3d bim service - pinnaclecad · 2017-04-17 · bbs (quantity take-off) sheet created from tekla...

16
3D BIM SERVICE For Reinforcement www.pinnaclecad.com CONSTRUCTABILITY REVIEW REINFORCEMENT 3D MODEL CLASH COORDINATION & REPORT REINFORCEMENT SHOP DRAWING REBAR QUANTITY SCHEDULE QUANTITY TAKE-OFF

Upload: others

Post on 17-Mar-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 3D BIM SERVICE - pinnaclecad · 2017-04-17 · BBS (Quantity Take-off) sheet created from Tekla Model Pinnacle specializes in the virtual construction of the Reinforcement 3D Models

3D BIM SERVICE For Reinforcement

ww

w.p

innacl

eca

d.c

om

CONSTRUCTABILITY REVIEW

REINFORCEMENT 3D MODEL

CLASH COORDINATION & REPORT

REINFORCEMENT SHOP DRAWING

REBAR QUANTITY SCHEDULE

QUANTITY TAKE-OFF

Page 2: 3D BIM SERVICE - pinnaclecad · 2017-04-17 · BBS (Quantity Take-off) sheet created from Tekla Model Pinnacle specializes in the virtual construction of the Reinforcement 3D Models

INDEX

COMMITMENT

We are committed to our core values and corporate mission:

Maximizing client value by adopting the latest technologies and innovations.

Improving project efficiency by streamlining workflow and providing services of superior quality.

Saving time by using a large global team and leveraging time zone advantages.

Reducing client's expenditure up to 30% by intelligent use of a dedicated workforce.

3 Benefits of Reinforcement Modeling

6Constructability Review

6Request For Information

Reinforcement Shop Drawing 7

6BBS / Rebar Quantity Schedule

10Quality Control Process (QC)

11Work Flow

12Why Pinnacle?

Testimonials 13

Project Snap Shots 14

43D Model of Rebar / Reinforcement

Software Platform and Process 9

Page 3: 3D BIM SERVICE - pinnaclecad · 2017-04-17 · BBS (Quantity Take-off) sheet created from Tekla Model Pinnacle specializes in the virtual construction of the Reinforcement 3D Models

03

Proper planning and coordination are the keys to the successful execution of projects in the construction industry. Advancements in 3D technology and the advent of Building Information Modeling (BIM) have revolutionized the Architectural, Engineering and Construction (AEC) industry.

BIM allows stakeholders to create and examine virtual representations of the architecture model and other utilities of their project. The virtual construction can be used to generate accurate construction drawings and address all constructability issues before construction begins.

Pinnacle Infotech has been acknowledged as the global leader in providing innovative BIM solutions. We have received several awards and recognition from both industry and government. NASSCOM, the leading IT trade

association, has named Pinnacle among the Top IT innovators 3 years in a row (2006, 2007, and 2008) and again in 2011.

The successful completion of more than 4000 BIM projects in 30 countries has provided Pinnacle with a deep understanding of international building codes and procedures. Our global delivery system allows us to maintain constant contact with our clients.

We recognize the importance of effective work process management and regular communication when outsourcing services. We have developed an ideal mix of infrastructure, experience, global presence and commitment to excellence that has led to long-term relationships with more than 1000 clients worldwide.

Revolutionizing the Concrete Construction

Building Information Modeling - Concrete

Building Information Modeling (BIM) is the creation and use of coordinated 3D model via link to intelligent database for a construction project. BIM concrete model enables seamless collaboration between Architects, Engineers, Contractors and Sub-Contractors enabling quick decision making, accurate construction documents, better construction management. BIM offers structural engineers complete control over the design and detailing of concrete, steel and reinforcement.

Following structural elements are modelled in BIM:

Beam, Columns, Joists/Truss, Slab/Bracings, CMU/Pre-Cast Walls, Footings and Foundation, Stairs, Pile Details, Construction Joints, Rebar, Embeds, Shoring, etc.

Through BIM usage, we enhance Dynamic Rebar detailing & shop drawings and create ‘intelligent’ rebar objects for incorporation in Revit Structure 3-D models. Since BIM can easily combine pre-cast concrete with other building materials like steel and reinforced concrete, we promote efficient project management & error-free collaboration throughout the entire building value chain.

