350-1818 equipment manufacturer · 2020-05-19 · spiral slide center post footing (detail1)...

10
Equipment Manufacturer 350-1818

Upload: others

Post on 06-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 350-1818 Equipment Manufacturer · 2020-05-19 · spiral slide center post footing (detail1) support post footing (detail 1 or 4) (112" indicates post length) cantilever, "t" post,

Equipment Manufacturer350-1818

Page 2: 350-1818 Equipment Manufacturer · 2020-05-19 · spiral slide center post footing (detail1) support post footing (detail 1 or 4) (112" indicates post length) cantilever, "t" post,

Equipment Manufacturer350-1818

Page 3: 350-1818 Equipment Manufacturer · 2020-05-19 · spiral slide center post footing (detail1) support post footing (detail 1 or 4) (112" indicates post length) cantilever, "t" post,

0.5 1.0

05'

Meters2.0 3.0

10'

36"

0,92M

48"

1,22M

72"

1,83M

33'-1"

[10.09M]

28'-6"

[8.68M]

TRANSFER

STATION

W/ STEP

GLIDE

SLIDE

LEG

LIFT

HORIZONTAL

LOOP LADDER

W/ ACCESS

LADDER

RIBBON

CLIMBER

360° NUVO

SPIRAL

SLIDE

ACTIVITY PANEL

W/ A-MAZE-ING

INSERT (deck)

90° CRAWL

TUBE (ground)

POST

MOUNT

BELLS

ACCESS

GATE

ADA

STAIR

6'-1"

[1.86M]

6'-1"

[1.86M]

6'-1"

[1.86M]

6'-5"

[1.97M]

6'-3"

[1.90M]

6'-2"

[1.88M]

6'-2"

[1.88M]

6'-2"

[1.89M]

6'-1"

[1.87M]

Total Elevated Play Activities:

Total Ground-Level Play Activities:

AccessibleElevatedActivities

AccessibleGround-Level

Activities

AccessibleGround-LevelPlay Types

Required

Provided

AD

A S

CH

EDU

LE 5

3

4

4

2

4

2

3

PLAYWORLD SYSTEMS, INC.

1000 Buffalo Road

Lewisburg, PA

17837-9795 USA

BPaper Size

DATE:

SCALE:PROJECT NO:

*PLAYGROUND SUPERVISION REQUIRED

DRAWN BY:

USER CAPACITY: AGE GROUP:

AREA: PERIMETER:

EQUIPMENT SIZE:

USE ZONE:

FALL HEIGHT:

CPSC #325ASTM F1487-

350-

1818

CA

TA

LO

G P

RE

-D

ES

IG

N

350-1818 1/4"=1'-0"

M. MERTZ

17-MAY-18

20'11" x 16'2" x 10'6"6,38M x 4,93M x 3,2M

33'1" X 28'6"10,08M x 8,69M

736 SqFt.68,37 SqM

98'0"29,87 M

8'0"2,44M

31 5-12

11

Page 4: 350-1818 Equipment Manufacturer · 2020-05-19 · spiral slide center post footing (detail1) support post footing (detail 1 or 4) (112" indicates post length) cantilever, "t" post,

0.5 1.0

05'

Meters2.0 3.0

10'

36"

0,92M

48"

1,22M

72"

1,83M

33'-1"

[10.09M]

28'-6"

[8.68M]

6'-1"

[1.86M]

6'-1"

[1.86M]

6'-1"

[1.86M]

6'-5"

[1.97M]

6'-3"

[1.90M]

6'-2"

[1.88M]

6'-2"

[1.88M]

6'-2"

[1.89M]

6'-1"

[1.87M]

6

7

8

9

11

10

12

15

13

14

16

17

18

20

19

21

Total Elevated Play Activities:

Total Ground-Level Play Activities:

AccessibleElevatedActivities

AccessibleGround-Level

Activities

AccessibleGround-LevelPlay Types

Required

Provided

AD

A S

CH

EDU

LE 5

3

4

4

2

4

2

3

PLAYWORLD SYSTEMS, INC.

