

and

acc

essi

ble

publ

icat

ion

of o

ppor

tuni

ties

2. M

anda

tory

pub

licat

ion

of re

sults

bas

ed o

n th

resh

olds

3. M

inim

um ti

me

limits

for s

ubm

issi

on o

f ten

ders

con

sist

ent w

ith

met

hods

of

proc

urem

ent

4. J

ustif

icat

ions

and

con

trols

for n

egot

iatio

n/di

rect

con

tract

ring

2. A

ll ar

eas

of p

rocu

rem

nt in

clud

ed

3. U

se o

f pub

lic fu

nds

rega

rdle

ss o

f val

ue

3. D

efin

ed b

asis

for u

se o

f oth

er p

rocu

rem

ent m

etho

d

1. P

refe

renc

e fo

r ope

n an

d co

mpe

titiv

e bi

ddin

gBa

selin

e (b

) Pro

cure

men

t Met

hods

Rat

ing

Pilla

r I -

The

Legi

slat

ive

and

Reg

ulat

ory

Fram

ewor

k W

eigh

ts

1. S

cope

and

cov

erag

e

Base

line

(a) S

cope

of a

pplic

atio

n an

d co

vera

ge o

f the

legi

slat

ive

and

regu

lato

ry fr

amew

ork

2. L

imite

d an

d co

ntro

lled

use

of p

rice

pref

eren

tial c

laus

es

4. C

onsi

sten

t and

acc

essi

ble

to a

ll

2. C

lear

met

hodo

logy

for e

valu

atio

n ba

sed

on d

iscl

osed

fact

ors

Base

line

(g) S

ubm

issi

on, r

ecei

pt a

nd o

peni

ng o

f ten

ders

1. P

ublic

ope

ning

in a

def

ined

man

ner

2. C

lear

requ

irem

ent t

o m

aint

ain

reco

rds

for r

evie

w/a

udit

3. R

equi

rem

ent f

or s

ecur

ity a

nd c

onfid

entia

lity

of te

nder

s

1. C

ompl

aint

and

rem

edy

proc

edur

es in

clud

ed a

nd p

rovi

des

for f

air,

inde

pend

ent a

nd ti

mel

y im

plem

enta

tion

Base

line

(c) A

dver

tisin

g ru

les

and

time

limits

Base

line

(h) C

ompl

aint

revi

ew p

roce

dure

s

Base

line

(f) T

ende

r eva

luat

ion

and

awar

d cr

iteria

4. E

qual

trea

tmen

t for

gov

ernm

ent o

wne

d en

terp

rises

in c

ompe

titiv

e pr

ocur

emen

t

2. N

eutra

l tec

hnic

al s

peci

ficat

ions

with

refe

renc

e to

inte

rnat

iona

l st

anda

rds

whe

re p

ossi

ble

1. M

inim

um c

onte

nt o

f ten

der d

ocum

enta

tion

spec

ified

3. D

efin

ed d

ebar

men

t pro

cess

w/ d

ue p

roce

ss a

nd a

ppea

l

1. F

air,

pred

icta

ble

and

defin

ed ru

les

base

d on

qua

lific

atio

ns

Base

line

(e) T

ende

r doc

umen

tatio

n an

d te

chni

cal s

peci

ficat

ions

1. O

bjec

tive,

fair,

and

pre

-dis

clos

ed c

riter

ia fo

r eva

luat

ion/

awar

d

Indi

cato

r 1 –

Pub

lic p

rocu

rem

ent l

egis

lativ

e an

d re

gula

tory

fram

ewor

k ac

hiev

es th

e ag

reed

sta

ndar

ds a

nd c

ompl

ies

with

app

licab

le o

blig

atio

ns

Lege

nd:

NA

- No

Base

line

elem

ents

sub

stan

tially

met

PA -

Less

than

50%

of B

asel

ine

elem

ents

sub

stan

tially

met

SA -

Mor

e th

an 5

0% o

f Bas

elin

e el

emen

ts s

ubst

antia

lly m

etFA

- Al

l Bas

elin

e el

emen

ts a

re s

ubst

antia

lly m

et

Page 65: 2nd UPDATE - World Bank

Indi

cato

r 2 -

Exi

sten

ce o

f Im

plem

entin

g R

egul

atio

ns a

nd D

ocum

enta

tion

10.0

%8.

00%

80.0

%FA

0.20

00.

100

1.00

%

0.20

00.

200

2.00

%

0.10

00.

100

1.00

%

0.10

00.

100

1.00

%

0.20

00.

100

1.00

%

0.20

00.

200

2.00

%

Bas

elin

e (b

) – T

he e

xist

ence

and

ava

ilabi

lity

of m

odel

tend

er d

ocum

ents

fo

r goo

ds, w

orks

and

ser

vice

s

Bas

elin

e (c

) – T

he e

xist

ence

and

ava

ilabi

lity

of p

roce

dure

s fo

r pre

-qu

alifi

catio

n

Bas

elin

e (d

) – T

he e

xist

ence

and

ava

ilabi

lity

of p

roce

dure

s su

itabl

e fo

r co

ntra

ctin

g fo

r ser

vice

s or

oth

er re

quire

men

ts w

here

tech

nica

l cap

acity

is a

ke

y cr

iteria

Bas

elin

e (e

) – T

he e

xist

ence

and

ava

ilabi

lity

of u

ser’s

gui

de o

r man

ual f

or

cont

ract

ing

entit

ies

Bas

elin

e (a

) – T

he e

xist

ence

and

ava

ilabi

lity

of im

plem

entin

g re

gula

tion

that

pro

vide

s de

fined

pro

cess

es a

nd p

roce

dure

s no

t inc

lude

d in

hig

her

leve

l leg

isla

tion

Bas

elin

e (f)

