3rd MeetingMatt Bernstein, Paul Capelli, Jared Segal
November 20, 2008
![Page 2: 3rd Meeting Matt Bernstein, Paul Capelli, Jared Segal November 20, 2008](https://reader036.vdocuments.net/reader036/viewer/2022082821/5697c01a1a28abf838ccedb8/html5/thumbnails/2.jpg)
Accomplishments
Preliminary syllabus research Meeting with X Follow-up meeting with David Lynn Project Schedule Requirements Draft Started
![Page 3: 3rd Meeting Matt Bernstein, Paul Capelli, Jared Segal November 20, 2008](https://reader036.vdocuments.net/reader036/viewer/2022082821/5697c01a1a28abf838ccedb8/html5/thumbnails/3.jpg)
What is a syllabus?
Paul has provided us with excellent outline Defines all the fields required to develop a
syllabus Mentions ABET requirements Should work as good template to present to
stakeholders
![Page 4: 3rd Meeting Matt Bernstein, Paul Capelli, Jared Segal November 20, 2008](https://reader036.vdocuments.net/reader036/viewer/2022082821/5697c01a1a28abf838ccedb8/html5/thumbnails/4.jpg)
Discussion With David Lynn
Followed up with David Lynn Need a version description Configuration description Installation and maintenance Well-commented code
![Page 5: 3rd Meeting Matt Bernstein, Paul Capelli, Jared Segal November 20, 2008](https://reader036.vdocuments.net/reader036/viewer/2022082821/5697c01a1a28abf838ccedb8/html5/thumbnails/5.jpg)
Prototype
Begun prototype construction Will be accomplished using Javascript, pre-
developed syllabus Lightweight model will not include any back-end
database interaction Will eventually be demonstrated to stakeholders
![Page 6: 3rd Meeting Matt Bernstein, Paul Capelli, Jared Segal November 20, 2008](https://reader036.vdocuments.net/reader036/viewer/2022082821/5697c01a1a28abf838ccedb8/html5/thumbnails/6.jpg)
Prototype Progress
Started on the student view Provides a listing of courses Login portion still required Additional views still in development Will be using prototype as framework for
development Ideas for design will be taken from prototype
![Page 7: 3rd Meeting Matt Bernstein, Paul Capelli, Jared Segal November 20, 2008](https://reader036.vdocuments.net/reader036/viewer/2022082821/5697c01a1a28abf838ccedb8/html5/thumbnails/7.jpg)
High Level Schedule
High Level Schedule Produced Taken from a certain organization's “Custom
Development Framework” Should provide high level guidelines for
completing tasks in required timeframe Additional tasks can be added to separate .mpp
file to document what we have performed
![Page 8: 3rd Meeting Matt Bernstein, Paul Capelli, Jared Segal November 20, 2008](https://reader036.vdocuments.net/reader036/viewer/2022082821/5697c01a1a28abf838ccedb8/html5/thumbnails/8.jpg)
Website
Will website be PHP accessible? If so, Matt has an open source PHP CMS to
allow for the easy update of the website If not, we still need FTP, password, link to begin
progress on our project website
![Page 9: 3rd Meeting Matt Bernstein, Paul Capelli, Jared Segal November 20, 2008](https://reader036.vdocuments.net/reader036/viewer/2022082821/5697c01a1a28abf838ccedb8/html5/thumbnails/9.jpg)
Software Development Environment
Hardware Procurement What is the state of server procurement? Apache Webserver installed on all of our local
machines J2EE, MySql also installed on local machines Plan is to perform development on local
machines until hardware (server) is procured
![Page 10: 3rd Meeting Matt Bernstein, Paul Capelli, Jared Segal November 20, 2008](https://reader036.vdocuments.net/reader036/viewer/2022082821/5697c01a1a28abf838ccedb8/html5/thumbnails/10.jpg)
Requirements Documentation
Will seek to develop requirements documentation over the break
Hoping to complete a few more stakeholder interviews today
Project schedule places final requirements due date on 12/8/2008
We are on schedule to complete this timeframe
![Page 11: 3rd Meeting Matt Bernstein, Paul Capelli, Jared Segal November 20, 2008](https://reader036.vdocuments.net/reader036/viewer/2022082821/5697c01a1a28abf838ccedb8/html5/thumbnails/11.jpg)
Next Steps
Begin draft of requirements document Continue Interviews of stakeholders Website Server procurement Complete Prototype Discussions with David Lynn of interfacing with
Blackboard/Class Rolls/OASIS