2x110 mw parichha thermal power project, parichha (jhansi) b · b-2059 23.06.18 cpd-i m/s r.s.p....

49
Fund Reverved Supply PI B- 925 31.08.16 CSD-I M/s Swastik Enterprises 1474/CPD-I/CF/11.07.16 1749/42 Supply of Eaton makes spares 32117.00 0.00 B- 983 05.10.16 CSD-I M/s United Engineering Works 219/CPD-II/30.04.16 1827/140 Supply of order Works 161964.00 B- 992 15.10.16 CSD-I M/s Mechanical Engg. Co. 709/CPD-III/06.09.16 1718/72 Supply Coupling 196236.00 0.00 B- 1132 29.12.16 CSD-I M/s Jaisia Industries Pvt. Ltd 1647/CPD-II/07.10.16 1718/74A Supply of Spares 388892.00 0.00 B- 1172 12.01.17 CSD-I M/s AtoZ Infra Spares 2380/CSD-I/23.11.16 1925/47 Supply of Spares 63529.00 B- 1192 30.01.17 CSD-I M/s AtoZ Infra Spares 11/BMD-II/12-13 1849/70 Supply 1663.00 0.00 B- 1215 15.02.17 CSD-I M/s Jalvid Udyog Kanpur 157/CPD-I/30.01.17 1959/22 Supply 22080.00 B- 1217 15.02.17 CSD-I M/s Jalvid Udyog Kanpur 157/CPD-I/30.01.17 1959/23 Supply 10879.00 B- 1218 15.02.17 CSD-I M/s Jalvid Udyog Kanpur 157/CPD-I/30.01.17 1959/23 Supply 16746.00 B- 1219 15.02.17 CSD-I M/s Jalvid Udyog Kanpur 154/CPD-II/30.01.17 1959/20 Supply 202207.00 0.00 B- 1264 09.03.17 CSD-I M/s Assam Carbon Products 137/CPD-I/28.01.17 1950/28 Supply 269663.00 0.00 B- 1308 06.04.17 CSD-I M/s Kaymohan Corporation 2503/CPD-I/19.12.16 1874/105 Supply 7161.00 B- 1311 06.04.17 CSD-I M/s Anurag Engineering Works 2504/CPD-I/16-17 1874/106 Supply 6782.00 0.00 B- 1507 05.06.17 CSD-I M/s U.P. Udyog Aligarh 106/CPD-I/21.01.17 1948/36 Supply of Spares 487980.00 0.00 B- 1613 01.08.17 CSD-I M/s Ganesh Sales Services 155/CPD-I/20.01.17 1925/55 Supply 31463.00 B- 1614 01.08.17 CSD-I M/s Technow Engg. Works 151/CPD-I/30.01.17 1925/107 Supply 4408.00 0.00 B- 1683 18.09.17 EMD-I M/s Online Bhopal 07/EMD-I/17-18 1759/38 Security 64500.00 B- 1691 22.09.17 AHD-I M/s S.R. Enterprises 1 03/AHD-I/17-18 2032/52 Fabrication/Laying of AH Line 321722.00 0.00 0.00 B- 1725 02.11.17 TMD-I M/s The Indian Thermit Corp. Ltd 14/TMD-I/17-18 2028/05 M&R of Turbine Hall 370500.00 B- 1758 15.11.17 EMD-I M/s Process Maintinance Enterprises 06/EMD-I/17-18 1404/191 M&r of ABT Service Maint. 57392.00 FUND RESERVED Description of Work/Supply Work MB NO./Page No/ FUND RESERVED FUND RESERVED 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B FUND RESERVED Material/Spares Reg Index Bill No FUND RESERVED Date Name Of Division FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED Name of Firm RAB Agr/PO/LOI/WO and Dt FUND RESERVED FUND RESERVED FUND RESERVED FUND RESERVED

Upload: others

Post on 15-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

Fund Reverved

Supply PI

B- 925 31.08.16 CSD-I M/s Swastik Enterprises 1474/CPD-I/CF/11.07.16 1749/42 Supply of Eaton makes spares

32117.00

0.00

B- 983 05.10.16 CSD-I M/s United Engineering Works 219/CPD-II/30.04.16 1827/140 Supply of order Works 161964.00B- 992 15.10.16 CSD-I M/s Mechanical Engg. Co. 709/CPD-III/06.09.16 1718/72 Supply Coupling 196236.00

0.00

B- 1132 29.12.16 CSD-I M/s Jaisia Industries Pvt. Ltd 1647/CPD-II/07.10.16 1718/74A Supply of Spares 388892.000.00

B- 1172 12.01.17 CSD-I M/s AtoZ Infra Spares 2380/CSD-I/23.11.16 1925/47 Supply of Spares 63529.00B- 1192 30.01.17 CSD-I M/s AtoZ Infra Spares 11/BMD-II/12-13 1849/70 Supply 1663.00

0.00

B- 1215 15.02.17 CSD-I M/s Jalvid Udyog Kanpur 157/CPD-I/30.01.17 1959/22 Supply 22080.00B- 1217 15.02.17 CSD-I M/s Jalvid Udyog Kanpur 157/CPD-I/30.01.17 1959/23 Supply 10879.00B- 1218 15.02.17 CSD-I M/s Jalvid Udyog Kanpur 157/CPD-I/30.01.17 1959/23 Supply 16746.00B- 1219 15.02.17 CSD-I M/s Jalvid Udyog Kanpur 154/CPD-II/30.01.17 1959/20 Supply 202207.00

0.00

B- 1264 09.03.17 CSD-I M/s Assam Carbon Products 137/CPD-I/28.01.17 1950/28 Supply 269663.000.00

B- 1308 06.04.17 CSD-I M/s Kaymohan Corporation 2503/CPD-I/19.12.16 1874/105 Supply 7161.00B- 1311 06.04.17 CSD-I M/s Anurag Engineering Works 2504/CPD-I/16-17 1874/106 Supply 6782.00

0.00

B- 1507 05.06.17 CSD-I M/s U.P. Udyog Aligarh 106/CPD-I/21.01.17 1948/36 Supply of Spares 487980.000.00

B- 1613 01.08.17 CSD-I M/s Ganesh Sales Services 155/CPD-I/20.01.17 1925/55 Supply 31463.00B- 1614 01.08.17 CSD-I M/s Technow Engg. Works 151/CPD-I/30.01.17 1925/107 Supply 4408.00

0.00

B- 1683 18.09.17 EMD-I M/s Online Bhopal 07/EMD-I/17-18 1759/38 Security 64500.00B- 1691 22.09.17 AHD-I M/s S.R. Enterprises 1 03/AHD-I/17-18 2032/52 Fabrication/Laying of AH

Line321722.00

0.00

0.00

B- 1725 02.11.17 TMD-I M/s The Indian Thermit Corp. Ltd 14/TMD-I/17-18 2028/05 M&R of Turbine Hall 370500.00B- 1758 15.11.17 EMD-I M/s Process Maintinance

Enterprises06/EMD-I/17-18 1404/191 M&r of ABT Service Maint. 57392.00

FUND RESERVED

Description of Work/Supply

WorkMB NO./Page

No/

FUND RESERVED

FUND RESERVED

2X110 MW Parichha Thermal Power Project, Parichha (Jhansi)B

FUND RESERVED

Material/Spares Reg Index Bill No

FUND RESERVED

Date Name Of Division

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

Name of Firm RAB Agr/PO/LOI/WO and Dt

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

Page 2: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 1787 30.11.17 CSD-I M/s ABB India Ltd 1081/CPD-I/O-1/07.11.17 1833/48 Supply of ABB Makes Spares

142085.00

0.00

B- 1792 07.12.17 CHD-I M/s Bharati Enterprises F&F 07/CHD-I/17-18 2005/13 Evocation of Bill R.C. Bonkers

476198.00

B- 1816 23.12.17 CSD-I M/s Sail Kanpur 1263/CPD-I/19.12.17 1757/10 Supply of Steels 1277327.000.00

B- 1866 23.01.18 CSD-I M/s AAR Sellar Tredco 1313/CPD-I/17-18 1965/24 Supply of Electrical Items 92049.00

0.00

B- 1877 05.02.18 EMD-I M/s Awasthi Motor Winding Works 33/EMD-I/15-16 1630/ Security 88073.00

B- 1882 08.02.18 CSD-I M/s Trade India Corporation 1343/CPD-I/10.01.18 1977/107 Supply of Bearing 6230.00B- 1889 13.02.18 CSD-I M/s Sadan Engg. Works 06/CSD-I/16-17 1746/197 Security 25512.00B- 1890 13.02.18 CSD-I M/s Sadan Engg. Works 07/CSD-I/15-16 1746/197 Security 24455.00B- 1899 20.02.18 EMD-I M/s Nosad Contractor 4 19/EMD-I/16-17 1987/59 Shifting of Motor 41636.00B- 1906 27.02.18 CSD-I M/s Technow Engg Work 1404/CPD-I/24.01.18 1947/86 Supply of Consumable 12980.00

0.00

B- 1909 07.03.18 OGD-I M/s Maa Shakti Enterprises 15/OGD-I/16-17 1906/193 Security 34998.00B- 1913 09.03.18 ECMD-II M/s Akshat Enterprises 2 14/ECMD-II/17-18 1911/35 M&R of Door & Window 102696.00B- 1915 14.03.18 CSD-I M/s Technow Engg Work 1265/CPD-I/19.12.17 1925/68 Supply 11725.00B- 1916 14.03.18 CSD-I M/s Jalvid Udyog 1143/CPD-I/21.11.17 1925/66 Supply 278557.00B- 1918 14.03.18 CSD-I M/s Jalvid Udyog 1264/21.11.17 1925/59 Supply 18025.00B- 1921 16.03.18 CHD-III M/s Priya Construction co. 1 10/CHD-III/17-18 1853/52 Rewinding of LT Motor 142542.00B- 1928 20.03.18 CSD-I M/s Sail Kanpur 1312/CPD-I/02.01.18 1957/11 Supply 250750.00

0.00

B- 1948 13.04.18 CHD-III M/s Priya Construction co. 2 10/CHD-III/06.01.18 1853/55B Rewinding of LT Motor 180104.000.00

B- 1977 09.05.18 CPD-I M/s AARSELLER TREDCO 1313/CPD-I/02.01.18 1799/111 Supply of 0.4KV LT Module

59118.00

B- 1978 09.05.18 CPD-I M/s AARSELLER TREDCO 1313/CPD-I/02.01.18 1799/111 Supply of 0.4KV LT Module

82187.00

B- 1981 14.05.18 EMD-I M/s Easun Royralle Limited F 145/EMD-I/25.03.14 1793/81A Erection Lesting & Comm. 548640.00

B- 2003 24.05.18 CPD-III M/s Hems Corporation 117/CPD-III/20.04.18 1718/82B Supply 141030.000.00

B- 2013 01.06.18 CPD-III M/s BEML Limited 84/CPD-III/02.04.18 1834/65 Supply 67124.00B- 2014 01.06.18 CPD-III M/s BEML Limited 83/CPD-III/02.04.18 1834/65-66 Supply 1656497.00

B- 2022 02.06.18 CPD-I M/s Aarseller Tredco 1313/CPD-I/02.01.18 1949/84 Supply 162250.00B- 2029 06.06.18 CHD-II M/s Schenck Process India Pvt. Ltd F 09/CHD-II/2016-17 2038/55 AMC 132750.00

B- 2030 06.06.18 CHD-II M/s Kanha Construction 2 12/CHD-II/2011-17 2020/22 Qulity uproting 315414.00B- 2036 11.06.18 CHD-III M/s Priya Construction co. 3 10/CHD-III/06.01.18 1853/58B Rewinding of LT 215232.00B- 2058 22.06.18 CHD-I M/s Priyanka Enterprises 2&F 07/CHd-I/19.08.16 1867/52 Overhauling 1581677.00B- 2059 23.06.18 CPD-I M/s R.S.P. Oversease Pvt. Ltd 402/CPd-I/22.06.17 1828/185 Supply 5141.00B- 2063 26.06.18 CPD-I M/s Ranjana Rakesh Corporation 54/CPD-I/17-18 1949/85 Supply 1150500.00

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

Page 3: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

0.00 0.00 0.00

B- 2074 03.07.18 CPD-III M/s Escorts Railway Equipment Quision

116/CPD-III/20.04.18 1820/92 Supply 117600.00

B- 2083 12.07.18 EMD-II M/s Instrument Care Group 3 07/EMD-II/10.10.17 1898/33B Up Keeping Works 121684.00B- 2086 13.07.18 EMD-II M/s Electrical & Instrument

Engineers2 16/EMD-II/05.02.18 2036/13 Up Keeping Works 121142.00

B- 2087 13.07.18 CPD-II M/s BEML Limited 281/CPD-III/23.06.18 1954/87 Supply 1172006.00B- 2090 19.07.18 CPD-I M/s Eckhardt Steel & Allous 2505/CPD-I/19.12.16 1827/162 Supply 3993.00B- 2095 21.07.18 CPD-III M/s BEML Limited 306/CPD-III/07.07.18 1820/94 Supply 1747239.00B- 2096 21.07.18 TMD-I M/s Zenith Engineers 01/TMD-I/2018-19 2026/22B Repairing & Serviceing 107330.00B- 2098 24.07.18 ECMD-II M/s K.S. & Brothers 29/ECMD-II/12.12.17 1845/55B Water Supply 425178.00

0.00 0.00 0.00

B- 2100 01.08.18 ECMD-II M/s Sharma Enterprises 12/ECMD-II/26.11.15 1777/86B Security 22175.00B- 2101 01.08.18 ECMD-II M/s Sharma Enterprises 13/ECMD-II/28.11.15 1777/86B Security 47241.00B- 2102 01.08.18 ECMD-II M/s Shiv Mahadev Engg. Works 33/ECMD-II/18.03.17 1777/86A Security 24477.00B- 2103 01.08.18 CPD-I M/s Trade India Corporation 1706/CPD-I/05.10.15 1948/73 Supply 157442.00B- 2104 01.08.18 CPD-I M/s Trade India Corporation 1706/CPD-I/05.10.15 1948/73 Supply 10084.00B- 2105 01.08.18 CPD-I M/s Trade India Corporation 1706/CPD-I/05.10.15 1948/73 Supply 10084.00B- 2107 04.08.18 TMD-I M/s M.K. Traders 3 07/TMD-I/2017-18 1972/119 Overhauling 24973.00B- 2109 07.08.18 CHD-I M/s S.K. Engineering Works 3 20/CHD-I/16-17 2021/03 Overhauling 39000.00B- 2111 07.08.18 C&ID-I M/s D.K. & Sons Co. 1 02/C&ID-I/22.05.18 1881/69B Cutting & Repairing 24970.00B- 2112 07.08.18 C&ID-I M/s D.K. & Sons Co. 1 03/C&ID-I/22.05.18 1881/70 Overhauling 28724.00B- 2113 07.08.18 C&ID-I M/s Industrial Engineering

Enterprises4 09/C&ID-I/25.08.17 1881/71B Repairing & Serviceing 73662.00

B- 2114 08.08.18 TMD-I M/s Ajanta Engineering Works 1 17/TMD-I/17-18 1802/187 Maint. & Reparing 185228.00B- 2116 09.08.18 ECMD-II M/s Bharti Enterprises 1&F 18/ECMD-II/12.07.18 1790/95 Levelling & Dressing 321324.00B- 2118 09.08.18 CPD-II M/s T.S. Enterprises 2 15/CPD-II/05.02.18 1939/68 Annula Maint. 111046.00B- 2119 10.08.18 CHD-I M/s Priyanka Enterprises 2 03/CHD-I/05.06.18 1872/68 Overhauling 130620.00B- 2121 13.08.18 CHD-III M/s Nosad Contractor 4 04/CHD-III/10.05.18 1853/62B O/H Shifting 75123.00B- 2123 18.08.18 ECMD-II M/s Sadan Engineering Work 1 48/ECMD-II/21.03.18 1893/56 Cleaning of Spectic Tank 116770.00

B- 2125 18.08.18 ECMD-II M/s Sadan Engineering Work 2&F 47/ECMD-II/21.03.18 1893/57B MR of Spectic Tank 71882.00B- 2126 18.08.18 ECMD-II M/s Sadan Engineering Work 2&F 48/ECMD-II/21.03.18 1893/58 MR of Spectic Tank 34435.00B- 2137 21.08.18 BMD-II M/s Syndicate Engineers 8 15/BMD-II/27.07.16 1963/51 Overhauling of Chain 67797.00B- 2138 21.08.18 BMD-II M/s MAK Construction 4 30/BMD-II/06.10.16 1963/50 Breakdown/ Prep. 46280.00B- 2140 24.08.18 EMD-II M/s Nosad Contractor 4 28/EMD-II/25.11.16 1899/27A Complete Overhauling 4500.00B- 2141 24.08.18 EMD-II M/s Nosad Contractor 5 28/EMD-II/25.11.16 1899/29A Complete Overhauling 52698.00B- 2142 24.08.18 EMD-II M/s Nosad Contractor 6 28/EMD-II/25.11.16 1899/30B Security 67182.00B- 2143 24.08.18 TMD-I M/s Usha Enterprises 10/TMD-I/14-15 1802/189 Security 17333.00B- 2144 24.08.18 TMD-I M/s Usha Enterprises 17/TMD-I/15-16 1802/190 Security 66028.00B- 2145 28.08.18 C&ID-I M/s D.K. & Sons Co. 2 02/C&ID-I/22.05.18 1896/59 Cutting & Repairing 25349.00B- 2146 28.08.18 C&ID-I M/s D.K. & Sons Co. 2 03/C&ID-I/22.05.18 1896/59B Overhauling 20848.00B- 2148 28.08.18 CAMD-I M/s D.K. & Sons Co. 07/CAMD-I/19.11.16 1926/50 Security 3077.00B- 2149 28.08.18 CAMD-I M/s Usha Enterprises 06/CAMD-I/15-16 1926/50B Security 44322.00B- 2150 28.08.18 CPD-II M/s Ramanna Safety & Systems 05/CPD-II/03.03.16 1926/49B Security 27112.00B- 2151 28.08.18 CPD-II M/s Ramanna Safety & Systems 04/CPD-II/03.03.16 1926/49 Security 93220.00B- 2152 28.08.18 CAMD-I M/s Usha Enterprises 01/CAMD-I/02.01.15 1926/50 Security 68688.00B- 2153 28.08.18 CPD-III M/s J.K. Engg. Co. 364/CPD-III/27.06.18 1833/60 Supply 945436.00B- 2156 29.08.18 ECMD-II M/s Bharti Enterprises 06/ECMD-II/28.04.18 2012/21B Levelling & Dressing 178167.00B- 2157 29.08.18 ECMD-II M/s Kanha Construction 45/ECMD-II/21.03.18 3217/84B M&R Residirtial 212891.00

1535368.00 945436.00 0.00

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVED

Page 4: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 2159 04.09.18 BMD-II M/s Marfat Construction 6 05/BMD-II/16.08.17 1952/112 Insulation Works 143286.00B- 2162 10.09.18 CHD-II M/s M.K. Traders 7 15/CHD-II/20.11.17 2009/68 Maintence & O/H 131654.00B- 2164 11.09.18 ECMD-II M/s Jamuna Meher 11/ECMD-II/14.07.16 2014/20 Security 122073.00B- 2165 11.09.18 CHD-III M/s Nosad Contractor 5 04/CHD-III/10.05.18 1853/63 O/H of LT Motor 66045.00B- 2167 11.09.18 ECMD-II M/s Sadan Engineering Work 1&F 42/ECMD-II/13.03.18 1866/65B Hire Charg. JCB 129600.00B- 2168 13.09.18 CSD-I M/s Sadan Engineering Work 2 07/CSD-I/23.12.17 1991/59 Unloading & Shifting 27301.00B- 2169 13.09.18 CPD-I M/s J. Umashankar & Co. P. Lt 460/CPD-I/26.07.18 1991/62 Supply 178926.00B- 2171 14.09.18 EMD-I M/s Nosad Contractor 11 02/EMD-I/26.07.17 1985/46 Annual Maintinance 7734.00B- 2172 14.09.18 EMD-I M/s Nosad Contractor 12 02/EMD-I/26.07.17 1985/47 Annual Maintinance 8584.00B- 2173 14.09.18 EMD-I M/s Nosad Contractor 6 09/EMD-I/03.11.17 1985/49 Preventing 4118.00B- 2174 22.09.18 CPD-II M/s Ashish Enterprises 7 08/CPD-II/31.10.15 1789/79 O/M of 3.0 MLD 437627.00B- 2175 22.09.18 CPD-II M/s Ashish Enterprises 8&F 08/CPD-II/31.10.15 1789/81 O/M of 3.0 MLD 152026.00B- 2177 22.09.18 C&ID-I M/s Karishna Enterprises 02/C&ID-I/20.04.16 1910/84B Security 44400.00B- 2182 24.09.18 EMD-II M/s Priya Construction 2 14/EMD-II/17-18 1932/61 Electrical Breakdown 118043.00B- 2185 24.09.18 EMD-II M/s Priya Construction F 13/EMD-II/17-18 1945/34 P.M. & O/H LT Motor 71201.00B- 2187 25.09.18 CPD-I M/s Mohan Corpotation 404/CPD-I/23.07.18 1990/22 Supply for Fastner 17346.00B- 2189 25.09.18 S&TD M/s Jadaun Bus Service 29/S&TD/07.10.17 2035/12 Security 186750.00B- 2190 26.09.18 CPD-I M/s Asha Printing Press 165/CPD-I/18.05.18 1925/78 Supply 11201.00B- 2191 26.09.18 CPD-I M/s Jalvid Udyog 989/CPD-I/09.08.18 1925/78 Supply 12980.00B- 2192 26.09.18 CPD-I M/s Fludomat Limited 284/CPD-III/23.06.18 1833/60 Supply 341881.00

1650442.00 532008.00 30326.00

B- 2194 03.10.18 CPD-I M/s Anurag Engineering 405/CPD-I/23.07.18 1991/63 Supply 66316.00B- 2195 04.10.18 CHD-II M/s Bharti Enterprises 735/CHD-II/04.09.18 1958/148 Security 56570.00B- 2196 04.10.18 CHD-II M/s Balram Engineers 805/CHD-II/22.09.18 1958/148 Security 85893.00B- 2197 04.10.18 CHD-II M/s Balram Engineers 135/CHD-II/21.02.17 1958/149 Security 111100.00B- 2204 05.10.18 S&TD M/s Electrical & Instrumentation

Engineers18/S&TD/12.10.15 1836/36B Security 50400.00

B- 2205 05.10.18 S&TD M/s MAK Construction 08/S&TD/05.05.17 1836/36B Security 22500.00B- 2214 09.10.18 CHD-III M/s Priyanka Enterprises 3 11/CHD-III/30.03.11 1853/64B O/H & LT Brekers 9164.00B- 2215 10.10.18 ECMD-I M/s Vijay Kumar Gupta 14/ECMD-I/26.10.17 2017/62 Security 5508.00B- 2217 10.10.18 ECMD-I M/s Vijay Kumar Gupta 12/ECMD-I/08.09.17 1878/56 Security 28502.00B- 2221 11.10.18 TMD-I M/s Maarfat Construction 4 09/TMD-I/17-18 1935/153 Insulation Works 107288.00B- 2222 11.10.18 CAMD-I M/s Syndicate Engineers 4 04/CAMD-I/14.06.17 1927/19 Breakdowan Maint. 198541.00B- 2223 12.10.18 CPD-II M/s Simplex Switchgear P. Ltd 965/CPD-II/12.01.17 1954/94 Supply 1682856.00B- 2225 22.10.18 EMD-III M/s Krishna Enterprises 2 15/EMD-III/22.12.17 2050/5B Reparing & O/H 188387.00B- 2232 26.10.18 EMD-I M/s Nosad Contractor 9 10/EMD-I/28.03.16 2016/31A Ent Termination 1670.00B- 2235 26.10.18 CHD-I M/s Priyanka Enterprises 13/CHD-I/13.03.18 1972/82B Security 6900.00B- 2238 29.10.18 TMD-I M/s Usha Enterprises 19/TMD-I/15-16 1972/110 Security 38625.00B- 2239 29.10.18 TMD-I M/s Harsh & Brothers 06/TMD-I/15-16 1972/111 Security 6550.00B- 2240 29.10.18 TMD-I M/s Usha Enterprises 18/TMD-I/15-16 1972/111 Security 42513.00B- 2241 31.10.18 EMD-III M/s T.S.Enterprises 06/EMD-III/11.07.18 1994/114 Rewinding of Built 264814.00

1224925.00 1682856.00 66316.00

B- 2244 02.11.18 CPD-II M/s S.R. Enterprises 33/CPD-II/05.05.16 1970/126 Security 18929.00B- 2245 02.11.18 CPD-II M/s Ramit Erectors 02/CPD-II/22.03.17 1970/127 Security 38143.00B- 2249 02.11.18 BMD-II M/s P.K. Enterprises 9F 27/BMD-II/06.10.16 1999/25 Removal Fly Ash 66341.00B- 2256 14.11.18 C&ID M/s D.K. & Sons Co. 4F 03/C&ID/22.05.18 1896/65A Overhauling 23901.00B- 2257 14.11.18 C&ID M/s D.K. & Sons Co. 1 09/C&ID/15.10.18 1896/67A Reparing & Serviceing 22431.00B- 2260 15.11.18 TMD-I M/s M.K. Traders 4 07/TMD-I/17.07.17 1972/139 Overhauling 32119.00B- 2261 16.11.18 EMD-II M/s Vikas Electricals 1 17/EMD-II/17-18 2073/4 Breakdowan Maint. 384545.00B- 2267 17.11.18 CHD-III M/s Priyanka Enterprises 10 11/CHD-III/30.03.17 1853/65B O/H of LT Breker 51605.00B- 2268 17.11.18 CHD-III M/s Priya Construction 4 10/CHD-III/06.01.18 1853/66 Rewinding of LT Motor 152102.00B- 2269 17.11.18 CHD-III M/s Nosad Contractor 6 04/CHD-III/10.05.18 1853/67 Shifting o/H of LT Motor 22532.00

Page 5: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 2270 17.11.18 TMD-I M/s Usha Enterprises 3 09/TMD-I/31.01.17 1972/139 Transfer from Alist 4222/15.11.18 30815.00

B- 2271 17.11.18 ECMD-II M/s Jamuna Mahar Enterprises 2&F 35/ECMD-II/19.01.18 2014/22 M&R of Colony 348236.00B- 2272 19.11.18 CPD-II M/s Ewit Infotech 990/CPD-I/09.08.18 1925/81 Door Fram 214760.00B- 2276 27.11.18 C&ID M/s Sadan Engineering Works 3 07/C&ID-I/23.12.17 1874/119 Unloading 33817.00B- 2277 27.11.18 CHD-IV M/s Hind Udyog 4 06/CHD-IV/12.07.17 2029/ Replecement & Repairng 118672.00

B- 2278 27.11.18 ECMD-II M/s Jamuna Mahar Enterprises 2 36/ECMD-II/19.01.18 2011/35 White Washing 320753.00B- 2280 27.11.18 CPD-I M/s Technow Engineering Works 1158/CPD-I/01.11.18 1959/57 Consumable 6567.00B- 2281 27.11.18 CPD-III M/s BEML Limited 727/CPD-III/15.06.13 1833/62 Supply 18433.00B- 2282 27.11.18 CPD-III M/s BEML Limited 470/CPD-III/21.05.14 1833/63 Supply 130574.00B- 2283 27.11.18 CPD-III M/s BEML Limited 31/CPD-III/14.01.15 1833/64 Supply 8155.00B- 2284 28.11.18 CHD-I M/s Priyanka Enterprises 3 11/CHD-I/13.03.18 1872/84 Annual Contant 931512.00B- 2285 30.11.18 EMD-III M/s T.S. Enterprises 06/EMD-III/11.07.18 1994/124 Overhauling 99768.00

2696221.00 214760.00 163729.00

B- 2286 04.12.18 CPD-II M/s Mtandt Ltd 1278/CPD-II/01.12.18 1995/28 Supply 1165336.00B- 2291 07.12.18 AHD-I M/s Desein Private Limited 492/AHD-I/05.10.16 2057/59 Tr A 4339/22.12.18 0.00B- 2292 07.12.18 AHD-I M/s R.B. Engg. Works 1 04/AHD-I/23.10.18 2057/64 Tr A-4406/18.01.19 0.00B- 2293 10.12.18 ECMD-II M/s Bharti Enterprises 2 06/ECMD-II/28.04.18 2012/24 Levelling & Dresser 170041.00B- 2295 11.12.18 CPD-I M/s Mashel Electric 1049/CPD-I/09.10.18 1950/83 Supply 2774287.00B- 2296 12.12.18 EMD-III M/s Ramit Erectors 19/EMD-III/27.01.18 1994/109 Security 29125.00B- 2297 12.12.18 EMD-III M/s T.S. Enterprises 12/EMD-III/25.09.17 1994/114 Security 26920.00B- 2298 12.12.18 EMD-III M/s Ramit Erectors 04/EMD-III/20.06.17 1994/120 Security 50345.00B- 2299 13.12.18 CHD-III M/s Priyanka Enterprises 11 11/CHD-III/30.03.17 1853/69 Ranning Bill 29594.00B- 2300 13.12.18 CHD-I M/s Priyanka Enterprises 1 10/CHD-I/22.11.18 1872/98 Ranning Bill 89250.00B- 2301 15.12.18 EMD-I M/s Nosad Contractor 7 09/EMD-I/03.11.17 2055/22 Work Bill 33590.00B- 2302 15.12.18 EMD-I M/s Nosad Contractor 8 09/EMD-I/03.11.17 2055/23 Work Bill 96288.00B- 2303 15.12.18 EMD-I M/s Nosad Contractor 9 09/EMD-I/03.11.17 2055/25 Work Bill 6993.00B- 2304 15.12.18 EMD-I M/s Nosad Contractor 10 09/EMD-I/03.11.17 2055/26 Work Bill 96288.00B- 2305 15.12.18 EMD-I M/s Nosad Contractor 2 18/EMD-I/15.03.18 2055/27 Work Bill 14968.00B- 2306 15.12.18 EMD-I M/s Nosad Contractor 3 18/EMD-I/15.03.18 2055/28 Work Bill 9978.00B- 2307 15.12.18 EMD-I M/s Nosad Contractor 13 02/EMD-I/26.07.17 2055/33 Work Bill 76411.00B- 2308 15.12.18 EMD-I M/s Nosad Contractor 14 02/EMD-I/26.07.17 2055/34 Work Bill 111643.00B- 2309 15.12.18 EMD-I M/s Nosad Contractor 15 02/EMD-I/26.07.17 2055/32 Work Bill 40894.00B- 2315 17.12.18 TCID-I M/s Hindustan Thermometer 292/CPD-I/13.04.17 2066/2 Tr to R&M 0.00B- 2316 17.12.18 TCID-I M/s Electromed 1921/CPD-I/28.08.16 2066/3 Tr to R&M 0.00B- 2317 17.12.18 EMD-III M/s R P Constn Co. 1 12/EMD-III/30.11.18 1758/113 Work Bill 232036.00B- 2318 17.12.18 EMD-III M/s Krishna Enterprises 02/EMD-III/29.04.17 1756/65B Security 90666.00B- 2321 20.12.18 CPD-I M/s Shrihari Switchgear & Services

P Ltd1330/CPD-I/11.12.18 1969/51 Supply 118641.00

B- 2322 20.12.18 OGD-I M/s D K & Sons Co. 1 13/OGD-I/18-19 1750/ Work Bill 150749.00B- 2325 24.12.18 CHD-IV M/s Hind Udyog 4 03/CHD-IV/09.08.18 2029/20 Work Bill 60416.00B- 2326 29.12.18 CPD-III M/s AARSELLER TREDCO 557/CPD-III/02.11.18 1949/100 Supply 69496.00B- 2327 29.12.18 Cancel 0.00

1416195.00 1283977.00 2843783.00

B- 2329 04.01.19 CPD-I M/s Jalvind Udyog 1159/CPD-I/01.11.18 1925/ Supply 8776.00B- 2331 07.01.19 BMD-II M/s Bharat Mechenical and Stru. 7 07/BMD-II/24.08.17 1953/180 B/D Maint 63616.00B- 2334 10.01.19 EMD-I M/s Nosad Contractor 10 10/EMD-I/28.03.16 2015/20B Annual Maint 3338.00B- 2336 10.01.19 CHD-I M/s Awadesh Pateriya 04/CHD-I/07.06.18 1672/64 Security 7000.00B- 2337 10.01.19 CHD-I M/s Priyanka Enterprises 1 09/CHD-I/22.11.18 1867/60 O/H 574476.00B- 2339 11.01.19 AHD-I M/s R B Engg Works 2 04/AHD-I/23.10.18 2057/95 Opt of ESP 112810.00

Cancel

Page 6: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 2341 11.01.19 CHD-III M/s Priyanka Enterprises 12 11/CHD-III/30.03.17 1853/70 O/H LT Breaker 38066.00B- 2342 11.01.19 CHD-III M/s Nosad Contractor 7 04/CHD-III/10.05.18 1853/70 O/H LT Motor 42263.00B- 2345 16.01.19 EMD-II M/s Priya Construction 3 14/EMD-II/17-18 1932/66 Breakdown Maint 103358.00B- 2346 16.01.19 EMD-II M/s Priya Construction 1 14/EMD-II/17-18 1946/19 LT Motor 297081.00B- 2348 17.01.19 ECMD-II M/s K S & Brother 2 37/ECMD-II/29.01.18 1942/61 M&R Work 181319.00B- 2349 17.01.19 C&ID M/s R K Traders 1 12/TCID-I/19.12.18 2066/3 Supply 203040.00B- 2350 17.01.19 C&ID M/s D K & Sons 1 10/TCID-I/15.10.18 1881/73B Overhauling 25797.00B- 2351 17.01.19 C&ID M/s D K & Sons 2 09/TCID-I/15.10.18 1881/74B Reparing 22431.00B- 2352 17.01.19 EMD-III M/s Krishna Enterprises 3 15/EMD-III/22.12.17 2050/09 Reparing 180549.00B- 2355 18.01.19 CPD-I M/s A T Distributers 1427/CPD-I/28.12.18 1949/101 Supply 1435810.00B- 2357 19.01.19 CSD-I M/s Sadan Engg Works 4 07/CSD-I/23.12.17 1991/64 Unloading 10334.00B- 2358 19.01.19 TMD-I M/s Marfat Construction 5 19/TMD-I/17-18 1935/155 Supply 61420.00B- 2359 19.01.19 CPD-I M/s Kay Mohan Corporation 1403/CPD-I/19.12.18 1828/193 Supply 59479.00B- 2360 23.01.19 EMD-II M/s Vikas Electrical 1 03/EMD-III/21.05.18 1895/48 Rewinding 185661.00B- 2361 23.01.19 EMD-II M/s R L Engg 1 02/EMD-II/18-19 1880/81 Rewinding 285260.00B- 2362 23.01.19 CPD-III M/s Paramoung International 59/cpd-iii/16.01.19 1874/61 Supply 56100.00B- 2363 23.01.19 EMD-II M/s Nosad Contractor 04/EMD-II/26.06.18 1899/33B Overhauling 105220.00

2238579.00 0.00 1824625.00

B 2367 02.02.19 CHD-I M/s Aka Logistick Pvt. Ltd. 1 12/CHD-I/2018-19 2030 Fabrication & Erection 312660.00B 2368 04.02.19 ECMD-II M/s Kanha Construction 3 45/ECMD-II/21.03.18 1829/91 B M/R Rectification 76000.00B 2370 04.02.19 CHD-I M/s Priyanka Enterprises 06/CHD-I/19.08.16 1872/136 Security 189009.00B 2371 04.02.19 CHD-I M/s Priyanka Enterprises 11/CHD-I/09.09.16 1872/134 Security 169830.00B 2373 07.02.19 CHD-IV M/s Hind Udyog 06/CHD-IV/12.07.17 2029/20 Repairing 144776.00B 2377 08.02.19 ECMD-II M/s Akshat Enterprises 09/ECMD-I/13.07.17 2069/4 Security 25085.00B 2378 08.02.19 ECMD-II M/s Akshat Enterprises 14/ECMD-II/04.10.17 2069/5 Security 63512.00B 2379 08.02.19 ECMD-II M/s Akshat Enterprises 26/ECMD-II/11.12.17 2069/6 Security 27938.00B 2384 08.02.19 ECMD-II M/s Kanha Construction 24/ECMD-II/19.08.18 2070/4 M&R Colony Area 37006.00

B 2385 11.02.19 CPD-I M/s Sone Obra Enterprises 1438/CPD-I/29.12.18 1828/194-B Supply 51436.00

B 2386 11.02.19 CPD-I M/s Globe Enterprises 37/CPD-I/10.01.17 1897/115 Supply 68908.00B 2387 11.02.19 E&TD M/s Siri Energy & Carbon 24/E&TD/13.06.18 1821/85-B Detail of energy audit 1122635.00B 2388 13.02.19 ECMD-II M/s K.S. Brothers 2 29/ECMD-II/12.12.17 1845/59 M&R Colony Area 216229.00B 2389 14.02.19 BMD-II M/s Marfat Construction 7 05/BMD-II/16.08.17 1981/27 Supply 92587.00B 2390 14.02.19 BMD-II M/s Marfat Construction 8 05/BMD-II/16.08.17 1931/51 Supply 155349.00B 2391 14.02.19 CHD-III M/s Nosad Contractor 8 04/CHD-III/10.05.18 1853/72 O/H Shifting 32034.00B 2392 14.02.19 CHD-III M/s Priyanka Enterprises 13 11/CHD-III/30.01.17 1853/72-B O/H Shifting 23477.00B 2393 16.02.19 BMD-II M/s M/s Syndicate Engineer 15/BMD-II/27.07.16 2007/92 Maintenance 59059.00B 2394 16.02.19 BMD-II M/s M/s Syndicate Engineer 20/BMD-II/16-17 2007/94 Maintenance 210374.00B 2395 16.02.19 CSD-I M/s Hindustan Thermometer 292/CPD-II/13.04.17 1750/PSO Supply of flame 744016.00B 2396 20.02.19 CHD-I M/s Priyanka Enterprises 5 03/CHD-I/05.06.18 1867/67 Overhauling 164845.00B 2397 20.02.19 CHD-I M/s Priyanka Enterprises 2 09/CHD-I/22.11.2018 1867/68 Overhauling 691716.00B 2398 25.02.19 CPD-I M/s Trade India Corporation 401/CPD-I/22.06.17 1990/28 Supply 2418.00

B 2401 26.02.19 EMD-I M/s M/s Singh & Singh Electricals 69/EMD-I/15.02.19 1630/160 With Held 174485.00

B 2402 27.02.19 TMD-I M/s M/s Usha Enterprises 03/TMD-I/17-18 1973/81 Security 42513.003746177.00 834876.00 316844.00

B 2403 06.03.19 CPD-I M/s Globe Enterprises 33/CPD-I/12.05.17 1995/32 Supply 196203.00B 2404 06.03.19 CPD-I M/s Aditi Enterprises 211/CPD-I/18-19 191536 Supply 11800.00B 2405 06.03.19 CPD-III M/s BEML Limited 82/CPD-III/02.04.18 1833/65 Supply 145898.00

Page 7: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B 2407 08.03.19 TMD-I M/s S.K. Engineering Works 1 10/TMD-I/18-19 1972/164 Dismantling Fabrication 149095.00B 2408 11.03.19 CHD-I M/s S.K. Engineering Works 4 20/CHD-I/16-17 2021/05 Repairing 55756.00B 2409 11.03.19 CSD-I M/s Sadan Engineering 5 09/CSD-I/08.03.19 1968/45 Loading Unloading 47765.00B 2410 12.03.19 TMD-I M/s S.R. Construction 12/TMD-I/15-16 1935/157 Security 15030.00B 2411 12.03.19 CHD-III M/s Priya Construction 1 11/CHD-III/13.02.19 1653/74 Rewinding of Lt ML 25652.00B 2412 12.03.19 CHD-III M/s Nosad Contractor 04/CHD-III/10.05.18 1853/75 O/H Shifting 20578.00B 2413 12.03.19 EMD-II M/s Priya Construction 1 09/EMD-II/18-19 1945/38 Over Hauling 130878.00B 2414 12.03.19 EMD-II M/s Vikash Electrical 2 12/EMD-II/01.12.17 2073/5 Breakdown Maintenance 37602B 2415 13.03.19 CAMD-I M/s Harsh & Brothers 01/CAMD-I/18.04.16 1909 Security 18858.00B 2416 13.03.19 CAMD-I M/s Harsh & Brothers 02/CAMD-I/18.04.16 1909/30-A Security 29989.00B 2419 18.03.19 BMD-II M/s Syndicate Engineering 20/BMD-II/16-17 1963/55-B Security 99035.00B 2420 18.03.19 BMD-II M/s Syndicate Engineering 12/BMD-II/16-17 1963/55-B Security 58680.00B 2421 18.03.19 BMD-II M/s Syndicate Engineering 16/BMD-II/16.08.16 1963/55-A Security 94900.00B 2422 18.03.19 CSD-I M/s Harish Chandra Kushwaha 02/CSD-I/21.04.18 1947/140 Security 6624.00B 2424 25.03.19 CPD-II M/s T.S. Enterprises 5 15/CPD-II/07.02.18 1939/82 Annual Maintenance 79122.00B 2425 26.03.19 CAMD-I M/s Universal Engineering Works 1 07/CAMD-I/20.12.18 2061/15-B Fabrication & Repairing 87479.00B 2426 26.03.19 C&ID-I M/s D.K. & Sons 2 10/C&ID-I/15.10.18 2066/5 Overhauling & Reparing 28732.00B 2427 26.03.19 C&ID-I M/s D.K. & Sons 1 14/C&ID-I/31.12.18 2066/6-B Repair & Replacement 17938.00B 2428 26.03.19 C&ID-I M/s D.K. & Sons 3 09/C&ID-I15.10.18 2066/6 Repairing & Servicing 18646.00

Total 491156.00 885104.00 0.00

B 1 01.04.19 CPD-I M/s A.K. Agencies 163/CPD-I/29.01.19 1991/65 Bearing Supply 107616B 2 01.04.19 EMD-III M/s Sadan Engineering Works 2 04/EMD-III/25.06.18 2048/10-A Overhauling 31067

B 3 01.04.19 CPD-II M/s Giriraj Hydraulics Pvt. Ltd. 541/CPD-II/25.10.18 1954/115 Supply 0

B 4 12.04.19 CPD-I M/s Trade India Corporation 4 395/CPD-I/22.06.17 1874/178 Timken Torr 398351B 5 12.04.19 CHD-III M/s Priya Construction 5 10/CHD-III/06.01.18 1853/68 Rewinding LT Motor 2950B 6 12.04.19 CHD-I M/s Priyanka Enterprises 14 11/CHD-III/30.01.17 1853/77 O/H LT Braker 23168B 7 12.04.19 CAMD-I M/s Usha Enterprises 6 03/CAMD-I/17-18 1926/53-B Overhauling 46390B 8 12.04.19 CAMD-I M/s Usha Enterprises 1 08/CAMD-I/07.03.19 1926/54-B Re-arrangement 47922B 9 12.04.19 CAMD-I M/s Usha Enterprises 7 03/CAMD-I/17-18 1926/55 Overhauling 61568

B 10 12.04.19 CPD-III M/s Adarsh Electronics & Electricity 558/CPD-III/02.11.18 1949/104 Pin Insulator 2124

B 11 12.04.19 CPD-III M/s Adarsh Electronics & Electricity 558/CPD-III/02.11.18 1949/103 Pin Insulator 105244

B 12 12.04.19 BMD-II M/s Bharti Enterprises 1 16/BMD-II/23.01.19 1931/52 Up Keeping 110729B 13 12.04.19 BMD-II M/s S.K. Engineering Works 3 06/BMD-II/16.08.17 1931/53 Repairing 107958B 14 12.04.19 CPD-II M/s Auto Service Equipment 66-CPD-II/06.11.18 1834/84 Compressor 184585

B 15 12.04.19 EMD-II M/s Electrical & Instrument Engineer 1 16/EMD-II/18-19 2036/29 Up Keeping 100250

B 16 12.04.19 CPD-II M/s BHEL 1889/CPD-II/12.12.14 1828/195 Pipe Coller 86063B 17 12.04.19 CSD-I M/s Amit Kumar 01/CSD-I/15.05.17 1968/46 Security 6480B 19 15.04.19 CSD-I M/s Satyam Weighing System 118/CSD-I/16.02.18 1716/148 Service Maintenance 22420B 20 15.04.19 CAMD-I M/s Usha Enterprises 5 03/CAMD-I/11-16 2062/17 O/H 173661B 22 15.04.19 CHD-II M/s Kanha Construction 1 12/CHD-II/20.11.17 2062/32-B Uprooting 157708B 23 15.04.19 CHD-II M/s S.K. Engineering Works 1 13/CHD-II/07.12.18 2062/30 Proxding grouting 303227B 24 15.04.19 CHD-I M/s Hind Udyog 1 19/CHD-I/18-19 2002/22 Repairing 298718B 25 15.04.19 CHD-I M/s Priyanka Enterprises 6 03/AHD-I/05.06.18 1867 Overhauling 449490B 26 15.04.19 CHD-III M/s Amit Shrivas 13/CHD-III/14.03.18 1853 Security 7007B 27 15.04.19 CHD-III M/s Insturment Care Group 07/CHD-III/01.08.17 1938 Security 15372B 28 15.04.19 CHD-III M/s Amit Shrivas 07/CHD-III/18.09.18 1853 Security 7007

