· 4 january working group meeting meetings day time event room affiliate due diligence committee...

20
® Health Level Seven, HL7, CDA, FHIR and the FHIR [FLAME DESIGN] are registered trademarks of Health Level Seven International, registered in the US Patent and Trademark Office. January 27—February 2, 2018 Hilton New Orleans Riverside, New Orleans, LA Health Level Seven ® International Unlocking the Power of Health Information Follow us on Twitter for all the latest updates #HL7WGM Access the EventMobi App eventmobi.com/jwgm2018 Working Group Meeting On-Site Meeting Schedule & Hotel Guide

Upload: others

Post on 22-Jan-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1:  · 4 January Working Group Meeting MEETINGS Day Time Event Room AFFILIATE DUE DILIGENCE COMMITTEE (ADDC) Will not meet in January ANESTHESIA (GAS) Will not meet in January

® Health Level Seven, HL7, CDA, FHIR and the FHIR [FLAME DESIGN] are registered trademarks of Health Level Seven International, registered in the US Patent and Trademark Office.

January 27—February 2, 2018Hilton New Orleans Riverside, New Orleans, LA

Health Level Seven® InternationalUnlocking the Power of Health Information

Follow us on Twitter for all the latest updates #HL7WGM

Access the EventMobi Appeventmobi.com/jwgm2018

Working Group Meeting On-Site Meeting Schedule & Hotel Guide

Page 2:  · 4 January Working Group Meeting MEETINGS Day Time Event Room AFFILIATE DUE DILIGENCE COMMITTEE (ADDC) Will not meet in January ANESTHESIA (GAS) Will not meet in January

TABLE OF CONTENTS

Registration Hours . . . . . . . . . . . . . . . . . . . . . . . . . 3

Meals & Breaks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

General Session Room . . . . . . . . . . . . . . . . . . . . . . . 3

Meetings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4–14

Tutorials at a Glance . . . . . . . . . . . . . . . . . . . . . . . 15

Meetings at a Glance . . . . . . . . . . . . . . . . . . . . . 16-17

Hotel Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18–19

Work Group Co-Chair Elections . . . . . . . . . . . . .19

Upcoming Meetings . . . . . . . . . . . . . . . . . . . . . . . 20

Thank You to Our WGM Sponsors

2 January Working Group Meeting

TUESDAY NIGHT PARTY

LANYARDS

ROOM KEY

Meeting Schedule KeyQ1 = 9:00 am – 10:30 am

Q2 = 11:00 am – 12:30 pm

Q3 = 1:45 pm – 3:00 pm

Q4 = 3:30 pm – 5:00 pm

Thank You to Our Payer Summit Sponsors

GOLD SPONSOR

GOLD SPONSOR

GOLD SPONSOR

GOLD SPONSOR

Page 3:  · 4 January Working Group Meeting MEETINGS Day Time Event Room AFFILIATE DUE DILIGENCE COMMITTEE (ADDC) Will not meet in January ANESTHESIA (GAS) Will not meet in January

MEETINGS

On-Site Meeting Schedule & Hotel Guide 3

REGISTRATION HOURSDay Time Event Room

Sunday 8:30 – 5:00 pm Registration 3rd Floor

Monday – Tuesday 7:00 – 5:00 pm Registration 3rd Floor

Wednesday – Thursday 7:30 – 5:00 pm Registration 3rd Floor

Friday 8:00 – 1:00 pm Staff on Hand for Assistance 3rd Floor

MEALS & BREAKSDay Time Event Room

Sunday – Thursday 7:30 – 8:30 am Continental Breakfast* St. Charles Foyer – 3rd Floor

Friday 8:00 – 9:00 am Continental Breakfast* Jackson – 3rd Floor

Sunday – Thursday 10:30 – 11:00 am Morning Break St. Charles Foyer – 3rd Floor

Friday 10:30 – 11:00 am Morning Break Jackson – 3rd Floor

Sunday – Thursday 12:30 – 1:30 pm Lunch St. Charles Foyer – 3rd Floor

Friday 12:30 – 1:30 pm Lunch Jackson – 3rd Floor

Sunday – Thursday 3:00 – 3:30 pm Afternoon Break St. Charles Foyer – 3rd Floor

GENERAL SESSION ROOMPlease plan to attend the Monday through Thursday morning General Sessions for daily highlights, meeting announcements and changes.

Day Time Event Room

Monday 8:30 – 12:30 pmHL7 CEO and International Council Reports, Announcements

St. Charles Ballroom – 3rd Floor

Tuesday 8:00 – 8:45 am HL7, CTO and TSC Reports, Announcements St. Charles Ballroom – 3rd Floor

Wednesday 8:00 – 8:45 am HL7 Board Report, Awards Presentations, Announcements St. Charles Ballroom – 3rd Floor

Thursday 8:00 – 8:45 am Announcements St. Charles Ballroom – 3rd Floor

Friday NO GENERAL SESSION

Meeting times and locations are subject to change.NOTE:  In compliance with our status as an ANSI-accredited standards development organization, anyone may register to attend HL7 meetings.

*LIGHT continental breakfasts will be provided. Attendees wanting a full breakfast may order room service or go to the hotel restaurant at their own expense.

Page 4:  · 4 January Working Group Meeting MEETINGS Day Time Event Room AFFILIATE DUE DILIGENCE COMMITTEE (ADDC) Will not meet in January ANESTHESIA (GAS) Will not meet in January

4 January Working Group Meeting

MEETINGS

Day Time Event RoomAFFILIATE DUE DILIGENCE COMMITTEE (ADDC)Will not meet in January

ANESTHESIA (GAS)Will not meet in January

ARCHITECTURAL REVIEW BOARD (ARB)Sunday 11:00 – 12:30 pm Hosting: SGB Fulton – 3rd Floor Monday 11:00 – 12:30 pm MEETING Windward – Riverside BldgThursday 1:45 – 3:00 pm MEETING Windward – Riverside Bldg

ARDEN SYNTAX (AS)Monday 9:00 – 5:00 pm MEETING Newberry – 3rd Floor

ATTACHMENTSMonday 11:00 – 12:30 pm Joint w/EHR, CIMI Camp – 3rd FloorTuesday – Wednesday 9:00 – 5:00 pm MEETING Parish – 3rd FloorThursday 9:00 – 10:30 am Hosting: FM Parish – 3rd Floor

11:00 – 12:30 pm MEETING Parish – 3rd Floor

BIOMEDICAL RESEARCH AND REGULATION (BR&R)Monday 1:45 – 3:00 pm Joint w/EHR, CIMI, CIC, EC, PC Jefferson Ballroom – 3rd Floor

3:30 – 5:00 pm MEETING Marlborough B – 2nd FloorTuesday 9:00 – 10:30 am MEETING Marlborough B – 2nd Floor

