    Dear Judge:

    Please receive cordial greetings from the entire team Unimet Mortorsports.

    The main objective of this book is to provide an accurate reports of the

    material used, processes required, fasteners and tools used in the

    construction of our 2016 prototype; wich will participate in the Formula SAE

    competition Michigan 2016 under number 35.

    As the result of having made this compendium, the following was obtained:

    Concept Cost

    Material 8,178.40

    Processes 2,716.51

    Fasteners 38.90

    Tooling 185.78Total 12,013.75

    Resulting in a total cost for the 2016 prototype: 12,013.75

    Viewed from another perspective, the distribution of the Budget was: 26%

    was used in Engine & Drivetrain, 12% in Frame & Body, 14% in Suspension &Shocks, 8% in Wheels & Tires, 16% in Intruments & Wirings, 13% in

    Miscellaneous, Fit & Finish, 10% in the Brakes System and 1% in the Steering

    System

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    3/146

    Table of Contents

    Introduction………………………………………………………………………………………………4 

    Cost Sumary………………………………………………………………………………………………5 

    Bill of Material……………………………………………………………………………………………6 

    Sections:

    Brake System……………………………………………………………………………………………..10

    Engine and Drivetrain…………………………………………………………………………………24

    Frame and Body…………………………………………………………………………………………66

    Instruments and Wiring……………………………………………………………………………..80

    Miscellaneous, Fit and Finish……………………………………………………………………..93

    Steering System………………………………………………………………………………………….99

    Suspensions and Shocks……………………………………………………………………………..116

    Wheels and Tires………………………………………………………………………………………..135

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    4/146

    Introduction

    Formula SAE Series competitions challenge teams of university undergraduate

    and graduate to conceive, design, develop, manufacture and race a small

    Formula type vehicle. For the purpose of this competition is to create a vehicle

    to be sold for the non-professional, weekend racers; by which the

    performance, design and production cost is evaluated.

    UNIMET Motorsports has build five (5) vehicles, but without maintainingsustainability over time. The first prototype was build for 2004, the following

    three for 2006, 2007, 2010 and the last on 2015. Given this, the 2016 team

    has the purpose to build a prototype for this year, and also work to leave a

    solid foundation for forthcoming years, in order to get better results each

    year.

    In Venezuela, UNIMET Motorsport’s headquarters, in going through a rough

    economical situation where the country register a hyper-inflation and a lack of

    raw material; therefore, for this year, the team set as a main goal to build a

    vehicle that end each of the technical test. Given the situation and the

    purpose of the competition, the team has designed each of the pieces best

    within their scope both capacity building and economic.

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    5/146

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    6/146

     

    University Universidad Metropolitana Total Vehicle Cost 12013,75

    Competition Code FSAEM

    Year 2016

    Car # 35 The cost of assemlies on this chart should n ot include the co st of the parts in the assembly but only th e materials, processes, fasteners and tool ing in the assembly level .

    Line Num. Area of Commodity Asm/Prt # Rev. Lvl. Asm Component Description Unit Cost QuantityMaterial

    CostProcess

    CostFastener

    CostTooling

    Cost Total Cost

    Details

    PageNumber 

    1 Brake System A1001 AbrF Front Rotor Assembly Complete Front Brake Asm 0,00 0,00

    2 Brake System P1001 AbrF Brake Disks Brake disks part 6,78 2 5,00$ 1,78$ 13,56

    3 Brake System P1002 AbrF Calipers wilwood, dynalite single floater 123,21 2 119,93$ 3,00$ 0,28$ 246,42

    4 Brake System P1003 AbrF Brake Pads wilwood, 6812 62,51 4 62,25$ 0,26$ 250,04

    5 Brake System P1004 AbrF Rear Rotor Assembly 0,00 0,00

    6 Brake System P1005 Brake Disks Brake disks part 6,78 2 5,00$ 1,78$ 13,56

    7 Brake System P1006 Brake Calipers wilwood, dynalite single floater 123,21 2 119,93$ 3,00$ 0,28$ 246,42

    8 Brake System P1007 AbrR Brake Pads wilwood, 6812 0,00 4 0,00

    9 Brake System A1002 AbrR Brake Line Assembly 0,00 0,00

    10 Brake System P1008 AbrR Brake Master Cylinder wilwood 260-3374 78,81 2 75,53$ 3,00$ 0,28$ 157,62

    11 Brake System P1009 AbrR Balance Barwilwood, balance bar

    replacemente 67,26 1 65,93$ 1,33$ 67,26

    12 Brake System P1010 AbrR brake lines 18,61 1 8,71$ 9,90$ 18,61

    13 Brake System A0003 0,00 0,00

    14 Brake System P1011 AbrL All brake fittings brake fitting 186,51 1 156,51$ 30,00$ 186,51

    Brake System Area Total 1130,92 67,39 1,68 0,00 1199,99

    18 Engine & Drivetrain A2001 AA Engine Assembly Engine parts and mounts - 0,0019 Engine & Drivetrain P2001 AA Engine Kawasaki ZX6RR 1.507,60 1 1502,85 4,75 1507,60

    20 Engine & Drivetrain P2002 AA Polyurethene engine mounts Rubber mounts insert info chasis 1,91 1 0,66 1,25 1,91

    21 Engine & Drivetrain P2003 AA custom crankshaft trigger wheel modification for ECU 1,58 1 1,58 1,58

    22 Engine & Drivetrain A2002 AA custom oil Pn Kawasaki ZX6RR 81,69 1 7,14 74,55 81,69

    23 Engine & Drivetrain P2004 AA Custom casch cam Kawasaki ZX6RR 29,74 1 1,88 27,86 29,74

    24 Engine & Drivetrain P2005 AA Exhaust Assembly - 0,00

    25Engine & Drivetrain P2006 AA exhaus flange

    Header Flange to Engine and

    colectors 4,28 1 1,13 3,15 4,28

    26 Engine & Drivetrain P2007 AA header Direct exhaust gases to muffler 26,62 1 8,25 18,37 26,62

    27 Engine & Drivetrain A2003 AA muffler Silence Exhaust Noise 62,60 1 40 22,6 62,60

    28 Engine & Drivetrain P2008 AA Collector 50,93 1 0,68 50,25 50,93

    29 Engine & Drivetrain P2009 AA Air Intake Assembly - 0,00

    30 Engine & Drivetrain P2010 AA Air filter Air filter - 1 0,00

    31

    Engine & Drivetrain P2011 AA throtle bodyControls quantity of air going intoengine

    - 1 0,00

    32 Engine & Drivetrain P2012 AA Venturi air retriction Restric air flow 9,11 1 4,8 0,5 3,81 9,1133 Engine & Drivetrain P2013 AA air intake plenum Divide air to all 4 cylinders 243,10 1 240 2 1,1 243,10

    34 Engine & Drivetrain P2014 AA air intake runner Direct flow to cylinders 29,74 1 6,09 23,65 29,74

    35 Engine & Drivetrain A2004 AA thermal gaskets Seal between joints 268,70 1 129 139,7 268,70

    36 Engine & Drivetrain P2015 AA fuelsystem assembly - 0,00

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    7/146

    7

    37 Engine & Drivetrain P2016 AA fuel injectot Purchased fuel injector 10,26 1 10 0,26 10,26

    38Engine & Drivetrain P2017 AA fuel pump

    Internal Bosch purchased fuel

    pump 38,74 1 35 3,26 0,48 38,74

    39 Engine & Drivetrain P2018 AA fuel tank Moded fuel tank from old team 119,16 1 9,3 109,5 0,36 119,16

    40Engine & Drivetrain P2019 AA fuel pressure regulator  

    Purchased Fuel Pressure

    Regulator 16,50 1 15 1,5 16,50

    41 Engine & Drivetrain P2020 AA fuel filter and check valve Purchased Fuel filter 23,26 1 23 0,26 23,26

    42Engine & Drivetrain P2021 AA fuel lines Supply fuel rail and return to tank

    144,86 1 133,38 10,8 0,68 144,86

    43 Engine & Drivetrain A2005 AA fuel rail Supply fuel to injectors 1,28 1 0 1,13 0,15 1,28

    44 Engine & Drivetrain P2022 AA Cooling Assembly - 0,00

    45Engine & Drivetrain P2023 AA radiator and fan

    Modified radiator and purchased

    fan 59,69 1 39,38 19,73 0,58 59,69

    46Engine & Drivetrain P2024 AA cooland lines

    Purchased hoses and aluminum

    pipes 23,40 1 9,7 13,7 23,40

    47 Engine & Drivetrain A2006 AA fluid reservoir Custom built fluid reservoir 35,85 1 10,2 25,65 35,85

    48Engine & Drivetrain P2025 AA Shift System Assembly

    - 0,00

    49 Engine & Drivetrain P2026 AA shifter Purchased Actuator 22,12 1 22,02 0,1 22,12

    50 Engine & Drivetrain P2027 AA line Purchased parts 2,78 1 0,27 2,51 2,78

    51 Engine & Drivetrain P2028 AA DriveTrain System - 0,00

    52 Engine & Drivetrain P2029 AA tre chain drive differential Purchased Diff 203,89 1 171,76 32,13 203,8953 Engine & Drivetrain P2030 AA Differential mounts Purchased parts 12,66 1 1,79 10,87 12,66

    drive train system Purchased CV Joints 46,22 1 7,2 39,02 46,22

    engine sproket Purchased parts 11,061

    0,27 10,79 11,06

    Differential sproket Purchased parts 61,06 1 3,36 57,7 61,06

    Half shalf Purchased parts 3,45 1 2,7 0,75 3,45

    chaing guard Student made 13,40 1 5,4 8 13,40

    Engine & Drivetrain Area Total 2423,28 717,87 7,16 0,00 3167,24

    54Frame & Body A3001 AA

    Pedal & controls

    assembly

    Complete pedal & controls

    assembly - 0,00

    55 Frame & Body P3001 AA Brake pedal Steel brake pedal 23,34 1 1,252 20,87 1,22 0 23,34

    56 Frame & Body P3002 AA Gas pedal Steel gas pedal 17,77 1 5 11,55 1,22 0 17,77

    57 Frame & Body P3003 AA Clutch lever Clutch pedal 13,74 1 1,184 11,34 1,22 0 13,74

    58 Frame & Body A3002 AA Tube space frame Steel tube Space frame - 0,00

    59 Frame & Body P3004 AA Complete tube frame Steel alloy tube frame 875,12 1 75,279 667,66 0 132,18 875,12

    60 Frame & Body P3005 AA Tab stock All body parts attached 156,53 1 1,571 154,96 0 0 156,5361 Frame & Body A3003 AA Body assembly All body parts attached - 0,00

    62 Frame & Body P3006 AA Right Side Panel Right Side Panel 323,87 1 233,125 90,38 0,36 0 323,87

    63 Frame & Body P3007 AA Left Side Panel Left Side Panel 323,87 1 233,125 90,38 0,36 0 323,87

    64 Frame & Body P3008 AA Nose Cone Nose Cone 207,03 1 200 7,03 0 0 207,03

    65 Frame & Body P3009 AA Floor Pan Floor Pan 111,54 1 12 99,21 0,42 0 111,54

    66 Frame & Body A3004 AA Shifter All Linkages - 0,00

    67 Frame & Body P3010 AA Shift Leaver Clutch Linkage - 0,00

    Frame & Body Area Total317,41 956,76 4,02 132,18 1410,37

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    8/146

    8

    68 Electrical A4001 AA Engine control - 0,00

    69 Electrical P4001 AA ECU, Halteh Elite 1500 ECU engine control 1.566,00 1 1566 1566,00

    70 Electrical P4002 AA Harness Harness 184,20 1 184,72 40,86 184,20

    71 Electrical A4002 AA 12V Power System - 0,00

    72 Electrical A4003 AA Kill Switch and Isolator (starter button) Kill Switch and Isolator (starter 28,05 1 24,33 3,72 28,05

    73 Electrical P4003 AA Battery and Master Switch Battery and Master Switch 62,51 1 58,67 3,84 62,5174 Electrical A4004 AA Brake System - 0,00

    75 Electrical P4004 AA Lamp, Brake with Housing Lamp, Brake with Housing 5,36 1 4,5 0,86 5,36

    76 Electrical A4005 AA Brake Pedal Sensor Brake Pedal Sensor 5,36 1 4,5 0,86 5,36

    77 Electrical P4005 AA Dashboard - 0,00

    78 Electrical A4006 AA Aluminum Mount Aluminum Mount 33,50 1 0,5 33 33,50

    79 Electrical P4006 AA Gauges Gauges 77,35 1 57,37 19,98 77,35

    Instruments & Wiring Area Total 1900,59 103,12 0,00 0,00 1962,33

    80Miscel laneous, Fi t & Finish A5001 AA Cockpit Safety & Driver Confort System - 0,00

    81 Miscellaneous, Fit & Finish P5001 AA Seat Foam Bead Seat 713,24 1 72,5 640,74 0 0 713,24

    82 Miscellaneous, Fit & Finish P5002 AA Head Rest Hand Made Headrest 33,67 1 3,542 30,13 0 0 33,67

    83 Miscellaneous, Fit & Finish P5003 AA Spray Paint Paint on Chasis 788,46 1 788,46 0 0 0 788,46

    84 Miscellaneous, Fit & Finish P5004 AA Firewall Aluminum Firewall 56,24 1 6,14 50,1 0 0 56,24

    Miscellaneous, Fit & Finish Area Total 870,64 720,97 0,00 0,00 1591,61

    Steering System A6001 AA Steering Rack Assembly Complete Steering Rack 0,00P6001 AA Pinion Gear Pinion Gear 6,19 1 0,585 5 0,6 6,19