Transferred to A List 439A/29.07.19

Page 8: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B 29 15.04.19 CPD-I M/s Elecon 370/CPD-I/11.03.19 1834/83 Supply 1855244B 30 15.04.19 CPD-III M/s Auto Service Equipment 566/CPD-III/16.11.18 1834/81 Supply 266466B 31 16.04.19 C&ID-I M/s A.K. Construction 03/C&ID-I/22.04.17 1851/75-B Security 288876B 32 18.04.19 CPD-I M/s Laxmi Trading Company 1435/CPD-I/29.12.18 1827/175 Bearing 5931B 33 18.04.19 CPD-I M/s Sone Obra Enterprises 1438/CPD-I/29.12.18 1827/176 Bearing 39820B 34 18.04.19 CPD-I M/s Sone Obra Enterprises 160/CPD-I/29.01.19 1827/177 Bearing 88997B 35 18.04.19 EMD-II M/s Priya Construction 2 09/EMD-II/18-19 1945/42 O/H 97098B 36 18.04.19 EMD-II M/s Priya Construction 1 15/EMD-II/18-19 1946/27 O/H 83500B 37 18.04.19 EMD-II M/s Priya Construction 1 15/EMD-II/18-19 1932/71 O/H 78280B 38 18.04.19 EMD-III M/s Ramit Erectors 1 16/EMD-III/11.03.14 2050/13 Improvement in Protech 317524B 39 18.04.19 EMD-III M/s Vikas Electricals 1 19/EMD-III/29.03.17 2050/14 O/H 128259B 41 20.04.19 CHD-I M/s BEML Limited 1 139/CHD-I/11.03.19 1867/81 O/H 2245600B 42 20.04.19 CPD-I M/s J. Umashankar & Co. 164/CPD-I/29.01.19 1948/82 Bearing 361401B 43 20.04.19 CHD-II M/s M.K. TRADERS 3 11/CHD-II/18-19 3092/6 Maintenance 10224B 45 24.04.19 EMD-II M/s PRIYA CONSTRUCTION 1 14/EMD-II/28.05.18 2013/8-A Energy Breakdown 136966B 46 25.04.19 CHD-III M/s S.R. CONSTRUCTION 02/CHD-III/07.05.18 2046/9 Security 24387B 47 26.04.19 EMD-I M/s Nosad Contractor 1 17/EMD-I/27.10.18 2045/12 Annual Maintenance 35549

B 48 26.04.19 EMD-I M/s Nosad Contractor 19/EMD-I/03.11.16 2045/13 Shifting of Venous COPG 20818

B 49 27.04.19 OGD-I M/s Maa Shakti Enterprises 3 12/OGD-I/15.10.18 2082/16 B/D Maintenance 106844Total 5547017 726530 2775312

B 51 02.05.19 ECMD-II M/s Jamuna Mehar 1 33/ECMD-II/14.11.18 1846/81 M&R Colony Area 345521B 52 03.05.19 CPD-I M/s RSP Over Seas Pvt. Ltd. 396/CPD-I/22.06.17 1991/66 Bearing 278358B 53 03.05.19 CPD-I M/s Laxmi Treding Company 1435/CPD-I/29.12.18 1874/129 Bearing 1997B 54 07.05.19 EMD-II M/s R.L. Engineering 2 02/EMD-II/18-19 1880/85 O/H Rewinding 96780B 55 08.05.19 EMD-I M/s ABB India Ltd. 265/EMD-I/15.06.18 2055/38 Overhauling 100000B 58 09.05.19 ECMD-II M/s Jamuna Mehar Enterprises 3 36/ECMD-II/19.10.18 2011/52 White Washing 338264B 59 09.05.19 ECMD-II M/s K.S. & Brothers 228/ECMD-II/23.02.19 1930/94 Security 130452B 60 09.05.19 CPD-II M/s K.S. & Brothers 19/CPD-II/31.05.16 1930/94-B Security 183882B 61 09.05.19 CHD-II M/s Aka Logistics Pvt. Ltd. 02/CHD-II/24.04.19 2093/4 Security 208905B 62 14.05.19 CPD-I M/s Commercial Enterprises 1344/CPD-I/10.01.18 1828/196 Bearing 52286B 63 14.05.19 EMD-I M/s Synergy System & Solution 597/EMD-I/01.11.17 2045/14 Supply 88500B 64 14.05.19 EMD-I M/s Nosad Contractor 11 09/EMD-I/03.11.17 2045/15 Maintenance 3066B 65 14.05.19 TMD-I M/s Usha Enterprises 1 14/TMD-I/18-19 1935/159 Complete Re-tubing 148401B 66 14.05.19 EMD-III M/s S.R. Construction 10/EMD-III/25.07.16 2049/9 Security 33998B 67 14.05.19 EMD-III M/s S.R. Construction 13/EMD-III/07.10.17 2049/9 Security 31470B 73 21.05.19 ECMD-II M/s Kanha Construction 24/ECMD-II/09.08.18 2070 Security 28867B 74 23.05.19 BMD-II M/s Bharti Enterprises 2 16/BMD-II/23.01.19 1999/32 Up Keeping 86434B 76 24.05.19 CPD-I M/s Laxmi Treding Company 161/CPD-I/29.01.19 1799/121 Bearing 36044B 78 25.05.19 EMD-I M/s Nosad Contractor 09/EMD-I/03.11.17 2044/9 Breakdown Maintenance 44649B 79 25.05.19 E&TD M/s K.S. & Brothers 1 32/E&TD/20.01.19 1992/64 Supply 24023B 80 27.05.19 CPD-III M/s R.L. Rasayan Udyog 42/CPD-II/11.01.19 1995/42-B Caustic Soda 736678B 81 27.05.19 CPD-I M/s Jain Mill Stone Pvt. Ltd. 1395/CPD-I/19.12.18 1945/45 Make Gland Packing 161061B 82 27.05.19 CPD-I M/s Jalvid Udyog 209/CPD-I/07.02.19 1945/48 Nipple of Oil 3540B 83 27.05.19 CSD-I M/s Sadan Engineering Works 6 09/CSD-I/08.03.19 1990/30 Shifting 22378B 85 28.05.19 ECMD-II M/s Jamuna Mehar 1 07/ECMD-II/06.04.19 1777/96-B M&R Colony Area 178913B 86 28.05.19 CPD-I M/s Thermoserve Corporation 1425/CPD-II/10.12.18 1828/192 Supply 1149192

Page 9: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

Total 2722198 356664 1434797

B 88 01.06.19 EMD-I M/s Nosad Contractor 2 17/EMD-I/17.10.18 1987/98 Maintenance 16071B 89 01.06.19 EMD-I M/s Nosad Contractor 13 09/EMD-I/03.11.17 1987/100 Maintenance 96288B 90 01.06.19 EMD-I M/s Nosad Contractor 3 17/EMD-I/17.10.18 1987/102 Maintenance 2984B 91 10.06.19 CPD-I M/s BEML Limited 556/CPD-I/15.05.19 1820/405 Misc & Advance 4559815B 92 14.06.19 CAMD-I M/s Priya Construction Co. 3 14/CAMD-I/13.02.19 1853/80 Rewinding 232580B 93 14.06.19 AHD-I M/s Zenith Engineers 06/AHD-I/25.12.17 2032/199 Security 116115B 94 14.06.19 TMD-I M/s Marfat Construction 1 01/TMD-I/2019-20 1972/181 Insulation Work 77807B 95 15.06.19 EMD-III M/s T.S. Enterprises 06/EMD-III/01.07.18 2045/17-B Overhauling 187143B 96 19.06.19 CPD-II M/s Ardee Trading Company 271/CPD-II/18.03.19 1954/118 Track Roller 823148B 97 19.06.19 CPD-I M/s Jalvid Udyog 669/CPD-I/03.06.19 1995/49 Fabric Tripal 311933B 98 19.06.19 CPD-I M/s Srikant 04/CPD-II/26.11.18 1654/117 Security 6969B 101 20.06.19 C&ID-I M/s D.K. & Sons 10/C&ID-I/15.10.18 2066/9 Overhauling 39047B 102 20.06.19 C&ID-I M/s D.K. & Sons 2 14/C&ID-I/31.12.18 2066/9 Repairing 37939B 103 20.06.19 C&ID-I M/s D.K. & Sons 09/C&ID-I/15.10.18 2066/10 Repairing 13339B 104 26.06.19 CPD-II M/s Ardee Trading Company 271/CPD-II/18.03.19 1833/70 Track Roller 330953B 106 26.06.19 ECMD-II M/s Ashish Enterprises 13/ECMD-II/04.10.17 1960/27 Security 28230B 107 26.06.19 ECMD-II M/s Vijay Kumar Gupta 1 67/ECMD-II/14.03.19 3090/28 Construction 311329B 108 26.06.19 CHD-IV M/s Hind Udyog 6 03/CHD-IV/18-19 2029/23 Fabrication 85028B 109 26.06.19 S&TD M/s Laxmi Narayan 48/S&TD/24.01.18 1836/84 Security 4200B 110 26.06.19 S&TD M/s Electrical & Instrument 38/S&TD/06.11.17 1836/84 Security 53880B 111 26.06.19 S&TD M/s Electrical & Instrument 29/S&TD/06.10.16 1836/84 Security 51810B 112 27.06.19 CHD-I M/s Priyanka Enterprises 7 03/CHD-I/05.06.18 1867/90 Overhauling 234477

Total 3061270 4559815 0

B 113 01.07.19 EMD-I M/s Awasthi Motor Winding Works 5 33/EMD-I/24.09.15 1688/166 Provisional 310303

B 114 01.07.19 EMD-I M/s Punjab Electrical Industries 3 12/EMD-I/05.12.12 1790/107 Complete Rewinding 159607B 115 01.07.19 EMD-I M/s Singh & Singh Electrical 3 03/EMD-I/06.07.18 1793/87-A Repair & Rewinding 27013B 116 01.07.19 CPD-I M/s Trupati Industries Agency 1 739/CPD-I/19.06.19 1793/88-B Retrofitting Testing 229999B 117 04.07.19 CPD-I M/s Aditi Enterprises 613/CPD-I/18-19 1897/122 Battery for Diesel 33984B 118 04.07.19 EMD-II M/s Vikas Electrical 2 03/EMD-II/18-19 1895/51 Rewinding 101913B 119 04.07.19 EMD-II M/s Electrical & Instrument 17/EMD-II/14.03.18 1800/130 Security 32380

B 120 04.07.19 BMD-II M/s Bharat Mechanical & Structure 07/BMD-II/24.08.17 2000/33-B Breakdown 66568

B 121 04.07.19 BMD-II M/s Bharti Enterprises 3 16/BMD-II/23.01.19 2000/35-B Up Keeping 79195

B 122 04.07.19 BMD-II M/s Bharat Mechanical & Structure 1 04/BMD-II/06.06.19 2000 B/D Maintenance 105086

B 123 04.07.19 BMD-II M/s Puneet Construction 1 10/BMD-II/28.12.18 1962/115 Lifting & Shifting 183483B 124 04.07.19 TMD-I M/s M.K. Traders 5 07/TMD-I/17-18 1973/88 Overhauling 85473B 125 04.07.19 TMD-I M/s Zenith Engineers 3 11/TMD-I/14-15 1973/89 Operation 50315B 126 05.07.19 CHD-I M/s Hind Udyog 2 19/CHD-I/18-19 2002/25 Repairing 144899B 127 05.07.19 CSD-I M/s Satyam Weighting System 302/CSD-I/01.04.19 1575/182 Service Maintenance 9750

B 128 10.07.19 ECMD-II M/s R.P. Construction 1 27/ECMD-II/12.10.18 1877/70-BProviding & Sanitation (T/F to A-List 372/12.07.19)

0

Page 10: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B 129 12.07.19 CPD-II M/s V.K. Pump Industries 456/CPD-II/31.05.19 1874/139 Metering Pump 101480B 130 12.07.19 CHD-III M/s Priyanka Enterprises 15 11/CHD-III/30.03.17 1853/81 O/H 44098B 131 12.07.19 CHD-III M/s S.R. Construction 1 02/CHD-III/30.05.19 1853/81 B/D Maintenance 74800B 132 12.07.19 CHD-III M/s Priya Construction 3 11/CHD-III/13.12.18 1853/83-B Rewinding Motor 20737B 133 12.07.19 ECMD-II M/s K.S. & Brothers 1 52/ECMD-II/02.02.19 1942/95 M/R Inter Water 301843B 134 16.07.19 EMD-II M/s R.L. Engineering 3 02/EMD-II/18-19 1880/89 O/H 43790B 135 17.07.19 AHD-I M/s S. Kumar 04/AHD-I/17-18 1996/193 Security 12000B 136 17.07.19 AHD-I M/s S. Kumar 02/AHD-I/17-18 1996/197 Security 7045B 137 17.07.19 AHD-I M/s SGL Engineering Industries 01/AHD-I/17-18 1996/194 Security 12000B 138 17.07.19 AHD-I M/s SGL Engineering Industries 06/AHD-I/18-19 1996/195 Security 12000B 139 17.07.19 AHD-I M/s SGL Engineering Industries 05/AHD-I/17-18 1996/197 Security 7045B 140 17.07.19 AHD-I M/s SGL Engineering Industries 02/AHD-I/25.04.18 1996/198 Security 7045B 141 17.07.19 AHD-I M/s SGL Engineering Industries 05/AHD-I/15.07.19 1996/199 Security 7046B 142 17.07.19 C&ID-I M/s Manoj Singh Rajpoot 05/C&ID-I/12.07.18 2051/20-A Security 8235B 143 17.07.19 CHD-IV M/s Hind Udyog 06/CHD-IV/12.07.19 2029/25-B Security 84991B 144 17.07.19 AHD-I M/s Zenith Engineers 1 05/AHD-I/12.07.19 2057/129 Breakdown Maint. 51054B 145 19.07.19 ECMD-I M/s Puneet Construction 2 12/ECMD-I/18.01.19 2052/106 Jungle Cleaning 118398B 147 19.07.19 ECMD-I M/s Ravindra Singh 1 03/ECMD-I/14.05.19 2052/110 Civil Works 308246B 148 20.07.19 ECMD-II M/s Jamuna Mehar Enterprises 07/ECMD-II/06.04.19 1977/97 Security 15162B 149 20.07.19 ECMD-II M/s Jamuna Mehar Enterprises 35/ECMD-II/19.01.18 1977/98 Security 50993

B 151 23.07.19 BMD-IIM/s Bharat Mechanical & Structure 19/BMD-II/03.08.16 1953/185 Security 128996

B 152 23.07.19 BMD-II M/s R.P. Construction Co. 26/BMD-II/23.02.16 1953/183 Security 29214B 153 23.07.19 BMD-II M/s R.P. Construction Co. 39/BMD-II/21.01.17 1953/184 Security 27681

B 154 24.07.19 CHD-IVM/s Lokenath Construction Pvt.

Ltd.1 09/CHD-IV/19-20 2029/24-B Repairing 7 Damage 346566

B 155 25.07.19 EMD-I M/s Nosad Contractor 7 19/EMD-I/03.11.16 1688/152 Shifting 19031B 156 25.07.19 EMD-I M/s Nosad Contractor 8 19/EMD-I/03.11.16 1688/153 Shifting 12429B 157 25.07.19 EMD-I M/s Nosad Contractor 9 19/EMD-I/03.11.16 1688/154 Shifting 22708B 158 25.07.19 EMD-I M/s Nosad Contractor 3 08/EMD-I/09.10.16 1688/156 Preventive Maintenance 64458B 159 25.07.19 EMD-I M/s Nosad Contractor 4 08/EMD-I/09.10.16 1688/157 Preventive Maintenance 3050B 160 25.07.19 EMD-I M/s Nosad Contractor 5 08/EMD-I/09.10.16 1688/158 Preventive Maintenance 10363B 161 25.07.19 EMD-I M/s Nosad Contractor 11 10/EMD-I/28.03.16 1688/159 Cable Salvaging 1670B 162 25.07.19 EMD-I M/s Nosad Contractor 12 10/EMD-I/28.03.16 1688/160 Cable Salvaging 20941B 163 25.07.19 EMD-I M/s Nosad Contractor 13 10/EMD-I/28.03.16 1688/161 Cable Salvaging 14820B 164 27.07.19 ECMD-II M/s Shiv Mahadev Engineering 32/ECMD-II/18.01.18 2070/6 Security 28923B 165 27.07.19 ECMD-II M/s Shiv Mahadev Engineering 25/ECMD-II/22.09.18 2070/8 Security 29222B 166 27.07.19 ECMD-II M/s Shiv Mahadev Engineering 12/ECMD-II/06.08.18 2070/12 Security 29710B 167 29.07.19 BMD-II M/s Bharti Enterprises 4 16/BMD-II/23.01.19 1931/57 Up Keeping 42918B 168 29.07.19 CHD-I M/s Awadesh Pateria 08/CHD-I/22.11.18 1867/97 Security 5000B 169 29.07.19 CHD-I M/s Priyanka Enterprises 5 11/CHD-I/13.03.18 1867/98 Overhauling 249099B 170 30.07.19 CPD-II M/s Thermoserve Corp. 635/CPD-II/03.07.19 2095/4 Coupling 300320B 171 31.07.19 CAMD-I M/s Universal Engineering 1 13/CAMD-I/12.03.19 2061/25 Fabrication 184958

Total 4044269 0 135464

B 172 02.08.19 CPD-I M/s T.S. Enterprises 925/CPD-I/06.07.19 2098/2 Supply 159045

Page 11: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B 173 02.08.19 ECMD-II M/s Balram Engineers 1 54/ECMD-II/02.02.19 2011/63 Annual M&R 241871B 175 02.08.19 ECMD-II M/s Kanha Construction 1 01/ECMD-II/01.04.19 2011/66-B M&R Building 226173B 177 03.08.19 C&ID-I M/s D.K. & Sons 3 14/C&ID-I/31.12.18 2066/12 Cutting & Welding 28031B 178 07.08.19 BMD-II M/s MAK Construction 6 32/BMD-II/06.10.16 1708/130 Breadown Maintenance 162405B 179 08.08.19 TMD-I M/s Pawan Kumar 04/TMD-I/29.07.19 1738/58 Security 5220B 180 08.08.19 TMD-I M/s Pawan Kumar 15/TMD-I/18-19 1738/58 Security 6552

B 181 09.08.19 CPD-I M/sRaviraj Engineering Corporation

1109/CPD-I/25.07.19 1874/140 Supply 1915560

B 182 13.08.19 CPD-II M/s Bearing Engineering 525/CPD-II/08.05.19 2098/5 Supply 603680B 183 13.08.19 EMD-II M/s R.P. Construction 13/EMD-II/04.01.19 2036/36 Security 2090B 185 17.08.19 CSD-I M/s Satyam Weighing System 602/CSD-I/26.07.19 1575/183 Repairing 61360B 186 17.08.19 ECMD-II M/s Akram Enterprises 3 11/ECMD-II/01.06.19 1939/86 Servicing 3073B 187 17.08.19 ECMD-II M/s Pooja Traders 1 22/ECMD-II/26.06.19 1961/21 M&R 337242

B 188 19.08.19 CHD-II M/s SCHNCK Process India Ltd. 01/CHD-II/23.04.19 2038/144 AMC 144550

B 189 20.08.19 ECMD-II M/s Ashish Enterprises 1 03/ECMD-II/03.04.19 2013/17-B M&R Colony Area 502955B 190 20.08.19 ECMD-II M/s Sultan Singh 39/ECMD-II/12.12.18 1877/69 Security 8967B 191 20.08.19 ECMD-II M/s Sultan Singh 01/ECMD-II/19.04.18 1877/69-B Security 8933B 192 20.08.19 ECMD-II M/s Kanha Construction 1 26/ECMD-II/18.07.19 1845/64-B M&R Colony Area 219480B 193 20.08.19 ECMD-II M/s Sadan Engineering Works 1 17/ECMD-II/10.06.19 1789/92 Removal of Chocking 190090B 194 20.08.19 ECMD-II M/s Sadan Engineering Works 1 64/ECMD-II/06.03.19 1789/93 Cleaning of Road 305424B 195 20.08.19 ECMD-II M/s Goverdhan Contractors 1 07/ECMD-II/25.06.19 2011/67-B Maintenance of Park 150911B 196 20.08.19 ECMD-II M/s Vijay Kumar Gupta 2 45/ECMD-II/19.01.19 3091/20 M&R Colony Area 445652B 197 20.08.19 ECMD-II M/s Sadan Engineering Works 1 29/ECMD-II/30.07.19 3091/ Premansoon Cleaning 317002B 198 21.08.19 EMD-II M/s Vikas Electrical 08/EMD-II/13.06.19 1945/43 Security 27445B 199 21.08.19 EMD-II M/s Priya Construction 13/EMD-II/20.01.18 1945/43 Security 28004B 200 21.08.19 EMD-II M/s Priya Construction 26/EMD-II/29.12.16 1932/74 Security 28545B 201 21.08.19 EMD-II M/s Priya Construction 14/EMD-II/20.01.18 1932/75 Security 24914B 202 21.08.19 EMD-II M/s Priya Construction 14/EMD-II/20.01.18 1946/28 Security 28175B 203 22.08.19 OGD-I M/s D.K. & Sons 1 06/OGD-I/01.08.19 2081/41 Dismanting 93185B 204 22.08.19 CAMD-I M/s Maa Shakti Enterprises 1 14/CAMD-I/13.03.19 2062/29-B Conditioning of Paint 178077

B 205 22.08.19 CHD-II M/s Rohini Transport 1 06/CHD-II/02.08.19 1958/161 Breadown Maintenance 323910

B 206 22.08.19 EMD-I M/s Nosad Contractor 7 02/EMD-I/04.01.16 1688/163 O/H 66546B 207 22.08.19 EMD-I M/s Nosad Contractor 1 18/EMD-I/27.10.18 1688/165 O/H 2568B 208 22.08.19 EMD-I M/s Nosad Contractor 6 19/EMD-I/03.11.16 1688/151 Shifting 41451B 209 24.08.18 TMD-I M/s Usha Enterprises 06/TMD-I/17-18 2025/26 Security 78528B 210 24.08.18 TMD-I M/s Zenith Engineers 01/TMD-I/06.06.18 2025/25-A Security 9938

B 211 26.08.19 TMD-I M/s Zenith Engineers 4 11/TMD-I/14-15 2028/18Operation Annual Maintenance 42890

B 212 27.08.19 CHD-I M/s Priyanka Enterprises 8 03/CHD-I/05.06.18 1867/99 Annual Contract 125430B 213 27.08.19 CPD-I M/s Glove Enterprises 331/CPD-I/12.05.17 2097/6 Measurment Book 4794

4472381 0 2678285

Page 12: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B 214 02.09.19 C&ID-I M/s D.K. & Sons 1 03/C&ID-I/24.06.19 2066/13 Repairing 42124B 215 03.09.19 ECMD-III M/s Amit 01/ECMD-III/16.07.18 1918/14 Security 7047B 216 04.09.19 EMD-II M/s Nosad Contractor 2 04/EMD-II/18-19 1899/36 O/H 69990B 217 04.09.19 CPD-I M/s Supath Engineering 1248/CPD-I/08.08.19 1948/86 Supply 566414B 218 04.09.19 ECMD-II M/s Vijay Kumar Gupta 1 33/ECMD-II/21.08.19 3090/65 Deployment of Park 316941B 219 04.09.19 ECMD-II M/s Jamuna Mehar Enterprises 1 48/ECMD-II/28.01.19 2012/39 White Washing 335439B 220 05.09.19 CPD-II M/s Uniflow Marketing 863/CPD-II/19.08.19 1991/69 Bearing 2449310B 221 05.09.19 CPD-II M/s Thermoserve Corpration 873/CPD-II/21.08.19 1991/70 Coupling 376750

B 222 05.09.19 ECMD-II M/s Vijay Kumar Gupta 1 19/ECMD-II/19.06.19 3090/66Water Supply (Tranf. To A-List 577-A/13.09.19) 0

B 223 13.09.19 BMD-II M/s Instrument Care Group 02/BMD-II/19-20 1785/83 Security 29188

B 224 13.09.19 ECMD-I M/s Rambali Singh 1 11/ECMD-I/13.05.19 1879/36-B Construction 3438303970619 0 566414

Gross Total 38816817.00 12022026.00 12835895.00

Dy. Chief Accounts Officer

Page 13: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

Supply PI

B- 576 18.11.15 CSD-II M/S Jain Mill Stores Pvt Ltd 1055/CPD-I/O-1/18.06.15 376/48 13.07.15 Supply 126046.00B- 584 18.11.15 CSD-II M/S Jalvid Udyog 1160/CPD-I/O-1/02.07.15 376/51A 14.07.15 Supply 15960.00

TOTAL 0.00

B- 685 11.01.16 CSD-II M/S Amco Industries 2302/CPD-II/O-1/14.12.15 386/144 23.12.15 Supply 457288.00B- 701 21.01.16 CSD-II M/S Kay Mohan Corpn 1535/CPD-I/O-1/03.09.15 411/41 19.11.15 Supply 44940.00B- 708 21.01.16 CSD-II M/S Hitachi Hi Rel Power Electronics Pvt Ltd 1960/CPD-I/O-1/11.12.15 411/46 14.01.16 Supply 368112.00

TOTAL 0.00

B- 756 02.02.16 CSD-II M/S Indian Rubber Products 1124/CPD-I/O-1/18.06.15 267/165 05.01.16 Supply 207844.00B- 757 02.02.16 CSD-II M/S Indian Rubber Products 1124/CPD-I/O-1/18.06.15 267/167 05.01.16 Supply 41976.00

TOTAL 0.00

B- 821 02.03.16 CSD-II M/S Jalvid Udyog 58/CPD-I/11.01.16 341/68-69 Supply 51786.00B- 844 28.03.16 CSD-II M/S Durg India Intrumentation (P) Ltd 141/CPD-I/O-1/05.01.16 411/47 26.02.16 Supply 255273.00B- 847 28.03.16 CSD-II M/S Amco Industries 2808/CPD-II/O-1/29.02.16 386/151 01.03.16 Supply 60767.00B- 848 28.03.16 CSD-II M/S Amco Industries 2807/CPD-II/O-1/29.02.16 386/150 01.03.16 Supply 1001920.00

TOTAL 0.00

B- 119 02.05.16 CSD-II M/S MEKASTER Engineering Service 110/C&ID-III/28.03.16 445/28 04.04.16 Supply 302897.00B- 166 23.05.16 CSD-II M/S Pix Transmission Ltd 1467/CPD-I/O-1/19.08.15 267/186 14.05.16 Supply 144462.00B- 167 23.05.16 CSD-II M/S Aditya Enterprises 2895/CPD-II/O-1/10.03.16 267/187 23.03.16 Supply 229572.00

TOTAL 0.00

B- 196 01.06.16 CSD-II M/S Amco Industries 2995/CPD-II/O-1/29.03.16 386/156 07.04.16 Supply 386921.00B- 197 01.06.16 CSD-II M/S Dyanmic Power Service 2996/CPD-II/O-1/29.03.16 386/157 08.04.16 Supply 1307218.00B- 208 08.06.16 CSD-II M/S Indian Rubber Product 71/CPD-I/O-1/13.01.16 341/78 26.02.16 Supply 53187.00B- 222 21.06.16 CSD-II M/S Atlas Copco India Ltd 1579/CPD-I/O-1/14.09.15 445/31 02.06.16 Supply 374885.00B- 236 28.06.16 CSD-II M/S Kay Mohan Corporation 853/CPD-I/O-1/13.05.16 466/12 06.06.16 Supply 13440.00B- 237 28.06.16 CSD-II M/S K.S. & Brothers 529/CPD-I/O-1/04.04.16 411/51 15.06.16 Supply 14259.00B- 238 28.06.16 CSD-II M/S K.S. & Brothers 722/CPD-I/O-1/03.05.16 411/52 11.05.16 Supply 128069.00B- 240 28.06.16 CSD-II M/S Aditya Enterprises 723/CPD-I/O-1/03.05.16 411/53 11.05.16 Supply 240335.00B- 241 28.06.16 CSD-II M/S K.S. & Brothers 530/CPD-I/O-1/04.04.16 411/52 15.06.16 Supply 7330.00

TOTAL 0.00

B- 260 13.07.16 CSD-II M/S Anurag Engg Works 854/CPD-I/O-1/13.05.16 450/14 25.05.16 Supply 15294.00B- 261 13.07.16 CSD-II M/S Anurag Engg Works 968/CPD-I/O-1/25.05.16 450/17 10.06.16 Supply 165120.00

TOTAL 0.00

B- 322 10.08.16 CSD-II M/S L.D.R.Engineers 592/CPD-II/O-1/13.06.16 426/46 07.07.16 Supply 691461.00B- 323 10.08.16 CSD-II M/S R.S.P. overseas pvt. Ltd. 489/CPD-1/O-1/28.03.16 426/47 10.04.16 Supply 44370.00B- 343 16.08.16 CSD-II M/S Indian Rubber Product 1270/CPD-I/O-1/20.06.16 376/57 23.06.16 Supply 4081.00B- 346 16.08.16 CSD-II M/S Industrial Sales & Supply Agency 821/CPD-I/O-1/10.05.16 376/57 18.05.16 Supply 57887.00B- 348 16.08.16 CSD-II M/S Jalvid Udyog 1510/CPD-I/O-1/13.07.16 376/58 25.07.16 Supply 150652.00B- 349 16.08.16 CSD-II M/S Jalvid Udyog 1510/CPD-I/O-1/13.07.16 376/58 25.07.16 Supply 119400.00B- 354 22.08.16 CSD-II M/S Simplex Switchgear Pvt.Ltd. 1438/CPD-I/O-1/30.06.16 237/187 04.07.16 Supply 11733.00B- 357 22.08.16 CSD-II M/S Uttam Sales Carporation 1165/CPD-I/O-1/13/06.16 237/188 17.06.16 Supply 95785.00B- 361 22.08.16 CSD-II M/S S.S.Jayaswal & Brothers 1437/CPD-I/O-1/30.06.16 237/191 04.08.16 Supply 195894.00B- 382 30.08.16 CSD-II M/S Authentic System & Technologies 587/CPD-III/13.06.16 449/17 02.08.16 Supply 284747.00B- 386 30.08.16 CSD-II M/S Amco Industries 562/CPD-II/OI/09.06.16 374/150 18.06.16 Supply 666436.00

TOTAL 0.00

Fund Reserved Amount

2X210 MW Parichha Thermal Extension Project, Parichha (Jhansi)B

Description of Work/Supply WorkBill No & Date

Reg Inde

x

Date Name Of Division

Name of Firm RAB

FUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

Material/SparesAgr/PO/LOI/WO and Dt MB NO./Page No/

Date of Measur.

G:\210MW\2019-20\09-19\Liab_15.09.19_210MW 1

Page 14: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 400 07.09.16 CSD-II M/S K.S.& Brothers 1272/CPD--I/OI 20.06.16 411/58 23.06.16 Supply 799915.00B- 402 07.09.16 CSD-II M/S Uttam Sales Carporation 513/CPD--II/OI 01.06.16 411/59 05.06.16 Supply 205819.00B- 403 07.09.16 CSD-II M/S Siddhi Vinayak Engg. 843/CPD--I/OI 13.05.16 411/61 07.06.16 Supply 229863.00B- 404 07.09.16 CSD-II M/S Limitorque India Limited 1076/CPD--I/OI 27.09.14 411/63 22.07.16 Supply 2229.00B- 405 07.09.16 CSD-II M/S Ashbond Engineers (Pvt) Ltd. 1170/CPD--I/OI 15.10.14 411/65 09.08.16 Supply 15300.00B- 409 07.09.16 CSD-II M/S Javid udyog 1761/CPD--I/OI 04.08.16 411/66 27.08.16 Supply 143219.00B- 434 16.09.16 CSD-II M/S Swastik Enterprises 1434/CPD-I/O-I/30.06.16 445/39 02.08.16 Supply 31646.00B- 437 16.09.16 CSD-II M/S K.S.& Brothers 1821/CPD-I/O-I/12.08.16 445/41 18.08.16 Supply 587062.00B- 445 20.09.16 CSD-II M/S Veerangna Enterprises 662/CPD--II/O-I/ 22.06.16 406/38 23.07.16 Supply 382200.00B- 450 20.09.16 CSD-II M/S OM Shri Sai Ram Global Inpex 710/CPD--II/O-I/ 30.06.16 466/22 06.07.16 Supply 1029452.00B- 452 20.09.16 CSD-II M/S Shree Shyam Bearing Pvt. Ptd. 1505/CPD--I/O-I/ 13.07.16 466/23 29.08.16 Supply 47583.00B- 462 24.09.16 CSD-II M/S Jalvid Udyog 1834/CPD-I/16-17/17.08.16 267/195 12.09.16 Supply 145930.00B- 463 24.09.16 CSD-II M/S Industrial Sales& Supply Agencies 1840/CPD-I/O-I/17.08.16 267/194 15.09.16 Supply 92689.00B- 464 24.09.16 CSD-II M/S Indiana Sales 1820/CPD-I/O-I/12.08.16 267/196 15.09.16 Supply 140262.00B- 465 24.09.16 CSD-II M/S Jalvid Udyog 1173/CPD-II/O-I/24.08.16 267/195 12.09.16 Supply 80850.00

0.00

B- 515 24.10.16 CSD-II M/S K.S.& Brothers 1923/CPD-I/O-I/29.08.16 411/70 02.09.16 Supply 14259.00

0.00

B- 547 11.11.16 CSD-II M/S Actuators India 2078/CPD-I/O-I/21.09.16 486/09 18.10.16 Supply OH-3 393329.00B- 565 22.11.16 CSD-II M/S Jalvid Udyog 1406/CPD-II/O-I/26.09.16 485/10 03.10.16 Supply 75126.00B- 568 22.11.16 CSD-II M/S Jain Mill Stores Pvt. Ltd. 1839/CPD-I/O-I/17.08.16 485/17 05.11.16 Supply 103127.00B- 576 28.11.16 CSD-II M/S Hitpro Engineering Co. 1744/CPD-I/O-I/03.08.16 411/72 08.11.16 Supply 203044.00B- 577 28.11.16 CSD-II M/S Aditya Enterprises 2186/CPD-I/O-I/14.10.16 411/73 18.11.16 Supply 133494.00B- 580 30.11.16 CSD-II M/S Smap Engineers Pvt. Ltd. 818/CPD-II/O-I/13.07.16 448/29 12.09.16 Supply 128991.00B- 581 30.11.16 CSD-II M/S Smap Engineers Pvt. Ltd. 818/CPD-II/O-I/13.07.16 449/30 12.09.16 Supply 522467.00B- 585 30.11.16 CSD-II M/S Fluid Power seals 2087/CPD-I/O-I/22.09.16 449/32 01.11.16 Supply 9731.00

0.00

B- 632 22.12.16 CSD-II M/S Trident Precision International 863/CPD-III/O-1/26.09.16 386/176 23.11.16 Supply 311174.00B- 635 29.12.16 CSD-II M/S Amco Industries 1518/CPD-II/O-1/13.10.16 409/92 19.10.16 Supply 1468205.00B- 637 29.12.16 CSD-II M/S Amco Industries 561/CPD-II/O-1/09.06.16 409/93+94 18.06.16 Supply 212783.00B- 640 29.12.16 CSD-II M/S Jay Pee 563/CPD-II/O-1/09.06.16 409/96+97 14.07.16 Supply 18665.00B- 641 29.12.16 CSD-II M/S EPE Process Filters & Accumulators Pvt. Ltd. 723/CPD-II/O-1/02.07.16 409/97 12.09.16 Supply 91821.00B- 642 29.12.16 CSD-II M/S Amco Industries 560/CPD-II/O-1/09.06.16 409/98 18.06.16 Supply 2932650.00

0.00

B- 669 10.01.17 CSD-II M/S Vidyut Bhawan 1200/CPD-II/O-1/30.08.16 411/75 27.10.16 Supply 53180.00B- 683 12.01.17 CSD-II M/S Omega Engineering Works 2997/CPD-II/O-1/29.03.16 386/177 09.04.16 Supply 226195.00B- 684 12.01.17 CSD-II M/S S.Traders & Manufactures 407/CPD-III/O1/O-

1/04.05.16386/179 10.06.16 Supply 3305.00

B- 687 12.01.17 CSD-II M/S Amco Industries 1186/CPD-II/O-1/29.08.16 386/181 23.09.16 Supply 290785.00B- 689 12.01.17 CSD-II M/S New Allenberry Works 780/CPD-III/O-1/12.08.16 386/182 19.08.16 Supply 2306576.00B- 692 12.01.17 CSD-II M/S T.R.F.Limited 1032/CPD-III/O-1/22.10.16 386/184 26.10.16 Supply 2125912.00B- 693 12.01.17 CSD-II M/S Geeta Enterprises 967/CPD-III/O-1/30.09.16 386/185 23.12.16 Supply 509250.00B- 694 12.01.17 CSD-II M/S Geeta Enterprises 949/CPD-III/O-1/20.09.16 386/186 23.12.16 Supply 245700.00B- 707 13.01.17 CSD-II M/S Smap Engineers Pvt. Ltd. 1887/CPD-II/O-1/02.12.16 466/41 02.01.17 Supply O&M 778922.00B- 708 13.01.17 CSD-II M/S Smap Engineers Pvt. Ltd. 1908/CPD-II/O-1/03.12.16 466/41 05.01.17 Supply O&M 554278.00B- 713 17.01.17 CSD-II M/S AtoZ Infraspares Pvt. Ltd. 2380/CPD-I/PTPP/O-

1/23.11.16412/195 15.12.16 Supply OH3 53846.00

B- 718 17.01.17 CSD-II M/S Uttam Sales Corporation 2498/CPD-I/PTPP/O-1/19.12.16

445/52 20.12.16 Supply O&M 3180.00B- 720 17.01.17 CSD-II M/S Bee Gee Associates 2531/CPD-I/PTPP/O-

1/22.12.16491/1,2 06.01.17 Supply OH3 193457.00

B- 729 25.01.17 CSD-II M/S GEE BEE Enterprises 947/CPD-III/O-1/26.09.16 376/65 17.10.16 Supply 12331.00B- 733 25.01.17 CSD-II M/S S. Traders & manufactures 2070/CPD-II/O-1/26.12.16 374/170 02.01.17 Supply 348840.00B- 734 25.01.17 CSD-II M/S Amco Industries 1066/CPD-II/O-1/09.08.16 374/172 19.08.16 Supply 66660.00B- 735 25.01.17 CSD-II M/S Amco Industries 1071/CPD-II/O-1/09.08.16 374/172 19.08.16 Supply 7979.00B- 736 25.01.17 CSD-II M/S Amco Industries 1068/CPD-I/O-1/09.08.16 374/171 19.08.16 Supply 47308.00

Total 0.00

FUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVED

TOTAL

TOTAL

TOTAL

TOTAL

G:\210MW\2019-20\09-19\Liab_15.09.19_210MW 2

Page 15: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 772 07.02.17 CSD-II M/S Altas Capco Compresor Technigul sales 813/CPD-I/O-1/10.05.16 486/11 30.01.17 Supply 378489.00B- 773 07.02.17 CSD-II M/S Shri Bhawani Trading Co. 56/CPD-I/O-1/12.01.17 491/02 23.01.17 OH-3 Supply 11898.00B- 775 07.02.17 CSD-II M/S Vijay Enginering 1842/CPD-II/O-1/22.11.16 466/43 15.01.17 Supply O&H 440706.00B- 777 07.02.17 CSD-II M/S Thermaserve Corp. 2050/CPD-III/O-1/22.12.16 466/45 27.12.16 OH-3 Supply 475554.00B- 778 07.02.17 CSD-II M/S Thermaserve Corp. 2050/CPD-III/O-1/22.12.16 466/45 27.12.16 OH-3 Supply 594245.00B- 779 07.02.17 CSD-II M/S Thermaserve Corp. 2051/CPD-II/O-1/22.12.16 466/46 27.12.16 OH-3 Supply 1235175.00B- 780 07.02.17 CSD-II M/S Thermaserve Corp. 2051/CPD-II/O-1/22.12.16 466/47 27.12.16 OH-3 Supply 881626.00B- 782 07.02.17 CSD-II M/S Ashbond Engineers P. Ltd 2327/CPD-II/O-1/09.11.16 411/80 30.12.16 OH-3 Supply 788007.00B- 786 07.02.17 CSD-II M/S Kaltron Contrals 2326/CPD-II/O-1/09.11.16 411/83 11.01.17 Supply O&M 20765.00B- 787 07.02.17 CSD-II M/S Trilok Chand&Sons 2500/CPD-I/O-1/19.12.16 411/84 20.12.16 Supply O&M 126374.00B- 788 07.02.17 CSD-II M/S Atlas Copco Compressor Technige Sales 2086/CPD-I/O-1/22.09.16 411/85 29.09.16 Supply O&M 378489.00B- 789 07.02.17 CSD-II M/S Krishan Kumar Distribwar 86/CPD-I/O-1/18.01.17 411/86 20.01.17 Supply O&M 70346.00B- 794 14.02.17 CSD-II M/S Jalvid Udyog 2495/CPD-I/O-1/16.12.16 412/196 27.12.16 Supply 231994.00B- 795 14.02.17 CSD-II M/S Jalvid Udyog 2495/CPD-I/O-1/16.12.16 412/197 27.12.16 Supply 247521.00B- 796 14.02.17 CSD-II M/S Jalvid Udyog 2495/CPD-I/O-1/16.12.16 412/198 27.12.16 Supply 143629.00B- 797 14.02.17 CSD-II M/S Asan Engineers P. Ltd 2421/CPD-I/O-1/28.11.16 492/01 08.12.16 Supply 267791.00B- 807 20.02.17 CSD-II M/S Globe Enterprises 37/CPD-I/O-I/10.01.17 341/110 21.01.17 Supply 219061.00B- 808 20.02.17 CSD-II M/S Globe Enterprises 37/CPD-I/O-I/10.01.17 341/111 21.01.17 Supply 179060.00B- 809 20.02.17 CSD-II M/S Technow Engineering Works 32/CPD-I/O-I/09.01.17 341/112 20.01.17 Supply 26554.00B- 810 20.02.17 CSD-II M/S Technow Engineering Works 32/CPD-I/O-I/09.01.17 341/113 20.01.17 Supply 5961.00B- 811 20.02.17 CSD-II M/S J.K.Engineering Co. 112/CPD-I/O-I/21.01.17 341/114 24.01.17 Supply 599506.00B- 812 20.02.17 CSD-II M/S J.K.Engineering Co. 112/CPD-I/O-I/21.01.17 341/116 24.01.17 Supply 89040.00B- 813 20.02.17 CSD-II M/S Technow Engineering Works 156/CPD-I/O-I/30.01.17 341/117 05.02.17 Supply 2622.00B- 815 20.02.17 CSD-II M/S Jalvid Udyog 157/CPD-I/O-I/30.01.17 341/118 07.02.17 Supply 54804.00B- 816 20.02.17 CSD-II M/S Jalvid Udyog 157/CPD-I/O-I/30.01.17 341/119 07.02.17 Supply 10717.00B- 828 28.02.17 CSD-II M/S Kay Mohan Corporation 2530/CPD-I/O-I/22.12.16 426/72 27.12.16 Supply 270043.00B- 829 28.02.17 CSD-II M/S Goodwill Governer Services 2262/CPD-I/O-I/26.10.16 237/197 20.01.17 Supply 124550.00

0.00 192693.00 270043.00

B- 854 21.03.17 CSD-II M/S Supath Engineering Services P. Ltd 115/CPD-I/O-I/21.01.17 411/87 13.02.17 Supply OH 3 6203.00B- 855 21.03.17 CSD-II M/S Instrumentation Limited 2463/CPD-I/O-I/13.12.16 411/87 31.01.17 Supply OH 3 115781.00B- 856 21.03.17 CSD-II M/S Instrumentation Limited 2469/CPD-I/O-I/13.12.16 411/88 31.01.17 Supply OH 3 925300.00B- 859 21.03.17 CSD-II M/S Jalvid Udyog 116/CPD-I/O-I/21.01.17 411/91 03.02.17 Supply OH 3 224430.00B- 860 21.03.17 CSD-II M/S Aarseller Tredco 2075/CPD-II/O-I/26.12.16 411/92 16.03.17 Supply O&M 96942.00B- 861 21.03.17 CSD-II M/S Uttam Sales Corporation 174/CPD-II/O-I/28.01.17 411/92 01.02.17 Supply O&M 95767.00B- 862 21.03.17 CSD-II M/S Assam Carbon Product Limited 138/CPD-I/O-I/28.01.17 411/93 16.03.17 Supply O&M 202013.00B- 863 21.03.17 CSD-II M/S Ganesh Sales & Services 155/CPD-I/O-I/30.01.17 485/33 20.03.17 Supply O&M 3150.00B- 864 21.03.17 CSD-II M/S Jain Mill Stores Pvt. Ltd 89/CPD-I/O-I/18.01.17 485/34 20.03.17 Supply O&M 228986.00B- 865 21.03.17 CSD-II M/S Jain Mill Stores Pvt. Ltd 113/CPD-I/O-I/21.01.17 485/35 20.03.17 Supply OH 3 520438.00B- 866 21.03.17 CSD-II M/S Jain Mill Stores Pvt. Ltd 113/CPD-I/O-I/21.01.17 485/36 20.03.17 Supply OH 3 270041.00B- 867 21.03.17 CSD-II M/S Jain Mill Stores Pvt. Ltd 113/CPD-I/O-I/21.01.17 485/37 20.03.17 Supply OH 3 414759.00B- 868 21.03.17 CSD-II M/S Jalvid Udyog 31/CPD-I/O-I/09.01.17 485/37 230.03.17 Supply OH 3 53210.00

B- 869 21.03.17 CSD-II M/S Jalvid Udyog 31/CPD-I/O-I/09.01.17 485/38 20.03.17 Supply OH 3 27388.00B- 875 27.03.17 CSD-II M/S Jay Pee Machining Industries 1067/CPD-II/O_I/09.08.16 409/106 20.08.16 Supply OH 3 535592.00B- 876 27.03.17 CSD-II M/S Jay Pee Machining Industries 1070/CPD-II/O_I/09.08.16 409/108 20.08.16 Supply OH 3 636136.00B- 877 27.03.17 CSD-II M/S Jay Pee Machining Industries 1065/CPD-II/O_I/09.08.16 409/109 20.08.16 Supply OH 3 718962.00B- 878 27.03.17 CSD-II M/S Jay Pee Machining Industries 1185/CPD-II/O-I/09.08.16 409/111 22.09.16 Supply OH 3 698364.00B- 879 27.03.17 CSD-II M/S New Allenberry Works 919/CPD-III/O-I/22.09.16 409/113 27.09.16 Supply O&M 2537247.00

B- 883 27.03.17 CSD-II M/S Jay Pee Machining Industries 1587/CPD-II/O-I/20.10.16 409/119 23.11.16 Supply OH 3 369249.00B- 886 30.03.17 CSD-II M/S Ocean wires & Cables P. Ltd 1760/CPD-I/O-I/04.08.16 237/198 27.08.16 Supply OH3 717599.00B- 887 30.03.17 CSD-II M/S Simplex Switchgear P. Ltd 2027/CPD-I/O-I/14.09.16 237/199 14.09.16 Supply OH3 198894.00

0.00 7863431.00 1733020.00

B- 4 03.04.17 CSD-II M/S Balaji Corporation 220/CPD-II/O-I/07.02.17 374/184 25.03.17 Supply O&M 461160.00

FUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

TOTAL

FUND RESERVED

FUND RESERVED

TOTAL

G:\210MW\2019-20\09-19\Liab_15.09.19_210MW 3

Page 16: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 6 03.04.17 CSD-II M/S NeelKanth Power System Pvt. Ltd 221/CPD-II/O-I/07.02.17 374/184 24.03.17 Supply O&M 1112197.00B- 60 24.04.17 CSD-II M/S Vibhuh Power & Energy Solution 109/CPD-I/O-I/21.01.17 445/53 27.02.17 Supply 78152.00B- 61 24.04.17 CSD-II M/S Naren Electronics Company 147/CPD-I/O-I/30.01.17 445/54 02.02.17 Supply 25516.00

0.00 1573357.00 103668.00

B- 82 05.05.17 CSD-II M/S Power Engineers 478/CPD-II/O-I/03.04.17 450/55 24.04.17 Supply O&M 338556.00B- 85 08.05.17 CSD-II M/S Shreya Automation & Technochem Pvt. Ltd 85/CPD-I/O-I/18.01.17 491/03 05.05.17 Supply O&M 811422.00

B- 87 08.05.17 CSD-II M/S Supath Engineering Services P. Ltd 490/CPD-II/O-I/06.04.17 411/95 06.05.17 Supply O&M 954759.00B- 111 26.05.17 CSD-II M/S Instrumentation Limited 2089/CPD-II/O-1/27.12.16 409/129 20.03.17 Supply 404445.00B- 113 26.05.17 CSD-II M/S Multitech Engineer 457/CPD-II/O-1/30.03.17 409/130 16.05.17 Supply 399618.00B- 114 28.05.17 CSD-II M/S Simplex Switchgear P. Ltd 132/CPD-III/O-1/17.03.17 492/2 27.03.17 Supply 13290.00

0.00 2097378.00 824712.00B- 145 14.06.17 CSD-II M/S Actuatiors India 134/CPD-III/O-I/17.03.17 491/04 24.04.17 Supply 7980.00B- 147 14.06.17 CSD-II M/S Saurabh Udyog 296/CPD-I/O&I/13.04.17 445/59 01.05.17 Supply 121323.00B- 151 19.06.17 CSD-II M/S Nanak Electric Stores 147/CPD-III/O-I/22.03.17 491/05 03.04.17 Supply 57726.00B- 159 27.06.17 CSD-II M/S Globe Enterprises 331/CPD-I/16-17/12.05.17 341/127 22.06.17 Supply 82592.00B- 160 27.06.17 CSD-II M/S Globe Enterprises 331/CPD-I/16-17/12.05.17 341/128 22.06.17 Supply 51449.00B- 166 29.06.17 CSD-II M/S R.S.P Overseas Pvt. Ltd 1110/CPD-I/O-I/07.06.13 428/102 24.05.17 Supply 11868.00

0.00 255364.00 77574.00

B- 193 01.07.17 CSD-II M/S R.S.P Overseas Pvt. Ltd 1507/CPD-I/O-I/13.07.16 466/62 22.06.17 Supply OH3 3175.00B- 194 01.07.17 CSD-II M/S R.S.P Overseas Pvt. Ltd 1108/CPD-I/O-I/08.06.16 466/63 01.06.17 Supply O&M 2201.00B- 195 01.07.17 CSD-II M/S Shree R.N.Metals Ind. Pvt. Ltd 1885/CPD-II/O-I/02.12.16 386/189 23.05.17 Supply O&M 350702.00B- 196 11.07.17 CSD-II M/S Shri Sai Enterprises II 492/CPD-II/O-I/06.04.17 445/61 30.06.17 Supply 248899.00B- 221 22.07.17 CSD-II M/S R.S.P. Overseas Pvt. Ltd 402/CPD-I/O-I/22.06.17 450/67 15.07.17 Supply O&M 89128.00B- 222 22.07.17 CSD-II M/S R.S.P. Overseas Pvt. Ltd 1110/CPD-I/O-I/07.06.13 450/68 15.07.17 Supply O&M 40565.00B- 223 22.07.17 CSD-II M/S R.S.P. Overseas Pvt. Ltd 363/CPD-I/O-I/03.03.16 450/69 15.07.17 Supply O&M 50195.00B- 224 22.07.17 CSD-II M/S R.S.P. Overseas Pvt. Ltd 1707/CPD-I/O-I/03.03.16 450/69 15.07.17 Supply O&M 12176.00B- 225 22.07.17 CSD-II M/S R.S.P. Overseas Pvt. Ltd 1108/CPD-I/O-I/08.06.16 450/70 15.07.17 Supply 25116.00B- 226 22.07.17 CSD-II M/S R.S.P. Overseas Pvt. Ltd 150/CPD-I/O-I/13.07.16 450/70 15.07.17 Supply 20151.00B- 231 27.07.17 CSD-II M/S R.S.P. Overseas Pvt. Ltd 1707/CPD-I/o-i/05.10.15 449/52 21.07.17 Supply 17820.00

0.00 350702.00 509426.00

B- 288 13.10.17 CSD-II M/S New Allenberry Works 204/CPD-III/O-I/22.04.17 497/13 10.10.17 Supply 1239424.00B- 291 13.10.17 CSD-II M/S T.R.F Ltd 540/CPD-III/O-I/18.04.17 497/15 10.10.17 Supply 1293722.00B- 297 16.10.17 CSD-II M/S Electrocontrols India 544/CPD-I/O-I/27.07.17 486/32 10.10.17 Supply o&m 174166.00B- 299 16.10.17 CSD-II M/S Ceekay Engineers 550/CPD-III/O-I/16.04.14 486/33 11.10.17 Supply o&m 31141.00B- 302 16.10.17 CSD-II M/S Shree Shyam Bearing Pvt Ltd 1705/CPD-I/O-I/05.10.15 406/42 11.10.17 Supply o&m 87726.00B- 303 16.10.17 CSD-II M/S Globe Enterprises 331/CPD-I/16-17/12.05.17 341/142 11.10.17 Supply o&m 10376.00B- 304 16.10.17 CSD-II M/S Globe Enterprises 331/CPD-I/16-17/12.05.17 341/144 11.10.17 Supply o&m 15475.00B- 308 24.10.17 CSD-II M/S M.E.M.Industriec 358/CPD-I/O-1/03.01.16 411/100 24.10.17 Supply 45803.00

TOTAL 0.00 56992.00 2840841.00

B- 344 21.11.17 CSD-II M/S Shipra Industries 744/CPD-II/O-I/27.05.17 450/77 15.11.17 Supply OH-3 303133.00TOTAL 0.00 0.00 303133.00

B- 390 27.12.17 CSD-II M/S Trade India Corporation 401/CPD-I/O-I/22.06.17 427/61 14.07.17 Supply 164475.00B- 391 27.12.17 CSD-II M/S R.S.P.Overseas Pvt Ltd. 193/CPD-I/O-I/05.02.16 427/62 03.09.17 Supply 221720.00B- 392 27.12.17 CSD-II M/S R.S.P.Overseas Pvt Ltd. 193/CPD-I/O-I/05.02.16 427/62 23.12.17 Supply 215091.00

0.00 436811.00 164475.00

B- 407 02.01.18 CSD-II M/S Unitech Process Control 305/C&ID-II/22.12.17 487/47 01.01.18 Supply 79438.00B- 421 11.01.18 CSD-II M/S Net Cascade Automation Pvt.Ltd. 997/CPD-I/O-I/13.10.17 491/8 08.01.18 Supply 162049.00B- 432 25.01.18 CSD-II M/S Commercial Enterprises 1344/CPD-I/O-I/10.01.18 426/80 24.01.18 Supply 92792.00B- 433 25.01.18 CSD-II M/S Trade India Corporation 1343/CPD-I/O-I/10.01.18 426/80 24.01.18 Supply 458088.00

TOTAL TOTAL 0.00 458088.00 334279.00

B- 438 01.02.18 CSD-II M/S Trade India Corporation 1706/CPD-I/O-I/05.10.15 449/63 31.01.18 Supply 217411.00B- 450 12.02.18 CSD-II M/S Net Cascade Automati Pvt. Ltd. 1376/CPD-I/O-I/16.01.18 491/8 09.02.18 Supply 768656.00

TOTAL

TOTAL

TOTAL

G:\210MW\2019-20\09-19\Liab_15.09.19_210MW 4

Page 17: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 453 13.02.18 CSD-II M/S Supath Engineering Services P. Ltd 1298/CPD-I/O-I/22.12.17 445/65 09.02.18 Supply 91133.00B- 459 15.02.18 CSD-II M/S Technow Engineering Works 1265/CPD-I/PTPP/19.12.17 485/98 15.02.18 Supply 26451.00

B- 471 28.02.18 CSD-II M/S Shipra Industries 2330/CPD-II/O-I/19.12.15 449/64 24.02.18 Supply OH-4 957274.00B- 472 28.02.18 CSD-II M/S Ideal Flow Control Pvt.Ltd. 03/CPD-II/O-I/01.01.18 449/65 24.02.18 Supply OH-3 568839.00B- 473 28.02.18 CSD-II M/S Simplex Switchgear P. Ltd 144/CPD-II/O-I/30.01.18 449/66 24.02.18 Supply O&M 104030.00B- 474 28.02.18 CSD-II M/S Kay Mohan Corporation 1056/CPD-I/O-I/01.11.17 449/66 24.02.18 Supply O&M 75982.00B- 476 28.02.18 CSD-II M/S Supath Engineering Services P. Ltd 498/CPD-III/O-I 445/70 21.02.18 Supply O&M 3710.00

TOTAL TOTAL 0.00 1847554.00 965932.00

B- 488 07.03.18 CSD-II M/S Trade India Corporation 1546/CPD-IO-I/24.02.18 426/83 07.03.18 Supply O&M 894098.00B- 494 14.03.18 CSD-II M/S Levcon Instruments Pvt.Ltd. 58/CPD-I/O-I/12.01.17 486/43 09.03.18 Supply O&M 13287.00B- 500 14.03.18 CSD-II M/S Jalvid Udyog 1143/CPD-I/O-I/21.11.17 485/105 09.03.18 Supply 16485.00B- 501 14.03.18 CSD-II M/S Jalvid Udyog 1264/CPD-I/O-I/19.12.17 485/106 09.03.18 Supply 38350.00B- 502 14.03.18 CSD-II M/S Technow Engg.Works 1404/CPD-I/O-I/24.01.18 485/106 09.03.18 Supply 253101.00B- 504 17.03.18 CSD-II M/S Aditya Enterprises 1277/CPD-I/O-I/20.12.17 445/72 15.03.18 Supply 387811.00B- 517 26.03.18 CSD-II M/S Govardhan Controls 1358/CPD-I/O-I/12.01.18 492/40 24.03.18 Supply 148888.00B- 524 28.03.18 CSD-II M/S Aditya Enterprises 568/CPD-III/O-I/05.12.17 491/16 03.03.18 Supply 364841.00

TOTAL TOTAL 0.00 894098.00 1222763.00

B- 1 03.04.18 EMD-IV M/S S.M. Enterprises Sec 03/EMD-IV/17-18/29.05.17 517/6A 10.03.18 Security 1200.00

B- 2 03.04.18 CSD-II M/S Bee Gee Associates 1409/CPD-I/O-I/24.01.18 493/9 28.03.18 Supply O&M 265776.00B- 4 05.04.18 CHD-III M/S Nosad Contractor F 07/CHD-III/16-17/28.09.16 513/18 13.03.18 Overhauling of HT/LT Motor 2693.00

B- 10 13.04.18 CSD-II M/S Incom Power P. Ltd. 418/CPD-II/O-I/28.03.18 466/84 09.04.18 Supply 880822.00B- 11 13.04.18 CSD-II M/S Incom Power P. Ltd. 419/CPD-II/O-I/28.03.18 466/85 11.04.18 Supply 957254.00B- 16 14.04.18 CHD-III M/S Nosad Contractor Sec 07/CHD-III/16-17/28.09.16 519/25 06.04.18 Security 80957.00

B- 17 16.04.18 AHD-II M/S India Engg.Works Ist 13/AHD-II/17-18/30.09.17 515/19 11.02.18 Repairing Of Grinding Rolls. 26487.00B- 18 16.04.18 AHD-II M/S India Engg.Works Ist 04/AHD-II/17-18/15.05.17 515/20 28.02.18 Fabrication & Repairing 46367.00B- 20 17.04.18 ECM&EMD M/S Vijay Kumar Gupta Sec 12/ECM&EMD/16-

17/20.09.16439/69 22.03.18 Security 29957.00

B- 25 20.04.18 TMD-II M/S Harsh & Brothers 8th 08/TMD-II/17-18/09.01.18 475/43 16.02.18 Repairing & Reconditioning 58212.00B- 26 20.04.18 TMD-II M/S Thermal India Engineers Sec 33/TMD-II/16-17/17.06.17 475/45 27.01.18 Break Down Maintinance 41453.00B- 28 20.04.18 TMD-II M/S Thermal India Engineers T&f 02/TMD-II/16-17/11.04.16 475/49 06.03.18 Security 105183.00B- 29 20.04.18 TMD-II M/S Thermal India Engineers 9th 19/TMD-II/16-17/19.10.17 475/58 20.02.18 Dismentling & Shifting of Vaccum

Pump54841.00

B- 30 20.04.18 TMD-II M/S Thermal India Engineers I&F 33/TMD-II/16-17/17.06.17 475/60 19.02.18 Reparivs/Replacement OH-3 107664.00B- 35 21.04.18 EMD-IV M/S M.A.K.Construction Co. I&F 11/EMD-IV/17-18/02.02.18 472/89 05.02.18 Fabrication & Repairing 30240.00

B- 40 23.04.18 CAMD-II M/S India Engg.Works 01/CAMD-II/17-18/20.02.17 468/33 15.02.18 Maintenance & Relocation 76204.00

B- 50 23.04.18 CSD-II M/S Incom Power Pvt.Ltd. 394/CPD-II/O-I/24.03.18 374/194 23.04.18 Supply 640191.00B- 51 23.04.18 CSD-II M/S Incom Power Pvt.Ltd. 395/CPD-II/O-I/24.03.18 374/195 23.04.18 Supply 465807.00B- 63 24.04.18 CHD-II M/S S.K.Engineering Works 07/CHD-II/17-18/29.11.16 503/02 10.04.18 Security 25500.00B- 64 25.04.18 EMD-V M/S Priya Const Co. Sec 12/EMD-IV/17-18/12.12.17 316/76 18.11.17 Repair Rewainding 162111.00

B- 65 25.04.18 EMD-V M/S Priya Const Co. II 345/EMD-IV/PTPP/07.10.17 316/78 26.02.18 Repair Rewainding 330080.00

B- 70 25.04.18 CSD-II M/S Govardhan Controls 1407/CPD-I/O-I/24.01.18 411/118 24.04.18 Supply 119426.00TOTAL TOTAL 1179149.00 3063500.00 265776.00

B- 73 02.05.18 EMD-V M/S M.R.P.Constructions I&F 110/EMD-V/CF/13.04.18 372/33 26.04.18 OH of Compressor Bus Bar 10553.00B- 87 04.05.18 CSD-II M/S Instrumentation Ltd. 1677/CPD-II/O-I/02.11.16 450/87 27.04.18 Supply OH-3 111571.00B- 92 08.05.18 CSD-II M/S Jalvid Udyog 928/CPD-I/O-I/30.05.18 485/118 04.05.18 Supply 10665.00B- 96 08.05.18 CHD-III M/S Priya Construction Co. Sec 10/CHD-III/16-17/08.02.17 323/127 02.05.18 Security 48356.00

B- 97 08.05.18 CHD-III M/S M.R.P.Constructions Sec 09/CHD-III/1617/08.02.17 323/127 20.04.18 Security 53127.00B- 111 11.05.18 CSD-II M/S Vikash Chauda 1623/CPD-I/O-I/13.03.18 449/69 08.05.18 Supply O&M 17700.00B- 112 11.05.18 CSD-II M/S Balaji Corporation 496//CPD-II/O-I/18.04.18 449/69 08.05.18 Supply O&M 1627299.00B- 113 11.05.18 CSD-II M/S Jalvid Udyog 302/CPD-II/O-I/05.03.18 374/198 07.05.18 Supply O&M 398392.00

G:\210MW\2019-20\09-19\Liab_15.09.19_210MW 5

Page 18: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 124 14.05.18. CHD-IV M/S Hind Udyog V 06/CHD-IV/17-18/12.07.17 504/33 07.05.18 Reparing & Reconditioning 97916.00

B- 126 16.05.18 CSD-II M/S Supertech Engineers 1545/CPD-I/O-I/24.02.18 427/74 10.05.18 Supply O&M 561470.00B- 127 17.05.18 CHD-III M/S Priya Const Co. II 10/CPD-III/17-18/06.01.18 513/22 02.5.18 Rewainding Of LT. Motor 46776.00B- 128 19.05.18 EMD-IV M/S A.K. Engineers Sec 04/EMD-IV/13-14/10.01.14 94/79 25.04.18 Security 39960.00

B- 129 19.05.18 AHD-II M/S India Engg.Works II 04/AHD-II/PTPP/15.05.17 515/27 18.04.18 Fabrication & Repairing 33485.00B- 130 19.05.18 AHD-II M/S India Engg.Works II 13/AHD-II/17-18/30.09.17 515/28 22.04.18 Repairing Of Grinding Rolls 37812.00B- 132 (B) 24.05.18 C&ID-II M/S Syndicate Engineers Sec 01/C&ID-II/14-15/10.03.15 328/64 09.05.18 Security 668721.00

TOTAL TOTAL 1036706.00 129271.00 2597826.00

B- 137 04.06.18 CSD-II M/S Ocean Wire and Cables (P)Ltd 20/CPD-I/PTPP/06.04.18 487/61 22.05.18 Supply O&M 191041.00B- 138 04.06.18 CSD-II M/S Aarseller Tredco 120/EMD-V/PTPP/24.04.18 487/63 23.05.18 Supply O&M 233664.00

B- 139 04.06.18 CSD-II M/S Guru Enterprises 1642/CPD-I/O-I/ 493/15 26.05.18 Supply O&M 912834.00B- 140 04.06.18 CSD-II M/S Thermoserve Corporation 583/CPD-II/O-I/18.05.18 428/125 25.05.18 Supply O&M 423703.00B- 142 04.06.18 CSD-II M/S Trade India Corporation 1706/CPD-I/O-I/05.10.15 428/128 22.05.18 Supply O&M 22842.00B- 143 04.06.18 CSD-II M/S Trade India Corporation 1706/CPD-I/O-I/05.10.15 428/128 26.05.18 Supply O&M 16932.00B- 146 04.06.18 C&ID-III M/S M.S.Engg.Works Sec 11/C&ID-III/15-16/02.11.15 418/40 24.12.17 Security 64501.00

B- 149 05.06.18 CAMD-II M/S Usha Enterprises II 20/CAMD-II/17-18/27.02.18 388/59 23.04.18 Servicing & B/D Maintinance 6921.00

B- 151 05.06.18 CHD-III M/S M.R.P.Constructions Ist 01/CHD-III/18-19/07.05.18 323/133 01.06.18 B/D Maintinance Of Tranformer 38649.00

B- 153 08.06.18 CSD-II M/S Power Engineers 1669/CPD-I/O-I/21.03.18 466/90 31.05.18 Supply 2218381.00B- 157 13.06.18 BMD-III M/S M.K. Traders II 16/BMD-III/17-18/28.03.18 273/46 17.04.18 Erection Of New Hoist 22692.00B- 161 14.06.18 CAMD-II M/S Hars & Brothers Sec 17/CAMD-II/15-16/14.10.15 415/73 09.05.18 Security 60000.00

B- 163 14.06.18 TMD-II M/S Hind Udyog Ist 01/TMD-II/18-19/20.04.18 446/25 27.04.18 Fabrication & Repairing 58814.00B- 164 17.06.18 AHD-II M/S India Engg.Works III 13/AHD-II/17-18/30.09.17 459/59 14.05.18 Repairing of grinding Rolls 50525.00B- 165 17.06.18 AHD-II M/S India Engg.Works III 04/AHD-II/17-18/15.05.17 459/59 12.06.18 Repairing & Fabrication 52526.00B- 166 17.06.18 AHD-II M/S Hind Udyog II 14/AHD-II/17-18/30.11.17 459/60 17.05.18 Repairing & Replacement 43150.00B- 171 17.06.18 CSD-II M/S Jalvid Udyog 178/CPD-I/O-I/21.05.18 341/183 13.06.18 Supply 143748.00B- 172 17.06.18 CSD-II M/S Technow Engg. Works 177/CPD-I/O-I/21.05.18 341/182 13.06.18 Supply 12042.00B- 173 17.06.18 CSD-II M/S Supath Engineering Services P. Ltd 189/CPD-III/18.05.18 487/64 09.06.18 Supply 42854.00B- 174 17.06.18 CSD-II M/S Govardhan Controls 1408/CPD-I/O-I/24.01.18 487/65 09.06.18 Supply 206770.00B- 175 17.06.18 CSD-II M/S Simplex Switchgear P. Ltd 1428/CPD-I/O-I/31.01.18 487/66 12.06.18 Supply 467899.00B- 176 17.06.18 CSD-II M/S Trade India Corporation 1546/CPD-I/O-I/24.02.18 406/46 09.06.18 Supply 867578.00B- 178 17.06.18 CSD-II M/S AIA Engg.Ltd 740/CPD-II/O-I/02.07.16 391/75 09.06.18 Supply 861017.00B- 179 19.06.18 CSD-II M/S Thermoserve Corporation 632/CPD-II/O-I/01.06.18 466/93 08.06.18 Supply 1114798.00B- 185 22.06.18 CHD-IV M/S Hind Udyog 14/CHD-IV/17-18/19.03.18 504/36 15.06.18 Repairing & Reconditioning 142620.00

B- 190 23.06.18 TMD-II M/S Thermal India Engineers Final 33/TMD-II/16-17/17.06.17 511/10 17.04.18 Preventine & B/D Maintinance 54591.00B- 197 28.06.18 CAMD-II M/S Balram Engg. Contractor & Supplier Sec 18/CAMD-II/17-18/25.11.17 467/60 27.04.18 B/D Maintinance of Fixed fire

system21130.00

B- 198 28.06.18 CAMD-II M/S Balram Engg. Contractor & Supplier I&Final 85/CWCD-IV/12-13/12.02.13

467/62 01.06.18 Security 47472.00

B- 199 28.06.18 CAMD-II M/S Banaco Technology Pvt.Ltd. V 24/CAMD-II/15-16/24.12.15 467/63 Complete OH of Clorination 200330.00

B- 204 29.06.18 CSD-II M/S Neelkanth Power Systems (P) LTD. 618/CPD-II/O-I/29.05.18 499/11 29.06.18 Supply 102490.00B- 205 29.06.18 CSD-II M/S Shri. Bhawani Trading Co. 201/CPD-III/O-I/23.05.18 499/12 29.06.18 Supply 1725864.00B- 206 29.06.18 CSD-II M/S Siddhi Vinayak Engg. 1645/CPD-I/O-I/23.09.15 486/54 25.06.18 Supply 160797.00B- 207 29.06.18 CSD-II M/S Mohan Lal 1536/CPD-I/O-I/03.09.15 486/53 25.06.18 Supply 149688.00B- 208 29.06.18 CSD-II M/S R.S. P.Overseas Pvt.Ltd 1341/CPD-I/O-I/10.01.18 450/91 25.06.18 Supply 26019.00

TOTAL 863921.00 1959751.00 7941210.00

B- 210 04.07.18 CSD-II M/S Net Cascade Automation Pvt Ltd 268/CPD-I/O-I/15.06.18 492/8 02.07.18 Supply 654726.00B- 212 04.07.18 CSD-II M/S Smap Engineers Pvt.Ltd 02/CPD-II/O-I/01.01.18 449/70 29.06.18 Supply OH-3 128422.00B- 216 09.07.18 CSD-II M/S Shri. Bhawani Trading Co. 589/CPD-I/O-I/11.04.16 465/113 12.10.17 Supply 491028.00B- 217 09.07.18 CSD-II M/S Shri. Bhawani Trading Co. 589/CPD-I/O-I/11.04.16 465/113 12.10.17 Supply 200211.00

G:\210MW\2019-20\09-19\Liab_15.09.19_210MW 6

Page 19: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 218 10.07.18 CHD-IV M/S Hind Udyog Sec 17/CHD-IV/15-16/17.12.15 504/36 07.07.18 Security 183982.00

B- 219 10.07.18 CHD-IV M/S Hind Udyog Sec 26/CHD-IV/15-16/31.03.16 504/37 07.07.18 Security 114663.00

B- 220 10.07.18 CHD-IV M/S Hind Udyog Sec 04/CHD-IV/16-17/27.05.16 504/37 07.07.17 Security 172045.00

B- 221 12.07.18 EMD-V M/S R.P.Costruction Co. I&F 02/EMD-V/18-19/25.04.18 413/119 01.06.18 Removal Of Refurbishment 115050.00B- 228 19.07.18 CHD-IV M/S Hind Udyog IX 06/CHD-IV/17-18/12.07.18 504/39 16.07.18 Repairing & Reconditioning 224541.00

B- 229 20.07.18 CSD-II M/S AtoZ Infraspares Pvt.Ltd 301/CPD-I/22.06.18 535/1,2 12.07.18 V-Belt Supply 63046.00B- 230 21.07.18 AHD-II M/S Anil Kumar Singh Sec 08/AHD-II/17-18/12.09.17 530/1 04.07.18 Security 6552.00B- 231 21.07.18 BMD-III M/S Idle Flow Controls Pvt.Ltd. Ist 08/BMD-III/17-18/12.01.18 436/55 01.04.18 Complete Recortilioning Of Oil Gun 53209.00

B- 232 21.07.18 BMD-III M/S Tech Thermalogy I&F 11/BMD-III/17-18/03.02.18 436/55 24.11.17 Fabrication & Erection 269407.00B- 233 21.07.18 BMD-III M/S Jahangir Enterprises Sec 12/BMD-III/16-17/25.10.16 436/56 30.05.18 Security 20766.00B- 234 21.07.18 BMD-III M/S S.K.Engineering Works Sec 10/BMD-III/16-17/24.10.16 436/57 30.05.18 Security 36934.00B- 236 21.07.18 BMD-III M/S M.K. Traders IV 06/BMD-III/17-18/01.01.18 282/174 20.06.18 Break Down Maintinance 47083.00B- 237 21.07.18 BMD-III M/S M.K. Traders IX 15/BMD-II/15-16/06.10.15 282/175 22.06.18 Repairing Of Flue Gas Path 42946.00B- 241 21.07.18 CSD-II M/S AtoZ Infraspares Pvt.Ltd 300/CPD-I/O-I/22.06.18 535/01 18.07.18 Supply 24620.00B- 242 23.07.18 CSD-II M/S Fludomat Ltd 150/CPD-II/O-I/23.01.17 427/77 20.07.18 Supply O & M 237340.00B- 243 23.07.18 BMD-IV M/S Nosad Contractor F 10/BMD-IV/16-17/16.01.17 500/142 17.04.18 Maintinance & Reparing 78655.00

B- 246 24.07.18 CHD-IV M/S Hind Udyog II 14/CHD-IV/17-18/19.03.18 504/41 17.07.18 Repairing & Reconditioning 326680.00

B- 248 24.07.18 CHD-IV M/S Hind Udyog Sec 17/CHD-IV/16-17/15.12.16 504/41 21.07.18 Security 157970.00

B- 249 26.07.18 CSD-II M/S Balaji Corporation 301/CPD-III/O-I/05.07.18 409/185 25.07.18 Supply O&m 319662.00B- 250 26.07.18 CSD-II M/S Instrumentation Ltd. 1775/CPD-II/O-I/15.11.16 466/95 18.07.18 Supply O&m 1521157.00B- 252 26.07.18 AHD-II M/S India Engg.Works 4 04/AHD-II/17-18/15.05.17 515/36 24.06.18 Fabrication & Repairing 55809.00B- 253 26.07.18 AHD-II M/S India Engg.Works 4 13/AHD-II/17-18/30.09.17 515/38 24.06.18 Repairing of grinding rolls 51255.00B- 255 28.07.18 CSD-II M/S J.K. Engg. Co. 805/CPD-II/O-I/12.07.18 449/72 26.07.18 Supply O&m 71916.00B- 256 28.07.18 CSD-II M/S J.K. Engg. Co. 805/CPD-II/O-I/12.07.18 449/73 26.07.18 Supply O&m 883889.00B- 257 30.07.18 ECM&EMD M/S Vijay Kumar Gupta Contractor Sec 19/ECM&EMD/16-

17/29.12.16230/100 27.07.18 Security 159479.00

TOTAL TOTAL 2117026.00 1084227.00 3511790.00

B- 259 02.08.18 CHD-III M/S Priya Const. Co. Sec 08/CHD-III/16-17/03.11.16 513/30 12.06.18 Security 60000.00

B- 263 09.08.18 EMD-V M/S Priya Const. Co. III 12/EMD-V/17-18/12.12.17 316/81 30.07.18 Repair. Rewainding Of LT. Motor 427671.00

B- 265 09.08.18 EMD-V M/S S.K.Enterprises Sec 06/EMD-V/16-17/05.08.16 316/82 07.05.18 Security 27915.00B- 268 09.08.18 EMD-V M/S R.L.Engineering Sec 09/EMD-V/17-18/09.10.17 316/83 17.07.18 Security 2685.00B- 270 13.08.18 CSD-II M/S Adyaant Enterprises 210/CPD-I/O-I/30.05.17 411/126 30.07.18 Supply 372933.00B- 271 13.08.18 CSD-II M/S Supath Engineering Services P. Ltd 1006/CPD-I/O-I/01.06.16 411/127 30.07.18 Supply 442608.00B- 272 13.08.18 CSD-II M/S Supath Engineering Services P. Ltd 1006/CPD-I/O-I/01.06.16 411/127 30.07.18 Supply 393281.00B- 273 13.08.18 CHD-III M/S Priya Const. Co. 3 10/CHD-III/17-18/06.01.18 519/42 01.08.18 Rewainding Of LT. Motor 247528.00

B- 274 14.08.18 CSD-II M/S Atlas Copco (India) Ltd. 641/CPD-II/O-I/05.06.18 409/185 14.08.18 Supply O & M 1458358.00B- 278 16.08.18 CAMD-II M/S Usha Enterprises III 20/CAMD-II/17-18/27.02.18 312/93 10.07.18 B/D Maintinance 11596.00

B- 279 16.08.18 CAMD-II M/S Singh Metal Casting Sec 12/CAMD-II/15-16/16.07.15 387/20 27.07.18 Security 70110.00

B- 280 16.08.18 C&ID-III M/S Globe Enterprises 59/C&ID-III/CF/26.02.18 344/113 20.06.18 Supply of Telephone Quectoy 14974.00B- 283 18.08.18 CSD-II M/S Authentic Systems & Technalois 858/CPD-I/O-I/21.09.17 444/117 14.08.18 Supply 167248.00B- 285 18.08.18 TMD-II M/S S.K.Engineering Works Ist 04/TMD-II/18-19/19.07.18 475/103 05.06.18 Break Down Maintinance 35058.00B- 286 22.08.18 BMD-IV M/S M.A.K.Construction Co. Sec 10/BMD-IV/14-15/31.12.14 500/145 06.08.18 Security 131105.00

B- 287 22.08.18 BMD-IV M/S M.A.K.Construction Co. Sec 12/BMD-IV/15-16/31.03.16 500/146 06.08.18 Security 95106.00

B- 288 22.08.18 BMD-IV M/S M.A.K.Construction Co. Sec 09/BMD-IV/16-17/16.01.17 500/146 06.08.18 Security 22440.00

B- 289 22.08.18 BMD-IV M/S Nosad Contractor Sec 15/BMD-IV/14-15/28.02.15 500/147 06.08.18 Security 123524.00

G:\210MW\2019-20\09-19\Liab_15.09.19_210MW 7

Page 20: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 290 22.08.18 BMD-IV M/S M.A.K.Construction Co. Sec 05/BMD-IV/17-18/07.09.17 500/148 06.08.18 Security 124834.00

B- 291 22.08.18 BMD-IV M/S Nosad Contractor Sec 03/BMD-IV/16-17/22.09.16 500/149 06.08.18 Security 93845.00

B- 292 22.08.18 BMD-IV M/S Nosad Contractor Sec 10/BMD-IV/16.17-16.01.17 500/149 06.08.18 Security 76286.00B- 293 22.08.18 BMD-IV M/S M.A.K.Construction Co. Sec 09/BMD-IV/14-15/31.12.14 500/150 06.08.18 Security 16663.00

B- 294 22.08.18 BMD-IV M/S O.S. Contractor Sec 16/BMD-IV/15-16/31.03.16 278/74 21.06.18 Insullation Work 21576.00

B- 297 25.08.18 AHD-II M/S Hind Udyog 3 14/AHD-II/17-18/30.11.17 515/40 28.07.18 Repairing & Replacement 45213.00B- 298 25.08.18 AHD-II M/S India Engg.Works 5 04/AHD-II/17-18/15.05.17 515/36 28.07.18 Fabrication & Repairing 52525.00B- 299 25.08.18 AHD-II M/S India Engg.Works 5 13/AHD-II/17-18/30.09.17 515/43 02.08.18 Repairing of grinding rolls 28077.00B- 302 25.08.18 AHD-II M/S Bharti Enterprises Sec 08/AHD-II/16-17/20.09.16 530/02 09.08.18 Security 107692.00B- 303 25.08.18 AHD-II M/S Balram Engg. Contractor & Supplier Sec 11/AHD-II/15-16/14.01.16 530/02B 08.08.18 Security 86501.00B- 305 25.08.18 ECM&EMD M/S Puneet Construction I&F 10/ECM&EMD/18-

19/31.07.18424/68 18.08.18 Clenins of Roofs 274537.00

B- 309 29.08.18 ECM&EMD M/S Vijay Kumar Gupta III 11/ECM&EMD/15-16/21.12.15

362/126 21.08.18 Security 158405.00

TOTAL 2340892.00 1208822.00 1640580.00

B- 315 19.09.18 CPD-II M/S J.K. Engineering Co. 400/CPD-II/23.07.18 535/13 03.08.18 Supply 53233.00B- 316 19.09.18 CPD-II M/S J.K. Engineering Co. 400/CPD-II/23.07.18 535/14 03.08.18 Supply 65882.00B- 317 19.09.18 CPD-I M/S Asha Printing Press 165/CPD-I/07.09.18 535/14 18.05.18 Supply 157518.00B- 319 19.09.18 CPD-III M/S Supath Engg. Services (P) Ltd. 437/CPD-III/O-I/20.08.18 411/132 20.08.18 Supply 558139.00B- 320 19.09.18 CPD-I M/S J.Umashankar & Co. Pvt.Ltd 462/CPD-I/26.07.18 428/134 14.08.18 Supply O & M 317704.00B- 321 19.09.18 CPD-I M/S Trade India Corporation 463/CPD-I/26.07.18 428/135 26.07.18 Supply O & M 206128.00B- 322 19.09.18 CPD-I M/S Commercial Enterprises 464/CPD-I/26.07.18 428/136 01.08.18 Supply O & M 671526.00B- 323 19.09.18 CPD-II M/S VP. Engineers 1031/CPD-II/28.08.18 449/77 28.08.18 Supply O & M 170156.00B- 324 19.09.18 C&ID-II M/S Nosad Contractor Ist 06/C&ID-II/05.06.18 453/37B 17.08.18 Miscellaneons 52559.00B- 327 20.09.18 CHD-IV M/S Hind Udyog XI 06/CHD-IV/12.07.17 504/43 27.08.18 Repairing 271677.00B- 328 20.09.18 CHD-IV M/S Hind Udyog Ist 03/CHD-IV/09.08.18 504/44 03.09.18 Fabrication 159410.00B- 329 20.09.18 AHD-II M/S Hind Udyog 4 14/AHD-II/30.11.17 515/51 25.08.18 Repairing 53294.00B- 330 20.09.18 AHD-II M/S India Engg.Works 6 13/AHD-II/30.09.17 515/54 08.09.18 Repairing 49996.00B- 331 20.09.18 AHD-II M/S India Engg.Works 6 04/AHD-II/15.05.17 515/55 02.09.18 Repairing 52525.00B- 332 20.09.18 AHD-II M/S Bharti Enterprises II 04/AHD-II/15.05.17 496/133 07.09.18 Lifting & shifting 106757.00B- 333 20.09.18 TMD-II M/S Bharti Enterprises 9 06/TMD-II/28.08.17 522/7 06.07.18 Removal Of Refurbishment 81697.00B- 334 20.09.18 TMD-II M/S Bharti Enterprises 10 06/TMD-II/28.08.17 522/9B 21.05.18 Removal Of Refurbishment 81697.00B- 335 20.09.18 TMD-II M/S Bharti Enterprises 11 06/TMD-II/28.08.17 522/10B 21.06.18 Removal Of Refurbishment 105303.00B- 336 20.09.18 TMD-II M/S Bharti Enterprises 12 06/TMD-II/28.08.17 522/14B 21.07.18 Removal Of Refurbishment 130255.00B- 337 20.09.18 TMD-II M/S Bharti Enterprises 13 06/TMD-II/28.08.17 522/15B 21.08.18 Removal Of Refurbishment 130255.00B- 338 20.09.18 TMD-II M/S Omega Industries Pvt.Ltd. Ist 06/TMD-II/01.8.18 475/110 14.09.18 Repairing 832785.00B- 339 20.09.18 TMD-II M/S Omega Industries Pvt.Ltd. Ist & Final 19/TMD-II/20.11.15 475/109 06.09.18 Repairing 325439.00

B- 342 20.09.18 CHD-III M/S Nosad Contractor Ist 05/CHD-III/16.03.18 513/34 04.09.18 Overhaling Of HT/LT 20699.00B- 347 25.09.18 EMD-IV M/S Shiv Mahadev Engg.Works 15/EMD-IV/23.03.18 472/115 Security 9336.00B- 352 29.09.18 CSD-II M/S Shiv Mahadev Engg.Works 05/CSD-II/06.10.17 486/57 13.09.18 Security 4200.00B- 353 29.09.18 EMD-IV M/S Panjab Electrical Industries 11/EMD-IV/09.06.16 304/97 10.09.18 Security 63793.00B- 354 29.09.18 EMPED-VI M/S Cleanflo India Pvt.Ltd 384/EE.MPED-VI/22.08.17 341/198 27.09.18 Chemical 98642.00B- 355 29.09.18 CPD-I M/S Industrial Sales & Supply Agencies 401/CPD-I 341/199 27.09.18 Supply O & M 66287.00B- 358 29.09.18 CPD-II M/S Asan Engineers Pvt.Ltd 1046/CPD-II/30.08.18 427/81 26.09.18 Supply 600081.00B- 359 29.09.18 CPD-II M/S Multi Tech Engineers 987/CPD-II/09.08.18 409/188 09.08.18 Supply 480741.00B- 363 29.09.18 CPD-III M/S Upadhayay Engineering Works 327/CPD-III/13.07.18 409/192 26.09.18 Supply O & M 607730.00B- 364 29.09.18 CPD-III M/S Fluidomat Ltd. 404/CPD-III/09.08.18 409/191 26.09.18 Supply O & M 822094.00

TOTAL TOTAL 2630319.00 2423641.00 2353578.00

B- 366 03.10.18 CPD-I M/S A.K. Agencies 465/CPD-I/26.07.18 426/97 18.09.18 Supply O & M 2124.00B- 367 03.10.18 CPD-I M/S A.K. Agencies 465/CPD-I/26.07.18 426/98 18.09.18 Supply O & M 23600.00B- 369 03.10.18 CPD-I M/S Anurag Engineeriing Works 405/CPD-I/23.07.18 426/99 22.09.18 Supply O & M 40863.00B- 370 03.10.18 CPD-II M/S T C I Freight 548/CPD-II/09.05.18 426/100 24.08.18 Freght 3610.00B- 371 03.10.18 CPD-II M/S T C I Freight 548/CPD-II/09.05.18 426/100 24.08.18 Freght 4011.00B- 372 03.10.18 CPD-II M/S T C I Freight 548/CPD-II/09.05.18 426/101 24.08.18 Freght 777.00

G:\210MW\2019-20\09-19\Liab_15.09.19_210MW 8

Page 21: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 373 03.10.18 CPD-I M/S Bearing Edge Technocret 540/CPD-I/03.08.18 487/101 26.03.18 Supply O & M 170488.00B- 376 08.10.18 CPD-II M/S Shree Bhawani Trading Co. 1030/CPD-II/O-1/28.08.18 409/194 08.10.18 Supply 85809.00B- 377 08.10.18 CHD-IV M/S Hind Udyog 06/CHD-IV/12.07.17 504/45B 29.09.18 Reperaring & rew 171239.00B- 379 09.10.18 CAMD-II M/S Rahul Gupta & Comp I &f 03/CAMD-II/02.06.18 387/22 24.05.18 Reperaring & Spare 86992.00B- 381 09.10.18 CAMD-II M/S Rahul Gupta & Comp I &f 10/CAMD-II/20.09.18 387/23 10.09.18 Reperaring & rew 195900.00B- 387 12.10.18 TMD-II M/S Marfat Construction 03//TMD-II/19.07.18 410/87A 01.10.18 Thermal Insulation 46698.00B- 388 12.10.18 TMD-II M/S Thermal India Engineers 22/TMD-II/19.10.16 475/117 25.09.18 Security 112841.00B- 392 22.10.18 BMD-IV M/S G.S. Construction Co. Iind 11/BMD-IV/2017-

18/09.03.18524/5B Majon Overhaling 219240.00

B- 393 22.10.18 AHD-II M/S Amit Kumar Singh3 16/AHD-II/2017-18/28.03.18 530/3 Security 6552.00

B- 395 23.10.18 BMD-IV M/S Usha Enterprises 12 253/BMD-IV/02.02.17 274/64B 20.10.18 Maintinance (OH) 74163.00B- 397 23.10.18 BMD-IV M/S U.S.Enterprises V 01/BMD-IV/16.06.18 500/166 01.10.18 Maintinance (OH) 491088.00B- 398 23.10.18 BMD-IV M/S Nosad Contractor Ist 03/BMD-IV/04.09.18 500/170 01.10.18 Maintinance (OH) 156334.00B- 399 23.10.18 BMD-IV M/S Nosad Contractor Ist 04/BMD-IV/04.09.18 500/172 01.10.18 Maintinance (OH) 273575.00B- 401 23.10.18 AHD-II M/S India Engg.Works 7 13/AHD-II/30.09.17 459/66B 25.09.18 Repairing of Griding 56554.00B- 402 23.10.18 AHD-II M/S Hind Udyog 5 14/AHD-II/30.11.17 459/65B 22.09.18 Repairing 50937.00B- 403 23.10.18 CHD-IV M/S Hind Udyog XIII 06/CHD-IV/12.07.17 504/47 11.10.18 Repairing 89796.00B- 404 23.10.18 CPD-I M/S Atlas Copco 476/CPD-I/27.07.18 492/12 22.10.18 Supply O & M 405815.00B- 408 25.10.18 CSD-II M/S Indian Oil Cor. Ltd 832/CPD-I/590/11.09.18 242/103 25.10.18 Supply O/H 919338.00B- 409 25.10.18 CSD-II M/S Bharat Petroleum Cor. Ltd 131/CPD-I/1630/08.05.18 242/103 25.10.18 Supply O & M 184205.00B- 410 25.10.18 CAMD-II M/S India Engg.Works 01/CAMD-II/20.07.17 004/06 Security 40347.00B- 411 26.10.18 C&ID-III M/S Siddhi Vinayak Engg. 09/C&ID-III/2017-

18/20.09.17526/12 Supply Matenal 44091.00

B- 412 29.10.18 CSD-II M/S Scope T&M Pvt.Ltd. 513/CPD-II/15.10.18 487/82 Supply 145500.00TOTAL TOTAL 2080654.00 401797.00 1620036.00

B- 413 02.11.18 CSD-II M/S ESK India Commercer and Trade (P) Ltd 1579/CPD-I/05.03.18 493/18 Supply O & M 442795.00B- 414 02.11.18 CSD-II M/S FLUIDOMAT Ltd. 404/CPD-III/09.08.18 409/195 Supply O & M 822094.00B- 415 02.11.18 CSD-II M/S Leading Edge Technocrat 470/CPD-III/07.09.18 409/196 Supply O & M 512083.00B- 416 02.11.18 CSD-II M/S Simplex Switchgear P. Ltd 302/CPD-III/05.07.18 409/197 Supply O & M 865478.00B- 418 02.11.18 CSD-II M/S Thermoserve Corps 1207/CPD-II/11.01.18 449/80 Supply O & M 1048863.00B- 421 02.11.18 C&ID-III M/S Kapatia Instrument Erector 09/C&ID-III/10.08.18 526/15 Opration & Preventive 27911.00B- 423 03.11.18 CPD-I M/S Govardhan Controls 508/CPD-I/31.07.18 491/25 Supply O & M 22252.00B- 424 03.11.18 CPD-I M/S Govardhan Controls 508/CPD-I/31.07.18 491/25 Supply O & M 21075.00B- 429 03.11.18 CPD-I M/S Usha Enterprises IV 20/CAMD-II/27.02.18 41/195 30.10.18 Servicing of B/D 7624.00B- 435 03.11.18 CSD-II M/S Balaji Corporation 1210/CPD-II/11.10.18 450/106 22.10.18 Supply O & H4 187823.00B- 436 03.11.18 CSD-II M/S Balaji Corporation 1210/CPD-II/11.10.18 450/106 22.10.18 Supply O & M 375645.00B- 438 13.11.18 CAMD-II M/S Balram Engineers Contractrs 18/CAMD-II/25.11.17 468/49 01.11.18 Maintinance B/D 43690.00B- 440 14.11.18 BMD-III M/S M.K. Traders 16/BMD-III/28.03.18 258/94B 04.08.18 Erectin of new Haist 43786.00B- 443 14.11.18 BMD-III M/S Leak Seal Experrts (India) Pvt.Ltd 01/BMD-III/02.05.18 282/182 10.10.18 Service charge for maintinance 24960.00B- 444 14.11.18 CPD-III M/S Electrocontrols India 499/CPD-III/22.09.18 411/133 07.11.18 Supply O & M 18105.00B- 445 14.11.18 CPD-III M/S Leading Edge Technocrat 372/CPD-III/02.08.18 497/39 13.11.18 Supply O & M 475650.00B- 446 14.11.18 CPD-III M/S FLUIDOMAT Ltd. 250/CPD-III/13.06.18 497/40 05.11.18 Supply O & M 3344641.00B- 447 14.11.18 C&ID-III M/S R.K. Traders 400/C&ID/10.10.18 492/14 06.11.18 Supply O & M 63944.00B- 448 14.11.18 BMD-III M/S Ideal Flow Control Pvt.Ltd. 08/BMD-III/12.01.18 436/64 15.10.18 Complete Reconditining 242380.00B- 449 14.11.18 BMD-III M/S Shraddha Engg.& Const Co. 07/ BMD-III/04.08.18 436/64 01.11.18 Removing of tech wastage 43317.00B- 450 14.11.18 BMD-III M/S Ideal Flow Control Pvt.Ltd. 100/BMD-III/04.03.16 436/65B 05.11.18 Security 163650.00B- 454 14.11.18 CHD-III M/S S.R. Constrution 08/CHD-III/07.05.18 513/40 15.10.18 Prevetive & B/D 16218.00B- 455 14.11.18 CHD-III M/S Nosad Contractor II 05/CHD-III/16.03.18 513/41 01.11.18 Overhaling Of HT/LT 34547.00B- 456 14.11.18 CHD-III M/S M.R.P. Constructions 5 01/CHD-III/07.05.18 513/41B 01.11.18 Prevetive & B/D 58834.00B- 458 14.11.18 C&ID-II M/S D.K. & Sons Co. 01/C&ID-II/04.04.18 453/41 Security 8466.00B- 461 16.11.18 EMD-IV M/S Priya Const. Co. 76/CWCD-IV/28.12.12 254/82 Security 36534.00B- 462 16.11.18 EMD-IV M/S Priya Const. Co. 191/CWCD-IV/29.11.13 254/82B Security 41945.00B- 463 16.11.18 EMD-IV M/S Priya Const. Co. 08/EMD-IV/10.12.14 254/83B Security 47247.00B- 464 16.11.18 EMD-IV M/S Vikas Electricals 17/EMD-IV/08.01.16 254/84 Security 49705.00B- 465 16.11.18 EMD-IV M/S Priya Const. Co. 16/EMD-IV/24.12.16 254/84B Security 48900.00B- 467 19.11.18 CPD-II M/S Joy Marketing Co. Pvt.Ltd. 890/CPD-II/27.07.18 449/86 15.11.18 Supply O & M 541532.00B- 469 19.11.18 CPD-I M/S R.L. Rasaysn Udyog 1135/CPD-I/17.11.17 535/27 24.09.18 Supply 57263.00B- 470 19.11.18 CPD-I M/S R.L. Rasaysn Udyog 1135/CPD-I/17.11.17 535/28 17.11.18 Supply 45100.00B- 471 19.11.18 CPD-II M/S Navnidhi Trade Line 1435/CPD-II/17.10.17 535/28 05.10.18 Supply 2946.00