1000 Buffalo Road

Lewisburg, PA

17837-9795 USA

BPaper Size

DATE:

SCALE:PROJECT NO:

*PLAYGROUND SUPERVISION REQUIRED

DRAWN BY:

USER CAPACITY: AGE GROUP:

AREA: PERIMETER:

EQUIPMENT SIZE:

USE ZONE:

FALL HEIGHT:

CPSC #325ASTM F1487-

350-

1818

CA

TA

LO

G P

RE

-D

ES

IG

N

350-1818 1/4"=1'-0"

M. MERTZ

17-MAY-18

20'11" x 16'2" x 10'6"6,38M x 4,93M x 3,2M

33'1" X 28'6"10,08M x 8,69M

736 SqFt.68,37 SqM

98'0"29,87 M

8'0"2,44M

31 5-12

11

Page 5: 350-1818 Equipment Manufacturer · 2020-05-19 · spiral slide center post footing (detail1) support post footing (detail 1 or 4) (112" indicates post length) cantilever, "t" post,

DATE:

SCALE:

DRAWN BY:

SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)

SUPPORT POST FOOTING (DETAIL 1 or 4) INDICATES POST LENGTH)

CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)

(ZZCH1850 INDICATES PART NUMBER)

GROUND ZERO POST FOOTING (DETAIL 2) INDICATES POST LENGTH)

COMPONENT FOOTING (DETAIL 3)

(112"

(144"

Page 6: 350-1818 Equipment Manufacturer · 2020-05-19 · spiral slide center post footing (detail1) support post footing (detail 1 or 4) (112" indicates post length) cantilever, "t" post,

T

R

A

N

S

F

E

R

S

T

A

T

I

O

N

T

R

A

N

S

F

E

R

S

T

A

T

I

O

N

1

6

0

"

1

6

0

"

1

3

6

"

1

3

6

"

1

2

4

"

1

2

4

"

1

3

6

"

1

3

6

"

1

3

6

"

1

3

6

"

8

8

"

8

8

"

36" 15" 36"36"36"

36"

72"

9"

17"

9"

64"

18"

7"

16"

21"

3"

51"

15"

14"

36"

36"

32"

16"

41"

2"

19"

16"

152"

156"

153"

155"

TRANSFER

STATION

W/ STEP

GLIDE

SLIDE

HORIZONTAL

LOOP LADDER

W/ ACCESS

LADDER

RIBBON

CLIMBER

360° NUVO

SPIRAL

SLIDE

90°

CRAWL TUBE

(ground)

ADA

STAIR

81"

119"

PLAYWORLD SYSTEMS, INC.

1000 Buffalo Road

Lewisburg, PA

17837-9795 USA

BPaper Size

DATE:

SCALE:PROJECT NO:

*PLAYGROUND SUPERVISION REQUIRED

DRAWN BY:

FOOTING LEGEND

1

1

2

"

1

8

5

0

Z

Z

C

H

1

4

4

"

G

Z

SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)

SUPPORT POST FOOTING (DETAIL 1 or 4)(112" INDICATES POST LENGTH)

CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)

(ZZCH1850 INDICATES PART NUMBER)

GROUND ZERO POST FOOTING (DETAIL 2)(144" INDICATES POST LENGTH)

COMPONENT FOOTING (DETAIL 3)

350-

1818

20

16

W

in

te

r S

ale

350-1818 1/4"=1'-0"

M. MERTZ

17-MAY-18

Page 7: 350-1818 Equipment Manufacturer · 2020-05-19 · spiral slide center post footing (detail1) support post footing (detail 1 or 4) (112" indicates post length) cantilever, "t" post,

Posts

ZZCH0018 21 3.5in OD x 124in STEEL POST W/RIVETED CAP

ZZCH0028 62 3.5in OD x 136in STEEL POST W/ RIVETED CAP

ZZCH0048 23 3.5in OD x 160in STEEL POST W/ RIVETED CAP

ZZCH0356 24 3.50in x 88in STEEL POST w/CAP

Decks & Kick Plates

ZZCH0616 25 SQUARE COATED DECK ASSEMBLY

ADA Items

ZZCH2007 16 TRANSFER STATION w/TALL GUARDRAIL (36in DECK)

