    HUAWEI TECHNOLOGIES CO., LTD.

    OJO Project Quality Standards

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    2/29

    HISILICON SEMICONDUCTOR

    HUAWEI TECHNOLOGIES CO., LTD. Page 2

    Contents

    Cabinets installation: BTS 3900A cabinet installation& fixation

    Power cabinet installation& fixation (TP48200A)_1

    Power cabinet installation& fixation of stacked cabinets_2

    The equipment layout in BTS3900A cabinet

    The equipment layout and cables inside BTS3900A cabinet The equipment layout and cables inside TP48200A cabinet_1

    The equipment layout and cables inside stacked cabinets_2

    The MCB distribution for DCDU

    Sensor installation

    Cabinet labeling system

    RF I nstallation:

    Antennas and RRU installation

    Antenna ports

    Antenna Mechanical Tilt Install AISG cable from ANT to 3G RRU

    RRU power cable grounding

    Antennas and RRU ports sealing

    Feeders installation

    Batter ies installation

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    3/29

    HISILICON SEMICONDUCTOR

    HUAWEI TECHNOLOGIES CO., LTD. Page 3

    Cabinet Installation

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    4/29

    HISILICON SEMICONDUCTOR

    HUAWEI TECHNOLOGIES CO., LTD. Page 4

    BTS3900A cabinet installation fixation

    Base is fixed usconcrete foundmetal grillage f

    RFC cabinet fixed on thebasement, four boltsshould be tightened well

    APM30 over the RFC cabinet,should be fixed and tightenedby 4 bolts

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    5/29

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 5

    BTS cabinet base frame fixedon the basement, four boltsshould be tightened well

    Leave 80 cm from the baseframe to the end of theconcrete foundation isdesirable ( if available )

    BTS base frame must beleveled

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    6/29

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 6

    Power cabinet installation fixation (TP48200A)_1

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    7/29

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 7

    Power cabinet installation fixation of stacked cab

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    8/29

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 8

    - BTS and TP48 cabinetsshould be leveled togetherwhile doors are closed

    - Spacing between the 2

    cabinets should be 5 cm

    TP48 cabinet should be fixedwith 4 bolts

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    9/29

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 9

    The equipment layout in BTS3900A cabinet

    DCDU-12A for

    BBU and Fan

    BBU3910

    DCDU-12B for 3G

    and 4G RRU

    In case more than 6RRUs, add another

    DCDU-12B here.

    M

    R

    F

    U

    d

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    10/29

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 10

    The equipment layout and cables inside BTS3900A cabinet

    Page 10

    DCDU power cables and fiber

    cables and BTS ground cable to

    be from the left entry port

    RRU power cab

    cables should

    the right entry

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    11/29

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 11

    The equipment layout and cables inside TP48200A

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    12/29

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 12

    The equipment layout and cables inside stacked cab

    AC, Ground

    and IF cable

    to be installedfrom the left

    entry port

    Make sure to

    keep at least

    5cm between

    AC and IF

    Battery, RRU

    dc cables and

    alarm and

    signal cables

    to be installed

    from the right

    entry port

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    13/29

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 13

    The MCB distribution for DCDU

    BATBLVDLLVD

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    14/29

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 14

    Sensor installation

    Lamp in TPWater proofsensor

    Temperature-humidity index sensor

    smokesensor

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    15/29

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 15

    Cabinet labeling system

    Labels for all power cablesinside the rectifier, allcables should be terminated

    Rectifier AC power cablesconnected in PDP should belabeled, terminated and

    fixed

    All Signal, Power and Groundcables inside the cabinetshould have label

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    16/29

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 16

    RF Installation

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    17/29

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 17

    Antennas and RRU installation

    - Stainless steel bolts, doublenuts

    - Double nuts needed forAntenna fixation

    - Use the old antennagrounding cable for the newantenna after swap

    - Stainless steel bolts, Spring

    washer and nut.

