Fund Reverved Supply PI B- 1219 15.02.17 CSD-I M/s Jalvid Udyog Kanpur 154/CPD-II/30.01.17 1959/20 Supply 202207.00 0.00 0.00 0.00 202207.00 B- 1507 05.06.17 CSD-I M/s U.P. Udyog Aligarh 106/CPD-I/21.01.17 1948/36 Supply of Spares 487980.00 0.00 0.00 0.00 487980.00 B- 1787 30.11.17 CSD-I M/s ABB India Ltd 1081/CPD-I/O-1/07.11.17 1833/48 Supply of ABB Makes Spares 142085.00 0.00 0.00 0.00 142085.00 B- 1816 23.12.17 CSD-I M/s Sail Kanpur 1263/CPD-I/19.12.17 1757/10 Supply of Steels 1277327.00 0.00 0.00 0.00 1277327.00 B- 1906 27.02.18 CSD-I M/s Technow Engg Work 1404/CPD-I/24.01.18 1947/86 Supply of Consumable 12980.00 0.00 0.00 0.00 12980.00 B- 1928 20.03.18 CSD-I M/s Sail Kanpur 1312/CPD-I/02.01.18 1957/11 Supply 250750.00 0.00 0.00 0.00 250750.00 B- 2013 01.06.18 CPD-III M/s BEML Limited 84/CPD-III/02.04.18 1834/65 Supply 67124.00 B- 2014 01.06.18 CPD-III M/s BEML Limited 83/CPD-III/02.04.18 1834/65-66 Supply 1225734.00 0.00 0.00 0.00 1292858.00 B- 2074 03.07.18 CPD-III M/s Escorts Railway Equipment Quision 116/CPD-III/20.04.18 1820/92 Supply 117600.00 B- 2087 13.07.18 CPD-II M/s BEML Limited 281/CPD-III/23.06.18 1954/87 Supply 1172006.00 0.00 0.00 0.00 1289606.00 B- 2191 26.09.18 CPD-I M/s Jalvid Udyog 989/CPD-I/09.08.18 1925/78 Supply 12980.00 0.00 0.00 0.00 12980.00 B- 2194 03.10.18 CPD-I M/s Anurag Engineering 405/CPD-I/23.07.18 1991/63 Supply 66316.00 B- 2223 12.10.18 CPD-II M/s Simplex Switchgear P. Ltd 965/CPD-II/12.01.17 1954/94 Supply 0.00 0.00 0.00 0.00 66316.00 B- 2280 27.11.18 CPD-I M/s Technow Engineering Works 1158/CPD-I/01.11.18 1959/57 Consumable 6567.00 0.00 0.00 0.00 6567.00 B 41 20.04.19 CHD-I M/s BEML Limited 1 139/CHD-I/11.03.19 1867/81 O/H 2245600 0.00 0.00 0.00 2245600 B 55 08.05.19 EMD-I M/s ABB India Ltd. 265/EMD-I/15.06.18 2055/38 Overhauling 100000 B 76 24.05.19 CPD-I M/s Laxmi Treding Company 161/CPD-I/29.01.19 1799/121 Bearing 36044 B 79 25.05.19 E&TD M/s K.S. & Brothers 1 32/E&TD/20.01.19 1992/64 Supply 24023 B 82 27.05.19 CPD-I M/s Jalvid Udyog 209/CPD-I/07.02.19 1945/48 Nipple of Oil 3540 FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED Reg Index Bill No 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B Agr/PO/LOI/WO and Dt FUND RESERVED FUND RESERVED Date Name Of Division FUND RESERVED Name of Firm RAB Description of Work/Supply Work FUND RESERVED Material/Spares FUND RESERVED MB NO./Page No/ FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED Priority Already in R&M No. 1822/24.03.17

Upload: others

Post on 07-Jul-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

Fund Reverved

Supply PIB- 1219 15.02.17 CSD-I M/s Jalvid Udyog Kanpur 154/CPD-II/30.01.17 1959/20 Supply 202207.00

0.00 0.00 0.00 202207.00

B- 1507 05.06.17 CSD-I M/s U.P. Udyog Aligarh 106/CPD-I/21.01.17 1948/36 Supply of Spares 487980.000.00 0.00 0.00 487980.00

B- 1787 30.11.17 CSD-I M/s ABB India Ltd 1081/CPD-I/O-1/07.11.17 1833/48 Supply of ABB Makes Spares

142085.00

0.00 0.00 0.00 142085.00

B- 1816 23.12.17 CSD-I M/s Sail Kanpur 1263/CPD-I/19.12.17 1757/10 Supply of Steels 1277327.000.00 0.00 0.00 1277327.00

B- 1906 27.02.18 CSD-I M/s Technow Engg Work 1404/CPD-I/24.01.18 1947/86 Supply of Consumable 12980.000.00 0.00 0.00 12980.00

B- 1928 20.03.18 CSD-I M/s Sail Kanpur 1312/CPD-I/02.01.18 1957/11 Supply 250750.000.00 0.00 0.00 250750.00

B- 2013 01.06.18 CPD-III M/s BEML Limited 84/CPD-III/02.04.18 1834/65 Supply 67124.00B- 2014 01.06.18 CPD-III M/s BEML Limited 83/CPD-III/02.04.18 1834/65-66 Supply 1225734.00

0.00 0.00 0.00 1292858.00B- 2074 03.07.18 CPD-III M/s Escorts Railway Equipment

Quision116/CPD-III/20.04.18 1820/92 Supply 117600.00

B- 2087 13.07.18 CPD-II M/s BEML Limited 281/CPD-III/23.06.18 1954/87 Supply 1172006.000.00 0.00 0.00 1289606.00

B- 2191 26.09.18 CPD-I M/s Jalvid Udyog 989/CPD-I/09.08.18 1925/78 Supply 12980.000.00 0.00 0.00 12980.00

B- 2194 03.10.18 CPD-I M/s Anurag Engineering 405/CPD-I/23.07.18 1991/63 Supply 66316.00B- 2223 12.10.18 CPD-II M/s Simplex Switchgear P. Ltd 965/CPD-II/12.01.17 1954/94 Supply 0.00

0.00 0.00 0.00 66316.00

B- 2280 27.11.18 CPD-I M/s Technow Engineering Works 1158/CPD-I/01.11.18 1959/57 Consumable 6567.000.00 0.00 0.00 6567.00

B 41 20.04.19 CHD-I M/s BEML Limited 1 139/CHD-I/11.03.19 1867/81 O/H 22456000.00 0.00 0.00 2245600

B 55 08.05.19 EMD-I M/s ABB India Ltd. 265/EMD-I/15.06.18 2055/38 Overhauling 100000B 76 24.05.19 CPD-I M/s Laxmi Treding Company 161/CPD-I/29.01.19 1799/121 Bearing 36044B 79 25.05.19 E&TD M/s K.S. & Brothers 1 32/E&TD/20.01.19 1992/64 Supply 24023B 82 27.05.19 CPD-I M/s Jalvid Udyog 209/CPD-I/07.02.19 1945/48 Nipple of Oil 3540

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

Reg Index Bill No

2X110 MW Parichha Thermal Power Project, Parichha (Jhansi)B

Agr/PO/LOI/WO and Dt

FUND RESERVED

FUND RESERVED

Date Name Of Division

FUND RESERVED

Name of Firm RAB Description of Work/Supply

Work

FUND RESERVED

Material/Spares

FUND RESERVED

MB NO./Page

No/

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

Priority Already in R&M No. 1822/24.03.17

Page 2: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

0.00 0.00 0.00 163607.00

B 91 10.06.19 CPD-I M/s BEML Limited 556/CPD-I/15.05.19 1820/405 Misc & Advance 4559815Total 0.00 0.00 0.00 4559815.00

B 114 01.07.19 EMD-I M/s Punjab Electrical Industries 3 12/EMD-I/05.12.12 1790/107 Complete Rewinding 159607B 117 04.07.19 CPD-I M/s Aditi Enterprises 613/CPD-I/18-19 1897/122 Battery for Diesel 33984B 119 04.07.19 EMD-II M/s Electrical & Instrument 17/EMD-II/14.03.18 1800/130 Security 32380B 126 05.07.19 CHD-I M/s Hind Udyog 2 19/CHD-I/18-19 2002/25 Repairing 144899B 144 17.07.19 AHD-I M/s Zenith Engineers 1 05/AHD-I/12.07.19 2057/129 Breakdown Maint. 51054

Total 0.00 0.00 0.00 421924.00

B 195 20.08.19 ECMD-II M/s Goverdhan Contractors 1 07/ECMD-II/25.06.19 2011/67-B Maintenance of Park 150911B 196 20.08.19 ECMD-II M/s Vijay Kumar Gupta 2 45/ECMD-II/19.01.19 3091/20 M&R Colony Area 445652B 197 20.08.19 ECMD-II M/s Sadan Engineering Works 1 29/ECMD-II/30.07.19 3091/ Premansoon Cleaning 317002B 198 21.08.19 EMD-II M/s Vikas Electrical 08/EMD-II/13.06.19 1945/43 Security 27445B 199 21.08.19 EMD-II M/s Priya Construction 13/EMD-II/20.01.18 1945/43 Security 28004B 200 21.08.19 EMD-II M/s Priya Construction 26/EMD-II/29.12.16 1932/74 Security 28545B 201 21.08.19 EMD-II M/s Priya Construction 14/EMD-II/20.01.18 1932/75 Security 24914B 202 21.08.19 EMD-II M/s Priya Construction 14/EMD-II/20.01.18 1946/28 Security 28175B 203 22.08.19 OGD-I M/s D.K. & Sons 1 06/OGD-I/01.08.19 2081/41 Dismanting 93185B 206 22.08.19 EMD-I M/s Nosad Contractor 7 02/EMD-I/04.01.16 1688/163 O/H 66546B 207 22.08.19 EMD-I M/s Nosad Contractor 1 18/EMD-I/27.10.18 1688/165 O/H 2568B 208 22.08.19 EMD-I M/s Nosad Contractor 6 19/EMD-I/03.11.16 1688/151 Shifting 41451B 209 24.08.18 TMD-I M/s Usha Enterprises 06/TMD-I/17-18 2025/26 Security 78528B 210 24.08.18 TMD-I M/s Zenith Engineers 01/TMD-I/06.06.18 2025/25-A Security 9938

B 211 26.08.19 TMD-I M/s Zenith Engineers 4 11/TMD-I/14-15 2028/18Operation Annual Maintenance 42890

B 212 27.08.19 CHD-I M/s Priyanka Enterprises 8 03/CHD-I/05.06.18 1867/99 Annual Contract 1254301511184.00 0.00 0.00 0.00

B 214 02.09.19 C&ID-I M/s D.K. & Sons 1 03/C&ID-I/24.06.19 2066/13 Repairing 42124B 215 03.09.19 ECMD-III M/s Amit 01/ECMD-III/16.07.18 1918/14 Security 7047B 216 04.09.19 EMD-II M/s Nosad Contractor 2 04/EMD-II/18-19 1899/36 O/H 69990B 218 04.09.19 ECMD-II M/s Vijay Kumar Gupta 1 33/ECMD-II/21.08.19 3090/65 Deployment of Park 316941B 219 04.09.19 ECMD-II M/s Jamuna Mehar Enterprises 1 48/ECMD-II/28.01.19 2012/39 White Washing 335439B 220 05.09.19 CPD-II M/s Uniflow Marketing 863/CPD-II/19.08.19 1991/69 Bearing 2449310B 221 05.09.19 CPD-II M/s Thermoserve Corpration 873/CPD-II/21.08.19 1991/70 Coupling 376750B 224 13.09.19 ECMD-I M/s Rambali Singh 1 11/ECMD-I/13.05.19 1879/36-B Construction 343830B 226 16.09.19 CPD-I M/s Kay Mohan Corporation 1001/CPD-I/12.07.19 1834/87 Plumner Block 37760B 227 16.09.19 CPD-I M/s Balbir Singh & Sons 1158/CPD-I/29.07.19 1834/86 Supply 66198B 234 21.09.19 CAMD-I M/s A.S. Enterprises 15/CAMD-I/15.03.19 1908/99-B Security 13548B 235 21.09.19 CAMD-I M/s A.S. Enterprises 18/CAMD-I/03.04.19 1908/99-A Security 12942

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

Page 3: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B 237 21.09.19 CAMD-I M/s Maa Shakti Enterprises 01/CAMD-I/17-18 1909 Security 11361B 238 21.09.19 ECMD-II M/s K.S. & Brothers 2 53/ECMD-II/02.02.19 1961/25 M&R Colony Area 190505B 239 23.09.19 TMD-I M/s Maa Engineering & Works 13/TMD-I/18-19 1935/163 Security 16956B 240 23.09.19 TMD-I M/s Maa Engineering & Works 06/TMD-I/18-19 1935/163 Security 11234B 241 23.09.19 CHD-III M/s Priya Construction 4 11/CHD-III/13.02.19 1853/85 Rewinding 51047B 243 24.09.19 CHD-II M/s Balram Engineers 1 14/CHD-II/30.08.19 2020/43-B Providing & Fixing 282347B 246 24.09.19 CPD-II M/s Jalvid Udyog 901/CPD-II/30.08.19 2095/9 Supply 111982B 247 24.09.19 CPD-II M/s Jalvid Udyog 901/CPD-II/30.08.19 2095/9 Supply 203833B 248 25.09.19 CHD-II M/s M.K. Traders 6 11/CHD-II/19.11.18 3092/29 O/H 109373B 249 26.09.19 C&ID-I M/s D.K. & Sons Co. 1 06/C&ID-I/31.07.19 2066/16 Repairing 31305B 250 26.09.19 C&ID-I M/s D.K. & Sons Co. 2 03/C&ID-I/24.06.19 2066/17 Repairing 53995B 251 27.09.19 CPD-II M/s AllA Engineering Ltd. 740/CPD-II/02.07.16 1991/71 Supply 3115427B 252 27.09.19 CPD-I M/s BEML Limited 1102/CPD-I/25.07.19 1820/111 Supply 772675B 255 27.09.19 CPD-I M/s J.K. Engineering 1255/CPD-I/08.08.19 1820/115 Supply 3538413

4726044.00 0.00 7846288.00 0.00

B 257 04.10.19 ECMD-II M/s Bharti Enterprises 1 58/ECMD-II/11.02.19 1905/67 Construction 348269B 258 04.10.19 TMD-I M/s Marfat Construction 2 01/TMD-I/19-20 2028/24 Insulation Work 71972B 259 04.10.19 TMD-I M/s Thermal India Engineers 1 07/TMD-I/19-20 2028/25 Rectification 314280B 260 04.10.19 CSD-I M/s Safe Pro Service Pvt. Ltd. 405/CPD-II/15.05.19 1959/66 Supply 174050B 261 04.10.19 CSD-I M/s Globe Enterprises 1322/CPD-I/22.08.19 1959/67 Supply 275730B 263 05.10.19 BMD-II M/s S.K. Engineering Works 1 13/BMD-II/19.01.19 2000/43 O/H 60007B 264 09.10.19 CAMD-I M/s Usha Enterprises 8 03/CAMD-I/01.11.16 1926/59 O/H 193436

B 265 10.10.19 CPD-I M/s J.K. Engineering Comp. 1442/CPD-I/09.09.19 1833/79 Supply 2256398

B 266 10.10.19 CPD-II M/s Joy Marketing Comp. 763/CPD-II/25.07.19 1823/81 Supply 40976

B 267 11.10.19 AHD-I M/s Zenith Engineers 1 06/AHD-I/13.08.19 2057/177 OSM Work 63202B 268 11.10.19 AHD-I M/s Zenith Engineers 1 07/AHD-I/12.03.19 2057/179 O&M 18960B 270 11.10.19 AHD-I M/s Zenith Engineers 2 07/AHD-I/12.09.19 2057/200 O&M 234550B 271 11.10.19 AHD-I M/s Zenith Engineers 06/AHD-I/31.08.19 1996/199 Security 5852B 272 11.10.19 AHD-I M/s Zenith Engineers 03/AHD-I/11.05.16 1996/200 Security 46000B 274 11.10.19 CPD-I M/s Electromag Joest Pvt. Ltd. 725/CPD-I/15.06.19 1949/106 Supply 576284B 276 14.10.19 ECMD-II M/s Jamuna Mehar 1 27/ECMD-II/26.07.19 2014/29 Painting 343276B 277 14.10.19 ECMD-II M/s Jamuna Mehar 36/ECMD-II/19.01.18 2011/71 Security 59700B 278 14.10.19 ECMD-II M/s Akshat Enterprises 25/ECMD-II/11.12.17 2011/72 Security 93693B 279 14.10.19 ECMD-II M/s S.R. Enterprises 39/ECMD-II/26.02.18 1539/181 Security 27999B 280 14.10.19 ECMD-II M/s Jamuna Mehar 1 49/ECMD-II/28.01.19 1846/83 White Washing 653562B 282 14.10.19 ECMD-II M/s Vijay Kumar Gupta 26/ECMD-II/08.10.18 1942/98 Security 29247B 283 14.10.19 ECMD-II M/s Vijay Kumar Gupta 30/ECMD-II/22.12.17 1942/99 Security 152915B 285 19.10.19 CHD-I M/s Hind Udyog 3 19/CHD-I/18-19 2002/28 Repairing 363232B 286 19.10.19 CHD-I M/s Rohini Transport 16/CHD-I/17.01.19 2031/3-B Security 28802B 287 19.10.19 EMD-II M/s Instrument Care Group 07/EMD-II/18-19 2040/40 Security 42545B 288 19.10.19 EMD-II M/s Priya Construction 3 09/EMD-II/18-19 1945/45 O/H 78697

Page 4: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B 289 19.10.19 EMD-II M/s Priya Construction 2 14/EMD-II/18-19 1932/77 Electrical B/D 118260B 290 19.10.19 EMD-II M/s Bharti Enterprises 1 30/ECMD-II/11.07.19 1912/47 Supply 346500B 291 21.10.19 CPD-II M/s Floway Valves Pvt. Ltd. 900/CPD-II/30.08.19 1827/178 Supply 191426B 292 21.10.19 CPD-I M/s Sone Obra Enterprises 1473/CPD-I/17.09.19 1827/179 Supply 56636B 293 21.10.19 CPD-I M/s J. Umashankar P. Ltd 164/CPD-I/29.01.19 1827/180 Supply 36140B 294 21.10.19 S&TD M/s Jadaun Bus Service 13/S&TD/06.07.18 2068/21-B Security 29821B 295 21.10.19 S&TD M/s Jadaun Bus Service 12/S&TD/06.07.18 2068/22-A Security 218699B 298 22.10.19 CPD-I M/s Jalvid Udyog 976/CPD-II/09.09.19 1925/101 Supply 121269

3596976.00 641819.00 3433590.00 0.00

B 299 01.11.19 CHD-II M/s Kanha Construction 37/CHD-II/11.01.19 1958/159 Security 59675B 300 01.11.19 TMD-I M/s M.K. Traders 4 14/TMD-I/15-16 1973/95 Supply 57205B 301 02.11.19 CPD-I M/s Luxmi Trading Comp. 1472/CPD-I/17.09.19 1991/74 Supply 251711B 302 02.11.19 CPD-II M/s Uniflow Marketing 1059/CPD-II/26.09.19 1991/73 Supply 802270B 303 02.11.19 CPD-I M/s New Indo Trading Marketing 1454/CPD-I/13.09.19 1718/89 Supply 612284B 304 02.11.19 EMD-II M/s R.L. Engineering 30/EMD-II/07.02.17 1880/78 Security 31641B 305 02.11.19 EMD-II M/s R.L. Engineering 06/EMD-II/01.08.17 1880/91 Security 7579

B 306 02.11.19 CHD-IV M/s Hind Udyog 1 05/CHD-IV/19-20 2029/27 Repairing & Recondition 89184

B 307 04.11.19 CHD-I M/s Priyanka Enterprises 6 119/CHD-I/13.03.18 1873/11-B Overhauling 120662

B 308 04.11.19 TMD-I M/s Zenith Engineers 5 11/TMD-I/2014-15 1935/170 Operation & Annual 50315

B 309 04.11.19 TMD-I M/s S.R. Enterprises 1 06/TMD-I/10.06.19 1935/171 Overhauling 50634B 310 05.11.19 ECMD-II M/s Vijay Kumar Gupta 16/ECMD-II/01.10.19 2069/17 Security 72544B 311 06.11.19 ECMD-III M/s Krishna Enterprises 1 19/ECMD-III/01.11.19 1825/38 Supply 319666B 312 06.11.19 CPD-I M/s Shrikant 07/CPD-I/23.04.19 1654/125 Security 7084B 313 07.11.19 EMD-III M/s Vikas Electrical 2 19/EMD-III/29.03.19 2050/19 Overhauling 141303B 314 07.11.19 BMD-II M/s M.A.K. Construction 6 33/BMD-II/06.10.16 1708/141 Overhauling 243068B 315 07.11.19 CAMD-I M/s Electromach Consultant 1 26/CAMD-I/24.08.19 2061/26 Overhauling 311040B 316 08.11.19 ECMD-II M/s Jamuna Meher Enterprises 1 43/ECMD-II/20.12.18 2101/2 Civil Work 255716B 317 08.11.19 EMD-III M/s R.P. Construction 14/EMD-III/21.01.19 1756/72 Security 9230B 318 13.11.19 CPD-I M/s Sone Obra Enterprises 160/CPD-I/29.01.19 1827/91 Supply 3261B 319 15.11.19 EMD-III M/s T.S. Enterprises 1 13/EMD-III/18.09.19 2048/14-A Supply 273769B 320 16.11.19 ECMD-II M/s B.P.Singh & CO. 31/ECMD-II/16.01.17 2012/27 Security 53744B 322 20.11.19 CHD-I M/s Priyanka Enterprises 1 08/CHD-I/14.10.19 1873/19 Supply 313200B 323 20.11.19 CHD-I M/s Priyanka Enterprises 1 05/CHD-I/30.08.18 1873/22-B Overhauling 465061B 324 21.11.19 ECMD-II M/s Balram Engineering 3 55/ECMD-II/02.02.19 2014/30-B M&R Colony Area 180653B 325 21.11.19 ECMD-II M/s Winex India 1 12/ECMD-I/11.09.19 2018/29 Proofing 318791B 326 22.11.19 CHD-III M/s Singh & Singh Electronics 1 07/CHD-III/16.09.19 2103/1-B Rewinding 470187B 327 22.11.19 CHD-III M/s Priya Construction 5 11/CHD-III/13.02.19 1853/88 Rewinding 73525B 328 22.11.19 CHD-III M/s Nosad Contractor 1 09/CHD-III/24.10.19 1853/88-B O/H 62669B 330 22.11.19 CPD-I M/s Pacific Fire System 978/CPD-I/09.09.19 2098/14 Supply 4379B 331 23.11.19 OGD-I M/s D.K. & Sons 1 09/OGD-I/30.09.19 2081/66 Supply 17380

Page 5: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B 332 23.11.19 OGD-I M/s Maa Shakti Enterprises 1 05/OGD-I/18.06.19 2081/68 Fabrication 100344B 336 23.11.19 CPD-II M/s Bearing & Engineering Co. 904/CPD-II/30.08.19 2095/10 Supply 0 68746B 337 25.11.19 S&TD M/s Technow Engineering Works 1 22/S&TD/24.09.18 1903/89 Overhauling 164112B 339 26.11.19 EMD-II M/s Vikas Electrical 17/EMD-II/01.12.17 1898/40 Security 39331B 340 26.11.19 EMD-II M/s Priya Construction 2 14/EMD-II/11.12.18 1651/ Breakdown Maint. 233250B 341 26.11.19 EMD-II M/s Priya Construction 25/EMD-II/30.09.16 1889/40-A Security 85629B 342 26.11.19 BMD-II M/s Marfat Construction 05/BMD-II/16.08.17 1953/188 Security 116249B 343 26.11.19 BMD-II M/s Bharti Enterprises 08/BMD-II/09.08.19 1953/186 Security 94744B 344 26.11.19 EMD-II M/s Vikas Electrical 24/EMD-II/16-17 1733/199 Security 32287B 345 26.11.19 EMD-II M/s Priya Construction 09/EMD-II/28.10.17 1733/200 Security 87381B 346 26.11.19 EMD-II M/s Vikas Electrical 23/EMD-II/16-17 1733/200 Security 38584B 347 28.11.19 CHD-II M/s S.K. Engineering 1 18/CHD-II/14.10.19 2020/45 Overhauling 294799B 348 28.11.19 EMD-II M/s T.S. Enterprises 06/EMD-II/11.07.18 1994/130 Security 51251B 349 29.11.19 ECMD-II M/s Sadan Engineering Works 47/ECMD-II/21.03.18 2070/7 Security 19560B 350 29.11.19 ECMD-II M/s Sadan Engineering Works 48/ECMD-II/21.03.18 2070/8 Security 14326B 351 29.11.19 ECMD-II M/s Sadan Engineering Works 28/ECMD-II/22.12.16 2070/12 Security 45139B 352 29.11.19 CPD-II M/s Bearing & Engineering Co. 975/CPD-II/09.09.19 1925/163 Supply 0 1315180B 353 29.11.19 CAMD-I M/s United Manufacturing Co. 28/CAMD-I/19-20 1908/98 Overhauling 123816B 354 30.11.19 OGD-I M/s Syndicate Engineering 22/OGD-I/16.08.14 1926/39 Security 270996

5871702.00 3261.00 3050191.00 0.00

B 355 04.12.19 CHD-II M/s M.K. Traders 1 11/CHD-II/15.12.18 3092/40 Overhauling 59576B 356 04.12.19 CHD-II M/s S.K. Engineering Works 1 19/CHD-II/14.10.19 3092/38 Work at Transfer 312098B 357 04.12.19 ECMD-III M/s Akshat Enterprises 2 46/ECMD-II/19.01.19 1845/68 M&R Colony Area 310346B 358 07.12.19 CAMD-I M/s Rahul Gupta 1 32/CAMD-I/22.11.19 2062/40-B Repairing Bowl 246672B 360 07.12.19 CAMD-I M/s Rahul Gupta 1 33/CAMD-I/22.11.19 2062/42-A Repairing 96838B 361 07.12.19 CPD-I M/s Jalvid Udyog 1672/CPD-I/01.11.19 1874/146 Supply 13319

B 362 07.12.19 CPD-I M/s R.S.P. Works Pvt. Ltd. 1507/CPD-I/13.07.16 1874/147 Supply 11353

B 363 07.12.19 TMD-I M/s Shiv Mahadev Engg. Works 05/TMD-I/19-20 1935/172 Security 17255

B 364 10.12.19 EMD-II M/s Nosad Contractor 04/EMD-II/18-19 1899/37-B O/H 63820

B 365 11.12.19 ECMD-II M/s Balram Engineering 2 54/ECMD-II/02.02.19 2011/78 M&R 206338B 366 11.12.19 E&TD M/s Jamuna Meher Enterprises 1 39/E&TD/16.07.19 1672/188 Repairing 110911B 367 13.12.19 CPD-II M/s Amit Gupta 05/CPD-II/02.02.19 2059/82 Security 5600B 368 13.12.19 CHD-I M/s Priyanka Enterprises 1 12/CHD-I/10.12.19 1873/28 Overhauling 1278853B 369 18.12.19 OGD-I M/s D.K. & Sons 2 09/OGD-I/08.11.19 2082/ Repairing 17969B 370 18.12.19 CHD-III M/s Nosad Contractor 10 04/CHD-III/10.05.18 1938/97-B Shifting 27610B 371 20.12.19 EMD-I M/s Nosad Contractor 4 17/EMD-I/27.10.18 2045/28 Maintenance 45015B 372 20.12.19 EMD-I M/s Nosad Contractor 10 19/EMD-I/03.11.16 2045/31 Shifting of various 39729B 373 20.12.19 EMD-I M/s Nosad Contractor 4 08/EMD-I/09.10.17 2045/33 Maintenance 61041B 374 20.12.19 EMD-I M/s Nosad Contractor 2 18/EMD-I/27.10.18 2045/35 Overhauling 78926B 375 20.12.19 EMD-I M/s Nosad Contractor 14 10/EMD-I/28.03.16 2045/39 Cable laying 32656

Page 6: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B 376 20.12.19 EMD-I M/s Scientecs Proces Control 10/EMD-I/03.11.19 2055/87 Security 84150B 377 20.12.19 EMD-I M/s Nosad Contractor 14 09/EMD-I/03.11.17 2055/85 Maintenance 116685B 378 24.12.19 C&ID M/s Lakshmi Narayn Prajapati 06/C&ID-I/28.07.17 1875/72-B Security 1200B 379 24.12.19 C&ID M/s Lakshmi Narayn Prajapati 08/C&ID-I/24.09.18 1877/72-B Security 1200B 380 24.12.19 C&ID M/s Lakshmi Narayn Prajapati 15/C&ID-I/31.12.18 1875/72-A Security 2400B 381 24.12.19 C&ID M/s Lakshmi Narayn Prajapati 07/C&ID-I/28.07.17 1875/71-B Security 2400B 382 24.12.19 C&ID M/s Lakshmi Narayn Prajapati 16/C&ID-I/31.12.18 1875/71-B Security 2400B 383 24.12.19 C&ID M/s Lakshmi Narayn Prajapati 01/C&ID-I/13.04.18 1875/71-A Security 2400B 384 24.12.19 C&ID M/s Lakshmi Narayn Prajapati 08/C&ID-I/31.07.17 1875/71-A Security 1200B 385 26.12.19 TMD-I M/s S.R. Enterprises 1 11/TMD-I/19-20 1973/104 Deputation 138626B 387 26.12.19 BMD-II M/s Marfat Construction 2 13/BMD-II/26.08.19 1999/36 Insulation Work 164841B 389 26.12.19 ECMD-II M/s K.S. & Brothers 2 52/ECMD-II/02.02.19 2012/42 M&R Internals 358637B 390 26.12.19 CHD-I M/s M.K. Traders 1 17/CHD-I/07.03.19 1638/150 Repairing 315645B 391 26.12.19 BMD-II M/s Marfat Construction 1 13/BMD-II/19-20 2100/3 Insulation Work 66420B 392 26.12.19 EMD-IV M/s Singh & Singh Electrical 275/EMD-IV/08.06.18 1984/78 Repairing Work 24189B 393 27.12.19 EMD-II M/s Priya Construction 1 09/EMD-II/19-20 1932/82 Dismantling of Old 171548B 394 27.12.19 EMD-II M/s Priya Construction 3 15/EMD-II/18-19 1932/83 O/H 59862B 395 27.12.19 EMD-II M/s Priya Construction 2 15/EMD-II/18-19 1946/35 Preventive Maint. 178826B 396 27.12.19 EMD-II M/s Priya Construction 1 05/EMD-II/19-20 1945/48 O/H 140282B 397 27.12.19 BMD-II M/s D.K. & Sons 06/BMD-II/19.06.19 1931/60-B Security 14538

4858702.00 0.00 24672.00 0.00

B 398 01.01.20 CPD-I M/s ASKA Equipement Ltd. 1765/CPD-I/14.11.19 2098/15 Supply 1255992B 399 03.01.20 OGD-I M/s D.K. & Sons 13/OGD-I/18-19 2082/58 Security 12775B 400 03.01.20 OGD-I M/s Maa Shakti Enterprises 09/OGD-I/20.06.17 2082/48 Security 48848B 401 03.01.20 OGD-I M/s Ajay Kumar 20/OGD-I/29.03.19 2080/69 Security 7123B 402 04.01.20 BMD-II M/s Marfat Construction 3 13/BMD-II/26.08.19 2100/7 Insulation Work 86671B 404 04.01.20 BMD-II M/s Bharat Mechanical 1 24/BMD-II/19-20 2100/8 Attending tube 321506

B 406 04.01.20 BMD-II M/s Power Associated 1 25/BMD-II/15.11.19 2099/9 Attending tube 321328

B 407 04.01.20 BMD-II M/s Power Associated 1 26/BMD-II/15.11.19 2099/ Attending tube 321506

B 408 06.01.20 EMD-II M/s Vikas Electricals 3 03/EMD-II/18-19 1895/55 Rewinding 435809B 409 06.01.20 CAMD-I M/s Usha Enterprises 1 31/CAMD-I/04.11.19 1927/29 Overhauling 221730B 410 06.01.20 TMD-I M/s Marfat Construction 3 01/TMD-I/19-20 1972/193 Insulation Work 156855B 412 06.01.20 CAMD-I M/s Universal Engineering 1 23/CAMD-I/13.09.19 2062/38 Fabrication 314286B 413 06.01.20 CAMD-I M/s Rahul Gupta 1 12/CAMD-I/12.03.19 2062/45 Repairing 164978B 414 06.01.20 CAMD-I M/s S.R. Enterprises 2 24/CAMD-I/21.09.19 2062/46-B Fabrication 211702B 415 06.01.20 TMD-I M/s M.S. Bhadouria Enterprises 1 14/TMD-I/19-20 1973/106 Condensal Tube 352820B 417 07.01.20 ECMD-II M/s Anirudh Singh 23/ECMD-II/27.06.19 1877/76 Hiring of Tractor 48600B 418 07.01.20 ECMD-II M/s Vijay Kr. Gupta 3 45/ECMD-II/19.01.19 3091/50 M&R 177111B 420 07.01.20 BMD-II M/s P.K. Enterprises 1 21/BMD-II/18.10.19 1962/145 Removal of Charge 72512B 421 07.01.20 BMD-II M/s Nosad Constractor 1 18/BMD-II/24.09.19 1962/141 B/D Maintenance 190180

Page 7: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B 422 07.01.20 BMD-II M/s D.K. & Sons 1 19/BMD-II/10.10.19 1962/143 Overhauling 213292B 424 08.01.20 CSD-I M/s Agra Computer 03/CSD-I/15.05.18 1947/176 Security 21060B 425 08.01.20 EMD-I M/s Nosad Constractor 15 09/EMD-I/03.11.17 1984/80 Breakdown 61280B 426 08.01.20 EMD-I M/s Nosad Constractor 3 18/EMD-I/27.10.18 2045/38 O/H 14255B 427 08.01.20 EMD-I M/s Nosad Constractor 15 10/EMD-I/28.03.16 2045/42 Cable 54853B 428 08.01.20 EMD-I M/s Nosad Constractor 5 17/EMD-I/27.10.18 2055/68 Maintenance 7583

B 429 08.01.20 EMD-I M/s Nosad Constractor 6 17/EMD-I/27.10.18 2055/72 Maintenance 76872

B 430 08.01.20 EMD-I M/s Nosad Constractor 7 17/EMD-I/27.10.18 2055/74 Maintenance 47674B 431 08.01.20 EMD-I M/s Nosad Constractor 9 17/EMD-I/27.10.18 2055/79 Maintenance 83496B 432 08.01.20 EMD-I M/s Nosad Constractor 10 17/EMD-I/27.10.18 2055/84 Maintenance 16508B 433 08.01.20 EMD-I M/s Nosad Constractor 8 17/EMD-I/27.10.18 2055/78 Maintenance 11659B 434 10.01.20 AHD-I M/s Zenith Engineering 2 05/AHD-I/12.07.19 2063/34 Breakdown Maint. 51349B 435 10.01.20 TMD-I M/s Pawan Kumar 08/TMD-I/16.08.16 1736/34 Security 6520B 436 10.01.20 CAMD-I M/s Maa Shakti Enterprises 1 34/CAMD-I/01.01.20 2061/29 Printing Strickers 35400B 437 10.01.20 CAMD-I M/s Usha Enterprises 2 31/CAMD-I/04.11.19 2061/29-B Overhauling 71686B 438 10.01.20 TMD-I M/s S.R. Enterprises 2 06/TMD-I/19-20 1935/178 Overhauling 13512B 439 13.01.20 ECMD-I M/s Ashish Enterprises 2 47/ECMD-II/23.01.19 2069/ M&R 329605B 440 13.01.20 C&ID M/s D.K. & Sons 2 06/C&ID/31.07.19 2066/22 Cutting & Welding 28652B 441 13.01.20 C&ID M/s D.K. & Sons 3 03/C&ID/24.06.19 2066/23 Repairing 53995B 442 13.01.20 C&ID M/s D.K. & Sons 3 06/C&ID/31.07.19 2066/24 Cutting & Welding 27275B 443 13.01.20 C&ID M/s D.K. & Sons 4 03/C&ID/24.06.19 2066/25 Repairing 41331B 444 16.01.20 CHD-III M/s Nosad Constractor 2 09/CHD-III/24.10.19 1853/91 O/H 11514B 445 16.01.20 EMD-I M/s Nosad Constractor 16 09/EMD-I/03.11.17 1987/125 Maintenance 22586B 446 16.01.20 EMD-I M/s Nosad Constractor 1 12/EMD-I/29.11.19 1987/130 Maintenance 34176B 447 16.01.20 EMD-I M/s Nosad Constractor 1 10/EMD-I/05.11.19 1987/131 Salvaging & Cable 1457B 448 16.01.20 EMD-I M/s Nosad Constractor 1 11/EMD-I/07.11.19 1987/ Construction of earth 340878B 450 16.01.20 CPD-II M/s Hind Udyog 365/CPD-II/01.05.19 2097/9 Supply 18773B 451 16.01.20 CHD-III M/s Nosad Constractor 04/CHD-III/10.05.18 1854/100 Security 39571B 452 17.01.20 TMD-I M/s Marfat Construction 09/TMD-I/17-18 1972/195 Security 59810B 453 17.01.20 TMD-I M/s Usha Enterprises 09/TMD-I/16-17 1972/194 Security 29751B 454 17.01.20 TMD-I M/s Usha Enterprises 14/TMD-I/18-19 1972/194 Security 13741B 455 17.01.20 TMD-I M/s Usha Enterprises 03/TMD-I/19-20 1972/195 Security 61410B 456 17.01.20 TMD-I M/s Marfat Construction 01/TMD-I/19-20 1972/196 Security 29901B 457 17.01.20 TMD-I M/s Hind Udyog 19/CHD-I/18-19 2002/45 Servicing 151346B 459 18.01.20 TMD-I M/s Tech Thermology 08/TMD-I/16/17 1973/107 Security 25866B 460 18.01.20 TMD-I M/s Tech Thermology 13/TMD-I/19-20 1973/109 Security 26524B 461 18.01.20 TMD-I M/s Tech Thermology 04/TMD-I/19-20 1973/109 Security 28680B 462 18.01.20 TMD-I M/s Tech Thermology 02/TMD-I/17-18 1973/108 Security 86220B 463 18.01.20 TMD-I M/s Tech Thermology 04/TMD-I/16-17 1973/108 Security 25866