    P6002 AA Rack Gear Steering Rack Gear 6,77 1 1,125 5,04 0,6 6,77

    P6003 AA Steering Rack Aluminum Rack & Steel Mount 10,51 1 2,33 8,18 10,51

    P6004 AA Steering Rack Housing Rack Housing 6,96 1 1,013 5,95 6,96

     A6002 AA Steering Column Assembly Steering Column & Shaft 0,00

    P6005 AA Column Joints U-Joint for Column 42,39 1 40 1 1,39 42,39

    P6006 AA Column Steel Tube Column 6,51 1 0,45 6,06 6,51

     A6003 AA Steering Wheel Assembly Steering Wheel 0,00

    P6007 AA Steering Wheel Steering Wheel 13,10 1 5,1 8 13,10

    P6008 AA Quick Release Quick Release 13,24 1 6,45 6,6 0,19 13,24

     A6004 AA Tie Rod Assembly Tie Rod Assembly 12,48 6,72 19,20

    P6009 AA Rod Tube Steel Tubing 0,86 1 0,86 0,86

    P6010 AA Rod Inserts Student Bought 11,04 1 11,04 11,04

    P6011 AA Rod Ends Student Bought 11,04 1 11,04 11,04

    P6012 AA Rod Extension Rod Extension 7,17 1 4,2 2,97 7,17Steering System Area Total 84,19 48,80 2,78 0,00 154,98

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    9/146

    9

    Suspension A7001 AA Damper Assembly Damper Setup 12 12,00

    P7001 AA Damper Fox VAN RC Damper 320,96 4 320 0,96 1283,84

     A7002 AA Bell Crank Assembly Aluminum Bell Crank 0,00

    P7002 AA Bell Crank Aluminum Bell Crank 13,91 2 4,84 6 3,07 27,82

     A7003 AA Front A-Arms Assembly Complete Front A-Arms 0,00

    P7003 AA Front Lower A-Arm Steel Lower A-Arm 22,89 2 8,774 5,83 1,62 6,7 45,78

    P7004 AA Front Upper A-Arm Steel Upper A-Arm 22,82 2 8,767 5,77 1,62 6,7 45,64

     A7004 AA Front Upright Assemly Front Aluminum Upright 0,00

    P7005 AA Front Upright Front Aluminum Upright 17,59 2 6,72 9,82 1,05 35,18

     A7005 AA Push Rod Assembly Push Rod Assembly Front & Rear 12,48 5,52 18,00

    P7006 AA Rod Tubing Steel Tubing 0,70 1 0,7 0,70

    P7007 AA Rod Inserts Student Bought 11,04 1 11,04 11,04

    P7008 AA Rod Ends Student Bought 11,04 1 11,04 11,04

     A7006 AA Rear A-Arms Assembly Complete Rear A-Arms 0,00

    P7009 AA Rear Lower A-Arm Steel Lower A-Arm 23,60 2 9,44 5,87 1,62 6,7 47,20

    P7010 AA Rear Upper A-Arm Steel Lower A-Arm 22,68 2 8,626 5,77 1,62 6,7 45,36

     A7007 AA Rear Upright Assembly Rear Aluminum Upright 0,00

     A7011 AA Rear Upright Rear Aluminum Upright 18,43 2 7,5 9,82 1,05 36,86

    Suspension & Shocks Area Total 1412,11 101,60 23,30 53,60 1620,46

    Wheels & Tires A8001 AA Wheel Assembly Complete Wheel Assembly 0,00

    P8001 AA Wheel Student Bought Wheel 50,00 4 50 200,00

    P8002 AA Valve System Purchased Valve Stem 1,00 4 1 4,00

    P8003 AA Tires Hoosier 85,00 4 85 340,00

     A8002 AA Hub Assembly Front and Rear Hub Assembly 0,00

    P8004 AA Front Hub Steel Front Hub 35,59 2 4,5 29,01 2,08 71,18

    P8005 AA Rear Hub Rear Front Hub 34,54 2 3,938 28,52 2,08 69,08

    P8006 AA Front Spindle Steel Spindle 28,55 2 2,7 23,95 2 57,10

     A8007 AA Wheel Bearing Assembly Wheel Bearing Assemnbly 0,52 0,08 0,60

    P8007 AA Front Wheel Bearing Wheel Bearing 43,15 2 43,15 86,30

    P8008 AA Rear Wheel Bearing Wheel Bearing 39,25 2 39,25 78,50

    Wheels & Tires Area Total 731,08 162,96 12,32 0,00 906,76Vehicle Total Total 8.178,40 2.716,51 38,94 185,78 12.013,75

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    10/146

     

    Brake System

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    11/146

    11

    University   Uni versi dad M et ropol i t ana   C ar #   3 5   P a rt C o s t   2 5 7 . 5 7$

    System   B r a k e S y s t e m ( B R )   F ileL ink1 Qty   1

    Assembly   R ea r R o t o r A s s e mb l y   F ileL ink2 Fil eLink1

    P art   Brake l i ne Assembl y   F ileL ink3 Fil eLink2 E xtende d Cost   2 5 7 . 5 7$

    P / N B a s e   A1 0 0 3   FileL ink3

    Suf f ix   AA

    Details   C o m p le t e B r a k e l i n e A s s e m b l y

    ItemOrder P ar t P ar t cost Quantity Sub Total

    1 0 Brake L ine 1 8 . 6 1 1 . 0 0 E+0 0 1 8 . 6 1$

    2 0 M as ter c yli nder 7 8 . 8 1 1 7 8 .8 1

    3 0 Brake L ine Fit ti ngs 9 1 . 2 2 1 9 1 .2 2

    4 0 Balanc e Bar 6 5 .9 3 1 6 5 .9 3

    Sub T otal 2 5 4 .5 7 0$

    ItemOrder P rocess Use U nitC os t Uni t Quanti ty M ul tipl ier Mult. Val. Sub Total

    1 0 Wrenc h < = 2 5 . 4 mm Ti ghten Cal ipers Bo 1 . 5 0$ 2 3 . 0 0$Sub Total 3 . 0 0$

    ItemOrder Fastener Use U nitC os t Size1 Unit1 Siz e2 Unit2 Quantity Sub Total

    -$

    Sub Total -$

    ItemOrder Tool ing Use U nitC os t Uni t Quanti ty P VF Fr ac Inc ld Sub Total

    Sub Total 0

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    12/146

    12

    U niversit y   Univers idad Metropolitana   C a r #   3 5   P a r t C o s t   18.61$

    Syst em   B r a k e S y s t e m ( B R )   Fil eLi nk1 Qty   1

    A ssem bly   B r a k e L i n e A s s e m b ly Fil eLi nk2 F ileLink1

    Part   B r a k e L i n e A s s e m b ly Fil eLi nk3 F ileLink2 Ext ended Cost   18.61$

    P / N B a s e   P100   FileLink3

    Suffix   A A

    D et ails   B r a k e L i n e

    ItemO rder Material U se Uni tC ost Size1 Unit1 Size2 Unit 2 A rea Nam A rea Length Densi ty Q uant ity Sub Total

    10 Tubing, Steel Brake Line 2. 25$ Kg 2. 00E+00 4. 50$

    Hose, High Pressure, Stainless Steel Brai ded Outer Soft Brak e Line $ 4. 21 2 .8 m 1. 00E+00 $4 .21

    Sub Tot al 8.706$

    ItemO rder Process U se Uni tC ost U nit Quant ity Mult ipl ier Mult . Va Sub Tot al

    10 Tube Cut C ut Steel H ose 0. 15$ cm 16 2 .40$

    20 Tube Bends Bends St eel Tube 0.75$ Bends 1 0   7.50$

    S ub T ot al 9 .9 0$

    ItemO rder Fast ener U se Uni tC ost Size1 Unit1 Size2 Unit 2 Quant it y Sub Tot al

    -$Sub Tot al -$

    ItemO rder Tooli ng U se Uni tC ost U nit Quant ity PVF FracIncld Sub Tot al

    Sub Total 0

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    13/146

    13

    Univers ity   Universida d Metropolita na   C ar #   35   P a rt C o s t   78.81$

    Sys tem   Br a k e S y s t e m ( B R )   FileLink 1 Q ty   1

    Assembly   R e ar R o t o r A s s e m b l y   FileLink 2 FileLink1

    Part   Bra ke Ca liper   FileLink 3 FileLink2 Extended C   78.81$

    P / N B a s e   P1008   F ileLink 3

    Suf f ix   AA

    De tails   M a s te r c y l i nd e r p a r t

    Ite mOrder Mater ial Use UnitCost Size1 Uni t1 Size2 Unit2 Area Name Area Length Density Q ua ntity Sub Total

    10 Wil wood, 260-3374 Mas ter c ylinder 75.53$ 1.00E+00 75.53$

    Sub Total 75.530$

    Ite mOrder Process Use UnitCost Unit Quantity Mu ltiplier Mult. Val. Sub Total

    10 Wrench < = 25.4 mm Ti ghten Ca lipers Bo 1.50$ 2 3.00$

    Sub T otal 3.00$

    Ite mOrder F as tener Use UnitCost Size1 Uni t1 Size2 Unit2 Quantity Sub Total10   Bolt, Gra de 8.8 (S AE 5)   hold calipers 0.14 2 0. 28$

    S ub T ot al 0 .28$

    Ite mOrder Tooling Use UnitCost U nit Quantity PVF FracIncld Sub Total

    Sub Total 0

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    14/146

    14

    Un iversity   U nivers idad Metropolitana   C ar #   35   P a r t C o s t   186.58$

    System   Brake Sys tem (BR)   FileLin k1 Q ty   1

    Assem b ly   Brake Line As s embly   FileLin k2 FileLin k1

    Part   Fittings   F ileLin k3 FileLin k2 E xten d ed Co st   186.58$P / N B a s e   P 1014   FileLin k3

    Su f f ix   AA

    Details   A l l B r a k e F i t t i n gs

    I tem Ord er Material Use Un itCost Size1 Un it1 Size2 Un it2 Area Name Area Len gth De n sity Qu an tity Su b Total

    10  Brake Fitting, T ee, Bras s , Natural, 3/ 16 in.

    F e m a le I n v e rt e d F l a r e , E a c h  Brak e Fi tting, Tee $2.97 2.00E+00 $5.94

    20  Fitting, Hos e E nd, Speed-Seal, Straight, -3

    A N H o s e t o F e m a l e - 3 A N , S t e el , Z i n cFi tting, Hos e E nd $6.91 8 $55.28

    30  F i t t i n gs , Br a s s , M a l e 1 / 8 i n . N P T t o F e m a l e

    3/ 8 in.-24 T hread, Inverted Flare  Fi ttings, Br as s, Male $6.59 4 $26.36

    40  F i t t i n g , 9 0 De g r e e, - 3 A N M a l e t o 1 / 8 i n .

    NP T , Steel, Gold Iridited, E ach  brake lines $8.26 4 $33.04

    5 0 A F C - 7 01 0 - 0 0 0 3 F i t t i n g, A N t oI n v e rt e d F l a r e ,

    $8.99 4 $35.96

    Su b Total 15 6. 580$

    I tem Ord er Process Use Un itCost Un it Q u an tity Mu ltip lier Mu lt. Val. Su b Total

    10 Wrench

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    15/146

    15

    U n i v e r s i t y   U n i v e r s i d a d M e t r o p o l i t a n a   C a r # 3 5   P a r t C o s t   6 7 . 2 6$

    S y s t e m   B r a k e S y s t e m ( B R )   F i le Li n k 1 Q t y 1A s s e m b l y   B r a k e L i n e A s s e m b l y   F i le Li n k 2 F i l e L i n k 1

    P a r t   B a l a n c e B a r   F i le Li n k 3 F i l e L i n k 2 Ex te n d e d C o s t   6 7 . 2 6$

    P / N B a s e   P1 0 1 5   F i l e L i n k 3

    S u f f i x AA

    D e t a i l s   B a l a n c e B a r

    I t e m O r d e r M a t e r i a l U s e U n i t C o s t S i z e 1 U n i t1 S i z e 2 U n it 2 A r e a N a m e A r e a L e n g th De n s i t y Qu an t it y S u b T o t a l

    1 0 B a l a n c e B a r W ilw o o d , 3 4 0 -1 7 5 7 B a la n c e B a r 6 5 . 9 3$ 1 . 0 0 E+ 0 0 6 5 . 9 3$

    S u b T o t a l 6 5 . 9 3 0$

    I t e m O r d e r P r o c e s s U s e U n i t C o s t U n i t Q u a n t i t y M u lt i p l i e r M u lt . V a l . S u b T o t a l

    1 0 A ss em ble , 1 k g, L in e-o n-L in e F a ste n B ala nc e B ar 0 . 1 3$ u n it 1 0 . 1 3$

    2 0 T u b e e n d p r e p e r a t i o n fo r w e l d i n g

    b a l a n c e b a r h a u s i n g ,

    p re pe re ti on f or w el di ng 0 .7 5$ e nd 1 0 . 7 5

    3 0 w e ld w e ld b a la n c e b a r to p ed a l $ 0 . 1 5 c m 3 0 . 4 5

    S u b T o ta l 1 .3 3$

    I t e m O r d e r F a st e n e r U s e U n i t C o s t S i z e 1 U n i t1 S i z e 2 Un it 2 Q u a n t i t y S u b To t al