G:\210MW\2019-20\09-19\Liab_15.09.19_210MW 9

Page 22: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 472 19.11.18 CPD-I M/S Industrial Sale & Supply Agencies 1194/CPD-I/07.07.15 535/29 17.11.18 Supply 199789.00B- 473 19.11.18 CSD-II M/S Shree Sander Industrial 676/CSD-II/13.06.18 535/30 17.11.18 Supply 205416.00B- 474 19.11.18 CSD-II M/S Shree Sander Industrial 676/CSD-II/13.06.18 535/30 15.11.18 Supply 216143.00B- 475 19.11.18 CPD-II M/S Sudha Chemical Co. 714/CPD-II/22.06.18 535/31 15.11.18 Supply 203364.00B- 476 19.11.18 CPD-II M/S Sudha Chemical Co. 714/CPD-II/22.06.18 535/36 15.11.18 Supply 243065.00B- 477 19.11.18 CPD-II M/S Sudha Chemical Co. 714/CPD-II/22.06.18 536/36 15.11.18 Supply 243065.00B- 478 19.11.18 TMD-II M/S Usha Enterprises 28/CWCD-III/TMD-

II/28.07.14522/19B 23.10.18 Security 129957.00

B- 479 19.11.18 TMD-II M/S Usha Enterprises 27/TMD-II/30.01.16 522/22 23.10.18 Security 88558.00B- 480 19.11.18 TMD-II M/S Hind Udyog II 01/TMD-II/20.04.18 522/20B 23.10.18 Repiring Febrication 84273.00B- 483 19.11.18 TMD-II M/S S.K. Works II 04/TMD-II/19.07.18 538/03 10.09.18 Break Down Maintinance 133561.00B- 484 19.11.18 BMD-IV M/S O.S. Contractor 7&F 16/BMD-IV/31.03.16 356/71B 13.08.18 Insulation Work 32596.00B- 485 19.11.18 C&ID-III M/S M.S. Engineering Works 01/C&ID-III/24.04.15 461/154 06.11.18 Security 80640.00B- 486 20.11.18 AHD-II M/S Rajeev Kumar Contractor I&F 14/AHD-II/27.10.18 530/04 Providing and Lying of Cem 28936.00B- 487 20.11.18 AHD-II M/S Hind Udyog 6&F 14/AHD-II/30.11.17 459/68 Repeiring /Reelamation 59609.00B- 488 20.11.18 AHD-II M/S India Engineering Works 8&F 13/AHD-II/30.09.17 459/69B 15.11.18 Repeiring /Reelamation 39932.00B- 490 27.11.18 CPD-II M/S India Engineering Works 1190/CPD-II/08.10.18 466/109 14.11.18 Supply (OH&4) 21071.00

TOTAL 1617776.00 4720806.00 5458396.00

B- 499 03.12.18 CSD-II M/S Flocon Hyodraulies (P) Ltd 456/CSD-III/30.08.18 499/20 28.11.18 Supply 554787.00B- 500 03.12.18 CSD-II M/S Instant Engineers 498/CPD-III/22.09.18 445/110 27.11.18 Supply 58445.00B- 501 03.12.18 CSD-II M/S AA Rseller Tredco 1172/CPD-I/02.11.18 445/111 27.11.18 Freght (O&M) 31012.00B- 502 03.12.18 CSD-II M/S Deepak Traders 1173/CPD-I/02.11.18 445/111 29.11.18 Freght (O&M) 28273.00B- 506 05.12.18 C&ID-III M/S S.R. Construction 8 03/C&ID-III/03.05.18 525/19 15.11.18 Servicing Repairing 19310.00B- 507 05.12.18 C&ID-III M/S Kapatiya Instrument Elector 02/C&ID-III/14.06.16 526/19B Security 29683.00B- 508 05.12.18 C&ID-III M/S Kapatiya Instrument Elector 03/C&ID-III/06.07.17 526/20 Security 29620.00B- 509 15.12.18 CAMD-II M/S P.K. Enterprises 14/CAMD-II/30.10.17 312/96 05.12.18 Maintinance B/D 73089.00B- 510 15.12.18 CAMD-II M/S Shiv Mahadev Engg.Works Ist&F 11/CAMD-II/25.10.18 312/96B 05.12.18 Complete Cleanig 285901.00B- 518 17.12.18 CPD-III M/S Naren Electronics Co. 587/CPD-III/28.11.18 486/62 10.12.18 Supply O & M 16249.00B- 520 17.12.18 CHD-III M/S Nosad Contractor 3 05/CHD-III/10.05.18 519/53 10.12.18 Overhauling of HT/L/t 38396.00B- 521 17.12.18 CHD-III M/S S.R. Construction 7&f 08/CHD-III/07.05.18 513/44B 15.11.18 Preventive &Brekdown 12343.00B- 523 17.12.18 CHD-III M/S M.R.P. Constructions 6 523/01/CHD-III/07.05.18 542/14 01.12.18 Prevetive & B/D 28900.00B- 525 19.12.18 BMD-IV M/S Amit Vikram Contractor 07/BMD-IV/26.10.17 403/164 Security 73896.00B- 526 20.12.18 TMD-II M/S Midchem Technolegy 01/TMD-II/14.06.17 446/30A Security 117500.00B- 528 20.12.18 TMD-II M/S Thermal India Engineers Ist&f 13/TMD-II/26.10.18 446/33 22.06.18 Removing & Refiting 241310.00B- 529 21.12.18 CAMD-II M/S Jahangir Enterprises 11/CAMD-II/22.08.17 468/52 Security 65120.00B- 530 27.12.18 C&ID-II M/S R.K. Construction 15/C&ID-II/07.03.17 328/77B Security 753870.00B- 531 27.12.18 EMD-IV M/S M.R.P. Constructions I&F 07/EMD-IV/30.07.18 394/72B 12.09.18 Supply and Instaltion 519536.00

TOTAL 1828223.00 571036.00 577981.00

B- 532 04.01.19 CSD-II M/S R.K. Traders 452/C&ID-III/19.12.18 492/14 03.01.19 Supply of Bio 98530.00B- 533 04.01.19 CSD-II M/S J.R.M. Solution 1263/CPD-I/28.11.18 487/84 03.01.19 Supply O#H4 185284.00B- 535 04.01.19 CSD-II M/S S.K. Engineering & Alleed 1257/CPD-I/28.11.18 487/86 03.01.19 Supply O#H4 235116.00B- 539 04.01.19 CSD-II M/S Simplex Switchgear P. Ltd 1309/CPD-I/14.12.18 487/88 03.01.19 Supply O#H4 181257.00B- 540 04.01.19 CSD-II M/S Astech Marketing Pvt.Ltd. 1344/CPD-I/12.12.18 487/89 03.01.19 Supply O#H4 634694.00B- 542 04.01.19 CSD-II M/S Govardhan Controls 1361/CPD-I/13.12.18 487/91 03.01.19 Supply O#H4 369062.00B- 543 05.01.19 CSD-II M/S Govardhan Controls 1299/CPD-I/05.12.18 411/136 24.12.18 Supply O#4 128709.00B- 544 05.01.19 CSD-II M/S Astech Marketing Pvt.Ltd. 1340/CPD-I/12.12.18 411/137 28.12.18 Supply (O#H4) 269208.00B- 545 05.01.19 C&ID-III M/S R.K. Traders 17/C&ID-III/29.11.18 526/25 29.12.18 Supply Instalation 5806.00B- 547 05.01.19 CSD-II M/S Incom Power Ltd. 1428/CPD-II/07.12.18 428/145 27.12.18 Supply O & M 116876.00B- 548 05.01.19 CSD-II M/S HEMS Corporation 1160/CPD-I/01.11.18 428/166 18.12.18 Supply O & M 31241.00B- 549 05.01.19 CSD-II M/S Kay Mohan Corporation 1161/CPD-I/01.11.18 428/147 27.12.18 Supply O & M 158471.00B- 552 05.01.19 TMD-II M/S S.K. Engg.Works III 04/TMD-II/19.07.18 410/89 26.12.18 Breakdown 84815.00B- 553 05.01.19 TMD-II M/S S.K. Engg.Works IV 04/TMD-II/19.07.18 410/90 26.12.18 Breakdown 80372.00B- 555 05.01.19 EMD-IV M/S Casis Techno Engg. Pvt.Ltd. Ist 487/EMD-IV/31.10.18 348/32 30.12.18 Service Charges 72942.00B- 557 05.01.19 CHD-III M/S M.K. Traders XI 15/CHD-II/20.11.17 490/125 01.11.18 Maintinance OH 114361.00B- 559 16.01.19 CAMD-II M/S Usha Enterprises 14/CAMD-II/26.08.16 312/98 Security 72044.00B- 560 16.01.19 CAMD-II M/S Usha Enterprises 16/CAMD-II/30.12.11 312/98B Security 42871.00B- 561 16.01.19 CAMD-II M/S Usha Enterprises 15/CAMD-II/30.12.11 312/99 Security 47536.00B- 562 16.01.19 CAMD-II M/S Usha Enterprises 18/CAMD-II/31.03.15 312/99B Security 79124.00B- 563 16.01.19 CAMD-II M/S Usha Enterprises 30/CAMD-II/28.02.17 312/97 Security 10990.00

G:\210MW\2019-20\09-19\Liab_15.09.19_210MW 10

Page 23: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 564 16.01.19 CAMD-II M/S Usha Enterprises V 20/CAMD-II/27.02.18 387/27 27.12.18 Comple operationg 11880.00B- 565 16.01.19 CAMD-II M/S Usha Enterprises 13/CAMD-II/12.09.17 311/91 Security 34843.00B- 566 16.01.19 CSD-II M/S J. Umashankar & Co.(P) Ltd 462/CPD-I/26.07.18 426/109 11.01.19 Supply O & M 300633.00B- 568 16.01.19 CSD-II M/S Raviraj Engg. Com. 1484/CPD-I/24.12.18 426/110 09.01.19 Supply O & M 529561.00B- 571 16.01.19 CSD-II M/S Uttam Sales Corporation 578/CPD-III/03.12.18 445/116 11.01.19 Supply O#H4 62833.00B- 572 16.01.19 CSD-II M/S Govardhan Controls 1404/CPD-I/20.12.18 445/118 11.01.19 Supply O#H4 219792.00B- 573 16.01.19 CSD-II M/S T C I 2909217996 460/16 10.01.19 Freght 34100.00B- 574 16.01.19 CSD-II M/S Atlas Copco 606/CPD-II/25.05.18 499/23 21.12.18 Supply 184394.00B- 578 16.01.19 BMD-IV M/S Nosad Contractor II 03/BMD-IV/04.09.18 500/194 05.01.19 Meintenance/Repeiring 71064.00B- 579 16.01.19 BMD-IV M/S Syndicate Engineers Ist&F 07/BMD-IV/12.10.18 500/196 05.01.19 Contingency Work 216368.00B- 580 16.01.19 BMD-IV M/S Nosad Contractor II 04/BMD-IV/04.09.18 500/198 05.01.19 Meintenance of Milling 171413.00B- 581 16.01.19 BMD-IV M/S O.S. Contractor 7&F 16/BMD-IV/31.03.16 356/71B 13.08.18 Insulation Work 32596.00B- 582 16.01.19 CSD-II M/S SAPS Power Equipment pvt.ltd. 1223/CPD-II/15.10.18 499/26 10.01.19 Supply O & M 1265193.00B- 586 16.01.19 CSD-II M/S Amazon Control Technology P.Ltd. 986/CPD-II/09.08.18 499/29 10.01.19 Supply O & M 2891998.00B- 587 16.01.19 CSD-II M/S Amco Industries 1157/CPD-II/01.11.18 497/45 10.01.19 Supply 901815.00B- 589 17.01.19 TMD-II M/S Thermal India Engineers 05/TMD-II/28.07.18 446/35B 10.01.19 Breakdown 112547.00B- 595 17.01.19 CSD-II M/S Technow Engg.Works 1158/CPD-I/01.11.18 535/46 Supply O#H4 54122.00B- 597 17.01.19 CSD-II M/S Jalvid Udyog 1159/CPD-I/01.11.18 535/48 Supply O#H4 78655.00B- 599 17.01.19 BMD-III M/S Leak Seal Experrts (India) Pvt.Ltd 01/BMD-III/02.05.18 538/7B 14.01.19 Service for 16200.00B- 600 18.01.19 BMD-II M/S Zenith Engineers 02/BMD-III/26.04.18 474/36 11.01.19 Security 11545.00B- 605 18.01.19 CHD-III M/S Nosad Contractor 4 05/CHD-III/10.05.18 519/59 03.01.19 Overhaling of HT/Lt 32986.00B- 606 18.01.19 BMD-III M/S Sunrise Engineers & Contoractor 06/BMD-III/13.05.16 474/35 Security 49336.00B- 607 18.01.19 BMD-III M/S Sunrise Engineers & Contoractor 05/BMD-III/13.05.16 474/35 Security 17975.00B- 608 18.01.19 BMD-III M/S Sunrise Engineers & Contoractor 265/BMD-III/30.05.14 474/34 Security 69254.00B- 609 18.01.19 BMD-III M/S Shraddha Engg Construction Co. 07/BMD-III/04.08.18 436/68 Removing the Tech Wast 42710.00B- 610 22.01.19 CSD-II M/S Simplex Switchgear P. Ltd 1428/CPD-I/31.01.18 411/139 22.01.19 Supply 467899.00B- 612 22.01.19 CSD-II M/S Aditya Enterprises 723/CPD-I/03.05.16 411/141 22.01.19 Supply 240335.00B- 613 22.01.19 CSD-II M/S S.K. Engineering & Alleed 1409/CPD-I/21.12.18 411/142 22.01.19 Supply O#H4 122720.00B- 615 22.01.19 CSD-II M/S K.S. & Brothers 1336/CPD-I/12.12.18 411/143 22.01.19 Supply O#H4 682365.00B- 618 22.01.19 CSD-II M/S Keltron Controls Division 1261/CPD-I/28.11.18 411/147 22.01.19 Supply O & M 102639.00B- 619 22.01.19 CSD-II M/S Supath Engineering Serveces P.LTd 1367/CPD-I/14.12.18 411/147 28.12.18 Supply O#H4 300000.00B- 625 22.01.19 CSD-II M/S Supath Engineering Serveces P.LTd 16/CPD-I/03.01.19 444/129 22.01.19 Supply O#H4 1030620.00B- 626 22.01.19 CSD-II M/S Krishna Agencies 813/CPD-I/10.09.18 444/130 16.01.19 Supply O & M 896564.00B- 628 22.01.19 CSD-II M/S Quick Well Engg. Associates 1341/CPD-I/12.12.18 444/133 22.01.19 Supply O & M 59014.00B- 629 23.01.19 BMD-IV M/S Nosad Contractor 03/BMD-IV/04.09.18 524/33B 13.12.18 Meintenance/Repeiring 71480.00B- 630 23.01.19 BMD-IV M/S Nosad Contractor 04/BMD-IV/04.09.18 524/34B 16.12.18 Meintenance OF puling 44302.00B- 631 23.01.19 AHD-II M/S India Engg. Works 08/AHD-II/13.08.18 530/6 06.12.18 Laying of 100mb Pipe 315847.00B- 632 23.01.19 AHD-II M/S India Engg. Works 03/AHD-II/15.05.17 530/7A 16.01.19 Security 4200.00B- 633 23.01.19 AHD-II M/S Jahangir Enterprises 02/AHD-II/30.04.17 530/7A 16.01.19 Security 64902.00B- 634 23.01.19 AHD-II M/S India Engg. Works 15/AHD-II/28.01.17 530/7B 16.01.19 Security 165879.00B- 635 23.01.19 AHD-II M/S India Engg. Works 02/AHD-II/16.04.18 530/8 16.01.19 Security 25841.00B- 636 23.01.19 AHD-II M/S India Engg. Works 01/AHD-II/16.04.18 530/8 16.01.19 Security 9070.00B- 638 23.01.19 AHD-II M/S India Engg. Works 10/AHD-II/20.09.16 515/71 08.01.19 Security 78830.00B- 642 28.01.19 CSD-II M/S J.K. Engineering Company 1209/CPD-II/11.10.18 466/117 24.01.19 Supply (OH&4) 1094346.00B- 643 28.01.19 CSD-II M/S Power Engineers 1506/CPD-II/31.12.18 466/118 24.01.19 Supply (OH&4) 365517.00B- 644 28.01.19 CSD-II M/S Thermoserve Corps 53/CPD-II/15.01.18 466/119 24.01.19 Supply (OH&4) 278826.00B- 648 28.01.19 TMD-II M/S Amazon Control Technology P.Ltd. I&F 19/TMD-II/17.01.19 475/125 24.01.19 Supply 365531.00B- 650 28.01.19 BMD-III M/S M.K. Traders VII 06/BMD-III/01.01.18 282/190 01.12.18 Brekdown 54671.00B- 651 28.01.19 BMD-III M/S Sunrise Engineers & Contoractor II 04/BMD-III/28.06.18 454/23 17.12.18 Preventive & Brekdown 10018.00B- 654 28.01.19 BMD-III M/S R. Electronech 14/BMD-II/02.01.17 477/75 27.11.18 Security 56142.00B- 656 28.01.19 BMD-III M/S M.K. Traders VII 06/BMD-III/01.01.18 272/100 02.12.18 Brekdown 82076.00B- 657 28.01.19 CSD-II M/S J.K. Engineering Company 400/CPD-I/23.07.18 535/52 28.01.19 Supply 65882.00B- 659 29.01.19 CSD-II M/S TCI Freight 1056/CPD-I/11.10.18 242/109 29.01.19 Freght 34100.00B- 660 30.01.19 CSD-II M/S SAPS Power Equipment pvt.ltd. 1444/CPD-II/12.02.18 499/32 29.01.19 Supply Advance 973403.00B- 665 30.01.19 CSD-II M/S TRF Ltd. 192/CPD-III/18.05.18 499/37 29.01.19 Supply misadeance 573023.00

TOTAL TOTAL 2547230.00 9616966.00 6904968.00

B- 668 01.02.19 CSD-II M/S Income Power P. Ltd. 85/CPD-II/21.01.19 449/89 30.01.19 Supply (OH&4) 1606000.00B- 670 01.02.19 CSD-II M/S Sone Obra Enterprises Ltd. 98/CPD-I/16.01.19 449/91 30.01.19 Supply O & M 225695.00B- 671 01.02.19 CSD-II M/S Trade India Corporation 1432/CPD-I/29.12.18 449/91 30.01.19 Supply (OH&4) 196346.00B- 674 02.02.19 CSD-II M/S J. Umashankar & Co. Pvt.Ltd. 1437/CPD-I/29.12.18 428/149 01.02.19 Supply O & M 7328.00

G:\210MW\2019-20\09-19\Liab_15.09.19_210MW 11

Page 24: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 675 02.02.19 CSD-II M/S J. Umashankar & Co. Pvt.Ltd. 1434/CPD-I/29.12.18 428/149 01.02.19 Supply O & M 39585.00B- 676 02.02.19 CSD-II M/S SAPS Power Equipment Pvt.Ltd. 31/CPD-I/08.01.19 428/150 01.02.19 Supply O & M 302360.00B- 677 02.02.19 CSD-II M/S A R C Ltd. 548/CPD-I/09.05.18 428/151 02.02.19 Freght (O&M) 27300.00B- 678 02.02.19 CSD-II M/S T C I Freight 548/CPD-I/09.05.18 428/152 01.02.19 Freght (O&M) 575.00B- 679 02.02.19 CSD-II M/S T C I Freight 1451/CPD-II/02.02.19 428/152 01.02.19 Freght (O&M) 4765.00B- 680 02.02.19 CSD-II M/S Febteq Systems Pvt.Ltd. 1385/CPD-II/27.11.18 485/162 01.02.19 Supply 92516.00B- 686 02.02.19 CSD-II M/S Authentic Systems & Technologies 1362/CPD-I/13.12.18 487/95 01.02.19 Supply (OH&4) 333269.00B- 687 02.02.19 CSD-II M/S Net Cascade Antomation Pvt.Ltd. 57/CPD-I/10.01.19 487/96 01.02.19 Supply (OH&4) 138286.00B- 688 02.02.19 CSD-II M/S Krishna Agencies 1255/CPD-I/28.11.18 487/97 01.02.19 Supply 392446.00B- 691 02.02.19 C&ID-III M/S S.R. Construction 9&F 03/C&ID-III/03.05.18 525/22 18.12.18 Serving /Repairing 16092.00B- 692 02.02.19 C&ID-III M/S Balram Engineers Contructor 01/C&ID-III/03.05.16 525/24B Security 26724.00B- 698 05.02.19 CSD-II M/S Multimind Creations 35/EMD-V/21.01.19 445/121 04.02.19 Supply 2204350.00B- 701 05.02.19 CSD-II M/S Govardhan Controls 76/CPD-I/11.01.19 445/123 23.01.19 Supply (OH&4) 228296.00B- 704 05.02.19 EMD-V M/S Priya Construction Company 23/EMD-V/16.02.17 352/94A Security 56913.00B- 706 05.02.19 EMD-V M/S Priya Construction Company 07/EMD-V/05.08.16 352/95 Security 144991.00B- 707 06.02.19 CSD-II M/S Sone Obra Enterprises Ltd. 1438/CPD-II/29.12.18 391/81 Supply O & M 176262.00B- 709 06.02.19 CSD-II M/S A.K. Agencies 465/CPD-I/26.07.18 391/81B Supply O & M 23600.00B- 710 06.02.19 CSD-II M/S Asan Engineers Pvt.Ltd. 1046/CPD-II/30.08.18 391/82 Supply O & M 38500.00B- 711 06.02.19 CSD-II M/S Asan Engineers Pvt.Ltd. 1046/CPD-II/30.08.18 391/82 Supply O & M 561582.00B- 713 06.02.19 CSD-II M/S Balaji Corporation 1253/CPD-II/29.10.18 391/123 Supply O & M 171819.00B- 714 08.02.19 CSD-II M/S Aarseller Tredco 40/CPD-II/11.01.19 427/86 Supply 140112.00B- 715 08.02.19 CSD-II M/S Income Power P. Ltd. 118/CPD-II/31.01.19 427/86 07.02.19 Supply O & M 311994.00B- 716 08.02.19 CSD-II M/S Commercial Engg. Mart 1486/CPD-II/24.12.18 427/87 07.02.19 Supply O & M 314382.00B- 717 08.02.19 CSD-II M/S Rajat Associates 95/TMD-II/24.12.18 427/88 07.02.19 Supply O & M 45444.00B- 726 13.02.19 CSD-II M/S Simplex Switchgear P. Ltd 58/CPD-I/10.01.19 411/152 12.02.19 Supply (OH&4) 543285.00B- 734 13.02.19 CSD-II M/S M.P.Associates 1259/CPD-I/28.11.18 485/172 12.02.19 Supply (OH&4) 113563.00B- 739 13.02.19 CSD-II M/S ION Exchange 219/CPD-II/12.02.18 485/179 12.02.19 Supply (OH&4) 472236.00B- 740 13.02.19 CSD-II M/S ION Exchange 220/CPD-II/12.02.18 485/180 12.02.19 Supply (OH&4) 383648.00B- 744 15.02.19 CSD-II M/S Neelkanth Power Systems Pvt.Ltd 39/CPD-II/11.01.19 497/53 Supply O & M 150823.00B- 746 15.02.19 CSD-II M/S Neelkanth Power Systems Pvt.Ltd 50/CPD-II/15.01.19 497/56 Supply (OH&4) 3407250.00B- 747 15.02.19 CSD-II M/S Neelkanth Power Systems Pvt.Ltd 37/CPD-II/10.01.19 497/59 Supply O & M 400013.00B- 748 15.02.19 CSD-II M/S Shri Sai Enterprises 105/CPD-I/17.01.19 486/70 Supply (OH&4) 82024.00B- 751 15.02.19 CSD-II M/S S.K. Engipro & Alliced 78/CPD-I/11.01.19 486/73 Supply (OH&4) 349752.00B- 752 15.02.19 CSD-II M/S S.K. Engipro & Alliced 81/CPD-I/11.01.19 486/74 Supply (OH&4) 328040.00B- 754 15.02.19 CSD-II M/S Simplex Switchgear P. Ltd 187/CPD-I/01.02.19 445/124 Supply O & M 754311.00B- 756 16.02.19 EMD-IV M/S Nosad Contructor III 04/EMD-IV/06.07.18 473/140 05.12.18 Preventive & Brekdown 68459.00B- 757 16.02.19 EMD-IV M/S Mak Construction Co. Ist &F 11/EMD-IV/27.11.18 473/142 15.11.18 Repairing 20824.00B- 758 16.02.19 EMD-IV M/S Harsh & Brothers 193/EMD-IV/28.04.15 473/143 Security 14460.00B- 760 16.02.19 CHD-III M/S MRP Construction VIII 01/CHD-III/07.05.18 513/50B 01.02.19 Preventive & Brekdown 30450.00B- 761 16.02.19 CHD-III M/S Nosad Contructor 5 01/CHD-III/14.01.19 519/63 01.02.19 Overhouling of H/T 19083.00B- 763 19.02.19 BMD-III M/S Sunrise Engineers & Contoractor III 04/BMD-III/28.06.18 272/100 07.12.18 Preventive & Brekdown 22129.00B- 764 19.02.19 BMD-III M/S Sunrise Engineers & Contoractor III 05/BMD-III/28.06.18 272/101 10.12.18 Preventive & Brekdown 86375.00B- 765 21.02.19 CSD-II M/S Sail Kanpur 168/CPD-I/30.01.19 242/110 18.02.19 Supply (OH&4) 3157284.00B- 766 21.02.19 ECM&EMD M/S Vijay Kumar Gupta I&F 23/ECM&EMD/29.12.18 141/157 25.01.19 Make of Cable Gallons 211745.00B- 767 25.02.19 TMD-II M/S Hind Udyog III 01/TMD-II/20.04.18 528/4B 02.12.18 Repairing Fabrication 88022.00B- 770 25.02.19 BMD-III M/S Shiv Mahadev Engg. 02/BMD-III/18.10.16 258/99 Security 8143.00B- 773 25.02.19 CAMD-II M/S Balram Engg. Contractor F 29/CAMD-II/28.02.17 467/65 16.02.19 Ahending Leakege 174960.00B- 774 25.02.19 CAMD-II M/S Zenith Engineering 27/CAMD-II/17.02.16 23/130 Security 37655.00B- 779 28.02.19 CSD-II M/S Elecon 1370/CPD-I/15.12.18 545/2 27.02.19 Supply 947556.00B- 780 28.02.19 CSD-II M/S Krishna Agencies 238/CPD-I/11.02.19 545/162 Supply (OH&4) 1387963.00

TOTAL TOTAL 1059665.00 6156699.00 13871221.00

B- 783 01.03.19 CHD-III M/S M.R.P. Constructions IX 01/CHD-III/07.05.18 513/54B 01.03.19 Preventive & Brekdown 30450.00B- 784 02.03.19 C&ID-III M/S M.A. Engineering 08/C&ID-III/05.07.18 525/29 Security 5833.00B- 785 02.03.19 C&ID-III M/S M.A. Engineering 65/C&ID-III/06.03.18 525/28B Security 5495.00B- 786 02.03.19 C&ID-III M/S R.K. Traders Ist&F 18/C&ID-III/29.12.18 526/28B Work of Instullation 11800.00B- 787 02.03.19 C&ID-III M/S R.K. Traders Ist 391/C&ID-III/22.10.18 526/29 22.12.18 Refilling of Cartaidge 3610.00B- 792 02.03.19 CSD-II M/S Multi Tech Enggi 1402/CPD-II/03.12.18 535/76 Supply (OH&4) 7292.00B- 793 02.03.19 CSD-II M/S Aditi Enterprises 121/CPD-I/18.01.19 535/77 Supply 38114.00B- 794 02.03.19 CSD-II M/S Aditi Enterprises 211/CPD-I/07.02.19 535/78 Supply 162474.00B- 796 06.03.19 CSD-II M/S Placka Instruments India Pvt.Ltd. 141/CPD-I/22.01.19 411/167 Supply (O&M) 10027.00

G:\210MW\2019-20\09-19\Liab_15.09.19_210MW 12

Page 25: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 802 08.03.19 BMD-III M/S Bharat Mechanical & Structural Works IX 09/BMD-III/17-18/15.01.18 282/193 15.02.19 Break Down Maintinance 75432.00B- 803 08.03.19 BMD-III M/S Bharat Mechanical & Structural Works X&F 09/BMD-III/17-18/15.01.18 282/122 14.02.19 Break Down Maintinance 86701.00B- 805 09.03.19 C&ID-II M/S Mahadev Enterprises 16/C&ID-II/07.03.17 453/41 18.02.19 Security 18600.00B- 806 09.03.19 AHD-II M/S India Engineering Works 20/AHD-II/14.01.19 530/10B 15.12.18 Meintenance/Revival of demage 278576.00B- 809 13.03.19 CAMD-II M/S Horsh & Brothers 11/CAMD-II/06.12.14 416/123 28.02.19 Security 3714.00B- 810 13.03.19 CHD-III M/S Priya Construction 11/CHD-III/13.02.19 546/07 09.03.19 Rewanding of different 85690.00B- 811 13.03.19 CHD-III M/S Vikash Electricals Ist 08/CHD-III/29.10.18 546/08 01.03.19 Overhauling and reinglot 146099.00B- 812 13.03.19 CHD-III M/S Nosad Contractor 6 05/CHD-III/10.05.18 546/10 01.03.19 Over hauling of HT/LT 18794.00B- 814 13.03.19 CSD-II M/S Pee Kay Tribals 1048/CPD-II/09.10.19 242/110 24.10.18 Grease 150075.00B- 815 13.03.19 CSD-II M/S Pitambra Engineers & Controls 21/CHD-II/02.02.18 502/34 Unlocodiing of FO 34014.00B- 816 27.03.19 CSD-II M/S Jalvid Udyog 209/CPD-I/07.02.19 485/197 26.03.19 Supply 176087.00B- 819 27.03.19 CSD-II M/S Jalvid Udyog 209/CPD-I/07.02.19 485/201 26.03.19 Supply 77467.00B- 820 27.03.19 BMD-IV M/S Nosad Contractor IV 04/BMD-IV/04.09.18 524/39B 25.02.19 Maintinance of Pulvenig 51549.00B- 821 27.03.19 BMD-IV M/S Nosad Contractor V 04/BMD-IV/04.09.18 524/42B 01.03.19 Maintinance of Pulvenig 44756.00B- 833 28.03.19 CSD-II M/S Uttam Sales Corporation 106/CPD-II/17.01.19 487L/108 Supply 279203.00

TOTAL TOTAL 1051188.00 169766.00 580898.00

B- 3 03.04.19 EMD-IV M/S Nosad Contractor 04/EMD-IV/06.07.18 473/145 Preventive/Breaking 38984.00B- 4 03.04.19 CAMD-II M/S Balram Engineers V 18/CAMD-II/25.11.17 416/127 Maintinence B/D 23115.00B- 5 03.04.19 CAMD-II M/S Rakesh Kumar & Co. 02/CAMD-II/16.05.18 468/65 Security 7045.00B- 6 03.04.19 CAMD-II M/S Jahangir Enterprises 17/CAMD-II/20.11.17 468/66 Security 49491.00B- 17 06.04.19 CAMD-II M/S Jahangir Enterprises 14/CAMD-II/27.11.18 23/138 Security 28114.00B- 18 06.04.19 CAMD-II M/S Jahangir Enterprises 08/CAMD-II/19.09.18 23/138 Security 8062.00B- 19 06.04.19 CAMD-II M/S Kaveri Construction Co. 09/CAMD-II/21.07.17 23/139 Security 27500.00B- 21 06.04.19 CHD-III M/S Priya Construction Co. 4&f 10/CHD-III/06.01.18 513/45B Rewinding of Difrent 24566.00B- 22 06.04.19 CHD-III M/S Kanha Construction 05/CHD-III/30.06.17 513/57 Security 4200.00B- 23 06.04.19 CHD-III M/S Samabh Engineering Works 06/CHD-III/07.08.18 513/57 Security 4200.00B- 24 06.04.19 CHD-III M/S Instrument Care Group 07/CHD-III/03.10.17 513/57B Security 15372.00B- 25 06.04.19 CHD-III M/S Nosad Contractor 05/CHD-III/07.03.19 513/59 Overhaling Of HT 22410.00B- 26 06.04.19 CHD-III M/S Punjab Electrical Industries 04/CHD-III/12.06.17 513/60B Security 95810.00B- 27 06.04.19 CHD-III M/S Priya Construction Co. 11/CHD-III/13.02.19 513/60 Rewinding 48927.00B- 29 06.04.19 CHD-III M/S MRP Construction 01/CHD-III/07.05.18 513/57B Preventive/Breaking 17679.00B- 30 A 06.04.19 CHD-IV M/S Krishna Kumar 05/CHD-IV/11.09.18 495/81 Security 8820.00B- 31A 08.04.19 CHD-IV M/S Indrajeet Singh 08/CHD-IV/28.09.18 495/81 Security 6930.00B- 28 08.04.19 AHD-II M/S India Engineering Works Ist 19/AHD-II/14.01.19 515/87 Servicing of Hiis of Ash 30013.00B- 30 08.04.19 AHD-II M/S India Engineering Works 2 19/AHD-II/14.01.19 515/92 Servicing Repairing 33577.00B- 40 09.04.19 AHD-II M/S India Engineering Works Ist 21/AHD-II/14.01.19 459/78 Repairing 53590.00B- 41 09.04.19 AHD-II M/S India Engineering Works Ist 22/AHD-II/21.01.19 459/78B Repairing 57159.00B- 49 10.04.19 CSD-II M/S Trade India Corporation 165/CPD-I/ 450/125 Supply 213662.00B- 50 10.04.19 EMD-V M/S Priya Construction Co. 10/EMD-V/25.12.18 316/87B Repairing& Replecment 366063.00B- 53 10.04.19 CAMD-II M/S Gupta Enterprises Ist 24/CAMD-II/02.05.18 241/52 Fabrication 324324.00B- 57 11.04.19 BMD-IV M/S Nosad Contractor IV 03/BMD-IV/04.08.18 524/44 Maintinence /Repairing 37869.00B- 61 11.04.19 CSD-II M/S Kay Mohan Corporation 191/CPD-I/02.02.19 449/97 Supply 76020.00B- 62 11.04.19 CSD-II M/S Jalvid Udyog 120/CPD-I/18.01.19 491/35 Supply 21594.00B- 67 12.04.19 BMD-IV M/S Usha Enterprises II 11/BMD-IV/14.01.19 278/85 Maintinence of Pump 38809.00B- 68 12.04.19 BMD-IV M/S A.S. Enterprises II 15/BMD-IV/21.02.19 278/85B Depution of Supervis 55712.00B- 70 12.04.19 BMD-IV M/S O.S. Contractor 12/BMD-IV/08.02.19 278/86B Insulation Work 26967.00B- 72 12.04.19 C&ID-III M/S Kapatiya Instrument 02/C&ID-III/02.04.18 344/122 Miscellaneens (OH#4) 32329.00B- 76 15.04.19 TMD-II M/S S.K. Engineering Works V 04/TMD-II/19.07.18 538/9B Breakdown 65307.00B- 79 15.04.19 TMD-II M/S Harsh & Brothers 08/TMD-II/09.01.18 446/43B Security 5390.00B- 80 15.04.19 TMD-II M/S Harsh & Brothers 12/CWCD-III/27.05.14 446/44 Security 9810.00B- 81 15.04.19 TMD-II M/S Harsh & Brothers 08/TMD-II/21.05.15 446/44B Security 30755.00B- 82 15.04.19 TMD-II M/S Thermal India Engineers 3 05/TMD-II/28.07.18 446/45B Breakdown 32464.00B- 83 15.04.19 CSD-II M/S R.K. Traders 144/C&ID-III/18.03.19 445/130 Supply 277052.00B- 85 15.04.19 CSD-II M/S Fiducia Machinery & Services 240/CPD-II/14.03.19 557/4 Supply 675078.00B- 92 22.04.19 CSD-II M/S Luxmi Trading Company 1435/CPD-I/29.12.18 466/143 Supply 180392.00B- 105 22.04.19 CSD-II M/S Amit Gupta 02/CPD-III/01.08.18 487/111 Security 4200.00B- 106 22.04.19 CSD-II M/S K.S. Brothers 427/CPD-I/05.04.19 487/114 Supply 574977.00B- 114 23.04.19 CHD-II M/S M.K. Traders 11/CHD-II/15.12.18 490/140 Overhaling 130586.00B- 115 23.04.19 CHD-II M/S M.K. Traders 15/CHD-II/20.11.17 490/142 Security 93635.00B- 116 23.04.19 CHD-II M/S M.K. Traders Ist 10/CHD-II/15.10.18 503/5 Repairing of Cantridge 22550.00

G:\210MW\2019-20\09-19\Liab_15.09.19_210MW 13

Page 26: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 117 24.04.19 EMD-V M/S Instrument Care Group Ist&F 27/EMD-V/30.03.18 508/60 Centrifuging 297191.00B- 122 25.04.19 TMD-II M/S Thermal India Engineers 02/TMD-II/12.04.19 446/48 Inspeetion and caring 190570.00B- 123 25.04.19 CSD-II M/S Anurag Enggineering Works 1057/CPD-I/01.11.17 450/128 Supply 5428.00B- 125 26.04.19 CSD-II M/S Rasmen Technologies P.Ltd 237/CPD-I/11.02.19 535/89 Supply 27400.00B- 129 26.04.19 CAMD-II M/S Instrument Care Group 01/CAMD-II/10.05.18 416/132 Maintinence 44911.00

TOTAL TOTAL 2415006.00 421454.00 1630149.00

B- 132 03.05.19 CSD-II M/S Adarsh Electronics & Eletrical 558/CPD-III/02.11.18 486/88 Supply 31914.00B- 133 03.05.19 CSD-II M/S Elecon Engineering Co. Ltd. 1370/CPD-I/15.12.18 557/6 Supply 947556.00B- 141 04.05.19 EMD-V M/S Instrument Care Group Ist&F 43/EMD-V/25.01.19 483/51 Replacement of Dew 64476.00B- 142 04.05.19 EMD-V M/S Shiv Mahadev Engg Works 07/EMD-V/28.09.18 483/55 Security 9500.00B- 144 04.05.19 CSD-II M/S Commercial Engg Mart 99/CPD-I/16.01.19 450/133 Supply 21278.00B- 145 04.05.19 CSD-II M/S A.K. Agencies 62/CPD-I/10.01.19 450/134 Supply 754964.00B- 146 04.05.19 CSD-II M/S Power Engineers 54/CPD-II/15.01.19 450/134 Supply 1874467.00B- 147 04.05.19 CSD-II M/S Power Sales Corporation 64/CPD-II/16.01.19 450/136 Supply 248760.00B- 150 04.05.19 CSD-II M/S Upadhayog Engg. Works 273/CPD-I/15.02.19 560/9 Supply 177708.00B- 154 04.05.19 CSD-II M/S Hind Udyog 242/CPD-II/14.03.19 560/10 Supply 560854.00B- 155 07.05.19 ECM&EMD M/S Arvind Singh 10/ECM&EMD/26.12.17 322/92 Security 2400.00B- 157 07.05.19 BMD-III M/S R.Electromech XIV 15/BMD-III/28.03.18 226/164 Preventive /BD 14282.00B- 158 07.05.19 BMD-III M/S Sunrise Engineers & Contoractor IV 04/BMD-III/28.06.18 226/165 Preventive /BD 26656.00B- 159 07.05.19 BMD-III M/S Sunrise Engineers & Contoractor IV 05/BMD-III/28.06.18 455/41 Preventive /BD 86092.00B- 160 07.05.19 CHD-III M/S Priya Construction Co. III 11/CHD-III/13.02.19 546/28 Rewending of diff 25697.00B- 162 07.05.19 CSD-II M/S Steam Equipments Pvt. Ltd. 79/CPD-I/11.01.19 444/144 Supply 74930.00B- 164 07.05.19 CAMD-II M/S Usha Enterprises VI 20/CAMD-II/18.03.19 388/67 Services & B/d 20548.00B- 166 07.05.19 CSD-II M/S Trade India Corporation 1436/CPD-I/29.04.19 426/118 Repairing 67958.00B- 168 09.05.19 TMD-II M/S U.S.Enterprises Ist&F 08/TMD-II/22.04.19 537/14 Replacement 280800.00B- 170 10.05.19 CSD-II M/S Simplex Switvhgear Pvt.LTd. 381/CPD-I/14.03.19 411/172 Supply 86868.00B- 171 10.05.19 CSD-II M/S Govardhan Controls 508/CPD-I/31.07.18 411/174 Supply 6950.00B- 174 13.05.19 CSD-II M/S Amco Industries 136/CPD-II/02.02.19 561/01 Supply 505668.00B- 175 13.05.19 CSD-II M/S Amco Industries 139/CPD-II/02.02.19 561/02 Supply 1708494.00B- 181 14.05.19 TMD-II M/S Chembond Water Technologies Ltd. 09/TMD-II/25.04.19 511/14 Removal of scap OD 272700.00B- 188 15.05.19 CSD-II M/S J.Umashankar & Co. Pvt.Ltd.. 364/CPD-I/08.03.19 449/101 Supply 1568161.00B- 189 15.05.19 CSD-II M/S Laxmi Trading Co. 161/CPD-II/29.01.19 449/101 Supply 95493.00B- 190 15.05.19 CSD-II M/S HEMS Corporatioon 190/CPD-I/02.02.19 449/102 Supply 116492.00B- 191 15.05.19 CSD-II M/S Prakash Associates 192/CPD-I/02.02.19 449/103 Supply 74558.00B- 192 15.05.19 CSD-II M/S Kay Mohan Corporation 191/CPD-I/02.02.19 449/104 Supply 72056.00B- 196 17.05.19 M/S Guru Enterprises Ist&F 1642/CPD-I/16.03.18 513/55B Overhauling 272212.00B- 197 25.05.19 ECM&EMD M/S Rambali Singh II&F 21/ECM&EMD/28.12.18 364/177 Cleaning of Drain 186237.00B- 198 25.05.19 TMD-II M/S Chembond Water Technologies Ltd. 18/TMD-II/08.03.18 446/50 Security 164400.00B- 201 25.05.19 EMD-IV M/S Singh & Singh Electricals 03/EMD-IV/06.07.18 472/168 Repaire Rewinding 13404.00B- 202 25.05.19 CHD-III M/S Nosad Contractor 8 05/CHD-III/10.05.18 546/29 Overhauling 50866.00B- 204 25.05.19 EMD-IV M/S ABB India Ltd. 568/EMD-IV/31.12.18 347/96A Supply 90000.00B- 205 25.05.19 EMD-IV M/S Oasis Techno Engg. Pvt.Ltd. 487/EMD-IV/31.10.18 347/96B Services Charges 96393.00B- 207 25.05.19 TMD-II M/S S.K. Engg.Works Ist&F 05/TMD-II/10.04.19 527/12B Fabrication of Grd 144000.00B- 208 25.05.19 TMD-II M/S Bharti Enterrprises IX 09/TMD-II/24.09.18 527/12A Remavel of Tech 107259.00B- 209 27.05.19 EMD-V M/S Priya Construction Co. II 10/EMD-V/25.10.18 316/89B Repaire Rewinding 346243.00B- 210 29.05.19 CSD-II M/S ZKL Bearing (India) Pvt.Ltd 162/CPD-I/29.01.19 428/171 Supply 276305.00B- 211 29.05.19 CSD-II M/S Simplex Switchger Pvt.Ltd 381/CPD-I/14.03.19 411/176 Supply 42485.00B- 212 29.05.19 CSD-II M/S Sunil Kumar 12/CSD-II/08.10.18 427/109 Security 6624.00B- 213 29.05.19 CSD-II M/S Industrial Sales & Supply Agencis 453/CPD-I/08.04.19 535/112 Supply 429473.00B- 214 29.05.19 CSD-II M/S I G P Engineers Pvt.Ltd 366/CPD-I/08.03.19 560/14 Supply 9221.00

