422-3 pont roulant bipoutre 40-10t hall tg (1-2)
DESCRIPTION
Konecranes overhead crane 40-40 tons service manual 1 (French)TRANSCRIPT
![Page 1: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/1.jpg)
B 01/12/01 MOLEON CHABOT COLMAN AS-BUILT ASB
A 08/09/00 MOLEON CHABOT COLMAN First issue FUS
REV DATE AUTHOR VISA CHECK BY VISA APPR. BY VISA MODIFICATIONS STATUS
SCALE : SUPPLIER NAME: N° :
SIZE : A4 GGP - KONECRANES SPECIFICATION N°: G01
RADES II – TUNISIA
471 MW
COMBINED CYCLE PROJECT
DOSSIER DE MAINTENANCE FOURNISSEURVolume 1/2
PONT ROULANT BIPOUTRE 40t/10t "HALL TURBINE GAZ"Repère : 10DMMAR002
abcdENERGY
ALL RIGHTS PERTAINING TO THE REPRODUCTION, TRANSFORMATION AND USE OF THIS DOCUMENT IN ANY FORM ORMANNER REMAIN THE EXCLUSIVE PROPERTY OF ALSTOM.
POWER PLANTS
Nr R A D 0 1 M - - G 0 1 MM 2 0 1-
![Page 2: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/2.jpg)
Référence informatique Référence du document Date de création Date de mise à jour Indice
13SM0000.DOC 76007710\PR01-FR\UM1-1 01/05/2000 - A
a b c dDOSSIER DE MAINTENANCE FOURNISSEUR
RADES II - TUNISIASOMMAIRE
Nom de l'équipement : PONT ROULANT BIPOUTRE - "HALL TURBINE GAZ"Charge(s) nominale(s) : 40 t / 10 t - Portée : 20,000 m
Numéro Manuelde Maintenance :
Repère fonctionneléquipement
: 10DMMAR002(7600-771-0)
RAD01M...G01MM201(2 Volumes)
Nom du fournisseur : CGP-KONECRANES
TABLE DES MATIERES N° DOCUMENTEQUIVALENT
N° CHAPITREEQUIVALENT
1 DESCRIPTION DE L'EQUIPEMENT RAD01...G01DS201et 76007710 \ PR01-FR \ UM1-1 | NT12
Voir "11"et "12"
2 HYGIENE ET SECURITE 76007710 \ PR01-FR \ UM1-1 | IE13 Voir "13"et "21"
Page(s) 28
3 MAINTENANCE 76007710 \ PR01-FR \ UM1-1 | GM21 Voir "21"
3.1 Préventive 76007710 \ PR01-FR \ UM1-1 | GM21 Voir "21"Page(s) 3
3.1.1 Consignes de maintenance préventive 76007710 \ PR01-FR \ UM1-1 | GM21 Voir "21"Page(s) 2, 3
3.1.2 Programme de maintenance préventive 76007710 \ PR01-FR \ UM1-1 | GM21 Voir "21"Page(s) 6, 26
3.1.3 Programme et consignes de lubrification 76007710 \ PR01-FR \ UM1-1 | GM21et 76007710 \ PR01-FR \ UM1-1 | IL23
Voir "21"Page(s) 26
et "23"
3.1.4 Outillage spécial et appareils de manutention 76007710 \ PR01-FR \ UM1-1 | OM24Non applicable
Voir "24"
3.1.5 Consignes de stockage 76007710 \ PR01-FR \ UM1-1 | MS25Voir Chapitre 4 "Accessoires"
Voir "25"Page(s) 62, 116
3.1.6 Consignes de conservation 76007710 \ PR01-FR \ UM1-1 | MS25Voir Chapitre 4 "Accessoires"
Voir "25"Page(s) 62, 116
3.2 Consignes de maintenance corrective 76007710 \ PR01-FR \ UM1-1 | RP22Voir Chapitre 4 "Accessoires"
Voir "22"
4 ACCESSOIRES 76007710 \ PR01-FR \ UM1-1 | AC03Voir Volume 2
Voir "3"
5 PLANS ET NOMENCLATURES 76007710 \ PR01-FR \ UM1-1 | DS04 Voir "4"
![Page 3: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/3.jpg)
A 30/05/00 MOLEON First issue FUS
REV DATE AUTHOR VISA. CHECK BY VISA APPR. BY VISA MODIFICATIONS STATUS
SCALE : SUPPLIER NAME: N° :
SIZE :A4 CGP - KONECRANES SPECIFICATION N°: G01
RADES II – TUNISIA
471 MW
COMBINED CYCLE PROJECT
DATA SHEETSFor
GAS TURBINE HALL TRAVELLING CRANE
abcdENERGY
ALL RIGHTS PERTAINING TO THE REPRODUCTION, TRANSFORMATION AND USE OF THIS DOCUMENT IN ANY FORM ORMANNER REMAIN THE EXCLUSIVE PROPERTY OF ALSTOM.
POWER PLANTS
Nr R A D 0 1 M G 0 1 D S 2 0 1
![Page 4: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/4.jpg)
ALSTOM
MDS FT 229 A Folio 1/7
E N E R G Y SPECIFICATION PARTICULIEREPower P lants PONT ROULANT
Projet: RADES TUNISIE Unité:1 CLIENT REPERE FONCTIONNEL2 QUANTITE : 13 INSTALLATION : GAS TURBINE HALL CONSTRUCTEUR REF. CONSTRUCTEUR4 TYPE : Pont roulant 40/10 t CGP – KONECRANES 76 0 077156 DONNEES GENERALES DONNEES DE CALCUL7 Entr'axe des rails de roulement : 20.00 m Réactions8 Longueur des rails de roulement : 83.40 m - règle ou norme : FEM9 Capacité de levage : - réactions max. par galet à la charge nominale
10 - crochet principal : 40 t . réaction verticale :11 - crochet auxiliaire : 10 t . réaction horizontale12 Alimentation électrique : - longitudinale :13 - courant alternatif : 400 V - transversale :14 - courant continu Mécanismes et charpentes15 Tension circuit de commande : 48 V - règle ou norme : FEM16 Tension circuit éclairage (projecteurs) : 220 V - classification17 Tension circuit éclairage de secours . charpentes : A418 Huiles et graisses recommandées . mécanismes19 Périodicité de renouvellement . groupe : M3 sauf levage aux . : M420 Système de changement de vitesse21 CARACTERISTIQUES DE FONCTIONNEMENT22 Crochet principal Crochet auxiliaire CONSTRUCTION23 COURSES CHARPENTES24 Levage : 14 m 14 m LEVAGE PRINCIPAL25 Traversée : 16.790 m 16.790 m m Moufle26 Translation m Type moteur : A cage27 JEUX EN BOUT Raccordement : Presse étoupes28 Dans le sens de la traversée par rapport Réducteur :29 aux poteaux Tambour :30 - en ligne 2.425 – 2.980 m 2.425 – 2.980 Principe de commande : radio31 Dans le sens de la traversée par rapport Câble :32 aux axes des rails Freins :33 - ligne A : 1.350 m 2.250 m Freins de sécurité :34 - ligne C’ : 1.860 m 0.960 m Crochet : double croc35 VITESSES Fin de course : haut – bas36 Levage LEVAGE AUXILIAIRE37 - grande vitesse : 2.0 4.0 Moufle38 - petite vitesse : 0.2
- 110.6 Type de moteur : A cage
39 Traversée Raccordement : Presse étoupes40 - grande vitesse : 20 20 Réducteur : 41 - petite vitesse : 5 5 Tambour :42 Translation Principe de commande : radio43 - grande vitesse : 25 25 Câble44 - petite vitesse : 6 6 Freins : incorporés45 PUISSANCE MOTEUR Freins de sécurité46 Levage : 15 7.5 / 1.2 kW Crochet : simple croc47 - Marque et type : KCI MF13L-100 MF11Z-106 Fin de course : haut – bas48 Traversée : 2 * 1.1 kW TRAVERSEE49 - Marque et type : KCI MF11LA208 Nombre de galets : 450 Translation : 2 * 1.5 kW Principe de commande : radio51 - Marque et type : KCI MF11LB208 Type de moteur : A cage52 Raccordement : Presse étoupes53 Réducteur : GM65654 Freins : incorporés55 Système fin de course : Lyre
![Page 5: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/5.jpg)
ALSTOM
MDS FT 229 A Folio 2/7
E N E R G Y SPECIFICATION PARTICULIEREPower P lants PONT ROULANT
Projet: Unité:56 REMARQUES57585960616263646566676869707172737475767778798081828384858687888990919293949596979899
100101102103104105
Révision ADate 14/03/00Auteur JJ. MOLEONVérifiée parApprouvée par N°
![Page 6: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/6.jpg)
ALSTOM
MDS FT 229 A Folio 3/7
E N E R G Y SPECIFICATION PARTICULIEREPower P lants PONT ROULANT
Projet: Unité:1 TRANSLATION2 Nombre de galets : 43 Principe de commande : radio4 Type de moteur : A cage5 Raccordement : Presse étoupes6 Réducteur : GM6567 Commande des galets d'entraînement : Entraînement direct réducteur8 Freins : incorporés9 Type de rail : Burbach A100
10 Galets guides horizontaux : Non11 Système de fin de course : Lyre12 CABINE – TYPE : Non13 MATIERE : NORMES ET NUANCES14 Nuances Normes15 Structures (tôles, : S235 JR EN 10027-116 profilés, grands plats) : S235 JR17 Composants mécaniques :18 - tambour19 - galets dentés20 . forgés21 . coulés22 Pignons23 Arbres24 Boîte de vitesses25 - coulée26 - mécano-soudée27 Poulies28 - coulées29 - forgées30 Crochets31 Câbles32 Galets de roulement :33 - coulées34 - forgées : 42CrMo4N35 Rails36 EQUIPEMENT37 Partie électrique38 - Ligne d'alimentation électrique générale avec fixations : Mobilis FEELS39 - Accessoires électriques : SCHNEIDER40 - Accessoires de sécurité : SCHNEIDER41 - Câbles électriques : ALCATEL42 Accessoires43 - Projecteurs : MAZDA44 - Douilles de puissance45 - Récepteur – transmetteur – radios : KCI46 - Echelle de corde : Non47 - Pattes de mise à la terre : Non48 - Extincteur : Non49 - Rails de roulement avec fixations : GANTRY5051 POIDS DES ASSEMBLAGES INTEGRAUX52 Poutre 15.900 t53 Sommier 3.000 t54 Chariot 4.350 t55 Poids total 23.250 t56 REMARQUES57 Nota : pour tous ces déplacements, la variation de vitesse est obtenue par :58 Variateur Dynahoist pour le levage principal59
E N E R G Y SPECIFICATION PARTICULIERE
![Page 7: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/7.jpg)
ALSTOM
MDS FT 229 A Folio 4/7
Power P lants MOTEUR BTProjet : RADES TUNISIE Unité :
1 CLIENT REPERE FONCTIONNEL2 QUANTITE : 1 A-M13 DESIGNATION MOTEUR CONSTRUCTEUR REF. CONSTRUCTEUR4 MACHINE ENTRAINEE KCI MF13L-1005 RESEAU PRINCIPAL D'ALIMENTATION CONSTRUCTION6 Type : alternatif triphasé Rotor7 Tension entre phases / Variations : 400 V ± Enroulement stator8 Fréquence / variations : 50 Hz ± - classe isolation : F9 Neutre : isolé / à la terre - imprégnation enroulement : < 105°C
10 - échauffement admissible :11 ENVIRONNEMENT Forme de construction : B... ou V...12 Zone d'installation : non explosive - occasionnellement explosive – explosive Châssis :13 Conditions de l'air ambiant : sec - humide - air salin Type accouplement :14 Atmosphère : propre – poussiéreuse Paliers15 Température max/mini/normale : / / °C - sur côté extrémités arbre :16 Humidité relative maximum : - sur côté opposé ou butée :17 Altitude : m - type lubrification :18 Risques particuliers : huile ou eau / vibrations graissé/graissé à vie/bain huile/huile sous pression/...19 Seismicité : - type graisse ou huile ou quantité par palier : l/mn kg20 - viscosité graisse ou huile : cSt21 CARACTERISTIQUES DU MOTEUR - température huile entrée / sortie : / °C22 Type de moteur : asynchrone - remplacement graisse ou huile tous les :23 Installation : intérieur24 Disposition : horizontal Refroidissement25 Tension nominale : 400 V - type :26 Fréquence nominale : 50 Hz - débit air ventilation : m³/h27 Puissance nominale : 15 kW - pression eau de refroidissement : bar abs.28 Vitesse de rotation (synchronisme) 2860 : tr/mn - débit eau de refroidissement : m³/h29 Glissement (à 4/4 charge) : % - échauffement entrée/sortie eau : / °C30 Intensité nominale : 28 A - pertes de charge entrée/sortie eau : / mCE31 Intensité de démarrage Id/In : 154 PEINTURE32 Couple nominal : 48 mN33 Couple de démarrage Cd/Cn :145 MATIERES34 Couple maxi Cmax/Cn : Norme Nuance35 Intensité à vide : A Enroulement stator :36 2/4 3/4 4/4 Barres stator :37 Rendement % Châssis :38 Facteur de puissance Arbre :39 Facteur de marche : Isolation :40 Inertie du moteur : kg/m² Imprégnation :41 Temps de démarrage : sec. Boîtes à bornes :42 Nombre de démarrages successifs : Tôles rotor :43 Amplitudes de vibrations maxi admissibles : µ Tôles stator :44 Niveau de bruit à 1 m de la surface du moteur : <80 dB(A)45 Classe de protection : IP55 POIDS ET DIMENSIONS46 Sens de rotation pour observateur situé face au bout d'arbre : Hauteur axe : mm47 horaire / anti-horaire Hauteur : mm48 Couplage de l'enroulement statorique : étoile / triangle Longueur : mm49 Largeur : mm50 Normes applicables Diamètre bout d'arbre : mm51 - études : Poids net : kg52 - construction : Volume : m³53 - essais :5455 REMARQUES5657