– T

he e

xist

ence

and

ava

ilabi

lity

of G

ener

al C

ondi

tions

of

Con

tract

s fo

r pub

lic s

ecto

r con

tract

s co

verin

g go

ods,

wor

ks a

nd s

ervi

ces

cons

iste

nt w

ith n

atio

nal r

equi

rem

ents

and

inte

rnat

iona

l req

uire

men

ts w

hen

appl

icab

le

Page 66: 2nd UPDATE - World Bank

25.0

0%17

.90%

71.6

0%SA

9.00

%8.

10%

90.0

%S

A0.

300

0.30

02.

70%

0.10

00.

100

0.90

%

0.20

00.

200

1.80

%

0.20

00.

200

1.80

%

0.20

00.

100

0.90

%

8.00

%8.

00%

100.

00%

FA0.

300

0.30

02.

40%

0.20

00.

200

1.60

%

0.30

00.

300

2.40

%

0.20

00.

200

1.60

%

8.00

%1.

80%

22.5

%P

A0.

150

0.07

50.

60%

0.30

00.

150

1.20

%

0.25

00.

000

0.00

%

0.30

00.

000

0.00

%

Bas

elin

e (a

) – P

rocu

rem

ent p

lann

ing

and

data

on

cost

ing

is p

art o

f the

bu

dget

form

ulat

ion

proc

ess

and

cont

ribut

es to

mul

ti-ye

ar p

lann

ing

Bas

elin

e (c

) – O

rgan

izat

ion

and

staf

fing

of th

e B

ody

and

the

leve

l of

inde

pend

ence

and

aut

horit

y (fo

rmal

pow

er) o

f the

bod

y to

exe

rcis

e its

du

ties

is s

uffic

ient

and

con

sist

ent w

ith th

e re

spon

sibi

litie

s

Bas

elin

e (d

) – R

espo

nsib

ilitie

s of

the

Bod

y pr

ovid

e fo

r sep

arat

ion

and

clar

ity s

o as

to a

void

con

flict

of i

nter

est

Indi

cato

r 5 –

Exi

sten

ce o

f Ins

titut

iona

l Dev

elop

men

t Cap

acity

B

asel

ine

(a) –

A s

yste

m e

xist

s fo

r col

lect

ion

and

diss

emin

atio

n of

pr

ocur

emen

t inf

orm

atio

n, in

clud

ing

tend

er in

vita

tions

, req

uest

for p

ropo

sals

an

d co

ntra

ct a

war

d in

form

atio

n

Bas

elin

e (b

) – A

sus

tain

able

stra

tegy

exi

sts

to p

rovi

de tr

aini

ng a

dvic

e an

d as

sist

ance

to d

evel

op th

e ca

paci

ty o

f gov

ernm

ent a

nd p

rivat

e se

ctor

pa

rtici

pant

s to

und

erst

and

the

rule

s an

d re

gula

tions

and

how

they

sho

uld

be im

plem

ente

d

Bas

elin

e (d

) – C

ontra

ct e

xecu

tion

is s

ubje

ct to

bud

geta

ry c

ontro

ls to

en

sure

suf

ficie

nt fu

ndin

g fo

r con

tract

Bas

elin

e (e

) – B

udge

ting

syst

em p

rovi

des

for t

imel

y re

leas

e of

fund

s to

m

ake

paym

ents

aga

inst

con

tract

ual o

blig

atio

ns

Indi

cato

r 4 –

Fun

ctio

nal N

orm

ativ

e B

ody

(the

Bod

y) a

t the

Cen

tre

Bas

elin

e (c

) – S

yste

ms

and

proc

edur

es e

xist

for c

olle

ctio

n an

d m

onito

ring

of n

atio

nal p

rocu

rem

ent s

tatis

tics

Pilla

r II -

Cen

tral

Inst

itutio

nal F

ram

ewor

k an

d C

apac

ity

Bas

elin

e (b

) – B

udge

t Law

sup

ports

tim

ely

proc

urem

ent,

cont

ract

ex

ecut

ion

and

paym

ent

Bas

elin

e (c

) – N

o in

itiat

ion

of p

rocu

rem

ent a

ctio

ns w

ithou

t exi

stin

g bu

dget

ap

prop

riatio

ns

Indi

cato

r 3 –

Mai

nstre

amin

g P

roce

dure

s in

to P

ublic

Fin

anci

al M

anag

emen

t

Bas

elin

e (d

) – Q

ualit

y co

ntro

l sta

ndar

ds a

re d

isse

min

ated

and

use

d to

ev

alua

te p

erfo

rman

ce o

f sta

ff an

d ad

dres

s ca

paci

ty d

evel

opm

ent i

ssue

s

Bas

elin

e (a

) – T

he s

tatu

s an

d ba

sis

for t

he fu

nctio

nal n

orm

ativ

e bo

dy a

t th

e ce

ntre

is c

over

ed in

the

legi

slat

ive

and

regu

lato

ry fr

amew

ork

Bas

elin

e (b

) – T

he re

spon

sibi

litie

s of

the

Bod

y ad

dres

s a

defin

ed s

et o

f fu

nctio

ns w

hich

incl

ude,

but

are

not

lim

ited

to: t

he p

rovi

sion

s of

adv

ise

to

cont

ract

ing

entit

ies;