TOTAL TOTAL 2190789.00 2980844.00 6861769.00

B- 218 03.06.19 CSD-II M/S Instrumentation Ltd. 51/CPD-II/15.01.19 557/12 Supply 118000.00B- 219 03.06.19 CSD-II M/S Net Cascade Automation Pvt.Ltd. 577/CPD-II/16.05.19 487/120 Supply 1162439.00B- 222 07.06.19 CSD-II M/S Balaji Corporation 399/CPD-II/14.05.19 466/149 Supply 1084948.00B- 224 13.06.19 CHD-IV M/S Rahul Gupta & Co. 04/CHD-IV/04.06.19 505/17A-B Repairing and Recondition 306624.00B- 228 13.06.19 CAMD-II M/S Shiv Mahadev Engg Works 11/CAMD-II/25.10.18 23/15 S-MR 23825.00B- 230 13.06.19 CSD-II M/S Goverdhan Contractor 223/CPD-I/07.02.19 411/177-178 Control systems 878494.00B- 231 13.06.19 CSD-II M/S I Umashankar Co. 159/CPD-I/20.01.19 449/105-106 Supply 2092.00B- 232 13.06.19 EMD-IV M/S Sky. Engg. 03/EMD-IV/06.09.11 473/160 SMR 39630.00

G:\210MW\2019-20\09-19\Liab_15.09.19_210MW 14

Page 27: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 233 13.06.19 EMD-IV M/S Sky. Engg. 04/EMD-IV/06.09.11 473/160-161 SMR 49750.00B- 234 13.06.19 EMD-IV M/S Shiv Mahadev Engg Works 06/EMD-IV 473/165-166 Fabrication 86363.00B- 241 13.06.19 AHD-II M/S Rajeev Kumar Cont. 17/AHD-II/17.01.19 515/102 Operation 14745.00B- 245 13.06.19 C&ID-III M/S Kapatiya Instrument 21/C&ID-III/16.02.19 344/137 SMR 7980.00B- 249 13.06.19 EMD-V M/S Priya Cont. 24/EMD-V/27.03.19 508/78 SMR 21284.00B- 250 13.06.19 EMD-V M/S Shiv Mahadev Engg Works 25/EMD-V/27.03.19 508/78 SMR 12337.00B- 251 13.06.19 EMD-V M/S Instrument Care Group 27/EMD-V/30.03.19 508/79 SMR 27518.00B- 252 13.06.19 EMD-V M/S R.P. Cont. 23/EMD-V/27.03.19 508/79 SMR 8185.00B- 253 13.06.19 EMD-V M/S MRP Constructions 28/EMD-V/30.03.19 508/80 SMR 29842.00B- 266 20.06.19 TMD-II M/S Maarfat Cont. 03/TMD-II/ 538/16 Thermal Insult 99314.00B- 267 20.06.19 TMD-II M/S Veekay Engg. 16/TMD-II/18.01.18 538/16 AMC 136300.00B- 268 20.06.19 TMD-II M/S Veekay Engg. 11/TMD-II/17.06.19 538/17 AMC 5304.00B- 269 21.06.19 BMD-IV M/S G.S. Cont. 11/BMD-IV/09.03.18 555/20 SMR 88300.00B- 275 21.06.19 CAMD-II M/S Instrument Care Group 01/CAMD-II/10.05.18 647/68 Maintinence 30462.00B- 276 22.06.19 CSD-II M/S Raviraj Eng Co. 398/CPD-II/14.05.19 560/16 Supply 530649.00B- 277 22.06.19 CSD-II M/S Multimetals Ltd. 1445/CPD-II/12.12.18 560/17 Supply 2586549.00B- 278 22.06.19 EMD-IV M/S Elect & Instru Eng. 04/EMD-IV/18.04.19 347/97 SMR 12136.00B- 279 22.06.19 CSD-II M/S Rewer Sales Corp 64/CPD-II/16.01.19 558/85 Supply 915579.00B- 280 25.06.19 BMD-III M/S Ideal Flow Control Pvt.LTd. 06/BMD-III/12.04.19 436/82 Security 21600.00B- 282 25.06.19 EMD-V M/S MRP Constructions 19/EMD-V/26.02.19 508/72 Installation Commisission 66475.00B- 283 25.06.19 AHD-II M/S Garg Engineering & Sons 33/AHD-II/14.03.19 515/110 Dismalting / Cuttingg 63255.00B- 284 25.06.19 AHD-II M/S Garg Engineering & Sons 13/AHD-II/25.10.18 515/111 Repairing/ Replace 86134.00B- 285 25.06.19 AHD-II M/S India Engineering Works 19/AHD-II/14.01.19 515/107 Servicing Repairing 34280.00B- 286 25.06.19 AHD-II M/S India Engineering Works 21/AHD-II/14.01.19 515/109 Repairing 50242.00B- 287 25.06.19 AHD-II M/S India Engineering Works 22/AHD-II/21.01.19 515/106 Repairing 42766.00B- 288 25.06.19 AHD-II M/S Rajeev Kumar Contracctor 02/AHD-II/30.05.19 515/105 Cleaning of Chimny 77083.00B- 291 27.06.19 CAMD-II M/S Usha Enterprises 20/CAMD-II/27.02.19 241/56 Servcing of R/D 83878.00B- 292 27.06.19 CAMD-II M/S Usha Enterprises 09/CAMD-II/19.09.18 241/57 Servcing of R/D 41650.00B- 293 27.06.19 CAMD-II M/S Jahangir Enterprises 19/CAMD-II/28.02.19 241/57 Conditionng of Cold 70349.00B- 294 27.06.19 CAMD-II M/S Shiv Mahadev Engg Works 22/CAMD-II/19.03.19 241/58 Security 17673.00

TOTAL TOTAL 1655284.00 118000.00 7160750.00

B- 297 03.07.19 CSD-II M/S Instrumentation Ltd. 1507/CPD-II/31.12.18 557/18 Supply 593540.00B- 298 03.07.19 CSD-II M/S Aditi Enterprises 613/CPD-I/24.05.19 535/119 Supply 15812.00B- 299 03.07.19 CSD-II M/S Jalvid Udyog 614/CPD-I/24.05.19 535/120 Supply 45376.00B- 300 03.07.19 CSD-II M/S R.V. Industrial Company 75/CPD-I/11.01.19 491/45 Supply 385112.00B- 301 05.07.19 BMD-III M/S Jha Construction 08/BMD-III/15.04.19 436/79 Repairing of Dut 23211.00B- 302 05.07.19 BMD-III M/S M.K. Traders 06/BMD-III/01.01.18 302/67B Break Down Maintinance 43579.00B- 303 05.07.19 BMD-III M/S Jha Construction 05/BMD-III/05.10.17 302/68 Instaltation 25920.00B- 304 08.07.19 AHD-II M/S Rajeev Kumar Contractor 31/AHD-II/14.03.19 515/120 Cleaming of Pump 85060.00B- 305 08.07.19 AHD-II M/S Hind Udyog 14/AHD-II/29.11.16 515/121 Security 26176.00B- 306 08.07.19 AHD-II M/S Hind Udyog 14/AHD-II/30.11.17 515/122 Security 27157.00B- 307 08.07.19 CSD-II M/S Sone Obra Enterprises Pvt.Ltd. 1438/CPD-I/29.12.18 391/86 Supply 42688.00B- 309 08.07.19 CSD-II M/S Sone Obra Enterprises Pvt.Ltd. 160/CPD-I/29.01.19 391/86B Supply 488570B- 311 08.07.19 CSD-II M/S Multi Tech Engineers 516/CPD-II/16.06.19 560/19 Supply 902700.00B- 313 09.07.19 EMD-IV M/S Sumesh Petroleum 12/EMD-IV/22.09.15 347/89B Security 5148.00B- 314 10.07.19 BMD-III M/S O.S. Contractor Ist 15/BMD-III/13.05.19 474/44 36694.00B- 317 12.07.19 CSD-II M/S Sone Obra Enterprises Pvt.Ltd. 1438/CPD-I/29.12.18 466/152 Supply 107772.00B- 318 16.07.19 CHD-III M/S MRP Constructions 03/CHD-III/19.06.19 513/66B Preventive /BD 26882.00B- 319 16.07.19 CHD-III M/S Vikash Electrical 08/CHD-III/29.10.18 513/67B Cverhauing 195906.00B- 320 18.07.19 CAMD-II M/S Goga Jaharbeer Constration 17/CAMD-II/01.09.16 387/33 Security 8208.00B- 321 18.07.19 CAMD-II M/S Press Tool Industries Pvt.Ltd. 13/CAMD-II/08.08.16 387/33 Security 64548.00B- 322 18.07.19 AHD-II M/S Garg Engineering & Sons 08/AHD-II/11.07.19 496/198 Fabrication 170134.00B- 323 18.07.19 AHD-II M/S Bharti Enteriprises 05/AHD-II/15.05.17 530/15B Security 71935.00B- 324 18.07.19 AHD-II M/S Bharti Enteriprises 09/AHD-II/31.10.17 530/15B Security 83904.00B- 325 18.07.19 CHD-IV M/S Rahul Gupta & Co. 07/CHD-IV/25.09.18 505/19B Security 28668.00B- 329 19.07.19 CHD-III M/S Nosad Contractor 05/CHD-III/20.05.18 573/68B Overhauling 53863B- 330 23.07.19 OGD-II M/S Zenith Engineers 07/OGD-II/06.10.18 435/134 Assist.In the Work 241151B- 331 23.07.19 BMD-IV M/S Ravindra Singh & Co 10/BMD-IV/09.03.18 404/77B Security 91835.00B- 332 23.07.19 BMD-IV M/S U.S. Enterprises 01/BMD-IV/16.06.18 404/78 Security 473087.00B- 333 23.07.19 BMD-IV M/S Syndicate Engineers 07/BMD-IV/12.10.18 404/78B Security 20034.00

G:\210MW\2019-20\09-19\Liab_15.09.19_210MW 15

Page 28: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 334 24.07.19 CAMD-II M/S Balram Engineers Contractor 18/CAMD-II/25.11.17 416/143 Maintinence B/D 22991.00B- 335 24.07.19 CAMD-II M/S Balram Engineers Contractor 29/CAMD-II/28.02.17 468/67 Security 70200.00B- 336 24.07.19 CAMD-II M/S Rakesh Kumar & Co. 13/CAMD-II/20.11.18 468/68 Security 7084.00B- 337 24.07.19 TMD-II M/S Hind Udyog 07/TMD-II/22.04.19 522/27B Repairing Fabrication 69790.00B- 338 24.07.19 TMD-II M/S Thermal India Engg. 05/TMD-II/28.07.18 522/32 Preventive & B/d 176111.00B- 339 24.07.19 TMD-II M/S Hind Udyog 07/TMD-II/22.04.19 522/33B Repairing Fabrication 56570.00B- 341 24.07.19 TMD-II M/S Vee Kay Engineers 16/TMD-II/18.01.18 553/4B Security 58000.00B- 342 24.07.19 CHD-IV M/S Hind Udyog 07/CHD-IV/10.08.17 504/63 Security 110657.00B- 343 24.07.19 CHD-IV M/S Hind Udyog 14/CHD-IV/19.03.18 504/64 Security 134108.00B- 344 24.07.19 CHD-IV M/S Hind Udyog 06/CHD-IV/12.07.17 504/64 Security 151144.00B- 345 24.07.19 CHD-IV M/S Hind Udyog 05/CHD-IV/04.06.19 504/65 Rep & Recondition 233098.00B- 346 25.07.19 CSD-II M/S Luxmi Trading Co. 1435/CPD-I/29.12.18 406/57 Supply 106464.00B- 347 25.07.19 CSD-II M/S SAPS Power Equipment P.Ltd 241/CPD-II/14.03.19 561/05 Supply 903430.00B- 348 25.07.19 CSD-II M/S Aarseller Tradco 606/CPD-I/23.05.19 445/137 Supply 911171.00B- 349 25.07.19 CSD-II M/S Jalvid Udyog 426/CPD-I/15.04.19 486/90 Supply 511070.00B- 350 25.07.19 CSD-II M/S Jalvid Udyog 120/CPD-I/18.01.19 486/90 Supply 19647.00B- 351 25.07.19 CSD-II M/S S.K. Enteering Works 691/CPD-I/07.06.19 486/92 Supply 1253688.00B- 352 25.07.19 CSD-II M/S T.S. Enterprises 608/CPD-I/23.05.19 486/93 Supply 26255.00B- 353 25.07.19 CSD-II M/S Aarseller Tradco 107/CPD-I/17.01.19 486/94 Supply 89279.00B- 354 25.07.19 CAMD-II M/S Jahangir Enterprises 19/CAMD-II/28.02.19 388/72 27868.00

TOTAL TOTAL 6741725.00 1129112.00 1452458.00B- 355 02.08.19 CSD-II M/S Dev Enterprises 204/EMD-V/14.06.19 487/126 JP Camera 152963.00B- 356 02.08.19 CSD-II M/S Aditi Enterprises 121/CPD-I/18.01.19 559/59 Rotameter Supply 36432.00B- 357 02.08.19 CSD-II M/S J.Khushaldas & Co. 367/CPD-I/08.03.19 557/19 Supply 20689.00B- 359 05.08.19 CSD-II M/S Krishna Agencies 975/CPD-I/10.07.19 570/1 Supply 322754.00B- 360 05.08.19 CSD-II M/S Krishna Agencies 976/CPD-I/10.07.19 570/2 Supply 1387963.00B- 361 05.08.19 CSD-II M/S Simplex Switchger Pvt.Ltd 977/CPD-I/10.07.19 570/2 Supply 300676.00B- 362 05.08.19 CSD-II M/S Govardhan Controls 1008/CPD-I/15.07.19 570/3 Supply 854998.00B- 363 05.08.19 CSD-II M/S R.P. Contruction Co. 240/EMD-V/06.07.19 570/4 Supply 257476.00B- 364 05.08.19 CHD-IV M/S Aka Logistics Pvt.Ltd. 09/CHD-IV/12.10.18 539/79 Security 2671189.00B- 365 05.08.19 BMD-IV M/S Nosad Contructor 04/BMD-IV/04.09.18 554/20 Maintinence 47952.00B- 366 06.08.19 CSD-II M/S R.K. Traders 371/C&ID-III/25.07.19 569/4 Supply 135995B- 368 09..08.19 CSD-II M/S Vikash Chauda 507/CPD-II/13.06.19 466/156 Supply 51684.00B- 369 09..08.19 CSD-II M/S Maa Bhagwati Shardey Engg. Enterprises 828/CPD-I/28.06.19 466 Supply 1213813.00B- 370 09..08.19 CSD-II M/S Maa Bhagwati Shardey Engg. Enterprises 829/CPD-I/28.06.19 466/157 Supply 900918.00B- 371 09..08.19 CSD-II M/S Paramount Intrnational 684/CPD-II/09.07.19 466/158 Supply 1025375.00B- 372 09..08.19 CSD-II M/S Uniflow Parketing 637/CPD-II/15.07.19 466/160 Supply 1532083.00B- 373 09..08.19 CSD-II M/S Uniflow Parketing 712/CPD-II/12.07.19 466/163 Supply 445866.00B- 374 09..08.19 CSD-II M/S Thermorever Corps 696/CPD-II/12.07.19 466/161 Supply 2954166.00B- 375 09..08.19 CSD-II M/S Thermorever Corps 713/CPD-II/12.07.19 466/162 Supply 1602942.00B- 376 19.08.19 BMD-IV M/S Nosad Contractor 03/BMD-IV/04.09.18 555/44 Maintinence 32303.00B- 377 19.08.19 BMD-IV M/S Nosad Contractor 04/BMD-IV/04.09.18 555/46 Maintinence 78386.00B- 378 19.08.19 BMD-IV M/S A.S.Enterprises 15/BMD-IV/21.02.19 274/74 Deputation 53914.00B- 379 19.08.19 BMD-IV M/S A.S.Enterprises 14/BMD-IV/21.02.19 274/76 Security 19081.00B- 380 19.08.19 BMD-IV M/S Usha Enterprises 11/BMD-IV/14.01.19 274/76 Maintinence 49382.00B- 381 19.08.19 BMD-IV M/S Usha Enterprises 11/BMD-IV/02.02.17 274/77 Security 71673.00B- 382 19.08.19 BMD-IV M/S MAK Construktor 04/BMD-IV/09.04.19 463/88B Repairing 274432.00B- 383 19.08.19 BMD-IV M/S Gayatri Enterprises 08/BMD-IV/07.06.19 463/89 Security 23370.00B- 384 19.08.19 BMD-IV M/S Balveer Singh Enterprises 09/BMD-IV/27.12.18 463/89 Security 7008.00B- 385 19.08.19 CHD-III M/S Nosad Contractor 05/CHD-III/10.05.18 513/71 Overhaling 57289.00B- 387 19.08.19 CHD-III M/S MRP Constructions 03/CHD-III/19.06.19 513/70 Preventive & B/d 62096.00B- 388 19.08.19 CHD-III M/S Priya Construction 11/CHD-III/13.02.19 513/71 Rewanding 97618.00B- 389 20.08.19 CSD-II M/S Voith Turbo Privte Ltd. 30/CPD-II/08.01.19 428/173 Supply 892762.00B- 391 23.08.19 AHD-II M/S Garg Engg. & Sons 08/AHD-II/11.07.19 479/14 D.P.Electension 231660.00B- 392 23.08.19 AHD-II M/S Rajeev Kumar Contractor 17/AHD-II/14.01.19 515/126 Operation 16941.00B- 393 23.08.19 AHD-II M/S Garg Engg. & Sons 13/AHD-II/25.10.18 515/128 Repairing 104019.00B- 394 23.08.19 AHD-II M/S Rajeev Kumar Contractor 06/AHD-II/30.07.19 515/130 Providing of Sifting 206533.00B- 395 23.08.19 AHD-II M/S Rajeev Kumar Contractor 05/AHD-II/26.06.19 515/132 Cerdition of Paint 101088.00B- 396 23.08.19 AHD-II M/S Rahul Gupta & Co 23/AHD-II/06.02.19 515/133 Repairing 103239.00B- 397 28.08.19 TMD-II M/S M.K. Traders 261/TMD-II/20.06.19 538/19 Break Down 49127.00B- 398 28.08.19 TMD-II M/S Leak Seal Experts Pvt. 01/BMD-III/02.05.18 538/20 Service Charg 8640.00

G:\210MW\2019-20\09-19\Liab_15.09.19_210MW 16

Page 29: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 399 28.08.19 TMD-II M/S Usha Enterprises 31/TMD-II/02.06.17 522/35 Security 99717.00B- 400 28.08.19 TMD-II M/S Hind Udyog 07/TMD-II/22.04.19 528/16 Repairing 103762.00B- 401 29.08.19 AHD-II M/S Garg Engg. & Sons 04/AHD-II/26.06.19 530/17 Repairing 257971.00B- 402 29.08.19 CSD-II M/S Hydro Power Corporatioin 172/CPD-II/15.02.19 406/59 Supply 146000.00B- 403 29.08.19 CSD-II M/S ma Bhagwati Shardey Engg 762/CPD-I/25.06.19 406/59 Supply 742879.00B- 404 29.08.19 CSD-II M/S Thermoserve Corps 794/CPD-II/02.08.19 406/60 Supply 822987.00B- 405 29.08.19 CSD-II M/S Neelkanth Power System Pvt. 776/CPD-II/30.07.19 561/06 Supply 3606941.00B- 406 29.08.19 CSD-II M/S Raviraj Engineering Co. 793/CPD-II/12.08.19 561/08 Supply 883230.00B- 408 30.08.19 CSD-II M/S Kailash Trading Corporation 927/CPD-I/06.07.19 570/09 Supply 1447081.00B- 409 30.08.19 CSD-II M/S Supath Engineering services 827/CPD-I/28.06.19 570/10 Supply 1582961.00

TOTAL 4828390.00 156684.00 23164950.00

B- 410 02.09.19 EMD-IV M/S MRP Constructions 09/EMD-IV/31.07.19 394/85 Instaltion Commission 74304.00B- 411 02.09.19 EMD-IV M/S Panjab Electiric Industries 218/EMD-IV/04.06.16 472/184 Security 43390.00B- 412 03.09.19 BMD-III M/S M.K. Traders 06/BMD-III/01.01.18 281/194 Breakdown 34766.00B- 413 03.09.19 BMD-III M/S Bharat Mechanical & Structural Works 10/BMD-III/18.04.19 281/195 Preventive & B/d 59860.00B- 414 03.09.19 BMD-III M/S Jha Contruction 17/BMD-III/15.07.19 281/196 Instultion 32015.00B- 415 03.09.19 ECM&EMD M/S Vijay Kumar Gupta 403/ECM&EMD/24.07.19 142/12 Work of Ciling 315108.00B- 416 03.09.19 TMD-II M/S Thermal India Engineers 05/TMD-II/28.07.18 527/16 Break Down Maintinance 117649.00B- 417 07.09.19 ECM&EMD M/S Abhay Kumar Singh & Co 02/ECM&EMD/10.07.19 425/101 Miscellar Work 422272.00B- 418 07.09.19 C&ID-II M/S Nosad Contractor 06/C&ID-II/05.06.18 549/06 Miscellar Work 28183.00B- 419 07.09.19 C&ID-II M/S Mahadev Enterprises 11/C&ID-II/16.03.19 453/49 Work of Reparing 109929.00B- 420 11.09.19 CHD-III M/S Vikash Electirical 08/CHD-III/27.10.18 513/73 Overhouling 195906B- 421 11.09.19 CSD-II M/S Vibrant Engg. 1015/CPD-I/15.07.19 561/73 Supply 619500.00B- 422 11.09.19 CSD-II M/S S.K.Systems Pvt.LTd 1254/CPD-I/08.08.19 561/12 Supply 140125.00B- 423 11.09.19 CSD-II M/S Balaji Corporation 473/CPD-II/04.06.19 391/87 Supply 2106333.00B- 424 11.09.19 CSD-II M/S Tirupati Industrial Agenciecc 1303/CPD-I/20.08.19 391/88 Supply 1368145.00B- 425 11.09.19 CSD-II M/S Trade India Corporation 1299/CPD-I/20.08.19 391/88 Supply 305107.00B- 426 11.09.19 CSD-II M/S KVM Emgg.Pvt.Ltd. 862/CPD-II/19.08.19 391/89 Supply 689061.00B- 427 11.09.19 CSD-II M/S Commerical Enterprises 1301/CPD-I/20.08.19 391/89 Supply 1337277.00B- 428 11.09.19 CSD-II M/S J.Umashankar & Co. Pvt.Ltd.. 1300/CPD-I/20.08.19 391/89 Supply 1161120.00B- 429 11.09.19 CSD-II M/S J.Umashankar & Co. Pvt.Ltd.. 1355/CPD-I/28.08.19 391/90 Supply 625477.00B- 430 11.09.19 CAMD-II M/S Jahangir Enterprises 19/CAMD-II/28.02.19 310/75 Conditiong of Water 19246.00B- 431 15.09.19 CSD-II M/S Net Cascade Automation Pvt. Ltd. 1121/CPD-I/26.07.19 570/75 Supply 716644.00B- 432 15.09.19 CSD-II M/S S.S. Jaiswal & brothers 1107/CPD-I/25.07.19 570/12 Supply 110276.00B- 433 15.09.19 CSD-II M/S S.K. Engineering & Allied Solution 1071/CPD-I/22.07.19 570/13 Supply 94046.00B- 435 15.09.19 CSD-II M/S Shrihari Switchgears & Services Pvt. Ltd. 815/CPD-II/07.08.19 570/13 Supply 139929.00B- 436 15.09.19 CSD-II M/S S.K. Engg. & Automation Pvt. Ltd. 1228/CPD-I/07.08.19 570/14 Supply 775118.00B- 437 15.09.19 CSD-II M/S Goverdhan Controls 1229/CPD-I/07.08.19 570/15 Supply 268103.00B- 438 15.09.19 CSD-II M/S Net Cascade Automation Pvt. Ltd. 1230/CPD-I/07.08.19 570/16 Supply 252920.00B- 439 15.09.19 CSD-II M/S A.K. Agencies 1234/CPD-I/07.08.19 570/17 Supply 659233.00B- 440 15.09.19 CSD-II M/S Mother Blessing Enterprises 1247/CPD-I/08.08.19 570/17 Supply 213641.00B- 441 15.09.19 CSD-II M/S Instant Enggs 1311/CPD-I/22.08.19 570/18 Supply 108008.00B- 442 15.09.19 CSD-II M/S Net Cascade Automation Pvt. Ltd. 1319/CPD-I/22.08.19 570/19 Supply 46634.00B- 443 15.09.19 CSD-II M/S Techno Power Control 992/CPD-I/12.07.19 570/19 Supply 118026.00B- 444 15.09.19 CSD-II M/S Jalvid Udyog 868/CPD-II/19.08.19 568/9 Supply 615836.00B- 445 15.09.19 CSD-II M/S Aditi Enterprises 865/CPD-II/19.08.19 568/10 Supply 60350.00B- 446 15.09.19 CSD-II M/S Nosad Contractor 1101/CPD-I/25.07.19 557/22 Supply 320987.00

TOTAL TOTAL 1452628.00 0.00 12851896.00

39636571.00 52338844.00 109796098.00 0.00

Dy. Chief Accounts Officer

Grand Total

G:\210MW\2019-20\09-19\Liab_15.09.19_210MW 17

Page 30: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

Reg Index

Bill No DateName Of Division

Name of Firm

RAB Agr/PO/LOI/WO and Dt MB NO./ Page No

Description of Work/Supply Work Part Paid Amount

Fund Reserved Amount

Supply PIB- 303 04/09/2015 CSD-II M/s Jalvid Udyog 988/CPD-I/06.06.15 126L 03.09.15 Supply 16329B- 332 21/09/2015 CSD-II M/s Jain Mill Stores P. Ltd 1055/CSD-II/18.06.15 126L 19.09.15 Supply 150185

Total 0 0 0

B- 453 20/10/2015 CSD-II M/s Jain Mill Stores P. Ltd 1193/CSD-II/07.07.15 75L 20.10.15 Supply 102196Total 0 0 0

B- 566 14/12/2015 CSD-II M/s Eureka Industrial Equipment P.Lt 1348/CSD-II/29.07.15 89L 14.12.15 Supply 48583Total 0 0 0

B- 698 30/01/2016 CSD-II M/s Jain Mill Stores P. Ltd 1873/CSD-II/18.11.15 75L 29.01.16 Supply 308619B- 699 30/01/2016 CSD-II M/s Jain Mill Stores P. Ltd 1873/CSD-II/18.11.15 75L 29.01.16 Supply 85754

Total 0 0 0

B- 737 06-02-2016 CSD-II M/s Trade India Corporation 1989/CSD-II/18.12.15 134L 06.02.16 Supply 30273Total 0 0 0

B- 66 04-05-2016 CSD-II M/s Placka Instruments India P. Ltd 142/CSD-II/27.01.16 215L 03.05.16 Supply 23138B- 67 04-05-2016 CSD-II M/s Authentic Sys. & Tech 1772/CSD-II/20.10.15 215L 03.05.16 Supply 27872B- 117 16/05/2016 CSD-II M/s Kay Mohan Corporation 533/CSD-II/04.04.16 427L 13.05.16 Supply 44591B- 121 19/05/2016 CSD-II M/s Limitorque India Ltd 1773/CSD-II/20.10.15 215L 17.05.16 Supply 243978B- 122 19/05/2016 CSD-II M/s Limitorque India Ltd 835/CSD-II/08.08.14 215L 17.05.16 Supply 444059B- 146 26/05/2016 CSD-II M/s Jalvid Udyog 58/CSD-II/11.01.16 74L 23.05.16 Supply 575B- 147 26/05/2016 CSD-II M/s Veerangna Enterprises 2763/CSD-II/24.02.15 74L 23.05.16 Supply 247491

Total 0 0 0 0

B- 157 06-06-2016 CSD-II M/s Rama Industries 104/CPD-II/18.04.16 213L 03.06.16 Supply 826917B- 160 06-06-2016 CSD-II M/s V.R. Powergen Equipment 89/CPD-II/16.04.16 190L 03.06.16 Supply 80325B- 174 15/06/2016 CSD-II M/s Trade India Corp 776/CSD-II/07.05.16 185L 13.06.16 Supply 1681725 1009035B- 181 15/06/2016 CSD-II M/s Digita Promoters (I) P. Ltd 1959/CSD-II/11.12.15 215L 13.06.16 Supply 5647B- 188 18/06/2016 CSD-II M/s Hydromech Engineers 2920/CSD-II/15.03.16 213L 16.06.16 Supply 16865B- 197 20/06/2016 CSD-II M/s Genuine Filters 95/CSD-II/16.04.16 173L 18.06.16 Supply 278166B- 203 20/06/2016 CSD-II M/s Akshat Enterprises 844/CSD-II/13.05.16 232L 18.06.16 Supply 103410B- 206 20/06/2016 CSD-II M/s Vinay Trading Corporation 484/CSD-II/28.03.16 232L 18.06.16 Supply 43819B- 207 20/06/2016 CSD-II M/s Vinko Auto Industries 105/CSD-II/18.04.16 232L 18.06.16 Supply 141915B- 208 20/06/2016 CSD-II M/s J.K. Engineering Co 819/CSD-II/10.05.16 232L 18.06.16 Supply 151972

Total 0 0 0 1681725

B- 244 14/07/2016 CSD-II M/s Kay Mohan Corporation 853/CSD-II/13.05.16 239L 13.07.16 Supply 73080B- 245 14/07/2016 CSD-II M/s Kay Mohan Corporation 853/CSD-II/13.05.16 239L 13.07.16 Supply 44467B- 246 14/07/2016 CSD-II M/s Anurag Engineering Works 854/CSD-II/13.05.16 239L 13.07.16 Supply 212498 405958B- 247 14/07/2016 CSD-II M/s Anurag Engineering Works 854/CSD-II/13.05.16 239L 13.07.16 Supply 37639 120718B- 278 25/07/2016 CSD-II M/s Sumal Engineering P. Ltd 91/CSD-II/16.04.16 173L 22.07.16 Supply 770148B- 287 25/07/2016 CSD-II M/s Placka Instruments India P. Ltd 312/CSD-II/25.02.16 233L 22.07.16 Supply 12600B- 303 30/07/2016 CSD-II M/s Emience Engineering Services PLt 593/CSD-II/13.06.16 194L 27.07.16 Supply 492987B- 306 30/07/2016 CSD-II M/s Kay Mohan Corporation 666/CSD-II/22.06.16 194L 27.07.16 Supply 3980B- 307 30/07/2016 CSD-II M/s Globus Engineers 516/CSD-II/01.06.16 194L 27.07.16 Supply 319364B- 295 25-07-2016 M/s Alstom I&D Limited 70L 181606

Total 0 0 0 250137

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVED

2X250 MW Parichha Thermal Extension Project, Parichha (Jhansi)"B"

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

Material/Spares

FUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVED

G:\250MW\2019-20\09-19\Liab_15.09.19_250MW B-List-250MW

Page 31: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 342 09-08-2016 CSD-II M/s J. Umashanker & Co. P. Ltd 1508/CSD-II/13.07.16 240L 08.08.16 Supply 6457

B- 371 19-08-2016 CSD-II M/s Globus Engineers 517/CPD-II/01.06.16 190L 17.08.16 Supply 943226

B- 377 19-08-2016 CSD-II M/s Atlas Copco Compressor Tech. 1433/CPD-II/30.06.16 213L 17.08.16 Supply 216766 161723Total 0 0 0 216766

B- 411 02-09-2016 CSD-II M/s Trade India Corporation 362/CPD-I/03.03.16 185L 31.08.16 Supply 154364

B- 422 02-09-2016 CSD-II M/s Aarseller Tradco 965/CPD-II/28.07.16 233L 31.08.16 Supply 558158

B- 424 02-09-2016 CSD-II M/s J.K Engineering Co. 1072/CPD-I/06.06.16 232L 02.09.16 Supply 45444 512714

B- 425 02-09-2016 CSD-II M/s Jain Mill Stores P. Ltd 820/CPD-I/10.05.16 232L 02.09.16 Supply 116668

B- 426 02-09-2016 CSD-II M/s Jain Mill Stores P. Ltd 1073/CPD-I/06.06.16 232L 02.09.16 Supply 400263

B- 430 02-09-2016 CSD-II M/s Jalvid Udyog 1510/CPD-I/13.07.16 232L 02.09.16 Supply 26752

B- 437 02-09-2016 CSD-II M/s United Engineering Works 664/CPD-II/22.06.16 194L 02.09.16 Supply 67876

B- 438 02-09-2016 CSD-II M/s Jalvid Udyog 1058/CPD-II/09.8.16 194L 02.09.16 Supply 40968

B- 456 09-09-2016 CSD-II M/s Kay Mohan Corp 933/CPD-II/25.07.16 360L 06.09.16 Supply 77941

B- 473 21/09/2016 CSD-II M/s Shree Shyam Bearing P. Ltd 1105/CSD-II/08.06.16 239L 19.09.16 Supply 54789

B- 492 28/09/2016 CSD-II M/s Amco Industries 1887/CSD-II/24.08.16 61L 27.09.16 Supply 67599Total 0 0 0 45444

B- 498 04-10-2016 CSD-II M/s Jalvid Udyog 1834/CPD-I/17.08.16 126L 03.10.16 Supply 7214

B- 501 04-10-2016 CSD-II M/s Technow Engineering Work 1835/CPD-I/17.8.16 126L 03.10.16 Supply 27332

B- 554 26/10/2016 CSD-II M/s Jai Balaji Control Gears P. Ltd 905/CPD-I/18.05.16 233L 25.10.16 Supply 74358

B- 556 26/10/2016 CSD-II M/s S.K. Engipro & Allied Solution 2046/CPD-I/14.09.16 233L 25.10.16 Supply 257449

B- 559 28/10/2016 CSD-II M/s Atlas Copco Compressure Solu 1445/CPD-II/29.09.16 197L 27.10.16 Supply 269209 344083

B- 563 28/10/2016 CSD-II M/s Amco Industries 1925/CPD-I/29.08.16 61L 27.10.16 Supply 8838Total 0 0 0 269209

B- 592 15/11/2016 CSD-II M/s Keltron Controls 2043/CPD-I/14.07.16 215L 11.11.16 Supply 31554

B- 618 30/11/2016 CSD-II M/s Jain Mill Stores P. Ltd 1839/CSD-II/17.08.16 246L 29.11.16 Supply 326430

B- 619 30/11/2016 CSD-II M/s Jalvid Udyog 2090/CSD-II/22.09.16 246L 29.11.16 Supply 33571

B- 620 30/11/2016 CSD-II M/s Jalvid Udyog 2090/CSD-II/22.09.16 246L 29.11.16 Supply 283304 56208

B- 621 30/11/2016 CSD-II M/s Technow Engg Works 2091/CSD-II/22.09.16 246L 29.11.16 Supply 36166Total 0 0 0 283304

B- 626 02-12-2016 CSD-II M/s Jaisia Industries P. Ltd. 1528/CPD-II/14.10.16 173L 01.12.16 Supply 143154 338460

B- 637 15/12/2016 CSD-II M/s U.P. Udyog 1079/CPD-II/11.08.16 250L 14.12.16 Supply 263091 84573

B- 638 15/12/2016 CSD-II M/s U.P. Udyog 1080/CPD-II/11.08.16 250L 14.12.16 Supply 615346 455619

B- 644 15/12/2016 CSD-II M/s Aditya Enterprises 921/CPD-III/22.09.16 233L 08.12.16 Supply 571934

B- 646 15/12/2016 CSD-II M/s K.S & Brothers 895/CPD-III/14.09.16 233L 08.12.16 Supply 344509

B- 660 22/12/2016 CPD-II M/s V.R. Powergen Equipments 1393/CPD-II/23.09.16 190L 21.12.16 Supply 200395

B- 661 22/12/2016 CPD-II M/s krishna Kumar Distributors P. Ltd. 950/CPD-II/26.09.16 234L 21.12.16 Supply 265718

B- 672 26/12/2016 CSD-II M/s Trade India Corporation 2191/CPD-I/14.10.16 249L 26.12.16 Supply 507464 17962

B- 680 30/12/2016 CSD-II M/s SMAP Engineers (P) Ltd 1581/CPD-II/20.10.16 194L 29.12.16 Supply 986781 186963

B- 686 30/12/2016 CSD-II M/s Authentic Sys. & Technology 2384/CPD-I/23.11.16 250L 29.12.16 Supply 409252Total 0 0 0 2515836

B- 706 04/01/2017 CSD-III M/s Saurabh Udyog 896/CPD-III/30.05.14 234L 03.01.17 Supply 65048 102993

B- 707 04/01/2017 CSD-III M/s Saurabh Udyog 896/CPD-III/30.05.14 234L 03.01.17 Supply 36860 5003

B- 735 13/01/2017 CPD-III M/s Elecon Engineering Co. Ltd 1116/CPD-III/02.12.16 360L 13.01.17 Supply 1706440

B- 736 13/01/2017 CPD-I M/s Hindustan Petroleum Corporation Ltd 2240/CPD-I/22.10.16 126L 13.01.17 Supply 1797106 254356

B- 738 13/01/2017 CSD-I M/s Instant Engineers 2464/CPD-I/13.12.16 233L 13.01.17 Supply 172973

B- 739 13/01/2017 CSD-I M/s Krishna Engg. Com. 2466/CPD-I/13.12.16 233L 13.01.17 Supply 508820

B- 746 27.01.2017 CSD-I M/s Shree Shyam Bearings Pvt. Ltd. 2190/CPED-I/14.10.16 249L/03 27.01.17 Supply 121256

B- 750 27.01.2017 CSD-I M/s Simplex Switchgear Pvt. Ltd. 1031/CPED-III/22.10.16 233L/46 27.01.17 Supply 7722

B- 751 27.01.2017 CSD-I M/s Krishan Kumar Distributors P. Ltd. 484/CPED-III/18.05.16 233L/47 27.01.17 Supply 25718Total 0 0 0 1899014

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVED

G:\250MW\2019-20\09-19\Liab_15.09.19_250MW B-List-250MW

Page 32: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 789 13/02/2017 CSD-II M/s Aarseller Tredco 130/CPD-II/21.01.17 233L 10.02.17 Supply 711978

B- 790 13/02/2017 CSD-II M/s Atlas Copco Compressor Sales 1457/CPD-II/29.09.16 61L 09.02.17 Supply 576234 31565

B- 796 17/02/2017 CSD-II M/s Uttam Sales Corporation 1137/CPD-III/21.12.16 234L 16.02.17 Supply 30528Total 0 0 0 576234

B- 818 02-03-2017 CSD-II M/s AIA Engineering Ltd. 740/CPD-II/02.07.16 194L, 96 02.03.17 Supply 4812512 4409257

B- 837 07-03-2017 CSD-II M/s Globe Enterprises 37/CPD-I/10.01.17 232L, 12A 07.03.17 Supply 4676 123000

B- 838 07-03-2017 CSD-II M/s Jalvid Udyog 157/CPD-1/30.01.17 232L, 12B 07.03.17 Supply 10626

B- 839 07-03-2017 CSD-II M/s Jalvid Udyog 31/CPD-I/09.01.17 232L, 13A 07.03.17 Supply 30228

B- 852 09-03-2017 CSD-II M/s Kakati Karshak Industries P.L. 155/CPD-II/27.04.16 203L, 55B 09.03.17 Vacuum pump 3423

B- 875 24-03-2017 CSD-II M/s Uttam Sales Corporation 146/CPD-I/30.01.17 233L 23.03.17 Supply 7047

B- 876 24-03-2017 CSD-II M/s Aditya Enterprises 48/CPD-II/28.01.17 233L 23.03.17 Supply 630288

B- 878 24-03-2017 CSD-II M/s Keltron Controls 2425/CPD-I/28.11.16 233L 23.03.17 Supply 368522

B- 892 30-03-2017 CPD-I M/s RSP OVERSEAS PVT. LTD. 1108/CPD-I/08.06.16 239L 07.03.17 Supply of bearing 92211Total 0 0 0 4817188

B- 2 07.04.2017 CSD-II M/s Shivam Enterprise 213/CPD-I/20.02.17 194L 06.04.17 Supply 28305Total 0 0 0 0

B- 42 04.05.17 CSD-II M/s Shree Bhawani Trading Co. 110/CPD-III/01.03.17 197L 02.05.17 Supply 1485380

B- 64 18.05.17 EPED-IV M/s MRP Construction 07/EPED-IV/20.10.15 192L 15.05.17 Security 37018Total 0 0 0 0

B- 132 17.06.17 CSD-II M/s Vinay Trading Corporation 144/CPD-I/30.01.17 232L 16.06.17 Supply 77010

B- 133 17.06.17 CSD-II M/s Globe Enterprises 331/CPD-I/12.05.16 232L 16.06.17 Supply 77189

B- 134 17.06.17 CSD-II M/s Globe Enterprises 331/CPD-I/12.05.16 232L 16.06.17 Supply 31732

B- 139 22.06.17 CSD-II M/s Flowtech Engineers 530/CPD-II/15.04.17 249L 22.06.17 Supply 455707

Total 0 0 0 0

B- 183 13.07.17 CSD-II M/s Bharat Petroleum Corporation Ltd. 128/CPD-I/20.06.16 126L 12.07.17 Supply 141365

B- 184 13.07.17 CSD-II M/s Bharat Petroleum Corporation Ltd. 192/CPD-I/08.02.17 126L 12.07.17 Supply 107867 202391

B- 228 22.07.17 CSD-II M/s RSP Overseas Pvt. Ltd. 1108/CPD-I/08.06.16 185L 21.07.17 Supply 43541

B- 229 22.07.17 CSD-II M/s RSP Overseas Pvt. Ltd. 1108/CPD-I/08.06.16 185L 21.07.17 Supply 490

B- 230 22.07.17 CSD-II M/s RSP Overseas Pvt. Ltd. 1507/CPD-I/13.07.16 185L 21.07.17 Supply 3743

Total 0 0 0 107867

B- 243 19.08.17 CSD-II M/s Northland Rubber Mills 272/CPD-III/05.06.17 61L 19.08.17 Supply 2765448

B- 259 30.08.17 MPED-IV M/s Rajeev Kumar Contractor 20/MPED-IV/12.01.17 82L 17.08.17 Supply 100347

Total 0 0 0 0

B- 298 27.09.17 CSD-II M/s Instant Engineers 419/CPD-I/28.06.17 215L 27.09.17 Supply 24666

B- 299 27.09.17 CSD-II M/s Aditya Enterprises 398/CPD-I/22.06.17 215L 27.09.17 Supply 618075

B- 302 27.09.17 CSD-II M/s Aarseller Tredco 690/CPD-I/26.08.17 215L 27.09.17 Supply 115693Total 0 0 0 0

B- 312 11.10.17 CSD-II M/s U.W. & Associates 537/CPD-I/25.05.17 234L 11.10.17 Supply 31360

B- 317 16.10.17 CSD-II M/s Ion Exchange India Ltd. 1217/CPD-II/05.09.17 126L 13.10.17 Supply 655537

B- 344 30.10.17 CSD-II M/s Pee Kay Trivals 686/CPD-I/26.08.17 127L 28.10.17 Supply 198720

B- 345 30.10.17 CSD-II M/s Hindustan Petroleum Corporation Ltd. 501/CPD-I/12.10.17 127L 28.10.17 Supply 269925Total 0.00 0.00 0.00 0.00

B- 350 01.11.17 CSD-II M/s Asan Engineers Pvt. Ltd. 1451/CPD-II/07.10.17 250L 01.11.17 Supply 355769 222026

B- 370 15.11.17 CSD-II M/s Aarsellr Tredco 862/CPD-I/21.09.17 233L 15.11.17 Supply 1067432 276226

B- 371 15.11.17 CSD-II M/s V.K. Trading Corporation 957/CPD-I/10.10.17 233L 15.11.17 Supply 118810Total 0 0 1542011 498252

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVED

FUND RESERVED

FUND RESERVED

FUND RESERVEDFUND RESERVED

FUND RESERVEDFUND RESERVEDFUND RESERVED

G:\250MW\2019-20\09-19\Liab_15.09.19_250MW B-List-250MW

Page 33: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 418 06.12.17 CSD-II M/s Hindustan Petroleum Corporation Ltd. 1054/CPD-I/01.11.17 126L 06.12.17 Supply 957161

B- 429 13.12.17 CSD-II M/s Balaji Corporation 572/CPD-II/22.04.17 203L 12.12.17 Battery 348023 270000

B- 435 15.12.17 CSD-II M/s S.S. Jaiswal & Brothers 809/CPD-I/15.09.17 214L 15.12.17 Supply 1479170

B- 436 15.12.17 CSD-II M/s S.S. Jaiswal & Brothers 780/CPD-I/11.09.17 214L 15.12.17 Supply 1293825Total 0 1479170 2599009 270000

B- 468 10.01.18 CSD-II M/s Ion Exchange (India ) Ltd. 1738/CPD-II/04.12.17 232L/35B 10.01.18 Supply 0

B- 504 19.01.18 CPD-II M/s Leak Seal Engineering 1745/CPD-II/07.12.17 197L/21 18.01.18 Supply 126201Total 0 126201 0 0

B- 629 27.02.18 CSD-II M/s S.K. Engipro & Allied Solution (P) Ltd, 1006/CPD-I/17.10.17 233L/70 26.02.18 Pressure Gayses 239400

B- 630 27.02.18 CSD-II M/s Simplex Switchgear Pvt. Ltd. 1491/CPD-I/22.12.14 233L/71 26.02.18 Thermostart 198240

B- 631 27.02.18 CSD-II M/s Pawor Engineers 42/CPD-II/06.01.18 217L/16 15.02.18 Supply 538792

B- 632 27.02.18 CSD-II M/s Simplex Switchgear Pvt. Ltd. 133/CPD-II/29.01.18 217L/16 26.02.18 Alkal Unloading 104030

B- 633 27.02.18 CSD-II M/s Simplex Switchgear Pvt. Ltd. 1692/CPD-I/20.11.17 217L/17 26.02.18 Fume Absorber 140892

B- 634 27.02.18 CSD-II M/s Globus Engineers 1783/CPD-II/15.11.17 217L/19 26.02.18 Supply 699955

B- 635 27.02.18 CSD-II M/s Globus Engineers 2044/CPD-II/21.12.16 217L/20 26.02.18 Replaceable Seat 39552

B- 636 27.02.18 CSD-II M/s Technow Engineering Works 1404/CPD-I/24.01.18 232L/42B 26.02.18 Supply 22237

B- 637 27.02.18 CSD-II M/s Technow Engineering Works 1265/CPD-I/19.12.17 232L/43A 26.002.18 Supply 26451

B- 638 27.02.18 CSD-II M/s Jalvid Udyog 1264/CPD-I/19.12.17 232L/43B 26.02.18 Supply 287183TOTAL 0 581222 1715510 0

