40+00 38+00 36+00 34+00 32+00 30+00 28+00 26+00 24+00...

1
0+00 2+00 4+00 6+00 8+00 10+00 12+00 14+00 16+00 18+00 20+00 22+00 24+00 26+00 28+00 30+00 32+00 34+00 36+00 38+00 40+00 NFSR RAILWAY N40.203299 W76.782769 NFSR RAILWAY N40.203327 W76.782661 NFSR RAILWAY N40.203282 W76.782834 HDD ENTRY / EXIT N40.203556 W76.781798 GEOTECH SB-03 100 200 300 400 500 600 -1+00 0+00 2+00 4+00 6+00 8+00 10+00 12+00 14+00 16+00 18+00 20+00 22+00 24+00 26+00 28+00 30+00 32+00 +00 APPROXIMATE BEDROCK 5+16 ACCESS ROAD 11+15 EDGE OF SUSQUEHANNA RIVER S-A22 7+31 BUCKEYE PPL 1+10 GEOTECH SB-03 50' RT. HDD ENTRY / EXIT 0+00 EL.309' 4236' 67' 12° 276' 53' STA. 6+02 EL. 216' STA. 2+70 EL. 251' 77' 4+07 SUNOCO PPL 0+55 TIE-IN EL. 308' TIE-IN EL. 296' 3+06 NFSR RAILWAY 2+87 NFSR RAILWAY 2+55 NFSR RAILWAY 1+32 BUCKEYE PPL 3+32 OH ELECTRIC 2+34 OH ELECTRIC 3+45 UG ELECTRIC 29+48 CL SUSQUEHANNA RIVER S-A22 R = 1 6 0 0 ' L = 3 3 3 ' S = 3 3 5 ' 64' EDGE OF WETLAND W-A18 EDGE OF WETLAND W-A18 63' 0 150 150 300 FEET PROPOSED 20" PIPELINE PA-DA-0003.0000 PA-YO-0064.0000 PA-DA-0001.0000 PA-DA-0001.0001 PA-DA-0002.0000 SUSQUEHANNA RIVER S-A22 EXISTING PIPELINE BUCKEYE EXISTING PIPELINE SUNOCO EXISTING PIPELINE BUCKEYE -INCH HORIZONTAL DIRECTIONAL DRILL REF. DRAWING EROSION & SEDIMENT PLAN AERIAL SITE PLAN PLAN VIEW PROFILE VIEW NO. DESCRIPTION DATE BY CHK DATE REVISIONS DATE APP NOTES Sunoco Logistics Partners L.P. SUNOCO PIPELINE, L.P. 1. ALL COORDINATES SHOWN ARE IN LATITUDE AND LONGITUDE. ALL MSL ELEVATIONS ARE NAD83 2. STATIONING IS BASED ON HORIZONTAL DISTANCES. 3. ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP ARE NOT RESPONSIBLE FOR LOCATION OF FOREIGN UTILITIES SHOWN IN PLOT PLAN OR PROFILE. THE INFORMATION SHOWN HEREON IS FURNISHED WITHOUT LIABILITY ON THE PART OF ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP, FOR ANY DAMAGES RESULTING FROM ERRORS OR OMISSIONS THEREIN. 4. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES. CONTACT ONE CALL AT 811 PRIOR TO DIGGING. 5. SUNOCO EMERGENCY HOTLINE NUMBER IS #1-800-786-7440. PENNSYLVANIA PIPELINE PROJECT LEGEND PERMANENT ROW TEMPORARY CONSTRUCTION ROW TEMPORARY WORKSPACE TEMPORARY ACCESS ROAD PERMANENT ACCESS ROAD SPOIL SPACE ONLY PROPOSED HDD PROPOSED 20" PIPELINE PROPOSED 16" PIPELINE HDD ENTRY-EXIT PEM WETLANDS PSS WETLANDS PFO WETLANDS TO TO DWG NO DWG NO DESCRIPTION DESIGN AND CONSTRUCTION: 1. CONTRACTOR SHALL FIELD VERIFY DEPTH OF ALL EXITING UTILITIES SHOWN OR NOT SHOWN ON THIS DRAWING. 2. THE MINIMUM SEPARATION DISTANCE FROM EXISTING SUBSURFACE UTILITIES SHALL NOT BE LESS THAN 10 FEET AS MEASURED FROM THE OUTSIDE EDGE OF THE UTILITY TO OUTSIDE OF PROPOSED PIPELINE. 3. DESIGNED IN ACCORDANCE WITH CFR 49 195 & ASME B31.4 4. CROSSING PIPE SPECIFICATION: HDD HORZ. LENGTH (L=): HDD PIPE LENGTH (S=): 16" x 0.438" W.T., X-70, API5L, PSL2, ERW, BFW COATING: 14-16 MILS FBE WITH 40 MILS MIN. ARO (POWERCRETE R95) 5. INTERNAL DESIGN PRESSURE 1480 PSIG (SEAM FACTOR 1.0, DESIGN FACTOR 0.50 (HOOP STRESS)). 6. INSTALLATION METHOD: HORIZONTAL DIRECTIONAL DRILL (HDD). 7. PIPELINE WARNING MARKERS SHALL BE INSTALLED ON BOTH SIDES OF ALL ROAD, RAILWAY, AND STREAM CROSSINGS. 8. CARRIER PIPE NOT ENCASED. 9. PIPE / AMBIENT TEMPERATURE MUST BE NO LESS THAN 30°F DURING PULLBACK WITHOUT PRIOR WRITTEN APPROVAL FROM THE ENGINEER. 10. CONDUCT 4-HOUR PRE-INSTALLATION HYDROTEST OF HDD PIPE STRING TO MINIMUM 1850 PSIG. 11. PIPELINE AND CROSSING TO BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH LAST APPROVED AMERICAN RAILWAY ENGINEERING AND MAINTENANCE OF WAY ASSOCIATION SPECIFICATIONS FOR PIPELINES CONVEYING FLAMMABLE AND NON-FLAMMABLE SUBSTANCES. 12. BLASTING NOT PERMITTED. 13. SEE SUNOCO PENNSYLVANIA PIPELINE PROJECT ESRI WEBMAP FOR ACCESS ROAD ALIGNMENT. 16 SHEET 2 SHEET 13 ES-4.20 ES-4.04 SUSQUEHANNA RIVER 1"=300' PA-YO-0063.0000-RRa-16 YORK COUNTY, PENNSYLVANIA - FAIRVIEW TOWNSHIP DAUPHIN COUNTY, PENNSYLVANIA - LOWER SWATARA TOWNSHIP S2-0280A-16 0 ISSUED FOR CONSTRUCTION MRS RMB AAW 01/19/16 01/19/16 01/19/16 EP3 REVISED PER PADEP COMMENTS RECEIVED 01-30-17 DLM RMB CAG 02/01/17 02/01/17 02/01/17 3 DESIGN CHANGE - RELOCATED DRILL ENTRY/EXIT MRS RMB AAW 01/06/17 01/06/17 01/06/17 2 REVISED PER ENGINEERING COMMENTS MRS RMB AAW 08/31/16 08/31/16 08/31/16 1 REVISED PER COMMENTS FROM REI REVIEW MRS RMB AAW 02/19/16 02/19/16 02/19/16 6706' 6735' PROPOSED 16" PIPELINE MATCHLINE STA. 34+00 SEE PA-YO-0063.0000-RRb GEOTECH SB-03 -NG EL. 308' -COMPLETION DEPTH EL. 255' -FILL (0.0' - 14.7') -SILTSTONE \ SANDSTONE (37.0' - 43.2') -CL (14.7' - 37.0') -MAROON SANDSTONE (43.2' - 53.0') NOTE: REFER TO TEST BORING LOG S2-0280 FOR COMPLETE SOIL MATERIAL DESCRIPTION SUNOCO EASEMENT LIMITS - NOT LOD 33+

