30 july 2004usm 2004 upper pearl survey1 preparation: line building (skiff) outermost line: as close...

30
30 July 2004 USM 2004 Upper Pearl Survey 1 Preparation: Line Building (Skiff) • Outermost line: As close to the river bank as possible.

Upload: valerie-heath

Post on 03-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 1

Preparation:Line Building (Skiff)

• Outermost line:As close to the river bank as possible.

Page 2: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 2

Preparation: Line Building (Skiff)

Spacing requirements (Skiff)

Main survey lines:

The Skiff conducted survey lines with a spacing of 25m as per IHO S-44 Ed. 4 (1998) specifications for Order 1:

“3x average depth or 25 m, whichever is greater.”

Due to the lack of previous survey data, 2002 survey was used as a reference to determined average depth at 9 m in the navigational channel.

25 m line spacing was selected for Single beam.

Page 3: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 3

Preparation: Line Building (Skiff)

Spacing requirements (Skiff)

Main survey lines:

Due to the river characteristics, survey lines were not parallel. The farthest point between consecutive lines was kept at 25 m.

Page 4: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 4

Preparation:Line Building (Skiff)

HYPACK for Skiff

The Line Editor of Hypack Max was used to draw the survey and cross-check lines.

Page 5: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 5

Spacing requirements (Skiff)

Cross-check lines:

Along the river and as perpendicular as possible to the main survey lines. Three nearly equidistant cross check lines

Preparation:Line Building (Skiff)

Page 6: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 6

Processing:Navigation Aids Positioning

NAVAID Number Lat Long ColorDay mark 57 30-18-20.218 N 089-38-33.411 W GLight 59 30-18-27.694 N 089-38-22.664 W GDay mark 60 30-18-27.735 N 089-38-10.83 W RDay mark 61 30-18-33.019 N 089-37-57.241 W GLight 62 30-18-53.185 N 089-37-33.063 W RDay mark 63 30-19-05.526 N 089-37-51.401 W GDay mark 63 A 30-19-10.023 N 089-37-51.144 W GDay mark 64 30-19-18.476 N 089-37-45.355 W RDay mark 66 30-19-31.283 N 089-37-51.115 W RDay mark 67 30-19-42.2 N 089-37-59.028 W GDaymark 68 30-20-04.456 N 089-37-47.655 W RDay mark 70 30-20-15.985 N 089-37-50.555 W RDay mark 72 30-20-26.522 N 089-37-59.340 W RDay mark 73 30-20-37.928 N 089-38-05.841 W G

14 NAVAIDS : 12 Day marks and 2 lights.

Positioning:

Ashtec Z-extreme PPK

4 positions with antenna at the pole

9 positions with the bow of the boat at the pole

Day mark 64 with Ag GPS receiver

Page 7: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 7

Products:Database (HPD)

Caris HPD works based on Oracle:

Oracle9i (8i) Database is object oriented. Designed to support the capabilities of the Internet.

It also supports traditional mission critical OLTP (online transaction processing) and Data Warehousing applications.

It is capable of handling hydrographic information for many types of applications and provides scalability from low-end uniprocessor to high-end symmetric multi-processor systems and multi-node clustered configurations.

Page 8: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 8

Products:Database (HPD)

DATA1 DATA2

data1_01.dbf data2_01.dbf data2_02.dbf

The DATA1 tablespace

consists of one datafile

The DATA2 tablespace

consists of two datafiles

Tablespaces and datafiles

Oracle Database

Components of an Oracle database:

Table spaces and datafiles.

Page 9: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 9

CARIS HPD

Page 10: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 10

Products:Database (HPD)

User name

Password

HPD Database node name

Source Database

Product Database

HPD

Source Database

Product Database

Page 11: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 11

Products:Database (HPD)

Points Lines Areas

Feature Object

1+

Object

Spatial Object

Is located by Real world entity

Soundings

Based on the S-57 data model Stores real world entities as “objects”

Page 12: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 12

Products:Database (HPD)

ACRONYMAttributes

Feature Object

Geometry

Spatial Object

Representation

Usage 1

Representation

Usage 2

Representation

Usage ... N

ENC Area 1

Product 1

ENC Area 2

Product 2

Paper Chart Area 1

Product 3

... etc ...

Product ... N

Feature Certificatio

n:

Under Constructio

n

Not Verified

Verified

Products

Different representations for the same object

Page 13: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 13

Products:Database (HPD)

ACRONYMAttributes

Feature Object

BERTHING

Usage 1

HARBOUR

Usage 2

APPROACH

Usage 3

...

Usage ...

Representations based on “Usages”

Page 14: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 14

Source Database

No file/chart boundary limitation

Products:Database (HPD)

Page 15: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 15

Workspace of the survey area

Products:Database (HPD)

Page 16: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 16

Overlapping with 2002 survey 850 m

Page 17: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 17

Problems updating the shoreline

Page 18: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 18

Products:Database (HPD)

Viewing external products

SSS tiff image

Page 19: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 19

Viewing external products

Caris Map

Products:Database (HPD)

Page 20: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 20

Products:Database (HPD)

Digitizing and editing tools

Page 21: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 21

Under Construction

Not Verified

Verified

Products

Rejected

Editor Role

QA Role

Feature being added, or edited

Feature submitted, ready for QC

Product Role

Products:Database (HPD)

Feature creation:

Page 22: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 22

S-57 ENC

HOMImport and transformation into Caris format

QC Tool

s

HPD Load.bat file

New data in HPD Source Editor (database)

Loading process

Products:Database (HPD)

Page 23: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 23

Products:Database (HPD)

Feature change tracking

Page 24: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 24

Products:Database (HPD)

Product Database:

Product creation

Customize features

Spatial extent

Selection of attributes

Page 25: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 25

Products:Database (HPD)

Creation of new ENC product

Page 26: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 26

Products:Database (HPD)

Administration Tools

Page 27: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 27

Products:Database (HPD)

Workflow management

Page 28: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 28

Page 29: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 29

usm817.hydrows13

Source Database Product Database

Projects:Pearl_River_2004

Oracle 8iPearl River S57 Charts

U35PRL1C.000

U35PRL2C.000

HPD

Workspace

Workspace

Products:USM HPD Database

Page 30: 30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible

30 July 2004 USM 2004 Upper Pearl Survey 30

Summer Project workflow:

ISS60

HYPACK

HIPS/SIPS

HOM

GIS

HPDSkiff

SB/SSS

Bertram

MB/SSS

S57 ENC

Paper Chart

Database

Acquisition Post-

processing Product creationHydro

Survey