B- 657 19.03.18 CSD-II M/s Trade India Corporation 1343/CPD-I/10.01.18 284L/4A 19.03.18 Supply 443214

B- 659 20.03.18 CSD-II M/s BPCL 1055/CPD-I/01.11.17 126L/53 20.03.18 Supply (T To A List A-259dt.07.06.18) 0

B- 661 22.03.18 CSD-II M/s Goverdhan Controls 767/CPD-I/07.09.17 89L/58B 21.03.18 Supply 424120

B- 678 26.03.18 CSD-II M/s Astech Marketing Pvt. Ltd. 1641/CPD-I/16.03.18 214L/113 26.03.18 Supply 319339TOTAL 0 762553 424120 0

B- 1 03.04.18 CSD-II M/s Hind Udyog 207/CPD-II/09.02.18 213L/50 03.04.18 Supply 589528

B- 4 03.04.18 MPED-I M/s Nico Engineering Services Ltd. II 411/MPED-I/24.01.18 247L/56 OH 45312

B- 11 03.04.18 MPED-I M/s Syndicate Engineers II 14/MPED-I/19.07.17 291L/20 Replacement of Coal 102944

B- 12 03.04.18 MPED-I M/s S.K. Engineering Works III 27/MPED-I/15.01.18 291L/20B B/d Maintenance 38258

B- 15 04.04.18 CSD-II M/s K.S. & Brothers 958/CPD-I/10.10.17 198L/26 04.04.18 Supply 105545

B- 16 04.04.18 CSD-II M/s K.S. & Brothers 1403/CPD-I/29.01.18 198L/27 04.04.18 Supply 43746

B- 20 04.04.18 EPED-II M/s R.P. Construction Co. 07/EPED-II/26.10.17 313L/03 07.03.18 Misc. Mechanical Works 58611

B- 21 06.04.18 ECM&EMD M/s Ravindra Singh & Co. II 08/ECM&EMD/26.12.17 363L/150 07.03.18 Maintenance of Park 45199

B- 23 06.04.18 ECM&EMD M/s Ravindra Singh & Co. I 08/ECM&EMD/09.01.18 316L/02 08.03.18 Closing of Pumping 253648

B- 25 09.04.18 MPED-IV M/s India Engg. Works XIII 02/MPED-IV/05.05.17 84L/86B 12.02.18 Replacement/ Rafiting 51637

B- 26 09.04.18 MPED-IV M/s India Engg. Works XX 22/MPED-IV/12.02.17 83L/85 27.02.18 Febrication & Repairing 31624

B- 27 09.04.18 MPED-IV M/s India Engg. Works XXI 22/MPED-IV/12.02.17 83L/85B 06.03.18 Febrication & Repairing 64664

B- 29 09.04.18 MPED-IV M/s India Engg. Works 23/MPED-IV/12.01.17 83L/86 27.03.18 Security 18000

B- 30 09.04.18 MPED-IV M/s India Engg. Works 13/MPED-IV/24.03.17 83L/86B 27.03.18 Security 23650

B- 31 09.04.18 MPED-IV M/s India Engg. Works 11/MPED-IV/24.08.16 83L/87 27.03.18 Security 49568

B- 32 09.04.18 MPED-IV M/s India Engg. Works 04/MPED-IV/21.06.17 83L/87 27.03.18 Security 29256

B- 33 09.04.18 MPED-IV M/s MAK Construction Co. 06/MPED-IV/25.07.16 83L/87B 28.03.18 Security 98133

B- 34 09.04.18 MPED-IV M/s Rahul Gupta & Co. I 22/MPED-IV/12.01.18 83L/88B 31.03.18 Fab. Of Shaft Repairing 96649

B- 35 09.04.18 MPED-IV M/s Arun Kumar 08/MPED-IV/29.07.17 112L/77B 27.03.18 Security 1200

B- 36 09.04.18 MPED-IV M/s Kiran Devi 15/MPED-IV/29.09.16 112L/78L 27.03.18 Security 4582

B- 38 09.04.18 MPED-IV M/s India Engg. Works 02/MPED-IV/05.05.17 112L/78B 06.01.18 Repairing & Maintenance 24762

B- 39 09.04.18 MPED-IV M/s India Engg. Works 22/MPED-IV/12.01.17 112L/79 11.01.18 Repairing of ash 25110

B- 42 12.04.18 MPED-IV M/s India Engg. Works XIV 02/MPED-IV/05.05.17 102L/126 19.01.18 Repairing Maintenance 45453

B- 43 12.04.18 MPED-IV M/s India Engg. Works XVIII 22/MPED-IV/12.01.17 102L/127 24.01.16 Fabrication/ Repairing 23860

B- 44 12.04.18 MPED-IV M/s India Engg. Works XV 02/MPED-IV/05.05.17 102L/128 28.01.18 Repairing Maintenance 21501

B- 45 12.04.18 ECCU M/s RITES Ltd. VI 2170/ECCU/21.11.09 300L/03 11.04.18 Project Management Consultancy Works

1685756

B- 48 17.04.18 MPED-II M/s Usha Enterprises 13/MPED-II/31.08.16 206L/82 Security 81932

G:\250MW\2019-20\09-19\Liab_15.09.19_250MW B-List-250MW

Page 34: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 49 17.04.18 MPED-II M/s Thermal India Engineers 07/MPED-II/25.01.18 228L/99 Security 67920

B- 52 17.04.18 MPED-IV M/s MAK Construction IX 14/MPED-IV/26.01.18 103L/129 26.01.18 DP Extension & Diversion of Ash 86494

B- 53 17.04.18 MPED-IV M/s India Engg. Works XVI 02/MPED-IV/05.05.17 112L/82 10.03.18 Reelacment/Refitting 18889

B- 54 17.04.18 ECM&EMD M/s Vijay Kumar Gupta IFinal 20/ECM&EMD/14.03.18 399L/67B 11.04.18 M&R of door Reiforce cement 331112

B- 55 19.04.18 MPED-I M/s Bharat Mechanical & Structural Works V 28/MPED-I/15.01.18 176L/49 12.03.18 B/d Maintenance 105933

B- 60 20.04.18 MPED-V M/s MAK Construction Co. VI 05/MPED-V/20.06.17 151L/96B 02.04.18 opration of Bowler 269480

B- 62 20.04.18 MPED-V M/s MAK Construction Co. IX & Final 04/MPED-V/27.05.17 297L/23B 02.04.18 B/d Maintenance 110258

B- 63 20.04.18 MPED-V M/s O.S. Contractor II 18/MPED-V/18.07.17 121L/181 12.03.18 Servicing of hot air gats 35776

B- 64 20.04.18 MPED-III M/s Usha Enterprises II 27/MPED-III/10.03.17 238L/103 16.03.18 OH 97952

B- 65 20.04.18 MPED-III M/s Jahangir Enterprises IX 19/MPED-III/12.01.17 238L/119 29.03.18 B/d Maintenance 27335

B- 66 20.04.18 MPED-III M/s Jahangir Enterprises X 19/MPED-III/12.01.17 238L/120 29.03.18 B/d Maintenance 21335

B- 67 20.04.18 MPED-III M/s Jahangir Enterprises XI 19/MPED-III/12.01.17 238L/122 29.03.18 B/d Maintenance 29294

B- 68 20.04.18 MPED-III M/s Jahangir Enterprises XII 19/MPED-III/12.01.17 238L/123 29.03.18 B/d Maintenance 27786

B- 72 23.04.18 MPED-VI M/s Jahangir Enterprises II 28/EE-MPED-VI/29.10.17 256L/44B 02.04.18 B/d Maintenance 47003

B- 73 23.04.18 MPED-VI M/s Jahangir Enterprises III 28/EE-MPED-VI/29.10.17 256L/45B 02.04.18 B/d Maintenance 88038

B- 75 23.04.18 MPED-VI M/s Thermal India Engineers VI 08/MPED-II/03.08.17 228L/106 03.03.18 B/d Maintenance 203964

B- 76 23.04.18 MPED-VI M/s Thermal India Engineers VIII 08/MPED-II/03.08.17 228L/111 03.03.18 B/d Maintenance 203257

B- 77 23.04.18 MPED-VI M/s Thermal India Engineers VII 08/MPED-II/03.08.17 229L/114 B/d Maintenance 62569

B- 81 24.04.18 EPED-V M/s Awasthi Motar Winding Works Final 06/EPED-V/06.11.15 211L/82 03.04.17 Compelete Rotor care 310658

B- 83 24.04.18 MPED-I M/s S.K. Engineering Works IV 27/MPED-I/15.01.18 281L/9B 04.04.18 B/d Maintenance 26996

B- 84 24.04.18 MPED-I M/s Bharat Mechanical & Structural Works VI 28/MPED-I/15.01.18 281L/12 04.04.18 B/d Maintenance 56700

B- 87 24.04.18 MPED-I M/s O.S. Contractor IIFinal 30/MPED-I/30.03.17 290L/5B 20.04.18 Repairing 173420TOTAL 5323478 695073 43746 0

B- 88 03.05.18 M/s D.K. & Sons Co. IFinal 16/EPED-I/06.11.17 278L/17 16.03.18 Fab & Eveebon 276473

B- 90 03.05.18 MPED-VI M/s D.K. & Sons Co. VI 10/EPED-I/10.08.16 98L/77 16.03.18 B/D Maintenance 56004

B- 91 03.05.18 EPED-I M/s A.K. Construction 09/EPED-I/04.08.16 98L/78B Security 200387

B- 92 03.05.18 EPED-I M/s A.K. Construction 01/EPED-I/11.05.16 98L/79 Security 173943

B- 93 03.05.18 EPED-I M/s Bharat Mechanical & Structural Works IFinal 24/MPED-I/05.12.17 292L/11 23.02.18 Replacement of & 165526

B- 97 03.05.18 MPED-I M/s O.S. Contractor XII 07/MPED-I/08.08.16 13L/41 16.04.18 B/D Maintenance 202628

B- 98 03.05.18 MPED-I M/s O.S. Contractor XIII 07/MPED-I/08.08.16 13L/41B 21.04.18 Maintenance 114269

B- 99 03.05.18 MPED-I M/s R,B. Engineering Works II 26/MPED-I/05.12.17 13L/42B 23.04.18 B/D 101979

B- 105 03.05.18 MPED-III M/s Jahangir Enterprises I 15/MPED-III/21.03.18 182L/14 25.02.18 B/D Maintenance 37267

B- 106 03.05.18 MPED-III M/s Jahangir Enterprises security 23/MPED-III/06.02.17 164L/85 08.04.18 Security 22500

B- 107 03.05.18 MPED-III M/s Balram Engineer Contractor & Suppliers 70/CWCD-III/07.10.13 164L/86 08.04.18 Security 30660

B- 108 03.05.18 MPED-III M/s Jahangir Enterprises 17/MPED-III/18.11.15 164L/87 08.04.18 Security 17819

B- 111 03.05.18 MPED-IV M/s Rajeev Kumar Contractor I 25/MPED-IV/13.03.18 196L/39 01.03.18 Laying of ms Pipe Line 3000 139876

B- 113 03.05.18 MPED-IV M/s India Engineering Works IFinal 05/MPED-IV/26.04.18 320L/07 24.04.18 Lifting & Shifting 97308

B- 119 07.05.18 MPED-V M/s Syndicate Engineers 19/MPED-V/09.03.17 153L/70B 04.05.18 Security 245310

B- 120 07.05.18 MPED-V M/s Syndicate Engineers 12/MPED-V/15.07.17 121L/181 10.05.18 Security 9700

B- 121 07.05.18 MPED-V M/s Syndicate Engineers 14/MPED-V/17.07.17 121L/182 10.05.18 Security 358200

B- 122 07.05.18 MPED-V M/s Syndicate Engineers 13/MPED-V/17.07.17 121L/183 10.05.18 Security 47821

B- 127 07.05.18 CSD-II M/s Jalvid Udyog 302/CPD-II/05.03.18 250L/37 11.05.18 Supply 64223

B- 129 15.05.18 EPED-II M/s R.P. Construction Co. III 07/EPED-II/26.10.17 304L/13B 17.04.18 Laying Testing 45748

B- 134 17.05.18 MPED-IV M/s India Engineering Works I 02/MPED-IV/16.04.18 112L/85B 07.04.18 Reparing 18164

B- 135 17.05.18 MPED-IV M/s India Engineering Works XIX 02/MPED-IV/05.05.18 112L/85B 11.04.18 Replacement refitting 29662

B- 136 17.05.18 MPED-IV M/s Rahul Gupta & Co. II 22/MPED-IV/12.01.18 112L/86B 30.04.18 Febrication of enf cover 58470

B- 138 17.05.18 MPED-IV M/s India Engineering Works XX 02/MPED-IV/05.05.18 83L/90 28.04.18 Replacment Refiting 29080

B- 139 17.05.18 MPED-IV M/s Garg Engineering & Sons V 05/MPED-IV/29.06.17 83L/92B 28.04.18 Reparing/ Replecment 32958

B- 141 23.05.18 CSD-II M/s Trade India Corporation 1343/CPD-II/10.01.18 284L/5B 23.05.18 Supply 133057

B- 142 23.05.18 CSD-II M/s Mechfield Corporation 304/CPD-II/05.03.18 246L/34B 23.05.18 Supply 3197

B- 143 23.05.18 CSD-II M/s Hind Scientific Industries 546/CPD-II/08.05.18 246L/35 23.05.18 Supply 1662

B- 144 23.05.18 CSD-II M/s Priya Construction Co. 10/EPED-III/09.11.12 89L/60 23.05.18 Security 23873

B- 145 25.05.18 CSD-II M/s Naushad & Brothers 87/CPD-I/20.04.18 90L/38A 23.05.18 Supply 1033370

B- 148 26.05.18 MPED-IV M/s MAK Construction Co. X 14/MPED-IV/26.09.17 81L/122 13.04.18 Divirsion of ash 47872

B- 149 26.05.18 MPED-IV M/s Garg Engineering & Sons II 24/MPED-IV/10.01.18 81L/123 13.04.18 Febrication & Erection 54879

B- 150 26.05.18 MPED-IV M/s India Engineering Works I 07/MPED-IV/02.05.18 81L/124 04.05.18 OH of Sal 200861

G:\250MW\2019-20\09-19\Liab_15.09.19_250MW B-List-250MW

Page 35: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 151 26.05.18 MPED-IV M/s S.R. Enterprises 14/MPED-IV/06.09.16 81L/126 05.05.18 Security 10290

B- 152 26.05.18 MPED-IV M/s India Engineering Works 22/MPED-IV/12.01.17 81L/126 05.05.18 Security 87430

B- 153 26.05.18 MPED-IV M/s Garg Engineering & Sons IV 05/MPED-IV/29.06.17 102L/129 15.04.18 Crack vlalveelzing 38344

B- 155 28.05.18 EPED-V M/s Nosad Contractor III 04/EPED-V/04.09.17 299L/7B 10.05.18 B/D Maintenance 19197

B- 157 30.05.18 ECM&EMD M/s S.R. Enterprises II 23/ECM&EMD/15.03.18 397L/73B 16.04.18 Eart work 4132 36647

B- 158 31.05.18 MPED-II M/s Thermal India Engg. 14/MPED-II/19.10.16 55L/88B 30.05.18 Security money 116334TOTAL 2978088 1036567 198942 176523

B- 159 01.06.18 CSD-II M/s Technow Engineering Works 177/CPD-I/21.05.18 232L/47B 31.05.18 Supply 25453 90920

B- 160 01.06.18 CSD-II M/s Technow Engineering Works 177/CPD-I/21.05.18 232L/48B 31.05.18 Supply 24272 20686

B- 163 04.06.18 MPED-VI M/s Jahangir Enterprises VI 28/MPED-VI/29.10.17 318L/20 07.05.18 B/d Maintenance 59145

B- 171 04.06.18 MPED-V M/s MAK Construction Co. I 01/MPED-V/24.04.18 274L/55 01.05.18 B/d Maintenance 29596

B- 172 05.06.18 MPED-IV M/s India Engineering Works XXII 22/MPED-IV/12.01.17 82L/88 06.03.18 Fabrication Repairing 56558

B- 173 05.06.18 MPED-IV M/s India Engineering Works XVII 02/MPED-IV/05.05.17 82L/88 17.03.18 Replacement Refting 24945

B- 174 05.06.18 MPED-IV M/s India Engineering Works XVIII 02/MPED-IV/05.05.17 82L/89 26.03.18 Replacement Refting 24125

B- 175 05.06.18 MPED-IV M/s MAK Construction Co. IX 14/MPED-IV/26.09.17 82L/90 26.03.18 D.P. Extension 44774

B- 176 05.06.18 MPED-IV M/s India Engineering Works III 02/MPED-IV/16.04.18 84L/89 02.05.18 Reparing 65070

B- 177 05.06.18 MPED-IV M/s Hind Udyog 06/MPED-IV/15.07.17 84L/89A 03.05.18 Security 40241

B- 179 07.06.18 MPED-I M/s Bharat Mechanical & Structural Work VII 28/MPED-I/15.01.18 231L/88 30.04.18 B/d Maintenance 165306

B- 180 07.06.18 MPED-I M/s Jahangir Enterprises 13/MPED-I/09.09.16 292L/15 22.05.18 Security 46094

B- 185 07.06.18 CSD-II M/s Atlas Copco (India) Ltd. 1667/CPD-II/14.11.17 212L/63 06.06.18 Supply 990781

B- 188 14.06.18 ECCU M/s Sadan Engineering Works I 26/ECCU/09.01.18 64L/87 05.03.18 M& Raf Ash Dump 176552

B- 189 14.06.18 ECCU M/s Sadan Engineering Works II 26/ECCU/09.01.18 64L/89 20.04.18 M& Raf Ash Dump 92131

B- 191 14.06.18 ECCU M/s Sadan Engineering Works IF 31/ECCU/28.03.18 26L/67B 20.04.18 Cleaning Jungle 302501

B- 193 14.06.18 ECCU M/s Sadan Engineering Works IF 03/ECCU/21.05.18 300L/5B 30.04.18 Distempring & Painting 322631

B- 195 15.06.18 CSD-II M/s Shree Shyam Bearing Pvt. Ltd. 1342/CPD-I/10.01.18 285L/7A 14.06.18 Supply 96255

B- 196 15.06.18 CSD-II M/s Rajat Associates 1698/CPD-II/24.11.17 285L/7B 14.06.18 Supply PI 9333

B- 198 18.06.18 EPED-II M/s S.K.Engineering & Allied Solution IF 165/CPD-I/02.02.16 304L/14B 12.06.18 Supply 196176

B- 200 18.06.18 CSD-II M/s Jalvid Udyog 178/CPD-I/21.05.18 330L/01 15.06.18 Supply 22397

B- 201 18.06.18 CSD-II M/s Jalvid Udyog 178/CPD-I/21.05.18 330L/02 15.06.18 Supply 868

B- 202 19.06.18 ECM&EMD M/s Sawen Consultancy Services Pvt. Ltd. ILast 02/ECM&EMD/07.06.18 364L/154 22.05.18 Document for Submission (Transfer To A List A-278 dt. 21.06.18

0

B- 204 20.06.18 MPED-I M/s R.B. Engineering Works III 26/MPED-I/13.10.17 290L/09 10.05.18 B/d Maintenance 58799

B- 205 20.06.18 MPED-I M/s R.B. Engineering Works IV 26/MPED-I/05.12.17 290L/14B 06.06.18 B/d Maintenance 117995

B- 207 20.06.18 MPED-I M/s Syndicate Engineers 15/MPED-I 290L/16B 18.06.18 Security 89100

B- 208 22.06.18 MPED-I M/s Bharat Mechanical & Structural Work IX 28/MPED-I/15.01.18 170L/113 04.06.18 B/d Maintenance 64700

B- 210 22.06.18 MPED-I M/s Bharat Mechanical & Structural Work VIII 28/MPED-I/15.01.18 247L/62 07.05.18 B/d Maintenance 124632

B- 211 22.06.18 MPED-I M/s Leak Seal Experts (India) Pvt. Ltd. I 01/BMD-III/02.05.18 247L/64 Service Charges 68040

B- 212 22.06.18 CSD-II M/s Commercial Enterprises 1344/CPD-I/10.01.18 285L/6B 22.06.18 Supply 487816

B- 213 26.06.18 MPED-V M/s MAK Construction Co. Final 26/MPED-V/10.01.18 276L/14B 08.05.18 Repairing 40392

B- 215 26.06.18 MPED-V M/s Hind Udyog V 11/MPED-V/14.07.17 275L/64 09.06.18 Repairing 326570

B- 216 26.06.18 MPED-V M/s Thermal India Engineers IX&X 08/MPED-II/03.08.17 228L/118 B/d Maintenance 137254

B- 217 26.06.18 MPED-V M/s Hind Udyog VII 09/MPED-IV/01.08.17 84L/92 22.06.18 Supply 16850

B- 220 27.06.18 MPED-IV M/s India Engineering Works 03/MPED-IV/05.05.17 112L/88B 27.06.18 Security 806400

B- 221 29.06.18 CSD-II M/s New Allenberry Works 202/CPD-III/23.05.18 61L/92B 28.06.18 Gearbox 2802377

B- 222 29.06.18 MPED-III M/s Usha Enterprises I 06/MPED-III/10.10.17 244L/72 11.05.18 B/d Maintenance 104282

B- 224 29.06.18 MPED-III M/s Usha Enterprises IFinal 03/MPED-III/16.04.18 164L/91 12.06.18 Repairing 83268

B- 226 30.06.18 MPED-III M/s Jahangir Enterprises XIII 19/MPED-III/12.01.17 182L/33 29.04.18 B/d Maintenance 28505

B- 227 30.06.18 MPED-III M/s Jahangir Enterprises XIV 19/MPED-III/12.01.17 182L/35 11.05.18 B/d Maintenance 21048

B- 232 30.06.18 MPED-I M/s Hind Udyog 17/MPED-I/27.09.16 189L/20 14.12.17 Repairing 61950

B- 234 30.06.18 MPED-I M/s S.K. Engineering Works VI 27/MPED-I/15.01.18 247L/66 28.06.18 B/d Maintenance 119248

B- 235 30.06.18 MPED-IV M/s Rajeev Kumar Contractor I 06/MPED-IV/28.04.18 320L/2B 01.06.18 Opration of dewating 25138TOTAL 6529367 0 1870201 111606

B- 236 03.07.18 CSD-II M/s Supath Engineering Services Ltd. 765 1727/CPD-I/07.10.15 154L/51 31.03.18 Supply 9854

B- 239 06.07.18 ECM&EMD M/s Ashish Enterprises I 05/ECM&EMD/23.06.18 438L/76 05.06.18 Earth Work 362946

G:\250MW\2019-20\09-19\Liab_15.09.19_250MW B-List-250MW

Page 36: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 241 07.07.18 CSD-II M/s Yokogawa India Ltd. KA1801001192

1618/CPD-I/13.03.18 90L/40B 24.05.18 Supply 752969

B- 242 07.07.18 CSD-II M/s Aarseller Tredco PIN No. 06 1332/CPD-I/09.01.18 90L/41B 15.01.18 Supply 410901 41283

B- 243 07.07.18 MPED-IV M/s Rajeev Kumar Contractor II 06/MPED-IV/28.04.18 320L/04 01.07.18 Opration of Dewating 16396

B- 246 10.07.18 CSD-II M/s Masibud Automation And Instrument 173622 1411/CPD-I/24.01.18 234L/33 24.03.18 Supply 172575

B- 249 16.07.18 MPED-I M/s Bharat Mechanical & Structural Works XIIIFinal 28/MPED-I/15.01.18 231L/93 11.06.18 B/d Maintenance 59084

B- 251 16.07.18 MPED-V M/s MAK Construction Co. 23/MPED-V/07.11.17 132L/97B 04.07.18 Security 7045

B- 253 16.07.18 CSD-II M/s Flowtech Engineers 623/CPD-II/31.05.18 269L/20 13.07.18 Supply 1721692

B- 254 16.07.18 CSD-II M/s Trade India Corporation 1343/CPD-I/10.01.18 284L/6A 13.07.18 Supply 38745

B- 258 19.07.18 EPED-V M/s Nosad Contractor IV 04/EPED-V/04.09.17 302L/3B 03.07.18 B/d Maintenance 26392

B- 259 19.07.18 EPED-V M/s Electrical & Instrumantation Engg. 08/EPED-V/10.01.17 302L/4 17.07.18 Security 38160

B- 260 19.07.18 EPED-V M/s Electrical & Instrumantation Engg. 10/EPED-V/27.03.17 302L/4B 17.07.18 Security 21058

B- 261 19.07.18 EPED-V M/s Electrical & Instrumantation Engg. 11/EPED-V/27.03.17 302L/4B 17.07.18 Security 8230

B- 262 19.07.18 EPED-V M/s MRP C onstruction 10/EPED-V/05.01.16 302L/5 17.07.18 Security 94031

B- 266 20.07.18 MPED-V M/s MAK Construction Co. II 01/MPED-V/24.04.18 150L/82B 02.07.18 Opration of Bowl 30092

B- 271 21.07.18 MPED-II M/s India Engineering Works XXII 02/MPED-IV/05.05.17 84L/93 25.06.18 R&m of Bottam ash 34092

B- 272 21.07.18 MPED-IV M/s India Engineering Works XXI 02/MPED-IV/05.05.17 83L/92B 14.06.18 Repairing Maintenance 28495

B- 273 21.07.18 MPED-IV M/s Hind Udog VIII Final 09/MPED-IV/21.08.17 83L/93 28.06.18 Febrication Repairing 15020

B- 274 21.07.18 MPED-IV M/s Rajeev Kumar Contractor 17/MPED-IV/15.12.17 81L/130 12.07.18 Security 6552

B- 275 21.07.18 MPED-IV M/s Jitendra Kumar 26/MPED-IV/24.03.17 81L/130 12.07.18 Security 8232

B- 276 21.07.18 MPED-IV M/s Jitendra Kumar 11/MPED-IV/28.08.17 81L/131 12.07.18 Security 8918

B- 277 24.07.18 MPED-IV M/s MAK Construction Co. XIII, XIV 14/MPED-IV/26.09.17 102L/133 29.06.18 Ash Slury Disposal 83396

B- 279 24.07.18 MPED-VI M/s Jahangir Enterprises VII 28/MPED-VI/29.10.17 317L/53 18.05.18 B/d Maintenance 7340

B- 280 24.07.18 MPED-VI M/s Shavo Norgren India Pvt. Ltd. XIII 29/MPED-VI/10.01.17 317L/54 21.05.18 B/d Maintenance 13041

B- 281 24.07.18 MPED-VI M/s Bharti Enterprises XIV 29/MPED-VI/10.01.17 317L/56 30.05.18 B/d Maintenance 6804

B- 283 24.07.18 MPED-VI M/s Jahangir Enterprises VIII 28/MPED-VI/29.10.17 317L/66 12.06.18 B/d Maintenance 14378

B- 284 24.07.18 MPED-VI M/s Jahangir Enterprises IX 28/MPED-VI/29.10.17 317L/68 25.06.18 B/d Maintenance 18283

B- 285 24.07.18 MPED-VI M/s Balram Engineer Contractror & Suppliers II 13/MPED-VI/02.06.18 317L/70 06.07.18 B/d Maintenance 12144

B- 286 26.07.18 CSD-II M/s Hemen Industrial Corporation 682/CPD-II/14.06.18 194L/157 23.07.18 Supply 247328

B- 288 26.07.18 CSD-II M/s Vaith Turboput Ltd. 544/CPD-II/08.05.18 194L/159 23.07.18 Supply 1541777

B- 289 28.07.18 MPED-VI M/s Balram Engineer Contractror & Suppliers I 13/MPED-VI/02.06.18 318L/43 15.06.18 B/d Maintenance 9253

B- 290 28.07.18 CSD-II M/s Industrial Mill Stores 1297/CPD-I/22.12.17 233L/72 27.07.18 Supply 339073

B- 291 28.07.18 CSD-II M/s Shavo Norgren India Pvt. Ltd. 1549/CPD-I/24.02.18 233L/73 27.07.18 Supply 5381

B- 292 28.07.18 CSD-II M/s Elecon Engineering Co. Ltd. 24/CPD-II/27.01.18 212L/72 27.07.18 Supply 2734650

B- 295 31.07.18 CSD-II M/s Soniji Engineering Pvt. Ltd. 1053/CPD-I/01.11.17 217L/23 30.07.18 Supply 1104422

B- 296 31.07.18 MPED-III M/s Jahangir Enterprises III 15/MPED-III/21.03.18 244L/76 05.07.18 B/d Maintenance 21491

B- 297 31.07.18 MPED-III M/s Jahangir Enterprises IV 15/MPED-III/21.03.18 244L/77 05.07.18 B/d Maintenance 24577

B- 299 31.07.18 MPED-III M/s Voltas Limited 11/EE-MPED-III/08.09.16 244L/83 11.07.18 Security 104056

B- 300 31.07.18 MPED-III M/s Usha Enterprises 11/MPED-III/10.09.15 238L/133 28.07.18 Security (Note: one bill missed MB No.180L Page No. 112 Amount 9580

48857

B- 301 31.07.18 MPED-III M/s Jahangir Enterprises 16/MPED-III/24.10.16 238L/134 28.07.18 Security 83544

B- 302 31.07.18 MPED-III M/s Usha Enterprises 27/MPED-III/10.03.17 238L/134 28.07.18 Security 33405

B- 303 31.07.18 MPED-III M/s Usha Enterprises 114/MPED-III/13.12.13 238L/135 28.07.18 Security 76650

B- 304 31.07.18 MPED-III M/s Jahangir Enterprises II 15/MPED-III/21.03.18 238L/136 28.07.18 B/d Maintenance 37723TOTAL 1359685 3356871 5722496 41283

B- 307 01.08.18 MPED-III M/s Jahangir Enterprises XV 19/MPED-III/12.1.17 180L/160 14.05.18 B/d Maintenance 19873

B- 308 02.08.18 MPED-IV M/s Rajeev Kumar Contractor 18/MPED-IV/15.12.17 112L/90 27.07.18 Security 20410

B- 309 02.08.18 MPED-IV M/s Garg Engineering & Sons 19/MPED-IV/19.12.17 112L/90 27.07.18 Security 28847

B- 310 02.08.18 MPED-IV M/s Garg Engineering & Sons 20/MPED-IV/19.12.17 112L/90B 27.07.18 Security 8167

B- 311 02.08.18 MPED-IV M/s Garg Engineering & Sons 01/MPED-IV/28.04.17 112L/91 27.07.18 Security 28758

B- 312 02.08.18 MPED-IV M/s Garg Engineering & Sons 20/MPED-IV/21.01.17 112L/91 27.07.18 Security 9344

B- 314 02.08.18 MPED-IV M/s Rajeev Kumar Contractor 24/MPED-IV/13.03.18 112L/91B 27.07.18 Security 29001

B- 316 08.08.18 MPED-II M/s Bharti Enterprises Security 18/MPED-II/16.12.16 322L/06 06.08.18 Security 66920

B- 318 08.08.18 MPED-V M/s MAK Construction Co. Security 04/MPED-V/27.05.17 297L/32 24.07.18 Security 92058

B- 319 08.08.18 MPED-V M/s MAK Construction Co. Security 27/MPED-V/10.01.18 297L/32 24.07.18 Security 17355

G:\250MW\2019-20\09-19\Liab_15.09.19_250MW B-List-250MW

Page 37: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 320 08.08.18 MPED-V M/s O.S. Contractor Security 16/MPED-V/18.07.17 297L/32 26.07.18 Security 29493

B- 321 08.08.18 MPED-V M/s O.S. Contractor Security 17/MPED-V/18.07.17 297L/32B 26.07.18 Security 66020

B- 322 08.08.18 MPED-V M/s Authentic System & Technologis 1548/CPD-I/24.02.18 214L/115 08.08.18 Supply 6778

B- 323 08.08.18 MPED-V M/s Shravan Engineering Enterprises Pvt. Ltd. 1557/CPD-I/26.02.18 214L/115 08.08.18 Supply 1534

B- 325 08.08.18 EPED-I M/s R.P. Construction Co. III 11/EPED-I/21.08.17 199L/38 27.06.18 Laying & Fixing of cable 24487

B- 326 09.08.18 EPED-IV M/s Ge T&D India Limited 482/EPED-IV/24.11.16 279L/04 08.08.18 Service Charges 200000

B- 328 09.08.18 ECCU M/s Ashish Enterprises I 32/ECCU/23.03.18 114L/11 02.06.18 Cariage of Material 647455

B- 329 09.08.18 ECM&EMD M/s Sadan Engineering Works I 19/ECM&EMD/05.02.18 362L/110 10.03.18 Cleaning of obrain 235636

B- 331 09.08.18 ECM&EMD M/s Pitambra Engineering & Contractors I 07/ECM&EMD/02.07.18 362L/124 26.07.18 Cleaning of obrain (T to A List A-487) 0

B- 332 09.08.18 ECM&EMD M/s Pitambra Engineering & Contractors I 06/ECM&EMD/02.07.18 364L/161 02.07.18 Cleaning of obrain (T to A List A-488) 0

B- 334 09.08.18 ECM&EMD M/s Sadan Engineering Works III 18/ECM&EMD/29.01.18 462L/60 18.04.18 Cleaning of Toilats 59124

B- 335 09.08.18 ECM&EMD M/s Sadan Engineering Works III 18/ECM&EMD/29.01.18 462L/65 17.06.18 Cleaning of Toilats 60197

B- 336 13.08.18 MPED-III M/s Jahangir Enterprises 87/MPED-III/18.03.16 227L/110 28.07.18 Security 11616

B- 342 14.08.18 MPED-I M/s O.S. Contractor V 05/MPED-I/04.05.17 282L/11 03.08.18 Complete instalation work 109528

B- 344 16.08.18 MPED-VI M/s Cleanflo India Pvt. Ltd. I Final 15/MPED-VI/02.06.18 331L/14 12.06.18 Consultancy Services 59400

B- 345 18.08.18 CSD-II M/s Atlas Copco India Ltd. 457/CPD-I/26.07.18 90L/42 18.08.18 Supply 401618

B- 349 18.08.18 EPED-II M/s S.K. Engineering & Allied Solutions IFinal 130/EPED-II/22.05.18 303L/15B 16.08.18 Checking & Testing 70800

B- 350 18.08.18 MPED-V M/s A.K. Construction Co. III 01/MPED-V/24.04.18 274L/67 01.08.18 Opration of Bowl 15293

B- 353 18.08.18 MPED-V M/s Hind Udyog IIFinal 11/MPED-V/14.07.17 150L/85B 02.08.18 Repairing 228960

B- 354 18.08.18 ECM&EMD M/s Sadan Engineering Works IFinal 11/ECM&EMD/26.12.17 362L/102 10.01.18 Drain Cleming 24666

B- 357 20.08.18 MPED-V M/s Abhay Kumar Singh 14/ECM&EMD/15.11.16 425L/78 02.07.18 Misc. Civil Works 2314 22682

B- 359 21.08.18 MPED-VI M/s S.R. Construction 28/MPED-VI/05.01.17 130L/137 09.08.18 Security 63373

B- 361 21.08.18 ECM&EMD M/s Ravindra Singh & Co. III 08/ECM&EMD/26.12.17 363L/155 08.05.18 Maintenance of Park 44298

B- 362 21.08.18 ECM&EMD M/s Ravindra Singh & Co. IV 08/ECM&EMD/26.12.17 363L/161 07.07.18 Maintenance of Park 42352

B- 363 24.08.18 CSD-II M/s Atlas Copco India Ltd. 336/CPD-I/05.07.18 212L/76 21.08.18 Supply 460016

B- 364 24.08.18 CSD-II M/s Siemens Ltd. 569/CPD-II/16.05.18 212L/77 21.08.18 Supply 1025013

B- 366 29.08.18 MPED-III M/s SGL Engineering II 01/MPED-III/09.04.18 46L/70 19.08.18 Maintenance 21558

B- 368 29.08.18 CSD-II M/s Aarseller Tredco 378/CPD-III/04.08.18 233L/74 27.08.18 Supply 442486 1162169

B- 372 29.08.18 EPED-I M/s Priya Construction Co. 04/EPED-I/28.04.18 98L/83 07.08.18 Security 30652

B- 373 29.08.18 EPED-I M/s Priya Construction Co. 17/EPED-I/29.12.15 98L/83B 07.08.18 Security 26086

B- 374 29.08.18 EPED-I M/s Priya Construction Co. 02/EPED-I/23.05.16 98L/84 07.08.18 Security 52536

B- 379 29.08.18 CSD-II M/s G.P. Distributars 403/CPD-I/23.07.18 246L/49B 27.08.18 Supply 258646

B- 380 31.08.18 EPED-I M/s D.K. & Sons Co. Final Bill 04/EPED-I/26.07.18 326L/08 08.08.18 Fabrication 174636

B- 381 31.08.18 MPED-IV M/s Rajeev Kumar Contractor III 06/MPED-IV/28.04.18 320L/06 07.08.18 Opration of Dewating 16941Total 2638154 1726145 869946 1184851

B- 382 05.09.18 EPED-II M/s D.K. & Sons Co. 13/EPED-II/10.01.17 304L/18A 04.09.18 Security 28145

B- 387 05.09.18 CSD-II M/s Electronics & Electricals 414/CPD-III/16.08.18 234L/38 05.09.18 Supply 28152 214581

B- 388 06.09.18 MPED-IV M/s Garg Engineering & Sons 10/MPED-IV/28.08.17 83L/95 29.08.18 Security 9872

B- 389 06.09.18 MPED-IV M/s Garg Engineering & Sons 23/MPED-IV/29.01.18 83L/95 31.08.18 Security 28281

B- 390 06.09.18 MPED-IV M/s Rahul Gupta & Co. 22/MPED-IV/23.08.18 112L/93B 31.08.18 Supply 109985

B- 391 07.09.18 CSD-II M/s J. Umashankar & Co. Pvt. Ltd. 462/CPD-I/26.07.18 284L/6A 07.09.18 Supply 76759

B- 392 07.09.18 CSD-II M/s J. Umashankar & Co. Pvt. Ltd. 462/CPD-I/26.07.18 284L/6B 07.09.18 Supply 25260

B- 394 07.09.18 CSD-II M/s Rajat Associates 458/CPD-I/26.07.18 284L/7A 07.09.18 Supply 365604

B- 397 10.09.18 CHD-II M/s M.K. Traders VI 15/CHD-II/20.11.17 254L/102 30.12.17 Maintenance 49903

B- 399 11.09.18 EPED-IV M/s GE T&D India Ltd. 273/EPED-IV/13.09.17 70L/75B 29.08.18 Supervision Service 547520

B- 402 12.09.18 MPED-I M/s Jahangir Enterprises Ist final 05/MPED-I/03.08.18 282L/12B Fabrication 302400

B- 412 14.09.18 CSD-II M/s Asha Printing Press 165/CPD-I/18.05.18 246/51B 12.09.18 Supply 134206

B- 417 14.09.18 CSD-II M/s Ashbond Engineers Pvt. Ltd. 936/CPD-II/03.08.18 212L/78 13.09.18 Supply 980287

B- 418 19.09.18 ECM&EMD M/s Ravindra Singh & Company 22/ECM&EMD/15.03.18 112lL/93 08.06.18 Development of Nearby 67264 51843

B- 419 20.09.18 EPED-II M/s Siddhi Vinayak Enggi. 05/EPED-II/04.07.16 303L/18B 18.09.18 Security 38170

B- 422 20.09.18 CSD-II M/s RSP Overseas Pvt. Ltd. 1341/CPD-I/10.01.18 285L/09 20.09.18 Supply 87178

B- 424 22.09.18 CSD-II M/s Industrial Sales & Supply Agencies 401/CPD-I/23.07.18 330L/18 20.09.18 Supply 524326

B- 438 24.09.18 CSD-II M/s Flowtech Engineers 1068/CPD-II/07.09.18 249L/31 22.09.18 Supply 215972 251693

B- 440 24.09.18 ECM&EMD M/s Ravindra Singh & Company 02/ECM&EMD/06.05.17 397L/76 22.09.18 Security 53148

B- 441 24.09.18 ECM&EMD M/s Ravindra Singh & Company 21/ECM&EMD/15.03.18 310L/3B 09.04.18 Half Brick 68027

G:\250MW\2019-20\09-19\Liab_15.09.19_250MW B-List-250MW

Page 38: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 442 25.09.18 MPED-IV M/s Rajeev Kumar Contractor 06/MPED-IV/28.04.18 320L/7B 01.09.18 Operation of dewatering 16941

B- 443 27.09.18 EPED-I M/s Basch Rexroth (I) Pvt. Ltd. I 373/EPED-I/18.11.17 326L/09 14.09.18 Repairing testing work 14160

B- 444 27.09.18 EPED-I M/s Basch Rexroth (I) Pvt. Ltd. II 373/EPED-I/18.11.17 326L/10 14.09.18 Repairing testing work 413016

B- 445 27.09.18 EPED-I M/s Basch Rexroth (I) Pvt. Ltd. III 373/EPED-I/18.11.17 326L/11 14.09.18 Repairing testing work 14160

B- 446 27.09.18 EPED-I M/s Basch Rexroth (I) Pvt. Ltd. IV 373/EPED-I/18.11.17 326L/12 14.09.18 Repairing testing work 413016

B- 454 27.09.18 MPED-V M/s Energo Construction Ltd. 09/MPED-V/07.07.18 334L/9B 14.09.18 Security 697880

B- 461 28.09.18 CSD-II M/s Keltron Controls 130/CPD-I/08.05.16 234L/45 27.09.18 Supply 159045

B- 463 28.09.18 CSD-II M/s K.S. & Brothers 396/CPD-III/08.08.18 234L/47 27.09.18 Supply 534989

B- 465 28.09.18 CSD-II M/s Flowtech Engineers 751/CPD-I/31.08.18 234L/49 27.09.18 Supply 2916100TOTAL 2761903 1447910 4709953 518117

B- 466 09.10.18 ECM&EMD M/s Ashish Enterprises II 05/ECM&EMD/23.06.18 438L/79 02.08.18 Earth Work 180793 94895

B- 467 09.10.18 MPED-V M/s Rambali Singh Contractor I Final 13/MPED-V/27.08.18 307L/02B 05.09.18 Providing and Laying 349601

B- 468 09.10.18 MPED-V M/s Jahagir Enterprises XI Final 28/MPED-VI/29.10.17 317L/75 06.09.18 B/d Maintenance 22885

B- 469 09.10.18 MPED-V M/s Balram Engineers & Suppliers III 13/MPED-VI/02.06.18 317L/77 23.08.18 B/d Maintenance 11043

B- 470 09.10.18 MPED-V M/s Jahagir Enterprises 22/MPED-VI/23.10.17 317L/83 17.09.18 Security 2495

B- 471 09.10.18 MPED-V M/s Jahagir Enterprises X 28/MPED-VI/29.10.17 331L/16 27.07.18 B/d Maintenance 12349

B- 472 09.10.18 MPED-I M/s Leak Seal Experts (India) II 01/BMD-III/02.05.18 281L/25B Service Charges 66943

B- 473 09.10.18 CSD-II M/s Flowtech Engineers 1110/CPD-II/14.09.18 250L/39 09.10.18 Supply 12302 780034

B- 475 09.10.18 CSD-II M/s Kakati Karshak industries Pvt. Ltd. 569/CPD-II/22.04.18 250L/40 09.10.18 Supply 890786

B- 479 09.10.18 CSD-II M/s Jay Marketing Company Pvt. Ltd. 347/CPD-I/07.07.18 233L/78 06.10.18 Supply 67487

B- 487 09.10.18 CSD-II M/s Simplex Switchgear Pvt. Ltd. 483/CPD-II/15.09.18 197L/38 08.10.18 Supply 3511796

B- 488 10.10.18 CSD-II M/s Aditya Enterprises 839/CPD-I/12.09.18 234L/51 09.10.18 Supply 36338

B- 490 11.10.18 MPED-IV M/s India Engineering Works XXIII 02/MPED-IV/05.05.17 81L/133 09.08.18 Replascement Refitting 33538

B- 492 11.10.18 MPED-IV M/s India Engineering Works XXIV 02/MPED-IV/05.05.17 84L/97 19.08.18 Replacement Refting 22760

B- 494 22.10.18 MPED-III M/s Jahangir Enterprises V 15/MPED-III/21.03.18 244L/86 22.09.18 B/d Maintenance 15776

B- 496 22.10.18 MPED-III M/s Jahangir Enterprises XIV To XVIII Final

15/MPED-III/21.03.18 244L/88 24.09.18 B/d Maintenance 31093

B- 499 22.10.18 EPED-III M/s Electrical & Instrumentation Eng. 01/EPED-III/15.05.17 242L/33 10.10.18 Repairing Overhauling 101585

B- 501 24.10.18 CSD-II M/s Industrial Sals & Supply Agencies 841/CPD-I/12.09.18 246L/55A 22.10.18 Supply 933674

B- 503 24.10.18 CSD-II M/s Industrial Sals & Supply Agencies 844/CPD-I/12.09.18 246L/56A 22.10.18 Supply 41457

B- 507 24.10.18 CSD-II M/s Vijay Engineering 591/CPD-II/13.06.16 329L/10B 22.10.18 Supply 247350

B- 509 24.10.18 CSD-II M/s Trade India Corporation 463/CPD-I/26.07.18 285L/9A 22.10.18 Supply 100816

B- 511 24.10.18 MPED-II M/s Hind Udyog 06/MPED-II/15.07.17 228L/133 04.08.18 B/d Maintenance 63976

B- 513 24.10.18 ECM&EMD M/s Vijay Kumar Gupta 15/ECM&EMD/29.01.18 439L/77 23.10.18 Security 29781

B- 514 24.10.18 ECM&EMD M/s Vijay Kumar Gupta 14/ECM&EMD/29.01.18 439L/78 23.10.18 Supply 29570

B- 516 25.10.18 CSD-II M/s Govardhan Controls 933/CPD-I/22.09.18 215L/98 17.10.18 Supply 155481

B- 530 25.10.18 MPED-IV M/s Naushad & Brothers V Final 06/MPED-IV/28.04.18 321L/4B 12.10.18 Opration of Dewating 22953

B- 531 26.10.18 MPED-VI M/s S.R. Contractor IV 01/MPED-VI/01.04.18 163L/130 16.08.18 B/d Maintenance 107878

B- 532 26.10.18 MPED-VI M/s Hind Scientific Industries I Final 20/MPED-VI/13.08.18 163L/133 18.09.18 Repair for muffle 46804

B- 536 30.10.18 MPED-I M/s R.B. Engineering Works V 26/MPED-I/05.12.18 168L/38 29.09.18 B/d Maintenance 82097