Page 4: 3D BIM SERVICE - pinnaclecad · 2017-04-17 · BBS (Quantity Take-off) sheet created from Tekla Model Pinnacle specializes in the virtual construction of the Reinforcement 3D Models

04

Benefits of Concrete Modeling

| VISUALIZATION: It provides a three dimensional virtual representation of the whole building/structure.Real time view with owners ensured optimization of the design to reduce changes during construction.

| COLLABORATION & COORDINATION: 3D model enables flawless collaboration between Owners, Contractors, Engineers/Architects in a virtual environment. Collaboration take place on real time basis leading to significant time saving.

| PROJECT MANAGEMENT: Detailed material BOQ and Shop Drawings with 3D visualization enables a better look at the “Big Picture” and aids in the review, scheduling, and monitoring of each project.

| COST CONTROL: Preconstruction and prefabrication reviews mean better use of manpower, better quality ofconstructions, and reduced reworks and wastage, all of which translate into lower costs.

| QUALITY: Improving quality by producing accurate Shop Drawings directly from the 3D BIM model which isalso used for prefabrication.

| EFFICIENCY: Eliminates RFIs, work stoppages, and rework by checking the accuracy and completeness of drawings before starting construction on-site/off-site.

Our clients have reported cost savings up to 30% by successfully implementing BIM.

| DESIGN VALIDATION: 3D concrete model validates the accuracy, completeness and consistency of the design and enables the end users to virtually see their facilities in real time.

3D Model of Rebar / Reinforcement

Spillway Dam Residential

Spillway Dam Commercial

Page 5: 3D BIM SERVICE - pinnaclecad · 2017-04-17 · BBS (Quantity Take-off) sheet created from Tekla Model Pinnacle specializes in the virtual construction of the Reinforcement 3D Models

05

Parking Garage Parking Garage

ResidentialResidential

P-Stack ReactorMixed Use

Page 6: 3D BIM SERVICE - pinnaclecad · 2017-04-17 · BBS (Quantity Take-off) sheet created from Tekla Model Pinnacle specializes in the virtual construction of the Reinforcement 3D Models

06

Request For Information

The 3D BIM is updated on the basis of the responses to the RFIs. Status of all RFIs are maintained in a log and follow-up is done to resolve them at the preconstruction stage. This eliminates work stoppages and reworks during construction.

Constructability Review for Reinforcement

Virtual project constructions in BIM enable independent reviews of the construction plans and specifications. This identifies discrepancies in drawings and all constructability issues at preconstruction stage. During the constructability review, our BIM team generates a series of RFIs to help to identify the following types of constructability and operational issues:

Missing information / documents

Input inconsistencies

Conflicting data

Other constructability issues

The Bar Bending schedule helps in the management of reinforcement bars that need to be cut and bent into rebars.

BIM Model provides the following details;

Break down of bars by quantity and diameter Cross sectional views Length, weight, and shapes of bars

Bar Bending Schedule

Page 7: 3D BIM SERVICE - pinnaclecad · 2017-04-17 · BBS (Quantity Take-off) sheet created from Tekla Model Pinnacle specializes in the virtual construction of the Reinforcement 3D Models

07

Beam Reinforcement drawing Slab Reinforcement Drawing

Tilt-up Wall Shop Drawing Tilt-up Wall Shop Drawing

Column Reinforcement Drawing Foundation Reinforcement Drawing

Reinforcement Drawing

Reinforcement Beam Drawing for Hospital Slab Reinforcement Drawing for Hospital

Page 8: 3D BIM SERVICE - pinnaclecad · 2017-04-17 · BBS (Quantity Take-off) sheet created from Tekla Model Pinnacle specializes in the virtual construction of the Reinforcement 3D Models

08

Til-up Wall BBS

Building

Sheet No

Prepared By

Checked By

PIS

NAP

JEDDAH CHILDREN HOSPITAL

SHR3-NAP-SCH-SHD-SC-6SD01-0CSheet No

Drawing Reference

6 8 10 12 14 16 20 25 32

TOTAL WEIGHT (MT) REMARKSh

TOTAL

LENGTH

OF PER

UNIT IN

MM.