11:00 – 12:30 pm Joint w/O&O, Dev Kabacoff – Riverside Bldg1:45 – 5:00 pm MEETING Marlborough B – 2nd Floor

Wednesday 9:00 – 10:30 am MEETING Marlborough B – 2nd Floor11:00 – 12:30 pm Joint w/O&O, II Kabacoff – Riverside Bldg1:45 – 5:00 pm MEETING Marlborough B – 2nd Floor

Thursday 9:00 – 12:30 pm MEETING Marlborough B – 2nd Floor1:45 – 3:00 pm Joint w/PC, FHIR-I St. James – 3rd Floor3:30 – 5:00 pm MEETING Marlborough B – 2nd Floor

BIRDS OF A FEATHER – Enterprise Architect UsersWednesday 5:15 – 6:15 pm MEETING Prince of Whales – 2nd Floor

BIRDS OF A FEATHER – FHIR RegistryTuesday 7:30 – 9:30 pm MEETING St. James – 3rd Floor

BIRDS OF A FEATHER – HL7 Payers User Group ProjectSunday 5:30 – 6:30 pm MEETING Jackson – 3rd Floor

BOARD OF DIRECTORS’ MEETINGWednesday 12:30 – 1:30 pm Luncheon Compass – Riverside Complex

1:45 – 5:00 pm MEETING Chart – Riverside Complex

Page 5:  · 4 January Working Group Meeting MEETINGS Day Time Event Room AFFILIATE DUE DILIGENCE COMMITTEE (ADDC) Will not meet in January ANESTHESIA (GAS) Will not meet in January

MEETINGS

On-Site Meeting Schedule & Hotel Guide 5

CLINICAL DECISION SUPPORT (CDS)Tuesday 9:00 – 10:30 am MEETING Jackson – 3rd Floor

11:00 – 12:30 pm Joint w/CQI, FHIR-I St. James – 3rd Floor1:45 – 3:00 pm Hosting: CQI, FHIR-I St. James – 3rd Floor3:30 – 5:00 pm MEETING Marlborough A – 2nd Floor

Wednesday 9:00 – 10:30 am Joint w/CQI, CIMI St. James – 3rd Floor11:00 – 12:30 pm Joint w/CQI St. James – 3rd Floor1:45 – 3:00 pm Hosting: CQI St. James – 3rd Floor3:30 – 5:00 pm Hosting: CIMI, CQI St. James – 3rd Floor

Thursday 9:00 – 10:30 am Joint w/O&O, Templates Windsor – 3rd Floor

CDA MANAGEMENT GROUPMonday 3:30 – 5:00 pm MEETING Pelican – Riverside Bldg

CLINICAL GENOMICS (Clin Gen)Monday 1:45 – 3:00 pm MEETING Camp

3:30 – 5:00 pm Hosting: FHIR-I CampTuesday – Wednesday 9:00 – 5:00 pm MEETING Camp

CLINICAL INFORMATION MODELING INITIATIVE (CIMI)Sunday 9:00 – 5:00 pm MEETING Parish – 3rd FloorMonday 11:00 – 12:30 pm Joint w/EHR, Attachments Camp – 3rd Floor

1:45 – 3:00 pm Joint w/EHR, BR&R, CIC, EC, PC Jefferson Ballroom – 3rd Floor3:30 – 5:00 pm MEETING Ascot – 3rd Floor

Tuesday 9:00 – 10:30 am Joint w/PC, EC Jefferson Ballroom – 3rd Floor11:00 – 12:30 pm MEETING Ascot – 3rd Floor12:30 – 1:30 pm Luncheon/Meeting – Hosting: FHIR-I Parish – 3rd Floor1:45 – 3:00 pm MEETING Ascot – 3rd Floor3:30 – 5:00 pm Joint w/PC, O&O, Voc Jefferson Ballroom – 3rd Floor

Wednesday 9:00 – 10:30 am Joint w/CQI, CDS St. James – 3rd Floor11:00 – 12:30 pm Joint w/CIC Marlborough B – 2nd Floor1:45 – 3:00 pm MEETING Ascot – 3rd Floor3:30 – 5:00 pm Joint w/CDS, CQI St. James – 3rd Floor

Thursday 9:00 – 12:30 pm MEETING Ascot – 3rd Floor1:45 – 3:00 pm Joint w/Voc, CGIT Magazine – 3rd Floor3:30 – 5:00 pm Joint w/O&O Fulton – 3rd Floor

CLINICAL INTEROPERABILITY COUNCIL (CIC)Monday 1:45 – 3:00 pm Joint w/EHR, BR&R, CIMI, EC, PC Jefferson Ballroom – 3rd FloorTuesday 11:00 – 12:30 pm Joint w/EHR Commerce – 3rd Floor

1:45 – 5:00 pm MEETING Eglington Winton – 2nd FloorWednesday 11:00 – 12:30 pm Hosting: CIMI Marlborough B – 2nd Floor

1:45 – 3:00 pm MEETING Eglington Winton – 2nd FloorThursday 9:00 – 12:30 pm MEETING Eglington Winton – 2nd Floor

Day Time Event Room

Page 6:  · 4 January Working Group Meeting MEETINGS Day Time Event Room AFFILIATE DUE DILIGENCE COMMITTEE (ADDC) Will not meet in January ANESTHESIA (GAS) Will not meet in January

6 January Working Group Meeting

MEETINGS

CLINICAL QUALITY INFORMATION (CQI)Monday 9:00 – 12:30 pm MEETING Marlborough B – 2nd Floor

1:45 – 3:00 pm Joint w/O&O Kabacoff – Riverside Bldg3:30 – 5:00 pm MEETING Canal

Tuesday 9:00 – 10:30 am MEETING Canal11:00 – 12:30 pm Hosting: CDS, FHIR-I St. James – 3rd Floor1:45 – 3:00 pm Joint w/CDS, FHIR-I St. James – 3rd Floor3:30 – 5:00 pm MEETING Canal

Wednesday 9:00 – 10:30 am Hosting: CDS, CIMI St. James – 3rd Floor11:00 – 12:30 pm Hosting: CDS St. James – 3rd Floor1:45 – 3:00 pm Joint w/CDS St. James – 3rd Floor3:30 – 5:00 pm Joint w/CDS, CIMI St. James – 3rd Floor

Thursday 9:00 – 10:30 am MEETING Pelican – Riverside Bldg

CLINICAL STATEMENT (CS)Thursday 1:45 – 3:00 pm Hosting: O&O Marlborough A – 2nd Floor

CLINICIANS ON FHIR®Wednesday 12:30 – 1:30 pm Luncheon/Meeting Fulton – 3rd Floor Friday 9:00 – 3:00 pm MEETING St. Charles Ballroom – 3rd Floor