B- 537 31.10.18 CSD-II M/s Simplex Switchgear Pvt. Ltd. 801/CPD-II/11.07.18 249L/249 15.10.18 Supply 104030

B- 539 31.10.18 CSD-II M/s Uttam Sales Corporation 299/CPD-I/22.06.18 90L/40A 30.11.18 Supply 56284

TOTAL 1204350 5187226 1000145 874929 0

B- 546 01.11.18 CSD-II M/s V.K. Trading Corporation 932/CPD-I/22.09.18 89L/64B 31.10.18 Supply 160166

B- 552 02.11.18 MPED-II M/s MAK Construction Co. II 22/MPED-II/13.09.17 298L/27 01.10.18 Path Work 113077

B- 553 02.11.18 MPED-I M/s Hind Udyog II 32/MPED-I/23.01.18 281L/26B 01.10.18 Repairing 202326

B- 554 02.11.18 MPED-I M/s Jahangir Enterprises 05/MPED-I/13.08.18 281L/27 Security 28000

B- 555 02.11.18 MPED-I M/s S.K. Engineering Works VI 27/MPED-I/15.01.18 175L/61 23.10.18 B/d Maintenance 105933

B- 556 02.11.18 MPED-I M/s Syndicate Engineers IV 14/MPED-I/29.07.18 175L/63 23.10.18 Replacement of Coal 113356

B- 559 02.11.18 MPED-I M/s Syndicate Engineers I 03/MPED-I/25.06.18 290L/26B 18.10.18 Repairing 85847

B- 570 03.11.18 MPED-VI M/s Balram Engineers & Suppliers IV 13/MPED-VI/02.06.18 256/55 29.09.18 B/d Maintenance 54034

B- 571 12.11.18 ECCU M/s Ashish Enterprises II 32/ECCU/23.03.18 114L/13B 01.10.18 Carriage of Material 626083

B- 572 12.11.18 ECCU M/s Pitambra Engineers & Contractor III, Final 14/ECCU/26.09.17 1764L/170 01.10.18 Providing and Laying 106985

B- 574 14.11.18 ECM&EMD M/s Sadan Engineering Works IV 18/ECM&EMD/29.01.18 462L/68 02.07.18 Cleaning of Toilet 13311

G:\250MW\2019-20\09-19\Liab_15.09.19_250MW B-List-250MW

Page 39: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 575 14.11.18 MPED-III M/s Jahangir Enterprises I 10/EE-MPED-III/22.09.18 180L/170 14.08.18 B/d Maintenance 31521

B- 576 14.11.18 MPED-III M/s Jahangir Enterprises II 10/EE-MPED-III/22.09.18 180L/171 28.08.18 B/d Maintenance 41543

B- 579 14.11.18 MPED-III M/s Jahangir Enterprises IV 10/MPED-III/22.09.18 180L/176 25.09.18 B/d Maintenance 31921

B- 580 14.11.18 MPED-III M/s Harsh & Brothers I Final 17/MPED-III/28.10.16 180L/177 29.08.19 Repairing 198180

B- 581 14.11.18 MPED-III M/s Jahangir Enterprises VIII 15/MPED-III/21.03.18 164L/116 24.10.18 B/d Maintenance 32808

B- 582 14.11.18 MPED-III M/s Jahangir Enterprises IX 15/MPED-III/21.03.18 164L/117 24.10.18 B/d Maintenance 28808

B- 583 14.11.18 MPED-III M/s Jahangir Enterprises X 15/MPED-III/21.03.18 164L/118 24.10.18 B/d Maintenance 38867

B- 584 14.11.18 MPED-III M/s Balram Engineers & Suppliers I 11/MPED-III/01.10.18 164L/120 26.10.18 B/d Maintenance 21651

B- 585 14.11.18 MPED-III M/s SGL Engineering Industries III 01/MPED-III/09.04.18 46L/74 19.10.18 Maintenance 34742

B- 589 15.11.18 CSD-II M/s A.K. Agencies 465/CPD-I/26.07.18 285L/10B 14.11.18 Supply 5575

B- 590 15.11.18 CSD-II M/s A.K. Agencies 465/CPD-I/26.07.18 285L/11A 14.11.18 Supply 609

B- 592 17.11.18 MPED-IV M/s MAK Construction Co. II 14/MPED-IV/26.09.17 167L/59 03.11.18 DP Extenstion & Division 116326

B- 593 17.11.18 MPED-IV M/s India Engineering Works IV 02/MPED-IV/16.04.18 167L/60 20.10.18 Repairing 19272

B- 594 17.11.18 MPED-IV M/s Ashish Enterprises III 05/ECM&EMD/23.06.18 438L/83 02.11.18 Earth Work 168231

B- 598 17.11.18 CSD-II M/s S.R. Industries 1141/CPD-II/22.09.18 250L/47 15.11.18 Supply 425329 339097

B- 600 17.11.18 CSD-II M/s S.R. Industries 1143/CPD-II/22.09.18 250L/48 15.11.18 Supply 70008 636079

B- 608 22.11.18 EPED-I M/s D.K. & Sons Co. Final 10/EPED-I/10.08.16 179L/192 16.10.18 OH Reveinting & Maintenance 30370

B- 609 29.11.18 CSD-II M/s Simplex Switchgear Pvt. Ltd. 1078/CPD-I/12.10.18 90L/53 26.11.18 Supply 64236

B- 610 29.11.18 EPED-III M/s R.P. Construction Co. I 07/EPED-III/25.09.18 208L/165 26.11.18 Removal & Refurbishment 71075

B- 611 29.11.18 EPED-III M/s R.P. Construction Co. II Final 07/EPED-III/25.09.18 208L/166 01.11.18 Removal & Refurbishment 171304

B- 617 29.11.18 CSD-II M/s Jain Mill Stores Pvt. Ltd. 831/CPD-I/11.09.18 330L/27 28.11.18 Supply 413249

B- 619 29.11.18 CSD-II M/s Jain Mill Stores Pvt. Ltd. 842/CPD-I/12.09.18 330L/30 28.11.18 Supply 168723 407711TOTAL 2485571 646208 661687 1382887

B- 621 01.12.18 MPED-IV M/s India Engineering Works XXV Final 02/MPED-IV/05.05.17 84L/99 10.10.18 Replacement/ refiting 13032

B- 623 01.12.18 MPED-VI M/s S.R. Construction VI,VII 01/MPED-VI/01.04.18 163L/136 16.10.18 B/d Maintenance 80685

B- 624 03.12.18 CSD-II M/s Samsan Controls Pvt. Ltd. 1061/CPD-II/11.10.18 233L/86 30.11.18 Supply 196128

B- 629 05.12.18 CSD-II M/s Kay Mohan Corporation 1161/CPD-I/01.11.18 285L/11A 04.12.18 Supply 129026 336922

B- 631 05.12.18 CSD-II M/s Jyesth Marketing 1166/CPD-I/02.11.18 285L/12B 04.12.18 Supply 1358256

B- 632 05.12.18 CSD-II M/s Commercial Enterprises 1069/CPD-I/11.10.18 285L/13 04.12.18 Supply 317972

B- 633 05.12.18 CSD-II M/s Commercial Enterprises 1069/CPD-I/11.10.18 285L/13B 04.12.18 Supply 21537

B- 634 05.12.18 CSD-II M/s Commercial Enterprises 1069/CPD-I/11.10.18 285L/13B 04.12.18 Supply 34180

B- 635 05.12.18 CSD-II M/s Commercial Enterprises 1069/CPD-I/11.10.18 285L/14A 04.12.18 Supply 55139

B- 636 05.12.18 CSD-II M/s Commercial Enterprises 1069/CPD-I/11.10.18 285L/14B 04.12.18 Supply 172344

B- 641 05.12.18 CSD-II M/s J.K. Engineering Co. 829/CPD-I/11.09.18 232L/57B 04.12.18 Supply 301875

B- 647 05.12.18 CSD-II M/s Technow Engineering Works 1158/CPD-I/01.11.18 232L/60B 04.12.18 Supply 66983

B- 655 05.12.18 CSD-II M/s Regent Trading Co. 504/CPD-III/01.10.18 213L/70 05.12.18 Supply 533934 262993

B- 656 05.12.18 CSD-II M/s Neelkanth Power 538/CPD-II/05.05.18 213L/72 05.12.18 Supply 210366

B- 658 05.12.18 MPED-IV M/s Garg Engineering & Sons VII 05/MPED-IV/29.06.17 320L/9B 10.11.18 Repairing 41028

B- 664 10.12.18 CSD-II M/s A.K. Agencies 1070/CPD-I/11.10.18 284L/9B 10.12.18 Supply 33486

B- 665 10.12.18 CSD-II M/s A.K. Agencies 1070/CPD-I/11.10.18 284L/9B 10.12.18 Supply 280872 20823

B- 666 10.12.18 CSD-II M/s A.K. Agencies 1070/CPD-I/11.10.18 284L/10 10.12.18 Supply 42945

B- 670 11.12.18 CSD-II M/s Jalvid Udyog 1365/CPD-II/20.11.18 329L/21B 10.12.18 Supply 79642

B- 671 11.12.18 CSD-II M/s Jalvid Udyog 1365/CPD-II/20.11.18 329L/21B 10.12.18 Supply 2520

B- 675 14.12.18 MPED-IV M/s MAK Construction Co. XIV 14/MPED-IV/26.09.17 321L/9B 04.12.18 DP Extenstion & Division 155690

B- 676 14.12.18 MPED-I M/s R.B. Engineering Works VI Final 26/MPED-I/05.12.18 321L/10 04.12.18 B/d Maintenance 129824

B- 680 18.12.18 MPED-I M/s O.S. Contractor 30/MPED-I/30.03.17 209L/58 10.12.18 Security 59331

B- 681 18.12.18 MPED-I M/s Sunrise Engineers & Contractor 26/MPED-I/30.03.17 291L/30B 12.12.18 Security 74700

B- 683 18.12.18 MPED-I M/s Zenith Engineers 29/MPED-I/15.01.18 281L/27B 12.12.18 Security 14303

B- 684 18.12.18 MPED-I M/s Bharatt Mechanical & Structural Works 25/MPED-I/05.12.17 281L/28 12.12.18 Security 44570

B- 685 18.12.18 MPED-I M/s Kiran Construction Co. 20/MPED-I/05.12.17 281L/28B 12.12.18 Security 44570

B- 686 18.12.18 MPED-I M/s O.S. Contractor 29/MPED-I/30.03.17 281L/28B 12.12.18 Security 44281

B- 687 18.12.18 MPED-I M/s Hi Tek NDT Services 31/MPED-I/24.01.18 281L/29 12.12.18 Security 109480

B- 688 18.12.18 MPED-I M/s Bharatt Mechanical & Structural Works 24/MPED-I/05.12.17 219L/41 12.12.18 Security 62990

B- 689 18.12.18 MPED-I M/s Bharatt Mechanical & Structural Works 23/MPED-I/05.12.17 219L/42 12.12.18 Security 36000

B- 690 18.12.18 MPED-I M/s Kiran Construction Co. 22/MPED-I/05.12.17 219L/43 12.12.18 Security 36000

B- 691 18.12.18 MPED-I M/s Kiran Construction Co. 21/MPED-I/05.12.17 219L/44 12.12.18 Security 45264

G:\250MW\2019-20\09-19\Liab_15.09.19_250MW B-List-250MW

Page 40: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 692 18.12.18 MPED-I M/s Sunrise Engineers & Contractor 19/MPED-I/30.11.16 292L/20 09.08.18 B/d Maintenance 11495

B- 693 18.12.18 MPED-I M/s MAK Construction Co. 14/MPED-IV/26.09.17 320L/11B 15.12.18 Fabrication 124096

B- 694 20.12.18 MPED-III M/s SGL Engineering Industries IV 01/MPED-III/09.04.18 46L/77 19.11.18 Opration Maintenance 14545

B- 695 24.12.18 CSD-II M/s Naushad & Brothers 929/CPD-II/01.08.18 213L/87 21.12.18 Freight 6714

B- 697 24.12.18 CSD-II M/s J.K. Engineering Co. 843/CPD-I/12.09.18 330L/49 21.12.18 Supply 18181

B- 698 26.12.18 ECM&EMD M/s Ravindra Singh Co. V 08/ECM&EMD-26.12.17 1826L/169 12.11.18 Maintenance of Park 34198

B- 699 26.12.18 CSD-II M/s Anil Scientific Corporation 1360/CPD-II/19.11.18 232L/65A 24.12.18 Supply 108566

B- 700 26.12.18 CSD-II M/s Jalvid Udyog 1159/CPD-I/01.11.18 232L/67A 21.12.18 Supply 9057

B- 701 26.12.18 CSD-II M/s Jain Mill Stores Pvt. Ltd. 1101/CPD-I/25.10.18 232L/67A 24.12.18 Supply 41618Total 1182796 1926173 2088454 620738

B- 712 03.01.19 MPED-IV M/s Rahul Gupta & Co. IV,V 22/MPED-IV/12.01.18 112L/97 30.11.18 Fabrication 121444

B- 713 03.01.19 MPED-II M/s Thermal India Engineers I, Final 07/MPED-II/25.09.18 206L/85 01.08.18 Fabrication 152822

B- 714 03.01.19 MPED-II M/s Thermal India Engineers XV To XVI 08/MPED-II/03.08.17 206L/87 16.10.18 B/d Maintenance 115837

B- 715 03.01.19 MPED-I M/s O.S. Contractor I 10/MPED-I/10.08.18 320L/12 01.12.18 Maintenance 16205

B- 716 03.01.19 EPED-I M/s A.K. Construction 19/EPED-I/30.12.17 235L/40 01.01.19 Security 29640

B- 717 03.01.19 EPED-I M/s Priya Construction Co. 26/EPED-I/15.01.18 235L/41 01.01.19 Security 26086

B- 724 03.01.19 CSD-II M/s Shavo Norgren (I) Pvt. Ltd. I 1064/CPD-I/11.10.18 214L/126 03.01.19 Supply 16579

B- 727 03.01.19 EPED-I M/s D.K. & Sons Co. I 10/EPED-I/10.10.18 98L/89B 01.12.18 B/d Maintenance OH 35898

B- 728 05.01.19 CSD-II M/s Keltron Controls Division 130/CPD-I/08.05.18 89L/72A 05.01.19 Supply 159045

B- 733 05.01.19 CSD-II M/s Jay Pee Machining Industries 1403/CPD-II/04.12.18 212L/97 05.01.19 Supply 81562

B- 734 08.01.19 ECM&EMD M/s Vijay Kumar Gupta Contractor 20/ECM&EMD/14.03.18 399L/82 07.01.19 Security 29918

B- 735 08.01.19 MPED-IV M/s India Engineering Works V 02/MPED-IV/16.04.18 83L/97 01.12.18 Supply 65070

B- 736 08.01.19 MPED-IV M/s Rahul Gupta & Co. VI 22/MED-IV/12.01.18 83L/97 17.12.18 Repairing 54126

B- 737 08.01.19 MPED-IV M/s Rahul Gupta & Co. VII 22/MPED-IV/12.01.18 83L/98 28.12.18 Fabrication 40784

B- 740 10.01.19 EPED-II M/s Key Logic Systems Pvt. Ltd. 13/EPED-II/26.12.17 304L/24A 03.01.19 Security 131726

B- 742 11.01.19 EPED-III M/s Priya Construction Co. IFinal 10/EPED-III/01.12.18 222L/172 05.12.18 Distempering/ Printing 57348

B- 743 16.01.19 CSD-II M/s Krishna Agencies 944/CPD-I/26.09.18 234L/57 14.01.19 Supply 1379160B- 744 16.01.19 CSD-II M/s Simplex Switchgear Pvt. Ltd. 581/CPD-I/02.11.18 234L/58 14.01.19 Supply 217856

B- 745 16.01.19 CSD-II M/s Aarseller Tredco 582/CPD-I/26.11.18 234L/59 14.01.19 Supply 18472

B- 747 16.01.19 CSD-II M/s Deepak Traders 1173/CPD-I/02.11.18 234L/61 14.01.19 Supply 4943

B- 748 16.01.19 CSD-II M/s Aarseller Tredco 557/CPD-III/02.11.18 234L/62 14.01.19 Supply 294094

B- 749 16.01.19 CSD-II M/s S.K. Engineering & Allied Solutions (P) Ltd. 1179/CPD-I/03.11.18 234L/64 14.01.19 Supply 320547

B- 750 16.01.19 CSD-II M/s Adarsh Tube & Machinary Corporation 1127/CPD-I/29.10.18 234L/65 14.01.19 Supply 3174200

B- 751 16.01.19 CSD-II M/s Aarseller Tredco 1250/CPD-I/27.11.18 234L/65 14.01.19 Supply 149246

B- 752 16.01.19 CSD-II M/s Aarseller Tredco 1251/CPD-I/27.11.18 234L/66 14.01.19 Supply 857023

B- 753 16.01.19 CSD-II M/s Supath Engineering Services (P) Ltd. 1293/CPD-I/04.12.18 234L/67 14.01.19 Supply 1251489

B- 755 16.01.19 CSD-II M/s Bearing & Engineering Co. 1125/CPD-I/29.10.18 234L/68 14.01.19 Supply 194200 950440

B- 771 30.01.19 CSD-II M/s Mechfield Corporation 1397/CPD-II/01.12.18 328L/17 29.01.19 Supply 120024

B- 773 31.01.19 CSD-II M/s Regent Trading Company 1366/CPD-I/14.12.18 213L/95 29.01.19 Supply 1271036

B- 774 31.01.19 ECCU M/s Ashish Enterprises 32/ECCU/23.03.18 114L/17 02.01.19 Carriage of Material 768322Total 1580156 2105336 7469210 950440

B- 777 02.02.19 OGD-III M/s Jahangir Enterprises 08/MPED-VI/10.05.19 256L/63 Security 19550

B- 778 02.02.19 OGD-III M/s Usha Enterprises 16/MPED-VI/20.06.17 256L/63 17.11.18 Security 86899

B- 779 02.02.19 OGD-III M/s Usha Enterprises 33/MPED-VI/01.03.17 256/63B Security 47450

B- 780 02.02.19 OGD-III M/s Usha Enterprises 38/MPED-VI/20.02.18 256L/64 30.11.18 Security 27900

B- 781 02.02.19 OGD-III M/s Usha Enterprises 27/MPED-VI/10.03.17 256L/64 Security 5734

B- 782 02.02.19 OGD-III M/s Usha Enterprises 28/MPED-III/28.03.16 256L/64B Security 47450

B- 783 02.02.19 OGD-III M/s S.R. Constructions VIII,IX 01/MPED-VI/01.04.18 163L/142 15.12.18 B/d Maintenance 63563

B- 784 02.02.19 OGD-III M/s Hemant Singh 20/MPED-VI/15.08.17 163L/144 05.01.19 Security 4200

B- 785 02.02.19 OGD-III M/s Hemant Singh 25/MPED-VI/24.10.17 163L/144 05.01.19 Security 4200

B- 786 02.02.19 OGD-III M/s Hemant Singh 17/MPED-VI/20.06.17 163L/145 07.01.19 Security 37272

B- 787 02.02.19 MPED-VI M/s Balram Engineers & Suppliers V 13/MPED-VI/02.06.18 255L/44 22.10.18 B/d Maintenance 56100

B- 788 02.02.19 MPED-VI M/s Balram Engineers & Suppliers VI 13/MPED-VI/02.06.18 255L/46 22.10.18 B/d Maintenance 44068

B- 789 02.02.19 MPED-VI M/s Jahangir Enterprises 28/MPED-VI/29.10.17 255L/48 24.12.18 Security 38149

G:\250MW\2019-20\09-19\Liab_15.09.19_250MW B-List-250MW

Page 41: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 790 04.02.19 MPED-III M/s Jahangir Enterprises XI 15/MPED-III/21.03.18 227L/119 16.01.19 B/d Maintenance 32579

B- 791 04.02.19 MPED-III M/s Jahangir Enterprises XII 15/MPED-III/21.03.18 227L/120 16.01.19 B/d Maintenance 59444

B- 792 04.02.19 MPED-III M/s Usha Enterprises II 06/MPED-III/10.10.17 227L/122 16.01.19 B/d Maintenance 96049

B- 793 04.02.19 MPED-III M/s Usha Enterprises III 06/MPED-III/03.04.17 227L/123 16.01.19 B/d Maintenance 85953

B- 794 04.02.19 MPED-III M/s Jahangir Enterprises 21/MPED-III/25.01.17 227L/125 16.01.19 Security 90784

B- 797 04.02.19 MPED-III M/s SGL Engineer & Industries V 01/MPED-III/09.04.18 341L/04 19.01.19 Opration Maintenance 30034

B- 798 04.02.19 CSD-II M/s Authentic Systems & Technologies 1156/CPD-II/03.10.18 284L/23B 04.02.19 Supply 615246 27686

B- 800 05.02.19 ECCU M/s Puneet Construction Co. I 17/ECCU/01.02.19 1764L/172 24.01.19 Road Marking 67442

B- 801 05.02.19 CAMD-III M/s Jahangir Enterprises V 10/MPED-III/22.09.18 345L/02 05.11.18 B/d Maintenance 34883

B- 802 05.02.19 CAMD-III M/s Jahangir Enterprises VI 10/MPED-III/22.09.18 345L/04 05.11.18 B/d Maintenance 25295

B- 803 05.02.19 CAMD-III M/s Jahangir Enterprises VI 10/MPED-III/22.09.18 345L/05 15.11.18 B/d Maintenance 40822

B- 805 07.02.19 CSD-II M/s MAK Construction Co. 1366/CPD-II/20.11.18 329L/29B 06.02.19 Supply 456080

B- 809 07.02.19 MPED-IV M/s India Engineering Works VI 02/MPED-IV/14.08.18 112L/99B 22.01.19 Febrication 84099

B- 811 11.02.19 CSD-II M/s Vijay Hydro Tech 1032/CPD-II/28.08.18 212L/106 11.02.19 Supply 91968

B- 817 11.02.19 AHD-III M/s India Engineering Works VII 02/MPED-IV/16.04.18 111L/96B 02.01.19 Febrication 32584

B- 826 11.02.19 AHD-III M/s O.S. Contractor II 10/MPED-I/31.01.19 321L/14 01.02.19 Cleaning & Seeping 20754

B- 833 12.02.19 MPED-IV M/s R.B. Engineering Works I 14/MPED-IV/27.11.18 167L/66 02.02.19 B/d Maintenance OH 18256

B- 836 12.02.19 MPED-IV M/s India Engineering Works I 23/AHD-III/04.02.19 167L/70 16.11.18 Repairing & Maintenance 38125

B- 837 12.02.19 MPED-IV M/s India Engineering Works II 23/AHD-III/04.02.19 167L/71 24.11.18 Repairing & Maintenance 48450

B- 843 12.02.19 EPED-IV M/s MRP Constructions 07/EPED-IV/20.11.18 261L/70 15.12.18 B/d Maintenance 16668

B- 865 13.02.19 MPED-VI M/s Usha Enterprises 22/MPED-VI/10.10.18 332L/08 03.12.18 OH#6 10295

B- 869 14.02.19 MPED-V M/s A.S. Enterprises I 16/MPED-V/13.09.18 298L/28B 03.01.19 OH#6 245160

B- 870 14.02.19 MPED-V M/s A.S. Enterprises I, Final 05/MPED-V/19.06.18 298L/29 09.01.19 OH#6 621000

B- 871 14.02.19 MPED-V M/s Pitambra Engineers & Contractor I, Final 15/MPED-V/12.09.18 308L/08 05.12.19 Security 346944

B- 872 14.02.19 MPED-V M/s Bharti Enterprises Security 04/MPED-V/ 308L/09 OH#6 29576

B- 878 14.02.19 MPED-V M/s MAK Construction Co. VII 01/MPED-V/24.04.18 333L/13B 01.01.19 Opration of Bowl 114298

B- 880 16.02.19 CSD-II M/s Shell Automation 1083/CPD-II/22.10.18 233L/103 15.02.19 OH#6 21113

B- 882 18.02.19 CSD-II M/s Shree Shyam Bearing Pvt. Ltd. 465/CPD-I/26.07.18 285L/21 16.02.19 Supply 53950

B- 883 18.02.19 CSD-II M/s Ace Marketing Pvt. Ltd. 1130/CPD-I/15.09.18 250L/58 16.02.19 Supply 792283

B- 884 18.02.19 CSD-II M/s Sadan Engineering Works III Final 26/ECCU/09.01.18 64L/90B 14.02.19 Carriage Of material 45436

B- 887 20.02.19 EPED-III M/s C&C Electric Ltd. I Last 18/EMD-VIII/16.01.19 221L/125 07.02.19 Repairing 297360

B- 888 21.02.19 CSD-II M/s Jay Pee Machining Industries 1403/CPD-II/14.09.18 197L/51 20.02.19 Supply 160079

B- 889 21.02.19 CSD-II M/s Jay Pee Machining Industries 1403/CPD-II/14.09.18 197L/53 20.02.19 Supply 78022

B- 890 21.02.19 CSD-II M/s Globe Enterprises 331/CPD-I/12.05.17 246L/85B 18.02.19 Supply 30315

B- 891 21.02.19 CSD-II M/s Globe Enterprises 37/CPD-I/10.01.17 246L/86A 18.02.19 Supply 115111

B- 892 21.02.19 CSD-II M/s Asha Printing press 165/CPD-I/18.05.18 246L/86B 18.02.19 Supply 134206

B- 893 22.02.19 EPED-II M/s Key Logic Systems Pvt. Ltd. I,II 18/EPED-II/07.02.18 313L/18 01.02.19 Field Instament BDM 119900

B- 894 22.02.19 EPED-II M/s Hitachi Hi-Rel Power Electronic Pvt. Ltd. 03/EPED-I/26.07.18 324L/12 28.11.18 AMC 514799

B- 907 22.02.19 ECM&EMD M/s Ravindra Singh & Co. I 08/ECM&EMD/26.02.19 1826L/174 28.12.18 Maintenance of Park 2674

B- 908 23.02.19 MPED-I M/s Zenith Engineers VI Final 08/MPED-I/13.08.18 13L/49 01.01.19 B/d Maintenance 38797

B- 909 23.02.19 MPED-I M/s Bharat Mechanical & Structural Works I 13/MPED-I/05.10.18 13L/49B 28.11.18 B/d Maintenance 248728

B- 911 25.02.19 MPED-IV M/s R.B. Engineering Works IX Final 26/MPED-I/05.12.17 167L/79 19.02.19 Security 51049

B- 912 25.02.19 MPED-IV M/s Rajeev Kumar Contractor 06/MPED-IV/28.04.18 167L/79 22.02.19 Security 9109

B- 913 25.02.19 MPED-IV M/s Rajeev Kumar Contractor 26/AHD-III/07.02.19 167L/80 22.02.19 Security 29390

B- 914 25.02.19 MPED-IV M/s Rajeev Kumar Contractor 09/MPED-IV/10.07.18 167L/80 22.02.19 Security 37150

B- 915 25.02.19 MPED-IV M/s India Engineering Works VIII 02/MPED-IV/16.04.18 82L/95 12.02.19 Repairing 65070

B- 916 25.02.19 MPED-I M/s O.S. Contractor VI 05/MPED-I/04..05.17 175L/64 23.10.18 Supply & Fixing 26326

B- 917 25.02.19 CSD-II M/s Authentic Systems & Technologies 1407/CPD-II/06.12.18 250L/63 23.02.19 Supply 537244

B- 918 25.02.19 CSD-II M/s Bearing & Engineering Co. 1289/CPD-II/29.10.18 250L/64 23.02.19 Supply 448206

B- 919 25.02.19 CSD-II M/s Power Engineers 1117/CPD-II/14.09.18 250L/65 23.02.19 Supply 729713

B- 920 25.02.19 CSD-II M/s Flowtech Engineers 1140/CPD-II/22.09.18 250L/66 23.02.19 Supply 1805400

B- 921 25.02.19 CSD-II M/s Mechfield Corporation 1222/CPD-II/15.10.18 250L/67 23.02.19 Supply 341836

B- 922 25.02.19 CSD-II M/s S&M Industrial Valves Ltd. 1287/CPD-II/03.11.18 250L/68 23.02.19 Supply 76228

B- 924 25.02.19 CSD-II M/s Power Engineers 1482/CPD-II/24.12.18 329L/32 23.02.19 Supply 1692647

B- 932 27.02.19 CSD-II M/s Anurag Engineering Works 1370/CPD-I/15.01.18 285L/21B 27.02.19 Supply 113239

B- 933 27.02.19 CSD-II M/s Key Logic Systems Pvt. Ltd. 1403/CPD-I/19.12.18 285L/22B 27.02.19 Supply 189361

B- 936 27.02.19 CSD-II M/s Authentic Systems & Technologies II 82/CPD-I/11.01.19 234L/75 27.02.19 Supply 24436

G:\250MW\2019-20\09-19\Liab_15.09.19_250MW B-List-250MW

Page 42: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 937 27.02.19 MPED-I M/s Sunrise Engineer & Contractor I 14/MPED-I/12.11.18 169L/169 13.12.18 B/d Maintenance 41357

B- 938 28.02.19 EMD-VI M/s Electrical & Instrumentation Engg. III 10/EMD-VI/29.01.19 261L/75 26.01.19 OH#6 252558

B- 939 28.02.19 ECM&EMD M/s Ashish Enterprises 05/ECM&EMD/26.06.18 438L/85B 22.12.18 Earth Work 225345Total 4671864 5088246 3423650 27686

B- 940 01.03.19 EPED-I M/s R.P. Construction Co. 11/EPED-I/31.08.17 129L/46B 29.10.18 Misc Mechanical 31702

B- 941 01.03.19 AHD-III M/s India Engineering Works IX 12/AHD-III/15.01.19 195L/73 23.02.19 Febrication 32536

B- 944 01.03.19 CSD-II M/s Vikas Chauda 06/CPD-I/31.12.14 360L/124 28.02.19 Security 4200

B- 945 01.03.19 CSD-II M/s Vikas Chauda 02/CPD-I/09.07.15 360L/125 28.02.19 Security 4200

B- 946 01.03.19 CSD-II M/s Vikas Chauda 04/CPD-I/06.11.15 360L/125 28.02.19 Security 4200

B- 947 01.03.19 CSD-II M/s Vikas Chauda 02/CPD-I/10.06.16 360L/126 28.02.19 Security 4200

B- 948 01.03.19 CSD-II M/s Vikas Chauda 04/CPD-I/27.10.16 360L/127 28.02.19 Security 4200

B- 949 01.03.19 CSD-II M/s Vikas Chauda 02/CPD-I/04.07.17 360L/128 28.02.19 Security 4800

B- 957 02.03.19 CAMD-III M/s Jahangir Enterprises III 19/CAMD-III/30.01.19 244L/111 Cleaning of Coal 63482 109865

B- 969 11.03.19 EPED-V M/s Nosad Contractor IV, Final 36/CWCD-IV/09.07.14 342L/13B 05.03.19 OH#6 132033

B- 973 11.03.19 MPED-II M/s Arudra Engineers (P) Ltd. 12/MPED-II/27.11.15 228L/120 Security 48363

B- 974 11.03.19 MPED-II M/s Hind Udyog I,II 14/TMD-III/04.02.19 322L/24 25.01.19 Fabrication 383211

B- 975 11.03.19 MPED-VI M/s Kalicharan 10/MPED-VI/05.07.16 223L/89 25.02.19 Security 3312

B- 976 11.03.19 MPED-VI M/s Kalicharan 20/MPED-VI/10.11.16 223L/89 26.02.19 Security 6552

B- 977 11.03.19 MPED-VI M/s Kalicharan 15/MPED-VI/20.06.17 223L/90 26.02.19 Security 6588

B- 978 12.03.19 ECM&EMD M/s Jay Mahaveer Constructions 03/ECM&EMD/18.06.18 310L/18 12.03.19 Security 9838

B- 979 12.03.19 ECM&EMD M/s Puneet Construction Co. 10/ECM&EMD/31.07.18 214L/88 12.03.19 Security 25420

B- 980 12.03.19 MPED-I M/s Jahangir Enterprises 15/MPED-I/11.01.19 170L/130 06.03.19 Security 45368

B- 984 12.03.19 MPED-IV M/s India Engineering Works X 02/MPED-IV/16.04.18 321L/15B 11.02.19 Fabrication 61212

B- 985 12.03.19 MPED-IV M/s India Engineering Works XI 02/MPED-IV/16.04.18 321L/16 22.02.19 Fabrication 35443

B- 986 12.03.19 EPED-I M/s Kapatiya Instrument Erector 12/EPED-I/27.10.17 235L/49 15.02.19 B/d Maintenance 60097

B- 987 12.03.19 ECCU M/s Ashish Enterprises II 12/ECCU/03.08.18 300L/12 31.01.19 Serveyinprence 23023769

B- 990 13.03.19 OGD-III M/s Bareli Engineering Co. I Final 35/OGD-III/25.01.19 256L/67B 25.02.19 Complete Rubber (Transfer To A List A-09/02.04.19)

0

B- 991 14.03.19 EPED-V M/s Nosad Contractor V 04/EPED-V/01.04.17 287L/40 05.03.19 B/d Maintenance 21449

B- 992 15.03.19 MPED-I M/s Zenith Engineers II 08/MPED-I/13.08.18 209L/69 01.03.19 B/d Maintenance 50566

B- 993 15.03.19 MPED-I M/s Bharat Mechanical & Structural Works III 13/MPED-I/05.10.18 189L/77 06.02.19 B/d Maintenance 107197

B- 994 15.03.19 MPED-I M/s S.K. Engineering Works VIII 27/MPED-I/15.01.18 189L/179 06.02.19 B/d Maintenance 22646

B- 997 16.03.19 EPED-IV M/s MRP Construction I Final 11/EMD-VI/30.01.19 200L/115 28.01.19 Centrifuging 498933

B- 998 16.03.19 CSD-II M/s S.K. Engipro & Allied Solution (P) Ltd. 293/CPD-I/22.02.19 214L/136 16.03.19 Supply 233547

B- 999 16.03.19 CSD-II M/s Ashbond Engineers Pvt Ltd. 1060/CPD-I/11.10.18 214L/137 16.03.19 Supply 503857

B- 1000 16.03.19 CSD-II M/s Net Cascade Automation Pvt. Ltd. 338/CPD-I/01.03.19 214L/138 16.03.19 Supply 263985

B- 1001 16.03.19 CSD-II M/s Net Cascade Automation Pvt. Ltd. 339/CPD-II/01.03.19 214L/139 16.03.19 Supply 390883

B- 1003 16.03.19 CSD-II M/s Dycon System Pvt. Ltd. 1171/CPD-I/02.11.18 214L/140 16.03.19 Supply 185602

B- 1004 16.03.19 CSD-II M/s Qwick Well Engineering Associates 1128/CPD-I/29.10.18 214L/138 16.03.19 Supply 927633

B- 1005 18.03.19 MPED-I M/s Jha Constructions 32/BMD-V/05.02.19 210L/96 14.03.19 Security 26000

B- 1006 18.03.19 ECM&EMD M/s Pitambra Engineering & Contractors I 27/ECM&EMD/08.03.19 141L/170 01.03.19 Painting & Distempring 267661 94701

B- 1007 26.03.19 MPED-I M/s O.S. Contractor III 10/MPED-I/10.08.18 167L/82 01.03.19 Maintenance 16230

B- 1010 28.03.19 EPED-IV M/s MRP Construction I,Final 4193/PPMM/18.08.12 29L/146 01.12.13 Desigen Engg Febrication 575840

B- 1011 29.03.19 MPED-I M/s Sun Rise Engineer & Contractor 16/BMD-VI/21.01.19 170L/132 Security 56000

B- 1012 29.03.19 MPED-I M/s M.K. Traders 23/BMD-V/22.01.19 218L/47 Security 27520

B- 1013 29.03.19 MPED-I M/s S.K. Engineering Works 12/MPED-I/26.09.18 218L/48 Security 24525

B- 1014 29.03.19 MPED-I M/s R.B. Engineering Works 26/BMD-V/22.01.19 13L/52B Security 20400

B- 1015 29.03.19 MPED-I M/s S.K. Engineering Works 20/BMD-V/22.01.19 13L/52B Security 24780

B- 1016 29.03.19 MPED-I M/s S.K. Engineering Works 21/BMD-V/22.01.19 13L/53 Security 28628

B- 1017 29.03.19 MPED-I M/s S.K. Engineering Works 17/MPED-I/22.01.19 13L/53 Security 24627

B- 1018 29.03.19 MPED-I M/s M.K. Traders 22/BMD-V/22.01.19 13L/53B Security 43105

B- 1019 29.03.19 MPED-I M/s M.K. Traders 24/BMD-V/22.01.19 13L/53B Security 23520

B- 1020 29.03.19 MPED-I M/s S.K. Engineering Works 25/BMD-V/22.01.19 13L/54 Security 25500

B- 1021 29.03.19 MPED-I M/s Sun Rise Engineer & Contractor 14/MPED-I/12.11.18 169L/177 B/d Maintenance 10109

B- 1022 30.03.19 EPED-II M/s R.P. Construction Co. Final 07/EPED-II/26.10.17 304L/26A Misc Machanical 39171

B- 1023 30.03.19 MPED-VI M/s S.R. Consstruction X.XI,XII 01/MPED-VI/01.04.18 163L/149 19.03.19 B/d Maintenance 62125

G:\250MW\2019-20\09-19\Liab_15.09.19_250MW B-List-250MW

Page 43: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

Total 25991258 1161180 1344327 204566

B- 1 02.04.19 ECCU M/s Sadan Engineering Works I Final 13/ECCU/18.09.18 27L/4 01.10.18 M&R Demaged Drain 316634

B- 3 02.04.19 ECCU M/s Ashish Enterprises IV Final 32/ECCU/23.03.18 114L/20 02.02.19 Carriage of Material 594566

B- 4 02.04.19 MPED-III M/s SGL Engineering Industries VI Final 01/MPED-III/09.04.18 341L/8 19.03.19 Opration Stock 33800

B- 6 05.04.19 AHD-III M/s Rahul Gupta & Co. I 25/AHD-III/04.02.19 82L/99 30.03.19 Febrication 69383

B- 7 05.04.19 MPED-IV M/s Hind Udyog V 12/MPED-IV/13.08.18 82L/100 30.03.19 Reparing 88949

B- 10 05.04.19 AHD-III M/s MAK Construction Co. I 29/AHD-III/02.03.19 321L/17B 24.03.19 Distnantion Cutting 68068

B- 11 05.04.19 AHD-III M/s MAK Construction Co. I 28/AHD-III/07.03.19 321L/18 16.03.19 D.P. Extension 130054

B- 12 05.04.19 MPED-IV M/s India Engineering Works XII 02/MPED-IV/16.04.18 321L/19B 05.03.19 Fabrication 30940

B- 13 05.04.19 MPED-IV M/s India Engineering Works XIII 02/MPED-IV/16.04.18 321L/20 12.03.19 Fabrication 20439

B- 14 05.04.19 MPED-IV M/s Rajeev Kumar Contractor I 27/AHD-III/07.03.19 321L/21 31.03.19 Painting of Various 158112

B- 15 05.04.19 MPED-IV M/s MAK Construction Co. II 28/AHD-III/07.03.19 321L/21B 03.04.19 D.P. Extension 107560

B- 16 05.04.19 MPED-IV M/s O.S. Contractor IV 10/MPED-I/10.08.18 321L/22 01.04.19 Maintenance 19243

B- 17 05.04.19 MPED-I M/s O.S. Contractor 31/BMD-V/01.02.19 170L/133 01.04.19 Security 45821

B- 18 05.04.19 MPED-I M/s Hind Udyog 18/BMD-V/22.01.19 170L/134 01.04.19 Security 55156

B- 19 05.04.19 MPED-I M/s Sun Rise Engineer & Contractor 19/BMD-V/30.11.16 170L/134 01.04.19 Security 47870

B- 20 08.04.19 MPED-V M/s O.S. Contractor I 23/MPED-V/10.12.18 312L/12B 15.02.19 Supply of Insulation 218508

B- 22 08.04.19 MPED-V M/s MAK Construction Co. VIII 01/MPED-V/24.04.18 334L/16B 01.04.19 Opration of bowl 59690

B- 24 08.04.19 TMD-III M/s Thermal India Engineers 10/TMD-III/28.12.18 229L/136 Security 207031

B- 25 08.04.19 TMD-III M/s M.S. Bhadouriya Enterprises 16/TMD-III/25.02.19 229L/136 Security 36456

B- 26 08.04.19 TMD-III M/s Harsh & Brothers 17/MPED-II/13.01.15 322L/21 Security 36641

B- 27 08.04.19 TMD-III M/s Harsh & Brothers 02/MPED-II/18.04.16 322L/24 Security 54791

B- 28 09.04.19 CSD-II M/s Adarsh Electronics & Electricals 558/CPD-II/02.11.18 233L/110 05.04.19 Supply 5015

B- 29 09.04.19 CSD-II M/s Adarsh Electronics & Electricals 558/CPD-II/02.11.18 233L/111 05.04.19 Supply 99365

B- 30 09.04.19 CSD-II M/s Jay Pee Machining Industries 1403/CPD-II/04.12.18 197L/57 08.04.19 Supply 144631

B- 31 09.04.19 CSD-II M/s Ma Bhagwati Shardey Engineering 371/CPD-I/11.03.19 328L/21B 08.04.19 Supply 360955

B- 32 09.04.19 EPED-I M/s D.K. & Sons 16/EPED-I/06.11.17 278L/43 02.04.19 Security 25600

B- 33 09.04.19 MPED-I M/s O.S. Contractor VII 05/MPED-I/04.05.17 159L/68 05.02.19 Supply of Insulation 34957

B- 34 10.04.19 TMD-III M/s Thermal India Engineers I,II,III 01/TMD-III/06.04.19 52L/95B 03.04.19 B/d Maintenance 48569

B- 36 10.04.19 EPED-IV M/s Yadav Measurments Pvt. Ltd. 08/EPED-IV/08.11.16 261L/78 06.04.19 Security 11400

B- 37 10.04.19 MPED-III M/s Jahangir Enterprises VIII 10/MPED-III/22.09.18 345L/19 19.01.19 B/d Maintenance 54987

B- 38 10.04.19 MPED-III M/s Jahangir Enterprises IX 10/MPED-III/22.09.18 345L/20 16.02.19 B/d Maintenance 33958

B- 39 10.04.19 MPED-III M/s Jahangir Enterprises X 10/MPED-III/22.09.18 345L/21 01.03.19 B/d Maintenance 22474

B- 40 11.04.19 EPED-II M/s S.K. Engipro & Allied Solution (P) Ltd. 10/EPED-II/26.11.18 316L/15B 14.03.19 Maintenance 177000

B- 41 11.04.19 EPED-II M/s Siddhi Vinayak Engg. 09/EPED-II/26.10.17 303L/32 29.03.19 Security 37800

B- 43 11.04.19 MPED-IV M/s Rahul Gupta & Co. 20/AHD-III/04.02.19 82L/103 09.04.19 Security 19120

B- 45 11.04.19 MPED-IV M/s Rahul Gupta & Co. 22/AHD-III/12.01.18 82L/105 09.04.19 Security 41046

B- 49 11.04.19 MPED-VI M/s Balram Engineers & Suppliers 06/MPED-VI/13.05.17 255L/58 Security 86393

B- 50 11.04.19 MPED-VI M/s Balram Engineers & Suppliers 30/MPED-VI/10.01.17 255L/58B Security 85899

B- 51 11.04.19 MPED-III M/s Balram Engineers & Suppliers 11/MPED-III/01.10.18 346L/12 B/d Maintenance 27144

B- 52 11.04.19 MPED-III M/s SGL Engineering Industries 25/MPED-III/29.01.16 346L/14 05.04.19 Security 26682

B- 53 11.04.19 MPED-III M/s Balram Engineers & Suppliers 22/MPED-III/30.12.15 346L/14 Security 85191

B- 54 11.04.19 MPED-III M/s M.S. Elevators 01/MPED-III/13.04.17 346L/15 Security 27484

B- 55 11.04.19 MPED-III M/s Balram Engineers & Suppliers II 11/MPED-III/01.10.18 346L/149 B/d Maintenance 36127

B- 56 11.04.19 MPED-III M/s Balram Engineers & Suppliers III 11/MPED-III/01.10.18 346L/151 B/d Maintenance 38251

B- 57 11.04.19 MPED-V M/s MAK Construction Co. 20/MPED-V/10.10.18 150L/90B 09.04.19 Security 90195

B- 58 11.04.19 MPED-V M/s Hind Udyog 29/MPED-V/22.01.19 150L/91 09.04.19 Security 31961

B- 59 11.04.19 MPED-V M/s Maarfat Construction 30/MPED-V/25.01.19 120L/92 Security 26933

B- 60 11.04.19 MPED-V M/s G.S. Construction Co. 18/MPED-V/06.10.18 298L/31B 09.04.19 Security 94900

B- 61 11.04.19 MPED-V M/s A.S. Enterprises 19/MPED-V/06.10.18 298L/32 09.04.19 Security 69450

B- 63 11.04.19 MPED-V M/s G.S. Construction Co. 21/MPED-V/10.10.18 296L/7 26.03.19 Security 293500

B- 65 11.04.19 MPED-V M/s Hind Udyog 17/MPED-V/04.10.18 335L/15 13.03.19 Repairing 52506

B- 66 11.04.19 MPED-V M/s Rambali Singh Contractor I 33/BMD-VI/11.03.19 335L/15B Construction of RCC 348869

B- 67 12.04.19 EMD-VIII M/s Punjab Electric 14/EPED-III/17.03.17 222L/198 16.03.19 Security 23500

B- 68 12.04.19 MPED-VI M/s Usha Enterprises II 22/MPED-VI/10.10.18 332L/29 25.03.19 B/d Maintenance 52045

B- 69 16.04.19 ECCU M/s Vijay Kumar Gupta I 25/ECCU/16.03.19 64L/93B 05.04.19 Reconstruction Civil Work 655611

G:\250MW\2019-20\09-19\Liab_15.09.19_250MW B-List-250MW

Page 44: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 70 16.04.19 CHD-II M/s M.K. Traders Final 10/CHD-II/14.12.18 272L/6 19.12.18 Repairing of Cartridges 100300

B- 71 18.04.19 EPED-I M/s Priya Construction Co. Security 03/EPED-I/05.06.17 267L/24 Annual Maintenance For Routine 52533

B- 72 22.04.19 CHD-II M/s M.K. Traders I 11/CHD-II/15.12.18 254L/133 Maintenance 44944

B- 73 22.04.19 EPED-I M/s D.K. & Sons II 10/EPED-I/10.10.18 351L/9 OH 86313

B- 76 22.04.19 CSD-II M/s Simplex Switchgear Pvt. Ltd. 05/2019-20 323/CPD-I/27.02.19 215L/130 Supply 848263