B 464 18.01.20 EMD-I M/s Nosad Constractor 11 17/EMD-I/27.10.18 1987/125Maintenance (transf. to A list 986-A)

131332

B 465 22.01.20 CAMD-I M/s Usha Enterprises 08/CAMD-I/07.03.19 1926/72 Security 4608

Page 8: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B 466 22.01.20 CAMD-I M/s Maa Shakti Enterprises 14/CAMD-I/13.03.19 1908/99 Security 16500B 467 22.01.20 CAMD-I M/s Usha Enterprises 03/CAMD-I/17-18 1908/100 Security 66860B 470 22.01.20 ECMD-II M/s Jamuna Meher 2 49/ECMD-II/28.01.19 1846/ M&R Colony Area 172765B 471 22.01.20 ECMD-II M/s Akshat Enterprises 3 40/ECMD-II/13.12.18 1971/117 Water Supply 50828B 472 22.01.20 ECMD-II M/s Akshat Enterprises 3 38/ECMD-II/13.12.18 1971/114 Maintenance 39240B 473 22.01.20 ECMD-II M/s Jamuna Meher 2 48/ECMD-II/28.01.19 2012/58-B While Washing 421979B 476 22.01.20 CAMD-I M/s Rahul Gupta 06/CAMD-I/16.10.17 2062/50-A Security 3542B 477 22.01.20 CAMD-I M/s Rahul Gupta 08/CAMD-I/29.10.17 2062/50 Security 2664B 478 22.01.20 CAMD-I M/s Rahul Gupta 32/CAMD-I/22.11.19 2062/49-B Security 22840B 479 22.01.20 CAMD-I M/s Maa Shakti Enterprises 29/CAMD-I/14.10.19 2062/49 Security 25125B 480 22.01.20 CAMD-I M/s Rahul Gupta 33/CAMD-I/22.11.19 2062/49-A Security 8967B 481 22.01.20 CAMD-I M/s Rahul Gupta 12/CAMD-I/12.03.19 2062/49 Security 15275B 482 22.01.20 CAMD-I M/s Electromech Consultant 26/CAMD-I/24.09.19 2062/50 Security 28800B 483 22.01.20 AHD-I M/s Zenith Engineering 05/AHD-I/12.07.19 2063/40 Security 9458B 484 22.01.20 AHD-I M/s K.S. Construction 03/AHD-I/23.10.19 2063/41 Security 42144B 485 22.01.20 AHD-I M/s Zenith Engineering 07/AHD-I/12.09.19 2063/41 Security 141012B 486 22.01.20 AHD-I M/s Zenith Engineering 08/AHD-I/12.09.19 2063/42 Security 34600B 487 22.01.20 AHD-I M/s Zenith Engineering 10/AHD-I/15.11.16 2063/43 Security 37969B 488 22.01.20 AHD-I M/s S.G.L. Engineering 04/AHD-I/26.04.19 2063/44 Security 1200B 489 22.01.20 AHD-I M/s S.G.L. Engineering 09/AHD-I/11.10.19 2063/45 Security 1200B 490 22.01.20 AHD-I M/s S.G.L. Engineering 03/AHD-I/26.04.19 2063/45 Security 7046B 491 22.01.20 AHD-I M/s S.G.L. Engineering 10/AHD-I/11.10.19 2063/46 Security 7045B 492 22.01.20 AHD-I M/s Pushpendra Singh 02/AHD-I/02.04.19 2063/47 Security 1887B 493 22.01.20 BMD-II M/s Syndicate Engineering 1 28/BMD-II/15.11.19 1963/69 Breakdown Maint. 247891B 494 22.01.20 BMD-II M/s Nosad Constractor 2 18/BMD-II/24.09.19 1963/70 Breakdown Maint. 151649B 495 22.01.20 BMD-II M/s M.A.K. Construction 5 30/BMD-II/06.10.19 1963/71 O/H 158766B 496 22.01.20 BMD-II M/s Syndicate Engineering 1 14/BMD-II/23.01.19 1963/71 Dismantaling 178333B 497 22.01.20 BMD-II M/s M.A.K. Construction 05/BMD-II/03.02.14 1785/83-B Security 6545B 498 22.01.20 BMD-II M/s M.A.K. Construction 17/BMD-II/18.01.16 1785/83 Security 26823B 499 22.01.20 BMD-II M/s M.A.K. Construction 32/BMD-II/06.10.19 1785/84 Security 76685B 500 22.01.20 BMD-II M/s M.A.K. Construction 03/BMD-II/20.08.16 1785/84-B Security 7045B 501 22.01.20 BMD-II M/s M.A.K. Construction 33/BMD-II/06.10.16 1785/85 Security 57637B 502 22.01.20 BMD-II M/s M.A.K. Construction 08/BMD-II/10.06.16 1785/85 Security 29512B 503 22.01.20 BMD-II M/s M.A.K. Construction 16/BMD-II/14.01.16 1785/84-B Security 3465B 504 22.01.20 BMD-II M/s M.A.K. Construction 27/BMD-II/23.02.16 1785/86 Security 29325B 505 22.01.20 BMD-II M/s M.A.K. Construction 10/BMD-II/27.09.17 1785/85-B Security 7046B 506 22.01.20 BMD-II M/s M.A.K. Construction 38/BMD-II/21.01.17 1785/85-B Security 7046B 507 22.01.20 BMD-II M/s M.A.K. Construction 31/BMD-II/06.10.16 1785/86 Security 7046B 508 22.01.20 BMD-II M/s P.K. Enterprises 07/BMD-II/24.10.18 1785/86-B Security 29855B 509 22.01.20 BMD-II M/s P.K. Enterprises 05/BMD-II/19.06.19 1785/86-B Security 20142B 510 22.01.20 BMD-II M/s M.A.K. Construction 01/BMD-II/22.05.17 1785/87 Security 29940

Page 9: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B 511 23.01.20 CAMD-I M/s Universal Engineering Works 1 35/CAMD-I/20.12.19 2061/31 Repairing 306042

B 512 23.01.20 CAMD-I M/s Universal Engineering Works 1 36/CAMD-I/20.12.19 2061/30 Fabrication 298917B 513 23.01.20 BMD-II M/s Tech Thermology 09/BMD-II/15.11.18 1953/87 Security 18792B 514 23.01.20 BMD-II M/s Tech Thermology 01/BMD-II/02.06.18 1953/188 Security 9396B 515 23.01.20 BMD-II M/s Tech Thermology 04/BMD-II/03.07.18 1953/190 Security 18792B 516 23.01.20 BMD-II M/s Tech Thermology 23/BMD-II/06.10.16 1931/58 Security 83456B 517 23.01.20 BMD-II M/s Tech Thermology 03/BMD-II/30.04.16 1931/59 Security 25875B 518 23.01.20 BMD-II M/s Tech Thermology 21/BMD-II/29.12.15 1931/60 Security 25875B 519 23.01.20 BMD-II M/s Tech Thermology 13/BMD-II/14.11.16 1931/59-B Security 25875B 520 23.01.20 BMD-II M/s Tech Thermology 26/BMD-II/19.08.16 1936/101 Security 29400B 521 23.01.20 BMD-II M/s Tech Thermology 25/BMD-II/19.08.16 1936/100 Security 27700B 522 23.01.20 BMD-I M/s Tech Thermology 23/BMD-I/26.07.16 1936/ Security 61237B 523 23.01.20 BMD-I M/s R. Electromech 06/BMD-I/21.01.19 1936/99 Security 4200B 524 23.01.20 BMD-I M/s R. Electromech 03/BMD-I/28.05.18 1936/100 Security 4200B 525 23.01.20 BMD-I M/s R. Electromech 38/BMD-I/05.07.17 1936/102 Security 1200B 526 23.01.20 BMD-I M/s R.K. Traders 04/BMD-I/23.07.19 1936/106 Security 6969B 527 23.01.20 BMD-I M/s Jaiprakash 05/BMD-I/17.09.18 1936/105 Security 7084B 528 23.01.20 BMD-I M/s Jaiprakash 01/BMD-I/23.04.18 1936/105 Security 6969B 529 27.01.20 BMD-I M/s O.S. Contractor 10/BMD-I/04.03.15 1798/86 Security 78864B 530 27.01.20 BMD-I M/s O.S. Contractor 28/BMD-I/03.11.16 1798/86 Security 50000B 531 27.01.20 S&TD M/s Technow Engg. Works 2 22/S&TD/24.09.19 1762/71 Repairing 132892B 532 27.01.20 BMD-II M/s Khemraj 20/BMD-II/18.10.19 1962/150 Security 6660B 533 27.01.20 BMD-II M/s Bharti Enterprises 29/BMD-II/16.12.19 1962/152 Security 22074B 534 27.01.20 BMD-II M/s P.K. Enterprises 16/BMD-II/28.08.19 1962/152 Security 29855B 535 27.01.20 BMD-II M/s P.K. Enterprises 21/BMD-II/18.10.19 1962/151 Security 6714B 536 27.01.20 BMD-II M/s Khemraj 03/BMD-II/16.04.19 1962/151 Security 6660B 537 27.01.20 BMD-II M/s D.K. & Sons 19/BMD-II/10.10.19 1962/149 Security 28209B 538 27.01.20 CSD-I M/s Sadan Engineering works 4 09/CSD-I/08.03.19 2095/11 Loading & Unloading 9053B 539 27.01.20 ECMD-II M/s Akshat Enterprises 3 46/ECMD-II/19.01.19 1845/68 M&R 84099B 540 27.01.20 ECMD-II M/s Uttam Chandra 03/ECMD-II/19.04.18 1866/91 Security 4200B 541 27.01.20 ECMD-II M/s Uttam Chandra 44/ECMD-II/22.09.18 1866/ Security 4200B 542 27.01.20 ECMD-II M/s Uttam Chandra 41/ECMD-II/19.12.18 1866/ Security 4200B 543 27.01.20 ECMD-II M/s Uttam Chandra 02/ECMD-II/19.04.18 1866 Security 4200B 544 27.01.20 BMD-II M/s Bharat Mechanical 23/BMD-II/15.11.19 2100/ Security 29753B 545 27.01.20 BMD-II M/s Bharat Mechanical 04/BMD-II/06.06.19 2100/18 Security 24838B 546 27.01.20 BMD-II M/s Bharat Mechanical 24/BMD-II/15.11.19 2100/17 Security 29769B 547 27.01.20 BMD-II M/s Bharat Mechanical 22/BMD-II/05.11.19 2100/15 Security 18963B 548 27.01.20 BMD-II M/s Power Associated 25/BMD-II/15.11.19 2100/16 Security 29753B 549 27.01.20 BMD-II M/s Bharti Enterprises 16/BMD-II/23.11.19 2100/13 Security 29564B 550 27.01.20 BMD-II M/s Bharti Enterprises 10/BMD-II/18.09.19 2100/ Security 29371B 551 27.01.20 BMD-II M/s Marfat Construction 13/BMD-II/26.08.19 2100/12 Security 29438

Page 10: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B 552 27.01.20 BMD-II M/s Power Associated 26/BMD-II/15.11.19 2100/10 Security 29769B 553 29.01.20 C&ID M/s D.K. & Sons 1 11/C&ID-I/27.09.19 2060/15 Repairing 255211B 555 30.01.20 CPD-I M/s Vibrant Engineers 1506/CPD-I/20.09.19 1834/98 Supply 1275674B 556 31.01.20 BMD-II M/s P.K. Enterprises 3 07/BMD-II/20.07.19 2000/51 Replacement 18652B 557 31.01.20 BMD-II M/s D.K. & Sons 2 19/BMD-II/10.10.19 2000/ O/H 0

10070844.00 0.00 2531666.00 0.00

B 558 01.02.20 EMD-I M/s Nosad Constractor 4 18/EMD-I/27.10.18 2045/45 Overhauling 30566B 559 01.02.20 EMD-I M/s Nosad Constractor 11 19/EMD-I/03.11.16 2045/46 Shifting 38911B 560 01.02.20 EMD-I M/s Nosad Constractor 2 10/EMD-I/05.11.19 2045/49 Cable Salvaging 4874B 561 01.02.20 EMD-I M/s Nosad Constractor 12 17/EMD-I/27.10.18 2045/48 Maintenance work 8501B 562 01.02.20 ECMD-I M/s Pitambra Engineers 1 07/ECMD-I/28.06.19 2053/52 Painting 345411B 563 01.02.20 ECMD-I M/s A.S. Enterprises 1 13/ECMD-I/11.09.19 2053/56 Levelling 315988B 564 04.02.20 EMD-I M/s Nosad Constractor HR 13/EMD-I/20.05.16 2055/16 Security 53395

B 565 04.02.20 EMD-I M/s Nosad Constractor HR 09/EMD-I/28.03.16 2055/17 Security 59497

B 566 04.02.20 EMD-I M/s Nosad Constractor HR 04/EMD-I/05.01.16 2055/105 Security 38228

B 567 04.02.20 EMD-I M/s Nosad Constractor HR 11/EMD-I/29.04.16 2055/68 Security 27168

B 568 04.02.20 EMD-I M/s Nosad Constractor HR 31/EMD-I/28.06.15 2055/57 Security 58220B 569 04.02.20 EMD-I M/s Nosad Constractor HR 19/EMD-I/03.11.16 2055/14-B Security 38908B 570 04.02.20 EMD-I M/s Nosad Constractor HR 08/EMD-I/09.10.17 2055/92 Security 25000B 571 04.02.20 EMD-I M/s Nosad Constractor HR 20/EMD-I/13.12.15 2055/93 Security 50273B 572 04.02.20 EMD-I M/s Nosad Constractor HR 18/EMD-I/03.11.16 2055/94 Security 15000B 573 04.02.20 EMD-I M/s Nosad Constractor HR 02/EMD-I/04.01.16 2055/92 Security 42386B 574 04.02.20 EMD-I M/s Nosad Constractor HR 09/EMD-I/03.11.17 2055/55 Security 65000B 575 04.02.20 EMD-I M/s Nosad Constractor HR 02/EMD-I/26.07.17 2055/95 Security 62500B 576 04.02.20 EMD-I M/s Nosad Constractor HR 10/EMD-I/03.11.17 2055/97 Security 32421B 577 04.02.20 EMD-I M/s Nosad Constractor HR 06/EMD-I/29.09.18 2055/98 Security 27000B 578 04.02.20 EMD-I M/s Nosad Constractor HR 10/EMD-I/21.11.12 2055/78 Security 47538B 579 04.02.20 EMD-I M/s Nosad Constractor HR 07/EMD-I/05.12.11 2055/100 Security 59064B 580 04.02.20 EMD-I M/s Nosad Constractor HR 33/CWCD-II/17.10.12 2055/21-B Security 26435B 581 04.02.20 EMD-I M/s Nosad Constractor HR 08/EMD-I/08.12.11 2055/01 Security 31574B 582 04.02.20 EMD-I M/s Nosad Constractor HR 05/EMD-I/23.08.10 2055/102 Security 30000B 583 04.02.20 EMD-I M/s Nosad Constractor HR 04/EMD-I/12.10.19 2055/102 Security 27488B 584 04.02.20 EMD-I M/s Nosad Constractor HR 03/CSD-I/15.05.18 2055/104 Security 10000B 585 05.02.20 ECMD-II M/s Jamuna Meher Enterprises 2 43/ECMD-II/30.12.18 2101/17 Civil Work 696504B 586 05.02.20 BMD-II M/s P.K. Enterprises HR 07/BMD-II/20.07.19 2099/20 Security 29351B 588 05.02.20 CHD-I M/s Priyanka Enterprises 2 05/CHD-I/30.08.19 1873/38 Overhauling 267687

B 589 05.02.20 EMD-II M/s R.L. Engineering 1 02/EMD-II/25.06.19 1880/95 O/H 281973

B 590 05.02.20 ECMD-II M/s Akshat Enterprises 3 01/ECMD-II/02.04.19 3090/131 M&R 28642B 591 05.02.20 ECMD-II M/s Goverdhan Contractor 3 07/ECMD-II/25.06.19 3091/55 Maintenance 107998B 592 08.02.20 CPD-I M/s Diesel Locomotive HR 1910/CPD-I/07.12.19 1820/131 Supply 857422B 593 08.02.20 ECMD-II M/s Akshat Enterprises 2 09/ECMD-II/2019-20 1971/124 Misc. 180072

Page 11: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B 594 08.02.20 EMD-III M/s Ramit Erector HR 16/EMD-III/11.03.19 2050/22-B Security 29567B 595 14.02.20 CPD-I M/s Aditi Enterprises HR 1688/CPD-I/01.11.19 1799/131 Supply 18492B 596 14.02.20 ECMD-II M/s Kanha Construction 2 01/ECMD-II/01.04.19 2011/83 M&R 17705B 597 14.02.20 BMD-II M/s O.S. Contractor HR 35/BMD-II/27.10.16 1981/38 Security 96395B 598 14.02.20 BMD-II M/s O.S. Contractor HR 35/BMD-II/27.10.16 1981/39 Security 29521B 599 18.02.20 C&ID-I M/s D.K. & Sons HR 11/C&ID-I/27.09.19 2060/17 Security 18075B 600 19.02.20 CPD-I M/s Aditi Enterprises 1688/CPD-I/01.11.19 1969/64 Supply 30398B 601 19.02.20 AHD-I M/s MAK Construction HR 12/AHD-I/27.11.19 2063/48 Security 6022B 602 19.02.20 AHD-I M/s MAK Construction HR 17/AHD-I/15.03.16 2063/49 Security 29989B 603 19.02.20 AHD-I M/s India Engineering HR 11/AHD-I/22.03.14 2063/49-B Security 5378B 604 19.02.20 AHD-I M/s Zenith Engineering HR 05/AHD-I/09.08.16 2063/48 Security 93550B 605 19.02.20 ECMD-II M/s Vijay Kumar Gupta 1 53/ECMD-II/30.12.19 1960/29-B M&R 302998B 606 19.02.20 BMD-II M/s S.K. Engineering HR 06/BMD-II/16.08.17 1999/40 Security 47133B 607 19.02.20 BMD-II M/s M.K. Traders HR 22/BMD-II/23.08.16 1999/41 Security 51082B 608 19.02.20 BMD-II M/s S.K. Engineering HR 13/BMD-II/19.01.19 1999/40-B Security 5085B 609 19.02.20 BMD-II M/s M.K. Traders HR 28/BMD-II/06.10.16 1999/41-A Security 42725B 610 22.02.20 CPD-II M/s Akshat Enterprises HR 20/CPD-II/21.12.18 2101/05 Security 22000B 611 22.02.20 CPD-II M/s Pooja Traders HR 19/CPD-II/21.12.18 2101/05 Security 25425B 612 22.02.20 ECMD-II M/s Arkam Enterprises HR 11/ECMD-II/21.06.18 2101/06 Security 14823B 613 22.02.20 CPD-II M/s Krishna Enterprises HR 01/CPD-II/22.03.17 2101/06 Security 14734B 614 22.02.20 CPD-II M/s R.P. Construction HR 42/CPD-II/30.12.16 2101/07 Security 28093B 615 22.02.20 CPD-II M/s R.P. Construction HR 07/CPD-II/15.06.17 2101/07 Security 28957B 616 22.02.20 CPD-II M/s Akshat Enterprises HR 06/CPD-II/15.06.17 2101/08 Security 11088B 617 22.02.20 CPD-II M/s Pooja Traders HR 40/CPD-II/29.12.18 2101/08 Security 26103B 618 22.02.20 CPD-II M/s Akshat Enterprises HR 41/CPD-II/29.12.16 2101/09 Security 27429B 619 22.02.20 CPD-II M/s Akshat Enterprises HR 05/ECMD-II/28.05.19 2101/09 Security 29475B 620 22.02.20 CPD-II M/s Shiv Mahadev Engg. HR 08/ECMD-II/04.07.19 2101/12 Security 29400

TOTAL 4196325.00 0.00 906312.00 0.00

B 621 04.03.20 E&TD M/s K.S. & Brothers 2 32/E&TD/20.01.19 1992/94 Supply of Snaks 62339B 622 04.03.20 CHD-I M/s Hind Udyog 5 19/CHD-I/18-19 2002/51 Reconditioning 133718B 623 04.03.20 CHD-I M/s Hind Udyog 08/CHD-I/21.09.17 2002/59 Security 110491B 625 04.03.20 EMD-IV M/s T.S. Enterprises 1 22/EMD-III/25.11.19 2049/26 Replacement 347948B 626 04.03.20 ECMD-II M/s K.S. & Brothers 3 53/ECMD-II/02.02.19 1961/28-B M&R 98161B 627 04.03.20 ECMD-II M/s Aarseller 1 42/ECMD-II/23.09.19 2071/24 Supply 334530

B 628 04.03.20 CHD-II M/s Amber Computer HR 05/CHD-II/30.06.17 3092/45 Security 9600

B 629 05.03.20 EMD-III M/s Sadan Engineering 1 24/EMD-III/02.01.19 1994/131 Maintenance 432747

B 630 05.03.20 EMD-II M/s Priya Construction Final 05/EMD-II/19-20 1994/50 Overhauling 22139

B 631 05.03.20 ECMD-II M/s Jamuna Meher 1 50/ECMD-II/20.01.20 2069/28 Maintenance 332936

B 632 06.03.20 EMD-II M/s Electrical Instrument Engineers 4 16/EMD-II/18-19 2036/46 Upkeeping 93075

B 633 07.03.20 C&ID-I M/s Shiv Mahadev HR 13/C&ID-I/31.12.18 1944/55-A Security 26220

Page 12: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B 634 07.03.20 C&ID-I M/s D.K. & Sons HR 03/C&ID-I/22.05.18 2066/15-B Security 9337B 635 07.03.20 C&ID-I M/s D.K. & Sons HR 02/C&ID-I/25.05.18 2066/15-B Security 7818B 636 07.03.20 C&ID-I M/s D.K. & Sons HR 14/C&ID-I/31.12.18 2066/25-B Security 7769B 637 07.03.20 C&ID-I M/s D.K. & Sons HR 10/C&ID-I/15.10.18 2066/26-A Security 8665B 638 07.03.20 C&ID-I M/s D.K. & Sons HR 09/C&ID-I/15.10.18 2066/26 Security 7116B 639 07.03.20 C&ID-I M/s D.K. & Sons HR 03/C&ID-I/24.06.19 2066/27-A Security 16480B 640 07.03.20 C&ID-I M/s D.K. & Sons HR 06/C&ID-I/31.07.19 2066/26-B Security 7831B 641 07.03.20 C&ID-I M/s M.A. Engineering Works HR 01/C&ID-I/18-19 2066/27-B Security 7413B 642 13.03.20 CHD-III M/s Priya Construction 6 11/CHD-III/20.01.20 2055/100 Security 26562B 643 13.03.20 CSD-I M/s Satyam Weighing System 302/CSD-I/01.04.19 1575/187 Maintenance 11505B 644 13.03.20 EMD-II M/s Vikas Electricals 4 03/EMD-II/18-19 2055/01 Security 82378B 645 13.03.20 EMD-II M/s Priya Construction Co. 3 14/EMD-II/11.12.18 2073/13-B Emergency 58224B 646 21.03.20 CAMD-I M/s Syndicate Engineer 5 04/CAMD-I/14.06.17 1927/ Breakdown Maint. 16308B 647 21.03.20 BMD-I M/s R.K. Traders HR 06/BMD-I/08.01.20 1936/106 Security 7085B 649 21.03.20 OGD-I M/s S.G.L. Engineering HR 21/OGD-I/17.03.16 2024/39 Security 33000B 650 21.03.20 OGD-I M/s Maa Shakti Enterprises HR 05/OGD-I/12.04.19 2024/39 Security 17126B 651 21.03.20 OGD-I M/s Maa Shakti Enterprises HR 12/OGD-I/15.10.18 2024/40 Security 19184B 652 21.03.20 OGD-I M/s D.K. & Sons HR 06/OGD-I/01.08.19 2024/40 Security 8628B 653 21.03.20 OGD-I M/s Narendra HR 01/OGD-I/27.04.19 2024/41 Security 6588B 654 21.03.20 OGD-I M/s D.K. & Sons HR 09/OGD-I/06.11.19 2024/41 Security 9539B 655 21.03.20 OGD-I M/s Bareli Engg. Co. HR 11/OGD-I/16.08.17 2024/42 Security 70505B 656 21.03.20 OGD-I M/s S.G.L. Engineering HR 07/OGD-I/17-18 2024/43 Security 33540B 657 21.03.20 OGD-I M/s S.G.L. Engineering HR 06/OGD-I/14-15 2024/43 Security 30000B 658 30.03.20 CSD-I M/s Satyam Weighing System HR 302/CSD-I/01.04.19 1575/188 Maintenance 11505B 659 30.03.20 CSD-I M/s Satyam Weighing System 302/CSD-I/01.04.19 1575/ Maintenance 11505B 660 30.03.20 CHD-II M/s Balram Engineering 1 20/CHD-II/21.10.19 1958/177 Providing 280901

TOTAL 2810416.00 0.00 0.00 0.00

B 1 08.04.20 ECMD-II M/s Vijay Kumar Gupta H/R 44/ECMD-II/19.03.18 1942/100 Security 121064B 2 08.04.20 ECMD-II M/s Vijay Kumar Gupta H/R 02/ECMD-II/02.04.19 1942/101 Security 28837B 3 09.04.20 EMD-III M/s Sadan Engineering Works H/R 11/EMD-III/22.08.17 1994/133 Security 46434B 4 09.04.20 EMD-III M/s Sadan Engineering Works H/R 06/EMD-III/20.07.17 1994/133 Security 19035B 5 09.04.20 EMD-III M/s Sadan Engineering Works H/R 13/EMD-III/30.11.18 1994/134 Security 46890

TOTAL 262260.00 0.00 0.00 0.00

B 6 06.05.20 ECMD-I M/s Ramesh Construction H/R 10/ECMD-I/28.11.19 878/66-B Security 209606B 7 18.05.20 ECMD-I M/s Puneet Construction H/R 04/ECMD-I/23.07.18 1765/2 Security 19484B 8 18.05.20 ECMD-I M/s Puneet Construction H/R 12/ECMD-I/18.01.19 1765/2 Security 24211B 9 18.05.20 ECMD-I M/s Karan Singh H/R 07/ECMD-I/11.10.18 1765/188 Security 6931B 10 18.05.20 ECMD-I M/s Arvind Singh H/R 05/ECMD-I/14.05.19 1765/196 Security 2400B 11 18.05.20 ECMD-I M/s Puneet Construction H/R 08/ECMD-I/11.10.18 1765/195 Security 26223B 12 18.05.20 ECMD-I M/s Puneet Construction H/R 06/ECMD-I/07.06.19 1765/194 Security 23920

Page 13: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B 13 18.05.20 ECMD-I M/s Karan Singh H/R 18/ECMD-I/28.03.18 1765/188 Security 7047B 14 18.05.20 ECMD-I M/s Puneet Construction H/R 16/ECMD-I/01.07.18 1765/189 Security 26821B 15 18.05.20 ECMD-I M/s Arvind Singh H/R 01/ECMD-I/09.04.18 1765/191 Security 2400B 16 18.05.20 ECMD-I M/s Puneet Construction H/R 11/ECMD-I/08.09.17 1765/192 Security 12918B 17 18.05.20 ECMD-I M/s Arvind Singh H/R 15/ECMD-I/26.10.17 1765/192 Security 2400B 18 18.05.20 ECMD-I M/s Arvind Singh H/R 06/ECMD-I/11.10.18 1765/193 Security 2400B 19 18.05.20 ECMD-I M/s Vijay Kr. Gupta Contractor H/R 03/ECMD-I/22.06.18 2052/165 Security 64000B 21 18.05.20 ECMD-I M/s Puneet Construction H/R 09/ECMD-I/19-20 2052/166 Security 47294B 22 18.05.20 ECMD-I M/s Ramesh Construction H/R 10/ECMD-I/28.11.19 1878/67 Security 172117

TOTAL 650172.00 0.00 0.00 0.00Gross Total 38554625.00 645080.00 17792719.00 12432602.00

Dy. Chief Accounts Officer

Page 14: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

Supply PI

B- 685 11.01.16 CSD-II M/S Amco Industries 2302/CPD-II/O-1/14.12.15 386/144 23.12.15 SupplyB- 701 21.01.16 CSD-II M/S Kay Mohan Corpn 1535/CPD-I/O-1/03.09.15 411/41 19.11.15 SupplyB- 708 21.01.16 CSD-II M/S Hitachi Hi Rel Power Electronics Pvt

Ltd1960/CPD-I/O-1/11.12.15 411/46 14.01.16 Supply

TOTAL 0.00

B- 821 02.03.16 CSD-II M/S Jalvid Udyog 58/CPD-I/11.01.16 341/68-69 SupplyB- 844 28.03.16 CSD-II M/S Durg India Intrumentation (P) Ltd 141/CPD-I/O-1/05.01.16 411/47 26.02.16 SupplyB- 847 28.03.16 CSD-II M/S Amco Industries 2808/CPD-II/O-1/29.02.16 386/151 01.03.16 SupplyB- 848 28.03.16 CSD-II M/S Amco Industries 2807/CPD-II/O-1/29.02.16 386/150 01.03.16 Supply

TOTAL 0.00

B- 119 02.05.16 CSD-II M/S MEKASTER Engineering Service 110/C&ID-III/28.03.16 445/28 04.04.16 SupplyB- 166 23.05.16 CSD-II M/S Pix Transmission Ltd 1467/CPD-I/O-1/19.08.15 267/186 14.05.16 Supply

TOTAL 0.00

B- 208 08.06.16 CSD-II M/S Indian Rubber Product 71/CPD-I/O-1/13.01.16 341/78 26.02.16 SupplyB- 222 21.06.16 CSD-II M/S Atlas Copco India Ltd 1579/CPD-I/O-1/14.09.15 445/31 02.06.16 SupplyB- 240 28.06.16 CSD-II M/S Aditya Enterprises 723/CPD-I/O-1/03.05.16 411/53 11.05.16 SupplyB- 241 28.06.16 CSD-II M/S K.S. & Brothers 530/CPD-I/O-1/04.04.16 411/52 15.06.16 Supply

TOTAL 0.00

B- 261 13.07.16 CSD-II M/S Anurag Engg Works 968/CPD-I/O-1/25.05.16 450/17 10.06.16 SupplyTOTAL 0.00

B- 323 10.08.16 CSD-II M/S R.S.P. overseas pvt. Ltd. 489/CPD-1/O-1/28.03.16 426/47 10.04.16 SupplyB- 349 16.08.16 CSD-II M/S Jalvid Udyog 1510/CPD-I/O-1/13.07.16 376/58 25.07.16 SupplyB- 354 22.08.16 CSD-II M/S Simplex Switchgear Pvt.Ltd. 1438/CPD-I/O-1/30.06.16 237/187 04.07.16 Supply

TOTAL 0.00

B- 402 07.09.16 CSD-II M/S Uttam Sales Carporation 513/CPD--II/OI 01.06.16 411/59 05.06.16 SupplyB- 403 07.09.16 CSD-II M/S Siddhi Vinayak Engg. 843/CPD--I/OI 13.05.16 411/61 07.06.16 SupplyB- 409 07.09.16 CSD-II M/S Javid udyog 1761/CPD--I/OI 04.08.16 411/66 27.08.16 SupplyB- 434 16.09.16 CSD-II M/S Swastik Enterprises 1434/CPD-I/O-I/30.06.16 445/39 02.08.16 SupplyB- 452 20.09.16 CSD-II M/S Shree Shyam Bearing Pvt. Ptd. 1505/CPD--I/O-I/ 13.07.16 466/23 29.08.16 SupplyB- 462 24.09.16 CSD-II M/S Jalvid Udyog 1834/CPD-I/16-17/17.08.16 267/195 12.09.16 SupplyB- 465 24.09.16 CSD-II M/S Jalvid Udyog 1173/CPD-II/O-I/24.08.16 267/195 12.09.16 Supply

0.00

B- 515 24.10.16 CSD-II M/S K.S.& Brothers 1923/CPD-I/O-I/29.08.16 411/70 02.09.16 Supply

0.00

B- 568 22.11.16 CSD-II M/S Jain Mill Stores Pvt. Ltd. 1839/CPD-I/O-I/17.08.16 485/17 05.11.16 Supply

FUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVED

Fund Reserved Amount

Material/Spares

TOTAL

TOTAL

Agr/PO/LOI/WO and Dt MB NO./Page No/

Date of Measur.

