3 gas well deliquification practices in rag
TRANSCRIPT
RAG Rohöl-Aufsuchungs AGSchwarzenbergplatz 16 · A-1015 Wien · www.rohoel.at
Gas Well Deliquification Practices in RAG1st European Conference on Gas Well Deliquification, Groningen 2007
Konstantinos Mantatzis, Stefan Salchenegger
Groningen, 25.9.2007 2
Outline
� Overview of geology in Upper Austria
� Optimised use of compression units
� Solving the liquid loading challenge- Soap sticks- Continuous chemical injection (Capillary string)- Plunger lift- Sucker rod pump or PCPs- Downhole gas/water separation
� Summary
Groningen, 25.9.2007 3
Upper Austria oil and gas fields overview map
Groningen, 25.9.2007 4
Regional Geology in Upper Austria
� Reservoirs in deepwater clastic sediments in Puchkirchen and Hall form.
� Axial, deep marine channel belt (west -> east)
� Central channel <-> proximal overbank sands
� Traps: low-relief compaction anticlines or stratigraphicallytrapped against channel pinch-outs
Source: Hubbard etal. Borehole-Core Facies Associated with Seismically Imaged Deep-Sea Channel Deposits in the Puchkirchen Formation, Molasse Basin, Austria, 2003
Groningen, 25.9.2007 5
Integrated subsurface – surface modeling
� Modeling history match using MBAL
� Modeling rates using Prosper
� Combining MBAL & Prosper models using GAP
� Using GAP to match WHP & flow rates
� Predicting Forecasts
Groningen, 25.9.2007 6
Assessment of compression unit installation - Reservoir Modeling using MBAL
•Tank volume HTR5_2: 45 MM m3
• Tank volume T-01: 176 MM m3
•Aquifer Model: Hurst-Van Everdingen Dake
•Radial Aquifer
•Boundary: Sealed
Groningen, 25.9.2007 7
TR-007 Production Profiles w & w/o gas compressor
Tr-007 Producution Profile whitout GC
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
2006 2007 2008 2009
m^
3/d
118
120
122
124
126
128
130
132
134
136
138
140
Vn
MM
m^
3
Gas rate
Cum Gas
Tr-007 Production Profile with GC
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
2006 2007 2008 2009 2010 2011 2012 2013
m^3/d
110
115
120
125
130
135
140
145
150
Vn
MM
m^3
Gas rate
Cum Gas
Groningen, 25.9.2007 8
TR-007 Production Profiles w & w/o gas compressor
TR-007 Production Forecast
0 ,0 0 E+0 0
1,00 E+0 6
2 ,0 0 E+0 6
3 ,0 0 E+0 6
4 ,0 0 E+0 6
5,00 E+0 6
6 ,0 0 E+0 6
7,00 E+0 6
2 0 0 6 2 0 0 7 2 0 0 8 2 0 0 9 2 0 10 2 0 11 20 12 2 013 2 0 14
With GC (4 bar)
Without GC (13,8 bar)
Incremental Production
Groningen, 25.9.2007 9
Solving the liquid loading challenge
� Soap sticks
� Continuous chemical injection (Capillary string)
� Plunger lift
� Progressive Cavity Pump (PCP)
� Downhole gas/water separation
Incre
asin
gw
ate
r/gas ra
tio
Groningen, 25.9.2007 10
Critical Gas Rate Estimation
2/1
4/14/1 )(
g
gl
gc kVρ
ρρσ −=
Critical Gas Rate: Liquid Loading problems start to appear
Turner’s Critical Velocity
Turner’s Critical Gas Rate
zT
VAPQ
gc
gc*)460(
***06.3
+=
Vgc : critical gas velocity
K : Turner coefficient (1.92)
σ : surface tension of liquid to gas
ρl : Density of liquid
ρg : Density of gas
P : Reservoir pressure
Qgc : Critical rate
A : Cross-sectional area of flow
T : Down-hole temperature
Z : Gas compressibility factor
IPR / VLP Curve
Rate
Well flo
win
g p
ressure
Critical Gas Rate
Source: Lea et.al, Gas Well Deliquification, 2003
Groningen, 25.9.2007 11
Solving the liquid loading challenge – soap sticks
� Foam reduces surface tension
� Reduce density and size of liquid droplets
� Lifting capacity of gas increased
Ft=1/2 Cd ρg A vt
Fg=V (ρL - ρg) g
Water droplets
d
σ
Ft=1/2 Cd ρg A vt
Fg=V (ρL - ρg) g
Water droplets
d
σσ
Groningen, 25.9.2007 12
Soap stick injection
Example: TR-007
Groningen, 25.9.2007 13
Continuous chemical injection (Capillary string)
der SONDE:
Datum:
16-Jul-07 Ergänzungen: Aussteller: H-G Anders
Ergänzungen:
Hilprigen 1
E i n b a u d a t e n Länge: eingebaut
E - Kreuz: 2 1/16" x 5000 (geschätzt) (bzw.Teufe)
[ m ] bis [ m ]
6" X 10" x 2 3/8" EU Hänger geteilt 0.16 0.16
2 3/8" EU Doppelnippel 0.10 0.26
2 3/8" EU Kurzstück (3,07 m - 3,07 m) 6.14 6.40
7" Csg.
