HUAWEI TECHNOLOGIES CO., LTD.
OJO Project Quality Standards
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
2/29
HISILICON SEMICONDUCTOR
HUAWEI TECHNOLOGIES CO., LTD. Page 2
Contents
Cabinets installation: BTS 3900A cabinet installation& fixation
Power cabinet installation& fixation (TP48200A)_1
Power cabinet installation& fixation of stacked cabinets_2
The equipment layout in BTS3900A cabinet
The equipment layout and cables inside BTS3900A cabinet The equipment layout and cables inside TP48200A cabinet_1
The equipment layout and cables inside stacked cabinets_2
The MCB distribution for DCDU
Sensor installation
Cabinet labeling system
RF I nstallation:
Antennas and RRU installation
Antenna ports
Antenna Mechanical Tilt Install AISG cable from ANT to 3G RRU
RRU power cable grounding
Antennas and RRU ports sealing
Feeders installation
Batter ies installation
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
3/29
HISILICON SEMICONDUCTOR
HUAWEI TECHNOLOGIES CO., LTD. Page 3
Cabinet Installation
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
4/29
HISILICON SEMICONDUCTOR
HUAWEI TECHNOLOGIES CO., LTD. Page 4
BTS3900A cabinet installation fixation
Base is fixed usconcrete foundmetal grillage f
RFC cabinet fixed on thebasement, four boltsshould be tightened well
APM30 over the RFC cabinet,should be fixed and tightenedby 4 bolts
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
5/29
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 5
BTS cabinet base frame fixedon the basement, four boltsshould be tightened well
Leave 80 cm from the baseframe to the end of theconcrete foundation isdesirable ( if available )
BTS base frame must beleveled
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
6/29
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 6
Power cabinet installation fixation (TP48200A)_1
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
7/29
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 7
Power cabinet installation fixation of stacked cab
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
8/29
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 8
- BTS and TP48 cabinetsshould be leveled togetherwhile doors are closed
- Spacing between the 2
cabinets should be 5 cm
TP48 cabinet should be fixedwith 4 bolts
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
9/29
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 9
The equipment layout in BTS3900A cabinet
DCDU-12A for
BBU and Fan
BBU3910
DCDU-12B for 3G
and 4G RRU
In case more than 6RRUs, add another
DCDU-12B here.
M
R
F
U
d
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
10/29
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 10
The equipment layout and cables inside BTS3900A cabinet
Page 10
DCDU power cables and fiber
cables and BTS ground cable to
be from the left entry port
RRU power cab
cables should
the right entry
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
11/29
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 11
The equipment layout and cables inside TP48200A
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
12/29
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 12
The equipment layout and cables inside stacked cab
AC, Ground
and IF cable
to be installedfrom the left
entry port
Make sure to
keep at least
5cm between
AC and IF
Battery, RRU
dc cables and
alarm and
signal cables
to be installed
from the right
entry port
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
13/29
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 13
The MCB distribution for DCDU
BATBLVDLLVD
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
14/29
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 14
Sensor installation
Lamp in TPWater proofsensor
Temperature-humidity index sensor
smokesensor
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
15/29
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 15
Cabinet labeling system
Labels for all power cablesinside the rectifier, allcables should be terminated
Rectifier AC power cablesconnected in PDP should belabeled, terminated and
fixed
All Signal, Power and Groundcables inside the cabinetshould have label
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
16/29
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 16
RF Installation
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
17/29
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 17
Antennas and RRU installation
- Stainless steel bolts, doublenuts
- Double nuts needed forAntenna fixation
- Use the old antennagrounding cable for the newantenna after swap
- Stainless steel bolts, Spring
washer and nut.
If there is available space on
the Tower , the 2 RRU shouldbe of different types ( 3G & 4G) for each sector .. 4G on theleft and 3G on the right
If there is no availab
install 2 RRU for eacwe can install 3 RRUbut they should be type 3G or 4G
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
18/29
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 18
Antenna ports
4G-
1800M900M 3G-2100M
AISG
Male
AISG
Female
Left is 1800M, 4G Right is 2100M
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
19/29
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 19
Antenna Mechanical Tilt
This small triangle using todefine mechanical down tilt
The HW Tri-band antenna length is 2.6 meters, should set mechanical tilt according to the ma
Record and call OMC to confirm the M-tilt value of all the sectors
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
20/29
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 20
Install AISG cable from ANT to 3G RRU
Page 20
AISG cable will be installed from 3G RRU 3839 to antenna
AISG cable input inside
the RRU
AISG cable input on theantenna
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
21/29
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 21
RRU power cable grounding
6 incan
From RRU side The shielding
layer of RRU power cable need
to grounding using clip in RRU
From BTS When
RRU power cable
through into BTS
cabinet, must use 6
in 1 grounding clamp
for shield layer
grounding of RRU
power cable !
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
22/29
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 22
Wrap 3 layers ofwaterproof tape
Wrap 3 layers ofinsulation 3M tape
Top and bottomblack ties
Antennas and RRU ports sealing
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
23/29
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 23
Use out door labels for upper jumpers( fixed with black cable ties)
Use out door labels for Fiber,Power and ground cables
- Use the Antenna port coverfor the unused ports.
- Upper jumpers connectorsshould be sealed asmentioned before
Using joint
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
24/29
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 24
Feeders installation
Wrap 3 layers of
waterproof tape
Wrap 3 layers of
insulation 3M tape
Top and bottom
black tie wraps
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
25/29
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 25
Feeders and fiber and power
cables arranged inside the cable
try in the mentioned order and
all cables should be flat over the
cable tray
Old cable should be shifted
Without affecting their service
Outdoor Labels should be
installed before and after the
connectors
Feeder Grounding Kits to be
installed and connected to the
nearest grounding bar
Feeder Grounding Kits to be
isolated in the same way as the
antenna connecter
Subcontractor
VSWR for all th
before the swa
Snap shots ins
document
Cable tray Sharp
Edges should be
covered by
rubber
Earth Reading should be
taken before and after
the Swap , reading
should be less than 5
ohms
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
26/29
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 26
Outdoor label system
3G Tx Rx Power Fiber Grou
Sec1 ANT_0A ANT_0B MBTS PWR RRU 0 CPRI 0 MBTS PG
Sec2 ANT_1A ANT_1B MBTS PWR RRU 1 CPRI 1 MBTS PG
Sec3 ANT_2A ANT_2B MBTS PWR RRU 2 CPRI 2 MBTS PG
4G Tx Rx Power Fiber Grou
Sec1 ANT_3A ANT_3B MBTS PWR RRU 3 CPRI 3 MBTS PG
Sec2 ANT_4A ANT_4B MBTS PWR RRU 4 CPRI 4 MBTS PG
Sec3 ANT_5A ANT_5B MBTS PWR RRU 5 CPRI 5 MBTS PG
2G Tx Rx
Sec1 ANT_0C ANT_0D
Sec2 ANT_1C ANT_1D
Sec3 ANT_2C ANT_2D
Antenna RRU
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
27/29
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 27
Batteries installation
Page 27
2
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
28/29
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 28Page 28
1
3
4
-
7/23/2019 3.0 OJO Project Quality standars V1.2.pdf
29/29
Thank youwww.huawei.com