    -$

    S u b To t a l -$

    I t e m O r d e r T o o l i n g U s e U n i t C o s t U n i t Q u a n t i t y P V F F r ac I n c l d S u b T o t a l

    S u b T o ta l -$

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    16/146

    16

    U n i v e r s i t y   U n i v e r s i d a d M e t r o p o l i t a n a   C a r #   35   A s m C o s t   3 9 8 . 9 4$

    S y s t e m   B r a k e S y s t e m ( B R )   Qty   1

    A s s e m b l y   R e a r R o t o r A s s e m b l y   F i l eLi nk 1

    P / N B a s e   A 1 0 0 2   F i l e Li n k 2 E x t en d e d C o   3 9 8 . 9 4$

    S u f f i x   AA   F i l eLi nk 3

    D e t a i l s   C o m p l e t e R e a r R o t o r A s s e m b l y

    I t em O rd e r P a r t P a rt C o s t Q u a n t i t y S u b T o t a l

    1 0 B r a k e D is k 6 .7 8$ 2. 00 E + 0 0 1 3 .5 60$

    2 0 B r a k e Ca li pe r 6 6 .4 0$ 2. 00 E + 0 0 1 3 2 .8 00$

    3 0 B r a k e P a d 6 2 .5 2$ 4. 00 E + 0 0 2 5 0 .0 80$

    S u b T o t a l 39 6 . 4 40$

    I t em O rd e r M a t er i a l U se U n it C o s t Si z e1 U n i t 1 S i z e 2 U n i t 2 A re a N a m e A r ea Le n g t h D e n si t y Q u an t it y S u b T o t a l

    1 0 B ra k e B le ed - P er B l ee de r V al ve B r ak e B le ed 2 .5 0$ 1. 00 E + 0 0 2 .5 0$

    S u b T ot a l 2 . 5 00$

    I t em O rd e r P ro c e ss U se U n it C o s t U n i t Q u a n t M u l t i p M u l t . Va l . S u b T o t a l

    -$

    S u b T o t a l -$

    I t em O rd e r F a st e n er U se U n it C o s t S i z e1 U n i t 1 S i z e 2 U n i t 2 Q u a n t i t y S u b T o t al

    -$S u b T o t a l -$

    I t em O rd e r T o o l i n g U se U n it C o s t U n i t Q u a n t P V F F ra c t i o n I n S u b T o t a l

    S u b T o t a l 0

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    17/146

    17

    Uni ve rsi ty   U n iversid ad M etro p o lita n a   C ar #   3 5   P a r t C o s t   6 2 .5 2$

    Syste m   Br a k e S y s t e m ( B R )   Fi le Link1 Qty   2

    Asse mbl y   R e a r R o t o r A s s e mb l y   Fi le Link2 Fi le Link1

    Part   Bra ke Pa d   Fi le Link3 Fi le Link2 Extende d C ost   1 2 5 .0 4$

    P / N B a s e   P1 0 0 9   F i l e Li nk 3

    Suf f i x   AA

    De tai l s   B r a k e P a d P a rt

    Ite mOrder Materi al Use Uni tCost S ize 1 Uni t1 Size 2 Unit2 Are a Name Area Le ngth De nsi ty Quantity S ub Total

    1 0 Brake P ad, I ron o r S teel R ot or Br ake Pad 31 .13$ 2 5 .4 mm mm 38 .1 6.3 5  2 .0 0 E+0 0 6 2 .2 6$

    S ub T otal 62 .2 6 0$

    Ite mOrder Pr oce ss Use Uni tCost Uni t Quanti ty Multipl ie r Mul t. Val . S ub Total

    1 0 A ss em bl e, 1 k g , L ine -on- Li ne L ine u p P ads 0. 13$ u nit 2 1 0 .26$

    S ub Tota l 0. 26$

    Ite mOrder Fastene r Use Uni tCost S ize 1 Uni t1 Size 2 U nit2 Q ua nti ty Sub Total

    -$

    Sub Total -$

    Ite mOrder Tool ing Use Uni tCost Uni t Quanti ty PV F F racI ncld S ub Total

    S ub Tota l 0

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    18/146

    18

    U n i v e r s i t y   U n i v e r s i d a d M e t r o p o l i t a n a   C a r #   3 5   P a r t C o s t   1 2 3 . 2 1$

    S y s t e m   B r a k e S y s t e m ( B R )   F i l e L in k 1 Q ty   2

    A s s e m b l y   R e a r R o t o r A s s e m b l y   F i l e L in k 2 F i l e L i n k 1

    P a r t   B r a k e C a l i p e r   Fi l e L in k 3 F i l e L i n k 2 E x t e n d e d C   2 4 6 . 4 2$

    P / N B a s e   P 1 0 0 8   F i l e L i n k 3S u f f i x   AA

    D e t a i l s   B r a k e C a l i p e r P a r t

    It e m O r d e r M at e r i a l U s e U n i t C o s t S i z e 1 U n i t1 S i z e 2 U n i t 2 A r e a N a m e A r e a L e n g th D e n s i t y Q ua n ti t y Su b T o t a l

    1 0 W il wo o d, D yn a li te S in gl e F lo at er B ra ke C al ip er 1 1 9. 93$ 1 . 0 0E + 0 0 1 19 .9 3$

    S ub T ot al 1 19 .9 30$

    It e m O r d e r P r o c e s s U s e U n i t C o s t U n it Q u a n t i ty Mu lt i p l i e r M u l t . V a l . S u b T o t a l

    1 0 W r e n c h < = 2 5 . 4 m m T i gh t e n Ca l i p e r s B o 1 . 5 0$ 2 3 . 0 0$

    S u b T o t a l 3 . 0 0$

    It e m O r d e r F as te n e r U s e U n i t C o s t S i z e 1 U n i t1 S i z e 2 U n i t 2 Q u a n ti t y S u b T o t a l

    1 0   B o l t , G r a d e 8 . 8 ( S A E 5 )   h o l d c a l i p e r s 0 . 1 4 2 0 . 2 8$

    S ub T ot al 0 .2 8$

    It e m O r d e r To o l i n g U s e U n i t C o s t U n it Q u a n t i ty P V F F r a c I n c l d S u b T o t a l

    S u b T o t a l 0

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    19/146

    19

    University   U ni versi dad M etropol i tana   C ar #   35   P a r t C o s t   6. 78$

    System   B r ak e S y s t em ( B R )   Fil eLi nk1 Qty   1

    Assem bly   R e a r R o t o r A s s e m b ly   Fil eLi nk2 Fil eLi nk1

    Part   B r a k e D i s k   Fil eLi nk3 Fil eLi nk2 Extended Cost   6. 78$

    P / N B a s e   P1006   FileL ink3

    Suf f ix   A A

    Details   Br a k e D i s k P a r t

    ItemOrder Material Us e UnitCost Size1 Unit1 Si ze2 Uni t2 Area Nam Area Length Density Quantity Sub Total

    10 Cast I ron Brake disk 1. 00$ 1kg 5.00E+00 5.00$

    Sub Total 5.000$

    ItemOrder Process Us e UnitCost Unit Quantity Multipli Mult. Val. Sub Total

    1 0 M ac hi ni ng S et up , I ns ta ll a nd r em ov e Se tt in g u p f o r r em ov e 1 .3 0$ per rotor 1 1. 30$

    20 Machining Remove 0. 04$ c m^3 12 0. 48$

    S ub T ota l 1 .7 8$

    ItemOrder Fastener Us e UnitCost Size1 U nit1 Si ze2 Uni t2 Quantity Sub Total

    -$

    Sub Total -$

    ItemOrder Tooling Us e UnitCost Unit Quantity PVF FracIncld Sub Total

    Sub Total 0

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    20/146

    20

    U n i v e r s i t y   U n i v e r s i d a d M e t r o p o l i t a n a   C a r #   35

    S y s t e m   B r a k e S y s t e m ( B R )

    A s s e m b l y   F r o n t B r a k e R o t o r A s s e m b l y   F i l e L i n k 1

    P / N B a s e   A 1 0 0 1   F i l e L i n k 2

    S u f f i x   AA   F i l e L i n k 3

    D e t a i l s   C o m p l e t e F r o n t B r a k e A s s e m b l y

    I t em O r d er P a r t P a rt C o s t Q u a n t it y S u b T o t a l

    1 0 B ra k e Di s k 6 . 78$ 2. 0 0 E+ 00 1 3 .5 6 0$

    2 0 B ra k e Ca l i pe r 66 . 4 0$ 2. 0 0 E+ 00 1 3 2 .8 0 0$

    3 0 B ra k e P a d 62 . 5 2$ 4. 0 0 E+ 00 2 5 0 .0 8 0$

    S u b T o t a l 39 6 .4 4 0$

    I t em O r d er M a t er ia l U s e U n i t C o s t S iz e 1 U n i t 1 S i ze 2 U n it 2 A r e a N a m e A r e a L en g t h

    I t em O r d er P r o c es s U s e U n i t C o s t U n i t Q u a n t i t y M u l t i p lie r M u l t . V a l. S u b T o t a l

    1 0 B ra ke B l ee d - P er B l ee d er V a lv e B l ee d B ra ke 2 .5 0$ u n it 1 1 2 . 5 0$

    S u b T o t a l 2. 5 0$

    I t em O r d er F a s t en e r U s e U n i t C o s t S iz e 1 U n i t 1 S i ze 2 U n it 2 Q u a n t i t y S u b T o t al

    -$

    S u b T o t a l -$

    I t em O r d er T o o li n g U s e U n i t C o s t U n i t Q u a n t i t y P V F F ra c t i o n In c lu d e S u b T o t a l

    S u b T o t a l 0

    A s m C o s t   3 9 8 . 9 4$

    Qt y   1

    E x t e n d e d 3 9 8 . 9 4$

    Q u a n ti t y S u b T o t a l

    -$

    S u b T o t a l -$

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    21/146

    21

    Universit y   Universidad Metropolitana   Car #   116   Part Cost   6 . 7 8$

    Syst em   B r a k e S y s t e m ( B R )   FileLink1 Qt y   1

    Assembly   Rear Rotor A ssembly   FileLink2 FileLink1

    Part   Brake Disk   FileLink3 FileLink2 Extended Cost   6 . 7 8$

    P/N Base   P 1 0 0 6   F ile Link 3

    Suffix   A ADet ails   Brake Disk Part

    ItemO rder Mat erial Use UnitCost Size1 Unit 1 Size2 Unit 2 Area Nam Area Lengt h D ensit y Quant ity Sub Tot al

    10 C as t Ir o n Br ak e d isk 1 .0 0$ 1 kg 5 .0 0E +0 0 5 .0 0$

    Sub To tal 5.000$

    ItemO rder Pro cess Use UnitCost Unit Quant ity Mult iplier Mult . Val. Sub Tot al

    1 0 M a ch i ni n g S e tu p , I n st al l a n d r e mo v e S e tt in g u p f o r r e mo v e 1 . 30$ p er ro to r 1 1. 3 0$

    20 Ma ch in in g Rem o ve 0 .0 4$ c m ^3 1 2 0. 4 8$

    S ub T ot al 1 .78$

    ItemO rder Fa st ener Use UnitCost Size1 Unit 1 Size2 Unit 2 Qua ntit y Sub Tot al-$

    Sub Tot al -$

    ItemO rder Tooling Use UnitCost Unit Quant ity PVF F ra cIncld Sub Tot al

    Sub Tot al 0

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    22/146

    22

    Un ivers it y   Uni ver si dad Metr opol i tana   Ca r #   116   Pa rt Co s t   6 2 . 5 2$

    Sys t em   Br ake System (BR)   Fi le L in k1 Qt y   2

    As s emb ly   Rear Rotor Assem bl y   Fi le L in k2 Fi le L in k1

    Pa rt   Br ake P ad   Fi le L in k3 Fi le L in k2 E xt en d e d C o s t   1 2 5 . 0 4$

    P/N B a s e   P 1 0 0 9   FileL in k3

    Su ffix   AA

    Det a ils   Br ake P ad P ar t

    It e mO rd er M a t eri a l U s e U ni t Co s t S iz e 1 Un i t 1 Siz e 2 U n it 2 A re a N a me A rea L e n gt h D e n si t y Qu a n t it y S u b To t al

    1 0 B ra ke P ad , I ro n o r S te el R ot or Br ak e P ad 3 1. 13$ 2 5 .4 m m m m 38 . 1 m m 6. 3 5  2 .0 0 E+0 0 6 2 .2 6$

    S ub To t al 62 .2 6 0$

    It e mO rd er Pr oc e ss U s e U ni t Co s t U n i t Qu a n ti t y M u lt ip l ie r M u l t. Va l . S u b To t a l

    1 0 A ss em bl e, 1 k g, L in e- on -L in e L in e u p P ad s 0 .1 3$ u ni t 2 1 0 . 26$

    S ub To ta l 0. 26$

    It e mO rd er Fa s t en e r U s e U ni t Co s t S iz e 1 Un i t 1 Siz e 2 U n it 2 Q ua nt i ty Su b To t a l-$

    Su b To t a l -$

    It e mO rd er To ol in g U s e U ni t Co s t U n i t Qu a n ti t y PV F F ra cI n c ld S u b To t a l