dra

fting

am

endm

ents

to th

e le

gisl

ativ

e an

d re

gula

tory

fra

mew

ork

and

impl

emen

ting

regu

latio

ns; p

rovi

ding

mon

itorin

g of

pub

lic

proc

urem

ent;

prov

idin

g pr

ocur

emen

t inf

orm

atio

n; re

porti

ng o

n pr

ocur

emen

t to

oth

er p

arts

of g

over

nmen

t; de

velo

ping

and

sup

porti

ng im

plem

enta

tion

of

initi

ativ

es fo

r im

prov

emen

ts o

f the

dev

elop

men

t of i

mpl

emen

ting

staf

f

Page 67: 2nd UPDATE - World Bank

25.0

0%12

.50%

50.0

0%PA

10%

2.50

%25

.00%

PA

0.25

00.

000

0.00

%

0.25

00.

000

0.00

%

0.25

00.

125

1.25

%

0.25

00.

125

1.25

%

10.0

0%5.

00%

50.0

0%P

A0.

300

0.30

03.

00%

0.20

00.

200

2.00

%

0.20

00.

000

0.00

%

0.30

00.

000

0.00

%

5.00

%5.

00%

100.

00%

FA0.

500

0.50

02.

50%

0.25

00.

250

1.25

%

0.25

00.