FUND RESERVED

FUND RESERVED

FUND RESERVED

2X210 MW Parichha Thermal Extension Project, Parichha (Jhansi)B

Description of Work/Supply WorkBill No & Date

Reg Inde

x

Date Name Of Division

Name of Firm RAB

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

G:\2nd Pen Drive\210MW\2020-21\06-20\Liab_15.06.20_210MW 1

Page 15: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 576 28.11.16 CSD-II M/S Hitpro Engineering Co. 1744/CPD-I/O-I/03.08.16 411/72 08.11.16 Supply0.00

B- 632 22.12.16 CSD-II M/S Trident Precision International 863/CPD-III/O-1/26.09.16 386/176 23.11.16 Supply0.00

B- 669 10.01.17 CSD-II M/S Vidyut Bhawan 1200/CPD-II/O-1/30.08.16 411/75 27.10.16 SupplyB- 692 12.01.17 CSD-II M/S T.R.F.Limited 1032/CPD-III/O-1/22.10.16 386/184 26.10.16 SupplyB- 713 17.01.17 CSD-II M/S AtoZ Infraspares Pvt. Ltd. 2380/CPD-I/PTPP/O-

1/23.11.16412/195 15.12.16 Supply OH3

B- 718 17.01.17 CSD-II M/S Uttam Sales Corporation 2498/CPD-I/PTPP/O-1/19.12.16

445/52 20.12.16 Supply O&MB- 733 25.01.17 CSD-II M/S S. Traders & manufactures 2070/CPD-II/O-1/26.12.16 374/170 02.01.17 Supply

Total 0.00

B- 773 07.02.17 CSD-II M/S Shri Bhawani Trading Co. 56/CPD-I/O-1/12.01.17 491/02 23.01.17 OH-3 SupplyB- 775 07.02.17 CSD-II M/S Vijay Enginering 1842/CPD-II/O-1/22.11.16 466/43 15.01.17 Supply O&HB- 777 07.02.17 CSD-II M/S Thermaserve Corp. 2050/CPD-III/O-1/22.12.16 466/45 27.12.16 OH-3 SupplyB- 778 07.02.17 CSD-II M/S Thermaserve Corp. 2050/CPD-III/O-1/22.12.16 466/45 27.12.16 OH-3 Supply FUND

RESERVEDB- 779 07.02.17 CSD-II M/S Thermaserve Corp. 2051/CPD-II/O-1/22.12.16 466/46 27.12.16 OH-3 SupplyB- 780 07.02.17 CSD-II M/S Thermaserve Corp. 2051/CPD-II/O-1/22.12.16 466/47 27.12.16 OH-3 SupplyB- 782 07.02.17 CSD-II M/S Ashbond Engineers P. Ltd 2327/CPD-II/O-1/09.11.16 411/80 30.12.16 OH-3 SupplyB- 786 07.02.17 CSD-II M/S Kaltron Contrals 2326/CPD-II/O-1/09.11.16 411/83 11.01.17 Supply O&MB- 787 07.02.17 CSD-II M/S Trilok Chand&Sons 2500/CPD-I/O-1/19.12.16 411/84 20.12.16 Supply O&MB- 788 07.02.17 CSD-II M/S Atlas Copco Compressor Technige

Sales2086/CPD-I/O-1/22.09.16 411/85 29.09.16 Supply O&M

B- 789 07.02.17 CSD-II M/S Krishan Kumar Distribwar 86/CPD-I/O-1/18.01.17 411/86 20.01.17 Supply O&MB- 797 14.02.17 CSD-II M/S Asan Engineers P. Ltd 2421/CPD-I/O-1/28.11.16 492/01 08.12.16 SupplyB- 812 20.02.17 CSD-II M/S J.K.Engineering Co. 112/CPD-I/O-I/21.01.17 341/116 24.01.17 Supply

0.00 0.00 0.00

B- 859 21.03.17 CSD-II M/S Jalvid Udyog 116/CPD-I/O-I/21.01.17 411/91 03.02.17 Supply OH 3B- 862 21.03.17 CSD-II M/S Assam Carbon Product Limited 138/CPD-I/O-I/28.01.17 411/93 16.03.17 Supply O&MB- 863 21.03.17 CSD-II M/S Ganesh Sales & Services 155/CPD-I/O-I/30.01.17 485/33 20.03.17 Supply O&MB- 864 21.03.17 CSD-II M/S Jain Mill Stores Pvt. Ltd 89/CPD-I/O-I/18.01.17 485/34 20.03.17 Supply O&MB- 865 21.03.17 CSD-II M/S Jain Mill Stores Pvt. Ltd 113/CPD-I/O-I/21.01.17 485/35 20.03.17 Supply OH 3B- 866 21.03.17 CSD-II M/S Jain Mill Stores Pvt. Ltd 113/CPD-I/O-I/21.01.17 485/36 20.03.17 Supply OH 3B- 867 21.03.17 CSD-II M/S Jain Mill Stores Pvt. Ltd 113/CPD-I/O-I/21.01.17 485/37 20.03.17 Supply OH 3B- 868 21.03.17 CSD-II M/S Jalvid Udyog 31/CPD-I/O-I/09.01.17 485/37 230.03.17 Supply OH 3

B- 869 21.03.17 CSD-II M/S Jalvid Udyog 31/CPD-I/O-I/09.01.17 485/38 20.03.17 Supply OH 3B- 886 30.03.17 CSD-II M/S Ocean wires & Cables P. Ltd 1760/CPD-I/O-I/04.08.16 237/198 27.08.16 Supply OH3

0.00 0.00 0.00

B- 60 24.04.17 CSD-II M/S Vibhuh Power & Energy Solution 109/CPD-I/O-I/21.01.17 445/53 27.02.17 Supply0.00 0.00 0.00

B- 85 08.05.17 CSD-II M/S Shreya Automation & Technochem Pvt. Ltd

85/CPD-I/O-I/18.01.17 491/03 05.05.17 Supply O&M

B- 114 28.05.17 CSD-II M/S Simplex Switchgear P. Ltd 132/CPD-III/O-1/17.03.17 492/2 27.03.17 Supply

TOTAL

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVEDTOTAL

TOTAL

TOTAL

FUND RESERVED

TOTAL

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVED

G:\2nd Pen Drive\210MW\2020-21\06-20\Liab_15.06.20_210MW 2

Page 16: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

0.00 0.00 0.00B- 151 19.06.17 CSD-II M/S Nanak Electric Stores 147/CPD-III/O-I/22.03.17 491/05 03.04.17 SupplyB- 159 27.06.17 CSD-II M/S Globe Enterprises 331/CPD-I/16-17/12.05.17 341/127 22.06.17 Supply

0.00 0.00 0.00

B- 291 13.10.17 CSD-II M/S T.R.F Ltd 540/CPD-III/O-I/18.04.17 497/15 10.10.17 SupplyB- 302 16.10.17 CSD-II M/S Shree Shyam Bearing Pvt Ltd 1705/CPD-I/O-I/05.10.15 406/42 11.10.17 Supply o&mB- 308 24.10.17 CSD-II M/S M.E.M.Industriec 358/CPD-I/O-1/03.01.16 411/100 24.10.17 Supply

TOTAL 0.00 0.00 0.00

B- 407 02.01.18 CSD-II M/S Unitech Process Control 305/C&ID-II/22.12.17 487/47 01.01.18 SupplyTOTAL TOTAL 0.00 0.00 0.00

B- 472 28.02.18 CSD-II M/S Ideal Flow Control Pvt.Ltd. 03/CPD-II/O-I/01.01.18 449/65 24.02.18 Supply OH-3B- 474 28.02.18 CSD-II M/S Kay Mohan Corporation 1056/CPD-I/O-I/01.11.17 449/66 24.02.18 Supply O&M

TOTAL TOTAL 0.00 0.00 0.00

B- 494 14.03.18 CSD-II M/S Levcon Instruments Pvt.Ltd. 58/CPD-I/O-I/12.01.17 486/43 09.03.18 Supply O&MB- 500 14.03.18 CSD-II M/S Jalvid Udyog 1143/CPD-I/O-I/21.11.17 485/105 09.03.18 SupplyB- 501 14.03.18 CSD-II M/S Jalvid Udyog 1264/CPD-I/O-I/19.12.17 485/106 09.03.18 SupplyB- 504 17.03.18 CSD-II M/S Aditya Enterprises 1277/CPD-I/O-I/20.12.17 445/72 15.03.18 SupplyB- 524 28.03.18 CSD-II M/S Aditya Enterprises 568/CPD-III/O-I/05.12.17 491/16 03.03.18 Supply

TOTAL TOTAL 0.00 0.00 0.00

B- 2 03.04.18 CSD-II M/S Bee Gee Associates 1409/CPD-I/O-I/24.01.18 493/9 28.03.18 Supply O&MTOTAL TOTAL 0.00 0.00 0.00

B- 92 08.05.18 CSD-II M/S Jalvid Udyog 928/CPD-I/O-I/30.05.18 485/118 04.05.18 Supply B- 111 11.05.18 CSD-II M/S Vikash Chauda 1623/CPD-I/O-I/13.03.18 449/69 08.05.18 Supply O&MB- 113 11.05.18 CSD-II M/S Jalvid Udyog 302/CPD-II/O-I/05.03.18 374/198 07.05.18 Supply O&MB- 126 16.05.18 CSD-II M/S Supertech Engineers 1545/CPD-I/O-I/24.02.18 427/74 10.05.18 Supply O&M

TOTAL TOTAL 0.00 0.00 0.00

B- 137 04.06.18 CSD-II M/S Ocean Wire and Cables (P)Ltd 20/CPD-I/PTPP/06.04.18 487/61 22.05.18 Supply O&MB- 138 04.06.18 CSD-II M/S Aarseller Tredco 120/EMD-V/PTPP/24.04.18 487/63 23.05.18 Supply O&M

B- 171 17.06.18 CSD-II M/S Jalvid Udyog 178/CPD-I/O-I/21.05.18 341/183 13.06.18 SupplyB- 175 17.06.18 CSD-II M/S Simplex Switchgear P. Ltd 1428/CPD-I/O-I/31.01.18 487/66 12.06.18 SupplyB- 176 17.06.18 CSD-II M/S Trade India Corporation 1546/CPD-I/O-I/24.02.18 406/46 09.06.18 SupplyB- 178 17.06.18 CSD-II M/S AIA Engg.Ltd 740/CPD-II/O-I/02.07.16 391/75 09.06.18 SupplyB- 179 19.06.18 CSD-II M/S Thermoserve Corporation 632/CPD-II/O-I/01.06.18 466/93 08.06.18 SupplyB- 208 29.06.18 CSD-II M/S R.S. P.Overseas Pvt.Ltd 1341/CPD-I/O-I/10.01.18 450/91 25.06.18 Supply

TOTAL 0.00 0.00 0.00

B- 210 04.07.18 CSD-II M/S Net Cascade Automation Pvt Ltd 268/CPD-I/O-I/15.06.18 492/8 02.07.18 Supply

B- 229 20.07.18 CSD-II M/S AtoZ Infraspares Pvt.Ltd 301/CPD-I/22.06.18 535/1,2 12.07.18 V-Belt SupplyB- 241 21.07.18 CSD-II M/S AtoZ Infraspares Pvt.Ltd 300/CPD-I/O-I/22.06.18 535/01 18.07.18 SupplyB- 242 23.07.18 CSD-II M/S Fludomat Ltd 150/CPD-II/O-I/23.01.17 427/77 20.07.18 Supply O & M

TOTAL TOTAL 0.00 0.00 0.00

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVED

TOTAL

TOTAL

FUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVED

G:\2nd Pen Drive\210MW\2020-21\06-20\Liab_15.06.20_210MW 3

Page 17: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 278 16.08.18 CAMD-II M/S Usha Enterprises III 20/CAMD-II/17-18/27.02.18 312/93 10.07.18 B/D Maintinance

TOTAL 0.00 0.00 0.00

B- 358 29.09.18 CPD-II M/S Asan Engineers Pvt.Ltd 1046/CPD-II/30.08.18 427/81 26.09.18 SupplyTOTAL TOTAL 0.00 0.00 0.00

B- 366 03.10.18 CPD-I M/S A.K. Agencies 465/CPD-I/26.07.18 426/97 18.09.18 Supply O & MB- 373 03.10.18 CPD-I M/S Bearing Edge Technocret 540/CPD-I/03.08.18 487/101 26.03.18 Supply O & MB- 404 23.10.18 CPD-I M/S Atlas Copco 476/CPD-I/27.07.18 492/12 22.10.18 Supply O & MB- 408 25.10.18 CSD-II M/S Indian Oil Cor. Ltd 832/CPD-I/590/11.09.18 242/103 25.10.18 Supply O/HB- 411 26.10.18 C&ID-III M/S Siddhi Vinayak Engg. 09/C&ID-III/2017-

18/20.09.17526/12 Supply Matenal 44091.00

B- 412 29.10.18 CSD-II M/S Scope T&M Pvt.Ltd. 513/CPD-II/15.10.18 487/82 Supply TOTAL TOTAL 0.00 0.00 44091.00

B- 413 02.11.18 CSD-II M/S ESK India Commercer and Trade (P) Ltd

1579/CPD-I/05.03.18 493/18 Supply O & M

B- 444 14.11.18 CPD-III M/S Electrocontrols India 499/CPD-III/22.09.18 411/133 07.11.18 Supply O & MB- 445 14.11.18 CPD-III M/S Leading Edge Technocrat 372/CPD-III/02.08.18 497/39 13.11.18 Supply O & MB- 490 27.11.18 CPD-II M/S India Engineering Works 1190/CPD-II/08.10.18 466/109 14.11.18 Supply (OH&4)

TOTAL 0.00 0.00 0.00

B- 500 03.12.18 CSD-II M/S Instant Engineers 498/CPD-III/22.09.18 445/110 27.11.18 SupplyTOTAL 0.00 0.00 0.00

B- 532 04.01.19 CSD-II M/S R.K. Traders 452/C&ID-III/19.12.18 492/14 03.01.19 Supply of BioB- 543 05.01.19 CSD-II M/S Govardhan Controls 1299/CPD-I/05.12.18 411/136 24.12.18 Supply O#4B- 548 05.01.19 CSD-II M/S HEMS Corporation 1160/CPD-I/01.11.18 428/166 18.12.18 Supply O & MB- 549 05.01.19 CSD-II M/S Kay Mohan Corporation 1161/CPD-I/01.11.18 428/147 27.12.18 Supply O & MB- 568 16.01.19 CSD-II M/S Raviraj Engg. Com. 1484/CPD-I/24.12.18 426/110 09.01.19 Supply O & MB- 574 16.01.19 CSD-II M/S Atlas Copco 606/CPD-II/25.05.18 499/23 21.12.18 SupplyB- 613 22.01.19 CSD-II M/S S.K. Engineering & Alleed 1409/CPD-I/21.12.18 411/142 22.01.19 Supply O#H4 122720.00B- 618 22.01.19 CSD-II M/S Keltron Controls Division 1261/CPD-I/28.11.18 411/147 22.01.19 Supply O & M 102639.00B- 625 22.01.19 CSD-II M/S Supath Engineering Serveces

P.LTd16/CPD-I/03.01.19 444/129 22.01.19 Supply O#H4 1030620.00

B- 643 28.01.19 CSD-II M/S Power Engineers 1506/CPD-II/31.12.18 466/118 24.01.19 Supply (OH&4) 365517.00B- 644 28.01.19 CSD-II M/S Thermoserve Corps 53/CPD-II/15.01.18 466/119 24.01.19 Supply (OH&4) 278826.00B- 648 28.01.19 TMD-II M/S Amazon Control Technology

P.Ltd.I&F 19/TMD-II/17.01.19 475/125 24.01.19 Supply 365531.00

B- 657 28.01.19 CSD-II M/S J.K. Engineering Company 400/CPD-I/23.07.18 535/52 28.01.19 SupplyB- 665 30.01.19 CSD-II M/S TRF Ltd. 192/CPD-III/18.05.18 499/37 29.01.19 Supply misadeance 573023.00

TOTAL TOTAL 0.00 0.00 0.00

B- 670 01.02.19 CSD-II M/S Sone Obra Enterprises Ltd. 98/CPD-I/16.01.19 449/91 30.01.19 Supply O & M 225695.00B- 674 02.02.19 CSD-II M/S J. Umashankar & Co. Pvt.Ltd. 1437/CPD-I/29.12.18 428/149 01.02.19 Supply O & M 7328.00B- 675 02.02.19 CSD-II M/S J. Umashankar & Co. Pvt.Ltd. 1434/CPD-I/29.12.18 428/149 01.02.19 Supply O & M 39585.00B- 676 02.02.19 CSD-II M/S SAPS Power Equipment Pvt.Ltd. 31/CPD-I/08.01.19 428/150 01.02.19 Supply O & M 302360.00B- 680 02.02.19 CSD-II M/S Febteq Systems Pvt.Ltd. 1385/CPD-II/27.11.18 485/162 01.02.19 Supply 92516.00B- 698 05.02.19 CSD-II M/S Multimind Creations 35/EMD-V/21.01.19 445/121 04.02.19 Supply 2204350.00

FUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

G:\2nd Pen Drive\210MW\2020-21\06-20\Liab_15.06.20_210MW 4

Page 18: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 707 06.02.19 CSD-II M/S Sone Obra Enterprises Ltd. 1438/CPD-II/29.12.18 391/81 Supply O & M 176262.00B- 714 08.02.19 CSD-II M/S Aarseller Tredco 40/CPD-II/11.01.19 427/86 Supply 140112.00B- 716 08.02.19 CSD-II M/S Commercial Engg. Mart 1486/CPD-II/24.12.18 427/87 07.02.19 Supply O & M 314382.00B- 717 08.02.19 CSD-II M/S Rajat Associates 95/TMD-II/24.12.18 427/88 07.02.19 Supply O & M 45444.00B- 734 13.02.19 CSD-II M/S M.P.Associates 1259/CPD-I/28.11.18 485/172 12.02.19 Supply (OH&4) 113563.00B- 739 13.02.19 CSD-II M/S ION Exchange 219/CPD-II/12.02.18 485/179 12.02.19 Supply (OH&4) 472236.00B- 740 13.02.19 CSD-II M/S ION Exchange 220/CPD-II/12.02.18 485/180 12.02.19 Supply (OH&4) 383648.00B- 746 15.02.19 CSD-II M/S Neelkanth Power Systems Pvt.Ltd 50/CPD-II/15.01.19 497/56 Supply (OH&4) 3407250.00

B- 751 15.02.19 CSD-II M/S S.K. Engipro & Alliced 78/CPD-I/11.01.19 486/73 Supply (OH&4) 349752.00B- 752 15.02.19 CSD-II M/S S.K. Engipro & Alliced 81/CPD-I/11.01.19 486/74 Supply (OH&4) 328040.00B- 765 21.02.19 CSD-II M/S Sail Kanpur 168/CPD-I/30.01.19 242/110 18.02.19 Supply (OH&4) 3157284.00

TOTAL TOTAL 0.00 0.00 11184839.00

B- 793 02.03.19 CSD-II M/S Aditi Enterprises 121/CPD-I/18.01.19 535/77 Supply 38114.00B- 796 06.03.19 CSD-II M/S Placka Instruments India Pvt.Ltd. 141/CPD-I/22.01.19 411/167 Supply (O&M) 10027.00B- 814 13.03.19 CSD-II M/S Pee Kay Tribals 1048/CPD-II/09.10.19 242/110 24.10.18 GreaseB- 816 27.03.19 CSD-II M/S Jalvid Udyog 209/CPD-I/07.02.19 485/197 26.03.19 Supply 176087.00B- 819 27.03.19 CSD-II M/S Jalvid Udyog 209/CPD-I/07.02.19 485/201 26.03.19 Supply 77467.00B- 833 28.03.19 CSD-II M/S Uttam Sales Corporation 106/CPD-II/17.01.19 487L/108 Supply 279203.00

TOTAL TOTAL 0.00 0.00 580898.00

B- 3 03.04.19 EMD-IV M/S Nosad Contractor 04/EMD-IV/06.07.18 473/145 Preventive/Breaking 38984.00B- 4 03.04.19 CAMD-II M/S Balram Engineers V 18/CAMD-II/25.11.17 416/127 Maintinence B/D 23115.00B- 5 03.04.19 CAMD-II M/S Rakesh Kumar & Co. 02/CAMD-II/16.05.18 468/65 Security 7045.00B- 6 03.04.19 CAMD-II M/S Jahangir Enterprises 17/CAMD-II/20.11.17 468/66 Security 49491.00B- 17 06.04.19 CAMD-II M/S Jahangir Enterprises 14/CAMD-II/27.11.18 23/138 Security 28114.00B- 18 06.04.19 CAMD-II M/S Jahangir Enterprises 08/CAMD-II/19.09.18 23/138 Security 8062.00B- 19 06.04.19 CAMD-II M/S Kaveri Construction Co. 09/CAMD-II/21.07.17 23/139 Security 27500.00B- 21 06.04.19 CHD-III M/S Priya Construction Co. 4&f 10/CHD-III/06.01.18 513/45B Rewinding of Difrent 24566.00B- 22 06.04.19 CHD-III M/S Kanha Construction 05/CHD-III/30.06.17 513/57 Security 4200.00B- 23 06.04.19 CHD-III M/S Samabh Engineering Works 06/CHD-III/07.08.18 513/57 Security 4200.00B- 24 06.04.19 CHD-III M/S Instrument Care Group 07/CHD-III/03.10.17 513/57B Security 15372.00B- 25 06.04.19 CHD-III M/S Nosad Contractor 05/CHD-III/07.03.19 513/59 Overhaling Of HT 22410.00B- 26 06.04.19 CHD-III M/S Punjab Electrical Industries 04/CHD-III/12.06.17 513/60B Security 95810.00B- 27 06.04.19 CHD-III M/S Priya Construction Co. 11/CHD-III/13.02.19 513/60 Rewinding 48927.00B- 29 06.04.19 CHD-III M/S MRP Construction 01/CHD-III/07.05.18 513/57B Preventive/Breaking 17679.00B- 30 A 06.04.19 CHD-IV M/S Krishna Kumar 05/CHD-IV/11.09.18 495/81 Security 8820.00B- 31A 08.04.19 CHD-IV M/S Indrajeet Singh 08/CHD-IV/28.09.18 495/81 Security 6930.00B- 28 08.04.19 AHD-II M/S India Engineering Works Ist 19/AHD-II/14.01.19 515/87 Servicing of Hiis of Ash 30013.00B- 30 08.04.19 AHD-II M/S India Engineering Works 2 19/AHD-II/14.01.19 515/92 Servicing Repairing 33577.00B- 40 09.04.19 AHD-II M/S India Engineering Works Ist 21/AHD-II/14.01.19 459/78 Repairing 53590.00B- 41 09.04.19 AHD-II M/S India Engineering Works Ist 22/AHD-II/21.01.19 459/78B Repairing 57159.00B- 49 10.04.19 CSD-II M/S Trade India Corporation 165/CPD-I/ 450/125 Supply 213662.00B- 50 10.04.19 EMD-V M/S Priya Construction Co. 10/EMD-V/25.12.18 316/87B Repairing& Replecment 366063.00B- 53 10.04.19 CAMD-II M/S Gupta Enterprises Ist 24/CAMD-II/02.05.18 241/52 Fabrication 324324.00B- 57 11.04.19 BMD-IV M/S Nosad Contractor IV 03/BMD-IV/04.08.18 524/44 Maintinence /Repairing 37869.00B- 61 11.04.19 CSD-II M/S Kay Mohan Corporation 191/CPD-I/02.02.19 449/97 Supply 76020.00B- 62 11.04.19 CSD-II M/S Jalvid Udyog 120/CPD-I/18.01.19 491/35 Supply 21594.00B- 67 12.04.19 BMD-IV M/S Usha Enterprises II 11/BMD-IV/14.01.19 278/85 Maintinence of Pump 38809.00

FUND RESERVED

G:\2nd Pen Drive\210MW\2020-21\06-20\Liab_15.06.20_210MW 5

Page 19: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 68 12.04.19 BMD-IV M/S A.S. Enterprises II 15/BMD-IV/21.02.19 278/85B Depution of Supervis 55712.00B- 70 12.04.19 BMD-IV M/S O.S. Contractor 12/BMD-IV/08.02.19 278/86B Insulation Work 26967.00B- 79 15.04.19 TMD-II M/S Harsh & Brothers 08/TMD-II/09.01.18 446/43B Security 5390.00B- 80 15.04.19 TMD-II M/S Harsh & Brothers 12/CWCD-III/27.05.14 446/44 Security 9810.00B- 81 15.04.19 TMD-II M/S Harsh & Brothers 08/TMD-II/21.05.15 446/44B Security 30755.00B- 82 15.04.19 TMD-II M/S Thermal India Engineers 3 05/TMD-II/28.07.18 446/45B Breakdown 32464.00B- 85 15.04.19 CSD-II M/S Fiducia Machinery & Services 240/CPD-II/14.03.19 557/4 Supply 675078.00B- 92 22.04.19 CSD-II M/S Luxmi Trading Company 1435/CPD-I/29.12.18 466/143 Supply 180392.00B- 105 22.04.19 CSD-II M/S Amit Gupta 02/CPD-III/01.08.18 487/111 Security 4200.00B- 106 22.04.19 CSD-II M/S K.S. Brothers 427/CPD-I/05.04.19 487/114 Supply 574977.00B- 116 23.04.19 CHD-II M/S M.K. Traders Ist 10/CHD-II/15.10.18 503/5 Repairing of Cantridge 22550.00B- 117 24.04.19 EMD-V M/S Instrument Care Group Ist&F 27/EMD-V/30.03.18 508/60 Centrifuging 297191.00B- 122 25.04.19 TMD-II M/S Thermal India Engineers 02/TMD-II/12.04.19 446/48 Inspeetion and caring 190570.00B- 123 25.04.19 CSD-II M/S Anurag Enggineering Works 1057/CPD-I/01.11.17 450/128 Supply 5428.00B- 125 26.04.19 CSD-II M/S Rasmen Technologies P.Ltd 237/CPD-I/11.02.19 535/89 Supply 27400.00

TOTAL TOTAL 2048238.00 421454.00 1353097.00

B- 132 03.05.19 CSD-II M/S Adarsh Electronics & Eletrical 558/CPD-III/02.11.18 486/88 Supply 31914.00B- 133 03.05.19 CSD-II M/S Elecon Engineering Co. Ltd. 1370/CPD-I/15.12.18 557/6 Supply 947556.00B- 141 04.05.19 EMD-V M/S Instrument Care Group Ist&F 43/EMD-V/25.01.19 483/51 Replacement of Dew 64476.00B- 142 04.05.19 EMD-V M/S Shiv Mahadev Engg Works 07/EMD-V/28.09.18 483/55 Security 9500.00B- 144 04.05.19 CSD-II M/S Commercial Engg Mart 99/CPD-I/16.01.19 450/133 Supply 21278.00B- 145 04.05.19 CSD-II M/S A.K. Agencies 62/CPD-I/10.01.19 450/134 Supply 754964.00B- 146 04.05.19 CSD-II M/S Power Engineers 54/CPD-II/15.01.19 450/134 Supply 1874467.00B- 147 04.05.19 CSD-II M/S Power Sales Corporation 64/CPD-II/16.01.19 450/136 Supply 248760.00B- 150 04.05.19 CSD-II M/S Upadhayog Engg. Works 273/CPD-I/15.02.19 560/9 Supply 177708.00B- 154 04.05.19 CSD-II M/S Hind Udyog 242/CPD-II/14.03.19 560/10 Supply 560854.00B- 155 07.05.19 ECM&EMD M/S Arvind Singh 10/ECM&EMD/26.12.17 322/92 Security 2400.00B- 157 07.05.19 BMD-III M/S R.Electromech XIV 15/BMD-III/28.03.18 226/164 Preventive /BD 14282.00B- 158 07.05.19 BMD-III M/S Sunrise Engineers & Contoractor IV 04/BMD-III/28.06.18 226/165 Preventive /BD 26656.00B- 159 07.05.19 BMD-III M/S Sunrise Engineers & Contoractor IV 05/BMD-III/28.06.18 455/41 Preventive /BD 86092.00B- 160 07.05.19 CHD-III M/S Priya Construction Co. III 11/CHD-III/13.02.19 546/28 Rewending of diff 25697.00B- 162 07.05.19 CSD-II M/S Steam Equipments Pvt. Ltd. 79/CPD-I/11.01.19 444/144 Supply 74930.00B- 164 07.05.19 CAMD-II M/S Usha Enterprises VI 20/CAMD-II/18.03.19 388/67 Services & B/d 20548.00B- 166 07.05.19 CSD-II M/S Trade India Corporation 1436/CPD-I/29.04.19 426/118 Repairing 67958.00B- 170 10.05.19 CSD-II M/S Simplex Switvhgear Pvt.LTd. 381/CPD-I/14.03.19 411/172 Supply 86868.00B- 171 10.05.19 CSD-II M/S Govardhan Controls 508/CPD-I/31.07.18 411/174 Supply 6950.00B- 174 13.05.19 CSD-II M/S Amco Industries 136/CPD-II/02.02.19 561/01 Supply 505668.00B- 175 13.05.19 CSD-II M/S Amco Industries 139/CPD-II/02.02.19 561/02 Supply 1708494.00B- 181 14.05.19 TMD-II M/S Chembond Water Technologies Ltd. 09/TMD-II/25.04.19 511/14 Removal of scap OD 272700.00

B- 189 15.05.19 CSD-II M/S Laxmi Trading Co. 161/CPD-II/29.01.19 449/101 Supply 95493.00B- 190 15.05.19 CSD-II M/S HEMS Corporatioon 190/CPD-I/02.02.19 449/102 Supply 116492.00B- 191 15.05.19 CSD-II M/S Prakash Associates 192/CPD-I/02.02.19 449/103 Supply 74558.00B- 192 15.05.19 CSD-II M/S Kay Mohan Corporation 191/CPD-I/02.02.19 449/104 Supply 72056.00B- 196 17.05.19 M/S Guru Enterprises Ist&F 1642/CPD-I/16.03.18 513/55B Overhauling 272212.00B- 197 25.05.19 ECM&EMD M/S Rambali Singh II&F 21/ECM&EMD/28.12.18 364/177 Cleaning of Drain 186237.00B- 198 25.05.19 TMD-II M/S Chembond Water Technologies Ltd. 18/TMD-II/08.03.18 446/50 Security 164400.00

B- 201 25.05.19 EMD-IV M/S Singh & Singh Electricals 03/EMD-IV/06.07.18 472/168 Repaire Rewinding 13404.00

G:\2nd Pen Drive\210MW\2020-21\06-20\Liab_15.06.20_210MW 6

Page 20: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 202 25.05.19 CHD-III M/S Nosad Contractor 8 05/CHD-III/10.05.18 546/29 Overhauling 50866.00B- 204 25.05.19 EMD-IV M/S ABB India Ltd. 568/EMD-IV/31.12.18 347/96A Supply 90000.00B- 205 25.05.19 EMD-IV M/S Oasis Techno Engg. Pvt.Ltd. 487/EMD-IV/31.10.18 347/96B Services Charges 96393.00B- 208 25.05.19 TMD-II M/S Bharti Enterrprises IX 09/TMD-II/24.09.18 527/12A Remavel of Tech 107259.00B- 209 27.05.19 EMD-V M/S Priya Construction Co. II 10/EMD-V/25.10.18 316/89B Repaire Rewinding 346243.00B- 210 29.05.19 CSD-II M/S ZKL Bearing (India) Pvt.Ltd 162/CPD-I/29.01.19 428/171 Supply 276305.00B- 211 29.05.19 CSD-II M/S Simplex Switchger Pvt.Ltd 381/CPD-I/14.03.19 411/176 Supply 42485.00B- 212 29.05.19 CSD-II M/S Sunil Kumar 12/CSD-II/08.10.18 427/109 Security 6624.00B- 213 29.05.19 CSD-II M/S Industrial Sales & Supply Agencis 453/CPD-I/08.04.19 535/112 Supply 429473.00B- 214 29.05.19 CSD-II M/S I G P Engineers Pvt.Ltd 366/CPD-I/08.03.19 560/14 Supply 9221.00

TOTAL TOTAL 1765989.00 2980844.00 5293608.00

B- 224 13.06.19 CHD-IV M/S Rahul Gupta & Co. 04/CHD-IV/04.06.19 505/17A-B Repairing and Recondition 306624.00B- 228 13.06.19 CAMD-II M/S Shiv Mahadev Engg Works 11/CAMD-II/25.10.18 23/15 S-MR 23825.00B- 231 13.06.19 CSD-II M/S I Umashankar Co. 159/CPD-I/20.01.19 449/105-106 Supply 2092.00B- 232 13.06.19 EMD-IV M/S Sky. Engg. 03/EMD-IV/06.09.11 473/160 SMR 39630.00B- 233 13.06.19 EMD-IV M/S Sky. Engg. 04/EMD-IV/06.09.11 473/160-161 SMR 49750.00B- 234 13.06.19 EMD-IV M/S Shiv Mahadev Engg Works 06/EMD-IV 473/165-166 Fabrication 86363.00B- 241 13.06.19 AHD-II M/S Rajeev Kumar Cont. 17/AHD-II/17.01.19 515/102 Operation 14745.00B- 245 13.06.19 C&ID-III M/S Kapatiya Instrument 21/C&ID-III/16.02.19 344/137 SMR 7980.00B- 249 13.06.19 EMD-V M/S Priya Cont. 24/EMD-V/27.03.19 508/78 SMR 21284.00B- 250 13.06.19 EMD-V M/S Shiv Mahadev Engg Works 25/EMD-V/27.03.19 508/78 SMR 12337.00B- 251 13.06.19 EMD-V M/S Instrument Care Group 27/EMD-V/30.03.19 508/79 SMR 27518.00B- 252 13.06.19 EMD-V M/S R.P. Cont. 23/EMD-V/27.03.19 508/79 SMR 8185.00B- 253 13.06.19 EMD-V M/S MRP Constructions 28/EMD-V/30.03.19 508/80 SMR 29842.00B- 266 20.06.19 TMD-II M/S Maarfat Cont. 03/TMD-II/ 538/16 Thermal Insult 99314.00B- 267 20.06.19 TMD-II M/S Veekay Engg. 16/TMD-II/18.01.18 538/16 AMC 136300.00B- 268 20.06.19 TMD-II M/S Veekay Engg. 11/TMD-II/17.06.19 538/17 AMC 5304.00B- 269 21.06.19 BMD-IV M/S G.S. Cont. 11/BMD-IV/09.03.18 555/20 SMR 88300.00B- 277 22.06.19 CSD-II M/S Multimetals Ltd. 1445/CPD-II/12.12.18 560/17 Supply 2586549.00B- 278 22.06.19 EMD-IV M/S Elect & Instru Eng. 04/EMD-IV/18.04.19 347/97 SMR 12136.00B- 279 22.06.19 CSD-II M/S Rewer Sales Corp 64/CPD-II/16.01.19 558/85 Supply 915579.00B- 280 25.06.19 BMD-III M/S Ideal Flow Control Pvt.LTd. 06/BMD-III/12.04.19 436/82 Security 21600.00B- 282 25.06.19 EMD-V M/S MRP Constructions 19/EMD-V/26.02.19 508/72 Installation Commisission 66475.00B- 285 25.06.19 AHD-II M/S India Engineering Works 19/AHD-II/14.01.19 515/107 Servicing Repairing 34280.00B- 286 25.06.19 AHD-II M/S India Engineering Works 21/AHD-II/14.01.19 515/109 Repairing 50242.00B- 287 25.06.19 AHD-II M/S India Engineering Works 22/AHD-II/21.01.19 515/106 Repairing 42766.00B- 291 27.06.19 CAMD-II M/S Usha Enterprises 20/CAMD-II/27.02.19 241/56 Servcing of R/D 83878.00B- 292 27.06.19 CAMD-II M/S Usha Enterprises 09/CAMD-II/19.09.18 241/57 Servcing of R/D 41650.00B- 293 27.06.19 CAMD-II M/S Jahangir Enterprises 19/CAMD-II/28.02.19 241/57 Conditionng of Cold 70349.00B- 294 27.06.19 CAMD-II M/S Shiv Mahadev Engg Works 22/CAMD-II/19.03.19 241/58 Security 17673.00

TOTAL TOTAL 1398350.00 0.00 3504220.00

B- 297 03.07.19 CSD-II M/S Instrumentation Ltd. 1507/CPD-II/31.12.18 557/18 Supply 593540.00B- 299 03.07.19 CSD-II M/S Jalvid Udyog 614/CPD-I/24.05.19 535/120 Supply 45376.00B- 301 05.07.19 BMD-III M/S Jha Construction 08/BMD-III/15.04.19 436/79 Repairing of Dut 23211.00B- 303 05.07.19 BMD-III M/S Jha Construction 05/BMD-III/05.10.17 302/68 Instaltation 25920.00B- 305 08.07.19 AHD-II M/S Hind Udyog 14/AHD-II/29.11.16 515/121 Security 26176.00B- 306 08.07.19 AHD-II M/S Hind Udyog 14/AHD-II/30.11.17 515/122 Security 27157.00

G:\2nd Pen Drive\210MW\2020-21\06-20\Liab_15.06.20_210MW 7

Page 21: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 307 08.07.19 CSD-II M/S Sone Obra Enterprises Pvt.Ltd. 1438/CPD-I/29.12.18 391/86 Supply 42688.00B- 309 08.07.19 CSD-II M/S Sone Obra Enterprises Pvt.Ltd. 160/CPD-I/29.01.19 391/86B Supply 488570B- 311 08.07.19 CSD-II M/S Multi Tech Engineers 516/CPD-II/16.06.19 560/19 Supply 902700.00B- 313 09.07.19 EMD-IV M/S Sumesh Petroleum 12/EMD-IV/22.09.15 347/89B Security 5148.00B- 314 10.07.19 BMD-III M/S O.S. Contractor Ist 15/BMD-III/13.05.19 474/44 36694.00B- 317 12.07.19 CSD-II M/S Sone Obra Enterprises Pvt.Ltd. 1438/CPD-I/29.12.18 466/152 Supply 107772.00B- 318 16.07.19 CHD-III M/S MRP Constructions 03/CHD-III/19.06.19 513/66B Preventive /BD 26882.00B- 319 16.07.19 CHD-III M/S Vikash Electrical 08/CHD-III/29.10.18 513/67B Cverhauing 195906.00B- 320 18.07.19 CAMD-II M/S Goga Jaharbeer Constration 17/CAMD-II/01.09.16 387/33 Security 8208.00B- 321 18.07.19 CAMD-II M/S Press Tool Industries Pvt.Ltd. 13/CAMD-II/08.08.16 387/33 Security 64548.00B- 323 18.07.19 AHD-II M/S Bharti Enteriprises 05/AHD-II/15.05.17 530/15B Security 71935.00B- 324 18.07.19 AHD-II M/S Bharti Enteriprises 09/AHD-II/31.10.17 530/15B Security 83904.00B- 325 18.07.19 CHD-IV M/S Rahul Gupta & Co. 07/CHD-IV/25.09.18 505/19B Security 28668.00B- 329 19.07.19 CHD-III M/S Nosad Contractor 05/CHD-III/20.05.18 573/68B Overhauling 53863B- 330 23.07.19 OGD-II M/S Zenith Engineers 07/OGD-II/06.10.18 435/134 Assist.In the Work 241151B- 331 23.07.19 BMD-IV M/S Ravindra Singh & Co 10/BMD-IV/09.03.18 404/77B Security 91835.00B- 333 23.07.19 BMD-IV M/S Syndicate Engineers 07/BMD-IV/12.10.18 404/78B Security 20034.00B- 334 24.07.19 CAMD-II M/S Balram Engineers Contractor 18/CAMD-II/25.11.17 416/143 Maintinence B/D 22991.00B- 335 24.07.19 CAMD-II M/S Balram Engineers Contractor 29/CAMD-II/28.02.17 468/67 Security 70200.00B- 336 24.07.19 CAMD-II M/S Rakesh Kumar & Co. 13/CAMD-II/20.11.18 468/68 Security 7084.00B- 337 24.07.19 TMD-II M/S Hind Udyog 07/TMD-II/22.04.19 522/27B Repairing Fabrication 69790.00B- 338 24.07.19 TMD-II M/S Thermal India Engg. 05/TMD-II/28.07.18 522/32 Preventive & B/d 176111.00B- 339 24.07.19 TMD-II M/S Hind Udyog 07/TMD-II/22.04.19 522/33B Repairing Fabrication 56570.00B- 341 24.07.19 TMD-II M/S Vee Kay Engineers 16/TMD-II/18.01.18 553/4B Security 58000.00B- 342 24.07.19 CHD-IV M/S Hind Udyog 07/CHD-IV/10.08.17 504/63 Security 110657.00B- 343 24.07.19 CHD-IV M/S Hind Udyog 14/CHD-IV/19.03.18 504/64 Security 134108.00B- 344 24.07.19 CHD-IV M/S Hind Udyog 06/CHD-IV/12.07.17 504/64 Security 151144.00B- 345 24.07.19 CHD-IV M/S Hind Udyog 05/CHD-IV/04.06.19 504/65 Rep & Recondition 233098.00B- 346 25.07.19 CSD-II M/S Luxmi Trading Co. 1435/CPD-I/29.12.18 406/57 Supply 106464.00B- 347 25.07.19 CSD-II M/S SAPS Power Equipment P.Ltd 241/CPD-II/14.03.19 561/05 Supply 903430.00B- 348 25.07.19 CSD-II M/S Aarseller Tradco 606/CPD-I/23.05.19 445/137 Supply 573611.00B- 349 25.07.19 CSD-II M/S Jalvid Udyog 426/CPD-I/15.04.19 486/90 Supply 511070.00B- 350 25.07.19 CSD-II M/S Jalvid Udyog 120/CPD-I/18.01.19 486/90 Supply 19647.00B- 351 25.07.19 CSD-II M/S S.K. Enteering Works 691/CPD-I/07.06.19 486/92 Supply 1253688.00B- 352 25.07.19 CSD-II M/S T.S. Enterprises 608/CPD-I/23.05.19 486/93 Supply 26255.00B- 353 25.07.19 CSD-II M/S Aarseller Tradco 107/CPD-I/17.01.19 486/94 Supply 89279.00B- 354 25.07.19 CAMD-II M/S Jahangir Enterprises 19/CAMD-II/28.02.19 388/72 27868.00

TOTAL TOTAL 5632305.00 744000.00 1436646.00

B- 357 02.08.19 CSD-II M/S J.Khushaldas & Co. 367/CPD-I/08.03.19 557/19 Supply 20689.00B- 364 05.08.19 CHD-IV M/S Aka Logistics Pvt.Ltd. 09/CHD-IV/12.10.18 539/79 Security 2671189.00B- 365 05.08.19 BMD-IV M/S Nosad Contructor 04/BMD-IV/04.09.18 554/20 Maintinence 47952.00B- 368 09..08.19 CSD-II M/S Vikash Chauda 507/CPD-II/13.06.19 466/156 Supply 51684.00B- 370 09..08.19 CSD-II M/S Maa Bhagwati Shardey Engg.