Révision ADate 16/03/00Auteur F.PERDOUXVérifiée parApprouvée par N°
![Page 8: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/8.jpg)
ALSTOM
MDS FT 229 A Folio 5/7
E N E R G Y SPECIFICATION PARTICULIEREPower P lants MOTEUR BT
Projet : RADES TUNISIE Unité :1 CLIENT REPERE FONCTIONNEL2 QUANTITE : 2 H-M1 / H-M23 DESIGNATION MOTEUR CONSTRUCTEUR REF. CONSTRUCTEUR4 MACHINE ENTRAINEE KCI MF11LA2085 RESEAU PRINCIPAL D'ALIMENTATION CONSTRUCTION6 Type : alternatif triphasé Rotor7 Tension entre phases / Variations : 400 V ± Enroulement stator8 Fréquence / variations : 50 Hz ± - classe isolation : F9 Neutre : isolé / à la terre - imprégnation enroulement :
10 - échauffement admissible : <105°C11 ENVIRONNEMENT Forme de construction : B... ou V...12 Zone d'installation : non explosive - occasionnellement explosive - explosive Châssis :13 Conditions de l'air ambiant : sec - humide - air salin Type accouplement :14 Atmosphère : propre - poussiéreuse Paliers15 Température max/mini/normale : / / °C - sur côté extrémités arbre :16 Humidité relative maximum : - sur côté opposé ou butée :17 Altitude : m - type lubrification :18 Risques particuliers : huile ou eau / vibrations graissé/graissé à vie/bain huile/huile sous pression/...19 Seismicité : - type graisse ou huile ou quantité par palier : l/mn kg20 - viscosité graisse ou huile : cSt21 CARACTERISTIQUES DU MOTEUR - température huile entrée / sortie : / °C22 Type de moteur : asynchrone - remplacement graisse ou huile tous les :23 Installation : intérieur24 Disposition : vertical Refroidissement25 Tension nominale : 400 V - type :26 Fréquence nominale : 50 Hz - débit air ventilation : m³/h27 Puissance nominale : 1.1/0.2 kW - pression eau de refroidissement : bar abs.28 Vitesse de rotation (synchronisme) 1380/ 256 : tr/mn - débit eau de refroidissement : m³/h29 Glissement (à 4/4 charge) : % - échauffement entrée/sortie eau : / °C30 Intensité nominale : 2.9 / 2.9 A - pertes de charge entrée/sortie eau : / mCE31 Intensité de démarrage Id/In : 11 / 3.1 PEINTURE32 Couple nominal : mN33 Couple de démarrage Cd/Cn : 14.7 / 11.8 MATIERES34 Couple maxi Cmax/Cn : 17.7/ 11.8 Norme Nuance35 Intensité à vide : A Enroulement stator :36 2/4 3/4 4/4 Barres stator :37 Rendement % 71/25 Châssis :38 Facteur de puissance 0.71/0.2
5Arbre :
39 Facteur de marche : Isolation :40 Inertie du moteur : 0.043 kg/m² Imprégnation :41 Temps de démarrage : sec. Boîtes à bornes :42 Nombre de démarrages successifs : Tôles rotor :43 Amplitudes de vibrations maxi admissibles : µ Tôles stator :44 Niveau de bruit à 1 m de la surface du moteur : <80 dB(A)45 Classe de protection : IP55 POIDS ET DIMENSIONS46 Sens de rotation pour observateur situé face au bout d'arbre : Hauteur axe : mm47 horaire / anti-horaire Hauteur : mm48 Couplage de l'enroulement statorique : étoile / triangle Longueur : mm49 Largeur : mm50 Normes applicables Diamètre bout d'arbre : mm51 - études : Poids net : 43kg52 - construction : Volume : m³53 - essais :5455 REMARQUES5657
Révision ADate 16/03/00Auteur F.PERDOUXVérifiée par
![Page 9: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/9.jpg)
ALSTOM
MDS FT 229 A Folio 6/7
Approuvée par N°E N E R G Y SPECIFICATION PARTICULIEREPower P lants MOTEUR BT
Projet : RADES TUNISIE Unité :1 CLIENT REPERE FONCTIONNEL2 QUANTITE : 2 E-M1 / E-M23 DESIGNATION MOTEUR CONSTRUCTEUR REF. CONSTRUCTEUR4 MACHINE ENTRAINEE KCI MF11LB2085 RESEAU PRINCIPAL D'ALIMENTATION CONSTRUCTION6 Type : alternatif triphasé Rotor7 Tension entre phases / Variations : 400 V ± Enroulement stator8 Fréquence / variations : 50 Hz ± - classe isolation : F9 Neutre : isolé / à la terre - imprégnation enroulement :
10 - échauffement admissible : <105°C11 ENVIRONNEMENT Forme de construction : B... ou V...12 Zone d'installation : non explosive - occasionnellement explosive - explosive Châssis :13 Conditions de l'air ambiant : sec - humide - air salin Type accouplement :14 Atmosphère : propre - poussiéreuse Paliers15 Température max/mini/normale : / / °C - sur côté extrémités arbre :16 Humidité relative maximum : - sur côté opposé ou butée :17 Altitude : m - type lubrification :18 Risques particuliers : huile ou eau / vibrations graissé/graissé à vie/bain huile/huile sous pression/...19 Seismicité : - type graisse ou huile ou quantité par palier : l/mn kg20 - viscosité graisse ou huile : cSt21 CARACTERISTIQUES DU MOTEUR - température huile entrée / sortie : / °C22 Type de moteur : asynchrone - remplacement graisse ou huile tous les :23 Installation : intérieur24 Disposition : vertical Refroidissement25 Tension nominale : 400 V - type :26 Fréquence nominale : 50 Hz - débit air ventilation : m³/h27 Puissance nominale : 0.80/0.46 kW - pression eau de refroidissement : bar abs.28 Vitesse de rotation (synchronisme) 1400/280 : tr/mn - débit eau de refroidissement : m³/h29 Glissement (à 4/4 charge) : % - échauffement entrée/sortie eau : / °C30 Intensité nominale : 3.8 A - pertes de charge entrée/sortie eau : / mCE31 Intensité de démarrage Id/In : PEINTURE32 Couple nominal : mN33 Couple de démarrage Cd/Cn : MATIERES34 Couple maxi Cmax/Cn : Norme Nuance35 Intensité à vide : A Enroulement stator :36 2/4 3/4 4/4 Barres stator :37 Rendement % Châssis :38 Facteur de puissance Arbre :39 Facteur de marche : Isolation :40 Inertie du moteur : kg/m² Imprégnation :41 Temps de démarrage : sec. Boîtes à bornes :42 Nombre de démarrages successifs : Tôles rotor :43 Amplitudes de vibrations maxi admissibles : µ Tôles stator :44 Niveau de bruit à 1 m de la surface du moteur : <80 dB(A)45 Classe de protection : IP55 POIDS ET DIMENSIONS46 Sens de rotation pour observateur situé face au bout d'arbre : Hauteur axe : mm47 horaire / anti-horaire Hauteur : mm48 Couplage de l'enroulement statorique : étoile / triangle Longueur : mm49 Largeur : mm50 Normes applicables Diamètre bout d'arbre : mm51 - études : Poids net : kg52 - construction : Volume : m³53 - essais :5455 REMARQUES5657
Révision ADate 16/03/00Auteur F.PERDOUXVérifiée par
![Page 10: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/10.jpg)
ALSTOM
MDS FT 229 A Folio 7/7
Approuvée par N°
E N E R G Y SPECIFICATION PARTICULIEREPower P lants MOTEUR BT
Projet : RADES TUNISIE Unité :1 CLIENT REPERE FONCTIONNEL2 QUANTITE : 1 A-M23 DESIGNATION MOTEUR CONSTRUCTEUR REF. CONSTRUCTEUR4 MACHINE ENTRAINEE KCI MF11LB2085 RESEAU PRINCIPAL D'ALIMENTATION CONSTRUCTION6 Type : alternatif triphasé Rotor7 Tension entre phases / Variations : 400 V ± Enroulement stator8 Fréquence / variations : 50 Hz ± - classe isolation : F9 Neutre : isolé / à la terre - imprégnation enroulement : < 105°C
10 - échauffement admissible :11 ENVIRONNEMENT Forme de construction : B... ou V...12 Zone d'installation : non explosive - occasionnellement explosive – explosive Châssis :13 Conditions de l'air ambiant : sec - humide - air salin Type accouplement :14 Atmosphère : propre – poussiéreuse Paliers15 Température max/mini/normale : / / °C - sur côté extrémités arbre :16 Humidité relative maximum : - sur côté opposé ou butée :17 Altitude : m - type lubrification :18 Risques particuliers : huile ou eau / vibrations graissé/graissé à vie/bain huile/huile sous pression/...19 Seismicité : - type graisse ou huile ou quantité par palier : l/mn kg20 - viscosité graisse ou huile : cSt21 CARACTERISTIQUES DU MOTEUR - température huile entrée / sortie : / °C22 Type de moteur : asynchrone - remplacement graisse ou huile tous les :23 Installation : intérieur24 Disposition : horizontal Refroidissement25 Tension nominale : 400 V - type :26 Fréquence nominale : 50 Hz - débit air ventilation : m³/h27 Puissance nominale : 1.5/0.3 kW - pression eau de refroidissement : bar abs.28 Vitesse de rotation (synchronisme) 1480/280 : tr/mn - débit eau de refroidissement : m³/h29 Glissement (à 4/4 charge) : % - échauffement entrée/sortie eau : / °C30 Intensité nominale : 3.8/3.8 A - pertes de charge entrée/sortie eau : / mCE31 Intensité de démarrage Id/In : PEINTURE32 Couple nominal : mN33 Couple de démarrage Cd/Cn : MATIERES34 Couple maxi Cmax/Cn : Norme Nuance35 Intensité à vide : A Enroulement stator :36 2/4 3/4 4/4 Barres stator :37 Rendement % Châssis :38 Facteur de puissance Arbre :39 Facteur de marche : Isolation :40 Inertie du moteur : kg/m² Imprégnation :41 Temps de démarrage : sec. Boîtes à bornes :42 Nombre de démarrages successifs : Tôles rotor :43 Amplitudes de vibrations maxi admissibles : µ Tôles stator :44 Niveau de bruit à 1 m de la surface du moteur : <80 dB(A)45 Classe de protection : IP55 POIDS ET DIMENSIONS46 Sens de rotation pour observateur situé face au bout d'arbre : Hauteur axe : mm47 horaire / anti-horaire Hauteur : mm48 Couplage de l'enroulement statorique : étoile / triangle Longueur : mm49 Largeur : mm50 Normes applicables Diamètre bout d'arbre : mm51 - études : Poids net : kg52 - construction : Volume : m³53 - essais :5455 REMARQUES5657
Révision ADate 16/03/00
![Page 11: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/11.jpg)
DESCRIPTION GENERALECHAPITREChapter
12
General description VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
1
Référence informatique Référence du document Date de création Date de mise à jour Indice13NT1200.DOC 76007710\PR01-FR\UM1-1 | NT12 01/05/2000 - A
CGP-KONECRANES
PONT ROULANT BIPOUTREDouble girder crane
CARACTERISTIQUES PRINCIPALESMain characteristics
- Type de pont / Type of crane : Pont roulant bipoutre / Double girder crane- 1 Chariot(s) palan(s)
avec Unité(s) de levage Standard(s) "XL" (1 "XL708..."+ 1 "XL408...")1 Hoist(s) trolley(s)with Standard Hoisting unit(s) "XL" (1 "XL708..." + 1 "XL408...")
- N°Identification : 7600-771-0 (CGP-KONECRANES)Identification N° "GAZ TURBINE HALL" - PONT ROULANT 40 t (ALSTOM)
- Charge(s) nominale(s) : 40 t avec moufle "XL708..." / 40 t with pulley block "XL708..."Nominal load(s) <ou/or>
10 t avec moufle "XL408..." / 10 t with pulley block "XL408..."