CO-CHAIR INFORMATIONMonday 5:15 – 7:00 pm Co-Chairs Dinner/Meeting St. Charles Ballroom – 3rd Floor(Open meeting, however open for dinner ONLY to co-chairs. Co-chairs MUST register if you wish to attend the dinner/meeting)

Thursday 7:00 – 8:00 am Newly Elected Co-Chair Training Cambridge – 2nd Floor

COMMUNITY-BASED CARE AND PRIVACY (CBCP)Monday 1:45 – 5:00 pm Hosting: Sec Parish – 3rd FloorTuesday 1:45 – 3:00 pm Hosting: MH, Sec CanalWednesday 9:00 – 10:30 am Joint w/EHR, FHIR-I, Sec Jefferson Ballroom – 3rd Floor

11:00 – 5:00 pm MEETING Leeward – Riverside BldgThursday 9:00 – 10:30 am Joint w/Sec, FHIR-I Kabacoff – Riverside Bldg

11:00 – 12:30 pm MEETING Windward – Riverside Bldg

CONFORMANCE (CGIT)Monday 9:00 – 12:30 pm MEETING Leeward – Riverside BldgTuesday 9:00 – 12:30 pm MEETING Leeward – Riverside BldgWednesday 9:00 – 12:30 pm MEETING Bridge – Riverside Bldg

1:45 – 3:00 pm Hosting: FHIR-I, Templates Bridge – Riverside Bldg3:30 – 5:00 pm MEETING Bridge – Riverside Bldg

Thursday 9:00 – 10:30 am Joint w/Voc, InM Magazine – 3rd Floor11:00 – 12:30 pm Joint w/Voc Magazine – 3rd Floor1:45 – 3:00 pm Joint w/Voc, CIMI Magazine – 3rd Floor

Day Time Event Room

Page 7:  · 4 January Working Group Meeting MEETINGS Day Time Event Room AFFILIATE DUE DILIGENCE COMMITTEE (ADDC) Will not meet in January ANESTHESIA (GAS) Will not meet in January

MEETINGS

On-Site Meeting Schedule & Hotel Guide 7

EDUCATIONMonday 12:30 – 1:30 pm Education Facilitators’ Roundtable

Luncheon/MeetingJackson – 3rd Floor

1:45 – 5:00 pm MEETING Leeward – Riverside BldgThursday 9:00 – 12:30 pm MEETING Norwich – 3rd Floor

ELECTRONIC HEALTH RECORDS (EHR)Monday 9:00 – 10:30 am MEETING Camp – 3rd Floor

11:00 – 12:30 pm Hosting: Attachments, CIMI Camp – 3rd Floor1:45 – 3:00 pm Hosting: BR&R, CIMI, CIC, EC, PC Jefferson Ballroom – 3rd Floor3:30 – 5:00 pm MEETING Windsor – 3rd Floor

Tuesday 9:00 – 10:30 am Hosting: MH Commerce – 3rd Floor11:00 – 12:30 pm Hosting: CIC Commerce – 3rd Floor1:45 – 5:00 pm MEETING Commerce – 3rd Floor

Wednesday 9:00 – 10:30 am Hosting: CBCP, FHIR-I, Sec Jefferson Ballroom – 3rd Floor11:00 – 5:00 pm MEETING Commerce – 3rd Floor

Thursday 9:00 – 5:00 pm MEETING Commerce – 3rd Floor

ELECTRONIC SERVICES AND TOOLS (EST)Tuesday 11:00 – 12:30 pm MEETING Pelican – Riverside BldgThursday 9:00 – 10:30 pm MEETING Leeward – Riverside BldgFriday 9:00 – 10:30 am Joint w/Templates, SD Canal – 3rd Floor

EMERGENCY CARE (EC)Monday 11:00 – 12:30 pm Joint w/PC, FHIR-I, SD Jefferson Ballroom – 3rd Floor

1:45 – 3:00 pm Joint w/EHR, BR&R, CIMI, CIC, PC Jefferson Ballroom – 3rd Floor3:30 – 5:00 pm MEETING Norwich – 3rd Floor

Tuesday 9:00 – 10:30 am Joint w/PC, CIMI Jefferson Ballroom – 3rd Floor11:00 – 12:30 pm MEETING Norwich – 3rd Floor3:30 – 5:00 pm MEETING Leeward – Riverside Bldg

Wednesday 9:00 – 10:30 am MEETING Leeward – Riverside Bldg3:30 – 5:00 pm MEETING Ascot – 3rd Floor

Thursday 1:45 – 3:00 pm MEETING Norwich – 3rd Floor

FACILITATORS’ ROUNDTABLE DINNER/MEETING Thursday 5:30 – 8:00 pm Hosting: FHIR-I, MnM, Voc Commerce – 3rd Floor

FHIR CONNECTATHON Saturday 9:00 – 10:00 pm MEETING St. Charles Ballroom – 3rd Floor

12:30 – 1:30 pm Luncheon St. James Ballroom – 3rd FloorSunday 9:00 – 5:00 pm MEETING St. Charles Ballroom – 3rd Floor

12:30 – 1:30 pm Luncheon St. James Ballroom – 3rd Floor

Day Time Event Room

Page 8:  · 4 January Working Group Meeting MEETINGS Day Time Event Room AFFILIATE DUE DILIGENCE COMMITTEE (ADDC) Will not meet in January ANESTHESIA (GAS) Will not meet in January

8 January Working Group Meeting

MEETINGS

FHIR GOVERNANCE BOARD (FGB)Sunday 12:30 – 1:30 pm Luncheon/Meeting – Hosting: FMG Fulton – 3rd Floor Monday 7:00 – 8:00 am Breakfast/Meeting Parish – 3rd FloorThursday 3:30 – 5:00 pm Hosting: FMG Parish – 3rd Floor

FAST HEALTHCARE INTEROPERABILITY RESOURCES INFRASTRUCTURE (FHIR-I)Monday 9:00 – 10:30 am MEETING Commerce – 3rd Floor

11:00 – 12:30 pm Joint w/PC, EC, SD Jefferson Ballroom – 3rd Floor11:00 – 3:00 pm MEETING Commerce – 3rd Floor3:30 – 5:00 pm Hosting: II, MnM, O&O, PC Commerce – 3rd Floor3:30 – 5:00 pm Joint w/Clin Gen Camp3:30 – 5:00 pm Joint w/PH Marlborough A – 2nd Floor3:30 – 5:00 pm Joint w/SD Magazine – 3rd Floor7:00 – 10:00 pm MEETING Commerce – 3rd Floor