ZZUN2019 17 APPROACH STEP FOR TRANSFER STATION

Slides

ZZCH3126 18 GLIDE SLIDE (48in DECK)

ZZCH3537 19 SLIDE- NUVO 360 SPIRAL SLIDE

Activity Panels

ZZCH4671 110 CH PANEL FRAME- DECK LEVEL

ZZUN4673 111 A-MAZE-ING INSERT

Crawl Tubes

ZZCH5657 112 HORIZONTAL S/90 DEG ADVENTURE TUBE (GROUND LEVEL)

Barriers

ZZCH4288 113 ACCESS GATE

Climbers

ZZCH6190 114 24in DECK TO DECK CLIMBER

ZZCH8289 115 RIBBON CLIMBER (36in DECK)

Overhead Events

ZZCH5770 116 LEG LIFT

ZZCH5780 117 6ft HORIZONTAL LOOP LADDER

ZZCH5970 118 OVERHEAD EVENT ACCESS LADDER (36in DECK)

Audible Activities

ZZCH4557 119 8in BELL (POST MOUNT)

ZZCH4559 120 10in BELL (POST MOUNT)

Stairs and Ladders

ZZCH9168 121 12in ACCESS STEPPED PLATFORM (DECK TO DECK)

Additional Tool & Maintenance Kits

ZZUN1471 122 INSTALLER HARDWARE KIT

ZZUN9910 123 SURFACING WARNING LABEL KIT

ZZUN9930 124 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL

ZZXX0678 125 LABEL KIT- COMPOSITE STRUCTURE - ASTM

ZZXXGNGUID 126 GENERAL INSTALLERS GUIDE

Part No. Description

Design Number: 350-1818 - Bill Of Material

350-1818

Ref.No. Quantity

Thursday, April 30, 2020 Page of1 1 Playworld.com

Page 8: 350-1818 Equipment Manufacturer · 2020-05-19 · spiral slide center post footing (detail1) support post footing (detail 1 or 4) (112" indicates post length) cantilever, "t" post,

CertifiedZZCH00181 3.5in OD x 124in STEEL POST W/RIVETED CAP

2 77.82 108 0 2.00 0.25 0

CertifiedZZCH00282 3.5in OD x 136in STEEL POST W/ RIVETED CAP

6 261.06 351 0 6.00 0.75 0

CertifiedZZCH00483 3.5in OD x 160in STEEL POST W/ RIVETED CAP

2 100.42 136 0 2.00 0.25 0

CertifiedZZCH03564 3.50in x 88in STEEL POST w/CAP 2 59.42 79 0 2.00 0.26 0

CertifiedZZCH06165 SQUARE COATED DECK ASSEMBLY 2 109.72 348 6 2.00 0.00 0

CertifiedZZCH20076 TRANSFER STATION w/TALL GUARDRAIL (36in DECK)

1 148.40 310 2 2.00 0.09 0

CertifiedZZUN20197 APPROACH STEP FOR TRANSFER STATION1 35.83 72 1 1.00 0.04 0

CertifiedZZCH31268 GLIDE SLIDE (48in DECK)1 119.73 492 2 1.50 0.03 1

CertifiedZZCH35379 SLIDE- NUVO 360 SPIRAL SLIDE 1 650.00 1,417 2 6.00 0.15 1

CertifiedZZCH467110 CH PANEL FRAME- DECK LEVEL 1 32.87 163 0 1.00 0.00 0

CertifiedZZUN467311 A-MAZE-ING INSERT 1 14.51 198 2 0.25 0.00 1

CertifiedZZCH565712 HORIZONTAL S/90 DEG ADVENTURE TUBE (GROUND LEVEL)

