    LNG Terminal in LithuaniaSecurity of Gas Supply

    November, 2013Gas Naturally Event, Brussels

    Tadas MatulionisDeputy Director, LNG Terminal

    Klaipdos Nafta

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    2/30

    Content

    1. Security of Gas Supply

    2. The LNG Terminal in Lithuania

    3. Business Model

    4. Financing of LNG Terminal Infrastructure

    5. Small Scale LNG activities

    6. Closing Remarks

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    3/30

    1. Security of Gas Supply

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    4/30

    1. Security of Gas Supply

    THREE main challenges

    Market

    Source

    Price

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    5/30

    1. Security of Gas Supply

    Currently

    market b

    states an The inte

    countries

    There ar

    infrastru

    enhance

    Existing pipeline

    Future projects

    Annual gas

    consumption

    Market

    Source

    Price

    Projects fo

    1. Baltic

    2. Interc

    Polan

    3. Gas S

    4. LNG t

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    6/30

    1. Security of Gas Supply

    Currently

    gasex

    on a sing

    Low ene

    the regio

    One of thIslands

    Market

    Source

    Price

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    7/30

    1. Security of Gas Supply

    Market

    Source

    Price

    Source: European Commission

    Price in/MWh, July 2013

    R

    Comparison of EU wholesale gas prices

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    8/30

    2. The LNG terminal in Lithuania

    Impact

    Third party access will spur competition

    The terminal will help to diversify energy sou

    Ensures securityof energy supply

    Import prices will reflect the globalmarket pr

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    9/30

    LNG teoperatio

    Project

    less t

    LNG te

    capacit

    2. The LNG terminal in Lithuania

    Project timeline

    Construction of FSRU

    Construction of the

    Jetty

    Construction of the

    Pipeline

    Environmental Studies

    Regulatory Framework

    Financing

    Third party

    2011 2013 2014 2015

    T

    esting

    2012

    Dredging of the port (by the Port

    Authority)

    Jetty (by the Port Authority)

    Transmission pipeline (by TSO)

    Signed contract with EIB

    LNG terminal law

    Left dry dock

    Full scale EIA

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    10/30

    2. The LNG terminal in Lithuania

    Project Ingredients

    1. Floating Storage andRegasification Unit (FSRU)

    2. 450 m long jetty 3. 18 km long conntransmission op

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    11/30

    Pigs Back

    island

    Jetty and

    FSRU

    The connecting gas

    pipeline

    The Baltic

    Sea

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    12/30Launch of the FSRU Independence in Hyundai Heavy Industries dock in South Korea, 3rdof May, 20

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    13/30

    The regasification unit, mounted on the FSRU, tested and certified by the end of June, 2013

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    14/30

    LNG tanks of the FSRU are currently under construction

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    15/30

    2. The LNG terminal in Lithuania

    FSRU

    Tech specs

    Location Southern part of Klaipdasea port

    Supplier Hegh LNG

    Storage capacity 170 000 m3

    Annual capacity Up to 4 bcm of regasified NG

    294 m

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    16/30

    2. The LNG terminal in Lithuania

    The Jetty

    High gas pressure

    platform

    FSRU

    Berthing decks

    Mooring decksHigh gas pressure

    arms

    Bridge

    450 m

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    17/30

    Pigs Back

    island

    LNG Carrier

    FSRU

    Independence

    Service platform

    The Jetty

    High gas

    pressure

    platform

    Pipeline

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    18/30

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    19/30

    2. The LNG terminal in Lithuania

    The Pipeline

    The 18 km long

    Pipeline

    Horizontal directional

    drilling

    The gas

    metering station

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    20/30

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    21/30

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    22/30

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    23/30

    2. The LNG terminal in Lithuania

    The Pipeline

    QuLa

    M

    Co

    !

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    24/30

    3. The Business Model

    LNG Terminal

    InfrastructureGas Trading

    Key financials (2012, mln, EUR)

    Revenue 40,2

    EBITDA 20,2

    EBITDA margin 50%

    Assets 129

    Key financials (2012, mln, EUR

    Revenue 8

    EBITDA

    EBITDA margin 19,

    Assets 2.

    Full Ownership Unbundling

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    25/30

    3. The Business Model

    18%

    LNG Terminal

    Infrastructure

    Gas Trading

    Sells regasification

    capacity to companies

    Securit

    minimu

    Capacities of LNG Terminal will be open for suppliers to fill d

    Domestic Lithuanian and Baltic markets (+Finland, it is p

    the Baltic Connector pipeline will be completed by 2015)

    Small scale activities

    Up to 3bcmof NG annually

    Gas trading volume capacity

    f G f

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    26/30

    4. Financing of LNG Terminal Infrastructure

    For the initial period part of FSRU costs are socialized through gas transmission tariff.

    174

    43

    130

    Financing sources,

    mln. EUR

    Infrastructure (jetty,

    pipeline)

    Project

    management

    FSRU guarantee 43

    130

    EIB loan

    NIB, commercial bank

    SC Klaipdos nafta

    Additional securitysupplement

    174

    Guarantee from a com

    bank

    5 S ll S l LNG

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    27/30

    5. Small Scale LNG

    LNG Feeder Vessel

    LNG trading

    Infrastructure for small-scale L

    The LNG terminal will offer bus

    opportunities:

    LNG storage

    5 S ll S l LNG

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    28/30

    5. Small Scale LNG

    LNG bunkering

    Transshipment to small-scale

    Auto-tankers and railway tank

    The LNG terminal will create o

    small scale LNG activities

    6 Cl i R k

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    29/30

    6. Closing Remarks

    The first full scale terminal in the Baltics and Nordic countries operational from

    the end of the next year

    Operational all-year round at an ice-free port

    Third party access will ensure competition on national and, possibly, on

    regional level

    Infrastructure for small-scale LNG activities

    More than 40 years of safe and efficient oil terminal operational experience

  • 8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta

    30/30

    Contacts:

    Tadas Matulionis

    Deputy Director, LNG Terminal

    Klaipdosnafta

    Buriu 19, P.O.Box 81

    LT-91003 Klaipeda

    Lithuania

    Phone: +370 (46) 391772

    Fax: +370 (46) 311399

    www.oil.lt

    www.sgd.lt

    Thank you for your attention.

    http://www.oil.lt/http://www.sgd.lt/http://www.sgd.lt/http://www.oil.lt/