Upload: others

Post on 01-Feb-2021

20 views

Category:

Documents


0 download

TRANSCRIPT

  • 0+

    00

    2+

    00

    4+

    00

    6+

    00

    8+

    00

    10+

    00

    12+

    00

    14+

    00

    16+

    00

    18+

    00

    20+

    00

    22+

    00

    24+

    00

    26+

    00

    28+

    00

    30+

    00

    32+

    00

    34+

    00

    36+

    00

    38+

    00

    40+

    00

    NFSR RAILWAY

    N40.203299

    W76.782769

    NFSR RAILWAY

    N40.203327

    W76.782661

    NFSR RAILWAY

    N40.203282

    W76.782834

    HDD ENTRY / EXIT

    N40.203556

    W76.781798

    GEOTECH SB-03

    100

    200

    300

    400

    500

    600

    -1+000+002+004+006+008+0010+0012+0014+0016+0018+0020+0022+0024+0026+0028+0030+0032+0034+00

    APPROXIMATE

    BEDROCK

    5+

    16 A

    CC

    ES

    S R

    OA

    D

    11+

    15 E

    DG

    E

    OF

    S

    US

    QU

    EH

    AN

    NA

    RIV

    ER

    S

    -A

    22

    7+

    31 B

    UC

    KE

    YE

    P

    PL

    1+

    10 G

    EO

    TE

    CH

    S

    B-03

    50' R

    T.

