3210641 5s implementation plan at work place

Upload: manishlmehta

Post on 03-Jun-2018

223 views

Category:

Documents


1 download

TRANSCRIPT

  • 8/12/2019 3210641 5S Implementation Plan at Work Place

    1/18

    What ? Where? Team Leader Team Members P-D -C -A Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07

    Actual

    Who ?

    S5 = Shitsuke

    [Self - disciplineat workplace]

    S1 = Seiri

    [Sort out what is

    needed and

    what is not]

    S2 = Seiton

    [Do systematic

    arrangement for

    all needed items]

    S3 = Seiso

    [Ensure spic &

    span cleanliness

    with inspection]

    S4 = Seiketsu

    [Create a highly

    standardised

    workplace]Gemba-2 :

    Gemba-1 :

    S0 = Enablers[Motivate people

    for 5-S

    implementation]

    Actual

    S3

    S0

    When?

    '5-S' Road map - Depar

    Plan S0 S0 S1 S2 S2

    To do

    Plan S0 S2

    S0

    S0S1 S2 S3

  • 8/12/2019 3210641 5S Implementation Plan at Work Place

    2/18

    Jan-08 Feb-08 Mar-08

    1 ] Through continuous education,

    training, display of results & PDCA

    improvement cycles

    Zero setup PQCDEFSHE

    1 ] CLIA: Deploy Clean-Inspect-Lubricate-

    Adjust 2 ]CPCP

    Zero

    accidentsPQCD

    1 ] SOPs Developed & Displayed 2

    ]Establish SDCA

    Zero

    breakdownPQCD

    1 ]Demonstrate PQI by doing Kaizens

    2 ]Remove 3 D's at GembaZero defect SHE

    1 ]Develop criteria for need/want to

    release 50% place

    Zero

    inventory/

    More

    space

    EFSHE

    1 ]PEEP: Place for everything &

    everything in its place

    Zero

    waitingPQCD

    Remarks Why ?

    S4 S4 S5

    MOP

    ment

    S4 S4 S5

  • 8/12/2019 3210641 5S Implementation Plan at Work Place

    3/18

    Requisites Who Freq Status Remark

    Official information HOD Once 5-S Billboards / Camera TL X

    Participation of all TL N/A Gemba identified & teams formedEffective training TL / TM Weekly X

    PQCDEFSHE objectives TL / TM Qtr 5S awareness sessions1-30-300 principle TL / TM Qtr 5S awareness sessionsRoadmap TL Once Prepared & displayed5-S as a part of Kaizen roadmap

    Progress review TL / Auditor Qtr Publishing & widely communicating about the progress TM Monthly

    Active involvement of the teams TL

    Regular meetings TM Fortnight

    Developing suggestion schemes TM Weekly

    ACTION PLAN FOR "S0" Enablers

    Motivat ing people for 5S implementat ion (Jul - Aug 07)

  • 8/12/2019 3210641 5S Implementation Plan at Work Place

    4/18

    Requisites Area Who Status Remark

    TM TM TM TM TM X

    TM X

    TM X

    TM X

    X

    X

    X

    X

    TM X

    TM X

    TM X

    TM X

    TM X

    TM X

    TM X

    TM X

    Listing Wants in an Area after

    eliminating waste

    Audit / Visual Inspection of wants /

    wastes

    Scrap Disposal

    TL

    ACTION PLAN FOR "S1" Seiri

    Work Area

    Sort ing ou t what is required & dipo se unwanted (Aug - Sep 07)

    Classification in work areas

  • 8/12/2019 3210641 5S Implementation Plan at Work Place

    5/18

    Gemba

    Work Area

    TM

    Freq. Rare Never Good Worst Yes No Yes No Yes No

    Process / Equipment / Item in area

    Condition RepairableBetter

    Substitute

    avl

    Usage

    outside area

    (S1) Waste Identification Checklist

    Waste

    Usage

  • 8/12/2019 3210641 5S Implementation Plan at Work Place

    6/18

  • 8/12/2019 3210641 5S Implementation Plan at Work Place

    7/18

    Remark

  • 8/12/2019 3210641 5S Implementation Plan at Work Place

    8/18

  • 8/12/2019 3210641 5S Implementation Plan at Work Place

    9/18

    Requisites Area Who Status Remark

    TM X

    TM X

    TM X

    TM X

    TM X

    TM X

    TM X

    TM X

    TM X

    TM X

    TM X

    TM X

    Organising in compliance with PEEP &

    Identifying missing / abnormal item orstructure

    ACTION PLAN FOR "S2" Seiton

    Organising wants in an area in terms ofusage / value / importance to process / life

    cycle

    Systematic Arrang ement of wanted (Oct - Nov 07)

    Identifying amenities / infrastructure / tools

    required for correct organisation (P tags)

  • 8/12/2019 3210641 5S Implementation Plan at Work Place

    10/18

    Gemba

    Work Area

    TM

    Process / Equipment / Item in area Usage Value Qty (Nos) Critical toprocess Total Pref. No

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    (S2) Systematic arrangement checklist