- Portée / Span : 20,000 m / 20.000 m
- Tension de service réseau : 3 / 400 V / 50 HzMain running voltage
- Tension de commande : 48 V ACControl voltage
- Service / : IntérieurAmbiance / Température Normale / 0° à + 50 ° CService / InteriorAtmosphere / Temperature Normal / 0° to + 50°C
- Mode(s) d'exploitation : 2 Mode(s) / 2 Mode(s) :Operating mode(s) - Exploitation par radiocommande / Exploitation with radio remote control
- Type / Type : FST716/16 - "Micron 3" - 433.200 MHz(H4148 / H4147) (HBC Radiomatic France)
- Secours par boite à boutons brochableEmergency with pluggable push-buttons box
![Page 12: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/12.jpg)
DESCRIPTION GENERALECHAPITREChapter
12
General description VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
2
Référence informatique Référence du document Date de création Date de mise à jour Indice13NT1200.DOC 76007710\PR01-FR\UM1-1 | NT12 01/05/2000 - A
CGP-KONECRANES
CARACTERISTIQUES PRINCIPALES (suite)Main characteristics (con't)
CLASSIFICATION SUIVANT FEDERATION EUROPEENNE DE LA MANUTENTIONClassification according European Handling Federation
Charpente :Structure
- Classe d'utilisation / Classification : -- Etat de charge / Load sollicitation : -- Groupe / Group : A3
Mécanisme(s) :Mechanism(s)
LevageHoistingPalan40 tHoist40 t
LevageHoistingPalan10 tHoist10 t
DirectionCross travelling
Chariot(s)Trolley(s)40 t / 10 t40 t / 10 t
TranslationLong travelling
PontCrane
Classe(s) de fonctionnementWorking class(es)
T3 T4 T3 T3
Etat(s) des sollicitationsStress state(s)
L2 L2 L2 L2
Groupe(s)Group(s)
M3 (1Bm) M4 (1Am) M3 (1Bm) M3 (1Bm)
Facteur(s) de marche (%)Duty cycle(s)
40 40 40 40
Classe de démarrage (d/h)Starting class(es)
150 150 150 150
Durée(s) de vie théorique(s) (h)Theroretic longevity(ies)
1600 3200 1600 1600
![Page 13: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/13.jpg)
DESCRIPTION GENERALECHAPITREChapter
12
General description VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
3
Référence informatique Référence du document Date de création Date de mise à jour Indice13NT1200.DOC 76007710\PR01-FR\UM1-1 | NT12 01/05/2000 - A
CGP-KONECRANES
MECANISME (S) DE TRANSLATION - PONT ROULANT / PORTIQUELong travel machinery (ies) - Overhead crane / Gantry crane
- Vitesse(s) : 6 - 25 m/min par moteur bi-vitessesSpeed(s) 6 - 25 m/min with two speeds motor
- Puissance(s) : 2 x (0,30 kW - 1,5 kW)Power(s) 2 x (0.30 kW - 1.5 kW)
- Mécanisme(s) : GM656F11LB208-5400 (CE0478) (K.C.I.)Machinery(ies)- Nombre de mécanisme(s) : 2
Number of mechanism(s)- Moteur(s) frein : MF11LB208-153P30043T (K.C.I.)
Brake motor(s)- Numéro(s) de série : 679 120 / 679 119
Serial number(s)- Frein : NM340 06 - 190 V
Brake- Couple de freinage : 30 Nm
Braking torque- Réducteur(s) : GM6A 56
Reducer(s)- Numéro(s) de série : 54 062 / 54 063
Serial number(s)
- Type(s) de sommier(s) : Spécial / Special (CGP-KONECRANES)Type(s) of end carriage(s)- Type de galet(s) :
Type(s) of wheel(s)- Galet(s) moteur(s) : LHJ3.2:61-1 - Pour / For : SH 32 - GM6 - Ø 320 mm - U = 120 mm (CE0482) (K.C.I.)
Motor wheel(s) Arbre / Shaft : LHJ3.2 : 61-OP2 A2 (02) - GM6- Nombre de galet(s) : 2
Number of wheel(s)- Galet(s) porteur (s) : LHJ3.2:60-1 - Pour / For : SH 32 - Ø 320 mm - U = 120 mm (CE0482) (K.C.I.)
Free wheel(s)- Nombre de galet(s) : 2
Number of wheel(s)
![Page 14: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/14.jpg)
DESCRIPTION GENERALECHAPITREChapter
12
General description VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
4
Référence informatique Référence du document Date de création Date de mise à jour Indice13NT1200.DOC 76007710\PR01-FR\UM1-1 | NT12 01/05/2000 - A
CGP-KONECRANES
MECANISME (S) DE DIRECTION - CHARIOT PALAN(S)Cross travel machinery (ies)- Hoist(s) trolley
- Vitesse(s) : 5 - 20 m/min par moteur bi-vitessesSpeed(s) 5 - 20 m/min with two speeds motor
- Puissance(s) : 2 x (0,20. kW - 1,1 kW)Power(s) 2 x (0.20 kW - 1.1 kW)
- Type de chariot(s) : Chariot birail / Birail trolleyType of trolley(s) Spécial / Special (CGP-KONECRANES)- Numéro(s) de série : -
Serial number(s)
- Mécanisme(s) : GM656F11LA208-5400 (CE0485) (K.C.I.)Machinery(ies)- Nombre de mécanisme(s) : 2
Number of mechanism(s)- Moteur(s) frein : MF11LA208-152P30043T-IP55 (K.C.I.)
Brake motor(s)- Numéro(s) de série : 671 816 / 671 817
Serial number(s)- Frein : NM340 06 - 190 V
Brake- Couple de freinage : 30 Nm
Braking torque- Réducteur(s) : GM6A 56
Reducer(s)- Numéro(s) de série : 53 701 / 53 702
Serial number(s)
- Type(s) de sommier(s) : Standard / StandardType(s) of end carriage(s) UH25-2570-00000000000E (230 028) (K.C.I.)- Type de galet(s) :
Type(s) of wheel(s)- Galet(s) moteur(s) : Pour / For : UH 25 - GM5 - Ø 250 mm - U = 70 mm (K.C.I.)
Motor wheel(s) Pour / For : UH 25 - GM5- Nombre de galet(s) : 2
Number of wheel(s)- Galet(s) porteur (s) : Pour / For : UH 25 - Ø 250 mm - U = 70 mm (K.C.I.)
Free wheel(s)- Nombre de galet(s) : 2
![Page 15: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/15.jpg)
DESCRIPTION GENERALECHAPITREChapter
12
General description VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
5
Référence informatique Référence du document Date de création Date de mise à jour Indice13NT1200.DOC 76007710\PR01-FR\UM1-1 | NT12 01/05/2000 - A
CGP-KONECRANES
MECANISME (S) DE LEVAGE - PALAN N°01Hoisting machinery (ies) - Hoist N°01
- Type de palan / Type of hoist : Unité de levage / Hoisting unit : XL708F41GFC300A0DB (230851) (K.C.I.)Type of hoist- Numéro(s) de série : 297 680
Serial number(s)
- Charge nominale / Nominal load : 40 000 Kg
- Hauteur de levage : 14,000 m avec moufleLifting height 14.000 m with pulley block
- Course de levage : 14,000 m avec moufleLifting stroke 14.000 m with pulley block
- Vitesse(s) : 0 à 2 m/min par Variateur de vitesseSpeed(s) 0 to 2 m/min with Variable speed controller
"DYNALIFT" V150 F10PA0 (230851) (K.C.I.)
- Moteur frein de levage : MF13L-100N130P30013T-IP55 (K.C.I.)Lifting brake motor- Puissance(s) : 1 x (15 kW)
Power(s) 1 x (15 kW)- Numéro de série : 671 811
Serial number
- Frein(s) / Brake(s)- Frein de service : NM307NR1 - 190 V (K.C.I.)
Service brake- Couple de freinage : 87 Nm
Braking torque
- Frein de sécurité : Frein de tambour / Drum brake - DBOMD-1A - Pour / For : XL708...FC... (K.C.I.)Security brake Câble de levage / Lifting rope : Ø 16 mm
- Câble(s) de levage : - Diamètre nominal : Ø = 16 mm - 2160 N/mm2
Lifting rope(s) : Nominal diameter- Longueur : L = 64 +/- 0,5 m
Length L = 64 +/-0.5 m- Nb de câble : 2
Nb of rope- Toronnage : 1 Gauche + 1 Droit
Kind of lay 1 Left + 1 Right- Type of rope : 6X31 WS
Type of rope (K.C.I.)(RC1681 + RC1679)
- Moufle / Pulley block : P7C1001 - Pour / For : XL708... (K.C.I.)- Crochet / Hook forging : Double / Double - V-10 R.I.-896 - 10 RSN - DIN 15402 (8112) (FORJAS IRIZAR SL)- Réa(s) / Pulley(s) : P7C0011 - Pour / For : XL708... (K.C.I.)
- Traverse support / Support beam : P7S1003/1 - Pour / For : XL708... (K.C.I.)- Réa(s) / Pulley(s) : P7S1033 - Pour / For : XL708... (K.C.I.)
![Page 16: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/16.jpg)
DESCRIPTION GENERALECHAPITREChapter
12
General description VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
6
Référence informatique Référence du document Date de création Date de mise à jour Indice13NT1200.DOC 76007710\PR01-FR\UM1-1 | NT12 01/05/2000 - A
CGP-KONECRANES
MECANISME (S) DE LEVAGE - PALAN N°02Hoisting machinery (ies) - Hoist N°02
- Type de palan / Type of hoist : Unité de levage / Hoisting unit : XL408N30GFC400A0DB (230874) (K.C.I.)Type of hoist- Numéro(s) de série : 297 522
Serial number(s)
- Charge nominale / Nominal load : 10 000 Kg
- Hauteur de levage : 14,000 m avec moufleLifting height 14.000 m with pulley block
- Course de levage : 18,500 m avec moufleLifting stroke 18.500 m with pulley block
- Vitesse(s) de levage : 0,63 - 4 m/min par moteur bi-vitessesLifting speed(s) 0.63 - 4 m/min with two speeds motor
- Moteur frein de levage : MF11Z-106N146P44001T-IP55 (K.C.I.)Lifting brake motor- Puissance(s) : 1 x (1,2 kW - 7,5 kW)
Power(s) 1 x (1.2 kW - 7.5 kW)- Numéro de série : 667 487
Serial number
- Frein(s) / Brake(s)- Frein de service : NM306NR1 - 190 V (K.C.I.)
Service brake- Couple de freinage : 44 Nm
Braking torque
- Frein de sécurité : Frein de tambour / Drum brake - DB - Pour / For : XL408...FC... (K.C.I.)Security brake Câble de levage / Lifting rope : Ø 9 mm
- Câble(s) de levage : - Diamètre nominal : Ø = 9 mm - 2160 N/mm2
Lifting rope(s) : Nominal diameter- Longueur : L = 92 +/- 0,5 m
Length L = 92 +/-0.5 m- Nb de câble : 2
Nb of rope- Toronnage : 1 Gauche + 1 Droit
Kind of lay 1 Left + 1 Right- Type of rope : 9X17 COMPACTSR9
Type of rope (K.C.I.)(RC1379 + RC1374)
- Moufle / Pulley block : P4C0017 - Pour / For : XL408... (K.C.I.)- Crochet / Hook forging : Simple / Single - PO T4 34 - 4 RSN - DIN 15401 (4405/99/1) (FAPERUM)- Réa(s) / Pulley(s) : P4S0063 - Pour / For : XL408... (K.C.I.)
- Traverse support / Support beam : P4S0078 - Pour / For : XL408... (K.C.I.)- Réa(s) / Pulley(s) : P4S0063 - Pour / For : XL408... (K.C.I.)
![Page 17: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/17.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
1
Référence informatique Référence du document Date de création Date de mise à jour Indice13IT0000.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
TABLE DES MATIERES
PAGE
1. INTRODUCTION 2
2. CONCEPT DE MAINTENANCE 3
2.1 MAINTENANCE PREVENTIVE 3
2.1.1 Maintenance préventive systématique 3
2.1.2 Maintenance préventive conditionnelle 4
2.1.3 Maintenance corrective 4
2.2 NIVEAU DE MAINTENANCE 5
2.2.1 Maintenance du 1er niveau 5
2.2.2 Maintenance du 2éme niveau 5
2.2.3 Maintenance du 3éme niveau 5
2.2.4 Maintenance du 4éme niveau 5
2.2.5 Maintenance du 5éme niveau 5
3. MAINTENANCE 6
3.1 OPERATIONS DE CONTROLE 6
3.1.1 Présentation de la fiche 5
3.1.2 Principe d'utilisation 6
3.1.3 Récapitulatif fiche opérations de contrôle 7
3.2 TABLEAU DE GRAISSAGE 26
3.3 LUBRIFIANT 27
4. CONSIGNE / SECURITE / MAINTENANCE - SPECIALE 28
A ANNEXE 29
![Page 18: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/18.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
2
Référence informatique Référence du document Date de création Date de mise à jour Indice13IT0000.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
1. INTRODUCTION
Nous accordons beaucoup d'importance à la disponibilité et à la fiabilité de nosappareils. Vous bénéficierez d'un bien durable dans la mesure ou vous suivrez lesinstructions de maintenance décrite dans le chapitre "MAINTENANCEPREVENTIVE" (Instructions de maintenance, Guide de maintenance).