J 55 Zementkopf theoretisch bei 400m (16% Zuschlag)
bis 467,5m
Neigung Coil String (Injection Line 1/4")KOP: 455m
bis 748m: 24° aufgebaut
bis 2052m: 20 - 24° konst.
bis 2400m: abfallen auf 11°
4 1/2" Csg.
13,5 #, L 80
bis 308,69m Tubingstrang gebraucht (Weissring)
11,6 #, L 80
bis 2037,5m
2 3/8" EU Tubing, J-55, 4.7 lbs/ft, 224 Single 2082.28 2088.68
OPS A43 2 3/8" EU X-Landing Nippel 0.36 2089.04
2084.5 - 2089.0 m < > 2 3/8" EU Tubing, J-55, 4.7 lbs/ft - 1 Single 9.36 2098.40
1 11/16" EJ, 6spf, PJ, 01.03.2006 °°° 2 3/8" EU Otis SSD 121 x 01 (geschlossen) 1.18 2099.58
2 3/8" EU Tubing, J-55, 4.7 lbs/ft - 1 Single 9.45 2109.03
2 3/8" EU ON/OFF Tool, Baker L-10 0.40 2109.43
4 1/2" Lokset Packer 43 A2 Nr.: 121 1.10 2110.53
OPS A48 2 3/8" EU Tubing, J-55, 4.7 lbs/ft - 4 Single 37.50 2148.03
2120.5 - 2126.0 m < > Ps (Dez-05): 29.1 bar
2130.0 - 2139.0 m < >(2120,5 m = 2001,4 m TVD)
3 3/8" TCP, 6spf, PJ3406
Perforationen temporär mit MIX II Pille verschlossen (Polymer mit Calziumcarbonat)
UPS CHi 05 Zugang kann mit HCl-Säuerung wieder hergestellt werden.
2159.0 - 2161.5 m < >
2165.5 - 2169.0 m < > Injection Düse
2173.5 - 2174.5 m < >
2183.0 - 2185.0 m < >1 11/16" EJ, 6spf, PJ, 08.06.2006
UPS CP11
2227.5 - 2239.0 m < > Ps (Dez-05): 58.3 bar
2244.0 - 2245.5 m < >
2248.0 - 2249.5 m < >3 3/8" TCP, 6spf, PJ3406
4 1/2" Csg.