250

1.25

%

Bas

elin

e (d

) – A

t the

con

tract

ing

entit

y le

vel,

the

exis

tenc

e an

d im

plem

enta

tion

of in

tern

al c

ontro

l mec

hani

sms

for t

he u

nder

taki

ng o

f pr

ocur

emen

t ope

ratio

ns a

t the

con

tract

ing

leve

l, in

clud

ing

a co

de o

f co

nduc

t, se

para

tion

of re

spon

sibi

litie

s as

a c

heck

/bal

ance

mec

hani

sm a

nd

over

sigh

t/con

trol o

f sig

natu

re/a

ppro

val a

utho

rity

Bas

elin

e (a

) – A

t the

con

tract

ing

entit

y le

vel,

the

leve

l of p

rocu

rem

ent

com

pete

nce

amon

g go

vern

men

t offi

cial

s w

ithin

the

entit

y is

con

sist

ent w

ith

thei

r pro

cure

men

t res

pons

ibili

ties

Pilla

r III

- Pr

ocur

emen

t Ope

ratio

ns a

nd P

ublic

Pro

cure

men

t Mar

ket P

erfo

rman

ce

Indi

cato

r 6 –

Effi

cien

t Pro

cure

men

t Ope

ratio

ns a

nd P

ract

ice

Indi

cato

r 8 –

Exi

sten

ce o

f Con

tract

Adm

inis

tratio

n an

d D

ispu

te R

esol

utio

n P

rovi

sion

s

Bas

elin

e (c

) – P

roce

dure

s ex

ist t

o en

forc

e th

e ou

tcom

e of

the

disp

ute

reso

lutio

n pr

oces

s

Indi

cato

r 7 –

Fun

ctio

nalit

y of

the

Pub

lic P

rocu

rem

ent M

arke

t

Bas

elin

e (b

) – T

he q

ualit

y an

d co

nsis

tenc

y of

sub

mis

sion

s by

the

priv

ate

sect

or to

the

gove

rnm

ent e

nabl

es th

e ap

plic

atio

n of

the

proc

ess

lead

ing

to

the

awar

d an

d co

mpl

etio

n of

con

tract

s

Bas

elin

e (d

) – T

he p

rivat

e se

ctor

con

fiden

ce in

the

lega

l and

regu

lato

ry

fram

ewor

k go

vern

ing

the

proc

urem

ent p

roce

ss is

evi

denc

ed b

y th

eir u

se o

f co

mpl

aint

s or

pro

test

s m

echa

nism

s

Bas

elin

e (a

) – P

roce

dure

s ar

e de

fined

for u

nder

taki

ng c

ontra

ct

adm

inis

tratio

n re

spon

sibi

litie

s to

incl

ude

insp

ectio

n an

d ac

cept

ance

pr

oced

ures

, qua

lity

cont

rol p

roce

dure

s an

d m

etho

ds to

revi

ew a

nd is

sue

cont

ract

am

endm

ents

in a

tim

ely

man

ner

Bas

elin

e (c

) – T

he p

artic

ipat

ion

rate

of t

ende

rers

in re

spon

se to

co

mpe

titiv

e te

nder

invi

tatio

ns is

con

sist

ent w

ith th

e ca

paci

ty o

f the

m

arke

tpla

ce

Bas

elin

e (b

) – A

t the

con

tract

ing

entit

y le

vel,

the

proc

urem

ent t

rain

ing

and

info

rmat

ion

prog

ram

mes

impl

emen

ted

for g

over

nmen

t offi

cial

s, a

s w

ell a

s fo

r priv

ate

sect

or p

artic

ipan

ts is

con

sist

ent w

ith d

eman

d

Bas

elin

e (a

) – T

he p

ublic

pro

cure

men

t mar

ket i

n th

e co

untry

has

suf

ficie

nt

num

bers

of p

rodu

cers

/sup

plie

rs to

pro

vide

for c

ompe

titio

n an

d co

mpa

rativ

e pr

icin

g fo

r goo

ds, w

orks

and

ser

vice

s w

hen

com

pare

d to

pr

ices

pai

d fo

r sim

ilar r

equi

rem

ents

in lo

cal,

regi

onal

or i

nter

natio

nal

mar

kets

as

appl

icab

le

Bas

elin

e (c

) – A

t the

con

tract

ing

entit

y le

vel,

the

exis

tenc

e of

ad

min

istra

tive

syst

ems

for p

ublic

pro

cure

men

t ope

ratio

ns, a

nd in

form

atio

n da

taba

ses

to s

uppo

rt m

onito

ring

of p

erfo

rman

ce a

nd re

porti

ng to

and

re

spon

ding

to th

e ne

eds

of o

ther

rela

ted

gove

rnm

ent s

yste

ms

Bas

elin

e (b

) – D

ispu

te re

solu

tion

proc

edur

es a

re in

clud

ed in

the

cont

ract

do

cum

ent p

rovi

ding

for a

n ef

ficie

nt a

nd fa

ir pr

oces

s to

reso

lve

disp

utes

ar

isin

g du

ring

the

perfo

rman

ce o

f the

con

tract

Page 68: 2nd UPDATE - World Bank

25.0

0%15

.05%

60.2

0%SA

8.00

%2.

80%

35.0

0%P

A0.

250

0.12

51.

00%

0.20

00.

000

0.00

%

0.20

00.

000

0.00

%

0.10

00.

100

0.80

%

0.25

00.

125

1.00

%

5.00

%3.

25%

65.0

0%S

A0.

250

0.25

01.

25%

0.15

00.

150

0.75

%

0.25

00.

250

1.25

%

0.10

00.

000

0.00

%

0.15

00.

000

0.00

%0.

100

0.00

00.

00%

Indi

cato

r 10

– E

ffici

ency

of A

ppea

ls M

echa

nism

Bas

elin

e (d

) – T

he s

yste

m o

pera

tes

in a

fair

man

ner,

with

out

com

es o

f de

cisi

ons

bala

nced

and

just

ified

on

the

basi

s of

ava

ilabl

e in

form

atio

n

Bas

elin

e (e

) – D

ecis

ions

are

pub

lishe

d an

d m

ade

avai

labl

e to

the

publ

ic

Bas

elin

e (f)

– A

dmin

istra

tive

revi

ew b

ody

is s

epar

ate

from

the

regu

lato

ry

body

Bas

elin

e (b

) – D

ecis

ions

are

del

iber

ated

on

the

basi

s of

ava

ilabl

e in

form

atio

n an

d th

e fin

al d

ecis

ion

can

be re

view

ed a

nd ru

led

upon

by

a bo

dy w

ith ju

dici

al c

apac

ity u

nder

the

law

Indi

cato

r 9 –

Effe

ctiv

e C

ontro

l and

Aud

it Sy

stem

Bas

elin

e (a

) – T

he e

xist

ence

and

ope

ratio

n of

a c

ompl

aint

revi

ew s

yste

m

that

giv

es p

artic

ipan

ts in

the

publ

ic p

rocu

rem

ent p

roce

ss a

righ

t to

file

a co

mpl

aint

with

in th

e fra

mew

ork

of a

n ad

min

istra

tive

and

judi

cial

revi

ew

proc

edur

e

Bas

elin

e (c

) – T

he in

tern

al c

ontro

l sys

tem

pro

vide

s tim

ely

info

rmat

ion

on

com

plia

nce

to e

nabl

e m

anag

emen

t act

ion

Bas

elin

e (a

) – A

lega

l fra

mew

ork,

org

aniz

atio

n, p

olic

y an

d pr

oced

ures

for

inte

rnal

and

ext

erna

l con

trol a

nd a

udit

of p

ublic

pro

cure

men

t ope

ratio

ns

exis

ts a

nd o

pera

tes

to p

rovi

de a

func

tioni

ng c

ontro

l fra

mew

ork

Bas

elin

e (d

) – T

he in

tern

al c

ontro

l sys

tem

s ar

e su

ffici

ently

def

ined

to

enab

le p

erfo

rman

ce a

udits

to b

e co

nduc

ted

Bas

elin

e (e

) – A

udito

rs a

re s

uffic

ient

ly in

form

ed a

bout

pro

cure

men

t re

quire

men

ts a

nd c

ontro

ls s

yste

ms

to c

ondu

ct q

ualit

y au

dits

that

co

ntrib

ute

to c

ompl

ianc

e

Bas

elin

e (b

) – E

nfor

cem

ent a

nd fo

llow

-up

on fi

ndin

gs a

nd

reco

mm

enda

tions

of t

he c

ontro

l fra

mew

ork

prov

ide

an e

nviro

nmen

t tha

t fo

ster

s co

mpl

ianc

e

Bas

elin

e (c

) – T

he c

ompl

aint

revi

ew s

yste

m h

as th

e ca

paci

ty to

han

dle

lodg

ed c

ompl

aint

s ef

ficie

ntly

and

a m

eans

to e

nfor

ce th

e re

med

y im

pose

d

Pilla

r IV

- The

Inte

grity

and

Tra

nspa

renc

y of

the

Publ

ic P

rocu

rem

ent S

yste

m

Page 69: 2nd UPDATE - World Bank

4.00

%2.

00%

50.0

%P

A0.

500

0.25

01.

00%

0.25

00.

125

0.50

%

0.25

00.

125

0.50

%8.