ATTENTION !Lire attentivement le Chapitre 13 "INSTRUCTIONS POUR L'EXPLOITATION"
(avertissement général, manuel d'utilisation, guide d'exploitation, etc).
La garantie contractuelle ne comprend pas l'entretien du matériel.
Nous vous demandons de remettre ces instructions aux personnes de votre sociétéresponsable de la maintenance. Toutes les opérations de maintenance préventivesystématique doivent être réalisées aux fréquences indiquées. A défaut d'indication,vous reporter aux "Accessoires" (documents équipement, notices constructeurs)correspondantes.
Aucune modification ne doit être apportée sur l'appareil sans l'accord de ALSTOM.
![Page 19: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/19.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
3
Référence informatique Référence du document Date de création Date de mise à jour Indice13IT0000.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
2. CONCEPT DE MAINTENANCE
Rappelons que, dans sa notion logistique, la disponibilité d'un appareil dépend d'unebonne politique de maintenance.
2.1 MAINTENANCE PREVENTIVE
Elle regroupe les opérations suivantes :
- inspections, rondes,
- contrôle,
- visite (pouvant impliquer une maintenance du 1er niveau),
- test.
2.1.1 Maintenance préventive systématique
Maintenance effectuée sur un bien :
- selon des critères prédéterminés (PERIODICITE D'ENTRETIEN),
- dans l'intention de réduire sa probabilité de défaillance ou dégradation d'unservice rendu.
PERIODICITE D'ENTRETIEN
Nous vous demandons d'adapter ces temps en fonction de l'exploitation réelle de nosappareils.
![Page 20: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/20.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
4
Référence informatique Référence du document Date de création Date de mise à jour Indice13IT0000.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
2.1.2 Maintenance préventive conditionnelle
Maintenance effectuée sur un bien :
- Selon un événement prédéterminé (information d'un capteur, mesure d'uneusure, etc.).
2.1.3 Maintenance corrective
Maintenance effectuée après défaillance.
Elle regroupe les opérations suivantes :
- détection,
- localisation,
- diagnostic,
- dépannage,
- réparation,
- révision,
- rénovation,
- reconstruction
- modification,
- échange standard,
- inventaire de départ.
![Page 21: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/21.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
5
Référence informatique Référence du document Date de création Date de mise à jour Indice13IT0000.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
2.2 NIVEAU DE MAINTENANCE
2.2.1 Maintenance du 1er niveau
C'est un ensemble d'actions, telles que :
- réglages simples au moyen d'éléments accessibles sans aucun démontage,
- échanges d'élément consommables accessibles (voyants, fusibles, etc.).
2.2.2 Maintenance du 2éme niveau
C'est l'ensemble d'actions, telles que :
- échange standard des éléments prévus à cet effet,
- opérations mineures de maintenance telles que graissage ou contrôle de bonfonctionnement.
2.2.3 Maintenance du 3éme niveau
C'est un ensemble d'actions, telles que :
- identification et diagnostic des pannes,
- réparation par échange de composants ou d'éléments fonctionnels,
- réparation mécanique mineure,
- opération courante de maintenance préventive telle que réglage général,réajustement des appareils de mesure.
2.2.4 Maintenance du 4éme niveau
C'est un ensemble d'actions, telles que :
- travaux importants de maintenance corrective ou préventive,
- vérification des étalons de travail par les organismes spécialisés.
2.2.5 Maintenance du 5éme niveau
C'est un ensemble d'actions, telles que :
- rénovation,
- reconstruction,
- exécution de réparation importante.
![Page 22: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/22.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
6
Référence informatique Référence du document Date de création Date de mise à jour Indice13IT0000.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
3. MAINTENANCE
3.1 OPERATIONS DE CONTROLE
3.1.1 Présentation de la fiche
��
= Installé= Non installé
PREMIERE(S)INTERVENTION(S)
INTERVENTION(S)PERIODIQUE(S)ULTERIEURE(S)
PI OBS IPU OBS
� MOTEUR (1)Type : MF07... - MF09... - MF10... - MF11... - MF13... - MF16...- Contrôler la fixation 1 S - 3 M 3 M- Contrôler l'échauffement 3 M 3 M- Contrôler l'absence de bruit 3 M 3 M- ... 3 M 3 M1ére Intervention 3 M
3 M2éme Intervention 3 M
(2) (2)Intervention périodique
Remarque :
- Colonne "PI" (PREMIERE INTERVENTION)
Colonne "IPU" (INTERVENTION PERIODIQUE ULTERIEURE)
- ... H = ... Heure
- ... J = ... Jour
- ... S = ... Semaine
- ... M = ... Mois
OBSERVATION
![Page 23: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/23.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
7
Référence informatique Référence du document Date de création Date de mise à jour Indice13IT0000.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
3.1.2 Principe d'utilisation
A chaque intervention :
1. Photocopier la fiche concernée.
2. Compléter la fiche
Parties du document à compléter :
- Colonne "OBS" (OBSERVATIONS) :
Indications suggérées :
- " / " ou " F " = Fait
- "AC" = A Changer
- "AR" = A Régler
- "B" = Bon
- "M" = Mauvais
- "Valeur d'une mesure" ou "Valeur d'un réglage"- Exemple. :
- FREIN ELECTROMAGNETIQUEValeur de l'entrefer = 0,4 mm
- "VO" = Voir "OBSERVATION"A la fin du chapitre "MAINTENANCE PREVENTIVE" vous trouverezune fiche "OBSERVATION" pour reporter vos commentaires.
- "Fait par" : Nom + Signature - Le : Date
- "Vérifié par" : Nom + Signature - Le : Date
3. Conserver ces fiches dans un classeur "CARNET D'ENTRETIEN".
![Page 24: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/24.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
8
Référence informatique Référence du document Date de création Date de mise à jour Indice13IT0000.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
3.1.3 Récapitulatif fiche opérations de contrôle
DESIGNATION ENSEMBLE FICHE PAGETRANSLATION PONT PONT ROULANT OC TP 01 09DIRECTION CHARIOT PALAN(S) CHARIOT PALAN(S) OC DP 01 11LEVAGE PALAN N°01 CHARIOT PALAN(S) OC LP 01 13LEVAGE PALAN N°02 CHARIOT PALAN(S) OC LP 02 17GENERAL PONT OC GN 01 21CHEMIN DE ROULEMENT CHEMIN DE ROULEMENT OC CR 01 25
![Page 25: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/25.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
9
Référence informatique Référence du document Date de création Date de mise à jour Indice13OCTP01.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
OPERATIONS DE CONTROLE
TRANSLATION PONT OC TP 01Groupe : M3 (1Bm) Folio : 01/02
��
= Installé= Non installé
PREMIERE(S)INTERVENTION(S)
INTERVENTION(S)PERIODIQUE(S)ULTERIEURE(S)
PI OBS IPU OBS
� MOTEUR (1)Type : MF07... - MF09... - MF10... - MF11... - MF13... - MF16...- Contrôler l'état 1 S / 6 M 6 M
- Contrôler la fixation 1 S / 6 M 6 M
- Contrôler l'échauffement 1 S / 6 M 6 M
- Contrôler l'absence de bruit 1 S / 6 M 6 M
- Contrôler l'absence de vibration 1 S / 6 M 6 M
- Contrôler la propreté, nettoyer si nécessaire 6 M 6 M
- Contrôler les connexions électriques 6 M 6 M� FREIN ELECTROMAGNETIQUE (1)
Type : NM340...- Contrôler le fonctionnement J J
- Contrôler l'efficacité freinage J J
- Contrôler l'état 1 S / 6 M 6 M
- Contrôler la fixation 1 S / 6 M 6 M
- Contrôler la propreté de la grille de ventilation, nettoyer si nécessaire 6 M 6 M
- Contrôler l'entrefer 6 M 6 M
- Contrôler le couple de freinage 6 M 6 M
- Nettoyer 6 M 6 M� REDUCTEUR (1)
Type : GS2... - GS3... - GM2... - GM3... - GM4...Type : GM5... - GM6... - GM8... - GM10...- Contrôler l'état 1 S / 6 M 6 M
- Contrôler la fixation 1 S / 6 M 6 M
- Contrôler l'échauffement 1 S / 6 M 6 M
- Contrôler l'absence de bruit 1 S / 6 M 6 M
- Contrôler l'absence de vibration 1 S / 6 M 6 M
- Contrôler l'absence de fuite 1 S / 6 M 6 M
- Contrôler le niveau (2) (2)
- Vidanger (2) (2)
Fait par Vérifié par(1) Pour compléments d'informations :
Voir "NOTICES DES CONSTRUCTEURS" ou "ACCESSOIRES".(2) Voir "TABLEAU DE GRAISSAGE" ou "INSTRUCTIONS POUR LA LUBRIFICATION"
Le . . . / . . . / . . . Le . . . / . . . / . . .
![Page 26: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/26.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
10
Référence informatique Référence du document Date de création Date de mise à jour Indice13OCTP01.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
OPERATIONS DE CONTROLE
TRANSLATION PONT OC TP 01Groupe : M3 (1Bm) Folio : 02/02
��
= Installé= Non installé
PREMIERE(S)INTERVENTION(S)
INTERVENTION(S)PERIODIQUE(S)ULTERIEURE(S)
PI OBS IPU OBS
� GALET- Contrôler l'état 1 S / 12 M 12 M
- Contrôler l'usure 12 M 12 M
- Graisser les paliers (2) (2)� BROSSE DE RAIL
- Contrôler l'état 1 S / 12 M 12 M
- Contrôler La fixation 1 S / 12 M 12 M
- Contrôler l'usure 12 M 12 M� INTERRUPTEUR DE POSITION - DOIGT DE FIN DE COURSE (1)� INTERRUPTEUR MAGNETIQUE - AIMANT (1)� CELLULE PHOTO-ELECTRIQUE - REFLECTEUR (1)� DETECTEUR DE PROXIMITE INDUCTIF (1)
- Contrôler le fonctionnement J J
- Contrôler l'état 1 S / 6 M 6 M
- Contrôler la fixation 1 S / 6 M 6 M
Fait par Vérifié par(1) Pour compléments d'informations :
Voir "NOTICES DES CONSTRUCTEURS" ou "ACCESSOIRES".(2) Voir "TABLEAU DE GRAISSAGE" ou "INSTRUCTIONS POUR LA LUBRIFICATION"
Le . . . / . . . / . . . Le . . . / . . . / . . .
![Page 27: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/27.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
11
Référence informatique Référence du document Date de création Date de mise à jour Indice13OCDP01.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
OPERATIONS DE CONTROLE
DIRECTION CHARIOT PALAN OC DP 01Groupe : M3 (1Bm) Folio : 01/02
Chariot(s) : Spécial (CGP-KONECRANES)
��
= Installé= Non installé
PREMIERE(S)INTERVENTION(S)
INTERVENTION(S)PERIODIQUE(S)ULTERIEURE(S)
PI OBS IPU OBS
� MOTEUR (1)Type : MF07... - MF09... - MF10... - MF11... - MF13... - MF16...- Contrôler l'état 1 S / 6 M 6 M
- Contrôler la fixation 1 S / 6 M 6 M
- Contrôler l'échauffement 1 S / 6 M 6 M
- Contrôler l'absence de bruit 1 S / 6 M 6 M
- Contrôler l'absence de vibration 1 S / 6 M 6 M
- Contrôler la propreté, nettoyer si nécessaire 6 M 6 M
- Contrôler les connexions électriques 6 M 6 M� FREIN ELECTROMAGNETIQUE (1)
Type : NM340...- Contrôler le fonctionnement J J
- Contrôler l'efficacité freinage J J
- Contrôler l'état 1 S / 6 M 6 M
- Contrôler la fixation 1 S / 6 M 6 M
- Contrôler la propreté de la grille de ventilation, nettoyer si nécessaire 6 M 6 M
- Contrôler l'entrefer 6 M 6 M
- Contrôler le couple de freinage 6 M 6 M
- Nettoyer 6 M 6 M� REDUCTEUR (1)
Type : GS2... - GS3... - GM2... - GM3... - GM4...Type : GM5... - GM6... - GM8... - GM10...- Contrôler l'état 1 S / 6 M 6 M
- Contrôler la fixation 1 S / 6 M 6 M
- Contrôler l'échauffement 1 S / 6 M 6 M
- Contrôler l'absence de bruit 1 S / 6 M 6 M
- Contrôler l'absence de vibration 1 S / 6 M 6 M
- Contrôler l'absence de fuite 1 S / 6 M 6 M
- Contrôler le niveau (2) (2)
- Vidanger (2) (2)
Fait par Vérifié par(1) Pour compléments d'informations :
Voir "NOTICES DES CONSTRUCTEURS" ou "ACCESSOIRES".(2) Voir "TABLEAU DE GRAISSAGE" ou "INSTRUCTIONS POUR LA LUBRIFICATION"
Le . . . / . . . / . . . Le . . . / . . . / . . .