Enterprises829/CPD-I/28.06.19 466/157 Supply 900918.00

B- 372 09..08.19 CSD-II M/S Uniflow Parketing 637/CPD-II/15.07.19 466/160 Supply 1532083.00B- 374 09..08.19 CSD-II M/S Thermorever Corps 696/CPD-II/12.07.19 466/161 Supply 879127.00B- 375 09..08.19 CSD-II M/S Thermorever Corps 713/CPD-II/12.07.19 466/162 Supply 169555.00B- 376 19.08.19 BMD-IV M/S Nosad Contractor 03/BMD-IV/04.09.18 555/44 Maintinence 32303.00B- 377 19.08.19 BMD-IV M/S Nosad Contractor 04/BMD-IV/04.09.18 555/46 Maintinence 78386.00

G:\2nd Pen Drive\210MW\2020-21\06-20\Liab_15.06.20_210MW 8

Page 22: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 378 19.08.19 BMD-IV M/S A.S.Enterprises 15/BMD-IV/21.02.19 274/74 Deputation 53914.00B- 379 19.08.19 BMD-IV M/S A.S.Enterprises 14/BMD-IV/21.02.19 274/76 Security 19081.00B- 380 19.08.19 BMD-IV M/S Usha Enterprises 11/BMD-IV/14.01.19 274/76 Maintinence 49382.00B- 381 19.08.19 BMD-IV M/S Usha Enterprises 11/BMD-IV/02.02.17 274/77 Security 71673.00B- 382 19.08.19 BMD-IV M/S MAK Construktor 04/BMD-IV/09.04.19 463/88B Repairing 274432.00B- 384 19.08.19 BMD-IV M/S Balveer Singh Enterprises 09/BMD-IV/27.12.18 463/89 Security 7008.00B- 385 19.08.19 CHD-III M/S Nosad Contractor 05/CHD-III/10.05.18 513/71 Overhaling 57289.00B- 387 19.08.19 CHD-III M/S MRP Constructions 03/CHD-III/19.06.19 513/70 Preventive & B/d 62096.00B- 388 19.08.19 CHD-III M/S Priya Construction 11/CHD-III/13.02.19 513/71 Rewanding 97618.00B- 389 20.08.19 CSD-II M/S Voith Turbo Privte Ltd. 30/CPD-II/08.01.19 428/173 Supply 892762.00B- 391 23.08.19 AHD-II M/S Garg Engg. & Sons 08/AHD-II/11.07.19 479/14 D.P.Electension 231660.00B- 392 23.08.19 AHD-II M/S Rajeev Kumar Contractor 17/AHD-II/14.01.19 515/126 Operation 16941.00B- 393 23.08.19 AHD-II M/S Garg Engg. & Sons 13/AHD-II/25.10.18 515/128 Repairing 104019.00B- 394 23.08.19 AHD-II M/S Rajeev Kumar Contractor 06/AHD-II/30.07.19 515/130 Providing of Sifting 206533.00B- 395 23.08.19 AHD-II M/S Rajeev Kumar Contractor 05/AHD-II/26.06.19 515/132 Cerdition of Paint 101088.00B- 396 23.08.19 AHD-II M/S Rahul Gupta & Co 23/AHD-II/06.02.19 515/133 Repairing 103239.00B- 397 28.08.19 TMD-II M/S M.K. Traders 261/TMD-II/20.06.19 538/19 Break Down 49127.00B- 398 28.08.19 TMD-II M/S Leak Seal Experts Pvt. 01/BMD-III/02.05.18 538/20 Service Charg 8640.00B- 399 28.08.19 TMD-II M/S Usha Enterprises 31/TMD-II/02.06.17 522/35 Security 99717.00B- 400 28.08.19 TMD-II M/S Hind Udyog 07/TMD-II/22.04.19 528/16 Repairing 103762.00B- 401 29.08.19 AHD-II M/S Garg Engg. & Sons 04/AHD-II/26.06.19 530/17 Repairing 257971.00B- 402 29.08.19 CSD-II M/S Hydro Power Corporatioin 172/CPD-II/15.02.19 406/59 Supply 146000.00B- 403 29.08.19 CSD-II M/S ma Bhagwati Shardey Engg 762/CPD-I/25.06.19 406/59 Supply 742879.00B- 404 29.08.19 CSD-II M/S Thermoserve Corps 794/CPD-II/02.08.19 406/60 Supply 223848.00B- 409 30.08.19 CSD-II M/S Supath Engineering services 827/CPD-I/28.06.19 570/10 Supply 1582961.00

TOTAL 4805020.00 20689.00 7121817.00

B- 410 02.09.19 EMD-IV M/S MRP Constructions 09/EMD-IV/31.07.19 394/85 Instaltion Commission 74304.00B- 411 02.09.19 EMD-IV M/S Panjab Electiric Industries 218/EMD-IV/04.06.16 472/184 Security 43390.00B- 412 03.09.19 BMD-III M/S M.K. Traders 06/BMD-III/01.01.18 281/194 Breakdown 34766.00B- 413 03.09.19 BMD-III M/S Bharat Mechanical & Structural Works 10/BMD-III/18.04.19 281/195 Preventive & B/d 59860.00

B- 414 03.09.19 BMD-III M/S Jha Contruction 17/BMD-III/15.07.19 281/196 Instultion 32015.00B- 416 03.09.19 TMD-II M/S Thermal India Engineers 05/TMD-II/28.07.18 527/16 Break Down Maintinance 117649.00B- 418 07.09.19 C&ID-II M/S Nosad Contractor 06/C&ID-II/05.06.18 549/06 Miscellar Work 28183.00B- 420 11.09.19 CHD-III M/S Vikash Electirical 08/CHD-III/27.10.18 513/73 Overhouling 195906B- 423 11.09.19 CSD-II M/S Balaji Corporation 473/CPD-II/04.06.19 391/87 Supply 1439923.00B- 425 11.09.19 CSD-II M/S Trade India Corporation 1299/CPD-I/20.08.19 391/88 Supply 305107.00B- 426 11.09.19 CSD-II M/S KVM Emgg.Pvt.Ltd. 862/CPD-II/19.08.19 391/89 Supply 689061.00B- 427 11.09.19 CSD-II M/S Commerical Enterprises 1301/CPD-I/20.08.19 391/89 Supply 1337277.00B- 428 11.09.19 CSD-II M/S J.Umashankar & Co. Pvt.Ltd.. 1300/CPD-I/20.08.19 391/89 Supply 1161120.00B- 430 11.09.19 CAMD-II M/S Jahangir Enterprises 19/CAMD-II/28.02.19 310/75 Conditiong of Water 19246.00B- 441 15.09.19 CSD-II M/S Instant Enggs 1311/CPD-I/22.08.19 570/18 Supply 108008.00B- 444 15.09.19 CSD-II M/S Jalvid Udyog 868/CPD-II/19.08.19 568/9 Supply 615836.00B- 445 15.09.19 CSD-II M/S Aditi Enterprises 865/CPD-II/19.08.19 568/10 Supply 60350.00B- 446 15.09.19 CSD-II M/S Nosad Contractor 1101/CPD-I/25.07.19 557/22 Supply 320987.00B- 447 17.09.19 BMD-IV M/S Nosad Contractor 04/BMD-IV/04.09.18 554/54 Maintinance 81815.00B- 448 20.09.19 TMD-II M/S Omega Industries Pvt.Ltd. 87/TMD-II/06.03.19 522/36 Rebabhi hied& Machine 177849.00B- 449 20.09.19 OGD-II M/S Zenith Engineering 07/OGD-II/06.10.18 422/174 Assist is Work 81417.00B- 450 20.09.19 EMD-V M/S Priya Construction Co. 10/EMD-V/25.10.18 316/91 Reparing 428128.00

G:\2nd Pen Drive\210MW\2020-21\06-20\Liab_15.06.20_210MW 9

Page 23: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 451 20.09.19 CHD-IV M/S Hind Udyog 05/CHD-IV/04.06.19 504/66 Reparing 124632.00B- 452 20.09.19 CHD-IV M/S R.K. Traders 11/CHD-IV/25.09.17 480/49 Security 1200.00B- 453 20.09.19 CHD-IV M/S R.K. Traders 13/CHD-IV/09.03.18 480/49 Security 2400.00B- 454 20.09.19 CHD-IV M/S R.K. Traders 02/CHD-IV/28.06.18 480/50 Security 1800.00B- 455 24.09.19 CAMD-II M/S Balram Engineering Con.& Supper 03/CAMD-II/29.07.19 329/84 Break Down Maintinance 28198.00B- 459 24.09.19 CAMD-II M/S Usha Enterprises 09/CAMD-II/31.08.18 388/72B Complete Operation 28012.00B- 460 25.09.19 CSD-II M/S Amazon Control Tecnology Pvt.Ltd 87/CPD-II/21.01.19 557/22 Supply 1365220.00B- 461 25.09.19 CSD-II M/S S.K. Engipra& Alied 1305/CPD-I/20.08.19 486/96 Supply 299947.00B- 464 25.09.19 ECM&EMD M/S Arvind Singh 08/ECM&EMD/02.07.18 322/95 Security 2400.00B- 465 25.09.19 CAMD-II M/S Usha Enterprises 09/CAMD-II/19.09.18 310/76 Complete Operation 80321.00B- 466 25.09.19 CHD-III M/S MRP Construction 03/CHD-III/19.06.19 513/75 Preventive & B/d 31048.00B- 467 27.09.19 TMD-II M/S Thermal India Engineers 05/TMD-II/28.07.18 528/19 Preventive & B/d 151918.00B- 468 27.09.19 TMD-II M/S Hind Udyog 07/TMD-II/22.04.19 527/18 Repairing Fabricatrion 93398.00B- 469 27.09.19 CHD-II M/S M.K. Traders 11/CHD-II/19.11.18 490/77 Servicing & Reparing 103188.00B- 471 27.09.19 CSD-II M/S Ishan Power tech Pvt.Ltd. 825/CPD-II/07.08.19 428/176 Supply 955477.00B- 472 27.09.19 AHD-II M/S Rajeev Kumar 17/AHD-II/14.01.19 515/139 Operation & Maintinance 16941.00B- 473 27.09.19 AHD-II M/S Rajeev Kumar 06/AHD-II/30.07.19 515/140 Providing Cement 106653.00B- 474 27.09.19 AHD-II M/S Rahul Gupta & Co. 23/AHD-II/06.02.19 515/141 Repairing/ Replace 86072.00B- 475 27.09.19 AHD-II M/S India Engg. Works 19/AHD-II/14.01.19 515/142 Serving Repairing 27152.00B- 476 27.09.19 AHD-II M/S Energo Construction Ltd. 03/AHD-II/01.05.18 530/18 Security 872789.00B- 480 27.09.19 CSD-II M/S AIA Engineering LTD 423/CPD-II/22.05.19 428/177 Supply 1216108.00B- 481 27.09.19 CSD-II M/S AIA Engineering LTD 423/CPD-II/22.05.19 428/178 Supply 967129.00B- 483 27.09.19 CSD-II M/S Shiv Mahadev Engg.Works 11/CSD-II/01.10.18 428/130 Security 9960.00B- 484 27.09.19 CSD-II M/S Simplex Switchgear Pvt.Ltd. 607/CPD-I/23.05.19 569/08 Supply 168027.00

TOTAL TOTAL 3142610.00 1533247.00 9476330.00

B- 485 03.10.19 CSD-II M/S Amazon Control Tecnology Pvt.Ltd 72/CPD-II/21.01.19 560/28 Supply 1003448.00B- 487 14.10.19 TMD-II M/S Balram Engineers Conttractor 21/TMD-II/26.11.15 527/19B Security 5904.00B- 488 14.10.19 TMD-II M/S Bharti Enterprises 06/TMD-II/28.08.17 527/19B Security 120118.00B- 489 14.10.19 CHD-II M/S Pitambra Engineers Contractor 05/CHD-II/16.07.19 503/15 Work of unloding 46182.00B- 500 15.10.19 CSD-II M/S Sone Obra Enterprises 1473/CPD-I/17.09.19 428/183 Supply 211409.00B- 501 16.10.19 AHD-II M/S Garg Engineering & Sons 08/AHD-II/11.07.19 479/25 D.P.Extension 54756.00B- 502 16.10.19 AHD-II M/S Rahul Gupta & Co. 23/AHD-II/06.02.19 515/148 Repairing 88284.00B- 503 16.10.19 AHD-II M/S Garg Engineering & Sons 11/AHD-II/05.08.19 515/150 Repairing 74359.00B- 504 16.10.19 AHD-II M/S Rajeev Kumar Controls 17/AHD-II/14.01.19 515/147 Maintinance 16393.00B- 505 16.10.19 AHD-II M/S Bharti Enterprises 12/AHD-II/07.08.19 53019 Conditioning 330400.00B- 506 16.10.19 BMD-IV M/S Nosad Contractor 03/BMD-IV/04.09.18 566/29 Maintinance 56879.00B- 509 16.10.19 EMD-V M/S Dev Enterprises 06/EMD-V/19.08.19 509/25 Supply and rection 354000.00B- 510 16.10.19 CSD-II M/S Govardhan Controls 1466/CPD-I/16.09.19 568/19 Supply 798270.00B- 511 19.10.19 BMD-IV M/S Nosad Contractor 04/BMD-IV/04.09.18 566/30 Maintinance 51672.00B- 513 21.10.19 CSD-II M/S Shree Shyam Braring Pvt. Ltd. 1499/CPD-I/19.09.19 427/119 Supply 630120.00B- 514 21.10.19 EMD-V M/S Enduman Intranationl P.Ltd. 08/EMD-V/25.09.19 482/29 Service Charge 221782.00B- 522 24.10.19 CHD-III M/S MRP Constructions 03/CHD-III/19.06.19 519/72 Preventive & B/d 31048.00B- 523 24.10.19 CHD-III M/S Nosad Contractor 05/CHD-III/10.05.18 519/74 Overhouling 106803.00B- 524 24.10.19 CHD-III M/S Priya Constreuction Co. 11/CHD-III/13.02.19 519/76 Rewancing 88435.00B- 525 24.10.19 CHD-III M/S S.R. Construction 05/CHD-III/19.08.19 513/77B Preventive & B/d 40754.00B- 527 24.10.19 EMD-IV M/S MRP Constructions 02/EMD-IV/20.02.19 394/86B Security 7360.00B- 528 24.10.19 EMD-IV M/S MRP Constructions 07/EMD-IV/30.07.18 394/87A Security 48106.00B- 529 24.10.19 EMD-IV M/S Nosad Contractor 08/EMD-V/24.08.19 394/87 Security 61220.00

G:\2nd Pen Drive\210MW\2020-21\06-20\Liab_15.06.20_210MW 10

Page 24: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 530 31.10.19 BMD-IV M/S Usha Enterprises 11/BMD-IV/14.01.19 274/82A Maintinance of Dewating 28199.00TOTAL TOTAL 2630924.00 0.00 1844977.00

B- 531 04.11.19 BMD-III M/S O.S. Contractor 15/BMD-III/13.05.19 188/88B Supply & application 45657.00B- 532 04.11.19 BMD-III M/S Jha Construction 17/BMD-III/15.07.19 188/89 Irstallation 25535.00B- 533 04.11.19 BMD-III M/S Sunrise Engineer & Contractor 05/BMD-III/28.06.18 188/89B Preventive & Brekdown 15299.00B- 534 04.11.19 BMD-III M/S Sunrise Engineer & Contractor 04/BMD-III/28.06.18 188/90 Preventive & Brekdown 9795.00B- 535 04.11.19 BMD-III M/S Leak Seal Expert India Pvt.Ltd. 01/BMD-III/02.05.18 188/90B Service Charger 57240.00B- 536 04.11.19 BMD-III M/S Bharat Mechanical & Structural Works 10/BMD-III/18.04.19 437/1B Preventive & B/d 59860.00B- 537 04.11.19 BMD-III M/S Jha Construction 08/BMD-III/15.04.19 437/2B Repairing of Duct 20434.00B- 538 04.11.19 BMD-III M/S Geeco Enercor Pvt.Ltd. 433/BMD-III/24.08.19 226/170 Consultancy 73606.00B- 539 05.11.19 C&ID-III M/S S.R. Constructions 05/C&ID-III/20.06.19 525/50B Serving Repaire 24488.00B- 541 05.11.19 CSD-II M/S Balaji Corporation 1511/CPD-I/20.09.19 561/17 Supply 173063.00B- 543 08.11.19 CAMD-II M/S Jahangir Enterprises 19/CAMD-II/28.02.19 241/63 Security 72523.00B- 544 A 13.11.19 CSD-II M/S Luxmi Trading Co. 1472/CPD-I/17.09.19 580/01 Supply 63950.00B- 544 13.11.19 CSD-II M/S Uniflow Marketing 1085/CPD-II/27.09.19 580/05 Supply 228139.00B- 546 13.11.19 EMD-IV M/S Electrical & Instrumentation Engg. 02/EMD-IV/29.06.18 518/15B Security 24835.00B- 547 13.11.19 CHD-IV M/S Indrajeet Singh 01/CHD-IV/01.04.19 495/100 Security 6930.00B- 548 16.11.19 TMD-II M/S M.K. Traders 13/TMD-II/08.08.19 538/20 Brekdown 53343.00B- 550 16.11.19 TMD-II M/S S.K.Enterprises 04/TMD-II/19.07.18 538/21B Security 516652.00B- 551 18.11.19 AHD-II M/S Rajeev Kumar 16/AHD-II/10.09.19 515/158 Providing and lying 165904.00B- 552 18.11.19 AHD-II M/S Garg Engineering & Sons 10/AHD-II/05.08.19 515/159 Repairing 16797.00B- 553 18.11.19 AHD-II M/S Bharti Enterprises 07/AHD-II/08.07.19 479/30 Lifting & Shifting 84723.00B- 554 20.11.19 BMD-III M/S Jha Construction 17/BMD-III/15.07.19 436/86B Installation Operation 86265.00B- 555 23.11.19 BMD-IV M/S Nosad Contractor 03/BMD-IV/04.09.18 566/41 Maintinance/Repainding 25691.00B- 556 23.11.19 BMD-IV M/S Nosad Contractor 04/BMD-IV/04.09.18 566/43 Maintinance/Repainding 44756.00B- 557 23.11.19 BMD-IV M/S Amit Vikram 08/BMD-IV/18.12.18 566/47 Security 166432.00B- 558 23.11.19 BMD-IV M/S Balveer Singh Enterprises 09/BMD-IV/10.06.19 566/48 Security 7046.00B- 559 30.11.19 BMD-IV M/S Usha Enterprises 09/BMD-IV/14.01.19 274/86B Maintinance of Dewating 62133.00B- 560 30.11.19 BMD-III M/S Bharat Mechanical & Structural Works 10/BMD-III/18.04.19 455/45 Preventive & Brekdown 28293.00B- 562 30.11.19 BMD-III M/S Sunrise Engineers & Contractor 04/BMD-III/28.06.18 454/24B Preventive & Brekdown 30974.00B- 563 30.11.19 BMD-III M/S Jha Construction 17/BMD-III/15.07.19 454/25 Installation Operation 27183.00

TOTAL TOTAL 1752394.00 0.00 465152.00

B- 566 02.12.19 CSD-II M/S Techno Engineering Works 1674/CPD-I/01.11.19 568/24 Supply 84238.00B- 568 02.12.19 CSD-II M/S Aditi Enterprises 1679/CPD-I/01.11.19 568/25 Supply 43687.00B- 570 02.12.19 CSD-II M/S Aditi Enterprises 1673/CPD-I/01.11.19 568/27 Supply 297000.00B- 572 02.12.19 CSD-II M/S J.K. Engineering Company 1660/CPD-I/01.11.19 576/1 Supply 232457.00B- 574 02.12.19 CSD-II M/S Jain Mill Stores Pvt.Ltd. 1686/CPD-I/01.11.19 576/03 Supply 37878.00B- 575 02.12.19 CSD-II M/S Industrial Sales & Supply Agenci 1661/CPD-I/01.11.19 576/04 Supply 124013.00B- 581 02.12.19 CSD-II M/S Commecial Engineering Ment 1559/CPD-I/28.09.19 560/30 Supply 144927.00B- 584 02.12.19 EMD-IV M/S Nosad Contraction 11/EMD-IV/16.08.19 573/02B Preventive & Maintine 90908.00B- 585 03.12.19 CHD-III M/S Nosad Contraction 05/CHD-III/10.05.18 513/80 Overhouling of HT 23792.00B- 586 03.12.19 CHD-III M/S Priya Construction 11/CHD-III/13.02.19 513/81 Rewineling 88705.00B- 587 03.12.19 EMD-V M/S Electrical & Instrumentation Engg. 01/EMD-V/25.02.19 366/25B Repairing & O/H 99910.00B- 588 03.12.19 CHD-III M/S S.R. Construction 05/CHD-III/19.08.19 519/80 Preventive & Maintinance 37166.00B- 589 03.12.19 C&ID-II M/S Syndicate Engineers 04/C&ID-II/17.01.18 328/89 Security 617100.00B- 591 04.12.19 CSD-II M/S Atlas Copco 1108/CPD-I/25.07.19 557/30 Supply 478416.00B- 594 06.12.19 C&ID-III M/S Net Cascads Automation P.Ltd. 09/C&ID-III/25.03.15 526/68B Security 21500.00B- 595 06.12.19 EMD-V M/S Instrument Care Group 17/EMD-V/21.02.19 483/61 Security 5970.00

G:\2nd Pen Drive\210MW\2020-21\06-20\Liab_15.06.20_210MW 11

Page 25: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 596 06.12.19 EMD-V M/S S.K. Enterprises 11/EMD-V/20.11.18 483/61 Security 6228.00B- 597 06.12.19 CHD-II M/S M.K. Traders 11/CHD-II/15.12.18 503/17 Maintinance 147974.00B- 598 06.12.19 ECM&EMD M/S Sadan Engineering 11/ECM&EMD/12.09.19 462/98 Clanig of Toilet 165908.00B- 599 09.12.19 EMD-V M/S Dev Enterprises 07/EMD-V 508/111 Cable Supply 90180.00B- 600 10.12.19 CSD-II M/S Simplex Switchger Pvt.Ltd 1740/CPD-I/07.11.19 535/136 Supply 361794.00B- 601 10.12.19 CSD-II M/S Jalvid Udyog 167/CPD-I/01.11.19 535/138 Supply 9385.00B- 610 13.12.19 CSD-II M/S Neelkanth Power System Pvt.Ltd. 685/CPD-II/09.07.19 561/19 Supply 166820.00B- 611 13.12.19 CSD-II M/S J.K. Engineering Company 922/CPD-II/03.09.18 580/07 Supply 160015.00B- 613 17.12.19 AHD-II M/S Garg Engineering & Sons 15/AHD-II/23.09.19 530/20B Conditionig and Pointing 314496.00B- 620 18.12.19 CSD-II M/S Priya Construction Co. 1764/CPD-I/14.11.19 559/87 Supply 1241360.00B- 622 18.12.19 CSD-II M/S Incom Power P.Ltd. 1305/CPD-II/25.11.19 426/134 Supply 924084.00B- 624 18.12.19 CSD-II M/S Trade India Corporation 1498/CPD-I/19.09.19 426/136 Supply 250561.00B- 625 18.12.19 CSD-II M/S Kashi Engineers 967/CPD-II/09.09.19 426/137 Supply 444340.00

B- 627 19.12.19 CHD-III M/S MRP Construction 03/CHD-III/19.06.19 513/81b Preventive & Brekdown 31048.00B- 628 19.12.19 CHD-III M/S MRP Construction 03/CHD-III/19.06.19 513/84 Preventive & Brekdown 31992.00B- 629 19.12.19 CHD-III M/S Priya Construction Co. 11/CHD-III/10.11.18 513/87b Rewinding 54381.00B- 630 20.12.19 BMD-III M/S M.K. Traders 21/BMD-III/25.11.19 436/88 Break Down Maintinance 78326.00B- 631 20.12.19 BMD-III M/S M.K. Traders 20/BMD-III/25.11.19 436/88B Arresting Ingres 502330.00B- 632 20.12.19 AHD-II M/S India Engineering Works 19/AHD-II/14.01.19 515/164 Servicing Repirring 17176.00B- 633 20.12.19 AHD-II M/S Rahul Gupta & Co. 23/AHD-II/06.02.19 515/167 Repaire Reclanation 109157.00B- 634 20.12.19 AHD-II M/S Rajeev Kumar 17/AHD-II/10.10.19 515/168 Cleaning of Jungle 103420.00B- 635 20.12.19 AHD-II M/S India Engineering Works 22/AHD-II/21.01.19 515/189 Repaire of Grinaling 41128.00B- 636 20.12.19 AHD-II M/S Rajeev Kumar 17/AHD-II/14.01.19 515/170 Operation & Maintinace 56693.00B- 637 23.12.19 CHD-IV M/S Hind Udyog 05/CHD-IV/04.06.19 504/69B Dep & Recodition 22355.00B- 638 23.12.19 TMD-II M/S Thermal India Engineers 05/TMD-II/28.07.18 527/21 Preventive & Brekdown 216154.00B- 639 23.12.19 TMD-II M/S Hind Udyog 07/TMD-II/22.04.19 527/24 Repairing Fabrication 83255.00B- 640 24.12.19 EMD-V M/S R.P.Construction 03/EMD-V/04.07.19 482/31 Installation of A/C 267608.00B- 641 27.12.19 BMD-IV M/S Nosad Contractor 04/BMD-IV/04.09.18 555/56 Maintinance 76616.00B- 642 27.12.19 BMD-IV M/S Nosad Contractor 03/BMD-IV/08.06.19 555/58 Maintinance 49616.00B- 646 28.12.19 C&ID-II M/S Hitachi Hirel Power Electro 04/C&ID-II/17.08.15 328/91 Security 120000.00B- 647 28.12.19 C&ID-II M/S Hitachi Hirel Power Electro 06/C&ID-II/30.06.16 328/91B Security 160000.00B- 648 28.12.19 C&ID-III M/S M.A. Engineering Works 09/C&ID-III/27.08.19 525/58 Overhauling 159820.00B- 649 30.12.19 CSD-II M/S S.K. Engineering Works 1705/CPD-I/04.11.19 444/158 Supply 541620.00B- 652 30.12.19 CSD-II M/S Ashbond Engineers Pvt.Ltd. 1309/CPD-II/25.11.19 561/23 Supply 102190.00

TOTAL TOTAL 3800732.00 0.00 5734965.00

B- 654 03.01.20 CSD-II M/S Oriantal Rubber Industrises P. Ltd. 1271/CPD-I/19.08.19 557/34 Supply 2955310.00B- 656 04.01.20 CAMD-II M/S Jahangir Enterprises 07/CAMD-II/28.08.18 416/156 Security 29609.00B- 657 06.01.20 CHD-IV M/S Hind Udyog 05/CHD-IV/04.06.19 504/72B Rep. & recondition 61437.00B- 658 08.01.20 TMD-II M/S Omega Industries 06/TMD-II/01.08.18 262/19 Repairing 832785.00B- 659 08.01.20 TMD-II M/S Maarfat Construction 23/TMD-II/02.12.19 537/19 Thermal Inslation 44258.00B- 660 08.01.20 TMD-II M/S Maarfat Construction 23/TMD-II/02.12.19 537/19B Thermal Inslation 33936.00B- 661 08.01.20 TMD-II M/S M.K. Traders 13/TMD-II/08.08.19 537/20 Break Down 154752.00B- 662 08.01.20 TMD-II M/S M.K. Traders 13/TMD-II/08.08.19 537/21 Break Down 59023.00B- 663 08.01.20 BMD-III M/S M.K. Traders 21/BMD-III/25.11.19 474/45 Break Down 25094.00B- 665 10.01.20 BMD-III M/S Sunrise Engineers & Contractor 05/BMD-III/28.06.19 454/24 Preventive & Brekdown 83368.00B- 669 14.01.20 CAMD-II M/S Jahangir Enterprises 07/CAMD-II/18.09.19 310/83 Fabrication 121824.00B- 670 14.01.20 CAMD-II M/S Shiv Mahadev Engg.Works 11/CAMD-II/05.10.19 310/84 Fabrication 194006.00

G:\2nd Pen Drive\210MW\2020-21\06-20\Liab_15.06.20_210MW 12

Page 26: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 671 14.01.20 CAMD-II M/S Jahangir Enterprises 06/CAMD-II/27.08.18 310/84B Security 71004.00B- 672 14.01.20 CAMD-II M/S P.K.Enterprises 15/CAMD-II/28.12.18 387/7B Maintinance 83677.00B- 673 18.01.20 CHD-IV M/S Hind Udyog 14/CHD-IV/04.10.19 504/74 Repaire 370366B- 674 18.01.20 BMD-IV M/S Hind Udyog 19/BMD-IV/30.03.19 274/92B Repaire 83359B- 675 18.01.20 BMD-IV M/S Usha Enterprises 11/BMD-IV/14.01.19 274/93 Maintinance 71901.00B- 676 18.01.20 BMD-IV M/S G.S. Construction Ist 18/BMD-IV/30.12.19 274/93B Round The Clock 124333.00B- 677 20.01.20 AHD-II M/S Industrial it solutions Pvt.Ltd. 316/AHD-II/26.09.18 451/30 Upgradation 212400.00B- 678 20.01.20 AHD-II M/S India Engg. Works 27/AHD-II/26.12.19 451/30B Maintinance 248140.00B- 679 20.01.20 AHD-II M/S Garg Engg. & Sons 22/AHD-II/25.11.19 515/177 Conditianig 292480.00B- 680 20.01.20 AHD-II M/S Garg Engg. & Sons 11/AHD-II/05.08.19 515/178 Repairing 86151.00B- 681 20.01.20 AHD-II M/S Rahul Gupta & Co. 23/AHD-II/06.02.19 515/179 Repairing 101244.00B- 682 20.01.20 AHD-II M/S India Engg. Works 21/AHD-II/14.01.19 515/180 Repairing 48898.00B- 683 21.01.20 CSD-II M/S Jalvid Udyog 1675/CPD-I/01.11.19 580/17 Supply 58491.00B- 689 21.01.20 CSD-II M/S S.S. Rubber Pvt.Ltd. 1014/CPD-I/15.07.19 580/24 Supply 774835.00B- 696 21.01.20 CHD-III M/S Saurabh Engg. Works 13/CHD-III/18.03.19 519/81 Security 8400.00B- 697 21.01.20 CHD-III M/S Nosad Contractor 05/CHD-III/10.05.18 579/82 Security 45135.00B- 702 22.01.20 CHD-III M/S Nosad Contractor 12/CHD-III/18.11.19 513/87B Overhauling 10199.00B- 707 25.01.20 CFA&BO M/S Rohat Ashish & Co. 523/CPD-II/26.04.18 494/33B Security 14325.00B- 708 25.01.20 EMD-IV M/S Nosad Contractor 11/EMD-IV/16.08.19 574/6B Preventive & Brekdown 50971.00B- 709 25.01.20 EMD-IV M/S Usha Enterprises 17/EMD-IV/09.10.19 94/94 Complete Retubing 511920.00B- 720 27.01.20 CSD-II M/S Jalvid Udyog 1672/CPD-I/01.11.19 535/165 Supply 34335.00B- 721 27.01.20 CSD-II M/S Jalvid Udyog 1672/CPD-I/01.11.19 535/165 Supply 74128.00B- 725 30.01.20 AHD-II M/S Bharti Enterprises 04/AHD-II/15.05.18 530/21 Security 81381.00B- 726 30.01.20 AHD-II M/S Jahangir Enterprises 09/AHD-II/24.08.18 530/21 Security 64516.00B- 728 31.01.20 ECM&EMD M/S Vijay Kumar Gupta 31/ECM&EMD/14.03.19 424/191 Water Supply 464148.00

TOTAL 4685040.00 3897099.00 0.00

B- 730 03.02.20 CSD-II M/S Amco Industries 979/CPD-II/11.09.19 561/30 Supply 1020531 736 05.02.20 CSD-II M/S Govardhan Controls 508/CPD-I/31.07.18 486/113 Supply 3586.00B- 739 05.02.20 CSD-II M/S Supath Enginring Services Ltd. 1432/CPD-I/09.09.19 444/161 Supply 306653.00B- 740 05.02.20 CSD-II M/S Instant Engineers 1467/CPD-I/16.09.19 444/162 Supply 1023060.00B- 741 05.02.20 CSD-II M/S Govardhan Controls 1725/CPD-I/07.11.19 444/163 Supply 101121.00B- 745 05.02.20 CSD-II M/S Govardhan Controls 1952/CPD-I/17.12.19 444/166 Supply 90813.00B- 746 05.02.20 CSD-II M/S Govardhan Controls 1955/CPD-I/17.12.19 444/167 Supply 222921.00B- 748 05.02.20 CAMD-II M/S Rakesh Kumar 01/CAMD-II/22.05.19 415/136 Security 7046.00B- 749 05.02.20 CAMD-II M/S Usha Enterprises 20/CAMD-II/27.02.18 310/82 Servicing& B/d 10826.00B- 750 07.02.20 CSD-II M/S Dynamic Power Services 82/CPD-II/21.01.20 560/37 Supply 593492.00B- 751 07.02.20 CSD-II M/S Amco Industries 42/CPD-II/09.01.20 560/38 Supply 996417.00B- 752 07.02.20 CSD-II M/S Amco Industries 35/CPD-II/09.01.20 560/41 Supply 749847.00B- 753 07.02.20 CSD-II M/S Dynamic Power Services 94/CPD-II/22.01.20 560/43 Supply 2596000.00B- 756 07.02.20 CSD-II M/S Amco Industries 81/CPD-II/21.01.20 560/45 Supply 77384.00B- 757 07.02.20 CSD-II M/S Amco Industries 85/CPD-II/21.01.20 560/46 Supply 1620671.00B- 758 07.02.20 CSD-II M/S Amco Industries 88/CPD-II/21.01.20 560/46 Supply 1971638.00B- 759 07.02.20 CSD-II M/S Dynamic Power Services 91/CPD-II/22.01.20 560/47 Supply 1121000.00B- 760 07.02.20 CSD-II M/S Dynamic Power Services 97/CPD-II/22.01.20 560/47 Supply 382030.00B- 761 07.02.20 CSD-II M/S Omega Engineering 83/CPD-II/21.01.20 560/48 Supply 889519.00B- 762 07.02.20 CSD-II M/S Omega Engineering 96/CPD-II/22.01.20 560/50 Supply 1115111.00B- 763 07.02.20 CSD-II M/S Placka Industrumats Pvt. 1731/CPD-I/07.11.19 411/181 Supply 103449.00B- 765 07.02.20 CSD-II M/S Uttam Sales Corporation 1741/CPD-I/07.11.19 411/182 Supply 3776.00