    S ub To ta l 0

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    23/146

    23

    U niv ersity   Univ e rsidadMe tropolitana   C ar #   116   P a r t C o s t   123.21$

    Sy stem   B r a k e S y s t e m ( B R )   FileLink1 Qty   2

    A ssembly   R e a r R o t o r A s s e m bl y   FileLink2 FileLink1

    Part   Brak e Calipe r   FileLink3 FileLink2 Extended Cost   246.42$

    P / N B a s e   P 1008   FileLink3Suffix   AA

    D etails   Brak e Calipe r P art

    ItemOrder Material Use UnitCost S ize1 Unit1 Size2 Uni t2 Area Name Area Length D ensity Qua ntity Sub Total

    1 0 W il wo od , D y na li te S in gl e F l oa te r B ra ke C al i pe r 1 19 .9 3$ 1. 00E+00 119. 93$

    Sub T otal 119.930$

    ItemOrder Process Use UnitCost Unit Quantity Multi plier Mult. Val. Sub T ota l

    10 Wrench < = 25.4 m m Tighten C alipe rs B o 1.50$ 2 3.00$

    Sub T ota l 3.00$

    ItemOrder Fastener Use UnitCost Size1 Unit1 Size2 Uni t2 Quantity Sub Total

    10   B o l t, G ra d e 8 . 8 ( S AE 5 )   hold cal ipers 0.14 2 0.28$

    Sub T otal 0. 28$

    ItemOrder T ooling Use UnitCost Unit Quantity PVF FracIncld Sub Tota l

    Sub T ota l 0

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    24/146

    Engine and

    Drivetrain

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    25/146

    25

    U n i v e r si t y C a r #   35   A s m C o s t   1 , 7 0 9 . 1 1$

    S y s t e m Q t y   1

    A s s e m b l y

    P / N B a se E x t e n d e d C o s t   1 , 7 0 9 . 1 1$

    S u f f i x

    D e t a i l s

    I t e m O r d e r P a r t P a r t C o st Q u a n t i t y S u b T o t a l

    1 0 K a w a s a k i ZX 6 R R 1 , 5 0 7 . 6 0$ 1 . 0 0  1 , 5 0 7 . 6 0$

    2 0 Po l y u r e t h a n e e n g i n e m o u n ts 7 . 6 4$ 4 . 0 0  3 0 . 5 6$

    3 0 C u s t o m C r a n k s h a f t t r i g g e r w h e e l 1 . 5 8$ 1 . 0 0  1 . 5 8$

    4 0 C u s t om O i l P a n 8 1 . 6 9$ 1 . 0 0  8 1 . 6 9$

    5 0 C u s t om C a t c h c a n 2 9 . 7 4$ 1 . 0 0  2 9 . 7 4$

    S ub T ot al 1 ,6 5 1. 1 7$

    I t e m O r d e r M a t e r ia l U se U n i t C o s t S iz e 1 U n i t 1 S i ze 2 U n i t 2 A r e a N a m e A r e a Le n g t h D e n s i t y Q u an t i t y S u b T o t a l

    -$

    Su b T o t a l -$

    I t e m O r d e r P r o c e ss U se U n i t C o s t U n i t Q u an t i t y M u l t ip l i e r M u l t . V a l . S u b T o t a l

    10

    C o n n e c t o r I n s t a l l , S q u a r e ,

    La tc h / S n a p -o n T y p e C o n n e ct c o i l s 0 . 1 7$ u n i t 4 0 . 6 8$

    2 0 R a t c h e t < = 2 5 . 4 m m T i gh t e n S p a r k P l u g s 0 . 7 5$ u n i t 4 3 . 0 0$

    3 0 R a t c h e t < = 2 5 .4 m m T i gh te n e n g i n e t o c h a s i s 0 . 7 5$ u n i t 4 3 . 0 0$

    4 0 E ng in e f ir st s ta rt , i nc lu de s f ue l E ng in e f ir st t es t 5 0. 00$ u n i t 1 5 0 . 0 0$

    5 0 R a t c h e t < = 2 5 . 4 m m T i gh t e n O i l P a n 0 . 7 5$ u n i t 4 3 . 0 0$

    6 0 R at ch et < = 2 5. 4 m m T i gh te n C at ch Ca n M ou nt in g 0 .7 5$ u n i t 2 1 . 5 0$

    7 0 A s s e m bl e , 1 k g, Lo os e M ou nt O i l p an 0 . 0 6$ u n i t 1 0 . 0 6$

    8 0 A s s e m b l e , 1 k g , L o o s e M o u n t C t a c h c a n 0 . 0 6$ u n i t 1 0 . 0 6$

    9 0 A s s e m b l e , 1 k g , Li n e - o n - L i n e

    C o n n e c t w i r i n g f r o m c o i l s t o

    E C U 0 . 1 3$ u n i t 4 0 . 5 2$

    1 0 0 A s s e m b l e , 1 k g , L o o s e R o u t e C h a i n o v e r S p r o c k e t 0 . 0 6$ u n i t 1 0 . 0 6$S ub To tal 5 7. 26$

    I t e m O r d e r F a s t e n e r U se U n i t C o s t S iz e 1 U n i t 1 S i ze 2 U n i t 2 Q u an t it y S u b T o t a l

    1 0 B ol t , G ra de 8 .8 ( SA E 5 ) B ol ts fo r m ot or m ou nt s 0 .7 6$ 9 m m 1 1 0 m m 2 1 . 5 3$

    2 0 N ut , G ra de 8 .8 ( SA E 5 ) N u ts f or M o to r M o un ts 0 .0 5$ 9 m m 4 0 . 2 0$

    3 0 W a sh e r, G r ad e 8 . 8 ( S AE 5 ) W a sh e rs f o r M o t or M o u nt s 0 . 01$ 9 m m 8 0 . 0 8$

    4 0 B o l t , G r a d e 8 . 8 ( S A E 5 ) B o l ts fo r O i l p a n 0 . 0 5$ 6 m m 2 0 m m 1 5 0 . 6 8$

    5 0 N u t , G r a d e 8 . 8 ( S A E 5 ) N u t s f o r C a t c h c a n 0 . 0 3$ 6 m m 2 0 . 0 6$

    6 0 W as he r, G ra de 8 .8 (S AE 5 ) W as h er s f or C at ch c an 0 .0 1$ 6 m m 4 0 . 0 4$

    7 0 B ol t, G ra de 8 .8 ( SA E 5 ) B ol ts f or C at ch c an 0 .0 5$ 6 m m 2 0 m m 2 0 . 0 9$

    8 0 Bo lt , G ra de 8 .8 ( SA E 5 ) B ol ts f or L ow e r M o un t   2 . 5 6$ 9 m m 2 5 5 m m 1 2 . 5 6$

    S u b T o t a l   0 . 6 8$

    I t e m O r d e r To o l i n g U se U n i t C o s t U n i t Q u an t i t y P V F F ra c t i o n In c l u d S u b T o t a l

    -$ -$

    S u b T o t a l   -$

    U n i v e r s i d a d M e t r o p o l i t a n a

    E n g i n e p a r t s a n d M o u n t s

    BA

    A 2 0 0 1

    E n g i n e A s s e m b l y

    E n g i n e & D r i v e t r a i n ( E N )

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    26/146

    26

    Unive rsity Car #   35   Part Cost   1,507.60$

    Syst em Qt y   1

    Asse m bly

    Part Ext ended Cost   1,507.60$

    P/N Base

    Suffix

    De t ails

    It emOrder Mate rial Use UnitCost Size1 Unit 1 Size2 Unit2 Are a Name Area Lengt h Density Quantit y Sub Total

    10

    En gin e a n d Tr a n s mis s io n,

    U l t r a H i g h P e r f or m a nc e ( > 1 0

    HP/100 cc) M o to r 2.50$ cc Hp 600.00  1,500.00$

    20 Spar k Plu g C oil Ign ition s ystem -$ Uni t 4.00  -$

    30 Fluid , O il Lub ricate E ngin e Co mpo n 0.75$ Liter 3.80  2.85$

    40 Oil F ilter F ilter Oil -$ unit 1.00  -$

    S ub T ot al 1 ,5 02 .8 50$

    It emOrder Proce ss Use UnitCost Unit Quant ity Multiplier Mult. Val. Sub Total

    1 0 A ss em bl e, 2 0 k g, L oo se M ou nt M ot or t o c h as is 1 .2 5$ Labo r 1 1.25$

    20 Ra tchet < = 25.4 m m Tighten s par k p lugs 0.75$ un it 4 3.00$

    30 Han d, Tight

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    27/146

    27

    Uni versity Car #   35   Pa rt Co st   1.91$

    S ystem Qty   4

    Assemb l y

    Pa rt Ext end ed Co s   7.64$

    P/N Ba se

    S u ffi x

    Det a i l s

    I temOrder Mat eri al Use Uni tCo st Si ze1 Uni t1 Si ze2 Un it 2 Area Name Area Leng th Den si ty Quan ti ty Sub T ota l

    10 Rubber Engine mount b ushing 3.30$ kg 0.20  0.66$

    S ub To tal 0.660$

    I temOrder P rocess Use Uni tCo st Uni t Qua nti ty Mu lti pl i er Mul t. Va l. Su b Tot al

    10

    Br oach,

    External Turn Bushing to D iame 0.50$ cm 5 1.25$

    20

    A s s emble, 1

    kg, Line- on-Line Insert bus hings 0.13$ unit 1 0.13$

    Sub To tal 1.25$

    I temOrder Fastener Use Uni tCo st Si ze1 Uni t1 Si ze2 Un it 2 Quant it y Sub Tota l

    -$

    Su b Tot al -$

    I temOrder To ol ing Use Uni tCo st Uni t Qua nti ty PVF FracI ncld Su b Tot al

    -$

    Sub To tal 0

    BA

    Rubber Mounts ins er ts into Chas is

    U niv er s idad Metr opolitana

    Engine & Dr iv etr ain (EN)

    Engine A s s embly

    P oly ur ethane engine mounts

    P 2002

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    28/146

    28

    Universi ty Car #   3 5   Par t C os t   1.58$

    System Qty   1As s embly

    Part Extended Cos   1.58$

    P/N Bas e

    Suffix

    Details

    ItemO rder Mate rial Use Uni tC ost Siz e1 Uni t1 Si ze2 Unit2 Area Name Ar ea Le ngth De ns ity Quantity Sub Total

    1 0

    OEM engi ne t ri gger

    wheel

    Igni t i o n si gnal t o

    ECU -$ 1 . 00  -$

    Sub Total -$

    ItemO rder Pr oce ss Use Uni tC ost Unit Quanti ty Mul ti pl ier M ult. V al. Sub Total

    1 0 G r i n d, F l a tRemo ve Met alTo oth 0.1 5$ c m^2 0.5 0 .0 8$

    2 0 R a tc h et < = 2 5 .4 m m

    D i smo unt and

    mo unt 0.7 5$ uni t 2 1 .5 0$

    Sub Total 1 .58$

    ItemO rder Fas tene r Use Uni tC ost S iz e1 Uni t1 Si ze2 Unit2 Quantity S ub Total

    -$

    Sub Total -$

    ItemO rder Tooling Use Uni tC ost Unit Quanti ty PVF Fr ac Inc ld Sub Total

    -$

    Sub Total 0

    Cust o m Crankshaft t ri gger wheel

    P2003

    BA

    Mo d so ECU c an read si gnal

    Uni versi dad Met ro po l i t ana

    Engi ne & D ri vet rai n (EN)Engi ne Assembl y

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    29/146

    29

    Uni vers ity C ar #   3 5   Par t C os t   8 1 .6 9$Syste m Qty   1

    As s embly

    Part Extended Cos   8 1 .6 9$

    P/N Bas e

    Suffix

    Details

    It emO rder Mater ial Us e U nitCos t Siz e1 Unit1 Si ze2 Uni t2 Are a Name Ar ea Le ngth Densi ty Quantity Sub Total

    1 0

    Al umi num, No rmal

    (per kg) Oil Pa n st ruc t ure 4 .2 0$ kg Hp 1.70  7 .1 4$

    Sub Tot al 7 .1 4$

    It emO rder Pr oce ss Us e U nitCos t Uni t Quantit y Multipl ie r M ul t. Val. Sub Tot al

    1 0 S h e e t M e t a l S a w C u t

    Cut Al umi num

    Sha pes 0 .2 0$ c m 21 3 4 2.60$

    2 0 Wel d Wel d stru ct ure 0 .1 5$ c m 21 3 3 1.95$

    Sub Total 7 4. 55$

    It emO rder Faste ne r Us e U nitCos t Siz e1 Unit1 Si ze2 Uni t2 Quantit y Sub Total

    -$

    Sub Total -$

    It emO rder Tool ing Us e U nitCos t Uni t Quantit y PVF Fr acIncl d Sub Tot al

    -$

    Sub Total 0

    AA

    Kawasaki ZX6 RR

    Uni versi dad Met ro po l i t anaEngi ne & D ri vet rai n (EN)

    Engi ne Assembl y

    Cust o m Oi l Pan

    P2 0 0 4

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    30/146

    30

    Univ ersity C ar #   35   P a rt Cost   29. 74$

    Sy stem Qty   1

    Assem bly

    Pa rt Extended Cos   29. 74$

    P /N Ba se

    S uffix

    Deta ils

    Item Order Ma teri al Use Uni tCost Size1 U nit1 S ize2 Unit 2 Area Na me Area Leng th Densi ty Qua nti ty Sub Total