Checked By NAP

Rev 0C

a b

NOS. OF

BARS PER

ELEMENT

TOTAL

NOS. OF

BARS

TOTAL

LENGTH IN

M.

LENGTH OF BAR DIA WISE IN METREBEND

ALLOWe f gc d i

DIMENSION ( mm )

HOOK

ALLOW

SHR3-NAP-SCH-SHD-SC-6SD01-0C

SHR3-NAP-SCH-SHD-SC-8SD01-0C

NAME OF STRUCTURAL

ELEMENTBAR MARK

SHAPE

CODE

BAR

DIA.

NOS. OF

ELEMENT

29A B 20 1 9 9 25.830 2870 1080 1850 60 26 0.064

32 A 12 1 20 20 24.800 1240 1240 25 0.022

33 K 20 1 9 9 26.055 2895 120 1925 970 120 26 0.064

34 A 20 1 9 9 25.200 2800 2800 25 0.062

37 A 12 1 9 9 25.200 2800 2800 25 0.022

38 C 12 1 7 7 17.976 2568 120 1800 720 72 18 0.016

39 A 12 1 1 1 1.270 1270 1270 1 0.001

40 A 20 1 1 1 1.270 1270 1270 1 0.003

ST 1 (FLIGHT-3)

49 B 12 1 11 11 13.244 1204 120 1120 36 13 0.012

50 B 20 1 11 11 18.260 1660 120 1600 60 18 0.045

51 B 12 1 10 10 12.040 1204 120 1120 36 12 0.011

DOWELS FROM CORE

WALL 8 AT (-)1.475

Stair BBS Drawing for Hospital

Rebar Quantity Schedule

BIM helps to accurately calculate the required quantity measures of all materials. These quantities are automatically updated whenever there are any changes in the BIM model. Quantity Take-off (QTO) reports can be formatted in Excel and exported to a database for detailed analysis. Quantities can be generated for a specific time period or project area (4D/5D) to help manage material procurement and save inventory costs.

Slab reinforcement – Review & Status

Page 9: 3D BIM SERVICE - pinnaclecad · 2017-04-17 · BBS (Quantity Take-off) sheet created from Tekla Model Pinnacle specializes in the virtual construction of the Reinforcement 3D Models

09

Software Platform and Process for Reinforcement Model & Shop Drawing Creation

Tekla Structures

Autodesk Revit

RebarCAD 2D

Autodesk Structure Detailing

AutoCAD & Ms-Excel

Reinforcement Model Creation in Revit

Input Drawings received from Client > RFI Generation > 3D Concrete Model Creation > Reinforcement 3D Model Creation > Quantity Take-off

Reinforcement Shop Drawing preparation in AutoCAD or RebarCAD

Reinforcement Model Created in Autodesk Revit

Reinforcement Shop Drawing Preparation in Rebar CAD

Input drawings received from clients > Review of Standard and reference Code > RFI’s generation for missing and mismatch information > Work Distribution and monitoring - Zoning plan and construction joint creation for individual Reinforced Concrete item > Rebar placement as per detail > BBS sheet (Quantity Take-off)

Reinforcement Model Creation using Tekla Structure

Reinforcement Model created in Tekla Structures

Reviewing the Input Drawing from the Client > Constructability Review & Clash Detection > Raising RFIs > Creating 3D Rebar Model > Updating the 3D Model > Controlling the Quality of the Model, combining Models of various trades > Shop Drawing / Lift Drawing Creation from the model > Bar Bending Schedule > Quantity Take-off

BBS (Quantity Take-off) sheet created from Tekla Model

Pinnacle specializes in the virtual construction of the Reinforcement 3D Models and shop drawings using various of software platforms like Tekla Structures, RebarCAD 2D, AutoCAD, MS-Excel, Autodesk Revit and Autodesk Structure Detailing.