00%

7.00

%87

.50%

FA0.

500

0.50

04.

00%

0.25

00.

125

1.00

%

0.25

00.

250

2.00

%

Gra

nd T

otal

100.

00%

67.8

9%

Bas

elin

e (c

) – S

take

hold

ers

(priv

ate

sect

or a

nd c

ivil

soci

ety)

sup

port

the

crea

tion

of a

pro

cure

men

t mar

ket k

now

n fo

r its

inte

grity

and

eth

ical

be

havi

our

Bas

elin

e (c

) – R

ecor

ds a

re m

aint

aine

d to

val

idat

e da

ta

Indi

cato

r 12

– E

thic

s an

d A

nti-c

orru

ptio

n M

easu

res

Bas

elin

e (a

) – T

he le

gal a

nd re

gula

tory

fram

ewor

k fo

r pro

cure

men

t, in

clud

ing

tend

er a

nd c

ontra

ct d

ocum

ents

, inc

lude

s pr

ovis

ions

add

ress

ing

the

issu

es o

f cor

rupt

ion,

frau

d, c

onfli

ct o

f int

eres

t and

une

thic

al b

ehav

iour

an

d st

ates

act

ions

whi

ch c

an b

e ta

ken

with

rega

rd to

suc

h be

havi

our

(eith

er d

irect

ly o

r by

refe

renc

e to

oth

er la

ws)

Bas

elin

e (b

) – S

peci

al m

easu

res

by th

e go

vern

men

t to

prev

ent a

nd d

etec

t po

tent

ial f

raud

and

cor

rupt

ion

in p

ublic

pro

cure

men

t is

addr

esse

d in

an

anti -

corr

uptio

n pr

ogra

mm

e

Indi

cato

r 11

– D

egre

e of

Acc

ess

to In

form

atio

n

SA

Bas

elin

e (b

) – S

yste

ms

exis

t to

colle

ct k

ey d

ata

rela

ted

to p

erfo

rman

ce o

f th

e pr

ocur

emen

t sys

tem

and

to re

port

regu

larly

Bas

elin

e (a

) – A

cces

s to

info

rmat

ion

is s

uppo

rted

by p

ublic

atio

n an

d di

strib

utio

n of

info

rmat

ion

thro

ugh

avai

labl

e m

edia

with

sup

port

from

in

form

atio

n te

chno

logy

whe

n fe

asib

le

Page 70: 2nd UPDATE - World Bank

BIS Charts

9 6 .2 4 % 8 0 .0 0 % 9 0 .0 %10 0 .0 0 %

2 2 .5 0 % 2 5 .0 0 %

5 0 .0 0 %

10 0 .0 0 %

3 5 .0 0 %

6 5 .0 0 %

5 0 .0 0 %

8 7 .5 0 %

0 .0 0 %

2 0 .0 0 %

4 0 .0 0 %

6 0 .0 0 %

8 0 .0 0 %

10 0 .0 0 %

Philippines Level of Achievement: BIS Indicators

22.44%

17.90%

12.50%15.05%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

Pillar I (FA) Pillar II (SA) Pillar III (PA) Pillar IV (SA)

Philippines Level of Achievement: BIS Pillars

Page 71: 2nd UPDATE - World Bank

0

2

4

6

8

10

12

14

16

Indicators

Philippines Level of Achievement: BIS Indicators

Rating 14.44 8 8.1 8 1.8 2.5 5 5 2.8 3.25 2 7

Weight 15 10 9 8 8 10 10 5 8 5 4 8

1 2 3 4 5 6 7 8 9 10 11 12

Page 72: 2nd UPDATE - World Bank
Page 73: 2nd UPDATE - World Bank

Appendix 9 - Consolidated Agreed Actions

Indicator

Existence ofinstitutionaldevelopmentcapacity

Specific Weakness

1. Contract award information notavailable and accessible in the existingsystem.

2. Sustainable strategy is not yetdeveloped to provide training adviceand assistance to develop the capacityof government and private sectorparticipants to understand the rules andregulations and how they should beimplemented.

3. Lack of systems and procedures forcollection and monitoring of nationalprocurement statistics in addition to theabsence of a similar system to collectprocurement related data to monitorperformance of agencies.

4. Lack of quality control standards toevaluate performance of staff andaddress capacity development issues.

Current Activities/Actionsto be Undertaken

Issuance of guidelinesreminding all heads ofprocurement entities andBACs to post in G-EPSawards of contract. TSOwill monitor compliance.

a) On-going;implementation of nationaltraining the trainorsprogram for agencies andLGUs.b) On going; medium termapproach to capacitybuilding is to accredit StateUniversities and Colleges,including the NationalDefense College;c) On going; is thedevelopment of long termplan to professionalizeprocurement as a career forpractitioners?d) Not started yet; is privatesector training to beincluded in the trainingprogram.

To be done –a) Develop actualperformance indicators andimplement a system fordata collection andinformation analysis fromcontracting entities up toGPPB;b) Replicate appropriate BISto assess national agenciesand LGUs, as managementtool.

To be done – include settingup of quality controlstandards to evaluate staffperformance and addresscapacity developmentissues in theprofessionalization programmentioned in No. 2(c).

Responsible Agencies,Funding and Timetable

GPPB -TSO

GPPB, SUCs, Group ofCSOs

GPPB

GPPB-TSO

GPPB

Matrix of Weaknesses and Targeted Activities (as of November 2004)

Page 74: 2nd UPDATE - World Bank

Indicator

Efficientprocurementoperation andpractice

Specific Weakness

5. At the contracting entity level, thelevel of procurement competenceamong government officials within theentity is not yet consistent with theirprocurement responsibilities.