Tuesday 9:00 – 10:30 am Joint w/ITS Bridge – Riverside Bldg9:00 – 10:30 am Joint w/PA Durham – 3rd Floor9:00 – 10:30 am Joint w/SOA Ascot – 3rd Floor11:00 – 12:30 pm Joint w/CQI, CDS St. James – 3rd Floor11:00 – 12:30 pm Joint w/InM Eglington Winton – 2nd Floor11:00 – 12:30 pm Joint w/Pharm Marlborough A – 2nd Floor12:30 – 1:30 pm Luncheon/Meeting – Joint w/CIMI Parish – 3rd Floor1:45 – 3:00 pm Joint w/CDS, CQI St. James – 3rd Floor1:45 – 3:00 pm Joint w/PC Magazine – 3rd Floor 3:30 – 5:00 pm Joint w/InM Ascot – 3rd Floor3:30 – 5:00 pm Joint w/SD Royal – 3rd Floor

Wednesday 9:00 – 10:30 am Joint w/EHR, CBCP, Sec Jefferson Ballroom – 3rd Floor9:00 – 10:30 am Joint w/Voc, MnM Commerce – 3rd Floor11:00 – 12:30 pm MEETING Ascot – 3rd Floor1:45 – 3:00 pm Joint w/CGIT, Templates Bridge – Riverside Bldg1:45 – 3:00 pm Joint w/MnM Windward – Riverside Bldg1:45 – 3:00 pm Joint w/O&O, PC, Pharm Jefferson Ballroom – 3rd Floor1:45 – 3:00 pm Joint w/Sec Royal – 3rd Floor3:30 – 5:00 pm Joint w/II Newberry – 3rd Floor3:30 – 5:00 pm Joint w/FM Pelican – Riverside Bldg

Thursday 9:00 – 10:30 am Joint w/Dev Bridge – Riverside Bldg9:00 – 10:30 am Joint w/Sec, CBCP Kabacoff – Riverside Bldg11:00 – 12:30 pm Joint w/MnM Pelican – Riverside Bldg11:00 – 12:30 pm Joint w/O&O Windsor – 3rd Floor11:00 – 3:00 pm MEETING Leeward – Riverside Bldg1:45 – 3:00 pm Joint w/PC, BR&R St. James – 3rd Floor1:45 – 3:00 pm Joint w/SD Canal – 3rd Floor5:30 – 8:00 pm Facilitators’ Roundtable Dinner/

Meeting – Joint w/MnM, VocCommerce – 3rd Floor

Day Time Event Room

Page 9:  · 4 January Working Group Meeting MEETINGS Day Time Event Room AFFILIATE DUE DILIGENCE COMMITTEE (ADDC) Will not meet in January ANESTHESIA (GAS) Will not meet in January

MEETINGS

On-Site Meeting Schedule & Hotel Guide 9

FHIR MANAGEMENT GROUP (FMG)Sunday 12:30 – 1:30 pm Luncheon/Meeting – Joint w/FGB Fulton – 3rd FloorMonday 12:30 – 1:30 pm FHIR Committer’s Town Hall Meeting Parish – 3rd FloorThursday 3:30 – 5:00 pm Joint w/FGB Parish – 3rd Floor

FINANCIAL MANAGEMENT (FM)Monday 9:00 – 12:30 pm MEETING Pelican – Riverside BldgWednesday 9:00 – 3:00 pm MEETING Pelican – Riverside Bldg

3:30 – 5:00 pm Hosting: FHIR-I Pelican – Riverside BldgThursday 9:00 – 10:30 am Joint w/Attachments Parish – 3rd Floor

11:00 – 12:30 pm Joint w/PA Durham – 3rd Floor11:00 – 12:30 pm Joint w/PA Guest Room 311

GOVERNANCE AND OPERATIONS COMMITTEE (GOC)Tuesday 11:00 – 12:30 pm MEETING Windward – Riverside Bldg

HL7 TERMINOLOGY AUTHORITY (HTA)Friday 9:00 – 12:30 pm MEETING Commerce – 3rd Floor

HEALTH CARE DEVICES (Dev)Monday 9:00 – 5:00 pm MEETING Bridge – Riverside BldgTuesday 9:00 – 10:30 am Joint w/O&O Kabacoff – Riverside Bldg

11:00 – 12:30 pm Joint w/O&O, BR&R Kabacoff – Riverside Bldg1:45 – 5:00 pm MEETING Bridge – Riverside Bldg

Wednesday 9:00 – 3:00 pm MEETING Windsor – 3rd Floor3:30 – 5:00 pm Hosting: MH Windsor – 3rd Floor

Thursday 9:00 – 10:30 am Hosting: FHIR-I Bridge – Riverside Bldg11:00 – 5:00 pm MEETING Bridge – Riverside Bldg

HEALTHCARE STANDARDS INTEGRATION (HSI)Tuesday 1:45 – 3:00 pm MEETING Norwich – 3rd FloorThursday 3:30 – 5:00 pm MEETING Windward – Riverside Bldg

IMAGING INTEGRATION (II)Monday 3:30 – 5:00 pm Joint w/FHIR-I, MnM, O&O, PC Commerce – 3rd FloorTuesday 9:00 – 5:00 pm MEETING Newberry – 3rd FloorWednesday 9:00 – 10:30 am MEETING Newberry – 3rd Floor

11:00 – 12:30 pm Joint w/O&O, BR&R Kabacoff – Riverside Bldg1:45 – 3:00 pm MEETING Newberry – 3rd Floor3:30 – 5:00 pm Hosting: FHIR-I Newberry – 3rd Floor

Thursday 9:00 – 5:00 pm MEETING Newberry – 3rd FloorFriday 9:00 – 3:00 pm MEETING Camp – 3rd Floor

Day Time Event Room

Page 10:  · 4 January Working Group Meeting MEETINGS Day Time Event Room AFFILIATE DUE DILIGENCE COMMITTEE (ADDC) Will not meet in January ANESTHESIA (GAS) Will not meet in January

10 January Working Group Meeting

MEETINGS

IMPLEMENTABLE TECHNOLOGY SPECIFICATIONS (ITS)Tuesday 9:00 – 10:30 am Hosting: FHIR-I Bridge – Riverside Bldg

11:00 – 12:30 pm MEETING Bridge – Riverside Bldg1:45 – 5:00 pm MEETING Windward – Riverside Bldg

INFRASTRUCTURE & MESSAGING (InM)Tuesday 9:00 – 10:30 am MEETING Windward – Riverside Bldg

11:00 – 12:30 pm Hosting: FHIR-I Eglington Winton – 2nd Floor1:45 – 3:00 pm MEETING Leeward – Riverside Bldg3:30 – 5:00 pm Hosting: FHIR-I Ascot – 3rd Floor

Thursday 9:00 – 10:30 am Joint w/Voc, CGIT Magazine – 3rd Floor

INTERNATIONAL COUNCIL MEETING Sunday 12:30 – 1:30 pm Luncheon St. James Ballroom – 3rd Floor

