39th ave. greenway - denver...existing pipe. 1 mile. map of project work area/mapa del Área de...

2
39th Ave. Greenway PROJECT UPDATE December 2018 I-70 40TH & COLORADO TRANSIT STATION TON ST OE ST VD Y 40TH AVE CLA ADO BL 38TH & BLAKE MONR OR TRANSIT STATION OL 39TH AVENUE GREENWAY 39TH AVE C P LEGEND Greenway New Piping Existing Pipe 1 mile MAP OF PROJECT WORK AREA/MAPA DEL ÁREA DE TRABAJO DEL PROYECT PROJECT OVERVIEW In June, the City and County of Denver and its contractor SEMA Construction Inc., began construction of the 39th Avenue Greenway Project. The Project will create a 1-mile-long, 12-acre recreational greenway along 39th Avenue between Franklin and Steele Street. The main goal of the project is to reduce the risk of flooding to nearby residents and businesses. The new greenway has been designed with community input to include a wide range of amenities: • A multi-use trail for bikes and pedestrians Activity plazas with seating areas and shade structures • Nature play areas • A community garden • An amphitheatre/outdoor classroom • Specialty seating and lighting • Pedestrian bridges PROJECT UPDATE Construction continues on 39th Avenue Greenway project. As of the end of November, the project is 18% complete. Asphalt has been removed and several underground water, storm and sanitary pipes have been relocated. Crews broke ground at Coca-Cola facility, and started work on the south end of the new bridge. In addition, crews cut into the existing 120” storm sewer (built nearly 100 years ago), incorporating it into the current design to assist in the conveyance of stormwater. The following project milestones have been completed this quarter: 1,216 linear feet of dual 10’ x 8’ culvert boxes (for stormwater drainage) placed • Nearly 100,000 lbs. of reinforced steel installed • 154 cubic yards of concrete poured • 895 linear feet of bridge piling Construction Work Hours Normal working hours are Monday through Friday from 7 a.m. to 9 p.m. and 8 a.m. to 5 p.m. Saturday and Sunday. When vibration operations are directly adjacent to residential or business properties, hours are 8 a.m. to 5 p.m. Monday through Saturday. Horas De Trabajo De La Construcción El horario normal de trabajo es de lunes a viernes de 7 a.m. a 9 p.m. y de 8 a.m. a 5 p.m. sábados y domingos. Cuando las operaciones de vibración son directamente adyacentes a propiedades residenciales o comerciales, el horario es de 8 a.m. a 5 p.m. de lunes a sábado. DESCRIPCIÓN DEL PROYECTO En junio, la Ciudad y el Condado de Denver y su contratista SEMA Construction Inc., comenzaron la construcción del Proyecto 39th Avenue Greenway. El Proyecto creará una zona verde recreativa de 1 milla de largo y 12 acres a lo largo de la 39th Avenue entre Franklin y Steele Street. El principal objetivo del proyecto es reducir el riesgo de inundaciones para los residentes y negocios cercanos. La nueva zona verde ha sido diseñada con aportes de la comunidad que incluye una amplia gama de servicios: • Un sendero multiusos para bicicletas y peatones • Plazas de actividades con áreas de descanso y estructuras de sombra • Áreas de juego en la naturaleza • Un jardín comunitario • Un anfiteatro/aula exterior • Asientos especiales e iluminación • Puentes peatonales ACTUALIZACIÓN DEL PROYECTO La construcción continúa en el Proyecto del 39th Avenue Greenway. Desde finales de noviembre, el proyecto está terminado en un 18%. Se retiró el asfalto y se reubicaron varias tuberías subterráneas de agua, de tormenta y sanitarias. Las cuadrillas de obreros comenzaron la construcción de las instalaciones de Coca-Cola y comenzaron a trabajar en el extremo sur del nuevo puente. Además, las cuadrillas de obreros cortaron la alcantarilla pluvial existente de 120”(construida hace casi 100 años), incorporándola en el diseño actual para asistir con el drenaje de las de aguas pluviales. Los siguientes hitos del proyecto se han completados este trimestre: • 1,216 pies lineales de cajas dobles de alcantarillas de 10 ’x 8’ (para drenaje de aguas pluviales) fueron colocadas (continued on other side) (continúa desde el otro lado)