    10 Tube cut Structure 0 .15$ cm 10. 16  1. 52$

    20

    Hos e,

    Rubber

    C onnect

    engine to

    catchcan 0. 18$ m 2 .00  0. 36$

    S ub T ot al 1. 88$

    Item Order Process Use Uni tCost Unit Qua nti ty M ult ipl ier M ult. Va l. S ub T ota l

    10

    Sheet M etal

    Saw C ut

    C ut

    Aluminum

    Shapes 0 .20$ cm 64 12 .80$

    2 0 W e ld

    Weld

    s tructure 0 .15$ cm 75 11 .25$

    3 0 T u b e cu t

    Structure

    and ports 0 .15$ cm 25.4 3.8 1$

    Sub Tota l 27 .86$

    Item Order Fastener Use Uni tCost Size1 U nit1 S ize2 Unit 2 Quantity Sub Tota l

    -$

    Sub Tota l -$

    Item Order Tooling Use Uni tCost Unit Qua nti ty P VF FracIncl d S ub T ota l

    -$

    Sub Tota l 0

    BA

    K a w a sa k i Z X 6 R R

    Univ ers idad M etropolitana

    Engine & D riv etrain (EN)

    Engine As s embly

    C us tom C atch can

    P2005

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    31/146

    31

    U niv ersity C ar #   35   A sm Cost   38.06$

    S y stem Qty   1

    A ssembly

    P/ N B ase Extend ed C ost   38.06$

    S uffix

    D etails

    ItemOrder P art P art C ost Qua ntity S u b Total

    10 Exhaust Fl ange 34. 20$ 1.00  34.20$

    20 H eade rs 26. 62$ 1.00  26.62$

    30 Muffle r 62. 60$ 1.00  62.60$

    40 C oll ec tor 152. 78$ 1.00  152.78$

    S u b Tota l 276.2 0$

    ItemOrder Ma ter ial U se Un itCos t S ize1 Un it1 Size2 U nit2 A rea Na me A rea Leng th D ens ity Qu an tity S u b Tota l

    10 The rmal G aske t Se al 3 .30$ 6.00  19.80$

    S u b To ta l 19 .80$

    ItemOrder P rocess U se Un itCos t Un it Qua ntity M ultip lier Mult. Va l. S u b To ta l

    10 Ratche t

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    32/146

    32

    U n i v e r s i t y C a r #   35   P a r t C o s t   4 . 2 8$

    S y s t e m Q t y   8

    A s s e m b l y

    P a r t E x t en d e d C o s t   3 4 . 2 0$

    P / N B a s e

    S u f f i x

    D e t a i l s

    I t e m O r d er M a t e r i a l U s e U n i t C o s t S i z e 1 U n i t 1 S i z e 2 U n it 2 A r e a N a m e A r ea L en g t h De n s i t y Q u a n t i t y S u b T o t a l

    1 0 S t e e l , S ta i n l e s s F l a n g e 2 . 2 5$ k g 0 . 5 0  1 . 1 3$

    S u b T o t a l 1 .1 3$

    I t e m O r d er P r o c es s U s e U n i t C o s t U n i t Q u a n t i t y Mu l ti p l ie r M u l t . V a l . S u b T o t a l

    1 0 P l a s m a C u tt i n g C u t F l a n g e t o f i t 0 . 1 0$ c m 31 . 5 3 . 1 5$

    S u b T o t a l 3 .1 5$

    I t e m O r d er F a s t e n er U s e U n i t C o s t S i z e 1 U n i t 1 S i z e 2 U n it 2 Q u a n t i t y S u b T o ta l

    -$

    S u b T o t a l -$

    I t e m O r d er T o o li n g U s e U n i t C o s t U n i t Q u a n t i t y P V F F r a c I n c ld S u b T o t a l

    -$

    S u b T o t a l 0

    AA

    H e a d e r F l a n g e t o E n g i n e a n d c o l e c t o r s

    U n i v e r s i d a d M e t r o p o l i t a n a

    E n g i n e & D r i v e t r a i n ( E N )

    E x h a u s t A s s e m b l y

    E x h a u s t F l a n g e

    P 2 0 0 6

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    33/146

    33

    Uni versity Car #   35   Pa rt Co st   26.62$

    S ystem Qty   1

    Assemb l y

    Pa rt Ext end ed Co s   26.62$

    P/N Ba se

    S u ffi x

    Det a i l s

    I temOrder Mat eri al Use Uni tCo st Si ze1 Uni t1 Si ze2 Un it 2 Area Name Area Leng th Den si ty Quan ti ty Sub T ota l

    1 0 S te el , S t ai nl es s H ea de r a n d d ow np ip e 3 .3 0$ kg 2.50  8.25$S ub To tal 8.25$

    I temOrder Process Use Uni tCo st Uni t Qua nti ty Mu lti pl i er Mul t. V a l. Su b Tot al

    10

    S a w o r t u b i ng

    cuts cut to lenghth 0.40$ unit 5 2.00$

    20

    Tube end pr ep

    for welding prep for w elding 0.75$ cm 1 3 9.75$

    3 0 B e n d Tu b e

    Bend to des ir ed

    ang les 0.75$ 3 2.25$

    40 Weld Roundtubing Joint tubes 0.38$ cm 11.5 4.37$

    Sub To tal 18.37$

    I temOrder Fastener Use Uni tCo st Si ze1 Uni t1 Si ze2 Un it 2 Quant it y Sub Tota l

    -$

    Su b Tot al -$

    I temOrder To ol ing Use Uni tCo st Uni t Qua nti ty PVF FracI ncld Su b Tot al

    -$

    Sub To tal -$

    BA

    Dir ect ex haus t gas es to muf f ler

    U niv er s idad Metr opolitana

    Engine & Dr iv etr ain (EN)

    Ex haus t A s s embly

    Header s

    P 2007

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    34/146

    34

    U n i v e r s it y C a r #   35   P a r t C o s t   6 2 . 6 0$

    S ys t e m Q t y   1

    A s s e m b l y

    P a r t E x t e n d e d C o s   6 2 . 6 0$

    P / N B a s e

    S u f f i x

    D e t a i l s

    It e m Or d e r M a t e r ia l U s e U n it C o s t S iz e 1 U n it 1 S iz e 2 U n it 2 A r e a N am e A r e a L e n gt h D e n s it y Q u an t it y Su b To t a l

    10 B e n e l l i M u f f l e r ( A l lc o s t s a s m a d e ) R e d u c e e n g i n es o u n d 4 0 . 0 0$ 1 . 0 0  4 0 . 0 0$

    S u b To t a l 4 0 . 0 0$

    It e m Or d e r P r o c e s s U s e U n it C o s t U n it Q u a n t i ty M u lt ip lie r M ult . V a l. S u b T o t a l

    10

    T u b e e n d p r e p f o r

    w e ld i n g P r e p f o r w el d in g 0 .7 5$ c m 2 0 1 5 .0 0$

    2 0 W e ld R o u n d t u b in g J o i n t t u b e s 0 .3 8$ c m 2 0 7 . 6 0$

    S u b T o t al 2 2 .6 0$

    It e m Or d e r F a s t e n e r U s e U n it C o s t S iz e 1 U n it 1 S iz e 2 U n it 2 Q u a n t i t y S u b T o t a l

    -$

    S u b To t a l -$

    It e m Or d e r T o o li n g U s e U n it C o s t U n it Q u a n t i ty P V F F r ac In c l d S u b T o t a l

    -$

    S u b T o t al 0

    A A

    S i l e n c e E x h a u s t N o i s e

    U n i v e r s i d a d M e t r o p o l i t a n a

    E n g i n e & D r i v e t r a i n ( E N )

    E x h a u s t A s s e m b l y

    M u f f l e r

    P 2 0 0 8

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    35/146

    35

    Universi ty C ar #   3 5   Part Cost   5 0 .9 3$

    System Qty   3

    As s embly

    Part Extende d Cost   152.78$

    P/N Bas e

    Suffix

    Details

    ItemO rder Mater ial Use UnitCost Size 1 Uni t1 Size 2 Unit2 Area Name Are a Length Densi ty Quantity Sub Total

    1 0

    St eel ,

    St ai nl ess

    C o n n ec t e x h a u st

    runners 2 .25$ kg 0.30  0 .6 8$

    Sub Total 0 .68$

    ItemO rder Process Use UnitCost Unit Quantity Multipli er M ul t. Val. Sub Total

    1 0

    Saw o r

    tubi ng Cuts 0 .40$ unit 5 2 .00$

    2 0

    Tube end

    prep fo r

    wel din g prep f or weld ing 0 .75$ c m 55 4 1.25$

    30 wel d Joint t ubes 0 .15$ c m 60 9 .00$

    Sub Total 5 0.25$

    ItemO rder Fas te ner Use UnitCost Size 1 Uni t1 Size 2 Unit2 Quanti ty Sub Total

    -$

    Sub Total -$

    ItemO rder Tooling Use UnitCost Unit Quantity PVF FracIncld Sub Total

    -$

    Sub Total 0

    BA

    Uni versi dad Met ro po l i t ana

    Engi ne & D ri vet rai n (EN)

    E x h a u st A s s e mb l y

    Co l l ec t o r

    P2 0 0 9

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    36/146

    36

    U n i v e r s i ty Ca r #   35   A s m C o s t   7 4 6 . 5 5$

    S y st e m Q t y   1

    A s s e m b l y

    P / N B a s e E x t en d ed C o s t   7 4 6 . 5 5$

    S u f f i x

    D e t a i l s

    I te m O r d er P a r t P a r t C o s t Q u a n t i t y S u b T o ta l

    1 0 A ir f il t e r 9 .1 1$ 1 . 0 0  9 . 1 1$

    2 0 T h r o t le B o d y 2 4 3 .1 0$ 1 . 0 0  2 4 3 . 1 0$

    3 0 V e n t u r i A ir r e s t r ic t i on 29 .7 4$ 1 . 0 0  2 9 . 7 4$

    4 0 A ir i n t a k e p le n u m 2 6 9 .7 5$ 1 . 0 0  2 6 9 . 7 5$

    5 0 A ir i n t a k e r u n n e rs 1 0 4 .4 8$ 1 . 0 0  1 0 4 . 4 8$

    6 0 T h e r m a l g a sk e t s 7 .1 3$ 1 . 0 0  7 . 1 3$

    S ub T ot al 6 63 .31$

    I te m O r d er M a t e r i a l U s e U n i t C o s t S i z e 1 U n i t1 S i z e 2 U n i t2 A r e a N a m e A r e a L en g t h D en s i ty Q u a n ti t y S u b T o ta l

    1 0 C ab le , P us h/ P ul l c on ne c t t hro tle a nd p ed al 3 0.0 0$ m 2. 5 0  1.00  7 5 . 0 0$

    S ub T ot al 7 5. 00$

    I te m O r d er P r o c e s s U s e U n i t C o s t U n i t Q u a n t i t y M u l ti p l i e r M u l t. V a l . S u b T o t a l

    1 0 R a t c h e t < = 2 5. 4 m m

    T i g h t e n A i r i n t a k e a s s e m b l y t o

    m ot or 0. 7 5$ u n it 8 6 .0 0$

    2 0 R a t c h e t < = 2 5. 4 m m

    T i g h t e n A i r i n t a k e a s s e m b l y t o

    c h a s is 0. 7 5$ u n it 2 1 .5 0$

    3 0 A ss em bl e, 1 k g, L oo se M ou nt A ir i nt ak e a ss em bl y 0 .0 6$ u n it 1 0 .0 6$

    S u b T o t a l 7 . 5 6$

    I te m O r d er F a s t en e r U s e U n i t C o s t S i z e 1 U n i t1 S i z e 2 U n i t2 Q u a n t i t y S u b T o t a l

    1 0 B o l t , G r a d e 8 . 8 ( S A E 5 ) B o l ts f o r A i r i n t a ke a s s em b l y 0 . 0 5$ 6 m m 2 0 m m 8 0 .3 6$

    S u b T o t a l 0 . 6 8$

    I te m O r d er T o o l i n g U s e U n i t C o s t U n i t Q u a n t i t y P V F F r a c ti o n I n c l u d S u b T o ta l

    -$

    S u b T o t a l   -$

    U n i v e r s i d a d M e t r o p o l i t a n a

    S t u d e n t B u i l t I n t a k e

    B A

    A 2 0 0 3

    A i r I n t a k e A s s e m b l y

    E n g i n e & D r i v e t r a i n ( E N )

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    37/146

    37

    U n i v e r s i t y C a r #   35   P a r t C o s t   9 . 1 1$

    S y s t e m Q t y   1

    A s s e m b l y

    P a r t E x t en d e d C o s t   9 . 1 1$

    P / N B a s e

    S u f f i x

    D e t a i l s

    I t e m O r d er M a t e r i a l U s e U n i t C o s t S i z e 1 U n i t 1 S i z e 2 U n it 2 A r e a N a m e A r ea L en g t h De n s i t y Q u a n t i t y S u b T o t a l

    1 0 A i r f i l te r F i l te r a ir 0 . 1 5$ c m ^ 2 3 2 . 0 0  4 . 8 0$

    S u b T o t a l 4 .8 0$

    I t e m O r d er P r o c es s U s e U n i t C o s t U n i t Q u a n t i t y Mu l ti p l ie r M u l t . V a l . S u b T o t a l