1:45 – 5:00 pm MEETING Jefferson Ballroom – 3rd FloorThursday 12:30 – 5:00 pm Affiliate Chair or Designated Rep

Luncheon/MeetingJackson – 3rd Floor

ISO TC215 & DICOMFriday 9:00 am – 3:00 pm MEETING Steering – Riverside Complex

LEARNING HEALTH SYSTEMS (LHS)Wednesday 1:45 – 3:00 pm MEETING Norwich – 3rd FloorThursday 9:00 – 10:30 am Joint w/PC St. James – 3rd Floor

3:30 – 5:00 pm MEETING Norwich – 3rd Floor

MOBILE HEALTH (MH)Tuesday 9:00 – 10:30 am Joint w/EHR Commerce – 3rd Floor

1:45 – 3:00 pm Joint w/CBCP, Sec Canal – 3rd Floor5:15 – 6:15 pm MEETING Ascot – 3rd Floor

Wednesday 9:00 – 3:00 pm MEETING Fulton – 3rd Floor3:30 – 5:00 pm Joint w/Dev Windsor – 3rd Floor

Thursday 9:00 – 12:30 pm MEETING Marlborough A – 2nd FloorFriday 9:00 – 5:00 pm MEETING Kabacoff – Riverside Bldg

MODELING & METHODOLOGY (MnM)Monday 1:45 – 3:00 pm MEETING Windward – Riverside Bldg

3:30 – 5:00 pm Joint w/FHIR-I, II, O&O, PC Commerce – 3rd FloorWednesday 9:00 – 10:30 am Joint w/Voc, FHIR-I Commerce – 3rd Floor

11:00 – 12:30 pm Joint w/Voc Norwich – 3rd Floor1:45 – 3:00 pm Hosting: FHIR-I Windward – Riverside Bldg

Thursday 9:00 – 10:30 am MEETING Windward – Riverside Bldg11:00 – 12:30 pm Hosting: FHIR-I Pelican – Riverside Bldg5:30 – 8:00 pm Facilitators’ Roundtable Dinner/

Meeting – Joint w/FHIR-I, VocCommerce – 3rd Floor

Day Time Event Room

Page 11:  · 4 January Working Group Meeting MEETINGS Day Time Event Room AFFILIATE DUE DILIGENCE COMMITTEE (ADDC) Will not meet in January ANESTHESIA (GAS) Will not meet in January

MEETINGS

On-Site Meeting Schedule & Hotel Guide 11

NETWORKING RECEPTION Wednesday 5:15 – 6:45 pm RECEPTION The District – 3rd Floor

NURSES BREAKFAST/MEETING Tuesday 7:00 – 8:00 am MEETING Parish – 3rd Floor

ORDERS & OBSERVATIONS (O&O)Monday 9:00 – 12:30 pm MEETING Ascot – 3rd Floor

1:45 – 3:00 pm Hosting: CQI Kabacoff – Riverside Bldg3:30 – 5:00 pm Joint w/FHIR-I, II, MnM, PC Commerce – 3rd Floor

Tuesday 9:00 – 10:30 am Hosting: Dev Kabacoff – Riverside Bldg11:00 – 12:30 pm Hosting: BR&R, Dev Kabacoff – Riverside Bldg1:45 – 3:00 pm MEETING Pelican – Riverside Bldg3:30 – 5:00 pm Joint w/PC, CIMI, Voc Jefferson Ballroom – 3rd Floor

Wednesday 9:00 – 10:30 am MEETING Windward – Riverside Bldg11:00 – 12:30 pm Hosting: BR&R, II Kabacoff – Riverside Bldg1:45 – 3:00 pm Hosting: FHIR-I, PC, Pharm Jefferson Ballroom – 3rd Floor3:30 – 5:00 pm MEETING Windward – Riverside Bldg

Thursday 9:00 – 10:30 am Hosting: CDS, Templates Windsor – 3rd Floor11:00 – 12:30 pm Hosting: FHIR-I Windsor – 3rd Floor1:45 – 3:00 pm Joint w/CS Marlborough A – 2nd Floor3:30 – 5:00 pm Hosting: CIMI Fulton – 3rd Floor

Friday 9:00 – 10:30 am MEETING Royal – 3rd Floor

PATIENT ADMINISTRATION (PA)Monday 9:00 – 5:00 pm MEETING Durham – 3rd FloorTuesday 9:00 – 10:30 am Hosting: FHIR-I Durham – 3rd Floor

11:00 – 5:00 pm MEETING Durham – 3rd FloorWednesday 9:00 – 10:30 am MEETING Durham – 3rd Floor

11:00 – 12:30 pm Hosting: PC Durham – 3rd Floor1:45 – 5:00 pm MEETING Durham – 3rd Floor

Thursday 9:00 – 10:30 am MEETING Durham – 3rd Floor11:00 – 12:30 pm Hosting: FM Durham – 3rd Floor1:45 – 3:30 pm MEETING Durham – 3rd Floor

PATIENT CARE (PC)Monday 9:00 – 10:30 am MEETING Windsor – 3rd Floor

11:00 – 12:30 pm Hosting: EC, FHIR-I, SD Jefferson Ballroom – 3rd Floor1:45 – 3:00 pm Joint w/EHR, BR&R, CIMI, CIC, EC Jefferson Ballroom – 3rd Floor3:30 – 5:00 pm Joint w/FHIR-I, II, MnM, O&O Commerce – 3rd Floor

Tuesday 9:00 – 10:30 am Hosting: CIMI, EC Jefferson Ballroom – 3rd Floor11:00 – 12:30 pm MEETING Magazine – 3rd Floor 1:45 – 3:00 pm Hosting: FHIR-I Magazine – 3rd Floor 3:30 – 5:00 pm Hosting: CIMI, O&O, Voc Jefferson Ballroom – 3rd Floor

Day Time Event Room

Page 12:  · 4 January Working Group Meeting MEETINGS Day Time Event Room AFFILIATE DUE DILIGENCE COMMITTEE (ADDC) Will not meet in January ANESTHESIA (GAS) Will not meet in January

12 January Working Group Meeting

MEETINGS

PC (continued)Wednesday 9:00 – 10:30 am MEETING Magazine – 3rd Floor

11:00 – 12:30 pm Joint w/PA Durham – 3rd Floor12:30 – 1:30 pm Luncheon/Meeting Magazine – 3rd Floor1:45 – 3:00 pm Joint w/O&O, FHIR-I, Pharm Jefferson Ballroom – 3rd Floor3:30 – 5:00 pm MEETING Magazine – 3rd Floor

Thursday 9:00 – 10:30 am Hosting: LHS St. James – 3rd Floor11:00 – 12:30 pm MEETING Jackson – 3rd Floor12:30 – 1:30 pm Luncheon/Meeting Magazine – 3rd Floor1:45 – 3:00 pm Hosting: BR&R, FHIR-I St. James – 3rd Floor