Upload: others

Post on 11-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 39th Ave. Greenway - Denver...Existing Pipe. 1 mile. MAP OF PROJECT WORK AREA/MAPA DEL ÁREA DE TRABAJO DEL PROYECT. PROJECT OVERVIEW. In June, the City and County of Denver and its

39th Aveconnecting & enhancing neighborhoods

Greenway

INTRODUCTION|Drainage Improvement Projects

17TH AVE

COLFAX AVE

MO

NAC

O P

KWY

COLO

RAD

O B

LVD

YORK

ST

FORE

ST S

T

DO

WN

ING

ST

BLAKE ST

26TH AVE

MLK BLVD

39TH AVE

SMITH RD

CITY PARK

ARK HILL GOLF CLUB

PARK HILL DETENTION & STORMWATER PIPES4

3 CITY PARK GOLF COURSE RE-DESIGN

39th Ave. Greenway PROJECT UPDATEDecember 2018

I-70

40TH & COLORADOTRANSIT STATION

TON

ST

OE

ST VDY

40TH AVE CLA

ADO

BL

38TH & BLAKE MO

NR

OR

TRANSIT STATION

OL

39TH AVENUE GREENWAY 39TH AVE C

P

LEGENDGreenwayNew PipingExisting Pipe

1 mile

MAP OF PROJECT WORK AREA/MAPA DEL ÁREA DE TRABAJO DEL PROYECT

PROJECT OVERVIEWIn June, the City and County of Denver and its contractor SEMA Construction Inc., began construction of the 39th Avenue Greenway Project. The Project will create a 1-mile-long, 12-acre recreational greenway along 39th Avenue between Franklin and Steele Street. The main goal of the project is to reduce the risk of flooding to nearby residents and businesses. The new greenway has been designed with community input to include a wide range of amenities: • A multi-use trail for bikes and pedestrians • Activity plazas with seating areas and shade

structures • Nature play areas • A community garden • An amphitheatre/outdoor classroom • Specialty seating and lighting • Pedestrian bridges

PROJECT UPDATEConstruction continues on 39th Avenue Greenway project. As of the end of November, the project is 18% complete. Asphalt has been removed and several underground water, storm and sanitary pipes have been relocated. Crews broke ground at Coca-Cola facility, and started work on the south end of the new bridge.

In addition, crews cut into the existing 120” storm sewer (built nearly 100 years ago), incorporating it into the current design to assist in the conveyance of stormwater.

The following project milestones have been completed this quarter: • 1,216 linear feet of dual 10’ x 8’ culvert boxes

(for stormwater drainage) placed • Nearly 100,000 lbs. of reinforced steel installed • 154 cubic yards of concrete poured • 895 linear feet of bridge piling

Construction Work Hours

Normal working hours are Monday through Friday from 7 a.m. to 9 p.m. and 8 a.m. to 5 p.m. Saturday and Sunday. When vibration operations are directly adjacent to residential or business properties, hours are 8 a.m. to 5 p.m. Monday through Saturday.

Horas De Trabajo De La ConstrucciónEl horario normal de trabajo es de lunes a viernes de 7 a.m. a 9 p.m. y de 8 a.m. a 5 p.m. sábados y domingos. Cuando las operaciones de vibración son directamente adyacentes a propiedades residenciales o comerciales, el horario es de 8 a.m. a 5 p.m. de lunes a sábado.

DESCRIPCIÓN DEL PROYECTOEn junio, la Ciudad y el Condado de Denver y su contratista SEMA Construction Inc., comenzaron la construcción del Proyecto 39th Avenue Greenway. El Proyecto creará una zona verde recreativa de 1 milla de largo y 12 acres a lo largo de la 39th Avenue entre Franklin y Steele Street. El principal objetivo del proyecto es reducir el riesgo de inundaciones para los residentes y negocios cercanos. La nueva zona verde ha sido diseñada con aportes de la comunidad que incluye una amplia gama de servicios:• Un sendero multiusos para bicicletas y peatones• Plazas de actividades con áreas de descanso y estructuras de sombra• Áreas de juego en la naturaleza• Un jardín comunitario• Un anfiteatro/aula exterior• Asientos especiales e iluminación• Puentes peatonales

