3 mev measurement line
DESCRIPTION
3 MeV measurement line. U. Raich Linac-4 Beam Coordination Committee 20.10.2009. Layout of the line. The BPMS. BPM Simulations. Simulations by J. Tan. BPM Simulations. Simulations: J. Tan. BPM simulations. Simulations: J. Tan. Status of BPMs. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: 3 MeV measurement line](https://reader035.vdocuments.net/reader035/viewer/2022062408/5681401f550346895dab791c/html5/thumbnails/1.jpg)
3 MeV measurement line
U. Raich
Linac-4 Beam Coordination Committee 20.10.2009
![Page 2: 3 MeV measurement line](https://reader035.vdocuments.net/reader035/viewer/2022062408/5681401f550346895dab791c/html5/thumbnails/2.jpg)
Layout of the line
CERN, 20.October 2009 Uli Raich BE/BI
![Page 4: 3 MeV measurement line](https://reader035.vdocuments.net/reader035/viewer/2022062408/5681401f550346895dab791c/html5/thumbnails/4.jpg)
BPM Simulations
CERN, 20.October 2009 Uli Raich BE/BI
Simulations by J. Tan
![Page 5: 3 MeV measurement line](https://reader035.vdocuments.net/reader035/viewer/2022062408/5681401f550346895dab791c/html5/thumbnails/5.jpg)
BPM Simulations
CERN, 20.October 2009 Uli Raich BE/BISimulations: J. Tan
![Page 6: 3 MeV measurement line](https://reader035.vdocuments.net/reader035/viewer/2022062408/5681401f550346895dab791c/html5/thumbnails/6.jpg)
BPM simulations
CERN, 20.October 2009 Uli Raich BE/BI
Simulations: J. Tan
![Page 7: 3 MeV measurement line](https://reader035.vdocuments.net/reader035/viewer/2022062408/5681401f550346895dab791c/html5/thumbnails/7.jpg)
Status of BPMs• Mechanical drawing available but not approved yet• Simulations being done to determine resolution
– Position– Intensity– Phase
• Consequences of debunching being studied using Giulia’s optics simulations
• 3 devices + electronics foreseen for June 2010• 3 MeV measurement line will be used as test bench for
all Linac-4 BPMs
CERN, 20.October 2009 Uli Raich BE/BI
![Page 9: 3 MeV measurement line](https://reader035.vdocuments.net/reader035/viewer/2022062408/5681401f550346895dab791c/html5/thumbnails/9.jpg)
Status of Transformer• Drawings ready for approval• Workshop is informed• The ceramics are ordered (has longest delay) and will be delivered
by March 2010• 2 Devices ready by June 2010• Will use same electronics as transformers at source and in LEBT• 3 MeV measurement line can be used to test new (and cheaper)
electronics to be used for Linac-4• EMC tests done with pulsing Quadrupole next to the transformer
CERN, 20.October 2009 Uli Raich BE/BI
![Page 10: 3 MeV measurement line](https://reader035.vdocuments.net/reader035/viewer/2022062408/5681401f550346895dab791c/html5/thumbnails/10.jpg)
BSM (Feschenko Monitor)
CERN, 20.October 2009 Uli Raich BE/BI
![Page 11: 3 MeV measurement line](https://reader035.vdocuments.net/reader035/viewer/2022062408/5681401f550346895dab791c/html5/thumbnails/11.jpg)
Status of BSM• Preliminary drawing available• Feschenko and collaborator will come to CERN
2.11 – 6.11 to discuss details• First inspection by Didier does not show any mechanical
incompatibilities• Electronics and software specifications to be formalized• Device should be ready by the end of 2010
CERN, 20.October 2009 Uli Raich BE/BI
![Page 12: 3 MeV measurement line](https://reader035.vdocuments.net/reader035/viewer/2022062408/5681401f550346895dab791c/html5/thumbnails/12.jpg)
Emittance Meter / SEMGrid
CERN, 20.October 2009 Uli Raich BE/BI
![Page 13: 3 MeV measurement line](https://reader035.vdocuments.net/reader035/viewer/2022062408/5681401f550346895dab791c/html5/thumbnails/13.jpg)
Status of Emittance Meter / SEMGrid• Emittance meter is currently installed on 3 MeV source• Consists of slit and grid in 2 tanks
– Grid to be re-used– Slit about to be re-designed for higher than source energy (up to
12 MeV)Simulations have been made
– Electronics ready– LabView program ready for testing in beam
• Size problems for integration into the tunnel (sticks into transport zone)
CERN, 20.October 2009 Uli Raich BE/BI
![Page 14: 3 MeV measurement line](https://reader035.vdocuments.net/reader035/viewer/2022062408/5681401f550346895dab791c/html5/thumbnails/14.jpg)
SEMGrid in spectrometer line• Not yet clear if in/out mechanism is needed• In/out mechanisms do exist• Integration with dump to be studied• 1 plane of 0.5mm wire distance• Electronics solution is available but a new and cheaper
one may be studied• Software to be specified and written
CERN, 20.October 2009 Uli Raich BE/BI
![Page 16: 3 MeV measurement line](https://reader035.vdocuments.net/reader035/viewer/2022062408/5681401f550346895dab791c/html5/thumbnails/16.jpg)
Halo Monitor• Device developed by M. Hori• Device is ready and was tested in beam• Commissioning in 3 MeV to be done• Take-over of responsibility for this device by CERN staff
CERN, 20.October 2009 Uli Raich BE/BI
![Page 17: 3 MeV measurement line](https://reader035.vdocuments.net/reader035/viewer/2022062408/5681401f550346895dab791c/html5/thumbnails/17.jpg)
CERN, 20.October 2009 Uli Raich BE/BI
Instruments in the measurement line• Transformers
– 2 transformers in the straight section of the line– Design done, ready for approval
• Halo Monitor– finished
• Emittance Meter box – hor/ver slit (on 1 movement) – hor/ver SEMGrids on 2 movements– will use the SEMGrids, movement and tank from source emittance meter– new, high energy slit under design
• SEMGrid– retractable hor (possibly on movement)
• BPMs– preliminary design done
• BSM– preliminary design received from INR