G:\2nd Pen Drive\210MW\2020-21\06-20\Liab_15.06.20_210MW 13

Page 27: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 766 07.02.20 CSD-II M/S Knowledge Lens Pvt.Ltd. 52/C&ID-III/01.02.20 411/183 Supply 317715.00B- 767 07.02.20 CSD-II M/S Electronics & Electtricals 57/CPD-I/17.01.20 411/184 Supply 35867.00B- 770 11.02.20 BMD-III M/S Jha Constructions 17/BMD-III/15.07.19 302/76 Instullation 42491.00B- 771 11.02.20 BMD-III M/S M.K. Traders 21/BMD-III/25.11.19 302/76B Brekdown 66129.00B- 772 11.02.20 BMD-III M/S Bharat Mechanical & Structural Works 10/BMD-III/18.04.19 302/77 Preventive 113823.00

B- 773 11.02.20 BMD-III M/S Jha Constructions 17/BMD-III/15.07.19 476/64 Instullation 33419.00B- 774 11.02.20 BMD-III M/S Bharat Mechanical & Structural Works 10/BMD-III/18.04.19 476/65 Preventive 173278.00

B- 775 11.02.20 BMD-III M/S M.K. Traders 21/BMD-III/25.11.19 476/66 Brekdown 65624.00B- 776 11.02.20 BMD-III M/S Jha Constructions 08/BMD-III/15.04.19 476/67 Repairing 21091.00B- 778 11.02.20 BMD-IV M/S M.A.K. Construction 04/BMD-IV/09.04.19 404/80B Repairing 264347.00B- 779 11.02.20 BMD-IV M/S U.S. Enterprises 10/BMD-IV/06.07.19 404/81 Maintinance 260439.00B- 780 11.02.20 BMD-IV M/S Nosad Contractor 04/BMD-IV/04.09.18 370/75B Maintinance 76616.00B- 781 14.02.20 BMD-IV M/S G.S.Construction Co. 05/BMD-IV/24.09.18 274/97 Security 122663.00B- 783 14.02.20 CSD-II M/S Industrial Sales & Supply 42/CPD-I/13.01.20 568/38 Supply 12159.00B- 785 17.02.20 CSD-II M/S Jakson Enterprisespvt.ltd. 2004/CPD-I/24.12.19 557/42 Supply 171647B- 786 17.02.20 CSD-II M/S Hind Udyog 1558/CPD-I/28.09.19 557/44 Supply 765260.00B- 787 17.02.20 CSD-II M/S Saps Power Equpnet Pvt.ltd. 1348/CPD-II/04.12.19 557/44 Supply 1012528.00B- 788 18.02.20 CHD-IV M/S Hind Udyog 05/CHD-IV/04.06.19 504/76 Repairing 184170.00B- 789 18.02.20 CSD-II M/S New Allanberry Works 22/CPD-II/07.01.20 580/47 Supply 441541.00B- 790 18.02.20 BMD-IV M/S O.S. Contractor 12/BMD-IV/08.02.19 274/97B Insulation 116943.00B- 791 18.02.20 BMD-IV M/S usha Erterprises 11/BMD-IV/14.01.19 274/98 Maintinance 48249.00B- 792 18.02.20 BMD-IV M/S G.S. Contruction co. 18/BMD-IV/30.12.19 274/99 Round The Clock 83566.00B- 795 18.02.20 CSD-II M/S Mother Blessing Enterprises 68/CPD-I/20.01.20 491/69 Supply 106140.00B- 803 19.02.20 CSD-II M/S Fiducia Machinery Services 158/CPD-II/03.02.20 561/34 Supply 302146.00B- 805 19.02.20 CSD-II M/S North Street Cooling Tower 1321/CPD-I/14.11.18 580/50 Supply 348948.00B- 806 19.02.20 CSD-II M/S RSP Overseas Pvt.Ltd. 1507/CPD-I/13.07.16 580/52 Supply 10275.00B- 807 19.02.20 CSD-II M/S RSP Overseas Pvt.Ltd. 1110/CPD-I/07.06.13 580/52 Supply 3738.00B- 808 19.02.20 CSD-II M/S Power Engineers 155/CPD-II/01.02.20 580/59 Supply 754915.00B- 809 19.02.20 CSD-II M/S Sone Obra Enterprises Pvt.Ltd. 81/CPD-I/21.01.20 580/60 Supply 114927.00B- 810 19.02.20 CSD-II M/S Sone Obra Enterprises Pvt.Ltd. 81/CPD-I/21.01.20 580/61 Supply 434749.00B- 811 19.02.20 CSD-II M/S Sone Obra Enterprises Pvt.Ltd. 81/CPD-I/21.01.20 580/62 Supply 427275.00B- 812 19.02.20 AHD-II M/S Rajeev Kumar 16/AHD-II/10.09.19 515/186 Proving 136108.00B- 813 19.02.20 AHD-II M/S Rahul Gupta & Co. 23/AHD-II/06.02.19 515/188 Reparing 89030.00B- 814 19.02.20 EMD-IV M/S Techno Power 23/EMD-IV/23.01.20 1986/13 Arresting of tras 317991.00B- 815 19.02.20 TMD-II M/S Atlas copco 108/TMD-II/ 523/14 Anuual Maintinenes 121422.00B- 816 19.02.20 TMD-II M/S Bharti Enterprises 22/TMD-II/15.11.19 527/26B Lifting & Shifting 333704.00B- 817 19.02.20 TMD-II M/S Bharti Enterprises 21/TMD-II/15.11.19 527/27 Fabrication 334742.00B- 818 29.02.20 C&ID-III M/S Marvel Engineering Company 31/C&ID-III/22.01.20 Fist/F 525/61b/62a 29264.00B- 819 29.02.20 EMD-V M/S R.P. Construction Co. 05/EMD-V/07.08.19 Fist/F 483/70-71 48282.00

TOTAL 18456023.00 0.00 4894089.00

B- 820 03.03.20 CAMD-II M/S Jahangir Enterprises 07/CAMD-II/18.09.19 241/66 Fabrication 11786.00B- 821 03.03.20 CAMD-II M/S P.K. Enterprises 15/CAMD-II/28.12.18 387/39B Maintinance 44512.00B- 822 03.03.20 CSD-II M/S Simplex Switchger Pvt.Ltd 159/CPD-I/07.02.20 559/104 Supply 213145.00B- 823 03.03.20 CSD-II M/S Simplex Switchger Pvt.Ltd 159/CPD-I/07.02.20 559/105 Supply 423644.00B- 825 03.03.20 CSD-II M/S Tirupati Industrial Agenceis 386/EMD-IV/18.07.20 487/141 Supply 2717853.00B- 826 03.03.20 CSD-II M/S Omega Engg. Works 174/CPD-II/05.02.20 561/35 Supply 244229.00B- 828 03.03.20 CSD-II M/S Multitech Engineers 184/CPD-II/07.02.20 557/48 Supply 492071.00

G:\2nd Pen Drive\210MW\2020-21\06-20\Liab_15.06.20_210MW 14

Page 28: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 829 04.03.20 CSD-II M/S Hind Udyog 134/CPD-I/01.02.20 560/52 Supply 597080.00B- 831 04.03.20 CSD-II M/S Eureka Industrial 1733/CPD-I/07.11.19 491/70 Supply 14509.00B- 832 04.03.20 CSD-II M/S Vertika Enterprises 67/CPD-I/20.01.20 491/71 Supply 90813.00B- 834 05.03.20 CSD-II M/S I Deal Flow Control pvt.Ltd. 07/CPD-I/04.01.20 426/162 Supply 64835.00B- 836 07.03.20 CHD-III M/S MRP Construction 03/CHD-III/19.06.19 519/85 Preventive 31048.00B- 837 07.03.20 CHD-III M/S Instrument Care Group 09/CHD-III/22.02.20 519/90 Security 15815.00B- 838 07.03.20 CAMD-II M/S Balram Engineering 03/CAMD-II/29.07.19 468/87 Maintinance 52371.00B- 839 13.03.20 CHD-IV M/S Aka Logistic Pvt.Ltd. 09/CHD-IV/11.10.18 582/28 Round The Clock 270725.00B- 840 13.03.20 CHD-IV M/S Hind Udyog 05/CHD-IV/04.06.19 504/78 Hork of Repairing 308076.00B- 841 19.03.20 CSD-II M/S S.K. Systems Pvt.Ltd. 2019/CPD-I/28.12.19 557/52 Supply 638528B- 842 19.03.20 CSD-II M/S Abhishek Engg. 185/CPD-II/07.02.20 557/52 Supply 595414B- 844 20.03.20 CHD-IV M/S Leading Edge Technocra 671/CHD-IV/28.09.19 507/15B Supply 180139B- 845 20.03.20 CSD-II M/S J. Umashankar & Co. Pvt.Ltd. 80/CPD-I/21.01.20 466/171 Supply 26512B-B- 847 20.03.20 TMD-II M/S Maarfat Const 23/TMD-II/02.12.19 553/173 Thermal Insulation 41752B- 848 20.03.20 C&ID-III M/S Kapatiya Instrument Elector 20/C&ID-III/07.12.19 526/75B miscelaneous 62938B- 853 23.03.20 CSD-II M/S Jalvid Udyog 1739/CPD-I/07.11.19 444/172 Supply 27612B- 854 23.03.20 CSD-II M/S AA RSELLER Tredco 1905/CPD-I/07.12.19 444/172 Supply 444576B- 855 23.03.20 CSD-II M/S Instant Engineers 1906/CPD-I/07.12.19 444/173 Supply 362455B- 856 23.03.20 CSD-II M/S R.P. Construction 86/EMD-V/20.02.20 444/174 Supply 47790B- 857 23.03.20 CSD-II M/S Priya Construction 85/EMD-V/20.02.20 444/174 Supply 1164830B- 858 23.03.20 CSD-II M/S Priya Construction 91/EMD-V/20.02.20 444/175 Supply 196484B- 859 23.03.20 CSD-II M/S MIEPL 228/CPD-I/02.03.20 444/176 Supply 127440B- 860 24.03.20 TMD-II M/S Thermal India Engineers 28/TMD-IV/28.02.20 538/23B Insppection 198240B- 861 24.03.20 TMD-II M/S Thermal India Engineers 29/TMD-II/28.02.20 538/24 Decoupling 348100B- 866 28.03.20 CSD-II M/S Gee Co Fnercon Pvt.Ltd. 109/CPD-II/25.01.20 580/69 Supply 525155B- 867 30.03.20 AHD-II M/S Rahul Gupta & Co. 25/AHD-II/06.02.19 515/195 Repeare 85708B- 868 30.03.20 AHD-II M/S Garg Engineering & Sons 11/AHD-II/05.08.19 515/197 Repeare 104167B- 869 30.03.20 CSD-II M/S New Allenberry Work 133/CPD-I/01.02.20 560/64 Supply 394945B- 870 30.03.20 CSD-II M/S Vibrant Engineers 45/CPD-I/13.01.20 560/65 Supply 854320B- 871 30.03.20 CSD-II M/S Elecon 132/CSD-I/01.02.20 560/66 Supply 1901773B- 872 30.03.20 CSD-II M/S Sempertrans India Pvt.Ltd 183/CPD-I/12.02.20 560/67 Supply 2926400B- 873 30.03.20 ECMD-II M/S Akshat Enterprises 10/ECMD-II/20.01.20 2101/24 Surface Leveling 313237B- 874 30.03.20 ECMD-II M/S Akshat Enterprises 12/ECMD-II/24.06.20 2101/28 Routine Maintination 86940B- 875 30.03.20 OGD-II M/S SGL Engg. Inustries 16/OGD-II/22.11.16 434/110 Accounts 28788B- 876 30.03.20 OGD-II M/S Kailash Singh 12/OGD-II/22.12.15 434/109 Security 7084B- 877 31.03.20 BMD-III M/S Jha Contruction 05/BMD-III/05.10.18 436/83B Security 38949

2374160.00 703363.00 14245265.00

B- 1 07.04.20 CSD-II M/S Dynamic Power Services 82/CPD-II/27.01.20 560/52 Supply 593493B- 2 07.04.20 CSD-II M/S Dynamic Power Services 94/CPD-II/22.01.20 560/53 Supply 2596000B- 3 07.04.20 CSD-II M/S Amco Industries 88/CPD-II/21.01.20 560/54 Supply 1971638B- 4 07.04.20 CSD-II M/S Amco Industries 85/CPD-II/21.01.20 560/54 Supply 1620671B- 5 07.04.20 CSD-II M/S Amco Industries 81/CPD-II/21.01.20 560/55 Supply 77384B- 6 07.04.20 CSD-II M/S Amco Industries 35/CPD-II/09.01.20 560/56 Supply 749848B- 7 07.04.20 CSD-II M/S Dynamic Power Services 97/CPD-II/22.01.20 560/55 Supply 382031B- 8 07.04.20 CSD-II M/S Omega Engg. Works 96/CPD-II/22.01.20 560/58 Supply 1115112B- 9 07.04.20 CSD-II M/S Omega Engg. Works 174/CPD-II/05.02.20 560/59 Supply 244229B- 10 07.04.20 CSD-II M/S Omega Engg. Works 83/CPD-II/21.01.20 560/63 Supply 889519

G:\2nd Pen Drive\210MW\2020-21\06-20\Liab_15.06.20_210MW 15

Page 29: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 11 07.04.20 EMD-V M/S Instrument Care Group 15/EMD-V 443/50A B/d 87156B-B-B- 14 08.04.20 C&ID-I M/S R.K. Traders 03/C&ID-I/03.01.19 2083/02 Upgrading 11564B- 15 08.04.20 C&ID-I M/S R.K. Traders 15/C&ID-I/26.12.19 2083/2B Supply 5900B- 16 08.04.20 ECMD-II M/S Kanha Construction 69/ECMD-II/06.03.20 1893/72 Annual Ment 190247B- 17 08.04.20 EMD-II M/S Priya Construction 15/EMD-II 1932/89 Electrical B/d 20173B- 18 08.04.20 M/S 107616B- 19 08.04.20 ECMD-II M/S Akshat Enterprises 54/ECMD-II 2070/20 M&R of Door 28932B- 20 08.04.20 CHD-II M/S M.K. Traders 11/CHD-II/15.12.19 490/124 Maintinance 54441B- 21 08.04.20 CHD-I M/S Aka Logistic Pvt.Ltd. 12/CHD-I/22.11.18 2030/06 Security 28950B- 24 08.04.20 CHD-I M/S Priyanka Enterprises 16/CHD-I/20.03.20 1873/47B B/d 268359B- 25 08.04.20 CHD-I M/S Priyanka Enterprises 05/CHD-I/30.03.19 1873/49 Replecement 323889B- 27 18.04.20 CHD-III M/S Nosad Contraction 12/CHD-III/18.11.19 513/94 Overhauling 36686B- 28 18.04.20 CSD-II M/S Vijay Chandra Industries 314/CPD-II/18.03.20 561/51 Supply 410650B- 30 18.04.20 CSD-II M/S Aditi Enterprises 158/CPD-I/07.02.20 576/24 Supply 116678B- 31 18.04.20 CSD-II M/S Gauri Gases Pvt.Ltd. 191/CPD-I/14.02.20 576/25 Gas 56498B- 32 18.04.20 CSD-II M/S Gauri Gases Pvt.Ltd. 1448/CPD-I/08.02.18 1959/71 Supply 14827B- 33 20.04.20 AHD-II M/S T.R. Technical Services 36/AHD-II/06.03.20 530/23 Hiring of expert 115291B- 34 20.04.20 AHD-II M/S India Engg. Works 19/AHD-II/11.10.19 530/24 Overhauling 2103953B- 35 20.04.20 CHD-III M/S Nosad Contraction 09/CHD-III/24.10.19 2046/19 O/H 8491B- 36 22.04.20 EMD-V M/S Nosad Contraction 10/EMD-V/05.01.19 372/44 Servicing 87205B- 37 22.04.20 CHD-III M/S Amit Shrivas 12/CHD-III/06.03.19 1853/93 Security 7007B- 38 22.04.20 CHD-III M/S Instrument Care Group 09/CHD-III/15.11.18 1853/94 Security 15815B- 39 22.04.20 ECMD-I M/S Techkriti Infratech Pvt.Ltd. 06/ECMD-I/30.12.19 2018/33 Physical 52392B- 40 23.04.20 TMD-II M/S Thermal India Engg. 05/TMD-II/28.07.18 527/31 B/d 44577B- 41 23.04.20 EMD-V M/S S.K. Enterprises 14/EMD-V/15.02.18 508/123 Security 20276B- 42 23.04.20 TMD-II M/S Thermal India Engg. 02/TMD-II/15.04.20 527/35 B/d 107587B- 43 23.04.20 TMD-II M/S Thermal India Engg. 05/TMD-II/28.07.18 527/33 B/d 33677B- 44 23.04.20 TMD-II M/S Amco Industries 573/TMD-II/07.12.19 553/12 Supply 720120B- 45 23.04.20 TMD-II M/S Ideal Flow Control Pvt.Ltd. 27/TMD-II/20.02.20 553/12 Overhauling 1259518B- 46 23.04.20 TMD-II M/S Millennium Enterrprises 476/TMD-II/04.10.19 553/13 Overhauling 411525B- 47 23.04.20 TMD-II M/S M.K. Traders 13/TMD-II/08.08.19 553/13 B/d 180453B- 48 23.04.20 OGD-II M/S Zenith Engineers 14/OGD-II/06.01.20 435/143 Assist the work 240757B- 49 25.04.20 BMD-III M/S R. Electromech 15/BMD-III/06.02.18 562/24 Security 52259B- 50 25.04.20 BMD-III M/S Bharat Mechanical & Structural Works 02/BMD-III/09.06.17 302/77 Security 48881

B- 51 25.04.20 BMD-III M/S Bharat Mechanical & Structural Works 03/BMD-III/15.06.18 476/69 Security 26017

B- 52 25.04.20 BMD-III M/S Bharat Mechanical & Structural Works 11/BMD-III/24.10.16 476/70 Security 93212

B- 53 25.04.20 BMD-III M/S Bharat Mechanical & Structural Works 09/BMD-III/15.01.18 476/71 Security 91939

B- 54 25.04.20 BMD-III M/S Bharat Mechanical & Structural Works 06/BMD-III/02.08.18 476/72 Security 57195

B- 56 27.04.20 C&ID-III M/S DK & Sons Co. 22/C&ID-III/09.01.20 576/07 Salvaging 164520B- 57 27.04.20 BMD-IV M/S Ravindra Singh & Co. 13/BMD-IV/15.02.19 370/80 Security 93285B- 58 27.04.20 OGD-I M/S DK & Sons Co. 09/OGD-I/06.11.19 2080/64 Break Down 4259B- 59 27.04.20 C&ID-III M/S Instrument Care Group 19/C&ID-III/07.01.19 344/154 Amc 64639B- 60 27.04.20 C&ID-III M/S Kapatiya Instrument 20/C&ID-III/07.12.19 344/157 miscellaneous 76490B- 61 27.04.20 BMD-III M/S M.K. Traders 21/BMD-III/25.11.19 283/148 B/d 21471

G:\2nd Pen Drive\210MW\2020-21\06-20\Liab_15.06.20_210MW 16

Page 30: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 62 27.04.20 BMD-III M/S Bharat Mechanical & Structural Works 10/BMD-III/18.04.19 283/148 Preventive 186437

B- 63 27.04.20 C&ID-III M/S R.K. Traders 01/C&ID-III/22.04.19 525/64 Supply 5900B- 64 28.04.20 AHD-II M/S Garg Engg. & Sons 21/AHD-II/25.11.19 459/91 Refractory work 433567B- 65 28.04.20 AHD-II M/S Garg Engg. & Sons 20/AHD-II/11.10.19 459/92 Refractory work 424418B- 66 28.04.20 AHD-II M/S Garg Engg. & Sons 34/AHD-II/06.03.20 459/93 Rotation 258299B- 67 28.04.20 BMD-IV M/S MAK Construction 19/BMD-IV/13.01.20 565/13 Maintinance 119270B- 68 28.04.20 BMD-IV M/S Nosad Contraction 03/BMD-IV/04.09.18 565/14 Maintinance 134989B- 69 28.04.20 CPD-I M/S Adarsh Electronics & Electricals 1669/CPD-I/01.11.19 1949/113 Supply 28504B- 70 28.04.20 BMD-III M/S Jha Constructioin 08/BMD-III/15.04.19 437/4 Reparing 10291B- 71 28.04.20 BMD-III M/S O.S. Contractor 15/BMD-III/13.05.19 188/92 Supply 125809B- 72 28.04.20 BMD-III M/S Bharat Mechanical & Structural Works 10/BMD-III/18.04.19 346/54 Preventive 22611

B- 73 28.04.20 OGD-I M/S Eureka forbes 244/OGD-I/08.08.19 2080/66 Supply 8805B- 74 29.04.20 CHD-III M/S Priya Construction 10/CHD-III/06.01.18 513/96 Security 50000B- 75 29.04.20 CHD-III M/S Vikash Electricals 08/CHD-III/29.10.18 513/96 Security 49807B- 76 29.04.20 CHD-III M/S S.R. Construction 05/CHD-III/19.08.19 513/95 Preventive B/d 36297B- 77 30.04.20 CAMD-II M/S Hi-tech Diesels 15/CAMD-II/05.02.20 416/167 Repaire 108000B- 78 30.04.20 CAMD-II M/S Shiv Mahadev 05/CAMD-II/05.09.19 23/171 Security 23350B- 79 30.04.20 CAMD-II M/S Usha Enterprises 08/CAMD-II/30.09.19 388/78 Complete operation 50622B- 80 30.04.20 CAMD-II M/S Bharti Enterprises 10/CAMD-II/04.10.19 388/79 Supply 305592B- 81 30.04.20 CAMD-II M/S Universal Engg. 23/CAMD-II/19.03.19 388/80 Security 37661B- 82 30.04.20 CPD-I M/S IGP Engg. Pvt.Ltd. 43/CPD-I/13.01.20 568/63 Supply 54063B- 83 30.04.20 BMD-II M/S Punecet Construction Co. 10/BMD-II/28.12.18 1963/72 Security 28960B- 84 30.04.20 BMD-II M/S Punecet Construction Co. 11/BMD-II/19.08.19 1963/73 Security 28960B- 85 30.04.20 OGD-II M/S SGL Engg. Indurtries 17/OGD-II/06.03.20 422/185 Repaire 33311B- 86 30.04.20 EMD-V M/S Electrical & Instrumentation Engg. 01/EMD-V/25.04.18 366/29 Security 19993

9849680.00 701213.00 10239925.00

B- 87 04.05.20 EMD-I M/S Ajay Kumar 13/EMD-I/28.12.19 2016/49A Security 7046.00B- 88 04.05.20 EMD-I M/S Sanjeev Kumar 21/EMD-I/25.11.16 2016/50 Security 2400.00B- 89 04.05.20 EMD-I M/S Sanjeev Kumar 05/EMD-I/30.08.17 2016/50 Security 1200.00B- 90 05.05.20 OGD-I M/S Ajay Kumar 13/OGD-I/07.11.19 2082/68 Security 6930.00B- 91 05.05.20 BMD-II M/S Instrument Care Group 12/BMD-II/19.08.19 1708/150 Security 29013.00B- 92 06.05.20 CSD-II M/S Excel Technology 479/C&ID-III/23.09.19 492/60 Supply 367853.00B- 93 06.05.20 CSD-II M/S Jalvid Udyog 1907/CPD-I/07.12.19 492/61 Supply 31860.00B- 94 06.05.20 CSD-II M/S Priya Construction Co. 122/EMD-V/06.03.20 492/61 Supply 619500.00B- 95 06.05.20 CSD-II M/S Excel Technology 479/C&ID-III/23.09.19 492/62 Supply 367853.00B- 96 06.05.20 CSD-II M/S Cooling Center 163/C&ID-III/08.04.20 492/62 Supply 155141.00B- 97 06.05.20 CSD-II M/S Instant Engg 1923/CPD-I/11.12.19 492/63 Supply 108008.00B- 98 06.05.20 CSD-II M/S Authentic Systems &

Technologies1735/CPD-I/07.11.19 492/64 Supply 132107.00

B- 99 06.05.20 CSD-II M/S Authentic Systems & Technologies

1746/CPD-I/08.11.19 492/64 Supply 39637.00B- 100 06.05.20 CSD-II M/S R.K. Traders 636/C&ID-III/27.12.19 444/180 Supply 186145.00B- 101 06.05.20 CSD-II M/S R.K. Traders 636/C&ID-III/27.12.19 444/181 Supply 2950.00B- 102 06.05.20 CSD-II M/S R.K. Traders 636/C&ID-III/27.12.19 444/181 Supply 2950.00B- 103 06.05.20 CSD-II M/S K. S. & Brothers 282/CPD-III/08.05.19 444/183 Supply 33760.00B- 104 06.05.20 EMD-II M/S Priya Construction Co. 15/EMD-II 1932/92 B/d 20580.00B- 105 06.05.20 EMD-II M/S R.L. Engg. 02/EMD-II/25.06.19 1880/99 Rewainding 56706.00

G:\2nd Pen Drive\210MW\2020-21\06-20\Liab_15.06.20_210MW 17

Page 31: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 106 11.05.20 CSD-II M/S Amco Industries 42/CPD-II/09.01.20 557/54 Supply 993892.00B- 107 11.05.20 CSD-II M/S Chanki Construction Co. 14/CSD-II/15.12.18 449/135 UnloadingB- 108 11.05.20 EMD-V M/S Priya Construction Co. 22/EMD-V/20.03.20 316/95 Rewainding 234503.00B- 109 11.05.20 EMD-V M/S Priya Construction Co. 22/EMD-V/20.03.20 316/96 Rewainding 243603.00B- 110 11.05.20 EMD-V M/S Priya Construction Co. 22/EMD-V/20.03.20 316/98 Rewainding 250437.00B- 111 11.05.20 EMD-V M/S Priya Construction Co. 22/EMD-V/20.03.20 316/99 Rewainding 122071.00B- 112 12.05.20 CHD-I M/S Priyanka Enterprises 05/CHD-I/30.08.19 1873/54 Repair 72187.00B- 113 13.05.20 CHD-IV M/S Inderjeet Singh 12/CHD-IV/23.09.19 458/81 Security 6930.00B- 114 13.05.20 AHD-II M/S Garg Engineering & sons 08/AHD-II/11.07.19 479/61 Dipasal Pipe Line 126360.00B- 115 13.05.20 BMD-IV M/S Usha Enterprises 11/BMD-IV/14.01.19 356/83 Mant of Dewalering 13969.00B- 116 13.05.20 BMD-IV M/S Hind Udyog 19/BMD-IV/30.03.19 356/82B Repairing Reetification 118986.00B- 117 13.05.20 BMD-IV M/S A.S. Enterprises 15/BMD-IV/21.12.19 356/83A Security 24960.00B- 118 13.05.20 BMD-IV M/S A.S. Enterprises 12/BMD-II/19.08.19 356/83A Security 29952.00B- 119 13.05.20 C&ID-II M/S MAK Construction Co. 12/C&ID-II/25.01.20 549/12 Mirecelanius 61633.00B- 120 13.05.20 EMD-II M/S Krishna Enterprises 04/EMD-II 1945/54 B/d Maintinec 137031.00B- 121 13.05.20 EMD-II M/S Vikash Electrical 03/EMD-II 1945/57 Reusnding 3021.00B- 122 13.05.20 EMD-V M/S Pooran Singh 15/EMD-V/22.12.19 222/87 Security 8200.00B- 123 13.05.20 AHD-II M/S Garg Engineering & sons 35/AHD-II/06.03.20 459/95 Laying of 200880.00B- 124 13.05.20 AHD-II M/S Rajeev Kumar 01/AHD-II/24.04.20 459/96 Cleanig 231724.00B- 125 13.05.20 AHD-II M/S Garg Engineering & sons 10/AHD-II/05.08.19 459/96 Reparing 85833.00B- 126 13.05.20 AHD-II M/S Rajeev Kumar 23/AHD-II/05.12.18 459/97 Operation 16721.00B- 127 13.05.20 TMD-II M/S Maarfat Const. 24/TMD-II/02.12.19 538/25 Thermal Inst. 847670.00B- 128 13.05.20 AHD-II M/S Nosad Contructor 33/AHD-II/04.03.20 530/25 marking 338542.00B- 129 13.05.20 CSD-I M/S Soalar Engg. 09/CSD-I/08.03.19 1969/69 Unloading 8793.00B- 130 13.05.20 BMD-IV M/S Ravindra Singh & Co. 21/BMD-IV/07.03.20 566/72 Removal of Technical 85670.00B- 131 13.05.20 BMD-IV M/S Nosad Contructor 03/BMD-IV/04.09.18 566/74 Maint Repai 21384.00B- 132 13.05.20 CHD-I M/S Priyanka Enterprises 07/CHD-I/14.10.19 2031/10 Overtaulig 380374.00B- 133 13.05.20 EM-IV M/S ABB Power Product Cntd

Systems2016/EMD-IV/10.01.20 395/90 Attending the O/h work 354000.00

B- 134 13.05.20 EMD-I M/S Nosad Contructor 17/EMD-I/27.10.18 2055/112 Maintinace 9701.00B- 135 13.05.20 EMD-I M/S Nosad Contructor 12/EMD-I/29.11.19 2055/115 Maintinace 105051.00B- 136 13.05.20 EMD-I M/S Nosad Contructor 17/EMD-I/27.10.18 2055/116 Maintinace 7931.00B- 137 16.05.20 CPD-II M/S North Street Cooling Tower P.

Ltd.200/CPD-II/10.02.20 426/167 Supply 1323496.00

B- 139 16.05.20 CPD-II M/S North Street Cooling Tower P. Ltd.

200/CPD-II/10.02.20 426/172 Supply 1340000.00B- 140 16.05.20 CPD-I M/S R S P Overeas Pvt. Ltd. 1108/CPD-I/08.06.16 426/173 Supply 15072.00B- 141 16.05.20 C&ID-III M/S R.K. Traders 371/C&ID-III/25.01.19 526/85B Supply 9440.00B- 142 16.05.20 C&ID-III M/S R.K. Traders 28/C&ID-III/05/03.20 526/86 Instalation 10620.00B- 143 16.05.20 TMD-II M/S Hind Udyog 07/TMD-I/22.04.19 511/32 Repairing 29107.00B- 144 16.05.20 EMD-IV M/S Nosad Contructor 11/EMD-IV/16.08.19 583/12 Preventive B/d 22679.00B- 145 18.05.20 C&ID-III M/S Cooling Center 12/C&ID-III/14.01.20 589/05 O/H of Compresor 235289.00B- 146 18.05.20 C&ID-III M/S Goverdhan Controls 15/C&ID-III/15.10.19 589/07 Routine Mant. 27972.00B- 147 18.05.20 EMD-III M/S Vinayak Sylinders 17/EMD-III/14.10.19 1757/192 Rounding Repaiar 252350.00B- 148 18.05.20 CAMD-I M/S Maa Shakti Enterprises 52/S&TD/24.03.20 2061/32 Laying of 76700.00B- 149 18.05.20 BMD-III M/S O.S. Contruction 15/BMD-III/13.05.19 226/176 Supply 46153.00B- 150 18.05.20 CHD-III M/S Priya Construction Co. 10/CHD-III/06.1.10 1853/94 Reeinding of differ 50000.00B- 151 18.05.20 CHD-III M/S Priya Construction Co. 11/CHD-III/13.02.19 1853/94 Reeinding of differ 40000.00

Transfer to 'A' List

G:\2nd Pen Drive\210MW\2020-21\06-20\Liab_15.06.20_210MW 18

Page 32: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 152 18.05.20 E&TD M/S Ganges Consultancy 38/S&TD/11.07.19 1992/100 Consultancy 288510.00B- 153 18.05.20 E&TD M/S K.S. Brothers 32/S&TD/20.11.19 1992/102 Supply 5665.00B- 154 26.05.20 EMD-II M/S Priya Construction Co. 15/EMD-II 1932/86 Eletrical Maint. 21906.00B- 155 28.05.20 CAMD-II M/S Shiv Mahadev Engg. Works 16/CAMD-II/17.03.20 387/44 Cooditioiag 261630.00B- 156 28.05.20 CAMD-II M/S P.K. Enterprises 18/CAMD-II/11.05.20 387/43 Maint. B/d 15294.00B- 157 28.05.20 CAMD-II M/S Usha Enterprises 20/CAMD-II/05.03.19 387/44 Repairing 131224.00B- 158 28.05.20 CAMD-II M/S Usha Enterprises 20/CAMD-II/27.02.18 387/45 Service Maint. 82952.00B- 159 28.05.20 EMD-IV M/S M.R.P. Construction 29/EMD-IV/25.03.20 348/42 O/h of Servics 474776.00B- 160 28.05.20 EMD-IV M/S M.R.P. Construction 28/EMD-IV/25.03.20 348/42 Aorual Overhouling 80281.00B- 161 28.05.20 EMD-IV M/S M.R.P. Construction 32/EMD-IV/20.02.20 348/43 Instalation 124200.00B- 162 28.05.20 BMD-IV M/S U.S. Enterprises 27/BMD-IV/19.03.20 278/98 O/H of id 2189772.00B- 163 28.05.20 BMD-IV M/S Gayatri Enterprises 26/BMD-IV/19.03.20 554/76 Repairing 505883.00B- 164 28.05.20 BMD-IV M/S Gayatri Enterprises 01/BMD-IV/15.04.20 554/78 Repleshment 190485.00B- 165 28.05.20 BMD-II M/S U.S. Enterprises 10/BMD-II/06.07.19 554/82 Milling System 670428.00B- 166 30.05.20 EMD-III M/S Priya Construction Co. 29/EMD-III/10.02.20 2050/24 Preventive B/d 156032.00B- 167 30.05.20 EMD-IV M/S M A K Construction Co. 25/EMD-IV/15.02.20 573/15 O/h Work 562806.00B- 168 30.05.20 EMD-IV M/S Nosad Contructor 33/EMD-IV/27.03.20 473/186 Painting 335163.00B- 169 30.05.20 EMD-IV M/S Nosad Contructor 30/EMD-IV/25.02.20 473/189 Repleshment 248038.00B- 170 30.05.20 BMD-I M/S Jha Construction Co. 18/BMD-I/2009-10 1955/89 Security 22950.00B- 171 30.05.20 BMD-I M/S Jha Construction Co. 03/BMD-I/2010-11 1955/88 Security 18800.00B- 172 30.05.20 BMD-I M/S Sirnroo Construction 07/BMD-I/2018-19 1955/89 Security 7084.00B- 173 30.05.20 BMD-I M/S O.S. Contruction 22/BMD-I/2010-11 1955/88 Security 27000.00B- 174 30.05.20 CAMD-II M/S Jahangir Enterprises 16/CAMD-II/16.09.19 388/83A Routine Maint. 70304.00B- 175 30.05.20 CAMD-II M/S Usha Enterprises 09/CAMD-II/01.10.19 388/85A Routine 25346.00B- 176 30.05.20 CAMD-II M/S Usha Enterprises 08/CAMD-II/30.09.19 388/85B Routine Cheking 25312.00

Total 12800080.00 0.00 4534287.00

B 177 03.06.20 CAMD-II M/s Balram Engg. Contractor & Suppliers

03/CAMD-II/29.07.19 467/86 Maintenance/ B/D Maint. 57483.00B 178 03.06.20 CAMD-II M/s Instrument Care Group 04/CAMD-II/25.07.19 467/88 Maintenance/Relocation 28908.00B 179 03.06.20 CAMD-I M/s S.R. Enterprises 24/CAMD-I/21.09.19 2062/55-A Routine 124543.00B 180 03.06.20 BMD-IV M/s Roshani Enterprises 25/BMD-IV/16.03.20 572/38-A Major Overhauling 295380.00B 181 03.06.20 BMD-IV M/s G.S. Construction Co. 24/BMD-IV/16.03.20 572/37-B Major Overhauling 295380.00B 182 03.06.20 BMD-IV M/s U.S. Enterprises 18/BMD-IV/30.03.19 572/39-A Major Overhauling 286200.00B 183 03.06.20 EMD-II M/s Electrical & Instrumentation