    1 0 R at c h e t < = 6 . 3 5 m m t i g h te n c la m p 0 . 5 0$ L a b or 1 0 . 5 0$

    S u b T o t a l 0 .5 0$

    I t e m O r d er F a s t e n er U s e U n i t C o s t S i z e 1 U n i t 1 S i z e 2 U n it 2 Q u a n t i t y S u b T o ta l

    1 0 H o s e C l a m p , W or m D ri v e C l a m p a i r f il t e r 0 . 6 0$ 6 . 3 5 c m 1 3 . 8 1$

    S u b T o t a l 3 . 8 1$

    I t e m O r d er T o o li n g U s e U n i t C o s t U n i t Q u a n t i t y P V F F r a c I n c ld S u b T o t a l

    -$

    S u b T o t a l 0

    AA

    A i r f i l t e r

    U n i v e r s i d a d M e t r o p o l i t a n a

    E n g i n e & D r i v e t r a i n ( E N )

    A i r I n t a k e A s s e m b l y

    A i r f i l t e r

    P 2 0 1 0

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    38/146

    38

    University Car #   35   Part Cost   243.10$

    S ystem Qty   1

    A ssembly

    Part Exten ded Cost   243.10$

    P/ N B ase

    S uffix

    D etails

    ItemOrder Materia l Use UnitCost S ize1 U ni t1 S ize2 Unit2 Area Name Area Length Density Quantity S ub Total

    10 Throtle Body Controls air 240.00$ al l cost as made 1.00  240.00$

    S ub T ot al 2 40 .0 00$

    ItemOrder Process Use UnitCost U nit Quantity Multip lier Mult. Val. Sub Total

    10

    R a t ch e t < = 6 . 3 5

    mm Tigthe n bolts 0. 50$ uni t 4 2. 00$

    S ub Total 2.00$

    ItemOrder Fastener Use UnitCost S ize1 U ni t1 S ize2 Unit2 Quantity S ub Total

    10

    B o l t , G r a d e 8 . 8

    ( SA E 5 ) B ol ts f or A ir i nt ak e a ss em bl y 0 .0 5$ 6 mm 20 mm 4 0. 18$

    20

    Nut, G rade 8.8

    (SAE 5) Se cure bolts 0. 03$ 6 mm 4 0. 12$

    30

    Washer, Grade 8.8

    (SA E 5 ) Was her s fo r syst em 0. 10$ 6 mm 8 0. 80$

    S ub Total 1.10$

    ItemOrder Tooling Use UnitCost U nit Quantity PVF FracIncld S ub Total

    -$

    S ub Total -$

    AA

    C o n t ro l s q u a nt i t y o f a i r g o i n g i n t o e n g i ne

    Univ e rsidad Me tropolitana

    Engine & Driv e train (EN)

    Air Intake Asse mbly

    Throtle Body

    P 2011

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    39/146

    39

    Univers it y Car #   3 5   P art C os t   2 9 .7

    Sys te m Qty   1

    As s embly

    Part Ex tended Co   2 9 .7 4$

    P /N Bas e

    Suffix

    Details

    It emOrde r Mat erial Us e Uni tCost Size 1 Unit1 Size 2 Unit2 Are a Name Area Leng th De ns ity Quant it y Sub Total

    10 A lumi num, N or mal Flanges a nd Ven tu r i 4 .20$ k g 0.80  3 .3 6$

    A lum inum , N or m al

    (p er kg) shape ventur i 4 .20$ k g 0.65  2 .7 3$

    Sub Total 6.09$

    It emOrde r P roc ess Us e Uni tCost Unit Q uant it y Mult iplier Mult. Val. Sub Total

    1 0

    Gear Shaping

    (h obb ing) Shape to th r o tl e for m 0 .50$ L abor 2 1.0 0$

    20 weld Jo int f langes an d ventu 0 .15$ cm 26 3.9 0$

    3 0

    Machining Setup,

    C hange Cha nge Lath e to ols 0 .65$ L abor 1 0.6 5$

    4 0

    Machining Setup,

    Install and r em ove

    Install and center

    alum in um i n lathe 1 .30$ L abor 1 1.3 0$

    5 0

    Dr illed holes < 2 5 .4

    mm dia. Hol es fo r bo lts 0 .35$ ho le 4 1.4 0$60 Machini ng Shape ventur i 0 .04$ cm^3 38 4. 94 15 .40$

    Sub Total 23 .6 5$

    It emOrde r Fas te ner Us e Uni tCost Size 1 Unit1 Size 2 Unit2 Quantity Sub Tot al

    Sub Tot al -$

    It emOrde r Tooling Us e Uni tCost Unit Q uant it y PV F F rac Inc ld Sub Total

    -$

    Sub Total 0

    BA

    R e s t r i c ai r f l o w

    U niver sidad Metr opolitana

    E ngine & Dr ivetr ain (E N )

    A i r I n t a k e A s s e m bl y

    V e n t u r i A i r r e s t r i ct i o n

    P2 0 1 2

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    40/146

    40

    U ni ver si ty C ar #   35 1 1   Par t C os t   2 6 9 .7 5

    Sys tem Qty   1

    As s embly

    Part Exte nde d C os   2 6 9 .7 5$

    P/N Bas e

    Suffix

    Details

    I temO r der Mater ial Us e U nitC ost Si ze1 Uni t1 Siz e2 Unit 2 A re a N ame A re a L engt h De nsi ty Quant ity Sub Total

    1 0 Al umi nu m, No rmal Ple num 4.2 0$ kg 1 .00  4 .2 0$

    2 0  V e l o c i t y S t a c k s

    R ed uc e T ur bu le nc e 3 1. 20$

    Al l c o st s as

    m ade 4 .00  1 2 4 .8 0$

    Sub T otal 12 9. 00$

    I temO r der Proc es s Us e U nitC ost Uni t Quanti ty Mul ti pl ie r Mul t. Val . S ub Total

    1 0

    S h e e t M e t a l Sa w

    Cut All cu ts mad e 0.4 0$ c m 2 52 1 0 0.80$

    2 0

    D r i l le d h o l e s < 2 5 . 4

    mm di a. Hol es for bol ts 0.3 5$ h ol e 1 4 4 .9 0$

    3 0

    R a tc h et < = 6 . 35

    mm Ti gt hen bo l ts 0.5 0$ u ni t 1 4 7 .0 0$

    4 0 we ld Jo i nt Par ts 0.1 5$ c m 1 80 27 .00$

    S ub T ot al 1 39. 70$

    I temO r der Fas te ne r Us e U nitC ost Si ze1 Uni t1 Siz e2 Unit 2 Quant ity Sub Total

    1 0

    B o l t , G r a d e 8 . 8

    (SAE 5) Bol t s for ass embl y 0.0 5$ 6 mm 2 0 mm 14 0 .6 3$

    2 0

    N u t , G r a d e 8 . 8 ( S A E

    5 ) Sec ur e b ol ts 0.0 3$ 6 mm 14 0 .4 2$

    Sub Total 1 .05$

    I temO r der Tool ing Us e U nitC ost Uni t Quanti ty PVF Fr acInc ld S ub Total

    -$

    S ub Total 0

    BA

    D i v i de a i r t o a l l 4 c y l i n d e r s

    Uni versi dad Met ro po l i t ana

    Engi ne & D ri vet rai n (EN)

    Ai r Int ake Assembl y

    Ai r i nt ake pl enum

    P2 0 1 3

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    41/146

    41

    U n iv e r s ity C ar #   3 5 1 1   P a r t C o s t   1 0 4 . 4 8 3 6

    S y st e m Q t y 1

    A s s e m b l y

    P a r t E x t e n d e d C o s   1 0 4 . 4 8$

    P / N B a s e

    Su f f ix

    D e t a i l s

    I t e m O r d e r M a te ri a l U s e U n i tC o s t S iz e 1 U n it1 Si ze 2 U n it 2 A r e a N am e A r e a L e n g t h D e n si ty Q u an ti ty S u b T o ta l

    1 0 A lu m in u m , N o r m a l Pl e n u m 4 .2 0$ k g 0 . 4 6  1 . 9 2$

    20   E n g i n e F l a n g e s  C o n n e c t r u n n e r s t o

    e n gi n e -$ 4 . 0 0 -$

    S u b T o ta l 1 . 9 2$

    I t e m O r d e r P r o c e s s U s e U n i tC o s t U n it Q u a n t it y M u lti p l ie r Mu lt . Va l . Su b T o t a l

    1 0 S a w o r t ub i n g c u t s A i r ru n n e r s 0 .4 0$ u n i t 8 3 . 2 0$

    2 0 S h e e t M e t a l S a w C u t A l l cu t s m a d e 0 .4 0$ c m 1 3 5 5 4 . 0 0$

    30

    D r i l l e d h o l e s < 2 5 . 4 m m

    d ia . H o le s f o r b o l t s 0 .3 5$ h o l e 3 0 1 0 . 5 0$

    40

    D r i l l e d h o l e < 5 0 . 8 m m

    d ia . H o le s f o r r u n n e rs 0 .7 0$ h o l e 4 2 . 8 0$

    5 0 S h e e t m et al b en ds B a s e f o r f u e l r a il 0 .2 5$ b e n d 2 0 . 5 0$

    60

    T u b e e n d p r e p f o r

    w el d i n g Pr e p f o r w e l d in g 0 .7 5$ c m 8 6 . 0 0$

    7 0 Ra tch e t

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    42/146

    42

    U ni versity Car #   3 5 11   Part Cost   3.566

    S y stem Q ty   2

    A ssembly

    Pa rt E xtend ed Co st   7.13$

    P/ N B ase

    S uffix

    D etails

    ItemOrder Ma te ria l U se Un itCo st S ize1 Un it1 S ize2 U ni t2 A rea Name A rea Len gth D ensi ty Q ua ntity S u b To tal

    10 Rubbe r Seal 3. 30$ kg 0. 002  0.01$

    20 Rubbe r Seal 3. 30$ kg 0. 02  0.06$

    S u b To tal 0 .07$

    ItemOrder P rocess U se Un itCo st U ni t Qua ntity Multi plier Mu lt. Va l. S u b T o tal

    1 0 N o n- me ta ll i c c ut t in g < = C ut f la ge s s ha pe s 0 . 35$ Cut 10 3. 50$

    S u b T o tal 3.5 0$

    ItemOrder Fa stener U se Un itCo st S ize1 Un it1 S ize2 U ni t2 Qu an ti ty S ub T ota l

    -$

    S ub T ota l -$

    ItemOrder T oo lin g U se Un itCo st U ni t Qua ntity P VF Fra cIn cld S u b To tal

    -$S u b To tal 0

    AA

    S e a l b e t w e e n j o i n t s

    Univ e rsidad Me tropolitana

    E n g i n e & D r i v e t r ai n ( E N )

    A i r I n t a k e A s s em b l y

    The rmal gaske ts

    P 2015

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    43/146

    43

    U n i v e rs it y C ar # 35   A s m C o s t   3 9 5 . 6 7$

    S ys t e m Q t y 1

    A s s e m b l y

    P / N B a s e E x t e n d e d C o s t   3 9 5 . 6 7$

    S u f f i x

    Det ails

    I t e m O rd e r P a rt P ar t C o s t Q u an t i t y S u b T o t a l

    1 0 F ue l I n je c t o r 4 1 .0 4$ 1 . 0 0  4 1 . 0 4$

    2 0 F ue l P um p 3 8 .4 4$ 1 . 0 0  3 8 . 4 4$

    3 0 F ue l T a nk (A l l C o s t a s M a d e ) 1 1 9 .1 6$ 1 . 0 0  1 1 9 . 1 6$

    4 0 F ue l P r e ss u r e R eg u l a to r 1 6 .5 0$ 1 . 0 0  1 6 . 5 0$

    5 0 F ue l f i lt er a n d c h e ck v a l v e 2 3 .2 6$ 1 . 0 0  2 3 . 2 6$

    6 0 F ue l l i ne s 1 4 4 .8 6$ 1 . 0 0  1 4 4 . 8 6$

    7 0 F ue l r a il 1 . 2 8$ 1 . 0 0  1 . 2 8$

    S ub To t a l 3 84 .5 4$

    I t e m O rd e r M a t e ria l U s e U n i t Co s t S i ze 1 U n it 1 S iz e 2 U n it 2 A re a N a m e A re a L e n g t h D e n s i t y Q u a n t it y Su b T o t a l

    1 0 G a s o li n e -$ 1 0 . 0 0 -$

    F o a m , F ue l A n t i- S u r g e Av o i d f u el s l o sh i n g 1 . 0 0$ l i te r 5 . 5 0  5 . 5 0$

    S u b To t al 5 . 5 0$

    I t e m O rd e r P r o c e s s U s e U n i t Co s t U n it Q u a n t i ty M u lt ip lie r M u lt . V a l. S u b To t al

    A ss em bl e, 3 k g , In ter f er e nc e M oun t T an k t o c ha sis 0 .5 6$ U n i t 1 0 .5 6$

    A s s em b l e , 1 k g , L in e -o n - Li n e As s em b le l i ne s 0 . 1 3$ U n i t 9 1 .1 7$