1 132.66 1,062 4 2.00 0.00 1

CertifiedZZCH428813 ACCESS GATE 1 17.34 65 0 0.50 0.00 0

CertifiedZZCH619014 24in DECK TO DECK CLIMBER 1 41.34 145 1 1.00 0.00 1

CertifiedZZCH828915 RIBBON CLIMBER (36in DECK)1 35.02 101 2 1.50 0.06 1

CertifiedZZCH577016 LEG LIFT 1 6.76 30 1 0.50 0.00 1

CertifiedZZCH578017 6ft HORIZONTAL LOOP LADDER 1 55.72 124 4 1.00 0.00 1

CertifiedZZCH597018 OVERHEAD EVENT ACCESS LADDER (36in DECK)

1 25.12 71 1 1.50 0.06 0

CertifiedZZCH455719 8in BELL (POST MOUNT) 1 5.15 44 1 0.25 0.00 1

CertifiedZZCH455920 10in BELL (POST MOUNT) 1 6.87 49 1 0.25 0.00 1

CertifiedZZCH916821 12in ACCESS STEPPED PLATFORM (DECK TO DECK)

1 70.28 277 1 2.00 0.00 0

N/AZZUN147122 INSTALLER HARDWARE KIT 1 57

CertifiedZZUN991023 SURFACING WARNING LABEL KIT 1 0.05 1 0 0.25 0.00 0

DescriptionConcrete

(Yds3)

TotalWeight

(lbs) Users

Design Number: 350-1818 - Compliance and Technical Data

350-1818

Pre-Consumer

Recycled Content(lbs)

CO2eFootprint

(kgs)InstallHours

Ref.No.

Reference Document: ASTM F1487

UnitASTMStatus

ActivePlay

Events

Post-

Part No. Qty.

Thursday, April 30, 2020 Page of1 3 Playworld.com

Page 9: 350-1818 Equipment Manufacturer · 2020-05-19 · spiral slide center post footing (detail1) support post footing (detail 1 or 4) (112" indicates post length) cantilever, "t" post,

N/AZZUN993024 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL

1 90

N/AZZXX067825 LABEL KIT- COMPOSITE STRUCTURE - ASTM1 0.04 TBD 0 0.08 0.00 0

N/AZZXXGNGUID26 GENERAL INSTALLERS GUIDE 1 1

DescriptionConcrete

(Yds3)

TotalWeight

(lbs) Users

Design Number: 350-1818 - Compliance and Technical Data

350-1818

Pre-Consumer

Recycled Content(lbs)

CO2eFootprint

(kgs)InstallHours

Ref.No.

Reference Document: ASTM F1487

UnitASTMStatus

ActivePlay

Events

Post-

Part No. Qty.

247 496 5,788 31 36.58 1.942,006.13 10Totals:

6 Metric Tons223 Kg111 Kg902.76 Kg 1.47 m3

Thursday, April 30, 2020 Page of2 3 Playworld.com

Page 10: 350-1818 Equipment Manufacturer · 2020-05-19 · spiral slide center post footing (detail1) support post footing (detail 1 or 4) (112" indicates post length) cantilever, "t" post,

DescriptionConcrete

(Yds3)

TotalWeight

(lbs) Users

Design Number: 350-1818 - Compliance and Technical Data

350-1818

Pre-Consumer

Recycled Content(lbs)

CO2eFootprint

(kgs)InstallHours

Ref.No.

Reference Document: ASTM F1487

UnitASTMStatus

ActivePlay

Events

Post-

Part No. Qty.

The lay-out for this custom playscape, design number 350-1818, has been configured to meet the requirements of the ASTM F1487 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F1487 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.

The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.

The lay-out was also designed to meet the 2010 Standards published 15-Sep-2010, by the Department of Justice when installed over a properly maintained surfacing material that is in compliance with ASTM F1951 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F1292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure.

Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]

A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.

A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.

ASTM F1487

2010 ADA Standards for Accessible Design

Installation Times

Carbon Footprint

Pre-Consumer Recycle Content

Post-Consumer Recycle Content

Thursday, April 30, 2020 Page of3 3 Playworld.com