6. At the contracting entity level, theprocurement training and informationprograms implemented for governmentofficials, as well as for private sectorparticipants is not yet consistent withdemand.

7. While administrative systems existat the contracting entity level, they donot adequately support monitoringprocurement performance in mostagencies.

Current Activities/Actionsto be Undertaken

a) Link to No. 2.b) To be done – conduct oftraining program to improveof skills in estimating pricesand analyzing bidvariances.c) To be done as follow-upto Value Engineering (VE)Briefings which are: (i) toenhance capacity for valueengineering focusing moreon upstream reviews; (ii)issuance of guidelines toagencies for the use ofvalue engineering.

a) On-going; should belinked to No. 2. Expansionof the training should bedone to meet demands.b) To be done – the trainingprogram should include theprivate sector and the civilsociety observers.

a) Link to No. 3.b) On-going; developmentof G-EPS will provide online information oncommonly used suppliesprocurement such as prices,contracts performance, etc.c) To be done – collection oftechnical specifications onnon-commonly usedsupplies such drugs, etc.,catalogue and disseminateon line.d) To be done – stand alonestudy on comparison of bidprices for commonprocurement items, such asclassrooms, medicalsupplies, water supply andbooks procured by selectedagencies.e) On-going;implementation of E-Procurement as atransactional tool.

Responsible Agencies,Funding and Timetable

GPPB

GPPB

a) GPPBb) GPPB, PS (September2005)

c) GPPB, PS (funding byEU)

d) GPPB, COA, G-Watch, byJune 2005, funding by WB-IDF.

e) GPPB, PS by September2005 with possible fundingfrom ADB.f) GPPB, BSP, IC, DOF andWB.

Matrix of Weaknesses and Targeted Activities (as of November 2004)

Page 75: 2nd UPDATE - World Bank

Indicator

Functionality ofthe PublicProcurementMarket

Specific Weakness

8. Inadequate internal controlmechanisms for undertakingprocurement operations at thecontracting level.

9. The participation rate of tenderers inresponse to competitive tenderinvitations is not consistent with thecapacity of the marketplace. Thereason is that political interventionsdistort competition and participationrate. A number of private sectorcompanies are not participating.

Current Activities/Actionsto be Undertaken

f) To be done as follow-upto recommendations in theSecurity Report: (i) discussprocurement securityrelevance with BSP andInsurance Commission, and(ii) issue guidelines onselective reputable suretycompanies.

a) To be done –implementation ofProcurement Manual in allagencies and harmonizationwith donors.b) To be done – (i)strengthen the internalcontrol mechanism atagency level by: enforcingthe law that mandatescreation of internal auditunits; (ii) prepare internalaudit manual onprocurement; and (iii)implementation of a trainingprogram for internalauditors.

a) To be done – ntensiveinformation disseminationand familiarization on thenew law to the privatesector and civil society tobring trust and confidencein the new system.b) To be done – support toprivate sector initiatives ontrainings on the newsystem.c) To be done – includeprivate learning institutionsin accreditation ofprocurement traininginstitutes to cater to privatedemand.d) To be done – issuanceof a policy thatadvertisements shouldinclude key evaluationcriteria.

Responsible Agencies,Funding and Timetable

f) GPPB, BSP, IC, DOF andWB.

a) GPPBProcurement Manual to beissued in January 2005; Pilottesting in 6 agencies;

b) January 2005 (Prepare forpossible IDF funding).

GPPB

Matrix of Weaknesses and Targeted Activities (as of November 2004)

Page 76: 2nd UPDATE - World Bank

Indicator

Effective controland AuditSystem

Degree ofaccess toinformation

Specific Weakness

10. Lack of enforcement and follow-upon findings and recommendations fromthe control framework.

11. The internal control system ofagencies does not provide timelyinformation on compliance to enablemanagement action.

12. While the law requires publicationin the G-EPS, websites andnewspapers, the full access toinformation by the civil society is notyet fully institutionalized.

13. Some agencies and LGUs are notmaintaining records to validate data.

Current Activities/Actionsto be Undertaken

a) On-going; implement theGuidelines for Suspensionand Blacklisting of Bidders,Suppliers and Constructors.b) To be done – strengthenthe role of Presidential Anti-Graft Commission inensuring that procurementaudit is institutionalizedthrough the internal auditunits of each agency.Training on fraudexamination and audit.c) To be done – (i) COAshould include as part of itsAnnual Report anassessment of adequacy ofinternal control mechanismin weak agencies; and, (ii)training of investigators onfraud examination andaudit.d) To be done – provideactive assistance toOmbudsman for successfulprosecution of procurementcases.

To be done – agenciesshould institute adequateinternal control mechanismto ensure that timelyinformation are provided toagency management. Linkto No. 10.

a) On going. Support toPWI in improving trainingdesign and delivery for BACcivil society observers(CSOs).b) To be done – informationsupport system for trainedBAC CSOs.

To be done – issuance ofguidelines for proper recordmanagement for nationalagencies and LGUs.Prepare the TOR and hireconsultant.