    R a tc h e t < = 2 5 . 4 m m T i gh t en bo l t s 0 . 7 5$ U n i t 4 3 .0 0$

    Su b T o t a l 4 . 7 3$

    I t e m O rd e r F as t e n er U s e U n i t Co s t S i ze 1 U n it 1 S iz e 2 U n it 2 Q u a n t it y S u b To t a l

    N u t, G r ad e 8 . 8 ( S AE 5 ) N u ts f o r s y st e m 0 . 03$ 6 m m 4 0 .7 2$

    B olt , G ra de 8 .8 (S A E 5 ) B o lt s f or f uel ta nk t o C ha ss is 0 .0 5$ 6 m m 2 0 m m 4 0 .1 8$

    S u b To t al 0 . 9 0$

    I t e m O rd e r T o o l in g U s e U n i t Co s t U n it Q u a n t i ty P V F F r ac t io n I n c lu d ed S u b T o t a l

    -$

    Su b T o t a l -$

    U n i v e r s i d a d M e t r o p o l i t a n a

    S t u d e n t B u i l t F u e l S y s t e m

    B A

    A 2 0 0 4

    F u e l s y s t e m A s s e m b l y

    E n g i n e & D r i v e t r a i n ( E N )

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    44/146

    44

    U n i v e r s i t y C a r # 35   P a r t C o s t   1 0 . 2 6$

    S y s t e m Q t y 4

    A s s e m b l y

    P ar t E x t e n d ed C o s t   4 1 . 0 4$

    P / N B a s e

    S u f f i x

    D e t a i l s

    I t e m O r d e r M a t e r i a l U s e U n it C o s t S i z e 1 U n i t1 Si z e 2 U n i t2 A r e a N a m e A r e a L e n g t h D e n s i t y Q u an t it y S u b T o t a l

    1 0 F ue l in je ct or , M ist g aso li ne in to a ir m ix tu re 1 0. 0 0$ u n it 1 . 0 0  1 0 . 0 0$

    S u b To t a l 1 0 . 0 0$

    I t e m O r d e r P r o c e s s U s e U n it C o s t U n it Q u a n t i t y Mu l t ip l ie r M u lt . V al . S u b T o t a l

    1 0 A ss em bl e, 1 k g, L in e- on -L in e M ou nt i nj ec to r t o r u nn er s 0 .1 3$ L a b o r 2 0 . 2 6$

    S u b To t al 0 . 2 6$

    I t e m O r d e r F as t e n e r U s e U n it C o s t S i z e 1 U n i t1 Si z e 2 U n i t2 Q u a n t i t y S u b To t al

    -$

    S u b T o t a l -$

    I t e m O r d e r T o o l in g U s e U n it C o s t U n it Q u a n t i t y P V F F r a cI n c l d S u b T o t a l

    -$

    S u b To t al 0

    AA

    P u r c h a s e d f u e l i n j e c t o r

    U n i v e r s i d a d M e t r o p o l i t a n a

    E n g i n e & D r i v e t r a i n ( E N )

    F u e l s y s t e m A s s e m b l y

    F u e l I n j e c t o r

    P 2 0 1 6

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    45/146

    45

    U n iv er s it y C a r # 35   P a r t C o s t   3 8 . 4 4$

    S y s te m Q t y 1

    A s s e m b l y

    P a r t E x t e n d ed C o st   3 8 . 4 4$

    P / N B a s e

    S u f f i x

    D e t a i l s

    I te m O r d e r M a te r ia l U s e U n i t C o s t Si ze 1 U n i t1 S i ze 2 U n i t2 A r e a N a m e A r e a L e n g t h D e n si ty Q u a n t i ty S u b T o ta l

    1 0 F u e l P u m p , F u e l I n j e c t e d , P u m p s g a s o l i n e f r o m t h e t a n k 3 5 . 0 0$ al l c o s t as 1.00  3 5 . 0 0$

    S ub T ot al 3 5. 00 0$

    I te m O r d e r P r o c e ss U s e U n i t C o s t U n i t Q ua n ti ty M u lt ip l i e r M u lt . V a l. S u b T o t a l

    1 0 R at c he t < = 6 .3 5 m m T ig t h en m ou nt i n g b ol t s 0 .5 0$ u n i t 6 3 .0 0$

    2 0 A s s e m b le , 1 k g , L i n e - o n - M o u n t f u e l p u m p 0 . 1 3$ L a b o r 1 0 .2 6$

    S u b T o t a l 3 .2 6$

    I te m O r d e r F a s t en e r U s e U n i t C o s t S i ze 1 U n i t1 S i ze 2 U n i t2 Q u a nt i ty S u b T o t a l

    1 0 B o lt , G r ad e 8 . 8 ( S AE 5 ) B o lt s f o r f u el p u mp b a se f l an g e 0 . 05$ 6 m m 2 0 m m 6 0 .3 0$

    2 0 N ut G ra de 8 .8 ( SA E 5 ) N ut s f or s ys te m 0 .0 3$ 6 m m 6 0 .1 8$

    S u b T o t a l 0 .4 8$

    I te m O r d e r T o o l i ng U s e U n i t C o s t U n i t Q ua n ti ty P VF F r a c I nc l d S u b T o t a l

    -$

    S u b T o t a l -$

    F u e l P u m p

    P 2 0 1 7

    A A

    I n t e r n a l B o s c h p u r c h a s e d f u e l p u m p

    Un i ve rs i d ad Me t ro p o l i t an a

    E n g i n e & D r i v e t r a i n ( E N )

    F u e l s y s t e m A s s e m b l y

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    46/146

    46

    U n i v e r s it y Ca r #   35   P a r t C o s t   1 1 9 . 1 6$

    S y s t em Q t y   1

    A s s e m b l y

    P a r t Ex t en d ed Co s   1 1 9 . 1 6$

    P / N B a s e

    S u f f i x

    D e t a i l s

    I te m O r d e r M a t er i a l U s e Un it C o s t S i ze 1 U n it 1 S i z e2 U n it 2 A r e a N a m e Ar ea L e n g th D e n s it y Q u a n t it y S u b T o ta l

    1 0 A l u m i n u m , N or m a l Fl a n g e s a n d B af f l e s 4 .2 0$ k g 1. 5 0  6 . 3 0$2 0 F i ll e r C a p Fu e l f i ll p o i n t 3 .0 0$ u n i t 1. 0 0  3 . 0 0$

    S u b T o t a l 9 .3 0$

    I te m O r d e r P r o c e s s U s e Un it C o s t U n it Q u a n t it y M u l ti p l ie r M u l t . V a l . S u b T o t a l

    1 0 G e a r Sh ap i n g ( h ob b i n g ) Sh ap e to fo r m 0 .5 0$ L ab or 2 1 . 0 0$

    2 0 D r i l l ed h o l e s < 2 5 . 4 m m H o l es f o r f l a ng e s a n d p o r ts 0 . 3 5$ h o l e 6 2 . 1 0$

    3 0 S h e e t M e ta l S a w C u t A ll c u t s m a d e 0 .2 0$ c m 3 4 0 6 8 .0 0$

    4 0 W e l d Jo i n t f l a n g e s a n d b af f le s 0 .1 5$ c m 1 7 0 2 5 .5 0$

    5 0 T ub e e n d p re p f o r w el din g P re p f o r w eld in g 0 .7 5$ c m 2 1 . 5 0$

    6 0 D ril l e d h o le < 50 . 8 m m d ia . H o l e f i l l p o r t 0 .7 0$ h o l e 12 8 . 4 0$

    7 0 R a t c h e t < = 6 . 3 5 m m

    T i g t h e n f u e l p u m p f l a g e

    m ou n ti n g b ol ts 0 .5 0$ u n i t 6 3 . 0 0$

    S u b T o t a l 1 09 .5 0$

    I te m O r d e r F a s t e ne r U s e Un it C o s t Si ze 1 U n it 1 S i z e2 U n it 2 Q u a nt i t y S u b T o t a l

    1 0 B o lt , G r ad e 8 . 8 ( S AE 5 ) B o lt s f o r a s se m bl y 0 . 05$ 6 m m 20 m m 8 0. 3 6$

    2 0 W a s h er , G r a d e 8 . 8 ( S A E 5 ) W a s h er s f o r s y s t em 0 . 1 0$ 6 m m 8 4. 8 0$

    S u b T o t a l 0. 36$

    I te m O r d e r T o o lin g U s e Un it C o s t U n it Q u a n t it y PV F F r a c In c l d Su b T o t a l

    -$

    S u b T o t a l 0

    F u e l T a n k ( A l l C o s t a s M a d e )

    P 2 0 1 8

    BA

    M o d e d f u e l t a n k f r o m o l d t e a m

    U n i v e r s i d a d M e t r o p o l i t a n a

    E n g i n e & D r i v e t r a i n ( E N )

    F u e l s y s t e m A s s e m b l y

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    47/146

    47

    Un iversity Car #   35   Part Co st   16.5

    System Qty   1

    Assem b ly

    Part Exten d ed Cost   16.50$

    P/N Base

    Su f f ix

    Details

    I temOr d er Material Use UnitCost Size1 Unit1 Size2 Un it2 Area Name Area Len gth Den sity Qu an tity Su b Total

    10  Fuel P res s ure Regulator, Gas oline

      Control the fuel pres s ure on

    rail 15.00$ unit 1.00E+00 15.00$

    S ub Tot al 1 5.0 0$

    I temOr d er Process Use UnitCost Un it Q u an tity Mu ltip lier Mu lt. Val. Su b Total

    10 Rat chet

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    48/146

    48

    University Car #   3 5   P art C os t   23.26

    Syst em Qty   1

    As s embly

    P art Exte nded C os t   23.26$

    P /N Bas e

    Suffix

    Details

    Ite mOrder Material Us e UnitCost Size1 Unit1 Siz e2 Unit 2 Area Name Area Le ngth Dens ity Quant it y Sub Total

    10 Fuel Filter , Gasoline Filter fuel 8 .00$ u nit 1 .00  8.00$

    2 0

    Fuel C heck Valve, In- line,

    Alumi num Ro llover Avoid f uel spillage 15.00$ u nit 1 .00  15.00$

    Sub T ot al 23.00$

    Ite mOrder Process Us e UnitCost Unit Q uantity Multiplier Mult. Val. Sub Total

    1 0

     

    Line Mo un t f uel filter 0 .13$ La bor 1 0.13$

    1 1

     

    L in e M ou nt f u el C he ck v al ve 0 .1 3$ La bor 1 0.13$

    Sub Total 0.2 6$

    Ite mOrder Fast ener Us e UnitCost S ize1 Unit1 Siz e2 Unit 2 Quantity Sub Tot al

    -$ -$

    Sub Total -$

    Ite mOrder Tooling Us e UnitCost U nit Q uantity P VF FracIncld Sub Total

    -$

    Sub Total 0

    Fuel f ilter and check valve

    P2020

    A A

    P u r c h as e d F u e l f i l t er

    U niver sidad Metr opolitana

    E ngine & Dr ivetr ain (E N )

    F u e l s y s t e m A s s e m b l y

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    49/146

    49

    U n i v er s i ty Ca r #   35   P a r t C o s t   1 4 4 . 8 6

    S y s te m Q t y   1

    A s s e m b l y

    P a r t E xt e nd e d C o s   1 4 4 . 8 6$

    P / N B a s e

    S u f f i x

    D e t a i l s

    I te m Or de r M a te r i a l U s e U n it C o s t S i z e1 U n i t 1 S iz e 2 Un it 2 A r ea N a m e A r e a L en g t h D en s it y Q u a n t it y S u b T o ta l

    10

    H o s e , H i g h P r e s s u r e ,

    S ta in le ss S te el B ra id ed O ut er C on ne ct R us se l f it ti ng s 1 9. 50$ m 1. 5 0  2 . 0 0  5 8 . 5 0$2 0 H os e , R u b b e r C on n e c t ta n k a n d f i l te r 1 . 6 2$ m 1. 0 0  2 . 0 0  3 . 2 4$

    3 0 A N f i tt in g s C on n e c t a ll c om p on e n t s 5 . 9 7$ u n i t 1 2. 0 0  7 1 . 6 4$

    S ub T ot al 1 33 .3 8$

    I te m Or de r P r o c es s U s e U n it C o s t U n it Q u a n ti ty M u lt i pl i er M u l t. V a l. S u b T o ta l

    1 0 A ss em bl e, 1 k g, L in e- on -L in e Mo un t f ue l l in es 0 .1 3$ L a b o r 4 0. 52$

    1 0 R a tc h e t < = 6 . 35 m m Ti g t h e n c l a m p s 0 . 5 0$ u n i t 4 2. 00$

    1 1 R atc he t < = 6 .35 m m Ti gt he n A N f i tt in g s 0 .5 0$ u n i t 12 6. 00$

    3 0 A ss em bl e, 1 k g, L in e- on -L in e A ss em bl e f it ti ng s 0 .1 3$ L a b o r 12 1. 56$

    4 0 C u t ( s c i s so r s, k n if e ) C u t h o s e t o l e n g h t 0 . 0 6$ c m 12 0. 72$

    S u b T ota l 1 0. 80$

    I te m Or de r F a s t en e r U s e U n it C o s t Si z e1 U n i t 1 S iz e 2 Un it 2 Q u a n t it y Su b T o t a l

    1 0 H o s e C l a m p, W o r m D r i v e B o l t s f o r a s s em b l y 0 . 1 7$ 1 0 m m 4 0. 6 8$S u b T o ta l 0. 68$