    If there is available space on

    the Tower , the 2 RRU shouldbe of different types ( 3G & 4G) for each sector .. 4G on theleft and 3G on the right

    If there is no availab

    install 2 RRU for eacwe can install 3 RRUbut they should be type 3G or 4G

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    18/29

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 18

    Antenna ports

    4G-

    1800M900M 3G-2100M

    AISG

    Male

    AISG

    Female

    Left is 1800M, 4G Right is 2100M

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    19/29

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 19

    Antenna Mechanical Tilt

    This small triangle using todefine mechanical down tilt

    The HW Tri-band antenna length is 2.6 meters, should set mechanical tilt according to the ma

    Record and call OMC to confirm the M-tilt value of all the sectors

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    20/29

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 20

    Install AISG cable from ANT to 3G RRU

    Page 20

    AISG cable will be installed from 3G RRU 3839 to antenna

    AISG cable input inside

    the RRU

    AISG cable input on theantenna

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    21/29

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 21

    RRU power cable grounding

    6 incan

    From RRU side The shielding

    layer of RRU power cable need

    to grounding using clip in RRU

    From BTS When

    RRU power cable

    through into BTS

    cabinet, must use 6

    in 1 grounding clamp

    for shield layer

    grounding of RRU

    power cable !

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    22/29

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 22

    Wrap 3 layers ofwaterproof tape

    Wrap 3 layers ofinsulation 3M tape

    Top and bottomblack ties

    Antennas and RRU ports sealing

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    23/29

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 23

    Use out door labels for upper jumpers( fixed with black cable ties)

    Use out door labels for Fiber,Power and ground cables

    - Use the Antenna port coverfor the unused ports.

    - Upper jumpers connectorsshould be sealed asmentioned before

    Using joint

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    24/29

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 24

    Feeders installation

    Wrap 3 layers of

    waterproof tape

    Wrap 3 layers of

    insulation 3M tape

    Top and bottom

    black tie wraps

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    25/29

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 25

    Feeders and fiber and power

    cables arranged inside the cable

    try in the mentioned order and

    all cables should be flat over the

    cable tray

    Old cable should be shifted

    Without affecting their service

    Outdoor Labels should be

    installed before and after the

    connectors

    Feeder Grounding Kits to be

    installed and connected to the

    nearest grounding bar

    Feeder Grounding Kits to be

    isolated in the same way as the

    antenna connecter

    Subcontractor

    VSWR for all th

    before the swa

    Snap shots ins

    document

    Cable tray Sharp

    Edges should be

    covered by

    rubber

    Earth Reading should be

    taken before and after

    the Swap , reading

    should be less than 5

    ohms

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    26/29

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 26

    Outdoor label system

    3G Tx Rx Power Fiber Grou

    Sec1 ANT_0A ANT_0B MBTS PWR RRU 0 CPRI 0 MBTS PG

    Sec2 ANT_1A ANT_1B MBTS PWR RRU 1 CPRI 1 MBTS PG

    Sec3 ANT_2A ANT_2B MBTS PWR RRU 2 CPRI 2 MBTS PG

    4G Tx Rx Power Fiber Grou

    Sec1 ANT_3A ANT_3B MBTS PWR RRU 3 CPRI 3 MBTS PG

    Sec2 ANT_4A ANT_4B MBTS PWR RRU 4 CPRI 4 MBTS PG

    Sec3 ANT_5A ANT_5B MBTS PWR RRU 5 CPRI 5 MBTS PG

    2G Tx Rx

    Sec1 ANT_0C ANT_0D

    Sec2 ANT_1C ANT_1D

    Sec3 ANT_2C ANT_2D

    Antenna RRU

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    27/29

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 27

    Batteries installation

    Page 27

    2

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    28/29

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 28Page 28

    1

    3

    4

  • 7/23/2019 3.0 OJO Project Quality standars V1.2.pdf

    29/29

    Thank youwww.huawei.com