Page 10: 3D BIM SERVICE - pinnaclecad · 2017-04-17 · BBS (Quantity Take-off) sheet created from Tekla Model Pinnacle specializes in the virtual construction of the Reinforcement 3D Models

10

Quality Control Process

QC Check Phase III

QC 2

Screen checking done by QC Department/Team

DELIVERY

TO

CLIENT

100% Quality

QC 1

Plot checking done by Production Team

QC 3

Preshipment checking performed by Project Manager

QC Check Phase I

The model is plotted on paper and a preliminary grid-by-grid check is done by comparing with the original contract documents. At least one member of the Project Management team assists in this process.

The project's Team Leader sends a status report to the QC Department to begin QC Phase II.

QC Check Phase II

The QC Team performs a more detailed comparison of the contract documents against the 3D BIM model. A specific Checklist is prepared to review/check the deliverables. Its main objective is to review, identify and address the following:

The QA/QC Team continuously interacts with the Project Lead and other team members to resolve all technical issues related to the project.

The Project Manager conducts the preshipment check before sending them to the client.

Our quality control (QC) process is ISO 9001:2008 certified and managed by an independent QC team. The main objective of the QC process is to detect errors and rectify them.

Ensuring quality is a group effort and our QC team comprises experienced and dedicated members.

The entire QC process is handled in three phases:

Missing dataMismatches with the contract documentsProject Grid and ElevationConstruction point of viewMaterial ScheduleConflicts dataClashes with other tradesGeometry of all componentsAnnotations, dimensions, and aesthetic viewMiscellaneous issues

Page 11: 3D BIM SERVICE - pinnaclecad · 2017-04-17 · BBS (Quantity Take-off) sheet created from Tekla Model Pinnacle specializes in the virtual construction of the Reinforcement 3D Models

Work FlowBIM WORK PROCESS FOR CONCRETE PROJECT

11

CLIENT OWNER/CONCRETE CONTRACTORS/

GENERAL CONTRACTOR

PINNACLE MARKETING

TEAMESTIMATES

PINNACLE BIM PROJECT MANAGER

PROJECT TEAM

DELIVERABLES

UN

DE

RS

TA

ND

ING

DE

TA

ILE

D S

CO

PE

/RF

I/C

LA

RIF

ICA

TIO

N

DE

LIV

ER

AB

LE

S

BIM COORDINATION WITH ARCH./STRUC./MECH./PLMB. TEAM

Combining all the models from various trades and disciplines

Performing Clash Detection

Coordination Meetings to discuss unresolved Clashes

Updating the Model to resolve Clashes

Project Study/Input Doc.Review

Raising RFIs for missinginformation

RFIs Answered

Creating 3D Model

Updating the 3D Model to Reflect VE and CR Changes

QC of Model Phasing/4D Scheduling

Presentation Outputs (Rendered Images/Videos/Mock-ups)

Quantity Take-off and it's QC

2D Drawings and their QC

Page 12: 3D BIM SERVICE - pinnaclecad · 2017-04-17 · BBS (Quantity Take-off) sheet created from Tekla Model Pinnacle specializes in the virtual construction of the Reinforcement 3D Models

12

Why Pinnacle? Multidisciplinary Team

Pinnacle is a global leader in providing innovative BIM services. Our in-house team of more than 750 experienced architects, engineers, and BIM professionals helps us to provide end-to-end solutions to discerning clients around the world.

Our 3,50,000 sq ft world-class production facility is equipped with high-end workstations, advanced servers with real time backup, and a high-speed data and voice network. Also there is uninterrupted power supply and a 24 x 7 security system.

Fast Turnaround

Our skilled team of professionals can provide quick turnarounds on complex projects. We have successfully completed several large-scale projects across multiple verticals including health care, hospitality, airports, university centers, data centers, convention centers, and commercial and residential projects.

Global Presence

Pinnacle has offices around the world (USA, India-Durgapur and Kolkata, UAE-Dubai and Italy) enabling us to serve our clients around the clock.

Experienced in BIM Domain

Our global experience is of 17 years and we have successfully collaborated with several leading contractors on BIM projects for specialty hospitals, stadiums, universities, dams, apartment complexes, hotels, casinos, large retail centers, high schools, airports, commercial buildings, convention centers, highrise towers and industrial projects.

Communication

Pinnacle’s Project Management team is available to clients through a number of communication channels including:

1. Global telephone networks for instant communication.2. FTP over a secured network for file transfers.3. Email for reports and interactions.