B- 77 23.04.19 CSD-II M/s A.K. Agencies 1070/CPD-I/11.10.18 285L/25B Supply 4531

B- 78 23.04.19 CSD-II M/s A.K. Agencies 1070/CPD-I/11.10.18 285L/26 Supply 90289

B- 79 23.04.19 CSD-II M/s Sone Obra Enterprises 675/CPD-I/21.08.18 285L/27 07.03.19 Supply 7788

B- 80 23.04.19 CSD-II M/s Smridhi Manufacturar Co. 1204/CPD-II/11.10.18 285L/27B 13.03.19 Supply 203404

B- 83 23.04.19 CSD-II M/s Jain Mill Stores Pvt. Ltd. 842/CPD-I/12.09.18 353L/4 23.04.19 Supply 93092

B- 84 23.04.19 CSD-II M/s Indian Rubber Products 1428/CPD-I/28.12.18 353L/4 Supply 40813

B- 85 26.04.19 CSD-II M/s Anuag Engineering Works 14 854/CPD-I/13.05.16 240L/14B Supply 216162

B- 86 26.04.19 ECM&EMD M/s Vijay Kumar Gupta I & Final 30/ECM&EMD/14.03.19 112L/97B Civil Work 283633

B- 87 26.04.19 BMD-V M/s Harsh & Brothers Security 31/MPED-I/14.02.15 170L/137 Security 19799

B- 88 26.04.19 CSD-II M/s krishna Agencies 944/CPD-I/26.09.18 90L/64A 30.03.19 Supply 648007

B- 89 30.04.19 ECCU M/s Pitambra Engineering & Contractors I 01/ECCU/2019-20/05.04.19 369L Civil Work (T to A List A-169 dt. 04.05.19

0

B- 90 30.04.19 ECM&EMD M/s Ravindra Singh & Co. I 26/ECM&EMD/28.02.19 1826L Civil Work 120548Total 5767334 1192304 1570011 0

B- 91 02.05.19 MPED-IV M/s India Engineering Works II & Final 07/MPED-IV/02.05.18 82L/106 OH 57815

B- 92 02.05.19 ECM&EMD M/s Sadan Engineering Works II RAB 24/ECM&EMD/14.02.19 462L/79 Civil Work 122882

B- 93 02.05.19 CSD-II M/s Industrial IT Salutions Pvt. Ltd. 384/CPD-I/14.03.19 234L/76 02.05.19 Supply 259827

B- 94 02.05.19 CSD-II M/s RNS Automation 324/CPD-I/27.02.19 234L/78 02.05.19 Supply 501249

B- 95 02.05.19 CSD-II M/s RNS Automation 324/CPD-I/27.02.19 234L/78 02.05.19 Supply 555033

B- 96 02.05.19 CSD-II M/s RNS Automation 324/CPD-I/27.02.19 234L/79 02.05.19 Supply 634444

B- 97 02.05.19 CSD-II M/s Aditi Enterprises 121/CPD-I/18.01.19 358L/2 02.05.19 Supply 41787 60000

B- 98 02.05.19 CSD-II M/s Power Engineers 319/CPD-II/10.04.19 328L/22 02.05.19 Supply 723054

B- 101 07.05.19 ECCU M/s Vijay Kumar Gupta Contractor I 21/ECCU/22.02.19 113L/83 09.04.19 Fencing Repairing 317355

B- 102 07.05.19 AHD-III M/s India Engineering Works I 01/AHD-III/09.04.19 167L/85 02.05.19 Water Washing 285120

B- 103 07.05.19 AHD-III M/s India Engineering Works I 02/AHD-III/09.04.19 167L/86 02.05.19 Water Washing 189972

B- 104 10.05.19 CSD-I M/s Jayshree Electrodevices Pvt. Ltd. 429/CPD-I/05.04.19 214L/141 Supply 162014

B- 105 10.05.19 CSD-I M/s krishna Agencies 2 440/CPD-I/05.04.19 214L/141 16.04.19 Supply 258203

B- 106 10.05.19 CSD-I M/s Jalvid udyog 117 441/CPD-I/05.04.19 214L/142 15.04.19 Supply 499730

B- 107 10.05.19 CSD-I M/s Aditi Enterprises 1 442/CPD-I/05.04.19 214L/143 02.05.19 Supply 271607

B- 108 10.05.19 CSD-I M/s Net Cascade Automation Pvt. Ltd. PI004 456/CPD-I/09.04.19 214L/143 11.04.19 Supply 2110995

B- 109 10.05.19 CSD-I M/s Modern Electronic Works 211 383/CPD-I/14.03.19 214L/144 18.03.19 Supply 693840

B- 110 10.05.19 AHD-III M/s MAK Construction Co. III 29/AHD-III/07.03.19 321L/24 28.04.19 Distnantion Cutting 103816

B- 111 10.05.19 AHD-III M/s MAK Construction Co. III 28/AHD-III/07.03.19 321L/24B 20.04.19 D.P. Extension 144942

B- 112 10.05.19 AHD-III M/s India Engineering Works 05/MPED_IV/26.04.18 321L/25 Security 9010

B- 113 10.05.19 AHD-II M/s India Engineering Works 24/AHD-III/04.02.19 321L/25 Security 176907

B- 114 10.05.19 MPED-I M/s O.S. Contractor V 10/MPED-I/10.08.18 321L/25B 01.05.19 Maintenance 24863

B- 115 14.05.19 ECM&EMD M/s Vijay Kumar Gupta Contractor I RAB 18/ECM&EMD/ 11.01.19 142L/04 Repairing of Fundation 109102

B- 117 16.05.19 MPED-I M/s Bharat Mechanical & Structural Works IV 13/MPED-I/05.10.18 209L/82 07.05.19 B/d Maintenance 118700

B- 118 16.05.19 MPED-I M/s Syndicate Engineer II 03/MPED-I/25.06.19 209L/85 07.05.19 Repairing 47755

B- 120 16.05.19 MPED-I M/s Zenith Engineers III 08/MPED-I/13.08.18 159L/72 06.05.19 B/d Maintenance 76979

B- 121 17.05.19 ECM&EMD M/s Vijay Kumar Gupta Contractor 14/ECM&EMD/11.09.18 214L/90B 16.05.19 Security 29530

B- 122 21.05.19 MPED-IV M/s Harsh & Brothers 10/MPED-IV/09.03.15 81L/154 17.05.19 Security 40241

B- 123 22.05.19 MPED-IV M/s India Engineering Works II 02/MPED-IV/16.04.18 168L/49 09.04.19 Fabrication 114771

B- 124 22.05.19 AHD-III M/s MAK Construction Co. Final 29/AHD-III/07.03.19 168L/50 04.05.19 Distnantion Cutting 109692

B- 125 22.05.19 AHD-I M/s MAK Construction Co. IV 28/AHD-III/07.03.19 168L/51 09.05.19 D.P. Extension 137140

B- 126 22.05.19 MPED-IV M/s R.B. Engineering Works II 14/MPED-IV/27.11.18 168L/52 12.04.19 B/d Maintenance 134490

B- 127 24.05.19 ECCU M/s Vijay Kumar Gupta II 25/ECCU/2018-19 64L/95 15.05.19 Reconstruction Civil Work 554499

B- 129 24.05.19 CSD-II M/s K.S. Brothers 811/CPD-I/10.09.18 89L/79B Supply of Item 137581

B- 130 24.05.19 CSD-II M/s Aarseller Tredco 1286/CPD-I/04.12.18 89L/79B Supply 4269

B- 131 24.05.19 CSD-II M/s Aarseller Tredco 122/CPD-I/18.01.19 89L/80A Supply 16166

B- 132 24.05.19 CPD-I M/s Aarseller Tredco 373/CPD-I/11.03.19 89L/80A Supply 1381044

G:\250MW\2019-20\09-19\Liab_15.09.19_250MW B-List-250MW

Page 45: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 133 24.05.19 CPD-I M/s Aarseller Tredco 413/CPD-I/03.04.19 89L/80B Supply 302284

B- 134 24.05.19 CPD-I M/s Goverdhan Controls GDC/024 457/CPD-I/09.04.19 89L/81A Supply 1281632

B- 137 24.05.19 OGD-III M/s Balram Engineers & Suppliers IX 13/MPED-VI/02.06.18 256L/73 13.04.19 B/d Maintenance 51694

B- 138 25.05.19 C&IMD M/s Vertiv Energy Pvt. Ltd. I Final 19/C&IMD-V/28.10.19 359L/1 30.04.19 Depution of Service 70800

B- 139 28.05.19 ECM&EMD M/s Ravindra Singh & Co. 21/ECM&EMD/15.03.18 310L/19 Security 29881

B- 140 28.05.19 CSD-II M/s Aarseller Tredco 2/03.11.18 1172/CPD-I/02.11.18 198L/61 Supply 163905

B- 141 28.05.19 CSD-II M/s V.K. Trading Corporation 21/18.02.19 269/CPD-I/15.02.19 198L/63 Supply 254592

B- 142 28.05.19 CSD-II M/s V.K. Trading Corporation 2/25.11.18 1058/CPD-I/11.10.18 198L/63 Supply 256266Total 3028426 203801 10335251 60000

B- 143 03.06.19 AHD-III M/s India Engineering Works III 23/AHD-III/04.02.19 168L/58 25.05.19 Repairing & Maintenance 69056

B- 144 03.06.19 CSD-II M/s Power Sales Corporation P1004 90/CPD-I/11.01.19 154L/80 26.02.19 Supply 32527

B- 145 03.06.19 CSD-II M/s Rajdhani Engineering 135 678/CPD-I/21.08.16 90L/68A 15.04.19 Supply 419252

B- 146 03.06.19 CSD-II M/s Steam Equipments 1819-0691 1181/CPD-I/03.11.18 90L/68A 30.03.19 Supply 69620

B- 148 03.06.19 CSD-II M/s Jalvid udyog 105 209/CPD-I/07.02.19 358L/7 19.02.19 Civil Work 6348

B- 149 06.06.19 CSD-II M/s Balaji Corporation 9 1408/CPD-II/06.12.18 329L/42B Civil Work 484471

B- 150 06.06.19 CSD-II M/s Jayashree Election Pvt. Ltd. 428/CPD-I/05.04.19 233L/114 04.05.19 Civil Work 97350

B- 151 06.06.19 CSD-II M/s Supath Engineering Services Pvt. Ltd. 526/CPD-I/08.05.19 233L/115 04.06.19 Civil Work 880215

B- 152 06.06.19 CSD-II M/s Net Cascade Automation Pvt. Ltd. 563/CPD-I/15.05.19 233L/115 08.06.19 Civil Work 1988739

B- 153 06.06.19 CSD-II M/s S.K. Engipro & Allied Solutions Pvt. Ltd. 576/CPD-I/16.05.19 233L/116 04.06.19 Civil Work 75490

B- 154 10.06.19 MPED-I M/s Sunrise Engineer & Contractor IV 240/MPED-I/11.06.18 170L/143 04.06.19 Maintenance 42879

B- 155 10.06.19 EPED-I M/s Shiv Mahadev Engineering Security 06/EPED-I/02.08.18 324L/16 Security 13318

B- 156 10.06.19 EPED-V M/s Rajdhani Engineering 05/EPED-V/25.09.17 309L/16 Security 144000

B- 157 12.06.19 ECM&EMD M/s Ravindra Singh & Co. II 26/ECM&EMD/28.02.19 1826L/186 10.05.19 Maintenance of Park 82678

B- 158 12.06.19 AHD-III M/s Rahul Gupta & Co. II 25/AHD-III/04.02.19 195L/78 Fabrication 48088

B- 159 12.06.19 AHD-III M/s Hind Udyog VII 12/MPED-IV/15.09.18 195L/79 27.05.19 Fabrication 107749

B- 160 12.06.19 AHD-III M/s India Engineering Works 02/MPED-IV/16.04.18 195L/80 Fabrication 65070

B- 161 12.06.19 AHD-III M/s Hind Udyog VI 12/MPED-IV/15.09.18 82L/109 03.05.19 Fabrication 33966

B- 162 13.06.19 CSD-II M/s Goverdhan Controls 23 222/CPD-I/07.02.19 215L/131 12.02.19 Supply 1300961

B- 163 13.06.19 CSD-II M/s Simplex Switchgear Pvt. Ltd. 310 310/CPD-I/25.02.19 215L/133 01.03.19 Supply 413545

B- 164 13.06.19 CSD-II M/s Balaji Corporation 1 496/CPD-I/26.04.19 215L/133 23.05.19 Supply 382261

B- 165 14.06.19 MPED-IV M/s Hind Udyog VI 12/MPED-IV/15.09.18 82L/109 03.05.19 Fabrication 33966

B- 166 15.06.19 MPED-IV M/s Vijay Engineering 1314/CPD-II/27.06.15 250L/71 14.06.19 Security 23643

B- 167 15.06.19 CSD-II M/s Vijay Engineering 1971/CPD-II/05.10.15 250L/71 14.06.19 Security 43987

B- 168 15.06.19 CSD-II M/s Om Sai Ram Global Impex 154/CPD-II/27.04.16 250L/72 14.06.19 Security 18840

B- 169 15.06.19 CSD-II M/s Om Sai Ram Global Impex 2230/CPD-II/24.11.15 250L/72 14.06.19 Security 55326

B- 170 15.06.19 CSD-II M/s Om Sai Ram Global Impex 92/CPD-II/16.04.16 250L/73 14.06.19 Security 9958

B- 171 15.06.19 EPED-V M/s Ranjani Construction Co. 09/EPED-V/15.03.17 299L/19 08.06.19 Security 89407

B- 172 15.06.19 EPED-V M/s Electrical & Instrumentation Engineers 09/EPED-V/24.03.18 299L/19B 14.06.19 Security 27169

B- 173 15.06.19 EPED-V M/s Nosad Contractor 36/CWCD-IV/25.04.19 299L/20 14.06.19 Security 112754

B- 174 18.06.19 BMD-V M/s M.K. Traders I&Final 02/BMD-V/14.05.19 159L/75A 01.06.19 Installation of LDO Pipe Line 282789

B- 175 18.06.19 BMD-V M/s S.K. Engineering Works I&Final 03/BMD-V/14.05.19 159L/76 01.06.19 Repairing of Seal 190080

B- 176 19.06.19 CSD-II M/s Analyser Instruments Ltd. 527/CPD-I/08.05.19 214L/146 Supply 683645

B- 177 19.06.19 CAMD-III M/s Jahangir Enterprises XIII 15/CAMD-III/21.03.18 238L/155 Maintenance 42410

B- 178 20.06.19 MPED-III M/s Jahangir Enterprises XIII 10/MPED-III/22.09.19 345L/23 19.05.19 B/d Maintenance 49680

B- 179 20.06.19 MPED-III M/s Jahangir Enterprises XII 10/MPED-III/22.09.19 345L/24 31.05.19 B/d Maintenance 49680

B- 180 20.06.19 MPED-III M/s Balram Engineers & Contractor & Supp. V 11/MPED-III/01.10.18 345L/30 10.04.19 B/d Maintenance 32869

B- 181 21.06.19 CSD-II M/s Jalvid udyog 614/CPD-I/24.05.19 358L/12 21.06.19 Supply 52854

B- 182 22.06.19 ECM&EMD M/s Sadan Engineering Works III 24/ECM&EMD/14.02.19 462L/85 02.05.19 Civil Work 58126

B- 183 22.06.19 ECCU M/s Sadan Engineering Works I 23/ECCU/22.02.19 368L/121 01.06.19 M&R of Ash Daykes 706027

B- 185 26.06.19 CSD-II M/s Goverdhan Controls 1173/CPD-II/05.10.18 217L/53 01.06.19 Supply 24284

B- 186 26.06.19 MPED-IV M/s O.S. Contractor VI 10/MPED-I/10.08.18 321L/27B 11.06.19 Maintenance 21959

B- 187 26.06.19 MPED-IV M/s R.B. Engineering Works III 14/MPED-IV/27.11.18 321L/28 B/d Maintenance 59133

B- 188 26.06.19 AHD-III M/s Aadityesh Construction Security 17/AHD-III/30.01.19 321L/28B Security 24811

B- 189 26.06.19 ECM&EMD M/s Ravindra Singh & Co. Security 22/ECM&EMD/15.03.18 112L/99 Security 29683

B- 190 26.06.19 EPED-III M/s Vikas Electricals Security 15/EPED-III/12.01.16 207L/195 Security 54205

B- 191 26.06.19 EPED-III M/s Vikas Electricals Security 14/EPED-III/12.01.16 207L/196 Security 72500

G:\250MW\2019-20\09-19\Liab_15.09.19_250MW B-List-250MW

Page 46: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 192 26.06.19 EPED-III M/s Vikas Electricals Security 05/EPED-III/14.10.15 207L/197 Security 34356

B- 193 26.06.19 EPED-III M/s Vikas Electricals Security 06/EPED-III/14.10.15 207L/197 Security 49957

B- 194 26.06.19 EPED-III M/s Vikas Electricals Security 12/EPED-III/20.02.17 207L/198 Security 56796

B- 195 26.06.19 EPED-III M/s Priya Construction Co. Security 04/EPED-III/16.09.16 207L/198 Security 96102

B- 196 26.06.19 EPED-III M/s Priya Construction Co. Security 04/EPED-III/21.09.15 207L/199 Security 112803

B- 197 26.06.19 EPED-III M/s Priya Construction Co. Security 13/EPED-III/20.02.17 207L/199 Security 77500

B- 198 26.06.19 EPED-III M/s Vikas Electricals Security 13/EPED-III/08.01.18 207L/200 Security 127500

B- 199 27.06.19 ECCU M/s Vijay Kumar Gupta Contractor III & Final 25/ECCU/2018-19/16.03.19 64L/96B Civil Work 283132

B- 200 29.06.19 MPED-V M/s U.S. Enterprises Security 25/MPED-V/06.01.18 295L/19B Security 240465

B- 201 29.06.19 MPED-V M/s O.S. Contractor IV 18/MPED-V/18.07.17 120L/92B Hot Air Gates 55612

B- 203 29.06.19 BMD-VI M/s Bharti Enterprises I & Final 32/BMD-VI/07.03.19 336L/28B Repairing 343036Total 4505782 1143044 5435801

B- 204 02.07.19 CSD-II M/s Joy Marketing Pvt. Ltd. PI 433/CPD-II/24.05.19 329L/46 19.06.19 Supply 1474528

B- 205 02.07.19 CSD-II M/s Joy Marketing Pvt. Ltd. PI 434/CPD-II/24.05.19 329L/46B 11.06.19 Supply 765064

B- 206 02.07.19 AHD-III M/s Shradha Engineers & Construction 112/CWCD-II/13.12.13 102L/134 Security 23877

B- 207 02.07.19 OGD-III M/s S.R. Constructions RAB-13 01/MPED-VI/01.04.18 163L/166 B/d Maintenance 75445

B- 208 02.07.19 OGD-III M/s S.R. Constructions RAB-14,15 01/MPED-VI/01.04.18 163L/168 B/d Maintenance 92483

B- 209 06.07.19 CSD-II M/s Aditi Enterprises 12 613/CPD-I/24.05.19 358L/14 20.06.19 Supply 47908

B- 212 10.07.19 ECM&EMD M/s Vijay Kumar Gupta Contractor II 18/ECM&EMD/27.12.18 142L/6 Civil Work 203524

B- 213 10.07.19 CSD-II M/s Goverdhan Controls 26 600/CPD-I/20.05.19 234L/84 02.06.19 Supply 168372

B- 214 10.07.19 CSD-II M/s Goverdhan Controls 25 649/CPD-I/30.05.19 234L/84 02.06.19 Supply 1317542

B- 215 10.07.19 CSD-II M/s S.A. Distributer 12 700/CPD-I/12.06.19 234L/85 17.06.19 Supply 1151468

B- 216 10.07.19 CSD-II M/s Aarseller Tredco PI 03 606/CPD-I/23.05.19 234L/86 28.05.19 Supply 97961

B- 217 15.07.19 MPED-IV M/s O.S. Contractor VIII 10/MPED-I/10.08.18 168L/62 Maintenance 21031

B- 218 15.07.19 EPED-IV M/s Zentih Engineers 08/EPED-IV/21.09.17 264L/68 Security 36620

B- 219 15.07.19 EPED-IV M/s Hemant Singh 31/EPED-IV/28.10.13 262L/46 Security 4200

B- 220 15.07.19 EPED-IV M/s Hemant Singh 02/EPED-IV/20.05.14 262L/47 Security 4200

B- 221 15.07.19 EPED-IV M/s Hemant Singh 08/EPED-IV/22.11.14 262L/47 Security 4200

B- 222 15.07.19 EPED-IV M/s Hemant Singh 28/EPED-IV/25.05.13 262L/47 Security 4200

B- 223 15.07.19 EPED-IV M/s Shiv Kumar Rajpoot 08/EPED-IV/18.11.15 283L/30 Security 6588

B- 224 15.07.19 EPED-IV M/s Shiv Kumar Rajpoot 03/EPED-IV/19.06.17 283L/31 Security 6588

B- 225 15.07.19 EPED-IV M/s Shiv Kumar Rajpoot 10/EPED-IV/15.12.17 283L/31 Security 6516

B- 226 15.07.19 MPED-I M/s Hind Udyog III 32/MPED-I/23.02.18 282L/13B Repairing 51093

B- 227 18.07.19 EPED-II M/s Mecon Limited I & Final 260/C&ID-III/30.05.19 294L/73 Consultancy Services 2414280

B- 228 20.07.19 EPED-II M/s Uttam Chandra Gupta 12/EPED-II/18-19 294L/74 Security 4200

B- 229 20.07.19 CSD-II M/s Simplex Switchgear Pvt. Ltd. PI/539 539/CPD-I/10.05.19 212L/124 08.07.19 Supply 2084640

B- 230 20.07.19 EPED-I M/s R.K. Construction 14/EPED-I/27.10.17 351L/29 B/d Maintenance 194994

B- 232 23.07.19 MPED-V M/s MAK Consstruction Co. VIII 01/MPED-V/24.04.18 334L/22 Opration Bowl Mill 44890

B- 233 25.07.19 EMD-VIII M/s Priya Construction Co. I&Final 03/EMD-VIII/03.06.19 360L/07 Erection/Commiss 307800

B- 234 25.07.19 MPED-VI M/s Zentih Engineers Security 02/CAMD-II/02.05.16 256L/77 Security 29775

B- 235 25.07.19 MPED-VI M/s Jahangir Enterprises Security 33/MPED-VI/10.01.18 256L/77 Security 36099

B- 236 25.07.19 MPED-VI M/s Balram Engineers & Contractor & Supp. Security 34/MPED-VI/28.01.19 256L/77A Security 9801

B- 237 25.07.19 MPED-VI M/s Balram Engineers & Contractor & Supp. Security 37/MPED-VI/10.02.18 256L/78 Security 136529

B- 238 25.07.19 EPED-II M/s Mecon Limited 260/C&ID-III/30.05.19 241L/150 Consultancy Services 845241

B- 239 25.07.19 CSD-II M/s Atlas Copco 665046/18.07.19

528/CPD-I/08.05.19 89L/83B 18.07.19 Supply 388602

B- 240 25.07.19 CSD-II M/s Atlas Copco 670220/18.07.19

657/CPD-I/31.05.19 89L/84A 18.07.19 Supply 356450

B- 241 27.07.19 MPED-II M/s Thermal India Engineers IV,V,VI,VII 01/TMD-III/06.04.19 322L/29 B/d Maintenance 539474

B- 242 31.07.19 MPED-III M/s Usha Enterprises IV 06/MPED-III/10.10.17 164L/178 B/d Maintenance 159935

B- 243 31.07.19 CAMD-III M/s Jahangir Enterprises I 06/CAMD-III/17.07.19 164L/180 B/d Maintenance 16653

B- 244 31.07.19 CSD-II M/s Goverdhan Controls 32 958/CPD-I/09.07.19 233L/121 17.02.19 Supply 101023

B- 245 31.07.19 CSD-II M/s Goverdhan Controls 31 959/CPD-I/09.07.19 233L/122 17.02.19 Supply 94962

B- 246 31.07.19 CSD-II M/s Krishna Agencies PI 961/CPD-I/09.07.19 233L/123 11.07.19 Supply 73939

B- 247 31.07.19 CSD-II M/s Simplex Switchgear Pvt. Ltd. PI 963/CPD-I/09.07.13 233L/124 11.07.19 Supply 146858

B- 248 31.07.19 CSD-II M/s Uttam Sales Corporation PI 964/CPD-I/09.07.19 233L/124 11.07.19 Supply 847872

G:\250MW\2019-20\09-19\Liab_15.09.19_250MW B-List-250MW

Page 47: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 249 31.07.19 CSD-II M/s Goverdhan Controls 29 972/CPD-I/10.07.19 233L/125 17.07.19 Supply 97314

B- 250 31.07.19 CSD-II M/s S.K. Engineering & Allied Solutions 14 973/CPD-I/10.07.19 233L/126 11.07.19 Supply 244271

B- 251 31.07.19 CSD-II M/s Simplex Switchgear Pvt. Ltd. 991 991/CPD-I/12.07.19 233L/127 13.07.19 Supply 166674

B- 252 31.07.19 CSD-II M/s S.K. Engineering & Allied Solutions 17 1009/CPD-I/15.07.19 233L/128 16.07.19 Supply 286457

B- 253 31.07.19 CSD-II M/s S.K. Engineering & Allied Solutions 18 1010/CPD-I/15.07.19 233L/128 16.07.19 Supply 550767

B- 254 31.07.19 CSD-II M/s Goverdhan Controls 30 988/CPD-I/12.07.19 233L/126 17.07.19 Supply 117439TOTAL 5280236 5605176 4974935

B- 255 01.08.19 EPED-IV M/s Sieger Electrical System Ltd. Security 483/EPED-IV/24.11.16 200L/132 Security 12000

B- 256 01.08.19 EPED-IV M/s Sieger Electrical System Ltd. Security 193/EPED-IV/04.07.17 200L/133 Security 16000

B- 257 01.08.19 EPED-IV M/s Thermal India Engineers I & Final 02/EMD-VI/24.04.19 200L/133 Inspection of Generator 295000

B- 258 01.08.19 EPED-IV M/s MRP Constructions 07/EPED-IV/20.11.18 200L/134 B/d Maintenance (T To A List A-416 dt.06.08.19)

0

B- 259 01.08.19 CSD-II M/s Thermoserv Corps. 20 699/CPD-II/12.07.19 250L/134 18.07.19 Supply 799277

B- 260 01.08.19 CSD-II M/s Balaji Corporation 4/19-20/ 549/CPD-II/21.06.19 250L/76 08.07.19 Supply 286591

B- 262 01.08.19 MPED-IV M/s India Engineering Works RAB-16 02/MPED-IV/16.04.18 103L/136 Repairing 16268

B- 263 01.08.19 MPED-IV M/s India Engineering Works RAB-17 02/MPED-IV/16.04.18 103L/137 Security 14016

B- 264 01.08.19 MPED-IV M/s India Engineering Works I & Final 07/MPED-IV/02.05.18 103L/137 Erection 24213

B- 265 02.08.19 EPED-I M/s Kapatiya Instrument Erector III 13/EPED-I/24.10.18 267L/31 B/d Maintenance 18468

B- 266 02.08.19 EPED-I M/s D.K. & Sons Co. Security 10/EPED-I/10.10.18 267L/33 Security 72119

B- 269 05.08.19 ECCU M/s Jay Mahaveer Construction I RAB 04/ECCU/01.05.19 26L/70 B Supply 193183

B- 270 06.08.19 CSD-II M/s S.R. Industries PI-012 736/CPD-II/20.07.19 217L/61 27.07.19 Supply 1282648

B- 271 06.08.19 CSD-II M/s Paramount International 18 664/CPD-II/06.07.19 217L/62 25.07.19 Supply 345780

B- 272 06.08.19 CSD-II M/s Fluidomat 722/CPD-II/18.07.19 217L/63 Supply 149553

B- 273 06.08.19 CSD-II M/s S.S. Rubbers Pvt. Ltd. 1013/CPD-I/15.07.19 217L/64 Supply 125552

B- 274 06.08.19 CSD-II M/s Geeco Enercon Pvt. Ltd. 683/CPD-II/09.07.19 217L/65 Supply 431002

B- 275 06.08.19 CSD-II M/s Mechfield Corporation 633/CPD-II/03.07.19 217L/65 Security 1531131

B- 276 06.08.19 BMD-V M/s Jahangir Enterprises Security 04/BMD-V/14.05.19 218L/66 Security 16565

B- 277 06.08.19 CSD-II M/s Adars Electronics & Electricals Supply 558/CPD-III/02.11.18 234L/91 Supply 35840

B- 278 07.08.19 CSD-II M/s Atlas Copco 904674794 426/CPD-II/TMD-III/22.05.19 197L/60 30.06.19 Supply 2328642

B- 279 07.08.19 CSD-II M/s Atlas Copco 904674315 646/CPD-II/TMD-III/22.05.19 197L/61 29.07.19 Supply 1627714

B- 280 07.08.19 CSD-II M/s Multi Tech Engineers 222 698/CPD-II/TMD-III/12.07.19 197L/62 26.07.19 Supply 584121

B- 281 07.08.19 CSD-II M/s Multi Tech Engineers 223 714/CPD-II/TMD-III/12.07.19 197L/63 26.07.19 Supply 2334103

B- 282 07.08.19 CSD-II M/s Instant Engineers 13 715/CPD-II/TMD-III/12.07.19 197L/64 20.07.19 Supply 96047

B- 283 07.08.19 CSD-II M/s Atlas Copco 904674340 724/CPD-II/12.07.19 197L/64 21.07.19 Supply 1808466

B- 284 08.08.19 CSD-II M/s Instant Engineers 16 1111/CPD-I/25.07.19 154L/85 27.07.19 Supply 72872

B- 285 08.08.19 CSD-II M/s ACE Communication 656/CPD-I/31.05.19 154L/85 Supply 68613

B- 286 08.08.19 CSD-II M/s Guru Entrerprises 9 831/CPD-I/28.06.19 154L/86 15.07.19 Supply 546826

B- 287 08.08.19 CSD-II M/s Guru Entrerprises 10 831/CPD-I/28.06.19 154L/87 15.07.19 Supply 24731

B- 288 08.08.19 CSD-II M/s R.P. Construction Co. 2/RPCC 241/EMD-V/06.07.19 154L/88 01.08.19 Supply 604102

B- 289 08.08.19 CSD-II M/s Astech Marketing Pvt. Ltd. PI031 962/CPD-I/09.07.19 154L/89 Supply 1306416

B- 290 08.08.19 CSD-II M/s Net Cascade Automation Pvt. Ltd. GDC 1011/CPD-I/15.07.19 154L/90 24.07.19 Supply 481699

B- 291 08.08.19 CSD-II M/s Goverdhan Controls RAB-8 1012/CPD-I/15.07.19 154L/91 23.07.19 Supply 634574

B- 292 09.08.19 AHD-III M/s Hind Udyog RAB-9 398/MPED-IV/13.08.18 195L/89 Fabrication 70016

B- 293 09.08.19 AHD-III M/s Hind Udyog RAB-10 398/MPED-IV/13.08.18 195L/89 Fabrication 70016

B- 294 09.08.19 AHD-III M/s Hind Udyog RAB-11 & Final

398/MPED-IV/13.08.18 195L/90 Fabrication 41682

B- 295 09.08.19 AHD-III M/s Hind Udyog 5 & 6 398/MPED-IV/13.08.18 195L/92 Repairing 36892

B- 296 09.08.19 AHD-III M/s India Engineering Works I & Final 23/AHD-III/04.02.19 82L/118 Repairing 65131

B- 297 09.08.19 BMD-VI M/s U.S. Enterprises Security 01/BMD-VI/01.04.19 295L/21 Repairing 795960

B- 299 09.08.19 BMD-VI M/s A.S. Enterprises Security 16/MPED-V/13.09.18 355L/17 Repairing 114867 7713

B- 301 09.08.19 AHD-III M/s MAK Consstruction Co. 1 & 2 28/AHD-III/07.03.19 82L/120 Fabrication 182324

B- 302 09.08.19 AHD-III M/s Garg Engineering & Sons 1 & 2 09/AHD-III/25.06.19 82L/121 Lying/ Erection 216870

B- 303 09.08.19 AHD-III M/s MAK Consstruction Co. I & Final 10/AHD-III/05.08.19 82L/122 Dis Mantling 95670

B- 306 13.08.19 CAMD-III M/s Jahangir Enterprises RAB-14 10/MPED-III/22.09.18 345L/38 B/d Maintenance 31695

B- 307 13.08.19 CAMD-III M/s Jahangir Enterprises 10/MPED-III/22.09.18 345L/39 B/d Maintenance 28101

B- 308 13.08.19 CAMD-III M/s Balram Engineers & Contractor & Supp. 11/MPED-III/01.10.18 345L/40 B/d Maintenance 44648

B- 311 16.08.19 MPED-I M/s M.K.Traders II 35/BMD-V/23.03.19 282L/15 B/d Maintenance 104524

B- 312 16.08.19 MPED-I M/s S.K. Engineering Works I & Final 06/BMD-V/12.06.19 219L/73 Repairing 259200

G:\250MW\2019-20\09-19\Liab_15.09.19_250MW B-List-250MW

Page 48: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 313 16.08.19 MPED-I M/s Zentih Enterprises IV 08/MPED-I/13.08.18 159L/80 B/d Maintenance 165932

B- 314 16.08.19 MPED-I M/s Syndicate Engineers III 03/MPED-I/25.06.18 159L/81 Repairing 162056

B- 315 20.08.19 CSD-II M/s Vijay Chandra Industries 040/19-20 647/CPD-II/05.07.19 197L/67 18.07.19 Supply 573291

B- 316 20.08.19 CSD-II M/s Ashbond Engineers Pvt. Ltd. PI/1558 760/CPD-II/25.07.19 197L/69 03.08.19 Supply 897286

B- 317 20.08.19 CSD-II M/s Omega Industries Pvt. Ltd. PI/32 737/CPD-II/20.07.19 197L/71 12.08.19 Supply 169802

B- 318 20.08.19 CSD-II M/s Naushad & Brothers PRO/1908/2

734/CPD-II/20.07.19 363L/10 10.08.19 Supply 2333766

B- 319 21.08.19 CSD-II M/s Mechfield Corporation 006/19-20 777/CPD-II/30.07.19 329L/47A 03.08.19 Supply 154875

B- 320 21.08.19 CSD-II M/s Mechfield Corporation 19-08-2020 768/CPD-II/27.07.19 329L/47A 03.08.19 Supply 1513260

B- 321 21.08.19 CSD-II M/s Mechfield Corporation 19-07-2020 768/CPD-II/27.07.19 329L/48 03.08.19 Supply 1513260

B- 322 21.08.19 CSD-II M/s Leading Edge Technocrat PI/19-20/07

783/CPD-II/31.07.19 329L/48 Supply 338569

B- 323 21.08.19 CSD-II M/s Authentic Systems & Technologies 62/19-20 764/CPD-II/25.07.19 329L/48A 05.08.19 Supply 588319

B- 324 21.08.19 CSD-II M/s Dynamech Cranes Pvt. Ltd. 55 1398/CPD-II/01.12.18 329L/48A 11.04.19 Supply 485865

B- 325 21.08.19 CSD-II M/s Balaji Corporation 19-06-2020 779/CPD-II/30.07.19 329L/49 07.08.19 Supply 487175

B- 326 21.08.19 CSD-II M/s Leco Instruments Pvt. Ltd. 61003 769/CPD-II/27.07.19 329L/49A 07.08.19 Supply 2340117

B- 327 21.08.19 CSD-II M/s Rajat Associates PI/19-20 307/CPD-II/08.04.19 329L/51 15.04.19 Supply 127880

B- 328 21.08.19 CSD-II M/s Raviraj Engineering Co. 4 775/CPD-II/30.07.19 329L/51 09.08.19 Supply 758537

B- 329 21.08.19 CSD-II M/s Raviraj Engineering Co. 5 775/CPD-II/30.07.19 329L/51A 09.08.19 Supply 104738

B- 330 21.08.19 CSD-II M/s Raviraj Engineering Co. 6 775/CPD-II/30.07.19 329L/51A 09.08.19 Supply 57917

B- 331 21.08.19 CSD-II M/s Elecon Engineering Ltd. 8 723/CPD-II/18.07.19 329L/53 20.07.19 Supply 1048649

B- 332 21.08.19 CSD-II M/s Boiler Controls Pvt. Ltd. 666/CPD-II/06.07.19 329L/53A Supply 501358

B- 333 21.08.19 CSD-II M/s J. Umashankar & Co. Pvt. Ltd. 015/19-20 935/CPD-I 329L/53A Supply 1247850

B- 334 26.08.19 CSD-II M/s Naushad & Brothers 1908 761/CPD-II/25.07.19 329L/54 10.08.19 Supply 2022231

B- 335 26.08.19 CSD-II M/s Mechfield Corporation 008/19-20 816/CPD-II/07.08.19 329L/54A 03.08.19 Supply 486463

B- 336 26.08.19 CSD-II M/s Naushad & Brothers 1908/04 1151/CPD-II/29.07.19 329L/55 10.08.19 Supply 1554285

B- 337 26.08.19 CSD-II M/s S.S. Jaiswal & Brothers 96011 960/CPD-I/09.07.19 215L/135 05.08.19 Supply 468115

B- 338 26.08.19 CSD-II M/s S.K. Engineering & Allied Solutions 1070/CPD-I/22.07.19 215L/136 Supply 145140

B- 339 26.08.19 CSD-II M/s K.S. & Brothers 22 1098/CPD-I/25.07.19 215L/137 27.07.19 Supply 1170007

B- 340 26.08.19 CSD-II M/s Instant Engineers 15 1072/CPD-I/22.07.19 215L/138 24.07.19 Supply 197410

B- 341 26.08.19 CSD-II M/s Aarseller Tredco 1 1075/CPD-I/22.07.19 215L/138 27.07.19 Supply 440120

B- 342 26.08.19 CSD-II M/s ACE Communication 5 999/CPD-I/12.07.19 215L/139 26.07.19 Supply 85932

B- 343 26.08.19 CSD-II M/s SAPS Power Equipments Pvt. Ltd. 21/1-20 1097/CPD-I/25.07.19 215L/140 29.07.19 Supply 275302

B- 344 26.08.19 CSD-II M/s S.A. Distributor 1156/CPD-I/29.07.19 215L/141 Supply 241336

B- 345 26.08.19 ECM&EMD M/s Ravindra Singh & Co. III & Final 26/ECM&EMD/28.02.19 1826L/191 Maintenance Park 75768

B- 346 26.08.19 ECM&EMD M/s Pitambra Engineers & Contractor II & Final 27/ECM&EMD/08.03.19 141L/176 Painting 103158

B- 347 26.08.19 CSD-II M/s Ashbond Engineers Pvt. Ltd. 1557 989/CPD-I/12.07.19 234L/92 Supply 22387

B- 348 26.08.19 CSD-II M/s Net Cascade Automation Pvt. Ltd. PI032 1099/CPD-I/25.07.19 234L/92 Supply 12940

B- 349 26.08.19 CSD-II M/s Naushad & Brothers 1908/3 1126/CPD-I/27.07.19 234L/93 Supply 492305

B- 350 26.08.19 CSD-II M/s Shyam Cable Industries 314 967/CPD-I/09.07.19 234L/94 Supply 454196

B- 351 26.08.19 CSD-II M/s Indian Sales 1162/19-20 1162/CPD-I/31.07.19 249L/82 04.08.19 Supply 779850

B- 352 26.08.19 CSD-II M/s S.R. Industries 14 824/CPD-II/07.08.19 249L/83 20.04.19 Supply 551874

B- 353 26.08.19 CSD-II M/s S.R. Industries 15 824/CPD-II/07.08.19 249L/84 20.04.19 Supply 555819

B- 354 26.08.19 CSD-II M/s Power Sales Corporation 3 845/CPD-II/13.08.19 249L/85 22.08.19 Supply 2283902

B- 355 28.08.19 MPED-III M/s Harsh & Brothers Security 12/MPED-III/31.12.14 345L/42 Security 69956

B- 356 28.08.19 MPED-III M/s Harsh & Brothers Security 23/MPED-III/21.01.16 345L/42 Security 40820

B- 357 30.08.19 CSD-II M/s Flowtech Engineers 54 852/CPD-II/14.08.19 328L/32A 27.08.19 Supply 219817

B- 358 30.08.19 CSD-II M/s Flowtech Engineers 55 871/CPD-II/21.08.19 328L/33 27.08.19 Supply 623748

B- 359 30.08.19 CSD-II M/s Jakson Enterprises Pvt. Ltd. PI 1128/CPD-I/27.07.19 233L/129 Supply 522923TOTAL 4791066 16168352 28848616

B- 360 02.09.19 CAMD-III M/s Balram Engineers & Contractor & Supp. RAB-7 11/MPED-III/01.10.18 244L/132 B/d Maintenance 49081

B- 361 02.09.19 CAMD-III M/s Balram Engineers & Contractor & Supp. RAB-8 11/MPED-III/01.10.18 244L/134 B/d Maintenance 36791

B- 362 02.09.19 CAMD-III M/s Balram Engineers & Contractor & Supp. RAB-9 11/MPED-III/01.10.18 244L/136 B/d Maintenance 61015

B- 363 02.09.19 BMD-VI M/s MAK Consstruction Co. RAB-Final 22/MPED-V/31.01.18 152L/49 patch Work of PA,FD 202838

B- 364 02.09.19 BMD-VI M/s Syndicate Engineers Security 31/MPED-V/31.01.18 152L/48 Security 208872

B- 365 02.09.19 EMD-VII M/s Priya Construction Co. RAB-I 04/EMD-VIII/19.07.19 360L/10 Repair, Revinding 236257

B- 366 05.09.19 AHD-III M/s India Engineering Works RAB-19 124/MPED-IV/12.03.18 195L/99 Fabrication 84142

G:\250MW\2019-20\09-19\Liab_15.09.19_250MW B-List-250MW

Page 49: 2X110 MW Parichha Thermal Power Project, Parichha (Jhansi) B · b-2059 23.06.18 cpd-i m/s r.s.p. oversease pvt. ltd 402/cpd-i/22.06.17 1828/185 supply 5141.00 b-2063 26.06.18 cpd-i

B- 367 05.09.19 AHD-III M/s Garg Engineering & Sons 3 & Final 09/AHD-III/25.06.19 195L/103 Laying/Erection 89492

B- 368 05.09.19 AHD-III M/s MAK Consstruction Co. RAB-3 10/AHD-III/05.08.19 195L/104 Dismantling 51712

B- 369 05.09.19 AHD-III M/s India Engineering Works RAB-18 02/MPED-IV/16.04.19 195L/105 Fabrication 24028

B- 370 06.09.19 BMD-VI M/s Gayatri Enterprises I&Final 13/BMD-VI/05.07.19 120L/93A Fabrication 321300

B- 371 09.09.19 CSD-II M/s Uniflow Marketing 211 867/CPD-II/AHD-III/19.08.19 217L/66 23.08.19 Supply 224578

B- 372 09.09.19 CSD-II M/s Paramount International 23 875/CPD-II/OGD-III/21.08.19 217L/67 03.09.19 Supply 143390

B- 373 09.09.19 CSD-II M/s Flowtech Engineers 56 879/CPD-II/22.08.19 217L/67 02.09.19 Supply 234238

B- 374 09.09.19 CSD-II M/s S.R. Industries PI-016 880/CPD-II/22.08.19 217L/68 05.09.19 Supply 580151

B- 375 09.09.19 CSD-II M/s S.R. Industries PI-017 913/CPD-II/AHD-III/31.08.19 217L/69 05.09.19 Supply 145561

B- 376 09.09.19 CSD-II M/s New Allenberry Works 19 840/CPD-II/09.08.19 217L/70 27.08.19 Supply 2027594

B- 377 12.09.19 C&IMD-V M/s Mecon Limited C-II/2019-20/308

260/C&ID-III/30.05.19 243L/135 Consultancy SR 305743

B- 378 12.09.19 CAMD-III M/s Thyssenkrupp Elevators (India) Pvt. Ltd. RAB-IV 29/MPED-III/31.03.16 164L/181 Maintenance 103773

B- 379 12.09.19 CAMD-III M/s Usha Enterprises Security 03/MPED-III/16.04.18 164L/182 Security 7710

B- 380 12.09.19 CAMD-III M/s Balram Engineers & Contractor & Supp. Security 14/MPED-III/13.10.16 164L/182 Security 63144

B- 381 12.09.19 CAMD-III M/s SGL Engineering Security 04/MPED-III/12.05.16 164L/183 Security 2100

B- 382 12.09.19 CAMD-III M/s Balram Engineers & Contractor & Supp. Security 41/MPED-III/25.07.14 164L/183 Security 55891

B- 383 12.09.19 CAMD-III M/s Jahangir Enterprises Security 19/MPED-III/12.01.17 164L/184 Security 39190

B- 384 12.09.19 CAMD-III M/s Jahangir Enterprises Security 19/CAMD-III/30.01.19 164L/185 Security 53385

B- 385 12.09.19 AHD-III M/s R.B. Engineering Works IV 14/MPED-IV/27.11.18 81L/160 B/d Maintinance 25098

B- 386 12.09.19 AHD-III M/s Bharti Enterprises I&II 05/AHD-III/24.06.19 81L/162 Distemper 342099

B- 387 12.09.19 AHD-III M/s Bharti Enterprises I+II 06/AHD-III/25.06.19 81L/163 painting of Buffer 149884

B- 388 12.09.19 AHD-III M/s Bharti Enterprises III+IV 06/AHD-III/25.06.19 103L/145 painting of Buffer 171418

B- 389 12.09.19 AHD-III M/s MAK Consstruction Co. RAB(4+5) 10/AHD-III/05.08.19 103L/146 Dismentling 128106

B- 390 12.09.19 AHD-III M/s MAK Consstruction Co. RAB(7+8) 28/AHD-III/07.03.19 103L/147 D.P. Ex tension 201864

B- 391 13.09.19 CSD-II M/s Siemens Ltd. 3006356705 614/CPD-II/02.07.19 197L/72 31.08.19 Supply 701634

B- 392 13.09.19 CSD-II M/s Control Component India Pvt. Ltd. A42186 690/CPD-II/06.09.19 197L/73 06.09.19 Supply 3169227TOTAL 3014933 0 7226373

Grand Total 85094447.00 51638758.00 94074394.00

Dy. Chief Accounts Officer

G:\250MW\2019-20\09-19\Liab_15.09.19_250MW B-List-250MW