388 investments & construction joint stock company mechanical - electrical - energy
TRANSCRIPT
388 INVESTMENTS & CONSTRUCTION JOINT STOCK
COMPANY
Mechanical - Electrical - Energy
Address: No.46 Lot 22 Le Hong Phong St, Ngo Quyen Dist,
Hai Phong city
Factory/ Warehouse: Dong Hoa Industrial – Kien An – Hai Phong
Tax code: 0201147210
Tel: + 84 31.6.292.952
Fax: + 84 31.3.851.266
Email: [email protected]
Website: www.388ic.com.vn – www.388ic.vn
Mechanical - Electrical - Energy
1. GENERAL COMPANY’S PROFILE
1.1 Brief Introduction
1.2 Legal Document of Company
2. OUR MISSON- VISSION – CORE VALUES- MANAGAMENT SYSTEM – CULTURA AND OUT POEPLE
3. SERVICES PROVIDED
4. EXPERIENCES OF EXECUTING WORK
The list of main project excecued
5. THE LIST OF EXECUTING EQUIPMENT AND MANPOWER
4.1 The list of executing equipment
4.2 Manpower
4.3 Organization chart
6. HEALTH AND SAFETY PLAN
7. CLIENT & REFERENCE PICTURES
8. CERTIFICATIONS
Mechanical - Electrical - Energy
388IC the construction company specializing in mechanical items - power, assure us always meet the demanding requirements of our customers regardless of the complexity of the project and even in the most remote places. 388IC confident will comply with any commitments made thanks to a clever combination of profound knowledge, rich experience and skills accumulated. We support our customers save cost and time for their projects through the proposed optimization techniques.
Mechanical - Electrical - Energy
Mechanical - Electrical - Energy
Mechanical - Electrical - Energy
Mechanical - Electrical - Energy
Our Mission: To be a reliable long-term partner of Local and Foreign Clients by exceeding customer expectations and gaining your trust through exceptional performance from every member of our team.
Our Vision: Shaping the future through creative solution.
Our Core Values: As a major engineering, construction and construction management company, we pride ourselves on running by a set of core values; Integrity, Safety, Continual Improvement, Relationships, People, Innovation.
Our Management System: The extra mile to keep Clients satisfied – and coming back for more. We are proud to be the leading Vietnamese construction company that applies state – of- the - art management systems, which differentiates us from many local contractors.
Our Cultura & our people: We recognize that our people are our key assets and our competitive advantage; and that ultimately people determine our reputation and success. We have created a work environment that nurtures innovation, fosters team work, where individuals combine their many levels of experience in cooperative workgroups.
Mechanical - Electrical - Energy
388IC are a multi-discipline Building Services Engineering Consultancy and offer a complete range of environmental services which include:
Mechanical - Electrical - Energy
- Mechanical Engineering Services
-Electrical Engineering Services
- Water Conservation
- IT/Data
- Lighting – Internal and External
- Lightning Protection
- Security, Intruder and CCTV, Access Control
- Fire Alarm – Fire Detection & Protection
Mechanical - Electrical - Energy
No Projects name Duration Location Owner Remark
1 Supply & installation Electric system, water system and lightning An Minh Thinh factory
04 – 2011 Hai Phong An Minh Thinh Co., Ltd
Contractor
2 Maintenance Electric system VCCI Hai Phong
05 – 2011 Hai Phong VCCI Contractor
3 Supply panel MSB – Trang Thanh building
06 – 2011 Hai Phong Trang Thanh trading Co., Ltd
Contractor
4 Supply & installation Electric system, water system Minh Thanh factory No. 2
08 – 2011 Hai Phong Minh Thanh Co Ltd Contractor
5 Supply & installation M&E system Hữu Nghị Hotel
10 – 2011 Hai Phong Cty CP Du lich Hai Phong
Contractor
6 Installation lighting and power Cargill Hà Nam
01 – 2012 Dong Van – Ha Nam
Cargill Sub Contract
7 Supply & installation M&E system Cat Ba resort & spa
02 – 2012 Cat Hai – Hai Phong
Cty CP Khu du lich Dao Cat Ba
Contractor
8 General Electric Lotte Ha Noi 04 – 2012 Ha Noi Lotte Sub Contract
9 Installation lighting and power CP Hai Duong factory
05 – 2012 Tan Truong industrial – Hai
Duong
CP Viet Nam Sub Contract
13 General Electric Kefico – Huyndai factory
5 – 2012 Dai An industrial – Hai
Duong
Kefico - Huyndai Sub Contract
10 Installation lighting Hai Phong Thermal Power factory
05 – 2012 Thuy Nguyen – Hai Phong
EVN Sub Contract
12 Supply & installation M&E system Viet Phuc Plaza Quang Ninh
08 – 2012 Uong Bi – Quang Ninh
Cty TNHH Van Tai Phuc Xuyen
Contractor
13 Supply & installation M&E system dormitory and cafeteria - Formosa Ha Tinh
11 – 2012 Ky Anh – Ha Tinh
Formosa Ha Tinh Sub Contract
14 Installation general electric DAP Ha Bac
5 - 2013 Bac Giang Nha may Dam Ha Bac - Vinachem
Sub Contract