    HD

    D E

    NT

    RY

    / E

    XIT

    0+

    00

    EL.309'

    4236'

    67'

    12°

    276'

    53'

    STA. 6+02

    EL. 216'

    STA. 2+70

    EL. 251'

    77'

    4+

    07 S

    UN

    OC

    O P

    PL

    0+

    55 T

    IE

    -IN

    EL. 308'

    TIE

    -IN

    E

    L. 296'

    3+

    06 N

    FS

    R R

    AILW

    AY

    2+

    87 N

    FS

    R R

    AILW

    AY

    2+

    55 N

    FS

    R R

    AILW

    AY

    1+

    32 B

    UC

    KE

    YE

    P

    PL

    3+

    32 O

    H E

    LE

    CT

    RIC

    2+

    34 O

    H E

    LE

    CT

    RIC

    3+

    45 U

    G E

    LE

    CT

    RIC

    29+

    48 C

    L

    SU

    SQ

    UE

    HA

    NN

    A

    RIV

    ER

    S

    -A

    22

    R=16

    00

    '

    L=

    33

    3'

    S=

    33

    5'

    64'

    ED

    GE

    O

    F W

    ET

    LA

    ND

    W-A

    18

    ED

    GE

    O

    F W

    ET

    LA

    ND

    W-A

    18

    63'

    0150 150 300

    FEET

    PROPOSED 20" PIPELINE

    PA-DA-0003.0000

    PA-YO-0064.0000

    PA-DA-0001.0000

    PA-DA-0001.0001

    PA-DA-0002.0000

    SUSQUEHANNA RIVER

    S-A22

    EXISTING PIPELINE

    BUCKEYE

    EXISTING PIPELINE

    SUNOCO

    EXISTING PIPELINE

    BUCKEYE

    -INCH HORIZONTAL DIRECTIONAL DRILL

    REF. DRAWING

    EROSION & SEDIMENT PLAN

    AERIAL SITE PLAN

    PLAN VIEW

    PROFILE VIEW

    NO. DESCRIPTION DATEBY CHK DATE

    REVISIONS

    DATEAPP

    NOTES Sunoco LogisticsPartners L.P.

    SUNOCO PIPELINE, L.P.

    1. ALL COORDINATES SHOWN ARE IN LATITUDE AND LONGITUDE. ALL MSL ELEVATIONS ARE NAD83

    2. STATIONING IS BASED ON HORIZONTAL DISTANCES.

    3. ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP ARE NOT RESPONSIBLE FOR LOCATION

    OF FOREIGN UTILITIES SHOWN IN PLOT PLAN OR PROFILE. THE INFORMATION SHOWN HEREON IS

    FURNISHED WITHOUT LIABILITY ON THE PART OF ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE,

    LP, FOR ANY DAMAGES RESULTING FROM ERRORS OR OMISSIONS THEREIN.

    4. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES. CONTACT ONE CALL AT 811 PRIOR TO

    DIGGING.

    5. SUNOCO EMERGENCY HOTLINE NUMBER IS #1-800-786-7440.

    PENNSYLVANIA PIPELINE PROJECT

    LEGEND

    PERMANENT ROW

    TEMPORARY CONSTRUCTION ROW

    TEMPORARY WORKSPACE

    TEMPORARY ACCESS ROAD

    PERMANENT ACCESS ROAD

    SPOIL SPACE ONLY

    PROPOSED HDD

    PROPOSED 20" PIPELINE

    PROPOSED 16" PIPELINE

    HDD ENTRY-EXIT

    PEM WETLANDS

    PSS WETLANDS

    PFO WETLANDS

    TO

    TO

    DWG NO DWG NO DESCRIPTION

    DESIGN AND CONSTRUCTION:

    1. CONTRACTOR SHALL FIELD VERIFY DEPTH OF ALL EXITING UTILITIES SHOWN OR NOT SHOWN ON

    THIS DRAWING.