Engg.17/EMD-II/ 1800/142 Security 33022.00

B 184 03.06.20 EMD-V M/s Priya Construction Co. 91/EMD-V/20.02.20 411/189 Supply 185156.00B 185 03.06.20 CHD-I M/s Priyanka Enterprises 01/CHD-I/04.04.18 1873/41-B Security 273071.00B 186 03.06.20 CHD-I M/s Priyanka Enterprises 12/CHD-I/13.03.18 1873/42-A Security 138999.00B 187 03.06.20 CHD-I M/s Priyanka Enterprises 03/CHD-I/05.06.18 1873/42-B Security 167713.00B 188 03.06.20 CHD-I M/s Priyanka Enterprises 10/CHD-I/22.11.18 1873/44-A Security 8500.00B 189 03.06.20 CHD-I M/s Priyanka Enterprises 11/CHD-I/13.03.18 1873/55-B Security 154177.00B 190 03.06.20 CPD-I M/s Aditi Enterprises 158/CPD-I/07.02.20 557/60 Wire Rope 126850.00B 191 03.06.20 CPD-I M/s Trade India Corporation 1299/CPD-I/20.08.19 466/179 Purchase 101226.00B 192 03.06.20 CPD-II M/s Joy Marketing Company 1320/CPD-II/27.11.19 466/181 Purchase 682388.00B 193 03.06.20 CPD-II M/s Power Engineers 784/CPD-II/31.07.19 466/182 Gate Valve 1162954.00B 194 03.06.20 CPD-II M/s North Street Cooling Tower 198/CPD-II/10.02.20 450/145 Supply 1275184.00B 195 05.06.20 BMD-II M/s Syndicate Engineering 11/BMD-II/18.12.18 1963/73-B Security 24102.00

G:\2nd Pen Drive\210MW\2020-21\06-20\Liab_15.06.20_210MW 19

Page 33: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B 196 05.06.20 BMD-II M/s Syndicate Engineering 12/BMD-II/28.12.18 1963/73 Security 29343.00B 197 05.06.20 BMD-II M/s Syndicate Engineering 09/BMD-II/27.07.19 1963/74 Security 24102.00B 198 05.06.20 BMD-II M/s Syndicate Engineering 27/BMD-II/15.11.19 1963/74-B Security 24102.00B 199 05.06.20 BMD-II M/s Syndicate Engineering 14/BMD-II/23.01.19 1963/74 Security 28053.00B 200 05.06.20 BMD-II M/s Syndicate Engineering 28/BMD-II/15.11.19 1963/74--B Security 29342.00B 201 05.06.20 CAMD-I M/s Usha Enterprises 3 31/CAMD-I/04.11.19 1909/58 O/H 172872.00B 202 05.06.20 AHD-II M/s MAK Construction 32/AHD-II/30.03.13 530/26 Security 61730.00B 203 05.06.20 AHD-II M/s MAK Construction 59/AHD-II/30.05.20 530/27 Security 29644.00B 204 05.06.20 AHD-II M/s MAK Construction 60/AHD-II/30.05.20 530/26-B Security 60800.00B 205 05.06.20 AHD-II M/s MAK Construction 61/AHD-II/30.05.20 530/27 Security 53855.00B 206 05.06.20 AHD-II M/s Nosad Contractor 62/AHD-I/30.05.20 530/27 Security 14498.00B 207 06.06.20 ECMD-II M/s Puneet Construction 38/ECMD-II/08.02.18 1866/91-B Security 12000.00B 208 06.06.20 ECMD-II M/s Sadan Engineering Works 42/ECMD-II/09.01.18 1866/92-A Security 12000.00B 209 06.06.20 ECMD-II M/s Puneet Construction 20/ECMD-II/31.07.18 1866/92-B Security 12000.00B 210 06.06.20 ECMD-II M/s Sadan Engineering Works 30/ECMD-II/12.11.18 1866/93-A Security 11964.00B 211 06.06.20 ECMD-II M/s Akshat Enterprises 68/ECMD-II/14.03.19 1866/93-B Security 29103.00B 212 06.06.20 ECMD-II M/s Jamuna Meher Enterprises 41/ECMD-II/21.09.19 1866/94-A Security 29126.00B 213 06.06.20 ECMD-II M/s Uttam Chandra Gupta 15/ECMD-II/05.10.17 1866/95 Security 4200.00B 214 06.06.20 ECMD-II M/s Uttam Chandra Gupta 17/ECMD-II/07.10.17 1866/94-B Security 4200.00B 215 06.06.20 C&ID-III M/s Jha Construction 164/C&ID-III/08.04.20 1949/114 Supply 577846.00B 216 06.06.20 TMD M/s Zenith Engineering 08/TMD/2018-19 2026/42 Security 29806.00B 217 08.06.20 CPD-I M/s ION Exchange 30/CPD-I/24.04.20 575/44 Cancle by AO 0.00B 218 08.06.20 CPD-II M/s Thermoserve 980/CPD-II/11.09.19 426/176 Supply 1444611.00B 219 08.06.20 CPD-II M/s Thermoserve 632/CPD-II/01.06.18 426/176 Cancle by AO 0.00B 220 08.06.20 CPD-II M/s Thermoserve 49/CPD-II/15.01.19 426/176 Cancle by AO 0.00B 221 08.06.20 CSD-II M/s Neelkant Power System 158/CSD-I/19.05.20 561/52 Supply 250417.00B 222 12.06.20 EMD-IV M/s Ramag Ejectors Pvt. Ltd. 20/EMD-IV/02.12.19 574/10-B Cancle by AO 0.00B 223 12.06.20 EMD-I M/s Secure Meters Ltd. 09/EMD-I/18.10.19 1984/109 Supply 295236.00B 224 16.06.20 C&ID-III M/s Sanjay Electronics 1st 26/C&ID-III/22.01.20 526/95-B Overhauling 270000.00B 225 16.06.20 C&ID-II M/s Syndicate Engineering 1st 02/C&ID-II/10.06.20 526/91-A Overhauling 133488.00B 226 16.06.20 C&ID-II M/s Kapatia Instrument Vth 21/C&ID-III/07.12.19 526/89-A Operation 106571.00B 227 16.06.20 C&ID-II M/s Knowledge Lens Pvt. Ltd. 51/C&ID-II/22.05.20 525/72 AMC Lence 81420.00B 228 16.06.20 C&ID-III M/s Shiv Mahadev Engg. Works 1st 27/C&ID-III/05.03.20 526/96-B Maintenance 98011.00B 229 18.06.20 ECMD-II M/s Shiv Mahadev Engg. Works 2nd 49/ECMD-II/20.01.20 2014/34 Jungle Cleaning 119530.00B 230 18.06.20 CPD-I M/s Siddhivinayak 473/CPD-I/01.06.20 1901/195 Supply 893402.00B 231 18.06.20 CPD-I M/s Lioyd's Register 183/CPD-I/12.02.20 557/60 Supply 84960.00B 232 18.06.20 S&TD M/s Technow Engineering 3rd 22/S&TD/24.09.19 1998/86 Supply 56339.00B 233 18.06.20 ECMD-II M/s Ravindra Kumar 2nd 19/ECMD/16.12.19 141/120 M&R 73935.00

Total 10579742.0085721287.00 11001909.00 81954206.00Grand Total

Dy. Chief Accounts Officer

G:\2nd Pen Drive\210MW\2020-21\06-20\Liab_15.06.20_210MW 20

Page 34: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

Reg Index

Bill No DateName Of Division

Name of Firm

RAB Agr/PO/LOI/WO and Dt MB NO./ Page No

Description of Work/Supply Work Part Paid Amount

Fund Reserved Amount

Supply PIB- 66 04-05-2016 CSD-II M/s Placka Instruments India P. Ltd 142/CSD-II/27.01.16 215L 03.05.16 Supply 23138B- 117 16/05/2016 CSD-II M/s Kay Mohan Corporation 533/CSD-II/04.04.16 427L 13.05.16 Supply 44591

Total 0 0 0 0

B- 174 15/06/2016 CSD-II M/s Trade India Corp 776/CSD-II/07.05.16 185L 13.06.16 Supply 1681725 1009035B- 181 15/06/2016 CSD-II M/s Digita Promoters (I) P. Ltd 1959/CSD-II/11.12.15 215L 13.06.16 Supply 5647B- 188 18/06/2016 CSD-II M/s Hydromech Engineers 2920/CSD-II/15.03.16 213L 16.06.16 Supply 16865B- 207 20/06/2016 CSD-II M/s Vinko Auto Industries 105/CSD-II/18.04.16 232L 18.06.16 Supply 141915B- 208 20/06/2016 CSD-II M/s J.K. Engineering Co 819/CSD-II/10.05.16 232L 18.06.16 Supply 151972

Total 0 0 0 1681725

B- 244 14/07/2016 CSD-II M/s Kay Mohan Corporation 853/CSD-II/13.05.16 239L 13.07.16 Supply 73080B- 247 14/07/2016 CSD-II M/s Anurag Engineering Works 854/CSD-II/13.05.16 239L 13.07.16 Supply 37639 120718B- 278 25/07/2016 CSD-II M/s Sumal Engineering P. Ltd 91/CSD-II/16.04.16 173L 22.07.16 Supply 770148B- 287 25/07/2016 CSD-II M/s Placka Instruments India P. Ltd 312/CSD-II/25.02.16 233L 22.07.16 Supply 12600B- 295 25-07-2016 M/s Alstom I&D Limited 70L 181606

Total 0 0 0 37639

B- 342 09-08-2016 CSD-II M/s J. Umashanker & Co. P. Ltd 1508/CSD-II/13.07.16 240L 08.08.16 Supply 6457Total 0 0 0 0

B- 411 02-09-2016 CSD-II M/s Trade India Corporation 362/CPD-I/03.03.16 185L 31.08.16 Supply 154364

B- 424 02-09-2016 CSD-II M/s J.K Engineering Co. 1072/CPD-I/06.06.16 232L 02.09.16 Supply 45444 512714

B- 426 02-09-2016 CSD-II M/s Jain Mill Stores P. Ltd 1073/CPD-I/06.06.16 232L 02.09.16 Supply 400263

B- 473 21/09/2016 CSD-II M/s Shree Shyam Bearing P. Ltd 1105/CSD-II/08.06.16 239L 19.09.16 Supply 54789

B- 492 28/09/2016 CSD-II M/s Amco Industries 1887/CSD-II/24.08.16 61L 27.09.16 Supply 67599Total 0 0 0 45444

B- 498 04-10-2016 CSD-II M/s Jalvid Udyog 1834/CPD-I/17.08.16 126L 03.10.16 Supply 7214

B- 501 04-10-2016 CSD-II M/s Technow Engineering Work 1835/CPD-I/17.8.16 126L 03.10.16 Supply 27332

B- 554 26/10/2016 CSD-II M/s Jai Balaji Control Gears P. Ltd 905/CPD-I/18.05.16 233L 25.10.16 Supply 74358Total 0 0 0 0

B- 592 15/11/2016 CSD-II M/s Keltron Controls 2043/CPD-I/14.07.16 215L 11.11.16 Supply 31554

B- 618 30/11/2016 CSD-II M/s Jain Mill Stores P. Ltd 1839/CSD-II/17.08.16 246L 29.11.16 Supply 272918 53512

B- 621 30/11/2016 CSD-II M/s Technow Engg Works 2091/CSD-II/22.09.16 246L 29.11.16 Supply 36166Total 0 0 0 272918

B- 637 15/12/2016 CSD-II M/s U.P. Udyog 1079/CPD-II/11.08.16 250L 14.12.16 Supply 263091 84573

B- 638 15/12/2016 CSD-II M/s U.P. Udyog 1080/CPD-II/11.08.16 250L 14.12.16 Supply 615346 455619

B- 661 22/12/2016 CPD-II M/s krishna Kumar Distributors P. Ltd. 950/CPD-II/26.09.16 234L 21.12.16 Supply 265718

B- 672 26/12/2016 CSD-II M/s Trade India Corporation 2191/CPD-I/14.10.16 249L 26.12.16 Supply 507464 17962Total 0 0 0 1385901

B- 738 13/01/2017 CSD-I M/s Instant Engineers 2464/CPD-I/13.12.16 233L 13.01.17 Supply 172973

B- 739 13/01/2017 CSD-I M/s Krishna Engg. Com. 2466/CPD-I/13.12.16 233L 13.01.17 Supply 508820

B- 750 27.01.2017 CSD-I M/s Simplex Switchgear Pvt. Ltd. 1031/CPED-III/22.10.16 233L/46 27.01.17 Supply 7722

B- 751 27.01.2017 CSD-I M/s Krishan Kumar Distributors P. Ltd. 484/CPED-III/18.05.16 233L/47 27.01.17 Supply 25718Total 0 0 0 0

FUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi)"B"

Material/Spares

FUND RESERVEDFUND RESERVED

G:\2nd Pen Drive\250MW\2020-21\06-20\Liab_15.06.20_250 MW B-List-250MW

Page 35: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 790 13/02/2017 CSD-II M/s Atlas Copco Compressor Sales 1457/CPD-II/29.09.16 61L 09.02.17 Supply 576234 31565

B- 796 17/02/2017 CSD-II M/s Uttam Sales Corporation 1137/CPD-III/21.12.16 234L 16.02.17 Supply 30528Total 0 0 0 576234

B- 837 07-03-2017 CSD-II M/s Globe Enterprises 37/CPD-I/10.01.17 232L, 12A 07.03.17 Supply 4676 123000

B- 838 07-03-2017 CSD-II M/s Jalvid Udyog 157/CPD-1/30.01.17 232L, 12B 07.03.17 Supply 10626

B- 839 07-03-2017 CSD-II M/s Jalvid Udyog 31/CPD-I/09.01.17 232L, 13A 07.03.17 Supply 30228

B- 852 09-03-2017 CSD-II M/s Kakati Karshak Industries P.L. 155/CPD-II/27.04.16 203L, 55B 09.03.17 Vacuum pump 3423

B- 875 24-03-2017 CSD-II M/s Uttam Sales Corporation 146/CPD-I/30.01.17 233L 23.03.17 Supply 7047

B- 876 24-03-2017 CSD-II M/s Aditya Enterprises 48/CPD-II/28.01.17 233L 23.03.17 Supply 564825 65463

B- 878 24-03-2017 CSD-II M/s Keltron Controls 2425/CPD-I/28.11.16 233L 23.03.17 Supply 368522

B- 892 30-03-2017 CPD-I M/s RSP OVERSEAS PVT. LTD. 1108/CPD-I/08.06.16 239L 07.03.17 Supply of bearing 92211Total 0 0 0 569501

B- 2 07.04.2017 CSD-II M/s Shivam Enterprise 213/CPD-I/20.02.17 194L 06.04.17 Supply 28305Total 0 0 0 0

B- 133 17.06.17 CSD-II M/s Globe Enterprises 331/CPD-I/12.05.16 232L 16.06.17 Supply 77189

B- 134 17.06.17 CSD-II M/s Globe Enterprises 331/CPD-I/12.05.16 232L 16.06.17 Supply 31732

Total 0 0 0 0

B- 228 22.07.17 CSD-II M/s RSP Overseas Pvt. Ltd. 1108/CPD-I/08.06.16 185L 21.07.17 Supply 43541

B- 229 22.07.17 CSD-II M/s RSP Overseas Pvt. Ltd. 1108/CPD-I/08.06.16 185L 21.07.17 Supply 490

B- 230 22.07.17 CSD-II M/s RSP Overseas Pvt. Ltd. 1507/CPD-I/13.07.16 185L 21.07.17 Supply 3743Total 0 0 0 0

B- 370 15.11.17 CSD-II M/s Aarsellr Tredco 862/CPD-I/21.09.17 233L 15.11.17 Supply 407317 121286Total 0 0 0 407317

B- 631 27.02.18 CSD-II M/s Pawor Engineers 42/CPD-II/06.01.18 217L/16 15.02.18 Supply 538792

B- 632 27.02.18 CSD-II M/s Simplex Switchgear Pvt. Ltd. 133/CPD-II/29.01.18 217L/16 26.02.18 Alkal Unloading 104030

B- 633 27.02.18 CSD-II M/s Simplex Switchgear Pvt. Ltd. 1692/CPD-I/20.11.17 217L/17 26.02.18 Fume Absorber 140892

B- 638 27.02.18 CSD-II M/s Jalvid Udyog 1264/CPD-I/19.12.17 232L/43B 26.02.18 Supply 287183TOTAL 0 0 0 0

B- 16 04.04.18 CSD-II M/s K.S. & Brothers 1403/CPD-I/29.01.18 198L/27 04.04.18 Supply 43746TOTAL 0 0 0 0

B- 159 01.06.18 CSD-II M/s Technow Engineering Works 177/CPD-I/21.05.18 232L/47B 31.05.18 Supply 90920 25453

B- 160 01.06.18 CSD-II M/s Technow Engineering Works 177/CPD-I/21.05.18 232L/48B 31.05.18 Supply 20686 24272

B- 195 15.06.18 CSD-II M/s Shree Shyam Bearing Pvt. Ltd. 1342/CPD-I/10.01.18 285L/7A 14.06.18 Supply 96255

B- 200 18.06.18 CSD-II M/s Jalvid Udyog 178/CPD-I/21.05.18 330L/01 15.06.18 Supply 22397

B- 201 18.06.18 CSD-II M/s Jalvid Udyog 178/CPD-I/21.05.18 330L/02 15.06.18 Supply 868TOTAL 0 0 0 111606

B- 241 07.07.18 CSD-II M/s Yokogawa India Ltd. KA1801001192 1618/CPD-I/13.03.18 90L/40B 24.05.18 Supply 752969

B- 253 16.07.18 CSD-II M/s Flowtech Engineers 623/CPD-II/31.05.18 269L/20 13.07.18 Supply 1326224 395468

B- 288 26.07.18 CSD-II M/s Vaith Turboput Ltd. 544/CPD-II/08.05.18 194L/159 23.07.18 Supply 1541777

B- 291 28.07.18 CSD-II M/s Shavo Norgren India Pvt. Ltd. 1549/CPD-I/24.02.18 233L/73 27.07.18 Supply 5381TOTAL 0 0 0 1326224

B- 323 08.08.18 MPED-V M/s Shravan Engineering Enterprises Pvt. Ltd. 1557/CPD-I/26.02.18 214L/115 08.08.18 Supply 1534

B- 326 09.08.18 EPED-IV M/s Ge T&D India Limited 482/EPED-IV/24.11.16 279L/04 08.08.18 Service Charges 200000Total 0 0 0 0

B- 387 05.09.18 CSD-II M/s Electronics & Electricals 414/CPD-III/16.08.18 234L/38 05.09.18 Supply 214581 28152

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

G:\2nd Pen Drive\250MW\2020-21\06-20\Liab_15.06.20_250 MW B-List-250MW

Page 36: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 438 24.09.18 CSD-II M/s Flowtech Engineers 1068/CPD-II/07.09.18 249L/31 22.09.18 Supply 251693 215972

B- 461 28.09.18 CSD-II M/s Keltron Controls 130/CPD-I/08.05.16 234L/45 27.09.18 Supply 159045TOTAL 0 0 0 466274

B- 473 09.10.18 CSD-II M/s Flowtech Engineers 1110/CPD-II/14.09.18 250L/39 09.10.18 Supply 780034 12302

B- 503 24.10.18 CSD-II M/s Industrial Sals & Supply Agencies 844/CPD-I/12.09.18 246L/56A 22.10.18 Supply 41457TOTAL 0 0 0 780034

B- 546 01.11.18 CSD-II M/s V.K. Trading Corporation 932/CPD-I/22.09.18 89L/64B 31.10.18 Supply 160166

B- 589 15.11.18 CSD-II M/s A.K. Agencies 465/CPD-I/26.07.18 285L/10B 14.11.18 Supply 5575

B- 619 29.11.18 CSD-II M/s Jain Mill Stores Pvt. Ltd. 842/CPD-I/12.09.18 330L/30 28.11.18 Supply 500803 75631TOTAL 0 0 0 500803

B- 748 16.01.19 CSD-II M/s Aarseller Tredco 557/CPD-III/02.11.18 234L/62 14.01.19 Supply 294094

B- 749 16.01.19 CSD-II M/s S.K. Engineering & Allied Solutions (P) Ltd. 1179/CPD-I/03.11.18 234L/64 14.01.19 Supply 148162 172385

B- 750 16.01.19 CSD-II M/s Adarsh Tube & Machinary Corporation 1127/CPD-I/29.10.18 234L/65 14.01.19 Supply 3174200Total 0 0 0 148162

B- 798 04.02.19 CSD-II M/s Authentic Systems & Technologies 1156/CPD-II/03.10.18 284L/23B 04.02.19 Supply 27686 615246

B- 800 05.02.19 ECCU M/s Puneet Construction Co. I 17/ECCU/01.02.19 1764L/172 24.01.19 Road Marking 67442

B- 811 11.02.19 CSD-II M/s Vijay Hydro Tech 1032/CPD-II/28.08.18 212L/106 11.02.19 Supply 91968

B- 880 16.02.19 CSD-II M/s Shell Automation 1083/CPD-II/22.10.18 233L/103 15.02.19 OH#6 21113

B- 882 18.02.19 CSD-II M/s Shree Shyam Bearing Pvt. Ltd. 465/CPD-I/26.07.18 285L/21 16.02.19 Supply 53950

B- 887 20.02.19 EPED-III M/s C&C Electric Ltd. I Last 18/EMD-VIII/16.01.19 221L/125 07.02.19 Repairing 297360

B- 918 25.02.19 CSD-II M/s Bearing & Engineering Co. 1289/CPD-II/29.10.18 250L/64 23.02.19 Supply 448206

B- 920 25.02.19 CSD-II M/s Flowtech Engineers 1140/CPD-II/22.09.18 250L/66 23.02.19 Supply 591600 1213800

B- 932 27.02.19 CSD-II M/s Anurag Engineering Works 1370/CPD-I/15.01.18 285L/21B 27.02.19 Supply 66364 46875

B- 933 27.02.19 CSD-II M/s Key Mohan 1403/CPD-I/19.12.18 285L/22B 27.02.19 Supply 189361Total 0 0 0 685650

B- 1003 16.03.19 CSD-II M/s Dycon System Pvt. Ltd. 1171/CPD-I/02.11.18 214L/140 16.03.19 Supply 185602Total 0 0 0 0

B- 14 05.04.19 MPED-IV M/s Rajeev Kumar Contractor I 27/AHD-III/07.03.19 321L/21 31.03.19 Painting of Various 158112

B- 36 10.04.19 EPED-IV M/s Yadav Measurments Pvt. Ltd. 08/EPED-IV/08.11.16 261L/78 06.04.19 Security 11400

B- 67 12.04.19 EMD-VIII M/s Punjab Electric 14/EPED-III/17.03.17 222L/198 16.03.19 Security 23500

B- 69 16.04.19 ECCU M/s Vijay Kumar Gupta I 25/ECCU/16.03.19 64L/93B 05.04.19 Reconstruction Civil Work 655611

B- 83 23.04.19 CSD-II M/s Jain Mill Stores Pvt. Ltd. 842/CPD-I/12.09.18 353L/4 23.04.19 Supply 93092

B- 85 26.04.19 CSD-II M/s Anuag Engineering Works 14 854/CPD-I/13.05.16 240L/14B Supply 216162

B- 87 26.04.19 BMD-V M/s Harsh & Brothers Security 31/MPED-I/14.02.15 170L/137 Security 19799

B- 89 30.04.19 ECCU M/s Pitambra Engineering & Contractors I 01/ECCU/2019-20/05.04.19 369L Civil Work (T to A List A-169 dt. 04.05.19

120548

Total 0 0 0 0

B- 92 02.05.19 ECM&EMD M/s Sadan Engineering Works II RAB 24/ECM&EMD/14.02.19 462L/79 Civil Work 122882

B- 97 02.05.19 CSD-II M/s Aditi Enterprises 121/CPD-I/18.01.19 358L/2 02.05.19 Supply 60000 41787

B- 104 10.05.19 CSD-I M/s Jayshree Electrodevices Pvt. Ltd. 429/CPD-I/05.04.19 214L/141 Supply 162014

B- 105 10.05.19 CSD-I M/s krishna Agencies 2 440/CPD-I/05.04.19 214L/141 16.04.19 Supply 258203

B- 106 10.05.19 CSD-I M/s Jalvid udyog 117 441/CPD-I/05.04.19 214L/142 15.04.19 Supply 499730

B- 107 10.05.19 CSD-I M/s Aditi Enterprises 1 442/CPD-I/05.04.19 214L/143 02.05.19 Supply 271607

B- 109 10.05.19 CSD-I M/s Modern Electronic Works 211 383/CPD-I/14.03.19 214L/144 18.03.19 Supply 693840

B- 121 17.05.19 ECM&EMD M/s Vijay Kumar Gupta Contractor 14/ECM&EMD/11.09.18 214L/90B 16.05.19 Security 29530

B- 122 21.05.19 MPED-IV M/s Harsh & Brothers 10/MPED-IV/09.03.15 81L/154 17.05.19 Security 40241

B- 130 24.05.19 CSD-II M/s Aarseller Tredco 1286/CPD-I/04.12.18 89L/79B Supply 4269

B- 131 24.05.19 CSD-II M/s Aarseller Tredco 122/CPD-I/18.01.19 89L/80A Supply 16166

B- 134 24.05.19 CPD-I M/s Goverdhan Controls GDC/024 457/CPD-I/09.04.19 89L/81A Supply 1281632

B- 138 25.05.19 C&IMD M/s Vertiv Energy Pvt. Ltd. I Final 19/C&IMD-V/28.10.19 359L/1 30.04.19 Depution of Service 70800

B- 140 28.05.19 CSD-II M/s Aarseller Tredco 2/03.11.18 1172/CPD-I/02.11.18 198L/61 Supply 160518 3387

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

G:\2nd Pen Drive\250MW\2020-21\06-20\Liab_15.06.20_250 MW B-List-250MW

Page 37: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 141 28.05.19 CSD-II M/s V.K. Trading Corporation 21/18.02.19 269/CPD-I/15.02.19 198L/63 Supply 254592

B- 142 28.05.19 CSD-II M/s V.K. Trading Corporation 2/25.11.18 1058/CPD-I/11.10.18 198L/63 Supply 256266Total 0 0 0 220518

B- 143 03.06.19 AHD-III M/s India Engineering Works III 23/AHD-III/04.02.19 168L/58 25.05.19 Repairing & Maintenance 69056

B- 144 03.06.19 CSD-II M/s Power Sales Corporation P1004 90/CPD-I/11.01.19 154L/80 26.02.19 Supply 32527

B- 150 06.06.19 CSD-II M/s Jayashree Election Pvt. Ltd. 428/CPD-I/05.04.19 233L/114 04.05.19 Civil Work 97350

B- 154 10.06.19 MPED-I M/s Sunrise Engineer & Contractor IV 240/MPED-I/11.06.18 170L/143 04.06.19 Maintenance 42879

B- 155 10.06.19 EPED-I M/s Shiv Mahadev Engineering Security 06/EPED-I/02.08.18 324L/16 Security 13318

B- 158 12.06.19 AHD-III M/s Rahul Gupta & Co. II 25/AHD-III/04.02.19 195L/78 Fabrication 48088

B- 159 12.06.19 AHD-III M/s Hind Udyog VII 12/MPED-IV/15.09.18 195L/79 27.05.19 Fabrication 107749

B- 160 12.06.19 AHD-III M/s India Engineering Works 02/MPED-IV/16.04.18 195L/80 Fabrication 65070

B- 161 12.06.19 AHD-III M/s Hind Udyog VI 12/MPED-IV/15.09.18 82L/109 03.05.19 Fabrication 33966

B- 162 13.06.19 CSD-II M/s Goverdhan Controls 23 222/CPD-I/07.02.19 215L/131 12.02.19 Supply 700961 600000

B- 163 13.06.19 CSD-II M/s Simplex Switchgear Pvt. Ltd. 310 310/CPD-I/25.02.19 215L/133 01.03.19 Supply 413545

B- 164 13.06.19 CSD-II M/s Balaji Corporation 1 496/CPD-I/26.04.19 215L/133 23.05.19 Supply 382261

B- 165 14.06.19 MPED-IV M/s Hind Udyog VI 12/MPED-IV/15.09.18 82L/109 03.05.19 Fabrication 33966

B- 166 15.06.19 MPED-IV M/s Vijay Engineering 1314/CPD-II/27.06.15 250L/71 14.06.19 Security 23643

B- 167 15.06.19 CSD-II M/s Vijay Engineering 1971/CPD-II/05.10.15 250L/71 14.06.19 Security 43987

B- 168 15.06.19 CSD-II M/s Om Sai Ram Global Impex 154/CPD-II/27.04.16 250L/72 14.06.19 Security 18840

B- 169 15.06.19 CSD-II M/s Om Sai Ram Global Impex 2230/CPD-II/24.11.15 250L/72 14.06.19 Security 55326

B- 170 15.06.19 CSD-II M/s Om Sai Ram Global Impex 92/CPD-II/16.04.16 250L/73 14.06.19 Security 9958

B- 172 15.06.19 EPED-V M/s Electrical & Instrumentation Engineers 09/EPED-V/24.03.18 299L/19B 14.06.19 Security 27169

B- 173 15.06.19 EPED-V M/s Nosad Contractor 36/CWCD-IV/25.04.19 299L/20 14.06.19 Security 112754

B- 174 18.06.19 BMD-V M/s M.K. Traders I&Final 02/BMD-V/14.05.19 159L/75A 01.06.19 Installation of LDO Pipe Line 282789

B- 176 19.06.19 CSD-II M/s Analyser Instruments Ltd. 527/CPD-I/08.05.19 214L/146 Supply 683645

B- 177 19.06.19 CAMD-III M/s Jahangir Enterprises XIII 15/CAMD-III/21.03.18 238L/155 Maintenance 42410

B- 178 20.06.19 MPED-III M/s Jahangir Enterprises XIII 10/MPED-III/22.09.19 345L/23 19.05.19 B/d Maintenance 49680

B- 179 20.06.19 MPED-III M/s Jahangir Enterprises XII 10/MPED-III/22.09.19 345L/24 31.05.19 B/d Maintenance 49680

B- 180 20.06.19 MPED-III M/s Balram Engineers & Contractor & Supp. V 11/MPED-III/01.10.18 345L/30 10.04.19 B/d Maintenance 32869

B- 182 22.06.19 ECM&EMD M/s Sadan Engineering Works III 24/ECM&EMD/14.02.19 462L/85 02.05.19 Civil Work 58126

B- 183 22.06.19 ECCU M/s Sadan Engineering Works I 23/ECCU/22.02.19 368L/121 01.06.19 M&R of Ash Daykes 706027

B- 185 26.06.19 CSD-II M/s Goverdhan Controls 1173/CPD-II/05.10.18 217L/53 01.06.19 Supply 24284

B- 186 26.06.19 MPED-IV M/s O.S. Contractor VI 10/MPED-I/10.08.18 321L/27B 11.06.19 Maintenance 21959

B- 187 26.06.19 MPED-IV M/s R.B. Engineering Works III 14/MPED-IV/27.11.18 321L/28 B/d Maintenance 59133

B- 188 26.06.19 AHD-III M/s Aadityesh Construction Security 17/AHD-III/30.01.19 321L/28B Security 24811

B- 190 26.06.19 EPED-III M/s Vikas Electricals Security 15/EPED-III/12.01.16 207L/195 Security 54205

B- 191 26.06.19 EPED-III M/s Vikas Electricals Security 14/EPED-III/12.01.16 207L/196 Security 72500

B- 192 26.06.19 EPED-III M/s Vikas Electricals Security 05/EPED-III/14.10.15 207L/197 Security 34356

B- 193 26.06.19 EPED-III M/s Vikas Electricals Security 06/EPED-III/14.10.15 207L/197 Security 49957

B- 194 26.06.19 EPED-III M/s Vikas Electricals Security 12/EPED-III/20.02.17 207L/198 Security 56796

B- 195 26.06.19 EPED-III M/s Priya Construction Co. Security 04/EPED-III/16.09.16 207L/198 Security 96102

B- 196 26.06.19 EPED-III M/s Priya Construction Co. Security 04/EPED-III/21.09.15 207L/199 Security 112803

B- 197 26.06.19 EPED-III M/s Priya Construction Co. Security 13/EPED-III/20.02.17 207L/199 Security 77500

B- 198 26.06.19 EPED-III M/s Vikas Electricals Security 13/EPED-III/08.01.18 207L/200 Security 127500

B- 203 29.06.19 BMD-VI M/s Bharti Enterprises I & Final 32/BMD-VI/07.03.19 336L/28B Repairing 343036Total 2526128 1090190 1266260 0

B- 206 02.07.19 AHD-III M/s Shradha Engineers & Construction 112/CWCD-II/13.12.13 102L/134 Security 23877

B- 212 10.07.19 ECM&EMD M/s Vijay Kumar Gupta Contractor II 18/ECM&EMD/27.12.18 142L/6 Civil Work 203524

B- 213 10.07.19 CSD-II M/s Goverdhan Controls 26 600/CPD-I/20.05.19 234L/84 02.06.19 Supply 168372

B- 214 10.07.19 CSD-II M/s Goverdhan Controls 25 649/CPD-I/30.05.19 234L/84 02.06.19 Supply 1317542

B- 217 15.07.19 MPED-IV M/s O.S. Contractor VIII 10/MPED-I/10.08.18 168L/62 Maintenance 21031

B- 218 15.07.19 EPED-IV M/s Zentih Engineers 08/EPED-IV/21.09.17 264L/68 Security 36620

B- 219 15.07.19 EPED-IV M/s Hemant Singh 31/EPED-IV/28.10.13 262L/46 Security 4200

B- 220 15.07.19 EPED-IV M/s Hemant Singh 02/EPED-IV/20.05.14 262L/47 Security 4200

B- 221 15.07.19 EPED-IV M/s Hemant Singh 08/EPED-IV/22.11.14 262L/47 Security 4200

B- 222 15.07.19 EPED-IV M/s Hemant Singh 28/EPED-IV/25.05.13 262L/47 Security 4200

B- 223 15.07.19 EPED-IV M/s Shiv Kumar Rajpoot 08/EPED-IV/18.11.15 283L/30 Security 6588

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

G:\2nd Pen Drive\250MW\2020-21\06-20\Liab_15.06.20_250 MW B-List-250MW

Page 38: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 224 15.07.19 EPED-IV M/s Shiv Kumar Rajpoot 03/EPED-IV/19.06.17 283L/31 Security 6588

B- 225 15.07.19 EPED-IV M/s Shiv Kumar Rajpoot 10/EPED-IV/15.12.17 283L/31 Security 6516

B- 226 15.07.19 MPED-I M/s Hind Udyog III 32/MPED-I/23.02.18 282L/13B Repairing 51093

B- 227 18.07.19 EPED-II M/s Mecon Limited I & Final 260/C&ID-III/30.05.19 294L/73 Consultancy Services 245520 2168760

B- 228 20.07.19 EPED-II M/s Uttam Chandra Gupta 12/EPED-II/18-19 294L/74 Security 4200

B- 229 20.07.19 CSD-II M/s Simplex Switchgear Pvt. Ltd. PI/539 539/CPD-I/10.05.19 212L/124 08.07.19 Supply 2084640

B- 230 20.07.19 EPED-I M/s R.K. Construction 14/EPED-I/27.10.17 351L/29 B/d Maintenance 194994

B- 232 23.07.19 MPED-V M/s MAK Consstruction Co. VIII 01/MPED-V/24.04.18 334L/22 Opration Bowl Mill 44890

B- 233 25.07.19 EMD-VIII M/s Priya Construction Co. I&Final 03/EMD-VIII/03.06.19 360L/07 Erection/Commiss 307800

B- 234 25.07.19 MPED-VI M/s Zentih Engineers Security 02/CAMD-II/02.05.16 256L/77 Security 29775

B- 235 25.07.19 MPED-VI M/s Jahangir Enterprises Security 33/MPED-VI/10.01.18 256L/77 Security 36099

B- 236 25.07.19 MPED-VI M/s Balram Engineers & Contractor & Supp. Security 34/MPED-VI/28.01.19 256L/77A Security 9801

B- 237 25.07.19 MPED-VI M/s Balram Engineers & Contractor & Supp. Security 37/MPED-VI/10.02.18 256L/78 Security 136529

B- 238 25.07.19 EPED-II M/s Mecon Limited 260/C&ID-III/30.05.19 241L/150 Consultancy Services 345457 499784

B- 239 25.07.19 CSD-II M/s Atlas Copco 665046/18.07.19 528/CPD-I/08.05.19 89L/83B 18.07.19 Supply 388602

