39- bidding documents & cost estimates

3
Ref: 2463/066/KCC/IU/39 Dated: October 02, 2013 Chief Engineer/PD, Kachhi Canal Project, WAPDA, 248-C, Khyaban-e-Sarwar, Dera Ghazi Khan. ON-GOING KACHHI CANAL PROJECT FOR REMAINING WORKS OF PHASE-I (PART-A) PERTAINING TO KC-04, KC-05, KC-06A & KC-06C Subject: BIDDING DOCUMENTS AND COST ESTIMATES OF CONTRACT KC-12, KC-13 & KC-14 Reference: Your letter No. CE/KCP/DGK/12-W/7257-59 of dated 24-09- 2013 This refers to your above letter vide which you have submitted the Bidding Documents, cost estimates & drawings of contract KC-12, KC- 13 & KC-14 for our comments. S. No Name of Work Estimated Cost Rs. Completio n Period 1 Contract KC-12 Construction of residential buildings (02 No. CAT-II and 02 No. CAT-III) for O&M Colony at D.G Khan. 28,408,12 4/- 270 days 2 Contract KC-13 Construction of non-residential buildings- XEN (C) office & 03 Bed Rest House) for O&M Colony at D.G Khan. 25,644,91 4/- 270 days 3 O&M of Kachhi Canal Project from RD 0+000 to 106+000 (Earth filling of flood breaches, Rain Cuts & Removal of Weeds and Repair of Damaged Lined portion of Completed Contract under Contract KC-14 38,070,13 1/- 90 days Page 1 of 3 (PM/DGK-39)

Upload: arshad-mahmood

Post on 21-Jul-2016

12 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: 39- Bidding Documents & Cost Estimates

Ref: 2463/066/KCC/IU/39 Dated: October 02, 2013

Chief Engineer/PD,Kachhi Canal Project, WAPDA,248-C, Khyaban-e-Sarwar,Dera Ghazi Khan.

ON-GOING KACHHI CANAL PROJECT FOR REMAINING WORKS OF PHASE-I (PART-A) PERTAINING TO KC-04, KC-05, KC-06A & KC-06C

Subject: BIDDING DOCUMENTS AND COST ESTIMATES OF CONTRACT KC-12, KC-13 & KC-14

Reference: Your letter No. CE/KCP/DGK/12-W/7257-59 of dated 24-09-2013

This refers to your above letter vide which you have submitted the Bidding Documents, cost estimates & drawings of contract KC-12, KC-13 & KC-14 for our comments.

S. No Name of Work Estimated

Cost Rs.Completion

Period

1Contract KC-12Construction of residential buildings (02 No. CAT-II and 02 No. CAT-III) for O&M Colony at D.G Khan.

28,408,124/- 270 days

2Contract KC-13Construction of non-residential buildings-XEN (C) office & 03 Bed Rest House) for O&M Colony at D.G Khan.

25,644,914/- 270 days

3

O&M of Kachhi Canal Project from RD 0+000 to 106+000 (Earth filling of flood breaches, Rain Cuts & Removal of Weeds and Repair of Damaged Lined portion of Completed Contract under Contract KC-14

38,070,131/- 90 days

Although these contracts are not included in our scope of Consultancy Services (Amendment No. 4) however our comments on above documents are as follow.

1. Project formation may ensure that administrative approval for these works has been accorded by the Competent authority and has allocated proper funds for execution of these works.

2. The estimates of these works be technically sanctioned by the Competent authority.

3. Standard Form of Bidding Documents (Civil Works) (to be used for estimated value of more than Rs. 25 Millions) will be applicable.

4. Prior to Bidding, these documents be got vetted from General Manger (C&M) and General Manger (CCC).

5. Completion period for Contract No. KC-14 is 90 days therefore price adjustment under clause - 70 (Condition of Contract) will not be applicable.

6. As per general practice, Volume-I mainly includes Instructions to Bidders, BOQ Appendixes, Part-I : “General Conditions of Contract” and Part-II: “Particular Conditions

Page 1 of 2 (PM/DGK-39)

Page 2: 39- Bidding Documents & Cost Estimates

of Contract” while Volume-II includes Technical Provisions & Specifications and Volume-III includes Drawings.

7. Project formation must ensure that Drawings have been issued or vetted by Central Design Office (CDO) WAPDA Lahore.

8. At page (6) of “Invitation for Bids” category of license issued by the Pakistan Engineering Council (PEC) be mentioned.

Moreover, documents received with your above referred letter are returned herewith for your further necessary action please.

Your’s faithfullyfor & on behalf of Kachhi Canal Consultants.

(IRFAN ULLAH)The Engineer/Project Manager

Camp office at D.G.Khan.

Encl: Bidding Documents, Cost Estimates & Drawings.

Cc:1. VP W.R Division- NESPAK /Chairman BOM, KCC, NESPAK House Lahore. 2. General Manger (Central) Water WAPDA, 3-Canal Bank, Mughal Pura Lahore.3. Chief Resident Engineer Kachhi Canal Consultants, D.G. Khan.4. Office Copy.

Page 2 of 2 (PM/DGK-39)