PAYER SUMMITMonday 8:00 – 5:00 pm Summit Fulton – 3rd FloorTuesday 9:00 – 12:30 pm Summit Fulton – 3rd Floor

PHARMACY (Pharm)Monday 9:00 – 5:00 pm MEETING Eglington Winton – 2nd FloorTuesday 9:00 – 10:30 am MEETING Marlborough A – 2nd Floor

11:00 – 12:30 pm Hosting: FHIR-I Marlborough A – 2nd Floor1:45 – 3:00 pm MEETING Marlborough A – 2nd Floor3:30 – 5:00 pm Joint w/PH Windsor – 3rd Floor

Wednesday 9:00 – 12:30 pm MEETING Eglington Winton – 2nd Floor1:45 – 3:00 pm Joint w/O&O, FHIR-I, PC Jefferson Ballroom – 3rd Floor3:30 – 5:00 pm MEETING Eglington Winton – 2nd Floor

Thursday 9:00 – 5:00 pm MEETING Camp – 3rd Floor

PHYSICIANS BREAKFAST/MEETINGWednesday 7:00 – 8:00 am MEETING Parish – 3rd Floor

POLICY ADVISORY COMMITTEE (PAC)Wednesday 9:00 – 10:30 am MEETING Ascot – 3rd Floor

PROCESS IMPROVEMENT COMMITTEE (PIC)Monday 3:30 – 5:00 pm MEETING Windward – Riverside Bldg

PRODUCT LINE ARCHITECTURE PROGRAM (PLA)Monday 1:45 – 3:00 pm Joint w/Publishing, SGB Pelican – Riverside BldgFriday 8:00 – 9:00 am MEETING Fulton – 3rd Floor

PROJECT SERVICESThursday 1:45 – 3:00 pm MEETING Ascot – 3rd Floor

PUBLIC HEALTH (PH)Monday 9:00 – 3:00 pm MEETING Marlborough A – 2nd Floor

3:30 – 5:00 pm Hosting: FHIR-I Marlborough A – 2nd FloorTuesday 9:00 – 3:00 pm MEETING Windsor – 3rd Floor

Day Time Event Room

Page 13:  · 4 January Working Group Meeting MEETINGS Day Time Event Room AFFILIATE DUE DILIGENCE COMMITTEE (ADDC) Will not meet in January ANESTHESIA (GAS) Will not meet in January

MEETINGS

On-Site Meeting Schedule & Hotel Guide 13

PH (continued)Tuesday (continued) 3:30 – 5:00 pm Hosting: Pharm Windsor – 3rd FloorWednesday 9:00 – 5:00 pm MEETING Marlborough A – 2nd FloorThursday 9:00 – 3:00 pm MEETING Fulton – 3rd Floor

PUBLISHING Monday 1:45 – 3:00 pm Hosting: PLA, SGB Pelican – Riverside Bldg

3:30 – 5:00 pm MEETING Kabacoff – Riverside BldgWednesday 9:00 – 10:30 am MEETING Norwich – 3rd Floor

SECURITY (Sec)Monday 1:45 – 5:00 pm Joint w/CBCP Parish – 3rd FloorTuesday 9:00 – 12:30 pm MEETING Royal – 3rd Floor

1:45 – 3:00 pm Joint w/CBCP, MH Canal – 3rd Floor3:30 – 5:00 pm MEETING Norwich – 3rd Floor

Wednesday 9:00 – 10:30 am Joint w/EHR, CBCP, FHIR-I Jefferson Ballroom – 3rd Floor1:45 – 3:00 pm Hosting: FHIR-I Royal – 3rd Floor3:30 – 5:00 pm MEETING Royal – 3rd Floor

Thursday 9:00 – 10:30 am Hosting: CBCP, FHIR-I Kabacoff – Riverside Bldg11:00 – 12:30 pm MEETING Royal – 3rd Floor

SERVICES ORIENTED ARCHITECTURE (SOA) Monday 1:45 – 5:00 pm MEETING Royal – 3rd FloorTuesday 9:00 – 10:30 am Hosting: FHIR-I Ascot – 3rd Floor

11:00 – 5:00 pm MEETING Jackson – 3rd FloorWednesday 9:00 – 5:00 pm MEETING Canal – 3rd Floor

STANDARDS GOVERNANCE BOARD (SGB)Sunday 11:00 – 12:30 pm Joint w/ARB Fulton – 3rd FloorMonday 1:45 – 3:00 pm Joint w/PLA, Publishing Pelican – Riverside BldgFriday 9:00 – 12:30 pm MEETING Fulton – 3rd Floor

STEERING DIVISIONSMonday 7:00 – 8:30 pm Domain Experts Camp – 3rd Floor

Foundation & Technology Canal – 3rd FloorStructure and Semantic Design Magazine – 3rd FloorTechnical and Support Services Jackson – 3rd Floor

STRUCTURED DOCUMENTS (SD)Monday 9:00 – 10:30 am MEETING St. James Ballroom – 3rd Floor

11:00 – 12:30 pm Joint w/PC, EC, FHIR-I Jefferson Ballroom – 3rd Floor1:45 – 3:00 pm MEETING Magazine – 3rd Floor3:30 – 5:00 pm Hosting: FHIR-I Magazine – 3rd Floor

Tuesday 9:00 – 10:30 am MEETING Magazine – 3rd Floor11:00 – 12:30 pm Joint w/Voc Jefferson Ballroom – 3rd Floor

Day Time Event Room

Page 14:  · 4 January Working Group Meeting MEETINGS Day Time Event Room AFFILIATE DUE DILIGENCE COMMITTEE (ADDC) Will not meet in January ANESTHESIA (GAS) Will not meet in January

14 January Working Group Meeting

MEETINGS

SD (continued)Tuesday (continued) 1:45 – 3:00 pm MEETING Royal – 3rd Floor

3:30 – 5:00 pm Hosting: FHIR-I Royal – 3rd FloorWednesday 9:00 – 5:00 pm MEETING Jackson – 3rd FloorThursday 9:00 – 12:30 pm MEETING Canal – 3rd Floor

1:45 – 3:00 pm Hosting: FHIR-I Canal – 3rd Floor3:30 – 5:00 pm MEETING Canal – 3rd Floor

Friday 9:00 – 10:30 am Joint w/Templates, EST Canal – 3rd Floor

TECHNICAL STEERING COMMITTEE (TSC) MEETINGSSaturday 9:00 – 12:30 pm MEETING Newberry – 3rd Floor

12:30 – 1:30 pm Luncheon St. James Ballroom – 3rd Floor1:45 – 5:00 pm MEETING Newberry – 3rd Floor