Technical Strengths

As we have a deep understanding of global and regional codes and standards, we have ensured that our Quality Management System is as per ISO 9001:2008.

4. Video and teleconferencing for presentations and conversations.5. WebEx conferences with US-based phone systems.6. Newforma project information management system.

Our engineers use the latest BIM software: Revit Software Suite (Revit, Revit MEP, Revit Architecture and Revit Structure), Microstation, Ecotect Analysis,

NavisWorks, Inventor, Civil 3D, Plant Design Suite, Pro/Engineer, Tekla Structure, SolidWorks, Autodesk Fabrication Suite, Quickpen, Cadpipe, SketchUp, Bluebeam and other software.

Page 13: 3D BIM SERVICE - pinnaclecad · 2017-04-17 · BBS (Quantity Take-off) sheet created from Tekla Model Pinnacle specializes in the virtual construction of the Reinforcement 3D Models

Kevin McGuireBaker Concrete Construction, Inc.

“My experience in working with Pinnacle has been very good. Pinnacle assisted Baker on a very complex and demanding project and Pinnacle’s hard work, dedication and attention to detail really contributed to our team’s success on the project. Thanks to the Pinnacle team members for their hard work, dedication, and quality work that they provided to Baker on this project.”

Testimonials

13

Chandan and his team have been excellent to deal with and have responded to requests very quickly. I am extremely happy with Pinnacle's performance and would use your company again if the need arises.

Chris RobbinsASI Constructors

Working with Sujit was very easy. We never once worried that deadlines wouldn't be met, or that the quality was lacking in anyway. His communication with us instilled confidence.

Daniel FahmiBaker Concrete Construction, Inc.

Drawing review comments were regularly incorporated into revised drawings properly. The timely incorporation of updates was good. When the AutoCAD glitch occurred and line weights and dimensions were pixelated, your team worked to find a solution. Weekly design meetings worked very well to ensure comments were fully understood.

Crosby LovellPacific Structures Inc

It has been a pleasure working with Pinnacle. We dealt with a very complicated, poorly designed project and Pinnacle's modeling service was able to help point out several discrepancies during the modeling process. The scope of work was updated, revised, and changed so many times and Pinnacle was happy to continue working with us.

S. M. Wilson & Co.Lauren Smith

I am a returning client following the good experience I had with Pinnacle at the Guam Naval Hospital. Pinnacle completes their work in an efficient and expedient manner and I appreciate that meetings are scheduled to discuss questions. The volume of RFIs has been relatively low and Pinnacle has presented several good questions for the designer to help resolve discrepancies.

Christopher Beaman

Guam MACC Builders

Corey WagemanPacific Structures

Great clean work. RFIs for the most part are clean and to the point.

Overall good experience. Complicated Job with keeping track of many design changes and RFIs that were issued on the job. Pinnacle preformed very well with the large amount of changes on this hospital project. All the section views and keys/legends provided on the shop drawings meet expectations and were outstanding. The most important thing is that when it came to the end of the project Pinnacle stepped up to and produce the needed changes in a timely manner.

Jayson Kaze

Urata & Sons

Stacey CerettiCeco Concrete Construction LLC

So far, the experience has been a positive one. Pinnacle has done a great job of creating RFIs when they're needed; learning from and applying feedback on all aspects of the project; and following up on issues.

Cristina CarilloWatts Constructors LLC

Very responsive. I will recommend Pinnacle to our future projects to come.

All good things to say about the Pinnacle team I have been working with.

Darrius Gates

Southern Pan Structures

Page 14: 3D BIM SERVICE - pinnaclecad · 2017-04-17 · BBS (Quantity Take-off) sheet created from Tekla Model Pinnacle specializes in the virtual construction of the Reinforcement 3D Models

Jeddah, Kingdom of Saudi Arabia

232,002 sq mNesma & Partners

National Guard Health Affairs Specialized Hospitals in Regions (NSGH)

Ongoing

20-25 Engineers

Specialized Hospital

Constructability review, LOD 400 3D Model, Clash coordination, Shop drawing and QTO

Structural Scope: Structural general arrangement & Reinforcement shop drawing preparation with BBS sheet.