  • 8/12/2019 3210641 5S Implementation Plan at Work Place

    11/18

    List down amenities / tools / structure for correct arrangement. When identified

    can be purchased or can be picked up from scrap

    Scores can be 1/ 3/ 5forlow/ Med/ Highcategories repectively & Pref. no willbe in descending order of total score

    Item with pref. no "1" should always be the easiest accesible and further on

    In case of consumables qty. to be re-ordered when inventory level for High /

    Med or Lowvalue items reaches 25 %/50 % levels

    Arrangement to complyPEEPconcept so that any missing / misplaced item

    can be identified by visual inspection

  • 8/12/2019 3210641 5S Implementation Plan at Work Place

    12/18

    Requisites Area Who Status Remark

    TL / TM X

    TL / TM X

    TL / TM X

    TL / TM X

    TM X

    TM X

    TM X

    TM X

    TM X

    TM X

    TM X

    TM X

    All Items / Process / Equipments easly

    identifiable / accesible / safe

    ACTION PLAN FOR "S3" Seiso

    External / Internal man power

    arrangement for through cleaning

    Systematic Arrang ement of w anted (Nov - Dec 07)

    Through cleaning done & scrap disposed

    safely

  • 8/12/2019 3210641 5S Implementation Plan at Work Place

    13/18

    Requisites Area Who Status Remark

    TM X

    TM X

    TM X

    TM X

    TM X

    TM X

    TM X

    TM X

    ACTION PLAN FOR "S4" Seiketsu

    Daily Inspection / Reporting

    abnormalities

    Systematic Arrang ement of w anted (Jan - Feb 08)

    Action for deviation / 5S awareness

    session or training

  • 8/12/2019 3210641 5S Implementation Plan at Work Place

    14/18

    Requisites Area Who Status Remark

    TL / Auditor X

    TL / Auditor X

    TL / Auditor X

    TL / Auditor X

    TL / TM X

    TL / TM X

    TL / TM X

    TL / TM X

    TL / TM X

    TL / TM X

    TL / TM X

    TL / TM X

    TL X

    TL X

    TL X

    TL X

    Gains in terms of value, life cycle,

    availability to be published

    ACTION PLAN FOR "S5" Shitsuke

    Monthly / Qtrly. "5S" audit by Internal /

    External accesor

    Systematic Arrang ement of w anted (Mar 08)

    5S awareness session / training for

    continual improvement / Visits

    Action for deviation / findings /

    document learnings

  • 8/12/2019 3210641 5S Implementation Plan at Work Place

    15/18

    0 1 2 3 4

    Materials / parts Does the inventory or in-process inventory include unneeded mtrl / partsMachines / Equipment Are there any unused machines or other equipment

    Papers / Plastic Mtrl Is there any paper / plastic scrap around

    Visual Control Is the waste identified

    Sub Total 0 0 0 0 0

    0 1 2 3 4

    Location Indicators Are shelves and other storage areas marked with addresses

    Item Indicators Do the shelves have signboards showing which items go whereQty. Indicators Are Max / Min Inventory levels indicated

    Walkway Demarcation Storage areas / Process Area / Units marked

    Sub Total 0 0 0 0 0

    0 1 2 3 4

    Floor / Work station Are floors / work station shiny to spot any waste

    M/c & Equipments Are they Dust free, running healthy with allowed noise / vibration

    Cleaning Stewards Is there a dedicated staff / do they do it voluntarilySub Total 0 0 0 0 0

    0 1 2 3 4

    Improvement Idea Is any action plan in place for its deployment

    Standard procedure Is the 5S implementation plan documented / published / communicated

    Future scope Any continual improvement idea / process / recognition

    First 3S Is Seiri / Seiton / Seiso maintained

    Sub Total 0 0 0 0 0

    0

    Check Item Description

    Score

    0

    1S Check Item Description

    2S

    3S Check Item DescriptionScore

    SEIRI

    Score

    SEITO

    N

    SEISO

    0

    4S Check Item DescriptionScore

    0 = Very Bad 1 = Bad 2 = Avg 3 = Good 4 = Very Good

    SEIKTSU

    0

  • 8/12/2019 3210641 5S Implementation Plan at Work Place

    16/18

    0 = Very Bad 1 = Bad 2 = Avg 3 = Good 4 = Very Good

    0 1 2 3 4

    Equipments / Process Are they easily gettable / managable

    Stock levels Is the inventory control adhered to

    Training Is Training / 5S awareness in progress

    Support Is top management active support available

    5-S Billboards Are they updated

    Sub Total 0 0 0 0 0

    Grand Total

    SHITSUKE

    0

    0

    5S Check Item DescriptionScore

  • 8/12/2019 3210641 5S Implementation Plan at Work Place

    17/18

    SEIRI 0SEITON 0

    SEISO 0

    SEIKTSU 0

    SHITSUKE 0

    0

    0.5

    1SEIRI

    SEITON

    SEISOSEIKTSU

    SHITSUKE

    Audit Result

  • 8/12/2019 3210641 5S Implementation Plan at Work Place

    18/18