44THTH STREET BRIDGE STREET BRIDGEPueblo, ColoradoPueblo, Colorado
December 2006
Project Overview
![Page 2: 4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview](https://reader035.vdocuments.net/reader035/viewer/2022062516/56649db35503460f94aa37c7/html5/thumbnails/2.jpg)
Project TeamProject Team Colorado Department of TransportationColorado Department of Transportation FHWAFHWA Design ConsultantsDesign Consultants
– FIGG FIGG Project Management & Bridge EngineeringProject Management & Bridge Engineering
– PBS&J PBS&J Civil, Roadway, Traffic, Utilities, EnvironmentalCivil, Roadway, Traffic, Utilities, Environmental
– Ayres Associates Ayres Associates Hydraulics & DrainageHydraulics & Drainage
– Goodson/MWWA Goodson/MWWA Geotechnical, GeologyGeotechnical, Geology
– The Szynskie Group The Szynskie Group Lighting & Electrical DesignLighting & Electrical Design
– EDAW EDAW Urban Design & Landscape ArchitectureUrban Design & Landscape Architecture
– Abel Engineering Abel Engineering Survey & ROW SupportSurvey & ROW Support
![Page 3: 4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview](https://reader035.vdocuments.net/reader035/viewer/2022062516/56649db35503460f94aa37c7/html5/thumbnails/3.jpg)
Project HistoryProject History Replacement of existing bridge K-18-ZReplacement of existing bridge K-18-Z
– Structurally Deficient, Functionally ObsoleteStructurally Deficient, Functionally Obsolete Statewide Transportation Plan – 1996Statewide Transportation Plan – 1996 Consultant Services - 2000Consultant Services - 2000 Conceptual Design – 2001/2002Conceptual Design – 2001/2002 Preliminary Design 2003Preliminary Design 2003 Environmental Clearance – 2003 thru 2005Environmental Clearance – 2003 thru 2005 Final Design – 2006Final Design – 2006
![Page 4: 4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview](https://reader035.vdocuments.net/reader035/viewer/2022062516/56649db35503460f94aa37c7/html5/thumbnails/4.jpg)
Project TimelineProject Timeline
90% Plans90% Plans October 18, 2006 October 18, 2006 PS&EPS&E December 18, 2006 December 18, 2006 AdvertisementAdvertisement March 2007 March 2007 Contract AwardContract Award May- June 2007 May- June 2007 Construction (3-4 years)Construction (3-4 years) 2007-2011 2007-2011
![Page 5: 4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview](https://reader035.vdocuments.net/reader035/viewer/2022062516/56649db35503460f94aa37c7/html5/thumbnails/5.jpg)
Project DescriptionProject Description
![Page 6: 4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview](https://reader035.vdocuments.net/reader035/viewer/2022062516/56649db35503460f94aa37c7/html5/thumbnails/6.jpg)
Project Aerial MapProject Aerial Map
River
RR Yard
Mall
Loop Ramp Rd
Floodwall
Bluff
Bluff
To I-25
![Page 7: 4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview](https://reader035.vdocuments.net/reader035/viewer/2022062516/56649db35503460f94aa37c7/html5/thumbnails/7.jpg)
Site PhotoSite Photo
![Page 8: 4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview](https://reader035.vdocuments.net/reader035/viewer/2022062516/56649db35503460f94aa37c7/html5/thumbnails/8.jpg)
Project DescriptionProject Description
• Study CorridorElizabeth St. to Abriendo Ave.
• Construction LimitsMidtown Circle to Corona Ave.
![Page 9: 4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview](https://reader035.vdocuments.net/reader035/viewer/2022062516/56649db35503460f94aa37c7/html5/thumbnails/9.jpg)
Bluff
Arkansas River
Trail
Fishing Pier
Kayak Course
Site Description – West EndSite Description – West End
![Page 10: 4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview](https://reader035.vdocuments.net/reader035/viewer/2022062516/56649db35503460f94aa37c7/html5/thumbnails/10.jpg)
Site Description – East EndSite Description – East End
Railroad Facilities
Midtown Mall
Commercial
Downtown Pueblo
![Page 11: 4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview](https://reader035.vdocuments.net/reader035/viewer/2022062516/56649db35503460f94aa37c7/html5/thumbnails/11.jpg)
Existing Bridge ConditionsExisting Bridge Conditions
Undesirable Roadway GeometryUndesirable Roadway Geometry Insufficient Safety ClearancesInsufficient Safety Clearances Substandard Load Carrying CapacitySubstandard Load Carrying Capacity Structurally DeficientStructurally Deficient Functionally ObsoleteFunctionally Obsolete Insufficient Pedestrian/Bicycle FacilitiesInsufficient Pedestrian/Bicycle Facilities
![Page 12: 4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview](https://reader035.vdocuments.net/reader035/viewer/2022062516/56649db35503460f94aa37c7/html5/thumbnails/12.jpg)
Existing Bridge ConditionsExisting Bridge Conditions
Narrow Lanes, Shoulders, SidewalksNarrow Lanes, Shoulders, Sidewalks
![Page 13: 4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview](https://reader035.vdocuments.net/reader035/viewer/2022062516/56649db35503460f94aa37c7/html5/thumbnails/13.jpg)
Project ConsiderationsProject Considerations
Railroad CoordinationRailroad Coordination City CoordinationCity Coordination UtilitiesUtilities Phasing / Maintenance of TrafficPhasing / Maintenance of Traffic Arkansas River & Recreation AreaArkansas River & Recreation Area Access to Midtown MallAccess to Midtown Mall Construction Access and Staging AreasConstruction Access and Staging Areas Environmental ComplianceEnvironmental Compliance
![Page 14: 4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview](https://reader035.vdocuments.net/reader035/viewer/2022062516/56649db35503460f94aa37c7/html5/thumbnails/14.jpg)
Proposed Roadway SectionProposed Roadway Section
4-Lane Build / 6-Lane Future Capacity4-Lane Build / 6-Lane Future Capacity
![Page 15: 4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview](https://reader035.vdocuments.net/reader035/viewer/2022062516/56649db35503460f94aa37c7/html5/thumbnails/15.jpg)
Proposed Structure & AlignmentProposed Structure & Alignment
![Page 16: 4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview](https://reader035.vdocuments.net/reader035/viewer/2022062516/56649db35503460f94aa37c7/html5/thumbnails/16.jpg)
Proposed AlignmentProposed AlignmentNorth Alignment - AerialNorth Alignment - Aerial
![Page 17: 4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview](https://reader035.vdocuments.net/reader035/viewer/2022062516/56649db35503460f94aa37c7/html5/thumbnails/17.jpg)
Proposed Structure InformationProposed Structure Information
Twin Structures Twin Structures 6-ft 6-ft SeparationSeparation
Average Length:Average Length: 1,137 feet 1,137 feet
5 Spans (151’, 235’, 378’, 5 Spans (151’, 235’, 378’, 228’, 145’)228’, 145’)
Clear Spans:Clear Spans:– Arkansas River & LeveeArkansas River & Levee– River TrailRiver Trail– UPRR & BNSF Yards (w/ pier between)UPRR & BNSF Yards (w/ pier between)– Loop Ramp RoadLoop Ramp Road
![Page 18: 4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview](https://reader035.vdocuments.net/reader035/viewer/2022062516/56649db35503460f94aa37c7/html5/thumbnails/18.jpg)
Proposed Bridge (from Bluff)Proposed Bridge (from Bluff)