    2. THE MINIMUM SEPARATION DISTANCE FROM EXISTING SUBSURFACE UTILITIES SHALL NOT BE LESS

    THAN 10 FEET AS MEASURED FROM THE OUTSIDE EDGE OF THE UTILITY TO OUTSIDE OF PROPOSED

    PIPELINE.

    3. DESIGNED IN ACCORDANCE WITH CFR 49 195 & ASME B31.4

    4. CROSSING PIPE SPECIFICATION:

    HDD HORZ. LENGTH (L=):

    HDD PIPE LENGTH (S=):

    16" x 0.438" W.T., X-70, API5L, PSL2, ERW, BFW

    COATING: 14-16 MILS FBE WITH 40 MILS MIN. ARO (POWERCRETE R95)

    5. INTERNAL DESIGN PRESSURE 1480 PSIG (SEAM FACTOR 1.0, DESIGN FACTOR 0.50 (HOOP STRESS)).

    6. INSTALLATION METHOD: HORIZONTAL DIRECTIONAL DRILL (HDD).

    7. PIPELINE WARNING MARKERS SHALL BE INSTALLED ON BOTH SIDES OF ALL ROAD, RAILWAY, AND

    STREAM CROSSINGS.

    8. CARRIER PIPE NOT ENCASED.

    9. PIPE / AMBIENT TEMPERATURE MUST BE NO LESS THAN 30°F DURING PULLBACK WITHOUT PRIOR

    WRITTEN APPROVAL FROM THE ENGINEER.

    10. CONDUCT 4-HOUR PRE-INSTALLATION HYDROTEST OF HDD PIPE STRING TO MINIMUM 1850 PSIG.

    11. PIPELINE AND CROSSING TO BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH LAST APPROVED

    AMERICAN RAILWAY ENGINEERING AND MAINTENANCE OF WAY ASSOCIATION SPECIFICATIONS FOR

    PIPELINES CONVEYING FLAMMABLE AND NON-FLAMMABLE SUBSTANCES.

    12. BLASTING NOT PERMITTED.

    13. SEE SUNOCO PENNSYLVANIA PIPELINE PROJECT ESRI WEBMAP FOR ACCESS ROAD ALIGNMENT.

    16

    SHEET 2SHEET 13

    ES-4.20 ES-4.04

    SUSQUEHANNA RIVER

    1"=300'

    PA-YO-0063.0000-RRa-16

    YORK COUNTY, PENNSYLVANIA - FAIRVIEW TOWNSHIP

    DAUPHIN COUNTY, PENNSYLVANIA - LOWER SWATARA TOWNSHIP

    S2-0280A-16

    0 ISSUED FOR CONSTRUCTION MRS RMB AAW 01/19/1601/19/16 01/19/16

    EP3 REVISED PER PADEP COMMENTS RECEIVED 01-30-17 DLM RMB CAG02/01/17 02/01/1702/01/17

    3 DESIGN CHANGE - RELOCATED DRILL ENTRY/EXIT MRS RMB AAW01/06/17 01/06/1701/06/17

    2 REVISED PER ENGINEERING COMMENTSMRS RMB AAW08/31/1608/31/16 08/31/16

    1 REVISED PER COMMENTS FROM REI REVIEWMRS RMB AAW02/19/1602/19/16 02/19/16

    6706'

    6735'

    PROPOSED 16" PIPELINE

    MA

    TC

    HL

    IN

    E S

    TA

    . 3

    4+

    00

    SE

    E P

    A-Y

    O-0

    06

    3.0

    00

    0-R

    Rb

    GEOTECH SB-03

    -NG EL. 308'

    -COMPLETION

    DEPTH EL. 255'

    -FILL (0.0' - 14.7')

    -SILTSTONE \ SANDSTONE

    (37.0' - 43.2')

    -CL (14.7' - 37.0')

    -MAROON SANDSTONE

    (43.2' - 53.0')

    NOTE: REFER TO TEST BORING LOG S2-0280

    FOR COMPLETE SOIL MATERIAL DESCRIPTION

    SUNOCO EASEMENT

    LIMITS - NOT LOD

    33+

    Sheets and ViewsPA-YO-0063.0000-RRa-16