Installation Guide
Outdoor System
MetroSite BTS Breaker2x16A
8/18/2019 356815-033 InstGde BTS Breaker Kit
http://slidepdf.com/reader/full/356815-033-instgde-bts-breaker-kit 2/12
8/18/2019 356815-033 InstGde BTS Breaker Kit
http://slidepdf.com/reader/full/356815-033-instgde-bts-breaker-kit 3/12
Installation Guide MetroSite Load Breaker Kit ~ 356815.033, Issue 3, 2009-02 3
Table of Contents1. General .................................................................................. 4
Scope and purpose. ........................................................................................ 4
Safety Precautions .......................................................................................... 4 Recommended tools ....................................................................................... 4
Torque settings ............................................................................................... 4
Ordering Information ....................................................................................... 4
2. Consists of / Overview ......................................................... 5
3. Installation in old Micro BBU (105417) ............................... 6
4. Installation in new Micro BBU (C20315.001) ...................... 9
5. Schematic drawing for Micro BBU ................................... 10
8/18/2019 356815-033 InstGde BTS Breaker Kit
http://slidepdf.com/reader/full/356815-033-instgde-bts-breaker-kit 4/12
4 Installation Guide MetroSite Load Breaker Kit ~ 356815.033, Issue 3, 2009-02
1. General
Scope and purpose.The Micro Site Load Breaker kit makes it possible to extend the Outdoor Cabinet (both
105417 and C20315.001) with an additional double pole 16A load breaker. Installation
must be done by authorized personnel only.
Safety Precautions
WARNING: You are operating in a live system. Precaution must be takenwhen working in th is area.
WARNING: Installation must be done by authorized personnel only.
Note! Eltek Valere recommends that the system is powered down beforeinstallation of the kit.
Recommended tools
Standard equipment used by an authorized electrician. Use insulated tools with torque
control.
Torque settings
All terminals on the load breaker must be tightened with 3.0Nm.
Ordering Information
Part number Description
234584 Kit: Metro Site load breaker
8/18/2019 356815-033 InstGde BTS Breaker Kit
http://slidepdf.com/reader/full/356815-033-instgde-bts-breaker-kit 5/12
Installation Guide MetroSite Load Breaker Kit ~ 356815.033, Issue 3, 2009-02 5
n
s
t
a
l
l
a
t
i
o
n
m
a
n
u
a
l
l
t
e
k
X
x
x
x
x
x
x
x
x
x
X
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
10
F3 F4
2. Consists of / Overview
The Metro Site Load breaker kit consists of the following components;
Note Description Qty Unit Old New1 CBI QY-Series 2x16A 1 pcs x x
2 Contb WDU 16 Screw Term G1 1 pcs x
3 Cross conn. 10-pole WDU 16mm2 0,4 pcs x
4 Connection rail CBI 1-pole 54 pos 0,074 pcs x x
5 Cable gland M20 6-12 black 2 pcs x
5 Locknut M20 Black 2 pcs x
6 2-pole link for CBI MCB 1 pcs x x
7 Label sheet KITS PRSB 3kW 0,05 pcs x
8 Strap PLT 1,5mm 0 Panduit 2 pcs x
9 Term Label DekaFix-5-GW “+” 1 pcs x10 Manual 1 pcs x x
11 Loom: RK6 blue 2xferr L=1,2m 1 pcs x
2
8
9
3
5
6
4
8/18/2019 356815-033 InstGde BTS Breaker Kit
http://slidepdf.com/reader/full/356815-033-instgde-bts-breaker-kit 6/12
6 Installation Guide MetroSite Load Breaker Kit ~ 356815.033, Issue 3, 2009-02
3. Installation in old Micro BBU (105417)Step Action OK
1 The mains input must be turned OFF during the installation.Turn OFF the external mains input breaker!
2 Remove the End Stops on the left and right hand side of the BTS load breakerF1/terminal blocks. The load cable labeled –F1 and the copper link on top of F1have to be removed too.Remove the 2 position inter link in the middle of the terminal blocks.