ACTUALIZACIÓN DEL PROYECTOLa construcción continúa en el Proyecto del 39th Avenue Greenway. Desde finales de noviembre, el proyecto está terminado en un 18%. Se retiró el asfalto y se reubicaron varias tuberías subterráneas de agua, de tormenta y sanitarias. Las cuadrillas de obreros comenzaron la construcción de las instalaciones de Coca-Cola y comenzaron a trabajar en el extremo sur del nuevo puente.

Además, las cuadrillas de obreros cortaron la alcantarilla pluvial existente de 120”(construida hace casi 100 años), incorporándola en el diseño actual para asistir con el drenaje de las de aguas pluviales.

Los siguientes hitos del proyecto se han completados este trimestre:• 1,216 pies lineales de cajas dobles de alcantarillas de 10 ’x 8’ (para drenaje de aguas pluviales) fueron colocadas

(continued on other side) (continúa desde el otro lado)

Page 2: 39th Ave. Greenway - Denver...Existing Pipe. 1 mile. MAP OF PROJECT WORK AREA/MAPA DEL ÁREA DE TRABAJO DEL PROYECT. PROJECT OVERVIEW. In June, the City and County of Denver and its

39th Ave. Greenway PROJECT UPDATE

39th Ave. GreenwayPROJECT UPDATE ANUNCIO DEL PROYECTO

December 2018

Public Information Manager c/o ZoZo Group, LLC, 2590 N. Washington St., Suite #101, Denver, CO 80205

You can also subscribe to our texting service for traffic impact alerts by texting “39thAveGreenway” to 313131.

UPCOMING WORK AND TRAFFIC IMPACTS Construction crews began on the west-side of the project near Blake and 40th Street. Work will continue to progress east, along 39th Avenue. The project is scheduled for completion in June 2020. Starting in late December through early 2019, crews will be constructing two pedestrian bridges, located at Gilpin and High Streets, and two vehicular bridges at Williams and York Streets. Single lane and intersection closures can be expected. The closures near Blake and 40th Street should reopen in early 2019.

CONTACTING THE PROJECT TEAMIf you have questions about the project, would like to receive updates, or would like to be notified of upcoming closures, please contact the Public Information Team. We will respond within 24 business hours.

(continued from other side) (continúa desde el otro lado)

• Casi 100,000 libras de acero reforzado instalado• 154 yardas cúbicas de concreto vertido• 895 pies lineales de apilado de puente

PRÓXIMOS IMPACTOS DEL TRABAJO Y AL TRAFICO Los equipos de construcción comenzaron en el lado oeste del proyecto cerca de Blake y 40th Street. El trabajo continuará avanzando hacia el este, a lo largo de 39th Avenue. El proyecto está programado para ser terminado en junio de 2020. Comenzando a finales de diciembre y hasta principios de 2019, las cuadrillas de obreros construirán dos puentes peatonales, ubicados en Gilpin y High Street, y dos puentes vehiculares en Williams y York Street. Se pueden esperar cierres de un solo carril e intersecciones. Los cierres cerca de Blake y 40th Street deberán reabrirse a principios de 2019.

CONTACTANDO AL EQUIPO DEL PROYECTOSi tiene preguntas sobre el proyecto, le gustaría recibir actualizaciones o le gustaría ser notificado de los próximos cierres, por favor comuníquese con el Equipo de Información Pública. Le responderemos dentro de las 24 horas hábiles.

For more information/Para más información: Project Hotline: 720-457-6222 Email: [email protected] Web: www.39thAveGreenway.org

La foto se mues-tra una tubería de tormenta de ladrillo de 120”de ancho

Pictured is a 120” construida en 1920 wide brick storm pipe junto con la alcanta-

built in 1920 along- rilla de doble caja de side SEMA’s 10”x18” 10”x18”de SEMA. Am-

dual box culvert. Both bas trabajarán para will work together to manejar las aguas manage stormwater. pluviales.