B- 240 25.07.19 CSD-II M/s Atlas Copco 670220/18.07.19 657/CPD-I/31.05.19 89L/84A 18.07.19 Supply 356450

B- 241 27.07.19 MPED-II M/s Thermal India Engineers IV,V,VI,VII 01/TMD-III/06.04.19 322L/29 B/d Maintenance 539474

B- 242 31.07.19 MPED-III M/s Usha Enterprises IV 06/MPED-III/10.10.17 164L/178 B/d Maintenance 159935

B- 243 31.07.19 CAMD-III M/s Jahangir Enterprises I 06/CAMD-III/17.07.19 164L/180 B/d Maintenance 16653TOTAL 2443764 2829692 1485914 2668544

B- 257 01.08.19 EPED-IV M/s Thermal India Engineers I & Final 02/EMD-VI/24.04.19 200L/133 Inspection of Generator 295000

B- 258 01.08.19 EPED-IV M/s MRP Constructions 07/EPED-IV/20.11.18 200L/134 B/d Maintenance (T To A List A-416 dt.06.08.19)

0

B- 260 01.08.19 CSD-II M/s Balaji Corporation 4/19-20/ 549/CPD-II/21.06.19 250L/76 08.07.19 Supply 286591

B- 262 01.08.19 MPED-IV M/s India Engineering Works RAB-16 02/MPED-IV/16.04.18 103L/136 Repairing 16268

B- 263 01.08.19 MPED-IV M/s India Engineering Works RAB-17 02/MPED-IV/16.04.18 103L/137 Security 14016

B- 264 01.08.19 MPED-IV M/s India Engineering Works I & Final 07/MPED-IV/02.05.18 103L/137 Erection 24213

B- 265 02.08.19 EPED-I M/s Kapatiya Instrument Erector III 13/EPED-I/24.10.18 267L/31 B/d Maintenance 18468

B- 266 02.08.19 EPED-I M/s D.K. & Sons Co. Security 10/EPED-I/10.10.18 267L/33 Security 72119

B- 269 05.08.19 ECCU M/s Jay Mahaveer Construction I RAB 04/ECCU/01.05.19 26L/70 B Supply 193183

B- 276 06.08.19 BMD-V M/s Jahangir Enterprises Security 04/BMD-V/14.05.19 218L/66 Security 16565

B- 277 06.08.19 CSD-II M/s Adars Electronics & Electricals Supply 558/CPD-III/02.11.18 234L/91 Supply 35840

B- 285 08.08.19 CSD-II M/s ACE Communication 656/CPD-I/31.05.19 154L/85 Supply 68613

B- 286 08.08.19 CSD-II M/s Guru Entrerprises 9 831/CPD-I/28.06.19 154L/86 15.07.19 Supply 546826

B- 287 08.08.19 CSD-II M/s Guru Entrerprises 10 831/CPD-I/28.06.19 154L/87 15.07.19 Supply 24731

B- 292 09.08.19 AHD-III M/s Hind Udyog RAB-9 398/MPED-IV/13.08.18 195L/89 Fabrication 70016

B- 293 09.08.19 AHD-III M/s Hind Udyog RAB-10 398/MPED-IV/13.08.18 195L/89 Fabrication 70016

B- 294 09.08.19 AHD-III M/s Hind Udyog RAB-11 & Final 398/MPED-IV/13.08.18 195L/90 Fabrication 41682

B- 295 09.08.19 AHD-III M/s Hind Udyog 5 & 6 398/MPED-IV/13.08.18 195L/92 Repairing 36892

B- 296 09.08.19 AHD-III M/s India Engineering Works I & Final 23/AHD-III/04.02.19 82L/118 Repairing 65131

B- 301 09.08.19 AHD-III M/s MAK Consstruction Co. 1 & 2 28/AHD-III/07.03.19 82L/120 Fabrication 182324

B- 303 09.08.19 AHD-III M/s MAK Consstruction Co. I & Final 10/AHD-III/05.08.19 82L/122 Dis Mantling 95670

B- 306 13.08.19 CAMD-III M/s Jahangir Enterprises RAB-14 10/MPED-III/22.09.18 345L/38 B/d Maintenance 31695

B- 307 13.08.19 CAMD-III M/s Jahangir Enterprises 10/MPED-III/22.09.18 345L/39 B/d Maintenance 28101

B- 308 13.08.19 CAMD-III M/s Balram Engineers & Contractor & Supp. 11/MPED-III/01.10.18 345L/40 B/d Maintenance 44648

B- 311 16.08.19 MPED-I M/s M.K.Traders II 35/BMD-V/23.03.19 282L/15 B/d Maintenance 104524

B- 313 16.08.19 MPED-I M/s Zentih Enterprises IV 08/MPED-I/13.08.18 159L/80 B/d Maintenance 165932

B- 314 16.08.19 MPED-I M/s Syndicate Engineers III 03/MPED-I/25.06.18 159L/81 Repairing 162056

B- 319 21.08.19 CSD-II M/s Mechfield Corporation 006/19-20 777/CPD-II/30.07.19 329L/47A 03.08.19 Supply 154875

B- 331 21.08.19 CSD-II M/s Elecon Engineering Ltd. 8 723/CPD-II/18.07.19 329L/53 20.07.19 Supply 1048649

B- 333 21.08.19 CSD-II M/s J. Umashankar & Co. Pvt. Ltd. 015/19-20 935/CPD-I 329L/53A Supply 1023000 224850

B- 345 26.08.19 ECM&EMD M/s Ravindra Singh & Co. III & Final 26/ECM&EMD/28.02.19 1826L/191 Maintenance Park 75768

B- 346 26.08.19 ECM&EMD M/s Pitambra Engineers & Contractor II & Final 27/ECM&EMD/08.03.19 141L/176 Painting 103158

B- 355 28.08.19 MPED-III M/s Harsh & Brothers Security 12/MPED-III/31.12.14 345L/42 Security 69956TOTAL 1804218 1155784 2226524 224850

B- 360 02.09.19 CAMD-III M/s Balram Engineers & Contractor & Supp. RAB-7 11/MPED-III/01.10.18 244L/132 B/d Maintenance 49081

G:\2nd Pen Drive\250MW\2020-21\06-20\Liab_15.06.20_250 MW B-List-250MW

Page 39: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 361 02.09.19 CAMD-III M/s Balram Engineers & Contractor & Supp. RAB-8 11/MPED-III/01.10.18 244L/134 B/d Maintenance 36791

B- 362 02.09.19 CAMD-III M/s Balram Engineers & Contractor & Supp. RAB-9 11/MPED-III/01.10.18 244L/136 B/d Maintenance 61015

B- 363 02.09.19 BMD-VI M/s MAK Consstruction Co. RAB-Final 22/MPED-V/31.01.18 152L/49 patch Work of PA,FD 202838

B- 364 02.09.19 BMD-VI M/s Syndicate Engineers Security 31/MPED-V/31.01.18 152L/48 Security 208872

B- 365 02.09.19 EMD-VII M/s Priya Construction Co. RAB-I 04/EMD-VIII/19.07.19 360L/10 Repair, Revinding 236257

B- 366 05.09.19 AHD-III M/s India Engineering Works RAB-19 124/MPED-IV/12.03.18 195L/99 Fabrication 84142

B- 368 05.09.19 AHD-III M/s MAK Consstruction Co. RAB-3 10/AHD-III/05.08.19 195L/104 Dismantling 51712

B- 369 05.09.19 AHD-III M/s India Engineering Works RAB-18 02/MPED-IV/16.04.19 195L/105 Fabrication 24028

B- 379 12.09.19 CAMD-III M/s Usha Enterprises Security 03/MPED-III/16.04.18 164L/182 Security 7710

B- 380 12.09.19 CAMD-III M/s Balram Engineers & Contractor & Supp. Security 14/MPED-III/13.10.16 164L/182 Security 63144

B- 381 12.09.19 CAMD-III M/s SGL Engineering Security 04/MPED-III/12.05.16 164L/183 Security 2100

B- 382 12.09.19 CAMD-III M/s Balram Engineers & Contractor & Supp. Security 41/MPED-III/25.07.14 164L/183 Security 55891

B- 383 12.09.19 CAMD-III M/s Jahangir Enterprises Security 19/MPED-III/12.01.17 164L/184 Security 39190

B- 384 12.09.19 CAMD-III M/s Jahangir Enterprises Security 19/CAMD-III/30.01.19 164L/185 Security 53385

B- 385 12.09.19 AHD-III M/s R.B. Engineering Works IV 14/MPED-IV/27.11.18 81L/160 B/d Maintinance 25098

B- 386 12.09.19 AHD-III M/s Bharti Enterprises I&II 05/AHD-III/24.06.19 81L/162 Distemper 342099

B- 387 12.09.19 AHD-III M/s Bharti Enterprises I+II 06/AHD-III/25.06.19 81L/163 painting of Buffer 149884

B- 388 12.09.19 AHD-III M/s Bharti Enterprises III+IV 06/AHD-III/25.06.19 103L/145 painting of Buffer 171418

B- 389 12.09.19 AHD-III M/s MAK Consstruction Co. RAB(4+5) 10/AHD-III/05.08.19 103L/146 Dismentling 128106

B- 390 12.09.19 AHD-III M/s MAK Consstruction Co. RAB(7+8) 28/AHD-III/07.03.19 103L/147 D.P. Ex tension 201864

B- 393 16.09.19 BMD-VI M/s MAK Consstruction Co. RAB-IX 01/MPED-V/24.04.18 297L/45 Operetion of Bowl 97728

B- 395 16.09.19 BMD-VI M/s Nosad Contractor I & Final 02/MPED-V/24.04.18 335L/27 Commissoning 627760

B- 397 19.09.19 CHD-III M/s Gouri Enterprises C-60 831/CPD-I/28.06.19 513L/76 17.09.19 Security 247311

B- 398 19.09.19 CAMD-III M/s SGL Engg. Industries 10/MPED-III/21.10.13 182L/117 Security 4200

B- 399 19.09.19 CAMD-III M/s SGL Engg. Industries 02/MPED-III/24.05.14 182L/118 Security 4200

B- 400 19.09.19 CAMD-III M/s SGL Engg. Industries 10/MPED-III/05.08.16 182L/118 Security 2400

B- 401 19.09.19 CAMD-III M/s Jahangir Enterprises 02/MPED-III/08.06.17 182L/119 Security 68438

B- 402 19.09.19 CAMD-III M/s Jahangir Enterprises 17/CAMD-III/24.01.19 182L/119 Security 15060

B- 403 19.09.19 CAMD-III M/s Harsh & Brothers 17/MPED-III/28.10.16 182L/120 Security 18350

B- 404 19.09.19 CAMD-III M/s Jahangir Enterprises RAB-15 10/MPED-III/22.09.18 345L/47 B/d Maintenance 53972

B- 405 19.09.19 CAMD-III M/s Jahangir Enterprises RAB-16 10/MPED-III/22.09.18 345L/48 B/d Maintenance 53881

B- 406 19.09.19 CAMD-III M/s Balram Engineers & Contractor & Supp. RAB-XVI 11/MPED-III/01.10.18 345L/52 B/d Maintenance 44031

B- 407 19.09.19 C&IMD-IV M/s D.K. & Sons Co. RAB-IV 10/EPED-I/10.10.18 98L/90A B/d Maintenance 22085

B- 408 23.09.19 BMD-V M/s Shiv Mahadev Engg. Works I & Final 10/BMD-V/02.08.19 158L/35A Repairing 336300

B- 409 23.09.19 BMD-V M/s Bharat Mechanical Structural & Works V RAB 13/MPED-I/05.10.18 175L/70 B/d Maintenance 262694

B- 410 23.09.19 BMD-V M/s Sunrise Engg. & Contractor V RAB 14/MPED-I/12.11.18 293L/17 B/d Maintenance 111412

B- 414 24.09.19 CSD-II M/s Jai Balaji 28180819 1161/CPD-I/31.07.19 215L/143 14.08.19 Supply 8832

B- 416 24.09.19 CSD-II M/s K.S. & Brothers 38 1235/CPD-I/07.08.19 215L/145 10.08.19 Supply 159593 149130

B- 419 24.09.19 ECCU M/s Sadan Engineering Works II RAB 23/ECCU/22.02.19 368L/125 Civil Work 442540

B- 420 24.09.19ECCU M/s Puneet Construction 17/ECCU/01.02.19 175L/1764 Security 29701

B- 422 24.09.19 ECCU M/s Jay Mahadev Construction II & Final 04/ECCU/01.05.19 26L/72 Civil Work 154798

B- 423 24.09.19 C&IMD-IV M/s D.K. & Sons Co. 10/EPED-I/10.08.16 220L/113 Security 20856

B- 424 24.09.19 CHD-II M/s M.K. Traders RAB-IV 11/CHD-I/15.12.18 254L/144 OH 128503

B- 425 24.09.19ECM M/s Ravindra Singh & Co. 08/ECM/26.12.17 1826L/194 Security 31137

B- 426 26.09.19 AHD-III M/s India Engineering Works RAB-20 02/MPED-IV/16.04.18 195L/110 Repairing 15016

B- 427 26.09.19 AHD-III M/s India Engineering Works RAB-21 02/MPED-IV/16.04.18 195L/111 Repairing 62129

B- 428 26.09.19 ECCU M/s Techkriti Infratrech Pvt. Ltd. I & Final 07/ECCU/27.06.19 369L/80 To Pographical Service 270810

B- 429 26.09.19 AHD-III M/s R.B. Engineering Works RAB-05 14/MPED-I/27.11.18 320L/18 B/d Maintenance 81591

B- 431 26.09.19 ECM M/s Vijay Kumar Gupta Contractor 23/ECM/29.12.18 141L/178 Security 19606

B- 432 26.09.19 ECM M/s S.R. Enterprises 23/ECM/15.03.18 397L/81A Security 29423

B- 433 26.09.19 BMD-V M/s Goga Jaharbeer 18/MPED-I/30.11.16 218L/67 Security 47698

B- 435 27.09.19 CSD-II M/s Juco Corporation 19-10-2020 1298/CPD-I/20.08.19 250L/83 05.09.19 Supply 1150500

B- 437 27.09.19 CSD-II M/s Simplex Switchgear Pvt. Ltd. 926/01 926/CPD-II/03.09.19 250L/84 09.09.19 Supply 272392

B- 438 30.09.19 BMD-VI M/s Hind Udyog RAB-II 17/MPED-V/04.10.18 298L/41 09.09.19 Fabrication 183726

B- 442 30.09.19 CFA&BO M/s Dheeraj 174/CFA&BO/22.04.19 265L/65 Security 6000

B- 443 30.09.19 OGD-III M/s Usha Enterprises III 22/MPED-VI/10.01.18 256L/78A B/d Maintenance 26416

G:\2nd Pen Drive\250MW\2020-21\06-20\Liab_15.06.20_250 MW B-List-250MW

Page 40: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 444 30.09.19 OGD-III M/s Kaveri Construction 07/MPED-VI/10.05.18 256L/79 Security 161000

B- 445 30.09.19 OGD-III M/s Bareli Engineering 35/OGD-III/25.01.19 256L/79A Security 26818TOTAL 5902215 0 1591317 149130

B- 446 01.10.19 C&IMD-IV M/s D.K. & Sons Co. RAB-V 10/EPED-I/10.10.18 267L/39 OH 11569

B- 447 01.10.19 ECM&EMD M/s Sadan Engineering Works IV 24/ECM/18-19/14.02.19 462L/92 Cleaning 207124

B- 448 03.10.19 ECCU M/s Ashish Enterprises 32/ECCU/28.03.18 114L/27 02.07.19 Security 244114

B- 450 09.10.19 CSD-II M/s Simplex Switchgear Pvt. Ltd. PI/607/10.06.19 607/CPD-I/23.05.19 234L/99 30.09.19 Supply 38772

B- 454 10.10.19 TMD-III M/s Thermal India Engineers VIII+IX RAB 01/TMD-III/06.04.19 228L/143 B/d Maintenance 208603

B- 455 10.10.19 TMD-III M/s Hind Udyog III 104/TMD-III/04.02.19 228L/146 Fabrication 41897

B- 456 10.10.19 TMD-III M/s Atlas Copco III 14/MPED-II/09.01.18 228L/148 Supply 115640

B- 460 11.10.19 BMD-V M/s Kaushal Kishore Security 02/MPED-I/25.06.18 231L/101 Security 5892

B- 462 15.10.19 CSD-II M/s S.K. Engineering & Allied Solutions PI 340/CPD-I/01.03.19 353L/32 04.03.19 Supply 644953 602661

B- 467 15.10.19 CSD-II M/s Shree Bhawani Trading Co. 06/19-20/25.09.19

927/CPD-II/03.09.19 250L/86 25.09.19 Supply 341028 134500

B- 469 15.10.19 CSD-II M/s Trade India Corporation 1299/26.08.19 1299/CPD-I/20.08.19 250L/87 26.08.19 Supply 30780

B- 471 15.10.19 CSD-II M/s Sone Obra Enterprises Pvt. Ltd. PI 1473/CPD-I/17.09.19 250L/89 26.09.19 Supply 199778 72057

B- 472 18.10.19 AHD-III M/s O.S. Contractor RAB-09 10/MPED-I/10.08.18 168L/67 Preventive Maintenance 22511

B- 475 19.10.19 AHD-III M/s MAK Consstruction Co. 03/MPED-IV/01.06.15 195L/114 Security 25988

B- 476 19.10.19 AHD-III M/s MAK Consstruction Co. 08/CWCD-II/16.06.14 195L/115 Security 95550

B- 477 19.10.19 AHD-III M/s MAK Consstruction Co. 14/MPED-IV/26.09.17 195L/116 Security 98134

B- 478 21.10.19 BMD-V M/s M.K. Traders RAB-III 35/BMD-V/25.03.19 247L/82 Overhauling 8843

B- 480 21.10.19 BMD-V M/s Hind Udyog RAB-IV 32/MPED-I/21.03.18 177L/108 Repairing 25034

B- 485 23.10.19 EMD-VIII M/s D.K. & Sons Co. I & Final 07/EMD-VIII/05.08.19 221L/169 Repairing 105192

B- 486 23.10.19 AHD-III M/s India Engineering Works 02/AHD-III/09.04.19 102L/159 Security 17590

B- 487 23.10.19 AHD-III M/s India Engineering Works 01/AHD-III/09.04.19 102L/159 Security 26400

B- 488 23.10.19 AHD-III M/s MAK Consstruction Co. 29/AHD-III/02.03.19 102L/160 Security 28220

B- 489 23.10.19 AHD-III M/s MAK Consstruction Co. 10/AHD-III/05.08.19 102L/161 Security 26560

B- 490 23.10.19 AHD-III M/s MAK Consstruction Co. RAB (9+10) 28/AHD-III/07.03.19 102L/162 D.P. Ex tension 161112

B- 491 23.10.19 AHD-III M/s India Engineering Works (07+08) 23/AHD-III/04.02.19 102L/163 Repairing 72028

B- 492 23.10.19 AHD-III M/s Avtar Construction 146/AHD-III/10.02.14 102L/167 Security 37920

B- 495 24.10.19 BMD-VI M/s MAK Consstruction Co. X & Final 01/MPED-V/24.04.18 335L/35 Operetion of Bowl 53877

B- 496 24.10.19 BMD-VI M/s Hind Udyog III 17/MPED-V/04.10.18 335L/36 Fabrication 137582

B- 497 24.10.19 BMD-V M/s TR Technical Services I & Final 11/BMD-V/09.08.19 175L/74 Laying of New Pipe Line 176635

B- 498 31.10.19 BMD-VI M/s Nosad Contractor I & Final 04/BMD-VI/24.08.12 307L/13A Supply 691480TOTAL 1838375 807120 1255311 809218

B- 499 01.11.19 CHD-III M/s S.A. Distributar 320 700/CPD-I/12.06.19 519L/72 28.09.19 Supply 49560

B- 500 04.11.19 CSD-II M/s Flowserve Sanwar 100038824 898/CPD-II/29.08.19 197L/72 14.10.19 Supply 241667 556298

B- 501 04.11.19 CSD-II M/s Adarsh Electronics 4791 558/CPD-III/02.111.18 234L/103 12.10.19 Supply 8118

B- 502 06.11.19 CSD-II M/s Bhagwati Shardey Engineering 21 372/CPD-I/11.03.19 250L/93 19.09.19 Supply 644773

B- 503 06.11.19 ECCU M/s Ashish Enterprises I 14/ECM&EMD/30.09.19 362L Civil Work 340775

B- 504 07.11.19 CSD-II M/s Sadan Engineering Works I 14/ECCU/11.09.19 26L/73A Jungle Cleaning 218829

B- 505 07.11.19 CSD-II M/s Bhagwati Shardey Engineering 25 372/CPD-I/11.03.19 250L/93 14.10.19 Supply 612507

B- 506 11.11.19 CSD-II M/s Select-N-Drive PI 1208/CPD-II/05.11.19 328L/42 07.11.19 Supply 1807760

B- 508 11.11.19 CSD-II M/s Flowtech Engineers 1119/205 1209/CPD-II/05.11.19 328L/43 06.11.19 Supply 500697

B- 509 11.11.19 CSD-II M/s Flowtech Engineers 1119/206 1210/CPD-II/05.11.19 328L/43 06.11.19 Supply 579752 1606948

B- 510 11.11.19 CSD-II M/s Flowtech Engineers 1119/207 1211/CPD-II/05.11.19 328L/43A 06.11.19 Supply 591208

B- 511 11.11.19 CAMD-III M/s Jahangir Enterprises II 06/CAMD-III/17.07.19 227L/142 B/d Maintenance 41402

B- 512 11.11.19 BMD-V M/s Bharat Mechanical Structural & Works VI 13/MPED-I/05.10.18 209L/90 B/d Maintenance 29511

B- 513 11.11.19 BMD-V M/s M.K. Traders I & Final 05/BMD-V/11.06.19 293L/21 Repairing 259200

B- 514 11.11.19 BMD-V M/s Jahangir Enterprises Security 07/BMD-V/21.06.19 231L/102 Security 23383

B- 515 11.11.19 BMD-V M/s Jha Construction Security 04/MPED-I/04.05.17 210L/107 Security 59132

B- 516 11.11.19 ECM&EMD M/s Pitambra Engineering I & Final 08/ECM&EMD/27.08.19 398L/61A Disposal Malve 332678

B- 517 13.11.19 EMD-VII M/s Shiv Mahadev Engg. Works Security 09/EMD-VI/29.01.19 263L/79 Security 13400

B- 518 20.11.19 BMD-V M/s Jahangir Enterprises 09/BMD-V/02.08.19 158L/37 Security 15142

B- 520 20.11.19 ECM&EMD M/s Amit Vikram I&Final 15/ECM&EMD/30.09.19 425L/107 Fencing 348829

G:\2nd Pen Drive\250MW\2020-21\06-20\Liab_15.06.20_250 MW B-List-250MW

Page 41: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 521 20.11.19 ECM&EMD M/s Pitambra Engineering I&Final 13/ECM&EMD/25.09.19 310L/21 Grass Cutting 345398

B- 523 21.11.19 TMD-III M/s Thermal India Engineers X 01/TMD-III/06.04.19 322L/34 B/d Maintenance 94793

B- 525 21.11.19 AHD-III M/s MAK Consstruction Co. 04/MPED-IV/10.06.13 195L/128 Security 78795

B- 527 22.11.19 CAMD-III M/s Jahangir Enterprises 16/CAMD-III/24.01.19 244L/165 Security 34736

B- 528 22.11.19 CAMD-III M/s Kaveri Construction 11/MPED-III/09.02.18 244L/166 Security 51100

B- 529 22.11.19 CAMD-III M/s Usha Enterprises 18/CAMD-III/28.01.19 244L/166 Security 49416

B- 530 25.11.19 CSD-II M/s Simplex Switchgear Pvt. Ltd. 61 667/CPD-I/03.06.19 214L/165 23.10.19 Supply 15135

B- 532 25.11.19 AHD-III M/s MAK Consstruction Co. 28/AHD-III/07.03.19 102L/175 Security 99126

B- 534 27.11.19 CSD-II M/s Power Engineers PI 1067/CPD-II/26.09.19 249L/108 Supply 1277680

B- 543 27.11.19 CSD-II M/s Jalvid Udyog PI No. 159 1675/CPD-I/01.11.19 249L/113 13.11.19 Supply 187853 409515

B- 549 27.11.19 CSD-II M/s jain Mill Stores Pvt. Ltd. PI 1686/CPD-I/01.11.19 364L/5 13.11.19 Supply 252914 9065

B- 551 27.11.19 CSD-II M/s Industrial Sales 1685/06.11.19 1685/CPD-I/01.11.19 364L/7 06.11.19 Supply 107983

B- 554 27.11.19 CSD-II M/s Jalvid Udyog 164/13.11.19 1672/CPD-I/01.11.19 364L/11 13.11.19 Supply 26367

B- 556 27.11.19 CSD-II M/s Jalvid Udyog 168/13.11.19 1672/CPD-I/01.11.19 364L/13 13.11.19 Supply 4950

B- 557 27.11.19 CSD-II M/s Jalvid Udyog 170/13.11.19 1672/CPD-I/01.11.19 364L/14 13.11.19 Supply 53525

B- 562 27.11.19 CSD-II M/s Jalvid Udyog 172/15.11.19 1197/CPD-II/04.11.19 364L/19 15.11.19 Supply 179478

B- 563 27.11.19 BMD-V M/s T.R. Technical Services 11/BMD-V/09.08.19 247L/83 Security 16355

B- 566 29.11.19 CSD-II M/s Supath Engineering Services 40/04.10.19 1557/CPD-I/28.09.19 234L/114 04.10.19 Supply 1125607

B- 569 29.11.19 CSD-II M/s T.S. Enterprises 03/27.09.19 1535/CPD-I/24.09.19 234L/116 27.09.19 Supply 74973 101761TOTAL 2501560 1265398 7027549 2683587

B- 576 03.12.19 CSD-II M/s M.K.Traders VII 11/CHD-II/15.12.18 272/20 15.12.18 Overhauling 172846

B- 581 07.12.19 CSD-II M/s Rahil Metal 017/27.11.19 1194/CPD-II/04.11.19 250/109 04.11.19 Supply 420716 773410

B- 584 13.12.19 C&IMD-IV M/s D.K. & Sons Co. VI 10/EPED-I/10.10.18 220/120 10.10.18 B.D.M. 97627

B- 589 13.12.19 CSD-II M/s Simplex Switchgear Pvt. 70/19-20/5.12.19

381/CPD-I/14.03.19 353/57 14.03.19 Supply 94962

B- 590 13.12.19 AHD-III M/s India Engineering Works 9 23/AHD-III/04.02.19 103L/154 04.02.19 Repairing 39330

B- 591 13.12.19 AHD-III M/s Bharti Enterprises 32425 17/AHD-III/20.09.19 103L/156 20.09.19 Painting 171216

B- 592 13.12.19 AHD-III M/s Pitambra Engineer & Contractor 02 & Final 12/AHD-III/06.08.19 103L/157 06.08.19 Distempering 179625

B- 593 13.12.19 AHD-III M/s Pitambra Engineer & Contractor I 12/AHD-III/06.08.19 82/127 06.08.19 Distempering 153891

B- 594 13.12.19 AHD-III M/s Bharti Enterprises I 17/AHD-III/20.09.19 82/128 20.09.19 Painting 171216

B- 595 13.12.19 ECCU M/s Sadan Engineering Works I & Final 18/ECCU/26.11.19 113/89(A) 26.11.19 Cleaning Jungle 321154

B- 596 13.12.19 ECCU M/s Sadan Engineering Works II & Final 14/ECCU/11.09.19 26/75 11.09.19 Cleaning Jungle 96432

B- 597 13.12.19 ECCU M/s Puneet Construction I & Fianal 17/ECCU/09.10.19 1764/177 09.10.19 Work for grading 348575

B- 599 18.12.19 CSD-II M/s Shradha Enterprises PI/07/12.12.19

1291/CPD-II/21.11.19 354L/36 12.12.19 Supply 162988

B- 607 18.12.19 C&IMD-V M/s Damodar Security 05/EPED-II/24.09.18 316L/20A Security 8190

B- 608 18.12.19 C&IMD-V M/s Damodar Security 20/C&IMD-V/29.03.19 316L/20A Security 8869

B- 609 19.12.19 BMD-VI M/s MAK Construction Co. Security 26/MPED-V/10.01.18 276L/22A Security 22440

B- 611 19.12.19 AHD-III M/s O.S. Contractor 10 RAB 10/MPED-I/10.08.18 168L/71 Cleaning & Sweep 19630

B- 612 19.12.19 AHD-III M/s O.S. Contractor 11 RAB 10/MPED-I/10.08.18 168L/72 Cleaning & Sweep 20134

B- 613 21.12.19 BMD-V M/s T.R. Technical Services I & F 27/BMD-V/15.10.19 159L/86 Fabrication 263251

B- 615 26.12.19 ECCU M/s Sadan Engineering Works III 23/ECCU/2018/22.02.19 368L/132 30.11.19 Earth Ash Work 485772

B- 616 27.12.19 AHD-III M/s Pitambra Engineer & Contractor I & Final 13/AHD-III/07.08.19 167L/97 01.09.19 Providing and upkeeping 346622

B- 617 27.12.19 AHD-III M/s Bharti Enterprises I & Final 15/AHD-III/13.08.19 167L/98 23.09.19 Cleaning & Removal of Jungle 325124

B- 618 27.12.19 AHD-III M/s Bharti Enterprises I & Final 18/AHD-III/20.11.19 167L/99 06.11.19 Cleaning & Removal of Jungle 342501

B- 619 27.12.19 AHD-III M/s Balram Engineers I & Final 16/AHD-III/14.08.19 167L/100 10.10.19 Laying of Cement Concrete 310328

B- 620 27.12.19 AHD-III M/s A.S. Enterprises I & Final 26/AHD-III/03.12.19 167L/101 10.10.19 Laying of Cement Concrete 304747

B- 623 28.12.19 AHD-III M/s Shiv Mahadev Engg. Works I 20/AHD-III/05.10.19 81L/169 13.11.19 Shsized Strutural Steel 209088

B- 624 28.12.19 AHD-III M/s Rajeev Kumar Contractor I 28/AHD-III/16.12.19 81L/171 05.10.19 Surface Laying/ Flooring 206678

B- 625 28.12.19 AHD-III M/s Rajeev Kumar Contractor II 28/AHD-III/16.12.19 81L/172 08.11.19 Reparing of Grill 108702

B- 626 28.12.19 ECM&EMD M/s Ravindra Singh & Co. II 05/ECM&EMD/14.08.19 142L/21 25.11.19 Maintenance of Park 88279

B- 634 31.12.19 EMD-VI M/s Pitambra Engineer & Contractor I, Final 06/EMD-VI/14.10.19 339L/6B 14.10.19 Construction of RCC 25400 264160TOTAL 4822267 120362 583704 1037570

B- 635 03.01.20 ECM&EMD M/s Ashish Enterprises Security 05/ECM&EMD/23.06.19 397L/82 26.11.19 Security 95575

B- 638 03.01.20 CSD-II M/s Rajdhani Engineering 175/11.12.19 1468/CPD-I/16.09.19 364L/26 27.12.19 Supply 249995

B- 643 04.01.20 CSD-II M/s Aarseller tredco 05/24.09.19 1500/CPD-I/19.09.19 89L/87B 01.10.19 Supply 524400 915200

G:\2nd Pen Drive\250MW\2020-21\06-20\Liab_15.06.20_250 MW B-List-250MW

Page 42: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 644 04.01.20 CSD-II M/s Aarseller tredco 01//01.10.19 1534/CPD-I/24.09.19 89L/87B 10.10.19 Supply 138425 98600

B- 649 08.01.20 AHD-III M/s Rahul Gupta & Co. III 25/AHD-III/04.02.19 103L/161 Fabrication 75119

B- 650 08.01.20 AHD-III M/s Rahul Gupta & Co. IV 25/AHD-III/04.02.19 103L/162 Fabrication 75119

B- 652 08.01.20 AHD-III M/s O.S. Contractor RAB-12 10/MPED-I/10.08.18 168L/79 Maintenance of ESP 19630

B- 654 08.01.20 BMD-V M/s Sunrise Engineering & Contractor VI 14/MPED-I/12.11.18 293L/21A B/d Maintenance 14536

B- 658 13.01.20 ECM&EMD M/s A.S. Enterprises I 16/ECM&EMD/16.12.19 1826L/199 M&R of Door 165933

B- 660 13.01.20 CSD-II M/s Simplex Switchgear Pvt. Ltd. 1525/01/12.10.19

1525/CPD-I/24.09.19 154L/103 12.10.19 Supply 5664 254638

B- 661 13.01.20 CSD-II M/s Aditi Enterprises 10/15.11.19 1668/CPD-I/01.11.19 90L/74B 15.11.19 Supply 272938 25776

B- 665 13.01.20 CSD-II M/s Vidyut Bhawan 30/28.12.19 1924/CPD-I/11.12.19 90L/76B 28.12.19 Supply 12397

B- 669 14.01.20 EMD-VI M/s Thermal India Engineers I & Final 05/EMD-VI/14.10.19 200L/143 Loading Generator 35400

B- 670 14.01.20 EMD-VI M/s MRP Constructions Security 11/EMD-VI/30.01.19 200L/145 Security 48162

B- 671 14.01.20 EMD-VI M/s MRP Constructions Security 15/EPED-IV/12.01.18 200L/145 Security 47322

B- 672 14.01.20 EMD-VI M/s Nosad Contractor Security 01/EPED-IV/16.05.17 200L/146 Security 2880

B- 673 14.01.20 EMD-VI M/s Nosad Contractor Security 12/EPED-IV/30.12.17 200L/146 Security 84934

B- 674 14.01.20 EMD-VI M/s Nosad Contractor Security 11/EPED-IV/28.01.17 200L/147 Security 75263

B- 675 14.01.20 EMD-VI M/s Nosad Contractor Security 39/CWCD-IV/09.07.17 200L/147 Security 90214

B- 676 14.01.20 EMD-VI M/s Nosad Contractor Security 12/EPED-IV/02.02.16 200L/148 Security 75263

B- 677 14.01.20 EMD-VI M/s Nosad Contractor Security 166/CWCD-IV/06.09.13 200L/148 Security 53699

B- 678 16.01.20 EMD-VI M/s Gupta Enterprises I & Final 15/EMD-VI/26.12.19 29L/151 Shifting of Damages 714800 300000

B- 679 16.01.20 EMD-VIII M/s Electrical & Instrumentation Security 01/EPED-III/15.05.17 202L/61 Security 22500

B- 680 18.01.20 ECCU M/s Vijay Kumar Gupta Security 21/ECCU/22.02.19 113L/90 Security 29385

B- 682 20.01.20 CSD-II M/s Power Sales Corporation 10/19-20/26.11.19

268/CPD-I/15.02.19 329L/63 26.11.19 Supply 208719

B- 686 21.01.20 ECCU M/s Sadan Engineering Work Security 03/ECCU/21.05.18 300L/20A Security 29873

B- 687 21.01.20 ECCU M/s Sadan Engineering Work Security 17/ECCU/14.03.16 300L/21 Security 29527

B- 688 21.01.20 ECCU M/s Sadan Engineering Work Security 26/ECCU/09.01.18 300L/21A Security 29086

B- 689 21.01.20 ECCU M/s Sadan Engineering Work Security 18/ECCU/14.03.16 300L/21A Security 29584

B- 690 21.01.20 ECCU M/s Sadan Engineering Work Security 26/ECCU/27.01.17 300L/22 Security 17746

B- 691 21.01.20 ECCU M/s Sadan Engineering Work Security 05/ECCU/13.07.17 300L/22 Security 9354

B- 692 21.01.20 ECCU M/s Sadan Engineering Work Security 22/ECCU/23.01.17 300L/22A Security 29527

B- 694 21.01.20 ECCU M/s Bharti Enterprises Security 11/ECCU/19.09.17 300L/23 Security 28857

B- 695 21.01.20 ECCU M/s Sadan Engineering Work Security 04/ECCU/13.07.17 300L/23A Security 15049

B- 696 21.01.20 ECCU M/s Sadan Engineering Work Security 18/ECCU/07.11.17 300L/23A Security 29303

B- 697 21.01.20 ECCU M/s Sadan Engineering Work Security 31/ECCU/28.03.18 266L/76 21.09.19 Security 28009

B- 698 23.01.20 CSD-II M/s S.K. Engipro & Allied Solutions PI/22/21.09.19

1474/CPD-I/17.09.19 90L/76B 04.12.19 Supply 344127 1403949

B- 702 23.01.20 CSD-II M/s Trident Precision International PI/14012020/14.01.20

1774/CPD-I/15.11.19 197L/111 09.01.20 Supply 376553

B- 703 23.01.20 CSD-II M/s BEML Ltd. PI/9165005380/09.01.20

26/CPD-I/08.01.20 197L/111 Supply 2540350

B- 704 23.01.20 CAMD-III M/s Bharti Enterprises I & Final 14/CAMD-III/20.08.19 244L/168 Distemper 346449