Sunday 5:15 – 6:15 pm MEETING Fulton – 3rd FloorMonday 5:15 – 6:15 pm Co-Chair Dinner/Meeting St. Charles Ballroom – 3rd FloorTuesday 12:30 – 1:30 pm Luncheon/Meeting Jackson – 3rd Floor

TEMPLATESMonday 1:45 – 3:00 pm MEETING Ascot – 3rd FloorTuesday 3:30 – 5:00 pm MEETING Pelican – Riverside BldgWednesday 1:45 – 3:00 pm Joint w/CGIT, FHIR-I Bridge – Riverside BldgThursday 9:00 – 10:30 am Joint w/O&O, CDS Windsor – 3rd FloorFriday 9:00 – 10:30 am Hosting: EST, SD Magazine – 3rd Floor

US REALM STEERING COMMITTEEWednesday 7:00 – 8:00 am Breakfast/Meeting Fulton – 3rd Floor

VOCABULARY (Voc)Sunday 1:45 – 5:00 pm MEETING Canal – 3rd FloorMonday 9:00 – 5:00 pm MEETING Jackson – 3rd FloorTuesday 7:00 – 10:30 am MEETING Eglington Winton – 2nd Floor

11:00 – 12:30 pm Hosting: SD Jefferson Ballroom – 3rd Floor1:45 – 3:00 pm MEETING Kabacoff – Riverside Bldg3:30 – 5:00 pm Joint w/PC, CIMI, O&O Jefferson Ballroom – 3rd Floor

Wednesday 9:00 – 10:30 am Hosting: FHIR-I, MnM Commerce – 3rd Floor11:00 – 12:30 pm Hosting: MnM Norwich – 3rd Floor1:45 – 5:00 pm MEETING Kabacoff – Riverside Bldg

Thursday 7:00 – 8:00 am MEETING Magazine – 3rd Floor9:00 – 10:30 am Hosting: CGIT, InM Magazine – 3rd Floor11:00 – 12:30 pm Hosting: CGIT Magazine – 3rd Floor1:45 – 3:00 pm Hosting: CIMI, CGIT Magazine – 3rd Floor3:30 – 5:00 pm MEETING Magazine – 3rd Floor5:30 – 8:00 pm Facilitators’ Roundtable Dinner/

Meeting – Joint w/FHIR-I, MnMCommerce – 3rd Floor

Day Time Event Room

Page 15:  · 4 January Working Group Meeting MEETINGS Day Time Event Room AFFILIATE DUE DILIGENCE COMMITTEE (ADDC) Will not meet in January ANESTHESIA (GAS) Will not meet in January

TUTORIALS AT A GLANCE

On-Site Meeting Schedule & Hotel Guide 15

Topic Class ID Room SUN

PMMONAM

MONPM

TUEAM

TUEPM

WEDAM

WEDPM

THUAM

THUPM

Track 1—FHIR®

FHIR Connectathon S1 St. Charles Ballroom – 3F

Sat–Sun

FHIR for Clinicians and Decision Makers M1 Prince of Whales – 2F

Introduction to HL7 FHIR M4 Prince of Whales – 2F

HAPI on FHIR M5 Chequers – 2F

FHIR for Architects T7 Prince of Whales – 2F

FHIR for Specifiers T10 Prince of Whales – 2F

Introduction to FHIR for Software Developers W13 Prince of Whales – 2F

C-CDA on FHIR W14 Chequers – 2F

Understanding and Using Terminology in HL7 FHIR W16 Cambridge – 2F

FHIR for Clinical and Administrative Workflows W17 Prince of Whales – 2F

HL7 FHIR STU3 Proficiency Exam Review W18 Chequers – 2F

Precision Medicine via FHIR: From Design to Deployment TH22 Cambridge – 2F

HL7 FHIR STU3 Proficiency Exam TH23 Prince of Whales – 2F 2 – 4

Track 2—CDA® & C–CDAIntroduction to Clinical Document Architecture T8 Cambridge – 2F

Attachments for Reimbursement, Authorization, and Referrals: Overview for Managers, Architects and Implementers

T9 Chequers – 2F

Consolidated CDA 2.1 T11 Cambridge – 2F

Attachments: Technical Introduction for Architects and Implementers T12 Chequers – 2F

CDA Template Design in Theory and Practice TH19 Prince of Whales – 2F

Track 3—General Interest & Special TopicsOverview of HL7 Standards for Interoperability M2 Cambridge – 2F

Healthcare Challenges, Technological Advances, and HL7’s Response M3 Chequers – 2F

Implementing Standards for Real World Success M6 Cambridge – 2F

Driving Health Information Exchange Using XDS with CDA & FHIR W15 Cambridge – 2F

US Law MACRA: Role of Standards in QPP, MU3 and the Changing World of Provider Reimbursement (Volume to Value) TH20 Cambridge – 2F

On–the–Fly Data Capture Tooling for FHIR/HL7 V2 TH21 Chequers – 2F

Implementing Interoperability for US Regulatory Compliance: MACRA, Meaningful Use, and 21st Century Cures TH24 Chequers – 2F

Track 4—HL7 Information Forums—FREE TUTORIALSOrientation for First-Time Attendees F1 Jackson – 3F 3 – 4

Understanding the HL7 International Organization—From Process to Governance F2 Jackson – 3F 4 – 5

Orientation for First-Time Attendees F3 Prince of Whales – 2F 7 – 8

ISO IDMP, Substances and Allergies F4 Cambridge – 2F 7 – 8

Glossary Management—Defining and Managing the Terms Used by Healthcare SDOs F5 Cambridge – 2F 7 – 8

Introduction to Germany F6 Prince of Whales – 2F 7 – 8

Work Group Facilitator Training Workshop F7 Cambridge – 2F 7 – 8

GS1 Standards for Supply Chain Meets HL7 F8 Prince of Whales – 2F 7 – 8

Newly Elected Co-Chair Training F9 Cambridge – 2F 7 – 8

How to Develop and Teach a Tutorial for HL7 F10 Prince of Whales – 2F 7 – 8

Room Key: 2F – Second Floor; 3F – Third Floor

Page 16:  · 4 January Working Group Meeting MEETINGS Day Time Event Room AFFILIATE DUE DILIGENCE COMMITTEE (ADDC) Will not meet in January ANESTHESIA (GAS) Will not meet in January