15 Installation M&E system dormitory Samsung Thai Nguyen
09 – 2013 Yen Binh industrial –
Thai Nguyen
Samsung Sub Contract
16 Installation general electric DAP Ha Bac
12 – 2013 Tang Loong industrial – Lao
Cai
Nha may DAP2 Lao Cai
Sub Contract
Mechanical - Electrical - Energy
No Description Qty Remark
1 Pressing plier for bare conducter sleeve 100
2 Pressing plier for insulated cable lugs 20
3 Pressing plier for insulated cable lugs 20
4 Automatic wire insulation stripper 10
5 Crimping tool 10
6 Cable insulation stripper 4
7 Cable cutter 6
8 Compounding tool 1
9 Concrete drill – Bosh 30
13 Metalic drill – Bosh 30
10 Grinding machine – Bosh 10
12 Motorized cutter 3
13 Welding machine inverter 200A 10
14 Welding machine tig 300A 8
15 Steel hammer 50
16 Toothed wrench 50
17 Tool bag 50
18 Tube cutter 4
19 Tube clamp 4
20 Pipe bender 2
21 Panel site 8
22 Halogen floodlight/laying down type 40
23 Cordless Impact Driver-Drill Kit 5
Mechanical - Electrical - Energy
No Description Qty Remark
24 Cable rolley 500
25 Pulley 10
26 Cable machine 4
27 Scaffolding set 3mx1,5mx2m 100
28 Scaffolding set 3mx1,5mx1m 100
29 Home made manual cart 3
30 Gantry 3T with hoist 3.8m x 4m 2
31 Manual forklift 2,5T 2
32 Manlift 9m 1
33 Digital amprobe 2
34 Earthing resistance measurement 2
35 KWh meter 2
36 LV Insulation measurement 2
37 High Accuracy, High Performance and Reliable Measurements
2
38 Non-Contact Safety Phase Indicator 1
39 Digital light meter 1
40 Truck 2.5 ton 1
41 Truclk 0.75 ton 1
Mechanical - Electrical - Energy
No Description Qty Remark
1 Project manager 2
2 Technical Staffs 26
2.1 Mechanical Engineer 4
2.2 Electrical Engineer 10
2.3 Draff men 4
2.4 Site Admin 2
2.5 Document control 2
2.6 QA/ QC 4
3 Team Leader 20
4 Technical Worker 155
4.1 Electric installation worker 80
4.2 Fabrication worker 10
4.3 Piping 25
4.4 High pressure welder 20
4.5 Mechanical worker 20
4.6 Temponary worker ( supply) 80~150
388IC recognizes the importance of planning health and safety into the project at the earliest possible stage if injuries and ill health arising from the construction activity are to be avoided. To this end this Site Safety Plan has been prepared to describe how 388IC intends to manage, control and co-ordinate the works in order to protect the health, safety and welfare of all personnel engaged on the projectand others who may be affected by the operations.
Whilst this plan provides the intention and the area where 388IC will exercise control to ensure safe operation of the works, detailed procedures will be supplemented by Health and Safety procedures which be issued from time to time to cover the various operations.
388IC also acknowledges the importance the Employer places on health and safety matters and will ensure that all relevant contractual requirements are satisfied.
For this Site Safety Plan to be effective it is essential that the management and supervisory staff of 388IC is familiar with the implementation of the relevant requirement of the plan. All 388IC management and supervisory personnel will therefore be provided with a copy of the plan. A copy will also be provided to each Sub-contractor.
388IC will actively seek the support of all operatives engaged on the project to look after the health and safety of themselves and their colleagues by working within the spirit of this Site Safety Plan.
Any person found to be disregarding the requirements of the plan will be subject to disciplinary action which may result in their dismissal from the project.
This plan and Health and Safety procedures are subject to periodic review and will be updated when new technology, construction method, new legislation or new process are introduced.
Mechanical - Electrical - Energy
Mechanical - Electrical - Energy
Project: Samsung Dormitory Building Project
Item: General Electric
Location: Yen Binh Industry, Thai Nguyen
Mechanical - Electrical - Energy
Project: DAP Ha Bac – Bac GiangItem: Installation lighting and powerLocation: Bac Giang city, Bac Giang
Mechanical - Electrical - Energy
Project: Lotte Mart – Ha NoiItem: General Electric
Location: Ha Noi
Mechanical - Electrical - Energy
Project: CP Hai DuongItem: General Electric
Location: Tan Truong industry, Hai Duong
Mechanical - Electrical - Energy
Project: Kefico – HuyndaiItem:Item: General Electric
Location: Dai An industry, Hai Duong
Mechanical - Electrical - Energy
Project: Cargill Ha NamItem: Installation lighting and power
Location: Dong Van industruy, Ha Nam
Mechanical - Electrical - Energy
Project: Formosa Ha TinhItem: General Electric
Location: Ky Anh, Ha Tinh
Mechanical - Electrical - Energy
Project: Dongbu Vietnam Steel Factory – Hai Phong
Item: Transformer Station 63MVA – 110/ 22/ 6.3 kV
Location: Dinh Vu Industry, Hai Phong
Mechanical - Electrical - Energy