![Page 28: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/28.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
12
Référence informatique Référence du document Date de création Date de mise à jour Indice13OCDP01.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
OPERATIONS DE CONTROLE
DIRECTION CHARIOT PALAN OC DP 01Groupe : M3 (1Bm) Folio : 02/02
Chariot(s) : Spécial (CGP-KONECRANES)
��
= Installé= Non installé
PREMIERE(S)INTERVENTION(S)
INTERVENTION(S)PERIODIQUE(S)ULTERIEURE(S)
PI OBS IPU OBS
� GALET- Contrôler l'état 1 S / 12 M 12 M
- Contrôler l'usure 12 M 12 M
- Graisser les paliers (2) (2)� BROSSE DE RAIL
- Contrôler l'état 1 S / 12 M 12 M
- Contrôler La fixation 1 S / 12 M 12 M
- Contrôler l'usure 12 M 12 M� OSSATURE CHARIOT
- Contrôler si il n'y a pas d'objet suspect J J
- Contrôler le serrage des éléments d'assemblage 1 S / 6 M 6 M
- Contrôler l'état 6 M 6 M
- Contrôler les soudures 6 M 6 M
- Contrôler la propreté, nettoyer si nécessaire 6 M 6 M� INTERRUPTEUR DE POSITION - DOIGT DE FIN DE COURSE (1)� INTERRUPTEUR MAGNETIQUE - AIMANT (1)� CELLULE PHOTO-ELECTRIQUE - REFLECTEUR (1)� DETECTEUR DE PROXIMITE INDUCTIF (1)
- Contrôler le fonctionnement J J
- Contrôler l'état 1 S / 6 M 6 M
- Contrôler la fixation 1 S / 6 M 6 M
Fait par Vérifié par(1) Pour compléments d'informations :
Voir "NOTICES DES CONSTRUCTEURS" ou "ACCESSOIRES".(2) Voir "TABLEAU DE GRAISSAGE" ou "INSTRUCTIONS POUR LA LUBRIFICATION"
Le . . . / . . . / . . . Le . . . / . . . / . . .
![Page 29: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/29.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
13
Référence informatique Référence du document Date de création Date de mise à jour Indice13OCLP01.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
OPERATIONS DE CONTROLE
LEVAGE PALAN OC LP 01Groupe : M3 (1Bm) Folio : 01/04
Palan(s) : XL708F41GFC300A0DB (K.C.I.)
��
= Installé= Non installé
PREMIERE(S)INTERVENTION(S)
INTERVENTION(S)PERIODIQUE(S)ULTERIEURE(S)
PI OBS IPU OBS
� UNITE DE LEVAGE (1)Type : XL708...- Contrôler l'état 1 S / 12 M 12 M
- Contrôler la fixation 1 S / 12 M 12 M
- Contrôler l'échauffement 1 S / 6 M 6 M
- Contrôler l'absence de bruit 1 S / 6 M 6 M
- Contrôler l'absence de vibration 1 S / 6 M 6 M� MOTEUR (1)
Type : MF09... - MF10... - MF11... - MF13... - MF16...- Contrôler l'état 1 S / 6 M 6 M
- Contrôler la fixation 1 S / 6 M 6 M
- Contrôler la propreté, nettoyer si nécessaire 6 M 6 M
- Contrôler les connexions électriques 6 M 6 M� Ventilation moteur
- Contrôler l'état 1 S / 6 M 6 M
- Contrôler la fixation 1 S / 6 M 6 M
- Contrôler la propreté du filtre, nettoyer si nécessaire 6 M 6 M� FREIN ELECTROMAGNETIQUE (1)
Type : NM307...- Contrôler le fonctionnement J J
- Contrôler l'efficacité freinage J J
- Contrôler l'état 1 S / 1 M 1 M
- Contrôler la fixation 1 S / 1 M 1 M
- Contrôler l'entrefer 12 M 12 M
- Contrôler le couple de freinage 12 M 12 M
- Contrôler la propreté de la grille de ventilation, nettoyer si nécessaire 6 M 6 M
- Nettoyer 6 M 6 M� ACCOUPLEMENT (1)
Moteur frein / RéducteurType : Pour XL708...- Contrôler l'état 48 M 48 M
- Graisser (2) (2)
Fait par Vérifié par(1) Pour compléments d'informations :
Voir "NOTICES DES CONSTRUCTEURS" ou "ACCESSOIRES".(2) Voir "TABLEAU DE GRAISSAGE" ou "INSTRUCTIONS POUR LA LUBRIFICATION"
Le . . . / . . . / . . . Le . . . / . . . / . . .
![Page 30: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/30.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
14
Référence informatique Référence du document Date de création Date de mise à jour Indice13OCLP01.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
OPERATIONS DE CONTROLE
LEVAGE PALAN OC LP 01Groupe : M3 (1Bm) Folio : 02/04
Palan(s) : XL708F41GFC300A0DB (K.C.I.)
��
= Installé= Non installé
PREMIERE(S)INTERVENTION(S)
INTERVENTION(S)PERIODIQUE(S)ULTERIEURE(S)
PI OBS IPU OBS
� REDUCTEUR (1)Type : Pour XL708...- Contrôler l'état 96 M 96 M
- Contrôler l'absence de fuite 1 S / 96 M 96 M
- Contrôler La propreté des trous d'évent, nettoyer si nécessaire 96 M 96 M
- Contrôler le niveau (2) (2)
- Vidanger (2) (2)� TAMBOUR DE LEVAGE (1)
- Contrôler l'état 1 S / 12 M 12 M
- Contrôler l'usure des gorges 1 S / 12 M 12 M
- Contrôler l'état des paliers 48 M 48 M
- Graisser le tambour (2) (2)
- Graisser le palier moteur (2) (2)� FREIN DE TAMBOUR (1)
Type : DB... - Pour XL708...FC... - Câble de levage : Ø 16 mm- Contrôler l'état 1 S / 12 M 12 M
- Contrôler la propreté, nettoyer si nécessaire 12 M 12 M
- Contrôler le fonctionnement des butées de fin de course, régler si nécessaire 24 M 24 M
- Contrôler l'état du ressort 24 M 24 M
- Contrôler la bonne rotation des pièces de blocage 24 M 24 M� ATTACHE CABLE (1)
- Contrôler l'état 1 S / 6 M 6 M
- Contrôler le serrage des éléments d'assemblage 1 S / 6 M 6 M� CABLE DE LEVAGE (1)
- Contrôler l'état 1 S / 1 M 1 M
- Contrôler la fixation 1 S / 6 M 6 M
- Contrôler l'usure 1 M 1 M
- Nettoyer, graisser (2) (2)
Fait par Vérifié par(1) Pour compléments d'informations :
Voir "NOTICES DES CONSTRUCTEURS" ou "ACCESSOIRES".(2) Voir "TABLEAU DE GRAISSAGE" ou "INSTRUCTIONS POUR LA LUBRIFICATION"
Le . . . / . . . / . . . Le . . . / . . . / . . .
![Page 31: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/31.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
15
Référence informatique Référence du document Date de création Date de mise à jour Indice13OCLP01.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
OPERATIONS DE CONTROLE
LEVAGE PALAN OC LP 01Groupe : M3 (1Bm) Folio : 03/04
Palan(s) : XL708F41GFC300A0DB (K.C.I.)
��
= Installé= Non installé
PREMIERE(S)INTERVENTION(S)
INTERVENTION(S)PERIODIQUE(S)ULTERIEURE(S)
PI OBS IPU OBS
� GUIDE CABLE (1)- Contrôler l'état 1 S / 6 M 6 M
- Contrôler le serrage des éléments d'assemblage 1 S / 6 M 6 M
- Contrôler le fonctionnement 1 S / 6 M 6 M
- Contrôler l'usure 6 M 6 M
- Nettoyer, graisser (2) (2)� MOUFLE DE LEVAGE (1)� Fourniture client
- Contrôler l'état 1 S / 6 M 6 M
- Contrôler le serrage des éléments d'assemblage 1 S / 6 M 6 M
- Contrôler l'état du linguet de sécurité 1 S / 6 M 6 M
- Contrôler le fonctionnement 1 S / 6 M 6 M
- Contrôler l'usure du crochet 6 M 6 M
- Contrôler le jeu du crochet 6 M 6 M
- Contrôler l'usure des poulies 6 M 6 M
- Graisser le palier crochet (2) (2)� REA (1)
- Contrôler l'état 1 S / 6 M 6 M
- Contrôler la fixation 1 S / 6 M 6 M
- Contrôler l'usure 6 M 6 M� POINT FIXE� Boite à coin� Palonnier� Chape
- Contrôler l'état 1 S / 6 M 6 M
- Contrôler la fixation 1 S / 6 M 6 M� CAPTEUR DE CHARGE (1)
Type : LP-20...- Contrôler l'état 1 S / 6 M 6 M
� TRAVERSE SUPPORT- Contrôler le serrage des éléments d'assemblage 1 S / 6 M 6 M
- Contrôler l'état 1 S / 12 M 12 M
- Contrôler les soudures 12 M 12 M
Fait par Vérifié par(1) Pour compléments d'informations :
Voir "NOTICES DES CONSTRUCTEURS" ou "ACCESSOIRES".(2) Voir "TABLEAU DE GRAISSAGE" ou "INSTRUCTIONS POUR LA LUBRIFICATION"
![Page 32: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/32.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
16
Référence informatique Référence du document Date de création Date de mise à jour Indice13OCLP01.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
OPERATIONS DE CONTROLE
LEVAGE PALAN OC LP 01Groupe : M3 (1Bm) Folio : 04/04
Palan(s) : XL708F41GFC300A0DB (K.C.I.)
��
= Installé= Non installé
PREMIERE(S)INTERVENTION(S)
INTERVENTION(S)PERIODIQUE(S)ULTERIEURE(S)
PI OBS IPU OBS
� LIMITEUR DE CHARGE (1)Type : - Capteur de charge : LP-20...- Contrôler l'état 48 M 48 M
- Contrôler le fonctionnement 48 M 48 M� INTERRUPTEUR DE POSITION - DOIGT DE FIN DE COURSE (1)� INTERRUPTEUR MAGNETIQUE - AIMANT (1)� CELLULE PHOTO-ELECTRIQUE - REFLECTEUR (1)� DETECTEUR INDUCTIF (1)� SELECTEUR DE POSITION (1)
- Contrôler le fonctionnement J J
- Contrôler l'état 1 S / 6 M 6 M
- Contrôler la fixation 1 S / 6 M 6 M
Fait par Vérifié par(1) Pour compléments d'informations :
Voir "NOTICES DES CONSTRUCTEURS" ou "ACCESSOIRES".(2) Voir "TABLEAU DE GRAISSAGE" ou "INSTRUCTIONS POUR LA LUBRIFICATION"
Le . . . / . . . / . . . Le . . . / . . . / . . .
![Page 33: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/33.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
17
Référence informatique Référence du document Date de création Date de mise à jour Indice13OCLP02.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
OPERATIONS DE CONTROLE
LEVAGE PALAN OC LP 02Groupe : M4 (1Am) Folio : 01/04
Palan(s) : XL408N30GFC400A0DB (K.C.I.)
��
= Installé= Non installé
PREMIERE(S)INTERVENTION(S)
INTERVENTION(S)PERIODIQUE(S)ULTERIEURE(S)
PI OBS IPU OBS
� UNITE DE LEVAGE (1)Type : XL408...- Contrôler l'état 1 S / 12 M 12 M
- Contrôler la fixation 1 S / 12 M 12 M
- Contrôler l'échauffement 1 S / 6 M 6 M
- Contrôler l'absence de bruit 1 S / 6 M 6 M
- Contrôler l'absence de vibration 1 S / 6 M 6 M� MOTEUR (1)
Type : MF09... - MF10... - MF11... - MF13... - MF16...- Contrôler l'état 1 S / 6 M 6 M
- Contrôler la fixation 1 S / 6 M 6 M
- Contrôler la propreté, nettoyer si nécessaire 6 M 6 M
- Contrôler les connexions électriques 6 M 6 M� Ventilation moteur
- Contrôler l'état 1 S / 6 M 6 M
- Contrôler la fixation 1 S / 6 M 6 M
- Contrôler la propreté du filtre, nettoyer si nécessaire 6 M 6 M� FREIN ELECTROMAGNETIQUE (1)
Type : NM306...- Contrôler le fonctionnement J J
- Contrôler l'efficacité freinage J J
- Contrôler l'état 1 S / 1 M 1 M
- Contrôler la fixation 1 S / 1 M 1 M
- Contrôler l'entrefer 12 M 12 M
- Contrôler le couple de freinage 12 M 12 M
- Contrôler la propreté de la grille de ventilation, nettoyer si nécessaire 6 M 6 M
- Nettoyer 6 M 6 M� ACCOUPLEMENT (1)
Moteur frein / RéducteurType : Pour XL408...- Contrôler l'état 48 M 48 M
- Graisser (2) (2)
Fait par Vérifié par(1) Pour compléments d'informations :
Voir "NOTICES DES CONSTRUCTEURS" ou "ACCESSOIRES".(2) Voir "TABLEAU DE GRAISSAGE" ou "INSTRUCTIONS POUR LA LUBRIFICATION"
Le . . . / . . . / . . . Le . . . / . . . / . . .
