LNG Terminal in LithuaniaSecurity of Gas Supply
November, 2013Gas Naturally Event, Brussels
Tadas MatulionisDeputy Director, LNG Terminal
Klaipdos Nafta
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
2/30
Content
1. Security of Gas Supply
2. The LNG Terminal in Lithuania
3. Business Model
4. Financing of LNG Terminal Infrastructure
5. Small Scale LNG activities
6. Closing Remarks
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
3/30
1. Security of Gas Supply
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
4/30
1. Security of Gas Supply
THREE main challenges
Market
Source
Price
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
5/30
1. Security of Gas Supply
Currently
market b
states an The inte
countries
There ar
infrastru
enhance
Existing pipeline
Future projects
Annual gas
consumption
Market
Source
Price
Projects fo
1. Baltic
2. Interc
Polan
3. Gas S
4. LNG t
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
6/30
1. Security of Gas Supply
Currently
gasex
on a sing
Low ene
the regio
One of thIslands
Market
Source
Price
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
7/30
1. Security of Gas Supply
Market
Source
Price
Source: European Commission
Price in/MWh, July 2013
R
Comparison of EU wholesale gas prices
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
8/30
2. The LNG terminal in Lithuania
Impact
Third party access will spur competition
The terminal will help to diversify energy sou
Ensures securityof energy supply
Import prices will reflect the globalmarket pr
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
9/30
LNG teoperatio
Project
less t
LNG te
capacit
2. The LNG terminal in Lithuania
Project timeline
Construction of FSRU
Construction of the
Jetty
Construction of the
Pipeline
Environmental Studies
Regulatory Framework
Financing
Third party
2011 2013 2014 2015
T
esting
2012
Dredging of the port (by the Port
Authority)
Jetty (by the Port Authority)
Transmission pipeline (by TSO)
Signed contract with EIB
LNG terminal law
Left dry dock
Full scale EIA
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
10/30
2. The LNG terminal in Lithuania
Project Ingredients
1. Floating Storage andRegasification Unit (FSRU)
2. 450 m long jetty 3. 18 km long conntransmission op
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
11/30
Pigs Back
island
Jetty and
FSRU
The connecting gas
pipeline
The Baltic
Sea
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
12/30Launch of the FSRU Independence in Hyundai Heavy Industries dock in South Korea, 3rdof May, 20
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
13/30
The regasification unit, mounted on the FSRU, tested and certified by the end of June, 2013
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
14/30
LNG tanks of the FSRU are currently under construction
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
15/30
2. The LNG terminal in Lithuania
FSRU
Tech specs
Location Southern part of Klaipdasea port
Supplier Hegh LNG
Storage capacity 170 000 m3
Annual capacity Up to 4 bcm of regasified NG
294 m
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
16/30
2. The LNG terminal in Lithuania
The Jetty
High gas pressure
platform
FSRU
Berthing decks
Mooring decksHigh gas pressure
arms
Bridge
450 m
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
17/30
Pigs Back
island
LNG Carrier
FSRU
Independence
Service platform
The Jetty
High gas
pressure
platform
Pipeline
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
18/30
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
19/30
2. The LNG terminal in Lithuania
The Pipeline
The 18 km long
Pipeline
Horizontal directional
drilling
The gas
metering station
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
20/30
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
21/30
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
22/30
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
23/30
2. The LNG terminal in Lithuania
The Pipeline
QuLa
M
Co
!
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
24/30
3. The Business Model
LNG Terminal
InfrastructureGas Trading
Key financials (2012, mln, EUR)
Revenue 40,2
EBITDA 20,2
EBITDA margin 50%
Assets 129
Key financials (2012, mln, EUR
Revenue 8
EBITDA
EBITDA margin 19,
Assets 2.
Full Ownership Unbundling
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
25/30
3. The Business Model
18%
LNG Terminal
Infrastructure
Gas Trading
Sells regasification
capacity to companies
Securit
minimu
Capacities of LNG Terminal will be open for suppliers to fill d
Domestic Lithuanian and Baltic markets (+Finland, it is p
the Baltic Connector pipeline will be completed by 2015)
Small scale activities
Up to 3bcmof NG annually
Gas trading volume capacity
f G f
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
26/30
4. Financing of LNG Terminal Infrastructure
For the initial period part of FSRU costs are socialized through gas transmission tariff.
174
43
130
Financing sources,
mln. EUR
Infrastructure (jetty,
pipeline)
Project
management
FSRU guarantee 43
130
EIB loan
NIB, commercial bank
SC Klaipdos nafta
Additional securitysupplement
174
Guarantee from a com
bank
5 S ll S l LNG
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
27/30
5. Small Scale LNG
LNG Feeder Vessel
LNG trading
Infrastructure for small-scale L
The LNG terminal will offer bus
opportunities:
LNG storage
5 S ll S l LNG
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
28/30
5. Small Scale LNG
LNG bunkering
Transshipment to small-scale
Auto-tankers and railway tank
The LNG terminal will create o
small scale LNG activities
6 Cl i R k
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
29/30
6. Closing Remarks
The first full scale terminal in the Baltics and Nordic countries operational from
the end of the next year
Operational all-year round at an ice-free port
Third party access will ensure competition on national and, possibly, on
regional level
Infrastructure for small-scale LNG activities
More than 40 years of safe and efficient oil terminal operational experience
-
8/10/2019 3. Presentation for Gas Naturally Complete and Final Klapeidos Nafta
30/30
Contacts:
Tadas Matulionis
Deputy Director, LNG Terminal
Klaipdosnafta
Buriu 19, P.O.Box 81
LT-91003 Klaipeda
Lithuania
Phone: +370 (46) 391772
Fax: +370 (46) 311399
www.oil.lt
www.sgd.lt
Thank you for your attention.