HILP-001Komplettierung
Groningen, 25.9.2007 14
Example gas production rate for continuous chemical injection
Example: HILP 001
Groningen, 25.9.2007 15
Plunger Lift Cycle
Source: Lea et.al, Solving gas-well liquid-loading problems, 2004
Groningen, 25.9.2007 16
Plunger Lift Feasibility
� GLR rule of thumb
minimum required GLR: 400 scf/bbl per 1,000 ft
� Charts from Beeson provide more accurate way to determine the applicability of plunger lift, because they take into consideration the Net Operating Pressure (Pcs-Ptf)
Source: Lea et.al, Gas Well Deliquification, 2003
Groningen, 25.9.2007 17
Feasibility Evaluation Based on Rule of Thumb
0
250
500
750
1000
1250
1500
1750
2000
2250
2500
2750
3000
0 1000 2000 3000 4000 5000 6000 7000
GLR [cbm/cbm]
De
pth
[m
]
Min GLR
Pfaf-006
Laut-002
Laut-003
Mu-007
Mu-011
Groningen, 25.9.2007 18
PFAF-006 Completion
Groningen, 25.9.2007 19
PFAF-006 Production
• On production since
22. Aug. 2005
• Cumulative production:
260.000 m³
• Current rate: 4.800 m³/d gas
2,7 m³/d water
• Current Pcs: 28 bar
6 – 7 cycles / day
Groningen, 25.9.2007 20
Progressive Cavity Pump
Komple ttie rung de r S ONDE: WZBG-001Da tum:
11-Apr-05 Ergä nzunge n: file : G:\FBO\S BH\WZBG-001.xls
Aus s te lle r: C . Burgs ta lle r
We izbe rg 1Drive He a d NDH 045 E i n b a u d a t e n Lä nge : e inge ba ut
E-Kre uz: 3 1/8" x 2 1/16" x 5000 ps i (bzw.Te ufe )[ m ] b is [ m ]
6" x 10" x 2 7/8" VAGT Tbg.-Ha nge r 0,152 7/8" Doppe lnippe l 0,20 0,35
1 1/4" P olie rs ta nge 36 ft (ne u)
7/8" P umpge s tä nge
9 5/8" Cs g. ( 40 S tk. Non Rota ting Ce ntra lis e rs 2 7/8" x 7/8" )
36 lb/ft, J -55400,56 m 1 3/8" Rotor ck45/250um HCP , P 6
ZK be i 960 m
lt. CBL-GR-CCL
7" Cs g .
20 lb/ft, J -55bis 1252,44 m
2 7/8" VAGT Tubing, L-80, 6,4 lbs /ft ( ... S ingle )Übe rga ng 2 7/8" VAGT-M x 2 7/8" EUZÜbe rga ng 2 7/8" EUM x 3 1/2" EUM3 1/2" EU P up J ointÜbe rga ng 3 1/2" EUM x 3 1/2" EUM
P CP (P umpe NTZ 350 * 180 S T 25, S ta tor S t/237, 3 1/2" EU Z)
3 1/2" EU S top P in As s e mblyÜbe rga ng 3 1/2" EUM x 2 7/8" EUM7" x 2 7/8" EU Tubing Anke rÜbe rga ng 2 7/8" EUM x 3 1/2" EUM
OPS A3b Ga s S e pa ra tor (3 1/2" EU) mit 1 1/2" s uction pipe 1710,001714,5 - 1717,5 m
S a nds ohle a m 4.10.94 1765,00Ze me nts ohle 1772,50
7" Cs g .
23 lb/ft, J -55bis 1800,23 m
Groningen, 25.9.2007 21
Downhole gas/water separation
Upper Puchkirchen-
Sands (A3B20 or
A3B30)
Lower Puchkirchen-
Sands (CF40)
PackerCF38
150 bar
17 bar
1700 m
2070 m
Groningen, 25.9.2007 22
Example gas production for downhole gas/water separation
15
20
25
30
35
40
45
50
55
14.04
12:00
14.04
15:36
14.04
19:12
14.04
22:48
15.04
02:24
15.04
06:00
15.04
09:36
15.04
13:12
15.04
16:48
15.04
20:24
16.04
00:00
16.04
03:36
16.04
07:12
16.04
10:48
16.04
14:24
Do
wn
ho
le p
res
su
re i
n b
ar
0
20000
40000
60000
80000
100000
120000
140000
160000
180000
200000
Gas
ra
te in
m3
/d,
wate
r ra
te i
n L
3/d
Upper gauge, 1708 m depth
gas rate
SSD openSSD closed
Compression on
water rate
Lower gauge, 2076 m depth
Compression out
Groningen, 25.9.2007 23
Summary
� Soap sticks – Cheap, effective –> frequently used in RAG
� Continuous chemical injection (Capillary string) –first test in RAG successful, more wells equipped soon
� Plunger lift – many candidates, step by step implementation
� PCP – 2 wells equipped in 07, more to come
� Downhole gas/water separation – successfully tested, due to conversion of deposal reservoir to underground gas storage not implemented
Groningen, 25.9.2007 24
Stefan Salchenegger
Rohöl Aufsuchungs AG
Schwarzenbergplatz 16
A – 1015 Wien
Tel: +43 (0) 50 724 – 5432
Konstantinos Mantatzis
Rohöl Aufsuchungs AG
Schwarzenbergplatz 16
A – 1015 Wien
Tel: +43 (0) 50 724 – 5381