Responsible Agencies,Funding and Timetable

a) GPPB

b) PAGC, COA

c) COA, OMB

d) PAGC

PAGC, COA

a) GPPB

b) OMB, COA

GPPB

Matrix of Weaknesses and Targeted Activities (as of November 2004)

Page 77: 2nd UPDATE - World Bank

Appendix 10 - Annex to the Procurement Schedule of Loan Agreement

1. Eligibility screening shall not be applied. However, bids that do not contain any of the followingdocuments will not pass the documentary compliance check: (a) evidence of the required financial,technical or production capability; (b) audited financial statements; (c) credit line, or cash depositcertificate; (d) bid security; and (e) authority of the bid signatory.

2. In the case of prequalification, if any bidder is denied access to the bidding process for reasonsunrelated to its financial and technical qualifications to perform the contract, prior concurrence ofthe Bank shall be sought.

3. A ceiling maybe applied to bid prices, with prior concurrence of the Bank in advance of bidding.However, the Approved Budget Estimate maybe disclosed in the advertisement or in the biddingdocuments.

4. Domestic or regional preferences will not be applied in the evaluation of bids, and other preferencesin effect in the Philippines will not be used except with the prior concurrence of the Bank.

5. Suppliers and contractors will not be required to purchase only local goods or supplies or materials.

6. In case of contracts for prior review, modifications exceeding 15% of contract amount and materialchanges in the conditions during implementation require prior Bank concurrence.

7. Foreign suppliers and contractors shall be allowed to participate, if interested, without first beingrequired to associate with, or enter into joint venture with, local firms. Moreover, foreign biddersshall be allowed to bid, even without registration, licensing, and other government authorizations,leaving these requirements for after award and before signing of contract.

8. For works contract, the experience qualification requirement shall be: (a) at least one previouscontract at 80% of the estimated cost of the contract being procured; and (b) an annual turnoverfrom all works averaged over the last three years equal to 100% of the estimated cost of the contractbeing procured.

Page 78: 2nd UPDATE - World Bank
Page 79: 2nd UPDATE - World Bank

79COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

Overview

Following the completion of the Country ProcurementAssessment Report in June 2002, which was publishedin March 2003, there has been a great deal of progressin pushing procurement reform in the Philippines. ThisCPAR Update was undertaken in November-December2003 to take stock of achievements so far, and to reviewthe priorities for further action in procurement reform.

Discussions were held between the World Bank andthe Government in November 2003 to review the statusof actions identified in the first CPAR which wererecommended and taken, and to discussrecommendations for future actions to carry forwardthe reform process. The Japan Bank for InternationalCooperation (JBIC) and the Asian Development Bank(ADB) also joined key meetings. The Bank MissionTeam met with other key stakeholders such as theCouncil of Engineering Consultants of the Philippines,the Philippine Contractors Association, ProcurementWatch, Incorporated and the Philippine Center forInvestigative Journalism. The list of participants to theMission and persons met by the Mission Team ispresented in Appendix 1 (see the CPAR Update). In awrap-up meeting held on December 11, 2003, the keyfindings and recommendations were discussed with theGovernment Procurement Policy Board (GPPB)chaired by Secretary Boncodin.

Big Progress in Procurement Reform

Laudable achievements have been made in theGovernment’s agenda for procurement reform in thepast year, as follows:

Passage and promulgation of the Government Pro-curement Reform Act (GPRA) on January 10, 2003(Republic Act No. 9184). The Law consolidates

the more than sixty laws pertaining to public pro-curement and institutionalizes transparency mea-sures including the use of electronic procurementand the participation of Civil Society Organiza-tions. The Law covers all national agencies, gov-ernment owned and controlled corporations, allgovernment entities and instrumentalities.The inclusion of all Local Government Units inthe coverage of the Government ProcurementReform Act.The issuance of Implementing Rules and Regula-tions (IRRs) for the Law on October 8, 2003.The creation of the Government ProcurementPolicy Board vested with sole authority to overseeprocurement reform and protect the national inter-est in all matters affecting public procurement. ATechnical Support Office was created by the Imple-menting Rules and Regulations to undertake theday-to-day operations of the GPPB in the perfor-mance of its duties and responsibilities in policymaking, monitoring compliance, and training andadvocacy.Mandatory use of the Government Electronic Pro-curement System (G-EPS) for the procurement ofcommon supplies and to promote transparency andefficiency through the establishment of a centralgovernment procurement web site to be the primarysource of information on all government procure-ment transactions. Initially, this has involved theposting of bid invitations and awards in the pro-curement web site.The monitoring and enforcement of procurementrules as well as ensuring efficiency and effective-ness for each step of the procurement processthrough procurement audit.The provision of penal sanctions against violatorsof the Law, and its rules and regulations.The development of a procurement manual and

Appendix 11 - CPAR Update February 2004 (without Appendices)

Page 80: 2nd UPDATE - World Bank

80COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

Review of the June 2002 CPARAgenda

The CPAR was a comprehensive document that coveredthe entire public procurement system of the countryplus an in-depth study of three sectors: Public Works,Education and Health. It contained fiftyrecommendations and agreed actions. Responsiblegovernment agencies reported on the status ofcompletion of each agreed action. These agreed actionswere classified into (a) national and local governments,and (b) the three sectors. The detailed statusarepresented in Appendix 2 (see the CPAR Update).Most of the recommendations have either beencompleted (58%) or are on-going (26%). The data inTable 1 provides an overview.

Some activities that are still to be completed relateto:

Professionalization of the procurement function;Corporatization of procurement services;Study on securities and bank guarantee;Streamline and reducing delay in registration andlicensing procedures;Establishment of record keeping systems at theLGU level; andEligibility of textbooks with foreign authors(Science, Math and English).