    I te m Or de r T o o l in g U s e U n it C o s t U n it Q u a n ti ty PV F Fr a cI n c ld S u b T o ta l

    -$

    S u b T o ta l 0

    F u e l l i n e s

    P 2 0 2 1

    AA

    S u p p l y f u e l r a i l a n d r e t u r n t o t a n k

    U n i v e r s i d a d M e t r o p o l i t a n a

    E n g i n e & D r i v e t r a i n ( E N )

    F u e l s y s t e m A s s e m b l y

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    50/146

    50

    U n i v e r si t y C ar #   35   P a r t C o s t   1 . 2 8

    S y st e m Q t y   1

    A s s e m b l y

    P ar t E x t e n d e d C o st   1 . 2 8$

    P / N B a s e

    S u f f i x

    D e t a i l s

    I t e m O r d e r M a t e r i al U se U n i t C o st S iz e 1 U n it 1 S i ze 2 U n i t 2 A r e a Na m e A r e a L e n g t h D e n s it y Q u a n t i t y S u b To t a l

    1 0 F u e l R a i l (A l l C o s t a s M a d e ) S u p p l y fu e l -$ 1 . 0 0  -$

    S u b To t a l -$

    I t e m O r d e r P ro c e ss U se U n i t C o st U n i t Q u a n t it y M u l t i p l i e r M u l t . V a l . Su b T o t al

    1 0 A ss em b le , 1 k g, L in e- on -L in e M o un t f ue l r ai l 0 .1 3$ La b o r 1 0 . 1 3$

    1 0 R at ch et < = 6 .3 5 m m T ig th en b ol ts 0 .5 0$ u n i t 2 1 . 0 0$

    S u b T o t al 1 . 1 3$

    I t e m O r d e r F a st e n e r U se U n i t C o st S iz e 1 U n it 1 S i ze 2 U n i t 2 Q u a n t it y S u b T o t a l

    1 0 B o lt , G ra d e 8 . 8 ( S AE 5 ) B o lt s f o r a s se m bl y 0 . 05$ 6 mm 2 0 m m 2 0 . 0 9$

    2 0 N ut , G ra de 8 .8 ( SA E 5 ) N ut s f or b ol ts 0 .0 3$ 6 mm 2 0 . 0 6$

    S u b T o t a l 0 . 1 5$

    I t e m O r d e r T o o l in g U se U n i t C o st U n i t Q u a n t it y P V F F r ac In c l d Su b T o t al

    -$S u b T o t al 0

    F u e l r a i l

    P 2 0 2 2

    AA

    S u p p l y f u e l t o i n j e c t o r s

    U n i v e r s i d a d M e t r o p o l i t a n a

    E n g i n e & D r i v e t r a i n ( E N )

    F u e l s y s t e m A s s e m b l y

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    51/146

    51

    U n i ve r s it y C a r # 35   A s m C o s t   # R E F !

    Sy s t e m Q t y 1

    A s s e m b l y

    P / N B a s e E x t e n d e d C o st   # R E F !

    S u f f i x

    Det ails

    I t e m O rd e r Pa rt P ar t C o s t Qu a n t it y S u b T o t a l

    1 0 R a d ia t o r a n d F an 5 9 .6 9$ 1 . 0 0  5 9 . 6 9$

    2 0 Co o l a n t li n es # R E F ! 1 . 0 0  #R E F !

    3 0 F lu i d r e s er v o i r 3 5 .8 5$ 1 . 0 0  3 5 . 8 5$

    S ub T ot al # RE F!

    I t e m O rd e r M a t e ria l U se U n it C o st S iz e 1 U n it 1 S iz e 2 U n it 2 A re a N am e A re a L e n g t h De n s it y Q u an t it y Su b T o t a l

    1 0 F lu i d , C o o l a nt -$ l it e r 8 . 0 0 -$

    Su b T o t a l -$

    I t e m O rd e r Pr o c e s s U se U n it C o st U n i t Q u an t it y M u lt i p lie r M u l t . V a l. Su b T o t a l

    1 0 As s em b l e , 1 k g , Li n e- o n- L in e M o u nt r a d to ch a s i s 0 . 1 3$ u ni t 1 0 . 1 3$

    2 0 As s em b l e , 1 k g , Li n e- o n- L in e M o u nt R e so v o i r 0 . 1 3$ u ni t 1 0 . 1 3$

    3 0 A ss em bl e, 1 k g, L in e- on -L in e R ou te a nd c on ne ct h os es 0 .1 3$ u ni t 4 0 . 5 2$

    4 0 R a tc h e t < = 6 .3 5 m m B o l ts f o r r ad i a to r m o un t s 0 . 5 0$ u ni t 8 4 . 0 0$

    5 0 R a tc h e t < = 6 .3 5 m m B o l ts f o r r es e r v o ir m ou n t 0 . 5 0$ u ni t 2 1 . 0 0$

    6 0 R a tc h e t < = 6 .3 5 m m H o s e c l am p s 0 . 5 0$ u ni t 8 4 . 0 0$

    S u b To t a l 9 . 7 8$

    I t e m O rd e r F as t e n er U se U n it C o st S iz e 1 U n it 1 Siz e 2 U n it 2 Qu an t i t y Su b T o t a l

    1 0 B o lt , G r a de 8 .8 (S A E 5 ) B o l ts f o r m o u n ti n gs 0 . 0 5$ 6 m m 2 0 m m 8 0 .3 6$2 0 N u t, G r ad e 8 . 8 ( SA E 5 ) N u t f o r s y st e m 0 . 03$ 6 m m 8 0 .2 4$

    3 0 H o se C la m p , W o r m D r i v e C l a m ps fo r h o s es 0 . 6 5$ 3 8 . 1 m m 9 5 .8 5$

    4 0 T ie W r a p S e c ur in g h o se s 0 . 0 4$ u n it 1 0 0 .4 0$

    Su b T o t a l 6 . 8 5$

    I t e m O rd e r To o l in g U se U n it C o st U n i t Q u an t it y P V F F r ac t io n I n c lu d e d Su b T o t al

    -$

    S u b To t a l -$

    U n i v e r s i d a d M e t r o p o l i t a n a

    S t u d e n t B u i l t c o o l i n g l S y s t e m

    B A

    A 2 0 0 5

    C o o l i n g A s s e m b l y

    E n g i n e & D r i v e t r a i n ( E N )

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    52/146

    52

    U ni v e r s i ty C ar # 35   P a r t C o s t   5 9 . 6 9$

    S y s te m Q ty 1

    A s s e m b l y

    P a rt E x te n d ed C o s t   5 9 . 6 9$

    P / N B a s e

    S u f f i x

    D e t a i l s

    I te m O r d e r M at e ri a l U s e U n it C o s t Si z e 1 U n i t1 S iz e 2 U n i t2 A re a N a m e A re a L e n g th D e n s it y Q u an t it y S u b To ta l

    1 0 H ea t E xc h a n g er F a n L o w e r w a t e r t e m p . 3 0 . 0 0$ 1 . 0 0  3 0 . 0 0$

    2 0 H ea t E xc h an ger , Ai r- t o- A ir L ow e r w a te r t e mp . 0 .0 035$ 2 5 83 c m ^ 3 1 . 0 0  9 . 0 4$

    3 0 Alu m inu m , N o r m a l M o u n t ing p la t e s 4 . 2 0$ 0 . 0 8 k g 1 . 0 0  0 . 3 4$S u b To t al 3 9 .3 8$

    I te m O r d e r P ro c e s s U s e U n it C o s t U n i t Q u a n ti ty M u l ti p l i er M u lt . V a l . S u b T o ta l

    1 0 S a w or t ub in g c u t s R a ds m ou n t in g p o in t 0 . 4 0$ un it 6 2 . 4 0$

    2 0 W e ld Jo in t ra d a n d p la t en m ou n t 0 . 1 5$ c m 2 4 3 . 6 0$

    3 0 T u b e e n d p re p f o r w e ld in g P r e p f o r w e ld in g 0 . 7 5$ c m 8 6 . 0 0$

    4 0 D rille d h ol e < 5 0 . 8 m m d ia . H o le f o r t h re a d s 0 . 7 0$ ho le 8 5 . 6 0$

    5 0 As s e m b le , 1 k g , L in e- o n - L in e M o u n t f a n t o r a d 0 . 1 3$ un it 1 0 . 1 3$

    6 0 R a t c h et < = 6 . 3 5 m m B o lt s f o r f a n m ou n t s 0 . 5 0$ un it 4 2 . 0 0$

    Su b To ta l 1 9 .7 3$

    I te m O r d e r F a s te n e r U s e U n it C o s t Si z e 1 U n i t1 S iz e 2 U n i t2 Q u an t it y S u b T o ta l

    1 0 B o lt , G r a d e 8 . 8 ( S A E 5 ) B o lt s f o r f a n m ou n t in gs 0 . 0 5$ 6 m m 2 0 m m 4 0 . 1 8$

    2 0 W a sh e r, G r ad e 8 . 8 ( S AE 5 ) W a sh e rs f o r s y st em 0 . 10$ 6 m m 4 0 . 4 0$

    3 0 N ut , G ra de 8 .8 ( SA E 5 ) N ut s f or s ys te m 0 .0 3$ 6 m m 4 0 . 1 2$

    S u b To ta l 0 . 5 8$

    I te m O r d e r To o l i n g U s e U n it C o s t U n i t Q u a n ti ty P V F F ra c In c l d S u b T o ta l

    -$

    Su b To ta l 0

    B A

    M o d i f i e d r a d i a t o r a n d p u r c h a s e d f a n

    U n i v e r s i d a d M e t r o p o l i t a n a

    E n g i n e & D r i v e t r a i n ( E N )

    C o o l i n g A s s e m b l y

    R a d i a t o r a n d F a n

    P 2 0 2 3

    U i i C # 35 P C # R E F !U i i d d M l i

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    53/146

    53

    U n i v er si ty C a r # 35   P a r t C o s t   # R E F !

    S y ste m Q ty 1

    A s s e m b l y

    P a rt E x te n d ed C o st   # R E F !

    P / N B a s e

    S uffix

    D e t a i l s

    It em O r de r M a t e r i a l U se U n i tC o st S i ze 1 U ni t1 S i ze 2 U ni t2 A re a N a m e A r ea L en g t h D e n sit y Q u a n ti ty S u b To t a l

    10 H o s e , R u b b e r C o n n e c t c o o l i n g s ys t e m c o m p o n e n t s 1 . 62$ m 1 . 20  2 . 0 0  3 . 8 9$

    20 Fi l l e r C a p f i l l p o i n t 3 . 00$ 1 . 0 0  3 . 0 0$

    30 A l u m i n u m, N o r ma l H ard p i p i n g 4 . 20$ 0. 6 7 k g 1 . 00  2 . 8 1$

    S u b T o ta l 9 .70$

    It em O r de r Pr o c es s U se U n i tC o st U n it Q u a nt it y M u lti p li er M u lt . V a l . S u b T ot a l

    10 Ra tc h et < = 6 .3 5 m m T ig t h en m ou n ti n g b o lt s 0 .50$ u n i t 2 1 . 00$

    20 Cu t ( s c i s s o rs , k n i fe ) C u t h o s e t o l e n g h t 0 . 06$ c m 1 0 0 . 60$

    30 W e l d J o i n t p i p e s 0 . 15$ c m 4 0 . 60$

    40 Tu b e e n d p r e p f o r w e l d i n g P r e p f o r w e l d in g 0 . 75$ c m 8 6 . 00$

    50 Sa w o r t u b i n g c u t s P r e s s u re e x c e s s ve n t p o i n t 0 . 40$ u n i t 6 2 . 40$

    60 Dr i l le d h o le < 5 0 .8 m m d i a . H o l e f o r ve n t p o in t 0 . 70$ h o le 1 0 . 70$

    7 0 A ss em bl e, 1 k g, L in e- on -L in e A ss em bl e h os es a nd p ip in g 0 .1 3$ L a b o r 6 2 . 40$

    S u b T o ta l 13 .7 0$

    It em O r de r Fa s te ne r U se U n i tC o st S i ze 1 U ni t1 S i ze 2 U ni t2 Q ua n ti ty S u b T ot a l

    -$ -$

    S ub T o ta l -$

    It em O r de r T o ol in g U se U n i tC o st U n it Q u a nt it y P VF F r a c I nc ld S u b T ot a l

    -$

    S u b T o ta l -$

    Co o l an t l i n e s

    P 2 0 2 4

    A A

    Pu rc h as e d h o s e s an d al u mi n u m p i p e s

    Un i ve rs i d ad Me t ro p o l i t an a

    En g i n e & Dri ve t rai n (EN)

    Co o l i n g A s s e mb l y

    U i i t C # 35 P t C t 3 5 8 5$U i i d d M t l i t

  • 8/17/2019 35 Universidad Metropolitana FSAEM CR Supplement

    54/146

    54

    U n i v e r s i ty C a r # 35   P a r t C o s t   3 5 . 8 5$

    S y s t e m Q t y 1

    A s s e m b l y

    P ar t E x t e n d e d C o s t   3 5 . 8 5$

    P / N B a s e

    S u f f i x

    D e t a i l s

    I t e m O r d e r M at e r ia l U s e U n it C o s t S iz e 1 U n it 1 S iz e 2 U n i t 2 A r e a N a m e A r e a L e n g t h D e n s it y Q u a n t it y S u b T o ta l

    1 0 A l u m i n u m , N o r m a l