8/18/2019 356815-033 InstGde BTS Breaker Kit
http://slidepdf.com/reader/full/356815-033-instgde-bts-breaker-kit 7/12
Installation Guide MetroSite Load Breaker Kit ~ 356815.033, Issue 3, 2009-02 7
Step Action OK
3 Mount the Micro Site load breaker to the left side of F1. Mount the extra terminalblock on the right hand side of the existing ones. Lock all components with theEnd Stops removed before.Remount the load cable with the new 4 position copper link on top of F1 and F2.Mount the new 4 position inter link in the middle of the terminal blocks (Cut off
one position if only 3 terminal blocks are used).Mount the copper link at the bottom of the new BTS breaker if the breaker mustbe parallel connected for maximum 32A load.
TRIP
60A
CBI
I
0
CURVE U2
10 kA
80V
QY-1(13)-D
TRIP
16A
CBI
I
0
CURVE U2
10 kA
80V
QY-2(13)-D
+ +
TRIP
16A
CBI
I
0
CURVE U2
10kA
80V
QY-2(13)-D
F1F2
+
4 Remove 2 of the appropriate size knock-outs to accommodate the suppliedcable glands. Refer to the Installation Guide for an overview of knock-outs in thecabinet base.Put a flat screw driver between the 2 tags that support the disc. Give the top ofthe screw driver a knock with a hammer.Put the screw driver to the other side between the tags and knock again. Start byknocking cautiously and gradually increase the force. Repeat the knocking untilthe tags are so fatigued that the disc drops out.
8/18/2019 356815-033 InstGde BTS Breaker Kit
http://slidepdf.com/reader/full/356815-033-instgde-bts-breaker-kit 8/12
8 Installation Guide MetroSite Load Breaker Kit ~ 356815.033, Issue 3, 2009-02
Step Action OK
5 Mount the cable glands in the openings. Run cables from the new BTS loadbreaker F2 (-48V) and the new terminal blocks (0V) through the cable glands tothe BTS.
6 The 2nd BTS Breaker Kit has now been installed. Turn on both BTS breakers(F1 and F2) and the battery breaker (Fb1).Start up the system by turning on the external AC breaker.
8/18/2019 356815-033 InstGde BTS Breaker Kit
http://slidepdf.com/reader/full/356815-033-instgde-bts-breaker-kit 9/12
Installation Guide MetroSite Load Breaker Kit ~ 356815.033, Issue 3, 2009-02 9
4. Installation in new Micro BBU (C20315.001)
Step Action OK
1 The mains input must be turned OFF during the installation.Turn OFF the external mains input breaker!
2 Remove the End Stop to the right hand side of the Door fan breaker. Snap theBTS breaker on the DIN rail next to the Door fan breaker. Remount the End Stopto the DIN rail and lock the BTS breaker with this.Cut the connection rail (Item 4 in the Consist of table) in half (use cable ties tosecure insulation) and mount on the bottom of the MCB. Route the cable from theBTS breaker to the free connection in the system’s distribution just above F1. Forpositive connection use one of the free 0V screw terminals in the distribution.If needed mount the 2-pole link on top of the MCB to parallel connect the 2
breakers.The kit has now been installed.Dispose superfluous parts.
Doorfan
breaker
F1
F2
FB1
FB2
FB3
Screw
terminalsfor
0Vdcoutput
F3 F4
Double
poleBTS
breaker
3 Turn ON the mains external breaker(s) and measure that the voltage on theunderside of the Metrosite BTS breaker is -48V.Turn ON the MetroSite BTS breaker.
8/18/2019 356815-033 InstGde BTS Breaker Kit
http://slidepdf.com/reader/full/356815-033-instgde-bts-breaker-kit 10/12
10 Installation Guide MetroSite Load Breaker Kit ~ 356815.033, Issue 3, 2009-02
5. Schematic drawing for Micro BBU
8/18/2019 356815-033 InstGde BTS Breaker Kit
http://slidepdf.com/reader/full/356815-033-instgde-bts-breaker-kit 11/12
Installation Guide MetroSite Load Breaker Kit ~ 356815.033, Issue 3, 2009-02 11
8/18/2019 356815-033 InstGde BTS Breaker Kit
http://slidepdf.com/reader/full/356815-033-instgde-bts-breaker-kit 12/12
www.eltekvalere.comHeadquarters:Eltek Valere
661 N Plano Rd Suite 300 Richardson, TX. 75081, USAPhone: +1 (469) 330 9100 Fax: +1 (469) 330 9101
Eltek Valere
Gråterudv. 8, Pb 2340 Strømsø, 3003 Drammen, NorwayPhone: +47 32 20 32 00 Fax: +47 32 20 32 10