![Page 34: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/34.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
18
Référence informatique Référence du document Date de création Date de mise à jour Indice13OCLP02.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
OPERATIONS DE CONTROLE
LEVAGE PALAN OC LP 02Groupe : M4 (1Am) Folio : 02/04
Palan(s) : XL408N30GFC400A0DB (K.C.I.)
��
= Installé= Non installé
PREMIERE(S)INTERVENTION(S)
INTERVENTION(S)PERIODIQUE(S)ULTERIEURE(S)
PI OBS IPU OBS
� REDUCTEUR (1)Type : Pour XL408...- Contrôler l'état 96 M 96 M
- Contrôler l'absence de fuite 1 S / 96 M 96 M
- Contrôler La propreté des trous d'évent, nettoyer si nécessaire 96 M 96 M
- Contrôler le niveau (2) (2)
- Vidanger (2) (2)� TAMBOUR DE LEVAGE (1)
- Contrôler l'état 1 S / 12 M 12 M
- Contrôler l'usure des gorges 1 S / 12 M 12 M
- Contrôler l'état des paliers 48 M 48 M
- Graisser le tambour (2) (2)
- Graisser les paliers (2) (2)� FREIN DE TAMBOUR (1)
Type : -- Contrôler l'état 1 S / 12 M 12 M
- Contrôler la propreté, nettoyer si nécessaire 12 M 12 M
- Contrôler le fonctionnement des butées de fin de course, régler si nécessaire 24 M 24 M
- Contrôler l'état du ressort 24 M 24 M
- Contrôler la bonne rotation des pièces de blocage 24 M 24 M� ATTACHE CABLE (1)
- Contrôler l'état 1 S / 6 M 6 M
- Contrôler le serrage des éléments d'assemblage 1 S / 6 M 6 M� CABLE DE LEVAGE (1)
- Contrôler l'état 1 S / 1 M 1 M
- Contrôler la fixation 1 S / 6 M 6 M
- Contrôler l'usure 1 M 1 M
- Nettoyer, graisser (2) (2)
Fait par Vérifié par(1) Pour compléments d'informations :
Voir "NOTICES DES CONSTRUCTEURS" ou "ACCESSOIRES".(2) Voir "TABLEAU DE GRAISSAGE" ou "INSTRUCTIONS POUR LA LUBRIFICATION"
Le . . . / . . . / . . . Le . . . / . . . / . . .
![Page 35: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/35.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
19
Référence informatique Référence du document Date de création Date de mise à jour Indice13OCLP02.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
OPERATIONS DE CONTROLE
LEVAGE PALAN OC LP 02Groupe : M4 (1Am) Folio : 03/04
Palan(s) : XL408N30GFC400A0DB (K.C.I.)
��
= Installé= Non installé
PREMIERE(S)INTERVENTION(S)
INTERVENTION(S)PERIODIQUE(S)ULTERIEURE(S)
PI OBS IPU OBS
� GUIDE CABLE (1)- Contrôler l'état 1 S / 6 M 6 M
- Contrôler le serrage des éléments d'assemblage 1 S / 6 M 6 M
- Contrôler le fonctionnement 1 S / 6 M 6 M
- Contrôler l'usure 6 M 6 M
- Nettoyer, graisser (2) (2)� MOUFLE DE LEVAGE (1)� Fourniture client
- Contrôler l'état 1 S / 6 M 6 M
- Contrôler le serrage des éléments d'assemblage 1 S / 6 M 6 M
- Contrôler l'état du linguet de sécurité 1 S / 6 M 6 M
- Contrôler le fonctionnement 1 S / 6 M 6 M
- Contrôler l'usure du crochet 6 M 6 M
- Contrôler le jeu du crochet 6 M 6 M
- Contrôler l'usure des poulies 6 M 6 M
- Graisser le palier crochet (2) (2)� REA (1)
- Contrôler l'état 1 S / 6 M 6 M
- Contrôler la fixation 1 S / 6 M 6 M
- Contrôler l'usure 6 M 6 M� POINT FIXE� Boite à coin� Palonnier� Chape
- Contrôler l'état 1 S / 6 M 6 M
- Contrôler la fixation 1 S / 6 M 6 M� CAPTEUR DE CHARGE (1)
Type : LP-20...- Contrôler l'état 1 S / 6 M 6 M
� TRAVERSE SUPPORT- Contrôler le serrage des éléments d'assemblage 1 S / 6 M 6 M
- Contrôler l'état 1 S / 12 M 12 M
- Contrôler les soudures 12 M 12 M
Fait par Vérifié par(1) Pour compléments d'informations :
Voir "NOTICES DES CONSTRUCTEURS" ou "ACCESSOIRES".(2) Voir "TABLEAU DE GRAISSAGE" ou "INSTRUCTIONS POUR LA LUBRIFICATION"
![Page 36: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/36.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
20
Référence informatique Référence du document Date de création Date de mise à jour Indice13OCLP02.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
OPERATIONS DE CONTROLE
LEVAGE PALAN OC LP 02Groupe : M4 (1Am) Folio : 04/04
Palan(s) : XL408N30GFC400A0DB (K.C.I.)
��
= Installé= Non installé
PREMIERE(S)INTERVENTION(S)
INTERVENTION(S)PERIODIQUE(S)ULTERIEURE(S)
PI OBS IPU OBS
� LIMITEUR DE CHARGE (1)Type : - Capteur de charge : LP-20...- Contrôler l'état 48 M 48 M
- Contrôler le fonctionnement 48 M 48 M� INTERRUPTEUR DE POSITION - DOIGT DE FIN DE COURSE (1)� INTERRUPTEUR MAGNETIQUE - AIMANT (1)� CELLULE PHOTO-ELECTRIQUE - REFLECTEUR (1)� DETECTEUR INDUCTIF (1)� SELECTEUR DE POSITION (1)
- Contrôler le fonctionnement J J
- Contrôler l'état 1 S / 6 M 6 M
- Contrôler la fixation 1 S / 6 M 6 M
Fait par Vérifié par(1) Pour compléments d'informations :
Voir "NOTICES DES CONSTRUCTEURS" ou "ACCESSOIRES".(2) Voir "TABLEAU DE GRAISSAGE" ou "INSTRUCTIONS POUR LA LUBRIFICATION"
Le . . . / . . . / . . . Le . . . / . . . / . . .
![Page 37: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/37.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
21
Référence informatique Référence du document Date de création Date de mise à jour Indice13OCGN01.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
OPERATIONS DE CONTROLE
GENERAL OC GN 01Groupe : M3 (1Bm) Folio : 01/04
��
= Installé= Non installé
PREMIERE(S)INTERVENTION(S)
INTERVENTION(S)PERIODIQUE(S)ULTERIEURE(S)
PI OBS IPU OBS� TAMPONS / BUTOIRS
- Contrôler la fixation 1 S / 6 M 6 M
- Contrôler l'état 6 M 6 M� DISPOSITIF D'ANCRAGE
- Contrôler l'état 6 M 6 M
- Contrôler le fonctionnement 6 M 6 M� Broche
- Contrôler le bon graissage (2) (2)� Pince rail mécanique
- Contrôler le bon graissage (2) (2)� ACCES PASSERELLE
- Contrôler l'état 1 S / 6 M 6 M
- Contrôler le serrage des éléments d'assemblage 1 S / 6 M 6 M
- Contrôler les soudures 6 M 6 M
- Contrôler la propreté, nettoyer si nécessaire 6 M 6 M� PORTILLON
- Contrôler l'état 1 S / 6 M 6 M
- Contrôler la fixation 1 S / 6 M 6 M� PASSERELLE
- Contrôler si il n'y a pas d'objet suspect J J
- Contrôler l'état 1 S / 6 M 6 M
- Contrôler le serrage des éléments d'assemblage 1 S / 6 M 6 M
- Contrôler la propreté, nettoyer si nécessaire 6 M 6 M� OSSATURE
- Contrôler si il n'y a pas d'objet suspect J J
- Contrôler le serrage des éléments d'assemblage 1 S / 12 M 12 M
- Contrôler l'état 1 S / 12 M 12 M
- Contrôler les soudures 12 M 12 M
- Contrôler la propreté, nettoyer si nécessaire 12 M 12 M� CHEMIN DE ROULEMENT (Poutre Principale
- Contrôler si il n'y a pas d'objet suspect J J
- Contrôler l'état 1 S / 6 M 6 M
- Contrôler l'usure des rails 6 M 6 M
- Contrôler les soudures 6 M 6 M
- Contrôler les joints de rails 6 M 6 M
Fait par Vérifié par(1) Pour compléments d'informations :
Voir "NOTICES DES CONSTRUCTEURS" ou "ACCESSOIRES".
![Page 38: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/38.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
22
Référence informatique Référence du document Date de création Date de mise à jour Indice13OCGN01.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
OPERATIONS DE CONTROLE
GENERAL OC GN 01Groupe : M3 (1Bm) Folio : 02/04
��
= Installé= Non installé
PREMIERE(S)INTERVENTION(S)
INTERVENTION(S)PERIODIQUE(S)ULTERIEURE(S)
PI OBS IPU OBS
� CHEMIN DE CABLE ELECTRIQUE- Contrôler la fixation 1 S / 6 M 6 M
- Contrôler l'état 6 M 6 M
- Contrôler l'état des câbles 6 M 6 M� ARMOIRE ELECTRIQUE
- Contrôler la fixation 1 S / 6 M 6 M
- Contrôler la fixation des appareillages 1 S / 6 M 6 M
- Contrôler l'état 6 M 6 M
- Contrôler le fonctionnement de l'interrupteur général 6 M 6 M
- Contrôler les sécurités électroniques 6 M 6 M
- Contrôler le fonctionnement des relais temporisés 6 M 6 M
- Contrôler le fonctionnement des contacteurs 6 M 6 M
- Contrôler l'état des conducteurs 6 M 6 M
- Contrôler l'état des fusibles 6 M 6 M
- Contrôler les valeurs des réglages des thermiques 6 M 6 M
- Contrôler toutes les connexions 6 M 6 M
- Contrôler la propreté des appareillages, nettoyer si nécessaire 6 M 6 M
Fait par Vérifié par(1) Pour compléments d'informations :
Voir "NOTICES DES CONSTRUCTEURS" ou "ACCESSOIRES".(2) Voir "TABLEAU DE GRAISSAGE" ou "INSTRUCTIONS POUR LA LUBRIFICATION"
Le . . . / . . . / . . . Le . . . / . . . / . . .
![Page 39: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/39.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
23
Référence informatique Référence du document Date de création Date de mise à jour Indice13OCGN01.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
OPERATIONS DE CONTROLE
GENERAL OC GN 01Groupe : M3 (1Bm) Folio : 03/04
��
= Installé= Non installé
PREMIERE(S)INTERVENTION(S)
INTERVENTION(S)PERIODIQUE(S)ULTERIEURE(S)
PI OBS IPU OBS
� VENTILATEUR- Contrôler le fonctionnement J J
- Contrôler la fixation 1 S / 6 M 6 M
- Contrôler la propreté du filtre, nettoyer si nécessaire 6 M 6 M� COFFRET ELECTRIQUE
- Contrôler la fixation 1 S / 6 M 6 M
- Contrôler la fixation des appareillages 1 S / 6 M 6 M
- Contrôler toutes les connexions 6 M 6 M
- Contrôler la propreté des appareillages, nettoyer si nécessaire 6 M 6 M� GUIRLANDE D'ALIMENTATION (1)� Fourniture client
- Contrôler la fixation 1 S / 6 M 6 M
- Contrôler l'état des câbles 6 M 6 M
- Contrôler l'état des chariots 6 M 6 M
- Contrôler l'état des rails 6 M 6 M
- Contrôler la propreté des rails, nettoyer si nécessaire 6 M 6 M� GAINE D'ALIMENTATION (1)� Fourniture client
- Contrôler la fixation 1 S / 6 M 6 M
- Contrôler l'état des charbons et chariot 6 M 6 M
- Contrôler l'état des rails 6 M 6 M
- Contrôler la propreté des rails, nettoyer si nécessaire 6 M 6 M� LIGNE BOITE A BOUTONS
- Contrôler la fixation 1 S / 6 M 6 M
- Contrôler l'état des câbles 6 M 6 M
- Contrôler l'état des chariots 6 M 6 M
- Contrôler l'état des rails 6 M 6 M
- Contrôler la propreté des rails, nettoyer si nécessaire 6 M 6 M� BOITE A BOUTONS (Service)
- Contrôler le fonctionnement J J
- Contrôler l'état 1 S / 6 M 6 M
Fait par Vérifié par(1) Pour compléments d'informations :
Voir "NOTICES DES CONSTRUCTEURS" ou "ACCESSOIRES".(2) Voir "TABLEAU DE GRAISSAGE" ou "INSTRUCTIONS POUR LA LUBRIFICATION"
Le . . . / . . . / . . . Le . . . / . . . / . . .