B- 705 23.01.20 CAMD-III M/s Bharti Enterprises I & Final 13/CAMD-III/14.08.19 244L/169 Laying of Concrete 346053

B- 710 23.01.20 CSD-II M/s Indiana Sales 10DL/20.12.19 1818/CPD-I/20.11.19 365L/12 20.12.19 Supply 143754

B- 711 23.01.20 CSD-II M/s Indiana Sales 11DL/20.12.19 1818/CPD-I/20.11.19 365L/12 20.12.19 Supply 56770 17721

B- 713 23.01.20 C&IMD-IV M/s D.K. & Sons Co. VII 10/EPED-I/10.10.19 98L/93 OH#5 31185

B- 717 27.01.20 BMD-VI M/s O.S. Contractor Final 23/MPED-V/10.12.18 121L/195 Supply 75444

B- 718 27.01.20 ECM&EMD M/s Shiv Mahadev Engineering Security 17/ECM&EMD/21.12.18 214L/95A Supply 27931

B- 723 27.01.20 CSD-II M/s Industrial Sales & Supply Agency PI/1819/22.11.19

1819/CPD-I/20.11.19 354L/59 22.11.19 Supply 380712

B- 724 27.01.20 CSD-II M/s Jalvid Udyog PIJU-188/28.11.19

1672/CPD-I/01.11.19 354L/60 28.11.19 Supply 216270

B- 725 27.01.20 CSD-II M/s Sarasha Rubbers 87/19-20/02.01.20

1450/CPD-II/28.12.19 284L/37 02.01.20 Supply 63130

B- 726 27.01.20 CSD-II M/s Goverdhan Controls PI/47/18.11.19

1677/CPD-I/04.12.19 284L/40 18.11.19 Supply 1156400

B- 727 27.01.20 CSD-II M/s Instant Engineers 41/03.01.20 1462/CPD-I/25.07.19 234L/124 03.01.20 Supply 11864 688070

B- 729 27.01.20 CSD-II M/s Paramount International 30/26.11.19 1080/CPD-II/26.09.19 328L/50 26.11.19 Supply 1948020

G:\2nd Pen Drive\250MW\2020-21\06-20\Liab_15.06.20_250 MW B-List-250MW

Page 43: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

TOTAL 2725336 7800039 953824 3703954

B- 733 01.02.20 CSD-II M/s Techno Power Control 06/07.01.20 1836/CPD-I/25.11.19 233L/142 07.01.20 Supply 350421

B- 735 01.02.20 CSD-II M/s Yokogawa India Ltd. Form-28 32/C&IMD-V/25.01.20 215L/164 Supply 1978800

B- 736 04.02.20 ECM&EMD M/s Ashish Enterprises RAB-II 14/ECM&EMD/30.09.19 362L/14 M & R of Civil Work 484452

B- 739 05.02.20 CSD-II M/s Jain Mill Stores Pvt. Ltd. 5405/07.01.20 1820/CPD-I/20.11.19 353L/68 07.01.20 Supply 185444

B- 742 07.02.20 CSD-II M/s Sadan Engineering Work IV 23/ECCU/22.02.19 368L/138 M & R Ash Dyke 462777

B- 744 10.02.20 CSD-II M/s Industrial Sales & Supply Agency PI/42/14.01.20

42/CPD-I/13.01.20 364L/45 14.01.20 Supply 8678

B- 745 10.02.20 CSD-II M/s Jalvid Udyog PI/203/21.01.20

1290/CPD-II/21.11.19 364L/46 21.01.20 Supply 472

B- 747 12.02.20 CSD-II M/s Flowtech Engineers PI/FT/62/07.02.20

152/CPD-II/01.02.20 250L/115 07.02.20 Supply 989359

B- 748 12.02.20 C&IMD-IV M/s Hitachi Hi-Rel Power Electronics Security 07/EPED-I/03.08.17 278L/51 Security 14000

B- 749 12.02.20 C&IMD-IV M/s Hitachi Hi-Rel Power Electronics Security 03/EPED-I/26.07.18 278L/51 Security 143001

B- 752 12.02.20 AHD-III M/s Hind Udyog I 14/AHD-III/09.08.19 81L/179 Fabrication 3153

B- 753 12.02.20 AHD-III M/s Hind Udyog II 14/AHD-III/09.08.19 81L/180 Fabrication 62613

B- 754 12.02.20 AHD-III M/s Rahul Gupta & Co. IV 25/AHD-III/04.02.19 81L/181 Fabrication 52846

B- 757 13.02.20 C&IMD-V M/s Mecon Ltd. 5 & Final 260/C&ID-III/30.05.19 294L/88 Consultance Fire 804760

B- 758 13.02.20 CSD-II M/s JRM Solution PI/001559/12.10.19

1658/CPD-I/01.11.19 233L/151 12.10.19 Supply 34869

B- 759 13.02.20 CSD-II M/s Goverdhan Controls PI/046/18.11.19

1665/CPD-I/01.11.19 233L/152 18.11.19 Supply 105232

B- 760 13.02.20 CSD-II M/s Authentic Systems & Technologies PI/186/21.01.20

1683/CPD-I/01.11.19 233L/153 21.01.20 Supply 424803

B- 762 13.02.20 CSD-II M/s Aditi Enterprises PI/043/25.11.19

1801/CPD-I/19.11.19 233L/155 25.11.19 Supply 83955

B- 764 13.02.20 CSD-II M/s Control Component India Pvt. Ltd. PI/A47198/17.12.19

1787/CPD-I/15.11.19 233L/156 17.12.19 Supply 1828688

B- 765 13.02.20 CSD-II M/s Net Cascade Automation Pvt. Ltd. PI/61/10.12.19

1903/CPD-I/07.12.19 233L/157 10.12.19 Supply 337638

B- 766 13.02.20 CSD-II M/s Net Cascade Automation Pvt. Ltd. PI/63/20.12.19

1946/CPD-I/16.12.19 233L/157 20.12.19 Supply 610777

B- 767 13.02.20 CSD-II M/s Power Engineers PI/144/16.01.20

1947/CPD-I/16.12.19 233L/158 16.01.20 Supply 264927

B- 769 18.02.20 EMD-VIII M/s Priya Construction II RAB 04/EMD-VIII/19.07.19 349L/53 Repair 465432

B- 770 19.02.20CSD-II

M/s UT Pumps & Systems Pvt. Ltd. SO/19-20/678/13.02.

20

156/CPD-II/01.02.20 217L/88 Supply 577315

B- 771 19.02.20 CSD-II M/s J. Umashankar & Co. PI/JUC/19-20/07.02.20

84/CPD-I/22.01.20 217L/88 Supply 122118

B- 772 19.02.20 CSD-II M/s Trade India Corporation Pro/86/19-20/05.02.19

86/CPD-I/22.01.20 217L/89 Supply 72204

B- 773 19.02.20 CSD-II M/s MAK Construction Co. Security 1366/CPD-II/20.11.18 217L/90 Security 45608

B- 774 20.02.20 AHD-III M/s India Engineering Works I 32/AHD-III/06.02.20 81L/191 Fabrication 67024

B- 775 20.02.20 AHD-III M/s Hind Udyog III 14/AHD-III/09.08.19 81L/91 Fabrication 71416

B- 779 22.02.20 C&IMD-IV M/s D.K. & Sons Co. I & Final 08/C&IMD-IV/20.09.19 324L/24 Fabrication 151681

B- 783 22.02.20 BMD-V M/s R.B. Engineering Works I & Final 33/BMD-V/04.11.19 176L/81 Extension of Plat Formal 307800

B- 790 25.02.20 BMD-VI M/s Nosad Contractor I RAB 03/BMD-VI/02.05.19 336L/37A Breakdown Maintenance 248849

B- 791 25.02.20 BMD-VI M/s Hind Udyog IV RAB 17/MPED-V/04.10.18 336L/38 Fabrication 126378

B- 792 26.02.20 BMD-VI M/s Energo Construction Ltd. Security 09/MPED-V/18-19 350L/10 Security 416320

B- 793 26.02.20 BMD-V M/s Toughleak Engineering I 23/BMD-III/18.01.20 281L/36 Online Leak Seal 28080TOTAL 3288149 157473 8486268 0

B- 794 02.03.2020 BMD-VI M/s O.S. Contractor I 19/BMD-VI/19-20 335L/38A Servicing 74920 486024

B- 795 02.03.2020 BMD-VI M/s MAK Construction Co. I 16/BMD-VI/16.11.19 335L/39 Fabrication 331082

B- 796 02.03.2020 EMD-VII M/s Electrical & Instrumentation Security 09/EMD-VII/14.01.19 342L/28A Security 7327

B- 797 02.03.2020 EMD-VII M/s Electrical & Instrumentation Security 08/EMD-VII/11.01.19 342L/28B Security 17608

B- 802 03.03.2020 EMD-III M/s R.P. Construction Security 11/EPED-III/30.01.17 360L/25A Security 57054

B- 803 03.03.2020 EMD-III M/s R.P. Construction Security 13/EPED-III/12.01.16 360L/25A Security 61358

B- 804 03.03.2020 EMD-III M/s R.P. Construction Security 12/EPED-III/01.12.15 360L/27 Security 80082

G:\2nd Pen Drive\250MW\2020-21\06-20\Liab_15.06.20_250 MW B-List-250MW

Page 44: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 805 03.03.2020 EMD-III M/s R.P. Construction Security 06/EPED-III/20.11.16 360L/27 Security 80082

B- 806 03.03.2020 EMD-III M/s R.P. Construction Security 07/EPED-III/25.09.18 360L/28 Security 15862

B- 807 03.03.2020 EMD-III M/s R.P. Construction Security 07/EPED-III/25.09.18 360L/29 Security 6581

B- 810 03.03.2020 BMD-VI M/s A.S. Enterprises I & Final 17/BMD-VI/16.11.19 276L/26A OH 235440 719280

B- 815 04.03.2020 CSD-II M/s R.K. Traders 28/18.02.20 210/CPD-II/12.12.20 358L/44 Supply 18500

B- 816 04.03.2020 CSD-II M/s Shree Ambe PI/SAC/01/19-20

28/CPD-II/08.01.20 284L/42A Supply 516306

B- 829 05.03.2020 AHD-III M/s Garg Engineering & Sons I,II 08/AHD-III/22.06.19 103L/174 OH 23214

B- 830 05.03.2020 AHD-III M/s India Engineering Works 108 Firal RAB 23/AHD-III/04.02.19 103L/175 Repairs Maintenance 15251

B- 835 05.03.2020 AHD-III M/s Rahul Gupta & Co. VI 25/AHD-III/04.02.19 103L/183 Fabrication 20792

B- 836 06.03.2020 CAMD-III M/s Balram Engineers XI 11/CAMD-III/01.10.18 181L/103 Breakdown Maintenance 45795

B- 837 06.03.2020 BMD-V M/s Jahangir Enterprises Form-28 28/BMD-V/15.10.19 177L/117 Security 24375

B- 838 06.03.2020 BMD-V M/s Hind Udyog Form-28 17/MPED-I/27.09.16 177L/118 Security 62090

B- 839 06.03.2020 BMD-V M/s Hind Udyog Form-28 32/MPED-I/21.03.18 177L/119 Security 50220

B- 840 06.03.2020 CSD-II M/s S.K. Engipro & Allied Solutions PI/35/17.02.20

75/CPD-I/21.01.20 90L/80B Supply 75490

B- 841 06.03.2020 CSD-II M/s Atals Copco PI/905563967 1688/CPD-I/01.11.19 90L/80B Supply 38781 341292

B- 842 06.03.2020 CSD-II M/s Quick Well Engineering Associates PI/011/18-19/11.12.19

1803/CPD-I/19.11.19 90L/81A Supply 156635

B- 843 06.03.2020 CSD-II M/s Simplex Switchgear Pvt. Ltd. PI/I/02.02.20 58/CPD-I/17.01.20 90L/81B Supply 414062

B- 845 06.03.2020 CAMD-III M/s Bharti Enterprises I & Final 10/CAMD-III/13.08.19 181L/104 Lifting Of Sludge 349162

B- 846 06.03.2020 CAMD-III M/s Balram Engineers I & Final 11/CAMD-III/14.08.19 181L/105 Erection 320639

B- 847 06.03.2020 CAMD-III M/s Balram Engineers I & Final 16/CAMD-III/22.08.19 181L/107 Inter connecting 315512

B- 848 06.03.2020 CAMD-III M/s Jahangir Enterprises I 17/CAMD-III/18.09.19 181L/108 Breakdown Maintenance 11135

B- 849 06.03.2020 CAMD-III M/s Jahangir Enterprises III 06/CAMD-III/17.07.19 181L/109 Breakdown Maintenance 44333

B- 850 06.03.2020 CAMD-III M/s Jahangir Enterprises IV 06/CAMD-III/17.07.19 181L/110 Breakdown Maintenance 36816

B- 851 06.03.2020 CAMD-III M/s Jahangir Enterprises II 17/CAMD-III/18.09.19 181L/111 Breakdown Maintenance 12306

B- 852 06.03.2020 CAMD-III M/s Jahangir Enterprises III 17/CAMD-III/18.09.19 181L/113 Breakdown Maintenance 14514

B- 853 06.03.2020 CAMD-III M/s Jahangir Enterprises IV 17/CAMD-III/18.09.19 181L/114 Breakdown Maintenance 83048

B- 854 06.03.2020 CAMD-III M/s Jahangir Enterprises V 17/CAMD-III/18.09.19 181L/115 Breakdown Maintenance 86914

B- 855 06.03.2020 C&IMD-IV M/s D.K. & Sons Co. VIII 10/C&IMD-IV/ 98L/94 OH Rewinding 34399

B- 856 06.03.2020 CSD-II M/s Amco Industries PI/5/19-20/24.01.20

42/CPD-II/09.01.20 213L/139 Supply 12617

B- 860 12.03.2020 ECM&EMD M/s Puneet Construction I 20/ECM&EMD/03.01.20 310L/24 Cleaning of Jungle 199988

B- 862 13.03.2020 TMD-III M/s Thermal India Engineers XI + XII 01/TMD-III/06.04.19 228L/169 Breakdown Maintenance 210385

B- 863 13.03.2020 TMD-III M/s Hind Udyog IV 14/TMD-III/23.12.19 228L/171 Fabrication 41897

B- 868 13.03.2020 EMD-VIII M/s R.P. Construction Form-28 07/EPED-III/25.09.18 360L/28 Security 6581

B- 869 16.03.2020 BMD-VI M/s Hind Udyog V 17/MPED-V/04.10.18 298L/58 Fabrication 441976

B- 870 16.03.2020 EMD-VII M/s Nosad Contractor Final 04/EPED-VI/04.09.17 287L/55 B/d Maintenance 51500 108000

B- 873 16.03.2020 EMD-VII M/s Instrumetn Care Group RAB-III 05/EMD-VII/13.09.19 287L/57 B/d Maintenance 107330

B- 874 16.03.20 EMD-VII M/s Instrumetn Care Group 05/EMD-VII/13.09.19 287L/57 B/d Maintenance 26400 76954

B- 880 16.03.2020 EMD-VI M/s MAK Construction Co. I & Final 25/EMD-VI/24.02.20 30L/75 OH 128758

B- 885 16.03.2020 EMD-VI M/s Apex Engg. & Fabricators II-RAB 24/EMD-VI/17.02.20 200L/161 OH 128000 885476

B- 886 16.03.2020 EMD-VI M/s Ge Power Systems India Ltd. GST/90/08.09.19

365/EMD-VI/24.09.19 200L/161 Rewinding Generator 1180800 28686800

B- 887 17.03.2020 CSD-II M/s RSP Overseas Pvt. Ltd. Form-28 1108/CPD-I/08.06.16 329L/74A Supply 75301

B- 888 17.03.2020 CSD-II M/s Agra Computer I & Final 280/CSD-I/28.03.18 329L/75 Security 15795

B- 889 17.03.2020 ECMD-II M/s Vijay Kumar Gupta I 51/ECMD-II/20.01.20 370L/03 Construction of Drain 314498

B- 890 17.03.2020 ECMD-II M/s Akshat Enterprises I & Final 61/ECMD-II/25.01.20 370L/06 M&R of Door 131360

B- 891 17.03.2020 ECMD-II M/s Akshat Enterprises I & Final 66/ECMD-II/04.03.20 370L/10 Removal of Sheet 649216

B- 894 19.03.2020 C&IMD-V M/s Process Maintenance Enterprises I & Final 20/C&IMD-V/28.01.20 304L/42B Testing Work 130464

B- 898 19.03.2020 C&IMD-V M/s Aryan Enterprises I & Final 11/C&IMD-IV/24.12.19 235L/68 Cleaning 216216

B- 904 20.03.2020 BMD-VI M/s O.S. Contractor I 24/MPED-V/10.12.18 297L/59A Servicing 136046

B- 907 21.03.2020 BMD-V M/s T.R. Technical Services Form-28 27/BMD-V/15.10.19 291L/37A Security 24375

B- 908 21.03.2020 ECCU M/s Sadan Engineering Work I & Final 23/ECCU/22.02.19 368L/143 Carriage of CMR 295414

B- 909 21.03.2020 ECCU M/s Sadan Engineering Work I & Final 19/ECCU/03.12.20 300L/24 Providing Man Power 348760

B- 910 21.03.2020 ECCU M/s Vijay Kumar Gupta Form-28 30/ECM&EMD/14.03.19 364L/200 Security 26262

G:\2nd Pen Drive\250MW\2020-21\06-20\Liab_15.06.20_250 MW B-List-250MW

Page 45: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 918 23.03.2020 EMD-VIII M/s Electrical & Instrumentation (6 To 9) 05/EMD-VIII/19.07.19 242L/49 Repairing 86748

B- 920 24.03.2020 OGD-III M/s Manvendra Singh Rajpoot Form-28 81/MPED-VI/20.01.16 255L/84A Security 6588

B- 921 24.03.2020 OGD-III M/s Manvendra Singh Rajpoot Form-28 11/MPED-VI/11.05.18 255L/85 Security 6588

B- 922 24.03.2020 OGD-III M/s Manvendra Singh Rajpoot Form-28 54/MPED-VI/01.03.15 255L/84A Security 4464

B- 923 24.03.2020 OGD-III M/s Manvendra Singh Rajpoot Form-28 27/MPED-VI/01.12.18 255L/85 Security 6552

B- 924 24.03.2020 OGD-III M/s Manvendra Singh Rajpoot Form-28 13/MPED-VI/08.07.16 255L/85A Security 6588

B- 925 24.03.2020 OGD-III M/s Manvendra Singh Rajpoot Form-28 18/MPED-VI/30.06.17 255L/86 Security 6588

B- 926 24.03.2020 OGD-III M/s Manvendra Singh Rajpoot Form-28 31/MPED-VI/10.01.17 255L/86 Security 6552

B- 927 24.03.2020 OGD-III M/s Manvendra Singh Rajpoot Form-28 31/MPED-VI/01.11.17 255L/86A Security 6552

B- 929 27.03.2020 CDS-II M/s Ideal Industries 164/05.02.20 665/CPD-II/06.07.19 217L/93 Supply 250490

B- 930 27.03.2020 CDS-II M/s A.K. Agencies PI/25.02.20 85/CPD-I/22.01.20 217L/97 Supply 5410TOTAL 7467152 0 1563592 31303826

B- 1 03.04.2020 CSD-II M/s Panchal Industries Pvt. Ltd. Form-28 1616/CPD-II/07.10.16 284L/43 Security 104209

B- 3 03.04.2020 CHD-II M/s M.K. Traders RAB-XI 11/CHD-II/05.12.18 254L/79B OH 23989

B- 6 03.04.2020 ECM&EMD M/s A.S. Enterprises II & Final 16/ECM&EMD/16.12.19 362L/21 M&R of Door 139274

B- 7 07.04.2020 CAMD-III M/s Jahangir Enterprises V 06/CAMD-III/17.07.19 181L/117 B/d Maintenance 27261

B- 13 07.04.2020 CAMD-III M/s Jahangir Enterprises VI 06/CAMD-III/17.07.19 181L/117 B/d Maintenance 85733

B- 15 13.04.2020 CSD-II M/s Jain Mill Stores Pvt. Ltd. 5688 1820/CPD-I/20.11.19 364L/65 26.02.20 Supply 50766

B- 16 13.04.2020 CSD-II M/s Aditi Enterprises 41 158/CPD-I/07.02.20 364L/66 04.03.20 Supply 45961

B- 17 13.04.2020CSD-II

M/s Jay Pee Machining Industries JP/19-20/90/11.03.2

0

43/CPD-II/ 212L/179 11.03.20 Supply 35801

B- 18 15.04.2020 BMD-VI M/s MAK Construction Co. II RAB 16/BMD-VI/16.11.19 336L/42 Fabrication 70658

B- 19 15.04.2020 BMD-VI M/s Nosad Contractor II 03/BMD-VI/02.05.19 336L/43 Operation 71734

B- 20 15.04.2020 ECM&EMD M/s Vijay Kumar Gupta II 22/ECM&EMD/25.01.20 425L/118 M&R of Cable 740758

B- 21 16.04.2020 ECMD-II M/s Shiva Mahadev Engineering IV & Final 02/ECMD-II/03.04.19 1905L/74B Transfer To A List (A-28 dt.16.04.20) 0

B- 22 16.04.2020 BMD-VI M/s Voith Turbo Pvt. Ltd. II 02/BMD-VI/03.01.20 307L/28 Services Charge 31350 243280

B- 25 16.04.2020 BMD-VI M/s G.S. Construction Form-28 10/BMD-VI/19.20 298L/64B Security 287500

B- 26 17.04.2020 AHD-III M/s Hind Udyog RAB-04 14/AHD-III/09.08.19 81L/200 Fabrication 15468

B- 27 17.04.2020 AHD-III M/s India Engineering Works II 32/AHD-III/06.02.20 195L/134 Fabrication 15958

B- 28 17.04.2020 AHD-III M/s Shiva Mahadev Engineering III 20/AHD-III/05.10.19 195L/135 Painting 91330

B- 29 17.04.2020 AHD-III M/s Nosad Contractor I 21/AHD-III/29.11.19 195L/135 D.P. Extension 64636

B- 30 17.04.2020 AHD-III M/s Garg Engineering & Sons III+IV 18/AHD-III/22.06.19 195L/137 Repairing 42317

B- 31 17.04.2020 AHD-III M/s Hind Udyog Form-28 29/AHD-III/17.12.19 195L/138 Security 19596

B- 32 20.04.2020 C&IMD-IV M/s Kapatiya Instrument II 13/EPED-II/26.11.18 304L/44A Mechanical Work 63228

B- 33 20.04.2020 C&IMD-IV M/s Mahadev Enterprises I 15/C&IMD-IV/27.12.19 348L/23 Testing 208440

B- 35 22.04.2020 BMD-V M/s Hind Udyog I 22/BMD-V/01.10.19 231L/121 Fabrication 247712

B- 36 22.04.2020 BMD-V M/s O.S. Contractor II 36/BMD-V/25.03.19 231L/122 Supply 159624

B- 37 22.04.2020 BMD-V M/s Syndicate Engineer V 14/MPED-I/29.07.17 231L/123 Replacement 176595

B- 38 22.04.2020 BMD-V M/s Syndicate Engineer IV 03/MPED-I/25.06.18 290L/39B Repair 61032

B- 39 24.04.2020 TMD-III M/s Thermal India Engineers XIII+IXV 01/TMD-III/06.04.19 206L/114 B/d Maintenance 184391

B- 40 24.04.2020 BMD-V M/s Bharat Mechanical Structural & Works VII 13/MPED-I/05.10.18 290L/34 B/d Maintenance 142490

B- 41 24.04.2020 BMD-V M/s Bharat Mechanical Structural & Works VIII 13/MPED-I/05.10.18 290L/38B B/d Maintenance 24014

B- 42 24.04.2020 OGD-III M/s Balram Engineers & Contractor X 13/MPED-VI/02.06.18 256L/86 B/d Maintenance 115574

B- 43 24.04.2020 OGD-III M/s Balram Engineers & Contractor XI 13/MPED-VI/02.06.18 256L/88 B/d Maintenance 193571

B- 44 24.04.2020 OGD-III M/s Balram Engineers & Contractor XII 13/MPED-VI/02.06.18 256L/92 B/d Maintenance 191163

B- 45 24.04.2020 OGD-III M/s Usha Enterprises IV 22/MPED-VI/10.01.18 256L/94B B/d Maintenance 62160

B- 46 24.04.2020 OGD-III M/s Usha Enterprises V 22/MPED-VI/10.01.18 256L/96 B/d Maintenance 48984

B- 47 24.04.2020 BMD-II M/s Gayatri Enterprises II 22/BMD-VI/06.01.20 308L/22B Fabrication 208695

B- 48 24.04.2020 BMD-II M/s Ravindra Singh & Co. Form-28 07/MPED-V/19.06.18 308L/23 Security 69083

B- 49 25.04.2020 C&IMD-II M/s Goverdhan Controls I & Final 06/C&IMD-V/14.11.19 294L/93 Software Gredation 165240

B- 52 27.04.2020 SD-C M/s Jalvid Udyog PI/PIJU/107 120/CPD-I/18.01.19 90L/82B Supply 19358

B- 53 27.04.2020 SD-C M/s Jalvid Udyog PI/PIJU/122 120/CPD-I/18.01.19 90L/82B Supply 8152

B- 54 27.04.2020 SD-C M/s S.K. Engineering PI.37/14.02.20 126/CPD-I/31.01.20 90L/83A 14.02.20 Supply 100084

B- 55 27.04.2020 SD-C M/s Techno Power Control PI/10/19-20/20.04.20

161/CPD-I/07.02.20 90L/83A 20.04.20 Supply 743121

G:\2nd Pen Drive\250MW\2020-21\06-20\Liab_15.06.20_250 MW B-List-250MW

Page 46: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 56 27.04.2020 SD-C M/s Aditi Enterprises 43/12.03.20 158/CPD-I/07.02.20 365L/19 12.03.20 Supply 10443

B- 57 27.04.2020 SD-C M/s IGP Engineers Pvt. Ltd. A009461/10.02.20

43/CPD-I/13.01.20 365L/21 10.02.20 Supply 31192

TOTAL 3970154 357776 870715 243280

B- 58 04.05.2020 EMD-I M/s Electrical & Instrumentation Form-28 10/EMD-VI/29.01.19 261L/108 Security 26182

B- 59 04.05.2020 EMD-I M/s MRP Constructions Form-28 17/EPED-IV/12.01.18 263L/96 Security 16969

B- 60 04.05.2020 EMD-I M/s MRP Constructions Form-28 16/EPED-IV/12.01.18 263L/97 Security 29888

B- 61 04.05.2020 EMD-I M/s Nosad Contractor Form-28 22/EPED-IV/20.01.13 200L/165 Security 82614

B- 62 04.05.2020 EMD-I M/s Nosad Contractor Form-28 13/EPED-IV/27.07.12 200L/165 Security 21075

B- 63 04.05.2020 EMD-I M/s MRP Constructions Form-28 05/EPED-IV/01.09.17 200L/167 Security 31749

B- 64 04.05.2020 EMD-I M/s MRP Constructions Form-28 14/EPED-IV/12.01.18 200L/168 Security 27928

B- 65 05.05.2020 ECMD-II M/s Kanha Construction I 71/ECMD-II/12.03.20 371L/16 M&R of Building 281241

B- 66 05.05.2020 C&IMD-I M/s T.R. Technical Services I & Final 33/C&IMD-IV/20.03.20 98L/95A Repairing 47520

B- 67 05.05.2020 ECM&EMD M/s Vijay Kumar Gupta Contractor Form-28 18/ECM&EMD/ 142L/33 Security 28947

B- 68 05.05.2020 TMD M/s Maarfat Construction I & Final 01/TMD/23.04.20 206L/117 Spray Insulation 486000

B- 69 11.05.2020 CHD-II M/s M.K. Treders I 27/CHD-II/03.02.20 272L/41 OH 22148

B- 70 11.05.2020 C&IMD-II M/s Kanha Construction Form-28 04/EPED-II/18.09.18 258L/30 Security 6516

B- 71 11.05.2020 C&IMD-II M/s Kanha Construction Form-28 02/EPED-II/02.06.19 258L/31 Security 3276

B- 72 11.05.2020 C&IMD-II M/s Meticulous I 510/C&IMD-V/28.11.19 303L/46 Deputation of Eng 159300

B- 73 11.05.2020 CAMD M/s Jahangir Enterprises VI 17/EE/CAMD-III 181L/123 B/d Maintenance 88618

B- 74 11.05.2020 CAMD M/s Jahangir Enterprises VII 17/EE/CAMD-III 181L/124 B/d Maintenance 67400

B- 75 12.05.2020 CHD-II M/s M.K. Treders II 27/CHD-II/03.02.20 503L/25 OH 139812

B- 76 12.05.2020 CHD-II M/s M.K. Treders III 27/CHD-II/03.02.20 3092L/50 OH 27273

B- 77 14.05.2020 CAMD-III M/s Bharti Enterprises I & Final 18/CAMD-III/30.09.19 181L/132 Laying Cement 340478

B- 78 14.05.2020 CAMD-III M/s Balram Engineers & Contractor & Supp. I & Final 20/CAMD-III/18.10.19 181L/134 Fabrication 331296

B- 79 15.05.2020 ECMD-II M/s Sadan Engineering Works Form-28 29/ECMD-II/30.07.19 3091L/67 Security 29352

B- 80 15.05.2020 ECMD-II M/s Vijay Kumar Gupta Contractor Form-28 45/ECMD-II/19.01.19 3091L/69 Security 78960

B- 81 15.05.2020 ECMD-II M/s Sadan Engineering Works Form-28 38/ECMD-II/07.08.19 3091L/70 Security 28280

B- 82 15.05.2020 ECMD-II M/s Sadan Engineering Works Form-28 27/ECMD-II/ 1905L/46 Security 55387

B- 83 15.05.2020 ECMD-II M/s Sadan Engineering Works Form-28 31/ECMD-II/02.01.18 1905L/76B Security 28364

B- 84 15.05.2020 ECMD-II M/s Sadan Engineering Works Form-28 09/ECMD-II/14.05.18 1905L/77 Security 9495

B- 85 15.05.2020 ECMD-II M/s Sadan Engineering Works Form-28 13/ECMD-II/08.06.18 1905L/77B Security 27690

B- 86 15.05.2020 ECMD-II M/s Sadan Engineering Works Form-28 62/ECMD-II/23.02.19 1905L/78 Security 11965

B- 87 15.05.2020 ECMD-II M/s Sadan Engineering Works Form-28 29/ECMD-II/26.10.18 1905L/78B Security 28270

B- 88 15.05.2020 ECMD-II M/s Jamuna Meher Enterprises Form-28 48/ECMD-II/28.01.19 2012L/64B Security 70131

B- 89 15.05.2020 ECMD-II M/s Sadan Engineering Works Form-28 39/ECMD-II/02.09.19 2012L/65 Security 11960

B- 90 15.05.2020 ECMD-II M/s Vijay Kumar Gupta Contractor Form-28 33/ECMD-II/21.08.19 3090L/148 Security 29347

B- 91 15.05.2020 ECMD-II M/s Vijay Kumar Gupta Contractor Form-28 51/ECMD-II/30.01.19 3090L/149 Security 181476

B- 92 15.05.2020 ECMD-II M/s Vijay Kumar Gupta Contractor Form-28 67/ECMD-II/14.03.19 3090L/150 Security 28826

B- 93 15.05.2020 ECMD-II M/s Shiv Mahadev Engineering Form-28 21/ECMD-II/19.06.19 3090L/151 Security 29560

B- 94 15.05.2020 ECMD-II M/s Akshat Enterprises Form-28 01/ECMD-II/02.04.19 3090L/152 Security 72184

B- 95 15.05.2020 ECMD-II M/s Uttam Chandra Gupta Form-28 32/ECMD-II/19.10.19 2011L/88 Security 29621

B- 96 15.05.2020 ECMD-II M/s Shiv Mahadev Engineering Form-28 05/ECMD-II/05.04.19 2011L/88B Security 29432

B- 97 15.05.2020 ECMD-II M/s Balram Engineers & Contractor & Supp. Form-28 54/ECMD-II/02.02.19 2011L/89 Security 57241

B- 98 15.05.2020 C&IMD-II M/s Kapatiya Instrument Erectro Form-28 10/EPED-II/26.10.17 313L/45 Security 18481

B- 99 16.05.2020 BMD-I M/s Jahangir Enterprises Form-28 24/BMD-V/05.10.19 159L/93 Security 48648

B- 100 16.05.2020 BMD-I M/s Shiv Mahadev Engineering Form-28 31/BMD-V/22.10.19 159L/93A Security 29882

B- 101 16.05.2020 CAMD M/s Balram Engineers & Contractor & Supp. XII 11/CAMD-III/01.10.18 244L/190 B/d Maintenance 43261

B- 102 16.05.2020 CAMD M/s Balram Engineers & Contractor & Supp. XIII 11/CAMD-III/01.10.18 244L/191 B/d Maintenance 51392

B- 103 16.05.2020 CAMD M/s Balram Engineers & Contractor & Supp. XIV 11/CAMD-III/01.10.18 244L/193 B/d Maintenance 49750

G:\2nd Pen Drive\250MW\2020-21\06-20\Liab_15.06.20_250 MW B-List-250MW

Page 47: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · 2020-07-02 · 2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi) "B" Material/Spares FUND RESERVED FUND

B- 104 20.05.2020 C&IMD-I M/s D.K. & Sons Co. Form-28 04/EPED-I/26.07.18 325L/58 Security 16170

B- 105 20.05.2020 BMD-I M/s Sunrise Engineering & Contractor RAB-VII 14/MPED-I/12.11.18 219L/87 B/d Maintenance 36975

B- 106 20.05.2020 ECCU M/s Sadan Engineering Works I 21/ECCU/13.02.20 300L/25B M&R 332318

B- 109 28.05.2020 CHD-II M/s Kanha Construction I 01/CHD-II/21.04.20 2093L/18 Cutting Of Grass 96174TOTAL 3637589 189233 0 0

B- 111 02.06.2020 TMD-III M/s Bharti Enterprises I & Final 07/TMD-III/09.01.20 206L/118 Fabrication 342894

B- 112 02.06.2020 TMD-III M/s BHEL Banglore Form-28 131/SE/BHEL/23.03.20 206L/119 Security 36000756

B- 113 05.06.2020 CSD-II M/s Multitech Engineers PI/42/23.05.20

159/PD-I/19.05.20 197L/120 Supply 1103340

B- 114 08.06.2020 SD-C M/s Instant Engineers PI/28/09.10.19

1462/CPD-I/16.09.19 90L/83B Supply 905835

B- 115 08.06.2020 SD-C M/s Plastek PI/06/11.05.20

231/CPD-I/02.03.20 90L/84A Supply 330534

B- 116 08.06.2020 SD-C M/s Hitachi Hi-Rel PI/130421/13.04.20

328/CPD-I/07.04.20 90L/84B Supply 441332

B- 117 08.06.2020 SD-C M/s Atlas Copco PI/905794237/08.04.20

35/CPD-I/09.01.20 90L/85A Supply 285848

B- 118 08.06.2020 ECM&EMD M/s S.R. Enterprises Form-28 22/ECM&EMD/29.12.18 399L/98 Security 25350

B- 119 09.06.2020 ECM&EMD M/s Puneet Construction Form-28 10/ECM&EMD/27.08.19 362L/178 Security 29062

B- 120 11.06.2020 SD-C M/s Techno Power Control PI/01/20-21/03.06.20

474/CPD-I/23.05.20 364L/75 Supply 182751

B- 121 11.06.2020 C&IMD-I M/s D.K. & Sons Co. Form-28 18/C&IMD-IV/08.01.19 324L/30 Security 18225

B- 122 11.06.2020 C&IMD-I M/s Shiv Mahadev Engineering Works Form-28 17/C&IMD-IV/05.01.19 324L/30 Security 24250

B- 123 11.06.2020 C&IMD-I M/s Sanjay Electronics Form-28 12/CWCD-IV/29.05.14 324L/31 Security 8835

B- 124 11.06.2020 C&IMD-I M/s Sanjay Electronics Form-28 13/CWCD-IV/29.05.14 324L/31 Security 58700

B- 125 11.06.2020 C&IMD-I M/s Sanjay Electronics Form-28 25/EPED-I/30.03.16 324L/32 Security 47150

B- 126 12.06.2020 BMD-VI M/s Gayatri Enterprises III & Final 22/BMD-VI/06.01.20 336L/45A Fabrication 133497

B- 127 12.06.2020 BMD-II M/s Gayatri Enterprises I & Final 04/BMD-II/16.05.20 336L/46A Fabrication 281282TOTAL 36970001 3249640 0 0

Grand Total 79896908.00 19022707.00 27310978.00 52039909.00