KolkataIndia

55,741 sq mBharti Realty

Astra Towers May 2015

8 Engineers

Commercial Building

1. RCC/Concrete 3D Model and RCC Quantities 2. Reinforcement 3D model and Rebar/Reinforcement Quantities

Project Snap Shots

LOCATIONCLIENT PROJECT NAME

DETAILSTIME LINE MANPOWER

SECTOR PROJECT AREA

14

MinnesotaUSA

412,800 sq ftCeco Concrete Construction

DePaul Uniersity School of Music December2015

5 Engineers

Educational

Concrete Model and Shop Drawing creation

HydroelectricFacility

October

2013

36.4 MW

Pella, IowaUSA

10 Structural Engineers

Concrete

Contractor Pinnacle provided complete 3D BIM model of cast-in-place and precast concrete. MEP cut-outs and steel embedment were also included in the scope. Quantity Take-offs for form work, cast-in-place, and precast concrete were also generated from themodel.

Red Rock Hydroelectric Power Plant

OklahomaUSA

417,408 sq ftLithko Contracting, Inc.

River Spirit Casino May2015

3 Engineers

Casino

Reviewing and updating of Structural 3D Model and preparation of Concrete Shop Drawing for entire building.

CaliforniaUSA

160,936 sq ftUrata & Sons Cement, Inc

360 Berry

Concrete Foundation Level (Level 2) 3D Model for: footing and foundation, columns and beams, and shear/retaining walls were provided. 2D Drawings and Inset Drawing (Wall): detailed 2D drawings will be prepared showing the annotations, dimensions and tagging. For shop drawing the top, bottom, and vertical details of the slab will be shown. The trades covered include structural and concrete.

April2015

2 Engineers

Residential - Multy family

CaliforniaUSA

89,997 sq ftNibbi Concrete

Alice Griffith Block 4

Scope is to produce concrete model through Tekla software.

April2015

3 Structural Engineers

Mixed Use

GuamUSA

117,541 sq ftWatts Constructors, LLC

P-625 BAMS Forward Operational & Maintenance HangarPinnacle is working with the concrete contractor and our scope is to produce cast-in-place shop drawing for the client.

April2015

4 Structural Engineers

Maintenance Hangar

CaliforniaUSA

496,692 sq ftPacific Structures

Pine & Franklin

Pinnacle's scope of work for this includes reviewing structural 3D model and preparing concrete shop drawings for the entire building.

February2015

3 Engineers

Residential

CaliforniaUSA

21,808 sq ftPacific Structure

Rinconada WTP Reliability Improvemen September2015

5 Engineers

Water Treatment Plan

Structural 3D model and Shop Drawings

GuamUSA

317,408 sq ftWebcor Concrete

Guam Naval Hospital Replacement June2015

6 Engineers

Hospital

Concrete Model and Shop Drawing creation

Page 15: 3D BIM SERVICE - pinnaclecad · 2017-04-17 · BBS (Quantity Take-off) sheet created from Tekla Model Pinnacle specializes in the virtual construction of the Reinforcement 3D Models

LOCATIONCLIENT TIME

LINE MANPOWERSECTOR PROJECT AREA

15

Project Snap Shots

PROJECT NAME DETAILS

Tata Realty TCS Sahyadri Park December

2010

1,667,168 sq ft

Pune India

15 Structural Engineers.

IT SEZ Centre

General

Contractor Pinnacle provided complete coordinated 3D BIM services for the entire architectural, structural, plumbing, fire protection, HVAC, and electrical trades along with a complete set of Good for Construction Drawings, wall penetration drawings of different trades.

Office Garage General

Contractor

Queen City Square Tower August

2010

1,349,999 sq ft

Cincinnati USA

15 Structural Retail

Engineers

Pinnacle's scope included 3D model of the architectural and structural elements. After clash detection and resolution with all the trades, a completely coordinated 3D model was generated to ensure clash-free construction on-site. Shop drawings for Concrete Contractor were produced.