16 January Working Group Meeting

MEETINGS AT A GLANCE Meeting Grid Includes Both Hosting and Joint Sessions

Sunday Monday Tuesday Wednesday Thursday Friday

AM PM AM PM AM PM AM PM AM PM AM PM

Affiliate Due Diligence Committee Will not meet in January

Anesthesia Will not meet in January

Architectural Review Board Q2 Q2 Q3

Arden Syntax

Attachments Q2

Biomedical Research & Regulation

Birds of a Feather – Enterprise Architect Users 5:15–6:15

Birds of a Feather – FHIR Registry 7:30–9:30

Birds of a Feather – HL7 Payers User Group 5:30–6:30

Board of Directors’ Meeting Lunch &

CDA Management Group Q4

Clinical Decision Support Q1

Clinical Genomics

Clinical Information Modeling Initiative Q2 Lunch &

Clinical Interoperability Council Q3 Q2 Q2 Q3

Clinical Quality Information Q1

Clinical Statement Q3

Clinicians on FHIR Lunch Q3

Co–Chair Information 5:15–7:00 7:00–8:00

Community-Based Care and Privacy Q3

Conformance Q3

Education Lunch &

Electronic Health Records

Electronic Services and Tools Q2 Q1 Q1

Emergency Care Q2 Q4 Q1 Q4 Q3

Facilitators’ Roundtable Dinner/Meeting 5:30–8:00

FHIR Connectathon (Note: There is also a meeting scheduled for

Saturday, 9/10/2018, 5:00–10:00 pm)

FHIR Governance Board Lunch 7:00–8:00 Q4

FHIR Infrastructure & 7:00–10:00

Q3 &

5:30–8:00

FHIR Management Group Lunch Lunch Q4

Financial Management

General Session 8:00–8:45 8:00–8:45 8:00–8:45 8:00–8:45

Governance and Operations Committee Q2

HL7 Terminology Authority

Health Care Devices

Healthcare Standards Integration Q3 Q4

Q1 = 9:00 – 10:30 am; Q2 = 11:00 – 12:30 pm; Q3 = 1:45 – 3:00 pm; Q4 = 3:30 – 5:00 pm DISCLAIMER: Meeting times are subject to change.

Page 17:  · 4 January Working Group Meeting MEETINGS Day Time Event Room AFFILIATE DUE DILIGENCE COMMITTEE (ADDC) Will not meet in January ANESTHESIA (GAS) Will not meet in January

MEETINGS AT A GLANCE

On-Site Meeting Schedule & Hotel Guide 17

Meeting Grid Includes Both Hosting and Joint Sessions

Sunday Monday Tuesday Wednesday Thursday Friday

AM PM AM PM AM PM AM PM AM PM AM PM

Imaging Integration Q4 Q3

Implementable Technology Specifications

Infrastructure & Messaging Q1

International Council Lunch &

Lunch &

ISO TC215 & DICOM Q3

Learning Health Systems Q3 Q1 Q4

Mobile Health Q1 Q3 & 5:15–6:15

Modeling & Methodology Q3 5:30–8:00

Networking Reception 5:15–6:45

Nurses Breakfast/Meeting 7:00–8:00

Orders & Observations Q1

Patient Administration Q3

Patient Care Lunch & Lunch

& Q3

Payer Summit 8:15– 12:30

Pharmacy

Physicians Breakfast/Meeting 7:00–8:00

Policy Advisory Committee Q1

Process Improvement Committee Q4

Product Line Architecture Program Q3 8:00–9:00

Project Services Q3

Public Health Q3

Publishing Q3 Q1 Q3

Security Q1

Services Oriented Architecture

Standards Governance Board Q2 Q3

Steering Divisions:Domain Experts

Foundation & TechnologyStructure & Semantic DesignTechnical & Support Services

7:00–8:30

Structured Documents Q1

Technical Steering Committee Meetings (Note: There is also a meeting scheduled for

Saturday, 5/6, 9:00–5:00 pm)5:15–6:15 5:15–6:15 Lunch

Templates Q3 Q4 Q3 Q1 Q1

US Realm Steering Committee 7:00–8:00

Vocabulary 7:00–8:00 & 7:00–8:00

& &

5:30–8:00

Q1 = 9:00 – 10:30 am; Q2 = 11:00 – 12:30 pm; Q3 = 1:45 – 3:00 pm; Q4 = 3:30 – 5:00 pm DISCLAIMER: Meeting times are subject to change.

Page 18:  · 4 January Working Group Meeting MEETINGS Day Time Event Room AFFILIATE DUE DILIGENCE COMMITTEE (ADDC) Will not meet in January ANESTHESIA (GAS) Will not meet in January

HOTEL MAP

On-Site Meeting Schedule & Hotel Guide 18

Meals & BreaksSt. Charles Foyer – 3rd Floor Jackson – 3rd Floor (Friday only)

General SessionSt. Charles Ballroom – 3rd Floor

Registration3rd Floor

Page 19:  · 4 January Working Group Meeting MEETINGS Day Time Event Room AFFILIATE DUE DILIGENCE COMMITTEE (ADDC) Will not meet in January ANESTHESIA (GAS) Will not meet in January

HOTEL MAP

On-Site Meeting Schedule & Hotel Guide 19

Work Group Co-chair ElectionsThe following HL7 work groups will conduct co-chair elections at this working group meeting.

Work Group # being elected

Anesthesia 1

Attachments 2

Biomedical Research & Regulation 1

CIMI 2

Clinical Decision Support 1

Clinical Genomics 1

Clinical Interoperability Council 1

Clinical Statement 1

Community-Based Care and Privacy 1

Education 1

Electronic Health Record 3

Electronic Services and Tools 1

Work Group # being elected

Emergency Care 1

Health Care Devices 1

Imaging Integration 1

Implementable Technology Specifications 1

Infrastructure & Messaging 1

Patient Administration 2

Patient Care 1

Project Services 1

Security 3

Services Oriented Architecture 1

Structured Documents 1

Vocabulary 2

Page 20:  · 4 January Working Group Meeting MEETINGS Day Time Event Room AFFILIATE DUE DILIGENCE COMMITTEE (ADDC) Will not meet in January ANESTHESIA (GAS) Will not meet in January

3300 Washtenaw Avenue, Suite 227 • Ann Arbor, MI 48104-4261 USAPhone: +1 (734) 677–7777 • Fax: +1 (734) 677–6622 • www.HL7.org • Email: [email protected]

Upcoming HL7 Events

Jan 12–18, 2019

Working Group MeetingHyatt Regency San Antonio on the RiverwalkSan Antonio, Texas

May 12–18, 2018

International Working Group MeetingMaritim Hotel CologneCologne, Germany

Upcoming Working Group Meetings

Upcoming HL7 Events

Feb 20–21, 2018HL7 Genomics ConferenceHouse of Sweden Conference CenterWashington, DC

June 19–21, 2018 HL7 FHIR DevDays The State RoomBoston, Massachusetts

Sep 29–Oct 5, 2018

32nd Annual Plenary & Working Group MeetingHyatt Regency Baltimore Inner HarborBaltimore, Maryland

May 4–10, 2019

International Working Group MeetingLe Centre Sheraton HotelMontreal, Quebec, Canada