Emerging Issues/Priorities

Several new issues emerged which were not includedin the June 2002 CPAR. These arose from ongoingdiscussions with government, and issues that arose fromthe completed activities. For example:

Some key priorities identified by Governmentinclude the apparent high cost of some works andgoods procured by Government and the eligibilityof Philippine firms to compete for internationallyfinanced contracts;It was also noted that government has madeconsiderable progress in electronic procurementsystems and further development now needs to bepursued; and,With the passage of the new Law, issuance of theImplementing Rules and Regulations andcompletion of harmonized bid documents, a majorchallenge is to disseminate the new rules andprocedures, and provide training at all levelsincluding local government units, the private sectorand in civil society.

The focus of the CPAR Update therefore is on newactivities to achieve these objectives. Discussions wereheld on how to implement funding requirements and toexplore possible opportunities for partnerships withinternational organizations. There was a strong senseof commitment among the various organizations towork together to follow-up on the strong momentumfor procurement reform–to achieve better governanceand better value for money for public spending in thePhilippines. Some of these partnerships are reflectedin the joint responsibilities shown in the matrix inAppendix 3. Important priorities that were identifiedare:

Disseminate information on Government Procure-ment Reform Act/Implementing Rules and Regu

National/Local Levels 15 7 5 27Sectoral Levels 14 5 4 23

29 12 9 50

Completed On-Going Open TOTAL

Table 1: Status of Recommendations in the March2003 CPAR

standard bidding documents and forms (harmo-nized with thosse of the major international financ-ing institutions: World Bank, ADB and JBIC) tofacilitate compliance with the new law.

Page 81: 2nd UPDATE - World Bank

81COUNTRY PROCUREMENT ASSESSMENT REPORT 2ND UPDATE

lations to all stakeholders including local govern-ments, the private sector and civil society;Implement E-Procurement as a transactional tool;Preparation of a report on capacity, quality and sizeof contracts for works;Training on harmonized bidding documents at alllevels including national agencies, local govern-ments, the private sector and civil society;Introduce a system of value engineering analysison a pilot basis to check that designs and cost esti-mates ensure best value for money;Pilot “design and build” procurement schemes inat least one contract; andCapacity Building of Civil Society Organizations(CSOs).

Discussions with the PrivateSector

The discussions with the Philippines ContractorsAssociation and the Council of Engineering Consultantsof Philippines (CECOPHIL) indicated some positiveelements in the introduction of the GPRA and IRRs.The discussions disclosed some serious concernsrelating to:

Qualification criteria for short listing of consult-ants and contractors, especially under contractsfunded by International Financing Institutions;Transparency of the pre-qualification/eligibility andevaluation processes;Lack of interest of contractors to participate in pro-vincial procurement as a result of provincial pref-erence provisions;Capacity building of Civil Society Organizationswith extended participation as observers in the Bidsand Awards Committees;Adjustment of prices of contracts with long comple-tion periods;

No clear mechanism in submitting a legitimate pro-test; andHiring only of international firms as coordinatingconsultants.

These are legitimate concerns, which need to beaddressed in the on-going efforts of the government toensure an efficient, transparent and open competitiveprocess, however, it appears that almost all of theseissues had been addressed in the Law and in theImplementing Rules and Regulations. Further, someof them are likewise considered in the procurementmanuals and harmonized bidding documents. Whatappears to be lacking is the dissemination of informationand training of the private sector and civil society. Theseactivities are included in the emerging issues/prioritiespresented in Appendix 3 (see the CPAR Update).

Meeting with GPPB and NextSteps

In a meeting held on December 11, 2003, the GPPBand the Bank agreed on the following next steps:

Appointment of the new Executive Director ofTSO-GPPB soonest. The new TSO Executive Di-rector is on board.Issuance of harmonized bid documents with neces-sary forms.Responsible Agencies will implement agreed ac-tions on dates specified. Progress will be monitoredjointly by the TSO-GPPB and the World Bank.International partners will make the promised as-sistance available. A request for ASEM 2 funds isbeing processed internally by the World Bank.GPPB will discuss with other donors possible as-sistance.Finalize World Bank Procurement Side Letter. TheTSO-GPPB, DOF and NEDA representatives willstart discussing the draft Side Letter, included asAppendix 4 (see the CPAR Update).

.

Page 82: 2nd UPDATE - World Bank
Page 83: 2nd UPDATE - World Bank
Page 84: 2nd UPDATE - World Bank

UPDATE2nd

THE WORLD BANK1818 H Street N.W.Washington, D.C. 20433 USAhttp://www.worldbank.org

Country Office Manila23rd Floor, The Taipan PlaceFrancisco Ortigas, Jr. Road(formerly Emerald Avenue)Ortigas Center, Pasig CityPhilippines 1605Telephone: (632) 637-5855 to 64http://worldbank.org.ph

The Philippine LGU Assistance Portalhttp://lguportal.org

Knowledge Development CenterGround Floor, The Taipan PlaceFrancisco Ortigas, Jr. RoadOrtigas Center, Pasig CityPhilippines 1605Telephone: (632) 917-3034, 917-3088Fax. (632) 637-5870http://www.worldbank.org.ph/kdc

Anticorruption hotline:From the Philippines, dial 10511for an AT&T operator and thendial 1-800-831-0463 or callcollect at (704) 558-7046