![Page 40: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/40.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
24
Référence informatique Référence du document Date de création Date de mise à jour Indice13OCGN01.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
OPERATIONS DE CONTROLE
GENERAL OC GN 01Groupe : M3 (1Bm) Folio : 04/04
��
= Installé= Non installé
PREMIERE(S)INTERVENTION(S)
INTERVENTION(S)PERIODIQUE(S)ULTERIEURE(S)
PI OBS IPU OBS
� BOITE A BOUTONS (Brochable : Secours ou Maintenance)- Contrôler l'état 6 M 6 M
- Contrôler le fonctionnement 6 M 6 M� RADIOCOMMANDE (Service) (1)� Fourniture client
- Contrôler le fonctionnement J J
- Contrôler l'état 1 S / 6 M 6 M
- Contrôler la fixation du récepteur 1 S / 6 M 6 M� DISPOSITIF ANTICOLLISION� - Cellule photo-électrique - Réflecteur (1)� - Détecteur ultrasonique (1)� - Interrupteur magnétique - Aimant (1)� - Interrupteur de position - Doigt de fin de course (1)
- Contrôler le fonctionnement J J
- Contrôler l'état 1 S / 6 M 6 M
- Contrôler la fixation 1 S / 6 M 6 M� PROJECTEUR (1)
- Contrôler le fonctionnement J J
- Contrôler la fixation 1 S / 6 M 6 M
- Contrôler l'état 6 M 6 M� FEU A ECLAT (1)� FEU TOURNANT
- Contrôler le fonctionnement J J
- Contrôler la fixation 1 S / 6 M 6 M
- Contrôler l'état 6 M 6 M� SIRENE ELECTRONIQUE� KLAXON
- Contrôler le fonctionnement J J
- Contrôler la fixation 1 S / 6 M 6 M
- Contrôler l'état 6 M 6 M� INTERRUPTEUR DE POSITION - DOIGT DE FIN DE COURSE (1)� INTERRUPTEUR MAGNETIQUE - AIMANT (1)� CELLULE PHOTO-ELECTRIQUE - REFLECTEUR (1)� DETECTEUR INDUCTIF (1)
- Contrôler le fonctionnement J J
- Contrôler l'état 1 S / 6 M 6 M
- Contrôler la fixation 1 S / 6 M 6 M
![Page 41: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/41.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
25
Référence informatique Référence du document Date de création Date de mise à jour Indice13OCCR01.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
OPERATIONS DE CONTROLE
CHEMIN DE ROULEMENT OC CR 01Groupe : M3 (1Bm) Folio : 01/01
��
= Installé= Non installé
PREMIERE(S)INTERVENTION(S)
INTERVENTION(S)PERIODIQUE(S)ULTERIEURE(S)
PI OBS IPU OBS
� RAIL- Contrôler si il n'y a pas d'objet suspect J J
- Contrôler l'état 1 S / 6 M 6 M
- Contrôler l'usure des rails 6 M 6 M
- Contrôler les soudures 6 M 6 M
- Contrôler les joints de rails 6 M 6 M� BUTOIRS
- Contrôler la fixation 1 S / 6 M 6 M
- Contrôler l'état 6 M 6 M� DISPOSITIF D'ANCRAGE
- Contrôler l'état 6 M 6 M
- Contrôler le fonctionnement 6 M 6 M� INTERRUPTEUR DE POSITION - DOIGT DE FIN DE COURSE (1)� INTERRUPTEUR MAGNETIQUE - AIMANT (1)� CELLULE PHOTO-ELECTRIQUE - REFLECTEUR (1)� DETECTEUR DE PROXIMITE INDUCTIF (1)
- Contrôler le fonctionnement J J
- Contrôler l'état 1 S / 6 M 6 M
- Contrôler la fixation 1 S / 6 M 6 M
Fait par Vérifié par(1) Pour compléments d'informations :
Voir "NOTICES DES CONSTRUCTEURS" ou "ACCESSOIRES".(2) Voir "TABLEAU DE GRAISSAGE" ou "INSTRUCTIONS POUR LA LUBRIFICATION"
Le . . . / . . . / . . . Le . . . / . . . / . . .
![Page 42: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/42.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
26
Référence informatique Référence du document Date de création Date de mise à jour Indice13TGIT01.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
TABLEAU DE GRAISSAGE
3.2 TABLEAUX DE GRAISSAGE
IMPORTANT
PRECAUTIONS AVANT GRAISSAGE
- NE JAMAIS MELANGER DES LUBRIFIANTS DE QUALITES DIFFERENTES.
- EVITER TOUT DEPOT DE LUBRIFIANTS SUR LES ORGANES TELS QUE LESRAILS DE ROULEMENTS.
REDUCTEUR
- VEILLER A CE QUE LE LUBRIFIANT SOIT A LA TEMPERATURE DEFONCTIONNEMENT LORS DES DIFFERENTES VIDANGES DU REDUCTEUR.
- SI NECESSAIRE EXECUTER UN RINÇAGE DU REDUCTEUR A LA PREMIEREVIDANGE.
AMBIANCE POUSSIEREUSE
Surveiller particulièrement la propreté du(des) guide câble(s)Périodicité conseillée : 1 Mois
- - -
Vous trouverez le(s) Tableau(x) de graissage auChapitre 23 "INSTRUCTIONS POUR LA LUBRIFICATION".
![Page 43: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/43.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
27
Référence informatique Référence du document Date de création Date de mise à jour Indice13TELB01.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
3.3 LUBRIFIANT
Vous trouverez le(s) lubrifiant(s) auChapitre 23 "INSTRUCTIONS POUR LA LUBRIFICATION".
![Page 44: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/44.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
28
Référence informatique Référence du document Date de création Date de mise à jour Indice13IS0000.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
4 CONSIGNE / SECURITE / MAINTENANCE - SPECIALE
4.1 CABLE DE LEVAGE DE MARQUE "VEREIGNIGTE DRAHTSEILWERKE"
- Il est nécessaire après deux semaines d'utilisation de l'appareil de démonter lepoint fixe du câble (au niveau de la boite à coin) afin d'éliminer les contraintes detorsion résiduelles.
IMPORTANTCette opération doit être exécuter accessoires de levage (moufle, palonnier,
etc.) en position basse (aucune tension sur le câble de levage).
4.2 COUPLE DE SERRAGE / CABLE DE LEVAGE PALAN
- Voir Chapitre 3 "ACCESSOIRES" Notice(s) "GUIDE D'USAGE POUR PALAN ".
![Page 45: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/45.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
29
Référence informatique Référence du document Date de création Date de mise à jour Indice13AN0000.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
A ANNEXE
A1 OBSERVATION
![Page 46: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/46.jpg)
MAINTENANCE PREVENTIVEPreventive maintenance
CHAPITREChapter
21
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
30
Référence informatique Référence du document Date de création Date de mise à jour Indice13AN0000.DOC 76007710\PR01-FR\UM1-1 | GM21 01/05/2000 - A
CGP-KONECRANES
A1 - OBSERVATION
Folio : ..../....
FICHE COMMENTAIRE
![Page 47: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/47.jpg)
REPARATIONSCHAPITREChapter
22
Repairs VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
1
Référence informatique Référence du document Date de création Date de mise à jour Indice13RP2200.DOC 76007710\PR01-FR\UM1-1 | RP22 01/05/2000 - A
CGP-KONECRANES
Voir Chapitre 3 "ACCESSOIRES"See Chapter 3 "Accessories"
![Page 48: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/48.jpg)
"GAZ TURBINE HALL"PONT ROULANT 40 t / 10 t
PARTENAIRE EQUIPEMENT PIECES A LUBRIFIER PERIODE NOMBRE DE POINTS
LUBRIFIANT QUANTITE FREQUENCE DE VIDANGE
UNITE SYSTEME IDENTIFIANT NUMERO DECOMPOSANT D'ORDRE LUBRIFICATION REF 1 REF 2 REF 3
CGP-KONECRANES PONT ROULANT 40 t / 10 t TRANSLATION PONT - REDUCTEUR GM6… - Contrôler le niveau 500 H 2 ELF Reductelf SP 220 BP Energol GR XP 220 SHELL Omala 200 Faire l'appoint si nécessaire
CGP-KONECRANES PONT ROULANT 40 t / 10 t TRANSLATION PONT - REDUCTEUR GM6… - Vidanger 200 H 2 ELF Reductelf SP 220 BP Energol GR XP 220 SHELL Omala 200 1,7 l 500 HCGP-KONECRANES PONT ROULANT 40 t / 10 t TRANSLATION PONT - GALET - Graisser les paliers Y 4 ELF Epexelf 2 BP Energrease LS EP 2 SHELL Alvania EP 2 Pompe à graisseCGP-KONECRANES PONT ROULANT 40 t / 10 t DIRECTION CHARIOT TREUIL - REDUCTEUR GM6… - Contrôler le niveau 500 H 2 ELF Reductelf SP 220 BP Energol GR XP 220 SHELL Omala 200 Faire l'appoint si nécessaireCGP-KONECRANES PONT ROULANT 40 t / 10 t DIRECTION CHARIOT TREUIL - REDUCTEUR GM6… - Vidanger 200 H 2 ELF Reductelf SP 220 BP Energol GR XP 220 SHELL Omala 200 1,7 l 500 HCGP-KONECRANES PONT ROULANT 40 t / 10 t DIRECTION CHARIOT TREUIL - GALET - Graisser les paliers Y 4 ELF Epexelf 2 BP Energrease LS EP 2 SHELL Alvania EP 2 Pompe à graisseCGP-KONECRANES PONT ROULANT 40 t / 10 t LEVAGE PALAN N°01 - ACCOUPLEMENT - Graisser 4 Y 1 - BP Energol GR3000-2 SHELL Super Kuggfet Pinceau ou AérosolCGP-KONECRANES PONT ROULANT 40 t / 10 t LEVAGE PALAN N°01 - REDUCTEUR - Contrôler le niveau 6 M 1 ELF Reductelf SP 220 BP Energol GR XP 220 SHELL Omala 200 Faire l'appoint si nécessaireCGP-KONECRANES PONT ROULANT 40 t / 10 t LEVAGE PALAN N°01 - REDUCTEUR - Vidanger 8 Y 1 ELF Reductelf SP 220 BP Energol GR XP 220 SHELL Omala 200 6,0 l 8 YCGP-KONECRANES PONT ROULANT 40 t / 10 t LEVAGE PALAN N°01 - TAMBOUR - Graisser le tambour 6 M 2 ELF Epexelf 2 BP Energrease LS EP 2 SHELL Alvania EP 2 ChiffonCGP-KONECRANES PONT ROULANT 40 t / 10 t LEVAGE PALAN N°01 - TAMBOUR - Graisser le palier moteur 6 M 1 ELF Epexelf 2 BP Energrease LS EP 2 SHELL Alvania EP 2 Pompe à graisseCGP-KONECRANES PONT ROULANT 40 t / 10 t LEVAGE PALAN N°01 - CABLE DE LEVAGE - Nettoyer, graisser 1 M 2 ELF Epexelf 2 BP Energrease LS EP 2 SHELL Alvania EP 2 Chiffon - 18 g/mCGP-KONECRANES PONT ROULANT 40 t / 10 t LEVAGE PALAN N°01 - GUIDE CABLE - Nettoyer, graisser 6 M 2 ELF Epexelf 2 BP Energrease LS EP 2 SHELL Alvania EP 2 PinceauCGP-KONECRANES PONT ROULANT 40 t / 10 t LEVAGE PALAN N°01 - MOUFLE DE LEVAGE - Graisser le palier crochet Y 1 ELF Epexelf 2 BP Energrease LS EP 2 SHELL Alvania EP 2 Pompe à graisseCGP-KONECRANES PONT ROULANT 40 t / 10 t LEVAGE PALAN N°01 - MOUFLE DE LEVAGE - Nettoyer puis Graisser le palier crochet 10 Y 1 ELF Epexelf 2 BP Energrease LS EP 2 SHELL Alvania EP 2 Pinceau & Pompe à graisseCGP-KONECRANES PONT ROULANT 40 t / 10 t LEVAGE PALAN N°02 - ACCOUPLEMENT - Graisser 4 Y 1 - BP Energol GR3000-2 SHELL Super Kuggfet Pinceau ou AérosolCGP-KONECRANES PONT ROULANT 40 t / 10 t LEVAGE PALAN N°02 - REDUCTEUR - Contrôler le niveau 6 M 1 ELF Reductelf SP 220 BP Energol GR XP 220 SHELL Omala 200 Faire l'appoint si nécessaireCGP-KONECRANES PONT ROULANT 40 t / 10 t LEVAGE PALAN N°02 - REDUCTEUR - Vidanger 8 Y 1 ELF Reductelf SP 220 BP Energol GR XP 220 SHELL Omala 200 1,3 l 8 YCGP-KONECRANES PONT ROULANT 40 t / 10 t LEVAGE PALAN N°02 - TAMBOUR - Graisser le tambour 6 M 2 ELF Epexelf 2 BP Energrease LS EP 2 SHELL Alvania EP 2 ChiffonCGP-KONECRANES PONT ROULANT 40 t / 10 t LEVAGE PALAN N°02 - TAMBOUR - Graisser le palier moteur 6 M 1 ELF Epexelf 2 BP Energrease LS EP 2 SHELL Alvania EP 2 Pompe à graisseCGP-KONECRANES PONT ROULANT 40 t / 10 t LEVAGE PALAN N°02 - CABLE DE LEVAGE - Nettoyer, graisser 1 M 2 ELF Epexelf 2 BP Energrease LS EP 2 SHELL Alvania EP 2 Chiffon - 5 g/mCGP-KONECRANES PONT ROULANT 40 t / 10 t LEVAGE PALAN N°02 - GUIDE CABLE - Nettoyer, graisser 6 M 2 ELF Epexelf 2 BP Energrease LS EP 2 SHELL Alvania EP 2 PinceauCGP-KONECRANES PONT ROULANT 40 t / 10 t LEVAGE PALAN N°02 - MOUFLE DE LEVAGE - Graisser le palier crochet Y 1 ELF Epexelf 2 BP Energrease LS EP 2 SHELL Alvania EP 2 Pompe à graisseCGP-KONECRANES PONT ROULANT 40 t / 10 t LEVAGE PALAN N°02 - MOUFLE DE LEVAGE - Nettoyer puis Graisser le palier crochet 10 Y 1 ELF Epexelf 2 BP Energrease LS EP 2 SHELL Alvania EP 2 Pinceau & Pompe à graisse
10DMMAR002-50 AaM10DMMAR002-50 AaM10DMMAR002-50 AaM10DMMAR002-50 AaM
10DMMAR002-50 AaM10DMMAR002-50 AaM10DMMAR002-50 AaM10DMMAR002-50 AaM
10DMMAR002-50 AaM10DMMAR002-50 AaM
10DMMAR002-50 AaM
10DMMAR002-50 AaM
10DMMAR002-50 AaM10DMMAR002-50 AaM
10DMMAR002-50 AaM10DMMAR002-50 AaM
10DMMAR002-50 AaM10DMMAR002-50 AaM
10DMMAR002-50 AaM
PROGRAMME DE LUBRIFICATION
REPERE FONCTIONNEL
10DMMAR002-50 AaM10DMMAR002-50 AaM
10DMMAR002-50 AaM10DMMAR002-50 AaM10DMMAR002-50 AaM
DC : 01/05/00 - DMAJ : 17/10/00 - I : B RD : 76007710\PR01-FR\UM1-1 | IL03 - RI : 02PL2302.XLS 1/1
![Page 49: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/49.jpg)
OUTILS SPECIAUX ET MOYENS DE MANUTENTIONCHAPITREChapter
24
Special tools and handling devices VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
1
Référence informatique Référence du document Date de création Date de mise à jour Indice13OM2400.DOC 76007710\PR01-FR\UM1-1 | OM24 01/05/2000 - A
CGP-KONECRANES
Non applicableNot applicable
![Page 50: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/50.jpg)
MATERIEL ET PIECES DE RECHANGE POUR STOCKAGEET INSTRUCTIONS POUR CONSERVATION
CHAPITREChapter
25
Equipment and spare parts storageand preservation instructions
VOLUMEVolume
UM1-1
ALSTOM - RADES II - TUNISIA - 471 MW - COMBINED CYCLE PROJECTPONT ROULANT BIPOUTRE 40 t / 10 t "HALL TURBINE GAZ" - Repère : 10DMMAR002
PAGEPage
1
Référence informatique Référence du document Date de création Date de mise à jour Indice13MS2500.DOC 76007710\PR01-FR\UM1-1 | MS25 01/05/2000 - A
CGP-KONECRANES
Voir Chapitre 3 "ACCESSOIRES"See Chapter 3 "Accessories"
![Page 51: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/51.jpg)
![Page 52: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/52.jpg)
![Page 53: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/53.jpg)
![Page 54: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/54.jpg)
![Page 55: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/55.jpg)
![Page 56: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/56.jpg)
![Page 57: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/57.jpg)
![Page 58: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/58.jpg)
![Page 59: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/59.jpg)
![Page 60: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/60.jpg)
![Page 61: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/61.jpg)
![Page 62: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/62.jpg)
![Page 63: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/63.jpg)
![Page 64: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/64.jpg)
![Page 65: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/65.jpg)
![Page 66: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/66.jpg)
![Page 67: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/67.jpg)
![Page 68: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/68.jpg)
![Page 69: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/69.jpg)
![Page 70: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/70.jpg)
![Page 71: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/71.jpg)
![Page 72: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/72.jpg)
![Page 73: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/73.jpg)
![Page 74: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/74.jpg)