Water Robert B. Diemer Water Treatment Plant July

2008

9,234,714 sq ft

Yorba Linda USA

10 Structural EngineersTreatment

General

Contractor

PlantPinnacle was entrusted with the responsibility of the entire 3D modeling, detailing, and construction document for the project. We generated complete sets of lift drawings by considering all kinds of embeds and penetrations for the precast walls and slabs as per the sequence of pouring (primary and secondary) as well as of the steel fabrication drawings. The project also required complete clash-detection among all the services (structural, HVAC, piping, and support). these clashes were resolved as per the client's requirements and capacity.

Hydro Electric Concrete

Contractor

Meldahl Hydroelectric Power Plant June

2010

111 MW

KentuckyUSA

15 Structural EngineersFacility Pinnacle provided complete 3D BIM model of cast-in-place,

precast concrete. MEP cut-outs and steel embedments were also included in the scope. Quantity Take-offs for form work, cast-in-place, and precast concrete was generated from the model. 1365 Lift Drawings as per pour sequence was delivered as per time line.

Office Building May

2013

741,633 sq ft

FloridaUSA

4 Structural Engineers

Concrete

Contractor Pinnacle’s scope of this project included developing the entire exterior Rebar model for beams, columns, slabs, and joists for other trade coordination. The other trade coordination was performed with the exterior embeds of precast panels which is controlled by the general contractor. Pinnacle provided level wise exterior rebar model to Baker concrete and they submittedthe model to GC for the coordination. After the trade coordination GC fixed the clashes and finalized some new changes in the drawings.

Broward County Courthouse

Mixed Use Residential Township

DohaQatar

ConspelandObayashiCorporationand HBKConstruction

Ambit of this project included architectural and structural3D modeling, MEP-FP (mechanical, electrical, plumbing, and fire protection) 3D modeling, providing coordination services, final shop drawings and generation of constructability report, quantity take-offs, creation of 3D Mock up along with phasing and 4D Scheduling.

Msheireb Downtown Doha July2013

374,541 sq m

45 MEP Engineers, 16 Architectural and Structural Engineers

Shopping Mall North Gate Mall November

2011

417,500 sq m

DohaQatar

32 Architectural/

Structural/Civil Engineers.

A clash-free 3D BIM model (architectural and structural)for the entire mall area along with the office building was provided by Pinnacle. A walkthrough presentation was also created and delivered.

General

Contractor

Page 16: 3D BIM SERVICE - pinnaclecad · 2017-04-17 · BBS (Quantity Take-off) sheet created from Tekla Model Pinnacle specializes in the virtual construction of the Reinforcement 3D Models

Kolkata Office

Suite 530, SDF Building.Salt Lake Sector V, Kolkata - 700091 Phone : +91 33 23576195 Email : [email protected]

Pinnacle Infotech Solutions

UAE Office

Office No – 307, 3rd Floor, Building No. 7PO Box - 345869, Dubai Outsource ZoneDubai, UAE

Bimal Patwari

Phone : +971504965954Email : [email protected]

Pinnacle Infotech TechnologiesFZ-LLC

ww

w.p

innacl

eca

d.c

om

ITALY Office

Phone : + 39 0341630070Email : [email protected]

Nunki di M.Brossa,Via Calvi, 10 - 23801Calolziocorte, LC - Italy

Jaipur Office

Plot No - IT-A-016-E, Mahindra World City(Jaipur) LTD, PO - Mahindra World City, Tehsil -Sanganer, Jaipur - 302037

Pinnacle Infotech Solutions

Texas, USA

Dubai, UAE

Lecco, Italy

Kolkata, India

Durgapur, IndiaJaipur, India

London, UK

Pinnacle Infotech Inc.

6161 Savoy Drive #1125,Houston, TX 77036Phone : 713 780 2135Fax : 713 780 8784Email : [email protected]

USA Office

Biswanath TodiOperations ManagerCell : 832 283 6628

Pinnacle Infotech Solutions

S.S.B. Sarani, Bidhannagar, DurgapurWest Bengal, India - 713212Phone : +91 343 6602222 / 6602231 – 35Fax : +91 343 6602230Email : [email protected]

Durgapur Office

Bimal PatwariPresident Cell : 713 589 9125

UK Office

TechHub, 4-5 Bonhill Street London EC2A 4 BX

Mathew GomesPhone: +44 20 7096 1664Email: [email protected]

International Office Locations