![Page 75: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/75.jpg)
![Page 76: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/76.jpg)
![Page 77: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/77.jpg)
![Page 78: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/78.jpg)
![Page 79: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/79.jpg)
![Page 80: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/80.jpg)
![Page 81: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/81.jpg)
![Page 82: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/82.jpg)
![Page 83: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/83.jpg)
![Page 84: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/84.jpg)
![Page 85: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/85.jpg)
![Page 86: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/86.jpg)
![Page 87: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/87.jpg)
![Page 88: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/88.jpg)
![Page 89: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/89.jpg)
![Page 90: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/90.jpg)
![Page 91: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/91.jpg)
![Page 92: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/92.jpg)
![Page 93: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/93.jpg)
![Page 94: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/94.jpg)
![Page 95: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/95.jpg)
![Page 96: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/96.jpg)
![Page 97: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/97.jpg)
![Page 98: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/98.jpg)
![Page 99: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/99.jpg)
![Page 100: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/100.jpg)
![Page 101: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/101.jpg)
![Page 102: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/102.jpg)
![Page 103: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/103.jpg)
![Page 104: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/104.jpg)
![Page 105: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/105.jpg)
![Page 106: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/106.jpg)
![Page 107: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/107.jpg)
![Page 108: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/108.jpg)
![Page 109: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/109.jpg)
![Page 110: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/110.jpg)
![Page 111: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/111.jpg)
![Page 112: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/112.jpg)
![Page 113: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/113.jpg)
![Page 114: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/114.jpg)
![Page 115: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/115.jpg)
![Page 116: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/116.jpg)
![Page 117: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/117.jpg)
![Page 118: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/118.jpg)
![Page 119: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/119.jpg)
![Page 120: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/120.jpg)
![Page 121: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/121.jpg)
![Page 122: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/122.jpg)
![Page 123: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/123.jpg)
![Page 124: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/124.jpg)
![Page 125: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/125.jpg)
![Page 126: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/126.jpg)
![Page 127: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/127.jpg)
![Page 128: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/128.jpg)
![Page 129: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/129.jpg)
![Page 130: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/130.jpg)
![Page 131: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/131.jpg)
![Page 132: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/132.jpg)
![Page 133: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/133.jpg)
![Page 134: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/134.jpg)
![Page 135: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/135.jpg)
![Page 136: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/136.jpg)
![Page 137: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/137.jpg)
![Page 138: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/138.jpg)
![Page 139: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/139.jpg)
![Page 140: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/140.jpg)
![Page 141: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/141.jpg)
![Page 142: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/142.jpg)
![Page 143: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/143.jpg)
![Page 144: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/144.jpg)
![Page 145: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/145.jpg)
![Page 146: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/146.jpg)
![Page 147: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/147.jpg)
![Page 148: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/148.jpg)
![Page 149: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/149.jpg)
![Page 150: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/150.jpg)
![Page 151: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/151.jpg)
![Page 152: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/152.jpg)
![Page 153: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/153.jpg)
![Page 154: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/154.jpg)
![Page 155: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/155.jpg)
![Page 156: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/156.jpg)
![Page 157: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/157.jpg)
![Page 158: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/158.jpg)
![Page 159: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/159.jpg)
![Page 160: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/160.jpg)
![Page 161: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/161.jpg)
![Page 162: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/162.jpg)
![Page 163: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/163.jpg)
![Page 164: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/164.jpg)
![Page 165: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/165.jpg)
![Page 166: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/166.jpg)
![Page 167: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/167.jpg)
![Page 168: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/168.jpg)
![Page 169: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/169.jpg)
![Page 170: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/170.jpg)
![Page 171: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/171.jpg)
![Page 172: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/172.jpg)
![Page 173: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/173.jpg)
![Page 174: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/174.jpg)
![Page 175: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/175.jpg)
![Page 176: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/176.jpg)
![Page 177: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/177.jpg)
![Page 178: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/178.jpg)
![Page 179: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/179.jpg)
![Page 180: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/180.jpg)
![Page 181: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/181.jpg)
![Page 182: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/182.jpg)
![Page 183: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/183.jpg)
![Page 184: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/184.jpg)
![Page 185: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/185.jpg)
![Page 186: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/186.jpg)
![Page 187: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/187.jpg)
![Page 188: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/188.jpg)
![Page 189: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/189.jpg)
![Page 190: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/190.jpg)
![Page 191: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/191.jpg)
![Page 192: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/192.jpg)
![Page 193: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/193.jpg)
![Page 194: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/194.jpg)
![Page 195: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/195.jpg)
![Page 196: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/196.jpg)
![Page 197: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/197.jpg)
![Page 198: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/198.jpg)
![Page 199: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/199.jpg)
![Page 200: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/200.jpg)
![Page 201: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/201.jpg)
![Page 202: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/202.jpg)
![Page 203: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/203.jpg)
![Page 204: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/204.jpg)
![Page 205: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/205.jpg)
![Page 206: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/206.jpg)
![Page 207: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/207.jpg)
![Page 208: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/208.jpg)
![Page 209: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/209.jpg)
![Page 210: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/210.jpg)
![Page 211: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/211.jpg)
![Page 212: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/212.jpg)
![Page 213: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/213.jpg)
![Page 214: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/214.jpg)
![Page 215: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/215.jpg)
![Page 216: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/216.jpg)
![Page 217: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/217.jpg)
![Page 218: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/218.jpg)
![Page 219: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/219.jpg)
![Page 220: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/220.jpg)
![Page 221: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/221.jpg)
![Page 222: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/222.jpg)
![Page 223: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/223.jpg)
![Page 224: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/224.jpg)
![Page 225: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/225.jpg)
![Page 226: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/226.jpg)
![Page 227: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/227.jpg)
![Page 228: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/228.jpg)
![Page 229: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/229.jpg)
![Page 230: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/230.jpg)
![Page 231: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/231.jpg)
![Page 232: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/232.jpg)
![Page 233: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/233.jpg)
![Page 234: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/234.jpg)
![Page 235: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/235.jpg)
![Page 236: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/236.jpg)
![Page 237: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/237.jpg)
![Page 238: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/238.jpg)
![Page 239: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/239.jpg)
![Page 240: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/240.jpg)
![Page 241: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/241.jpg)
![Page 242: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/242.jpg)
![Page 243: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/243.jpg)
![Page 244: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/244.jpg)
![Page 245: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/245.jpg)
![Page 246: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/246.jpg)
![Page 247: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/247.jpg)
![Page 248: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/248.jpg)
![Page 249: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/249.jpg)
![Page 250: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/250.jpg)
![Page 251: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/251.jpg)
![Page 252: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/252.jpg)
![Page 253: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/253.jpg)
![Page 254: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/254.jpg)
![Page 255: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/255.jpg)
![Page 256: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/256.jpg)
![Page 257: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/257.jpg)
![Page 258: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/258.jpg)
![Page 259: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/259.jpg)
![Page 260: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/260.jpg)
![Page 261: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/261.jpg)
![Page 262: 422-3 Pont Roulant Bipoutre 40-10t Hall Tg (1-2)](https://reader034.vdocuments.net/reader034/viewer/2022052123/577c83a91a28abe054b5b4cd/html5/thumbnails/262.jpg)